Tdoc List
2017-12-01 15:22
Agenda | Topic | TDoc | Title | Source | Type | For | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | Opening of the meeting |   | ||||||||||
2 | Approval of the agenda | S5‑176000 | Agenda | WG Chairman | agenda | Yes |
Yes
| approved | No | |||
3 | IPR declaration | S5‑176023 | IPR and legal declaration | WG Chairman | other | Yes |
Yes
| noted | No | |||
4 | Meetings and activities reports |   | ||||||||||
4.1 | Last SA5 meeting report | S5‑176001 | Report from last SA5 meeting | MCC | report | Yes |
Yes
| approved | No | |||
4.2 | Last SA meeting report | S5‑176002 | SA5 status report at last SA meeting | WG Chairman | report | Yes |
Yes
| noted | No | |||
S5‑176003 | SA5 results at last SA meeting | WG Chairman | report | Yes |
Yes
| noted | No | |||||
4.3 | Inter-organizational reports | S5‑176286 | Presentation on 3GPP Network Slicing at October 2017 NGMN Forum | SA5 vice chairman | report | Information | Yes |
Yes
| noted | No | ||
S5‑176289 | Minutes of joint SA5-SG2 call on methodology 2017-11-09 | Ericsson LM | report | Information | Yes |
YesNokia asked if it was possible to investigate the A.5 qualification for 3GPP. MCC commented that this issue should be carried out via PCG. The Chair took note to query about this.
| noted | No | ||||
5 | Cross-SWG issues |   | ||||||||||
5.1 | Administrative issues at SA5 level | S5‑176006 | Leaders meeting agenda | WG Chairman | agenda | Yes |
Yes
| noted | No | |||
S5‑176007 | Leaders meeting minutes | WG Chairman | report | Yes |
YesNokia queried about the communication with ONAP. It was clarified that this hadn’t started given that the WID had to be formally approved in the next SA plenary first.
ONAP will be added to the list of agenda items in the leaders meeting minutes.
| noted | No | |||||
S5‑176011 | SA5 Working Procedures | WG Vice Chair (Huawei) | other | Yes |
Yes
| noted | No | |||||
S5‑176012 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | other | Yes |
Yes
| noted | No | |||||
S5‑176013 | Process for management of draft TSs/TRs | WG Chairman | other | Yes |
Yes
| noted | No | |||||
S5‑176014 | CR Quality Check | MCC | other | Yes |
YesMCC commented that the use of "prohibited" and "allowed" was possible although it was recommended to use better normative language such as "shall".
In any case, the inclusion in a NOTE was not possible and the change should be to leave it in plain text and not inside a NOTE.
| noted | No | |||||
S5‑176024 | Status of email approvals | WG Vice Chair (Orange) | other | No |
No
| reserved | No | |||||
S5‑176269 | Requirements template (high-level) example | Ericsson LM | other | Yes |
YesTo be put in the guidelines folder.
| approved | No | |||||
5.2 | Technical issues at SA5 level |   | ||||||||||
5.3 | Liaison statements at SA5 level | S5‑176046 | Resubmitted Liaison Statement from ETSI NTECH to 3GPP SA5 and SA2 on GANA instantiation in the Core and Backhaul network parts of the 3GPP Architecture | ETSI TC NTECH | LS in | Yes |
YesORANGE commented that SA2 noted this LS without doing any other action about it.
There was no feedback on the TR and there wasn't much interest in colaborating with NTECH. A reply LS was drafted.
| replied to | No | |||
S5‑176381 | Reply to: Resubmitted Liaison Statement from ETSI NTECH to 3GPP SA5 and SA2 on GANA instantiation in the Core and Backhaul network parts of the 3GPP Architecture | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑176051 | Ls from BBF to SA5 on Cooperation on Network Slicing | Broadband Forum | LS in | Yes |
YesNokia commented that SA5 needed to inform them about the full range of specifications relevant to network slicing.
Some WIDs needed to be revised as well.
NTT-Docomo commented that SA5 doesn’t know what BBF does in this subject and that we shld ask them about details on their work.
| replied to | No | |||||
S5‑176382 | Reply to: Ls from BBF to SA5 on Cooperation on Network Slicing | Huawei | LS out | approval | Yes |
Yes
| revised | No | S5‑176563 | |||
S5‑176563 | Reply to: Ls from BBF to SA5 on Cooperation on Network Slicing | Huawei | LS out | approval | No |
Yes
| left for email approval | No | S5‑176382 | |||
S5‑176293 | Resubmitted LS from MEF forum to SA5 on MEF Forum Work on 5G | MEF Forum | LS in | Yes |
YesThe Chair commented that MEF intended to work on slicing from their perspective without overlapping with 3GPP's work.
| replied to | No | |||||
S5‑176383 | Reply to: Resubmitted LS from MEF forum to SA5 on MEF Forum Work on 5G | Ericsson | LS out | approval | No |
Yes
| left for email approval | No | ||||
S5‑176437 | LS to ITU-T SG2 on progress of methodology | Ericsson | LS out | Approval | Yes |
Yes
| approved | No | ||||
5.4 | SA5 meeting calendar | S5‑176010 | SA5 Meeting Calendar | WG Chairman | other | Yes |
Yes
| noted | No | |||
5.5 | Review of the Work Plan | S5‑176015 | Deliverables due for the NEXT SA Plenary | MCC | other | Yes |
Yes
| noted | No | |||
S5‑176016 | Ongoing SA5 WIDs and SIDs | WG Vice Chair (Huawei) | other | Yes |
Yes
| noted | No | |||||
S5‑176017 | SA5 3GPP Work Plan | MCC | other | Yes |
Yes
| noted | No | |||||
S5‑176026 | Work Plan status | WG Chair | other | No |
No
| reserved | No | |||||
6 | OAM&P |   | ||||||||||
6.1 | OAM&P Plenary | S5‑176004 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | Yes |
Yes
| revised | No | S5‑176360 | ||
S5‑176360 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - | Yes |
Yes
| noted | No | S5‑176004 | |||
S5‑176005 | OAM Executive Report | WG Vice Chair (Huawei) | report | Yes |
Yes
| revised | No | S5‑176562 | ||||
S5‑176562 | OAM Executive Report | WG Vice Chair (Huawei) | report | - | No |
No
| reserved | No | S5‑176005 | |||
S5‑176025 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | Yes |
Yes
| noted | No | |||||
S5‑176027 | Minutes of OAM&P SWG opening session | WG Vice Chair (Huawei) | report | Yes |
Yes
| noted | No | |||||
S5‑176042 | LS from NGMN to SA5 on Cooperation on Network Slicing | NGMN | LS in | No |
Yes
| withdrawn | Yes | |||||
S5‑176043 | LS from NGMN to SA5 on NGMN “RAN functional split and x-haul” work item | NGMN | LS in | Yes |
Yes
| noted | No | |||||
S5‑176048 | Resubmitted LS from RAN3 to SA5 on support of Trace and MDT in NG-RAN in rel-15 | R3-173422 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑176477 | Reply to: Resubmitted LS from RAN3 to SA5 on support of Trace and MDT in NG-RAN in rel-15 | Nokia | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑176050 | Resubmitted LSOut reply from ETSI NFV cc SA5 on lifecycle management for 3GPP service based architecture | ETSI ISG NFV | LS in | Yes |
YesNokia commented that some of the questions should be answered by SA2, SA5 and other WGs but that should be addressed directly to them by NGMN and in this case only SA5 was in copy.
