Tdoc List
2017-10-20 15:17
TDoc | Title | Source | Type | For | Agenda | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|
S5‑175000 | Agenda | WG Chairman | agenda |
2Approval of the agenda
| Yes |
Yes
| approved | No | |||
S5‑175001 | Report from last SA5 meeting | MCC | report |
4.1Last SA5 meeting report
| Yes |
Yes
| approved | No | |||
S5‑175002 | SA5 status report at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | |||
S5‑175003 | SA5 results at last SA meeting | WG Chairman | report |
4.2Last SA meeting report
| Yes |
Yes
| noted | No | |||
S5‑175004 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑175349 | ||
S5‑175005 | OAM Executive Report | WG Vice Chair (Huawei) | report |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑175491 | ||
S5‑175006 | Leaders meeting agenda | WG Chairman | agenda |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑175007 | Leaders meeting minutes | WG Chairman | report |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑175008 | CH Agenda and Time Plan | CH SWG Chair | agenda |
7.1Charging Plenary
| Yes |
Yes
| approved | No | |||
S5‑175009 | CH Executive Report | CH SWG Chair | report |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑175010 | SA5 Meeting Calendar | WG Chairman | other |
5.4SA5 meeting calendar
| Yes |
Yes
| revised | No | S5‑175427 | ||
S5‑175011 | SA5 Working Procedures | WG Vice Chair (Huawei) | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | |||
S5‑175012 | SA5 Meeting Facility Requirements | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | |||
S5‑175013 | Process for management of draft TSs/TRs | WG Chairman | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| approved | No | |||
S5‑175014 | CR Quality Check | MCC | other |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑175015 | Deliverables due for the NEXT SA Plenary | MCC | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑175016 | Ongoing SA5 WIDs and SIDs | WG Vice Chair (Huawei) | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑175017 | SA5 3GPP Work Plan | MCC | other |
5.5Review of the Work Plan
| Yes |
Yes
| noted | No | |||
S5‑175018 | Minutes of New Work Item proposals - OAM&P | WG Vice Chair (Orange) | report |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | |||
S5‑175019 | Minutes of OAM&P Maintenance and Rel-15 small Enhancements | MCC | report |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| noted | No | |||
S5‑175020 | Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service | Rapporteur (Huawei) | report |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | |||
S5‑175021 | Minutes for Study on Implementation for the Partitioning of Itf-N | Rapporteur(China Mobile) | report |
6.5.1Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| noted | No | |||
S5‑175022 | Minutes for Study on management aspects of next generation network architecture and features | Rapporteur(Nokia) | report |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | |||
S5‑175023 | IPR and legal declaration | WG Chairman | other |
3IPR declaration
| Yes |
Yes
| noted | No | |||
S5‑175024 | Status of email approvals | WG Vice Chair (Orange) | other |
5.1Administrative issues at SA5 level
| No |
No
| reserved | No | |||
S5‑175025 | OAM&P SWG action list | WG Vice Chair (Huawei) | other |
6.1OAM&P Plenary
| Yes |
Yes
| revised | No | S5‑175490 | ||
S5‑175026 | Work Plan status | WG Chair | other |
5.5Review of the Work Plan
| No |
No
| reserved | No | |||
S5‑175027 | Minutes of OAM&P SWG opening session | WG Vice Chair (Huawei) | report |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑175028 | Minutes of Study on Management aspects of selected IoT-related features | Rapporteur (Cisco) | report |
6.5.4Study on Management aspects of selected IoT-related features
| Yes |
Yes
| noted | No | |||
S5‑175029 | Minutes of Study on a RESTful HTTP-based Solution Set | Rapporteur (Nokia) | report |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| noted | No | |||
S5‑175030 | Minutes of Study on management aspects of virtualized network functions that are part of the NR | Rapporteur (Intel) | report |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| noted | No | |||
S5‑175031 | Minutes of Study on Management Enhancement of CUPS of EPC Nodes | Rapporteur (Huawei) | report |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| noted | No | |||
S5‑175032 | Minutes of Study on OAM aspects of LTE and WLAN integration | Rapporteur (Intel) | report |
6.5.8Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| noted | No | |||
S5‑175033 | Minutes of Study on network policy management for mobile networks based on NFV scenarios | Rapporteur ( China Mobile) | report |
6.5.9Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| noted | No | |||
S5‑175034 | Minutes of Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN) | Rapporteur (ORANGE) | report |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| noted | No | |||
S5‑175035 | Minutes of Management of QoE measurement collection | Rapporteur (Ericsson) | report |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| noted | No | |||
S5‑175036 | Minutes of Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements | Rapporteur (Ericsson) | report |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | |||
S5‑175037 | Minutes of Provisioning of network slicing for 5G networks and services | Rapporteur (Huawei) | report |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| noted | No | |||
S5‑175038 | Minutes of Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management | Rapporteur (Nokia) | report |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| noted | No | |||
S5‑175039 | Minutes of Study on system and functional aspects of Energy Efficiency in 5G networks | Rapporteur (ORANGE) | report |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| noted | No | |||
S5‑175040 | LS from NGMN cc SA5 on requirement of lifecycle management for 3GPP service based architecture | NGMN | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑175041 | Liaison Statement from ETSI NTECH to 3GPP SA5 and SA2 on GANA instantiation in the Core and Backhaul network parts of the 3GPP Architecture | ETSI TC NTECH AFI | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| postponed | No | |||
S5‑175042 | Reply LS from CT1 cc SA5 on Supported features by 5GC for E-UTRA connected to 5G CN | C1-173571 | LS in |
5.3Liaison statements at SA5 level
| Yes |
Yes
| noted | No | |||
S5‑175043 | Reply LS from CT1 cc SA5 on request to update maximum data rate values in EPS | C1-173572 | LS in |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑175044 | Reply LS from CT3 to SA5 on Request to update maximum data rate values in EPS | C3-174339 | LS in |
7.1Charging Plenary
| Yes |
Yes
| noted | No | |||
S5‑175045 | Reply LS from CT4 to SA5 on Charging support for Control and User Plane Separation | C4-174324 | LS in |
7.1Charging Plenary
| Yes |
Yes
| postponed | No | |||
S5‑175046 | LS from CT3/CT4 to SA5 on Conclusion on Service Based Architecture Protocol Selection | C3-174370,C4-174343 | LS in |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| noted | No | |||
S5‑175047 | LS from TSG CT cc SA5 on Evolution of IMSI format and E.212 Recommendation | CP-172153 | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesNokia commented that this had been discussed in the Charging SWG. It wasn't clear what they had to do with this LS.
It was suggested to note the LS given that CT4 will take initiative and ask SA5 for their comments once they have some input.
| noted | No | |||
S5‑175048 | LS from RAN3 to SA5 on support of Trace and MDT in NG-RAN in rel-15 | R3-173422 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | |||
S5‑175049 | Reply Lsfrom SA2 to SA5 on progress of Network Slicing related work | S2-176505 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑175050 | Resubmitted LS from GSMA cc SA5 on Network Slicing initiative | GSMA | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesBT commented that the SA5 Chair had the action point to talk with the SA chair about this LS. There had been an email exchange with him. The SA Chair encouraged SA5 to go for this work without any SA coordination.
The SA5 Chair commented that he needed to talk about it further with the SA Chair.
| replied to | No | |||
S5‑175051 | Resubmitted LS from RAN2 to SA5 on supported features by 5GC for E-UTRA connected to 5G CN | R2-1706153 | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesMaryse (Nokia) commented that Charging had a study covering the charging aspects of the SA2 work, but there was also some OAM aspects that should be covered by SA5.
| replied to | No | |||
S5‑175052 | Resubmitted LS from SA2 to SA5 on EUTRAN sharing enhancement | S2-173701 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| replied to | No | |||
S5‑175053 | Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery | S2-172506 | LS in |
7.1Charging Plenary
| Yes |
Yes
| replied to | No | |||
S5‑175054 | Resubmitted LS from RAN3 to SA5 on Collection Period correction for MDT M3 measurement in eUTRAN | R3-171382 | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | |||
S5‑175055 | Resubmitted LS from SA3 cc SA5 Reply LS on Security for T8 interface | S3-172076 | LS in |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| noted | No | |||
S5‑175056 | Resubmitted LS from MEF Forum to SA5 on MEF Forum Work on 5G | MEF Forum | LS in |
5.3Liaison statements at SA5 level
| Yes |
YesOn bullet point 3, Nokia commented that the work of SA5 in 5G was not properly advertised.
