Tdoc List

2017-12-01 15:22

Agenda Topic TDoc Title Source Type For Avail Treated Decision Wdrn Replaced-by Replaces
1 Opening of the meeting                      
2 Approval of the agenda S5‑176000 Agenda WG Chairman agenda   Yes
Yes
approved No    
3 IPR declaration S5‑176023 IPR and legal declaration WG Chairman other   Yes
Yes
noted No    
4 Meetings and activities reports                      
4.1 Last SA5 meeting report S5‑176001 Report from last SA5 meeting MCC report   Yes
Yes
approved No    
4.2 Last SA meeting report S5‑176002 SA5 status report at last SA meeting WG Chairman report   Yes
Yes
noted No    
    S5‑176003 SA5 results at last SA meeting WG Chairman report   Yes
Yes
noted No    
4.3 Inter-organizational reports S5‑176286 Presentation on 3GPP Network Slicing at October 2017 NGMN Forum SA5 vice chairman report Information Yes
Yes
noted No    
    S5‑176289 Minutes of joint SA5-SG2 call on methodology 2017-11-09 Ericsson LM report Information Yes
YesNokia asked if it was possible to investigate the A.5 qualification for 3GPP. MCC commented that this issue should be carried out via PCG. The Chair took note to query about this.
noted No    
5 Cross-SWG issues                      
5.1 Administrative issues at SA5 level S5‑176006 Leaders meeting agenda WG Chairman agenda   Yes
Yes
noted No    
    S5‑176007 Leaders meeting minutes WG Chairman report   Yes
YesNokia queried about the communication with ONAP. It was clarified that this hadn’t started given that the WID had to be formally approved in the next SA plenary first. ONAP will be added to the list of agenda items in the leaders meeting minutes.
noted No    
    S5‑176011 SA5 Working Procedures WG Vice Chair (Huawei) other   Yes
Yes
noted No    
    S5‑176012 SA5 Meeting Facility Requirements WG Vice Chair (Orange) other   Yes
Yes
noted No    
    S5‑176013 Process for management of draft TSs/TRs WG Chairman other   Yes
Yes
noted No    
    S5‑176014 CR Quality Check MCC other   Yes
YesMCC commented that the use of "prohibited" and "allowed" was possible although it was recommended to use better normative language such as "shall". In any case, the inclusion in a NOTE was not possible and the change should be to leave it in plain text and not inside a NOTE.
noted No    
    S5‑176024 Status of email approvals WG Vice Chair (Orange) other   No
No
reserved No    
    S5‑176269 Requirements template (high-level) example Ericsson LM other   Yes
YesTo be put in the guidelines folder.
approved No    
5.2 Technical issues at SA5 level                      
5.3 Liaison statements at SA5 level S5‑176046 Resubmitted Liaison Statement from ETSI NTECH to 3GPP SA5 and SA2 on GANA instantiation in the Core and Backhaul network parts of the 3GPP Architecture ETSI TC NTECH LS in   Yes
YesORANGE commented that SA2 noted this LS without doing any other action about it. There was no feedback on the TR and there wasn't much interest in colaborating with NTECH. A reply LS was drafted.
replied to No    
    S5‑176381 Reply to: Resubmitted Liaison Statement from ETSI NTECH to 3GPP SA5 and SA2 on GANA instantiation in the Core and Backhaul network parts of the 3GPP Architecture Ericsson LS out approval Yes
Yes
approved No    
    S5‑176051 Ls from BBF to SA5 on Cooperation on Network Slicing Broadband Forum LS in   Yes
YesNokia commented that SA5 needed to inform them about the full range of specifications relevant to network slicing. Some WIDs needed to be revised as well. NTT-Docomo commented that SA5 doesn’t know what BBF does in this subject and that we shld ask them about details on their work.
replied to No    
    S5‑176382 Reply to: Ls from BBF to SA5 on Cooperation on Network Slicing Huawei LS out approval Yes
Yes
revised No S5‑176563  
    S5‑176563 Reply to: Ls from BBF to SA5 on Cooperation on Network Slicing Huawei LS out approval No
Yes
left for email approval No   S5‑176382
    S5‑176293 Resubmitted LS from MEF forum to SA5 on MEF Forum Work on 5G MEF Forum LS in   Yes
YesThe Chair commented that MEF intended to work on slicing from their perspective without overlapping with 3GPP's work.
replied to No    
    S5‑176383 Reply to: Resubmitted LS from MEF forum to SA5 on MEF Forum Work on 5G Ericsson LS out approval No
Yes
left for email approval No    
    S5‑176437 LS to ITU-T SG2 on progress of methodology Ericsson LS out Approval Yes
Yes
approved No    
5.4 SA5 meeting calendar S5‑176010 SA5 Meeting Calendar WG Chairman other   Yes
Yes
noted No    
5.5 Review of the Work Plan S5‑176015 Deliverables due for the NEXT SA Plenary MCC other   Yes
Yes
noted No    
    S5‑176016 Ongoing SA5 WIDs and SIDs WG Vice Chair (Huawei) other   Yes
Yes
noted No    
    S5‑176017 SA5 3GPP Work Plan MCC other   Yes
Yes
noted No    
    S5‑176026 Work Plan status WG Chair other   No
No
reserved No    
6 OAM&P                      
6.1 OAM&P Plenary S5‑176004 Time Plan for OAM&P WG Vice Chair (Huawei) other   Yes
Yes
revised No S5‑176360  
    S5‑176360 Time Plan for OAM&P WG Vice Chair (Huawei) other - Yes
Yes
noted No   S5‑176004
    S5‑176005 OAM Executive Report WG Vice Chair (Huawei) report   Yes
Yes
revised No S5‑176562  
    S5‑176562 OAM Executive Report WG Vice Chair (Huawei) report - No
No
reserved No   S5‑176005
    S5‑176025 OAM&P SWG action list WG Vice Chair (Huawei) other   Yes
Yes
noted No    
    S5‑176027 Minutes of OAM&P SWG opening session WG Vice Chair (Huawei) report   Yes
Yes
noted No    
    S5‑176042 LS from NGMN to SA5 on Cooperation on Network Slicing NGMN LS in   No
Yes
withdrawn Yes    
    S5‑176043 LS from NGMN to SA5 on NGMN “RAN functional split and x-haul” work item NGMN LS in   Yes
Yes
noted No    
    S5‑176048 Resubmitted LS from RAN3 to SA5 on support of Trace and MDT in NG-RAN in rel-15 R3-173422 LS in   Yes
Yes
replied to No    
    S5‑176477 Reply to: Resubmitted LS from RAN3 to SA5 on support of Trace and MDT in NG-RAN in rel-15 Nokia LS out approval Yes
Yes
approved No    
    S5‑176050 Resubmitted LSOut reply from ETSI NFV cc SA5 on lifecycle management for 3GPP service based architecture ETSI ISG NFV LS in   Yes
YesNokia commented that some of the questions should be answered by SA2, SA5 and other WGs but that should be addressed directly to them by NGMN and in this case only SA5 was in copy.
noted No    
    S5‑176285 Recommendations on time management in OAM&P SWG SA5 vice chairman discussion Endorsement Yes
Yes
endorsed No    
    S5‑176290 Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric ATIS discussion   Yes
Yes
revised No S5‑176330  
    S5‑176330 Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric ATIS discussion - Yes
Yes
revised No S5‑176521 S5‑176290
    S5‑176521 Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric ATIS discussion - Yes
Yes
revised No S5‑176523 S5‑176330
    S5‑176523 Input from ATIS NRSC to 3GPP TSG SA WG5 Drop in Registered Users Metric ATIS discussion - Yes
Yes
endorsed No   S5‑176521
    S5‑176295 Analysis of TS 32.101 external references Huawei discussion Discussion Yes
Yes
noted No    
    S5‑176384 OAM&P SWG action list ORANGE other discussion Yes
Yes
noted No    
    S5‑176385 Structure of 5G specifications WG Vice Chair (ORANGE) other Endorsement Yes
Yes
withdrawn Yes    
6.2 New OAM&P Work Item proposals S5‑176018 Minutes of New Work Item proposals - OAM&P WG Vice Chair (Orange) report   Yes
Yes
noted No    
    S5‑176079 New WID on 5G Management Architecture Ericsson Inc. WID new Agreement Yes
Yes
noted No    
    S5‑176332 New WID on 5G Management Architecture Ericsson Inc. WID new Agreement No
Yes
withdrawn Yes    
    S5‑176097 New WID EPC CUPS enhancement Huawei WID new Agreement Yes
Yes
revised No S5‑176495  
    S5‑176495 New WID EPC CUPS enhancement Huawei WID new Agreement Yes
Yes
agreed No   S5‑176097
    S5‑176098 New WID 5G Network management architecture Huawei, China Mobile WID new Agreement Yes
Yes
noted No    
    S5‑176169 New SID on management aspects of edge computing Intel Corporation (UK) Ltd SID new Agreement Yes
Yes
revised No S5‑176333  
    S5‑176333 New SID on management aspects of edge computing Intel Corporation (UK) Ltd SID new Agreement Yes
Yes
revised No S5‑176524 S5‑176169
    S5‑176524 New SID on management aspects of edge computing Intel Corporation (UK) Ltd SID new Agreement Yes
Yes
revised No S5‑176553 S5‑176333
    S5‑176553 New SID on management aspects of edge computing Intel Corporation (UK) Ltd SID new Agreement No
Yes
left for email approval No   S5‑176524
    S5‑176268 New WID on REST Solution Sets Nokia Germany WID new Agreement Yes
Yes
revised No S5‑176334  
    S5‑176334 New WID on REST Solution Sets Nokia Germany WID new Agreement Yes
Yes
agreed No   S5‑176268
    S5‑176276 Organization of 5G Management and Orchestration WIDs Ericsson Limited discussion Endorsement Yes
Yes
revised No S5‑176331  
    S5‑176331 Organization of 5G Management and Orchestration WIDs Ericsson Limited discussion Endorsement Yes
Yes
endorsed No   S5‑176276
    S5‑176291 Structure of 5G specifications SA5 vice chairman discussion Endorsement Yes
Yes
noted No    
    S5‑176442 New WID on Trace management Nokia WID new Agreement Yes
Yes
revised No S5‑176501  
    S5‑176501 New WID on Trace management Nokia WID new Agreement Yes
Yes
revised No S5‑176525 S5‑176442
    S5‑176525 New WID on Trace management Nokia WID new Agreement Yes
Yes
agreed No   S5‑176501
    S5‑176502 Revised WID Management and orchestration of 5G networks and network slicing Ericsson,Huawei WID revised Agreement Yes
Yes
revised No S5‑176526  
    S5‑176526 Revised WID Management and orchestration of 5G networks and network slicing Ericsson,Huawei WID revised Agreement Yes
Yes
agreed No   S5‑176502
    S5‑176503 Revised WID Provisioning of 5G networks and network slicing Huawei WID revised Agreement Yes
Yes
agreed No    
    S5‑176504 Revised WID Management of 5G networks that include virtualised network functions Intel WID new Agreement Yes
Yes
revised No S5‑176522  
    S5‑176522 Revised WID Management of 5G networks that include virtualised network functions Intel WID revised Agreement Yes
Yes
revised No S5‑176527 S5‑176504
    S5‑176527 Revised WID Management of 5G networks that include virtualised network functions Intel WID revised Agreement Yes
