Tdoc List

2020-03-11 10:24

TDoc Title Source Type For Agenda Avail Treated Decision Wdrn Replaced-by Replaces
S5‑201100 Agenda WG Chair agenda  
2Approval of the agenda
Yes
Yes
revised No S5‑201338  
S5‑201101 SA5#129e E-Meeting process WG Chair discussion Information
5.1Administrative issues at SA5 level
Yes
Yes
revised No S5‑201240  
S5‑201102 SA5#129e CH E-Meeting process CH SWG Chair discussion Information
7.1Charging Plenary
Yes
Yes
merged No S5‑201240  
S5‑201103 Rel-16 CR TS 28.541 Include PNF in network slice NRM fragment diagram Orange CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201104 Rel-15 CR 32.298 Correction ASN.1 syntax Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201105 Rel-16 CR 32.298 Correction ASN.1 syntax Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201465  
S5‑201106 Rel-16 CR 32.255 Introduction of V-SMF change in Roaming HR - principles Nokia, Nokia Shanghai Bell CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201459  
S5‑201107 Rel-16 CR TS 28.531 Replace occurences of Management Function by Management Service Orange CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201108 pCR TS 28.537 First draft with Edithelp comments and text in Scope Orange draft TS Approval
6.4.165G management capabilities
Yes
Yes
approved No    
S5‑201109 Revised WID on 5G management capabilities Orange WID revised Approval
6.4.165G management capabilities
Yes
Yes
agreed No    
S5‑201110 Presentation of TS 28.537 for Information and approval to SA#87 Orange TS or TR cover Approval
6.4.165G management capabilities
Yes
Yes
approved No    
S5‑201111 Rel-16 CR 28.531 Network Slice Identification Fix Stage 2 and Stage 3 Samsung R&D Institute UK CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201112 Rel-15 CR 28.531 Network Slice Identifiction Fix Stage 2 and Stage 3 Samsung R&D Institute UK CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201113 Rel 16 CR 28.541 NRM adding missing managedNFProfile Stage 2 and Stage 3 Samsung R&D Institute UK CR Approval
6.4.6NRM enhancements
Yes
Yes
not pursued No    
S5‑201114 Rel-16 CR 28.541 nSIIdList NRM Fix Stage 2 and Stage 3 Samsung R&D Institute UK CR Approval
6.4.6NRM enhancements
Yes
Yes
not pursued No    
S5‑201115 Rel-15 CR 28.541 nSIIdList NRM Fix Stage 2 and Stage 3 Samsung R&D Institute UK CR Approval
6.4.6NRM enhancements
Yes
Yes
not pursued No    
S5‑201116 pCR TS 28.310 Add solution for distributed energy saving management Orange pCR Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
revised No S5‑201484  
S5‑201117 Rel-15 CR TS 32.422 Updating the measurements list for Immediate MDT China Telecommunications, Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201526  
S5‑201118 Rel-16 CR TS 32.422 Updating the measurements list for Immediate MDT China Telecommunications, Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201527  
S5‑201119 Rel-16 CR TS 28.554 Update KPI definitions to align with the new template China Telecommunications, ZTE, Huawei CR Agreement
6.4.11KPI reporting
Yes
Yes
revised No S5‑201522  
S5‑201120 Add missing definition for matching-criteria-attributes Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201121 Add configurable FM. Ericsson Limited CR Approval
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201548  
S5‑201122 Implement ME (instead of MF) relation to VNF Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201123 Use new 28xyz for 28622 material Ericsson Limited discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
noted No    
S5‑201124 Add missing definition for matching-criteria-attributes Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
withdrawn Yes    
S5‑201125 Correct placement of notifyEvent definition stage 2 Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201126 Add stage 3 notifyEvent stage 3 Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201127 Clarify capability of ack alarms and filter constraint Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201553  
S5‑201128 Add notifyAlarmRecord Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201129 Clarify NSI can be RAN resource only Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201130 Rel-16 CR TS 28.540 Correction of requirement number Ericsson LM CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201131 pCR TS 28.310 Add requirement on energy saving reactivation Nanjing Ericsson Panda Com Ltd pCR Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
revised No S5‑201485  
S5‑201132 Rel-16 CR TS 28.541 Correction of reference Ericsson LM CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201133 Rel-16 CR TS 28.552 Correction of PDCP Data Volume measurement name Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No    
S5‑201134 Rel-16 CR TS 28.552 Correction of text color Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No    
S5‑201135 Rel-16 CR TS 28.552 Correction of UE throughput measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201565  
S5‑201136 Rel-16 CR TS 28.554 Correction of equation color Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No    
S5‑201137 Rel-16 CR TS 28.552 Correction of Packet Drop Rate measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201566  
S5‑201138 Rel-16 CR TS 28.552 Correction of Packet Loss Rate measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201567  
S5‑201139 Rel-16 CR TS 25.552 Add the measurement of PCI of candidate cells Intel Corporation (UK) Ltd CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
not pursued No    
S5‑201140 Rel-16 CR TS 25.552 Add measurements related to RACH optimization Intel Corporation (UK) Ltd CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
merged No S5‑201557  
S5‑201141 Rel-16 CR TS 25.552 Add handover measurements related to MRO Intel Corporation (UK) Ltd CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
not pursued No    
S5‑201142 Rel-16 CR TS 25.552 Add IOCs to support SON functions Intel Corporation (UK) Ltd CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
withdrawn Yes    
S5‑201143 pCR 28.313 LBO use cases Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
noted No    
S5‑201144 pCR 28.313 LBO procedures Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
noted No    
S5‑201145 pCR 28.313 LBO information Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
noted No    
S5‑201146 pCR 28.313 changes to PCI configuration Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
noted No    
S5‑201147 pCR 28.313 changes to MRO Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
revised No S5‑201583  
S5‑201148 pCR 28.313 changes to RACH optimization Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
revised No S5‑201584  
S5‑201149 Rel-16 CR TS 28.552 Add new measurements related to DRB Setup via Initial Context Setup Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201569  
S5‑201150 Rel-16 CR TS 28.552 Correct measurements related to QoS flows Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201577  
S5‑201151 Rel-16 CR TS 28.552 Correct PDU Data Volume measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No    
S5‑201152 New WID on management aspects for Edge Applications enablement Samsung R&D Institute UK WID new Agreement
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201597  
S5‑201153 DP for new WID on management aspects for Edge Applications enablement Samsung R&D Institute UK discussion  
6.2New OAM&P Work Item proposals
Yes
Yes
noted No    
S5‑201154 Rel-16 CR 32.291 Update of Serving Network Function ID Nokia, Nokia Shanghai Bell CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No    
S5‑201155 Rel-16 CR 32.255 Introduction of ATSSS architecture reference and charging requirements Nokia, Nokia Shanghai Bell CR Agreement
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
revised No S5‑201461  
S5‑201156 Rel-16 CR 32.255 Introduction of MA PDU session and PCC Rules Nokia, Nokia Shanghai Bell CR Agreement
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
revised No S5‑201462  
S5‑201157 Rel-16 CR 32.255 Introduction of ATSSS flows Nokia, Nokia Shanghai Bell CR Agreement
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
revised No S5‑201464  
S5‑201158 Rel-16 CR 32.255 Introduction of MA PDU session indicator Nokia, Nokia Shanghai Bell CR Agreement
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
not pursued No    
S5‑201159 LS reply on Reply LS on supporting simultaneous online and offline reporting level access Nokia, Nokia Shanghai Bell LS out Approval
7.1Charging Plenary
Yes
Yes
revised No S5‑201457  
S5‑201160 Rel-16 CR 32.255 Introduction of V-SMF Change in Roaming HR - flows Nokia, Nokia Shanghai Bell CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201460  
S5‑201161 Rel-16 CR TS 28.541 Add NRM fragment for energy saving management Orange, Huawei CR Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
not pursued No    
S5‑201162 Rel-16 pCR 28.201 Add performance and analytics inputs to clause 5.1.3 China Mobile Com. Corporation pCR Approval
