Tdoc List

2018-10-12 16:14

TDoc Title Source Type For Agenda Avail Treated Decision Wdrn Replaced-by Replaces
S5‑186000 Agenda WG Chairman agenda  
2Approval of the agenda
Yes
Yes
approved No    
S5‑186001 IPR and legal declaration WG Chairman other  
3IPR declaration
Yes
Yes
noted No    
S5‑186002 Report from last SA5 meeting MCC report  
4.1Last SA5 meeting report
Yes
Yes
approved No    
S5‑186003 SA5 status report at last SA meeting WG Chairman report  
4.2Last SA meeting report
Yes
Yes
noted No    
S5‑186004 SA5 results at last SA meeting WG Chairman report  
4.2Last SA meeting report
Yes
Yes
noted No    
S5‑186005 Leaders meeting agenda WG Chairman agenda  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑186006 Leaders meeting minutes WG Chairman report  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑186007 SA5 Working Procedures WG Vice Chair (Huawei) other  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑186008 SA5 Meeting Facility Requirements WG Vice Chair (Orange) other  
5.1Administrative issues at SA5 level
Yes
Yes
approved No    
S5‑186009 Process for management of draft TSs/TRs WG Chairman other  
5.1Administrative issues at SA5 level
Yes
Yes
approved No    
S5‑186010 CR Quality Check MCC other  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑186011 Status of email approvals WG Vice Chair (Orange) other  
5.1Administrative issues at SA5 level
No
No
reserved No    
S5‑186012 SA5 Meeting Calendar WG Chairman other  
5.4SA5 meeting calendar
Yes
YesIt was commented that there was a long time between August and November meetings in 2019. The Chair repled that it was always possible to arrange an ad-hoc if necessary. Meeting in April 2020 would be alternative one with the possibility of co-locating with RAN2+3 in Japan.
revised No S5‑186492  
S5‑186013 Deliverables due for the NEXT SA Plenary MCC other  
5.5Review of the Work Plan
Yes
Yes
noted No    
S5‑186014 Ongoing SA5 WIDs and SIDs WG Vice Chair (Huawei) other  
5.5Review of the Work Plan
No
Yes
withdrawn Yes    
S5‑186015 3GPP SA5 Work Plan MCC other  
5.5Review of the Work Plan
Yes
Yes
noted No    
S5‑186016 Work Plan status WG Chair other  
5.5Review of the Work Plan
No
No
reserved No    
S5‑186017 Time Plan for OAM&P WG Vice Chair (Huawei) other  
6.1OAM&P Plenary
Yes
Yes
revised No S5‑186285  
S5‑186018 OAM Executive Report WG Vice Chair (Huawei) report  
6.1OAM&P Plenary
Yes
Yes
revised No S5‑186489  
S5‑186019 OAM&P SWG action list WG Vice Chair (Huawei) other  
6.1OAM&P Plenary
Yes
Yes
revised No S5‑186412  
S5‑186020 Minutes of OAM&P SWG opening session WG Chair report  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑186021 Minutes of New Work Item proposals - OAM&P WG Chair report  
6.2New OAM&P Work Item proposals
Yes
Yes
noted No    
S5‑186022 Minutes of OAM&P Maintenance and Rel-15 small Enhancements MCC report  
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
noted No    
S5‑186023 Minutes of Assurance data and Performance Management for 5G networks and network slicing Rapporteur (Intel) report  
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑186024 Minutes of Management of QoE measurement collection Rapporteur (Ericsson) report  
6.5.1Management of QoE measurement collection
Yes
Yes
noted No    
S5‑186025 Minutes of Energy effciency of 5G Rapporteur (ORANGE) report  
6.5.2Energy Efficiency of 5G
Yes
Yes
noted No    
S5‑186026 Minutes of Study on OAM aspects of LTE and WLAN integration Rapporteur (Intel) report  
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
noted No    
S5‑186027 Minutes of Network policy management for mobile networks based on NFV scenarios Rapporteur (China Mobile) report  
6.5.4Network policy management for mobile networks based on NFV scenarios
Yes
Yes
noted No    
S5‑186028 Minutes of Methodology for 5G management specifications Rapporteur (Ericsson) report  
6.5.5Methodology for 5G management specifications
Yes
Yes
noted No    
S5‑186029 Minutes of Intent driven management service for mobile networks Rapporteur (Huawei) report  
6.5.6Intent driven management service for mobile networks
Yes
Yes
noted No    
S5‑186030 Minutes of Enhancement of performance assurance for 5G networks including network slicing Rapporteur (Intel) report  
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
noted No    
S5‑186031 Minutes for Study on system and functional aspects of Energy Efficiency in 5G networks Rapporteur (ORANGE) report  
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
noted No    
S5‑186032 Minutes of Study on integration of ONAP DCAE and 3GPP management architecture Rapporteur ORANGE) report  
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
noted No    
S5‑186033 Minutes of Study on integration of ONAP and 3GPP configuration management services for 5G networks Rapporteur (Ericsson) report  
6.6.3Study on integration of ONAP and 3GPP configuration management services for 5G networks
Yes
Yes
noted No    
S5‑186034 Minutes of Study on protocol enhancement for real time communication Rapporteur(Nokia) report  
6.6.4Study on protocol enhancement for real time communication
No
Yes
withdrawn Yes    
S5‑186035 Minutes of Study on management aspects of edge computing Rapporteur (Intel) report  
6.6.5Study on management aspects of edge computing
Yes
Yes
noted No    
S5‑186036 Minutes of Study on tenancy concept in 5G networks and network slicing management Rapporteur (Huawei) report  
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
noted No    
S5‑186037 Minutes of Study on management aspects of communication services Rapporteur (Ericsson) report  
6.6.7Study on management aspects of communication services
Yes
Yes
noted No    
S5‑186038 Minutes of Study on Self-Organizing Networks (SON) for 5G Rapporteur (Intel) report  
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
noted No    
S5‑186039 CH Agenda and Time Plan CH SWG Chair agenda  
7.1Charging Plenary
Yes
Yes
revised No S5‑186287  
S5‑186040 CH Executive Report CH SWG Chair report  
7.1Charging Plenary
Yes
Yes
noted No    
S5‑186041 TS 28.310 Skeleton Orange draft TS Approval
6.5.2Energy Efficiency of 5G
Yes
Yes
approved No    
S5‑186042 pCR TS 28.310 – Concepts and overview Orange pCR Agreement
6.5.2Energy Efficiency of 5G
Yes
Yes
revised No S5‑186374  
S5‑186043 Resubmitted Reply LS from CT3 to SA5 on Addition of AVP code definitions C3-183701 LS in  
7.1Charging Plenary
Yes
Yes
replied to No    
S5‑186044 Reply LS from CT4 to SA5 on template availability in TS 29.501 C4-186360 LS in  
7.1Charging Plenary
Yes
Yes
noted No    
S5‑186045 LS from CT4 cc SA5 on API specification and API version number maintenance C4-186602 LS in  
5.3Liaison statements at SA5 level
Yes
YesMaryse (Nokia) commented that SA5 should have a look at this, although it was necessary to wait for CT's reaction in CT#82. The Chairman commented that APIs are similar to the REST based interfaces of SA5, but some alignment was needed between CT and SA5 frameworks.
noted No    
S5‑186046 Reply LS from TSG CT to SA5 on API specification and API version number maintenance CP-182239 LS in  
5.3Liaison statements at SA5 level
Yes
Yes
postponed No    
S5‑186047 Liaison to 3GPP SA5 on Energy Efficiency for 5G ETSI TC EE LS in  
6.5.2Energy Efficiency of 5G
Yes
Yes
replied to No    
S5‑186048 LS to SA5 on Joint ETSI - OSA Workshop: Open Implementations & Standardization ETSI LS in  
5.3Liaison statements at SA5 level
Yes
YesIt was noted that the workshop wasn't relevant with the management/charging work in SA5.