Yes
agreed No   S5‑176522
    S5‑176505 New WID Network Resource Model for 5G networks and network slcing Nokia WID new Agreement Yes
Yes
agreed No    
    S5‑176506 Revised WID Fault supervision for 5G networks and network slicing ZTE WID revised Agreement Yes
Yes
revised No S5‑176528  
    S5‑176528 Revised WID Fault supervision for 5G networks and network slicing ZTE WID revised Agreement Yes
Yes
agreed No   S5‑176506
    S5‑176507 Revised WID assurance data and performance managemetn for 5G networks and network slicing Intel, China Mobile WID new Agreement Yes
Yes
agreed No    
6.3 OAM&P Maintenance and Rel-15 small Enhancements S5‑176019 Minutes of OAM&P Maintenance and Rel-15 small Enhancements MCC report   Yes
Yes
noted No    
    S5‑176068 pCR 32.880 Revision on edithelp's comments China Mobile pCR   Yes
Yes
approved No    
    S5‑176099 Rel-14 CR 28.518 Update the reference to ETSI GS NFV-SOL 002 Huawei CR Agreement Yes
Yes
agreed No    
    S5‑176049 Resubmitted LS from RAN3 to SA5 on Collection Period correction for MDT M3 measurement in eUTRAN R3-171382 LS in   Yes
Yes
replied to No    
    S5‑176163 Collection Period correction for MDT M3 measurement in eUTRAN Ericsson LM discussion Discussion Yes
Yes
endorsed No    
    S5‑176164 Draft Reply LS on Collection Period correction for MDT M3 measurement in eUTRAN Ericsson LS out Approval Yes
Yes
revised No S5‑176335  
    S5‑176335 Reply LS on Collection Period correction for MDT M3 measurement in eUTRAN Ericsson LS out Approval Yes
Yes
approved No   S5‑176164
    S5‑176278 CR R8 32511-820 NCR Ericsson CR   Yes
Yes
revised No S5‑176337  
    S5‑176337 CR R8 32511-820 NCR Ericsson CR - Yes
Yes
agreed No   S5‑176278
    S5‑176279 CR R9 32511-900 NCR Ericsson CR   Yes
Yes
revised No S5‑176338  
    S5‑176338 CR R9 32511-900 NCR Ericsson CR - Yes
Yes
agreed No   S5‑176279
    S5‑176280 CR R10 32511-a00 NCR Ericsson CR   Yes
Yes
revised No S5‑176339  
    S5‑176339 CR R10 32511-a00 NCR Ericsson CR - Yes
Yes
agreed No   S5‑176280
    S5‑176281 CR R11 32511-b20 NCR Ericsson CR   Yes
Yes
revised No S5‑176340  
    S5‑176340 CR R11 32511-b20 NCR Ericsson CR - Yes
Yes
agreed No   S5‑176281
    S5‑176282 CR R12 32511-c00 NCR Ericsson CR   Yes
Yes
revised No S5‑176341  
    S5‑176341 CR R12 32511-c00 NCR Ericsson CR - Yes
Yes
agreed No   S5‑176282
    S5‑176283 CR R13 32511-d00 NCR Ericsson CR   Yes
Yes
revised No S5‑176342  
    S5‑176342 CR R13 32511-d00 NCR Ericsson CR - Yes
Yes
agreed No   S5‑176283
    S5‑176284 CR R14 32511-e00 NCR Ericsson CR   Yes
Yes
revised No S5‑176343  
    S5‑176343 CR R14 32511-e00 NCR Ericsson CR - Yes
Yes
agreed No   S5‑176284
    S5‑176336 Draft TR 32.880 China Mobile draft TR Approval Yes
Yes
approved No    
    S5‑176344 Rel-14 TS 28.528 Update References to ETSI NFV SOL specifications Nokia CR Agreement Yes
Yes
revised No S5‑176345  
    S5‑176345 Rel-14 TS 28.528 Update References to ETSI NFV SOL specifications Nokia CR Agreement Yes
Yes
agreed No   S5‑176344
    S5‑176514 Presentation sheet TR 32.880 China Mobile TS or TR cover Approval Yes
Yes
approved No    
6.4 Rel-15 Operations, Administration, Maintenance and Provisioning (OAM&P)                      
6.4.1 Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) S5‑176033 Minutes of Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) Rapporteur (ORANGE) report   Yes
Yes
noted No    
    S5‑176052 pCR TS 28304 Editorial cleanup and Removal of editor note ORANGE pCR Agreement Yes
Yes
approved No    
    S5‑176053 pCR TS 28.305 Scope and System Context ORANGE pCR Agreement Yes
Yes
revised No S5‑176418  
    S5‑176418 pCR TS 28.305 Scope and System Context ORANGE pCR Approval Yes
Yes
approved No   S5‑176053
    S5‑176054 pCR TS 28.305 Add missing definitions for solution 1 ORANGE pCR Approval Yes
Yes
noted No    
    S5‑176388 pCR TS 28.305 Add missing definitions for solution 1 ORANGE pCR Approval No
Yes
withdrawn Yes    
    S5‑176055 draft CR 28.622 Add attribute to IOC MF (Rev of S5-175361) ORANGE draftCR Approval Yes
Yes
revised No S5‑176389  
    S5‑176389 draft CR 28.622 Add attribute to IOC MF (Rev of S5-175361) ORANGE draftCR Approval Yes
Yes
approved No   S5‑176055
    S5‑176056 draft CR 32.425 Add PEE meas for E-UTRAN (Rev of S5-175362) ORANGE draftCR Approval Yes
Yes
revised No S5‑176390  
    S5‑176390 draft CR 32.425 Add PEE meas for E-UTRAN (Rev of S5-175362) ORANGE draftCR Approval Yes
Yes
approved No   S5‑176056
    S5‑176057 draft CR 32.405 Add PEE meas for UTRAN ORANGE draftCR Approval Yes
Yes
revised No S5‑176391  
    S5‑176391 draft CR 32.405 Add PEE meas for UTRAN ORANGE draftCR Approval Yes
Yes
approved No   S5‑176057
    S5‑176058 draft CR 52.402 Add PEE meas for GERAN ORANGE draftCR Approval Yes
Yes
revised No S5‑176392  
    S5‑176392 draft CR 52.402 Add PEE meas for GERAN ORANGE draftCR Approval Yes
Yes
revised No S5‑176515 S5‑176058
    S5‑176515 draft CR 52.402 Add PEE meas for GERAN ORANGE draftCR Approval Yes
Yes
approved No   S5‑176392
    S5‑176059 pCR TS 28.305 Add missing definitions for solution 2 ORANGE pCR Approval Yes
Yes
revised No S5‑176393  
    S5‑176393 pCR TS 28.305 Add missing definitions for solution 2 ORANGE pCR Approval Yes
Yes
approved No   S5‑176059
    S5‑176060 pCR TS 28.306 Solution set definitions for solution 1 ORANGE pCR Approval Yes
Yes
revised No S5‑176394  
    S5‑176394 pCR TS 28.306 Solution set definitions for solution 1 ORANGE pCR Approval Yes
Yes
approved No   S5‑176060
    S5‑176061 pCR TS 28.306 Input to solution set definitions for solution 2 ORANGE pCR Approval Yes
Yes
revised No S5‑176395  
    S5‑176395 pCR TS 28.306 Input to solution set definitions for solution 2 ORANGE pCR Approval Yes
Yes
revised No S5‑176517 S5‑176061
    S5‑176517 pCR TS 28.306 Input to solution set definitions for solution 2 ORANGE pCR Approval Yes
Yes
approved No   S5‑176395
    S5‑176386 Draft TS 28.304 ORANGE draft TS Approval No
Yes
left for email approval No    
    S5‑176387 Draft TS 28.305 ORANGE draft TS Approval No
Yes
left for email approval No    
    S5‑176396 Presentation sheet TS 28.304 ORANGE TS or TR cover Approval Yes
Yes
approved No    
    S5‑176397 Presentation sheet TS 28.305 ORANGE TS or TR cover Approval Yes
Yes
approved No    
    S5‑176398 Presentation sheet TS 28.306 ORANGE TS or TR cover Approval Yes
Yes
revised No S5‑176518  
    S5‑176518 Presentation sheet TS 28.306 ORANGE TS or TR cover Approval Yes
Yes
approved No   S5‑176398
    S5‑176516 Draft TS 28.306 ORANGE draft TS Approval No
Yes
left for email approval No    
6.4.2 Management of QoE measurement collection S5‑176034 Minutes of Management of QoE measurement collection Rapporteur (Ericsson) report   Yes
Yes
noted No    
    S5‑176154 pCR to the TS 28.404 Use case 5.4.1 clarification Cisco Systems Inc., Ericsson pCR   Yes
Yes
approved No    
    S5‑176274 Attributes for QoE measurement collection Ericsson discussion Approval Yes
Yes
revised No S5‑176408  
    S5‑176408 Attributes for QoE measurement collection Ericsson discussion Endorsement Yes
Yes
endorsed No   S5‑176274
    S5‑176407 Draft TR 28.404 Ericsson draft TR Approval No
Yes
left for email approval No    
    S5‑176409 LS on atributes for QoE measurement collection Ericsson LS out Approval Yes
Yes
approved No    
6.4.3 Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements S5‑176035 Minutes of Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements Rapporteur (Ericsson) report   Yes
Yes
noted No    
    S5‑176080 pCR TS 28.530 – Enhancements to clauses 4.6 and 4.7 ORANGE pCR Approval Yes
Yes
merged No S5‑176415  
    S5‑176100 pCR 28.530 Adjustment of subclauses sequence of Clause 4 Huawei pCR Approval Yes
Yes
approved No    
    S5‑176101 pCR 28.530 Add business level requirements Huawei pCR Approval Yes
Yes
revised No S5‑176454  
    S5‑176454 pCR 28.530 Add business level requirements Huawei pCR Approval Yes
Yes
approved No   S5‑176101
    S5‑176102 pCR 28.530 Add business level use case and requirements of performance data isolation when multiple CSP share the same network slice instance Huawei pCR Approval Yes
Yes
noted No    
    S5‑176455 pCR 28.530 Add business level use case and requirements of performance data isolation when multiple CSP share the same network slice instance Huawei pCR Approval No
Yes
withdrawn Yes    
    S5‑176103 pCR 28.530 Clarification of network slice related requirements Huawei pCR Approval Yes
Yes
revised No S5‑176456  
    S5‑176456 pCR 28.530 Clarification of network slice related requirements Huawei pCR Approval Yes
Yes
approved No   S5‑176103
    S5‑176104 pCR 28.530 Add the set of network slicing management functions Huawei pCR Approval Yes
Yes
noted No    
    S5‑176412 pCR 28.530 Add the set of network slicing management functions Huawei pCR Approval No
Yes
withdrawn Yes    
    S5‑176105 pCR 28.530 Update clause 5.4.2 usecase of to satisfy a request to create an NSI and clause 5.4.3 to satisfy a request to create an NSSI Huawei pCR Approval Yes
Yes
merged No S5‑176444  
    S5‑176106 pCR 28.530 Update Clause 4.1 Management aspects of a network slice instance Huawei pCR Approval Yes
Yes
noted No 3  
    S5‑176413 pCR 28.530 Update Clause 4.1 Management aspects of a network slice instance Huawei pCR Approval No
Yes
withdrawn Yes    
    S5‑176107 pCR 28.530 Update clause 4.10 Coordination with management system of non-3GPP parts Huawei pCR Approval Yes
Yes
revised No S5‑176414  
    S5‑176414 pCR 28.530 Update clause 4.10 Coordination with management system of non-3GPP parts Huawei pCR Approval Yes
Yes
approved No   S5‑176107
    S5‑176108 DRAFT LS to SA1 and GSMA on Actor and roles related to network slicing management Huawei pCR Approval Yes
Yes
revised No S5‑176500  
    S5‑176500 LS to SA1 and GSMA on Actor and roles related to network slicing management Huawei pCR Approval No
Yes
left for email approval No   S5‑176108
    S5‑176109 pCR 28.530 Add use case and requirements on 3GPP management system coordinating with TN management system Huawei, China Unicom pCR Approval Yes
Yes
noted No    
    S5‑176457 pCR 28.530 Add use case and requirements on 3GPP management system coordinating with TN management system Huawei, China Unicom pCR Approval No
Yes
withdrawn Yes    