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201446  
S5‑201163 Reply LS to SA5 on QoE Measurement Collection R2-1916328 LS in  
6.4.1Management of QoE measurement collection
Yes
Yes
withdrawn Yes    
S5‑201164 LS to SA5 on EN-DC related MDT configuration details R2-1916579 LS in  
6.4.15Management of MDT in 5G
Yes
Yes
postponed No    
S5‑201165 LS to SA5 on trace related configurations for NR MDT R2-1916598 LS in  
6.4.15Management of MDT in 5G
Yes
Yes
replied to No    
S5‑201166 Resubmitted Reply LS to SA5 on clarification of OAM requirements for RIM R3-197540 LS in  
6.4.6NRM enhancements
Yes
Yes
noted No    
S5‑201167 Reply LS to SA5 on energy efficiency R3-197745 LS in  
6.4.2Energy Efficiency of 5G
Yes
Yes
postponed No    
S5‑201168 Reply LS to SA5 on analytics support for energy saving SP-191378 LS in  
6.4.2Energy Efficiency of 5G
Yes
Yes
replied to No    
S5‑201169 LS ccSA5 on analytics support for energy saving S2-1912770 LS in  
6.4.2Energy Efficiency of 5G
Yes
Yes
replied to No    
S5‑201170 Reply LS to SA5 on supporting simultaneous online and offline reporting level access S2-1912278 LS in  
7.1Charging Plenary
Yes
Yes
replied to No S5‑201457  
S5‑201171 Reply LS to SA5 on Application Architecture for enabling Edge Applications S6-200306 LS in  
6.2New OAM&P Work Item proposals
Yes
Yes
replied to No    
S5‑201172 LS to SA5 on Reply on QoE Measurement Collection S4-200241 LS in  
6.4.1Management of QoE measurement collection
Yes
Yes
postponed No    
S5‑201173 Reply LS on Application Architecture for enabling Edge Applications Samsung R&D Institute UK LS out  
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201598  
S5‑201174 pCR TS 28.310 Add solution for centralized energy saving management Orange pCR Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
approved No    
S5‑201175 Rel-16 CR TS 28.552 Add reference to RAN L2 measurement specification Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201568  
S5‑201176 Rel-16 CR TS 28.552 Add Random Access Preambles measurements Ericsson LM CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
revised No S5‑201557  
S5‑201177 Rel-16 CR TS 28.552 Add measurement Average delay UL on over-the-air interface Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201561  
S5‑201178 Rel-16 CR TS 28.552 Add Number of Active UEs measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201580  
S5‑201179 Rel-16 CR 28.552 Add measurements on DL delay between PSA UPF and NG-RAN Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201562  
S5‑201180 Rel-16 CR 28.552 Add measurements on UL delay between PSA UPF and NG-RAN Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201563  
S5‑201181 Rel-16 CR 28.552 Add measurements on RTT delay between PSA UPF and NG-RAN Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201564  
S5‑201182 Rel-16 CR 28.552 Add measurements on DL delay between PSA UPF and UE Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201559  
S5‑201183 Rel-16 CR 28.552 Add measurements on UL delay between PSA UPF and UE Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201560  
S5‑201184 Rel-15 CR 28.550 Update the performance data streaming procedure Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201528  
S5‑201185 Rel-16 CR 28.550 Update the performance data streaming procedure Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201529  
S5‑201186 Rel-15 CR 28.550 Add streaming procedure for measurement collection termination Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201533  
S5‑201187 Rel-16 CR 28.550 Add streaming procedure for measurement collection termination Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201534  
S5‑201188 Rel-15 CR 28.533 Add the missing paradigm of interaction between MnS producer and MnS consumer Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201537  
S5‑201189 Rel-16 CR 28.533 Add the missing paradigm of interaction between MnS producer and MnS consumer Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201538  
S5‑201190 Rel-16 CR TS 28.541 Correct the parameter sNSSAIList in ServiceProfile and SliceProfile Huawei CR Agreement
6.4.6NRM enhancements
Yes
Yes
not pursued No    
S5‑201191 Rel-16 CR TS 28.541 Update the NR NRM to align with NG-RAN overview architecture Huawei CR Agreement
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201543  
S5‑201192 Rel-16 CR TS 28.541 Correct the xml solution set for NR Huawei CR Agreement
6.4.6NRM enhancements
No
Yes
withdrawn Yes    
S5‑201193 Rel-16 CR TS 28.541 Some correction the NR NRM Huawei CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201194 Rel-16 CR TS 28.533 Update Clause 5.3 Management service deployment based on ZSM framework Huawei CR Agreement
6.4.9Closed loop SLS Assurance
Yes
Yes
revised No S5‑201489  
S5‑201195 New WID on Self-Organizing Networks (SON) for 5G networks Intel Corporation (UK) Ltd WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201496  
S5‑201196 New WID on management aspects of edge computing Intel Corporation (UK) Ltd WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
merged No S5‑201597  
S5‑201197 Rel-16 CR TS 28.541 Fix merging errors of the specification CATT, Nokia, Nokia Shanghai Bell CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201198 Rel-16 CR TS 28.541 Update NRM attribute definitions CATT CR Agreement
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201550  
S5‑201199 Rel-16 CR TS 28.541 Add NRPhysicalCellDU and NRCarrier NRM ZTE Corporation CR Agreement
6.4.6NRM enhancements
Yes
Yes
not pursued No    
S5‑201200 Rel-16 CR TS 28.622 Add configurable KPI control NRM ZTE, China Telecom CR Agreement
6.4.11KPI reporting
Yes
Yes
revised No S5‑201581  
S5‑201201 pCR TS 28.810 Add Self-healing scenario for classification of network autonomy levels CATT pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
merged No S5‑201495  
S5‑201202 pCR TS 28.810 Add Self-healing scenario for classification of network autonomy levels CATT pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
withdrawn Yes    
S5‑201203 Rel-16 CR TS 28.623 Add configurable KPI control NRM ZTE, China Telecom CR Agreement
6.4.11KPI reporting
Yes
Yes
revised No S5‑201582  
S5‑201216 Rel-16 pCR 28.201 Update of the Reference Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201445  
S5‑201217 Rel-16 pCR 28.201 Add charging requirements Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201431  
S5‑201218 Rel-16 pCR 28.201 Add message content Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201432  
S5‑201219 Rel-16 pCR 28.201 Add message flow Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
noted No    
S5‑201220 Rel-16 pCR 28.201 Update of the Terms, Symbols and Abbreviations Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201444  
S5‑201221 Rel-16 pCR 28.201 Add Basic Principles to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201443  
S5‑201222 Rel-16 pCR 28.201 Add applicable triggers to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201442  
S5‑201223 Rel-16 pCR 28.201 Add MnF message flows to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
noted No    
S5‑201224 Rel-16 pCR 28.201 Add NWDAF message flows to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
noted No    
S5‑201225 Rel-16 CR 32.255 Add the branching point or UL CL controlled by I-SMF Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201451  
S5‑201226 Rel-16 CR 32.255 Correct PDU session modification procedure with I-SMF insertion. Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201433  
S5‑201227 Rel-16 CR 32.255 Correct PDU session establishment procedure with I-SMF insertion Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201434  
S5‑201228 Rel-16 CR 32.255 Add 5WWC charging requirements Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201436  
S5‑201229 Rel-16 CR 32.255 Add 5WWC architecture diagram Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201447  
S5‑201230 Rel-16 CR 32.255 Add description on charging information Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201437  
S5‑201231 Rel-16 CR 32.255 Add precedure for 5G RG+scenario Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201438  
S5‑201232 Rel-16 CR 32.255 Add precedure for FN RG scenario Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201439  
S5‑201233 Rel-16 CR 32.255 Add description on identifier in a PDU session for 5G RG and FN RG Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201440  
S5‑201234 Rel-16 CR 32.291 Add description on identifier for 5G RG and FN RG Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
not pursued No    
S5‑201235 Rel-16 CR 32.290 Suspend or resume quota management via the charging notify request Huawei CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
not pursued No    
S5‑201236 Rel-16 CR 32.291 Suspend or resume quota management via the charging notify request Huawei CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
not pursued No    
S5‑201237 Discussion paper on CHF controlled Quota management Huawei discussion Discussion