noted No    
S5‑186049 Resubmitted LS from IETF to SA5 on Further Information About IETF Work Relevant to Network Slicing IETF LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑186050 Resubmitted LS from GSMA to SA5 on Publication of new paper on network slicing and future plans GSMA NEST LS in  
5.3Liaison statements at SA5 level
Yes
Yes
replied to No    
S5‑186051 Resubmitted Lsout from ETSI NFV (forwarded to SA5) to various organisations on usage of NFV Specifications ETSI ISG NFV LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑186052 LS from ETSI NFV to SA5 on ETSI starts work on YANG models for Virtualised Network Function and Network Services Descriptor specification ETSI ISG NFV LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑186053 LS from ETSI NFV to SA5 on Clarifications on support of priority of NFV NS in context of Network Slicing ETSI ISG NFV LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑186054 LSOut reply from ETSI NFV to 3GPP SA5 on connectivity among PNF and VNF instances ETSI ISG NFV LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑186055 LS from RAN3 cc SA5 on Data Volume Reporting in 5GC R3-185307 LS in  
7.1Charging Plenary
Yes
Yes
noted No    
S5‑186056 LS from RAN4 cc SA5 on RAN2 progress on ANR R4-1811851 LS in  
5.3Liaison statements at SA5 level
Yes
Yes
noted No    
S5‑186057 LS from SA1 to SA5 on Multi-identity and multi-device requirements S1-182744 LS in  
7.1Charging Plenary
Yes
Yes
replied to No    
S5‑186058 LS from SA2 to SA5 on Slice related Data Analytics S2-189049 LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑186059 Reply LS from SA3 cc SA5 on Bluetooth/WLAN measurement collection in MDT S3-182592 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑186060 Resubmitted Reply LS from SA4 to SA5 on Attributes for QoE measurement collection S4-180240 LS in  
6.1OAM&P Plenary
Yes
Yes
postponed No    
S5‑186061 Resubmitted LS from ITU-T to SA5 on LS on cooperation on REST-based network management framework ITU-T SG2 LS in  
6.1OAM&P Plenary
Yes
Yes
postponed No    
S5‑186062 LS from ITU-T to SA5 on LS on consent of draft Recommendation Y.3103 (formerly Y.IMT2020-BM) ITU-T SG13 LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑186063 pCR TR 32.972 Edithelp comments Orange pCR Agreement
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
approved No    
S5‑186064 pCR TR 32.972 – Potential solutions Orange pCR Agreement
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
revised No S5‑186432  
S5‑186065 skeleton TR 28.812-000 HUAWEI Technologies Japan K.K. draft TR  
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No    
S5‑186066 Draft TR 28.804 Skeleton HUAWEI TECH. GmbH draft TR Information
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
approved No    
S5‑186067 LS out to RAN3 about providing the necessary information for UE throughput through F1 interface ZTE Corporation LS out Approval
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
noted No    
S5‑186068 R16 CR 28.552 Add CQI measurement ZTE Corporation CR Agreement
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No    
S5‑186069 Update Figure 4.2.1-3 to solve the clash between CR28 and CR30 Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186325  
S5‑186070 Fix issues raised by EditHelp Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186326  
S5‑186071 Update NR IS definition to align with TS 37.340 for MR-DC Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186268  
S5‑186072 Update 5GC IS to align with TS 23.501 for 5GC architecture Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186327  
S5‑186073 Update 5GC IS for SBI definition Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑186074 Update xml SS of NR to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186328  
S5‑186075 Update JSON SS of NR to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186329  
S5‑186076 Update YANG SS of NR to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186330  
S5‑186077 Update xml SS of 5GC to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186331  
S5‑186078 Update JSON SS of 5GC to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186332  
S5‑186079 Update YANG SS of 5GC to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑186080 Update xml SS of NS to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186333  
S5‑186081 Update JSON SS of NS to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186334  
S5‑186082 Update YANG SS of NS to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186335  
S5‑186083 TD YANG Module or Submodule Nokia, Nokia Shanghai Bell discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186336  
S5‑186084 R15 CR 32.251 Correction in OCS subscription to multiple PRA(s) Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186305  
S5‑186085 R15 CR 32.299 Correction on reporting UE-dedicated PRA(s) to OCS Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186306  
S5‑186086 R15 CR 32.251 Correction on multiple PRA(s) in offline charging Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186307  
S5‑186087 R15 CR 32.299 Correction on multiple PRA(s) in offline charging Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186308  
S5‑186088 R15 CR 32.298 Correction on multiple PRA(s) in offline charging Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186421  
S5‑186089 R15 CR 32.298 Correction of session priority values description Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186090 R15 CR 32.297 Add new 5G TS in CDR header description Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186091 R12 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186301  
S5‑186092 R13 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186302  
S5‑186093 R14 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186303  
S5‑186094 R15 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186304  
S5‑186095 R15 CR 32.260 Solve Editor's Note on Access Network charging Identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186310  
S5‑186096 R15 CR 32.299 Solve Editor's Note on Access Network charging Identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186419  
S5‑186097 R15 CR 32.298 Solve Editor's Note on Access Network charging Identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186420  
S5‑186098 Rel-15 CR TS 28.552 Remove the redundant measurement of end-to-end latency Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186337  
S5‑186099 Rel-15 CR TS 28.532 Modification of reference Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑186100 Rel-16 CR 28.533 Add concept of service registration and discovery Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186338  
S5‑186101 pCR 28.812 General concept for Intent driven management Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
revised No S5‑186414  
S5‑186102 pCR 28.812 Add intent driven network provisioning scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
revised No S5‑186417  
S5‑186103 pCR 28.812 Key issues for IDM study Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
revised No S5‑186416  
S5‑186104 pCR 28.805 Add mangement support for Service SLA Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
revised No S5‑186459  
S5‑186105 Skeleton for TR 28.861 Intel Mobile France draft TR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
approved No    
S5‑186106 Rel-15 CR 28.526 Add a procedure to associate an VNF instance with a VNF profile Intel Mobile France CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186340  
S5‑186107 Rel-15 CR 28.526 Add a procedure to associate an PNF with a PNF profile Intel Mobile France CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186341  
S5‑186108 pCR TR 28.900 No subscribe in ONAP AT&T, Orange pCR  
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186434  
S5‑186109 pCR TR 28.900 No PM job control in ONAP AT&T, Orange pCR  
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186436  
S5‑186110 pCR TR 28.900 FM-PM Data Reporting Methods AT&T, Orange pCR  
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186438  
S5‑186111 New SID on Charging Aspects of Network Slicing in 5G Phase 2 Huawei Technologies SID new Agreement
7.2New Charging Work Item proposals
Yes
Yes
revised No S5‑186290  
S5‑186112 New WID on 5G Online and Offline Charging Services Huawei Technologies WID new Agreement
7.2New Charging Work Item proposals
Yes
Yes
revised No S5‑186291  
S5‑186113 New WID on Charging Enhancement of 5GC interworking with EPC Huawei Technologies WID new Agreement
7.2New Charging Work Item proposals
Yes
Yes
revised No S5‑186292  
S5‑186114 R15 CR 32.254 Correction on TTRI and TLTRI Huawei Technologies CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186311  
S5‑186115 R15 CR 32.298 Correction on TTRI and TLTRI Huawei Technologies CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186312  
S5‑186116 R15 CR 32.299 Correction on TTRI and TLTRI Huawei Technologies CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186313  
