Tdoc List
2018-10-12 16:14
TDoc | Title | Source | Type | For | Agenda | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|
S5‑186000 | Agenda | WG Chairman | agenda |
2Approval of the agenda
| Yes |
Yes
| approved | No | |||
S5‑186001 | IPR and legal declaration | WG Chairman | other |
3IPR declaration
| Yes |
Yes
| noted | No | |||
S5‑186002 | Report from last SA5 meeting | MCC | report |
4.1Last SA5 meeting report
| Yes |
Yes
| approved | No | |||
S5‑186003 | SA5 status report at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | |||
S5‑186004 | SA5 results at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | |||
S5‑186005 | Leaders meeting agenda | WG Chairman | agenda |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑186006 | Leaders meeting minutes | WG Chairman | report |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑186007 | SA5 Working Procedures | WG Vice Chair (Huawei) | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑186008 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | |||
S5‑186009 | Process for management of draft TSs/TRs | WG Chairman | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | |||
S5‑186010 | CR Quality Check | MCC | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑186011 | Status of email approvals | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| No |
No
| reserved | No | |||
S5‑186012 | SA5 Meeting Calendar | WG Chairman | other |
5.4SA5 meeting calendar
| Yes |
YesIt was commented that there was a long time between August and November meetings in 2019. The Chair repled that it was always possible to arrange an ad-hoc if necessary.
Meeting in April 2020 would be alternative one with the possibility of co-locating with RAN2+3 in Japan.
| revised | No | S5‑186492 | ||
S5‑186013 | Deliverables due for the NEXT SA Plenary | MCC | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑186014 | Ongoing SA5 WIDs and SIDs | WG Vice Chair (Huawei) | other |
5.5Review of the Work Plan
| No |
Yes
| withdrawn | Yes | |||
S5‑186015 | 3GPP SA5 Work Plan | MCC | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑186016 | Work Plan status | WG Chair | other |
5.5Review of the Work Plan
| No |
No
| reserved | No | |||
S5‑186017 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑186285 | ||
S5‑186018 | OAM Executive Report | WG Vice Chair (Huawei) | report |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑186489 | ||
S5‑186019 | OAM&P SWG action list | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑186412 | ||
S5‑186020 | Minutes of OAM&P SWG opening session | WG Chair | report |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑186021 | Minutes of New Work Item proposals - OAM&P | WG Chair | report |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | |||
S5‑186022 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | MCC | report |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| noted | No | |||
S5‑186023 | Minutes of Assurance data and Performance Management for 5G networks and network slicing | Rapporteur (Intel) | report |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| noted | No | |||
S5‑186024 | Minutes of Management of QoE measurement collection | Rapporteur (Ericsson) | report |
6.5.1Management of QoE measurement collection
| Yes |
Yes
| noted | No | |||
S5‑186025 | Minutes of Energy effciency of 5G | Rapporteur (ORANGE) | report |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| noted | No | |||
S5‑186026 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| noted | No | |||
S5‑186027 | Minutes of Network policy management for mobile networks based on NFV scenarios | Rapporteur (China Mobile) | report |
6.5.4Network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| noted | No | |||
S5‑186028 | Minutes of Methodology for 5G management specifications | Rapporteur (Ericsson) | report |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| noted | No | |||
S5‑186029 | Minutes of Intent driven management service for mobile networks | Rapporteur (Huawei) | report |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| noted | No | |||
S5‑186030 | Minutes of Enhancement of performance assurance for 5G networks including network slicing | Rapporteur (Intel) | report |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| noted | No | |||
S5‑186031 | Minutes for Study on system and functional aspects of Energy Efficiency in 5G networks | Rapporteur (ORANGE) | report |
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| noted | No | |||
S5‑186032 | Minutes of Study on integration of ONAP DCAE and 3GPP management architecture | Rapporteur ORANGE) | report |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| noted | No | |||
S5‑186033 | Minutes of Study on integration of ONAP and 3GPP configuration management services for 5G networks | Rapporteur (Ericsson) | report |
6.6.3Study on integration of ONAP and 3GPP configuration management services for 5G networks
| Yes |
Yes
| noted | No | |||
S5‑186034 | Minutes of Study on protocol enhancement for real time communication | Rapporteur(Nokia) | report |
6.6.4Study on protocol enhancement for real time communication
| No |
Yes
| withdrawn | Yes | |||
S5‑186035 | Minutes of Study on management aspects of edge computing | Rapporteur (Intel) | report |
6.6.5Study on management aspects of edge computing
| Yes |
Yes
| noted | No | |||
S5‑186036 | Minutes of Study on tenancy concept in 5G networks and network slicing management | Rapporteur (Huawei) | report |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| noted | No | |||
S5‑186037 | Minutes of Study on management aspects of communication services | Rapporteur (Ericsson) | report |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| noted | No | |||
S5‑186038 | Minutes of Study on Self-Organizing Networks (SON) for 5G | Rapporteur (Intel) | report |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| noted | No | |||
S5‑186039 | CH Agenda and Time Plan | CH SWG Chair | agenda |
7.1Charging Plenary
| Yes |
Yes
| revised | No | S5‑186287 | ||
S5‑186040 | CH Executive Report | CH SWG Chair | report |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑186041 | TS 28.310 Skeleton | Orange | draft TS | Approval |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| approved | No | ||
S5‑186042 | pCR TS 28.310 – Concepts and overview | Orange | pCR | Agreement |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| revised | No | S5‑186374 | |
S5‑186043 | Resubmitted Reply LS from CT3 to SA5 on Addition of AVP code definitions | C3-183701 | LS in |
7.1Charging Plenary
| Yes |
Yes
| replied to | No | |||
S5‑186044 | Reply LS from CT4 to SA5 on template availability in TS 29.501 | C4-186360 | LS in |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑186045 | LS from CT4 cc SA5 on API specification and API version number maintenance | C4-186602 | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesMaryse (Nokia) commented that SA5 should have a look at this, although it was necessary to wait for CT's reaction in CT#82.
The Chairman commented that APIs are similar to the REST based interfaces of SA5, but some alignment was needed between CT and SA5 frameworks.
| noted | No | |||
S5‑186046 | Reply LS from TSG CT to SA5 on API specification and API version number maintenance | CP-182239 | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| postponed | No | |||
S5‑186047 | Liaison to 3GPP SA5 on Energy Efficiency for 5G | ETSI TC EE | LS in |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| replied to | No | |||
S5‑186048 | LS to SA5 on Joint ETSI - OSA Workshop: Open Implementations & Standardization | ETSI | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesIt was noted that the workshop wasn't relevant with the management/charging work in SA5.