    S5‑176110 pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as a service case Huawei, China Unicom, CATR, China Telecom pCR Approval Yes
Yes
revised No S5‑176458  
    S5‑176458 pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as a service case Huawei, China Unicom, CATR, China Telecom pCR Approval Yes
Yes
noted No   S5‑176110
    S5‑176556 pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as a service case Huawei, China Unicom, CATR, China Telecom pCR Approval No
Yes
withdrawn Yes    
    S5‑176111 pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as NOP internals case Huawei, China Unicom, China Telecom pCR Approval Yes
Yes
revised No S5‑176460  
    S5‑176460 pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice as NOP internals case Huawei, China Unicom, China Telecom pCR Approval Yes
Yes
noted No   S5‑176111
    S5‑176112 pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice subnet as a service case Huawei, China Unicom, China Telecom pCR Approval Yes
Yes
revised No S5‑176462  
    S5‑176462 pCR 28.530 Add business level requirements and use case of the exposure of management function interfaces and management data for network slice subnet as a service case Huawei, China Unicom, China Telecom pCR Approval Yes
Yes
noted No   S5‑176112
    S5‑176113 pCR 28.530 Add use case and requirements on performance management of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176463  
    S5‑176463 pCR 28.530 Add use case and requirements on performance management of a network slice instance Huawei pCR Approval Yes
Yes
approved No   S5‑176113
    S5‑176114 pCR 28.530 Add use case and requirements on performance management of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176475  
    S5‑176475 pCR 28.530 Add use case and requirements on performance management of a network slice subnet instance Huawei pCR Approval Yes
Yes
approved No   S5‑176114
    S5‑176115 pCR 28.530 Add use case and requirements on alarm notification of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176476  
    S5‑176476 pCR 28.530 Add use case and requirements on alarm notification of a network slice instance Huawei pCR Approval Yes
Yes
approved No   S5‑176115
    S5‑176116 pCR 28.530 Add use case and requirements on alarm notification of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176497  
    S5‑176497 pCR 28.530 Add use case and requirements on alarm notification of a network slice subnet instance Huawei pCR Approval Yes
Yes
approved No   S5‑176116
    S5‑176117 pCR 28.530 Add concept and use case of MEC Huawei pCR Approval Yes
Yes
revised No S5‑176420  
    S5‑176420 pCR 28.530 Add concept and use case of MEC Huawei pCR Approval Yes
Yes
noted No   S5‑176117
    S5‑176118 pCR 28.530 Adding concept of recursion Huawei pCR Approval Yes
Yes
revised No S5‑176421  
    S5‑176421 pCR 28.530 Adding concept of recursion Huawei pCR Approval Yes
Yes
revised No S5‑176557 S5‑176118
    S5‑176557 pCR 28.530 Adding concept of recursion Huawei pCR Approval No
Yes
left for email approval No   S5‑176421
    S5‑176119 pCR 28.530 pCR 28.530 Add use case for multi-operator slicing Huawei pCR Approval Yes
Yes
revised No S5‑176498  
    S5‑176498 pCR 28.530 pCR 28.530 Add use case for multi-operator slicing Huawei pCR Approval Yes
Yes
revised No S5‑176558 S5‑176119
    S5‑176558 pCR 28.530 pCR 28.530 Add use case for multi-operator slicing Huawei pCR Approval No
Yes
left for email approval No   S5‑176498
    S5‑176120 pCR 28.530 pCR 28.530 Add network slice subnet as a service Huawei pCR Approval Yes
Yes
revised No S5‑176461  
    S5‑176461 pCR 28.530 pCR 28.530 Add network slice subnet as a service Huawei pCR Approval Yes
Yes
noted No   S5‑176120
    S5‑176121 pCR 28.530 Clarify relationship between Communication Service and Network Slice Huawei pCR Approval Yes
Yes
revised No S5‑176416  
    S5‑176416 pCR 28.530 Clarify relationship between Communication Service and Network Slice Huawei pCR Approval Yes
Yes
approved No   S5‑176121
    S5‑176122 pCR 28.530 Clarify relationships for Network Slice as a Service Huawei pCR Approval Yes
Yes
merged No S5‑176415  
    S5‑176197 pCR TS 28.530 Clarifications for network slice as a service role description NTT DOCOMO pCR Approval Yes
Yes
revised No S5‑176415  
    S5‑176415 pCR TS 28.530 Clarifications for network slice as a service role description NTT DOCOMO,ORANGE pCR Approval Yes
Yes
approved No   S5‑176197
    S5‑176198 pCR 28.530 Update to the role description Huawei pCR Approval Yes
Yes
revised No S5‑176417  
    S5‑176417 pCR 28.530 Update to the role description Huawei pCR Approval Yes
Yes
approved No   S5‑176198
    S5‑176199 pCR 28.530 Network slice deliverable concepts Huawei, China Unicom pCR Approval Yes
Yes
revised No S5‑176419  
    S5‑176419 pCR 28.530 Network slice deliverable concepts Huawei, China Unicom pCR Approval Yes
Yes
approved No   S5‑176199
    S5‑176200 pCR 28.530 Add business level use case of policy management for slicing Huawei, China Unicom, CATR pCR Approval Yes
Yes
noted No    
    S5‑176201 pCR 28.530 Provide Network Slice as a Service Huawei pCR Approval Yes
Yes
revised No S5‑176566  
    S5‑176566 pCR 28.530 Provide Network Slice as a Service Huawei pCR Approval No
Yes
left for email approval No   S5‑176201
    S5‑176221 Add business use case of provide network slice as a service with guaranteed quality of service China Mobile Com. Corporation pCR Approval Yes
Yes
revised No S5‑176499  
    S5‑176499 Add business use case of provide network slice as a service with guaranteed quality of service China Mobile Com. Corporation pCR Approval Yes
Yes
revised No S5‑176567 S5‑176221
    S5‑176567 Add business use case of provide network slice as a service with guaranteed quality of service China Mobile Com. Corporation pCR Approval No
Yes
left for email approval No   S5‑176499
    S5‑176226 pCR 28.530 Use case and requirements for activate network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176446  
    S5‑176446 pCR 28.530 Use case and requirements for activate network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
approved No   S5‑176226
    S5‑176227 pCR 28.530 Use case and requirements for de-activate network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176447  
    S5‑176447 pCR 28.530 Use case and requirements for de-activate network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
approved No   S5‑176227
    S5‑176228 pCR 28.530 Use case and requirements for modify a network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176448  
    S5‑176448 pCR 28.530 Use case and requirements for modify a network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
approved No   S5‑176228
    S5‑176229 pCR 28.530 Use case and requirements for terminate a network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176449  
    S5‑176449 pCR 28.530 Use case and requirements for terminate a network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
approved No   S5‑176229
    S5‑176231 pCR 28.530 Use case for create a network slice instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176444  
    S5‑176444 pCR 28.530 Use case for create a network slice instance Ericsson, Huawei pCR Approval Yes
Yes
revised No S5‑176568 S5‑176231
    S5‑176568 pCR 28.530 Use case for create a network slice instance Ericsson, Huawei pCR Approval No
Yes
left for email approval No   S5‑176444
    S5‑176238 pCR 28.530 text proposal for actors and roles clause 5.2 Ericsson Limited pCR Approval Yes
Yes
revised No S5‑176443  
    S5‑176443 pCR 28.530 text proposal for actors and roles clause 5.2 Ericsson Limited pCR Approval Yes
Yes
approved No   S5‑176238
    S5‑176240 Discussion paper overview use cases and requirements for management of network slicing Ericsson Limited discussion Endorsement Yes
Yes
noted No    
    S5‑176441 Discussion paper overview use cases and requirements for management of network slicing Ericsson Limited discussion Endorsement No
Yes
withdrawn Yes   S5‑176240
    S5‑176242 pCR 28.530 align headings to formal TS template Ericsson Limited pCR Approval Yes
Yes
revised No S5‑176410  
    S5‑176410 pCR 28.530 align headings to formal TS template Ericsson Limited pCR Approval Yes
Yes
approved No   S5‑176242
    S5‑176243 Sequence proposal for network slicing concepts use cases and requirements agenda point 6.4.3 Ericsson Limited pCR Discussion Yes
Yes
noted No    
    S5‑176246 pCR 28.530 Use case and requirements for activate network slice subnet instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176450  
    S5‑176450 pCR 28.530 Use case and requirements for activate network slice subnet instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176569 S5‑176246
    S5‑176569 pCR 28.530 Use case and requirements for activate network slice subnet instance Ericsson GmbH, Eurolab pCR Approval No
Yes
left for email approval No   S5‑176450
    S5‑176247 pCR 28.530 Use case and requirements for de-activate network slice subnet instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176451  
    S5‑176451 pCR 28.530 Use case and requirements for de-activate network slice subnet instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176570 S5‑176247
    S5‑176570 pCR 28.530 Use case and requirements for de-activate network slice subnet instance Ericsson GmbH, Eurolab pCR Approval No
Yes
left for email approval No   S5‑176451
    S5‑176249 pCR 28.530 Use case and requirements for modify a network slice subnet Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176452  
    S5‑176452 pCR 28.530 Use case and requirements for modify a network slice subnet Ericsson GmbH, Eurolab pCR Approval Yes
Yes
left for email approval No   S5‑176249
    S5‑176250 pCR 28.530 Use case and requirements for terminate a network slice subnet instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
revised No S5‑176453  
    S5‑176453 pCR 28.530 Use case and requirements for terminate a network slice subnet instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
left for email approval No   S5‑176250
    S5‑176251 pCR 28.530 Use case for create a network slice subnet instance Ericsson GmbH, Eurolab pCR Approval Yes
Yes
merged No S5‑176444  
    S5‑176299 pCR TS 28.530 Network Slicing terminology and concepts misalignments NTT DOCOMO pCR Approval Yes