S5‑186117 pCR 28.804 Add tenant management concept Huawei pCR Approval
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
noted No    
S5‑186118 pCR 28.804 Add key issues for tenant management Huawei pCR Approval
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
revised No S5‑186452  
S5‑186119 pCR 28.805 Add concept of SLA management Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
noted No    
S5‑186120 pCR 28.805 Add types of communication services Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
revised No S5‑186461  
S5‑186121 pCR 28.805 Add management aspects of communication services Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
revised No S5‑186462  
S5‑186122 pCR 28.805 Add key issues for communication services management Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
revised No S5‑186458  
S5‑186123 R15 CR 32.255 Correction on the User Information Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186314  
S5‑186124 R15 CR 32.291 Correction on the Reference and Resource name Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186315  
S5‑186125 R15 CR 32.291 Editorial Correction Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186316  
S5‑186126 R15 CR 32.291 Data Type Applicability Correction Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186376  
S5‑186127 R15 CR 32.291 Serving Node ID Correction Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186377  
S5‑186128 R15 CR 32.290 Failure Handling Mechnism Description Clarification Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186378  
S5‑186129 R15 CR 32.291 Failure Handling Mechnism Clarification Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186379  
S5‑186130 Rel-15 CR TS 28.532 Correction of references Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186342  
S5‑186131 Rel-15 CR TS 28.532 Correction of the usage of must Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186343  
S5‑186132 Rel-15 CR TS 28.532 Correction of the numbering and title of figures and tables Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186344  
S5‑186133 Rel-15 CR TS 28.531 Complete the reference information and rewording the note Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186345  
S5‑186134 Rel-15 CR TS 28.531 Update operation names in the procedures of NSI provisioning Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186135 Rel-15 CR TS 28.531 Update operation names in the procedures of NSSI provisioning Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186136 Rel-15 CR TS 28.531 Update operation names in the procedures of NF provisioning Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186346  
S5‑186137 Rel-15 CR TS 28.541 Correct the term sNSSAIList and nRTAC Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186347  
S5‑186138 Rel-15 CR TS 28.541 Update the inheritance hierarchy figure for NR NRM to include BWP IOC and NRSectorCarrier IOC Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186348  
S5‑186139 Rel-15 CR TS 28.541 Change the term nCGI to nCI Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186349  
S5‑186140 Rel-15 CR TS 28.533 Update reference to TS 28.532 Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
merged No S5‑186350  
S5‑186141 Rel-15 CR TS 28.532 Remove unnecessary Editor's Note and figure Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186351  
S5‑186142 pCR 28.812 Add scope for intent driven management services for mobile network Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
revised No S5‑186415  
S5‑186143 pCR 28.812 Add automation concept for the management of mobile networks Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
No
Yes
withdrawn Yes    
S5‑186144 pCR 28.812 Add intent driven cell re-home scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
revised No S5‑186423  
S5‑186145 pCR 28.812 Add intent driven predictive load balance scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
revised No S5‑186424  
S5‑186146 pCR 28.812 Add intent driven cell update scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
revised No S5‑186425  
S5‑186147 pCR TS 28.550 Update concept for analytical KPI Huawei pCR Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑186426  
S5‑186148 pCR TR 28.900 Correct the reference to configuration management related notifications Huawei pCR Approval
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No    
S5‑186149 pCR TR 32.972 Cleanup Ericsson, Orange pCR Agreement
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
approved No    
S5‑186150 CR CUPS NRM IOC clean up HUAWEI TECH. GmbH CR Decision
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186352  
S5‑186151 CR CUPS measurement clean up HUAWEI TECH. GmbH CR Decision
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186353  
S5‑186152 CR CUPS XML schema update HUAWEI TECH. GmbH CR  
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186354  
S5‑186153 CR CUPS CORBA schema update HUAWEI TECH. GmbH CR Decision
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186355  
S5‑186154 pCR Update NF measurement job creation and termination HUAWEI TECH. GmbH pCR Decision
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
noted No    
S5‑186155 pCR 28.804 scope of tenancy TR HUAWEI TECH. GmbH pCR Decision
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
revised No S5‑186450  
S5‑186156 R15 CR TS 28.545 Correction for Requirements of Fault Supervision Service China Mobile Com. Corporation CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186356  
S5‑186157 New WID on Repository of management service in 5G network management HUAWEI TECH. GmbH WID new Decision
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑186323  
S5‑186158 pCR Tenancy definition in 3GPP management system HUAWEI TECH. GmbH pCR  
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
revised No S5‑186451  
S5‑186159 R15 CR TS 28.545 Correction for Use Cases of Fault Supervision Service China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186160 R15 CR TS 28.532 Update resource URI of alarmCount China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186357  
S5‑186161 Revised SID Study on 5G network and network slicing tenant management HUAWEI TECH. GmbH SID revised Decision
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
revised No S5‑186466  
S5‑186162 R15 CR TS 28.532 Remove Operation setComment China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186163 R15 CR TS 28.532 Remove Notification notifyCorrelatedNotificationChanged China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186164 R15 CR TS 28.532 change alarmIRP to FaultSupervisionMF ZTE, China Mobile CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186358  
S5‑186165 R15 CR TS 28.532 change notificationIRP to notificationMF ZTE, China Mobile CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186359  
S5‑186166 R15 CR TS 28.532 Remove Notification notifyPotentialFaultyAlarmList China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186167 R15 CR TS 28.532 Correct the subsription resourece related errors ZTE, China Mobile CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186168 R15 CR TS 28.532 Remove Notification notifyComments China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186169 R15 CR TS 28.532 Remove Notification notifyChangedAlarmGeneral China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186170 R15 CR TS 28.532 Remove Notification notifyAlarmListRebuilt China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑186171 R15 CR TS 28.532 Remove Notification notifyAlarmListRebuilt China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186172 pCR 28.900 skeleton for Integration of ONAP with 3GPP management services for configuration management purposes Nanjing Ericsson Panda Com Ltd pCR Approval
6.6.3Study on integration of ONAP and 3GPP configuration management services for 5G networks
Yes
Yes
revised No S5‑186445  
S5‑186173 R15 CR TS 28.532 General correction of alarm notifications China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186174 Discussion about how SA5/SA2 _x00B_work together to guarantee slice SLA China Mobile (Hangzhou) Inf. discussion Endorsement
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186370  
S5‑186175 Reply LS on Slice related Data Analytics China Mobile (Hangzhou) Inf. LS out  
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186371  
S5‑186176 Reference of Policy Management Interface specification China Mobile (Hangzhou) Inf. pCR  
6.5.4Network policy management for mobile networks based on NFV scenarios
Yes
Yes
noted No    
S5‑186177 Reference of Policy Management Interface specification China Mobile (Hangzhou) Inf. pCR  
6.5.4Network policy management for mobile networks based on NFV scenarios
No
Yes
withdrawn Yes    
S5‑186178 Scope of Policy Management Interface specification China Mobile (Hangzhou) Inf. pCR  
6.5.4Network policy management for mobile networks based on NFV scenarios
Yes
Yes
revised No S5‑186398  
S5‑186179 Skeleton for Policy Management Interface specification China Mobile (Hangzhou) Inf. pCR  