| noted | No | |||
S5‑186049 | Resubmitted LS from IETF to SA5 on Further Information About IETF Work Relevant to Network Slicing | IETF | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑186050 | Resubmitted LS from GSMA to SA5 on Publication of new paper on network slicing and future plans | GSMA NEST | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| replied to | No | |||
S5‑186051 | Resubmitted Lsout from ETSI NFV (forwarded to SA5) to various organisations on usage of NFV Specifications | ETSI ISG NFV | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑186052 | LS from ETSI NFV to SA5 on ETSI starts work on YANG models for Virtualised Network Function and Network Services Descriptor specification | ETSI ISG NFV | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑186053 | LS from ETSI NFV to SA5 on Clarifications on support of priority of NFV NS in context of Network Slicing | ETSI ISG NFV | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑186054 | LSOut reply from ETSI NFV to 3GPP SA5 on connectivity among PNF and VNF instances | ETSI ISG NFV | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑186055 | LS from RAN3 cc SA5 on Data Volume Reporting in 5GC | R3-185307 | LS in |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑186056 | LS from RAN4 cc SA5 on RAN2 progress on ANR | R4-1811851 | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑186057 | LS from SA1 to SA5 on Multi-identity and multi-device requirements | S1-182744 | LS in |
7.1Charging Plenary
| Yes |
Yes
| replied to | No | |||
S5‑186058 | LS from SA2 to SA5 on Slice related Data Analytics | S2-189049 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑186059 | Reply LS from SA3 cc SA5 on Bluetooth/WLAN measurement collection in MDT | S3-182592 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑186060 | Resubmitted Reply LS from SA4 to SA5 on Attributes for QoE measurement collection | S4-180240 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | |||
S5‑186061 | Resubmitted LS from ITU-T to SA5 on LS on cooperation on REST-based network management framework | ITU-T SG2 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | |||
S5‑186062 | LS from ITU-T to SA5 on LS on consent of draft Recommendation Y.3103 (formerly Y.IMT2020-BM) | ITU-T SG13 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑186063 | pCR TR 32.972 Edithelp comments | Orange | pCR | Agreement |
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | ||
S5‑186064 | pCR TR 32.972 – Potential solutions | Orange | pCR | Agreement |
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| revised | No | S5‑186432 | |
S5‑186065 | skeleton TR 28.812-000 | HUAWEI Technologies Japan K.K. | draft TR |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | |||
S5‑186066 | Draft TR 28.804 Skeleton | HUAWEI TECH. GmbH | draft TR | Information |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| approved | No | ||
S5‑186067 | LS out to RAN3 about providing the necessary information for UE throughput through F1 interface | ZTE Corporation | LS out | Approval |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| noted | No | ||
S5‑186068 | R16 CR 28.552 Add CQI measurement | ZTE Corporation | CR | Agreement |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| not pursued | No | ||
S5‑186069 | Update Figure 4.2.1-3 to solve the clash between CR28 and CR30 | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186325 | |
S5‑186070 | Fix issues raised by EditHelp | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186326 | |
S5‑186071 | Update NR IS definition to align with TS 37.340 for MR-DC | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186268 | |
S5‑186072 | Update 5GC IS to align with TS 23.501 for 5GC architecture | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186327 | |
S5‑186073 | Update 5GC IS for SBI definition | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑186074 | Update xml SS of NR to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186328 | |
S5‑186075 | Update JSON SS of NR to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186329 | |
S5‑186076 | Update YANG SS of NR to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186330 | |
S5‑186077 | Update xml SS of 5GC to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186331 | |
S5‑186078 | Update JSON SS of 5GC to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186332 | |
S5‑186079 | Update YANG SS of 5GC to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑186080 | Update xml SS of NS to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186333 | |
S5‑186081 | Update JSON SS of NS to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186334 | |
S5‑186082 | Update YANG SS of NS to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186335 | |
S5‑186083 | TD YANG Module or Submodule | Nokia, Nokia Shanghai Bell | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186336 | |
S5‑186084 | R15 CR 32.251 Correction in OCS subscription to multiple PRA(s) | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186305 | |
S5‑186085 | R15 CR 32.299 Correction on reporting UE-dedicated PRA(s) to OCS | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186306 | |
S5‑186086 | R15 CR 32.251 Correction on multiple PRA(s) in offline charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186307 | |
S5‑186087 | R15 CR 32.299 Correction on multiple PRA(s) in offline charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186308 | |
S5‑186088 | R15 CR 32.298 Correction on multiple PRA(s) in offline charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186421 | |
S5‑186089 | R15 CR 32.298 Correction of session priority values description | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186090 | R15 CR 32.297 Add new 5G TS in CDR header description | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186091 | R12 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186301 | |
S5‑186092 | R13 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186302 | |
S5‑186093 | R14 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186303 | |
S5‑186094 | R15 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186304 | |
S5‑186095 | R15 CR 32.260 Solve Editor's Note on Access Network charging Identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186310 | |
S5‑186096 | R15 CR 32.299 Solve Editor's Note on Access Network charging Identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186419 | |
S5‑186097 | R15 CR 32.298 Solve Editor's Note on Access Network charging Identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186420 | |
S5‑186098 | Rel-15 CR TS 28.552 Remove the redundant measurement of end-to-end latency | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186337 | |
S5‑186099 | Rel-15 CR TS 28.532 Modification of reference | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑186100 | Rel-16 CR 28.533 Add concept of service registration and discovery | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186338 | |
S5‑186101 | pCR 28.812 General concept for Intent driven management | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| revised | No | S5‑186414 | |
S5‑186102 | pCR 28.812 Add intent driven network provisioning scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| revised | No | S5‑186417 | |
S5‑186103 | pCR 28.812 Key issues for IDM study | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| revised | No | S5‑186416 | |
S5‑186104 | pCR 28.805 Add mangement support for Service SLA | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| revised | No | S5‑186459 | |
S5‑186105 | Skeleton for TR 28.861 | Intel Mobile France | draft TR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| approved | No | ||
S5‑186106 | Rel-15 CR 28.526 Add a procedure to associate an VNF instance with a VNF profile | Intel Mobile France | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186340 | |
S5‑186107 | Rel-15 CR 28.526 Add a procedure to associate an PNF with a PNF profile | Intel Mobile France | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186341 | |
S5‑186108 | pCR TR 28.900 No subscribe in ONAP | AT&T, Orange | pCR |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186434 | ||
S5‑186109 | pCR TR 28.900 No PM job control in ONAP | AT&T, Orange | pCR |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186436 | ||
S5‑186110 | pCR TR 28.900 FM-PM Data Reporting Methods | AT&T, Orange | pCR |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186438 | ||
S5‑186111 | New SID on Charging Aspects of Network Slicing in 5G Phase 2 | Huawei Technologies | SID new | Agreement |
7.2New Charging Work Item proposals
| Yes |
Yes
| revised | No | S5‑186290 | |
S5‑186112 | New WID on 5G Online and Offline Charging Services | Huawei Technologies | WID new | Agreement |
7.2New Charging Work Item proposals
| Yes |
Yes
| revised | No | S5‑186291 | |
S5‑186113 | New WID on Charging Enhancement of 5GC interworking with EPC | Huawei Technologies | WID new | Agreement |
7.2New Charging Work Item proposals
| Yes |
Yes
| revised | No | S5‑186292 | |
S5‑186114 | R15 CR 32.254 Correction on TTRI and TLTRI | Huawei Technologies | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186311 | |
S5‑186115 | R15 CR 32.298 Correction on TTRI and TLTRI | Huawei Technologies | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186312 | |
S5‑186116 | R15 CR 32.299 Correction on TTRI and TLTRI | Huawei Technologies | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186313 | |
S5‑186117 | pCR 28.804 Add tenant management concept | Huawei | pCR | Approval |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| noted | No | ||