Thomas replied that he had written an article on the 3GPP website on SA5's work, and he was planning to write another one. He clarified that the marketing work of SA5 should be coordinated by the 3GPP marketing, although LS could be used to communicate SA5's work.
Nokia commented that ocasional articles were not enough.
The Chair proposed to write an LS to inform MEF about the network slicing work.
| replied to | No | |||
S5‑175057 | LSOut reply to 3GPP SA5 on progress of measurement definitions | ETSI ISG NFV | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑175058 | LSOut reply to 3GPP SA5 on Managing EM IP address provided to VNF | ETSI ISG NFV | LS in |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | |||
S5‑175059 | CR TS 32.450 Uplink E-UTRAN IP Latency KPI Definition | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175060 | CR TS 32.425 E-UTRAN Latency measurement and drop rate in Uplink | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175061 | CR TS 32.455 Roud Trip Time KPI on S1-U Definition | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175062 | CR TS 32.426 Latency measurement on S1-U | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175063 | pCR 32.848 Scope enhancement | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| revised | No | S5‑175389 | |
S5‑175064 | pCR 32.848 Potential requirements | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| revised | No | S5‑175390 | |
S5‑175065 | pCR 32.848 Charging architecture | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| revised | No | S5‑175391 | |
S5‑175066 | pCR 32.848 Key Issue Support of the end user identifier | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| revised | No | S5‑175392 | |
S5‑175067 | NR NRM Requirements | Ericsson LM | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| No |
Yes
| withdrawn | Yes | ||
S5‑175068 | NR NRM Requirements | Ericsson LM | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175365 | |
S5‑175069 | TR 28.802 Add potential solution for NR NRM | Ericsson LM | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑175070 | pCR TR 32.972 Restructuring clause 5.2 | ORANGE, Ericsson | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | ||
S5‑175071 | pCR TR 32.972 Additional existing EE KPI definitions | ORANGE, Ericsson | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | ||
S5‑175072 | pCR TR 32.972 Add existing EE KPI definitions for VNF | ORANGE, Ericsson | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | ||
S5‑175073 | pCR TR 32.972 – Introduction and Scope | ORANGE | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| revised | No | S5‑175453 | |
S5‑175074 | pCR TR 32.972 Measurement methods | ORANGE | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | ||
S5‑175075 | pCR TS 28.304 Update on Architecture and Clause 6 actor roles, telecom resources and use cases | ORANGE | pCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑175359 | |
S5‑175076 | pCR TS 28.305 Information Model for solution 1 | ORANGE | pCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑175360 | |
S5‑175077 | Rel-15 pCR 32.848 Charging for support of CAT | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| revised | No | S5‑175393 | |
S5‑175078 | R15 CR 32.240 Introduce the Northbound API charging | HUAWEI TECHNOLOGIES Co. Ltd. | CR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| revised | No | S5‑175295 | |
S5‑175079 | Rel-15 pCR 32.254 Charging Principle for NAPS | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| revised | No | S5‑175296 | |
S5‑175080 | Rel-15 pCR 32.254 Basic principle for Online Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| revised | No | S5‑175297 | |
S5‑175081 | Rel-15 pCR 32.254 Basic principle for Offline Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| revised | No | S5‑175300 | |
S5‑175082 | Rel-15 pCR 32.899 Update of Reference | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑175083 | Rel-15 pCR 32.899 Update of Network Capability Exposure | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175314 | |
S5‑175084 | Rel-15 pCR 32.899 PDU session charging – counts in two UPF anchors | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175319 | |
S5‑175085 | Rel-15 pCR 32.899 QoS Flow based Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175315 | |
S5‑175086 | Rel-15 pCR 32.899 Charging for removal of additional PDU session Anchor and Branching Point or UL CL | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175320 | |
S5‑175087 | Rel-15 pCR 32.899 Charging procedure for UE Served by Multiple NSIs | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175385 | |
S5‑175088 | Rel-15 pCR 32.899 Charging procedure for Network Slicing Tenant based Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| noted | No | ||
S5‑175089 | Rel-15 pCR 32.899 Interworking between 5G System and existing systems - EPS handover 5G | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175316 | |
S5‑175090 | Organization of future 5G WIDs | WG Vice Chair (Huawei) | discussion | Endorsement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175462 | |
S5‑175091 | pCR 28.404 Add use case and requirement for QoE collection | Huawei | pCR | Approval |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| revised | No | S5‑175382 | |
S5‑175092 | pCR 28.530 Add concept and use case of V2X services using network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| merged | No | S5‑175377 | |
S5‑175093 | pCR 28.530 Adding concept and use case of network slicing with fixed mobile convergence | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175377 | |
S5‑175094 | pCR 28.530 Add business level use cases of providing communication services with massive IoT connections using network slice | Huawei, CATT, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| merged | No | S5‑175377 | |
S5‑175095 | pCR 28.530 Add concept of services using network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175380 | |
S5‑175096 | pCR 28.530 Add managed network slice concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175381 | |
S5‑175097 | pCR 28.530 Add managed network slice subnet concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175403 | |
S5‑175098 | pCR 28.530 Add definition for managed network slice template | Huawei, China Telecom, CATT, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175404 | |
S5‑175099 | pCR 28.530 Add network slice management related roles description | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175405 | |
S5‑175100 | pCR 28.530 Add network slice management operation description | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| merged | No | S5‑175376 | |
S5‑175101 | pCR 28.530 Add high level service requirements | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175409 | |
S5‑175102 | pCR 28.530 Add concept of use of the non-3GPP parts for a slice | Huawei, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175410 | |
S5‑175103 | pCR 28.530 Clarify Communication Service Instance Lifecycle | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175411 | |
S5‑175104 | pCR 28.530 Add different types of services using network slice concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175412 | |
S5‑175105 | pCR 28.530 Add business level use case of policy management for slicing | Huawei, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175106 | pCR 28.530 Add business level general requirements | Huawei, China Telecom, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175416 | |
S5‑175107 | pCR 28.530 Add business level requirements and use case of the exposure of management functions and management data for network slice as NSP internals case | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175108 | pCR 28.530 Add business level requirements and use case of the exposure of management functions and management data for network slice as a service case | Huawei, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175422 | |
S5‑175109 | pCR 28.530 Add business level requirements and use case of the exposure of management functions and management data for network slice subnet as a service case | Huawei, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175110 | pCR 28.530 Add SON concept in network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175413 | |
S5‑175111 | pCR 28.530 Add use case and requirement for network slice instance priority | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175112 | pCR 28.530 Add concept and use case of MEC | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | ||
S5‑175113 | pCR 28.530 Add use case for multi-operator slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175114 | Draft TS 28.531 Provisioning of network slicing for 5G networks and services | Huawei | draft TS | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| approved | No | ||
S5‑175115 | pCR 28.531 Adding new skeleton clauses | Huawei, Nokia | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| revised | No | S5‑175423 | |
S5‑175116 | pCR 28.531 Adding content of scope | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| noted | No | ||
S5‑175117 | pCR 28.531 Add potential network slice subnet deployment scenarios | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| noted | No | ||
S5‑175118 | pCR 28.531 Adding use case of utilizing network slice instance for communication service | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| merged | No | S5‑175425 | |
S5‑175119 | pCR 28.531 Adding use case of network slice instance creation | Huawei, CATT, China Unicom | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| revised | No | S5‑175425 | |
S5‑175120 | pCR 28.531 Adding use case of network slice subnet instance creation | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| revised | No | S5‑175426 | |
S5‑175121 | pCR 28.531 Adding general description for managed network slice template | Huawei, CATR, China Unicom | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑175122 | pCR 28.531 Adding information model for managednetworkslice and managednetworkslicesubnet | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑175123 | pCR 28.531 Add network slice related management functions | Huawei, CATR, China Telecom, CATT, China Unicom | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑175124 | pCR 28.531 Add general description of provisioning of network slice instance | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑175125 | pCR 28.800 Remove unnecessary editor note regarding network slicing | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | ||
