Tdoc List

2018-04-13 13:55

TDoc Title Source Type For Agenda Avail Treated Decision Wdrn Replaced-by Replaces
S5‑182000 Agenda WG Chairman agenda  
2Approval of the agenda
Yes
Yes
approved No    
S5‑182001 IPR and legal declaration WG Chairman other  
3IPR declaration
Yes
Yes
noted No    
S5‑182002 Report from last SA5 meeting MCC report  
4.1Last SA5 meeting report
Yes
Yes
approved No    
S5‑182003 SA5 status report at last SA meeting WG Chairman report  
4.2Last SA meeting report
Yes
Yes
noted No    
S5‑182004 SA5 results at last SA meeting WG Chairman report  
4.2Last SA meeting report
Yes
Yes
Robert (Ericsson) asked if CT4 had checked the working methods of the Charging group. The Chair didn’t know to what extent they had seen the alignment in the API work. Maryse (Nokia) commented that it was too early and that this wasn't going to affect the work in Charging at the moment, but discussions were encouraged.
Thomas commented that for OAM it was a bit late and that apparently they hadn’t seen the OAM work yet. There was little time to align the work.
Erik (Samsung) commented that CT/SA was trying to aling the API and use of protocols internally in the operator's network.
Robert (Ericsson) commented that they could have invited SA5 for cooperation a bit earlier, it was too difficult to start the work now.
As for the references to ONAP's work, Erik commented that the material had creative commons license, anyone could copy and modify. This was to be cheked by ETSI and SA5 had green light to carry on. Using the URL archive was another issue.
 
 
noted No    
S5‑182005 Leaders meeting agenda WG Chairman agenda  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑182006 Leaders meeting minutes WG Chairman report  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑182007 SA5 Working Procedures WG Vice Chair (Huawei) other  
5.1Administrative issues at SA5 level
Yes
Yes
approved No    
S5‑182008 SA5 Meeting Facility Requirements WG Vice Chair (Orange) other  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑182009 Process for management of draft TSs/TRs WG Chairman other  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑182010 CR Quality Check MCC other  
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑182011 Status of email approvals WG Vice Chair (Orange) other  
5.1Administrative issues at SA5 level
No
No
reserved No    
S5‑182012 SA5 Meeting Calendar WG Chairman other  
5.4SA5 meeting calendar
Yes
Yes
January 2019: Hosted by NAF.
June 2019: Sapporo (Japan). This was intended to be an ad-hoc meeting. JF3 could not fulfil the request to host in January. Proposed to have the meeting Tuesday-Friday.
Potential ad-hoc in October 2019 is cancelled.
April 2019: hosted by NAF.
November 2019: hosted by CF3.
 
 
noted No    
S5‑182013 Deliverables due for the NEXT SA Plenary MCC other  
5.5Review of the Work Plan
Yes
Yes
noted No    
S5‑182014 Ongoing SA5 WIDs and SIDs WG Vice Chair (Huawei) other  
5.5Review of the Work Plan
Yes
Yes
noted No    
S5‑182015 SA5 3GPP Work Plan MCC other  
5.5Review of the Work Plan
Yes
Yes
noted No    
S5‑182016 Work Plan status WG Chair other  
5.5Review of the Work Plan
No
No
reserved No    
S5‑182017 Time Plan for OAM&P WG Vice Chair (Huawei) other  
6.1OAM&P Plenary
Yes
Yes
revised No S5‑182364  
S5‑182018 OAM Executive Report WG Vice Chair (Huawei) report  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182019 OAM&P SWG action list WG Vice Chair (Huawei) other  
6.1OAM&P Plenary
Yes
Yes
revised No S5‑182539  
S5‑182020 Minutes of OAM&P SWG opening session WG Vice Chair (Huawei) report  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182021 Minutes of New Work Item proposals - OAM&P WG Vice Chair (Orange) report  
6.2New OAM&P Work Item proposals
No
Yes
withdrawn Yes    
S5‑182022 Minutes of OAM&P Maintenance and Rel-15 small Enhancements MCC report  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
noted No    
S5‑182023 Minutes of Management and orchestration of 5G networks and network slicing Rapporteur (Ericsson) report  
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182024 Minutes of Provisioning of 5G networks and network slicing Rapporteur (Huawei) report  
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182025 Minutes of Network Resource Model (NRM) for 5G networks and network slicing Rapporteur (Nokia) report  
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182026 Minutes of Fault Supervision for 5G networks and network slicing Rapporteur (ZTE) report  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182027 Minutes of Assurance data and Performance Management for 5G networks and network slicing Rapporteur (Intel) report  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182028 Minutes of Management of 5G Trace management Rapporteur(Nokia) report  
6.4.65G Trace management
Yes
Yes
noted No    
S5‑182029 Minutes of Management and virtualization aspects of 5G networks Rapporteur Intel report  
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
noted No    
S5‑182030 Minutes for Management of QoE measurement collection Rapporteur (Ericsson) report  
6.4.8Management of QoE measurement collection
Yes
Yes
noted No    
S5‑182031 Minutes for REST Solution Sets Rapporteur(Nokia) report  
6.4.9REST Solution Sets
Yes
Yes
noted No    
S5‑182032 Minutes for Management Enhancement for EPC CUPS Rapporteur (Huawei) report  
6.4.10Management Enhancement for EPC CUPS
Yes
Yes
noted No    
S5‑182033 Minutes of Study on OAM aspects of LTE and WLAN integration Rapporteur (Intel) report  
6.5.1Study on OAM aspects of LTE and WLAN integration
Yes
Yes
noted No    
S5‑182034 Minutes of Study on network policy management for mobile networks based on NFV scenarios Rapporteur (China Mobile) report  
6.5.2Study on network policy management for mobile networks based on NFV scenarios
Yes
Yes
noted No    
S5‑182035 Minutes for Study on system and functional aspects of Energy Efficiency in 5G networks Rapporteur (ORANGE) report  
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
noted No    
S5‑182036 Minutes of Study on integration of ONAP DCAE and 3GPP management architecture Rapporteur (ORANGE) report  
6.5.4Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
noted No    
S5‑182037 CH Agenda and Time Plan CH SWG Chair agenda  
7.1Charging Plenary
Yes
Yes
approved No    
S5‑182038 CH Executive Report CH SWG Chair report  
7.1Charging Plenary
Yes
Yes
revised No S5‑182466  
S5‑182039 LS from MEF Forum to SA5 on MEF Forum Work on 5G MEF Forum LS in  
5.3Liaison statements at SA5 level
Yes
Yes
noted No    
S5‑182040 LS Reply from ETSI NFV to 3GPP SA5 on transport network support of network slicing management ETSI ISG NFV LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182041 LS from ETSI NFV to 3GPP SA5 on NFV support for Network Slicing ETSI ISG NFV LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑182042 LS reply from ETSI ZSM to 3GPP SA5 on transport network support of network slicing management ETSI ISG ZSM LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182043 LS from NGMN to SA5 on NGMN “RAN functional split and x-haul” work item NGMN LS in  
5.3Liaison statements at SA5 level
Yes
Yes
noted No    
S5‑182044 LS from NGMN cc SA5 on NGMN Paper on 5G End-to-End Architecture Framework. NGMN LS in  
5.3Liaison statements at SA5 level
Yes
Yes
noted No    
S5‑182045 LS from GSMA to SA5 on Publication of new paper on network slicing and future plans GSMA LS in  
5.3Liaison statements at SA5 level
Yes
Yes
noted No    
S5‑182046 LS from RAN2 cc SA5 on Reply LS on adding new service type in QMC reporting R2-1804085 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182047 Reply LS from RAN2 to SA5 on Attributes for QoE measurement collection R2-1804086 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182048 LS from RAN2 to SA5 on Response LS on adding PRB usage distribution and IP throughput distribution measurements R2-1804087 LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑182049 Response LS from RAN2 to SA5 on adding measurements on average number of total active UEs R2-1804088 LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑182050 Reply LS from RAN2 to SA5 on measurement of user plane latency R2-1804096 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182051 Reply LS from RAN3 to SA5 on Collection Period correction for MDT M3 measurement in eUTRAN R3-181544 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182052 Reply LS from RAN6 cc SA5 on adding new service type in QMC reporting R6-180049 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182053 LS from SA2 to SA5 on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic S2-182411 LS in  
7.1Charging Plenary
Yes
Yes
replied to No    
S5‑182054 Reply LS from SA2 to SA5 on alignment of clarification of network slicing and sharing concepts S2-182837 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182055 LS reply from SA2 to SA5 on Response on 5G Specification of PSy and LS on Reply on 5G Specification of N28 interface S2-182875 LS in  
7.1Charging Plenary
Yes
Yes
replied to No    
S5‑182056 LS from SA2 cc SA5 on slicing S2-183035 LS in  
5.3Liaison statements at SA5 level
Yes
Yes
noted No    
S5‑182057 LS from SA2 to BBF cc SA5 on general status of work S2-183036 LS in  
5.3Liaison statements at SA5 level
Yes
Yes
noted No    
S5‑182058 LS from SA4 to SA5 on Attributes for QoE measurement collection S4-180240 LS in  
6.1OAM&P Plenary
Yes
Yes
postponed No    
S5‑182059 Resubmitted LS from ITU-T to SA5 on Transport network management to support IMT-2020/5G ITU-T SG-15 LS in  
6.1OAM&P Plenary
Yes
Yes
noted No    
S5‑182060 LS from ITU-T to SA5 on Transport network management to support 3GPP 5G ITU-T SG-15 LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑182061 LS from ITU-T to SA5 on Energy efficiency (reply to 3GPP TSG SA - S5-181570 -E) ITU-T SG-5 LS in  
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
replied to No    
S5‑182062 LS from NGMN forwarded to SA5 on Architectural Proposal for the Handling of Network Operations Data with Specific Focus on Virtualized Networks NGMN LS in  
6.1OAM&P Plenary
No
Yes
withdrawn Yes    
S5‑182063 use of NR model for deployment scenarios Ericsson Inc. discussion Endorsement
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182242  
S5‑182064 pCR Rel-15 TS 28.533 re network management framework Ericsson Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
merged No S5‑182393  
S5‑182065 pCR Rel-15 TS 28.541 NR cell relation to sector equipment Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182399  
S5‑182066 pCR Rel-15 TS 28.541 editorial changes to class names and UML diagrams Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182391  
S5‑182067 pCR Rel-15 TS 28.541 class attribute pLMNList Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182397  
S5‑182068 pCR Rel-15 TS 28.541 class attribute administrative state Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182400  
S5‑182069 CR Rel-15 Add NR frequency bands supported by the hardware associated with the SectorEquipmentFunction Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
not pursued No    
S5‑182070 CR Rel-15 28663 Add NR frequency bands supported by the hardware associated with the SectorEquipmentFunction Ericsson Inc. CR Approval
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
not pursued No    
S5‑182071 TD Rel-15 relation between node and cell Ericsson Inc. discussion Endorsement
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182072 Skeleton for Rel-15 32.159 Template for stage 2 and stage 3 of management service definitions. Ericsson Inc. draft TS Approval
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
approved No    