Yes
revised No S5‑176411  
    S5‑176411 pCR TS 28.530 Network Slicing terminology and concepts misalignments NTT DOCOMO pCR Approval Yes
Yes
approved No   S5‑176299
    S5‑176472 Draft TS 28.530 Ericsson draft TS Approval No
Yes
left for email approval No    
6.4.4 Provisioning of network slicing for 5G networks and services S5‑176036 Minutes of Provisioning of network slicing for 5G networks and services Rapporteur (Huawei) report   Yes
Yes
noted No    
    S5‑176123 pCR 28.531 Add general description of provisioning of network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176422  
    S5‑176422 pCR 28.531 Add general description of provisioning of network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176573 S5‑176123
    S5‑176573 pCR 28.531 Add general description of provisioning of network slice instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176422
    S5‑176124 pCR 28.531 Add specification level requirements Huawei pCR Approval Yes
Yes
revised No S5‑176432  
    S5‑176432 pCR 28.531 Add specification level requirements Huawei pCR Approval Yes
Yes
revised No S5‑176574 S5‑176124
    S5‑176574 pCR 28.531 Add specification level requirements Huawei pCR Approval No
Yes
left for email approval No   S5‑176432
    S5‑176125 pCR 28.531 Add usecase and requirements of querying network slice subnet capability Huawei pCR Approval Yes
Yes
noted No    
    S5‑176424 pCR 28.531 Add usecase and requirements of querying network slice subnet capability Huawei pCR Approval No
Yes
withdrawn Yes    
    S5‑176126 pCR 28.531 Update clause 5.1.1 usecase of network slice instance creation and clause 5.1.2 usecase of network slice subnet instance creation Huawei pCR Approval Yes
Yes
revised No S5‑176425  
    S5‑176425 pCR 28.531 Update clause 5.1.1 usecase of network slice instance creation and clause 5.1.2 usecase of network slice subnet instance creation Huawei pCR Approval Yes
Yes
revised No S5‑176575 S5‑176126
    S5‑176575 pCR 28.531 Update clause 5.1.1 usecase of network slice instance creation and clause 5.1.2 usecase of network slice subnet instance creation Huawei pCR Approval No
Yes
left for email approval No   S5‑176425
    S5‑176127 pCR 28.531 Adding general description for usgae of network slice subnet template Huawei pCR Approval No
Yes
withdrawn Yes    
    S5‑176128 pCR 28.531 Adding information model for managednetworkslice and networkslicesubnet Huawei pCR Approval Yes
Yes
noted No    
    S5‑176435 pCR 28.531 Adding information model for managednetworkslice and networkslicesubnet Huawei pCR Approval No
Yes
withdrawn Yes    
    S5‑176129 pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176426  
    S5‑176426 pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176576 S5‑176129
    S5‑176576 pCR 28.531 Add use case and requirements on activation and deactivation of a network slice instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176426
    S5‑176130 pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176427  
    S5‑176427 pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176577 S5‑176130
    S5‑176577 pCR 28.531 Add use case and requirements on activation and deactivation of a network slice subnet instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176427
    S5‑176131 pCR 28.531 Add use case and requirements on termination of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176428  
    S5‑176428 pCR 28.531 Add use case and requirements on termination of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176578 S5‑176131
    S5‑176578 pCR 28.531 Add use case and requirements on termination of a network slice instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176428
    S5‑176132 pCR 28.531 Add use case and requirements on termination of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176429  
    S5‑176429 pCR 28.531 Add use case and requirements on termination of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176579 S5‑176132
    S5‑176579 pCR 28.531 Add use case and requirements on termination of a network slice subnet instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176429
    S5‑176133 pCR 28.531 Add use case and requirements on modification of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176430  
    S5‑176430 pCR 28.531 Add use case and requirements on modification of a network slice instance Huawei pCR Approval Yes
Yes
revised No S5‑176580 S5‑176133
    S5‑176580 pCR 28.531 Add use case and requirements on modification of a network slice instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176430
    S5‑176134 pCR 28.531 Add use case and requirements on modification of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176431  
    S5‑176431 pCR 28.531 Add use case and requirements on modification of a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176581 S5‑176134
    S5‑176581 pCR 28.531 Add use case and requirements on modification of a network slice subnet instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176431
    S5‑176135 pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176440  
    S5‑176440 pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance Huawei pCR Approval Yes
Yes
revised No S5‑176582 S5‑176135
    S5‑176582 pCR 28.531 Add use case and requirements on associating a different network slice subnet template version to a network slice subnet instance Huawei pCR Approval No
Yes
left for email approval No   S5‑176440
    S5‑176194 Discussion paper about network slice modeling ZTE Wistron Telecom AB discussion Discussion Yes
Yes
noted No    
    S5‑176436 Discussion paper about network slice modeling ZTE Wistron Telecom AB discussion Discussion No
Yes
withdrawn Yes    
    S5‑176202 pCR 28.531 Adding description and requirements for NSI used to support multiple communication services Huawei pCR Approval Yes
Yes
revised No S5‑176433  
    S5‑176433 pCR 28.531 Adding description and requirements for NSI used to support multiple communication services Huawei pCR Approval Yes
Yes
revised No S5‑176583 S5‑176202
    S5‑176583 pCR 28.531 Adding description and requirements for NSI used to support multiple communication services Huawei pCR Approval No
Yes
left for email approval No   S5‑176433
    S5‑176203 pCR 28.531 Add configuration information for the constituents of an NSI Huawei pCR Approval Yes
Yes
revised No S5‑176434  
    S5‑176434 pCR 28.531 Add configuration information for the constituents of an NSI Huawei pCR Approval Yes
Yes
revised No S5‑176584 S5‑176203
    S5‑176584 pCR 28.531 Add configuration information for the constituents of an NSI Huawei pCR Approval No
Yes
left for email approval No   S5‑176434
    S5‑176204 pCR 28.531 Add use case for network slice preparation Huawei, China Unicom pCR Approval Yes
Yes
revised No S5‑176423  
    S5‑176423 pCR 28.531 Add use case for network slice preparation Huawei, China Unicom pCR Approval Yes
Yes
revised No S5‑176585 S5‑176204
    S5‑176585 pCR 28.531 Add use case for network slice preparation Huawei, China Unicom pCR Approval No
Yes
left for email approval No   S5‑176423
    S5‑176287 Contributions discussion sequence of 6.4.4 Huawei other Information Yes
Yes
noted No    
    S5‑176288 pCR 28531 Slice management model Ericsson Inc. pCR Approval Yes
Yes
noted No    
    S5‑176572 Draft TS 28.531 Huawei draft TS Approval No
Yes
left for email approval No    
6.4.5 Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management S5‑176037 Minutes of Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management Rapporteur (Nokia) report   Yes
Yes
noted No    
    S5‑176223 Rel-15 CR 28.659 Adding attribute of IOC EUtranGenericCell to support SON for AAS deployment management Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
agreed No    
    S5‑176224 Rel-15 CR 28.628 Add SON for AAS management description and attributes Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
revised No S5‑176438 S5‑175440
    S5‑176438 Rel-15 CR 28.628 Add SON for AAS management description and attributes Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
agreed No   S5‑176224
    S5‑176225 Rel-15 CR 28.629 Adding SON for AAS deployment management attributes Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
revised No S5‑176439  
    S5‑176439 Rel-15 CR 28.629 Adding SON for AAS deployment management attributes Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
revised No S5‑176471 S5‑176225
    S5‑176471 Rel-15 CR 28.629 Adding SON for AAS deployment management attributes Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
agreed No   S5‑176439
    S5‑176230 Summary of WI of SON for AAS deployment management Nokia, Nokia Shanghai Bell report Approval Yes
Yes
noted No    
6.4.6 Management of 5G networks that include virtualized network functions (preliminary work before WID approval by SA) S5‑176021 Management of 5G networks that include virtualized network functions Rapporteur(Intel) report   No
Yes
withdrawn Yes    
6.4.7 Network Resource Model (NRM) Integration Reference Point (IRP) for 5G network functions management (preliminary work before WID approval by SA) S5‑176039 Minutes of Network Resource Model (NRM) Integration Reference Point (IRP) for 5G network functions management Rapporteur (Nokia) report   No
Yes
withdrawn Yes    
    S5‑176252 skeleton of TS 28.xya NR and NG-RAN NRM IRP; Requirements Nokia, Nokia Shanghai Bell other Approval Yes
Yes
revised No S5‑176536  
    S5‑176536 skeleton of TS 28.xya NR and NG-RAN NRM IRP; Requirements Nokia, Nokia Shanghai Bell other Approval No
Yes
left for email approval No   S5‑176252
    S5‑176253 Skeleton of TS 28.xyc 5GC NRM IRP; Requirements Nokia, Nokia Shanghai Bell other Approval Yes
Yes
revised No S5‑176537  
    S5‑176537 Skeleton of TS 28.xyc 5GC NRM IRP; Requirements Nokia, Nokia Shanghai Bell other Approval No
Yes
left for email approval No   S5‑176253
    S5‑176254 Skeleton of TS 28.xyb NR and NG-RAN NRM IRP; IS and SS definitions Nokia, Nokia Shanghai Bell other Approval Yes
Yes
revised No S5‑176538  
    S5‑176538 Skeleton of TS 28.xyb NR and NG-RAN NRM IRP; IS and SS definitions Nokia, Nokia Shanghai Bell other Approval No
Yes
left for email approval No   S5‑176254