S5‑175126 | pCR 28.800 Add skeleton for 5G management architecture aspects | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑175127 | pCR 28.800 Management architecture relation between the non-5G NE management functions and the 5G NE management functions | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑175346 | |
S5‑175128 | pCR 28 800 Management architecture relation between Service management functions and slicing management functions | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑175129 | pCR 28.800 Management architecture relation between slicing management functions and 5G NE management functions | Huawei, CATR, China Unicom | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑175130 | pCR 28.800 Management architecture relation between slicing management functions and NFV-MANO | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑175353 | |
S5‑175131 | pCR 28 800 Management Architecture for Multiple Operators communication | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑175354 | |
S5‑175132 | pCR 32.867 Editor's notes cleanup | Huawei | pCR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| approved | No | ||
S5‑175133 | pCR 32.867 Add recommendations | Huawei | pCR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| revised | No | S5‑175451 | |
S5‑175134 | pCR 32.867 Add conclusions | Huawei | pCR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| approved | No | ||
S5‑175135 | Draft CR 28.622 Add PEE attribute to IOC ManagedFunction | ORANGE | draftCR | Discussion |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑175361 | |
S5‑175136 | Draft CR 28.623 Add attribute to IOC ManagedFunction - SS | ORANGE | draftCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | ||
S5‑175137 | Draft CR 32.425 Add PEE measurements for E-UTRAN | ORANGE | draftCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑175362 | |
S5‑175138 | pCR TS 28.305 Information Model for solution 2 | ORANGE | pCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| revised | No | S5‑175363 | |
S5‑175139 | pCR TR 32.871 The alignment of NFV policy terms and concept definition with ETSI MANO policy study | China Mobile Com. Corporation | pCR | Approval |
6.5.9Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| revised | No | S5‑175457 | |
S5‑175140 | pCR TR 32.871 The terms of NFV policy update | China Mobile Com. Corporation | pCR | Approval |
6.5.9Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | ||
S5‑175141 | Rel-14 CR 28622 Missing note in table of Attribute Properties | MCC | CR |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | |||
S5‑175142 | Rel-15 pCR TR 32.899 PDU session charging continuity | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175317 | |
S5‑175143 | Rel-15 pCR TR 32.899 Architecture conclusion for Session management and Service continuity | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑175144 | Rel-15 pCR TR 32.899 PDU sessions with BP and ULCL- additional scenarios | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175321 | |
S5‑175145 | Rel-15 pCR TR 32.899 online and offline - solution 9.1 evaluation | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑175146 | Rel-15 pCR TR 32.899 online and offline charging solution 9.2 evaluation | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑175147 | Rel-15 pCR TR 32.899 Online and offline new solution 9.x | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑175148 | Rel-15 pCR TR 32.899 Roaming Home routed – charging architecture | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175323 | |
S5‑175149 | Rel-15 pCR TR 32.899 registration topic in a new chapter | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175384 | |
S5‑175150 | New WID on Management of NG-RAN that includes virtualized network functions | Intel | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175327 | |
S5‑175151 | pCR Rel-15 TS 28530 Slice management model Requirements | Ericsson Inc. | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175418 | |
S5‑175152 | pCR Rel-15 28531 Slice management mode | Ericsson Inc. | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑175153 | pCR Relation of NMSF, NSSMF, EM/DM/NM management functions | Ericsson Inc. | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| revised | No | S5‑175154 | |
S5‑175154 | pCR Rel-15 TS 28530 Relation of NMSF, NSSMF, EM/DM/NM management functions | Ericsson Inc. | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | S5‑175153 | |
S5‑175155 | Rel-11 CR 32.422 Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175156 | Rel-12 CR 32.422 Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175157 | Rel-13 CR 32.422 Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175158 | Rel-14 CR 32.422 Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175159 | Rel-15 CR 32.422 Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175160 | Rel-15 pCR 28.308 References and System Overview for QoE IRP Information Service | Ericsson | pCR | Approval |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | ||
S5‑175161 | Rel-15 pCR 28.308 Information Object Classes and Interface Definition for QoE IRP | Ericsson | pCR | Approval |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| revised | No | S5‑175402 | |
S5‑175162 | New WID on Performance assurance of network slicing for 5G networks and services | Intel Corporation, CMCC | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| merged | No | S5‑175326 | |
S5‑175163 | New WID on Charging for WLAN-based Prose Direct Discovery | Intel Corporation | WID new | Approval |
7.2New Charging Work Item proposals
| Yes |
Yes
| revised | No | S5‑175298 | |
S5‑175164 | CR Rel-15 32.277 Add charging description for WLAN-based ProSe direct discovery | Intel Corporation | CR | Approval |
7.2New Charging Work Item proposals
| Yes |
Yes
| not pursued | No | ||
S5‑175165 | pCR TR 32.864 Add UC on providing location information of non-virtualized part of gNB | Intel Finland Oy | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175441 | |
S5‑175166 | pCR TR 32.864 Add potential solution for providing location of non-virtualized part of gNB to NFVO | Intel Finland Oy | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175442 | |
S5‑175167 | pCR TR 28.800 Add 5G network and service management and orchestration architecture option | Intel Finland Oy | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| merged | No | S5‑175350 | |
S5‑175168 | pCR TR 32.868 Add UC on configuration of mobility set for LWA | Intel Finland Oy | pCR | Approval |
6.5.8Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| revised | No | S5‑175455 | |
S5‑175169 | pCR TR 32.868 Add UC on PM for non-collocated LWA | Intel Finland Oy | pCR | Approval |
6.5.8Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| approved | No | ||
S5‑175170 | pCR TR 32.868 Add UC on FM for non-collocated LWA | Intel Finland Oy | pCR | Approval |
6.5.8Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| approved | No | ||
S5‑175171 | pCR TR 32.868 Add UC on CM for LWIP | Intel Finland Oy | pCR | Approval |
6.5.8Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| approved | No | ||
S5‑175172 | pCR 28.802 add an UC for collecting performance measurements | Intel | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑175173 | pCR 28.802 add an UC for detecting faults | Intel | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑175174 | pCR 32.864 editor note cleanup | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175443 | |
S5‑175175 | pCR 32.864 add a UC for connecting gNB-CU to 5GC nodes | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175444 | |
S5‑175176 | pCR 32.864 alternative solution for transport network requirements update | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175445 | |
S5‑175177 | pCR 32.864 Add potential solution for adding VNFFGD and adding VNFFGs for the gNB | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175446 | |
S5‑175178 | pCR 32.864 add gap related to adding VNFFG | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175447 | |
S5‑175179 | pCR 32.864 revised conclusion | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| revised | No | S5‑175448 | |
S5‑175180 | Paper to discuss edge computing management issues | Intel | discussion | Discussion |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑175181 | New WID on Fault management of network slicing for 5G networks | ZTE Corporation | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175328 | |
S5‑175182 | Discussion paper about Network slice modelling | ZTE Corporation | discussion | Discussion |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| not treated | No | ||
S5‑175183 | pCR TR 32.880 Conclusionfor TR32.880 | China Mobile | pCR | Approval |
6.5.1Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| revised | No | S5‑175431 | |
S5‑175184 | pCR to the TR 32.857 TB related measurements | Cisco Systems Inc. | pCR | Approval |
6.5.4Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | ||
S5‑175185 | pCR to the TR 32.857 S1-connection related measurements | Cisco Systems Inc. | pCR | Approval |
6.5.4Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | ||
S5‑175186 | pCR to the TR 32.857 CQI and TA Distribution | Cisco Systems Inc. | pCR | Approval |
6.5.4Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | ||
S5‑175187 | pCR to the TR 32.857 Measurements related to Measurement Report | Cisco Systems Inc. | pCR | Approval |
6.5.4Study on Management aspects of selected IoT-related features
| Yes |
Yes
| approved | No | ||
S5‑175188 | pCR to the TS 28.404 Use case 5.4.1 clarification | Cisco Systems Inc. | pCR | Approval |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| not treated | No | ||
S5‑175189 | pCR to the TS 28.530 Network Slice Instance creation | Cisco Systems Inc. | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175190 | New WID on management data definitions for 5G network functions | Nokia Shanghai Bell | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175329 | |
S5‑175191 | pCR TS 32.972 About power consumption of network elements and functions | ORANGE | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| revised | No | S5‑175454 | |
S5‑175192 | Rel-15 CR 28.627 Add SON for AAS management requirements | Nokia Shanghai Bell | CR | Agreement |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| revised | No | S5‑175428 | |