| noted | No | |||||
S5‑176285 | Recommendations on time management in OAM&P SWG | SA5 vice chairman | discussion | Endorsement | Yes |
Yes
| endorsed | No | ||||
S5‑176290 | Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric | ATIS | discussion | Yes |
Yes
| revised | No | S5‑176330 | ||||
S5‑176330 | Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric | ATIS | discussion | - | Yes |
Yes
| revised | No | S5‑176521 | S5‑176290 | ||
S5‑176521 | Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric | ATIS | discussion | - | Yes |
Yes
| revised | No | S5‑176523 | S5‑176330 | ||
S5‑176523 | Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric | ATIS | discussion | - | Yes |
Yes
| endorsed | No | S5‑176521 | |||
S5‑176295 | Analysis of TS 32.101 external references | Huawei | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑176384 | OAM&P SWG action list | ORANGE | other | discussion | Yes |
Yes
| noted | No | ||||
S5‑176385 | Structure of 5G specifications | WG Vice Chair (ORANGE) | other | Endorsement | Yes |
Yes
| withdrawn | Yes | ||||
6.2 | New OAM&P Work Item proposals | S5‑176018 | Minutes of New Work Item proposals - OAM&P | WG Vice Chair (Orange) | report | Yes |
Yes
| noted | No | |||
S5‑176079 | New WID on 5G Management Architecture | Ericsson Inc. | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑176332 | New WID on 5G Management Architecture | Ericsson Inc. | WID new | Agreement | No |
Yes
| withdrawn | Yes | ||||
S5‑176097 | New WID EPC CUPS enhancement | Huawei | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176495 | |||
S5‑176495 | New WID EPC CUPS enhancement | Huawei | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑176097 | |||
S5‑176098 | New WID 5G Network management architecture | Huawei, China Mobile | WID new | Agreement | Yes |
Yes
| noted | No | ||||
S5‑176169 | New SID on management aspects of edge computing | Intel Corporation (UK) Ltd | SID new | Agreement | Yes |
Yes
| revised | No | S5‑176333 | |||
S5‑176333 | New SID on management aspects of edge computing | Intel Corporation (UK) Ltd | SID new | Agreement | Yes |
Yes
| revised | No | S5‑176524 | S5‑176169 | ||
S5‑176524 | New SID on management aspects of edge computing | Intel Corporation (UK) Ltd | SID new | Agreement | Yes |
Yes
| revised | No | S5‑176553 | S5‑176333 | ||
S5‑176553 | New SID on management aspects of edge computing | Intel Corporation (UK) Ltd | SID new | Agreement | No |
Yes
| left for email approval | No | S5‑176524 | |||
S5‑176268 | New WID on REST Solution Sets | Nokia Germany | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176334 | |||
S5‑176334 | New WID on REST Solution Sets | Nokia Germany | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑176268 | |||
S5‑176276 | Organization of 5G Management and Orchestration WIDs | Ericsson Limited | discussion | Endorsement | Yes |
Yes
| revised | No | S5‑176331 | |||
S5‑176331 | Organization of 5G Management and Orchestration WIDs | Ericsson Limited | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑176276 | |||
S5‑176291 | Structure of 5G specifications | SA5 vice chairman | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑176442 | New WID on Trace management | Nokia | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176501 | |||
S5‑176501 | New WID on Trace management | Nokia | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176525 | S5‑176442 | ||
S5‑176525 | New WID on Trace management | Nokia | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑176501 | |||
S5‑176502 | Revised WID Management and orchestration of 5G networks and network slicing | Ericsson,Huawei | WID revised | Agreement | Yes |
Yes
| revised | No | S5‑176526 | |||
S5‑176526 | Revised WID Management and orchestration of 5G networks and network slicing | Ericsson,Huawei | WID revised | Agreement | Yes |
Yes
| agreed | No | S5‑176502 | |||
S5‑176503 | Revised WID Provisioning of 5G networks and network slicing | Huawei | WID revised | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑176504 | Revised WID Management of 5G networks that include virtualised network functions | Intel | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176522 | |||
S5‑176522 | Revised WID Management of 5G networks that include virtualised network functions | Intel | WID revised | Agreement | Yes |
Yes
| revised | No | S5‑176527 | S5‑176504 | ||
S5‑176527 | Revised WID Management of 5G networks that include virtualised network functions | Intel | WID revised | Agreement | Yes |
Yes
| agreed | No | S5‑176522 | |||
S5‑176505 | New WID Network Resource Model for 5G networks and network slcing | Nokia | WID new | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑176506 | Revised WID Fault supervision for 5G networks and network slicing | ZTE | WID revised | Agreement | Yes |
Yes
| revised | No | S5‑176528 | |||
S5‑176528 | Revised WID Fault supervision for 5G networks and network slicing | ZTE | WID revised | Agreement | Yes |
Yes
| agreed | No | S5‑176506 | |||
S5‑176507 | Revised WID assurance data and performance managemetn for 5G networks and network slicing | Intel, China Mobile | WID new | Agreement | Yes |
Yes
| agreed | No | ||||
6.3 | OAM&P Maintenance and Rel-15 small Enhancements | S5‑176019 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | MCC | report | Yes |
Yes
| noted | No | |||
S5‑176068 | pCR 32.880 Revision on edithelp's comments | China Mobile | pCR | Yes |
Yes
| approved | No | |||||
S5‑176099 | Rel-14 CR 28.518 Update the reference to ETSI GS NFV-SOL 002 | Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑176049 | Resubmitted LS from RAN3 to SA5 on Collection Period correction for MDT M3 measurement in eUTRAN | R3-171382 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑176163 | Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson LM | discussion | Discussion | Yes |
Yes
| endorsed | No | ||||
S5‑176164 | Draft Reply LS on Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | LS out | Approval | Yes |
Yes
| revised | No | S5‑176335 | |||
S5‑176335 | Reply LS on Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | LS out | Approval | Yes |
Yes
| approved | No | S5‑176164 | |||
S5‑176278 | CR R8 32511-820 NCR | Ericsson | CR | Yes |
Yes
| revised | No | S5‑176337 | ||||
S5‑176337 | CR R8 32511-820 NCR | Ericsson | CR | - | Yes |
Yes
| agreed | No | S5‑176278 | |||
S5‑176279 | CR R9 32511-900 NCR | Ericsson | CR | Yes |
Yes
| revised | No | S5‑176338 | ||||
S5‑176338 | CR R9 32511-900 NCR | Ericsson | CR | - | Yes |
Yes
| agreed | No | S5‑176279 | |||
S5‑176280 | CR R10 32511-a00 NCR | Ericsson | CR | Yes |
Yes
| revised | No | S5‑176339 | ||||
S5‑176339 | CR R10 32511-a00 NCR | Ericsson | CR | - | Yes |
Yes
| agreed | No | S5‑176280 | |||
S5‑176281 | CR R11 32511-b20 NCR | Ericsson | CR | Yes |
Yes
| revised | No | S5‑176340 | ||||
S5‑176340 | CR R11 32511-b20 NCR | Ericsson | CR | - | Yes |
Yes
| agreed | No | S5‑176281 | |||
S5‑176282 | CR R12 32511-c00 NCR | Ericsson | CR | Yes |
Yes
| revised | No | S5‑176341 | ||||
S5‑176341 | CR R12 32511-c00 NCR | Ericsson | CR | - | Yes |
Yes
| agreed | No | S5‑176282 | |||
S5‑176283 | CR R13 32511-d00 NCR | Ericsson | CR | Yes |
Yes
| revised | No | S5‑176342 | ||||
S5‑176342 | CR R13 32511-d00 NCR | Ericsson | CR | - | Yes |
Yes
| agreed | No | S5‑176283 | |||
S5‑176284 | CR R14 32511-e00 NCR | Ericsson | CR | Yes |
Yes
| revised | No | S5‑176343 | ||||
S5‑176343 | CR R14 32511-e00 NCR | Ericsson | CR | - | Yes |
Yes
| agreed | No | S5‑176284 | |||
S5‑176336 | Draft TR 32.880 | China Mobile | draft TR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176344 | Rel-14 TS 28.528 Update References to ETSI NFV SOL specifications | Nokia | CR | Agreement | Yes |
Yes
| revised | No | S5‑176345 | |||
S5‑176345 | Rel-14 TS 28.528 Update References to ETSI NFV SOL specifications | Nokia | CR | Agreement | Yes |
Yes
| agreed | No | S5‑176344 | |||
S5‑176514 | Presentation sheet TR 32.880 | China Mobile | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
6.4 | Rel-15 Operations, Administration, Maintenance and Provisioning (OAM&P) |   | ||||||||||
6.4.1 | Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | S5‑176033 | Minutes of Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | Rapporteur (ORANGE) | report | Yes |
Yes
| noted | No | |||
S5‑176052 | pCR TS 28304 Editorial cleanup and Removal of editor note | ORANGE | pCR | Agreement | Yes |
Yes
| approved | No | ||||
S5‑176053 | pCR TS 28.305 Scope and System Context | ORANGE | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176418 | |||
S5‑176418 | pCR TS 28.305 Scope and System Context | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑176053 | |||
S5‑176054 | pCR TS 28.305 Add missing definitions for solution 1 | ORANGE | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176388 | pCR TS 28.305 Add missing definitions for solution 1 | ORANGE | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176055 | draft CR 28.622 Add attribute to IOC MF (Rev of S5-175361) | ORANGE | draftCR | Approval | Yes |
Yes
| revised | No | S5‑176389 | |||
S5‑176389 | draft CR 28.622 Add attribute to IOC MF (Rev of S5-175361) | ORANGE | draftCR | Approval | Yes |
Yes
| approved | No | S5‑176055 | |||
S5‑176056 | draft CR 32.425 Add PEE meas for E-UTRAN (Rev of S5-175362) | ORANGE | draftCR | Approval | Yes |
Yes
| revised | No | S5‑176390 | |||
S5‑176390 | draft CR 32.425 Add PEE meas for E-UTRAN (Rev of S5-175362) | ORANGE | draftCR | Approval | Yes |
Yes
| approved | No | S5‑176056 | |||
S5‑176057 | draft CR 32.405 Add PEE meas for UTRAN | ORANGE | draftCR | Approval | Yes |
Yes
| revised | No | S5‑176391 | |||
S5‑176391 | draft CR 32.405 Add PEE meas for UTRAN | ORANGE | draftCR | Approval | Yes |
Yes
| approved | No | S5‑176057 | |||
S5‑176058 | draft CR 52.402 Add PEE meas for GERAN | ORANGE | draftCR | Approval | Yes |
Yes
| revised | No | S5‑176392 | |||
S5‑176392 | draft CR 52.402 Add PEE meas for GERAN | ORANGE | draftCR | Approval | Yes |
Yes
| revised | No | S5‑176515 | S5‑176058 | ||
S5‑176515 | draft CR 52.402 Add PEE meas for GERAN | ORANGE | draftCR | Approval | Yes |
Yes
| approved | No | S5‑176392 | |||
S5‑176059 | pCR TS 28.305 Add missing definitions for solution 2 | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑176393 | |||
S5‑176393 | pCR TS 28.305 Add missing definitions for solution 2 | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑176059 | |||
S5‑176060 | pCR TS 28.306 Solution set definitions for solution 1 | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑176394 | |||
S5‑176394 | pCR TS 28.306 Solution set definitions for solution 1 | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑176060 | |||
S5‑176061 | pCR TS 28.306 Input to solution set definitions for solution 2 | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑176395 | |||
S5‑176395 | pCR TS 28.306 Input to solution set definitions for solution 2 | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑176517 | S5‑176061 | ||
S5‑176517 | pCR TS 28.306 Input to solution set definitions for solution 2 | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑176395 | |||
S5‑176386 | Draft TS 28.304 | ORANGE | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
S5‑176387 | Draft TS 28.305 | ORANGE | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
S5‑176396 | Presentation sheet TS 28.304 | ORANGE | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑176397 | Presentation sheet TS 28.305 | ORANGE | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑176398 | Presentation sheet TS 28.306 | ORANGE | TS or TR cover | Approval | Yes |