6.5.4Network policy management for mobile networks based on NFV scenarios
Yes
Yes
revised No S5‑186397  
S5‑186180 Skeleton for Policy Management Interface specification China Mobile (Hangzhou) Inf. pCR  
6.5.4Network policy management for mobile networks based on NFV scenarios
No
Yes
withdrawn Yes    
S5‑186181 R16 CR 28.552 Add MCS Distribution measurement ZTE Corporation CR Agreement
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
not pursued No    
S5‑186182 Rel-16 draft TR Skeleton 28.805 Ericsson LM draft TR  
6.6.7Study on management aspects of communication services
Yes
Yes
approved No    
S5‑186183 R16 CR 28.541 Add BeamCoverage Class ZTE Corporation CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186184 DP on integrating ONAP FM-PM into 3GPP 5G management framework – Subscribe/Notify AT&T, Deutsche Telekom, Orange discussion Endorsement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186433  
S5‑186185 DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM job control AT&T, Deutsche Telekom, Orange discussion Endorsement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186435  
S5‑186186 DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM FM reporting methods AT&T, Deutsche Telekom, Orange discussion Endorsement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186437  
S5‑186187 CR Rel-15 28662 on frequency band Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186360  
S5‑186188 CR Rel-15 28663 on frequency band Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186361  
S5‑186189 CR Rel-15 28541 Add NR attributes Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186190 CR Rel-15 28541 Correct properties of cell state Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186362  
S5‑186191 CR Rel-15 28541 Correct use of nCI and nGCI Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
merged No S5‑186349  
S5‑186192 CR Rel-15 28662 Modify SectorEquipmentFunction properties to support NR Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186366  
S5‑186193 CR Rel-15 28663 Modify SectorEquipmentFunction properties to support NR Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186367  
S5‑186194 pCR Rel-15 28550-200 stream requirement and stage 2 Ericsson Inc. pCR Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑186427  
S5‑186195 TD on NR cell relation Ericsson Inc. discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
noted No    
S5‑186196 TD Rel-15 28550-200 on file based solution Ericsson Inc. discussion Endorsement
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑186428  
S5‑186197 TD Rel-15 TS 28622 Generic NRM IS on Measurement Control Ericsson Inc. discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186404  
S5‑186198 Rel-15 CR 32.291 Correctons to CommonData reference Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186380  
S5‑186199 Rel-15 CR 32.291 Faulty references to TS 29.512, TS 29.514 and data types Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186381  
S5‑186200 Rel-15 CR 32.290 Clarifying requested units handling Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186382  
S5‑186201 Rel-15 CR 32.291 Clarifying requested units handling Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186383  
S5‑186202 Rel-15 CR 32.298 Correction of NetworkFunctionID in CHF CDR Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186384  
S5‑186203 Rel-15 CR 32.255 Charging Characteristics in roaming Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186387  
S5‑186204 Discussion paper around Data Volume measurement Ericsson LM discussion  
6.5.2Energy Efficiency of 5G
Yes
Yes
revised No S5‑186391  
S5‑186205 Rel-15 CR 32.255 Clarification of CHF selection Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186388  
S5‑186206 Rel-15 CR 32.255 Clarification of Charging Identifier handling Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186385  
S5‑186207 LS to RAN2 on Data Volume measurements Ericsson LM LS out  
6.5.2Energy Efficiency of 5G
Yes
Yes
revised No S5‑186392  
S5‑186208 Rel-15 CR 32.291 Remove of underscore in the API name Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186386  
S5‑186209 Rel-15 CR 32.274 Addition of Converged Charging flows Ericsson CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑186295  
S5‑186210 Rel-15 CR 32.298 Addition of SMS Charging to CHF CDR Ericsson CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑186300  
S5‑186211 Include information about referencers to CM, PM and FM IRPs Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186405  
S5‑186212 Discussion paper around using MnS Ericsson Japan K.K. discussion  
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
endorsed No    
S5‑186213 Removal of not correct reference in Annex A Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186214 Add missing attribute definition and condition Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186407  
S5‑186215 Add missing detail definition for attribute Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186408  
S5‑186216 Rel-15 CR 28.531 Remove release specific information from clause 7.9.1 Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186430  
S5‑186217 Adding missing attribute, and correction of reference Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186446  
S5‑186218 Rel-15 CR 28.532 Add notifyNewSecurityAlarm to notification type table Ericsson LM,Deutsche Telekom CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186219 Add missing attribute in 5.4.1 Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186220 Rel-15 CR 28.541 Remove NSSF from the abbreviation Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186221 Reference for notification description is missing Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
merged No S5‑186326  
S5‑186222 Rel-15 CR 32.156 Add producer - consumer interaction to Annex B Ericsson LM CR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
revised No S5‑186399  
S5‑186223 Rel-15 CR 32.156 Add producer - consumer interaction to Annex F Ericsson LM CR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
revised No S5‑186400  
S5‑186224 pCR 28.805 Add table of content Ericsson LM pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
approved No    
S5‑186225 pCR 28.805 Add introduction and scope Ericsson LM pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
revised No S5‑186457  
S5‑186226 CR Rel-16 28.622 Add IOC for supporting management of non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
not pursued No    
S5‑186227 CR Rel-16 28.623 Add IOC for supporting management of non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
not pursued No    
S5‑186228 pCR 28.861 add table of content Intel Mobile France pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
approved No    
S5‑186229 CR 32.158 Extend resource representation format descriptions Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186409  
S5‑186230 pCR 28.861 add scope Intel Mobile France pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
revised No S5‑186464  
S5‑186231 CR Rel-16 28.658 Add IOCs for managing non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
revised No S5‑186393  
S5‑186232 pCR 28.861 add SON overview Intel Mobile France pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
withdrawn Yes    
S5‑186233 pCR 28.861 add SON frameworks Intel Mobile France pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
withdrawn Yes    
S5‑186234 CR Rel-16 28.659 Add IOCs for managing non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
revised No S5‑186394  
S5‑186235 pCR 28.861 add use case for RAN condition data Intel Mobile France pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
withdrawn Yes    
S5‑186236 CR Rel-16 32.425 Add measurements related to user data transmission on Xw interface for non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
not pursued No    
S5‑186237 pCR 28.803 edge computing deployment scenarios Intel Mobile France pCR Approval
6.6.5Study on management aspects of edge computing
Yes
Yes
revised No S5‑186447  
S5‑186238 CR Rel-16 32.425 Add measurements related to XwAP procedures for non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
revised No S5‑186396  
S5‑186239 pCR 28.803 use cases for p2p management deployment scenarios Intel Mobile France pCR Approval
6.6.5Study on management aspects of edge computing
Yes
Yes
revised No S5‑186448  
S5‑186240 pCR 28.803 add use case for E2E OSS deployment scenario Intel Mobile France pCR Approval
6.6.5Study on management aspects of edge computing
Yes
Yes
revised No S5‑186449  
S5‑186241 CR 28.532 Correct stage 3 description of the Provisioning Management Service Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No    
S5‑186242 CR Rel-16 28.552 Add PDU Session Resource setup related measurements for gNB Intel Corporation (UK) Ltd CR Approval
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186372  
S5‑186243 CR Rel-16 28.552 Add inter-gNB handover related measurements Intel Corporation (UK) Ltd CR Approval
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186373  