S5‑175193 | Rel-15 CR 28.628 Add SON for AAS management description and attributes | Nokia Shanghai Bell | CR | Agreement |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| revised | No | S5‑175429 | |
S5‑175194 | Skeleton 28.307 | Ericsson | draft TS |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | |||
S5‑175195 | Skeleton 28.308 | Ericsson | draft TS |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | |||
S5‑175196 | Skeleton 28.405 | Ericsson | draft TS |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | |||
S5‑175197 | Skeleton 28.406 | Ericsson | draft TS |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | |||
S5‑175198 | R15 pCR 28.307-000 Introduction and scope for QoE IRP requirements | Ericsson | pCR |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| revised | No | S5‑175398 | ||
S5‑175199 | Rel-15 CR 28.658 Add attribute of E-UTRAN cell IOC to support SON for AAS management requirements | Nokia Shanghai Bell | CR | Agreement |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| revised | No | S5‑175430 | |
S5‑175200 | R15 pCR 28.307-000 Introduction of specification level use cases and requirements for QoE IRP requirements | Ericsson | pCR |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| revised | No | S5‑175399 | ||
S5‑175201 | R15 pCR 28.308-000 Introduction and scope for QoE IRP Inormation Service | Ericsson | pCR |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| revised | No | S5‑175400 | ||
S5‑175202 | Rel-15 pCR 32.867 Add use cases and requirements for PFCP and GTP-U related measurements On Sxa&Sxb interface | Nokia Shanghai Bell | pCR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| approved | No | ||
S5‑175203 | Rel-15 pCR 32.867 Add use cases and requirements for configuration management for S/P-GW with CUPS | Nokia Shanghai Bell | pCR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| revised | No | S5‑175450 | |
S5‑175204 | Rel-15 pCR 28.802 Add use cases to support management for ng-eNB connected to 5GC and EPC simultaneously | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175372 | |
S5‑175205 | Rel-15 pCR 28.802 Add potential NRM solution for gNB with functional split | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175368 | |
S5‑175206 | Rel-15 pCR 28.802 Add potential solution for NR performance management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175369 | |
S5‑175207 | Rel-15 pCR 28.802 Add potential solution for NR fault management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175370 | |
S5‑175208 | Rel-15 pCR 28.802 Add potential solutions for ng-eNB management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175373 | |
S5‑175209 | R14 CR 32.130-14.0.0 Correcting requirement tags | Ericsson | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑175210 | Rel-13 CR 32.298 Correction where rANNASCause is defined as a sequence | Ericsson | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175302 | |
S5‑175211 | Rel-13 CR 32.299 Correction where RAN-NAS-Release-Cause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175305 | |
S5‑175212 | Rel-14 CR 32.298 Correction where rANNASCause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175303 | |
S5‑175213 | Rel-14 CR 32.299 Correction where RAN-NAS-Release-Cause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175306 | |
S5‑175214 | Rel-15 CR 32.298 Correction where rANNASCause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175304 | |
S5‑175215 | Rel-15 CR 32.299 Correction where RAN-NAS-Release-Cause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175307 | |
S5‑175216 | 5G network slicing management architecture framework principles | NTT DOCOMO | discussion | Endorsement |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175415 | |
S5‑175217 | pCR TS 28.530 Network Slicing management framework principles | NTT DOCOMO | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175414 | |
S5‑175218 | New WID on Performance Assurance for Network Slicing | CCSA | WID new |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| withdrawn | Yes | |||
S5‑175219 | Rel-15 CR 28.801 Implement Edithelp and MCC comments | Ericsson Limited | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175338 | |
S5‑175220 | pCR 32.866 Discussion paper presenting considerations and alternatives | Ericsson Limited | discussion | Endorsement |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| noted | No | ||
S5‑175221 | pCR 32.866 Alternative solutions for filtering and scoping using hyperlinks | Ericsson Limited | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑175460 | |
S5‑175222 | Rel-15 CR 32.251 Data Volume Reporting for Secondary RAT usage | Ericsson LM | CR | Agreement |
7.4.2PS Charging enhancements to support 5G New Radio via Dual Connectivity
| Yes |
Yes
| revised | No | S5‑175294 | |
S5‑175223 | S5-175223 Sequence proposal for network slicing concepts use cases and requirements agenda point 6.4.3 | Ericsson Limited | pCR | Endorsement |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | ||
S5‑175224 | pCR 28.530 Overview of use cases and requirements for management of network slicing | Ericsson Limited | discussion | Endorsement |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | ||
S5‑175225 | pCR 32.899 Solution to key issue #7.1 Service based architecture | Ericsson LM | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175387 | |
S5‑175226 | pCR 28.530 text proposal for background and concepts | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175376 | |
S5‑175227 | pCR 32.899 Solution to key issue #4.2 Network slicing | Ericsson LM | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175386 | |
S5‑175228 | pCR 28.530 Use case and requirements for activate network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175229 | pCR 28.530 Use case and requirements for activate network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175230 | pCR 28.530 Use case and requirements for create a network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175420 | |
S5‑175231 | pCR 32.869 Description of existing overload control mechanism for online | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑175308 | |
S5‑175232 | pCR 32.869 OLR with buffer mechanism as alternative solution for online | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑175309 | |
S5‑175233 | pCR 28.530 Use case and requirements for create a network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175421 | |
S5‑175234 | pCR 28.530 Use case and requirements for de-activate network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175235 | pCR 32.869 OCS with CDR mechanism as alternative solution for online | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑175310 | |
S5‑175236 | pCR 28.530 Use case and requirements for de-activate network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175237 | pCR 28.530 Use case and requirements for modify a network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175238 | pCR 28.530 Use case and requirements for modify a network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175239 | pCR 28.530 Use case and requirements for query the network slice instance status | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175240 | pCR 28.530 Use case and requirements for query the network slice subnet instance status | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175241 | pCR 28.530 Use case and requirements for read a network slice instance attribute | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175242 | pCR 28.530 Use case and requirements for read a network slice subnet instance attribute | Ericsson Limited | pCR |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | |||
S5‑175243 | pCR 28.530 Use case and requirements for subscribe to NSMF notifications | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175244 | pCR 28.530 Use case and requirements for subscribe to NSSMF notifications | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175245 | pCR 28.530 Use case and requirements for terminate a network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175246 | pCR 28.530 Use case and requirements for terminate a network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175247 | New Study Item on integration of ONAP DCAE and 3GPP management architecture | AT&T, ORANGE | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175331 | |
S5‑175248 | Rel-14 CR 28.632 Remove unused reference | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175339 | |
S5‑175249 | Rel-14 CR 32.103 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175352 | |
S5‑175250 | Rel-14 CR 32.150 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175340 | |
S5‑175251 | Rel-14 CR 32.153 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑175252 | Rel-14 CR 32.155 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | ||
S5‑175253 | Rel-14 CR 32.182 Update erroneous references | Ericsson LM | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| not pursued | No | ||
S5‑175254 | Rel-12 CR 28.732 Update erroneous references | Ericsson LM | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175341 | |
S5‑175255 | Rel-13 CR 28.732 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175342 | |
S5‑175256 | Rel-14 CR 28.732 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| revised | No | S5‑175343 | |
S5‑175257 | pCR 32.866 Add IRP design principles | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175258 | pCR 32.866 Add Overview of existing Solution Sets | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175259 | pCR 32.866 Add reference for REST | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175260 | pCR 32.866 Add missing HTTP method descriptions | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175261 | pCR 32.866 Add a new chapter about URI Templates | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175262 | pCR 32.866 Add a second possibility for mapping the DN into a URI | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175263 | pCR 32.866 Add references for JSON and JSON Schema | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175264 | pCR 32.866 Add Usage of HTTP headers and media types | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175265 | pCR 32.866 Clarify design patterns | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175266 | pCR 32.866 Add new design pattern for iterations | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | ||
S5‑175267 | pCR 32.866 Add Recommendations | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑175434 | |
