Tdoc List
2019-03-01 16:20
Agenda | Topic | TDoc | Title | Source | Type | For | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Opening of the meeting |   | ||||||||||
2 | Approval of the agenda | S5‑192000 | Agenda | WG Chairman | agenda | Yes |
Yes
| approved | No | |||
3 | IPR declaration | S5‑192001 | IPR and legal declaration | WG Chairman | other | Yes |
Yes
| noted | No | |||
4 | Meetings and activities reports |   | ||||||||||
4.1 | Last SA5 meeting report | S5‑192002 | Report from last SA5 meeting | MCC | report | Yes |
Yes
| approved | No | |||
4.2 | Last SA meeting report | S5‑192015 | SA5 status report at last SA meeting | WG Chairman | report | Yes |
Yes
| noted | No | |||
S5‑192016 | SA5 results at last SA meeting | WG Chairman | report | Yes |
Yes
| noted | No | |||||
4.3 | Inter-organizational reports |   | ||||||||||
5 | Cross-SWG issues |   | ||||||||||
5.1 | Administrative issues at SA5 level | S5‑192003 | Leaders meeting agenda | WG Chairman | agenda | Yes |
Yes
| noted | No | |||
S5‑192004 | Leaders meeting minutes | WG Chairman | report | Yes |
Yes
| noted | No | |||||
S5‑192005 | SA5 Working Procedures | WG Vice Chair (Huawei) | other | Yes |
Yes
| noted | No | |||||
S5‑192006 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | other | Yes |
Yes
| noted | No | |||||
S5‑192007 | Process for management of draft TSs/TRs | WG Chairman | other | Yes |
Yes
| noted | No | |||||
S5‑192008 | CR Quality Check | MCC | other | Yes |
Yes
| noted | No | |||||
S5‑192009 | Status of email approvals | WG Vice Chair (Orange) | other | No |
No
| reserved | No | |||||
5.2 | Technical issues at SA5 level |   | ||||||||||
5.3 | Liaison statements at SA5 level | S5‑192046 | Resubmitted LS from ITU-T to SA5 on Draft new Recommendation E.RQST – “KPI targets for mobile networks” | ITU-T SG12 | LS in | Yes |
YesIt was commented that this was a table of proposed KPIs. Huawei added that there were no 3GPP references to the LTE values proposed and that the GSM KPIs were not correct since they were referring to 3GPP internal TRs (800 series).
ZTE added that new KPIs could also be proposed by SA5.
Intel: no 5G KPIs here, not relevant for our current work in 5G. Take a look at the KPIs we have defined and validate their proposal.
It was finally decided to postpone it for the next meeting given that it would happen before their deadline.
| postponed | No | |||
S5‑192047 | Resubmitted LS from ITU-T to SA5 - Update of Technical Report – “Transport network support of IMT-2020/5G” | ITU-T SG15 | LS in | Yes |
YesIntel: we sent an LS to them asking about a solution and now we are studying a different solution They are still studying the former solution. SA5 needs to guide them.
Nokia: 28.531 says that we are not limiting the possible solutions. We can tell ITU-T about this specification.If we receive their results before the end of this year we can react and include it in Rel-16.
The Chair proposed to reply with the expected time plan of SA5.
Huawei: no need to send a LS to them, they are still studying.
The Chair proposed to reply and this was agreed.
| replied to | No | |||||
S5‑192304 | Reply to: Resubmitted LS from ITU-T to SA5 - Update of Technical Report – “Transport network support of IMT-2020/5G” | Ericsson | LS out | approval | Yes |
Yes
| revised | No | S5‑192459 | |||
S5‑192459 | Reply to: Resubmitted LS from ITU-T to SA5 - Update of Technical Report – “Transport network support of IMT-2020/5G” | Ericsson | LS out | approval | Yes |
Yes
| approved | No | S5‑192304 | |||
5.4 | SA5 meeting calendar | S5‑192010 | SA5 Meeting Calendar | WG Chairman | other | Yes |
Yes
| noted | No | |||
5.5 | Review of the Work Plan | S5‑192011 | 3GPP SA5 Work Plan | MCC | other | Yes |
Yes
| noted | No | |||
6 | OAM&P |   | ||||||||||
6.1 | OAM&P Plenary | S5‑192012 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | Yes |
Yes
| revised | No | S5‑192306 | ||
S5‑192306 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - | Yes |
Yes
| noted | No | S5‑192012 | |||
S5‑192013 | OAM Executive Report | WG Vice Chair (ORANGE) | report | Yes |
Yes
| revised | No | S5‑192458 | ||||
S5‑192458 | OAM Executive Report | WG Vice Chair (ORANGE) | report | - | Yes |
Yes
| noted | No | S5‑192013 | |||
S5‑192014 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | Yes |
Yes
| revised | No | S5‑192307 | ||||
S5‑192307 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | - | No |
Yes
| noted | No | S5‑192014 | |||
S5‑192017 | Minutes of OAM&P SWG opening session | WG Vice Chair (Ericsson) | report | Yes |
Yes
| noted | No | |||||
S5‑192049 | Reply LS from SA2 to SA5 on Slice related Data Analytics | S2-1901294 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑192050 | Ls from SA2 ccSA5 on providing information on SLA fulfilment to NG-RAN | S2-1901382 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑192309 | Reply to: Ls from SA2 ccSA5 on providing information on SLA fulfilment to NG-RAN | Nokia | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑192051 | Ls from SA4 cc SA5 on Collection of Slice Related Data Analytics from UEs | S4-190195 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑192310 | Reply to: Ls from SA4 cc SA5 on Collection of Slice Related Data Analytics from UEs | Ericsson | LS out | approval | No |
YesThe content was approved, but the final version was to be created after the email approval of the drafts.
| left for email approval | No | ||||
S5‑192075 | SA5 presentation to ZTA congress - Integration of 3GPP and ONAP | AT&T, Orange,Deutsche Telekom | discussion | Discussion | Yes |
Yes
| revised | No | S5‑192311 | |||
S5‑192311 | SA5 presentation to ZTA congress - Integration of 3GPP and ONAP | AT&T, Orange,Deutsche Telekom | discussion | Discussion | Yes |
Yes
| agreed | No | S5‑192075 | |||
S5‑192237 | LS on Reply LS on Slice related Data Analytics | Ericsson España S.A. | LS out | Approval | Yes |
Yes
| revised | No | S5‑192308 | |||
S5‑192308 | LS on Reply LS on Slice related Data Analytics | Ericsson España S.A. | LS out | Approval | Yes |
Yes
| approved | No | S5‑192237 | |||
S5‑192267 | Overview of the 5G specification structure | Huawei Tech.(UK) Co., Ltd | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑192341 | LSReply to 3GPP SA5 on network slicing | ETSI ISG NFV | discussion | discussion | Yes |
Yes
| noted | No | ||||
6.2 | New OAM&P Work Item proposals | S5‑192018 | Minutes of New Work Item proposals - OAM&P | WG Vice Chair (Orange) | report | No |
Yes
| withdrawn | Yes | |||
6.3 | OAM&P Maintenance and Rel-16 small Enhancements | S5‑192019 | Minutes of OAM&P Maintenance and Rel-16 small Enhancements | MCC | report | Yes |
Yes
| noted | No | |||
S5‑192092 | Rel-15 CR TS 28.541 Add NRM Info Model definitions for beam managed object class | Pivotal Commware, ZTE, Intel, P.I. Works, China Mobile | CR | Agreement | Yes |
Yes
| revised | No | S5‑192312 | |||
S5‑192312 | Rel-15 CR TS 28.541 Add NRM Info Model definitions for beam managed object class | Pivotal Commware, ZTE, Intel, P.I. Works, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑192092 | |||