S5‑186244 Discussion paper on collection of e2e latency measurements Intel Corporation (UK) Ltd discussion Agreement
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
noted No    
S5‑186245 pCR 28.550 Update the UCs and requirements related to performance data streaming Intel, BT pCR Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑186429  
S5‑186246 pCR 28.550 Add solution for performance data streaming Intel, BT pCR Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
merged No S5‑186427  
S5‑186247 R15 CR 32.240 Introduction of SMSF in charging architecture for 5GS Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑186293  
S5‑186248 R15 CR 32.274 Introduction of SMSF as a new Node for SMS charging Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑18294  
S5‑186249 R15 CR 32.274 Introduction of SMS charging scenario for SMSF Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
merged No S5‑186295  
S5‑186250 R15 CR 32.274 Introduction of CHF CDR generation for SMSF Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑186296  
S5‑186251 R15 CR 32.274 Introduction of Message content charging SMSF Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑186297  
S5‑186252 R15 CR 32.274 Introduction of CHF CDR description for SMSF Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑186298  
S5‑186253 R15 CR 32.274 Introduction of SMS information converged charging Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑186299  
S5‑186254 R15 CR 32.255 Complete description for CHF selection in roaming Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186389  
S5‑186255 R15 CR 32.291 Correction of data type for subscriber identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186390  
S5‑186256 Rel-15 CR 32.156 Update example of the generalization relationship Ericsson LM CR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
revised No S5‑186401  
S5‑186257 pCR 28.900 Updated references Ericsson Japan K.K. pCR Agreement
6.2New OAM&P Work Item proposals
No
Yes
withdrawn Yes    
S5‑186258 new WID on NRM enhancements Nokia Shanghai Bell WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑186324  
S5‑186259 pCR 28.900 3GPP vs ONAP Interface technologies Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186440  
S5‑186260 pCR 28.900 Updated references Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186441  
S5‑186261 pCR 28.900 Updated architecture overview Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186442  
S5‑186262 pCR 28.900 ONAP DCAE VES Collector updates Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186443  
S5‑186263 pCR 28.900 Handling of alarm / event notifications Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186444  
S5‑186264 Discussion paper around restructuring Comparisons Ericsson Japan K.K. discussion Discussion
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
noted No    
S5‑186265 pCR 28.861 add SON overview Intel Mobile France, Verizon pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
noted No    
S5‑186266 pCR 28.861 add SON frameworks Intel Mobile France, Verizon pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
noted No    
S5‑186267 pCR 28.861 add use case for RAN condition data Intel Mobile France, Verizon pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
noted No    
S5‑186268 Update NR IS definition to align with TS 37.340 for MR-DC Nokia, Nokia Shanghai Bell, Ericsson Inc. CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186411 S5‑186071
S5‑186269 Rel-16 draft TS Skeleton 32.160 Ericsson LM draft TS Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
approved No    
S5‑186270 pCR Rel-16 28.404-040 Include MTSI measurements Ericsson pCR  
6.5.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑186271 pCR Rel-16 28.405-020 Include MTSI measurements Ericsson pCR  
6.5.1Management of QoE measurement collection
Yes
Yes
approved No    
S5‑186272 pCR Rel-16 28.405-020 Add X2 handover Ericsson pCR  
6.5.1Management of QoE measurement collection
No
Yes
withdrawn Yes    
S5‑186273 pCR Rel-16 28.405-020 Clarify forced deactivation Ericsson pCR  
6.5.1Management of QoE measurement collection
No
Yes
withdrawn Yes    
S5‑186274 pCR Rel-16 28.405-020 Add data definitions Ericsson pCR  
6.5.1Management of QoE measurement collection
No
Yes
withdrawn Yes    
S5‑186275 pCR 32.160 Add scope Ericsson LM pCR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
approved No    
S5‑186276 Reply LS from SA5 to SA4 on Attributes for QoE measurement collection Ericsson LS out  
6.5.1Management of QoE measurement collection
No
Yes
withdrawn Yes    
S5‑186277 Rel-15 CR 28.541 Replace symbol for network slice state management Ericsson Limited,Deutsche Telekom CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186278 Rel-15 CR 28.533 Add missing TS number and reference Ericsson Limited CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186350  
S5‑186279 SA WG5 5G TS overview (presented to SA#81) Ericsson LM other Information
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑186280 LS to 3GPP SA1 on business roles related to 5G networks and network slicing management Orange LS out Approval
6.1OAM&P Plenary
Yes
Yes
revised No S5‑186321  
S5‑186281 R15 CR 32.255 Correction on flows for alignment with TS 23.502 Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186418  
S5‑186282 pCR 32.160 Add table of content Ericsson Limited,Deutsche Telekom pCR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
revised No S5‑186403  
S5‑186283 Rel-15 CR 28530 Align title with TS database Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186284 Rel-15 CR 28554 Align title with TS database Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186285 Time Plan for OAM&P WG Vice Chair (Huawei) other -
6.1OAM&P Plenary
Yes
Yes
revised No S5‑186319 S5‑186017
S5‑186286 LS from BBF cc SA5 on Response to 3GPP SA2 liaison S2-189038 on ‘general status of work’ BBF LS in discussion
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑186287 CH Agenda and Time Plan CH SWG Chair agenda -
7.1Charging Plenary
Yes
Yes
approved No   S5‑186039
S5‑186288 Reply to: Resubmitted Reply LS from CT3 to SA5 on Addition of AVP code definitions Huawei LS out approval
7.1Charging Plenary
Yes
Yes
approved No    
S5‑186289 Reply to: LS from SA1 to SA5 on Multi-identity and multi-device requirements Ericsson LS out approval
7.1Charging Plenary
Yes
Yes
approved No    
S5‑186290 New SID on Charging Aspects of Network Slicing in 5G Phase 2 Huawei Technologies SID new Agreement
7.2New Charging Work Item proposals
Yes
Yes
agreed No   S5‑186111
S5‑186291 New WID on 5G Online and Offline Charging Services Huawei Technologies WID new Agreement
7.2New Charging Work Item proposals
Yes
Yes
agreed No   S5‑186112
S5‑186292 New WID on Charging Enhancement of 5GC interworking with EPC Huawei Technologies WID new Agreement
7.2New Charging Work Item proposals
Yes
Yes
agreed No   S5‑186113
S5‑186293 R15 CR 32.240 Introduction of SMSF in charging architecture for 5GS Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186247
S5‑186294 R15 CR 32.274 Introduction of SMSF as a new Node for SMS charging Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186248
S5‑186295 Rel-15 CR 32.274 Addition of Converged Charging flows Ericsson, Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186209
S5‑186296 R15 CR 32.274 Introduction of CHF CDR generation for SMSF Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186250
S5‑186297 R15 CR 32.274 Introduction of Message content charging SMSF Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186251
S5‑186298 R15 CR 32.274 Introduction of CHF CDR description for SMSF Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186252
S5‑186299 R15 CR 32.274 Introduction of SMS information converged charging Nokia, Nokia Shanghai Bell CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186253
S5‑186300 Rel-15 CR 32.298 Addition of SMS Charging to CHF CDR Ericsson CR Agreement
7.4.1SMS Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑186210
S5‑186301 R12 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186091
S5‑186302 R13 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186092
S5‑186303 R14 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186093
S5‑186304 R15 CR 32.298 Correction on wrong references Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186094
S5‑186305 R15 CR 32.251 Correction in OCS subscription to multiple PRA(s) Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186084
S5‑186306 R15 CR 32.299 Correction on reporting UE-dedicated PRA(s) to OCS Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186085
S5‑186307 R15 CR 32.251 Correction on multiple PRA(s) in offline charging Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186086
S5‑186308 R15 CR 32.299 Correction on multiple PRA(s) in offline charging Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186087
S5‑186309 LS to CT3 on PRA extension for offline charging Charging SWG LS out Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
approved No    
