Agenda with allocated Tdocs
Created: 2015-11-20 12:28 Last document: S5-156415
Agenda | Topic | Tdoc | Title | Source | Doc-type | Doc-for | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 |
Opening of the meeting |
|||||||||||
2 |
Approval of the agenda |
S5-156000 | Agenda | WG Chairman | agenda | Yes | Yes | approved | No | |||
3 |
IPR declaration |
S5-156040 | IPR and legal declaration | WG Chairman | other | Yes | Yes | noted | No | |||
4 |
Meetings and activities reports |
|||||||||||
4.1 |
Last SA5 meeting report |
S5-156001 | Report from last SA5 meeting | ETSI Secretariat | report | Yes | Yes | approved | No | |||
4.2 |
Last SA meeting report |
S5-156002 | SA5 status report at last SA meeting | WG Chairman | report | Yes | Yes | noted | No | |||
S5-156003 | SA5 results at last SA meeting | WG Chairman | report | Yes | Yes | noted | No | |||||
4.3 |
Inter-organizational reports |
S5-156237 | Minutes of methodology coordination meeting with ITU-T SG2 | WG Chairman | report | discussion | Yes | Yes | noted | No | ||
S5-156268 | Report from World Expo Milan 2015 LSA | WG Chairman | report | discussion | Yes | Yes | noted | No | ||||
5 |
Cross-SWG issues |
|||||||||||
5.1 |
Administrative issues at SA5 level |
S5-156007 | Leaders meeting agenda | WG Chairman | agenda | Yes | Yes | noted | No | |||
S5-156008 | Leaders meeting minutes | WG Chairman | report | Yes | Yes | noted | No | |||||
S5-156014 | SA5 Working Procedures | WG Vice Chair | other | Yes | Yes | noted | No | |||||
S5-156015 | SA5 Meeting Facility Requirements | WG Vice Chair | other | Yes | Yes | noted | No | |||||
S5-156016 | Process for management of draft TSs/TRs | Ericsson LM | other | Yes | Yes | noted | No | |||||
S5-156017 | CR Quality Check | ETSI Secretariat | other | Yes | Yes | noted | No | |||||
S5-156021 | List of Rapporteurs | ETSI Secretariat | other | Yes | Yes | noted | No | |||||
S5-156042 | Status of email approvals | WG Chairman | other | No | Yes | noted | No | |||||
5.2 |
Technical issues at SA5 level |
S5-156415 | List of specs to be upgraded to Rel-13 | MCC | other | discussion | No | Yes | noted | No | ||
5.3 |
Liaison statements at SA5 level |
S5-156156 | LS from ETSI NTECH to SA5 on Call for Proof of Concept demonstrations on autonomic networking | ETSI NTECH | LS in | Information | Yes | Yes | noted | No | ||
5.4 |
SA5 meeting calendar |
S5-156013 | SA5 Meeting Calendar | WG Chairman | other | Yes | Yes | noted | No | |||
5.5 |
Review of the Work Plan |
S5-156018 | Deliverables due for the NEXT SA Plenary | ETSI Secretariat | other | Yes | Yes | noted | No | |||
S5-156019 | Collection of ongoing SA5 WIDs | WG Vice Chairman | other | Yes | Yes | noted | No | |||||
S5-156020 | SA5 3GPP Work Plan | ETSI Secretariat | other | Yes | Yes | noted | No | |||||
6 |
OAM&P |
|||||||||||
6.1 |
OAM&P Plenary |
S5-156004 | Time Plan for OAM&P and Converged Management SWGs | WG Chairman | other | Yes | Yes | revised | No | S5-156308 | ||
S5-156308 | Time Plan for OAM&P and Converged Management SWGs | WG Chairman | other | - | No | Yes | noted | No | S5-156004 | |||
S5-156005 | OAM Executive Report from THIS Meeting | OAM SWG Chair | report | Yes | Yes | noted | No | |||||
S5-156049 | Resubmitted LS from RAN3 to SA5 on SON for AAS | R3-151315 | LS in | Yes | Yes | replied to | No | |||||
S5-156083 | LS reply on SON for AAS | Nokia Networks | LS out | Decision | Yes | Yes | revised | No | S5-156354 | |||
S5-156354 | LS reply on SON for AAS | Nokia Networks | LS out | Decision | Yes | Yes | approved | No | S5-156083 | |||
S5-156232 | OAM&P SWG action list | Huawei Tech.(UK) Co., Ltd | other | Information | Yes | Yes | revised | No | S5-156240 | |||
S5-156240 | OAM&P SWG action list | Huawei Tech.(UK) Co., Ltd | other | Information | Yes | Yes | noted | No | S5-156232 | |||
S5-156307 | Minutes of OAM&P Plenary | WG Vice Chair (Orange) | report | discussion | Yes | Yes | noted | No | ||||
6.2 |
New Work Item proposals - OAM&P & Converged Management |
S5-156022 | Minutes of New Work Item proposals - OAM&P & Converged Management | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156081 | Discussion paper on OAM aspects of SON for AAS | Nokia Networks | discussion | Discussion | Yes | Yes | noted | No | ||||
S5-156082 | New WID on OAM aspects of SON for AAS | Nokia Networks | WID new | Decision | Yes | Yes | revised | No | S5-156241 | |||
S5-156241 | New SID on OAM aspects of SON for AAS | Nokia Networks | SID new | Decision | Yes | Yes | revised | No | S5-156379 | S5-156082 | ||
S5-156379 | New SID on OAM aspects of SON for AAS | Nokia Networks | SID new | Decision | Yes | Yes | agreed | No | S5-156241 | |||
S5-156235 | New WID Study on Implementation for the Partitioning of Itf-N | China Mobile | WID new | Approval | Yes | Yes | noted | No | ||||
S5-156381 | New WID Study on Implementation for the Partitioning of Itf-N | China Mobile | WID new | Approval | No | No | withdrawn | Yes | ||||
6.3 |
Maintenance and Rel-13 small Enhancements - OAM&P & Converged Management |
S5-156023 | Minutes of Maintenance and Rel-13 small Enhancements - OAM&P & Converged Management | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156079 | Add missing Id attribute for 28.622 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156245 | ||||
S5-156245 | Add missing Id attribute for 28.622 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156079 | |||
S5-156080 | Add missing Id attribute for 28.622 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156246 | ||||
S5-156246 | Add missing Id attribute for 28.622 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156080 | |||
S5-156085 | CR R11 28.663-b20 Make the XML schema well formed | Ericsson | draftCR | Agreement | No | Yes | withdrawn | Yes | ||||
S5-156086 | Add missing Id attribute for 28.623 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | agreed | No | |||||
S5-156087 | Add missing Id attribute for 28.623 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156191 | ||||
S5-156092 | CR R11 28.663-b20 Make the XML schema well formed | Ericsson LM | CR | Yes | Yes | agreed | No | |||||
S5-156093 | CR R12 28.663-c00 Make the XML schema well formed | Ericsson | CR | Agreement | Yes | Yes | agreed | No | ||||
S5-156108 | Correction of Requirement GN-CON-4 | Ericsson Inc. | CR | Approval | Yes | Yes | revised | No | S5-156255 | |||
S5-156255 | Correction of Requirement GN-CON-4 | Ericsson Inc. | CR | Approval | Yes | Yes | agreed | No | S5-156108 | |||
S5-156110 | Add missing Id attribute for 28.622 | Nanjing Ericsson Panda Com Ltd | CR | No | Yes | withdrawn | Yes | |||||
S5-156111 | Align id attribute definitions for 28.652 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156247 | ||||
S5-156247 | Align id attribute definitions for 28.652 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156111 | |||
S5-156112 | Align id attribute definitions for 28.652 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156248 | ||||
S5-156248 | Align id attribute definitions for 28.652 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156112 | |||
S5-156113 | Align id attribute definitions for 28.653 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | agreed | No | |||||
S5-156114 | Align id attribute definitions for 28.653 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | agreed | No | |||||
S5-156115 | Align id attribute definitions for 28.658 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156249 | ||||
S5-156249 | Align id attribute definitions for 28.658 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156115 | |||
S5-156116 | Align id attribute definitions for 28.658 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156250 | ||||
S5-156250 | Align id attribute definitions for 28.658 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156116 | |||
S5-156117 | Align id attribute definitions for 28.659 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156251 | ||||