7.4.7CHF-controlled quota management
Yes
Yes
noted No    
S5‑201238 Rel-16 CR 32.290 Clarification of quota handling Ericsson CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201239 Rel-16 CR 32.298 Incomplete indicator missing in CDR Ericsson CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201448  
S5‑201240 SA5#129e E-Meeting process WG Vice Chair discussion Information
5.1Administrative issues at SA5 level
Yes
Yes
revised No S5‑201421 S5‑201101
S5‑201241 pCR TS 28.810 Add Resource optimization scenario for classification of network autonomy levels CATT pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
revised No S5‑201493  
S5‑201242 Rel-16 CR 32.298 Missing diagnostics for Nchf Ericsson CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201243 Rel-16 CR 32.298 Heading corrections Ericsson CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201449  
S5‑201244 Rel-15 CR 32.291 Correction of non-backward compatible change of usedUnitContainer Ericsson CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201245 New WID on management aspect of Communication Services Samsung R&D Institute UK WID new Agreement
6.2New OAM&P Work Item proposals
Yes
Yes
noted No    
S5‑201246 Rel-16 pCR 28.201 Adding charging scenarios principles Ericsson pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
merged No S5‑201443  
S5‑201247 Rel-16 pCR TS 28.535 Add UC on NWDAF assisted SLS Assurance Samsung R&D Institute UK pCR Agreement
6.4.9Closed loop SLS Assurance
Yes
Yes
revised No S5‑201473  
S5‑201248 Rel-16 pCR 28.201 Addition of flow section Ericsson pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
noted No    
S5‑201249 Rel-16 pCR 28.201 Addition of CSIF and CHF flows Ericsson pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201450  
S5‑201250 pCR 28.535 Add ManagementControlLoop Definition China Mobile E-Commerce Co. pCR Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
withdrawn Yes    
S5‑201251 pCR 28.809 Add load balancing optimization use case China Mobile E-Commerce Co. pCR Approval
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
withdrawn Yes    
S5‑201252 Rel-16 CR 32.290 Add unlimited quota in threshold triggers Ericsson CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
not pursued No    
S5‑201253 pCR 28.809 Modification on Management Interaction with NWDAF China Mobile E-Commerce Co. pCR  
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
revised No S5‑201491  
S5‑201254 Rel-16 CR 32.291 Add unlimited quota Ericsson CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
not pursued No    
S5‑201255 New WID Enhancement on Management Aspects of 5G Service-Level Agreement China Mobile E-Commerce Co. WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201480  
S5‑201256 pCR 28.807 Network Slice as a Service in the management of PNI-NPN TELEFONICA S.A. pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
revised No S5‑201596  
S5‑201257 New SID New areas on EE for 5G networks Orange SID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201477  
S5‑201258 New WID Enhancements on EE for 5G networks Orange WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201478  
S5‑201259 Rel-16 CR TS 28.541 Add the RIM parameters of mapping relations for remote interference management Huawei CR Agreement
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201547  
S5‑201260 Rel-16 CR TS 28.541 Add the NRM fragement for ANR management Huawei CR Agreement
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
not pursued No    
S5‑201261 Rel-16 CR TS 28.541 Add the NRM fragement for PCI configuration Huawei CR Agreement
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
not pursued No    
S5‑201262 Rel-16 CR TS 28.541 Update on slice NRM and solution sets Huawei, China Mobile CR Approval
6.4.14Management Aspects of 5G Service-Level Agreement
Yes
Yes
agreed No    
S5‑201263 pCR 28.807 Add introduction Huawei pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
revised No S5‑201593  
S5‑201264 pCR 28.807 pCR 28.807 Solutions and conclusion for mgmt of SNPN Huawei, Telefonica pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
revised No S5‑201594  
S5‑201265 pCR 28.807 Solutions and conclusion for mgmt of PNI-NPN Huawei, China Mobile pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
revised No S5‑201595  
S5‑201266 Presentation of TR 28.807 to SA for Information Huawei TS or TR cover Approval
6.6.2Study on non-public networks management
Yes
Yes
approved No    
S5‑201267 New WI on management of non-public networks Huawei WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201479  
S5‑201268 Add DL user plane packet delay measurement from PSA UPF to UE ETRI CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
merged No S5‑201559  
S5‑201269 Reply LS on analytics support for energy saving Orange LS out Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
revised No S5‑201472  
S5‑201271 pCR TS 28.535 Add description of communication service assurance in the concept China Mobile E-Commerce Co. pCR Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
merged No S5‑201488  
S5‑201272 Add UL user plane packet delay measurement from UE to PSA UPF ETRI CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
merged No S5‑201560  
S5‑201273 CR TS 28.541 Update attribute properties of resourceSharingLevel China Mobile E-Commerce Co. CR Approval
6.4.14Management Aspects of 5G Service-Level Agreement
Yes
Yes
not pursued No    
S5‑201274 pCR 28.535 Add ManagementControlLoop Definition China Mobile Com. Corporation pCR  
6.4.9Closed loop SLS Assurance
No
Yes
withdrawn Yes    
S5‑201275 pCR 28.809 Modification on Management Interaction with NWDAF China Mobile Com. Corporation pCR  
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
withdrawn Yes    
S5‑201276 pCR 28.809 Add load balancing optimization use case China Mobile Com. Corporation pCR  
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
withdrawn Yes    
S5‑201277 Rel-16 CR TS 28.532 Correction of MnS Stage 3 SSs for integration with ONAP VES AT&T, Ericsson, Nokia, Orange,Huawei CR Approval
6.4.8Integration of ONAP and 3GPP 5G management framework
Yes
Yes
revised No S5‑201487  
S5‑201278 Rel-16 CR TS 28.541 Update of GNBCUUPFunction NRM Ericsson LM CR Approval
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201545  
S5‑201279 pCR TR 28.812 Rapporteur cleanup Huawei Device Co., Ltd pCR  
6.4.3Intent driven management service for mobile networks
Yes
Yes
approved No    
S5‑201280 Small editorial corrections TNO pCR Approval
6.6.3Study on management and orchestration aspects with integrated satellite components in a 5G network
No
Yes
withdrawn Yes    
S5‑201281 Rel-16 WI Exception for Network Slice Management Charging in 5GS Nokia, Nokia Shanghai Bell WI exception request Agreement
7.4.4Network Slice Management Charging in 5G System
Yes
Yes
agreed No    
S5‑201282 pCR TR 28.812 Update Recommendation and Conclusion Huawei Device Co., Ltd pCR  
6.4.3Intent driven management service for mobile networks
Yes
Yes
revised No S5‑201486  
S5‑201283 Rel-16 pCR 28.201 Update of the Reference,Terms, Symbols and Abbreviations Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201284 Rel-16 pCR 28.201 Add charging requirements Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201285 Rel-16 pCR 28.201 Add message content Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201286 Rel-16 pCR 28.201 Add message flow Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201287 Rel-16 pCR 28.201 Update of the Terms, Symbols and Abbreviations Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201288 Rel-16 pCR 28.201 Add Basic Principles to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201289 Rel-16 pCR 28.201 Add applicable triggers to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201290 Rel-16 pCR 28.201 Add MnF message flows to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201291 Rel-16 pCR 28.201 Add MnF message flows to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
No
Yes
withdrawn Yes    
S5‑201292 Rel-16 CR 32.255 Add the branching point or UL CL controlled by I-SMF Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
No
Yes
withdrawn Yes    
S5‑201293 Rel-16 CR 32.255 Correct PDU session modification procedure with I-SMF insertion. Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
No
Yes
withdrawn Yes    
S5‑201294 Rel-16 CR 32.255 Correct PDU session establishment procedure with I-SMF insertion Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
No
Yes
withdrawn Yes    
S5‑201295 Rel-16 CR 32.255 Add 5WWC charging requirements Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
No
Yes
withdrawn Yes    
S5‑201296 Rel-16 CR 32.255 Add 5WWC architecture diagram Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
No
Yes
withdrawn Yes    
S5‑201297 Rel-16 CR 32.255 Add description on charging information Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
No
Yes
withdrawn Yes    