S5‑182073 pCR Rel-15 32159 Template for stage 2 and stage 3 of management service definitions. Ericsson Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182074 CR R15 to TS 32421-e00 Add support for 5G Trace Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182425  
S5‑182075 CR R15 to TS 32422-f00 Add support for 5G Trace (scope, references, definitions, abbreviations) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182426  
S5‑182076 CR R15 to TS 32422-f00 Add support for 5G Trace (management activation in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182427  
S5‑182077 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling activation in 5GC) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182428  
S5‑182078 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling activation in NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182429  
S5‑182079 CR R15 to TS 32422-f00 Add support for 5G Trace (management deactivation in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182430  
S5‑182080 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling deactivation in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182431  
S5‑182081 CR R15 to TS 32422-f00 Add support for 5G Trace (management trace recording session starting in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182432  
S5‑182082 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling trace recording session starting in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182433  
S5‑182083 CR R15 to TS 32422-f00 Add support for 5G Trace (management trace recording session stopping in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182434  
S5‑182084 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling trace recording session stopping in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182435  
S5‑182085 CR R15 to TS 32422-f00 Add support for 5G Trace (triggering events in 5GC) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No    
S5‑182086 CR R15 to TS 32422-f00 Add support for 5G Trace (5G NEs, interfaces and trace parameters) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182436  
S5‑182087 CR R15 to TS 32422-f00 Add support for 5G Trace (5G trace reporting) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No    
S5‑182088 pCR TR 32.972 – Cleanup Orange Spain pCR Approval
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
revised No S5‑182440  
S5‑182089 pCR TS 28.541 Correction of the definition of NR node related IOCs Orange, Nokia pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182394  
S5‑182090 pCR 32.848 Charging for support of identifiers of caller and callee China Mobile pCR Approval
7.5.1Study on Volume Based Charging Aspects for VoLTE
Yes
Yes
revised No S5‑182458  
S5‑182091 pCR 32.290 Introduce a new consumer China Mobile pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182351  
S5‑182092 pCR TR 32.972 – Potential use cases and requirements for assessing EE of 5G network functions Orange Spain pCR Approval
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
revised No S5‑182441  
S5‑182093 pCR TR 28.900 - Handling of performance data collection AT&T, Orange pCR  
6.5.4Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑182534  
S5‑182094 CR R15 32.404-e10 Added 5GS to PM template Ericsson CR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182414  
S5‑182095 pCR 28.533 Add building blocks to management framework Nokia Germany pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182490  
S5‑182096 pCR 32.158 Add resource archetypes Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
revised No S5‑182445  
S5‑182097 pCR 32.158 Add design pattern for scoping and filtering Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
revised No S5‑182446  
S5‑182098 pCR 32.158 Add design pattern for subscribe/notify Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
revised No S5‑182447  
S5‑182099 pCR 32.158 Add resource representation formats Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
approved No    
S5‑182100 pCR 32.158 Add REST SS specification template Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
revised No S5‑182449  
S5‑182101 pCR 28.552 Add subclauses to clause 5.1 Ericsson pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182102 pCR 32.158 Add example REST SS Nokia Germany pCR Approval
6.4.9REST Solution Sets
No
Yes
withdrawn Yes    
S5‑182103 pCR 28.552 Add UC for UL and DL packet loss and UL packet loss measurement Ericsson pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182421  
S5‑182104 pCR 28.552 Add UL and DL F1-U packet loss measurements Ericsson pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182422  
S5‑182105 pCR 28.552 Add DL packet drop UC and measurements Ericsson pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182520  
S5‑182106 [DRAFT] LS on L2 measurement specification for NR in R15 Ericsson LS out  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182521  
S5‑182107 CR R8 32642-860 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182108 CR R9 32642-940 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182109 CR R10 32642-a40 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182110 CR R11 32642-b50 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182111 CR R8 32652-810 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
approved No    
S5‑182112 CR R9 32652-920 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182113 Discussion paper for connectivity between VNF and PNF Intel Mobile Denmark discussion Decision
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
noted No    
S5‑182114 CR R10 32652-a30 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182115 CR R11 32652-b21 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182116 Rel-15 CR TS 32.425 Add use case and definition for distribution of scheduled IP Throughput Huawei CR Agreement
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
revised No S5‑182372  
S5‑182117 Rel-15 CR TS 32.425 Add use case and definition for distribution of total PRB usage Huawei CR Agreement
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
revised No S5‑182374  
S5‑182118 Revised WID Management and orchestration of 5G networks and network slicing Huawei WID revised Agreement
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182489  
S5‑182119 pCR 28.530 Add use case and requirements for configuration management of 5G networks and network slicing Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182120 pCR 28.530 Update use case and requirements for the case of network slicing supporting communication services Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182528  
S5‑182121 pCR 28.530 Update clause 4.1.3 5.4.2 and 5.4.7 Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182475  
S5‑182122 pCR 28.530 Update requirements on network slicing management Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182123 pCR 28.533 Add general description on service based management framework for 5G networks and network slicing Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
merged No S5‑182393  
S5‑182124 pCR 28.533 Add service based management architecture for 5G networks and network slicing Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182125 pCR 28.533 Network Function management service Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182451  
S5‑182126 pCR 28.533 Network management architecture interaction with NFV-MANO Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182127 Discussion paper on NST and NSST standardization Huawei discussion Endorsement
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182128 Discussion paper on NSI ID and MNSI ID Huawei discussion Endorsement
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182129 pCR 28.530 Add UC for Delegation of Network Management Capability China Southern Power Grid Co., Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182377  
S5‑182130 pCR 28.533 Add resource usage data collection services for NF, NSS and NS Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182131 pCR 28.533 Potential interactions between 5G management functions and 3GPP Legacy management systems Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182132 pCR 28.530 Network slice terminology alignment Ericsson Limited pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182468  
S5‑182133 CR R12 32652-c00 Align terminology Ericsson CR  
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182134 TS 28.525 add NSD relevant information to NSD on-boarding Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
not pursued No    
S5‑182135 pCR 28.530 Network slice subnet terminology alignment Ericsson Limited pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182469  
S5‑182136 TS 28.525 use case of adding VNF instance to a NS with connectivity Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
revised No S5‑182457  
S5‑182137 pCR R15 28404-030 Introduction of fault indication Ericsson pCR  
6.4.4Fault Supervision for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182138 Sequence proposal for management and orchestration of 5G networks and network slicing agenda point 6.4.1 Ericsson Limited other Information
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182373  
S5‑182139 [DRAFT] LS on indications for QoE data collection Ericsson LS out  
6.4.8Management of QoE measurement collection
No
Yes
withdrawn Yes    
S5‑182140 TS 28.525 use case of adding external connectivity to a PNF or VNF instance Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
revised No S5‑182473  
S5‑182141 Discussion paper on architecture description Ericsson Limited discussion Endorsement
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182142 TS 28.525 use case of adding / removing NS virtual link to / from a NS instance Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
revised No S5‑182438  
S5‑182143 pCR 28.550 Update UC and requirements on NF measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182416  
S5‑182144 pCR 28.550 Add UC and requirements on NF measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182417  
S5‑182145 pCR 28.531 Rapporteur proposal for cleanup Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No    
S5‑182146 pCR 28.532 Add procedure of obtaining network slice subnet capability information Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182482  
S5‑182147 pCR 28.531 Add use case and requirements on obtaining network slice instance information Huawei, China Southern Power Grid Co. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182381  
S5‑182148 pCR 28.532 Update Clause 7.2 Procedure of Network Slice Instance Allocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No    
S5‑182149 pCR 28.532 Add procedure of network slice subnet allocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182483  
S5‑182150 pCR 28.532 Add information element for allocateMNSI service operation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182151 pCR 28.532 Add information element for allocateMNSSI service operation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182152 pCR 28.532 Add information model definition of network slice Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182153 pCR 28.532 Add information model definition of network slice subnet Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182154 pCR 28.532 Add procedure of coordination with TN Manager Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182484  
S5‑182155 pCR 28.532 Add management services for network function provisioning Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182156 pCR 28.532 Add operations of NF provisioning Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182157 pCR 28.531 Add requirements for feasibility check Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182387  