S5‑186118 | pCR 28.804 Add key issues for tenant management | Huawei | pCR | Approval |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| revised | No | S5‑186452 | |
S5‑186119 | pCR 28.805 Add concept of SLA management | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| noted | No | ||
S5‑186120 | pCR 28.805 Add types of communication services | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| revised | No | S5‑186461 | |
S5‑186121 | pCR 28.805 Add management aspects of communication services | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| revised | No | S5‑186462 | |
S5‑186122 | pCR 28.805 Add key issues for communication services management | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| revised | No | S5‑186458 | |
S5‑186123 | R15 CR 32.255 Correction on the User Information | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186314 | |
S5‑186124 | R15 CR 32.291 Correction on the Reference and Resource name | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186315 | |
S5‑186125 | R15 CR 32.291 Editorial Correction | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186316 | |
S5‑186126 | R15 CR 32.291 Data Type Applicability Correction | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186376 | |
S5‑186127 | R15 CR 32.291 Serving Node ID Correction | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186377 | |
S5‑186128 | R15 CR 32.290 Failure Handling Mechnism Description Clarification | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186378 | |
S5‑186129 | R15 CR 32.291 Failure Handling Mechnism Clarification | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186379 | |
S5‑186130 | Rel-15 CR TS 28.532 Correction of references | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186342 | |
S5‑186131 | Rel-15 CR TS 28.532 Correction of the usage of must | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186343 | |
S5‑186132 | Rel-15 CR TS 28.532 Correction of the numbering and title of figures and tables | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186344 | |
S5‑186133 | Rel-15 CR TS 28.531 Complete the reference information and rewording the note | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186345 | |
S5‑186134 | Rel-15 CR TS 28.531 Update operation names in the procedures of NSI provisioning | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186135 | Rel-15 CR TS 28.531 Update operation names in the procedures of NSSI provisioning | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186136 | Rel-15 CR TS 28.531 Update operation names in the procedures of NF provisioning | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186346 | |
S5‑186137 | Rel-15 CR TS 28.541 Correct the term sNSSAIList and nRTAC | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186347 | |
S5‑186138 | Rel-15 CR TS 28.541 Update the inheritance hierarchy figure for NR NRM to include BWP IOC and NRSectorCarrier IOC | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186348 | |
S5‑186139 | Rel-15 CR TS 28.541 Change the term nCGI to nCI | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186349 | |
S5‑186140 | Rel-15 CR TS 28.533 Update reference to TS 28.532 | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| merged | No | S5‑186350 | |
S5‑186141 | Rel-15 CR TS 28.532 Remove unnecessary Editor's Note and figure | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186351 | |
S5‑186142 | pCR 28.812 Add scope for intent driven management services for mobile network | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| revised | No | S5‑186415 | |
S5‑186143 | pCR 28.812 Add automation concept for the management of mobile networks | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| No |
Yes
| withdrawn | Yes | ||
S5‑186144 | pCR 28.812 Add intent driven cell re-home scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| revised | No | S5‑186423 | |
S5‑186145 | pCR 28.812 Add intent driven predictive load balance scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| revised | No | S5‑186424 | |
S5‑186146 | pCR 28.812 Add intent driven cell update scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| revised | No | S5‑186425 | |
S5‑186147 | pCR TS 28.550 Update concept for analytical KPI | Huawei | pCR | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| revised | No | S5‑186426 | |
S5‑186148 | pCR TR 28.900 Correct the reference to configuration management related notifications | Huawei | pCR | Approval |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | ||
S5‑186149 | pCR TR 32.972 Cleanup | Ericsson, Orange | pCR | Agreement |
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | ||
S5‑186150 | CR CUPS NRM IOC clean up | HUAWEI TECH. GmbH | CR | Decision |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186352 | |
S5‑186151 | CR CUPS measurement clean up | HUAWEI TECH. GmbH | CR | Decision |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186353 | |
S5‑186152 | CR CUPS XML schema update | HUAWEI TECH. GmbH | CR |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186354 | ||
S5‑186153 | CR CUPS CORBA schema update | HUAWEI TECH. GmbH | CR | Decision |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186355 | |
S5‑186154 | pCR Update NF measurement job creation and termination | HUAWEI TECH. GmbH | pCR | Decision |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| noted | No | ||
S5‑186155 | pCR 28.804 scope of tenancy TR | HUAWEI TECH. GmbH | pCR | Decision |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| revised | No | S5‑186450 | |
S5‑186156 | R15 CR TS 28.545 Correction for Requirements of Fault Supervision Service | China Mobile Com. Corporation | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186356 | |
S5‑186157 | New WID on Repository of management service in 5G network management | HUAWEI TECH. GmbH | WID new | Decision |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑186323 | |
S5‑186158 | pCR Tenancy definition in 3GPP management system | HUAWEI TECH. GmbH | pCR |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| revised | No | S5‑186451 | ||
S5‑186159 | R15 CR TS 28.545 Correction for Use Cases of Fault Supervision Service | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186160 | R15 CR TS 28.532 Update resource URI of alarmCount | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186357 | |
S5‑186161 | Revised SID Study on 5G network and network slicing tenant management | HUAWEI TECH. GmbH | SID revised | Decision |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| revised | No | S5‑186466 | |
S5‑186162 | R15 CR TS 28.532 Remove Operation setComment | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186163 | R15 CR TS 28.532 Remove Notification notifyCorrelatedNotificationChanged | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186164 | R15 CR TS 28.532 change alarmIRP to FaultSupervisionMF | ZTE, China Mobile | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186358 | |
S5‑186165 | R15 CR TS 28.532 change notificationIRP to notificationMF | ZTE, China Mobile | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186359 | |
S5‑186166 | R15 CR TS 28.532 Remove Notification notifyPotentialFaultyAlarmList | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186167 | R15 CR TS 28.532 Correct the subsription resourece related errors | ZTE, China Mobile | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186168 | R15 CR TS 28.532 Remove Notification notifyComments | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186169 | R15 CR TS 28.532 Remove Notification notifyChangedAlarmGeneral | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186170 | R15 CR TS 28.532 Remove Notification notifyAlarmListRebuilt | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑186171 | R15 CR TS 28.532 Remove Notification notifyAlarmListRebuilt | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186172 | pCR 28.900 skeleton for Integration of ONAP with 3GPP management services for configuration management purposes | Nanjing Ericsson Panda Com Ltd | pCR | Approval |
6.6.3Study on integration of ONAP and 3GPP configuration management services for 5G networks
| Yes |
Yes
| revised | No | S5‑186445 | |
S5‑186173 | R15 CR TS 28.532 General correction of alarm notifications | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186174 | Discussion about how SA5/SA2 _x00B_work together to guarantee slice SLA | China Mobile (Hangzhou) Inf. | discussion | Endorsement |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186370 | |
S5‑186175 | Reply LS on Slice related Data Analytics | China Mobile (Hangzhou) Inf. | LS out |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186371 | ||
S5‑186176 | Reference of Policy Management Interface specification | China Mobile (Hangzhou) Inf. | pCR |
6.5.4Network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| noted | No | |||
S5‑186177 | Reference of Policy Management Interface specification | China Mobile (Hangzhou) Inf. | pCR |
6.5.4Network policy management for mobile networks based on NFV scenarios
| No |
Yes
| withdrawn | Yes | |||
S5‑186178 | Scope of Policy Management Interface specification | China Mobile (Hangzhou) Inf. | pCR |
6.5.4Network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑186398 | ||
S5‑186179 | Skeleton for Policy Management Interface specification | China Mobile (Hangzhou) Inf. | pCR |
6.5.4Network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑186397 | ||
S5‑186180 | Skeleton for Policy Management Interface specification | China Mobile (Hangzhou) Inf. | pCR |
6.5.4Network policy management for mobile networks based on NFV scenarios
| No |
Yes
| withdrawn | Yes | |||