S5-156251 | Align id attribute definitions for 28.659 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156117 | |||
S5-156118 | Align id attribute definitions for 28.659 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156252 | ||||
S5-156252 | Align id attribute definitions for 28.659 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156118 | |||
S5-156119 | Align id attribute definitions for 28.659 | Nanjing Ericsson Panda Com Ltd | CR | No | Yes | withdrawn | Yes | |||||
S5-156120 | Align id attribute definitions for 28.629 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156253 | ||||
S5-156253 | Align id attribute definitions for 28.629 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156120 | |||
S5-156121 | Align id attribute definitions for 28.629 | Nanjing Ericsson Panda Com Ltd | CR | No | Yes | withdrawn | Yes | |||||
S5-156122 | Align id attribute definitions for 28.629 | Nanjing Ericsson Panda Com Ltd | CR | No | Yes | withdrawn | Yes | |||||
S5-156123 | Align id attribute definitions for 28.629 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | revised | No | S5-156254 | ||||
S5-156254 | Align id attribute definitions for 28.629 | Nanjing Ericsson Panda Com Ltd | CR | - | Yes | Yes | agreed | No | S5-156123 | |||
S5-156124 | Align id attribute definitions for 28.629 | Nanjing Ericsson Panda Com Ltd | CR | No | Yes | withdrawn | Yes | |||||
S5-156166 | Rel-13 CR TR 32.842 Editorial cleanup on references | Huawei Tech.(UK) Co., Ltd | CR | Decision | Yes | Yes | revised | No | S5-156219 | |||
S5-156191 | Add missing Id attribute for 28.623 | Nanjing Ericsson Panda Com Ltd | CR | Yes | Yes | agreed | No | S5-156087 | ||||
S5-156219 | Rel-13 CR TR 32.842 Editorial cleanup on references | Huawei Tech.(UK) Co., Ltd | CR | Decision | Yes | Yes | agreed | No | S5-156166 | |||
6.4 |
Rel-13 Operations, Administration, Maintenance and Provisioning (OAM&P) |
|||||||||||
6.4.1 |
Enhanced Network Management (NM) centralized Coverage and Capacity Optimization |
S5-156035 | Minutes for Enhanced Network Management (NM) centralized Coverage and Capacity Optimization | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156094 | Finishing NM based CCO | Ericsson | other | Approval | Yes | Yes | endorsed | No | ||||
6.4.2 |
WLAN Management |
|||||||||||
6.4.2.1 |
WLAN Network Resource Model for Type-2 interface |
S5-156026 | Minutes for WLAN Network Resource Model for Type-2 interface | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156095 | pCR TS 28.682 WLAN NRM IS clarification | Intel Corporation (UK) Ltd | pCR | Approval | Yes | Yes | revised | No | S5-156256 | |||
S5-156256 | pCR TS 28.682 WLAN NRM IS clarification | Intel Corporation (UK) Ltd | pCR | Approval | Yes | Yes | approved | No | S5-156095 | |||
S5-156100 | pCR TS 28.683 WLAN NRM Solution Sets | Intel Corporation (UK) Ltd | pCR | Approval | Yes | Yes | revised | No | S5-156257 | |||
S5-156257 | pCR TS 28.683 WLAN NRM Solution Sets | Intel Corporation (UK) Ltd,Ericsson | pCR | Approval | Yes | Yes | revised | No | S5-156383 | S5-156100 | ||
S5-156383 | pCR TS 28.683 WLAN NRM Solution Sets | Intel Corporation (UK) Ltd, Nokia Networks,Ericsson | pCR | Approval | Yes | Yes | revised | No | S5-156357 | S5-156257 | ||
S5-156357 | pCR TS 28.683 WLAN NRM Solution Sets | Intel Corporation (UK) Ltd, Nokia Networks,Ericsson | pCR | Approval | Yes | Yes | approved | No | S5-156383 | |||
S5-156168 | Draft TS 28.681-010 Draft-clean_edithelp | Intel Corporation (UK) Ltd | draft TS | Information | Yes | Yes | noted | No | ||||
S5-156171 | Dradt TS 28682-110-clean_edithelp | Intel Corporation (UK) Ltd | draft TS | Information | Yes | Yes | noted | No | ||||
S5-156258 | Cover sheet TS 28.680 | Rapporteur (Intel) | TS or TR cover | discussion | Yes | Yes | approved | No | ||||
S5-156259 | Cover sheet TS 28.681 | Rapporteur (Intel) | TS or TR cover | discussion | Yes | Yes | revised | No | S5-156384 | |||
S5-156384 | Cover sheet TS 28.681 | Rapporteur (Intel) | TS or TR cover | discussion | Yes | Yes | approved | No | S5-156259 | |||
S5-156260 | Cover sheet TS 28.682 | Rapporteur (Intel) | TS or TR cover | discussion | Yes | Yes | revised | No | S5-156385 | |||
S5-156385 | Cover sheet TS 28.682 | Rapporteur (Intel) | TS or TR cover | discussion | Yes | Yes | approved | No | S5-156260 | |||
S5-156261 | Cover sheet TS 28.683 | Rapporteur (Intel) | TS or TR cover | discussion | Yes | Yes | revised | No | S5-156386 | |||
S5-156386 | Cover sheet TS 28.683 | Rapporteur (Intel) | TS or TR cover | discussion | Yes | Yes | approved | No | S5-156261 | |||
S5-156303 | MCC revision of TS 28.680 | MCC | draft TS | discussion | Yes | Yes | approved | No | ||||
S5-156304 | Rel-13 pCR 28.680 addressing MCC review comments | Orange | pCR | discussion | Yes | Yes | approved | No | ||||
S5-156312 | pCR TS 28.681 addressing MCC comments | Orange | pCR | discussion | Yes | Yes | approved | No | ||||
S5-156313 | pCR TS 28.682 addressing MCC comments | Orange | pCR | discussion | Yes | Yes | approved | No | ||||
S5-156387 | Latest draft TS 28.680 | Rapporteur (Intel) | draft TS | discussion | No | Yes | left for email approval | No | ||||
S5-156388 | Latest draft TS 28.681 | Rapporteur (Intel) | draft TS | discussion | No | Yes | left for email approval | No | ||||
S5-156389 | Latest draft TS 28.682 | Rapporteur (Intel) | draft TS | discussion | No | Yes | left for email approval | No | ||||
S5-156390 | Latest draft TS 28.683 | Rapporteur (Intel) | draft TS | discussion | No | Yes | left for email approval | No | ||||
6.4.2.2 |
WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface |
S5-156027 | Minutes for WLAN measurements defined in IEEE and IETF WLAN performance measurements for use on Type-2 interface | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156099 | Discussion paper of the format of WLAN performance measurements | Intel Corporation (UK) Ltd | pCR | Discussion | Yes | Yes | noted | No | ||||
S5-156172 | Draft TS 28403-110-clean_edithelp | Intel Corporation (UK) Ltd | draft TS | Information | Yes | Yes | noted | No | ||||
S5-156262 | Correction of WLAN PM formats | Intel | pCR | discussion | Yes | Yes | approved | No | ||||
S5-156263 | Rewording of scope | Rapporteur(Intel) | pCR | discussion | Yes | Yes | approved | No | ||||
S5-156264 | Cover sheet of TS 28.403 | Rapporteur(Intel) | TS or TR cover | discussion | Yes | Yes | revised | No | S5-156391 | |||
S5-156391 | Cover sheet of TS 28.403 | Rapporteur(Intel) | TS or TR cover | discussion | Yes | Yes | approved | No | S5-156264 | |||
S5-156392 | Last draft TS 28.403 | Rapporteur (Intel) | draft TS | discussion | No | Yes | left for email approval | No | ||||
6.4.3 |
Energy Efficiency related Performance Measurements |
S5-156025 | Minutes for Energy Efficiency related Performance Measurements | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156084 | Exception sheet for WI EE related performance measurements | Nokia Networks | WI exception request | Approval | Yes | Yes | approved | No | ||||
S5-156334 | Revised WID Energy Efficiency related Performance Measurements | Nokia Networks | WID revised | discussion | Yes | No | withdrawn | Yes | ||||
6.5 |
Rel-14 Operations, Administration, Maintenance and Provisioning (OAM&P) |
|||||||||||
6.5.1 |
Management of mobile networks that include virtualized network functions |
S5-156310 | Minutes of workshop preparation | Huawei | report | discussion | Yes | Yes | noted | No | ||
S5-156311 | Slides for ETSI NFV workshop on modelling | Huawei | other | discussion | No | Yes | left for email approval | No | ||||
6.5.1.1 |
Management concept, architecture and requirements for mobile networks that include virtualized network functions |
S5-156028 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | Rapporteur | report | Yes | Yes | revised | No | S5-156393 | ||