S5‑192435 | Rel-15 CR TS 28.541 Add NRM Info Model definitions for beam managed object class | Pivotal Commware, ZTE, Intel, P.I. Works, China Mobile | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑192118 | Add en-gNB to List of NE types and List of interfaces | Nokia, NTT DOCOMO | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑192119 | Add en-gNB to E-UTRAN Trace Record Content | Nokia, NTT DOCOMO | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑192124 | Rel-15 CR 28.541 Align the term mFIdList and constituentNSSIIdList | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192330 | |||
S5‑192330 | Rel-15 CR 28.541 Align the term mFIdList and constituentNSSIIdList | Huawei,Ericsson | CR | Approval | Yes |
Yes
| agreed | No | S5‑192124 | |||
S5‑192125 | Rel-15 CR 28.541 Correct the definition of nSSIId | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192313 | |||
S5‑192313 | Rel-15 CR 28.541 Correct the definition of nSSIId | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑192125 | |||
S5‑192126 | Rel-15 CR 28.541 Add missing attribute constraints for class definition of NSSFFunction | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192314 | |||
S5‑192314 | Rel-15 CR 28.541 Add missing attribute constraints for class definition of NSSFFunction | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑192126 | |||
S5‑192127 | Rel-15 CR 28.541 Correct attribute constraints for RRMpolicy related attributes in NRCellCU | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192316 | |||
S5‑192316 | Rel-15 CR 28.541 Correct attribute constraints for RRMpolicy related attributes in NRCellCU | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑192127 | |||
S5‑192141 | Rel-15 CR 28.550 Add the missing RESTFul API definitions | Intel Finland Oy | CR | Approval | Yes |
Yes
| revised | No | S5‑192317 | |||
S5‑192317 | Rel-15 CR 28.550 Add the missing RESTFul API definitions | Intel Finland Oy | CR | Approval | Yes |
Yes
| agreed | No | S5‑192141 | |||
S5‑192151 | Rel-15 CR 28.550 Correction on MDAS | Intel Finland Oy | CR | Approval | Yes |
Yes
| revised | No | S5‑192350 | |||
S5‑192350 | Rel-15 CR 28.550 Correction on MDAS | Intel Finland Oy | CR | Approval | Yes |
Yes
| agreed | No | S5‑192151 | |||
S5‑192152 | Rel-15 CR 28.531 Correct management service term | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192318 | |||
S5‑192318 | Rel-15 CR 28.531 Correct management service term | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑192152 | |||
S5‑192153 | Rel-16 CR 28.531 Correct management service term | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192319 | |||
S5‑192319 | Rel-16 CR 28.531 Correct management service term | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑192153 | |||
S5‑192180 | Add missing NR cell and freq relation | Ericsson Inc. | CR | Approval | Yes |
Yes
| revised | No | S5‑192320 | |||
S5‑192320 | Add missing NR cell and freq relation | Ericsson Inc. | CR | Approval | Yes |
Yes
| not pursued | No | S5‑192180 | |||
S5‑192181 | Correct cardinality of EP to target | Ericsson Inc. | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑192182 | Correct Import table | Ericsson Inc. | CR | Approval | Yes |
Yes
| revised | No | S5‑192321 | |||
S5‑192321 | Correct Import table | Ericsson Inc. | CR | Approval | Yes |
Yes
| agreed | No | S5‑192182 | |||
S5‑192183 | Remove ExternalNRCellCU.pLMNIdList | Ericsson Inc. | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑192184 | Use bS (not bs) to prefix all BS attributes | Ericsson Inc. | CR | Approval | Yes |
YesMCC had check S5-191357 to see if their changes overlap or they can be sent together. This was verified so the CR was agreed.
| agreed | No | ||||
S5‑192185 | Correct PLMN Id definition | Ericsson Inc. | CR | Approval | Yes |
Yes
| revised | No | S5‑192322 | |||
S5‑192322 | Correct PLMN Id definition | Ericsson Inc. | CR | Approval | Yes |
Yes
| agreed | No | S5‑192185 | |||
S5‑192187 | Correction of State attributes descriptions | Ericsson Japan K.K. (ARIB) | CR | Approval | Yes |
Yes
| revised | No | S5‑192323 | |||
S5‑192323 | Correction of State attributes descriptions | Ericsson Japan K.K. (ARIB) | CR | Approval | Yes |
Yes
| agreed | No | S5‑192187 | |||
S5‑192190 | Update State management SS to support JSON | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192324 | |||
S5‑192324 | Update State management SS to support JSON | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192190 | |||
S5‑192191 | Update Generic NRM Solution Set to support JSON | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192325 | |||
S5‑192325 | Update Generic NRM Solution Set to support JSON | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192191 | |||
S5‑192192 | Update 5G JSON Solution Set to align with generic NRM | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192193 | Update YANG Solution Set to align with Stage 2 definition | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192326 | |||
S5‑192326 | Update YANG Solution Set to align with Stage 2 definition | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
YesNokia wanted to capture the information of the not agreed editor's note in the meeting report:
"The stage 3 here is based on stage 2 defined in TS 28.541 V15.0.1, and some, not all, agreed changes to TS 28.541 V15.0.1".
It was discussed the fact that changes in stage 2 need an alignment in stage 3 (with another CR). It was argued whether this to-do CR should be created and email approved or whether should be done in the next meeting by creating an action item.
Huawei commented that stage 2 and 3 CRs could go together. MCC commented that draft CRs could be created and then converted to CRs to be sent together.
| agreed | No | S5‑192193 | |||
S5‑192194 | Update Information Service to fix Network Slice modeling issue | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192327 | |||
S5‑192327 | Update Information Service to fix Network Slice modeling issue | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192194 | |||
S5‑192195 | Update Solution Set to fix Network Slice modeling issue | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192328 | |||
S5‑192328 | Update Solution Set to fix Network Slice modeling issue | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192195 | |||
S5‑192222 | Add availability in service profile of network slice resource model | Nokia, Nokia Shanghai Bell | CR | Yes |
Yes
| revised | No | S5‑192329 | ||||
S5‑192329 | Add availability in service profile of network slice resource model | Nokia, Nokia Shanghai Bell | CR | - | Yes |
Yes
| agreed | No | S5‑192222 | |||
S5‑192223 | Rel-15 CR 28.541 Add mFIdList attribute definition | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| merged | No | S5‑192330 | |||
S5‑192224 | Discussion paper around sST attribute | Ericsson Hungary Ltd | discussion | Approval | Yes |
Yes
| revised | No | S5‑192331 | |||
S5‑192331 | Discussion paper around sST attribute | Ericsson Hungary Ltd | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192224 | |||
S5‑192225 | Rel-15 CR 28.541 Add sST attribute to ServiceProfile | Ericsson Hungary Ltd | CR | Approval | Yes |
YesHuawei asked to be minuted:
"The group is asked to consider adding "sST" as one attribute of SliceProfile datatype defined in TS 28.541 to keep consistency with the CR agreed in S5-192434".