S5‑201298 Rel-16 CR 32.255 Add precedure for 5G RG+scenario Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
No
Yes
withdrawn Yes    
S5‑201299 Rel-16 CR 32.255 Add precedure for FN RG scenario Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
No
Yes
withdrawn Yes    
S5‑201300 Rel-16 CR 32.255 Add description on identifier in a PDU session for 5G RG and FN RG Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
No
Yes
withdrawn Yes    
S5‑201301 Rel-16 CR 32.291 Add description on identifier for 5G RG and FN RG Huawei CR Agreement
7.4.6Charging Aspect for 5WWC
No
Yes
withdrawn Yes    
S5‑201302 Rel-16 CR 32.290 Suspend or resume quota management via the charging notify request Huawei CR Agreement
7.4.7CHF-controlled quota management
No
Yes
withdrawn Yes    
S5‑201303 Rel-16 CR 32.291 Suspend or resume quota management via the charging notify request Huawei CR Agreement
7.4.7CHF-controlled quota management
No
Yes
withdrawn Yes    
S5‑201304 Discussion paper on CHF controlled Quota management Huawei discussion Discussion
7.4.7CHF-controlled quota management
No
Yes
withdrawn Yes    
S5‑201305 Revised WID on Intent driven management service for mobile networks Huawei Device Co., Ltd WID revised  
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201471  
S5‑201306 Rel16 CR 28.622 Update references related to NFV Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201307 Rel16 CR 28.541 Update references related to NFV Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201308 Rel16 CR 28.533 Update references related to NFV Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201309 Rel16 CR 28.531 Update references related to NFV Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201310 Rel16 CR 28.532 Update references related to NFV Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201311 Rel16 CR 28.530 Add tenant concept associated to CSI consumer Huawei CR Agreement
6.4.13Enhancement of 3GPP management system for multiple tenant environment support
Yes
Yes
not pursued No    
S5‑201312 Rel16 CR 28.533 Add clarifications to concept description Huawei CR Agreement
6.4.13Enhancement of 3GPP management system for multiple tenant environment support
Yes
Yes
not pursued No    
S5‑201313 Rel-16 CR TS 28.552 Update the latency related measurements HUAWEI TECHNOLOGIES Co. Ltd. CR  
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No    
S5‑201314 CR TS 28.533 Add the cooperation with CN and RAN Huawei Device Co., Ltd CR  
6.4.9Closed loop SLS Assurance
Yes
Yes
not pursued No    
S5‑201315 pCR 28.809 Use case and potential solutions of MDA assisted EE HUAWEI TECHNOLOGIES Co. Ltd., China Telecommunications pCR  
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
approved No    
S5‑201316 pCR 28.809 Add the use cases related to SLA assurance HUAWEI TECHNOLOGIES Co. Ltd. pCR  
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
revised No S5‑201492  
S5‑201317 Rel-16 CR 28.541 Update of RRM Policy Ericsson, Huawei, Nokia CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑197638
S5‑201318 Rel-16 CR TS 28.532 Rapporteur clean up Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201319 Rel-16 CR TS 28.532 Update the description for generic provisioning MnS Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201320 Rel-16 CR TS 28.541 Clause 4.3.36 Update on RRMPolicyRatio Huawei CR Agreement
6.4.6NRM enhancements
Yes
Yes
not pursued No    
S5‑201321 Rel-16 CR TS 28.533 Add the description of methodology for integration of ONAP VES Collector and 3GPP MnS Huawei CR Agreement
6.4.8Integration of ONAP and 3GPP 5G management framework
Yes
Yes
not pursued No    
S5‑201322 pCR 28.313 Update usecase and procedures for establishment of a new RAN NE in network Huawei,China Telecom pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
revised No S5‑201585  
S5‑201323 pCR 28.810 Update Clause 5.3 NE deployment scenario example for classification of network autonomy levels Huawei,China Mobile,China Unicom, ZTE pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
revised No S5‑201494  
S5‑201324 pCR 28.810 Update Clause 4.4 Potential dimension for classification of network autonomy China Mobile, Huawei, China Unicom, ZTE pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
approved No    
S5‑201325 R16 CR TS28.552 Add measurements for SSB beam handover China Telecommunications, ZTE CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201578  
S5‑201326 pCR 28.810 Update Clause 5.1 Fault RCA and recovery scenario example for network autonomy level China Mobile, Huawei, China Unicom, ZTE pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
revised No S5‑201495  
S5‑201327 pCR 28.809 addition of resource utilization analysis solution ETRI pCR Approval
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
approved No    
S5‑201328 Rel-16 CR 32.255 Addition of PSA2 and UL CL or BP controlled by I-SMF Ericsson CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201458  
S5‑201329 Rel-16 CR 32.255 Change of PSA2 for UL CL or BP controlled by I-SMF Ericsson CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
merged No S5‑201574  
S5‑201330 Rel-16 CR 32.255 Removal of PSA2 and UL CL or BP controlled by I-SMF Ericsson CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
merged No S5‑201574  
S5‑201331 Rel-16 CR 32.255 Remove Editor's note of PDU Session establishment with I-SMF insertion Ericsson CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201452  
S5‑201332 R16 CR TS28.552 Modify Packet Delay measurements ZTE Corporation CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No    
S5‑201333 R16 CR TS28.552 Modify PRB usage measurements ZTE, China Telecom CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No    
S5‑201334 Rel-16 CR TS 28.541 Correct the parameter sNSSAIList Huawei,Ericsson CR Agreement
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201544 S5‑197634
S5‑201335 R16 CR TS28.552 Add RSRP measurements ZTE, China Mobile CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑201579  
S5‑201336 R16 CR TS 28.552 Add TA related measurements ZTE, China Mobile CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
No
Yes
withdrawn Yes    
S5‑201337 R16 CR TS 28.552 Add TA related measurements ZTE, China Mobile CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No    
S5‑201338 SA5#129e E-Meeting Agenda WG Vice Chair (Huawei) agenda  
2Approval of the agenda
Yes
Yes
approved No   S5‑201100
S5‑201339 Presentation of TS 28.310 for approval to SA#87 Orange TS or TR cover Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
approved No    
S5‑201340 Rel-16 CR 32.255 5GS to EPS handover using N26 interface with I-SMF Ericsson CR Approval
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201453 S5‑197066
S5‑201341 Rel-16 CR 32.255 EPS to 5GS handover using N26 interface with I-SMF Ericsson CR Approval
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201455 S5‑197067
S5‑201342 Rel-16 CR 32.291 Correction to tariffTimeChange with UTC format Ericsson CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No   S5‑197360
S5‑201343 YANG Guidelines Update Ericsson España S.A. CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201344 YANG_Netconf Operations Ericsson España S.A. CR Approval
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201539  
S5‑201345 pCR 28.535 Add ManagementControlLoop Definition China Mobile E-Commerce Co. pCR Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
merged No S5‑201488  
S5‑201346 Align text in network slice subnet concepts with NRM Ericsson LM,,Deutsche telekom CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201347 Align text in network slice subnet concepts with NRM Ericsson LM,Deutsche telekom CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201348 Correct reference to NOTE in attribute properties table in clause 5.2.1.1 Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201349 SA5 Rel-17 time plan proposal for OAM SA5 Vice chair (Huawei) Work Plan  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑201350 Remove incorrect example from constraints table Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201351 Resolution of Editors Note in clause W4.3 Class definitions Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201352 New WID on Enhanced Closed loop SLS assurance Ericsson LM,Deutsche telekom WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201599  
S5‑201353 Add MDT requirements for NR Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201591  
S5‑201354 Discussion paper around Closed Loop SLS Assurance architecture Ericsson LM discussion Endorsement
6.4.9Closed loop SLS Assurance
Yes
Yes
noted No    
S5‑201355 Add clauses to describe closed control loop interactions Ericsson LM CR Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
not pursued No    
S5‑201356 Add text for clause 4.2 Management control loops Ericsson LM pCR Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
revised No S5‑201488  
S5‑201357 Add control loop text for stage 2 Ericsson LM pCR Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