S5-156393 | Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions | Rapporteur | report | - | Yes | Yes | noted | No | S5-156028 | |||
S5-156135 | dCR R14 32.101-c00 Introduction of VNF in mobile networks | Ericsson | draftCR | Yes | Yes | revised | No | S5-156266 | S5-155164 | |||
S5-156266 | dCR R14 32.101-c00 Introduction of VNF in mobile networks | Ericsson | draftCR | - | Yes | Yes | revised | No | S5-156394 | S5-156135 | ||
S5-156394 | dCR R14 32.101-c00 Introduction of VNF in mobile networks | Ericsson | draftCR | - | Yes | Yes | approved | No | S5-156266 | |||
S5-156141 | pCR Guideline for organization of NFV management work items | China Mobile Com. Corporation | pCR | Approval | Yes | Yes | revised | No | S5-156267 | |||
S5-156267 | pCR Guideline for organization of NFV management work items | China Mobile Com. Corporation | pCR | Approval | Yes | Yes | revised | No | S5-156314 | S5-156141 | ||
S5-156314 | Guideline for organization of NFV management work items | China Mobile Com. Corporation,Nokia Networks | discussion | Endorsement | Yes | Yes | revised | No | S5-156374 | S5-156267 | ||
S5-156374 | Guideline for organization of NFV management work items | China Mobile Com. Corporation,Nokia Networks | discussion | Endorsement | Yes | Yes | endorsed | No | S5-156314 | |||
S5-156142 | pCR TS 28.500 Adding general business level requirements | China Mobile Com. Corporation | pCR | Approval | Yes | Yes | revised | No | S5-156269 | |||
S5-156269 | pCR TS 28.500 Adding general business level requirements | China Mobile Com. Corporation | pCR | Approval | Yes | Yes | approved | No | S5-156142 | |||
S5-156143 | pCR TS 28.500 Adding business level FM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156270 | ||||
S5-156270 | pCR TS 28.500 Adding business level FM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | revised | No | S5-156395 | S5-156143 | ||
S5-156395 | pCR TS 28.500 Adding business level FM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156270 | |||
S5-156144 | pCR TS 28.500 Adding specification level FM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156271 | ||||
S5-156271 | pCR TS 28.500 Adding specification level FM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156144 | |||
S5-156145 | pCR TS 28.500 Adding business level CM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156272 | ||||
S5-156272 | pCR TS 28.500 Adding business level CM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | revised | No | S5-156396 | S5-156145 | ||
S5-156396 | pCR TS 28.500 Adding business level CM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156272 | |||
S5-156146 | pCR TS 28.500 Adding specification level CM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156315 | ||||
S5-156147 | pCR TS 28.500 Adding business level PM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156316 | ||||
S5-156316 | pCR TS 28.500 Adding business level PM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156147 | |||
S5-156148 | pCR TS 28.500 Adding specification level PM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156317 | ||||
S5-156317 | pCR TS 28.500 Adding specification level PM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156148 | |||
S5-156149 | pCR TS 28.500 Adding business level LCM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156318 | ||||
S5-156318 | pCR TS 28.500 Adding business level LCM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | revised | No | S5-156397 | S5-156149 | ||
S5-156397 | pCR TS 28.500 Adding business level LCM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156318 | |||
S5-156150 | pCR TS 28.500 Adding specification level LCM requirements | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156319 | ||||
S5-156319 | pCR TS 28.500 Adding specification level LCM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | noted | No | S5-156150 | |||
S5-156151 | pCR TS 28.500 Editorial change on terminology | China Mobile Com. Corporation | pCR | Yes | Yes | revised | No | S5-156320 | ||||
S5-156320 | pCR TS 28.500 Editorial change on terminology | China Mobile Com. Corporation | pCR | - | Yes | Yes | revised | No | S5-156398 | S5-156151 | ||
S5-156398 | pCR TS 28.500 Editorial change on terminology | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156320 | |||
S5-156157 | LS Response to 3GPP SA5 on guidelines for cooperation between 3GPP TSG SA WG5 and ETSI ISG NFV | ETSI ISG NFV | LS in | Yes | Yes | replied to | No | |||||
S5-156321 | Reply to: LS Response to 3GPP SA5 on guidelines for cooperation between 3GPP TSG SA WG5 and ETSI ISG NFV | Ericsson | LS out | approval | No | Yes | left for email approval | No | ||||
S5-156167 | pCR TS 28.500 Add concept information on Network Service | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156322 | |||
S5-156322 | pCR TS 28.500 Add concept information on Network Service | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | noted | No | S5-156167 | |||
S5-156169 | pCR TS 28.500 Add the relationship between VNF and NE | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156324 | |||
S5-156324 | pCR TS 28.500 Add the relationship between VNF and NE | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | noted | No | S5-156169 | |||
S5-156170 | pCR TS 28.500 Addition of business level requirements | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156325 | |||
S5-156325 | pCR TS 28.500 Addition of business level requirements | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | S5-156170 | |||
S5-156323 | LS on service definition | Huawei | LS out | discussion | Yes | Yes | revised | No | S5-156399 | |||
S5-156399 | LS on service definition | Huawei | LS out | discussion | Yes | Yes | approved | No | S5-156323 | |||
S5-156360 | LS to ETSI ISG NFV on modelling | Intel,Nokia Networks | LS out | Approval | No | Yes | left for email approval | No | ||||
S5-156400 | Last draft TS 28.500 | Rapporteur(China Mobile) | draft TS | discussion | No | Yes | left for email approval | No | ||||
6.5.1.2 |
Configuration Management for mobile networks that include virtualized network functions |
S5-156029 | Minutes for Configuration Management for mobile networks that include virtualized network functions | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156125 | pCR draft TS 28.510 Add use case VNF Configuration after VNF instantiation | ZTE Corporation | pCR | Yes | Yes | revised | No | S5-156326 | ||||
S5-156326 | pCR draft TS 28.510 Add use case VNF Configuration after VNF instantiation | ZTE Corporation | pCR | - | Yes | Yes | approved | No | S5-156125 | |||
S5-156126 | pCR draft TS 28.510 Add business level use case release the MOI(s) | ZTE Corporation | pCR | Yes | Yes | revised | No | S5-156330 | ||||
S5-156330 | pCR TS 28.510 Adding NE MO deletion use case | Huawei, ZTE | pCR | - | Yes | Yes | approved | No | S5-156126 | |||
S5-156127 | pCR draft TS 28.510 Add use case release the MOI(s) dedicated to manage a VNF instance | ZTE Corporation | pCR | Yes | Yes | revised | No | S5-156331 | ||||
S5-156331 | pCR draft TS 28.510 Add use case release the MOI(s) dedicated to manage a VNF instance | ZTE Corporation | pCR | - | Yes | Yes | revised | No | S5-156401 | S5-156127 | ||
S5-156401 | pCR draft TS 28.510 Add use case release the MOI(s) dedicated to manage a VNF instance | ZTE Corporation | pCR | - | Yes | Yes | approved | No | S5-156331 | |||
S5-156138 | pCR draft TS 28.510 Business level Use case of updating the VNF application specific parameters after a VNF is scaled | ZTE Corporation | pCR | Yes | Yes | revised | No | S5-156327 | ||||
S5-156327 | pCR draft TS 28.510 Business level Use case of updating the VNF application specific parameters after a VNF is scaled | ZTE Corporation | pCR | - | Yes | Yes | revised | No | S5-156402 | S5-156138 | ||
S5-156402 | pCR draft TS 28.510 Business level Use case of updating the VNF application specific parameters after a VNF is scaled | ZTE Corporation | pCR | - | Yes | Yes | approved | No | S5-156327 | |||
