Tdoc List

2020-03-09 18:23

Agenda Topic TDoc Title Source Type For Avail Treated Decision Wdrn Replaced-by Replaces
1 Opening of the meeting R5‑200000 Agenda WG Chairman agenda Information Yes
YesRAN5#86 Electronic Meeting has full decision power. Review of the IPR obligations, Antitrust and US EAR regulations - please refer to the ‘Reminder for IPR Declaration’ (page 15); ‘Antitrust Guidance’ (page 15) and ‘Statement on US EAR’ (page 16) in R5-200000.
approved No    
    R5‑200001 Agenda - mid week session WG Chairman agenda Information No
Yes
withdrawn Yes    
    R5‑200002 Agenda - closing session WG Chairman agenda Information No
Yes
withdrawn Yes    
    R5‑200003 RAN5#86 E-meeting Timeline, Scope, Process WG Chairman agenda Information Yes
Yes
endorsed No    
2 Reports                      
2.1 Live Reports R5‑200004 RAN5 Leadership Team WG Chairman other Information Yes
Yes
noted No    
    R5‑200005 RAN5#85 WG Minutes ETSI Secretariat report Approval Yes
Yesopen until Fri.
approved No    
    R5‑200006 RAN5#85 WG Action Points ETSI Secretariat report Information Yes
Yes
noted No    
    R5‑200007 Latest RAN Plenary notes WG Chairman report Information Yes
Yes
noted No    
    R5‑200008 Latest RAN Plenary draft Report WG Chairman report Information Yes
Yes
noted No    
    R5‑200009 Post Plenary Active Work Item update ETSI Secretariat other Information Yes
Yesopen until Fri. Sprint: pls. update the WP table.
revised No R5‑200896  
    R5‑200896 Post Plenary Active Work Item update ETSI Secretariat other Information Yes
Yes
noted No   R5‑200009
2.2 General Reports for information R5‑200010 RAN5 SR to RP#86 WG Chairman report Information Yes
Yes
noted No    
    R5‑200011 TF160 SR to RP#86 WG Chairman report Information Yes
Yes
noted No    
    R5‑200012 RAN Chair Report to SA#86 WG Chairman report Information Yes
Yes
noted No    
    R5‑200238 GCF 3GPP TCL after GCF CAG#61 Ericsson other Information Yes
Yes
noted No    
    R5‑200479 3GPP RAN5 CA status list (pre-RAN5#86-e meeting) Ericsson other Information No
Yes
withdrawn Yes    
3 Incoming Liaison Statements R5‑200017 Reply LS on MOP for intra-band EN-DC TSG WG RAN4 LS in Information Yes
YesRAN5 Vice Chair RF: deferred until 20.2. Huawei: all the actions in RAN5 LS seem to have been taken care effectively, no further clarification is needed from RAN4. No reply LS needed.
noted No    
    R5‑200018 Reply LS on 5G-NR FR2 Transmitter & Receiver Testability Issues MSG TFES LS in Information Yes
Yesconclusion upfront postponed to RP#87.
withdrawn Yes    
    R5‑200019 dummy LS2 ETSI LS in Information No
Yes
withdrawn Yes    
4 RAN5 General Issues                      
4.1 New Work Item proposals - for intro only R5‑200683 Views on the NR FR1 TRP/TRS requirement specification Apple (UK) Limited WID new Decision No
Yes
withdrawn Yes    
    R5‑200684 Views on the NR FR1 TRP/TRS requirement specification Apple (UK) Limited WID new Decision Yes
YesRAN5 Chair: outside the meeting scope.
withdrawn Yes    
    R5‑200862 New SID on NR FR1 and EN-DC FR1 UE TRP and TRS Guangdong OPPO Mobile Telecom. SID new Information Yes
YesRAN5 Chair: is outside the meeting scope. Due to the reduced scope of E-meeting this topic cannot be part of the agenda. Suggestion is to make use of the RAN5 main exploder following the completion of RAN5#86-e meeting to collect RAN5 feedback on SID as well as the discussion paper. Guangdong OPPO Mobile Telecom: We have discussed with the parties that have strong views on this topic in RAN and mores discussions are still ongoing. We expect there will be some initial level agreement before going to the F2F meeting. And we will report the latest progress information for reference before the next F2F discussion.
withdrawn Yes    
4.2 General Discussion Papers                      
4.2.1 5GS R5‑200157 Discussion paper on NR test frequencies for PCells to achieve full bandwidth testing of NR bands Ericsson discussion Endorsement Yes
YesAll proposals accepted. r1 was produced. Based on comments from Rohde & Schwarz. The changes is editorial to correct duplicated clause numbers and the associated references in the discussion paper.
revised No R5‑201004  
    R5‑201004 Discussion paper on NR test frequencies for PCells to achieve full bandwidth testing of NR bands Ericsson discussion Endorsement Yes
YesNoted with all proposals accepted
noted No   R5‑200157
    R5‑200241 Discussion of ambiguity of Ninfo in TBS calculation Huawei,Hisilicon discussion Approval Yes
YesQualcomm and Motorola Mobility commented. Huawei: prefer to go with option 2 a little bit if this is not too difficult for TTCN implementation. By option 1, strictly speaking we don’t have a full TBS test, and we don’t know when RAN1 can make a choice, that may need a long time. ZTE: The following conclusion made in last RAN1 meeting clearly states that there is no consensus in RAN1 to address this issue in Rel-15. Conclusion On the issue of ambiguity with regards to the definition of N_info, there is no consensus in RAN1 to make specificiation change in Rel-15. For further discussion on whether to fix this in Rel-16 In the RAN1 email reflector, RAN1 is discussing whether the CR R1-2000558 should be treated in the upcoming e-meeting. The proposal from the Chair is not to treat this issue in this e-meeting because of the above RAN1 conclusion. " Issue #26(R1-2000558, Nokia): Based on the comments so far, I propose we do not take this issue for email discussion." And RAN2 also has no plan to define any mechanism to report UE behavior on it. So from our understanding, it is a proper assumption to assume that a real network will skip the "abnormal" cases by implementation. Therefore, we support Option 1 ( skip the specific TBS size) so that it is more aligned with this assumption. RAN5 Chair: no consensus on a way forward. There seems to be the following views expressed to date: 1. Wait for RAN1 to conclude at their current e-meeting and revisit this topic again in RAN5#87. 2. Accept and proceed with option 1 - skip the specific TBS size Will be postponed to the next RAN5#87 meeting. Impact on TC 7.1.1.4.2.3. ->proposal for RAN5 to go ahead with Option 1: skip the specific TBS size. Conclusion: RAN5 accepted the solution 'skip the specific TBS size'. Proponents to submit CRs to RAN5#87 meeting to introduce this solution into test specifications. TTCN implementation shall be dependent on prose update.
noted No    
    R5‑200245 Feature priority inputs for the RAN5 5GS work plan MCC TF160 discussion Information Yes
Yeslate doc. Ericsson: defer until RAN5#87? Conclusion: Noted with information collected to be used for 5GS Phase planning.
noted No    
    R5‑200792 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200793 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200809 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200845 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200846 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200847 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200848 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200850 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200851 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200852 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision No
Yesduplication of R5-200853.
withdrawn Yes    
    R5‑200853 About NR FR1 TRP TRS Guangdong OPPO Mobile Telecom. discussion Decision Yes
Yesoutside the meeting scope.
withdrawn Yes    
4.2.2 All other topics                      
4.3 RAN5 PRDs/Templates R5‑200013 RAN5#86 LS Template WG Chairman other Information Yes
Yes
noted No    
4.4 Meeting schedule for 2020-21 R5‑200014 Meeting schedule for 2020 WG Chairman other   Yes
Yes
noted No    
4.5 Tdocs for mid-week joint session                      
4.5.1 RF group docs for WG review/verdict - original A.I. retained                      
4.5.2 Sig group docs for WG review/verdict - original A.I. retained R5‑200286 Update TS38.508-2 Table A.4.3.2B.2.3.12-1 CGC Inc. CR Agreement No
Yeslate doc
withdrawn Yes    
4.5.3 Other open issues from joint sessions - original A.I. retained                      
4.5.4 UE Application Layer Data Throughput Performance TEI11_Test / TEI15_Test (TR 37.901)                      
4.5.5 GCF Test Optimisation                      
4.5.6 5GS                      
4.5.7 Other                      
5 RF Functional Area                      
5.1 Review action points (fm A.I. 2.1)                      
5.2 Review incoming LS (fm A.I. 3) & new subject discussion papers                      
5.3 Open Work Items                      
5.3.1 Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest                      
5.3.1.1 TS 36.508                      
5.3.1.2 TS 36.521-1 R5‑200772 Update of TC 8.2.2.3.1_A.4 TDD PDSCH Open Loop Spatial Multiplexing 2x2 for CA (5DL CA) SGS Wireless CR Agreement Yes
Yesout of scope of meeting, SGS agreed to withdraw
withdrawn Yes    
5.3.1.3 TS 36.521-2                      
5.3.1.4 TS 36.521-3                      
5.3.1.5 TS 37.571-1                      
5.3.1.6 TS 37.571-3                      
5.3.1.7 TS 37.571-5                      
5.3.1.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.1.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.1.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.1.11 Discussion Papers / Work Plan / TC lists                      
5.3.2 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest                      
5.3.2.1 TS 38.508-1 R5‑200331 CR to 38.508-1 to introduce DFF Range Length Keysight Technologies UK Ltd CR Agreement Yes
Yesno cl. aff. r1 was produced. Comments from R&S for the need of improvement of the text in one of the steps.