    S5‑176255 Skeleton of TS 28.xyd 5GC NRM IRP; IS and SS definitions Nokia, Nokia Shanghai Bell other Approval Yes
Yes
revised No S5‑176539  
    S5‑176539 Skeleton of TS 28.xyd 5GC NRM IRP; IS and SS definitions Nokia, Nokia Shanghai Bell other Approval No
Yes
left for email approval No   S5‑176255
    S5‑176256 pCR 28.xya Add scope to TS of NR and NG-RAN NRM IRP; Requirements Nokia, Nokia Shanghai Bell other Approval Yes
Yes
not treated No    
    S5‑176257 pCR 28.xyb Add scope to TS of NR and NG-RAN NRM IRP; IS and SS definitions Nokia, Nokia Shanghai Bell other Approval Yes
Yes
not treated No    
    S5‑176258 pCR 28.xyc Add scope to TS of 5GC NRM IRP; Requirements Nokia, Nokia Shanghai Bell other Approval Yes
Yes
not treated No    
    S5‑176259 pCR 28.xyd Add scope to TS of 5GC NRM IRP; IS and SS definitions Nokia, Nokia Shanghai Bell other Approval Yes
Yes
not treated No    
6.4.8 Fault Supervision for 5G network and network slicing (preliminary work before WID approval by SA) S5‑176136 pCR 28.xxx Add use case and requirements on alarm notification of a network slice instance Huawei other Approval Yes
Yes
not treated No    
    S5‑176137 pCR 28.xxx Add use case and requirements on alarm notification of a network slice subnet instance Huawei other Approval Yes
Yes
not treated No    
    S5‑176138 pCR 28.xxx Add network slice related management functions for fault supervision for 5G network and network slicing Huawei, China Unicom, CATR other Approval Yes
Yes
not treated No    
    S5‑176191 Skeleton of TS 28.cde Fault Supervision for 5G network and network slicing ZTE Wistron Telecom AB other Approval Yes
Yes
revised No S5‑176508  
    S5‑176508 Skeleton of TS 28.cde Fault Supervision for 5G network and network slicing ZTE Wistron Telecom AB other Approval Yes
Yes
revised No S5‑176540 S5‑176191
    S5‑176540 Skeleton of TS 28.cde Fault Supervision for 5G network and network slicing ZTE Wistron Telecom AB other Approval No
Yes
left for email approval No   S5‑176508
    S5‑176192 pCR TS 28.cde Add new skeleton clauses ZTE Wistron Telecom AB other Approval Yes
Yes
revised No S5‑176509  
    S5‑176509 pCR TS 28.cde Add new skeleton clauses ZTE Wistron Telecom AB other Approval Yes
Yes
revised No S5‑176541 S5‑176192
    S5‑176541 pCR TS 28.cde Add new skeleton clauses ZTE Wistron Telecom AB other Approval No
Yes
left for email approval No   S5‑176509
    S5‑176193 pCR TS 28.cde Add content of scope ZTE Wistron Telecom AB other Approval Yes
Yes
revised No S5‑176510  
    S5‑176510 pCR TS 28.cde Add content of scope ZTE Wistron Telecom AB other Approval Yes
Yes
not treated No   S5‑176193
    S5‑176298 Minutes for Fault Supervision for 5G network and network slicing Intel report   No
Yes
withdrawn Yes    
    S5‑176511 Skeleton of TS 28.yyy Fault Supervision for 5G network and network slicing (Stage 2 and 3) ZTE other Approval Yes
Yes
revised No S5‑176542  
    S5‑176542 Skeleton of TS 28.yyy Fault Supervision for 5G network and network slicing (Stage 2 and 3) ZTE other Approval No
Yes
left for email approval No   S5‑176511
    S5‑176512 pCR TS 28.yyy Add new skeleton clauses (Stage 2 and 3) ZTE other Approval Yes
Yes
revised No S5‑176543  
    S5‑176543 pCR TS 28.yyy Add new skeleton clauses (Stage 2 and 3) ZTE other Approval No
Yes
left for email approval No   S5‑176512
    S5‑176513 pCR TS 28.yyy Add content of scope (stage 2 and 3) ZTE other Approval Yes
Yes
not treated No    
6.4.9 Assurance data and Performance Management for 5G networks and network slicing (preliminary work before WID approval by SA) S5‑176040 Minutes of Assurance data and Performance Management for 5G networks and network slicing Rapporteur (Intel) report   No
Yes
withdrawn Yes    
    S5‑176139 pCR 28.xxx Add use case and requirements on performance management of a network slice instance Huawei other Approval Yes
Yes
not treated No    
    S5‑176140 pCR 28.xxx Add use case and requirements on performance management of a network slice subnet instance Huawei other Approval Yes
Yes
not treated No    
    S5‑176141 pCR 28.xxx Add network slice related management functions for assurance data and performance management for 5G network and network slicing Huawei, China Unicom other Approval Yes
Yes
not treated No    
    S5‑176142 pCR 28.xxx on adding use case for measurements of UL and DL user plane delay Huawei other Approval Yes
Yes
not treated No    
    S5‑176160 pCR 28.xxx Add new skeleton of End to end KPIs, performance measurements and assurance data for 5G networks and network slicing China Mobile Com. Corporation other Approval Yes
Yes
not treated No    
    S5‑176161 pCR 28.xxx Add scope of End to end KPIs, performance measurements and assurance data for 5G networks and network slicing China Mobile Com. Corporation other Approval Yes
Yes
not treated No    
    S5‑176162 pCR 28.xxx Add use case and requirements on end-to-end measurement of a network slice instance China Mobile Com. Corporation other Approval Yes
Yes
not treated No    
    S5‑176171 Skeleton of TS Performance Management interfaces for 5G networks and network slicing Intel China Ltd. other Approval Yes
Yes
revised No S5‑176545  
    S5‑176545 Skeleton of TS Performance Management interfaces for 5G networks and network slicing Intel China Ltd. other Approval No
Yes
left for email approval No   S5‑176171
    S5‑176172 pCR Add scope to TS PM interfaces for 5G networks and network slicing Intel China Ltd. other Approval Yes
Yes
not treated No    
    S5‑176173 Skeleton of TS Performance measurements and assurance data for NG-RAN Network Functions Intel China Ltd. other Approval Yes
Yes
revised No S5‑176546  
    S5‑176546 Skeleton of TS Performance measurements and assurance data for NG-RAN Network Functions Intel China Ltd. other Approval No
Yes
left for email approval No   S5‑176173
    S5‑176174 pCR Add scope to TS Performance measurements and assurance data for NG-RAN NFs Intel China Ltd. other Approval Yes
Yes
not treated No    
    S5‑176175 Skeleton of TS Performance measurements and assurance data for 5GC Network Functions Intel China Ltd. other Approval Yes
Yes
revised No S5‑176547  
    S5‑176547 Skeleton of TS Performance measurements and assurance data for 5GC Network Functions Intel China Ltd. other Approval No
Yes
left for email approval No   S5‑176175
    S5‑176176 pCR Add scope to TS Performance measurements and assurance data for 5GC NFs Intel China Ltd. other Approval Yes
Yes
not treated No    
    S5‑176484 Discussion sequence proposal Intel other Information Yes
Yes
noted No    
6.5 OAM&P Studies                      
6.5.1 Study on Management and Orchestration Architecture of Next Generation Network and Service S5‑176020 Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service Rapporteur (Huawei) report   Yes
Yes
noted No    
    S5‑176143 pCR 28.800 remove the unused references Huawei pCR Approval Yes
Yes
revised No S5‑176346  
    S5‑176346 pCR 28.800 remove the unused references Huawei pCR Approval Yes
Yes
revised No S5‑176529 S5‑176143
    S5‑176529 pCR 28.800 remove the unused references Huawei pCR Approval Yes
Yes
approved No   S5‑176346
    S5‑176144 pCR 28.800 add use case and requirements for Management and orchestration of networks with non-3GPP parts Huawei pCR Approval Yes
Yes
revised No S5‑176348  
    S5‑176348 pCR 28.800 add use case and requirements for Management and orchestration of networks with non-3GPP parts Huawei pCR Approval Yes
Yes
approved No   S5‑176144
    S5‑176145 pCR 28.800 add integrated management architecture option Huawei pCR Approval Yes
Yes
revised No S5‑176349  
    S5‑176349 pCR 28.800 add integrated management architecture option Huawei pCR Approval Yes
Yes
revised No S5‑176554 S5‑176145
    S5‑176554 pCR 28.800 add integrated management architecture option Huawei pCR Approval Yes
Yes
revised No S5‑176565 S5‑176349
    S5‑176565 pCR 28.800 add integrated management architecture option Huawei pCR Approval Yes
Yes
approved No   S5‑176554
    S5‑176146 pCR 28.800 Add potential requirements to management data interface to NFV-MANO Huawei pCR Approval Yes
Yes
revised No S5‑176347  
    S5‑176347 pCR 28.800 Add potential requirements to management data interface to NFV-MANO Huawei pCR Approval Yes
Yes
revised No S5‑176530 S5‑176146
    S5‑176530 pCR 28.800 Add potential requirements to management data interface to NFV-MANO Huawei pCR Approval Yes
Yes
revised No S5‑176555 S5‑176347
    S5‑176555 pCR 28.800 Add potential requirements to management data interface to NFV-MANO Huawei pCR Approval Yes
Yes
approved No   S5‑176530
    S5‑176147 Discussion paper on Concept of exposed interface management function Huawei pCR Endorsement Yes
Yes
noted No    
    S5‑176148 pCR 28.800 Multi-operator management architecture of communication services Huawei pCR Approval Yes
Yes
revised No S5‑176350  
    S5‑176350 pCR 28.800 Multi-operator management architecture of communication services Huawei pCR Approval Yes
Yes
revised No S5‑176531 S5‑176148
    S5‑176531 pCR 28.800 Multi-operator management architecture of communication services Huawei pCR Approval Yes
Yes
approved No   S5‑176350
    S5‑176149 pCR 28.800 Potential scenarios for overall communication service management across multiple CSPs Huawei pCR Approval Yes
Yes
revised No S5‑176352  
    S5‑176352 pCR 28.800 Potential scenarios for overall communication service management across multiple CSPs Huawei pCR Approval Yes
Yes
approved No   S5‑176149
    S5‑176150 pCR 28.800 Use case of communication service across multiple CSPs and its potential requirements Huawei pCR Approval Yes
Yes
revised No S5‑176351  
    S5‑176351 pCR 28.800 Use case of communication service across multiple CSPs and its potential requirements Huawei pCR Approval Yes
Yes
approved No   S5‑176150
    S5‑176195 pCR 28.800 add slice NM services Ericsson Inc. pCR Approval Yes
Yes
revised No S5‑176353  
    S5‑176353 pCR 28.800 add slice NM services Ericsson Inc. pCR Approval Yes
Yes
revised No S5‑176473 S5‑176195
    S5‑176473 pCR 28.800 add slice NM services Ericsson Inc. pCR Approval Yes
Yes
revised No S5‑176564 S5‑176353
    S5‑176564 pCR 28.800 add slice NM services Ericsson Inc. pCR Approval Yes
Yes
approved No   S5‑176473
    S5‑176205 pCR 28.800 Add management interfaces Huawei pCR Approval Yes
Yes