S5-156139 | pCR draft TS 28.510 Specification level Use case of updating the VNF application specific parameters after a VNF is scaled | ZTE Corporation | pCR | Yes | Yes | revised | No | S5-156328 | ||||
S5-156328 | pCR draft TS 28.510 Specification level Use case of updating the VNF application specific parameters after a VNF is scaled | ZTE Corporation | pCR | - | Yes | Yes | approved | No | S5-156139 | |||
S5-156315 | pCR TS 28.500 Adding specification level CM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | revised | No | S5-156403 | S5-156146 | ||
S5-156403 | pCR TS 28.500 Adding specification level CM requirements | China Mobile Com. Corporation | pCR | - | Yes | Yes | approved | No | S5-156315 | |||
S5-156173 | pCR TS 28.510 Adding VNF instance configuration use case | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156329 | |||
S5-156329 | pCR TS 28.510 Adding VNF instance configuration use case | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | S5-156173 | |||
S5-156174 | pCR TS 28.510 Adding NE MO deletion use case | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156330 | |||
S5-156175 | pCR TS 28.510 Addition of business level requirements for NE MO creation | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156332 | |||
S5-156332 | pCR TS 28.510 Addition of business level requirements for NE MO creation | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | S5-156175 | |||
S5-156265 | Proposed Discussion Sequence of 6.5.1.2 | ZTE | other | discussion | Yes | Yes | noted | No | ||||
S5-156404 | Last draft TS 28.510 | Rapporteur(ZTE) | draft TS | discussion | No | Yes | left for email approval | No | ||||
6.5.1.3 |
Fault Management for mobile networks that include virtualized network functions |
S5-156030 | Minutes for Fault Management for mobile networks that include virtualized network functions | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156129 | Add business use case for virtualization deployment healing triggered by 3GPP management system | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156362 | |||
S5-156362 | Add business use case for virtualization deployment healing triggered by 3GPP management system | NTT DOCOMO | pCR | Information | Yes | Yes | revised | No | S5-156405 | S5-156129 | ||
S5-156405 | Add business use case for virtualization deployment healing triggered by 3GPP management system | NTT DOCOMO | pCR | Information | Yes | Yes | approved | No | S5-156362 | |||
S5-156130 | Add business use case for virtualization-specific failure detection and notification by NFV-MANO | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156363 | |||
S5-156363 | Add business use case for virtualization-specific failure detection and notification by NFV-MANO | NTT DOCOMO | pCR | Approval | Yes | Yes | approved | No | S5-156130 | |||
S5-156131 | Add specification use case of virtualization deployment healing through operation request to VNFM from EM | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156364 | |||
S5-156364 | Add specification use case of virtualization deployment healing through operation request to VNFM from EM | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156406 | S5-156131 | ||
S5-156406 | Add specification use case of virtualization deployment healing through operation request to VNFM from EM | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156358 | S5-156364 | ||
S5-156358 | Add specification use case of virtualization deployment healing through operation request to VNFM from EM | NTT DOCOMO | pCR | Approval | Yes | Yes | approved | No | S5-156406 | |||
S5-156132 | Add specification use case of virtualization-specific failure detection and notification by VNFM | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156365 | |||
S5-156365 | Add specification use case of virtualization-specific failure detection and notification by VNFM | NTT DOCOMO | pCR | Approval | Yes | Yes | approved | No | S5-156132 | |||
S5-156134 | Add business and specification requirements related to VNF healing and virtualization fault notification | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156366 | |||
S5-156366 | Add business and specification requirements related to VNF healing and virtualization fault notification | NTT DOCOMO | pCR | Approval | Yes | Yes | approved | No | S5-156134 | |||
S5-156140 | pCR draft TS 28.515 Specification level use case of identifying the specific virtualized container in which an alarm was generated | ZTE Corporation | pCR | Yes | Yes | noted | No | |||||
S5-156176 | pCR TS 28.515 Adding contents for concepts clause | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156367 | |||
S5-156367 | pCR TS 28.515 Adding contents for concepts clause | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | S5-156176 | |||
S5-156177 | pCR TS 28.515 Add requirements for detailed alarm information reported from VNFM to EM | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156368 | |||
S5-156368 | pCR TS 28.515 Add requirements for detailed alarm information reported from VNFM to EM | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | S5-156177 | |||
S5-156178 | NFV Fault Management WI Status Report | Huawei Tech.(UK) Co., Ltd | discussion | Information | Yes | Yes | noted | No | ||||
S5-156179 | pCR TS 28.515 Addition of alarm correlation business level requirements | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156369 | |||
S5-156369 | pCR TS 28.515 Addition of alarm correlation business level requirements | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | S5-156179 | |||
S5-156407 | Last draft TS 28.515 | Rapporteur(Huawei) | draft TS | discussion | No | Yes | left for email approval | No | ||||
6.5.1.4 |
Performance management for mobile networks that include virtualized network functions |
S5-156031 | Minutes for Performance management for mobile networks that include virtualized network functions | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156153 | pCR TS 28.520 Add business level PM requirements and use cases | KDDI Corporation | pCR | Approval | Yes | Yes | revised | No | S5-156371 | |||
S5-156371 | pCR TS 28.520 Add business level PM requirements and use cases | KDDI Corporation | pCR | Approval | Yes | Yes | approved | No | S5-156153 | |||
S5-156160 | pCR TS 28.520 add VR PM use case and requirement | Intel Corporation (UK) Ltd | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156372 | pCR TS 28.520 add VR PM use case and requirement | Intel Corporation (UK) Ltd | pCR | Approval | No | No | withdrawn | Yes | ||||
S5-156161 | pCR TS 28.521 add PM data collection flow | Intel Corporation (UK) Ltd | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156373 | pCR TS 28.521 add PM data collection flow | Intel Corporation (UK) Ltd | pCR | Approval | No | No | withdrawn | Yes | ||||
S5-156162 | pCR TS 28.521 add scope | Intel Corporation (UK) Ltd | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156163 | pCR TS 28.521 add VR PM data collection procedure | Intel Corporation (UK) Ltd | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156180 | pCR TS 28.520 Editorial Correction | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | ||||
S5-156408 | Last draft TS 28.520 | Rapporteur(Intel) | draft TS | discussion | No | Yes | left for email approval | No | ||||
S5-156409 | Last draft TS 28.521 | Rapporteur(Intel) | draft TS | discussion | No | Yes | left for email approval | No | ||||
6.5.1.5 |
Lifecycle management for mobile networks that include virtualized network functions |
S5-156032 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | Rapporteur | report | Yes | Yes | revised | No | S5-156410 | ||
S5-156410 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | Rapporteur | report | - | Yes | Yes | revised | No | S5-156412 | S5-156032 | ||