S5‑186310 R15 CR 32.260 Solve Editor's Note on Access Network charging Identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186095
S5‑186311 R15 CR 32.254 Correction on TTRI and TLTRI Huawei Technologies CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186114
S5‑186312 R15 CR 32.298 Correction on TTRI and TLTRI Huawei Technologies CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186115
S5‑186313 R15 CR 32.299 Correction on TTRI and TLTRI Huawei Technologies CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186116
S5‑186314 R15 CR 32.255 Correction on the User Information Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186123
S5‑186315 R15 CR 32.291 Correction on the Reference and Resource name Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186124
S5‑186316 R15 CR 32.291 Editorial Correction Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186125
S5‑186317 Reply to: Resubmitted Lsout from ETSI NFV (forwarded to SA5) to various organisations on usage of NFV Specifications Nokia LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No    
S5‑186318 Reply to: LS from ETSI NFV to SA5 on Clarifications on support of priority of NFV NS in context of Network Slicing Huawei LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No    
S5‑186319 Time Plan for OAM&P WG Vice Chair (Huawei) other -
6.1OAM&P Plenary
Yes
Yes
noted No   S5‑186285
S5‑186320 Reply to: LS from ITU-T to SA5 on LS on consent of draft Recommendation Y.3103 (formerly Y.IMT2020-BM) ORANGE LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No    
S5‑186321 LS to 3GPP SA1 on business roles related to 5G networks and network slicing management Orange LS out Approval
6.1OAM&P Plenary
Yes
Yes
approved No   S5‑186280
S5‑186322 Reply to: LS from BBF cc SA5 on Response to 3GPP SA2 liaison S2-189038 on ‘general status of work’ Ericsson LS out approval
6.1OAM&P Plenary
Yes
Yes
revised No S5‑186484  
S5‑186323 New WID on management service discovery in 5G networks HUAWEI TECH. GmbH WID new Decision
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑186157
S5‑186324 New WID on NRM enhancements Nokia Shanghai Bell WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
revised No S5‑186485 S5‑186258
S5‑186325 Update Figure 4.2.1-3 Update Figure 4.2.1-3 Transport view of E-UTRAN and ng-eNB NRM Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186069
S5‑186326 Fix issues raised by EditHelp Nokia, Nokia Shanghai Bell,Ericsson CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186070
S5‑186327 Update 5GC IS to align with TS 23.501 for 5GC architecture Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186072
S5‑186328 Update xml SS of NR to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186074
S5‑186329 Update JSON SS of NR to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186075
S5‑186330 Update YANG SS of NR to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186076
S5‑186331 Update xml SS of 5GC to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186077
S5‑186332 Update JSON SS of 5GC to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186078
S5‑186333 Update xml SS of NS to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186080
S5‑186334 Update JSON SS of NS to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186081
S5‑186335 Update YANG SS of NS to align with IS Nokia, Nokia Shanghai Bell CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186082
S5‑186336 TD YANG Module or Submodule Nokia, Nokia Shanghai Bell discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
endorsed No   S5‑186083
S5‑186337 Rel-15 CR TS 28.552 Remove the redundant measurement of end-to-end latency Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186098
S5‑186338 Rel-16 CR 28.533 Add concept of service registration and discovery Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186100
S5‑186339 Way forward for MnS discovery Huawei discussion discussion
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
revised No S5‑186476  
S5‑186340 Rel-15 CR 28.526 Add a procedure to associate an VNF instance with a VNF profile Intel Mobile France CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186106
S5‑186341 Rel-15 CR 28.526 Add a procedure to associate an PNF with a PNF profile Intel Mobile France CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186107
S5‑186342 Rel-15 CR TS 28.532 Correction of references Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186130
S5‑186343 Rel-15 CR TS 28.532 Alignment with 3GPP drafting rules Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186131
S5‑186344 Rel-15 CR TS 28.532 Correction of the numbering and title of figures and tables Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186132
S5‑186345 Rel-15 CR TS 28.531 Complete the reference information and rewording the note Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186133
S5‑186346 Rel-15 CR TS 28.531 Update operation names in the procedures of NF provisioning Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186136
S5‑186347 Rel-15 CR TS 28.541 Correct the term sNSSAIList and nRTAC Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186137
S5‑186348 Rel-15 CR TS 28.541 Update the inheritance hierarchy figure for NR NRM to include BWP IOC and NRSectorCarrier IOC Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186138
S5‑186349 Rel-15 CR TS 28.541 Change the term nCGI to nCI Huawei, Ericsson CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186139
S5‑186350 Rel-15 CR 28.533 Add missing TS number and reference Huawei, Ericsson CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186278
S5‑186351 Rel-15 CR TS 28.532 Remove unnecessary Editor's Note and figure Huawei CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186141
S5‑186352 CR CUPS NRM IOC clean up HUAWEI TECH. GmbH CR Decision
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186150
S5‑186353 CR CUPS measurement clean up HUAWEI TECH. GmbH CR Decision
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186151
S5‑186354 CR CUPS XML schema update HUAWEI TECH. GmbH CR -
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186152
S5‑186355 CR CUPS CORBA schema update HUAWEI TECH. GmbH CR Decision
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186153
S5‑186356 R15 CR TS 28.545 Correction for Requirements of Fault Supervision Service China Mobile Com. Corporation CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186156
S5‑186357 R15 CR TS 28.532 Update resource URI of alarmCount China Mobile Com. Corporation, ZTE CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186160
S5‑186358 R15 CR TS 28.532 Change alarmIRP to FSMnSProducer ZTE, China Mobile CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186164
S5‑186359 R15 CR TS 28.532 change notificationIRP to notificationMF ZTE, China Mobile CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186165
S5‑186360 CR Rel-15 28662 on frequency band Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186187
S5‑186361 CR Rel-15 28663 on frequency band Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186188
S5‑186362 CR Rel-15 28541 Correct properties of cell state Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186190
S5‑186363 CR Rel-15 28541 Add NR attributes Ericsson Inc. draftCR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
approved No    
S5‑186364 Sequence proposal for study on management aspects of communication services Ericsson other Information
6.6.7Study on management aspects of communication services
Yes
Yes
noted No    
S5‑186365 Reply to: Resubmitted LS from GSMA to SA5 on Publication of new paper on network slicing and future plans Ericsson LS out approval
5.3Liaison statements at SA5 level
No
Yes
left for email approval No    
S5‑186366 CR Rel-15 28662 Modify SectorEquipmentFunction properties to support NR Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186192
S5‑186367 CR Rel-15 28663 Modify SectorEquipmentFunction properties to support NR Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186193
S5‑186368 TD on NR cell relation Ericsson Inc. discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑186369 R16 CR 28.552 Add CQI measurement ZTE Corporation CR Agreement
6.5.7Enhancement of performance assurance for 5G networks including network slicing
No
Yes
withdrawn Yes    
S5‑186370 Discussion about how SA5 SA2 RAN3 work together to guarantee network slice SLA China Mobile (Hangzhou) Inf. discussion Endorsement
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186486 S5‑186174
S5‑186371 Reply LS on Slice related Data Analytics China Mobile (Hangzhou) Inf. LS out -
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186487 S5‑186175
S5‑186372 CR Rel-16 28.552 Add PDU Session Resource setup related measurements for gNB Intel Corporation (UK) Ltd CR Approval
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186478 S5‑186242
S5‑186373 CR Rel-16 28.552 Add inter-gNB handover related measurements Intel Corporation (UK) Ltd CR Approval
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186473 S5‑186243
S5‑186374 pCR TS 28.310 – Concepts and overview Orange pCR Agreement