S5‑182158 pcR 28.531 Add UC and requirement for management capability exposure Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182159 pCR 28.532 Add network slice subnet exposure management service Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182160 pCR 28.531 Update use cases in clause 5.1 Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182379  
S5‑182161 pCR 28.531 Update requirements in clause 5.2 Huawei, China Southern Power Grid Co. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182380  
S5‑182162 pCR 28.532 Add procedure of network slice instance modification Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182488  
S5‑182163 pCR 28.532 Add procedure of network slice subnet instance modification Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182164 pCR 28.532 Add operation for network slice instance modification and network slice subnet instance modification Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182165 pCR 28.532 Add operation for network slice instance deallocation and network slice subnet instance deallocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
not treated No    
S5‑182166 pCR 28.532 Add provisioning procedures of Network slice instance deallocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182486  
S5‑182167 pCR 28.532 Add provisioning procedures of Network slice subnet instance deallocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182487  
S5‑182168 pCR 28.550 Add UC and requirements on NF measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182418  
S5‑182169 pCR 28.550 Update UC and requirements on NSSI measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182508  
S5‑182170 pCR 28.550 Add UC and requirements on NSSI measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182509  
S5‑182171 pCR 28.550 Add UC and requirements on NSSI measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182510  
S5‑182172 pCR 28.550 Update UC and requirements on NSI measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182511  
S5‑182173 pCR 28.550 Add UC and requirements on NSI measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182512  
S5‑182174 pCR 28.550 Add UC and requirements on NSI measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182513  
S5‑182175 pCR 28.550 Update UC and requirements on network measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182514  
S5‑182176 pCR 28.550 Add UC and requirements on network measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182515  
S5‑182177 pCR 28.550 Add UC and requirements on network performance data reporting Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182178 pCR 28.550 Add UC and requirements on network measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182516  
S5‑182179 pCR 28.551 Add measurement job control related SAIs Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182419  
S5‑182180 Add measurement job information related SAIs Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182420  
S5‑182181 TS 28.525 use case of adding or removing connectivity to or from a PNF Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
not pursued No    
S5‑182182 pCR 28.551 Add performance data file reporting related SAIs Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182518  
S5‑182183 pCR 28.551 Add performance data streaming related SAIs Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182184 pCR 28.533 Add general concepts for SBA Intel Finland Oy, Orange pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
merged No S5‑182393  
S5‑182185 TS 28.525 use case of changing external connectivity to a PNF or VNF instance Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
revised No S5‑182454  
S5‑182186 pCR 28.531 Add UC and requirements on NF instantiation Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182382  
S5‑182187 TS 28.525 use case of adding geographical location information in PNFD on-boarding Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
revised No S5‑182450  
S5‑182188 pCR 28.531 Add UC and requirements on NF configuration Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182383  
S5‑182189 pCR 28.531 Add UC and requirements on network creation Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182384  
S5‑182190 pCR 28.531 Add UC and requirements on network configuration Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182385  
S5‑182191 pCR 28.531 Update UC and requirements on NSSI creation Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
merged No S5‑182379  
S5‑182192 TS 28.526 procedure of adding the geographical location information in PNFD on-boarding Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
not pursued No    
S5‑182193 pCR 32.868 Editorial clean-up Intel Finland Oy pCR Approval
6.5.1Study on OAM aspects of LTE and WLAN integration
Yes
Yes
revised No S5‑182538  
S5‑182194 pCR 32.868 Add conclusions Intel Finland Oy pCR Approval
6.5.1Study on OAM aspects of LTE and WLAN integration
Yes
Yes
approved No    
S5‑182195 TS 28.515 scope extension Intel Mobile Denmark CR  
6.4.7Management and virtualization aspects of 5G networks
No
Yes
withdrawn Yes    
S5‑182196 pCR 32.868 Add recommendations Intel Finland Oy pCR Approval
6.5.1Study on OAM aspects of LTE and WLAN integration
Yes
Yes
approved No    
S5‑182197 pCR 28.545 Update Alarm related services Huawei pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182406  
S5‑182198 pCR 28.546 Add interfaces for fault supervision of networks and network slicing Huawei pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182409  
S5‑182199 pCR 28.545 Add requirements for VNF alarm correlation Huawei pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182407  
S5‑182200 pCR 28.554 Add NSI Provisioning Time Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182201 pCR 28.550 Update performance management related services Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182540  
S5‑182202 pCR 28.551 Add interfaces for performance management of networks and network slicing Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182519  
S5‑182203 pCR 28.554 Add definition of end-to-end latency of 5G network related KPI Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182507  
S5‑182204 pCR 28.554 Add definition of number of registered subscribers of single network slice instance related KPI Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
merged No S5‑182529  
S5‑182205 pCR 28.554 Add definition of IP throughput for one single network slice instance related KPI Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182530  
S5‑182206 pCR 28.550 Add requirement of decomposing performance data types(s). Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182207 pCR 28.553 Add measurement of number of PDU session of SMF Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182423  
S5‑182208 pCR 28.553 Add measurement of set-up time of PDU session of AMF Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182209 pCR 28.553 Add measurement of number of GTP-U packets on N3 Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182522  
S5‑182210 pCR 28.553 Add measurement of N6 related measurements Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182524  
S5‑182211 TS 28.515 scope extension Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No    
S5‑182212 TS 28.516 scope extension Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No    
S5‑182213 Presentation of TR 32.868 for approval Intel Finland Oy other Approval
6.5.1Study on OAM aspects of LTE and WLAN integration
No
Yes
withdrawn Yes    
S5‑182214 TS 28.520 scope extension Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No    
S5‑182215 TS 28.521 scope extension Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No    
S5‑182216 TS 28.527 scope extension Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No    
S5‑182217 TS 28.528 scope extension Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No    
S5‑182218 pCR TR 32.871 Mapping of Policy related function to MANO functional blocks China Mobile Com. Corporation pCR Approval
6.5.2Study on network policy management for mobile networks based on NFV scenarios
Yes
Yes
revised No S5‑182532  
S5‑182219 pCR TR 32.871 General message flow for policy active/deactive and policy conflict report China Mobile Com. Corporation pCR Approval
6.5.2Study on network policy management for mobile networks based on NFV scenarios
Yes
Yes
revised No S5‑182533  
S5‑182220 pCR draft TS 28.545 Add introduction and scope ZTE Corporation pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No    
S5‑182221 pCR draft TS 28.545 Add filtering requirements ZTE Corporation pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182408  
S5‑182222 pCR draft TS 28.545 update the service names and requirement tags ZTE Corporation pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182223 pCR 28.530 Update network slice as a service and network slice as NOP internals Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182472  
S5‑182224 pCR draft TS 28.546 add interfaces of services for fault supervision ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
merged No S5‑182409  
S5‑182225 pCR draft TS 28.546 add interfaces of subscriptionServices ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182410  
S5‑182226 pCR draft TS 28.546 add interfaces of AlarmListReadingServices ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182411  
S5‑182227 pCR draft TS 28.546 add interfaces of AlarmAcknowledgementServices ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182412  
S5‑182228 pCR draft TS 28.546 add interfaces of AlarmClearance Services ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182504  
S5‑182229 pCR TS 28.541 update NR NRM to support of network slicing feature HuaWei Technologies Co., Ltd pCR  
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
merged No S5‑182396  
S5‑182230 pCR 28.543 Add class definition of NSSF and NRF HuaWei Technologies Co., Ltd pCR  
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
merged No S5‑182492  
S5‑182231 Rel-15 pCR 32.848 Charging for support of 3PTY, HOLD and CW scenarios Huawei, China Mobile pCR Agreement
7.5.1Study on Volume Based Charging Aspects for VoLTE
Yes
Yes
revised No S5‑182459  
S5‑182232 Rel-15 pCR 32.255 Charging principle Huawei Technologies Co. Ltd. pCR Agreement
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑182343  
S5‑182233 Rel-15 pCR 32.255 Message flows Huawei Technologies Co. Ltd. pCR Agreement
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No S5‑182354  
S5‑182234 Rel-15 pCR 32.255 Definition of charging information Huawei Technologies Co. Ltd. pCR Agreement
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑182356  
S5‑182235 Rel-15 pCR 32.290 Converged charging service definition Huawei Technologies Co. Ltd. pCR Agreement
7.4.2Service Based Interface for 5G Charging
Yes
Yes
merged No S5‑182361  
S5‑182236 Rel-15 pCR 32.291 Nchf_UsageCharging service API definition Huawei Technologies Co. Ltd. pCR Agreement
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182362  
S5‑182237 R15 CR 32.299 Introduce the Northbound API charging Huawei Technologies Co. Ltd. CR Agreement
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
Yes
Yes
revised No S5‑182336  
S5‑182238 R15 CR 32.298 Introduce the Northbound API charging Huawei Technologies Co. Ltd. CR Agreement
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
Yes
Yes
revised No S5‑182338  
S5‑182239 pCR 28.530 Update principles and related requirements DOCOMO Communications Lab. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182240 pCR 32.290 Introduce Spending Limit Control Service China Mobile pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No    
S5‑182241 CR 28.708 Concept and references HuaWei Technologies Co., Ltd CR  
6.4.10Management Enhancement for EPC CUPS
Yes
Yes
Revised contents will be added to the draft CR in 444.