| revised | No | S5‑192434 | |||
S5‑192434 | Rel-15 CR 28.541 Add sST attribute to ServiceProfile | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| agreed | No | S5‑192225 | |||
S5‑192226 | Rel-15 CR 28.541 Update to sST attribute stage 3 | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| revised | No | S5‑192418 | |||
S5‑192418 | Rel-15 CR 28.541 Update to sST attribute stage 3 | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| agreed | No | S5‑192226 | |||
S5‑192228 | Correct the DN to URI mapping rules | Nokia Germany | CR | Approval | Yes |
Yes
| revised | No | S5‑192338 | |||
S5‑192338 | Correct the DN to URI mapping rules | Nokia Germany | CR | Approval | Yes |
Yes
| revised | No | S5‑192460 | S5‑192228 | ||
S5‑192460 | Correct the DN to URI mapping rules | Nokia Germany | CR | Approval | No |
Yes
| left for email approval | No | S5‑192338 | |||
S5‑192230 | Rel-15 CR 28.628 Correction of AAS IP Throughput load rate definition | P.I. WORKS | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192241 | Rel-16 28.541 Name datatypes SliceProfile and ServiceProfile | Ericsson España S.A. | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192242 | CR Rel-16 28.541 Add datatype definition for TAC | Ericsson España S.A. | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192243 | CR Rel-16 28.541 Add datatype definition for S-NSSAI | Ericsson España S.A. | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192244 | CR Rel-15 28.541 Add datatype definition for CoverageAreaTA | Ericsson España S.A. | CR | Yes |
Yes
| revised | No | S5‑192332 | ||||
S5‑192332 | CR Rel-15 28.541 Add datatype definition for CoverageAreaTA | Ericsson España S.A. | CR | - | Yes |
Yes
| revised | No | S5‑192436 | S5‑192244 | ||
S5‑192436 | CR Rel-16 28.541 Add datatype definition for CoverageAreaTA | Ericsson España S.A. | CR | - | Yes |
Yes
| agreed | No | S5‑192332 | |||
S5‑192245 | CR Rel-15 28.541 Name datatypes SliceProfile and ServiceProfile | Ericsson España S.A. | CR | Approval | Yes |
Yes
| revised | No | S5‑192333 | |||
S5‑192333 | CR Rel-16 28.541 Name datatypes SliceProfile and ServiceProfile | Ericsson España S.A. | CR | Approval | Yes |
Yes
| agreed | No | S5‑192245 | |||
S5‑192246 | CR Rel-15 28.541 Add datatype definition for S-NSSAI | Ericsson España S.A. | CR | Approval | Yes |
Yes
| revised | No | S5‑192334 | |||
S5‑192334 | CR Rel-16 28.541 Add datatype definition for S-NSSAI | Ericsson España S.A. | CR | Approval | Yes |
Yes
| agreed | No | S5‑192246 | |||
S5‑192247 | CR Rel-15 28.541 Add datatype definition for TAC | Ericsson España S.A. | CR | Approval | Yes |
Yes
| revised | No | S5‑192335 | |||
S5‑192335 | CR Rel-16 28.541 Add datatype definition for TAC | Ericsson España S.A. | CR | Approval | Yes |
Yes
| agreed | No | S5‑192247 | |||
S5‑192250 | CR Rel-15 28.541 Add datatype definition for NfProfile | Ericsson España S.A. | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192251 | CR Rel-15 28.541 Add datatype definition for PerfReq | Ericsson España S.A. | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑192337 | CR Rel-15 28.541 Add datatype definition for PerfReq | Ericsson España S.A. | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192252 | CR Rel-15 28.541 Name datatype RRMPolicyRatio2 | Ericsson España S.A. | CR | Approval | Yes |
Yes
| revised | No | S5‑192336 | |||
S5‑192336 | CR Rel-15 28.541 Name datatype RRMPolicyRatio2 | Ericsson España S.A. | CR | Approval | Yes |
Yes
| agreed | No | S5‑192252 | |||
6.4 | Rel-16 Operations, Administration, Maintenance and Provisioning (OAM&P) |   | ||||||||||
6.4.1 | Management of QoE measurement collection | S5‑192020 | Minutes of Management of QoE measurement collection | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑192188 | pCR R16 28405-040 Remove duplicated references | Ericsson | pCR | Yes |
Yes
| approved | No | |||||
S5‑192189 | pCR R16 28405-040 Activating and reporting in UTRAN | Ericsson | pCR | Yes |
Yes
| approved | No | |||||
S5‑192199 | pCR R16 28405-040 Handover handling in UTRAN | Ericsson | pCR | Yes |
Yes
| revised | No | S5‑192340 | ||||
S5‑192340 | pCR R16 28405-040 Handover handling in UTRAN | Ericsson | pCR | - | Yes |
Yes
| approved | No | S5‑192199 | |||
S5‑192200 | pCR R16 28405-040 Align terminology | Ericsson | pCR | Yes |
Yes
| noted | No | |||||
S5‑192265 | pCR R16 28404-060 Corrections according to edithelp | Ericsson and edithelp | pCR | Yes |
Yes
| approved | No | |||||
S5‑192339 | Draft TS 28.405 | Ericsson | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
S5‑192437 | Draft TR 28.404 | Ericsson | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.4.2 | Energy Efficiency of 5G | S5‑192021 | Minutes of Energy effciency of 5G | Rapporteur (ORANGE) | report | Yes |
Yes
| noted | No | |||
S5‑192160 | Discussion paper on PEE measurement data collection for NG-RAN split options | Huawei | discussion | Discussion | Yes |
Yes
| noted | No | ||||
6.4.3 | OAM aspects of LTE and WLAN integration | S5‑192022 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report | Yes |
Yes
| noted | No | |||
S5‑192149 | Rel-16 CR 32.425 Add measurements related to WLAN connection status report | Intel Finland Oy | CR | Approval | Yes |
Yes
| agreed | No | ||||
6.4.4 | Network policy management for mobile networks based on NFV scenarios | S5‑192023 | Minutes of Network policy management for mobile networks based on NFV scenarios | Rapporteur (China Mobile) | report | No |
Yes
| withdrawn | Yes | |||
6.4.5 | Methodology for 5G management specifications | S5‑192024 | Minutes of Methodology for 5G management specifications | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑192162 | Discussion paper on READ and WRITE controls on multiple MnS consumers | Huawei | discussion | Approval | Yes |
Yes
| noted | No | ||||
S5‑192163 | Resolution of the editor's note in W4.3.a.2 | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑192186 | YANG solution style guide | Ericsson Inc. | discussion | Agreement | Yes |
Yes
| noted | No | ||||
S5‑192227 | Some thoughts on XML, JSON and YANG style guides | Nokia Germany | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑192236 | pCR 32.160 Stage 2 to stage 3 mapping | Ericsson España S.A. | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑192239 | Presentation of Specification to TSG TS 32.160 | Ericsson España S.A. | TS or TR cover | Information | Yes |
Yes
| withdrawn | Yes | ||||
S5‑192240 | Discussion on Stage 2 to stage 3 mapping | Ericsson España S.A. | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑192258 | pCR 32.160 Align template for datatype with 28.541 | Ericsson España S.A. | pCR | Approval | Yes |
Yes
| revised | No | S5‑192342 | |||
S5‑192342 | pCR 32.160 Align template for datatype with 28.541 | Ericsson España S.A. | pCR | Approval | Yes |
Yes
| approved | No | S5‑192258 | |||
S5‑192384 | Draft TS 32.160 | Ericsson | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
6.4.6 | Intent driven management service for mobile networks | S5‑192025 | Minutes of Intent driven management service for mobile networks | Rapporteur (Huawei) | report | Yes |
Yes
| revised | No | S5‑192442 | ||
S5‑192442 | Minutes of Intent driven management service for mobile networks | Rapporteur (Huawei) | report | - | Yes |
Yes
| noted | No | S5‑192025 | |||
S5‑192128 | 28.812 Update concept of IDMS | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192343 | |||
S5‑192343 | 28.812 Update concept of IDMS | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192128 | |||
S5‑192129 | pCR 28.812 Add intent driven NF capacity expanding scenario | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192344 | |||
S5‑192344 | pCR 28.812 Add intent driven NF capacity expanding scenario | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192129 | |||
S5‑192130 | pCR 28.812 Add description of automation | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192345 | |||
S5‑192345 | pCR 28.812 Add description of automation | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192438 | S5‑192130 | ||
S5‑192438 | pCR 28.812 Add description of automation | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192345 | |||
S5‑192131 | pCR 28.812 Add conclusion | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192349 | |||
S5‑192349 | pCR 28.812 Add conclusion | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑192131 | |||
S5‑192132 | pCR 28.812 Add abbreviations | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑192133 | pCR 28.812 Add Intent driven 5GLAN service creation scenario | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192347 | |||
S5‑192347 | pCR 28.812 Add Intent driven 5GLAN service creation scenario | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192439 | S5‑192133 | ||
S5‑192439 | pCR 28.812 Add Intent driven 5GLAN service creation scenario | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192347 | |||
S5‑192134 | pCR 28.812 Add Intent translation description | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192348 | |||
S5‑192348 | pCR 28.812 Add Intent translation description | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑192134 | |||
S5‑192206 | Abstraction versus layering | Ericsson Inc. | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192231 | Discussion paper on Scope and boundaries for Intent Based Management | Ericsson Japan K.K. | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
S5‑192233 | pCR 28.812 Clarification of the scope | Ericsson Japan K.K. | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192234 | pCR 28.812 Clarification of the dimensions | Ericsson Japan K.K. | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192235 | pCR 28.812 Use case for multi-tier intent management | Ericsson Japan K.K. | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192266 | pCR 28812-030 edithelp | Huawei Tech.(UK) Co., Ltd | pCR | Yes |