6.5.2Energy Efficiency of 5G
Yes
Yes
approved No   S5‑186042
S5‑186375 Reply to: Liaison to 3GPP SA5 on Energy Efficiency for 5G ORANGE LS out approval
6.5.2Energy Efficiency of 5G
Yes
Yes
approved No    
S5‑186376 R15 CR 32.291 Data Type Applicability Correction Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186126
S5‑186377 R15 CR 32.291 Serving Node ID Correction Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186127
S5‑186378 R15 CR 32.290 Failure Handling Mechnism Description Clarification Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
not pursued No   S5‑186128
S5‑186379 R15 CR 32.291 Failure Handling Mechnism Clarification Huawei CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186129
S5‑186380 Rel-15 CR 32.291 Correctons to CommonData reference Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186198
S5‑186381 Rel-15 CR 32.291 Faulty references to TS 29.512, TS 29.514 and data types Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186199
S5‑186382 Rel-15 CR 32.290 Clarifying requested units handling Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186200
S5‑186383 Rel-15 CR 32.291 Clarifying requested units handling Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186201
S5‑186384 Rel-15 CR 32.298 Correction of NetworkFunctionID in CHF CDR Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186202
S5‑186385 Rel-15 CR 32.255 Clarification of Charging Identifier handling Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186206
S5‑186386 Rel-15 CR 32.291 Remove of underscore in the API name Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186208
S5‑186387 Rel-15 CR 32.255 Charging Characteristics in roaming Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186203
S5‑186388 Rel-15 CR 32.255 Clarification of CHF selection Ericsson CR Approval
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186205
S5‑186389 R15 CR 32.255 Correction of errors from Edithelp Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186254
S5‑186390 R15 CR 32.291 Correction of data type for subscriber identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186255
S5‑186391 Discussion paper around Data Volume measurement Ericsson LM discussion -
6.5.2Energy Efficiency of 5G
Yes
Yes
endorsed No   S5‑186204
S5‑186392 LS to RAN2 on Data Volume measurements Ericsson LM LS out -
6.5.2Energy Efficiency of 5G
Yes
Yes
approved No   S5‑186207
S5‑186393 CR Rel-16 28.658 Add IOCs for managing non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
agreed No   S5‑186231
S5‑186394 CR Rel-16 28.659 Add IOCs for managing non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
agreed No   S5‑186234
S5‑186395 CR Rel-16 32.425 Add measurements related to user data transmission on Xw interface for non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
No
Yes
withdrawn Yes    
S5‑186396 CR Rel-16 32.425 Add measurements related to XwAP procedures for non-collocated LWA Intel Corporation (UK) Ltd CR Approval
6.5.3OAM aspects of LTE and WLAN integration
Yes
Yes
not pursued No   S5‑186238
S5‑186397 Skeleton for Policy Management Interface specification China Mobile (Hangzhou) Inf. pCR -
6.5.4Network policy management for mobile networks based on NFV scenarios
Yes
Yes
revised No S5‑186468 S5‑186179
S5‑186398 pCR 28.311 Add Scope China Mobile, Ericsson, ZTE pCR -
6.5.4Network policy management for mobile networks based on NFV scenarios
Yes
Yes
approved No   S5‑186178
S5‑186399 Rel-15 CR 32.156 Add producer - consumer interaction to Annex B Ericsson LM CR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
agreed No   S5‑186222
S5‑186400 Rel-15 CR 32.156 Add producer - consumer interaction to Annex F Ericsson LM CR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
agreed No   S5‑186223
S5‑186401 Rel-15 CR 32.156 Update example of the generalization relationship Ericsson LM CR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
agreed No   S5‑186256
S5‑186402 Draft TS 32.160 Ericsson draft TS Approval
6.5.5Methodology for 5G management specifications
No
Yes
left for email approval No    
S5‑186403 pCR 32.160 Add table of content Ericsson Limited,Deutsche Telekom pCR Approval
6.5.5Methodology for 5G management specifications
Yes
Yes
approved No   S5‑186282
S5‑186404 TD Rel-15 TS 28622 Generic NRM IS on Measurement Control Ericsson Inc. discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
endorsed No   S5‑186197
S5‑186405 Include information about referencers to CM, PM and FM IRPs Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186211
S5‑186406 Removal of not correct reference in Annex A Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑186407 Add missing attribute definition and condition Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186214
S5‑186408 Add missing detail definition for attribute Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186215
S5‑186409 CR 32.158 Extend resource representation format descriptions Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186229
S5‑186410 CR 28.532 Correct stage 3 description of the Provisioning Management Service Nokia, Nokia Shanghai Bell CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
No
Yes
withdrawn Yes    
S5‑186411 Update NR IS definition to align with TS 37.340 for MR-DC Nokia, Nokia Shanghai Bell, Ericsson Inc. CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186268
S5‑186412 OAM&P SWG action list WG Vice Chair (Huawei) other -
6.1OAM&P Plenary
Yes
Yes
revised No S5‑186475 S5‑186019
S5‑186413 Priority of NFV NS in context of Network Slicing kia Shanghai Bell, Huawei discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
endorsed No    
S5‑186414 pCR 28.812 General concept for Intent driven management Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑186101
S5‑186415 pCR 28.812 Add scope for intent driven management services for mobile network Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑186142
S5‑186416 pCR 28.812 Key issues for IDM study Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑186103
S5‑186417 pCR 28.812 Add intent driven network provisioning scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑186102
S5‑186418 R15 CR 32.255 Correction on flows for alignment with TS 23.502 Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186281
S5‑186419 R15 CR 32.299 Solve Editor's Note on Access Network charging Identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186096
S5‑186420 R15 CR 32.298 Solve Editor's Note on Access Network charging Identifier Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186097
S5‑186421 R15 CR 32.298 Correction on multiple PRA(s) in offline charging Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186088
S5‑186422 Draft TR 28.804 Huawei draft TR Approval
6.6.6Study on tenancy concept in 5G networks and network slicing management
No
Yes
left for email approval No    
S5‑186423 pCR 28.812 Add intent driven cell re-home scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑186144
S5‑186424 pCR 28.812 Add intent driven predictive load balance scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑186145
S5‑186425 pCR 28.812 Add intent driven cell update scenario Huawei pCR Approval
6.5.6Intent driven management service for mobile networks
Yes
Yes
approved No   S5‑186146
S5‑186426 pCR TS 28.550 Update concept for analytical KPI Huawei pCR Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑186147
S5‑186427 pCR Rel-15 28550-200 stream requirement and stage 2 Ericsson Inc.,Intel pCR Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑186194
S5‑186428 TD Rel-15 28550-200 on file based solution Ericsson Inc.,Deutsche Telekom, Nokia, Huawei discussion Endorsement
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑186470 S5‑186196
S5‑186429 pCR 28.550 Update the UCs and requirements related to performance data streaming Intel, BT pCR Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑186245
S5‑186430 Rel-15 CR 28.531 Remove release specific information from clause 7.9.1 Ericsson LM CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186216
S5‑186431 Draft TR 32.972 ORANGE draft TR Approval
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
No
Yes
left for email approval No    
S5‑186432 pCR TR 32.972 – Potential solutions Orange pCR Approval
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
approved No   S5‑186064
S5‑186433 DP on integrating ONAP FM-PM into 3GPP 5G management framework – Subscribe/Notify AT&T, Deutsche Telekom, Orange discussion Endorsement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
endorsed No   S5‑186184
S5‑186434 pCR TR 28.900 No subscribe in ONAP AT&T, Orange pCR -
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186108
S5‑186435 DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM job control AT&T, Deutsche Telekom, Orange,Nokia, Ericsson discussion Endorsement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
endorsed No   S5‑186185
S5‑186436 pCR TR 28.900 No PM job control in ONAP AT&T, Orange pCR -
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑186479 S5‑186109