not pursued No    
S5‑182242 use of NR model for deployment scenarios Ericsson Inc, NTT DOCOMO INC discussion Endorsement
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182390 S5‑182063
S5‑182243 CR 28.708 IS EP_RP Diagram HuaWei Technologies Co., Ltd CR  
6.4.10Management Enhancement for EPC CUPS
Yes
Yes
Revised contents will be added to the draft CR in 444.
not pursued No    
S5‑182244 CR 28.708 IS NRM PGW Function.doc HuaWei Technologies Co., Ltd CR  
6.4.10Management Enhancement for EPC CUPS
Yes
Yes
Revised contents will be added to the draft CR in 444.
not pursued No    
S5‑182245 CR 28.708 IS NRM SGW Function HuaWei Technologies Co., Ltd CR  
6.4.10Management Enhancement for EPC CUPS
Yes
Yes
Revised contents will be added to the draft CR in 444.
not pursued No    
S5‑182246 CR 28.708 IS NRM IS PGW_C&U HuaWei Technologies Co., Ltd CR  
6.4.10Management Enhancement for EPC CUPS
Yes
Yes
Revised contents will be added to the draft CR in 444.
not pursued No    
S5‑182247 Delegating Network slice subnet instance management capability HuaWei Technologies Co., Ltd pCR  
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182402  
S5‑182248 pCR 28 531 Add UC of Network slice subnet configuration of slice constituents HuaWei Technologies Co., Ltd pCR  
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182476  
S5‑182249 Discussion Paper on analysis of 5G charging information definition Huawei Technologies Co. Ltd. discussion Agreement
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
noted No    
S5‑182250 pCR draft TS 28.546 add notifyNewAlarm interface of AlarmNotificationServices for fault supervision CMDI pCR  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182413  
S5‑182251 pCR draft TS 28.546 add notifyChangedAlarm interface of AlarmNotificationServices for fault supervision CMDI pCR  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182501  
S5‑182252 pCR draft TS 28.546 add notifyCorrelatedNotificationChanged interface of AlarmNotificationServices for fault supervision CMDI pCR  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182505  
S5‑182253 Rel-15 CR 32.251 Enhancement on location information in trusted and untrusted WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
revised No S5‑182339  
S5‑182254 Rel-15 CR 32.299 Enhancement on location information in trusted and untrusted WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
revised No S5‑182340  
S5‑182255 Rel-15 CR 32.298 Enhancement on location information in trusted and untrusted WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
revised No S5‑182341  
S5‑182256 Rel-15 CR 32.251 Introduce Emergency services over WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
agreed No    
S5‑182257 Rel-15 CR 32.298 Introduce Emergency services over WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
agreed No    
S5‑182258 Discussion paper on Services exposed by CHF through Nchf Nokia, Nokia Shanghai Bell discussion Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
noted No    
S5‑182259 Rel-15 pCR TS 32.255 Additional References and abbreviations Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑182355  
S5‑182260 Rel-15 pCR TS 32.255 Introduction offline scenario charging principles Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
noted No    
S5‑182261 Rel-15 pCR TS 32.255 Introduction online scenario charging principles Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
noted No    
S5‑182262 Rel-15 pCR TS 32.255 Introduction convergent scenario charging principles Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑182352  
S5‑182263 Rel-15 pCR TS 32.255 Introduction of SMF-PDU-CDR description Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑182359  
S5‑182264 Rel-15 pCR TS 32.255 Introduction of Service information - PDU session charging Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
merged No S5‑182356  
S5‑182265 Rel-15 pCR TS 32.290 Introduction of offline and online charging scenario Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182350  
S5‑182266 Rel-15 pCR TS 32.290 Introduction of event based convergent charging scenarios Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182347  
S5‑182267 Rel-15 pCR TS 32.290 Introduction of session based convergent charging scenarios Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182348  
S5‑182268 Rel-15 pCR TS 32.290 Introduction of Services exposed by CHF Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182361  
S5‑182269 Rel-15 pCR TS 32.290 Offline charging service over SBI Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
noted No    
S5‑182270 Rel-15 pCR TS 32.290 Online charging service over SBI Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
noted No    
S5‑182271 Rel-15 pCR TS 32.290 Converged charging service over SBI Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
noted No    
S5‑182272 Rel-15 pCR TS 32.290 Introduction of logical basic operations for SBI Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182357  
S5‑182273 Rel-15 pCR TS 32.255 Introduction of charging message content Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
noted No    
S5‑182274 pCR draft TS 28.546 Add notifyAlarmListRebuilt interface for AlarmNotification services CMDI pCR  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182506  
S5‑182275 Add notifyAckStateChanged interface of AlarmNotification services CMDI pCR  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182502  
S5‑182276 pCR draft TS 28.546 Add notifyClearedAlarm interface of AlarmNotification services CMDI pCR  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182503  
S5‑182277 pCR TS 28.540 Editor's note cleanup and editoral changes Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No    
S5‑182278 pCR TS 28.542 Editor's note cleanup and editoral changes Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No    
S5‑182279 pCR TS 28.541 Modify gNB IM definitions to support network slicing Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182396  
S5‑182280 pCR TS 28.541 Add IM definitions for en-gNB with functional split Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182395  
S5‑182281 pCR TS 28.541 Add IM definitions for ng-eNB Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182282 pCR TS 28.543 Modify 5GC NF NRM diagrams Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182398  
S5‑182283 pCR TS 28.543 Add IM definitions for SMF and UPF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182494  
S5‑182284 pCR TS 28.543 Add IM definitions for AUSF, UDM, UDR and 5GEIR Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182495  
S5‑182285 pCR TS 28.543 Add IM definitions for PCF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182496  
S5‑182286 pCR TS 28.543 Add IM definitions for NSSF and NRF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182492  
S5‑182287 pCR TS 28.543 Add IM definitions for AMF Set Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182493  
S5‑182288 pCR TS 28.543 Add IM definitions for UDSF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182497  
S5‑182289 pCR TS 28.543 Add IM definitions for N3IWF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182498  
S5‑182290 pCR TS 28.543 Add IM definitions for SEPP Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182499  
S5‑182291 pCR TS 28.543 Add IM definitions for SMSF and LMF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182500  
S5‑182292 pCR to 28.530 Network slice instance requirements Cisco Systems Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182546  
S5‑182293 pCR to 28.530 Network slice subnet concepts Cisco Systems Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182547  
S5‑182294 pCR to 28.530 NSaaS delivery concepts Cisco Systems Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182474  
S5‑182295 pCR to 28.531 RRM policy clarification Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182296 pCR to 28.531 NSSI states diagram Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182478  
S5‑182297 pCR to 28.531 Configuration information Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182479  
S5‑182298 pCR to 28.531 Network slice instance termination Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182480  
S5‑182299 pCR to 28.531 Network Slice instance creation Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182481  
S5‑182300 Clarifications on the definition of Managed NSI and Telecommunication resources terms NEC Telecom MODUS Ltd. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182470  
S5‑182301 Add description of network slicing template and network slice subnet template China Mobile E-Commerce Co. pCR  
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182537  
S5‑182302 pCR 28.553 Add a descripment of N3 throughput measurement China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182523  
S5‑182303 pCR 28.553 Add a description of registered subscribers measurement China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182525  
S5‑182304 pCR 28.554 Add use case for actual capacity of Network Slice instance related KPI China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182526  
S5‑182305 pCR 28.554 Add use case for virtual resource utilization of Network Slice instance related KPI China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182306 pCR 28.554 Add use case for physical resource utilization of Network Slice instance related KPI China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No    
S5‑182307 pCR 28.554 Add KPI template China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182527  
S5‑182308 pCR 28.554 Add KPI definition of upstream downstream throughput for one single network slice instance China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
merged No S5‑182530  
S5‑182309 pCR 28.554 Add KPI definition of registered subscribers of single network slice instance China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182529  
S5‑182310 pCR 28.554 Add KPI definition of end-to-end latency of single network slice instance China Mobile E-Commerce Co. pCR  
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
merged No S5‑182507  