S5-156412 | Minutes for Lifecycle management for mobile networks that include virtualized network functions | Rapporteur | report | - | Yes | Yes | noted | No | S5-156410 | |||
S5-156072 | pCR to 28.525 VNF Package On-boarding | Cisco Systems Belgium | pCR | Approval | Yes | Yes | revised | No | S5-156375 | |||
S5-156375 | pCR to 28.525 VNF Package On-boarding | Cisco Systems Belgium | pCR | Approval | Yes | Yes | revised | No | S5-156411 | S5-156072 | ||
S5-156411 | pCR to 28.525 VNF Package On-boarding | Cisco Systems Belgium | pCR | Approval | Yes | Yes | approved | No | S5-156375 | |||
S5-156133 | Add specification requirements related to VNF scaling and lifecycle change notifications | NTT DOCOMO | pCR | Approval | Yes | Yes | revised | No | S5-156376 | |||
S5-156376 | Add specification requirements related to VNF scaling and lifecycle change notifications | NTT DOCOMO | pCR | Approval | Yes | Yes | approved | No | S5-156133 | |||
S5-156154 | pCR TS 28.525 Add specification level VNF LCM requirements and use cases | KDDI Corporation | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156377 | pCR TS 28.525 Add specification level VNF LCM requirements and use cases | KDDI Corporation | pCR | Approval | No | No | withdrawn | Yes | ||||
S5-156155 | pCR TS 28.525 Add specification level NS LCM requirements and use cases | KDDI Corporation | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156164 | pCR to 28.525 add business level UCs and requirements for VNF termination | Nokia Networks | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156165 | pCR to 28.525 add specification level UCs and requirements for VNF termination | Nokia Networks | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156181 | pCR TS 28.525 Adding specification level requirements on VNF instance scaling | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | noted | No | ||||
S5-156182 | pCR TS 28.525 Adding VNF instance termination use cases and specification level requirements | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | noted | No | ||||
S5-156378 | LS to ETSI NFV IFA on network service scaling | Nokia Networks | LS out | discussion | Yes | Yes | revised | No | S5-156382 | |||
S5-156382 | LS to ETSI NFV IFA on network service scaling | Nokia Networks | LS out | discussion | Yes | Yes | approved | No | S5-156378 | |||
S5-156413 | Last draft TS 28.525 | Rapporteur(Nokia Networks) | draft TS | discussion | No | Yes | left for email approval | No | ||||
6.6 |
OAM&P Studies |
|||||||||||
6.6.1 |
Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function |
S5-156033 | Minutes for Study on Enhancements of OAM aspects of Distributed Mobility Load Balancing (MLB) SON function | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156065 | pCR to TR 32.860 CAC problem statement | Cisco Systems Belgium | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156103 | Concluding remarks for TR 32860 | Ericsson Inc. | pCR | Agreement | Yes | Yes | noted | No | ||||
S5-156104 | pCR on TR 32.860 Configuration for CAC PS and solution | Ericsson Inc. | pCR | Agreement | Yes | Yes | noted | No | ||||
S5-156309 | Revised WID Study on Enhancements of OAM aspects of Distributed MLB SON | Rapporteur(Cisco) | WID revised | discussion | Yes | Yes | agreed | No | ||||
6.6.2 |
Study on KQIs for Service Experience |
S5-156038 | Minutes for Study on KQIs for Service Experience | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156187 | Updated WID Study on KQIs for Service Experience | Huawei Tech.(UK) Co., Ltd | SID revised | Decision | Yes | Yes | agreed | No | ||||
S5-156188 | pCR TR32.862 update scope according to udated WID | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | ||||
S5-156189 | pCR TR32.862 Combining the access phase for the different scenarios in Section 5 | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156333 | |||
S5-156333 | pCR TR32.862 Combining the access phase for the different scenarios in Section 5 | Huawei Tech.(UK) Co., Ltd | pCR | Decision | No | Yes | left for email approval | No | S5-156189 | |||
S5-156190 | pCR TR32.862 Add Conclusions for the KQI for Service Experience | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156335 | |||
S5-156335 | pCR TR32.862 Add Conclusions for the KQI for Service Experience | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156414 | S5-156190 | ||
S5-156414 | pCR TR32.862 Add Conclusions for the KQI for Service Experience | Huawei Tech.(UK) Co., Ltd | pCR | Decision | No | Yes | left for email approval | No | S5-156335 | |||
S5-156336 | New draft TR 32.862 | Rapporteur(Huawei) | draft TR | discussion | No | Yes | left for email approval | No | ||||
6.6.3 |
Study on OAM support for Licensed Shared Access |
S5-156024 | Minutes for Study on OAM support for Licensed Shared Access | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156136 | pCR TR 32.855 Clarify application of the advantage/disadvantage statements | Ericsson | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156137 | pCR on TR 32.855 Functional split pros/cons | Ericsson | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156158 | Solutions evaluation | RED Technologies SAS | pCR | Approval | Yes | Yes | revised | No | S5-156341 | |||
S5-156341 | Solutions evaluation | RED Technologies SAS | pCR | Approval | Yes | Yes | noted | No | S5-156158 | |||
S5-156351 | WID revision OAM support for LSA | Nokia Networks | WID revised | discussion | Yes | Yes | revised | No | S5-156359 | |||
S5-156359 | WID revision OAM support for LSA | Nokia Networks | WID revised | discussion | Yes | Yes | agreed | No | S5-156351 | |||
S5-156352 | Last draft TS 32.855 | Rapporteur(Nokia Networks) | draft TS | Approval | No | Yes | left for email approval | No | ||||
6.6.4 |
Study on OAM support for assessment of energy efficiency in mobile access networks (preliminary work before SA approval) |
S5-156041 | Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156058 | TR on OAM study on OAM support of EE - Skeleton | ORANGE | TS or TR cover | Agreement | Yes | Yes | revised | No | S5-156337 | |||
S5-156337 | TR on OAM study on OAM support of EE - Skeleton | ORANGE | draft TR | Agreement | Yes | Yes | revised | No | S5-156353 | S5-156058 | ||
S5-156353 | TR on OAM study on OAM support of EE - Skeleton | ORANGE | draft TR | Agreement | Yes | Yes | approved | No | S5-156337 | |||
7 |
Converged Management |
|||||||||||
7.1 |
Converged Management Plenary |
S5-156006 | Converged Management Executive report from THIS meeting | Converged Management SWG Chair | report | Yes | Yes | noted | No | |||
S5-156233 | CMAN SWG action list | Huawei Tech.(UK) Co., Ltd | other | Information | Yes | Yes | revised | No | S5-156355 | |||
S5-156355 | CMAN SWG action list | Huawei Tech.(UK) Co., Ltd | other | Information | Yes | Yes | noted | No | S5-156233 | |||
S5-156239 | LS on Multi-SDO Converged Management PM Interface definitions JWG Output Document Completion | Multi-SDO Converged Management PM Interface definitions Joint Working Group | LS in | discussion | Yes | Yes | noted | No | ||||
7.2 |
Rel-13 Operations, Administration, Maintenance and Provisioning (OAM&P) |
|||||||||||
7.2.1 |
Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations |
|||||||||||
7.2.1.1 |
TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations |
S5-156034 | Minutes for TR on compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156066 | pCR to 32.838 T7.9.5 | Cisco | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156067 | pCR to 32.838 Tables 7.9.1 and 7.9.3 | Cisco | pCR | Approval | Yes | Yes | revised | No | S5-156338 | |||
S5-156338 | pCR to 32.838 Tables 7.9.1 and 7.9.3 | Cisco | pCR | Approval | Yes | Yes | approved | No | S5-156067 | |||
