ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG5_Test_ex-T1 / TSGR5_90_Electronic / Inbox / drafts

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon 3GPP Excellence Award 2020.pptx 2021/03/04 14:38 1901,5 KB
icon draft CR GPS signals R5-211298.zip 2021/02/19 11:36 50,3 KB
icon Draft r1 R5-210983 Revised RAN5 WID 5GS_NR_LTE-UEConTest.zip 2021/02/19 12:12 31,5 KB
icon draft R5-210099 WP - NR_Rel-16_CA_DC RAN5#90-e.zip 2021/03/10 11:08 971,2 KB
icon Draft R5-210965 (RAN5-90-e impact on GCF and PTCRB).zip 2021/04/12 11:46 66,1 KB
icon DRAFT R5-210974 (WP 5GS After RAN5-90-e).zip 2021/03/12 12:51 3038,4 KB
icon DRAFT R5-210975 (RAN5-90e SR 5GS WI).zip 2021/03/12 12:51 56 KB
icon DRAFT R5-210976 RAN5-90-e 5GS Rel-15 progress report.zip 2021/03/12 12:51 588,6 KB
icon DRAFT R5-210978 R90e_WP_NR_bands_BW_R16-UEConTest.zip 2021/03/09 15:12 27,8 KB
icon DRAFT R5-210979_SR_NR_bands_BW_R16-UEConTest.zip 2021/03/09 15:12 81 KB
icon Draft R5-210983 Revised RAN5 WID 5GS_NR_LTE-UEConTest.zip 2021/02/17 9:53 31,3 KB
icon draft R5-211307 New WID on UE Conformance Test Aspects – High power UE (power class 2) for EN-DC with 1 LTE band + 1 NR TDD band.doc 2021/02/26 13:10 96 KB
icon Draft R5-211314r1_Draft RAN WG5_ToR.docx 2021/03/02 12:09 26,8 KB
icon draft-R5-20xxxx_38523-1_11_3_7.zip 2021/02/26 14:04 69,9 KB
icon draft-R5-21xxxx-IMS 180 Ringing before or after resource reservation-MT UE without preconditions-v2.zip 2021/03/01 12:22 141,4 KB
icon draft-R5-21xxxx-IMS 180 Ringing before or after resource reservation-MT UE without preconditions.zip 2021/03/01 6:08 22,4 KB
icon draft-R5-21xxxx_38523-1_8.1.1.2.4.zip 2021/02/24 18:18 33,9 KB
icon draft_NBIOT_MFBI_test_frequencies.zip 2021/02/26 18:52 45,4 KB
icon draft_NBIOT_MFBI_test_frequencies_v2.zip 2021/02/26 19:00 45,6 KB
icon draft_NBIOT_MFBI_test_frequencies_v3.zip 2021/02/26 19:04 45,7 KB
icon Draft_r1 R5-210965 (RAN5-90-e impact on GCF and PTCRB).zip 2021/04/13 6:54 67,1 KB
icon Draft_r2 R5-210965 (RAN5-90-e impact on GCF and PTCRB).zip 2021/04/13 7:24 68 KB
icon Draft_r3 R5-210965 (RAN5-90-e impact on GCF and PTCRB).zip 2021/04/14 8:06 69,7 KB
icon draft_R5-210098 SR - NR_Rel-16_CA_DC after RAN5#90-e.docx 2021/03/10 11:08 42,5 KB
icon draft_R5-210105r1_New_SI_5G_UE_Network_Slicing_Testing.docx 2021/02/20 12:59 36,7 KB
icon draft_R5-210105r2_New_SI_5G_UE_Network_Slicing_Testing.docx 2021/02/26 12:49 37,1 KB
icon draft_R5-210106r1_Discussion_5G_UE_Network_Slicing_Testing.docx 2021/02/20 12:59 37,6 KB
icon draft_R5-210106r2_Discussion_5G_UE_Network_Slicing_Testing.docx 2021/02/26 12:49 39,5 KB
icon draft_R5-210289_draft_ProseCR_1113.zip 2021/02/26 18:33 320,8 KB
icon Draft_R5-210977 (RAN5-90e Updated 5GS planning).zip 2021/03/17 9:44 355,8 KB
icon Draft_R5-211087r1_new WID on NR ecall.docx 2021/02/22 4:53 36,9 KB
icon draft_R5-211303_New_WI_NR_eNS_UEConTest.docx 2021/03/03 11:03 36,2 KB
icon draft_R5-211309_New_SI_5G_UE_Network_Slicing_Testing.docx 2021/03/02 15:04 36 KB
icon R5-210312r1draft1 - On minimum requirements for ON_OFF time mask in UL MIMO FR1.docx 2021/02/25 16:52 45 KB
icon R5-21xxxx SIG Actions RAN5#90-e 1 Mar.doc 2021/03/02 15:46 35,5 KB
icon R5-21xxxx SIG Actions RAN5#90-e Start of Meeting.doc 2021/02/22 6:53 34 KB
icon R5-21xxx_Discussion_NBIoT_earlyfeature.zip 2021/03/01 9:48 79 KB
icon RAN5#90-e SIG Session 2 r1.pptx 2021/03/01 12:43 603,8 KB
icon RAN5#90-e_TTCN_Sidebar-v2.zip 2021/03/01 10:29 440,5 KB
icon RAN5#90-e_TTCN_Sidebar-v3.zip 2021/03/01 10:29 461,8 KB
icon UE_early_implementation.zip 2021/03/01 16:49 90,8 KB

41 items.