S5‑175268 | Rel-15 pCR TR 32.899 reporting and quota management – update scenarios | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| revised | No | S5‑175322 | |
S5‑175269 | New WID on Performance Assurance for Network Slicing | China Mobile | WID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175326 | |
S5‑175270 | New WID on Network Slicing Management Architecture | China Mobile | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑175271 | OLR with with service specific mechanism as alternative solution for online | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑175311 | |
S5‑175272 | Add business level requirements of provide network slice as a service with guaranteed quality of service | China Mobile | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175273 | Discussion paper on 5G Charging work status | Nokia | discussion | Discussion |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| noted | No | ||
S5‑175274 | Rel-15 pCR 28.802 Add conclusion and Recommendations for 5GC management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175374 | |
S5‑175275 | Rel-15 pCR 28.802 Add conclusion and Recommendations for NR management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175371 | |
S5‑175276 | Rel-15 pCR 28.802 Add use cases to support trace management in 5GS | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| revised | No | S5‑175375 | |
S5‑175277 | Rel-15 pCR 28.802 Add annex for relationship analysis between existing TSs and 5G NF management solutions | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑175278 | pCR 28.530 Use case and requirements for report performance of a network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175279 | pCR 28.530 Use case and requirements for report performance of a network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175280 | pCR 28.530 Use case and requirements for supervise a network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175281 | pCR 28.530 Use case and requirements for supervise a network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175282 | pCR 28.530 Use case and requirements for unsubscribe from NSMF notifications | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175283 | pCR 28.530 Use case and requirements for unsubscribe from NSSMF notifications | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| not treated | No | ||
S5‑175284 | pCR TR 32.864 Add UC on scaling the virtualized part of gNB for adapting to the network capacity | China Mobile Com. Corporation | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | ||
S5‑175285 | pCR TR 28.802 Add SON automated healing functionality for gNB in 5G-RAN | China Mobile Com. Corporation | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| withdrawn | Yes | ||
S5‑175286 | pCR TR 28.802 Add SON automated optimization functionality for gNB in 5G-RAN | China Mobile Com. Corporation | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| withdrawn | Yes | ||
S5‑175287 | Rel-15 pCR TR 32.870 Solution for Key issues 3-4-5 | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| approved | No | ||
S5‑175288 | Rel-15 pCR TR 32.870 Elaborate Solution 1 | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| revised | No | S5‑175395 | |
S5‑175289 | Minutes conference call on 5G WID organization | OAM&P SWG chairman | report | Information |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| noted | No | ||
S5‑175290 | TS quality campaign table themes and status | Ericsson LM | other | Action |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | ||
S5‑175291 | LS from SA4 to SA5 on adding new service type in QMC reporting | S4-170952 | LS in | discussion |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| noted | No | ||
S5‑175292 | LS from RAN2 to SA5 on RAN2 progress of QoE Measurement Collection in LTE | R2-1712035 | LS in | discussion |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| noted | No | ||
S5‑175293 | Reply LS from RAN2 cc SA5 to RAN3 on MDT | R2-1712041 | LS in | discussion |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | ||
S5‑175294 | Rel-15 CR 32.251 Data Volume Reporting for Secondary RAT usage | Ericsson LM | CR | Agreement |
7.4.2PS Charging enhancements to support 5G New Radio via Dual Connectivity
| Yes |
Yes
| agreed | No | S5‑175222 | |
S5‑175295 | R15 CR 32.240 Introduce the Northbound API charging | HUAWEI TECHNOLOGIES Co. Ltd. | CR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| agreed | No | S5‑175078 | |
S5‑175296 | Rel-15 pCR 32.254 Charging Principle for NAPS | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| approved | No | S5‑175079 | |
S5‑175297 | Rel-15 pCR 32.254 Basic principle for Online Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| approved | No | S5‑175080 | |
S5‑175298 | New WID on Charging for WLAN-based Prose Direct Discovery | Intel Corporation | WID new | Approval |
7.2New Charging Work Item proposals
| Yes |
Yes
| revised | No | S5‑175313 | S5‑175163 |
S5‑175299 | Reply to: Resubmitted LS from SA2 to SA5 on Stage 2 completion on introduction of WLAN as alternative technology for ProSe Direct Discovery | Intel | LS out | approval |
7.1Charging Plenary
| Yes |
Yes
| approved | No | ||
S5‑175300 | Rel-15 pCR 32.254 Basic principle for Offline Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| Yes |
Yes
| approved | No | S5‑175081 | |
S5‑175301 | Draft TS 32.254 | Huawei | draft TS | Approval |
7.4.3Charging Aspects of Northbound APIs for SCEF-SCS/AS Interworking
| No |
Yes
| left for email approval | No | ||
S5‑175302 | Rel-13 CR 32.298 Correction where rANNASCause is defined as a sequence | Ericsson | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175210 | |
S5‑175303 | Rel-14 CR 32.298 Correction where rANNASCause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175212 | |
S5‑175304 | Rel-15 CR 32.298 Correction where rANNASCause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175214 | |
S5‑175305 | Rel-13 CR 32.299 Correction where RAN-NAS-Release-Cause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175211 | |
S5‑175306 | Rel-14 CR 32.299 Correction where RAN-NAS-Release-Cause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175213 | |
S5‑175307 | Rel-15 CR 32.299 Correction where RAN-NAS-Release-Cause is defined as a sequence | Ericsson LM | CR | Agreement |
7.3Charging Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175215 | |
S5‑175308 | pCR 32.869 Description of existing overload control mechanism for online | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑175231 | |
S5‑175309 | pCR 32.869 OLR with buffer mechanism as alternative solution for online | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑175232 | |
S5‑175310 | pCR 32.869 OCS with CDR mechanism as alternative solution for online | Ericsson LM | pCR | Agreement |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑175235 | |
S5‑175311 | pCR 32.869 OLR with with service specific mechanism as alternative solution for online | Ericsson LM | pCR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑175271 | |
S5‑175312 | Draft TR 32.869 | Ericsson | draft TR | Approval |
7.5.1Study on Overload Control for Diameter Charging Applications
| No |
Yes
| left for email approval | No | ||
S5‑175313 | New WID on Charging for WLAN-based Prose Direct Discovery | Intel Corporation | WID new | Agreement |
7.2New Charging Work Item proposals
| Yes |
Yes
| agreed | No | S5‑175298 | |
S5‑175314 | Rel-15 pCR 32.899 Update of Network Capability Exposure | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175083 | |
S5‑175315 | Rel-15 pCR 32.899 QoS Flow based Charging | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175085 | |
S5‑175316 | Rel-15 pCR 32.899 Interworking between 5G System and existing systems - EPS handover 5G | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175089 | |
S5‑175317 | Rel-15 pCR TR 32.899 PDU session charging continuity | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175142 | |
S5‑175318 | Rel-15 pCR TR 32.899 Rules for Flows description | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑175319 | Rel-15 pCR 32.899 PDU session charging – counts in two UPF anchors | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175084 | |
S5‑175320 | Rel-15 pCR 32.899 Charging for removal of additional PDU session Anchor and Branching Point or UL CL | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175086 | |
S5‑175321 | Rel-15 pCR TR 32.899 PDU sessions with BP and ULCL- additional scenarios | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175144 | |
S5‑175322 | Rel-15 pCR TR 32.899 reporting and quota management – update scenarios | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175268 | |
S5‑175323 | Rel-15 pCR TR 32.899 Roaming Home routed – charging architecture | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175148 | |
S5‑175324 | LSOut reply from ETSI NFV cc SA5 on lifecycle management for 3GPP service based architecture | ETSI ISG NFV | LS in | approval |
6.1OAM&P Plenary
| Yes |
Yes
| postponed | No | ||
S5‑175325 | Additional meeting time considerations | WG Chair | other | discussion |
5.1Administrative issues at SA5 level
| Yes |
YesThe Chair commented that his preference was to have more ad-hoc meetings.
Nokia disagreed with extending the meeting to Saturdays. A whole weekend would be lost just for a small extra time.Working during weekends would be impossible for some companies/individuals due to religious or legal reasons.
Nokia advised to plan as early as possible the ad-hocs or extensions so companies can prepare accordingly.
The Chair clarified that these were options proposed by companies and not offered by the Chair alone.
Ericsson pointed out about the PCG#39 meeting where it was advised not to increase the number of hours of work more than reasonable.Showing the number of meetings of other groups was not helping.
MCC commented that using the weekends should also be out of the question, since there could be legal issues behind, although they could be used for offline discussions.
NTT-Docomo was against extending the work for the next week and proposed to work more efficiently with the prioritization of WIDs. Nokia supported this.
Nokia was in favour of not extending the meetings more than 6 per year. They also insisted on improving the means of advertising SA5's work.
ORANGE preferred to have conference calls with decision power for certain topics that had less supporting companies like RESTful or Energy Efficiency.