S5-156068 | pCR to 32.838 Tables 7.9.2 and 7.9.4 | Cisco | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156069 | pCR to 32.838 T7.3.6 | Cisco | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156070 | pCR to 32.838 T7.2.10 | Cisco | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156071 | pCR to 32.838 T7.6.9 | Cisco | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156183 | Progress status TR 32.838 | Huawei Tech.(UK) Co., Ltd | other | Information | Yes | Yes | revised | No | S5-156339 | |||
S5-156339 | Progress status TR 32.838 | Huawei Tech.(UK) Co., Ltd | other | Information | Yes | Yes | noted | No | S5-156183 | |||
S5-156186 | Conclusion TR 32.838 | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156340 | |||
S5-156340 | Conclusion TR 32.838 | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | S5-156186 | |||
S5-156234 | Rel-13 pCR 32.838 OSS tool support for optimization and operation | Huawei Tech.(UK) Co., Ltd | pCR | Decision | Yes | Yes | approved | No | ||||
S5-156236 | Rel-13 pCR 32.838 Correction of empty support status | Huawei | pCR | discussion | Yes | Yes | approved | No | ||||
S5-156305 | Presentation of TR 32.838 to SA for Approval | Huawei | TS or TR cover | discussion | Yes | Yes | approved | No | ||||
S5-156370 | Latest draft TR 32.838 | Rapporteur (Huawei) | draft TR | discussion | No | Yes | left for email approval | No | ||||
7.2.1.2 |
TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations |
S5-156036 | Minutes for TS work on Compliance of 3GPP SA5 specifications to the NGMN Top OPE Recommendations | Rapporteur | report | No | No | withdrawn | Yes | |||
7.2.2 |
Converged management Performance Management Interface Definitions |
S5-156037 | Minutes for Converged Management PM Interface definitions | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156184 | Updated WID Converged management Performance Management Interface Definitions | Huawei Tech.(UK) Co., Ltd | WID revised | Decision | Yes | Yes | revised | No | S5-156356 | |||
S5-156356 | Updated WID Converged management Performance Management Interface Definitions | Huawei Tech.(UK) Co., Ltd | WID revised | Decision | No | Yes | left for email approval | No | S5-156184 | |||
S5-156185 | Updated Draft TR Metadefinitions for Measurements and KPIs | Huawei Tech.(UK) Co., Ltd | draft TR | Decision | Yes | Yes | approved | No | ||||
S5-156306 | Presentation of TR 32.863 to SA for Information and Approval | Huawei | TS or TR cover | discussion | Yes | Yes | approved | No | ||||
7.3 |
Converged Management Studies |
|||||||||||
7.3.1 |
Study on Compliance of 3GPP SA5 specifications to the NGMN NGCOR |
S5-156039 | Minutes for compliance of 3GPP SA5 specifications to the NGMN NGCOR Requirements | Rapporteur | report | Yes | Yes | noted | No | |||
S5-156128 | Progress review of TR 32.837 | ORANGE | discussion | Discussion | Yes | Yes | noted | No | ||||
8 |
Charging |
|||||||||||
8.1 |
Charging Plenary |
S5-156009 | CH Agenda and Time Plan | CH SWG Chair | agenda | Yes | Yes | approved | No | |||
S5-156010 | CH Detailed Report from LAST Meeting | CH WSG Chair | report | Yes | Yes | approved | No | |||||
S5-156011 | CH Executive Report from THIS Meeting | CH SWG Chair | report | Yes | Yes | noted | No | |||||
S5-156012 | CH Detailed Report from THIS Meeting | CH SWG Chair | report | No | Yes | postponed | No | |||||
S5-156047 | LS from CT4 to SA5 on Mobile Equipment Identity Signalling over WLAN | C4-151756 | LS in | Yes | Yes | noted | No | |||||
S5-156048 | LS from CT4 to SA5 on the start of the work on Diameter Base Protocol Update | C4-151861 | LS in | Yes | Yes | noted | No | |||||
S5-156091 | LSout CT1 LS on Cell information with untrusted WLAN access information | Ericsson | LS out | Approval | Yes | Yes | revised | No | S5-156231 | |||
S5-156159 | Rel-13 draftCR 21.905 Correction and addition of definitions for Online and Offline Charging | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | draftCR | Endorsement | Yes | Yes | revised | No | S5-156282 | |||
S5-156282 | Rel-13 draftCR 21.905 Correction and addition of definitions for Online and Offline Charging | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | draftCR | Approval | Yes | Yes | approved | No | S5-156159 | |||
S5-156216 | pCR to TR 29.819 – 3GPP Charging Applications | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | pCR | Approval | Yes | Yes | noted | No | ||||
S5-156231 | LSout CT1 LS on Cell information with untrusted WLAN access information | Ericsson | LS out | Approval | Yes | Yes | revised | No | S5-156281 | S5-156091 | ||
S5-156281 | LSout CT1 LS on Cell information with untrusted WLAN access information | Ericsson | LS out | Approval | Yes | Yes | approved | No | S5-156231 | |||
S5-156238 | Reply LS to CT4 on the start of work on Diameter Base Protocol Update | S3-152460 | LS in | discussion | Yes | Yes | postponed | No | ||||
8.2 |
New Charging Work Item proposals |
|||||||||||
8.3 |
Charging Maintenance and Rel-13 small Enhancements |
S5-156053 | Modifications related to FMSS feature introduction | Allot Communications Ltd. | discussion | Discussion | Yes | Yes | noted | No | ||
S5-156055 | Inclusion of service data flows as an identifier of application related information for TDF | Allot Communications Ltd. | CR | Approval | Yes | Yes | not pursued | No | ||||
S5-156059 | Rel-8 CR 32.260 Correction of 2xx triggers for online and offline charging | Ericsson | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156060 | Rel-9 CR 32.260 Correction of 2xx triggers for online and offline charging | Ericsson | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156061 | Rel-10 CR 32.260 Correction of 2xx triggers for online and offline charging | Ericsson | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156062 | Rel-11 CR 32.260 Correction of 2xx triggers for online and offline charging | Ericsson | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156063 | Rel-12 CR 32.260 Correction of 2xx triggers for online and offline charging | Ericsson | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156064 | Rel-13 CR 32.260 Correction of 2xx triggers for online and offline charging | Ericsson | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156088 | Rel-13 CR 32.251 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | Yes | withdrawn | Yes | ||||
S5-156089 | Rel-13 CR 32.298 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156229 | |||
S5-156090 | Rel-13 CR 32.299 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156230 | |||
S5-156105 | Rel-13 CR 32.260 Charging support for Terminating Identification Presentation feature changes in terminating identity | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156347 | |||
S5-156347 | Rel-13 CR 32.260 Charging support for Terminating Identification Presentation feature changes in terminating identity | Ericsson | CR | Approval | Yes | Yes | agreed | No | S5-156105 | |||
S5-156106 | Rel-13 CR 32.298 Charging support for Terminating Identification Presentation feature changes in terminating identity | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156346 | |||
S5-156346 | Rel-13 CR 32.298 Charging support for Terminating Identification Presentation feature changes in terminating identity | Ericsson | CR | Approval | Yes | Yes | agreed | No | S5-156106 | |||
S5-156107 | Rel-13 CR 32.299 Charging support for Terminating Identification Presentation feature changes in terminating identity | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156348 | |||
S5-156348 | Rel-13 CR 32.299 Charging support for Terminating Identification Presentation feature changes in terminating identity | Ericsson | CR | Approval | Yes | Yes | agreed | No | S5-156107 | |||
S5-156192 | Rel-13 CR 32.251 Clarification of CGFOCS address determination in PGW | HuaWei Technologies Co., Ltd | CR | Approval | Yes | Yes | not pursued | No | ||||
S5-156196 | Rel-13 CR 32.251 Clarification of CGFOCS address determination in PGW | Huawei Tech.(UK) Co., Ltd | CR | Decision | No | Yes | withdrawn | Yes | ||||