revised No R5‑200899  
    R5‑200899 CR to 38.508-1 to introduce DFF Range Length Keysight Technologies UK Ltd CR Agreement Yes
Yescontained no revision marks.
revised No R5‑201232 R5‑200331
    R5‑201232 CR to 38.508-1 to introduce DFF Range Length Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200899
    R5‑200433 Correction to powerControlOffset for performance tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200434 Correction to RACH configuration for RRM tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200435 Correction to TDD UL-DL Config for performance test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200437 Correction to TRS configuration for RRM tests Anritsu, Keysight Technologies CR Agreement Yes
Yesr1 was produced. - Merge changes from R5-200871(KS) - Added n NZP-CSI-RS-Resources for NZP CRI RS. Added entries are conditioned with CRS_RS_RMC. - Added Keysight as co-source company.
revised No R5‑201197  
    R5‑201197 Correction to TRS configuration for RRM tests Anritsu, Keysight Technologies CR Agreement Yes
Yes
agreed No   R5‑200437
    R5‑200566 Addition of NR SUL connection diagrams Huawei,Hisilicon CR Agreement Yes
Yescover +NR r1 was produced. Comments from R&S. r2 was produced. i. Based on offline comments, update UE diagrams for SUL. Adding UE connection diagrams in which NR SUL and NR NUL transmitted on the same antenna.(Figure A.3.2.3.6 and A.3.2.3.8) ii. Adding Figure A.3.1.2.4: Test Equipment connection for NR SUL TX-tests with additional Spectrum Analyzer iii. Delete extra chapter title: A.3.1.2 Transmitter tests using Spectrum Analyser?
revised No R5‑200966  
    R5‑200966 Addition of NR SUL connection diagrams Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200566
    R5‑200594 Corrections on test frequencies for EN-DC band combinations including FR1 and FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yeswas wrong WIC r1 was produced. For joint.
revised No R5‑200900  
    R5‑200900 Corrections on test frequencies for EN-DC band combinations including FR1 and FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200594
    R5‑200595 Corrections on test frequencies for EN-DC band combinations including FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yeswas wrong WIC r1 was produced. For joint.
revised No R5‑200901  
    R5‑200901 Corrections on test frequencies for EN-DC band combinations including FR2 in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200595
    R5‑200596 Corrections on uplink EN-DC configurations for test frequencies in 38.508-1 ZTE Corporation CR Agreement Yes
Yeswas wrong WIC r1 was produced. For joint.
revised No R5‑200902  
    R5‑200902 Corrections on uplink EN-DC configurations for test frequencies in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200596
    R5‑200671 TRS configuration messages definition for RF in 38.508-1 Keysight Technologies UK Ltd CR Agreement Yes
Yesfor email agreement r1 was produced.
revised No R5‑201246  
    R5‑201246 TRS configuration messages definition for RF in 38.508-1 Keysight Technologies UK Ltd CR Agreement Yes
Yescorresponding RAN4 CR R4-2002918 has been agreed. Email agreed.
agreed No   R5‑200671
    R5‑200742 Addition of IFF DFF Hybrid Setup for FR2 2AoA RRM test Anritsu CR Agreement Yes
Yesr1 was produced. Remove the description about QZ Size to be aligned with updated associated discussion paper R5-200020r1.
revised No R5‑201189  
    R5‑201189 Addition of IFF DFF Hybrid Setup for FR2 2AoA RRM test Anritsu CR Agreement Yes
Yes
agreed No   R5‑200742
    R5‑200871 Update CSI-RS Meas config for RRM message exceptions Keysight Technologies UK Ltd CR Agreement Yes
Yesalready covered Anritsu R5-200437r1.
withdrawn Yes    
5.3.2.2 TS 38.508-2 R5‑200688 Updates on UE capability for Rel-15 NR CA configuration NTT DOCOMO INC. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201162  
    R5‑201162 Updates on UE capability for Rel-15 NR CA configuration NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑200688
5.3.2.3 TS 38.509                      
5.3.2.4 TS 38.521-1                      
5.3.2.4.1 Tx Requirements (Clause 6) R5‑200036 Correction of reference numbers in TS 38.521-1 CMCC CR Agreement Yes
Yesr1 was produced. r2 was produced.
revised No R5‑200971  
    R5‑200971 Correction of reference numbers in TS 38.521-1 CMCC CR Agreement Yes
Yes
agreed No   R5‑200036
    R5‑200344 Corrections to TC 6.3A.3 transmit On OFF time mask for CA FR1 China Unicom CR Agreement Yes
Yesr1 was produced. The Po_NominalWithGrant should set to -106dBm because only even value for Po_NominalWithGrant is allowed (step size 2) in TS38.311. The associated discussion paper is R5-200478r1.
revised No R5‑200962  
    R5‑200962 Corrections to TC 6.3A.3 transmit On OFF time mask for CA FR1 China Unicom CR Agreement Yes
Yes
agreed No   R5‑200344
    R5‑200396 Cleaning up of power class 2 test cases in FR1 Huawei, HiSilicon, CMCC CR Agreement Yes
Yesr2 was produced. Keysight: R5-200396 is also addressing the topic of the UE Tx Diversity in the proposed HPUE tests. However, my understanding is that there is not yet RAN4 consensus and response to “R5-198688 - LS on the testability of FR1 Tx diversity” so meanwhile only 1 UE Tx antenna should still be considered. Huawei: RAN4’s ongoing discussion is limited to MIMO mode with one layer and two antenna ports. That’s not the same as whats in this CR. For MOP testing it’s reasonable to measure the sum of power on both antenna connectors. This problem faces urgent industry need and we need to figure out a way forward in this meeting. Without clearly defining the test method, the validation and conformance testing of UE with 2 Tx antennas will be blocked. Ericsson and R&S agreed with Keysight. Probably withdrawn.
revised No R5‑201196  
    R5‑201196 Cleaning up of power class 2 test cases in FR1 Huawei, HiSilicon, CMCC CR Agreement Yes
YesRAN4 dependency R4-2000117 for email agreement r1 was produced. Qualcomm disagreed: TxD is out of scope for RAN 5 test procedure because there is no core requirement for it. The means for such UE declaration within the spec (signaling based or 38.508-2 PICS based or some other means) does not exist as of today. Without a means to implement a UE declaration, the proposed NOTE in 6.2.1 is un-testable. r2 was produced. Qualcomm agreed: pls. align r2 with what is endorsed in slide # 4 of R5-201181, text in Sections 6.2.1.4.2 Step # 4, 6.2.2.4.2 Step # 4 and 6.5.2.4.1.4.2 Step # 7 (and maybe other places) from “exception” to “message exception”.
revised No R5‑201247 R5‑200396
    R5‑201247 Cleaning up of power class 2 test cases in FR1 Huawei, HiSilicon, CMCC CR Agreement Yes
YesRAN4 CR was not approved. More discussion in RAN5 is needed to coordinate the understanding of current core specification. Postponed to next meeting. Verdict is not having any impact to R5-201196r2 and we can proceed with implementation of the final version of the CR into TS38.521-1."
agreed No   R5‑201196
    R5‑200397 Updating power configuration for PRACH time mask Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200438 Clarification of measurement interval of frequency error in FR1 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200439 Correction to 6.2.3 A-MPR test case Anritsu CR Agreement Yes
Yesr1 was produced. Corrected the test ID numbering in test requirement Tables in 6.2.3.5-4, 6.2.3.5-5. ericsson: Some changes conflict with R5-200767. r2 was produced.