Christian (Huawei) commented that there would be a call on November the 8th for a time management proposal. All options are in the time management document and there is no decision. This document had been submitted to SA5#114 and there were no comments.Christian proposed to resubmit the document to the current meeting (tdoc 357) and gather comments offline during the week.
| revised | No | S5‑175358 | |
S5‑175326 | New WID on Performance Assurance for Network Slicing | China Mobile,Intel | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175465 | S5‑175269 |
S5‑175327 | New WID on Management of NG-RAN that includes virtualized network functions | Intel | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175463 | S5‑175150 |
S5‑175328 | New WID on Fault management of network slicing for 5G networks | ZTE Corporation | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175466 | S5‑175181 |
S5‑175329 | New WID on management data definitions for 5G network functions | Nokia Shanghai Bell | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175464 | S5‑175190 |
S5‑175330 | New WID on Network Slicing Management Architecture | China Mobile | WID new | Agreement |
6.2New OAM&P Work Item proposals
| No |
Yes
| withdrawn | Yes | ||
S5‑175331 | New Study Item on integration of ONAP DCAE and 3GPP management architecture | AT&T, ORANGE | SID new | Approval |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑175247 | |
S5‑175332 | TR 28.802 TDocs discussion sequence proposal for section 6.5.3 | Nokia | other | Information |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| noted | No | ||
S5‑175333 | CR TS 32.450 Uplink E-UTRAN IP Latency KPI Definition | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑175334 | CR TS 32.425 E-UTRAN Latency measurement and drop rate in Uplink | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑175335 | CR TS 32.455 Roud Trip Time KPI on S1-U Definition | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑175336 | CR TS 32.426 Latency measurement on S1-U | TELECOM ITALIA S.p.A. | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑175337 | Rel-11 CR 32.422 Collection Period correction for MDT M3 measurement in eUTRAN | Ericsson | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| No |
Yes
| withdrawn | Yes | ||
S5‑175338 | Rel-15 CR 28.801 Implement Edithelp and MCC comments | Ericsson Limited | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175219 | |
S5‑175339 | Rel-14 CR 28.632 Remove unused reference | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175248 | |
S5‑175340 | Rel-14 CR 32.150 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175250 | |
S5‑175341 | Rel-12 CR 28.732 Update erroneous references | Ericsson LM | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175254 | |
S5‑175342 | Rel-13 CR 28.732 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175255 | |
S5‑175343 | Rel-14 CR 28.732 Update erroneous references | Ericsson LM | CR | Approval |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175256 | |
S5‑175344 | Draft TR 28.800 | Huawei | draft TR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| left for email approval | No | ||
S5‑175345 | pCR 28.800 Add skeleton for 5G management architecture aspects | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| withdrawn | Yes | ||
S5‑175346 | pCR 28.800 Management architecture relation between the non-5G NE management functions and the 5G NE management functions | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑175481 | S5‑175127 |
S5‑175347 | pCR 28 800 Management architecture relation between Service management functions and slicing management functions | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| withdrawn | Yes | ||
S5‑175348 | LSOut reply to NGMN cc SA5 on lifecycle management for 3GPP service based architecture | ETSI ISG NFV | LS in | discussion |
6.1OAM&P Plenary
| Yes |
Yes
| withdrawn | Yes | ||
S5‑175349 | Time Plan for OAM&P | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| Yes |
Yes
| noted | No | S5‑175004 | |
S5‑175350 | pCR 28.800 Management architecture relation between slicing management functions and 5G NE management functions | Huawei, CATR, China Unicom | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| withdrawn | Yes | ||
S5‑175351 | LS to SA5 on NGMN Paper on 5G End-to-End Architecture Framework | NGMN | LS in | Information |
5.3Liaison statements at SA5 level
| Yes |
Yes
| replied to | No | ||
S5‑175352 | Rel-14 CR 32.103 Update erroneous references | Ericsson LM | CR | Agreement |
6.3OAM&P Maintenance and Rel-15 small Enhancements
| Yes |
Yes
| agreed | No | S5‑175249 | |
S5‑175353 | pCR 28.800 Management architecture relation between slicing management functions and NFV-MANO | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑175483 | S5‑175130 |
S5‑175354 | pCR 28 800 Management Architecture for Multiple Operators communication | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑175131 | |
S5‑175355 | pCR 28.802 add an UC for collecting performance measurements | Intel | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| No |
Yes
| withdrawn | Yes | ||
S5‑175356 | Reply to: Resubmitted LS from RAN2 to SA5 on supported features by 5GC for E-UTRA connected to 5G CN | Nokia | LS out | approval |
5.3Liaison statements at SA5 level
| Yes |
Yes
| revised | No | S5‑175495 | |
S5‑175357 | Time management proposals | Huawei | other | discussion |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | ||
S5‑175358 | Additional meeting time considerations | WG Chair | other | discussion |
5.1Administrative issues at SA5 level
| Yes |
Yes
| noted | No | S5‑175325 | |
S5‑175359 | pCR TS 28.304 Update on Architecture and Clause 6 actor roles, telecom resources and use cases | ORANGE | pCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑175075 | |
S5‑175360 | pCR TS 28.305 Information Model for solution 1 | ORANGE | pCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑175076 | |
S5‑175361 | Draft CR 28.622 Add PEE attribute to IOC ManagedFunction | ORANGE | draftCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑175135 | |
S5‑175362 | Draft CR 32.425 Add PEE measurements for E-UTRAN | ORANGE | draftCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑175137 | |
S5‑175363 | pCR TS 28.305 Information Model for solution 2 | ORANGE | pCR | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| Yes |
Yes
| approved | No | S5‑175138 | |
S5‑175364 | pCR 28.802 add an UC for detecting faults | Intel | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| No |
Yes
| withdrawn | Yes | ||
S5‑175365 | NR NRM Requirements | Ericsson LM | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175068 | |
S5‑175366 | TR 28.802 Add potential solution for NR NRM | Ericsson LM | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| No |
Yes
| withdrawn | Yes | ||
S5‑175367 | Breakout session for way forward for 5G network management architecture | Huawei | report | Information |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| noted | No | ||
S5‑175368 | Rel-15 pCR 28.802 Add potential NRM solution for gNB with functional split | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175205 | |
S5‑175369 | Rel-15 pCR 28.802 Add potential solution for NR performance management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175206 | |
S5‑175370 | Rel-15 pCR 28.802 Add potential solution for NR fault management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175207 | |
S5‑175371 | Rel-15 pCR 28.802 Add conclusion and Recommendations for NR management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175275 | |
S5‑175372 | Rel-15 pCR 28.802 Add use cases to support management for ng-eNB connected to 5GC and EPC simultaneously | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175204 | |
S5‑175373 | Rel-15 pCR 28.802 Add potential solutions for ng-eNB management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175208 | |
S5‑175374 | Rel-15 pCR 28.802 Add conclusion and Recommendations for 5GC management | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175274 | |
S5‑175375 | Rel-15 pCR 28.802 Add use cases to support trace management in 5GS | Nokia, Nokia Shanghai Bell | pCR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| Yes |
Yes
| approved | No | S5‑175276 | |
S5‑175376 | pCR 28.530 text proposal for background and concepts | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175476 | S5‑175226 |
S5‑175377 | pCR 28.530 Add concept and use case of communication services using network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175093 | |
S5‑175378 | pCR 28.530 Add concept and use case of V2X services using network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| withdrawn | Yes | ||
S5‑175379 | pCR 28.530 Add business level use cases of providing communication services with massive IoT connections using network slice | Huawei, CATT, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| withdrawn | Yes | ||
S5‑175380 | pCR 28.530 Add concept of services using network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175397 | S5‑175095 |
S5‑175381 | pCR 28.530 Add managed network slice concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175096 | |
S5‑175382 | pCR 28.404 Add use case and requirement for QoE collection | Huawei | pCR | Approval |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| noted | No | S5‑175091 | |
S5‑175383 | Rel-15 pCR TR 32.899 Topic 5.9 for HPLMN in roaming and non Roaming | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | ||
S5‑175384 | Rel-15 pCR TR 32.899 registration topic in a new chapter | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175149 | |
