DOCUMENT:
|
Agenda
|
Doc.Name
|
S5-121450
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121450.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
Time plan
|
Doc.Name
|
S5-121451
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121451.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
Meeting report
|
Doc.Name
|
S5-121452
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121452.zip
|
|
|
Source:
|
Rapporteur
|
The file is uploaded
|
|
DOCUMENT:
|
FM Solution Profile for NGCOR Fault Management Requirements
|
Doc.Name
|
S5-121453
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121453.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
New IS Template for Converged Management IS specifications
|
Doc.Name
|
S5-121454
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121454.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Liaison Statement from NGMN Alliance - NGCOR Requirements v1 .3
|
Doc.Name
|
S5-121455
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121455.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
JWG RMA changes 32622-a00 to 28xyz
|
Doc.Name
|
S5-121456
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121456.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
JWG RMA changes 32792-a00 to 28.xyz
|
Doc.Name
|
S5-121457
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121457.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Proposal for new 28- and 32-series TS number structure and t itles
|
Doc.Name
|
S5-121458
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121458.zip
|
|
|
Source:
|
Ericsson
|
Document for:
|
Discussion & approval
|
The file is uploaded
|
|
DOCUMENT:
|
Requirements for PM for converged network
|
Doc.Name
|
S5-121459
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121459.zip
|
|
|
Source:
|
China Mobile
|
Specification:
|
None
|
CR category:
|
None
|
Release:
|
rel12
|
Document for:
|
discussion
|
Abstract:
|
Requirements for PM for converged network
|
The file is uploaded
|
|
DOCUMENT:
|
Draft gap analysis of PM between TMF and 3GPP
|
Doc.Name
|
S5-121460
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121460.zip
|
|
|
Source:
|
China Mobile
|
Specification:
|
None
|
CR category:
|
None
|
Release:
|
rel12
|
Document for:
|
discussion
|
Abstract:
|
Since performance management has been defined in 3GPP and TMF specifications, be fore converged network performance management hominize 3GPP and TMF performance management, the gap analysis of PM between them should be done firstly.
|
The file is uploaded
|
|
DOCUMENT:
|
JWG RMA overall Impact to NRM IRPs
|
Doc.Name
|
S5-121461
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121461.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
JWG RMA changes 32642-a00 to 28xyz
|
Doc.Name
|
S5-121462
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121462.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
JWG RMA changes 32712-a00 to 28xyz
|
Doc.Name
|
S5-121463
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121463.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Project NGCOR Phase 2
|
Doc.Name
|
S5-121464
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121464.zip
|
|
|
Source:
|
Deutsche Telekom
|
Document for:
|
Information
|
Abstract:
|
Next Generation Converged Operations Requirements Phase 2 – Structure – Business Scenarios for Converged Operations - Inventory Management (Service) - Performance Management - Configuration Management
|
The file is uploaded
|
|
DOCUMENT:
|
Stage 1 mapping between NGCOR FM requirements and 3GPP Fault Management Solution
|
Doc.Name
|
S5-121465
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121465.zip
|
|
|
Source:
|
Huawei
|
The file is uploaded
|
|
DOCUMENT:
|
Proposed clarifications and actions on ITU-T SG2 comments on JWG Model Repertoire
|
Doc.Name
|
S5-121466
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121466.zip
|
|
|
Source:
|
Ericsson, NSN
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion and proposal on TS number(s) for Profile TSs
|
Doc.Name
|
S5-121467
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121467.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Draft update of WID for IRP framework enhancements
|
Doc.Name
|
S5-121468
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121468.zip
|
|
|
Source:
|
Ericsson, NSN
|
The file is uploaded
|
|
DOCUMENT:
|
Add missing requirements to Inventory Management
|
Doc.Name
|
S5-121469
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121469.zip
|
|
|
Source:
|
ZTE
|
The file is uploaded
|
|
DOCUMENT:
|
Status 3GPP/TMF RMA JWG comments resolution
|
Doc.Name
|
S5-121470
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121470.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Draft work sharing plan on applying JWG output in 3GPP
|
Doc.Name
|
S5-121471
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121471.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Options & Recommendation for transitioning from 32-series to 28-series NRM IRP's
|
Doc.Name
|
S5-121472
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121472.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Proposed structure for NGCOR/3GPP gap analysis
|
Doc.Name
|
S5-121473
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121473.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on M-SDO Converged Management Model Alignment (Ph ase 2) preparation
|
Doc.Name
|
S5-121474
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121474.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Time Plan (revision of S5-121451)
|
Doc.Name
|
S5-121475
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121475.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
Stereotype related to names for FMC Model Repertoire
|
Doc.Name
|
S5-121476
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121476.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Draft work sharing plan on applying JWG output in 3GPP (revi sion of S5-121471)
|
Doc.Name
|
S5-121477
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121477.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Options & Recommendation for transitioning from 32-series to 28-series NRM IRP's (revision of S5-121472)
|
Doc.Name
|
S5-121478
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121478.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Proposed clarifications and actions on ITU-T SG2 comments on JWG Model Repertoire (revision of S5-121466)
|
Doc.Name
|
S5-121479
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121479.zip
|
|
|
Source:
|
Rapporteur
|
The file is uploaded
|
|
DOCUMENT:
|
Stereotype related to names for FMC Model Repertoire (revisi on of S5-121476)
|
Doc.Name
|
S5-121480
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121480.zip
|
|
|
Source:
|
SA5 ad hoc
|
The file is uploaded
|
|
DOCUMENT:
|
Time Plan (revision of S5-121475)
|
Doc.Name
|
S5-121482
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121482.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
Draft output LS on the clarification of FM-REQ (7)
|
Doc.Name
|
S5-121484
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121484.zip
|
|
|
Source:
|
Orange
|
The file is uploaded
|
|
DOCUMENT:
|
Draft output LS on the clarification of FM-REQ (7) (revised)
|
Doc.Name
|
S5-121485
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121485.zip
|
|
|
Source:
|
SA5 ad hoc
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on M-SDO Converged Management Model Alignment (Ph ase 2) preparation (revised)
|
Doc.Name
|
S5-121486
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121486.zip
|
|
|
Source:
|
Nokia Siemens Networks
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on M-SDO Converged Management PM preparation
|
Doc.Name
|
S5-121487
|
Allocations:
|
Content Type:
|
File Name:
|
S5-121487.zip
|
|
|
Source:
|
Huawei
|
The file is uploaded
|
|