Yes
| revised | No | S5‑176518 | |||
S5‑176518 | Presentation sheet TS 28.306 | ORANGE | TS or TR cover | Approval | Yes |
Yes
| approved | No | S5‑176398 | |||
S5‑176516 | Draft TS 28.306 | ORANGE | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
6.4.2 | Management of QoE measurement collection | S5‑176034 | Minutes of Management of QoE measurement collection | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑176154 | pCR to the TS 28.404 Use case 5.4.1 clarification | Cisco Systems Inc., Ericsson | pCR | Yes |
Yes
| approved | No | |||||
S5‑176274 | Attributes for QoE measurement collection | Ericsson | discussion | Approval | Yes |
Yes
| revised | No | S5‑176408 | |||
S5‑176408 | Attributes for QoE measurement collection | Ericsson | discussion | Endorsement | Yes |
Yes
| endorsed | No | S5‑176274 | |||
S5‑176407 | Draft TR 28.404 | Ericsson | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑176409 | LS on atributes for QoE measurement collection | Ericsson | LS out | Approval | Yes |
Yes
| approved | No | ||||
6.4.3 | Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements | S5‑176035 | Minutes of Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements | Rapporteur (Ericsson) | report | Yes |
Yes
| noted | No | |||
S5‑176080 | pCR TS 28.530 – Enhancements to clauses 4.6 and 4.7 | ORANGE | pCR | Approval | Yes |
Yes
| merged | No | S5‑176415 | |||
S5‑176100 | pCR 28.530 Adjustment of subclauses sequence of Clause 4 | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176101 | pCR 28.530 Add business level requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176454 | |||
S5‑176454 | pCR 28.530 Add business level requirements | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176101 | |||
S5‑176102 | pCR 28.530 Add business level use case and requirements of performance data isolation when multiple CSP share the same network slice instance | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176455 | pCR 28.530 Add business level use case and requirements of performance data isolation when multiple CSP share the same network slice instance | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176103 | pCR 28.530 Clarification of network slice related requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176456 | |||
S5‑176456 | pCR 28.530 Clarification of network slice related requirements | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176103 | |||
S5‑176104 | pCR 28.530 Add the set of network slicing management functions | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176412 | pCR 28.530 Add the set of network slicing management functions | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176105 | pCR 28.530 Update clause 5.4.2 usecase of to satisfy a request to create an NSI and clause 5.4.3 to satisfy a request to create an NSSI | Huawei | pCR | Approval | Yes |
Yes
| merged | No | S5‑176444 | |||
S5‑176106 | pCR 28.530 Update Clause 4.1 Management aspects of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| noted | No | 3 | |||
S5‑176413 | pCR 28.530 Update Clause 4.1 Management aspects of a network slice instance | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176107 | pCR 28.530 Update clause 4.10 Coordination with management system of non-3GPP parts | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176414 | |||
S5‑176414 | pCR 28.530 Update clause 4.10 Coordination with management system of non-3GPP parts | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176107 | |||
S5‑176108 | DRAFT LS to SA1 and GSMA on Actor and roles related to network slicing management | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176500 | |||
S5‑176500 | LS to SA1 and GSMA on Actor and roles related to network slicing management | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176108 | |||
S5‑176109 | pCR 28.530 Add use case and requirements on 3GPP management system coordinating with TN management system | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176457 | pCR 28.530 Add use case and requirements on 3GPP management system coordinating with TN management system | Huawei, China Unicom | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176110 | pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as a service case | Huawei, China Unicom, CATR, China Telecom | pCR | Approval | Yes |
Yes
| revised | No | S5‑176458 | |||
S5‑176458 | pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as a service case | Huawei, China Unicom, CATR, China Telecom | pCR | Approval | Yes |
Yes
| noted | No | S5‑176110 | |||
S5‑176556 | pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as a service case | Huawei, China Unicom, CATR, China Telecom | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176111 | pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as NOP internals case | Huawei, China Unicom, China Telecom | pCR | Approval | Yes |
Yes
| revised | No | S5‑176460 | |||
S5‑176460 | pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as NOP internals case | Huawei, China Unicom, China Telecom | pCR | Approval | Yes |
Yes
| noted | No | S5‑176111 | |||
S5‑176112 | pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice subnet as a service case | Huawei, China Unicom, China Telecom | pCR | Approval | Yes |
Yes
| revised | No | S5‑176462 | |||
S5‑176462 | pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice subnet as a service case | Huawei, China Unicom, China Telecom | pCR | Approval | Yes |
Yes
| noted | No | S5‑176112 | |||
S5‑176113 | pCR 28.530 Add use case and requirements on performance management of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176463 | |||
S5‑176463 | pCR 28.530 Add use case and requirements on performance management of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176113 | |||
S5‑176114 | pCR 28.530 Add use case and requirements on performance management of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176475 | |||
S5‑176475 | pCR 28.530 Add use case and requirements on performance management of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176114 | |||
S5‑176115 | pCR 28.530 Add use case and requirements on alarm notification of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176476 | |||
S5‑176476 | pCR 28.530 Add use case and requirements on alarm notification of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176115 | |||
S5‑176116 | pCR 28.530 Add use case and requirements on alarm notification of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176497 | |||
S5‑176497 | pCR 28.530 Add use case and requirements on alarm notification of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176116 | |||
S5‑176117 | pCR 28.530 Add concept and use case of MEC | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176420 | |||
S5‑176420 | pCR 28.530 Add concept and use case of MEC | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑176117 | |||
S5‑176118 | pCR 28.530 Adding concept of recursion | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176421 | |||
S5‑176421 | pCR 28.530 Adding concept of recursion | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176557 | S5‑176118 | ||
S5‑176557 | pCR 28.530 Adding concept of recursion | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176421 | |||
S5‑176119 | pCR 28.530 pCR 28.530 Add use case for multi-operator slicing | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176498 | |||
S5‑176498 | pCR 28.530 pCR 28.530 Add use case for multi-operator slicing | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176558 | S5‑176119 | ||
S5‑176558 | pCR 28.530 pCR 28.530 Add use case for multi-operator slicing | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176498 | |||
S5‑176120 | pCR 28.530 pCR 28.530 Add network slice subnet as a service | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176461 | |||
S5‑176461 | pCR 28.530 pCR 28.530 Add network slice subnet as a service | Huawei | pCR | Approval | Yes |
Yes
| noted | No | S5‑176120 | |||
S5‑176121 | pCR 28.530 Clarify relationship between Communication Service and Network Slice | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176416 | |||
S5‑176416 | pCR 28.530 Clarify relationship between Communication Service and Network Slice | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176121 | |||
S5‑176122 | pCR 28.530 Clarify relationships for Network Slice as a Service | Huawei | pCR | Approval | Yes |
Yes
| merged | No | S5‑176415 | |||
S5‑176197 | pCR TS 28.530 Clarifications for network slice as a service role description | NTT DOCOMO | pCR | Approval | Yes |
Yes
| revised | No | S5‑176415 | |||
S5‑176415 | pCR TS 28.530 Clarifications for network slice as a service role description | NTT DOCOMO,ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑176197 | |||
S5‑176198 | pCR 28.530 Update to the role description | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176417 | |||
S5‑176417 | pCR 28.530 Update to the role description | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176198 | |||
S5‑176199 | pCR 28.530 Network slice deliverable concepts | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| revised | No | S5‑176419 | |||
S5‑176419 | pCR 28.530 Network slice deliverable concepts | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| approved | No | S5‑176199 | |||
S5‑176200 | pCR 28.530 Add business level use case of policy management for slicing | Huawei, China Unicom, CATR | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176201 | pCR 28.530 Provide Network Slice as a Service | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176566 | |||
S5‑176566 | pCR 28.530 Provide Network Slice as a Service | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176201 | |||
S5‑176221 | Add business use case of provide network slice as a service with guaranteed quality of service | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑176499 | |||
S5‑176499 | Add business use case of provide network slice as a service with guaranteed quality of service | China Mobile Com. Corporation | pCR | Approval | Yes |
Yes
| revised | No | S5‑176567 | S5‑176221 | ||
S5‑176567 | Add business use case of provide network slice as a service with guaranteed quality of service | China Mobile Com. Corporation | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176499 | |||
S5‑176226 | pCR 28.530 Use case and requirements for activate network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176446 | |||
S5‑176446 | pCR 28.530 Use case and requirements for activate network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| approved | No | S5‑176226 | |||
S5‑176227 | pCR 28.530 Use case and requirements for de-activate network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176447 | |||
S5‑176447 | pCR 28.530 Use case and requirements for de-activate network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| approved | No | S5‑176227 | |||
S5‑176228 | pCR 28.530 Use case and requirements for modify a network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176448 | |||
S5‑176448 | pCR 28.530 Use case and requirements for modify a network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| approved | No | S5‑176228 | |||
S5‑176229 | pCR 28.530 Use case and requirements for terminate a network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176449 | |||
S5‑176449 | pCR 28.530 Use case and requirements for terminate a network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| approved | No | S5‑176229 | |||
S5‑176231 | pCR 28.530 Use case for create a network slice instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176444 | |||