revised No R5‑200972  
    R5‑200972 Correction to 6.2.3 A-MPR test case Anritsu CR Agreement Yes
Yes
agreed No   R5‑200439
    R5‑200440 Correction to 6.3.4.3 Power Control Relative power tolerance Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200441 Correction to SEM and ACLR test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200442 Correction to transmit modulation quality test in FR1 Anritsu CR Agreement Yes
Yesr1 was produced. Place of new paragraph regarding DC location in SUL test is corrected from 6.4C.2.1 to 6.4C.2.
revised No R5‑200973  
    R5‑200973 Correction to transmit modulation quality test in FR1 Anritsu CR Agreement Yes
Yes
withdrawn Yes   R5‑200442
    R5‑200443 Correction to UL power window description for 6.3.4.4 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200567 Update of test description for NR test case 6.2.2-MPR Huawei,Hisilicon CR Agreement Yes
Yesmissed +"test description for"
withdrawn Yes    
    R5‑200568 Update of test requirements for NR test case 6.5D.2.2 and 6.5D.2.4 Huawei,Hisilicon CR Agreement Yes
Yesmissed +"test requirements for" r1 was produced. Cover update.
revised No R5‑200974  
    R5‑200974 Update of test requirements for NR test case 6.5D.2.2 and 6.5D.2.4 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200568
    R5‑200569 Update of NR SUL test cases Huawei,Hisilicon CR Agreement Yes
Yes+ "test configurations for" r1 was produced.Correcting Title in the coversheet to solve 3GU issue. Adding content of table 6.4C.2.1.4-2 for PRACH message content in 6.4C.2. Correcting a mistake in the line above Table 6.4C.2.1.4-1. Based on offline comment, updating Test Channel bandwidth for Non-SUL carrier in Table 6.2C.3.4-1 to eliminate replication errors.
revised No R5‑200975  
    R5‑200975 Update of NR SUL test cases Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200569
    R5‑200570 Update of NR test case 6.5.3.2-Spurious emission for UE co-existence Huawei,Hisilicon CR Agreement Yes
YesSecoex
agreed No    
    R5‑200639 Update of Minimum requirements of 6.2.2 UE maximum output power reduction CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200640 Update of Minimum requirements of 6.2.2 UE maximum output power reduction CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200658 Update of 6.1 common part of Tx in TS38.521-1 China Unicom CR Agreement Yes
Yes
agreed No    
    R5‑200659 Core spec alignment for test case 6.3.4.3 Relative power tolerance Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200664 Correction of UL configuration for almost contiguous allocation in 6.2.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200666 Update measurement bandwidth references in 6.5.4 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200693 Update for 6.5.3.2 Spurious emission for UE co-existence Qualcomm Korea CR Agreement Yes
Yes
agreed No    
    R5‑200694 Update for 6.5.3.3 Additional spurious emissions Qualcomm Korea CR Agreement Yes
Yesr1 was produced. r2 was produced. Corrected typo in table numbering for new table added for NS_45 Added Editor’s note to indicate TP analysis for NS_05 and NS_45 are TBD.
revised No R5‑200892  
    R5‑200892 Update for 6.5.3.3 Additional spurious emissions Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑200694
    R5‑200696 Correct power window settings Qualcomm Korea CR Agreement Yes
YesDiscussion paper 0695 offline discussions To be withdrawn pending further agreements on the MUr value.
withdrawn Yes    
    R5‑200725 Correction of A-SE for NS_04 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200726 Update of NR test case 6.2.4-ConfigTP Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Coversheet correction.
revised No R5‑200976  
    R5‑200976 Update of NR test case 6.2.4-ConfigTP Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200726
    R5‑200755 Removing text from a Void clause Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200756 Aligning A-MPR clause with TS 38.101-1 Rel-15 Ericsson CR Agreement Yes
Yeslate doc r1 was produced. • Correcting Test applicability in 6.2.3.2 for NS_05U and NS_100. • Adding references to ACLR requirements for test case 6.5.2.4. • Correcting references to ACLR requirements in Table 6.2.3.3.1-1 for NS_03U, NS_05U and NS_43U.
revised No R5‑200906  
    R5‑200906 Aligning A-MPR clause with TS 38.101-1 Rel-15 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200756
    R5‑200757 Correction of A_MPR test for NS_05 and NS_05U Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200759 Update of test case 6.2.3 UE A_MPR, NS_37 Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200761 Update of test case 6.2.3 UE A_MPR, NS_38 Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200763 Update of test case 6.2.3 UE A_MPR, NS_39 Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200765 Corrections of NS_43 in 38.521-1 section 6 Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200767 Corrections of NS_43U in 38.521-1 section 6 Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc changes in R5-200439r1 conflict.
agreed No    
    R5‑200769 Corrections of NS_18 in 38.521-1 section 6 Ericsson CR Agreement Yes
Yeslate doc totally different title: "Adding test of A_MPR for NS_18 to clause 6.2.3". Revised after the meeting.
revised No R5‑201238  
    R5‑201238 Corrections of NS_18 in 38.521-1 section 6 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200769
5.3.2.4.2 Rx Requirements (Clause 7) R5‑200037 Update of TC 7.7A.1 CMCC, Huawei, Hisilicon CR Agreement Yes
Yesr1 was produced. The test procedure has been updated to fix the overlap with R5-200727. The header has been changed into e-meeting format. The Source of the coversheet have been changed.
revised No R5‑200907  
    R5‑200907 Update of TC 7.7A.1 CMCC, Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200037
    R5‑200461 Update of 7.6A.3.1 Out-of-band blocking for 2DL CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200462 Update of 7.6A.4.1 Narrow band blocking for 2DL CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200463 Update of 7.8A.2.1 Wide band Intermodulation for 2DL CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200571 Update of NR test case 7.4A Maximum input level for CA Huawei,Hisilicon CR Agreement Yes
Yescorrected coversheet title from old: Update of NR test case 7.4A.1-MaxIL 2DL CA r1 was produced. Undone some changes to resolve overlapping with R5-200391 and R5-200727.
revised No R5‑200977  
    R5‑200977 Update of NR test case 7.4A Maximum input level for CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200571
    R5‑200572 Update of NR test case 7.6A.2 Inband Blocking for CA Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Cover.
revised No R5‑200978  
    R5‑200978 Update of NR test case 7.6A.2 Inband Blocking for CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200572
    R5‑200641 Core spec alignment for 7.6.3 and 7.8 CAICT CR Agreement Yes
Yesr1 was produced.
revised No R5‑200893  
    R5‑200893 Core spec alignment for 7.6.3 and 7.8 CAICT CR Agreement Yes
Yes
agreed No   R5‑200641
    R5‑200700 Removal of square brackets for DCI format for test cases in 7.6 and 7.7 of SA FR1 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200727 Cleaning up of Rx 2DL CA test cases in FR1 Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Cleaning up overlapping with R5-200391. Deleting subclause 7.7A.1 to fix the overlap with R5-200037.
revised No R5‑200979  
    R5‑200979 Cleaning up of Rx 2DL CA test cases in FR1 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200727
5.3.2.4.3 Clauses 1-5 / Annexes R5‑200022 Updates of MU and TT in TS 38.521-1 NTT DOCOMO, INC. CR Agreement Yes
YesThere is no agreement for -1 MU and TT during this meeting except for Huawei’s papers (0392_Dp, 0393_CR)
withdrawn Yes    
    R5‑200038 Update of Clause 4 in TS 38.521-1 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200908  
    R5‑200908 Update of Clause 4 in TS 38.521-1 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200038
    R5‑200337 Update of clause 5 to TS 38.521-1 in R15 China Unicom CR Agreement Yes
Yesr1 was produced: Removed band combos n77D/n78D/n79D and n77E/n78E/n79E from Table 5.5A.1-1 to align with core spec TS38.101-1.
revised No R5‑200909  
    R5‑200909 Update of clause 5 to TS 38.521-1 in R15 China Unicom CR Agreement Yes
Yes
agreed No   R5‑200337
    R5‑200391 Adding statistical testing condition in Annex H for CA testing Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced.
revised No R5‑200924  
    R5‑200924 Adding statistical testing condition in Annex H for CA testing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200391
    R5‑200393 Adding MU and TT for FR1 Rx CA test cases Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.2.5 TS 38.521-2 R5‑200039 Correction of reference numbers in TS 38.521-2 CMCC CR Agreement Yes
Yescoversheet spec + data r1 was produced.
revised No R5‑200980  
    R5‑200980 Correction of reference numbers in TS 38.521-2 CMCC CR Agreement Yes
Yes
agreed No   R5‑200039
    R5‑200332 CR to 38.521-2 to properly define Link and Meas Angles Keysight Technologies UK Ltd CR Agreement Yes
Yesdependent on a RAN4 CR R4-2000198. for email agreement RAN4 CR had to be revised to R4-2002734 to make small editorial changes. Not pursued.