revised No S5‑176355  
    S5‑176355 pCR 28.800 Add management interfaces Huawei pCR Approval Yes
Yes
revised No S5‑176544 S5‑176205
    S5‑176544 pCR 28.800 Add management interfaces Huawei pCR Approval Yes
Yes
approved No   S5‑176355
    S5‑176206 pCR 28.800 update for service based management architecture Huawei pCR Approval Yes
Yes
revised No S5‑176356  
    S5‑176356 pCR 28.800 update for service based management architecture Huawei pCR Approval Yes
Yes
revised No S5‑176548 S5‑176206
    S5‑176548 pCR 28.800 update for service based management architecture Huawei pCR Approval Yes
Yes
revised No S5‑176571 S5‑176356
    S5‑176571 pCR 28.800 update for service based management architecture Huawei pCR Approval Yes
Yes
approved No   S5‑176548
    S5‑176207 pCR 28.800 Add conclusion and recommendations Huawei pCR Approval Yes
Yes
revised No S5‑176357  
    S5‑176357 pCR 28.800 Add conclusion and recommendations Huawei pCR Approval Yes
Yes
revised No S5‑176549 S5‑176207
    S5‑176549 pCR 28.800 Add conclusion and recommendations Huawei pCR Approval Yes
Yes
approved No   S5‑176357
    S5‑176208 Presentation sheet for TR 28.800 Huawei pCR Approval Yes
Yes
revised No S5‑176358  
    S5‑176358 Presentation sheet for TR 28.800 Huawei pCR Approval Yes
Yes
approved No   S5‑176208
    S5‑176209 pCR 28.800 Include additional functionality to management functions Huawei pCR Approval Yes
Yes
revised No S5‑176354  
    S5‑176354 pCR 28.800 Include additional functionality to management functions Huawei pCR Approval Yes
Yes
revised No S5‑176551 S5‑176209
    S5‑176551 pCR 28.800 Include additional functionality to management functions Huawei pCR Approval Yes
Yes
revised No S5‑176552 S5‑176354
    S5‑176552 pCR 28.800 Include additional functionality to management functions Huawei pCR Approval Yes
Yes
approved No   S5‑176551
    S5‑176292 Discussion sequence proposal for agenda item 6.5.1 Huawei discussion Discussion Yes
Yes
noted No    
    S5‑176533 Draft TR 28.800 Huawei draft TR Approval No
Yes
left for email approval No    
6.5.2 Study on management aspects of next generation network architecture and features S5‑176022 Minutes for Study on management aspects of next generation network architecture and features Rapporteur(Nokia) report   Yes
Yes
noted No    
    S5‑176062 pCR Rel-14 TR 28.802 re NR NRM Ericsson Inc. pCR Approval Yes
Yes
noted No    
    S5‑176359 pCR Rel-14 TR 28.802 re NR NRM Ericsson Inc. pCR Approval No
Yes
withdrawn Yes    
    S5‑176151 pCR 28.802 clarification of solution and conclusion for management of 5GC Huawei pCR Approval Yes
Yes
revised No S5‑176399  
    S5‑176399 pCR 28.802 clarification of solution and conclusion for management of 5GC Huawei pCR Approval Yes
Yes
approved No   S5‑176151
    S5‑176232 pCR 28.802 Add potential solution for 5GS Trace management Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176403  
    S5‑176403 pCR 28.802 Add potential solution for 5GS Trace management Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176232
    S5‑176235 pCR 28.802 Editor Note cleanup Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176401  
    S5‑176401 pCR 28.802 Editor Note cleanup Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176235
    S5‑176237 pCR 28.802 Add conclusion and recommendation for Trace management Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No    
    S5‑176239 pCR 28.802 Add conclusion and recommendation for ng-eNB management Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176402  
    S5‑176402 pCR 28.802 Add conclusion and recommendation for ng-eNB management Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176239
    S5‑176241 pCR 28.802 Add conclusion and recommendation for edge computing management Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176400  
    S5‑176400 pCR 28.802 Add conclusion and recommendation for edge computing management Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176241
    S5‑176244 pCR 28.802 Add potential solution, conclusion and recommendation for SON Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No    
    S5‑176245 Presentation of TR 28.802 Nokia, Nokia Shanghai Bell TS or TR cover Approval Yes
Yes
revised No S5‑176406  
    S5‑176406 Presentation of TR 28.802 Nokia, Nokia Shanghai Bell TS or TR cover Approval Yes
Yes
approved No   S5‑176245
    S5‑176248 TR 28.802 TDocs discussion sequence proposal for section 6.5.2 Nokia Korea other Information Yes
Yes
noted No    
    S5‑176262 pCR TR 28.802 Add functional requirements for edge computing support ETRI pCR Approval Yes
Yes
revised No S5‑176404  
    S5‑176404 pCR TR 28.802 Add functional requirements for edge computing support ETRI pCR Approval Yes
Yes
approved No   S5‑176262
    S5‑176405 Draft TR 28.802 Nokia draft TR Approval No
Yes
left for email approval No    
6.5.3 Study on Management aspects of selected IoT-related features S5‑176028 Minutes of Study on Management aspects of selected IoT-related features Rapporteur (Cisco) report   Yes
Yes
noted No    
    S5‑176152 pCR to the TR 32.857 Clarification on the number of measurements Cisco Systems Inc. pCR   Yes
Yes
revised No S5‑176478  
    S5‑176478 pCR to the TR 32.857 Clarification on the number of measurements Cisco Systems Inc. pCR - Yes
Yes
revised No S5‑176586 S5‑176152
    S5‑176586 pCR to the TR 32.857 Clarification on the number of measurements Cisco Systems Inc. pCR - No
Yes
left for email approval No   S5‑176478
    S5‑176153 pCR to the TR 32.857 Conclusions Cisco Systems Inc. pCR   Yes
Yes
approved No    
    S5‑176479 Draft TR 32.857 Cisco draft TR Approval No
Yes
left for email approval No    
6.5.4 Study on a RESTful HTTP-based Solution Set S5‑176029 Minutes of Study on a RESTful HTTP-based Solution Set Rapporteur (Nokia) report   Yes
Yes
noted No    
    S5‑176233 pCR 32.866 Propose to remove section on task resources Ericsson Limited pCR Approval Yes
Yes
noted No    
    S5‑176234 pCR 32.866 Propose to add RAML as alternative specification language Ericsson Limited pCR Approval Yes
Yes
revised No S5‑176481  
    S5‑176481 pCR 32.866 Propose to add RAML as alternative specification language Ericsson Limited pCR Approval Yes
Yes
approved No   S5‑176234
    S5‑176236 pCR 32.866 Propose to add query parameters for iterations Ericsson Limited pCR   Yes
Yes
revised No S5‑176532  
    S5‑176532 pCR 32.866 Propose to add query parameters for iterations Ericsson Limited pCR - Yes
Yes
approved No   S5‑176236
    S5‑176260 pCR 32.866 Propose to add a note to the discussion on scoping and filtering Ericsson Limited pCR   Yes
Yes
approved No    
    S5‑176263 pCR 32.866 Addition of JSON Patch to partial update operations Nokia Germany pCR Approval Yes
Yes
approved No    
    S5‑176264 pCR 32.866 Add recommendation on the usage of task operations Nokia Germany pCR Approval Yes
Yes
revised No S5‑176480  
    S5‑176480 pCR 32.866 Add recommendation on the usage of task operations Nokia Germany pCR Approval Yes
Yes
approved No   S5‑176264
    S5‑176265 pCR 32.866 Improve description of the design pattern for links Nokia Germany pCR Approval Yes
Yes
revised No S5‑176483  
    S5‑176483 pCR 32.866 Improve description of the design pattern for links Nokia Germany pCR Approval Yes
Yes
approved No   S5‑176265
    S5‑176266 pCR 32.866 Add RMM level 3 mapping of the Alarm IRP Nokia Germany pCR Approval No
Yes
withdrawn Yes    
    S5‑176267 pCR 32.866 Resolve editor’s notes Nokia Germany pCR Approval Yes
Yes
revised No S5‑176489  
    S5‑176489 pCR 32.866 Resolve editor’s notes Nokia Germany pCR Approval Yes
Yes
approved No   S5‑176267
    S5‑176277 pCR 32.866 Add recommendation on RMM level Nokia Germany pCR Approval Yes
Yes
revised No S5‑176485  
    S5‑176485 pCR 32.866 Add recommendation on RMM level Nokia Germany pCR Approval Yes
Yes
approved No   S5‑176277
    S5‑176445 Presentation of 32.866 to SA for approval Nokia TS or TR cover Approval Yes
Yes
approved No    
    S5‑176459 pCR 32. 866 Add design pattern for attribute selection Nokia pCR Approval Yes
Yes
approved No    
    S5‑176474 pCR 32. 866 Add content for introduction and scope sections Nokia pCR Approval Yes
Yes
approved No    
    S5‑176482 Draft TR 32.866 Nokia draft TR Approval No
Yes
left for email approval No    
6.5.5 Study on management aspects of virtualized network functions that are part of the NR S5‑176030 Minutes of Study on management aspects of virtualized network functions that are part of the NR Rapporteur (Intel) report   Yes
Yes
revised No S5‑176519  
    S5‑176519 Minutes of Study on management aspects of virtualized network functions that are part of the NR Rapporteur (Intel) report - Yes
Yes
noted No   S5‑176030
    S5‑176165 pCR TR 32.864 changes to address edithelp comments Intel Corporation (UK) Ltd pCR Approval Yes
Yes
revised No S5‑176487  
    S5‑176487 pCR TR 32.864 changes to address edithelp comments Intel Corporation (UK) Ltd pCR Approval Yes
Yes
approved No   S5‑176165
    S5‑176166 pCR TR 32.864 correct the wrong references Intel Corporation (UK) Ltd pCR Approval Yes
Yes
approved No    
    S5‑176167 LS on gaps identified in ETSI GS NFV-IFA 013 Intel Corporation (UK) Ltd LS out Approval Yes
Yes
revised No S5‑176520  
    S5‑176520 LS on gaps identified in ETSI GS NFV-IFA 013 Intel Corporation (UK) Ltd LS out Approval Yes
Yes
revised No S5‑176550 S5‑176167
    S5‑176550 LS on gaps identified in ETSI GS NFV-IFA 013 Intel Corporation (UK) Ltd LS out Approval Yes
Yes
approved No   S5‑176520
    S5‑176168 Presentation of TR 32.864 Intel Corporation (UK) Ltd report Approval Yes
Yes
approved No    
    S5‑176486 Draft TR 32.864 Intel draft TR Approval No
Yes
left for email approval No    
6.5.6 Study on OAM aspects of LTE and WLAN integration S5‑176031 Minutes of Study on OAM aspects of LTE and WLAN integration Rapporteur (Intel) report   Yes
Yes
noted No    
    S5‑176178 pCR TR 32.868 Add UC on PM on XwAP procedures for non-collocated LWA Intel China Ltd. pCR Approval Yes
Yes
approved No    
    S5‑176179 pCR TR 32.868 Add UC on PM on RRC procedures for LWA Intel China Ltd. pCR Approval Yes
Yes
approved No    
    S5‑176180 pCR TR 32.868 Add UC on configuration of mobility set for LWIP Intel China Ltd. pCR Approval Yes
Yes
approved No    