Yes
| approved | No | |||||
S5‑192346 | Draft TR 28.812 | Huawei | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.4.7 | Enhancement of performance assurance for 5G networks including network slicing | S5‑192026 | Minutes of Enhancement of performance assurance for 5G networks including network slicing | Rapporteur (Intel) | report | Yes |
Yes
| noted | No | |||
S5‑192084 | Rel-16 CR TS 32.425 Add measurements related to Secondary Node Addition for E-UTRA-NR Dual Connectivity | ZTE, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192376 | Rel-16 CR TS 32.425 Add measurements related to Secondary Node Addition for E-UTRA-NR Dual Connectivity | ZTE, China Mobile | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑192085 | Rel-16 CR TS 32.425 Add measurements related to Secondary Node Release for E-UTRA-NR Dual Connectivity | ZTE, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192086 | Rel-16 CR TS 32.425 Add measurements related to Secondary Node Change for E-UTRA-NR Dual Connectivity | ZTE, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192087 | Rel-16 CR TS 28.552 Add measurements related to Secondary Node Addition for MR-DC Dual Connectivity | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192088 | Rel-16 CR TS 28.552 Add measurements related to Secondary Node Change for MR-DC Dual Connectivity | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192089 | Rel-16 CR TS 28.552 Add measurements related to Secondary Node Release for MR-DC Dual Connectivity | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192090 | Rel-16 CR TS 28.552 Add measurements of RRC connection re-establishment | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| revised | No | S5‑192377 | |||
S5‑192377 | Rel-16 CR TS 28.552 Add measurements of RRC connection re-establishment | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192090 | |||
S5‑192091 | Rel-16 CR TS 28.552 Add measurements of RRC connection resume | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| revised | No | S5‑192378 | |||
S5‑192378 | Rel-16 CR TS 28.552 Add measurements of RRC connection resume | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192091 | |||
S5‑192093 | R16 CR TS28.552 Add RSRP measurements | ZTE, Intel, China Mobile | CR | Agreement | Yes |
Yes
| revised | No | S5‑192379 | |||
S5‑192379 | R16 CR TS28.552 Add RSRP measurements | ZTE, Intel, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑192093 | |||
S5‑192094 | R16 CR TS 28.552 Add UE Rx-Tx time difference related measurements | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| revised | No | S5‑192380 | |||
S5‑192380 | R16 CR TS 28.552 Add UE Rx-Tx time difference related measurements | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑192094 | |||
S5‑192095 | R16 CR TS 28.552 Add PDCP throughput measurements | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192123 | Add use case and definitions of QoS flow measurement over N3 | ETRI | CR | Approval | Yes |
Yes
| revised | No | S5‑192381 | |||
S5‑192381 | Add use case and definitions of QoS level measurement over N3 | ETRI | CR | Approval | Yes |
Yes
| agreed | No | S5‑192123 | |||
S5‑192140 | Add use case and definitions of packet loss rate measurement over N3 | ETRI | CR | Approval | Yes |
Yes
| revised | No | S5‑192382 | |||
S5‑192382 | Add use case and definitions of packet loss measurement over N3 | ETRI | CR | Approval | Yes |
Yes
| not pursued | No | S5‑192140 | |||
S5‑192142 | Rel-16 CR 28.550 Add operations for establishing and terminating streaming connection | Intel Finland Oy | CR | Approval | Yes |
Yes
| revised | No | S5‑192371 | |||
S5‑192371 | Rel-16 CR 28.550 Add operations for establishing and terminating streaming connection | Intel Finland Oy | CR | Approval | Yes |
Yes
| agreed | No | S5‑192142 | |||
S5‑192143 | Rel-16 CR 28.550 Add performance threshold monitoring service | Intel Finland Oy | CR | Approval | Yes |
Yes
| revised | No | S5‑192372 | |||
S5‑192372 | Rel-16 CR 28.550 Add performance threshold monitoring service | Intel Finland Oy | CR | Approval | Yes |
Yes
| not pursued | No | S5‑192372 | |||
S5‑192144 | Rel-16 CR 28.552 Add measurements related to registration via untrusted non-3GPP access for AMF | Intel Finland Oy | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192145 | Rel-16 CR 28.552 Add measurements related to registration via untrusted non-3GPP access for AMF | Intel Finland Oy | CR | Approval | Yes |
Yes
| agreed | No | ||||
S5‑192146 | Rel-16 CR 28.552 Add measurements related to inter-AMF handover | Intel Finland Oy | CR | Approval | Yes |
Yes
| revised | No | S5‑192383 | |||
S5‑192383 | Rel-16 CR 28.552 Add measurements related to inter-AMF handover | Intel Finland Oy | CR | Approval | Yes |
Yes
| agreed | No | S5‑192146 | |||
S5‑192147 | Rel-16 CR 28.622 Add IOCs for threshold monitoring control | Intel Finland Oy | CR | Approval | Yes |
Yes
| revised | No | S5‑192373 | |||
S5‑192373 | Rel-16 CR 28.622 Add IOCs for threshold monitoring control | Intel Finland Oy | CR | Approval | Yes |
Yes
| not pursued | No | S5‑192147 | |||
S5‑192148 | Rel-16 CR 28.623 Add IOCs for threshold monitoring control | Intel Finland Oy | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑192374 | Rel-16 CR 28.623 Add IOCs for threshold monitoring control | Intel Finland Oy | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192150 | Updated WID Performance assurance for 5G networks including network slicing | Intel Finland Oy | WID revised | Approval | Yes |
Yes
| agreed | No | ||||
S5‑192154 | R16 CR TS 28.552 Add PDCP Split Volume measurements | ZTE Corporation, China Mobile | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192178 | Rel-16 CR 28.552 Add mean radio resource utilization of network slice instance measurements | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192397 | |||
S5‑192397 | Rel-16 CR 28.552 Add mean radio resource utilization of network slice instance measurements | Huawei | CR | Approval | Yes |
Yes
| revised | No | S5‑192441 | S5‑192178 | ||
S5‑192441 | Rel-16 CR 28.552 Add mean radio resource utilization of network slice instance measurements | Huawei | CR | Approval | Yes |
Yes
| agreed | No | S5‑192397 | |||
S5‑192179 | Discussion paper on TS 28.552 re-organization approach | Huawei | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192375 | |||
S5‑192375 | Discussion paper on TS 28.552 re-organization approach | Huawei | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192179 | |||
S5‑192216 | Rel-16 CR TS 28.552 Add measurements related to DRB retainability | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑192219 | Rel-16 CR TS 28.554 Add KPI of DRB Retainability | Ericsson Hungary Ltd | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑192398 | Rel-16 CR TS 28.554 Add KPI of DRB Retainability | Ericsson Hungary Ltd | CR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192220 | LS on Data activity reporting | Ericsson Hungary Ltd | LS out | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑192399 | LS on Data activity reporting | Ericsson Hungary Ltd | LS out | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192260 | Update definition of mean number of PDU sessions KPI | ETRI | CR | Yes |
Yes
| revised | No | S5‑192385 | ||||
S5‑192385 | Update definition of mean number of PDU sessions KPI | ETRI | CR | - | Yes |
Yes
| revised | No | S5‑192400 | S5‑192260 | ||
S5‑192400 | Update definition of mean number of PDU sessions KPI | ETRI | CR | - | Yes |
Yes
| agreed | No | S5‑192385 | |||
S5‑192261 | 5G_SLICE_ePA | ETRI | CR | Yes |
Yes
| withdrawn | Yes | |||||
S5‑192262 | Rel-16 CR 28.552 Correction of percentage unrestricted volume measurements | P.I. WORKS | CR | Agreement | Yes |
Yes
| revised | No | S5‑192401 | |||
S5‑192401 | Rel-16 CR 28.552 Correction of percentage unrestricted volume measurements | P.I. WORKS | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192262 | |||
S5‑192305 | Tdoc discussion sequence | Intel | other | Information | Yes |
Yes
| noted | No | ||||
S5‑192402 | Rel-15 CR 28.552 Correction of percentage unrestricted volume measurements | P.I. Works | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192413 | Discussion paper around DC related measurement | ZTE | discussion | discussion | Yes |
Yes
| noted | No | ||||
6.4.8 | Discovery of management services in 5G | S5‑192027 | Minutes of Discovery of management services in 5G | Rapporteur (Huawei) | report | Yes |
Yes
| noted | No | |||
S5‑192161 | Add discovery of specified service interface access information use case and requirement | Huawei Technologies France | CR | Agreement | Yes |
Yes
| revised | No | S5‑192387 | |||
S5‑192387 | Add discovery of specified service interface access information use case and requirement | Huawei Technologies France | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑192161 | |||
S5‑192164 | Add MnS exposure governance use case and requirement | Huawei Technologies France | CR | Agreement | Yes |
Yes
| revised | No | S5‑192388 | |||
S5‑192388 | Add MnS exposure governance use case and requirement | Huawei Technologies France | CR | Agreement | Yes |
Yes
| not pursued | No | S5‑192164 | |||
S5‑192165 | Discussion paper on discovery of MnS in 5G | Huawei Technologies France | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192386 | |||
S5‑192386 | Discussion paper on discovery of MnS in 5G | Huawei Technologies France | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192453 | S5‑192165 | ||
S5‑192453 | Discussion paper on discovery of MnS in 5G | Huawei Technologies France | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192386 | |||
S5‑192176 | Revised WID on discovery of management services in 5G | Huawei Technologies France | WID revised | Agreement | Yes |
YesJust a change in the dates. The change was agreed but the revised WID doesn't need to be sent to SA.