S5‑182311 Rel-15 CR 32.295 Release Version handling for Rel-15 and above Ericsson CR Approval
7.3Charging Maintenance and Rel-15 small Enhancements
Yes
Yes
revised No S5‑182363  
S5‑182312 Rel-15 CR 32.274 Correction of Rf support in IP-SM-GW Ericsson CR Approval
7.3Charging Maintenance and Rel-15 small Enhancements
Yes
Yes
not pursued No    
S5‑182313 Rel-15 pCR TS 32.255 Introduction of charging requirements and principles Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
revised No S5‑182344  
S5‑182314 Correction Access-Network-Info-Change only used for Rf Ericsson CR Approval
7.3Charging Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182315 Correction Access Network Info Change missing in table Ericsson CR Approval
7.3Charging Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182316 Rel-15 CR 32.260 Correction Time Stamps missing in table Ericsson CR Approval
7.3Charging Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182317 Rel-15 CR 32.299 Adding Annex for Diameter Overload Control Ericsson CR Approval
7.4.5Diameter Overload Control for Charging
Yes
Yes
not pursued No    
S5‑182318 Rel-15 CR 32.299 Adding General information for Diameter Overload Control Ericsson CR Approval
7.4.5Diameter Overload Control for Charging
Yes
Yes
revised No S5‑182342  
S5‑182319 Rel-15 pCR 32.290 Adding Record requirements Ericsson pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182358  
S5‑182320 Rel-15 pCR 32.290 New Converged Charging Flows Ericsson pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
merged No S5‑182347  
S5‑182321 Rel-15 pCR 32.290 New Converged Charging Service Ericsson pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
revised No S5‑182360  
S5‑182322 Adding solution to P-CSCF Key Issue #3 Ericsson pCR Approval
7.5.1Study on Volume Based Charging Aspects for VoLTE
Yes
Yes
revised No S5‑182460  
S5‑182323 pCR 28.530 Use case and requirements to modify a network slice instance due to changed demand Ericsson Limited pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182548  
S5‑182324 Tdocs discussion sequence for agenda item 6.4.2 Huawei other Information
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182491  
S5‑182325 CR R15 to TS 32422-f00 Add support for 5G Trace (NG-RAN - F1) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
not pursued No    
S5‑182326 CR R15 to TS 32422-f00 Add support for 5G Trace (additional signaling scenarios in 5GC) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
Split into 428 and 431.
merged No S5‑182428  
S5‑182327 Updated WID on Management of QoE measurement collection Ericsson WID revised  
6.4.8Management of QoE measurement collection
Yes
Yes
revised No S5‑182443  
S5‑182328 Proposal of TDoc discussion sequence for agenda item 6.4.3 Nokia other Information
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
revised No S5‑182376  
S5‑182329 LS from BBF to SA5 on Cooperation on Network Slicing BBF LS in  
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑182330 TS quality campaign update Ericsson LM other Information
5.1Administrative issues at SA5 level
Yes
Yes
noted No    
S5‑182331 Discussion Sequence Proposal for 6.4.4 ZTE Corporation other  
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
revised No S5‑182403  
S5‑182332 TD Rel-15 use of NR model for deployment scenarios Ericsson Inc. discussion Endorsement
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182333 LS from ITU-T to SA5 on Response on transport network support of network slicing management (reply to 3GPP TSG SA - Tdoc S5-181456 –E) ITU-T SG15 LS in discussion
6.1OAM&P Plenary
Yes
Yes
replied to No    
S5‑182334 Reply to: LS from SA2 to SA5 on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic Nokia LS out approval
7.1Charging Plenary
Yes
Yes
approved No    
S5‑182335 Reply to: LS reply from SA2 to SA5 on Response on 5G Specification of PSy and LS on Reply on 5G Specification of N28 interface China Mobile LS out approval
7.1Charging Plenary
Yes
Yes
approved No    
S5‑182336 R15 CR 32.299 Introduce the Northbound API charging Huawei Technologies Co. Ltd. CR Agreement
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
Yes
Yes
agreed No   S5‑182237
S5‑182337 R15 pCR 32.254 Refinement on Northbound API charging description Huawei pCR Approval
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
Yes
Yes
approved No    
S5‑182338 R15 CR 32.298 Introduce the Northbound API charging Huawei Technologies Co. Ltd. CR Agreement
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
Yes
Yes
agreed No   S5‑182238
S5‑182339 Rel-15 CR 32.251 Enhancement on location information in trusted and untrusted WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
agreed No   S5‑182253
S5‑182340 Rel-15 CR 32.299 Enhancement on location information in trusted and untrusted WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
agreed No   S5‑182254
S5‑182341 Rel-15 CR 32.298 Enhancement on location information in trusted and untrusted WLAN Nokia, Nokia Shanghai Bell CR Agreement
7.4.6Charging aspects of WLAN access in EPC
Yes
Yes
agreed No   S5‑182255
S5‑182342 Rel-15 CR 32.299 Adding General information for Diameter Overload Control Ericsson CR Approval
7.4.5Diameter Overload Control for Charging
Yes
Yes
agreed No   S5‑182318
S5‑182343 Rel-15 pCR 32.255 Charging principle clause 5.1 Huawei Technologies Co. Ltd., Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No   S5‑182232
S5‑182344 Rel-15 pCR TS 32.255 Introduction of charging requirements and principles clauses 5.1.3 and 5.1.4 Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
agreed No   S5‑182313
S5‑182345 Rel-15 pCR 32.255 Charging scenarios clause 5.2 Huawei Technologies Co. Ltd. pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
No
Yes
withdrawn Yes    
S5‑182346 Rel-15 CR 32.298 Correction on ASN.1 type for RAN Secondary RAT Usage Report Nokia, Nokia Shanghai Bell CR Agreement
7.3Charging Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No    
S5‑182347 Rel-15 pCR TS 32.290 Introduction of event based convergent charging scenarios Nokia, Nokia Shanghai Bell,Ericsson pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182266
S5‑182348 Rel-15 pCR TS 32.290 Introduction of session based convergent charging scenarios Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182267
S5‑182349 Rel-15 pCR TS 32.290 Introduction of combined session based convergent charging scenarios Ericsson pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No    
S5‑182350 Rel-15 pCR TS 32.290 Introduction of offline and online charging scenario Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182265
S5‑182351 pCR 32.290 Introduce a new consumer China Mobile pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182091
S5‑182352 Rel-15 pCR 32.255 PDU session converged charging triggers description Huawei Technologies Co. Ltd. Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No   S5‑182262
S5‑182353 Rel-15 pCR 32.255 PDU session converged charging triggers from CHF Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No    
S5‑182354 Rel-15 pCR 32.255 Message flows Huawei Technologies Co. Ltd. pCR Agreement
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No   S5‑182233
S5‑182355 Rel-15 pCR TS 32.255 Additional References and abbreviations Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No   S5‑182259
S5‑182356 Rel-15 pCR 32.255 Definition of charging information Huawei Technologies Co. Ltd.,Nokia, Nokia Shanghai Bell pCR Agreement
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No   S5‑182234
S5‑182357 Rel-15 pCR TS 32.290 Introduction of logical basic operations for SBI Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182272
S5‑182358 Rel-15 pCR 32.290 Adding Record requirements Ericsson pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182319
S5‑182359 Rel-15 pCR TS 32.255 Introduction of SMF-PDU-CDR description Nokia, Nokia Shanghai Bell pCR Approval
7.4.1Data Charging in 5G System Architecture Phase 1
Yes
Yes
approved No   S5‑182263
S5‑182360 Rel-15 pCR 32.290 New Converged Charging Service Ericsson pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182321
S5‑182361 Rel-15 pCR TS 32.290 Introduction of Services exposed by CHF Huawei Technologies Co. Ltd.,Nokia, Nokia Shanghai Bell pCR Approval
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182268
S5‑182362 Rel-15 pCR 32.291 Nchf_UsageCharging service API definition Huawei Technologies Co. Ltd. pCR Agreement
7.4.2Service Based Interface for 5G Charging
Yes
Yes
approved No   S5‑182236
S5‑182363 Rel-15 CR 32.295 Release Version handling for Rel-15 and above Ericsson CR Approval
7.3Charging Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No   S5‑182311
S5‑182364 Time Plan for OAM&P WG Vice Chair (Huawei) other -
6.1OAM&P Plenary
Yes
Yes
noted No   S5‑182017
S5‑182365 Reply to: LS from ETSI NFV to 3GPP SA5 on NFV support for Network Slicing Nokia LS out approval
6.1OAM&P Plenary
Yes
Yes
revised No S5‑182570  
S5‑182366 Tdoc discussion sequence for WI on Assurance data and PM for 5G networks and network slicing Intel, CMCC other Information
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182401  
S5‑182367 Reply to: LS from ITU-T to SA5 on Transport network management to support 3GPP 5G Ericsson LS out approval
6.1OAM&P Plenary
No
Yes
withdrawn Yes    
S5‑182368 Reply to: LS from BBF to SA5 on Cooperation on Network Slicing Huawei LS out approval
6.1OAM&P Plenary
Yes
Yes
revised No S5‑182465  
S5‑182369 Reply to: LS from ITU-T to SA5 on Response on transport network support of network slicing management (reply to 3GPP TSG SA - Tdoc S5-181456 –E) Ericsson LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No    
S5‑182370 Draft CR Rel-15 Add NR frequency bands supported by the hardware associated with the SectorEquipmentFunction Ericsson Inc. draftCR Approval
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
approved No    
S5‑182371 draft CR Rel-15 28663 Add NR frequency bands supported by the hardware associated with the SectorEquipmentFunction Ericsson Inc. draftCR Approval
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
approved No    