S5‑186181 | R16 CR 28.552 Add MCS Distribution measurement | ZTE Corporation | CR | Agreement |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| not pursued | No | ||
S5‑186182 | Rel-16 draft TR Skeleton 28.805 | Ericsson LM | draft TR |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| approved | No | |||
S5‑186183 | R16 CR 28.541 Add BeamCoverage Class | ZTE Corporation | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186184 | DP on integrating ONAP FM-PM into 3GPP 5G management framework – Subscribe/Notify | AT&T, Deutsche Telekom, Orange | discussion | Endorsement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186433 | |
S5‑186185 | DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM job control | AT&T, Deutsche Telekom, Orange | discussion | Endorsement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186435 | |
S5‑186186 | DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM FM reporting methods | AT&T, Deutsche Telekom, Orange | discussion | Endorsement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186437 | |
S5‑186187 | CR Rel-15 28662 on frequency band | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186360 | |
S5‑186188 | CR Rel-15 28663 on frequency band | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186361 | |
S5‑186189 | CR Rel-15 28541 Add NR attributes | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186190 | CR Rel-15 28541 Correct properties of cell state | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186362 | |
S5‑186191 | CR Rel-15 28541 Correct use of nCI and nGCI | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| merged | No | S5‑186349 | |
S5‑186192 | CR Rel-15 28662 Modify SectorEquipmentFunction properties to support NR | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186366 | |
S5‑186193 | CR Rel-15 28663 Modify SectorEquipmentFunction properties to support NR | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186367 | |
S5‑186194 | pCR Rel-15 28550-200 stream requirement and stage 2 | Ericsson Inc. | pCR | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| revised | No | S5‑186427 | |
S5‑186195 | TD on NR cell relation | Ericsson Inc. | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| noted | No | ||
S5‑186196 | TD Rel-15 28550-200 on file based solution | Ericsson Inc. | discussion | Endorsement |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| revised | No | S5‑186428 | |
S5‑186197 | TD Rel-15 TS 28622 Generic NRM IS on Measurement Control | Ericsson Inc. | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186404 | |
S5‑186198 | Rel-15 CR 32.291 Correctons to CommonData reference | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186380 | |
S5‑186199 | Rel-15 CR 32.291 Faulty references to TS 29.512, TS 29.514 and data types | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186381 | |
S5‑186200 | Rel-15 CR 32.290 Clarifying requested units handling | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186382 | |
S5‑186201 | Rel-15 CR 32.291 Clarifying requested units handling | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186383 | |
S5‑186202 | Rel-15 CR 32.298 Correction of NetworkFunctionID in CHF CDR | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186384 | |
S5‑186203 | Rel-15 CR 32.255 Charging Characteristics in roaming | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186387 | |
S5‑186204 | Discussion paper around Data Volume measurement | Ericsson LM | discussion |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| revised | No | S5‑186391 | ||
S5‑186205 | Rel-15 CR 32.255 Clarification of CHF selection | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186388 | |
S5‑186206 | Rel-15 CR 32.255 Clarification of Charging Identifier handling | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186385 | |
S5‑186207 | LS to RAN2 on Data Volume measurements | Ericsson LM | LS out |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| revised | No | S5‑186392 | ||
S5‑186208 | Rel-15 CR 32.291 Remove of underscore in the API name | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186386 | |
S5‑186209 | Rel-15 CR 32.274 Addition of Converged Charging flows | Ericsson | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑186295 | |
S5‑186210 | Rel-15 CR 32.298 Addition of SMS Charging to CHF CDR | Ericsson | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑186300 | |
S5‑186211 | Include information about referencers to CM, PM and FM IRPs | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186405 | |
S5‑186212 | Discussion paper around using MnS | Ericsson Japan K.K. | discussion |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| endorsed | No | |||
S5‑186213 | Removal of not correct reference in Annex A | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186214 | Add missing attribute definition and condition | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186407 | |
S5‑186215 | Add missing detail definition for attribute | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186408 | |
S5‑186216 | Rel-15 CR 28.531 Remove release specific information from clause 7.9.1 | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186430 | |
S5‑186217 | Adding missing attribute, and correction of reference | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186446 | |
S5‑186218 | Rel-15 CR 28.532 Add notifyNewSecurityAlarm to notification type table | Ericsson LM,Deutsche Telekom | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186219 | Add missing attribute in 5.4.1 | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186220 | Rel-15 CR 28.541 Remove NSSF from the abbreviation | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186221 | Reference for notification description is missing | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| merged | No | S5‑186326 | |
S5‑186222 | Rel-15 CR 32.156 Add producer - consumer interaction to Annex B | Ericsson LM | CR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| revised | No | S5‑186399 | |
S5‑186223 | Rel-15 CR 32.156 Add producer - consumer interaction to Annex F | Ericsson LM | CR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| revised | No | S5‑186400 | |
S5‑186224 | pCR 28.805 Add table of content | Ericsson LM | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| approved | No | ||
S5‑186225 | pCR 28.805 Add introduction and scope | Ericsson LM | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| revised | No | S5‑186457 | |
S5‑186226 | CR Rel-16 28.622 Add IOC for supporting management of non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| not pursued | No | ||
S5‑186227 | CR Rel-16 28.623 Add IOC for supporting management of non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| not pursued | No | ||
S5‑186228 | pCR 28.861 add table of content | Intel Mobile France | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| approved | No | ||
S5‑186229 | CR 32.158 Extend resource representation format descriptions | Nokia, Nokia Shanghai Bell | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186409 | |
S5‑186230 | pCR 28.861 add scope | Intel Mobile France | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| revised | No | S5‑186464 | |
S5‑186231 | CR Rel-16 28.658 Add IOCs for managing non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑186393 | |
S5‑186232 | pCR 28.861 add SON overview | Intel Mobile France | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| withdrawn | Yes | ||
S5‑186233 | pCR 28.861 add SON frameworks | Intel Mobile France | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| withdrawn | Yes | ||
S5‑186234 | CR Rel-16 28.659 Add IOCs for managing non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑186394 | |
S5‑186235 | pCR 28.861 add use case for RAN condition data | Intel Mobile France | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| withdrawn | Yes | ||
S5‑186236 | CR Rel-16 32.425 Add measurements related to user data transmission on Xw interface for non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| not pursued | No | ||
S5‑186237 | pCR 28.803 edge computing deployment scenarios | Intel Mobile France | pCR | Approval |
6.6.5Study on management aspects of edge computing
| Yes |
Yes
| revised | No | S5‑186447 | |
S5‑186238 | CR Rel-16 32.425 Add measurements related to XwAP procedures for non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑186396 | |
S5‑186239 | pCR 28.803 use cases for p2p management deployment scenarios | Intel Mobile France | pCR | Approval |
6.6.5Study on management aspects of edge computing
| Yes |
Yes
| revised | No | S5‑186448 | |
S5‑186240 | pCR 28.803 add use case for E2E OSS deployment scenario | Intel Mobile France | pCR | Approval |
6.6.5Study on management aspects of edge computing
| Yes |
Yes
| revised | No | S5‑186449 | |
S5‑186241 | CR 28.532 Correct stage 3 description of the Provisioning Management Service | Nokia, Nokia Shanghai Bell | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑186242 | CR Rel-16 28.552 Add PDU Session Resource setup related measurements for gNB | Intel Corporation (UK) Ltd | CR | Approval |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186372 | |
S5‑186243 | CR Rel-16 28.552 Add inter-gNB handover related measurements | Intel Corporation (UK) Ltd | CR | Approval |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186373 | |
S5‑186244 | Discussion paper on collection of e2e latency measurements | Intel Corporation (UK) Ltd | discussion | Agreement |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| noted | No | ||
S5‑186245 | pCR 28.550 Update the UCs and requirements related to performance data streaming | Intel, BT | pCR | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| revised | No | S5‑186429 | |