S5‑176444 | pCR 28.530 Use case for create a network slice instance | Ericsson, Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176568 | S5‑176231 | ||
S5‑176568 | pCR 28.530 Use case for create a network slice instance | Ericsson, Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176444 | |||
S5‑176238 | pCR 28.530 text proposal for actors and roles clause 5.2 | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑176443 | |||
S5‑176443 | pCR 28.530 text proposal for actors and roles clause 5.2 | Ericsson Limited | pCR | Approval | Yes |
Yes
| approved | No | S5‑176238 | |||
S5‑176240 | Discussion paper overview use cases and requirements for management of network slicing | Ericsson Limited | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑176441 | Discussion paper overview use cases and requirements for management of network slicing | Ericsson Limited | discussion | Endorsement | No |
Yes
| withdrawn | Yes | S5‑176240 | |||
S5‑176242 | pCR 28.530 align headings to formal TS template | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑176410 | |||
S5‑176410 | pCR 28.530 align headings to formal TS template | Ericsson Limited | pCR | Approval | Yes |
Yes
| approved | No | S5‑176242 | |||
S5‑176243 | Sequence proposal for network slicing concepts use cases and requirements agenda point 6.4.3 | Ericsson Limited | pCR | Discussion | Yes |
Yes
| noted | No | ||||
S5‑176246 | pCR 28.530 Use case and requirements for activate network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176450 | |||
S5‑176450 | pCR 28.530 Use case and requirements for activate network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176569 | S5‑176246 | ||
S5‑176569 | pCR 28.530 Use case and requirements for activate network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176450 | |||
S5‑176247 | pCR 28.530 Use case and requirements for de-activate network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176451 | |||
S5‑176451 | pCR 28.530 Use case and requirements for de-activate network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176570 | S5‑176247 | ||
S5‑176570 | pCR 28.530 Use case and requirements for de-activate network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176451 | |||
S5‑176249 | pCR 28.530 Use case and requirements for modify a network slice subnet | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176452 | |||
S5‑176452 | pCR 28.530 Use case and requirements for modify a network slice subnet | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| left for email approval | No | S5‑176249 | |||
S5‑176250 | pCR 28.530 Use case and requirements for terminate a network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| revised | No | S5‑176453 | |||
S5‑176453 | pCR 28.530 Use case and requirements for terminate a network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| left for email approval | No | S5‑176250 | |||
S5‑176251 | pCR 28.530 Use case for create a network slice subnet instance | Ericsson GmbH, Eurolab | pCR | Approval | Yes |
Yes
| merged | No | S5‑176444 | |||
S5‑176299 | pCR TS 28.530 Network Slicing terminology and concepts misalignments | NTT DOCOMO | pCR | Approval | Yes |
Yes
| revised | No | S5‑176411 | |||
S5‑176411 | pCR TS 28.530 Network Slicing terminology and concepts misalignments | NTT DOCOMO | pCR | Approval | Yes |
Yes
| approved | No | S5‑176299 | |||
S5‑176472 | Draft TS 28.530 | Ericsson | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
6.4.4 | Provisioning of network slicing for 5G networks and services | S5‑176036 | Minutes of Provisioning of network slicing for 5G networks and services | Rapporteur (Huawei) | report | Yes |
Yes
| noted | No | |||
S5‑176123 | pCR 28.531 Add general description of provisioning of network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176422 | |||
S5‑176422 | pCR 28.531 Add general description of provisioning of network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176573 | S5‑176123 | ||
S5‑176573 | pCR 28.531 Add general description of provisioning of network slice instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176422 | |||
S5‑176124 | pCR 28.531 Add specification level requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176432 | |||
S5‑176432 | pCR 28.531 Add specification level requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176574 | S5‑176124 | ||
S5‑176574 | pCR 28.531 Add specification level requirements | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176432 | |||
S5‑176125 | pCR 28.531 Add usecase and requirements of querying network slice subnet capability | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176424 | pCR 28.531 Add usecase and requirements of querying network slice subnet capability | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176126 | pCR 28.531 Update clause 5.1.1 usecase of network slice instance creation and clause 5.1.2 usecase of network slice subnet instance creation | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176425 | |||
S5‑176425 | pCR 28.531 Update clause 5.1.1 usecase of network slice instance creation and clause 5.1.2 usecase of network slice subnet instance creation | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176575 | S5‑176126 | ||
S5‑176575 | pCR 28.531 Update clause 5.1.1 usecase of network slice instance creation and clause 5.1.2 usecase of network slice subnet instance creation | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176425 | |||
S5‑176127 | pCR 28.531 Adding general description for usgae of network slice subnet template | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176128 | pCR 28.531 Adding information model for managednetworkslice and networkslicesubnet | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176435 | pCR 28.531 Adding information model for managednetworkslice and networkslicesubnet | Huawei | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176129 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176426 | |||
S5‑176426 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176576 | S5‑176129 | ||
S5‑176576 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176426 | |||
S5‑176130 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176427 | |||
S5‑176427 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176577 | S5‑176130 | ||
S5‑176577 | pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176427 | |||
S5‑176131 | pCR 28.531 Add use case and requirements on termination of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176428 | |||
S5‑176428 | pCR 28.531 Add use case and requirements on termination of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176578 | S5‑176131 | ||
S5‑176578 | pCR 28.531 Add use case and requirements on termination of a network slice instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176428 | |||
S5‑176132 | pCR 28.531 Add use case and requirements on termination of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176429 | |||
S5‑176429 | pCR 28.531 Add use case and requirements on termination of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176579 | S5‑176132 | ||
S5‑176579 | pCR 28.531 Add use case and requirements on termination of a network slice subnet instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176429 | |||
S5‑176133 | pCR 28.531 Add use case and requirements on modification of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176430 | |||
S5‑176430 | pCR 28.531 Add use case and requirements on modification of a network slice instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176580 | S5‑176133 | ||
S5‑176580 | pCR 28.531 Add use case and requirements on modification of a network slice instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176430 | |||
S5‑176134 | pCR 28.531 Add use case and requirements on modification of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176431 | |||
S5‑176431 | pCR 28.531 Add use case and requirements on modification of a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176581 | S5‑176134 | ||
S5‑176581 | pCR 28.531 Add use case and requirements on modification of a network slice subnet instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176431 | |||
S5‑176135 | pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176440 | |||
S5‑176440 | pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176582 | S5‑176135 | ||
S5‑176582 | pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176440 | |||
S5‑176194 | Discussion paper about network slice modeling | ZTE Wistron Telecom AB | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑176436 | Discussion paper about network slice modeling | ZTE Wistron Telecom AB | discussion | Discussion | No |
Yes
| withdrawn | Yes | ||||
S5‑176202 | pCR 28.531 Adding description and requirements for NSI used to support multiple communication services | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176433 | |||
S5‑176433 | pCR 28.531 Adding description and requirements for NSI used to support multiple communication services | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176583 | S5‑176202 | ||
S5‑176583 | pCR 28.531 Adding description and requirements for NSI used to support multiple communication services | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176433 | |||
S5‑176203 | pCR 28.531 Add configuration information for the constituents of an NSI | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176434 | |||
S5‑176434 | pCR 28.531 Add configuration information for the constituents of an NSI | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176584 | S5‑176203 | ||
S5‑176584 | pCR 28.531 Add configuration information for the constituents of an NSI | Huawei | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176434 | |||
S5‑176204 | pCR 28.531 Add use case for network slice preparation | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| revised | No | S5‑176423 | |||
S5‑176423 | pCR 28.531 Add use case for network slice preparation | Huawei, China Unicom | pCR | Approval | Yes |
Yes
| revised | No | S5‑176585 | S5‑176204 | ||
S5‑176585 | pCR 28.531 Add use case for network slice preparation | Huawei, China Unicom | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176423 | |||
S5‑176287 | Contributions discussion sequence of 6.4.4 | Huawei | other | Information | Yes |
Yes
| noted | No | ||||
S5‑176288 | pCR 28531 Slice management model | Ericsson Inc. | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176572 | Draft TS 28.531 | Huawei | draft TS | Approval | No |
Yes
| left for email approval | No | ||||
6.4.5 | Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management | S5‑176037 | Minutes of Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management | Rapporteur (Nokia) | report | Yes |
Yes
| noted | No | |||
S5‑176223 | Rel-15 CR 28.659 Adding attribute of IOC EUtranGenericCell to support SON for AAS deployment management | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑176224 | Rel-15 CR 28.628 Add SON for AAS management description and attributes | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑176438 | S5‑175440 | ||
S5‑176438 | Rel-15 CR 28.628 Add SON for AAS management description and attributes | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑176224 | |||
S5‑176225 | Rel-15 CR 28.629 Adding SON for AAS deployment management attributes | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑176439 | |||
S5‑176439 | Rel-15 CR 28.629 Adding SON for AAS deployment management attributes | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| revised | No | S5‑176471 | S5‑176225 | ||