noted No    
S5‑201358 Alignment with RAN2, Replace area based MDT with management based MDT Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
withdrawn Yes    
S5‑201359 Presentation of TS 28.536 for information to SA#87e Ericsson LM TS or TR cover Information
6.4.9Closed loop SLS Assurance
Yes
Yes
noted No    
S5‑201360 Work Item Exception for Closed loop SLS Assurance Ericsson LM WI exception request Information
6.4.9Closed loop SLS Assurance
Yes
Yes
agreed No    
S5‑201361 Rel-15 CR TS 28.533 Update of Management service description and diagram Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201551  
S5‑201362 Rel-16 CR TS 28.533 Update of Management service description and diagram Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201552  
S5‑201363 Rel-16 CR TS 28.541 Add Stage 3 NRM Info Model definitions for RRMPolicy and PLMNInfo related CRs Ericsson LM CR Approval
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201546  
S5‑201364 Add missing LTE MDT trace record Oy LM Ericsson AB CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
merged No S5‑201526  
S5‑201365 Add configurable FM - YANG Solution Ericsson España S.A. CR Approval
6.4.6NRM enhancements
Yes
Yes
revised No S5‑201549  
S5‑201366 Alignment with RAN2, Replace area based MDT with management based MDT Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No    
S5‑201367 Add missing LTE MDT trace record Oy LM Ericsson AB CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
merged No S5‑201527  
S5‑201368 Alignment with RAN2, Replace area based MDT with management based MDT Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No    
S5‑201369 Add missing MDT trace record for LTE measurements Oy LM Ericsson AB CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201556  
S5‑201370 Add MDT trace record for NR measurements Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201587  
S5‑201371 Correct CR implementation errors Ericsson France S.A.S CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
revised No S5‑201586  
S5‑201372 New WID on management of MDT enhancement in 5G Oy LM Ericsson AB WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201481  
S5‑201373 Create initial text for the Scope clause. Openet Telecom pCR Approval
7.4.4Network Slice Management Charging in 5G System
Yes
Yes
withdrawn Yes    
S5‑201374 Add anonymization of MDT data for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201535  
S5‑201375 Add MDT signalling activation and deactionvation mechanisms for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201589  
S5‑201376 pCR 28.313 Replace duplicated ANR management Stage 2 with reference Ericsson France S.A.S pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
approved No    
S5‑201377 correct ackState name Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201558  
S5‑201378 Add new Use cases into A.28 according to agreed CRs Nokia, Nokia Shanghai Bell CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No    
S5‑201379 TD replance JSON with YAML in NRM Nokia, Nokia Shanghai Bell discussion Endorsement
6.4.6NRM enhancements
Yes
Yes
endorsed No    
S5‑201380 New WI proposal for REL17 NRM Nokia, Nokia Shanghai Bell WID new Agreement
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201482  
S5‑201381 TD tenant information to support multi-tenancy environment Nokia, Nokia Shanghai Bell discussion Agreement
6.4.13Enhancement of 3GPP management system for multiple tenant environment support
Yes
Yes
not pursued No    
S5‑201382 TD proposal for network slice isolation attribute Nokia, Nokia Shanghai Bell discussion Agreement
6.4.14Management Aspects of 5G Service-Level Agreement
Yes
Yes
noted No    
S5‑201383 TD proposal for tolerance indicator attribute Nokia, Nokia Shanghai Bell discussion Agreement
6.4.14Management Aspects of 5G Service-Level Agreement
Yes
Yes
noted No    
S5‑201384 Rel-15 CR 28.158 Clarify HTTP Patch methods Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201555  
S5‑201385 Rel-16 CR 28.532 Add summary CM notification to the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201540  
S5‑201386 Endorsement for GST parameters in Rel-16 and 17 Ericsson other  
6.4.14Management Aspects of 5G Service-Level Agreement
Yes
Yes
revised No S5‑201497  
S5‑201387 Rel-16 CR 28.532 Clarify and add numerous issues in the REST SS of the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201541  
S5‑201388 pCR R16 28.307-020 Rapporteur's clean up Ericsson pCR  
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201389 pCR R16 28.308-020 Rapporteur's clean up Ericsson pCR  
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201390 Rel-16 CR 28.532 Remove subscribe and unsubscribe operation from ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201391 pCR R16 28.405-110 Rapporteur's clean up Ericsson pCR  
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201392 Rel-16 CR 28.532 Correct OpenAPI definition of the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201542  
S5‑201393 Rel-16 CR 28.622 Correct HeartbeatControl IOC definition Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201554  
S5‑201394 pCR R16 28.307-020 Remove SBA Ericsson pCR  
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201395 Rel-16 CR 28.622 Add missing supported notifications of MeasurementReader, MeasurementControl and ThresholdMonitor Nokia, Nokia Shanghai Bell CR  
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201396 pCR R16 28.308-020 Remove SBA Ericsson pCR  
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201397 Rel-16 CR 28.623 Add OpenAPI definitions required by the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201398 Removing Signalling Based Activation Ericsson CR  
6.4.1Management of QoE measurement collection
Yes
Yes
agreed No    
S5‑201399 Rel-16 CR 28.541 Add OpenAPI definitions required by the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201400 TD Use YAML instead of JSON in the OpenAPI definitions of the REST SS Nokia, Nokia Shanghai Bell discussion Approval
6.4.6NRM enhancements
Yes
Yes
endorsed No    
S5‑201401 pCR R16 28.405-110 Remove SBA Ericsson pCR  
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201402 TD Definition of SystemDN Nokia, Nokia Shanghai Bell discussion Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
noted No    
S5‑201403 Correct ackState attribute name Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201404 pCR R16 28.406-011 Remove SBA Ericsson pCR  
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201405 New WID on QoE Measurement Collection in 5G and Signalling Based Activation for UMTS and LTE Ericsson WID new  
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑201483  
S5‑201406 Correct Heartbeat Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201407 Add MDT management activation and deactionvation mechanism for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201590  
S5‑201408 ME (instead of MF) relation to VNF in YANG Ericsson España S.A. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑201409 Add MDT specific configuration parameters for 5G Oy LM Ericsson AB CR Approval
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201588  
S5‑201410 Add MDT user consent handling for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201536  
S5‑201411 Introduce CHF-Controlled Quota Management Amdocs Software Systems Ltd CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
revised No S5‑201441  
S5‑201412 Add MDT trace recording session start and stop mechanism for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
revised No S5‑201592  
S5‑201413 Add CHF-Controlled Quota Management Amdocs Software Systems Ltd CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
not pursued No    
S5‑201414 Rel-16 CR TS 25.541 Add the stage 3 solution for SOM attributes Intel Corporation (UK) Ltd CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
not pursued No    
S5‑201415 Add quota management attributes Amdocs Software Systems Ltd CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
not pursued No    
S5‑201416 Rel-16 CR TS 25.541 Add IOCs to support SON functions Intel Corporation (UK) Ltd CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
not pursued No    
S5‑201417 Migrate SA5 Source files to Gitlab - step 1 Ericsson España S.A. discussion Endorsement
6.1OAM&P Plenary
No
Yes
withdrawn Yes    
S5‑201418 Add streaming format for Trace Record Reporting Oy LM Ericsson AB CR Agreement
6.4.10Streaming trace reporting
Yes
Yes
revised No S5‑201490  
S5‑201419 Rel-16 CR 28.533 Correct definition of MnS and introduce term Service Based Management Architecture and its abbreviation SBMA Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
merged No S5‑201600  
S5‑201420 SA5#129_agenda_with_Tdocs_sequence_proposal_OAM SA5 Vice Chair (Huawei) other  
6.1OAM&P Plenary
Yes
Yes
revised No S5‑201423  
S5‑201421 SA5#129e E-Meeting process WG Vice Chair discussion Information
5.1Administrative issues at SA5 level