| noted | No | ||||
S5‑192229 | MnS discovery | Nokia Germany | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
6.4.9 | NRM enhancements | S5‑192028 | Minutes of NRM enhancements | Rapporteur (Nokia) | report | Yes |
Yes
| noted | No | |||
S5‑192196 | TD Support Service Managed Object | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192389 | |||
S5‑192389 | TD Support Service Managed Object | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192196 | |||
S5‑192197 | TD Support Registration State of Managed Service | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192409 | |||
S5‑192409 | TD Support Registration State of Managed Service | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192456 | S5‑192197 | ||
S5‑192456 | TD Support Registration State of Managed Service | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192409 | |||
S5‑192198 | TD Support State of Managed Service | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192410 | |||
S5‑192410 | TD Support State of Managed Service | Nokia, Nokia Shanghai Bell | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192198 | |||
S5‑192411 | Revised WID on NRM enhancements | Nokia, Nokia Shanghai Bell | WID revised | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.10 | Trace Management in the context of Services Based Management Architecture | S5‑192029 | Minutes of Trace Management in the context of Services Based Management Architecture | Rapporteur (Nokia) | report | No |
Yes
| withdrawn | Yes | |||
6.4.11 | Integration of ONAP and 3GPP 5G management framework (Preliminary work before SA approval) | S5‑192030 | Minutes of Integration of ONAP DCAE and 3GPP management architecture | Rapporteur ORANGE) | report | Yes |
Yes
| noted | No | |||
S5‑192074 | Draft CR 28.532 Add RESTful HTTP-based SS of fault supervision for integration with ONAP VES | AT&T, Deutsche Telekom, Orange | discussion | Discussion | Yes |
Yes
| noted | No | ||||
6.5 | OAM&P Studies |   | ||||||||||
6.5.1 | Study on integration of ONAP DCAE and 3GPP management architecture | S5‑192031 | Minutes of Study on integration of ONAP DCAE and 3GPP management architecture | Rapporteur ORANGE) | report | Yes |
Yes
| noted | No | |||
S5‑192073 | pCR TS 28.890 – Heartbeat and Communication Surveillance | AT&T, Deutsche Telekom, Orange | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑192390 | Draft TR 28.890 | ORANGE | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.2 | Study on integration of ONAP and 3GPP configuration management services for 5G networks | S5‑192032 | Minutes of Study on integration of ONAP and 3GPP configuration management services for 5G networks | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑192135 | pCR 28.890 Update clause 6.2.2 Management principles | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑192136 | pCR 28.890 Add Handling of configuration notification | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192391 | |||
S5‑192391 | pCR 28.890 Add Handling of configuration notification | Huawei,Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑192136 | |||
S5‑192201 | Rel-16 pCR TR 28.890 Minor Technical Corrections | Nanjing Ericsson Panda Com Ltd | pCR | Yes |
Yes
| revised | No | S5‑192392 | ||||
S5‑192392 | Rel-16 pCR TR 28.890 Minor Technical Corrections | Nanjing Ericsson Panda Com Ltd | pCR | - | Yes |
Yes
| approved | No | S5‑192201 | |||
S5‑192204 | Rel-16 pCR 28.890 Add the description of 3GPP provisioning management service | Nanjing Ericsson Panda Com Ltd | pCR | Yes |
Yes
| revised | No | S5‑192393 | ||||
S5‑192393 | Rel-16 pCR 28.890 Add the description of 3GPP provisioning management service | Nanjing Ericsson Panda Com Ltd | pCR | - | Yes |
Yes
| approved | No | S5‑192204 | |||
S5‑192207 | Rel-16 pCR 28.890 Add the description of SDNC | Nanjing Ericsson Panda Com Ltd | pCR | Yes |
Yes
| revised | No | S5‑192394 | ||||
S5‑192394 | Rel-16 pCR 28.890 Add the description of SDNC | Nanjing Ericsson Panda Com Ltd | pCR | - | Yes |
Yes
| approved | No | S5‑192207 | |||
S5‑192209 | Rel-16 pCR 28.890 Configuration Management handling | Nanjing Ericsson Panda Com Ltd | pCR | Yes |
Yes
| revised | No | S5‑192395 | ||||
S5‑192395 | Rel-16 pCR 28.890 Configuration Management handling | Nanjing Ericsson Panda Com Ltd | pCR | - | Yes |
Yes
| approved | No | S5‑192209 | |||
S5‑192210 | Rel-16 pCR 28.890 Add Handling of configuration notification | Nanjing Ericsson Panda Com Ltd | pCR | Yes |
Yes
| merged | No | S5‑192391 | ||||
S5‑192212 | Rel-16 pCR 28.890 Conclusion on CM | Nanjing Ericsson Panda Com Ltd | pCR | Yes |
Yes
| revised | No | S5‑192396 | ||||
S5‑192396 | Rel-16 pCR 28.890 Conclusion on CM | Nanjing Ericsson Panda Com Ltd | pCR | - | Yes |
Yes
| revised | No | S5‑192443 | S5‑192212 | ||
S5‑192443 | Rel-16 pCR 28.890 Conclusion on CM | Nanjing Ericsson Panda Com Ltd | pCR | - | Yes |
Yes
| approved | No | S5‑192396 | |||
S5‑192270 | Presentation of TR 28.890 for Approval to SA#83 | AT&T, Ericsson, Orange | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
6.5.3 | Study on protocol enhancement for real time communication | S5‑192033 | Minutes of Study on protocol enhancement for real time communication | Rapporteur(Nokia) | report | No |
Yes
| withdrawn | Yes | |||
6.5.4 | Study on management aspects of edge computing | S5‑192034 | Minutes of Study on management aspects of edge computing | Rapporteur (Intel) | report | Yes |
Yes
| noted | No | |||
S5‑192080 | pCR 28.803 use case for performance measurements related to end-to-end QoS | Intel China Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑192403 | |||
S5‑192403 | pCR 28.803 use case for performance measurements related to end-to-end QoS | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑192080 | |||
S5‑192081 | pCR 28.803 solution for edge computing deployment | Intel China Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑192404 | |||
S5‑192404 | pCR 28.803 solution for edge computing deployment | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑192081 | |||
S5‑192082 | pCR 28.803 Add use case on PCF and NEF discovery for EC | Intel China Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑192405 | |||
S5‑192405 | pCR 28.803 Add use case on PCF and NEF discovery for EC | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑192082 | |||
S5‑192083 | [Draft] LS on PCF and NEF discovery for Edge Computing | Intel China Ltd. | LS out | Approval | Yes |
Yes
| revised | No | S5‑192406 | |||
S5‑192406 | LS on PCF and NEF discovery for Edge Computing | Intel China Ltd. | LS out | Approval | Yes |
Yes
| revised | No | S5‑192444 | S5‑192083 | ||
S5‑192444 | LS on PCF and NEF discovery for Edge Computing | Intel China Ltd. | LS out | Approval | Yes |
Yes
| revised | No | S5‑192454 | S5‑192406 | ||
S5‑192454 | LS on PCF and NEF discovery for Edge Computing | Intel China Ltd. | LS out | Approval | Yes |
Yes
| approved | No | S5‑192444 | |||
S5‑192315 | Revised Study on management aspects of edge computing | Intel | SID revised | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
S5‑192433 | Draft TR 28.803 | Intel | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.5 | Study on tenancy concept in 5G networks and network slicing management | S5‑192035 | Minutes of Study on tenancy concept in 5G networks and network slicing management | Rapporteur (Huawei) | report | Yes |
Yes
| noted | No | |||
S5‑192155 | pCR 28.804 Add managed data isolation concept | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192407 | |||
S5‑192407 | pCR 28.804 Add managed data isolation concept | Huawei Technologies France | pCR | Approval | Yes |
Yes
| noted | No | S5‑192155 | |||
S5‑192156 | pCR 28.804 Add UC for dedicated and for shared performance managed data | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192408 | |||
S5‑192408 | pCR 28.804 Add UC for dedicated and for shared performance managed data | China mobile,Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑192156 | |||
S5‑192157 | pCR 28.804 Add potential solutions and recommendations | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192412 | |||
S5‑192412 | pCR 28.804 Add potential solutions and recommendations | Huawei Technologies France | pCR | Approval | Yes |
Yes
| noted | No | S5‑192157 | |||
S5‑192158 | pCR 28.804 Add UC for 3GPP network represented as tenant in NFV MANO | Huawei Technologies France | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑192159 | pCR 28.804 Correct approved tenancy concept and definition | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192414 | |||
S5‑192414 | pCR 28.804 Correct approved tenancy concept and definition | Huawei Technologies France | pCR | Approval | Yes |