S5‑176471 | Rel-15 CR 28.629 Adding SON for AAS deployment management attributes | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | S5‑176439 | |||
S5‑176230 | Summary of WI of SON for AAS deployment management | Nokia, Nokia Shanghai Bell | report | Approval | Yes |
Yes
| noted | No | ||||
6.4.6 | Management of 5G networks that include virtualized network functions (preliminary work before WID approval by SA) | S5‑176021 | Management of 5G networks that include virtualized network functions | Rapporteur(Intel) | report | No |
Yes
| withdrawn | Yes | |||
6.4.7 | Network Resource Model (NRM) Integration Reference Point (IRP) for 5G network functions management (preliminary work before WID approval by SA) | S5‑176039 | Minutes of Network Resource Model (NRM) Integration Reference Point (IRP) for 5G network functions management | Rapporteur (Nokia) | report | No |
Yes
| withdrawn | Yes | |||
S5‑176252 | skeleton of TS 28.xya NR and NG-RAN NRM IRP; Requirements | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| revised | No | S5‑176536 | |||
S5‑176536 | skeleton of TS 28.xya NR and NG-RAN NRM IRP; Requirements | Nokia, Nokia Shanghai Bell | other | Approval | No |
Yes
| left for email approval | No | S5‑176252 | |||
S5‑176253 | Skeleton of TS 28.xyc 5GC NRM IRP; Requirements | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| revised | No | S5‑176537 | |||
S5‑176537 | Skeleton of TS 28.xyc 5GC NRM IRP; Requirements | Nokia, Nokia Shanghai Bell | other | Approval | No |
Yes
| left for email approval | No | S5‑176253 | |||
S5‑176254 | Skeleton of TS 28.xyb NR and NG-RAN NRM IRP; IS and SS definitions | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| revised | No | S5‑176538 | |||
S5‑176538 | Skeleton of TS 28.xyb NR and NG-RAN NRM IRP; IS and SS definitions | Nokia, Nokia Shanghai Bell | other | Approval | No |
Yes
| left for email approval | No | S5‑176254 | |||
S5‑176255 | Skeleton of TS 28.xyd 5GC NRM IRP; IS and SS definitions | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| revised | No | S5‑176539 | |||
S5‑176539 | Skeleton of TS 28.xyd 5GC NRM IRP; IS and SS definitions | Nokia, Nokia Shanghai Bell | other | Approval | No |
Yes
| left for email approval | No | S5‑176255 | |||
S5‑176256 | pCR 28.xya Add scope to TS of NR and NG-RAN NRM IRP; Requirements | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176257 | pCR 28.xyb Add scope to TS of NR and NG-RAN NRM IRP; IS and SS definitions | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176258 | pCR 28.xyc Add scope to TS of 5GC NRM IRP; Requirements | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176259 | pCR 28.xyd Add scope to TS of 5GC NRM IRP; IS and SS definitions | Nokia, Nokia Shanghai Bell | other | Approval | Yes |
Yes
| not treated | No | ||||
6.4.8 | Fault Supervision for 5G network and network slicing (preliminary work before WID approval by SA) | S5‑176136 | pCR 28.xxx Add use case and requirements on alarm notification of a network slice instance | Huawei | other | Approval | Yes |
Yes
| not treated | No | ||
S5‑176137 | pCR 28.xxx Add use case and requirements on alarm notification of a network slice subnet instance | Huawei | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176138 | pCR 28.xxx Add network slice related management functions for fault supervision for 5G network and network slicing | Huawei, China Unicom, CATR | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176191 | Skeleton of TS 28.cde Fault Supervision for 5G network and network slicing | ZTE Wistron Telecom AB | other | Approval | Yes |
Yes
| revised | No | S5‑176508 | |||
S5‑176508 | Skeleton of TS 28.cde Fault Supervision for 5G network and network slicing | ZTE Wistron Telecom AB | other | Approval | Yes |
Yes
| revised | No | S5‑176540 | S5‑176191 | ||
S5‑176540 | Skeleton of TS 28.cde Fault Supervision for 5G network and network slicing | ZTE Wistron Telecom AB | other | Approval | No |
Yes
| left for email approval | No | S5‑176508 | |||
S5‑176192 | pCR TS 28.cde Add new skeleton clauses | ZTE Wistron Telecom AB | other | Approval | Yes |
Yes
| revised | No | S5‑176509 | |||
S5‑176509 | pCR TS 28.cde Add new skeleton clauses | ZTE Wistron Telecom AB | other | Approval | Yes |
Yes
| revised | No | S5‑176541 | S5‑176192 | ||
S5‑176541 | pCR TS 28.cde Add new skeleton clauses | ZTE Wistron Telecom AB | other | Approval | No |
Yes
| left for email approval | No | S5‑176509 | |||
S5‑176193 | pCR TS 28.cde Add content of scope | ZTE Wistron Telecom AB | other | Approval | Yes |
Yes
| revised | No | S5‑176510 | |||
S5‑176510 | pCR TS 28.cde Add content of scope | ZTE Wistron Telecom AB | other | Approval | Yes |
Yes
| not treated | No | S5‑176193 | |||
S5‑176298 | Minutes for Fault Supervision for 5G network and network slicing | Intel | report | No |
Yes
| withdrawn | Yes | |||||
S5‑176511 | Skeleton of TS 28.yyy Fault Supervision for 5G network and network slicing (Stage 2 and 3) | ZTE | other | Approval | Yes |
Yes
| revised | No | S5‑176542 | |||
S5‑176542 | Skeleton of TS 28.yyy Fault Supervision for 5G network and network slicing (Stage 2 and 3) | ZTE | other | Approval | No |
Yes
| left for email approval | No | S5‑176511 | |||
S5‑176512 | pCR TS 28.yyy Add new skeleton clauses (Stage 2 and 3) | ZTE | other | Approval | Yes |
Yes
| revised | No | S5‑176543 | |||
S5‑176543 | pCR TS 28.yyy Add new skeleton clauses (Stage 2 and 3) | ZTE | other | Approval | No |
Yes
| left for email approval | No | S5‑176512 | |||
S5‑176513 | pCR TS 28.yyy Add content of scope (stage 2 and 3) | ZTE | other | Approval | Yes |
Yes
| not treated | No | ||||
6.4.9 | Assurance data and Performance Management for 5G networks and network slicing (preliminary work before WID approval by SA) | S5‑176040 | Minutes of Assurance data and Performance Management for 5G networks and network slicing | Rapporteur (Intel) | report | No |
Yes
| withdrawn | Yes | |||
S5‑176139 | pCR 28.xxx Add use case and requirements on performance management of a network slice instance | Huawei | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176140 | pCR 28.xxx Add use case and requirements on performance management of a network slice subnet instance | Huawei | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176141 | pCR 28.xxx Add network slice related management functions for assurance data and performance management for 5G network and network slicing | Huawei, China Unicom | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176142 | pCR 28.xxx on adding use case for measurements of UL and DL user plane delay | Huawei | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176160 | pCR 28.xxx Add new skeleton of End to end KPIs, performance measurements and assurance data for 5G networks and network slicing | China Mobile Com. Corporation | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176161 | pCR 28.xxx Add scope of End to end KPIs, performance measurements and assurance data for 5G networks and network slicing | China Mobile Com. Corporation | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176162 | pCR 28.xxx Add use case and requirements on end-to-end measurement of a network slice instance | China Mobile Com. Corporation | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176171 | Skeleton of TS Performance Management interfaces for 5G networks and network slicing | Intel China Ltd. | other | Approval | Yes |
Yes
| revised | No | S5‑176545 | |||
S5‑176545 | Skeleton of TS Performance Management interfaces for 5G networks and network slicing | Intel China Ltd. | other | Approval | No |
Yes
| left for email approval | No | S5‑176171 | |||
S5‑176172 | pCR Add scope to TS PM interfaces for 5G networks and network slicing | Intel China Ltd. | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176173 | Skeleton of TS Performance measurements and assurance data for NG-RAN Network Functions | Intel China Ltd. | other | Approval | Yes |
Yes
| revised | No | S5‑176546 | |||
S5‑176546 | Skeleton of TS Performance measurements and assurance data for NG-RAN Network Functions | Intel China Ltd. | other | Approval | No |
Yes
| left for email approval | No | S5‑176173 | |||
S5‑176174 | pCR Add scope to TS Performance measurements and assurance data for NG-RAN NFs | Intel China Ltd. | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176175 | Skeleton of TS Performance measurements and assurance data for 5GC Network Functions | Intel China Ltd. | other | Approval | Yes |
Yes
| revised | No | S5‑176547 | |||
S5‑176547 | Skeleton of TS Performance measurements and assurance data for 5GC Network Functions | Intel China Ltd. | other | Approval | No |
Yes
| left for email approval | No | S5‑176175 | |||
S5‑176176 | pCR Add scope to TS Performance measurements and assurance data for 5GC NFs | Intel China Ltd. | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176484 | Discussion sequence proposal | Intel | other | Information | Yes |
Yes
| noted | No | ||||
6.5 | OAM&P Studies |   | ||||||||||
6.5.1 | Study on Management and Orchestration Architecture of Next Generation Network and Service | S5‑176020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | Rapporteur (Huawei) | report | Yes |
Yes
| noted | No | |||
S5‑176143 | pCR 28.800 remove the unused references | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176346 | |||
S5‑176346 | pCR 28.800 remove the unused references | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176529 | S5‑176143 | ||
S5‑176529 | pCR 28.800 remove the unused references | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176346 | |||
S5‑176144 | pCR 28.800 add use case and requirements for Management and orchestration of networks with non-3GPP parts | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176348 | |||
S5‑176348 | pCR 28.800 add use case and requirements for Management and orchestration of networks with non-3GPP parts | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176144 | |||
S5‑176145 | pCR 28.800 add integrated management architecture option | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176349 | |||
S5‑176349 | pCR 28.800 add integrated management architecture option | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176554 | S5‑176145 | ||
S5‑176554 | pCR 28.800 add integrated management architecture option | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176565 | S5‑176349 | ||
S5‑176565 | pCR 28.800 add integrated management architecture option | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176554 | |||
S5‑176146 | pCR 28.800 Add potential requirements to management data interface to NFV-MANO | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176347 | |||
S5‑176347 | pCR 28.800 Add potential requirements to management data interface to NFV-MANO | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176530 | S5‑176146 | ||
S5‑176530 | pCR 28.800 Add potential requirements to management data interface to NFV-MANO | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176555 | S5‑176347 | ||
S5‑176555 | pCR 28.800 Add potential requirements to management data interface to NFV-MANO | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176530 | |||
S5‑176147 | Discussion paper on Concept of exposed interface management function | Huawei | pCR | Endorsement | Yes |
Yes
| noted | No | ||||
S5‑176148 | pCR 28.800 Multi-operator management architecture of communication services | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176350 | |||
S5‑176350 | pCR 28.800 Multi-operator management architecture of communication services | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176531 | S5‑176148 | ||