Yes
Yes
noted No   S5‑201240
S5‑201422 CH Agenda and Time Plan CH SWG Chair agenda  
7.1Charging Plenary
Yes
Yes
revised No S5‑201466  
S5‑201423 SA5#129_agenda_with_Tdocs_sequence_proposal_OAM SA5 Vice Chair (Huawei) other  
6.1OAM&P Plenary
Yes
Yes
noted No   S5‑201420
S5‑201424 Reply to LS to SA5 on trace related configurations for NR MDT Ericsson LM LS out  
6.4.15Management of MDT in 5G
Yes
Yes
approved No    
S5‑201425 Add missing definition for matching-criteria-attributes Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201426 Reply LS to SA5 on QoE Measurement Collection R2-1916328 LS in  
6.4.1Management of QoE measurement collection
Yes
Yes
postponed No    
S5‑201427 Rel-16 CR 32.291 Correct the style for TriggerType in OpenAPI Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201428 Rel-16 WIException for Network Slice performance and Analytics Charging in 5GS Huawei WI exception request  
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
revised No S5‑201467  
S5‑201429 Rel-16 WI Exception for Charging Access Traffic Steering, Switching and Splitting in 5G system architecture Nokia, Nokia Shanghai Bell WI exception request Approval
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
agreed No    
S5‑201430 Rel-16 WI Exception for 5WWC charging Huawei Tech.(UK) Co., Ltd WI exception request Approval
7.4.6Charging Aspect for 5WWC
Yes
Yes
agreed No    
S5‑201431 Rel16 pCR 28.801 Add requirements Huawei Tech.(UK) Co., Ltd pCR Approval
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
noted No   S5‑201217
S5‑201432 Rel16 pCR 28.801 Add message content Huawei Tech.(UK) Co., Ltd pCR Approval
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No   S5‑201218
S5‑201433 Rel-16 CR 32.255 Correct PDU session modification procedure with I-SMF insertion Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
not pursued No   S5‑201226
S5‑201434 Correct PDU session establishment procedure with I-SMF insertion Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
not pursued No   S5‑201227
S5‑201435 Rel-16 Work Item Exception for CHF-Controlled Quota Management Amdocs Software Systems Ltd WI exception request Approval
7.4.7CHF-controlled quota management
Yes
Yes
revised No S5‑201576  
S5‑201436 Rel16 CR 32.255 Add 5WWC charging requirements Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
agreed No   S5‑201228
S5‑201437 Rel16 CR 32.255 Add description on charging information Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
not pursued No   S5‑201230
S5‑201438 Rel16 CR 32.255 Add precedure for 5G RG scenario Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
agreed No   S5‑201231
S5‑201439 Rel16 CR 32.255 Add procedure for FN RG scenario Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201454 S5‑201232
S5‑201440 Rel16 CR 32.255 Add description on identifier in a PDU session for 5G RG and FN RG Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
revised No S5‑201456 S5‑201233
S5‑201441 Introduce CHF-Controlled Quota Management Amdocs Software Systems Ltd CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
revised No S5‑201463 S5‑201411
S5‑201442 Rel-16 pCR 28.201 Add applicable triggers to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No   S5‑201222
S5‑201443 Rel-16 pCR 28.201 Add Basic Principles to clause 5.2 Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No   S5‑201221
S5‑201444 Rel-16 pCR 28.201 Introduction of Reference point to the Billing system Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No   S5‑201220
S5‑201445 Rel-16 pCR 28.201 Update of the Reference Huawei pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No   S5‑201216
S5‑201446 Rel-16 pCR 28.201 Add performance and analytics inputs to clause 5.1.3 China Mobile Com. Corporation pCR Approval
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No   S5‑201162
S5‑201447 Rel-16 CR 32.255 Add 5WWC architecture diagram Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
agreed No   S5‑201229
S5‑201448 Rel-16 CR 32.298 Incomplete indicator missing in CDR Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201239
S5‑201449 Rel-16 CR 32.298 Heading corrections Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201243
S5‑201450 Rel-16 pCR 28.201 Addition of CSIF and CHF flows Ericsson pCR Agreement
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No   S5‑201249
S5‑201451 Rel-16 CR 32.255 Add the branching point or UL CL controlled by I-SMF Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201573 S5‑201225
S5‑201452 Rel-16 CR 32.255 Remove Editor's note of PDU Session establishment with I-SMF insertion Ericsson CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No   S5‑201331
S5‑201453 Rel-16 CR 32.255 5GS to EPS handover using N26 interface with I-SMF Ericsson CR Approval
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No   S5‑201340
S5‑201454 Rel-16 CR 32.255 Add precedure for FN RG scenario Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
agreed No   S5‑201439
S5‑201455 Rel-16 CR 32.255 EPS to 5GS handover using N26 interface with I-SMF Ericsson CR Approval
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No   S5‑201341
S5‑201456 Rel16 CR 32.255 Add description on identifier in a PDU session for 5G RG and FN RG Huawei Tech.(UK) Co., Ltd CR Agreement
7.4.6Charging Aspect for 5WWC
Yes
Yes
agreed No   S5‑201440
S5‑201457 LS reply on Reply LS on supporting simultaneous online and offline reporting level access Nokia, Nokia Shanghai Bell LS out Approval
7.1Charging Plenary
Yes
Yes
approved No   S5‑201159
S5‑201458 Rel-16 CR 32.255 Adding/removal/change of PSA2 and UL CL or BP controlled by I-SMF Ericsson, Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
revised No S5‑201574 S5‑201328
S5‑201459 Rel-16 CR 32.255 Introduction of V-SMF change in Roaming HR - principles Nokia, Nokia Shanghai Bell CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No   S5‑201106
S5‑201460 Rel-16 CR 32.255 Introduction of V-SMF Change in Roaming HR - flows Nokia, Nokia Shanghai Bell CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No   S5‑201160
S5‑201461 Rel-16 CR 32.255 Introduction of ATSSS architecture reference and charging requirements Nokia, Nokia Shanghai Bell CR Agreement
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
agreed No   S5‑201155
S5‑201462 Rel-16 CR 32.255 Introduction of MA PDU session and PCC Rules Nokia, Nokia Shanghai Bell CR Agreement
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
agreed No   S5‑201156
S5‑201463 Introduce CHF-Controlled Quota Management Amdocs Software Systems Ltd CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
revised No S5‑201575 S5‑201441
S5‑201464 Rel-16 CR 32.255 Introduction of ATSSS flows Nokia, Nokia Shanghai Bell CR Agreement
7.4.5Charging Access Traffic Steering, Switching and Splitting in 5G system architecture
Yes
Yes
agreed No   S5‑201157
S5‑201465 Rel-16 CR 32.298 Correction ASN.1 syntax Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201105
S5‑201466 CH Agenda and Time Plan CH SWG Chair agenda  
7.1Charging Plenary
Yes
Yes
revised No S5‑201572 S5‑201422
S5‑201467 Rel-16 WI Exception for Network Slice performance and Analytics Charging in 5GS Huawei WI exception request  
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
agreed No   S5‑201428
S5‑201468 Correct errors in yang solution set Oy LM Ericsson AB CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201469 Correct errors in yang solution set Oy LM Ericsson AB CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201470 Revised WID for MA5SLA China Mobile WID revised Agreement
6.4.14Management Aspects of 5G Service-Level Agreement
Yes
Yes
agreed No    
S5‑201471 Revised WID on Intent driven management service for mobile networks Huawei Device Co., Ltd WID revised -
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201305
S5‑201472 Reply LS on analytics support for energy saving ORANGE LS out approval
6.4.2Energy Efficiency of 5G
Yes
Yes
approved No   S5‑201269
S5‑201473 Rel-16 pCR TS 28.535 Add UC on NWDAF assisted SLS Assurance Samsung R&D Institute UK pCR Agreement
6.4.9Closed loop SLS Assurance
Yes
Yes
approved No   S5‑201247
S5‑201474 Exception sheet for WI EE_5G ORANGE WI exception request Agreement
6.4.2Energy Efficiency of 5G
Yes
Yes
agreed No    
S5‑201475 Exception sheet for WI TM_SBMA Nokia WI exception request Agreement
6.4.3Intent driven management service for mobile networks
Yes
Yes
agreed No    
S5‑201476 Exception sheet for WI OAM_RTT Nokia WI exception request Agreement
6.4.10Streaming trace reporting
Yes
Yes
agreed No    
S5‑201477 New SID New areas on EE for 5G networks Orange SID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201257
S5‑201478 New WID Enhancements on EE for 5G networks Orange WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201258
S5‑201479 New WI on management of non-public networks Huawei WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201267
S5‑201480 New WID Enhancement on Management Aspects of 5G Service-Level Agreement China Mobile E-Commerce Co. WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201255