    S5‑176181 pCR TR 32.868 Add UC on PM on user data tranmission via WLAN for LWIP Intel China Ltd. pCR Approval Yes
Yes
approved No    
    S5‑176182 pCR TR 32.868 Add UC on PM on RRC procedures for LWIP Intel China Ltd. pCR Approval Yes
Yes
revised No S5‑176490  
    S5‑176490 pCR TR 32.868 Add UC on PM on RRC procedures for LWIP Intel China Ltd. pCR Approval Yes
Yes
approved No   S5‑176182
    S5‑176183 pCR TR 32.868 Add UC on FM for LWIP Intel China Ltd. pCR Approval Yes
Yes
approved No    
    S5‑176488 Draft TR 32.868 Intel draft TR Approval No
Yes
left for email approval No    
6.5.7 Study on network policy management for mobile networks based on NFV scenarios S5‑176032 Minutes of Study on network policy management for mobile networks based on NFV scenarios Rapporteur ( China Mobile) report   Yes
Yes
noted No    
    S5‑176187 pCR TR 32.871 adding the PIP concept China Mobile E-Commerce Co. pCR Approval Yes
Yes
revised No S5‑176491  
    S5‑176491 pCR TR 32.871 adding the PIP concept China Mobile E-Commerce Co. pCR Approval Yes
Yes
revised No S5‑176587 S5‑176187
    S5‑176587 pCR TR 32.871 adding the PIP concept China Mobile E-Commerce Co. pCR Approval No
Yes
left for email approval No   S5‑176491
    S5‑176188 pCR TR 32.871 adding the NFV policy management architecture China Mobile E-Commerce Co. pCR Approval Yes
Yes
revised No S5‑176492  
    S5‑176492 pCR TR 32.871 adding the NFV policy management architecture China Mobile E-Commerce Co. pCR Approval Yes
Yes
revised No S5‑176588 S5‑176188
    S5‑176588 pCR TR 32.871 adding the NFV policy management architecture China Mobile E-Commerce Co. pCR Approval No
Yes
left for email approval No   S5‑176492
    S5‑176189 pCR TR 32.871 updating the UCs after the concept modification China Mobile E-Commerce Co. pCR Approval Yes
Yes
revised No S5‑176493  
    S5‑176493 pCR TR 32.871 updating the UCs after the concept modification China Mobile E-Commerce Co. pCR Approval Yes
Yes
revised No S5‑176589 S5‑176189
    S5‑176589 pCR TR 32.871 updating the UCs after the concept modification China Mobile E-Commerce Co. pCR Approval No
Yes
left for email approval No   S5‑176493
    S5‑176190 pCR TR 32.871 adding the concepts of policy conflict detection and resolution China Mobile E-Commerce Co. pCR Approval Yes
Yes
revised No S5‑176590  
    S5‑176590 pCR TR 32.871 adding the concepts of policy conflict detection and resolution China Mobile E-Commerce Co. pCR Approval No
Yes
left for email approval No   S5‑176190
    S5‑176591 Draft TR 32.871 China Mobile draft TR Approval No
Yes
left for email approval No    
6.5.8 Study on system and functional aspects of Energy Efficiency in 5G networks S5‑176038 Minutes of Study on system and functional aspects of Energy Efficiency in 5G networks Rapporteur (ORANGE) report   Yes
Yes
noted No    
    S5‑176063 pCR TR 32.972 - Defining and collecting EE KPI for 5G networks ORANGE, Huawei pCR Approval Yes
Yes
revised No S5‑176494  
    S5‑176494 pCR TR 32.972 - Defining and collecting EE KPI for 5G networks ORANGE, Huawei pCR Approval Yes
Yes
approved No   S5‑176063
    S5‑176222 pCR TR 32.972 – Introducing Energy Aware States in 5G Network Functions ORANGE pCR Approval Yes
Yes
revised No S5‑176496  
    S5‑176496 pCR TR 32.972 – Introducing Energy Aware States in 5G Network Functions ORANGE pCR Approval Yes
Yes
approved No   S5‑176222
    S5‑176470 Draft TR 32.972 ORANGE draft TR Approval No
Yes
left for email approval No    
6.5.9 Study on integration of ONAP DCAE and 3GPP management architecture (preliminary work before WID approval by SA) S5‑176041 Minutes of Study on integration of ONAP DCAE and 3GPP management architecture Rapporteur (ORANGE) report   No
Yes
withdrawn Yes    
    S5‑176064 TR 28.9bc - Skeleton AT&T, ORANGE other Approval Yes
Yes
revised No S5‑176534  
    S5‑176534 TR 28.9bc - Skeleton AT&T, ORANGE other Approval No
Yes
left for email approval No   S5‑176064
    S5‑176065 TR 28.9bc - Clause headers AT&T, ORANGE other Approval Yes
Yes
revised No S5‑176535  
    S5‑176535 TR 28.9bc - Clause headers AT&T, ORANGE other Approval No
Yes
left for email approval No   S5‑176065
    S5‑176066 TR 28.9bc - Positioning of ONAP DCAE wrt 3GPP ref mngt model AT&T, ORANGE other Approval Yes
Yes
not treated No    
    S5‑176067 TR 28.9bc – Communication principles for notifications AT&T, ORANGE other Approval Yes
Yes
not treated No    
7 Charging                      
7.1 Charging Plenary S5‑176008 CH Agenda and Time Plan CH SWG Chair agenda   Yes
Yes
approved No    
    S5‑176009 CH Executive Report CH SWG Chair report   Yes
Yes
revised No S5‑176561  
    S5‑176561 CH Executive Report CH SWG Chair report - Yes
Yes
noted No   S5‑176009
    S5‑176044 LS from RAN3 to SA5 on 5G specification of PSy C3-175295 LS in   Yes
Yes
noted No    
    S5‑176045 LS from OMA to 3GPP SA5 on improvements on AVP definition for CPM Charging OMA LS in   Yes
Yes
noted No    
    S5‑176047 Resubmitted Reply LS from CT4 to SA5 on Charging support for Control and User Plane Separation C4-174324 LS in   Yes
Yes
noted No    
    S5‑176155 Sequencing of Charging Features with respect to Releases Samsung Electronics GmbH discussion Discussion Yes
Yes
noted No    
    S5‑176294 LS from GSMA to 3GPP SA2 and SA5 on Differentiation of LTE-M (eMTC) traffic from other LTE data traffic GSMA LS in   Yes
Yes
noted No    
    S5‑176297 LS from CT4 to SA5 on Sx protocol extension to support Credit Pool C4-175354 LS in   Yes
Yes
replied to No    
    S5‑176300 Reply to: LS from CT4 to SA5 on Sx protocol extension to support Credit Pool Huawei LS out approval Yes
Yes
approved No    
7.2 New Charging Work Item proposals S5‑176095 New WID on Service Based Interface of 5G Charging System Huawei WID new Agreement Yes
Yes
revised No S5‑176373  
    S5‑176373 New WID on Service Based Interface of 5G Charging System Huawei WID new Agreement Yes
Yes
revised No S5‑176559 S5‑176095
    S5‑176559 New WID on Service Based Interface of 5G Charging System Huawei WID new Agreement Yes
Yes
agreed No   S5‑176373
    S5‑176170 New WID on Charging for WLAN-based Prose Direct Discovery Intel China Ltd. WID new Agreement Yes
Yes
agreed No    
    S5‑176261 New WID Data Charging in 5G System Architecture Phase 1 - part 1 Nokia, Nokia Shanghai Bell WID new Agreement Yes
Yes
revised No S5‑176374  
    S5‑176374 New WID Data Charging in 5G System Architecture Phase 1 - part 1 Nokia, Nokia Shanghai Bell WID new Agreement Yes
Yes
revised No S5‑176560 S5‑176261
    S5‑176560 New WID Data Charging in 5G System Architecture Phase 1 - part 1 Nokia, Nokia Shanghai Bell WID new Agreement Yes
Yes
agreed No   S5‑176374
7.3 Charging Maintenance and Rel-15 small Enhancements S5‑176076 Rel-15 CR 32.299 PoC-Server-Role AVP extension for OMA CPM Charging Nokia, Nokia Shanghai Bell CR Agreement Yes
Yes
agreed No    
7.4 Rel-15 Charging                      
7.4.1 Charging Enhancement for eFMSS S5‑176184 Bindings of eFMSS for EPC offline charging China Telecom CR Approval Yes
Yes
revised No S5‑176308  
    S5‑176308 Bindings of eFMSS for EPC offline charging China Telecom CR Approval Yes
Yes
agreed No   S5‑176184
    S5‑176185 Charging enhancement on TDF for eFMSS China Telecom CR Approval Yes
Yes
revised No S5‑176309  
    S5‑176309 Charging enhancement on TDF for eFMSS China Telecom CR Approval Yes
Yes
agreed No   S5‑176185
    S5‑176186 Editorial Modification for eFMSS China Telecom CR Approval Yes
Yes
revised No S5‑176310  
    S5‑176310 Editorial Modification for eFMSS China Telecom CR Approval Yes
Yes
agreed No   S5‑176186
    S5‑176311 Rel-15 CR Update list of service data containers China Telecom CR Agreement Yes
Yes
agreed No    
    S5‑176312 Revised WID eFMSS_CH China Telecom WID revised Agreement Yes
Yes
agreed No    
7.4.2 PS Charging enhancements to support 5G New Radio via Dual Connectivity S5‑176210 Rel-15 CR 32.298 EPC QoS update to support NR as a secondary RAT Ericsson CR Approval Yes
Yes
revised No S5‑176301  
    S5‑176301 Rel-15 CR 32.298 EPC QoS update to support NR as a secondary RAT Ericsson CR Approval Yes
Yes
agreed No   S5‑176210
    S5‑176211 Rel-15 CR 32.299 EPC QoS update to support NR as a secondary RAT Ericsson CR Approval Yes
Yes
revised No S5‑176302  
    S5‑176302 Rel-15 CR 32.299 EPC QoS update to support NR as a secondary RAT Ericsson CR Approval Yes
Yes
agreed No   S5‑176211
    S5‑176212 Rel-15 CR 32.298 Support for secondary RAT reporting from RAN Ericsson CR Approval Yes
Yes
not pursued No    
    S5‑176213 Rel-15 CR 32.299 Support for secondary RAT reporting from RAN Ericsson CR Approval Yes
Yes
not pursued No    
7.4.3 Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking S5‑176370 Updated NAPS-CH WID Huawei WID revised Agreement Yes
Yes
agreed No    
7.4.4 Charging for WLAN-based Prose Direct Discovery (preliminary work before WID approval by SA) S5‑176177 CR Rel-15 32.277 Add charging description for WLAN-based ProSe direct discovery Intel Corporation CR Approval Yes
Yes
revised No S5‑176322 S5‑175164
    S5‑176322 CR Rel-15 32.277 Add charging description for WLAN-based ProSe direct discovery Intel Corporation CR Approval Yes
Yes
agreed No   S5‑176177
7.5 Charging Studies                      
7.5.1 Study on Overload Control for Diameter Charging Applications S5‑176216 Rel-15 pCR 32.869 Update of flows for Overload in Offline Ericsson pCR Approval Yes
Yes
approved No    
    S5‑176217 Rel-15 pCR 32.869 Introducing Evaluation and recommendation Ericsson pCR Approval Yes
Yes
revised No S5‑176303  
    S5‑176303 Rel-15 pCR 32.869 Introducing Evaluation and recommendation Ericsson pCR Approval Yes
Yes
approved No   S5‑176217
    S5‑176304 Rel-15 pCR 32.869 Solutions numbering Ericsson pCR Approval Yes
Yes
approved No    
    S5‑176305 Draft TR 32.869 Ericsson draft TR Approval No
Yes
left for email approval No    
    S5‑176306 Presentation TR 32.869 to SA for information and approval Ericsson TS or TR cover Approval Yes
Yes
approved No    
    S5‑176307 LS to CT4 on TR 32.869 sent to SA for information and approval Ericsson LS out Approval Yes
Yes
approved No    
    S5‑176313 LS to CT4 on AVPs range numbers for Rel-15 Nokia LS out Approval Yes
Yes
approved No    
    S5‑176467 LS to CT4 on TR 32.870 sent to SA for information and approval Nokia, Nokia Shanghai Bell LS out Approval Yes