S5‑176531 | pCR 28.800 Multi-operator management architecture of communication services | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176350 | |||
S5‑176149 | pCR 28.800 Potential scenarios for overall communication service management across multiple CSPs | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176352 | |||
S5‑176352 | pCR 28.800 Potential scenarios for overall communication service management across multiple CSPs | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176149 | |||
S5‑176150 | pCR 28.800 Use case of communication service across multiple CSPs and its potential requirements | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176351 | |||
S5‑176351 | pCR 28.800 Use case of communication service across multiple CSPs and its potential requirements | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176150 | |||
S5‑176195 | pCR 28.800 add slice NM services | Ericsson Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176353 | |||
S5‑176353 | pCR 28.800 add slice NM services | Ericsson Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176473 | S5‑176195 | ||
S5‑176473 | pCR 28.800 add slice NM services | Ericsson Inc. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176564 | S5‑176353 | ||
S5‑176564 | pCR 28.800 add slice NM services | Ericsson Inc. | pCR | Approval | Yes |
Yes
| approved | No | S5‑176473 | |||
S5‑176205 | pCR 28.800 Add management interfaces | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176355 | |||
S5‑176355 | pCR 28.800 Add management interfaces | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176544 | S5‑176205 | ||
S5‑176544 | pCR 28.800 Add management interfaces | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176355 | |||
S5‑176206 | pCR 28.800 update for service based management architecture | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176356 | |||
S5‑176356 | pCR 28.800 update for service based management architecture | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176548 | S5‑176206 | ||
S5‑176548 | pCR 28.800 update for service based management architecture | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176571 | S5‑176356 | ||
S5‑176571 | pCR 28.800 update for service based management architecture | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176548 | |||
S5‑176207 | pCR 28.800 Add conclusion and recommendations | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176357 | |||
S5‑176357 | pCR 28.800 Add conclusion and recommendations | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176549 | S5‑176207 | ||
S5‑176549 | pCR 28.800 Add conclusion and recommendations | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176357 | |||
S5‑176208 | Presentation sheet for TR 28.800 | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176358 | |||
S5‑176358 | Presentation sheet for TR 28.800 | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176208 | |||
S5‑176209 | pCR 28.800 Include additional functionality to management functions | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176354 | |||
S5‑176354 | pCR 28.800 Include additional functionality to management functions | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176551 | S5‑176209 | ||
S5‑176551 | pCR 28.800 Include additional functionality to management functions | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176552 | S5‑176354 | ||
S5‑176552 | pCR 28.800 Include additional functionality to management functions | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176551 | |||
S5‑176292 | Discussion sequence proposal for agenda item 6.5.1 | Huawei | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑176533 | Draft TR 28.800 | Huawei | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.2 | Study on management aspects of next generation network architecture and features | S5‑176022 | Minutes for Study on management aspects of next generation network architecture and features | Rapporteur(Nokia) | report | Yes |
Yes
| noted | No | |||
S5‑176062 | pCR Rel-14 TR 28.802 re NR NRM | Ericsson Inc. | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176359 | pCR Rel-14 TR 28.802 re NR NRM | Ericsson Inc. | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176151 | pCR 28.802 clarification of solution and conclusion for management of 5GC | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176399 | |||
S5‑176399 | pCR 28.802 clarification of solution and conclusion for management of 5GC | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176151 | |||
S5‑176232 | pCR 28.802 Add potential solution for 5GS Trace management | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176403 | |||
S5‑176403 | pCR 28.802 Add potential solution for 5GS Trace management | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176232 | |||
S5‑176235 | pCR 28.802 Editor Note cleanup | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176401 | |||
S5‑176401 | pCR 28.802 Editor Note cleanup | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176235 | |||
S5‑176237 | pCR 28.802 Add conclusion and recommendation for Trace management | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176239 | pCR 28.802 Add conclusion and recommendation for ng-eNB management | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176402 | |||
S5‑176402 | pCR 28.802 Add conclusion and recommendation for ng-eNB management | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176239 | |||
S5‑176241 | pCR 28.802 Add conclusion and recommendation for edge computing management | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176400 | |||
S5‑176400 | pCR 28.802 Add conclusion and recommendation for edge computing management | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176241 | |||
S5‑176244 | pCR 28.802 Add potential solution, conclusion and recommendation for SON | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176245 | Presentation of TR 28.802 | Nokia, Nokia Shanghai Bell | TS or TR cover | Approval | Yes |
Yes
| revised | No | S5‑176406 | |||
S5‑176406 | Presentation of TR 28.802 | Nokia, Nokia Shanghai Bell | TS or TR cover | Approval | Yes |
Yes
| approved | No | S5‑176245 | |||
S5‑176248 | TR 28.802 TDocs discussion sequence proposal for section 6.5.2 | Nokia Korea | other | Information | Yes |
Yes
| noted | No | ||||
S5‑176262 | pCR TR 28.802 Add functional requirements for edge computing support | ETRI | pCR | Approval | Yes |
Yes
| revised | No | S5‑176404 | |||
S5‑176404 | pCR TR 28.802 Add functional requirements for edge computing support | ETRI | pCR | Approval | Yes |
Yes
| approved | No | S5‑176262 | |||
S5‑176405 | Draft TR 28.802 | Nokia | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.3 | Study on Management aspects of selected IoT-related features | S5‑176028 | Minutes of Study on Management aspects of selected IoT-related features | Rapporteur (Cisco) | report | Yes |
Yes
| noted | No | |||
S5‑176152 | pCR to the TR 32.857 Clarification on the number of measurements | Cisco Systems Inc. | pCR | Yes |
Yes
| revised | No | S5‑176478 | ||||
S5‑176478 | pCR to the TR 32.857 Clarification on the number of measurements | Cisco Systems Inc. | pCR | - | Yes |
Yes
| revised | No | S5‑176586 | S5‑176152 | ||
S5‑176586 | pCR to the TR 32.857 Clarification on the number of measurements | Cisco Systems Inc. | pCR | - | No |
Yes
| left for email approval | No | S5‑176478 | |||
S5‑176153 | pCR to the TR 32.857 Conclusions | Cisco Systems Inc. | pCR | Yes |
Yes
| approved | No | |||||
S5‑176479 | Draft TR 32.857 | Cisco | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.4 | Study on a RESTful HTTP-based Solution Set | S5‑176029 | Minutes of Study on a RESTful HTTP-based Solution Set | Rapporteur (Nokia) | report | Yes |
Yes
| noted | No | |||
S5‑176233 | pCR 32.866 Propose to remove section on task resources | Ericsson Limited | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176234 | pCR 32.866 Propose to add RAML as alternative specification language | Ericsson Limited | pCR | Approval | Yes |
Yes
| revised | No | S5‑176481 | |||
S5‑176481 | pCR 32.866 Propose to add RAML as alternative specification language | Ericsson Limited | pCR | Approval | Yes |
Yes
| approved | No | S5‑176234 | |||
S5‑176236 | pCR 32.866 Propose to add query parameters for iterations | Ericsson Limited | pCR | Yes |
Yes
| revised | No | S5‑176532 | ||||
S5‑176532 | pCR 32.866 Propose to add query parameters for iterations | Ericsson Limited | pCR | - | Yes |
Yes
| approved | No | S5‑176236 | |||
S5‑176260 | pCR 32.866 Propose to add a note to the discussion on scoping and filtering | Ericsson Limited | pCR | Yes |
Yes
| approved | No | |||||
S5‑176263 | pCR 32.866 Addition of JSON Patch to partial update operations | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176264 | pCR 32.866 Add recommendation on the usage of task operations | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑176480 | |||
S5‑176480 | pCR 32.866 Add recommendation on the usage of task operations | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑176264 | |||
S5‑176265 | pCR 32.866 Improve description of the design pattern for links | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑176483 | |||
S5‑176483 | pCR 32.866 Improve description of the design pattern for links | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑176265 | |||
S5‑176266 | pCR 32.866 Add RMM level 3 mapping of the Alarm IRP | Nokia Germany | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
S5‑176267 | pCR 32.866 Resolve editor’s notes | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑176489 | |||
S5‑176489 | pCR 32.866 Resolve editor’s notes | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑176267 | |||
S5‑176277 | pCR 32.866 Add recommendation on RMM level | Nokia Germany | pCR | Approval | Yes |
Yes
| revised | No | S5‑176485 | |||
S5‑176485 | pCR 32.866 Add recommendation on RMM level | Nokia Germany | pCR | Approval | Yes |
Yes
| approved | No | S5‑176277 | |||
S5‑176445 | Presentation of 32.866 to SA for approval | Nokia | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑176459 | pCR 32. 866 Add design pattern for attribute selection | Nokia | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176474 | pCR 32. 866 Add content for introduction and scope sections | Nokia | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176482 | Draft TR 32.866 | Nokia | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.5 | Study on management aspects of virtualized network functions that are part of the NR | S5‑176030 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | Rapporteur (Intel) | report | Yes |
Yes
| revised | No | S5‑176519 | ||
S5‑176519 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | Rapporteur (Intel) | report | - | Yes |
Yes
| noted | No | S5‑176030 | |||
S5‑176165 | pCR TR 32.864 changes to address edithelp comments | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| revised | No | S5‑176487 | |||
S5‑176487 | pCR TR 32.864 changes to address edithelp comments | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | S5‑176165 | |||
S5‑176166 | pCR TR 32.864 correct the wrong references | Intel Corporation (UK) Ltd | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176167 | LS on gaps identified in ETSI GS NFV-IFA 013 | Intel Corporation (UK) Ltd | LS out | Approval | Yes |
Yes
| revised | No | S5‑176520 | |||
S5‑176520 | LS on gaps identified in ETSI GS NFV-IFA 013 | Intel Corporation (UK) Ltd | LS out | Approval | Yes |
Yes
| revised | No | S5‑176550 | S5‑176167 | ||