S5-156200 | Rel-11 CR 32.260 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | No | withdrawn | Yes | ||||
S5-156201 | Rel-11 CR 32.298 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | No | withdrawn | Yes | ||||
S5-156202 | Rel-11 CR 32.299 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | No | withdrawn | Yes | ||||
S5-156203 | Rel-12 CR 32.260 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | No | withdrawn | Yes | ||||
S5-156204 | Rel-12 CR 32.298 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | No | withdrawn | Yes | ||||
S5-156205 | Rel-12 CR 32.299 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | No | withdrawn | Yes | ||||
S5-156206 | Rel-13 CR 32.260 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | Yes | revised | No | S5-156343 | |||
S5-156343 | Rel-13 CR 32.260 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation,ZTE,Huawei | CR | Approval | Yes | Yes | agreed | No | S5-156206 | |||
S5-156207 | Rel-13 CR 32.298 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | Yes | revised | No | S5-156344 | |||
S5-156344 | Rel-13 CR 32.298 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation,ZTE,Huawei | CR | Approval | Yes | Yes | revised | No | S5-156361 | S5-156207 | ||
S5-156361 | Rel-13 CR 32.298 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation,ZTE,Huawei,Nokia Networks | CR | Approval | Yes | Yes | revised | No | S5-156380 | S5-156344 | ||
S5-156380 | Rel-13 CR 32.298 Correction on CS Location Information in SIP AS CDR | China Mobile, Huawei, Nokia Networks, ZTE | CR | Approval | Yes | Yes | agreed | No | S5-156361 | |||
S5-156208 | Rel-13 CR 32.299 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation | CR | Approval | Yes | Yes | revised | No | S5-156345 | |||
S5-156345 | Rel-13 CR 32.299 Correction on CS Location Information in SIP AS CDR | China Mobile Com. Corporation,ZTE,Huawei | CR | Approval | Yes | Yes | agreed | No | S5-156208 | |||
S5-156228 | Rel-13 CR 32.260 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156244 | |||
S5-156244 | Rel-13 CR 32.260 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156278 | S5-156228 | ||
S5-156278 | Rel-13 CR 32.260 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | Yes | agreed | No | S5-156244 | |||
S5-156229 | Rel-13 CR 32.298 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | No | withdrawn | Yes | S5-156089 | |||
S5-156230 | Rel-13 CR 32.299 Cell information received with untrusted WLAN access information | Ericsson | CR | Approval | Yes | No | withdrawn | Yes | S5-156090 | |||
S5-156242 | Rel-13 CR 32.298 Cell information received with untrusted WLAN access information | Ericsson | CR | discussion | Yes | Yes | revised | No | S5-156279 | |||
S5-156279 | Rel-13 CR 32.298 Cell information received with untrusted WLAN access information | Ericsson | CR | discussion | Yes | Yes | agreed | No | S5-156242 | |||
S5-156243 | Rel-13 CR 32.299 Cell information received with untrusted WLAN access information | Ericsson | CR | Decision | Yes | Yes | revised | No | S5-156280 | |||
S5-156280 | Rel-13 CR 32.299 Cell information received with untrusted WLAN access information | Ericsson | CR | Decision | Yes | Yes | agreed | No | S5-156243 | |||
S5-156277 | LS to SA2 application based charging for applications identified by service data flow filters | Alcatel-Lucent | LS out | Approval | Yes | Yes | approved | No | ||||
8.4 |
Rel-13 Charging |
|||||||||||
8.4.1 |
Inter-PLMN PS domain online charging |
|||||||||||
8.4.1.1 |
TR on Inter-PLMN PS domain online charging |
S5-156054 | TDF based Inter-PLMN charging | Allot Communications Ltd., Alcatel-Lucent | pCR | Yes | Yes | revised | No | S5-156274 | ||
S5-156274 | TDF based Inter-PLMN charging | Allot Communications Ltd., Alcatel-Lucent | pCR | - | Yes | Yes | approved | No | S5-156054 | |||
S5-156057 | LS on Gyn support for inter-PLMN charging for application based charging | Alcatel-Lucent | LS out | Approval | Yes | No | withdrawn | Yes | ||||
S5-156073 | Presentation of TR 32.843 to SA for Approval | Alcatel-Lucent | TS or TR cover | Approval | Yes | Yes | approved | No | ||||
8.4.1.2 |
Specification of Inter-PLMN PS domain online charging |
S5-156056 | Addition of TDF to Annex for inter-PLMN PS Online Charging | Allot Communications Ltd. | CR | Approval | Yes | Yes | revised | No | S5-156275 | |
S5-156275 | Addition of TDF to Annex for inter-PLMN PS Online Charging | Allot Communications Ltd. | CR | Approval | Yes | Yes | agreed | No | S5-156056 | |||
S5-156193 | Rel-13 CR 32.299 Clarification of charging entity location limitation | HuaWei Technologies Co., Ltd | CR | Approval | Yes | Yes | revised | No | S5-156276 | |||
S5-156276 | Rel-13 CR 32.299 Clarification of charging entity location limitation | HuaWei Technologies Co., Ltd | CR | Approval | Yes | Yes | agreed | No | S5-156193 | |||
S5-156197 | Rel-13 CR 32.299 Clarification of charging entity location limitation | Huawei Tech.(UK) Co., Ltd | CR | Decision | No | Yes | withdrawn | Yes | ||||
8.4.2 |
ULI and release causes for charging enhancement for VoLTE |
S5-156075 | Rel-13 CR 32.260 Update of SIP methods triggering online charging session termination | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR | Approval | Yes | Yes | revised | No | S5-156283 | |
S5-156283 | Rel-13 CR 32.260 Update of SIP methods triggering online charging session termination | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR | Approval | Yes | Yes | agreed | No | S5-156075 | |||
S5-156076 | Rel-13 CR 32.260 Introduction of ULI TZ Changes in IMS offline and online charging | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,ORANGE | CR | Approval | Yes | Yes | revised | No | S5-156284 | |||
S5-156284 | Rel-13 CR 32.260 Introduction of ULI TZ Changes in IMS offline and online charging | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell,ORANGE | CR | Approval | Yes | Yes | agreed | No | S5-156076 | |||
S5-156077 | Rel-13 CR 32.299 Introduction of ULI TZ Changes in IMS offline and online charging | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156078 | Rel-13 CR 32.298 Introduction of ULI TZ Changes in IMS offline and online charging | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR | Approval | Yes | Yes | revised | No | S5-156285 | |||
S5-156285 | Rel-13 CR 32.298 Introduction of ULI TZ Changes in IMS offline and online charging | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR | Approval | Yes | Yes | agreed | No | S5-156078 | |||
8.4.3 |
Announcements for IMS Online Charging |
S5-156043 | Rel-13 PCR 32.28x Update of scope, definitions, symbols and abbreviations | Ericsson | pCR | Approval | Yes | Yes | revised | No | S5-156209 | |
S5-156044 | Rel-13 PCR 32.28x Architecture, principles and bindings | Ericsson, Orange | pCR | Approval | Yes | Yes | revised | No | S5-156210 | |||
S5-156045 | Rel-13 CR 32.240 Introduction of Announcement service | Ericsson | CR | Approval | Yes | Yes | agreed | No | ||||
S5-156046 | Rel-13 CR 32.299 Definition of AVPs for Announcement service | Ericsson | CR | Approval | Yes | Yes | revised | No | S5-156288 | |||
S5-156288 | Rel-13 CR 32.299 Definition of AVPs for Announcement service | Ericsson | CR | Approval | Yes | Yes | agreed | No | S5-156046 | |||
S5-156074 | Rel-13 CR 32.275 Introduction of Announcement service for MMTel service | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR | Approval | Yes | Yes | revised | No | S5-156289 | |||
S5-156289 | Rel-13 CR 32.275 Introduction of Announcement service for MMTel service | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR | Approval | Yes | Yes | agreed | No | S5-156074 | |||
S5-156152 | Presentation of Specification TS 32.28x to TSG | Ericsson | TS or TR cover | Approval | Yes | Yes | revised | No | S5-156287 | |||
S5-156287 | Presentation of Specification TS 32.28x to TSG | Ericsson | TS or TR cover | Approval | Yes | Yes | approved | No | S5-156152 | |||