S5‑175385 | Rel-15 pCR 32.899 Charging procedure for UE Served by Multiple NSIs | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175087 | |
S5‑175386 | pCR 32.899 Solution to key issue #4.2 Network slicing | Ericsson LM | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175227 | |
S5‑175387 | pCR 32.899 Solution to key issue #7.1 Service based architecture | Ericsson LM | pCR | Agreement |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| Yes |
Yes
| approved | No | S5‑175225 | |
S5‑175388 | Draft TR 32.899 | Huawei | draft TR | Approval |
7.5.3Study on Charging Aspects of 5G System Architecture Phase 1
| No |
Yes
| left for email approval | No | ||
S5‑175389 | pCR 32.848 Scope enhancement | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | S5‑175063 | |
S5‑175390 | pCR 32.848 Potential requirements | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | S5‑175064 | |
S5‑175391 | pCR 32.848 Charging architecture | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | S5‑175065 | |
S5‑175392 | pCR 32.848 Key Issue Support of the end user identifier | China Mobile (Suzhou) Software | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | S5‑175066 | |
S5‑175393 | Rel-15 pCR 32.848 Charging for support of CAT | HUAWEI TECHNOLOGIES Co. Ltd. | pCR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| Yes |
Yes
| approved | No | S5‑175077 | |
S5‑175394 | Draft TR 32.848 | China Mobile | draft TR | Approval |
7.5.4Study on Volume Based Charging Aspects for VoLTE
| No |
Yes
| left for email approval | No | ||
S5‑175395 | Rel-15 pCR TR 32.870 Elaborate Solution 1 | Nokia, Nokia Shanghai Bell | pCR | Approval |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| Yes |
Yes
| approved | No | S5‑175288 | |
S5‑175396 | TR 32.870 | Nokia, Nokia Shanghai Bell | draft TR | discussion |
7.5.2Study on forward compatibility for 3GPP Diameter Charging Applications
| No |
Yes
| left for email approval | No | ||
S5‑175397 | pCR 28.530 Add concept of services using network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175380 | |
S5‑175398 | R15 pCR 28.307-000 Introduction and scope for QoE IRP requirements | Ericsson | pCR | - |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | S5‑175198 | |
S5‑175399 | R15 pCR 28.307-000 Introduction of specification level use cases and requirements for QoE IRP requirements | Ericsson | pCR | - |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | S5‑175200 | |
S5‑175400 | R15 pCR 28.308-000 Introduction and scope for QoE IRP Inormation Service | Ericsson | pCR | - |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | S5‑175201 | |
S5‑175401 | Draft TS 28.308 | Ericsson | draft TS | Approval |
6.4.2Management of QoE measurement collection
| No |
Yes
| left for email approval | No | ||
S5‑175402 | Rel-15 pCR 28.308 Information Object Classes and Interface Definition for QoE IRP | Ericsson | pCR | Approval |
6.4.2Management of QoE measurement collection
| Yes |
Yes
| approved | No | S5‑175161 | |
S5‑175403 | pCR 28.530 Add managed network slice subnet concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175436 | S5‑175097 |
S5‑175404 | pCR 28.530 Add definition for managed network slice template | Huawei, China Telecom, CATT, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175437 | S5‑175098 |
S5‑175405 | pCR 28.530 Add network slice management related roles description | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175467 | S5‑175099 |
S5‑175406 | Reply to: Resubmitted LS from GSMA cc SA5 on Network Slicing initiative | Ericsson | LS out | approval |
5.3Liaison statements at SA5 level
| Yes |
Yes
| revised | No | S5‑175493 | |
S5‑175407 | Reply to: Resubmitted LS from MEF Forum to SA5 on MEF Forum Work on 5G | Ericsson | LS out | approval |
5.3Liaison statements at SA5 level
| Yes |
Yes
| noted | No | ||
S5‑175408 | Reply to: LS to SA5 on NGMN Paper on 5G End-to-End Architecture Framework | Ericsson | LS out | approval |
5.3Liaison statements at SA5 level
| Yes |
Yes
| revised | No | S5‑175494 | |
S5‑175409 | pCR 28.530 Add high level service requirements | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175438 | S5‑175101 |
S5‑175410 | pCR 28.530 Add concept of use of the non-3GPP parts for a slice | Huawei, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175102 | |
S5‑175411 | pCR 28.530 Clarify Communication Service Instance Lifecycle | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175103 | |
S5‑175412 | pCR 28.530 Add different types of services using network slice concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175439 | S5‑175104 |
S5‑175413 | pCR 28.530 Add SON concept in network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175475 | S5‑175110 |
S5‑175414 | pCR TS 28.530 Network Slicing management framework principles | NTT DOCOMO | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175488 | S5‑175217 |
S5‑175415 | 5G network slicing management architecture framework principles | NTT DOCOMO | discussion | Endorsement |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| endorsed | No | S5‑175216 | |
S5‑175416 | pCR 28.530 Add business level general requirements | Huawei, China Telecom, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175473 | S5‑175106 |
S5‑175417 | pCR 28.530 Overview of use cases and requirements for management of network slicing | Ericsson Limited | discussion | Endorsement |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| withdrawn | Yes | ||
S5‑175418 | pCR Rel-15 TS 28530 Slice management model Requirements | Ericsson Inc. | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | S5‑175151 | |
S5‑175419 | pCR 28.530 Add concept and use case of MEC | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| withdrawn | Yes | ||
S5‑175420 | pCR 28.530 Use case and requirements for create a network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175477 | S5‑175230 |
S5‑175421 | pCR 28.530 Use case and requirements for create a network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175478 | S5‑175233 |
S5‑175422 | pCR 28.530 Add business level requirements and use case of the exposure of management functions and management data for network slice as a service case | Huawei, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | S5‑175108 | |
S5‑175423 | pCR 28.531 Adding new skeleton clauses | Huawei, Nokia | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| approved | No | S5‑175115 | |
S5‑175424 | pCR 28.531 Adding use case of utilizing network slice instance for communication service | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| No |
Yes
| withdrawn | Yes | ||
S5‑175425 | pCR 28.531 Adding use case of network slice instance creation | Huawei, CATT, China Unicom | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| approved | No | S5‑175119 | |
S5‑175426 | pCR 28.531 Adding use case of network slice subnet instance creation | Huawei | pCR | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| Yes |
Yes
| approved | No | S5‑175120 | |
S5‑175427 | SA5 Meeting Calendar | WG Chairman | other | - |
5.4SA5 meeting calendar
| No |
Yes
| noted | No | S5‑175010 | |
S5‑175428 | Rel-15 CR 28.627 Add SON for AAS management requirements | Nokia Shanghai Bell | CR | Agreement |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| agreed | No | S5‑175192 | |
S5‑175429 | Rel-15 CR 28.628 Add SON for AAS management description and attributes | Nokia Shanghai Bell | CR | Agreement |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| revised | No | S5‑175440 | S5‑175193 |
S5‑175430 | Rel-15 CR 28.658 Add attribute of E-UTRAN cell IOC to support SON for AAS management requirements | Nokia Shanghai Bell | CR | Agreement |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| agreed | No | S5‑175199 | |
S5‑175431 | pCR TR 32.880 Conclusionfor TR32.880 | China Mobile | pCR | Approval |
6.5.1Study on Implementation for the Partitioning of Itf-N
| Yes |
Yes
| approved | No | S5‑175183 | |
S5‑175432 | Draft TR 32.857 | Cisco | draft TR | Approval |
6.5.4Study on Management aspects of selected IoT-related features
| No |
Yes
| left for email approval | No | ||
S5‑175433 | Draft TR 32.866 | Nokia | draft TR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| No |
Yes
| left for email approval | No | ||
S5‑175434 | pCR 32.866 Add Recommendations | Nokia Corporation | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| approved | No | S5‑175267 | |
S5‑175435 | Revised WID on Management of Network Slicing in Mobile networks | Ericsson | WID revised | Agreement |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| agreed | No | ||
S5‑175436 | pCR 28.530 Add managed network slice subnet concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175403 | |
S5‑175437 | pCR 28.530 Add definition for managed network slice template | Huawei, China Telecom, CATT, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175404 | |
S5‑175438 | pCR 28.530 Add high level service requirements | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175409 | |
S5‑175439 | pCR 28.530 Add different types of services using network slice concept | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175412 | |
S5‑175440 | Rel-15 CR 28.628 Add SON for AAS management description and attributes | Nokia Shanghai Bell | CR | Agreement |
6.4.5Self-Organizing Networks (SON) for Active Antenna System (AAS) deployment management
| Yes |
Yes
| agreed | No | S5‑175429 | |
S5‑175441 | pCR TR 32.864 Add UC on providing location information of non-virtualized part of gNB | Intel Finland Oy | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175165 | |