S5‑182372 Rel-15 CR TS 32.425 Add use case and definition for distribution of scheduled IP Throughput Huawei CR Agreement
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
revised No S5‑182541 S5‑182116
S5‑182373 Sequence proposal for management and orchestration of 5G networks and network slicing agenda point 6.4.1 Ericsson Limited other Information
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182424 S5‑182138
S5‑182374 Rel-15 CR TS 32.425 Add use case and definition for distribution of total PRB usage Huawei CR Agreement
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
revised No S5‑182543 S5‑182117
S5‑182375 pCR Rel-15 32159 Template for stage 2 and stage 3 of management service definitions. Ericsson Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182376 Proposal of TDoc discussion sequence for agenda item 6.4.3 Nokia other Information
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
noted No   S5‑182328
S5‑182377 pCR 28.530 Add UC for Delegation of Network Management Capability China Southern Power Grid Co., Huawei,China Mobile pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182129
S5‑182378 Report from breakout session on concepts and definitions Ericsson report Information
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No    
S5‑182379 pCR 28.531 Update use cases in clause 5.1 Huawei,Intel pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182160
S5‑182380 pCR 28.531 Update requirements in clause 5.2 Huawei, China Southern Power Grid Co. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182161
S5‑182381 pCR 28.531 Add use case and requirements on obtaining network slice instance information Huawei, China Southern Power Grid Co. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182147
S5‑182382 pCR 28.531 Add UC and requirements on NF instantiation Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182186
S5‑182383 pCR 28.531 Add UC and requirements on NF configuration Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182188
S5‑182384 pCR 28.531 Add UC and requirements on network creation Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182189
S5‑182385 pCR 28.531 Add UC and requirements on network configuration Intel Finland Oy pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182190
S5‑182386 Draft TS 28.531 Huawei draft TS Approval
6.4.2Provisioning of 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182387 pCR 28.531 Add requirements for feasibility check Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
 
 
revised No S5‑182550 S5‑182157
S5‑182388 Draft TS 28.540 Nokia draft TS Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182389 Draft TS 28.542 Nokia draft TS Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182390 use of NR model for deployment scenarios Ericsson Inc, NTT DOCOMO INC discussion Endorsement
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
noted No   S5‑182242
S5‑182391 pCR Rel-15 TS 28.541 editorial changes to class names and UML diagrams Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182066
S5‑182392 Reply to: Response LS from RAN2 to SA5 on adding measurements on average number of total active UEs Huawei LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No    
S5‑182393 pCR 28.533 Add Management Service Concept Huawei,Ericsson,Intel,Nokia,Deutsche Telekom AG,ZTE,China Mobile pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182064
S5‑182394 pCR TS 28.541 Correction of the definition of NR node related IOCs Orange, Nokia pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182089
S5‑182395 pCR TS 28.541 Add IM definitions for en-gNB with functional split Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182280
S5‑182396 pCR TS 28.541 Modify gNB IM definitions to support network slicing Huawei, Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182279
S5‑182397 pCR Rel-15 TS 28.541 class attribute pLMNList Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182067
S5‑182398 pCR TS 28.543 Modify 5GC NF NRM diagrams Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182282
S5‑182399 pCR Rel-15 TS 28.541 NR cell relation to sector equipment Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182065
S5‑182400 pCR Rel-15 TS 28.541 class attribute administrative state Ericsson Inc. pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182068
S5‑182401 Tdoc discussion sequence for WI on Assurance data and PM for 5G networks and network slicing Intel, CMCC other Information
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No   S5‑182366
S5‑182402 Delegating Network slice subnet instance management capability HuaWei Technologies Co., Ltd pCR -
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182247
S5‑182403 Discussion Sequence Proposal for 6.4.4 ZTE Corporation other -
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
noted No   S5‑182331
S5‑182404 Draft TS 28.545 ZTE draft TS Approval
6.4.4Fault Supervision for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182405 pCR draft TS 28.545 update the service names and requirement tags ZTE Corporation pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182406 pCR 28.545 Update Alarm related services Huawei pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182197
S5‑182407 pCR 28.545 Add requirements for VNF alarm correlation Huawei pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182199
S5‑182408 pCR draft TS 28.545 Add filtering requirements ZTE,China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182221
S5‑182409 pCR 28.546 Add interfaces for fault supervision of networks and network slicing Huawei,ZTE Corporation, China Mobile,Ericsson pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182198
S5‑182410 pCR draft TS 28.546 add interfaces of subscriptionServices ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182225
S5‑182411 pCR draft TS 28.546 add interfaces of AlarmListReadingServices ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182226
S5‑182412 pCR draft TS 28.546 add interfaces of AlarmAcknowledgementServices ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182227
S5‑182413 pCR draft TS 28.546 add notifyNewAlarm interface of AlarmNotificationServices for fault supervision China Mobile, ZTE pCR -
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182250
S5‑182414 CR R15 32.404-e10 Added 5GS to PM template Ericsson CR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
agreed No   S5‑182094
S5‑182415 pCR 28.552 Add subclauses to clause 5.1 Ericsson pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182416 pCR 28.550 Update UC and requirements on NF measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182143
S5‑182417 pCR 28.550 Add UC and requirements on NF measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182144
S5‑182418 pCR 28.550 Add UC and requirements on NF measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182168
S5‑182419 pCR 28.551 Add measurement job control related SAIs Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182179
S5‑182420 Add measurement job information related SAIs Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182180
S5‑182421 pCR 28.552 Add UC for UL and DL packet loss and UL packet loss measurement Ericsson pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182556 S5‑182103
S5‑182422 pCR 28.552 Add UL and DL F1-U packet loss measurements Ericsson pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182104
S5‑182423 pCR 28.553 Add measurement of number of PDU session of SMF Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182207
S5‑182424 Sequence proposal for management and orchestration of 5G networks and network slicing agenda point 6.4.1 Ericsson Limited other Information
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
noted No   S5‑182373
S5‑182425 CR R15 to TS 32421-e00 Add support for 5G Trace Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182074
S5‑182426 CR R15 to TS 32422-f00 Add support for 5G Trace (scope, references, definitions, abbreviations) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182075
S5‑182427 CR R15 to TS 32422-f00 Add support for 5G Trace (management activation in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182076
S5‑182428 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling activation in 5GC) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182077
S5‑182429 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling activation in NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182078
S5‑182430 CR R15 to TS 32422-f00 Add support for 5G Trace (management deactivation in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182079
S5‑182431 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling deactivation in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182080
S5‑182432 CR R15 to TS 32422-f00 Add support for 5G Trace (management trace recording session starting in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182081
S5‑182433 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling trace recording session starting in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182082
S5‑182434 CR R15 to TS 32422-f00 Add support for 5G Trace (management trace recording session stopping in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182083
S5‑182435 CR R15 to TS 32422-f00 Add support for 5G Trace (signaling trace recording session stopping in 5GC and NG-RAN) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182084
S5‑182436 CR R15 to TS 32422-f00 Add support for 5G Trace (5G NEs, interfaces and trace parameters) Nokia CR Approval
6.4.65G Trace management
Yes
Yes
agreed No   S5‑182086
S5‑182437 LS on 5G Trace Nokia LS out Approval
6.4.65G Trace management
Yes
Yes
revised No S5‑182566  
S5‑182438 TS 28.525 use case of adding / removing NS virtual link to / from a NS instance Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No   S5‑182142
S5‑182439 Reply to: LS from ITU-T to SA5 on Energy efficiency (reply to 3GPP TSG SA - S5-181570 -E) ORANGE LS out approval
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
approved No    
S5‑182440 pCR TR 32.972 – Cleanup Orange Spain pCR Approval
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
approved No   S5‑182088