S5‑201481 New WID on management of MDT enhancement in 5G Oy LM Ericsson AB WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201372
S5‑201482 New WID on Additional NRM features Nokia, Nokia Shanghai Bell WID new Agreement
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201380
S5‑201483 New WID on Enhancement of QoE Measurement Collection Ericsson WID new -
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201405
S5‑201484 pCR TS 28.310 Add solution for distributed energy saving management Orange pCR Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
approved No   S5‑201116
S5‑201485 pCR TS 28.310 Add requirement on energy saving reactivation Nanjing Ericsson Panda Com Ltd pCR Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
approved No   S5‑201131
S5‑201486 pCR TR 28.812 Update Recommendation and Conclusion Huawei Device Co., Ltd pCR -
6.4.3Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑201282
S5‑201487 Rel-16 CR TS 28.532 Correction of MnS Stage 3 SSs for integration with ONAP VES AT&T, Ericsson, Nokia, Orange,Huawei CR Approval
6.4.8Integration of ONAP and 3GPP 5G management framework
Yes
Yes
agreed No   S5‑201277
S5‑201488 Add text for clause 4.2 Management control loops Ericsson, China Mobile, Huawei, China Southern Power Grid Co pCR Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
approved No   S5‑201356
S5‑201489 Rel-16 CR TS 28.533 Update Clause 5.3 Management service deployment based on ZSM framework Huawei, Ericsson, Deutsche Telekom CR Agreement
6.4.9Closed loop SLS Assurance
Yes
Yes
agreed No   S5‑201194
S5‑201490 Add streaming format for Trace Record Reporting Oy LM Ericsson AB CR Agreement
6.4.10Streaming trace reporting
Yes
Yes
agreed No   S5‑201418
S5‑201491 pCR 28.809 Modification on Management Interaction with NWDAF China Mobile E-Commerce Co. pCR -
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
approved No   S5‑201253
S5‑201492 pCR 28.809 Add the use cases related to SLA assurance HUAWEI TECHNOLOGIES Co. Ltd. pCR -
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
approved No   S5‑201316
S5‑201493 pCR TS 28.810 Add Resource optimization scenario for classification of network autonomy levels CATT pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
approved No   S5‑201241
S5‑201494 pCR 28.810 Update Clause 5.3 NE deployment scenario example for classification of network autonomy levels Huawei,China Mobile,China Unicom, ZTE pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
approved No   S5‑201323
S5‑201495 pCR 28.810 Update Clause 5.1 Fault RCA and recovery scenario example for network autonomy level China Mobile, CATT,Huawei, China Unicom, ZTE pCR Approval
6.6.5Study on autonomous network levels
Yes
Yes
approved No   S5‑201326
S5‑201496 New WID on Self-Organizing Networks (SON) for 5G networks Intel Corporation (UK) Ltd WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201195
S5‑201497 Endorsement for GST parameters in Rel-16 and 17 Ericsson discussion -
6.4.14Management Aspects of 5G Service-Level Agreement
Yes
Yes
endorsed No   S5‑201386
S5‑201498 Rel-16 CR 28.533 Correct definition of MnS and introduce term Service Based Management Architecture and its abbreviation SBMA Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑201499 Draft TR 28.812 Huawei draft TR Approval
6.4.3Intent driven management service for mobile networks
Yes
Yes
approved No    
S5‑201500 Draft TR 28.313 Intel draft TR discussion
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
approved No    
S5‑201501 Draft TR 28.810 China Mobile draft TR Approval
6.6.5Study on autonomous network levels
Yes
Yes
approved No    
S5‑201502 OAM action list WG vice chair (Huawei) other discussion
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑201503 Draft TR 28.807 Huawei draft TR Approval
6.6.2Study on non-public networks management
Yes
Yes
approved No    
S5‑201504 Draft TS 28.310 ORANGE draft TS Approval
6.4.2Energy Efficiency of 5G
Yes
Yes
approved No    
S5‑201505 Draft TS 28.535 Ericsson draft TS Approval
6.4.9Closed loop SLS Assurance
Yes
Yes
approved No    
S5‑201506 Draft TS 28.307 Ericsson draft TS Approval
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201507 Draft TS 28.308 Ericsson draft TS Approval
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201508 Draft TS 28.405 Ericsson draft TS Approval
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201509 Draft TS 28.406 Ericsson draft TS Approval
6.4.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑201510 draft TR 28.809 Intel draft TR Approval
6.6.4Study on enhancement of Management Data Analytics Service
Yes
Yes
approved No    
S5‑201511 OAM report WG Vice Chair (Huawei) report Information
6.1OAM&P Plenary
No
No
reserved No    
S5‑201512 OAM Conclusions WG Chair report Information
6.1OAM&P Plenary
No
No
reserved No    
S5‑201513 OAM Chair notes and comments WG Chair report Information
6.1OAM&P Plenary
No
No
reserved No    
S5‑201514 (reserved) OAM other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201515 (reserved) OAM other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201516 (reserved) OAM other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201517 (reserved) OAM other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201518 (reserved) OAM other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201519 (reserved) OAM other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201520 (reserved) OAM other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201521 Rel-16 Exception sheet for WI 5G_SLICE_ePA Intel WI exception request Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No    
S5‑201522 Rel-16 CR TS 28.554 Update KPI definitions to align with the new template China Telecommunications, ZTE, Huawei CR Agreement
6.4.11KPI reporting
Yes
Yes
agreed No   S5‑201119
S5‑201523 Exception sheet for WI 5GDMS Huawei WI exception request Agreement
6.4.5Discovery of management services in 5G
Yes
Yes
agreed No    
S5‑201524 Rel-16 Work Item Exception for SON_5G Intel WI exception request Agreement
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
agreed No    
S5‑201525 LS on the status update of the SON support for NR works Intel LS out Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
approved No    
S5‑201526 Rel-15 CR TS 32.422 Updating the measurements list for Immediate MDT Telefónica S.A., Huawei, Orange CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201117
S5‑201527 Rel-16 CR TS 32.422 Updating the measurements list for Immediate MDT China Telecommunications, Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201118
S5‑201528 Rel-15 CR 28.550 Update the performance data streaming procedure Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201184
S5‑201529 Rel-16 CR 28.550 Update the performance data streaming procedure Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201185
S5‑201530 Rel-16 Exception sheet for eNRM Nokia WI exception request Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No    
S5‑201531 Rel-16 Work Item Exception for MEMTANE Huawei WI exception request Agreement
6.4.13Enhancement of 3GPP management system for multiple tenant environment support
Yes
Yes
revised No S5‑201607  
S5‑201532 Rel-16 Work Item Exception for QOED Ericsson WI exception request Agreement
6.4.1Management of QoE measurement collection
Yes
Yes
agreed No    
S5‑201533 Rel-15 CR 28.550 Add streaming procedure for measurement collection termination Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201186
S5‑201534 Rel-16 CR 28.550 Add streaming procedure for measurement collection termination Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201187
S5‑201535 Add anonymization of MDT data for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201374
S5‑201536 Add MDT user consent handling for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201410
S5‑201537 Rel-15 CR 28.533 Add the missing paradigm of interaction between MnS producer and MnS consumer Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201188
S5‑201538 Rel-16 CR 28.533 Add the missing paradigm of interaction between MnS producer and MnS consumer Intel Corporation (UK) Ltd CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201189
S5‑201539 YANG_Netconf Operations Ericsson, Orange, Telecom Italia, China Mobile, Huawei CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201344
S5‑201540 Rel-16 CR 28.532 Add summary CM notification to the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No   S5‑201385
S5‑201541 Rel-16 CR 28.532 Clarify and add numerous issues in the REST SS of the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201387
S5‑201542 Rel-16 CR 28.532 Correct OpenAPI definition of the ProvMnS Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201392
S5‑201543 Rel-16 CR TS 28.541 Update the NR NRM to align with NG-RAN overview architecture Huawei CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201191