not pursued No    
    R5‑200861 Update to SA FR2 Spurious Emission Test Case Anritsu CR Agreement Yes
Yesmerged into R5-200023 (Docomo).
withdrawn Yes    
5.3.2.5.1 Tx Requirements (Clause 6) R5‑200223 Correction to TC 6.3.4.4 Aggregate power tolerance LG Electronics CR Agreement Yes
Yesr1 was produced. Offline discussion with Ericsson. r2 was produced. - Alignment to latest Core Spec - The scheduling pattern is modified in figure 6.3.4.4.4.2-1 for RAN4 alignment(R4-2000003). - The power window is modified in test procedure from E///’s comments.
revised No R5‑200894  
    R5‑200894 Correction to TC 6.3.4.4 Aggregate power tolerance LG Electronics CR Agreement Yes
Yesfor email agreement Email agreed.
agreed No   R5‑200223
    R5‑200224 Introduction of New TC 6.4A.2.3.2 In-band emissions for 3UL CA LG Electronics CR Agreement No
Yes
withdrawn Yes    
    R5‑200368 Addition of new test case 6.3A.1.4 Minimum output power for 5UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200369 Addition of new test case 6.3A.1.5 Minimum output power for 6UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200372 Addition of new test case 6.3A.1.6 Minimum output power for 7UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200374 Addition of new test case 6.3A.1.7 Minimum output power for 8UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200375 Addition of new test case 6.4A.2.1.4 Error vector magnitude for 5UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200376 Addition of new test case 6.4A.2.1.5 Error vector magnitude for 6UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200377 Addition of new test case 6.4A.2.1.6 Error vector magnitude for 7UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200380 Clarification of UEsetting for FR2 in TS38.521-2 Conformance test Sporton International Inc. CR Agreement Yes
Yesoutside of meeting scope.
withdrawn Yes    
    R5‑200382 Addition of new test case 6.4A.2.1.7 Error vector magnitude for 8UL CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200383 Update of test cases for Error vector magnitude for CA in FR2 TTA CR Agreement Yes
Yes
agreed No    
    R5‑200444 Clarification of measurement interval of frequency error in FR2 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200445 Correction to transmit modulation quality tests in FR2 Anritsu CR Agreement Yes
Yesadding the same sentence from core requirement in general section will not provide enough clarity in each test case. Will come back in next meeting
withdrawn Yes    
    R5‑200467 Update of absolute power tolerance for test point 3 Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. .docx
revised No R5‑201060  
    R5‑201060 Update of absolute power tolerance for test point 3 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200467
    R5‑200555 Additions to Initial Conditions and Messages for SRS time mask with UL MIMO Samsung R&D Institute UK CR Agreement Yes
Yes"Addition to SRS time mask with UL MIMO test case document was not treated since UL-MIMO out of scope of e-meeting"
not treated No    
    R5‑200557 Clarify absolute power tolerance for CA TP3 Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No    
    R5‑200559 Beam correspondence TC message contents clarifications Samsung R&D Institute UK CR Agreement Yes
Yesr1 was produced. Changed the derivation path in the additional message contents. r2 was produced.
revised No R5‑200910  
    R5‑200910 Beam correspondence TC message contents clarifications Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No   R5‑200559
    R5‑200642 Updates to test case relative power tolerance 6.3.4.3 Ericsson CR Agreement Yes
YesR&S: didn't agree to remove the associated editor’s note. r1 was produced.
revised No R5‑201161  
    R5‑201161 Updates to test case relative power tolerance 6.3.4.3 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200642
    R5‑200652 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200654 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200655 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement No
Yes
withdrawn Yes    
    R5‑200656 Correction of Editor's note of 6.2.2 and 6.3.2 of SA FR2 R15 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200800 Update of Standalone FR2 A-MPR test case Ericsson CR Agreement Yes
Yes
agreed No    
5.3.2.5.2 Rx Requirements (Clause 7) R5‑200466 Update of FR2 REFSENS Huawei, HiSilicon CR Agreement Yes
YesCovered by R5-200602 from Qualcomm.
withdrawn Yes    
    R5‑200602 Updates to reference sensitivity test case Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No    
5.3.2.5.3 Clauses 1-5 / Annexes R5‑200023 Updates of MU and TT in TS 38.521-2 NTT DOCOMO, INC. CR Agreement Yes
Yesr1 was produced. 1) Brackets of Rx Spur (band n257, 34 to 40 GHz) was removed based on the endorsement of R5-201034. 2) Editor’s note in OFF power was removed based on the MU completion of R5-200744r2 (TR 38.902 CR). 3) Editor’s note and offset value of General Spurious was updated based on the R5-200744r2. 4) Some missing test cases for UL CA are introduced to the Annex F.
revised No R5‑201192  
    R5‑201192 Updates of MU and TT in TS 38.521-2 NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑200023
    R5‑200040 Update of Clause 4 in TS 38.521-2 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes. Associated supporting paper R5-200046r1.
revised No R5‑200911  
    R5‑200911 Update of Clause 4 in TS 38.521-2 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200040
    R5‑200319 CR to 38.521-2 on CDF/PDF Scaling Factor Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200320 CR to 38.521-2: Correction to TRP grid Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200418 Update of Operating bands and Channel arrangement of SA FR2 R15 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200465 Update of rx beampeak search Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. .docx
revised No R5‑201059  
    R5‑201059 Update of rx beampeak search Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200465
    R5‑200593 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement Yes
Yeswas wrong AI. r2 was produced. RAN4 dependency. Apple submitted similar CR in RAN4.
revised No R5‑200912  
    R5‑200912 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement Yes
Yesfor email agreement rev -. Needs final revision! No revision marks!
revised No R5‑201243 R5‑200593
    R5‑201243 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement No
Yesfor email agreement RAN4 agreed R4-200003 again no revision marks
revised No R5‑201244 R5‑200912
    R5‑201244 Correction of the FR2 RMC slot patterns for MOP test cases Apple (UK) Limited CR Agreement Yes
Yesfor email agreement Email agreed
agreed No   R5‑201243
    R5‑200667 Alignment of Table A.3.1-1 in 38.521-2 to core spec 38.101-2 Keysight Technologies UK Ltd CR Agreement Yes
YesRAN4 dependency, R4 spec correction needed as TRS config in RAN4 spec 38.101-1/2 causes TRS and SSB to collide in the same slot for email agreement r1 was produced.
revised No R5‑201248  
    R5‑201248 Alignment of Table A.3.1-1 in 38.521-2 to core spec 38.101-2 Keysight Technologies UK Ltd CR Agreement Yes
Yescorresponding RAN4 CR R4-2002918 has been agreed. Email agreed.
agreed No   R5‑200667
5.3.2.6 TS 38.521-3 R5‑200740 Update to EN-DC tests with 3CCs and above Anritsu CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200863 Update to NSA FR2 Spurious Emission Test Case Anritsu CR Agreement Yes
Yesr1 was produced. Editorial errors corrected. merged into R5-200024 (Docomo).
revised No R5‑200981  
    R5‑200981 Update to NSA FR2 Spurious Emission Test Case Anritsu CR Agreement Yes
Yes
withdrawn Yes   R5‑200863
5.3.2.6.1 Tx Requirements (Clause 6) R5‑200115 Updates of test parameter for MOP and Spurious co-existence NTT DOCOMO, INC. CR Agreement Yes
YesRelated/Conflicted CRs (0400, 0447) are still under discussion however this CR is covered by the other CRs in any case.
withdrawn Yes    
    R5‑200381 Clarification of UEsetting for FR2 in TS38.521-3 Conformance test Sporton International Inc. CR Agreement Yes
Yesoutside of meeting scope.
withdrawn Yes    
    R5‑200399 Adding common uplink configuration of E-UTRA carrier for EN-DC testing Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced.
revised No R5‑200925  
    R5‑200925 Adding common uplink configuration of E-UTRA carrier for EN-DC testing Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200399
    R5‑200400 Updating MOP for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. Revision is based on the understanding that SA MOP requirements would apply to non-overlapping transmission. r3 was produced. Removed ‘The test case is incomplete’ from Editor’s note so that the case remains complete based on 38.101-3 rapporteur’s comment. The test case has already fulfilled coverage of core requirements. Any further investigation of additional scenario can be carried without changing the test case back to incomplete.
revised No R5‑201055  
    R5‑201055 Updating MOP for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200400
    R5‑200401 Updating configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. Similar changes as in R5-200405r2.