S5‑186246 | pCR 28.550 Add solution for performance data streaming | Intel, BT | pCR | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| merged | No | S5‑186427 | |
S5‑186247 | R15 CR 32.240 Introduction of SMSF in charging architecture for 5GS | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑186293 | |
S5‑186248 | R15 CR 32.274 Introduction of SMSF as a new Node for SMS charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑18294 | |
S5‑186249 | R15 CR 32.274 Introduction of SMS charging scenario for SMSF | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| merged | No | S5‑186295 | |
S5‑186250 | R15 CR 32.274 Introduction of CHF CDR generation for SMSF | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑186296 | |
S5‑186251 | R15 CR 32.274 Introduction of Message content charging SMSF | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑186297 | |
S5‑186252 | R15 CR 32.274 Introduction of CHF CDR description for SMSF | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑186298 | |
S5‑186253 | R15 CR 32.274 Introduction of SMS information converged charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑186299 | |
S5‑186254 | R15 CR 32.255 Complete description for CHF selection in roaming | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186389 | |
S5‑186255 | R15 CR 32.291 Correction of data type for subscriber identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186390 | |
S5‑186256 | Rel-15 CR 32.156 Update example of the generalization relationship | Ericsson LM | CR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| revised | No | S5‑186401 | |
S5‑186257 | pCR 28.900 Updated references | Ericsson Japan K.K. | pCR | Agreement |
6.2New OAM&P Work Item proposals
| No |
Yes
| withdrawn | Yes | ||
S5‑186258 | new WID on NRM enhancements | Nokia Shanghai Bell | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑186324 | |
S5‑186259 | pCR 28.900 3GPP vs ONAP Interface technologies | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186440 | |
S5‑186260 | pCR 28.900 Updated references | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186441 | |
S5‑186261 | pCR 28.900 Updated architecture overview | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186442 | |
S5‑186262 | pCR 28.900 ONAP DCAE VES Collector updates | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186443 | |
S5‑186263 | pCR 28.900 Handling of alarm / event notifications | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186444 | |
S5‑186264 | Discussion paper around restructuring Comparisons | Ericsson Japan K.K. | discussion | Discussion |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| noted | No | ||
S5‑186265 | pCR 28.861 add SON overview | Intel Mobile France, Verizon | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| noted | No | ||
S5‑186266 | pCR 28.861 add SON frameworks | Intel Mobile France, Verizon | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| noted | No | ||
S5‑186267 | pCR 28.861 add use case for RAN condition data | Intel Mobile France, Verizon | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| noted | No | ||
S5‑186268 | Update NR IS definition to align with TS 37.340 for MR-DC | Nokia, Nokia Shanghai Bell, Ericsson Inc. | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186411 | S5‑186071 |
S5‑186269 | Rel-16 draft TS Skeleton 32.160 | Ericsson LM | draft TS | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| approved | No | ||
S5‑186270 | pCR Rel-16 28.404-040 Include MTSI measurements | Ericsson | pCR |
6.5.1Management of QoE measurement collection
| Yes |
Yes
| approved | No | |||
S5‑186271 | pCR Rel-16 28.405-020 Include MTSI measurements | Ericsson | pCR |
6.5.1Management of QoE measurement collection
| Yes |
Yes
| approved | No | |||
S5‑186272 | pCR Rel-16 28.405-020 Add X2 handover | Ericsson | pCR |
6.5.1Management of QoE measurement collection
| No |
Yes
| withdrawn | Yes | |||
S5‑186273 | pCR Rel-16 28.405-020 Clarify forced deactivation | Ericsson | pCR |
6.5.1Management of QoE measurement collection
| No |
Yes
| withdrawn | Yes | |||
S5‑186274 | pCR Rel-16 28.405-020 Add data definitions | Ericsson | pCR |
6.5.1Management of QoE measurement collection
| No |
Yes
| withdrawn | Yes | |||
S5‑186275 | pCR 32.160 Add scope | Ericsson LM | pCR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| approved | No | ||
S5‑186276 | Reply LS from SA5 to SA4 on Attributes for QoE measurement collection | Ericsson | LS out |
6.5.1Management of QoE measurement collection
| No |
Yes
| withdrawn | Yes | |||
S5‑186277 | Rel-15 CR 28.541 Replace symbol for network slice state management | Ericsson Limited,Deutsche Telekom | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186278 | Rel-15 CR 28.533 Add missing TS number and reference | Ericsson Limited | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186350 | |
S5‑186279 | SA WG5 5G TS overview (presented to SA#81) | Ericsson LM | other | Information |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | ||
S5‑186280 | LS to 3GPP SA1 on business roles related to 5G networks and network slicing management | Orange | LS out | Approval |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑186321 | |
S5‑186281 | R15 CR 32.255 Correction on flows for alignment with TS 23.502 | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186418 | |
S5‑186282 | pCR 32.160 Add table of content | Ericsson Limited,Deutsche Telekom | pCR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| revised | No | S5‑186403 | |
S5‑186283 | Rel-15 CR 28530 Align title with TS database | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186284 | Rel-15 CR 28554 Align title with TS database | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186285 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑186319 | S5‑186017 |
S5‑186286 | LS from BBF cc SA5 on Response to 3GPP SA2 liaison S2-189038 on ‘general status of work’ | BBF | LS in | discussion |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | ||
S5‑186287 | CH Agenda and Time Plan | CH SWG Chair | agenda | - |
7.1Charging Plenary
| Yes |
Yes
| approved | No | S5‑186039 | |
S5‑186288 | Reply to: Resubmitted Reply LS from CT3 to SA5 on Addition of AVP code definitions | Huawei | LS out | approval |
7.1Charging Plenary
| Yes |
Yes
| approved | No | ||
S5‑186289 | Reply to: LS from SA1 to SA5 on Multi-identity and multi-device requirements | Ericsson | LS out | approval |
7.1Charging Plenary
| Yes |
Yes
| approved | No | ||
S5‑186290 | New SID on Charging Aspects of Network Slicing in 5G Phase 2 | Huawei Technologies | SID new | Agreement |
7.2New Charging Work Item proposals
| Yes |
Yes
| agreed | No | S5‑186111 | |
S5‑186291 | New WID on 5G Online and Offline Charging Services | Huawei Technologies | WID new | Agreement |
7.2New Charging Work Item proposals
| Yes |
Yes
| agreed | No | S5‑186112 | |
S5‑186292 | New WID on Charging Enhancement of 5GC interworking with EPC | Huawei Technologies | WID new | Agreement |
7.2New Charging Work Item proposals
| Yes |
Yes
| agreed | No | S5‑186113 | |
S5‑186293 | R15 CR 32.240 Introduction of SMSF in charging architecture for 5GS | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186247 | |
S5‑186294 | R15 CR 32.274 Introduction of SMSF as a new Node for SMS charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186248 | |
S5‑186295 | Rel-15 CR 32.274 Addition of Converged Charging flows | Ericsson, Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186209 | |
S5‑186296 | R15 CR 32.274 Introduction of CHF CDR generation for SMSF | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186250 | |
S5‑186297 | R15 CR 32.274 Introduction of Message content charging SMSF | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186251 | |
S5‑186298 | R15 CR 32.274 Introduction of CHF CDR description for SMSF | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186252 | |
S5‑186299 | R15 CR 32.274 Introduction of SMS information converged charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186253 | |
S5‑186300 | Rel-15 CR 32.298 Addition of SMS Charging to CHF CDR | Ericsson | CR | Agreement |
7.4.1SMS Charging in 5G System Architecture Phase 1
| Yes |
Yes
| agreed | No | S5‑186210 | |
S5‑186301 | R12 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186091 | |
S5‑186302 | R13 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186092 | |
S5‑186303 | R14 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186093 | |
S5‑186304 | R15 CR 32.298 Correction on wrong references | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186094 | |
S5‑186305 | R15 CR 32.251 Correction in OCS subscription to multiple PRA(s) | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186084 | |
S5‑186306 | R15 CR 32.299 Correction on reporting UE-dedicated PRA(s) to OCS | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186085 | |
S5‑186307 | R15 CR 32.251 Correction on multiple PRA(s) in offline charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186086 | |
S5‑186308 | R15 CR 32.299 Correction on multiple PRA(s) in offline charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186087 | |
S5‑186309 | LS to CT3 on PRA extension for offline charging | Charging SWG | LS out | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| approved | No | ||
S5‑186310 | R15 CR 32.260 Solve Editor's Note on Access Network charging Identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186095 | |
S5‑186311 | R15 CR 32.254 Correction on TTRI and TLTRI | Huawei Technologies | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186114 | |