S5‑186437 DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM FM reporting methods AT&T, Deutsche Telekom, Orange discussion Endorsement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
endorsed No   S5‑186186
S5‑186438 pCR TR 28.900 FM-PM Data Reporting Methods AT&T, Orange pCR -
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186110
S5‑186439 Draft TR 28.900 ORANGE draft TR Approval
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
No
Yes
left for email approval No    
S5‑186440 pCR 28.900 3GPP vs ONAP Interface technologies Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186259
S5‑186441 pCR 28.900 Updated references Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186260
S5‑186442 pCR 28.900 Updated architecture overview Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186261
S5‑186443 pCR 28.900 ONAP DCAE VES Collector updates Ericsson Japan K.K. pCR Approval
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186262
S5‑186444 pCR 28.900 Handling of alarm / event notifications Ericsson Japan K.K. pCR Agreement
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186263
S5‑186445 pCR 28.900 skeleton for Integration of ONAP with 3GPP management services for configuration management purposes Nanjing Ericsson Panda Com Ltd pCR Approval
6.6.3Study on integration of ONAP and 3GPP configuration management services for 5G networks
Yes
Yes
approved No   S5‑186172
S5‑186446 Adding missing attribute, and correction of reference Ericsson Japan K.K. CR Approval
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No   S5‑186217
S5‑186447 pCR 28.803 edge computing deployment scenarios Intel Mobile France pCR Approval
6.6.5Study on management aspects of edge computing
Yes
Yes
noted No   S5‑186237
S5‑186448 pCR 28.803 use cases for p2p management deployment scenarios Intel Mobile France pCR Approval
6.6.5Study on management aspects of edge computing
Yes
Yes
noted No   S5‑186239
S5‑186449 pCR 28.803 add use case for E2E OSS deployment scenario Intel Mobile France pCR Approval
6.6.5Study on management aspects of edge computing
Yes
Yes
noted No   S5‑186240
S5‑186450 pCR 28.804 scope of tenancy TR HUAWEI TECH. GmbH pCR Approval
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
revised No S5‑186480 S5‑186155
S5‑186451 pCR Tenancy definition in 3GPP management system HUAWEI TECH. GmbH pCR -
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
revised No S5‑186481 S5‑186158
S5‑186452 pCR 28.804 Add key issues for tenant management Huawei pCR Approval
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
approved No   S5‑186118
S5‑186453 pCR 28.804 Add tenant management concept Huawei pCR Approval
6.6.6Study on tenancy concept in 5G networks and network slicing management
No
Yes
withdrawn Yes    
S5‑186454 Draft TS 28.404 Ericsson draft TS Approval
6.5.1Management of QoE measurement collection
No
Yes
left for email approval No    
S5‑186455 Draft TS 28.405 Ericsson draft TS Approval
6.5.1Management of QoE measurement collection
No
Yes
left for email approval No    
S5‑186456 Draft TR 28.805 Ericsson draft TR Approval
6.6.7Study on management aspects of communication services
No
Yes
left for email approval No    
S5‑186457 pCR 28.805 Add introduction and scope Ericsson LM pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
approved No   S5‑186225
S5‑186458 pCR 28.805 Add key issues for communication services management Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
approved No   S5‑186122
S5‑186459 pCR 28.805 Add management support for SLA assurance Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
revised No S5‑186482 S5‑186104
S5‑186460 pCR 28.805 Add concept of SLA management Huawei pCR Approval
6.6.7Study on management aspects of communication services
No
Yes
withdrawn Yes    
S5‑186461 pCR 28.805 Add types of communication services Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
approved No   S5‑186120
S5‑186462 pCR 28.805 Add management aspects of communication services Huawei pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
approved No   S5‑186121
S5‑186463 Draft TR 28.861 Intel draft TR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
No
Yes
left for email approval No    
S5‑186464 pCR 28.861 add scope Intel Mobile France pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
revised No S5‑186483 S5‑186230
S5‑186465 pCR 28.861 add SON overview Intel Mobile France, Verizon pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
No
Yes
withdrawn Yes    
S5‑186466 Revised SID Study on 5G network and network slicing tenant management HUAWEI TECH. GmbH SID revised Agreement
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
noted No   S5‑186161
S5‑186467 pCR 28.861 add SON frameworks Intel Mobile France, Verizon pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
No
Yes
withdrawn Yes    
S5‑186468 Skeleton for Policy Management Interface specification China Mobile (Hangzhou) Inf. pCR -
6.5.4Network policy management for mobile networks based on NFV scenarios
Yes
Yes
approved No   S5‑186397
S5‑186469 Draft TS 28.550 Intel draft TS Approval
6.4.1Assurance data and Performance Management for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑186470 TD Rel-15 28550-200 on file based solution Ericsson Inc.,Deutsche Telekom, Nokia, Huawei discussion Endorsement
6.4.1Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
endorsed No   S5‑186428
S5‑186471 Draft TR 28.812 Huawei draft TR Approval
6.5.6Intent driven management service for mobile networks
No
Yes
left for email approval No    
S5‑186472 Draft TS 28.311 China Mobile draft TS Approval
6.5.4Network policy management for mobile networks based on NFV scenarios
No
Yes
left for email approval No    
S5‑186473 CR Rel-16 28.552 Add inter-gNB handover related measurements Intel Corporation (UK) Ltd CR Approval
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
agreed No   S5‑186373
S5‑186474 Fix outdated reference Nokia CR Agreement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
agreed No    
S5‑186475 OAM&P SWG action list WG Vice Chair (ORANGE) other -
6.1OAM&P Plenary
Yes
Yes
noted No   S5‑186412
S5‑186476 Way forward for MnS discovery Huawei discussion Endorsement
6.3OAM&P Maintenance and Rel-16 small Enhancements
Yes
Yes
endorsed No   S5‑186339
S5‑186477 Draft TS 28.310 ORANGE draft TS Approval
6.5.2Energy Efficiency of 5G
No
Yes
left for email approval No    
S5‑186478 CR Rel-16 28.552 Add PDU Session Resource setup related measurements for gNB Intel Corporation (UK) Ltd CR Approval
6.5.7Enhancement of performance assurance for 5G networks including network slicing
No
Yes
left for email approval No   S5‑186372
S5‑186479 pCR TR 28.900 No PM job control in ONAP AT&T, Orange pCR -
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑186436
S5‑186480 pCR 28.804 scope of tenancy TR HUAWEI TECH. GmbH pCR Approval
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
approved No   S5‑186450
S5‑186481 pCR Tenancy definition in 3GPP management system HUAWEI TECH. GmbH pCR -
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
revised No S5‑186488 S5‑186451
S5‑186482 pCR 28.805Add management support for Service SLA assurance Huawei, China Mobile, Nokia, NEC, Deutsche Telekom, Ericsson,Intel,ZTE pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
revised No S5‑186490 S5‑186459
S5‑186483 pCR 28.861 add scope Intel Mobile France pCR Approval
6.6.8Study on Self-Organizing Networks (SON) for 5G
Yes
Yes
approved No   S5‑186464
S5‑186484 Reply to: LS from BBF cc SA5 on Response to 3GPP SA2 liaison S2-189038 on ‘general status of work’ Ericsson LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No   S5‑186322
S5‑186485 New WID on NRM enhancements Nokia Shanghai Bell WID new Approval
6.2New OAM&P Work Item proposals
Yes
Yes
agreed No   S5‑186324
S5‑186486 Discussion about how SA5 SA2 RAN3 work together to guarantee network slice SLA China Mobile, Huawei, Nokia, NEC, Deutsche Telekom, Ericsson, Intel, ZTE discussion Endorsement
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
endorsed No   S5‑186370
S5‑186487 Reply LS on Slice related Data Analytics China Mobile (Hangzhou) Inf. LS out -
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
revised No S5‑186491 S5‑186371
S5‑186488 pCR Tenancy definition in 3GPP management system HUAWEI TECH. GmbH pCR -
6.6.6Study on tenancy concept in 5G networks and network slicing management
Yes
Yes
approved No   S5‑186481
S5‑186489 OAM Executive Report WG Vice Chair (ORANGE) report -
6.1OAM&P Plenary
Yes
Yes
noted No   S5‑186018
S5‑186490 pCR 28.805Add management support for Service SLA assurance Huawei, China Mobile, Nokia, NEC, Deutsche Telekom, Ericsson,Intel,ZTE pCR Approval
6.6.7Study on management aspects of communication services
Yes
Yes
approved No   S5‑186482
S5‑186491 Reply LS on Slice related Data Analytics China Mobile (Hangzhou) Inf. LS out -
6.5.7Enhancement of performance assurance for 5G networks including network slicing
Yes
Yes
approved No   S5‑186487
S5‑186492 SA5 Meeting Calendar WG Chairman other -
5.4SA5 meeting calendar
Yes
Yes
noted No   S5‑186012