revised No R5‑200926  
    R5‑200926 Updating configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200401
    R5‑200404 Updating MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. SA MOP requirements apply to non-overlapping transmission.
revised No R5‑201183  
    R5‑201183 Updating MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesfor email agreement Ericsson disagreed: The provisions on MIMO support for EN-DC on 38.101-3 clause 6.1 are part of one of five options discussed by RAN4 for resolving the power class ambiguity. The RAN5 CRs for email agreement are assuming that “Option 1” is selected by RAN4. RAN4 discussions have not been concluded, which implies that the requirements are still open in this scenario (even if there are some text in 38.101 which contradicts this). Ericsson does not support Option 1 since this does not resolve the ambiguity in network signaling, and would like to remove the provision in section 6.1 of 38.101-3. RAN5 should not agree any CRs before RAN4 agreement has been reached, and the core specifications has been updated (depending on the option agreed). The 5 options mentioned above are also the reason why the related RAN5 discussion on power class 2 for single or dual UE Tx couldn’t be agreed. For the above reasons, Ericsson cannot agree to these CRs at this meeting and would like to continue discussing the subject and resolve it in coming meetings after RAN4 discussions have finalized.
postponed No   R5‑200404
    R5‑200405 Updating configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. r3 was produced. The test procedure step 3 is updated to cover all scenarios in a more general way.
revised No R5‑200927  
    R5‑200927 Updating configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200405
    R5‑200408 Updating MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. SA MOP requirements apply to non-overlapping transmission.
revised No R5‑201185  
    R5‑201185 Updating MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesfor email agreement Ericsson disagreed. See R5-201183.
postponed No   R5‑200408
    R5‑200409 Updating configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. Similar changes are captured as R5-200405r2.
revised No R5‑200928  
    R5‑200928 Updating configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200409
    R5‑200446 Correction to FR1 EN-DC Spurious Test Case Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200447 Correction to FR1 Inter-band EN-DC tests with exceptional requirement Anritsu CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200448 Correction to LTE specialSubframePatterns in Maximum Output Power Test Case Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200449 Correction to tdm-PatternConfig in FR1 EN-DC Maximum Output Power Test Case Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200630 Correcting usage of modifiedMPR-Behaviour Ericsson CR Agreement Yes
Yesr1 was produced. r2 was produced.
revised No R5‑201198  
    R5‑201198 Correcting usage of modifiedMPR-Behaviour Ericsson CR Agreement Yes
Yes
agreed No   R5‑200630
    R5‑200650 Updates to 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yesr1 was produced.
revised No R5‑200982  
    R5‑200982 Updates to 6.5B.2.1.3, Adjacent channel leakage ratio for intra-band contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No   R5‑200650
    R5‑200651 Updates to 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200653 Updates to 6.2B.2.2, UE Maximum Output Power reduction for Intra-Band Non-Contiguous EN-DC Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200657 Updates to 6.2B.2.3 and 6.2B.3.3 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200670 Update reference in Test Requirement section of 6.5B.4.3.5 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200724 Core spec alignment of EN-DC MOP and configured output power Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Fixing the overlapping with R5-200651 and R5-200653
revised No R5‑200929  
    R5‑200929 Core spec alignment of EN-DC MOP and configured output power Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200724
    R5‑200730 Correction to reference table number for TC 6.2B.2.3 and TC 6.2B.2.4 LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑200771 Corrections to 6.2B.3.1, UE A_MPR for Intra-band Contig EN_DC Ericsson CR Agreement Yes
Yeslate doc r1 was produced. R&S: In Table 6.2B.3.1.4.1-1 and Table 6.2B.3.1.4.1-2 there is a “B or B” entry. Should this just be B, or something else? In the test procedure you insert: “For TDD slots with transient periods are not under test.” which is coming from LTE. In NR we usually apply “For TDD, only slots consisting of only UL symbols are under test.” r2 was produced. • The insertion of a new column to existing tables is removed and replaced by a new table including the new column. The old table is removed. • “B or B” for Test ID 45 in Table 6.2B.3.1.4.1-1 and Table 6.2B.3.1.4.1-2 is replaced by “B or C”. • Clarification to Test procedure step 3 that “For TDD, only slots consisting of only UL symbols are under test.”
revised No R5‑200983  
    R5‑200983 Corrections to 6.2B.3.1, UE A_MPR for Intra-band Contig EN_DC Ericsson CR Agreement Yes
Yes
agreed No   R5‑200771
    R5‑200801 Update of Non-Standalone FR2 A-MPR test case Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200814 Correction to Test Case 6.5B.3.3.2 ROHDE & SCHWARZ CR Agreement Yes
Yesoverlap has been cleared since CR R5-200722 has been withdrawn.
agreed No    
5.3.2.6.2 Rx Requirements (Clause 7) R5‑200041 Addition of Clause 7.5B.0.3a CMCC CR Agreement Yes
Yesr1 was produced.
revised No R5‑200984  
    R5‑200984 Addition of Clause 7.5B.0.3a CMCC CR Agreement Yes
Yes
agreed No   R5‑200041
    R5‑200043 Update of TC 7.5B.1 ACS for for intra-band contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yesr1 was produced.
revised No R5‑200964  
    R5‑200964 Update of TC 7.5B.1 ACS for for intra-band contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yes
agreed No   R5‑200043
    R5‑200044 Update of TC 7.5B.2 ACS for for intra-band non-contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yescover: add +non-! wrong data. r1 was produced. r2 was produced.
revised No R5‑200963  
    R5‑200963 Update of TC 7.5B.2 ACS for for intra-band non-contiguous EN-DC 2CCs CMCC CR Agreement Yes
Yes
agreed No   R5‑200044
    R5‑200668 Correction of reference clause for 7.3B.2.3 Reference Sensitivity Test Procedure Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200669 Correction on invalid CBW in 7.3B.2.3 Keysight Technologies UK Ltd CR Agreement Yes
Yeschanges contained in R5-200813.
withdrawn Yes    
    R5‑200728 Correction of test cases in 7.6B.2 Inband blocking for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200731 Correction of test cases in 7.6B.3 Out-of-band blocking for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200732 Correction of test cases in 7.6B.4 Narrow band blocking for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200733 Correction of test cases in 7.7B Spurious response for DC CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200751 Correction of REFSENS for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesseveral comments by R&S. r1 was produced.
revised No R5‑201165  
    R5‑201165 Correction of REFSENS for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200751
    R5‑200813 Correction of Reference Sensitivity Test Case 7.3B.2.3 ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. Removal of changes to tables 7.3B.2.3.4.2.1-3c and -3k in order to resolve overlap with CR R5-200751. Typo corrections on cover sheet. No technical changes. r2 was produced. Correction of the test requirement in Table 7.3B.2.3.5-4 based on Keysight's comment.
revised No R5‑200995  
    R5‑200995 Correction of Reference Sensitivity Test Case 7.3B.2.3 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200813
    R5‑200859 Update of 7.3B.2 Reference sensitivity for EN-DC NTT DOCOMO INC. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201191  
    R5‑201191 Update of 7.3B.2 Reference sensitivity for EN-DC NTT DOCOMO INC. CR Agreement Yes
Yes
agreed No   R5‑200859
5.3.2.6.3 Clauses 1-5 / Annexes R5‑200024 Updates of MU and TT in TS 38.521-3 NTT DOCOMO, INC. CR Agreement Yes
Yesr1 was produced.1) Editor’s note (FR2 Spurious tests) was updated since corresponding SA test cases were updated. 2) Some missing test cases are introduced into Annex F. 3) Editor’s note (FR2 SC) was removed since this test case was already completed at the last RAN5#85. r2 was produced. OFF power (Inter-FR2, 2CCs), which is not implemented to the latest spec was introduced in this version.
revised No R5‑201193  
    R5‑201193 Updates of MU and TT in TS 38.521-3 NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑200024
    R5‑200042 Update of Clause 4 in TS 38.521-3 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200913  
    R5‑200913 Update of Clause 4 in TS 38.521-3 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200042
    R5‑200776 TS 38.521-3 Section 1-5 and Annex updates to align with core specification Qualcomm communications-France CR Agreement Yes
Yes
agreed No    
5.3.2.7 TS 38.521-4 R5‑200322 CR to 38.521-4 to introduce isolation procedure Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200663 Replacing derivation paths to 38.331 Ericsson CR Agreement Yes
Yesr1 was produced. Corrected table numbering in sub-clause 8.2.2.2.1.1.4.3_1 Elements and brackets added back to Table 6.2.2.1.1.1.4.4_1-2, Table 6.2.2.2.1.1.4.4_1-2 and Table 8.2.2.2.1.1.4.3_1-2
revised No R5‑201090  
    R5‑201090 Replacing derivation paths to 38.331 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200663
5.3.2.7.1 Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6) R5‑200271 Update to Demod TC 5.2.3.2.1_1 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No    
    R5‑200450 Addition of message exceptions for Type2 QCL information Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200452 Core alignment to 4Rx PDCCH Demod Test Cases Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000081->2447 for email agreement r1 was produced.