S5‑186312 | R15 CR 32.298 Correction on TTRI and TLTRI | Huawei Technologies | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186115 | |
S5‑186313 | R15 CR 32.299 Correction on TTRI and TLTRI | Huawei Technologies | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186116 | |
S5‑186314 | R15 CR 32.255 Correction on the User Information | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186123 | |
S5‑186315 | R15 CR 32.291 Correction on the Reference and Resource name | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186124 | |
S5‑186316 | R15 CR 32.291 Editorial Correction | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186125 | |
S5‑186317 | Reply to: Resubmitted Lsout from ETSI NFV (forwarded to SA5) to various organisations on usage of NFV Specifications | Nokia | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | ||
S5‑186318 | Reply to: LS from ETSI NFV to SA5 on Clarifications on support of priority of NFV NS in context of Network Slicing | Huawei | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | ||
S5‑186319 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑186285 | |
S5‑186320 | Reply to: LS from ITU-T to SA5 on LS on consent of draft Recommendation Y.3103 (formerly Y.IMT2020-BM) | ORANGE | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | ||
S5‑186321 | LS to 3GPP SA1 on business roles related to 5G networks and network slicing management | Orange | LS out | Approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | S5‑186280 | |
S5‑186322 | Reply to: LS from BBF cc SA5 on Response to 3GPP SA2 liaison S2-189038 on ‘general status of work’ | Ericsson | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑186484 | |
S5‑186323 | New WID on management service discovery in 5G networks | HUAWEI TECH. GmbH | WID new | Decision |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑186157 | |
S5‑186324 | New WID on NRM enhancements | Nokia Shanghai Bell | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑186485 | S5‑186258 |
S5‑186325 | Update Figure 4.2.1-3 Update Figure 4.2.1-3 Transport view of E-UTRAN and ng-eNB NRM | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186069 | |
S5‑186326 | Fix issues raised by EditHelp | Nokia, Nokia Shanghai Bell,Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186070 | |
S5‑186327 | Update 5GC IS to align with TS 23.501 for 5GC architecture | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186072 | |
S5‑186328 | Update xml SS of NR to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186074 | |
S5‑186329 | Update JSON SS of NR to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186075 | |
S5‑186330 | Update YANG SS of NR to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186076 | |
S5‑186331 | Update xml SS of 5GC to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186077 | |
S5‑186332 | Update JSON SS of 5GC to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186078 | |
S5‑186333 | Update xml SS of NS to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186080 | |
S5‑186334 | Update JSON SS of NS to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186081 | |
S5‑186335 | Update YANG SS of NS to align with IS | Nokia, Nokia Shanghai Bell | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186082 | |
S5‑186336 | TD YANG Module or Submodule | Nokia, Nokia Shanghai Bell | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| endorsed | No | S5‑186083 | |
S5‑186337 | Rel-15 CR TS 28.552 Remove the redundant measurement of end-to-end latency | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186098 | |
S5‑186338 | Rel-16 CR 28.533 Add concept of service registration and discovery | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186100 | |
S5‑186339 | Way forward for MnS discovery | Huawei | discussion | discussion |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| revised | No | S5‑186476 | |
S5‑186340 | Rel-15 CR 28.526 Add a procedure to associate an VNF instance with a VNF profile | Intel Mobile France | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186106 | |
S5‑186341 | Rel-15 CR 28.526 Add a procedure to associate an PNF with a PNF profile | Intel Mobile France | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186107 | |
S5‑186342 | Rel-15 CR TS 28.532 Correction of references | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186130 | |
S5‑186343 | Rel-15 CR TS 28.532 Alignment with 3GPP drafting rules | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186131 | |
S5‑186344 | Rel-15 CR TS 28.532 Correction of the numbering and title of figures and tables | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186132 | |
S5‑186345 | Rel-15 CR TS 28.531 Complete the reference information and rewording the note | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186133 | |
S5‑186346 | Rel-15 CR TS 28.531 Update operation names in the procedures of NF provisioning | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186136 | |
S5‑186347 | Rel-15 CR TS 28.541 Correct the term sNSSAIList and nRTAC | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186137 | |
S5‑186348 | Rel-15 CR TS 28.541 Update the inheritance hierarchy figure for NR NRM to include BWP IOC and NRSectorCarrier IOC | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186138 | |
S5‑186349 | Rel-15 CR TS 28.541 Change the term nCGI to nCI | Huawei, Ericsson | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186139 | |
S5‑186350 | Rel-15 CR 28.533 Add missing TS number and reference | Huawei, Ericsson | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186278 | |
S5‑186351 | Rel-15 CR TS 28.532 Remove unnecessary Editor's Note and figure | Huawei | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186141 | |
S5‑186352 | CR CUPS NRM IOC clean up | HUAWEI TECH. GmbH | CR | Decision |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186150 | |
S5‑186353 | CR CUPS measurement clean up | HUAWEI TECH. GmbH | CR | Decision |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186151 | |
S5‑186354 | CR CUPS XML schema update | HUAWEI TECH. GmbH | CR | - |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186152 | |
S5‑186355 | CR CUPS CORBA schema update | HUAWEI TECH. GmbH | CR | Decision |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186153 | |
S5‑186356 | R15 CR TS 28.545 Correction for Requirements of Fault Supervision Service | China Mobile Com. Corporation | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186156 | |
S5‑186357 | R15 CR TS 28.532 Update resource URI of alarmCount | China Mobile Com. Corporation, ZTE | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186160 | |
S5‑186358 | R15 CR TS 28.532 Change alarmIRP to FSMnSProducer | ZTE, China Mobile | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186164 | |
S5‑186359 | R15 CR TS 28.532 change notificationIRP to notificationMF | ZTE, China Mobile | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186165 | |
S5‑186360 | CR Rel-15 28662 on frequency band | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186187 | |
S5‑186361 | CR Rel-15 28663 on frequency band | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186188 | |
S5‑186362 | CR Rel-15 28541 Correct properties of cell state | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186190 | |
S5‑186363 | CR Rel-15 28541 Add NR attributes | Ericsson Inc. | draftCR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| approved | No | ||
S5‑186364 | Sequence proposal for study on management aspects of communication services | Ericsson | other | Information |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| noted | No | ||
S5‑186365 | Reply to: Resubmitted LS from GSMA to SA5 on Publication of new paper on network slicing and future plans | Ericsson | LS out | approval |
5.3Liaison statements at SA5 level
| No |
Yes
| left for email approval | No | ||
S5‑186366 | CR Rel-15 28662 Modify SectorEquipmentFunction properties to support NR | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186192 | |
S5‑186367 | CR Rel-15 28663 Modify SectorEquipmentFunction properties to support NR | Ericsson Inc. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186193 | |
S5‑186368 | TD on NR cell relation | Ericsson Inc. | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑186369 | R16 CR 28.552 Add CQI measurement | ZTE Corporation | CR | Agreement |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| No |
Yes
| withdrawn | Yes | ||
S5‑186370 | Discussion about how SA5 SA2 RAN3 work together to guarantee network slice SLA | China Mobile (Hangzhou) Inf. | discussion | Endorsement |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186486 | S5‑186174 |
S5‑186371 | Reply LS on Slice related Data Analytics | China Mobile (Hangzhou) Inf. | LS out | - |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186487 | S5‑186175 |
S5‑186372 | CR Rel-16 28.552 Add PDU Session Resource setup related measurements for gNB | Intel Corporation (UK) Ltd | CR | Approval |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186478 | S5‑186242 |
S5‑186373 | CR Rel-16 28.552 Add inter-gNB handover related measurements | Intel Corporation (UK) Ltd | CR | Approval |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186473 | S5‑186243 |
S5‑186374 | pCR TS 28.310 – Concepts and overview | Orange | pCR | Agreement |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| approved | No | S5‑186042 | |
S5‑186375 | Reply to: Liaison to 3GPP SA5 on Energy Efficiency for 5G | ORANGE | LS out | approval |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| approved | No | ||
S5‑186376 | R15 CR 32.291 Data Type Applicability Correction | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186126 | |