S5‑201544 Rel-16 CR TS 28.541 Correct the parameter sNSSAIList Huawei,Ericsson CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201334
S5‑201545 Rel-16 CR TS 28.541 Update of GNBCUUPFunction NRM Ericsson LM CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201278
S5‑201546 Rel-16 CR TS 28.541 Add Stage 3 NRM Info Model definitions for RRMPolicy and PLMNInfo related CRs Ericsson, Nokia, Huawei CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201363
S5‑201547 Rel-16 CR TS 28.541 Add the RIM parameters of mapping relations for remote interference management Huawei CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201259
S5‑201548 Add configurable FM. Ericsson Limited CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201121
S5‑201549 Add configurable FM - YANG Solution Ericsson España S.A. CR Approval
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201365
S5‑201550 Rel-16 CR TS 28.541 Update NRM attribute definitions CATT CR Agreement
6.4.6NRM enhancements
Yes
Yes
agreed No   S5‑201198
S5‑201551 Rel-15 CR TS 28.533 Update of Management service description and diagram Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201361
S5‑201552 Rel-16 CR TS 28.533 Update of Management service description and diagram Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑201600 S5‑201362
S5‑201553 Clarify capability of ack alarms and filter constraint Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201127
S5‑201554 Rel-16 CR 28.622 Correct HeartbeatControl IOC definition Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201393
S5‑201555 Rel-15 CR 28.158 Clarify HTTP Patch methods Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201384
S5‑201556 Add missing MDT trace record for LTE measurements Oy LM Ericsson AB CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201369
S5‑201557 Rel-16 CR TS 28.552 Add Random Access Preambles measurements Ericsson LM CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
agreed No   S5‑201176
S5‑201558 correct ackState name Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201377
S5‑201559 Rel-16 CR 28.552 Add measurements on DL delay between PSA UPF and UE Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No   S5‑201182
S5‑201560 Rel-16 CR 28.552 Add measurements on UL delay between PSA UPF and UE Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No   S5‑201183
S5‑201561 Rel-16 CR TS 28.552 Add measurement Average delay UL on over-the-air interface Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201177
S5‑201562 Rel-16 CR 28.552 Add measurements on DL delay between PSA UPF and NG-RAN Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201179
S5‑201563 Rel-16 CR 28.552 Add measurements on UL delay between PSA UPF and NG-RAN Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201180
S5‑201564 Rel-16 CR 28.552 Add measurements on RTT delay between PSA UPF and NG-RAN Intel Corporation (UK) Ltd CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201181
S5‑201565 Rel-16 CR TS 28.552 Correction of UE throughput measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201135
S5‑201566 Rel-16 CR TS 28.552 Correction of Packet Drop Rate measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201137
S5‑201567 Rel-16 CR TS 28.552 Correction of Packet Loss Rate measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201138
S5‑201568 Rel-16 CR TS 28.552 Add reference to RAN L2 measurement specification Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201175
S5‑201569 Rel-16 CR TS 28.552 Add new measurements related to DRB Setup via Initial Context Setup Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201149
S5‑201570 Draft TS 28.201 Huawei draft TS Approval
7.4.3Network Slice Performance and Analytics Charging in 5G System
Yes
Yes
approved No    
S5‑201571 Rel-16 CR 32.291 Update OpenAPI version Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑201572 CH Agenda and Time Plan CH SWG Chair agenda -
7.1Charging Plenary
Yes
Yes
noted No   S5‑201466
S5‑201573 Rel-16 CR 32.255 Add the branching point or UL CL controlled by I-SMF Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No   S5‑201451
S5‑201574 Rel-16 CR 32.255 Adding/removal/change of PSA2 and UL CL or BP controlled by I-SMF Ericsson, Huawei CR Agreement
7.4.2Charging aspects of Enhancing Topology of SMF and UPF in 5G Networks
Yes
Yes
agreed No   S5‑201458
S5‑201575 Introduce CHF-Controlled Quota Management Amdocs Software Systems Ltd CR Agreement
7.4.7CHF-controlled quota management
Yes
Yes
agreed No   S5‑201463
S5‑201576 Rel-16 Work Item Exception for CHF-Controlled Quota Management Amdocs Software Systems Ltd WI exception request Approval
7.4.7CHF-controlled quota management
Yes
Yes
agreed No   S5‑201435
S5‑201577 Rel-16 CR TS 28.552 Correct measurements related to QoS flows Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201150
S5‑201578 R16 CR TS28.552 Add measurements for SSB beam handover China Telecommunications, ZTE CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201325
S5‑201579 R16 CR TS28.552 Add RSRP measurements ZTE, China Mobile CR Agreement
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201335
S5‑201580 Rel-16 CR TS 28.552 Add Number of Active UEs measurements Ericsson LM CR Approval
6.4.4Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑201178
S5‑201581 Rel-16 CR TS 28.622 Add configurable KPI control NRM ZTE, China Telecom CR Agreement
6.4.11KPI reporting
Yes
Yes
agreed No   S5‑201200
S5‑201582 Rel-16 CR TS 28.623 Add configurable KPI control NRM ZTE, China Telecom CR Agreement
6.4.11KPI reporting
Yes
Yes
agreed No   S5‑201203
S5‑201583 pCR 28.313 changes to MRO Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
approved No   S5‑201147
S5‑201584 pCR 28.313 changes to RACH optimization Intel Corporation (UK) Ltd pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
approved No   S5‑201148
S5‑201585 pCR 28.313 Update usecase and procedures for establishment of a new RAN NE in network Huawei,China Telecom pCR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
approved No   S5‑201322
S5‑201586 Correct CR implementation errors Ericsson France S.A.S CR Approval
6.4.12Self-Organizing Networks (SON) for 5G networks
Yes
Yes
agreed No   S5‑201371
S5‑201587 Add MDT trace record for NR measurements Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201370
S5‑201588 Add MDT specific configuration parameters for 5G Oy LM Ericsson AB CR Approval
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201409
S5‑201589 Add MDT signalling activation and deactionvation mechanisms for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201375
S5‑201590 Add MDT management activation and deactionvation mechanism for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201407
S5‑201591 Add MDT requirements for NR Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201353
S5‑201592 Add MDT trace recording session start and stop mechanism for 5G Oy LM Ericsson AB CR Agreement
6.4.15Management of MDT in 5G
Yes
Yes
agreed No   S5‑201412
S5‑201593 pCR 28.807 Add introduction Huawei pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
approved No   S5‑201263
S5‑201594 pCR 28.807 pCR 28.807 Solutions and conclusion for mgmt of SNPN Huawei, Telefonica pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
approved No   S5‑201264
S5‑201595 pCR 28.807 Solutions and conclusion for mgmt of PNI-NPN Huawei, China Mobile pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
approved No   S5‑201265
S5‑201596 pCR 28.807 Network Slice as a Service in the management of PNI-NPN TELEFONICA S.A. pCR Approval
6.6.2Study on non-public networks management
Yes
Yes
approved No   S5‑201256
S5‑201597 New SID on edge computing management Samsung R&D Institute UK,Intel SID new Agreement
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201152
S5‑201598 Reply to: Reply LS to SA5 on Application Architecture for enabling Edge Applications Samsung LS out approval
6.2New OAM&P Work Item proposals
Yes
Yes
approved No   S5‑201173
S5‑201599 New WID on Enhanced Closed loop SLS assurance Ericsson LM,Deutsche telekom WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑201352
S5‑201600 Rel-16 CR TS 28.533 Update of Management service description and diagram Huawei CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑201552
S5‑201601 Email approval status WG Chair other Information
5.1Administrative issues at SA5 level
No
No
reserved No    
S5‑201602 (reserved) OAM revisions other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201603 (reserved) OAM revisions other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201604 (reserved) OAM revisions other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201605 (reserved) OAM revisions other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201606 (reserved) OAM revisions other discussion
8Any Other Business
No
Yes
withdrawn Yes    
S5‑201607 Rel-16 Work Item Exception for MEMTANE Huawei WI exception request Agreement
6.4.13Enhancement of 3GPP management system for multiple tenant environment support
Yes
Yes
agreed No   S5‑201531