AGENDA S2-98
1 Opening of the meeting Erik
2 Approval of the agenda Erik
2.1 Handling of Postponed Work Erik
2.2 IPR Call Reminder Erik
3 Meeting reports Erik
4 General issues and Incoming LSs Erik
5 Essential Corrections for Pre-Release 12 items S2-98
5.1 SAE: 23.401, 23.060; CSFB & SMSoSGs - 23.272; HENB, LIPA_SIPTO, NIMTC, VCSG, SIMTC, SA WG2 Part of FULL_MOCN-GERAN; SA WG2 Part of GWCN_GERAN Frank
5.2 SAE: QoS and PCC aspects; PEST, eVocoder, policy related aspects of other WIs, etc. Rel-11 PCC/QoS: SAPP, QoS_SSL, SIRIG Ivano
5.3 SAE: 23.402 (including eANDSF, MUPSAP, MAPCON, FlowMob, SMOG), DIDA, LOBSTER, SaMOG_WLAN, BBAI I, II _Not On Agenda
5.4 Other + IMS Related: 23.216, 23.237, 23.167, 23.228 (e.g Emergency, eMBMS, eMPS, SRVCC etc.), rSRVCC, NOVES-IMSESOM, NetLoc, RAVEL, vSRVCC, eMPS_SRVCC Frank
5.5 IMS: 23.228, 23.237, 23.292 (e.g. IMS, Service continuity, Centralized Services) _Not On Agenda
6 Release 12 S2-98
6.1 Release 12 Maintenance Ivano
6.1.1 3GPP Packet Access: LIPA Mobility and SIPTO at the Local Network (LIMONET) Frank
6.1.2 PCC/QoS Aspects: Usage Monitoring Control enhancement - SA WG2 Part (UMONC), Application Based Charging (ABC) Ivano
6.1.3 Non-3GPP Packet Access Maintenance: Operator Policies for IP Interface Selection (OPIIS) Ivano
6.1.4 IMS-Related Maintenance, (SMSMI), IMS Business Trunking for IP-PBX in Static Mode of Operation (BusTI) _Not On Agenda
6.2 Machine Type Communications Enhancements for Rel-12 (MTCe) Erik
6.2.1 (BB1): Small Data and Device Triggering Enhancements (MTCe-SDDTE) Erik
6.2.2 (BB3): UE Power Consumption Optimizations (MTCe-UEPCOP) Erik
6.3 WID for Policy and Charging Control for supporting fixed broadband Access networks (P4C-F) Erik
6.3.1 TR Phase P4C-F work Ivano
6.3.2 Normative Phase work Ivano
6.4 Proximity Services (ProSe) Erik
6.5 Group Communication System Enablers for LTE (GCSE_LTE) Erik
6.6 User Plane Congestion Management (UPCON) Erik
6.7 WLAN Network Selection for 3GPP Terminals (WLAN_NS) Ivano
6.8 ProSe Group Communication, ProSe Relays and Group Communication System Enablers for LTE Common Aspects (ProSe/GCSE_LTE) Erik
6.9 Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) Ivano
6.10 IMS Registration Control (IMS_RegCon) Ivano
6.11 Study on Core Network Overload solutions (FS_CNO) Phase 2 submissions. Erik
6.11.1 GTP-C Overload TEI12 CRs Erik
6.11.2 ULI Signalling Optimizations ongoing study Erik
6.12 Study on S2a Mobility based On GTP and WLAN access to EPC (FS_SaMOG) Ivano
6.13 Study on Optimizing Offloading to WLAN in 3GPP RAT mobility (FS_WORM) Erik
6.14 Consideration of LS on LTE-HRPD SON WID conditional approval (See SP-130298/RP-130865) Erik
6.15 Technical Enhancements and Improvements (TEI12) _Not On Agenda
6.16 Minor Corrections and Clean Up (TEI12) _Not On Agenda
7 Project Planning and Management Erik
7.1 Work Items Discussed in Parallel Session Erik
7.1.1 AOB Erik
7.2 Review of the Work Plan Erik
7.3 Planning future meetings Erik
8 AOB Erik
9 Close of the Meeting Erik