S5‑186377 | R15 CR 32.291 Serving Node ID Correction | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186127 | |
S5‑186378 | R15 CR 32.290 Failure Handling Mechnism Description Clarification | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| not pursued | No | S5‑186128 | |
S5‑186379 | R15 CR 32.291 Failure Handling Mechnism Clarification | Huawei | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186129 | |
S5‑186380 | Rel-15 CR 32.291 Correctons to CommonData reference | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186198 | |
S5‑186381 | Rel-15 CR 32.291 Faulty references to TS 29.512, TS 29.514 and data types | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186199 | |
S5‑186382 | Rel-15 CR 32.290 Clarifying requested units handling | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186200 | |
S5‑186383 | Rel-15 CR 32.291 Clarifying requested units handling | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186201 | |
S5‑186384 | Rel-15 CR 32.298 Correction of NetworkFunctionID in CHF CDR | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186202 | |
S5‑186385 | Rel-15 CR 32.255 Clarification of Charging Identifier handling | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186206 | |
S5‑186386 | Rel-15 CR 32.291 Remove of underscore in the API name | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186208 | |
S5‑186387 | Rel-15 CR 32.255 Charging Characteristics in roaming | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186203 | |
S5‑186388 | Rel-15 CR 32.255 Clarification of CHF selection | Ericsson | CR | Approval |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186205 | |
S5‑186389 | R15 CR 32.255 Correction of errors from Edithelp | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186254 | |
S5‑186390 | R15 CR 32.291 Correction of data type for subscriber identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186255 | |
S5‑186391 | Discussion paper around Data Volume measurement | Ericsson LM | discussion | - |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| endorsed | No | S5‑186204 | |
S5‑186392 | LS to RAN2 on Data Volume measurements | Ericsson LM | LS out | - |
6.5.2Energy Efficiency of 5G
| Yes |
Yes
| approved | No | S5‑186207 | |
S5‑186393 | CR Rel-16 28.658 Add IOCs for managing non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| agreed | No | S5‑186231 | |
S5‑186394 | CR Rel-16 28.659 Add IOCs for managing non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| agreed | No | S5‑186234 | |
S5‑186395 | CR Rel-16 32.425 Add measurements related to user data transmission on Xw interface for non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| No |
Yes
| withdrawn | Yes | ||
S5‑186396 | CR Rel-16 32.425 Add measurements related to XwAP procedures for non-collocated LWA | Intel Corporation (UK) Ltd | CR | Approval |
6.5.3OAM aspects of LTE and WLAN integration
| Yes |
Yes
| not pursued | No | S5‑186238 | |
S5‑186397 | Skeleton for Policy Management Interface specification | China Mobile (Hangzhou) Inf. | pCR | - |
6.5.4Network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑186468 | S5‑186179 |
S5‑186398 | pCR 28.311 Add Scope | China Mobile, Ericsson, ZTE | pCR | - |
6.5.4Network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | S5‑186178 | |
S5‑186399 | Rel-15 CR 32.156 Add producer - consumer interaction to Annex B | Ericsson LM | CR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| agreed | No | S5‑186222 | |
S5‑186400 | Rel-15 CR 32.156 Add producer - consumer interaction to Annex F | Ericsson LM | CR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| agreed | No | S5‑186223 | |
S5‑186401 | Rel-15 CR 32.156 Update example of the generalization relationship | Ericsson LM | CR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| agreed | No | S5‑186256 | |
S5‑186402 | Draft TS 32.160 | Ericsson | draft TS | Approval |
6.5.5Methodology for 5G management specifications
| No |
Yes
| left for email approval | No | ||
S5‑186403 | pCR 32.160 Add table of content | Ericsson Limited,Deutsche Telekom | pCR | Approval |
6.5.5Methodology for 5G management specifications
| Yes |
Yes
| approved | No | S5‑186282 | |
S5‑186404 | TD Rel-15 TS 28622 Generic NRM IS on Measurement Control | Ericsson Inc. | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| endorsed | No | S5‑186197 | |
S5‑186405 | Include information about referencers to CM, PM and FM IRPs | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186211 | |
S5‑186406 | Removal of not correct reference in Annex A | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑186407 | Add missing attribute definition and condition | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186214 | |
S5‑186408 | Add missing detail definition for attribute | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186215 | |
S5‑186409 | CR 32.158 Extend resource representation format descriptions | Nokia, Nokia Shanghai Bell | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186229 | |
S5‑186410 | CR 28.532 Correct stage 3 description of the Provisioning Management Service | Nokia, Nokia Shanghai Bell | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑186411 | Update NR IS definition to align with TS 37.340 for MR-DC | Nokia, Nokia Shanghai Bell, Ericsson Inc. | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186268 | |
S5‑186412 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑186475 | S5‑186019 |
S5‑186413 | Priority of NFV NS in context of Network Slicing | kia Shanghai Bell, Huawei | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| endorsed | No | ||
S5‑186414 | pCR 28.812 General concept for Intent driven management | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | S5‑186101 | |
S5‑186415 | pCR 28.812 Add scope for intent driven management services for mobile network | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | S5‑186142 | |
S5‑186416 | pCR 28.812 Key issues for IDM study | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | S5‑186103 | |
S5‑186417 | pCR 28.812 Add intent driven network provisioning scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | S5‑186102 | |
S5‑186418 | R15 CR 32.255 Correction on flows for alignment with TS 23.502 | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186281 | |
S5‑186419 | R15 CR 32.299 Solve Editor's Note on Access Network charging Identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186096 | |
S5‑186420 | R15 CR 32.298 Solve Editor's Note on Access Network charging Identifier | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186097 | |
S5‑186421 | R15 CR 32.298 Correction on multiple PRA(s) in offline charging | Nokia, Nokia Shanghai Bell | CR | Agreement |
7.3Charging Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186088 | |
S5‑186422 | Draft TR 28.804 | Huawei | draft TR | Approval |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| No |
Yes
| left for email approval | No | ||
S5‑186423 | pCR 28.812 Add intent driven cell re-home scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | S5‑186144 | |
S5‑186424 | pCR 28.812 Add intent driven predictive load balance scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | S5‑186145 | |
S5‑186425 | pCR 28.812 Add intent driven cell update scenario | Huawei | pCR | Approval |
6.5.6Intent driven management service for mobile networks
| Yes |
Yes
| approved | No | S5‑186146 | |
S5‑186426 | pCR TS 28.550 Update concept for analytical KPI | Huawei | pCR | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| approved | No | S5‑186147 | |
S5‑186427 | pCR Rel-15 28550-200 stream requirement and stage 2 | Ericsson Inc.,Intel | pCR | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| approved | No | S5‑186194 | |
S5‑186428 | TD Rel-15 28550-200 on file based solution | Ericsson Inc.,Deutsche Telekom, Nokia, Huawei | discussion | Endorsement |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| revised | No | S5‑186470 | S5‑186196 |
S5‑186429 | pCR 28.550 Update the UCs and requirements related to performance data streaming | Intel, BT | pCR | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| approved | No | S5‑186245 | |
S5‑186430 | Rel-15 CR 28.531 Remove release specific information from clause 7.9.1 | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186216 | |
S5‑186431 | Draft TR 32.972 | ORANGE | draft TR | Approval |
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
| No |
Yes
| left for email approval | No | ||
S5‑186432 | pCR TR 32.972 – Potential solutions | Orange | pCR | Approval |
6.6.1Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | S5‑186064 | |
S5‑186433 | DP on integrating ONAP FM-PM into 3GPP 5G management framework – Subscribe/Notify | AT&T, Deutsche Telekom, Orange | discussion | Endorsement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| endorsed | No | S5‑186184 | |
S5‑186434 | pCR TR 28.900 No subscribe in ONAP | AT&T, Orange | pCR | - |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186108 | |
S5‑186435 | DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM job control | AT&T, Deutsche Telekom, Orange,Nokia, Ericsson | discussion | Endorsement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| endorsed | No | S5‑186185 | |
S5‑186436 | pCR TR 28.900 No PM job control in ONAP | AT&T, Orange | pCR | - |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| revised | No | S5‑186479 | S5‑186109 |
S5‑186437 | DP on integrating ONAP FM-PM into 3GPP 5G management framework – PM FM reporting methods | AT&T, Deutsche Telekom, Orange | discussion | Endorsement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| endorsed | No | S5‑186186 | |