Yes
| noted | No | S5‑192159 | |||
S5‑192177 | pCR 28.804 Add tenant types | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192415 | |||
S5‑192415 | pCR 28.804 Add tenant types | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192445 | S5‑192177 | ||
S5‑192445 | pCR 28.804 Add tenant types | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192457 | S5‑192415 | ||
S5‑192457 | pCR 28.804 Add tenant types | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192445 | |||
6.5.6 | Study on management aspects of communication services | S5‑192036 | Minutes of Study on management aspects of communication services | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑192166 | pCR 28.805 Add data analytics for SLA assurance | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192417 | |||
S5‑192417 | pCR 28.805 Add data analytics for SLA assurance | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192446 | S5‑192166 | ||
S5‑192446 | pCR 28.805 Add data analytics for SLA assurance | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192455 | S5‑192417 | ||
S5‑192455 | pCR 28.805 Add data analytics for SLA assurance | Huawei Technologies France | pCR | Approval | Yes |
Yes
| approved | No | S5‑192446 | |||
S5‑192167 | pCR 28.805 Add UC and requirements for CSI fault and performance monitoring | Huawei Technologies France | pCR | Approval | Yes |
Yes
| revised | No | S5‑192420 | |||
S5‑192420 | pCR 28.805 Add UC and requirements for CSI fault and performance monitoring | Huawei Technologies France | pCR | Approval | Yes |
Yes
| noted | No | S5‑192167 | |||
S5‑192168 | pCR 28.805 Update UC MDA-Assisted network provisioning contributing to SLA assurance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192419 | |||
S5‑192419 | pCR 28.805 Update UC MDA-Assisted network provisioning contributing to SLA assurance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192447 | S5‑192168 | ||
S5‑192447 | pCR 28.805 Update UC MDA-Assisted network provisioning contributing to SLA assurance | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192419 | |||
S5‑192169 | pCR 28.805 Add use case for obtaining an NSI to provide multiple CSIs | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192421 | |||
S5‑192421 | pCR 28.805 Add use case for obtaining an NSI to provide multiple CSIs | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192448 | S5‑192169 | ||
S5‑192448 | pCR 28.805 Add use case for obtaining an NSI to provide multiple CSIs | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192421 | |||
S5‑192170 | pCR 28.805 Discussion on CSM functionalities and services | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑192171 | pCR 28.805 Add use case for exposing limited management capability to verticals | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192422 | |||
S5‑192422 | pCR 28.805 Add use case for exposing limited management capability to verticals | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192449 | S5‑192171 | ||
S5‑192449 | pCR 28.805 Add use case for exposing limited management capability to verticals | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192452 | S5‑192422 | ||
S5‑192452 | pCR 28.805 Add use case for exposing limited management capability to verticals | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192449 | |||
S5‑192172 | pCR 28.805 Management aspects of 5GLAN services | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑192173 | pCR 28.805 Solution for translation of communication service requirements into resource requirements | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑192423 | pCR 28.805 Solution for translation of communication service requirements into resource requirements | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192174 | pCR 28.805 Core network assisted network slice overload prevention | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑192238 | Discussion paper on lifecycle management of communication services | Ericsson España S.A. | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192416 | |||
S5‑192416 | Discussion paper on lifecycle management of communication services | Ericsson España S.A. | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑192451 | S5‑192238 | ||
S5‑192451 | Discussion paper on lifecycle management of communication services | Ericsson España S.A. | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192416 | |||
S5‑192253 | pCR 28.805 Use case and requirement to activate a resource facing communication service | Ericsson España S.A. | pCR | Approval | Yes |
Yes
| not treated | No | ||||
S5‑192254 | pCR 28.805 Use case and requirement to create a resource facing communication service | Ericsson España S.A. | pCR | Agreement | Yes |
Yes
| not treated | No | ||||
S5‑192255 | pCR 28.805 Use case and requirement to de-activate a resource facing communication service | Ericsson España S.A. | pCR | Agreement | Yes |
Yes
| not treated | No | ||||
S5‑192256 | pCR 28.805 Use case and requirement to modify the capacity of a resource facing communication service | Ericsson España S.A. | pCR | Agreement | Yes |
Yes
| not treated | No | ||||
S5‑192257 | pCR 28.805 Use case and requirement to terminate resource facing communication service | Ericsson España S.A. | pCR | Agreement | Yes |
Yes
| not treated | No | ||||
S5‑192259 | Sequence proposal for study on management aspects of communication services | Ericsson España S.A. | other | Information | Yes |
Yes
| noted | No | ||||
S5‑192264 | pCR 28.805 Introduce management model | Ericsson España S.A. | pCR | Agreement | Yes |
Yes
| not treated | No | ||||
S5‑192268 | pCR 28.805 Addressing Edithelp comments | Ericsson España S.A. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑192269 | pCR 28.805 Update abbreviations list | Ericsson España S.A. | pCR | Agreement | Yes |
Yes
| not treated | No | ||||
S5‑192450 | Draft TR 28.805 | Ericsson | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.7 | Study on Self-Organizing Networks (SON) for 5G | S5‑192037 | Minutes of Study on Self-Organizing Networks (SON) for 5G | Rapporteur (Intel) | report | Yes |
Yes
| noted | No | |||
S5‑192076 | pCR 28.861 editorial changes | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑192077 | pCR 28.861 add requirements for NSI resource allocation optimization UC | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑192078 | pCR 28.861 add use case for Mobility Robustness Optimisation | Intel China Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑192425 | |||
S5‑192425 | pCR 28.861 add use case for Mobility Robustness Optimisation | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑192078 | |||
S5‑192079 | pCR 28.861 add use case for automatic NSI creation | Intel China Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑192426 | |||
S5‑192426 | pCR 28.861 add use case for automatic NSI creation | Intel China Ltd. | pCR | Approval | Yes |
Yes
| noted | No | S5‑192079 | |||
S5‑192137 | pCR 28.861 Add concept, usecase and requirements for Self-healing | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192427 | |||
S5‑192427 | pCR 28.861 Add concept, usecase and requirements for Self-healing | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192137 | |||
S5‑192138 | pCR 28.861 Update the concept, usecase of Self-establishment of eNodeB | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192428 | |||
S5‑192428 | pCR 28.861 Update the concept, usecase of Self-establishment of eNodeB | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑192138 | |||
S5‑192139 | pCR 28.861 Add NSI PM input to support CCO | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑192429 | |||
S5‑192429 | pCR 28.861 Add NSI PM input to support CCO | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑192139 | |||
S5‑192221 | Add use case and requirements of self-monitoring of network performance | ETRI | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑192430 | Add use case and requirements of self-monitoring of network performance | ETRI | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑192232 | pCR TR 28.861 Management Data Analytics Service and SON functions | NEC Europe Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑192431 | |||
S5‑192431 | pCR TR 28.861 Management Data Analytics Service and SON functions | NEC Europe Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑192232 | |||
S5‑192424 | Draft TR 28.861 | Intel | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.8 | Study on non-file-based trace reporting | S5‑192038 | Minutes of Study on non-file-based trace reporting | Rapporteur(Nokia) | report | No |
Yes
| withdrawn | Yes | |||