revised No R5‑201245  
    R5‑201245 Core alignment to 4Rx PDCCH Demod Test Cases Anritsu CR Agreement Yes
YesEmail agreed.
agreed No   R5‑200452
    R5‑200453 Correction to FR1 2Rx PDSCH demodulation test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200454 Correction to FR1 4Rx PDSCH demodulation test cases Anritsu CR Agreement Yes
Yesr1 was produced. Recovering the hierachical structure of 5.4.3.3 and updating the wording of 5.4.3.2.
agreed No    
    R5‑200455 Correction to measurement uncertainty and test tolerance for CQI test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200456 Correction to PDCCH demod TCs Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200660 Correcting CQI value in test procedure Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200682 Correction to Applicability rules for Performance tests Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑200710 Update of TC 5.2.2.1.3_1 2Rx FDD PDSCH mapping Type B Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200711 Update of TC 5.2.3.1.2_1 4Rx FDD PDSCH mapping Type A and CSI-RS overlapped Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200712 Update of TC 5.2.3.1.3_1 4Rx FDD PDSCH mapping Type B Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200713 Update of TC 5.2.3.2.2_1 4Rx TDD PDSCH mapping Type A and CSI-RS overlapped Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200714 Update of TC 5.2.3.2.3_1 4Rx TDD PDSCH mapping Type B Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200715 Update of TC 6.2.3.1.1.1 4Rx FDD periodic CQI reporting Huawei, HiSilicon CR Agreement Yes
Yeschanges are fully contained in CR R5-200455 from Anritsu.
withdrawn Yes    
    R5‑200716 Update of TC 6.2.3.2.1.1 4Rx TDD perioidc CQI reporting Huawei, HiSilicon CR Agreement Yes
Yeschanges are fully contained in CR R5-200455 from Anritsu.
withdrawn Yes    
    R5‑200717 Update of TC 6.4.2.1_1 2Rx FDD RI reporting Huawei, HiSilicon CR Agreement Yes
YesR&S: In Table 6.4.2.1_1.4.3.1-2 CSI-RS-ResourceMapping for NZP-CSI-RS, Row3 is applied. However, Row3 is not a possible IE according to TS 38.331. In Table 6.4.2.1_1.4.3.1-3: CSI-RS-ResourceMapping for ZP-CSI-RS, “Row5” is not a valid value for frequencyDomainAllocation: only row1, row2, row4 and other are allowed. r1 was produced. Corrected the configuration of IE CSI-RS-ResourceMapping.
revised No R5‑201068  
    R5‑201068 Update of TC 6.4.2.1_1 2Rx FDD RI reporting Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200717
    R5‑200729 Core spec alignment for FR1 4Rx FDD PDSCH Type A Demodulation performance LG Electronics CR Agreement Yes
Yes
agreed No    
5.3.2.7.2 Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8) R5‑200661 Correction to test case 8.2.2.2.1.1 2 Rx, TDD FR2 periodic CQI reporting under AWGN performance for both SA and NSA Ericsson CR Agreement Yes
Yestab: r1 was produced.
revised No R5‑200914  
    R5‑200914 Correction to test case 8.2.2.2.1.1 2 Rx, TDD FR2 periodic CQI reporting under AWGN performance for both SA and NSA Ericsson CR Agreement Yes
Yes
agreed No   R5‑200661
5.3.2.7.3 Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10) R5‑200334 Addition of FR2 Demod sustained data rate test case Qualcomm Technologies Int CR Agreement Yes
Yesr1 was produced. Added editor’s note for pending MU/TT analysis. r2 was produced.
revised No R5‑201180  
    R5‑201180 Addition of FR2 Demod sustained data rate test case Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑200334
5.3.2.7.4 Clauses 1-4 / Annexes R5‑200045 Update of Clause 4 in TS 38.521-4 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200915  
    R5‑200915 Update of Clause 4 in TS 38.521-4 CMCC, Telecom Italia, Huawei, Hisilicon, CAICT CR Agreement Yes
Yes
agreed No   R5‑200045
    R5‑200451 Core alignment for FR2 demod test case Anritsu CR Agreement Yes
Yesr1 was produced. Changes in Annex B is removed to solve overlap with R5-200672(BV).
revised No R5‑200985  
    R5‑200985 Core alignment for FR2 demod test case Anritsu CR Agreement Yes
Yes
agreed No   R5‑200451
    R5‑200672 Updated to Annex A and B for performance tests Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑200718 Update of Test Tolerance in Annex F Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.2.8 TS 38.522 R5‑200145 TP and format updated for TS 38.522 Bureau Veritas, CMCC, Ericsson, Huawei, ROHDE & SCHWARZ, Sporton, Qualcomm, CAICT CR Agreement Yes
Yesr1 was produced. Based on the outcome of R5-200046 discussion. r2 was produced. - updated D004 to include n65; - removed PC2 standalone TC based on R5-200396 CR outcome; - RRM TC branch condition updated; - Completed SA FR1 TCs removed NOTE 1 r3 was produced. - summary change of 10 included for TS38.521-3 completed TCs; - Removed TS38.521-3 NOTE 5 for non LTE anchor agnostic TCs; - removed HPUE condition since no longer needed; - TS38.521-3 TC 7.6B.3.3 and 7.7B.3 are not completed yet, NOTE1 is added; - summary change of 11 included for TS38.521-4 completed TCs; - More completed SUL list in TS38.521-1
revised No R5‑201036  
    R5‑201036 TP and format updated for TS 38.522 Bureau Veritas, CMCC, Ericsson, Huawei, ROHDE & SCHWARZ, Sporton, Qualcomm, CAICT CR Agreement Yes
YesRAN4 dependency R4-2001396 for email agreement Email agreed.
agreed No   R5‑200145
    R5‑200287 Update TS38.522 Table 4.1.2-1a CGC Inc. CR Agreement Yes
Yesalready considered in the TS38.522 jumbo CR R5-2000145.
withdrawn Yes    
    R5‑200302 Correction of applicability of L1-RSRP measurements for beam reporting test cases Ericsson CR Agreement Yes
Yesmerged to R5-200145.
withdrawn Yes    
5.3.2.9 TS 38.533 R5‑200701 Correction to Test Applicability for 4.6.2.1 EN-DC FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201104  
    R5‑201104 Correction to Test Applicability for 4.6.2.1 EN-DC FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V., , Keysight Technologies CR Agreement Yes
Yesdifferent CR title in final doc: Correction to Message Exception for 4.5.1.3 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode (wrong doc was submitted).
revised No R5‑201242 R5‑200701
    R5‑201242 Correction to Test Applicability for 4.6.2.1 EN-DC FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V., , Keysight Technologies CR Agreement Yes
Yes
agreed No   R5‑201104
    R5‑200822 Correction to Test Applicability for 4.3.2.2.2 Non-contention based random access test in FR1 for PSCell in EN-DC Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200823 Correction to SRS Configuration for 4.4.3.1 EN-DC FR1 timing advance adjustment accuracy Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200824 Correction to Test Parameters for 4.5.1.1 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRev# R4-2002135. r1 was produced.
revised No R5‑201105  
    R5‑201105 Correction to Test Parameters for 4.5.1.1 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200824
    R5‑200825 Correction to Test Procedure for 4.5.1.2 EN-DC FR1 radio link monitoring in-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201106  
    R5‑201106 Correction to Test Procedure for 4.5.1.2 EN-DC FR1 radio link monitoring in-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200825
    R5‑200826 Correction to Message Exception for 4.5.1.3 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Merges the changes from KEYS CR R5-200844.
revised No R5‑201070  
    R5‑201070 Correction to Message Exception for 4.5.1.3 EN-DC FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200826
    R5‑200827 Correction to Message Exception for 4.5.1.4 EN-DC FR1 radio link monitoring In-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesMerged with Keysight's R5-200857.
withdrawn Yes    
    R5‑200828 Correction to Message Exceptions for 4.6.1.3 EN-DC FR1 event-triggered reporting with gap in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesMerged with R&S's R5-200620.
withdrawn Yes    
    R5‑200829 Correction to Message Exception for 4.6.1.5 EN-DC FR1 event-triggered reporting without gap in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200830 Correction to Test Applicability for 4.6.2.2 EN-DC FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced?