S5‑182441 pCR TR 32.972 – Potential use cases and requirements for assessing EE of 5G network functions Orange Spain pCR Approval
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
Yes
Yes
approved No   S5‑182092
S5‑182442 Draft TR 32.972 ORANGE draft TR Approval
6.5.3Study on system and functional aspects of Energy Efficiency in 5G networks
No
Yes
left for email approval No    
S5‑182443 Updated WID on Management of QoE measurement collection Ericsson WID revised -
6.4.8Management of QoE measurement collection
Yes
Yes
agreed No   S5‑182327
S5‑182444 Draft CR 28.708 on CUPS HuaWei Technologies Co., Ltd draftCR -
6.4.10Management Enhancement for EPC CUPS
Yes
Yes
approved No    
S5‑182445 pCR 32.158 Add resource archetypes Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
approved No   S5‑182096
S5‑182446 pCR 32.158 Add design pattern for scoping and filtering Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
approved No   S5‑182097
S5‑182447 pCR 32.158 Add design pattern for subscribe/notify Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
approved No   S5‑182098
S5‑182448 Draft TS 32.158 Nokia draft TS Approval
6.4.9REST Solution Sets
No
Yes
left for email approval No    
S5‑182449 pCR 32.158 Add REST SS specification template Nokia Germany pCR Approval
6.4.9REST Solution Sets
Yes
Yes
approved No   S5‑182100
S5‑182450 TS 28.525 use case of adding geographical location information in PNFD on-boarding Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No   S5‑182187
S5‑182451 pCR 28.533 Network Function management service Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182545 S5‑182125
S5‑182452 pCR 28.533 Add service based management architecture for 5G networks and network slicing Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182453 TS 28.525 use case of adding or removing connectivity to or from a PNF Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
No
Yes
withdrawn Yes    
S5‑182454 TS 28.525 use case of changing external connectivity to a PNF or VNF instance Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No   S5‑182185
S5‑182455 • LSout to ETSI ISG NFV IFA WG on connectivity among PNF(s) and VNF instance(s) Intel LS out Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
revised No S5‑182564  
S5‑182456 pCR 28.533 Network management architecture interaction with NFV-MANO Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182457 TS 28.525 use case of adding VNF instance to a NS with connectivity Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No   S5‑182136
S5‑182458 pCR 32.848 Charging for support of identifiers of caller and callee China Mobile pCR Approval
7.5.1Study on Volume Based Charging Aspects for VoLTE
Yes
Yes
approved No   S5‑182090
S5‑182459 Rel-15 pCR 32.848 Charging for support of 3PTY, HOLD and CW scenarios Huawei, China Mobile pCR Agreement
7.5.1Study on Volume Based Charging Aspects for VoLTE
Yes
Yes
approved No   S5‑182231
S5‑182460 Adding solution to P-CSCF Key Issue #3 Ericsson pCR Approval
7.5.1Study on Volume Based Charging Aspects for VoLTE
Yes
Yes
approved No   S5‑182322
S5‑182461 Draft TR 32.848 China Mobile draft TR Approval
7.5.1Study on Volume Based Charging Aspects for VoLTE
No
Yes
left for email approval No    
S5‑182462 Draft TS 32.290 Huawei draft TS Approval
7.4.2Service Based Interface for 5G Charging
No
Yes
left for email approval No    
S5‑182463 Draft TS 32.291 Huawei draft TS Approval
7.4.2Service Based Interface for 5G Charging
No
Yes
left for email approval No    
S5‑182464 Draft TS 32.255 Nokia,Nokia Shanghai Bell draft TS Approval
7.4.1Data Charging in 5G System Architecture Phase 1
No
Yes
left for email approval No    
S5‑182465 Reply to: LS from BBF to SA5 on Cooperation on Network Slicing Huawei LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No   S5‑182368
S5‑182466 CH Executive Report CH SWG Chair report -
7.1Charging Plenary
No
Yes
noted No   S5‑182038
S5‑182468 pCR 28.530 Network slice terminology alignment Ericsson Limited pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182132
S5‑182469 pCR 28.530 Network slice subnet terminology alignment Ericsson Limited pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182135
S5‑182470 Clarifications on the definition of Managed NSI and Telecommunication resources terms NEC Telecom MODUS Ltd. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
revised No S5‑182536 S5‑182300
S5‑182471 pCR 28.530 Update principles and related requirements DOCOMO Communications Lab. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182472 pCR 28.530 Update network slice as a service and network slice as NOP internals Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182223
S5‑182473 TS 28.525 use case of adding external connectivity to a PNF or VNF instance Intel Mobile Denmark CR Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
agreed No   S5‑182140
S5‑182474 pCR to 28.530 NSaaS delivery concepts Cisco Systems Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182294
S5‑182475 pCR 28.530 Update clause 4.1.3 5.4.2 and 5.4.7 Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182121
S5‑182476 pCR 28 531 Add UC of Network slice subnet configuration of slice constituents HuaWei Technologies Co., Ltd pCR -
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182248
S5‑182477 pCR to 28.531 RRM policy clarification Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182478 pCR to 28.531 NSSI states diagram Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182296
S5‑182479 pCR to 28.531 Configuration information Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182297
S5‑182480 pCR to 28.531 Network slice instance termination Cisco Systems Inc.,Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182298
S5‑182481 pCR to 28.531 Network Slice instance creation Cisco Systems Inc. pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182299
S5‑182482 pCR 28.532 Add procedure of obtaining network slice subnet capability information Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182146
S5‑182483 pCR 28.532 Add procedure of network slice subnet allocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182149
S5‑182484 pCR 28.532 Add procedure of coordination with TN Manager Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No   S5‑182154
S5‑182485 Draft TS 28.532 Huawei draft TS Approval
6.4.2Provisioning of 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182486 pCR 28.532 Add provisioning procedures of Network slice instance deallocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182166
S5‑182487 pCR 28.532 Add provisioning procedures of Network slice subnet instance deallocation Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182167
S5‑182488 pCR 28.532 Add procedure of network slice instance modification Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182162
S5‑182489 Revised WID Management and orchestration of 5G networks and network slicing Huawei,Ericsson,China Telecom WID revised Agreement
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
agreed No   S5‑182118
S5‑182490 pCR 28.533 Add building blocks to management framework Nokia Germany,Ericsson pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
merged No S5‑182393 S5‑182095
S5‑182491 Tdocs discussion sequence for agenda item 6.4.2 Huawei other Information
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
noted No   S5‑182324
S5‑182492 pCR TS 28.543 Add IM definitions for NSSF and NRF Nokia, Nokia Shanghai Bell, Huawei pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182286
S5‑182493 pCR TS 28.543 Add IM definitions for AMF Set Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182287
S5‑182494 pCR TS 28.543 Add IM definitions for SMF and UPF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182283
S5‑182495 pCR TS 28.543 Add IM definitions for AUSF, UDM, UDR and 5GEIR Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182284
S5‑182496 pCR TS 28.543 Add IM definitions for PCF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182285
S5‑182497 pCR TS 28.543 Add IM definitions for UDSF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182288
S5‑182498 pCR TS 28.543 Add IM definitions for N3IWF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182289
S5‑182499 pCR TS 28.543 Add IM definitions for SEPP Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182290
S5‑182500 pCR TS 28.543 Add IM definitions for SMSF and LMF Nokia, Nokia Shanghai Bell pCR Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
Yes
Yes
approved No   S5‑182291
S5‑182501 pCR draft TS 28.546 add notifyChangedAlarm interface of AlarmNotificationServices for fault supervision China Mobile, ZTE pCR -
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182251
S5‑182502 Add notifyAckStateChanged interface of AlarmNotification services China Mobile, ZTE pCR -
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182275
S5‑182503 pCR draft TS 28.546 Add notifyClearedAlarm interface of AlarmNotification services China Mobile, ZTE pCR -
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182276
S5‑182504 pCR draft TS 28.546 add interfaces of AlarmClearance Services ZTE Corporation, China Mobile pCR Approval
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182228
S5‑182505 pCR draft TS 28.546 add notifyCorrelatedNotificationChanged interface of AlarmNotificationServices for fault supervision China Mobile, ZTE pCR -
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182252
S5‑182506 pCR draft TS 28.546 Add notifyAlarmListRebuilt interface for AlarmNotification services China Mobile, ZTE pCR -
6.4.4Fault Supervision for 5G networks and network slicing
Yes
Yes
approved No   S5‑182274
S5‑182507 pCR 28.554 Add definition of end-to-end latency of 5G network related KPI Huawei,China Mobile pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182203
S5‑182508 pCR 28.550 Update UC and requirements on NSSI measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182169
S5‑182509 pCR 28.550 Add UC and requirements on NSSI measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182170
S5‑182510 pCR 28.550 Add UC and requirements on NSSI measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182171