S5‑176550 | LS on gaps identified in ETSI GS NFV-IFA 013 | Intel Corporation (UK) Ltd | LS out | Approval | Yes |
Yes
| approved | No | S5‑176520 | |||
S5‑176168 | Presentation of TR 32.864 | Intel Corporation (UK) Ltd | report | Approval | Yes |
Yes
| approved | No | ||||
S5‑176486 | Draft TR 32.864 | Intel | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.6 | Study on OAM aspects of LTE and WLAN integration | S5‑176031 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report | Yes |
Yes
| noted | No | |||
S5‑176178 | pCR TR 32.868 Add UC on PM on XwAP procedures for non-collocated LWA | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176179 | pCR TR 32.868 Add UC on PM on RRC procedures for LWA | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176180 | pCR TR 32.868 Add UC on configuration of mobility set for LWIP | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176181 | pCR TR 32.868 Add UC on PM on user data tranmission via WLAN for LWIP | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176182 | pCR TR 32.868 Add UC on PM on RRC procedures for LWIP | Intel China Ltd. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176490 | |||
S5‑176490 | pCR TR 32.868 Add UC on PM on RRC procedures for LWIP | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | S5‑176182 | |||
S5‑176183 | pCR TR 32.868 Add UC on FM for LWIP | Intel China Ltd. | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176488 | Draft TR 32.868 | Intel | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.7 | Study on network policy management for mobile networks based on NFV scenarios | S5‑176032 | Minutes of Study on network policy management for mobile networks based on NFV scenarios | Rapporteur ( China Mobile) | report | Yes |
Yes
| noted | No | |||
S5‑176187 | pCR TR 32.871 adding the PIP concept | China Mobile E-Commerce Co. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176491 | |||
S5‑176491 | pCR TR 32.871 adding the PIP concept | China Mobile E-Commerce Co. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176587 | S5‑176187 | ||
S5‑176587 | pCR TR 32.871 adding the PIP concept | China Mobile E-Commerce Co. | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176491 | |||
S5‑176188 | pCR TR 32.871 adding the NFV policy management architecture | China Mobile E-Commerce Co. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176492 | |||
S5‑176492 | pCR TR 32.871 adding the NFV policy management architecture | China Mobile E-Commerce Co. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176588 | S5‑176188 | ||
S5‑176588 | pCR TR 32.871 adding the NFV policy management architecture | China Mobile E-Commerce Co. | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176492 | |||
S5‑176189 | pCR TR 32.871 updating the UCs after the concept modification | China Mobile E-Commerce Co. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176493 | |||
S5‑176493 | pCR TR 32.871 updating the UCs after the concept modification | China Mobile E-Commerce Co. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176589 | S5‑176189 | ||
S5‑176589 | pCR TR 32.871 updating the UCs after the concept modification | China Mobile E-Commerce Co. | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176493 | |||
S5‑176190 | pCR TR 32.871 adding the concepts of policy conflict detection and resolution | China Mobile E-Commerce Co. | pCR | Approval | Yes |
Yes
| revised | No | S5‑176590 | |||
S5‑176590 | pCR TR 32.871 adding the concepts of policy conflict detection and resolution | China Mobile E-Commerce Co. | pCR | Approval | No |
Yes
| left for email approval | No | S5‑176190 | |||
S5‑176591 | Draft TR 32.871 | China Mobile | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.8 | Study on system and functional aspects of Energy Efficiency in 5G networks | S5‑176038 | Minutes of Study on system and functional aspects of Energy Efficiency in 5G networks | Rapporteur (ORANGE) | report | Yes |
Yes
| noted | No | |||
S5‑176063 | pCR TR 32.972 - Defining and collecting EE KPI for 5G networks | ORANGE, Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176494 | |||
S5‑176494 | pCR TR 32.972 - Defining and collecting EE KPI for 5G networks | ORANGE, Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176063 | |||
S5‑176222 | pCR TR 32.972 – Introducing Energy Aware States in 5G Network Functions | ORANGE | pCR | Approval | Yes |
Yes
| revised | No | S5‑176496 | |||
S5‑176496 | pCR TR 32.972 – Introducing Energy Aware States in 5G Network Functions | ORANGE | pCR | Approval | Yes |
Yes
| approved | No | S5‑176222 | |||
S5‑176470 | Draft TR 32.972 | ORANGE | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
6.5.9 | Study on integration of ONAP DCAE and 3GPP management architecture (preliminary work before WID approval by SA) | S5‑176041 | Minutes of Study on integration of ONAP DCAE and 3GPP management architecture | Rapporteur (ORANGE) | report | No |
Yes
| withdrawn | Yes | |||
S5‑176064 | TR 28.9bc - Skeleton | AT&T, ORANGE | other | Approval | Yes |
Yes
| revised | No | S5‑176534 | |||
S5‑176534 | TR 28.9bc - Skeleton | AT&T, ORANGE | other | Approval | No |
Yes
| left for email approval | No | S5‑176064 | |||
S5‑176065 | TR 28.9bc - Clause headers | AT&T, ORANGE | other | Approval | Yes |
Yes
| revised | No | S5‑176535 | |||
S5‑176535 | TR 28.9bc - Clause headers | AT&T, ORANGE | other | Approval | No |
Yes
| left for email approval | No | S5‑176065 | |||
S5‑176066 | TR 28.9bc - Positioning of ONAP DCAE wrt 3GPP ref mngt model | AT&T, ORANGE | other | Approval | Yes |
Yes
| not treated | No | ||||
S5‑176067 | TR 28.9bc – Communication principles for notifications | AT&T, ORANGE | other | Approval | Yes |
Yes
| not treated | No | ||||
7 | Charging |   | ||||||||||
7.1 | Charging Plenary | S5‑176008 | CH Agenda and Time Plan | CH SWG Chair | agenda | Yes |
Yes
| approved | No | |||
S5‑176009 | CH Executive Report | CH SWG Chair | report | Yes |
Yes
| revised | No | S5‑176561 | ||||
S5‑176561 | CH Executive Report | CH SWG Chair | report | - | Yes |
Yes
| noted | No | S5‑176009 | |||
S5‑176044 | LS from RAN3 to SA5 on 5G specification of PSy | C3-175295 | LS in | Yes |
Yes
| noted | No | |||||
S5‑176045 | LS from OMA to 3GPP SA5 on improvements on AVP definition for CPM Charging | OMA | LS in | Yes |
Yes
| noted | No | |||||
S5‑176047 | Resubmitted Reply LS from CT4 to SA5 on Charging support for Control and User Plane Separation | C4-174324 | LS in | Yes |
Yes
| noted | No | |||||
S5‑176155 | Sequencing of Charging Features with respect to Releases | Samsung Electronics GmbH | discussion | Discussion | Yes |
Yes
| noted | No | ||||
S5‑176294 | LS from GSMA to 3GPP SA2 and SA5 on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic | GSMA | LS in | Yes |
Yes
| noted | No | |||||
S5‑176297 | LS from CT4 to SA5 on Sx protocol extension to support Credit Pool | C4-175354 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑176300 | Reply to: LS from CT4 to SA5 on Sx protocol extension to support Credit Pool | Huawei | LS out | approval | Yes |
Yes
| approved | No | ||||
7.2 | New Charging Work Item proposals | S5‑176095 | New WID on Service Based Interface of 5G Charging System | Huawei | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176373 | |
S5‑176373 | New WID on Service Based Interface of 5G Charging System | Huawei | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176559 | S5‑176095 | ||
S5‑176559 | New WID on Service Based Interface of 5G Charging System | Huawei | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑176373 | |||
S5‑176170 | New WID on Charging for WLAN-based Prose Direct Discovery | Intel China Ltd. | WID new | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑176261 | New WID Data Charging in 5G System Architecture Phase 1 - part 1 | Nokia, Nokia Shanghai Bell | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176374 | |||
S5‑176374 | New WID Data Charging in 5G System Architecture Phase 1 - part 1 | Nokia, Nokia Shanghai Bell | WID new | Agreement | Yes |
Yes
| revised | No | S5‑176560 | S5‑176261 | ||
S5‑176560 | New WID Data Charging in 5G System Architecture Phase 1 - part 1 | Nokia, Nokia Shanghai Bell | WID new | Agreement | Yes |
Yes
| agreed | No | S5‑176374 | |||
7.3 | Charging Maintenance and Rel-15 small Enhancements | S5‑176076 | Rel-15 CR 32.299 PoC-Server-Role AVP extension for OMA CPM Charging | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | ||
7.4 | Rel-15 Charging |   | ||||||||||
7.4.1 | Charging Enhancement for eFMSS | S5‑176184 | Bindings of eFMSS for EPC offline charging | China Telecom | CR | Approval | Yes |
Yes
| revised | No | S5‑176308 | |
S5‑176308 | Bindings of eFMSS for EPC offline charging | China Telecom | CR | Approval | Yes |
Yes
| agreed | No | S5‑176184 | |||
S5‑176185 | Charging enhancement on TDF for eFMSS | China Telecom | CR | Approval | Yes |
Yes
| revised | No | S5‑176309 | |||
S5‑176309 | Charging enhancement on TDF for eFMSS | China Telecom | CR | Approval | Yes |
Yes
| agreed | No | S5‑176185 | |||
S5‑176186 | Editorial Modification for eFMSS | China Telecom | CR | Approval | Yes |
Yes
| revised | No | S5‑176310 | |||
S5‑176310 | Editorial Modification for eFMSS | China Telecom | CR | Approval | Yes |
Yes
| agreed | No | S5‑176186 | |||
S5‑176311 | Rel-15 CR Update list of service data containers | China Telecom | CR | Agreement | Yes |
Yes
| agreed | No | ||||
S5‑176312 | Revised WID eFMSS_CH | China Telecom | WID revised | Agreement | Yes |
Yes
| agreed | No | ||||
7.4.2 | PS Charging enhancements to support 5G New Radio via Dual Connectivity | S5‑176210 | Rel-15 CR 32.298 EPC QoS update to support NR as a secondary RAT | Ericsson | CR | Approval | Yes |
Yes
| revised | No | S5‑176301 | |
S5‑176301 | Rel-15 CR 32.298 EPC QoS update to support NR as a secondary RAT | Ericsson | CR | Approval | Yes |
Yes
| agreed | No | S5‑176210 | |||
S5‑176211 | Rel-15 CR 32.299 EPC QoS update to support NR as a secondary RAT | Ericsson | CR | Approval | Yes |
Yes
| revised | No | S5‑176302 | |||
S5‑176302 | Rel-15 CR 32.299 EPC QoS update to support NR as a secondary RAT | Ericsson | CR | Approval | Yes |
Yes
| agreed | No | S5‑176211 | |||
S5‑176212 | Rel-15 CR 32.298 Support for secondary RAT reporting from RAN | Ericsson | CR | Approval | Yes |
Yes
| not pursued | No | ||||
S5‑176213 | Rel-15 CR 32.299 Support for secondary RAT reporting from RAN | Ericsson | CR | Approval | Yes |
Yes
| not pursued | No | ||||
7.4.3 | Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking | S5‑176370 | Updated NAPS-CH WID | Huawei | WID revised | Agreement | Yes |
Yes
| agreed | No | ||
7.4.4 | Charging for WLAN-based Prose Direct Discovery (preliminary work before WID approval by SA) | S5‑176177 | CR Rel-15 32.277 Add charging description for WLAN-based ProSe direct discovery | Intel Corporation | CR | Approval | Yes |
Yes
| revised | No | S5‑176322 | S5‑175164 |
S5‑176322 | CR Rel-15 32.277 Add charging description for WLAN-based ProSe direct discovery | Intel Corporation | CR | Approval | Yes |
Yes
| agreed | No | S5‑176177 | |||
7.5 | Charging Studies |   | ||||||||||
7.5.1 | Study on Overload Control for Diameter Charging Applications | S5‑176216 | Rel-15 pCR 32.869 Update of flows for Overload in Offline | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑176217 | Rel-15 pCR 32.869 Introducing Evaluation and recommendation | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑176303 | |||
S5‑176303 | Rel-15 pCR 32.869 Introducing Evaluation and recommendation | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑176217 | |||