revised No R5‑201071  
    R5‑201071 Correction to Test Applicability for 4.6.2.2 EN-DC FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200830
    R5‑200831 Correction to Test Applicability for 4.6.2.5 EN-DC FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced?
revised No R5‑201072  
    R5‑201072 Correction to Test Applicability for 4.6.2.5 EN-DC FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200831
    R5‑200832 Correction to Test Applicability for 4.6.2.6 EN-DC FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced?
revised No R5‑201073  
    R5‑201073 Correction to Test Applicability for 4.6.2.6 EN-DC FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200832
    R5‑200833 Correction to Test Applicability for 6.3.2.2.2 Non-Contention based random access test in FR1 for NR standalone Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200834 Correction to SRS Configuration for 6.4.3.1 NR SA FR1 timing advance adjustment accuracy Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200835 Correction to Test Parameter for 6.5.1.1 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent on R4-2002135 being discussed currently in RAN4 e-meet. r2 was produced.
revised No R5‑201074  
    R5‑201074 Correction to Test Parameter for 6.5.1.1 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200835
    R5‑200836 Correction to Test Procedure for 6.5.1.2 NR SA FR1 radio link monitoring in-sync test for PCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent on R4-2002135 being discussed currently in RAN4 e-meet. Also took care of offline comments received. r2 was produced.
revised No R5‑201075  
    R5‑201075 Correction to Test Procedure for 6.5.1.2 NR SA FR1 radio link monitoring in-sync test for PCell configured with SSB-based RLM RS in non-DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200836
    R5‑200837 Correction to Message Exception for 6.5.1.3 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent being discussed currently in RAN4 e-meet. Also took care of offline editorial comments received. The dependent RAN4 CR number is R4-2002135. r2 was produced.
revised No R5‑201076  
    R5‑201076 Correction to Message Exception for 6.5.1.3 NR SA FR1 radio link monitoring Out-of-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesfor email agreement Email agreed.
agreed No   R5‑200837
    R5‑200838 Correction to Message Exception for 6.5.1.4 NR SA FR1 radio link monitoring In-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Added a change which is RAN4 dependent being discussed currently in RAN4 e-meet. Also took care of offline editorial comments received. The dependent RAN4 CR number is R4-2002135. r2 was produced.
revised No R5‑201077  
    R5‑201077 Correction to Message Exception for 6.5.1.4 NR SA FR1 radio link monitoring In-sync test for PSCell configured with SSB-based RLM RS in DRX mode Qualcomm Technologies Netherlands B.V. CR Agreement Yes
YesRAN4 dependency R4-2002135 for email agreement Email agreed.
agreed No   R5‑200838
    R5‑200839 Correction to Message Exception for 6.6.1.5 NR SA FR1 event-triggered reporting without gap in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No    
    R5‑200840 Correction to Test Applicability for 6.6.2.1 NR SA FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201078  
    R5‑201078 Correction to Test Applicability for 6.6.2.1 NR SA FR1-FR1 event-triggered reporting in non-DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200840
    R5‑200841 Correction to Test Applicability for 6.6.2.2 NA SA FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201079  
    R5‑201079 Correction to Test Applicability for 6.6.2.2 NA SA FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesrev -. Revised after the meeting.
revised No R5‑201240 R5‑200841
    R5‑201240 Correction to Test Applicability for 6.6.2.2 NA SA FR1-FR1 event-triggered reporting in DRX Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑201079
    R5‑200842 Correction to Test Applicability for 6.6.2.5 NR SA FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201080  
    R5‑201080 Correction to Test Applicability for 6.6.2.5 NR SA FR1-FR1 event-triggered reporting in non-DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200842
    R5‑200843 Correction to Test Applicability for 6.6.2.6 NR SA FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201081  
    R5‑201081 Correction to Test Applicability for 6.6.2.6 NR SA FR1-FR1 event-triggered reporting in DRX with SSB time index detection Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200843
    R5‑200844 Update TC 4.5.1.3 Keysight Technologies UK Ltd CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200849 Update RLM non DRX test cases Keysight Technologies UK Ltd CR Agreement Yes
Yesr1 was produced. Removed overlapping with R5-200824.
revised No R5‑201166  
    R5‑201166 Update RLM non DRX test cases Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200849
    R5‑200857 Update 4.5.1.4 test case Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Merged changes with R5-200827 to solve overlapping
revised No R5‑201167  
    R5‑201167 Update 4.5.1.4 test case Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200857
    R5‑200866 Clarification 4.4.1.1 test procedure Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Correction in T eval interval. r2 was produced.
revised No R5‑201168  
    R5‑201168 Clarification 4.4.1.1 test procedure Keysight Technologies UK Ltd, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200866
    R5‑200880 Correction to Test Parameters for 4.6.1.1 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Offline editorial comments r2 was produced.
revised No R5‑201082  
    R5‑201082 Correction to Test Parameters for 4.6.1.1 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200880
    R5‑200881 Correction to Test Parameters for 4.6.1.2 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Offline editorial comments
revised No R5‑201083  
    R5‑201083 Correction to Test Parameters for 4.6.1.2 Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200881
5.3.2.9.1 EN-DC with all NR cells in FR1 (Clause 4) R5‑200274 Test tolerance update inter-frequency SS-RSRP NSA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced.
revised No R5‑201039  
    R5‑201039 Test tolerance update inter-frequency SS-RSRP NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200274
    R5‑200275 Test tolerance update intra-frequency SS-RSRQ NSA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. Correction in the Highest allowed reported value for Test 3 for NC and EC, as pointed out by Ericsson as part of the TT analysis review.
revised No R5‑201040  
    R5‑201040 Test tolerance update intra-frequency SS-RSRQ NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200275
    R5‑200276 Test tolerance update inter-frequency SS-RSRQ NSA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. RAN4 dependent: R4-2001373. for email agreement Email agreed.
agreed No    
    R5‑200277 Test tolerance update intra-frequency SS-SINR NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200278 Test tolerance update inter-frequency SS-SINR NSA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200308 Correction of RRM Test Case 4.6.3.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201045  
    R5‑201045 Correction of RRM Test Case 4.6.3.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200308
    R5‑200309 Correction of RRM Test Case 4.6.3.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201046  
    R5‑201046 Correction of RRM Test Case 4.6.3.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200309
    R5‑200310 Correction of RRM Test Case 4.6.3.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201047  
    R5‑201047 Correction of RRM Test Case 4.6.3.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200310
    R5‑200311 Correction of RRM Test Case 4.6.3.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. This CR is RAN4 dependant. r2 was produced.
revised No R5‑201048  
    R5‑201048 Correction of RRM Test Case 4.6.3.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200311
    R5‑200422 Correction to EN-DC FR1 event-triggered reporting test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200426 Correction to test description of RRM TC 4.6.1.3 and 4.6.1.6 Anritsu CR Agreement Yes
Yesr1 was produced. Editorial.
revised No R5‑201057  
    R5‑201057 Correction to test description of RRM TC 4.6.1.3 and 4.6.1.6 Anritsu CR Agreement Yes
Yes
agreed No   R5‑200426
    R5‑200428 Correction to UE transmit timing accuracy test case Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000168 for email agreement Email agreed.
agreed No    
    R5‑200472 Update FR1 Test Tolerance of 4.5.2.3 interruptions on NR SCC in sync Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. 1.SCell addition procedure was added in step3 2.Message exceptions to configure “sCellToAddModList” and “SMTC” were added 3. Corrected some editorial errors.
revised No R5‑201063  
    R5‑201063 Update FR1 Test Tolerance of 4.5.2.3 interruptions on NR SCC in sync Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency on R4-2001596 for email agreement Email agreed.
agreed No   R5‑200472
    R5‑200473 Update FR1 Test Tolerance of 4.5.2.4 interruptions on NR SCC in async Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. 1.SCell addition procedure was added in step3 2.Message exceptions to configure “sCellToAddModList” and “SMTC” were added 3. Corrected some editorial errors.
revised No R5‑201064  
    R5‑201064 Update FR1 Test Tolerance of 4.5.2.4 interruptions on NR SCC in async Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency on R4-2001596 for email agreement Email agreed.
agreed No   R5‑200473
    R5‑200474 Update FR1 Test Tolerance of 4.5.2.5 E-UTRAN SCC in sync Huawei, HiSilicon CR Agreement Yes
Yesproblems have not been resolved in RAN4 and RAN5.
withdrawn Yes    
    R5‑200475 Update FR1 Test Tolerance of 4.5.2.6 E-UTRAN SCC in async Huawei, HiSilicon CR Agreement Yes
Yesproblems have not been resolved in RAN4 and RAN5.