6.5.9 | Study on non-public networks management (Preliminary work before SA approval) | S5‑192039 | Minutes of Study on non-public networks management | Rapporteur (Huawei) | report | No |
Yes
| withdrawn | Yes | |||
6.5.10 | Study on management and orchestration aspects with integrated satellite components in a 5G network (Preliminary work before SA approval) | S5‑192040 | Minutes of Study on management and orchestration aspects with integrated satellite components in a 5G network | Rapporteur (Thales) | report | No |
Yes
| withdrawn | Yes | |||
7 | Charging |   | ||||||||||
7.1 | Charging Plenary | S5‑192041 | CH Agenda and Time Plan | CH SWG Chair | agenda | Yes |
Yes
| approved | No | |||
S5‑192042 | CH Executive Report | CH SWG Chair | report | Yes |
Yes
| noted | No | |||||
S5‑192048 | LS to SA2 and SA5 on VoWiFi – VoLTE handover | GSMA | LS in | Yes |
Yes
| noted | No | |||||
S5‑192273 | Presentation on ETSI FORGE | MCC | other | Presentation | Yes |
Yes
| noted | No | ||||
S5‑192275 | LS to SA2 on VoWiFi – VoLTE handover | Ericsson | LS out | Approval | Yes |
Yes
| approved | No | ||||
7.2 | New Charging Work Item proposals |   | ||||||||||
7.3 | Charging Maintenance and Rel-16 small Enhancements | S5‑192052 | Rel-15 CR 32.291 Correction of Qos Information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192297 | S5‑191157 |
S5‑192297 | Rel-15 CR 32.291 Correction of Qos Information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192052 | |||
S5‑192053 | Rel-15 CR 32.298 Correction of Qos Information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192298 | S5‑191158 | ||
S5‑192298 | Rel-15 CR 32.298 Correction of Qos Information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192053 | |||
S5‑192054 | Rel-15 CR 32.255 Correction of Qos Information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192296 | |||
S5‑192296 | Rel-15 CR 32.255 Correction of Qos Information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192054 | |||
S5‑192055 | Discussion paper on 5GC Qos Information | Nokia, Nokia Shanghai Bell | discussion | Approval | Yes |
Yes
| noted | No | ||||
S5‑192057 | Rel-15 CR 32.255 Correction of user information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192299 | |||
S5‑192299 | Rel-15 CR 32.255 Correction of user information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192057 | |||
S5‑192058 | Rel-15 CR 32.291 Correction of user information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192300 | |||
S5‑192300 | Rel-15 CR 32.291 Correction of user information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192058 | |||
S5‑192059 | Rel-15 CR 32.291 Correction of dnn data type | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192060 | Rel-15 CR 32.255 Correction of serving network function | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192302 | |||
S5‑192302 | Rel-15 CR 32.255 Correction of serving network function | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192060 | |||
S5‑192061 | Rel-15 CR 32.291 Correction of serving network function | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192303 | |||
S5‑192303 | Rel-15 CR 32.291 Correction of serving network function | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192061 | |||
S5‑192062 | Rel-15 CR 32.298 Correction of serving network function | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192351 | |||
S5‑192351 | Rel-15 CR 32.298 Correction of serving network function | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192062 | |||
S5‑192063 | Rel-15 CR 32.298 Correction of pDUSessionId | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192352 | |||
S5‑192352 | Rel-15 CR 32.298 Correction of pDUSessionId | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192063 | |||
S5‑192064 | Rel-15 CR 32.298 Correction of missing fields in PDU Information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192065 | Rel-14 CR 32.297 Correction of Release Identifier extension | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192066 | Rel-15 CR 32.297 Correction of Release Identifier extension | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192099 | Rel-16 CR 32.255 Correction of Trigger Conditions for FBC | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192353 | |||
S5‑192353 | Rel-16 CR 32.255 Correction of Trigger Conditions for FBC | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192099 | |||
S5‑192100 | Rel-16 CR 32.290 Correction of Multiple Unit Information in ChargingDataResponse | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192354 | |||
S5‑192354 | Rel-16 CR 32.290 Correction of Multiple Unit Information in ChargingDataResponse | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192100 | |||
S5‑192101 | Rel-16 CR 32.291 Correction of Multiple Unit Information in ChargingDataResponse | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192355 | |||
S5‑192355 | Rel-16 CR 32.291 Correction of Multiple Unit Information in ChargingDataResponse | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192101 | |||
S5‑192102 | Rel-16 CR 32.290 Correction of triggers in ChargingDataResponse | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192103 | Rel-16 CR 32.291 Correction of triggers in ChargingDataResponse | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192356 | |||
S5‑192356 | Rel-16 CR 32.291 Correction of triggers in ChargingDataResponse | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192103 | |||
S5‑192104 | Rel-16 CR 32.255 Remove Quota Consumption Time | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192357 | |||
S5‑192357 | Rel-16 CR 32.255 Remove Quota Consumption Time | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192104 | |||
S5‑192105 | Rel-16 CR 32.290 Addition of failure handling and failover | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192358 | |||
S5‑192358 | Rel-16 CR 32.290 Addition of failure handling and failover | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192105 | |||
S5‑192106 | Rel-16 CR 32.290 Addition of message retry | Huawei | CR | Agreement | Yes |
Yes
| merged | No | S5‑192358 | |||
S5‑192107 | Rel-16 CR 32.291 Addition of message retry | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192108 | Rel-16 CR 32.291 Correction of RANSecondaryRATUsageReport occurrence | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192361 | |||
S5‑192361 | Rel-16 CR 32.291 Correction of RANSecondaryRATUsageReport occurrence | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192108 | |||
S5‑192120 | Rel-15 CR 32.298 Correction of user information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192301 | |||
S5‑192301 | Rel-15 CR 32.298 Correction of user information | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192120 | |||
S5‑192175 | Addition of message retry | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192205 | Retry handling for converged Charging | Ericsson | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑192213 | Rel-15 CR 32.291 Correcting the Quota management Indicator in CDR | Ericsson | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192214 | Rel-15 CR 32.298 Correcting the Used Unit Container definition | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑192363 | |||
S5‑192363 | Rel-15 CR 32.298 Correcting the Used Unit Container definition | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192214 | |||
S5‑192215 | Rel-15 CR 32.298 Correcting spelling of timeOfFirstUsage | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192217 | Rel-15 CR 32.291 Correcting of table for bindings | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192218 | Rel-15 CR 32.298 Correcting of User Location Information definition | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
S5‑192364 | Rel-15 CR 32.298 Correcting of User Location Information definition | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192248 | Rel-15 CR 32.298 Correction of UE IP Addresses | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192368 | |||
S5‑192368 | Rel-15 CR 32.298 Correction of UE IP Addresses | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192248 | |||
S5‑192249 | Rel-15 CR 32.291 Correction of UE IP Addresses | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑192369 | |||
S5‑192369 | Rel-15 CR 32.291 Correction of UE IP Addresses | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192249 | |||
S5‑192263 | Rel-15 CR 32.291 Correction local sequence nb | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192362 | Rel-15 CR 32.298 Correcting the Quota management Indicator in CDR | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑192366 | Draft TS 32.256 | Nokia, Nokia Shanghai Bell | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