S5-156209 | Rel-13 PCR 32.28x Update of scope, definitions, symbols and abbreviations | Ericsson, Orange, Amdocs | pCR | Approval | Yes | Yes | approved | No | S5-156043 | |||
S5-156210 | Rel-13 PCR 32.28x Architecture, principles and bindings | Ericsson, Orange, Alcatel-Lucent, Amdocs | pCR | Approval | Yes | Yes | revised | No | S5-156286 | S5-156044 | ||
S5-156286 | Rel-13 PCR 32.28x Architecture, principles and bindings | Ericsson, Orange, Alcatel-Lucent, Amdocs | pCR | Approval | Yes | Yes | approved | No | S5-156210 | |||
S5-156218 | Annoucement Privacy | Amdocs Software Systems Ltd | pCR | Decision | Yes | Yes | revised | No | S5-156286 | |||
S5-156342 | Latest draft TS 32.28x Telecommunication management;Charging management;Announcement service | Rapporteur(Amdocs) | draft TS | discussion | No | Yes | left for email approval | No | ||||
8.4.4 |
Charging Aspects of IP Flow Mobility support for S2a and S2b Interfaces |
S5-156096 | Rel-13 CR 32.251 Introduction of NBIFOM Support and NBIFOM Mode information for PS charging | Ericsson | CR | Approval | Yes | Yes | merged | No | S5-156290 | |
S5-156290 | Rel-13 CR 32.251 Introduction of NBIFOM Support and NBIFOM Mode information for PS charging | Ericsson,ZTE Corporation | CR | Approval | Yes | Yes | agreed | No | S5-156096 | |||
S5-156097 | Rel-13 CR 32.298 Introduction of NBIFOM Support and NBIFOM Mode information for PS charging | Ericsson | CR | Approval | Yes | Yes | merged | No | S5-156291 | |||
S5-156098 | Rel-13 CR 32.299 Introduction of NBIFOM Support and NBIFOM Mode information for PS charging | Ericsson | CR | Approval | Yes | Yes | merged | No | S5-156292 | |||
S5-156292 | Rel-13 CR 32.299 Introduction of NBIFOM Support and NBIFOM Mode information for PS charging | Ericsson,ZTE Corporation | CR | Approval | Yes | Yes | agreed | No | S5-156098 | |||
S5-156101 | Rel-13 CR 32.261 Charging Id assignment for NBIFOM | Ericsson | CR | Approval | Yes | Yes | noted | No | ||||
S5-156102 | LSout SA2 LS on Charging Id assignment for NBIFOM | Ericsson | LS out | Approval | Yes | Yes | noted | No | ||||
S5-156220 | Rel-13 CR 32 251 Extend the definition of PDN connection charging identifier for NBIFOM | ZTE Corporation | CR | Yes | Yes | noted | No | |||||
S5-156221 | Rel-13 CR 32 299 Extend the definition of PDN connection charging identifier for NBIFOM | ZTE Corporation | CR | Yes | No | withdrawn | Yes | |||||
S5-156222 | Rel-13 CR 32 298 Extend the definition of PDN connection charging identifier for NBIFOM | ZTE Corporation | CR | Yes | No | withdrawn | Yes | |||||
S5-156223 | Rel-13 CR 32 298 Extend the definition of PDN connection charging identifier for NBIFOM | ZTE Corporation | CR | No | Yes | withdrawn | Yes | |||||
S5-156224 | Rel-13 CR 32 251 Add NBIFOM related charging information | ZTE Corporation | CR | Yes | Yes | merged | No | S5-156290 | ||||
S5-156225 | Rel-13 CR 32.299 Add NBIFOM related charging information | ZTE Corporation | CR | Yes | Yes | merged | No | S5-156292 | ||||
S5-156226 | Rel-13 CR 32.299 Add NBIFOM related charging information | ZTE Corporation | CR | No | Yes | withdrawn | Yes | |||||
S5-156227 | Rel-13 CR 32.298 Add NBIFOM related charging information | ZTE Corporation | CR | Yes | Yes | merged | No | S5-156291 | ||||
S5-156291 | Rel-13 CR 32.298 Add NBIFOM related charging information | ZTE Corporation,Ericsson | CR | - | Yes | Yes | agreed | No | S5-156227 | |||
S5-156293 | Exception sheet for NBIFOM CH WID | ZTE Corporation | TS or TR cover | discussion | Yes | Yes | approved | No | ||||
8.4.5 |
Charging aspects of MONTE |
S5-156050 | Rel-13 CR 32.240 Introduction of Monitoring Event charging | Ericsson | CR | Approval | Yes | Yes | not pursued | No | ||
S5-156051 | Rel-13 PCR 32.278 Corrections for Monitoring Event charging | Ericsson | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156052 | Rel-13 PCR 32.278 Charging principles for Monitoring Event charging | Ericsson, Huawei, Openet | pCR | Approval | Yes | Yes | revised | No | S5-156294 | |||
S5-156294 | Rel-13 PCR 32.278 Charging principles for Monitoring Event charging | Ericsson, Huawei, Openet | pCR | Approval | Yes | Yes | approved | No | S5-156052 | |||
S5-156194 | Rel-13 pCR TR 32.278 changes for EditHelp | HuaWei Technologies Co., Ltd | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156195 | Rel-13 pCR 32.278 Rf, Ga, Ro message content of Monitoring Event charging | HuaWei Technologies Co., Ltd | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156198 | Rel-13 pCR 32.278 Rf message contenct of Monitoring Event offline charging | Huawei Tech.(UK) Co., Ltd | pCR | Decision | No | Yes | withdrawn | Yes | ||||
S5-156199 | Rel-13 pCR TR 32.278 changes for EditHelp | Huawei Tech.(UK) Co., Ltd | pCR | Decision | No | Yes | withdrawn | Yes | ||||
S5-156273 | Exception sheet for MONTE CH WID | HuaWei Technologies Co | WI exception request | Agreement | Yes | Yes | approved | No | ||||
S5-156302 | Latest draft TS 32.278 “Telecommunication management;Charging management;Monitoring Event charging” | Rapporteur(Huawei) | draft TS | Approval | No | Yes | left for email approval | No | ||||
S5-156349 | Presentation of TS 32.278 to SA for Information | Rapporteur(Huawei) | TS or TR cover | discussion | Yes | Yes | approved | No | ||||
S5-156350 | Last draft TR 32.843 “Study on Inter-PLMN PS domain online charging” | Rapporteur(Huawei) | draft TR | Approval | No | Yes | left for email approval | No | ||||
8.5 |
Charging Studies |
|||||||||||
8.5.1 |
Study on Determination of Completeness of Charging Information in IMS |
S5-156109 | Rel-13 PCR 32.850 KI#1 Alternative Solution: Furnish Charging Information to CTF | Ericsson | pCR | Approval | Yes | Yes | revised | No | S5-156295 | |
S5-156295 | Rel-13 PCR 32.850 KI#1 Alternative Solution: Furnish Charging Information to CTF | Ericsson | pCR | Approval | Yes | Yes | approved | No | S5-156109 | |||
S5-156213 | Proposed change for comments on CDR fields in Section 4.5 | Deutsche Telekom AG | pCR | Approval | Yes | Yes | revised | No | S5-156296 | |||
S5-156296 | Proposed change for comments on CDR fields in Section 4.5 | Deutsche Telekom AG | pCR | Approval | Yes | Yes | approved | No | S5-156213 | |||
S5-156214 | Improvement of Section 5 Description of Scenarios | Deutsche Telekom AG | pCR | Approval | Yes | Yes | approved | No | ||||
S5-156215 | Additions to section 6.1 Key Issue 1 | Deutsche Telekom AG | pCR | Approval | Yes | Yes | revised | No | S5-156297 | |||
S5-156297 | Additions to section 6.1 Key Issue 1 | Deutsche Telekom AG | pCR | Approval | Yes | Yes | approved | No | S5-156215 | |||
S5-156217 | pCR TR 32.850 Evaluation of solutions for Key issue 2 | ORANGE | pCR | Approval | Yes | Yes | revised | No | S5-156298 | |||
S5-156298 | pCR TR 32.850 Evaluation of solutions for Key issue 2 | ORANGE | pCR | Approval | Yes | Yes | approved | No | S5-156217 | |||
S5-156299 | Presentation of TR 32.850 to SA for Information | Rapporteur(Deutsche Telekom) | TS or TR cover | discussion | Yes | Yes | approved | No | ||||
S5-156300 | Revised WID “ Study on Determination of Completeness of Charging Information in IMS” | Rapporteur(Deutsche Telekom) | WID revised | discussion | Yes | Yes | agreed | No | ||||
S5-156301 | Last draft TR 32.850 “Study on Determination of Completeness of Charging Information in IMS” | Rapporteur(Deutsche Telekom) | draft TR | discussion | No | Yes | left for email approval | No | ||||
8.5.2 |
Study on Overload Control for Diameter Charging Applications |
S5-156211 | DP on alternative solution of Diameter Overload Control for Diameter charging applications | ZTE Corporation | pCR | No | Yes | withdrawn | Yes | |||
S5-156212 | DP on alternative solution of Diameter Overload Control for Diameter charging applications | ZTE Corporation | discussion | Yes | Yes | noted | No | |||||
9 |
Any Other Business |
|||||||||||
10 |
Closing of the meeting |
Created: 2015-11-20 12:28 Last document: S5-156415