S5‑186438 | pCR TR 28.900 FM-PM Data Reporting Methods | AT&T, Orange | pCR | - |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186110 | |
S5‑186439 | Draft TR 28.900 | ORANGE | draft TR | Approval |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| No |
Yes
| left for email approval | No | ||
S5‑186440 | pCR 28.900 3GPP vs ONAP Interface technologies | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186259 | |
S5‑186441 | pCR 28.900 Updated references | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186260 | |
S5‑186442 | pCR 28.900 Updated architecture overview | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186261 | |
S5‑186443 | pCR 28.900 ONAP DCAE VES Collector updates | Ericsson Japan K.K. | pCR | Approval |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186262 | |
S5‑186444 | pCR 28.900 Handling of alarm / event notifications | Ericsson Japan K.K. | pCR | Agreement |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186263 | |
S5‑186445 | pCR 28.900 skeleton for Integration of ONAP with 3GPP management services for configuration management purposes | Nanjing Ericsson Panda Com Ltd | pCR | Approval |
6.6.3Study on integration of ONAP and 3GPP configuration management services for 5G networks
| Yes |
Yes
| approved | No | S5‑186172 | |
S5‑186446 | Adding missing attribute, and correction of reference | Ericsson Japan K.K. | CR | Approval |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | S5‑186217 | |
S5‑186447 | pCR 28.803 edge computing deployment scenarios | Intel Mobile France | pCR | Approval |
6.6.5Study on management aspects of edge computing
| Yes |
Yes
| noted | No | S5‑186237 | |
S5‑186448 | pCR 28.803 use cases for p2p management deployment scenarios | Intel Mobile France | pCR | Approval |
6.6.5Study on management aspects of edge computing
| Yes |
Yes
| noted | No | S5‑186239 | |
S5‑186449 | pCR 28.803 add use case for E2E OSS deployment scenario | Intel Mobile France | pCR | Approval |
6.6.5Study on management aspects of edge computing
| Yes |
Yes
| noted | No | S5‑186240 | |
S5‑186450 | pCR 28.804 scope of tenancy TR | HUAWEI TECH. GmbH | pCR | Approval |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| revised | No | S5‑186480 | S5‑186155 |
S5‑186451 | pCR Tenancy definition in 3GPP management system | HUAWEI TECH. GmbH | pCR | - |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| revised | No | S5‑186481 | S5‑186158 |
S5‑186452 | pCR 28.804 Add key issues for tenant management | Huawei | pCR | Approval |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| approved | No | S5‑186118 | |
S5‑186453 | pCR 28.804 Add tenant management concept | Huawei | pCR | Approval |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| No |
Yes
| withdrawn | Yes | ||
S5‑186454 | Draft TS 28.404 | Ericsson | draft TS | Approval |
6.5.1Management of QoE measurement collection
| No |
Yes
| left for email approval | No | ||
S5‑186455 | Draft TS 28.405 | Ericsson | draft TS | Approval |
6.5.1Management of QoE measurement collection
| No |
Yes
| left for email approval | No | ||
S5‑186456 | Draft TR 28.805 | Ericsson | draft TR | Approval |
6.6.7Study on management aspects of communication services
| No |
Yes
| left for email approval | No | ||
S5‑186457 | pCR 28.805 Add introduction and scope | Ericsson LM | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| approved | No | S5‑186225 | |
S5‑186458 | pCR 28.805 Add key issues for communication services management | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| approved | No | S5‑186122 | |
S5‑186459 | pCR 28.805 Add management support for SLA assurance | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| revised | No | S5‑186482 | S5‑186104 |
S5‑186460 | pCR 28.805 Add concept of SLA management | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| No |
Yes
| withdrawn | Yes | ||
S5‑186461 | pCR 28.805 Add types of communication services | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| approved | No | S5‑186120 | |
S5‑186462 | pCR 28.805 Add management aspects of communication services | Huawei | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| approved | No | S5‑186121 | |
S5‑186463 | Draft TR 28.861 | Intel | draft TR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| No |
Yes
| left for email approval | No | ||
S5‑186464 | pCR 28.861 add scope | Intel Mobile France | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| revised | No | S5‑186483 | S5‑186230 |
S5‑186465 | pCR 28.861 add SON overview | Intel Mobile France, Verizon | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| No |
Yes
| withdrawn | Yes | ||
S5‑186466 | Revised SID Study on 5G network and network slicing tenant management | HUAWEI TECH. GmbH | SID revised | Agreement |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| noted | No | S5‑186161 | |
S5‑186467 | pCR 28.861 add SON frameworks | Intel Mobile France, Verizon | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| No |
Yes
| withdrawn | Yes | ||
S5‑186468 | Skeleton for Policy Management Interface specification | China Mobile (Hangzhou) Inf. | pCR | - |
6.5.4Network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | S5‑186397 | |
S5‑186469 | Draft TS 28.550 | Intel | draft TS | Approval |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| No |
Yes
| left for email approval | No | ||
S5‑186470 | TD Rel-15 28550-200 on file based solution | Ericsson Inc.,Deutsche Telekom, Nokia, Huawei | discussion | Endorsement |
6.4.1Assurance data and Performance Management for 5G networks and network slicing
| Yes |
Yes
| endorsed | No | S5‑186428 | |
S5‑186471 | Draft TR 28.812 | Huawei | draft TR | Approval |
6.5.6Intent driven management service for mobile networks
| No |
Yes
| left for email approval | No | ||
S5‑186472 | Draft TS 28.311 | China Mobile | draft TS | Approval |
6.5.4Network policy management for mobile networks based on NFV scenarios
| No |
Yes
| left for email approval | No | ||
S5‑186473 | CR Rel-16 28.552 Add inter-gNB handover related measurements | Intel Corporation (UK) Ltd | CR | Approval |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| agreed | No | S5‑186373 | |
S5‑186474 | Fix outdated reference | Nokia | CR | Agreement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑186475 | OAM&P SWG action list | WG Vice Chair (ORANGE) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑186412 | |
S5‑186476 | Way forward for MnS discovery | Huawei | discussion | Endorsement |
6.3OAM&P Maintenance and Rel-16 small Enhancements
| Yes |
Yes
| endorsed | No | S5‑186339 | |
S5‑186477 | Draft TS 28.310 | ORANGE | draft TS | Approval |
6.5.2Energy Efficiency of 5G
| No |
Yes
| left for email approval | No | ||
S5‑186478 | CR Rel-16 28.552 Add PDU Session Resource setup related measurements for gNB | Intel Corporation (UK) Ltd | CR | Approval |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| No |
Yes
| left for email approval | No | S5‑186372 | |
S5‑186479 | pCR TR 28.900 No PM job control in ONAP | AT&T, Orange | pCR | - |
6.6.2Study on integration of ONAP DCAE and 3GPP management architecture
| Yes |
Yes
| approved | No | S5‑186436 | |
S5‑186480 | pCR 28.804 scope of tenancy TR | HUAWEI TECH. GmbH | pCR | Approval |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| approved | No | S5‑186450 | |
S5‑186481 | pCR Tenancy definition in 3GPP management system | HUAWEI TECH. GmbH | pCR | - |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| revised | No | S5‑186488 | S5‑186451 |
S5‑186482 | pCR 28.805Add management support for Service SLA assurance | Huawei, China Mobile, Nokia, NEC, Deutsche Telekom, Ericsson,Intel,ZTE | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| revised | No | S5‑186490 | S5‑186459 |
S5‑186483 | pCR 28.861 add scope | Intel Mobile France | pCR | Approval |
6.6.8Study on Self-Organizing Networks (SON) for 5G
| Yes |
Yes
| approved | No | S5‑186464 | |
S5‑186484 | Reply to: LS from BBF cc SA5 on Response to 3GPP SA2 liaison S2-189038 on ‘general status of work’ | Ericsson | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | S5‑186322 | |
S5‑186485 | New WID on NRM enhancements | Nokia Shanghai Bell | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑186324 | |
S5‑186486 | Discussion about how SA5 SA2 RAN3 work together to guarantee network slice SLA | China Mobile, Huawei, Nokia, NEC, Deutsche Telekom, Ericsson, Intel, ZTE | discussion | Endorsement |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| endorsed | No | S5‑186370 | |
S5‑186487 | Reply LS on Slice related Data Analytics | China Mobile (Hangzhou) Inf. | LS out | - |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| revised | No | S5‑186491 | S5‑186371 |
S5‑186488 | pCR Tenancy definition in 3GPP management system | HUAWEI TECH. GmbH | pCR | - |
6.6.6Study on tenancy concept in 5G networks and network slicing management
| Yes |
Yes
| approved | No | S5‑186481 | |
S5‑186489 | OAM Executive Report | WG Vice Chair (ORANGE) | report | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑186018 | |
S5‑186490 | pCR 28.805Add management support for Service SLA assurance | Huawei, China Mobile, Nokia, NEC, Deutsche Telekom, Ericsson,Intel,ZTE | pCR | Approval |
6.6.7Study on management aspects of communication services
| Yes |
Yes
| approved | No | S5‑186482 | |
S5‑186491 | Reply LS on Slice related Data Analytics | China Mobile (Hangzhou) Inf. | LS out | - |
6.5.7Enhancement of performance assurance for 5G networks including network slicing
| Yes |
Yes
| approved | No | S5‑186487 | |
S5‑186492 | SA5 Meeting Calendar | WG Chairman | other | - |
5.4SA5 meeting calendar
| Yes |
Yes
| noted | No | S5‑186012 |