S5‑176304 | Rel-15 pCR 32.869 Solutions numbering | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176305 | Draft TR 32.869 | Ericsson | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑176306 | Presentation TR 32.869 to SA for information and approval | Ericsson | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
S5‑176307 | LS to CT4 on TR 32.869 sent to SA for information and approval | Ericsson | LS out | Approval | Yes |
Yes
| approved | No | ||||
S5‑176313 | LS to CT4 on AVPs range numbers for Rel-15 | Nokia | LS out | Approval | Yes |
Yes
| approved | No | ||||
S5‑176467 | LS to CT4 on TR 32.870 sent to SA for information and approval | Nokia, Nokia Shanghai Bell | LS out | Approval | Yes |
Yes
| approved | No | ||||
S5‑176468 | Rel-15 pCR 32.899 Evaluation and Conclusion on solution #4.2 | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176469 | Update WID Study on charging aspects of 5G system architecture phase 1 | Huawei | SID revised | Agreement | Yes |
Yes
| agreed | No | ||||
7.5.2 | Study on forward compatibility for 3GPP Diameter Charging Applications | S5‑176270 | Rel-15 pCR 32.870 Diameter extensibility rule in new chapter | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑176271 | Rel-15 pCR 32.870 New solutions and evaluation key issues 1,2 and 4 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176375 | |||
S5‑176375 | Rel-15 pCR 32.870 New solutions and evaluation key issues 1,2 and 4 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176271 | |||
S5‑176272 | Rel-15 pCR 32.870 New solution and evaluation for key issues 3 and 5 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176376 | |||
S5‑176376 | Rel-15 pCR 32.870 New solution and evaluation for key issues 3 and 5 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176272 | |||
S5‑176273 | Rel-15 pCR 32.870 New solution and evaluation for key issue 6 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176377 | |||
S5‑176377 | Rel-15 pCR 32.870 New solution and evaluation for key issue 6 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176273 | |||
S5‑176275 | Rel-15 pCR 32.870 Conclusions and recommendations | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176378 | |||
S5‑176378 | Rel-15 pCR 32.870 Conclusions and recommendations | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176275 | |||
S5‑176379 | Draft TR 32.870 | Nokia | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑176380 | TR 32.870 presentation for information and approval | Nokia | TS or TR cover | 32.870 | Yes |
Yes
| approved | No | ||||
S5‑176465 | Draft TR 32.848 | China Mobile | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
7.5.3 | Study on Charging Aspects of 5G System Architecture Phase 1 | S5‑176069 | 5G Charging normative work organization | Nokia, Nokia Shanghai Bell | discussion | Discussion | Yes |
Yes
| noted | No | ||
S5‑176070 | Rel-15 pCR TR 32.899 conclusion for Online and offline charging evaluation | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176364 | |||
S5‑176364 | Rel-15 pCR TR 32.899 conclusion for Online and offline charging evaluation | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176070 | |||
S5‑176071 | Rel-15 pCR TR 32.899 conclusion for roaming | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176362 | |||
S5‑176362 | Rel-15 pCR TR 32.899 conclusion for roaming | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176071 | |||
S5‑176072 | Rel-15 pCR TR 32.899 conclusion on Network exposure capability | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176329 | |||
S5‑176329 | Rel-15 pCR TR 32.899 conclusion on Network exposure capability | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176072 | |||
S5‑176073 | Rel-15 pCR TR 32.899 some conclusions on Interaction between SMF and UPF | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176321 | |||
S5‑176321 | Rel-15 pCR TR 32.899 some conclusions on Interaction between SMF and UPF | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176073 | |||
S5‑176074 | Rel-15 pCR TR 32.899 conclusions on session mngt and service continuity | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176318 | |||
S5‑176318 | Rel-15 pCR TR 32.899 conclusions on session mngt and service continuity | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176074 | |||
S5‑176075 | Rel-15 pCR TR 32.899 some final conclusions and recommendations | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176466 | |||
S5‑176466 | Rel-15 pCR TR 32.899 some final conclusions and recommendations | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176075 | |||
S5‑176077 | Rel-15 pCR TR 32.899 reference for PCC in roaming | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176078 | Rel-15 pCR TR 32.899 additional solution roaming LBO | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176361 | |||
S5‑176361 | Rel-15 pCR TR 32.899 additional solution roaming LBO | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176078 | |||
S5‑176081 | Rel-15 pCR 32.899 Addition of Combined Online and Offline charging | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176363 | |||
S5‑176363 | Rel-15 pCR 32.899 Addition of Combined Online and Offline charging | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑176081 | |||
S5‑176082 | Rel-15 pCR 32.899 Charging procedure for PDU session Anchor in UPFs | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176319 | |||
S5‑176319 | Rel-15 pCR 32.899 Charging procedure for PDU session Anchor in UPFs | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176082 | |||
S5‑176083 | Rel-15 pCR 32.899 Addition of Network Slicing Charging | Huawei | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176084 | Rel-15 pCR 32.899 Solutions for QoS based Charging | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176325 | |||
S5‑176325 | Rel-15 pCR 32.899 Solutions for QoS based Charging | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176084 | |||
S5‑176085 | Rel-15 pCR 32.899 Service Based Interface | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176365 | |||
S5‑176365 | Rel-15 pCR 32.899 Service Based Interface | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑176085 | |||
S5‑176086 | Rel-15 pCR 32.899 Conclusion on the QoS Topic in clause 5.2 | Huawei | pCR | Approval | Yes |
Yes
| revised | No | S5‑176327 | |||
S5‑176327 | Rel-15 pCR 32.899 Conclusion on the QoS Topic in clause 5.2 | Huawei | pCR | Approval | Yes |
Yes
| approved | No | S5‑176086 | |||
S5‑176087 | Rel-15 pCR 32.899 Conclusion on the Interaction between SMF and UPF in clause 5.3 | Huawei | pCR | Agreement | Yes |
Yes
| merged | No | S5‑176321 | |||
S5‑176088 | Rel-15 pCR 32.899 Conclusion on the Network Slicing Topic in clause 5.4 | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176328 | |||
S5‑176328 | Rel-15 pCR 32.899 Conclusion on the Network Slicing Topic in clause 5.4 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑176088 | |||
S5‑176089 | Rel-15 pCR 32.899 Conclusion on the Network Capability Exposure Topic in clause 5.5 | Huawei | pCR | Approval | Yes |
Yes
| merged | No | S5‑176329 | |||
S5‑176090 | Rel-15 pCR 32.899 Conclusion on the Service-based Architecture in clause 5.7 | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176366 | |||
S5‑176366 | Rel-15 pCR 32.899 Conclusion on the Service-based Architecture in clause 5.7 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑176090 | |||
S5‑176091 | Rel-15 pCR 32.899 Conclusion on the Interworking between 5G System and Existing Systems in clause 5.8 | Huawei | pCR | Agreement | Yes |
Yes
| revised | No | S5‑176367 | |||
S5‑176367 | Rel-15 pCR 32.899 Conclusion on the Interworking between 5G System and Existing Systems in clause 5.8 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | S5‑176091 | |||
S5‑176092 | Rel-15 pCR 32.899 Conclusion on the Online and Offline Charging Evaluation Topic in clause 5.9 | Huawei | pCR | Agreement | Yes |
Yes
| merged | No | S5‑176364 | |||
S5‑176093 | Rel-15 pCR 32.899 Suggestion on Clause 6 | Huawei | pCR | Agreement | Yes |
Yes
| noted | No | ||||
S5‑176094 | Rel-15 pCR 32.899 Correction on the TR 32.899 | Huawei | pCR | Agreement | Yes |
Yes
| approved | No | ||||
S5‑176096 | Rel-15 pCR TR 32.899 alternative solution for Network exposure capability | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176156 | Rel-15 pCR TR 32.899 introduction SSC mode 3 Multi homed | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176317 | |||
S5‑176317 | Rel-15 pCR TR 32.899 introduction SSC mode 3 Multi homed | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176156 | |||
S5‑176157 | Rel-15 pCR 32.899 Refinements on scenarios with BP- UL CL | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176320 | |||
S5‑176320 | Rel-15 pCR 32.899 Refinements on scenarios with BP- UL CL | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176157 | |||
S5‑176158 | Rel-15 pCR 32.899 Correction roaming Home routed scenario | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176159 | Rel-15 pCR 32.899 update scenarios SSC mode 2 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176315 | |||
S5‑176315 | Rel-15 pCR 32.899 update scenarios SSC mode 2 | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176159 | |||
S5‑176196 | Rel-15 pCR 32.899 Update conventions clause | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| revised | No | S5‑176314 | |||
S5‑176314 | Rel-15 pCR 32.899 Update conventions clause | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| approved | No | S5‑176196 | |||
S5‑176218 | Rel-15 pCR 32.899 Solution#3.6 Evaluation | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑176324 | |||
S5‑176324 | Rel-15 pCR 32.899 Solution#3.6 Evaluation | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑176218 | |||
S5‑176219 | Rel-15 pCR 32.899 Solution#3.8 Evaluation | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑176323 | |||
S5‑176323 | Rel-15 pCR 32.899 Solution#3.8 Evaluation | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑176219 | |||
S5‑176220 | Rel-15 pCR 32.899 Solution#10.1 Evaluation | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑176368 | |||
S5‑176368 | Rel-15 pCR 32.899 Solution#10.1 Evaluation | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑176220 | |||
S5‑176296 | LS from CT4 to SA5 on Reply LS on 5G Charging Study Phase 1 on N4 | C4-175223 | LS in | Yes |
Yes
| replied to | No | |||||
S5‑176369 | Reply to: LS from CT4 to SA5 on Reply LS on 5G Charging Study Phase 1 on N4 | Ericsson | LS out | approval | Yes |
Yes
| approved | No | ||||
S5‑176316 | Rel-15 pCR 32.899 Solution #3.1 evaluation | Huawei | pCR | Approval | Yes |
Yes
| approved | No | ||||
S5‑176326 | Rel-15 pCR 32.899 new Solution for QoS based Charging | Nokia, Nokia Shanghai Bell | pCR | Approval | Yes |
Yes
| noted | No | ||||
S5‑176371 | Draft TR 32.899 | Huawei | draft TR | Approval | No |
Yes
| left for email approval | No | ||||
S5‑176372 | Cover sheet TR 32.899 | Huawei | TS or TR cover | Approval | Yes |
Yes
| approved | No | ||||
7.5.4 | Study on Volume Based Charging Aspects for VoLTE | S5‑176214 | Rel-15 pCR 32.848 Introduction of potential requirements volume reporting from IMS | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | ||
S5‑176215 | Rel-15 pCR 32.848 Introduction of key issue for volume reporting in P-CSCF | Ericsson | pCR | Approval | Yes |
Yes
| revised | No | S5‑176464 | |||
S5‑176464 | Rel-15 pCR 32.848 Introduction of key issue for volume reporting in P-CSCF | Ericsson | pCR | Approval | Yes |
Yes
| approved | No | S5‑176215 | |||
8 | Any Other Business |   | ||||||||||
9 | Closing of the meeting |   |