S5‑175442 | pCR TR 32.864 Add potential solution for providing location of non-virtualized part of gNB to NFVO | Intel Finland Oy | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175166 | |
S5‑175443 | pCR 32.864 editor note cleanup | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175174 | |
S5‑175444 | pCR 32.864 add a UC for connecting gNB-CU to 5GC nodes | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175175 | |
S5‑175445 | pCR 32.864 alternative solution for transport network requirements update | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175176 | |
S5‑175446 | pCR 32.864 Add potential solution for adding VNFFGD and adding VNFFGs for the gNB | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175177 | |
S5‑175447 | pCR 32.864 add gap related to adding VNFFG | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175178 | |
S5‑175448 | pCR 32.864 revised conclusion | Intel | pCR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| Yes |
Yes
| approved | No | S5‑175179 | |
S5‑175449 | Draft TR 32.867 | Huawei | draft TR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| No |
Yes
| left for email approval | No | ||
S5‑175450 | Rel-15 pCR 32.867 Add use cases and requirements for configuration management for S/P-GW with CUPS | Nokia Shanghai Bell | pCR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| approved | No | S5‑175203 | |
S5‑175451 | pCR 32.867 Add recommendations | Huawei | pCR | Approval |
6.5.7Study on Management Enhancement of CUPS of EPC Nodes
| Yes |
Yes
| approved | No | S5‑175133 | |
S5‑175452 | Draft TR 32.972 | ORANGE | draft TR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| No |
Yes
| left for email approval | No | ||
S5‑175453 | pCR TR 32.972 – Introduction and Scope | ORANGE | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| Yes |
Yes
| approved | No | S5‑175073 | |
S5‑175454 | pCR TR 32.972 About power consumption of network elements and functions | ORANGE | pCR | Approval |
6.5.10Study on system and functional aspects of Energy Efficiency in 5G networks
| No |
Yes
| left for email approval | No | S5‑175191 | |
S5‑175455 | pCR TR 32.868 Add UC on configuration of mobility set for LWA | Intel Finland Oy | pCR | Approval |
6.5.8Study on OAM aspects of LTE and WLAN integration
| Yes |
Yes
| approved | No | S5‑175168 | |
S5‑175456 | Draft TR 32.868 | Intel | draft TR | Approval |
6.5.8Study on OAM aspects of LTE and WLAN integration
| No |
Yes
| left for email approval | No | ||
S5‑175457 | pCR TR 32.871 The alignment of NFV policy terms and concept definition with ETSI MANO policy study | China Mobile Com. Corporation | pCR | Approval |
6.5.9Study on network policy management for mobile networks based on NFV scenarios
| Yes |
Yes
| approved | No | S5‑175139 | |
S5‑175458 | Draft TR 32.871 | China Mobile | draft TR | Approval |
6.5.9Study on network policy management for mobile networks based on NFV scenarios
| No |
Yes
| left for email approval | No | ||
S5‑175459 | Structure of 5G specifications | WG Vice Chair (Huawei) | discussion | Endorsement |
6.1OAM&P Plenary
| Yes |
Yes
| endorsed | No | ||
S5‑175460 | pCR 32.866 Alternative solutions for filtering and scoping using hyperlinks | Ericsson Limited | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| Yes |
Yes
| revised | No | S5‑175485 | S5‑175221 |
S5‑175461 | Reply to: Resubmitted LS from SA2 to SA5 on EUTRAN sharing enhancement | Ericsson | LS out | approval |
6.1OAM&P Plenary
| Yes |
Yes
| approved | No | ||
S5‑175462 | Organization of future 5G WIDs | WG Vice Chair (Huawei) | discussion | Endorsement |
6.2New OAM&P Work Item proposals
| No |
Yes
| left for email approval | No | S5‑175090 | |
S5‑175463 | New WID on Management of NG-RAN that includes virtualized network functions | Intel | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑175327 | |
S5‑175464 | New WID on management data definitions for 5G network functions | Nokia Shanghai Bell | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑175329 | |
S5‑175465 | New WID on Performance Assurance for Network Slicing | China Mobile,Intel | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| revised | No | S5‑175487 | S5‑175326 |
S5‑175466 | New WID on Fault management of network slicing for 5G networks | ZTE Corporation | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑175328 | |
S5‑175467 | pCR 28.530 Add network slice management related roles description | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| revised | No | S5‑175472 | S5‑175405 |
S5‑175468 | Draft TS 28.304 | ORANGE | draft TS | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| No |
Yes
| left for email approval | No | ||
S5‑175469 | Draft TS 28.305 | ORANGE | draft TS | Approval |
6.4.1Control and monitoring of Power, Energy and Environmental (PEE) parameters in Radio Access Networks (RAN)
| No |
Yes
| left for email approval | No | ||
S5‑175470 | Draft TS 28.307 | Ericsson | draft TS | Approval |
6.4.2Management of QoE measurement collection
| No |
Yes
| left for email approval | No | ||
S5‑175471 | Draft TS 28.530 | Ericsson | draft TS | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| left for email approval | No | ||
S5‑175472 | pCR 28.530 Add network slice management related roles description | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175467 | |
S5‑175473 | pCR 28.530 Add business level general requirements | Huawei, China Telecom, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175416 | |
S5‑175474 | pCR 28.530 Add business level requirements and use case of the exposure of management functions and management data for network slice as a service case | Huawei, China Unicom | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| withdrawn | Yes | ||
S5‑175475 | pCR 28.530 Add SON concept in network slicing | Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| noted | No | S5‑175413 | |
S5‑175476 | pCR 28.530 text proposal for background and concepts | Ericsson Limited,Huawei | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175376 | |
S5‑175477 | pCR 28.530 Use case and requirements for create a network slice instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175420 | |
S5‑175478 | pCR 28.530 Use case and requirements for create a network slice subnet instance | Ericsson Limited | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| Yes |
Yes
| approved | No | S5‑175421 | |
S5‑175479 | Draft TS 28.531 | Huawei | draft TS | Approval |
6.4.4Provisioning of network slicing for 5G networks and services
| No |
Yes
| left for email approval | No | ||
S5‑175480 | Draft TR 32.880 | China Mobile | draft TR | Approval |
6.5.1Study on Implementation for the Partitioning of Itf-N
| No |
Yes
| left for email approval | No | ||
S5‑175481 | pCR 28.800 Add Management architecture option | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| approved | No | S5‑175346 | |
S5‑175482 | Draft TR 28.800 | Huawei | draft TR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| No |
Yes
| left for email approval | No | ||
S5‑175483 | pCR 28.800 Management architecture relation between slicing management functions and NFV-MANO | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| revised | No | S5‑175489 | S5‑175353 |
S5‑175484 | Draft TR 28.802 | Nokia | draft TR | Approval |
6.5.3Study on management aspects of next generation network architecture and features
| No |
Yes
| left for email approval | No | ||
S5‑175485 | pCR 32.866 Alternative solutions for filtering and scoping using hyperlinks | Ericsson Limited | pCR | Approval |
6.5.5Study on a RESTful HTTP-based Solution Set
| No |
Yes
| left for email approval | No | S5‑175460 | |
S5‑175486 | Draft TR 32.864 | Intel | draft TR | Approval |
6.5.6Study on management aspects of virtualized network functions that are part of the NR
| No |
Yes
| left for email approval | No | ||
S5‑175487 | New WID on Performance Assurance for Network Slicing | China Mobile,Intel | WID new | Agreement |
6.2New OAM&P Work Item proposals
| Yes |
Yes
| agreed | No | S5‑175465 | |
S5‑175488 | pCR TS 28.530 Network Slicing management framework principles | NTT DOCOMO | pCR | Approval |
6.4.3Management of Network Slicing in Mobile Networks, Concepts, Use cases and Requirements
| No |
Yes
| left for email approval | No | S5‑175414 | |
S5‑175489 | pCR 28.800 Management architecture relation between slicing management functions and NFV-MANO | Huawei | pCR | Approval |
6.5.2Study on Management and Orchestration Architecture of Next Generation Network and Service
| Yes |
Yes
| left for email approval | No | S5‑175483 | |
S5‑175490 | OAM&P SWG action list | WG Vice Chair (Huawei) | other | - |
6.1OAM&P Plenary
| No |
Yes
| left for email approval | No | S5‑175025 | |
S5‑175491 | OAM Executive Report | WG Vice Chair (Huawei) | report | - |
6.1OAM&P Plenary
| No |
No
| reserved | No | S5‑175005 | |
S5‑175492 | New WID on Charging for WLAN-based Prose Direct Discovery | Intel Corporation | WID new | Agreement |
7.2New Charging Work Item proposals
| No |
Yes
| withdrawn | Yes | ||
S5‑175493 | Reply to: Resubmitted LS from GSMA cc SA5 on Network Slicing initiative | Ericsson | LS out | approval |
5.3Liaison statements at SA5 level
| No |
Yes
| left for email approval | No | S5‑175406 | |
S5‑175494 | Reply to: LS to SA5 on NGMN Paper on 5G End-to-End Architecture Framework | Ericsson | LS out | approval |
5.3Liaison statements at SA5 level
| No |
Yes
| left for email approval | No | S5‑175408 | |
S5‑175495 | Reply to: Resubmitted LS from RAN2 to SA5 on supported features by 5GC for E-UTRA connected to 5G CN | Nokia | LS out | approval |
5.3Liaison statements at SA5 level
| Yes |
Yes
| approved | No | S5‑175356 |