S5‑182511 pCR 28.550 Update UC and requirements on NSI measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182172
S5‑182512 pCR 28.550 Add UC and requirements on NSI measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182173
S5‑182513 pCR 28.550 Add UC and requirements on NSI measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182174
S5‑182514 pCR 28.550 Update UC and requirements on network measurement job creation Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182175
S5‑182515 pCR 28.550 Add UC and requirements on network measurement job termination Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182176
S5‑182516 pCR 28.550 Add UC and requirements on network measurement job query Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182178
S5‑182517 pCR 28.550 Add requirement of decomposing performance data types(s). Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
withdrawn Yes    
S5‑182518 pCR 28.551 Add performance data file reporting related SAIs Intel Finland Oy pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182182
S5‑182519 pCR 28.551 Add interfaces for performance management of networks and network slicing Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No   S5‑182202
S5‑182520 pCR 28.552 Add DL packet drop UC and measurements Ericsson pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182557 S5‑182105
S5‑182521 LS on L2 measurement specification for NR in R15 Ericsson LS out -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182572 S5‑182106
S5‑182522 pCR 28.553 Add measurement of number of GTP-U packets on N3 Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182209
S5‑182523 pCR 28.553 Add a descripment of N3 throughput measurement China Mobile E-Commerce Co. pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182302
S5‑182524 pCR 28.553 Add measurement of N6 related measurements Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182210
S5‑182525 pCR 28.553 Add a description of registered subscribers measurement China Mobile E-Commerce Co. pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182565 S5‑182303
S5‑182526 pCR 28.554 Add use case for actual capacity of Network Slice instance related KPI China Mobile E-Commerce Co. pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182562 S5‑182304
S5‑182527 pCR 28.554 Add KPI template China Mobile E-Commerce Co. pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182307
S5‑182528 pCR 28.530 Update use case and requirements for the case of network slicing supporting communication services Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182120
S5‑182529 pCR 28.554 Add KPI definition of registered subscribers of single network slice instance China Mobile E-Commerce Co,Huawei pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182563 S5‑182309
S5‑182530 pCR 28.554 Add definition of IP throughput for one single network slice instance related KPI Huawei,China Mobile pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182205
S5‑182531 Draft TR 32.868 Intel draft TR Approval
6.5.1Study on OAM aspects of LTE and WLAN integration
No
Yes
left for email approval No    
S5‑182532 pCR TR 32.871 Mapping of Policy related function to MANO functional blocks China Mobile Com. Corporation,Ericsson pCR Approval
6.5.2Study on network policy management for mobile networks based on NFV scenarios
Yes
Yes
approved No   S5‑182218
S5‑182533 pCR TR 32.871 General message flow for policy active/deactive and policy conflict report China Mobile Com. Corporation,Ericsson pCR Approval
6.5.2Study on network policy management for mobile networks based on NFV scenarios
Yes
Yes
approved No   S5‑182219
S5‑182534 pCR TR 28.900 - Handling of performance data collection AT&T, Orange,Ericsson pCR -
6.5.4Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
revised No S5‑182569 S5‑182093
S5‑182535 Reply to: LS from RAN2 to SA5 on Response LS on adding PRB usage distribution and IP throughput distribution measurements Huawei LS out approval
6.1OAM&P Plenary
Yes
Yes
revised No S5‑182542  
S5‑182536 Clarifications on the definition of Managed NSI and Telecommunication resources terms NEC Telecom MODUS Ltd. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182470
S5‑182537 Add description of network slicing template and network slice subnet template China Mobile E-Commerce Co. pCR -
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
revised No S5‑182551 S5‑182301
S5‑182538 pCR 32.868 Editorial clean-up Intel, Ericsson pCR Approval
6.5.1Study on OAM aspects of LTE and WLAN integration
Yes
Yes
approved No   S5‑182193
S5‑182539 OAM&P SWG action list WG Vice Chair (Huawei) other -
6.1OAM&P Plenary
Yes
Yes
noted No   S5‑182019
S5‑182540 pCR 28.550 Update performance management related services Huawei pCR Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
noted No   S5‑182201
S5‑182541 Rel-15 CR TS 32.425 Add use case and definition for distribution of scheduled IP Throughput Huawei CR Agreement
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No   S5‑182372
S5‑182542 Reply to: LS from RAN2 to SA5 on Response LS on adding PRB usage distribution and IP throughput distribution measurements Huawei LS out approval
6.1OAM&P Plenary
Yes
Yes
revised No S5‑182571 S5‑182535
S5‑182543 Rel-15 CR TS 32.425 Add use case and definition for distribution of total PRB usage Huawei CR Agreement
6.3OAM&P Maintenance and Rel-15 small Enhancements
Yes
Yes
agreed No   S5‑182374
S5‑182544 Draft TS 28.530 Huawei draft TS Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182545 pCR 28.533 Network Function management service Huawei pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
Yes
Yes
approved No   S5‑182451
S5‑182546 pCR to 28.530 Network slice instance requirements Cisco Systems Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
left for email approval No   S5‑182292
S5‑182547 pCR to 28.530 Network slice subnet concepts Cisco Systems Inc. pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
left for email approval No   S5‑182293
S5‑182548 pCR 28.530 Use case and requirements to modify a network slice instance due to changed demand Ericsson Limited pCR Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
left for email approval No   S5‑182323
S5‑182549 Draft TS 28.533 Huawei draft TS Approval
6.4.1Management and orchestration of 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182550 pCR 28.531 Add requirements for feasibility check Huawei pCR Approval
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182387
S5‑182551 Add description of network slicing template and network slice subnet template China Mobile E-Commerce Co. pCR -
6.4.2Provisioning of 5G networks and network slicing
Yes
Yes
approved No   S5‑182537
S5‑182552 Draft TS 28.541 Nokia draft TS Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182553 Draft TS 28.543 Nokia draft TS Approval
6.4.3Network Resource Model (NRM) for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182554 Draft TS 28.546 ZTE draft TS Approval
6.4.4Fault Supervision for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182555 Draft TS 28.552 Intel draft TS Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182556 pCR 28.552 Add UC for UL and DL packet loss and UL packet loss measurement Ericsson pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182421
S5‑182557 pCR 28.552 Add DL packet drop UC and measurements Ericsson pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182520
S5‑182558 Draft TS 28.550 Intel draft TS Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182559 Draft TS 28.551 Intel draft TS Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182560 Draft TS 28.554 China Mobile draft TS Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182561 Draft TS 28.553 Intel draft TS Approval
6.4.5Assurance data and Performance Management for 5G networks and network slicing
No
Yes
left for email approval No    
S5‑182562 pCR 28.554 Add use case for actual capacity of Network Slice instance related KPI China Mobile E-Commerce Co. pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182526
S5‑182563 pCR 28.554 Add KPI definition of registered subscribers of single network slice instance China Mobile E-Commerce Co,Huawei pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182529
S5‑182564 LSout to ETSI ISG NFV IFA WG on connectivity among PNF(s) and VNF instance(s) Intel LS out Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
revised No S5‑182573 S5‑182455
S5‑182565 pCR 28.553 Add a description of registered subscribers measurement China Mobile E-Commerce Co. pCR -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182525
S5‑182566 LS on 5G Trace Nokia LS out Approval
6.4.65G Trace management
Yes
Yes
approved No   S5‑182437
S5‑182567 Draft TR 32.871 China Mobile draft TR Approval
6.5.2Study on network policy management for mobile networks based on NFV scenarios
No
Yes
left for email approval No    
S5‑182568 Draft TR 28.900 AT&T,ORANGE draft TR Approval
6.5.4Study on integration of ONAP DCAE and 3GPP management architecture
No
Yes
left for email approval No    
S5‑182569 pCR TR 28.900 - Handling of performance data collection AT&T, Orange pCR -
6.5.4Study on integration of ONAP DCAE and 3GPP management architecture
Yes
Yes
approved No   S5‑182534
S5‑182570 Reply to: LS from ETSI NFV to 3GPP SA5 on NFV support for Network Slicing Nokia LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No   S5‑182365
S5‑182571 Reply to: LS from RAN2 to SA5 on Response LS on adding PRB usage distribution and IP throughput distribution measurements Huawei LS out approval
6.1OAM&P Plenary
Yes
Yes
approved No   S5‑182542
S5‑182572 LS on L2 measurement specification for NR in R15 Ericsson LS out -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
revised No S5‑182574 S5‑182521
S5‑182573 LSout to ETSI ISG NFV IFA WG on connectivity among PNF(s) and VNF instance(s) Intel LS out Approval
6.4.7Management and virtualization aspects of 5G networks
Yes
Yes
approved No   S5‑182564
S5‑182574 LS on L2 measurement specification for NR in R15 Ericsson LS out -
6.4.5Assurance data and Performance Management for 5G networks and network slicing
Yes
Yes
approved No   S5‑182572