Yes
approved No    
    S5‑176468 Rel-15 pCR 32.899 Evaluation and Conclusion on solution #4.2 Ericsson pCR Approval Yes
Yes
approved No    
    S5‑176469 Update WID Study on charging aspects of 5G system architecture phase 1 Huawei SID revised Agreement Yes
Yes
agreed No    
7.5.2 Study on forward compatibility for 3GPP Diameter Charging Applications S5‑176270 Rel-15 pCR 32.870 Diameter extensibility rule in new chapter Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No    
    S5‑176271 Rel-15 pCR 32.870 New solutions and evaluation key issues 1,2 and 4 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176375  
    S5‑176375 Rel-15 pCR 32.870 New solutions and evaluation key issues 1,2 and 4 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176271
    S5‑176272 Rel-15 pCR 32.870 New solution and evaluation for key issues 3 and 5 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176376  
    S5‑176376 Rel-15 pCR 32.870 New solution and evaluation for key issues 3 and 5 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176272
    S5‑176273 Rel-15 pCR 32.870 New solution and evaluation for key issue 6 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176377  
    S5‑176377 Rel-15 pCR 32.870 New solution and evaluation for key issue 6 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176273
    S5‑176275 Rel-15 pCR 32.870 Conclusions and recommendations Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176378  
    S5‑176378 Rel-15 pCR 32.870 Conclusions and recommendations Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176275
    S5‑176379 Draft TR 32.870 Nokia draft TR Approval No
Yes
left for email approval No    
    S5‑176380 TR 32.870 presentation for information and approval Nokia TS or TR cover 32.870 Yes
Yes
approved No    
    S5‑176465 Draft TR 32.848 China Mobile draft TR Approval No
Yes
left for email approval No    
7.5.3 Study on Charging Aspects of 5G System Architecture Phase 1 S5‑176069 5G Charging normative work organization Nokia, Nokia Shanghai Bell discussion Discussion Yes
Yes
noted No    
    S5‑176070 Rel-15 pCR TR 32.899 conclusion for Online and offline charging evaluation Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176364  
    S5‑176364 Rel-15 pCR TR 32.899 conclusion for Online and offline charging evaluation Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176070
    S5‑176071 Rel-15 pCR TR 32.899 conclusion for roaming Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176362  
    S5‑176362 Rel-15 pCR TR 32.899 conclusion for roaming Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176071
    S5‑176072 Rel-15 pCR TR 32.899 conclusion on Network exposure capability Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176329  
    S5‑176329 Rel-15 pCR TR 32.899 conclusion on Network exposure capability Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176072
    S5‑176073 Rel-15 pCR TR 32.899 some conclusions on Interaction between SMF and UPF Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176321  
    S5‑176321 Rel-15 pCR TR 32.899 some conclusions on Interaction between SMF and UPF Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176073
    S5‑176074 Rel-15 pCR TR 32.899 conclusions on session mngt and service continuity Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176318  
    S5‑176318 Rel-15 pCR TR 32.899 conclusions on session mngt and service continuity Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176074
    S5‑176075 Rel-15 pCR TR 32.899 some final conclusions and recommendations Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176466  
    S5‑176466 Rel-15 pCR TR 32.899 some final conclusions and recommendations Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176075
    S5‑176077 Rel-15 pCR TR 32.899 reference for PCC in roaming Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No    
    S5‑176078 Rel-15 pCR TR 32.899 additional solution roaming LBO Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176361  
    S5‑176361 Rel-15 pCR TR 32.899 additional solution roaming LBO Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176078
    S5‑176081 Rel-15 pCR 32.899 Addition of Combined Online and Offline charging Huawei pCR Agreement Yes
Yes
revised No S5‑176363  
    S5‑176363 Rel-15 pCR 32.899 Addition of Combined Online and Offline charging Huawei pCR Agreement Yes
Yes
approved No   S5‑176081
    S5‑176082 Rel-15 pCR 32.899 Charging procedure for PDU session Anchor in UPFs Huawei pCR Agreement Yes
Yes
revised No S5‑176319  
    S5‑176319 Rel-15 pCR 32.899 Charging procedure for PDU session Anchor in UPFs Huawei pCR Approval Yes
Yes
approved No   S5‑176082
    S5‑176083 Rel-15 pCR 32.899 Addition of Network Slicing Charging Huawei pCR Approval Yes
Yes
noted No    
    S5‑176084 Rel-15 pCR 32.899 Solutions for QoS based Charging Huawei pCR Agreement Yes
Yes
revised No S5‑176325  
    S5‑176325 Rel-15 pCR 32.899 Solutions for QoS based Charging Huawei pCR Approval Yes
Yes
approved No   S5‑176084
    S5‑176085 Rel-15 pCR 32.899 Service Based Interface Huawei pCR Agreement Yes
Yes
revised No S5‑176365  
    S5‑176365 Rel-15 pCR 32.899 Service Based Interface Huawei pCR Agreement Yes
Yes
approved No   S5‑176085
    S5‑176086 Rel-15 pCR 32.899 Conclusion on the QoS Topic in clause 5.2 Huawei pCR Approval Yes
Yes
revised No S5‑176327  
    S5‑176327 Rel-15 pCR 32.899 Conclusion on the QoS Topic in clause 5.2 Huawei pCR Approval Yes
Yes
approved No   S5‑176086
    S5‑176087 Rel-15 pCR 32.899 Conclusion on the Interaction between SMF and UPF in clause 5.3 Huawei pCR Agreement Yes
Yes
merged No S5‑176321  
    S5‑176088 Rel-15 pCR 32.899 Conclusion on the Network Slicing Topic in clause 5.4 Huawei pCR Agreement Yes
Yes
revised No S5‑176328  
    S5‑176328 Rel-15 pCR 32.899 Conclusion on the Network Slicing Topic in clause 5.4 Huawei pCR Agreement Yes
Yes
approved No   S5‑176088
    S5‑176089 Rel-15 pCR 32.899 Conclusion on the Network Capability Exposure Topic in clause 5.5 Huawei pCR Approval Yes
Yes
merged No S5‑176329  
    S5‑176090 Rel-15 pCR 32.899 Conclusion on the Service-based Architecture in clause 5.7 Huawei pCR Agreement Yes
Yes
revised No S5‑176366  
    S5‑176366 Rel-15 pCR 32.899 Conclusion on the Service-based Architecture in clause 5.7 Huawei pCR Agreement Yes
Yes
approved No   S5‑176090
    S5‑176091 Rel-15 pCR 32.899 Conclusion on the Interworking between 5G System and Existing Systems in clause 5.8 Huawei pCR Agreement Yes
Yes
revised No S5‑176367  
    S5‑176367 Rel-15 pCR 32.899 Conclusion on the Interworking between 5G System and Existing Systems in clause 5.8 Huawei pCR Agreement Yes
Yes
approved No   S5‑176091
    S5‑176092 Rel-15 pCR 32.899 Conclusion on the Online and Offline Charging Evaluation Topic in clause 5.9 Huawei pCR Agreement Yes
Yes
merged No S5‑176364  
    S5‑176093 Rel-15 pCR 32.899 Suggestion on Clause 6 Huawei pCR Agreement Yes
Yes
noted No    
    S5‑176094 Rel-15 pCR 32.899 Correction on the TR 32.899 Huawei pCR Agreement Yes
Yes
approved No    
    S5‑176096 Rel-15 pCR TR 32.899 alternative solution for Network exposure capability Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No    
    S5‑176156 Rel-15 pCR TR 32.899 introduction SSC mode 3 Multi homed Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176317  
    S5‑176317 Rel-15 pCR TR 32.899 introduction SSC mode 3 Multi homed Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176156
    S5‑176157 Rel-15 pCR 32.899 Refinements on scenarios with BP- UL CL Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176320  
    S5‑176320 Rel-15 pCR 32.899 Refinements on scenarios with BP- UL CL Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176157
    S5‑176158 Rel-15 pCR 32.899 Correction roaming Home routed scenario Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No    
    S5‑176159 Rel-15 pCR 32.899 update scenarios SSC mode 2 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176315  
    S5‑176315 Rel-15 pCR 32.899 update scenarios SSC mode 2 Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176159
    S5‑176196 Rel-15 pCR 32.899 Update conventions clause Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
revised No S5‑176314  
    S5‑176314 Rel-15 pCR 32.899 Update conventions clause Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
approved No   S5‑176196
    S5‑176218 Rel-15 pCR 32.899 Solution#3.6 Evaluation Ericsson pCR Approval Yes
Yes
revised No S5‑176324  
    S5‑176324 Rel-15 pCR 32.899 Solution#3.6 Evaluation Ericsson pCR Approval Yes
Yes
approved No   S5‑176218
    S5‑176219 Rel-15 pCR 32.899 Solution#3.8 Evaluation Ericsson pCR Approval Yes
Yes
revised No S5‑176323  
    S5‑176323 Rel-15 pCR 32.899 Solution#3.8 Evaluation Ericsson pCR Approval Yes
Yes
approved No   S5‑176219
    S5‑176220 Rel-15 pCR 32.899 Solution#10.1 Evaluation Ericsson pCR Approval Yes
Yes
revised No S5‑176368  
    S5‑176368 Rel-15 pCR 32.899 Solution#10.1 Evaluation Ericsson pCR Approval Yes
Yes
approved No   S5‑176220
    S5‑176296 LS from CT4 to SA5 on Reply LS on 5G Charging Study Phase 1 on N4 C4-175223 LS in   Yes
Yes
replied to No    
    S5‑176369 Reply to: LS from CT4 to SA5 on Reply LS on 5G Charging Study Phase 1 on N4 Ericsson LS out approval Yes
Yes
approved No    
    S5‑176316 Rel-15 pCR 32.899 Solution #3.1 evaluation Huawei pCR Approval Yes
Yes
approved No    
    S5‑176326 Rel-15 pCR 32.899 new Solution for QoS based Charging Nokia, Nokia Shanghai Bell pCR Approval Yes
Yes
noted No    
    S5‑176371 Draft TR 32.899 Huawei draft TR Approval No
Yes
left for email approval No    
    S5‑176372 Cover sheet TR 32.899 Huawei TS or TR cover Approval Yes
Yes
approved No    
7.5.4 Study on Volume Based Charging Aspects for VoLTE S5‑176214 Rel-15 pCR 32.848 Introduction of potential requirements volume reporting from IMS Ericsson pCR Approval Yes
Yes
approved No    
    S5‑176215 Rel-15 pCR 32.848 Introduction of key issue for volume reporting in P-CSCF Ericsson pCR Approval Yes
Yes
revised No S5‑176464  
    S5‑176464 Rel-15 pCR 32.848 Introduction of key issue for volume reporting in P-CSCF Ericsson pCR Approval Yes
Yes
approved No   S5‑176215
8 Any Other Business                      
9 Closing of the meeting