7.4 | Rel-16 Charging |   | ||||||||||
7.4.1 | Volume Based Charging Aspects for VoLTE | S5‑192043 | Rel-16 CR 32.298 Support status of VoLTE service delivery | China Mobile | CR | Approval | Yes |
Yes
| revised | No | S5‑192277 | |
S5‑192277 | Rel-16 CR 32.298 Support status of VoLTE service delivery | China Mobile | CR | Approval | Yes |
Yes
| agreed | No | S5‑192043 | |||
S5‑192044 | Rel-16 CR 32.299 Support status of VoLTE service delivery | China Mobile | CR | Approval | Yes |
Yes
| revised | No | S5‑192278 | |||
S5‑192278 | Rel-16 CR 32.299 Support status of VoLTE service delivery | China Mobile | CR | Approval | Yes |
Yes
| agreed | No | S5‑192044 | |||
S5‑192045 | Rel-16 CR 32.260 Update description of volume based charging in IMS | China Mobile | CR | Approval | Yes |
Yes
| revised | No | S5‑192276 | |||
S5‑192276 | Rel-16 CR 32.260 Update description of volume based charging in IMS | China Mobile | CR | Approval | Yes |
Yes
| agreed | No | S5‑192045 | |||
7.4.2 | Nchf Online and Offline Charging Services | S5‑192109 | Rel-16 CR 32.255 Add Offline only charging CHF selection | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192279 | |
S5‑192279 | Rel-16 CR 32.255 Add Offline only charging CHF selection | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192109 | |||
S5‑192110 | Rel-16 CR 32.255 Add offline charging service procedures | Huawei | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑192111 | Rel-16 CR 32.255 Add offline only charging triggers for SSC modes | Huawei | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑192112 | Rel-16 CR 32.290 Add Offline charging Service Senario | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192281 | |||
S5‑192281 | Rel-16 CR 32.290 Add Offline charging Service Senario | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192112 | |||
S5‑192113 | Rel-16 CR 32.290 Add Offline charging Service Message | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192114 | Rel-16 CR 32.291 Add Offline only charging service API | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192115 | Rel-16 CR 32.291 Add Offline only charging service operations | Huawei | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192116 | Discussion on offline charging service API | Huawei | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑192117 | Rel-16 CR 32.298 Add offline charging data for CHF CDR | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192282 | |||
S5‑192282 | Rel-16 CR 32.298 Add offline charging data for CHF CDR | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192117 | |||
S5‑192121 | Rel-16 CR 32.255 offline charging service triggers for SSC modes | Huawei | CR | Agreement | Yes |
Yes
| revised | No | S5‑192280 | S5‑191410 | ||
S5‑192280 | Rel-16 CR 32.255 offline charging service triggers for SSC modes | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192121 | |||
S5‑192122 | Rel-16 CR 32.255 offline charging service procedures | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | S5‑191337 | |||
S5‑192211 | Rel-16 CR 32.255 Adding Offline trigger handling in SMF | Ericsson | CR | Agreement | Yes |
Yes
| not pursued | No | ||||
S5‑192271 | Discussion paper on separate charging services | Nokia, Nokia Shanghai Bell | discussion | Approval | Yes |
Yes
| noted | No | ||||
S5‑192359 | Discussion on 5G offline only charging in converged charging | Huawei | discussion | discussion | Yes |
Yes
| noted | No | ||||
S5‑192370 | Revised WID on Nchf Online and Offline Charging Services | Huawei | WID revised | Agreement | Yes |
Yes
| noted | No | ||||
7.4.3 | Charging Enhancement of 5GC interworking with EPC |   | ||||||||||
7.4.4 | Network Exposure Charging in 5G System Architecture | S5‑192202 | Rel-16 CR 32.254 Add message flows for convergent charging | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑192283 | |
S5‑192283 | Rel-16 CR 32.254 Add message flows for convergent charging | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192202 | |||
S5‑192203 | Rel-16 CR 32.254 Adding CDR generation and handling for convergent charging | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | S5‑192284 | |||
S5‑192284 | Rel-16 CR 32.254 Adding CDR generation and handling for convergent charging | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | S5‑192203 | |||
7.4.5 | Charging AMF in 5G System Architecture Phase 1 | S5‑192056 | Rel-16 CR 32.240 Introduction of AMF in charging architecture | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||
S5‑192067 | Rel-16 pCR 32.256 Introduction of Abbreviations and symbols | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑192286 | |||
S5‑192286 | Rel-16 pCR 32.256 Introduction of Abbreviations and symbols | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑192067 | |||
S5‑192068 | Rel-16 pCR 32.256 Introduction of Scope and References | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑192285 | |||
S5‑192285 | Rel-16 pCR 32.256 Introduction of Scope and References | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑192068 | |||
S5‑192069 | Rel-16 pCR 32.256 Introduction of Architectures | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑192070 | Rel-16 pCR 32.256 Introduction of charging principles | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑192287 | |||
S5‑192287 | Rel-16 pCR 32.256 Introduction of charging principles | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑192070 | |||
S5‑192071 | Rel-16 pCR 32.256 Introduction of converged charging scenarios principles | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑192288 | |||
S5‑192288 | Rel-16 pCR 32.256 Introduction of converged charging scenarios principles | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑192071 | |||
S5‑192072 | Rel-16 pCR 32.256 Introduction of registration offline message flow | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑192289 | |||
S5‑192289 | Rel-16 pCR 32.256 Introduction of registration offline message flow | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑192072 | |||
7.5 | Charging Studies |   | ||||||||||
7.5.1 | Study on Charging Aspects of Network Slicing | S5‑192096 | Rel-16 pCR 32.845 Addition of solution evaluation for solution #1.1 | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑192290 | |
S5‑192290 | Rel-16 pCR 32.845 Addition of solution evaluation for solution #1.1 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑192096 | |||
S5‑192097 | Rel-16 pCR 32.845 Addition of solution for event based charging | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑192291 | |||
S5‑192291 | Rel-16 pCR 32.845 Addition of solution for event based charging | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑192097 | |||
S5‑192098 | Rel-16 pCR 32.845 Addition of Use Case about Network Slice Subscription | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑192292 | |||
S5‑192292 | Rel-16 pCR 32.845 Addition of Use Case about Network Slice Subscription | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑192098 | |||
S5‑192208 | Rel-16 pCR 32.845 Solution to Performance based Charging | Ericsson | pCR | Agreement | Yes |
Yes
| revised | No | S5‑192293 | |||
S5‑192293 | Rel-16 pCR 32.845 Solution to Performance based Charging | Ericsson | pCR | Agreement | Yes |
Yes
| approved | No | S5‑192208 | |||
S5‑192272 | Discussion Paper on Network Slice Charging and Management | Huawei | discussion | Agreement | Yes |
Yes
| revised | No | S5‑192294 | |||
S5‑192294 | Discussion Paper on Network Slice Charging and Management | Huawei | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑192272 | |||
S5‑192274 | Addition of a few editorial corrections and many clarifications between NW Slice and NW Slice Instance | Huawei, Vodafone | pCR | Approval | Yes |
Yes
| revised | No | S5‑192295 | |||
S5‑192295 | Addition of a few editorial corrections and many clarifications between NW Slice and NW Slice Instance | Huawei, Vodafone | pCR | Approval | Yes |
Yes
| approved | No | S5‑192274 | |||
S5‑192360 | Introduction Charging for join session | Nokia | other | Presentation | Yes |
Yes
| noted | No | ||||
S5‑192365 | Draf TR 32.845 | Huawei | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑192367 | Revised SID Study on Charging Aspects of Network Slicing | Huawei | SID revised | Agreement | Yes |
Yes
| noted | No | ||||
8 | Any Other Business | S5‑192432 | SA5 20th anniversary song | WG Chair | other | Approval | Yes |
Yes
| revised | No | S5‑192440 | |
S5‑192440 | SA5 20th anniversary song | WG Chair | other | Approval | Yes |
Yes
| noted | No | S5‑192432 | |||
9 | Closing of the meeting |   |