withdrawn Yes    
    R5‑200561 Addition of RRM Test Case 4.5.4.1 minimum requirements Samsung R&D Institute UK CR Agreement Yes
Yes"EN-DC with all NR cells in FR1 (Clause 4) Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda "
not treated No    
    R5‑200563 Discussion on UE UL Carrier Reconfiguration Delay Samsung R&D Institute UK discussion   Yes
Yes"EN-DC with all NR cells in FR1 (Clause 4) Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda "
not treated No    
    R5‑200608 Corrections to SS-RSRP meas accuracy NSA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200620 Correct message contents event triggered measurement tests Rohde & Schwarz, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yesr1 was produced. Merged the changes from R5-200828. r2 was produced. Include two other message exception tables.
revised No R5‑201160  
    R5‑201160 Correct message contents event triggered measurement tests Rohde & Schwarz, Qualcomm Technologies Netherlands B.V. CR Agreement Yes
Yes
agreed No   R5‑200620
    R5‑200785 Update of EN-DC SSB-based RLM TC 4.5.1.1, 4.5.1.2, 4.5.1.3 and 4.5.1.4 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200786 Update of EN-DC CSI-RS-based RLM TC 4.5.1.5, 4.5.1.6, 4.5.1.7 and 4.5.1.8 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
5.3.2.9.2 EN-DC with at least 1 NR Cell in FR2 (Clause5)                      
5.3.2.9.3 NR Standalone in FR1 (Clause 6) R5‑200279 Test tolerance update inter-frequency SS-RSRP SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200280 Test tolerance update intra-frequency SS-RSRQ SA ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. Correction in the Highest allowed reported value for Test 3 for NC and EC, as pointed out by Ericsson as part of the TT analysis review.
revised No R5‑201041  
    R5‑201041 Test tolerance update intra-frequency SS-RSRQ SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200280
    R5‑200281 Test tolerance update inter-frequency SS-RSRQ SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200282 Test tolerance update intra-frequency SS-SINR SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200283 Test tolerance update inter-frequency SS-SINR SA ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200312 Correction of RRM Test Case 6.6.4.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. CR is RAN4 dependant. r2 was produced.
revised No R5‑201049  
    R5‑201049 Correction of RRM Test Case 6.6.4.1 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200312
    R5‑200313 Correction of RRM Test Case 6.6.4.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201050  
    R5‑201050 Correction of RRM Test Case 6.6.4.2 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200313
    R5‑200314 Correction of RRM Test Case 6.6.4.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201051  
    R5‑201051 Correction of RRM Test Case 6.6.4.3 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200314
    R5‑200315 Correction of RRM Test Case 6.6.4.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
Yes36.533 typo. weird bar. r1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu). Changes are related to correction of applied offset to Es/Noc. r2 was produced.
revised No R5‑201052  
    R5‑201052 Correction of RRM Test Case 6.6.4.4 including FR1 Test Tolerance Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200315
    R5‑200420 Core alignment for event-triggered reporting test cases Anritsu CR Agreement Yes
Yesr1 was produced. Empty cells in Table 6.3.1.5.5-1 are removed. (Editorial correction). RAN4 dependency : R4-2000166
revised No R5‑200986  
    R5‑200986 Core alignment for event-triggered reporting test cases Anritsu CR Agreement Yes
YesRAN4 dependency R4-2000166 for email agreement RAN4 CR was agreed in RAN4#94-e. Email agreed.
agreed No   R5‑200420
    R5‑200421 Correction to Active UL BWP for intra-frequency event triggered reporting with gap Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000161 for email agreement RAN4 CR was agreed in RAN4#94-e. Email agreed.
agreed No    
    R5‑200423 Correction to FR1 NR SA E-UTRA cell re-selection test cases Anritsu CR Agreement Yes
YesRAN4 dependency : R4-2000163 for email agreement RAN4 CR was agreed in RAN4#94-e. Email agreed.
agreed No    
    R5‑200424 Correction to message contents in 6.6.1.5 and 6.6.1.6 Anritsu CR Agreement Yes
Yesr1 was produced. Editorial.
revised No R5‑201056  
    R5‑201056 Correction to message contents in 6.6.1.5 and 6.6.1.6 Anritsu CR Agreement Yes
Yes
agreed No   R5‑200424
    R5‑200425 Correction to NR SA FR1 SS-RSRP measurement accuracy tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200607 Re-submission R5-197804 not implemented ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200609 Corrections to SS-RSRP meas accuracy SA tests ROHDE & SCHWARZ CR Agreement Yes
YesCR: "Test tolerance update inter-frequency SS-RSRP SA". r1 was produced.
revised No R5‑201030  
    R5‑201030 Corrections to SS-RSRP meas accuracy SA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200609
    R5‑200705 Correction to TC 6.1.1.2 FR1 inter-freq re-selection Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200706 Update of TC 6.3.2.1.1 FR1 RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Corrected SMTC configuration in message exceptions.
revised No R5‑200987  
    R5‑200987 Update of TC 6.3.2.1.1 FR1 RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200706
    R5‑200707 Update of TC 6.3.2.1.2 inter-freq RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Corrected SMTC configuration in message exceptions.
revised No R5‑200988  
    R5‑200988 Update of TC 6.3.2.1.2 inter-freq RRC re-establishment Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200707
    R5‑200708 Update of TC 6.3.2.3.1 FR1 RRC redirection Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency: R4-2001602 for email agreement Email agreed.
agreed No    
    R5‑200709 Update of TC 6.3.2.3.2 inter-freq RRC redirection Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency: R4-2001602 for email agreement Email agreed.
agreed No    
    R5‑200787 Update of NR CSI-RS-based RLM TC 6.5.1.5, 6.5.1.6, 6.5.1.7 and 6.5.1.8 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200788 Update of NR SSB-based RLM TC 6.5.1.1, 6.5.1.2, 6.5.1.3 and 6.5.1.4 MediaTek Inc. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201190  
    R5‑201190 Update of NR SSB-based RLM TC 6.5.1.1, 6.5.1.2, 6.5.1.3 and 6.5.1.4 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑200788
5.3.2.9.4 NR standalone with at least one NR cell in FR2 (Clause7)                      
5.3.2.9.5 E-UTRA – NR Inter-RAT with E-UTRA serving cell (Clause 8)                      
5.3.2.9.6 Clauses 1-3 / Annexes R5‑200284 Test tolerance update measurement tests Annex F ROHDE & SCHWARZ CR Agreement Yes
YesRAN4 dependency R4-2001565 for email agreement Email agreed.
agreed No    
    R5‑200305 Test Tolerance and Measurement Uncertainty in Annex F for L1-RSRP measurement test cases Ericsson CR Agreement Yes
Yesr1 was produced. Changes after offline discussion with the TT reviewing company (Anritsu) affect also annex F.
revised No R5‑201044  
    R5‑201044 Test Tolerance and Measurement Uncertainty in Annex F for L1-RSRP measurement test cases Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No   R5‑200305
    R5‑200306 Reference SSB configuration correction Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200307 Correction of Cell configuration mapping table for SA FR2 RRM Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 and R4-2001398 for email agreement Email agreed.
agreed No    
    R5‑200427 Correction to the simulated cell for cell-reselection test cases Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200429 Update of maximum test system uncertainty for FR1 RRM Test Anritsu CR Agreement Yes
Yesr1 was produced. Offline comments from Ericsson, R&S.
revised No R5‑201058  
    R5‑201058 Update of maximum test system uncertainty for FR1 RRM Test Anritsu CR Agreement Yes
Yes
agreed No   R5‑200429
    R5‑200476 Update of FR1 Test Tolerance in Annex F Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. 1. Removed the rows for 4.5.2.5 and 4.5.2.6, because the related TT analysis was withdrawn.
revised No R5‑201169  
    R5‑201169 Update of FR1 Test Tolerance in Annex F Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200476
    R5‑200562 Addition of RRM Cell configuration mapping table for EN-DC FR1 Test Case 4.5.4.1 Samsung R&D Institute UK CR Agreement Yes
Yes"EN EN-DC with all NR cells in FR1 (Clause 4) Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda"
not treated No    
    R5‑200564 Correction to Statistical testing of delay and UE measurement performance in RRM tests Samsung R&D Institute UK CR Agreement Yes
Yes
agreed No    
    R5‑200565 Addition of RRC message content exceptions for UE UL Carrier Reconfiguration Delay Samsung R&D Institute UK CR Agreement Yes
Yes"EN-DC with all NR cells in FR1 Test case is not a GCF/PVG priority test and is not 100% complete , out of scope of e-meeting agenda"
not treated No    
    R5‑200606 Cell mapping update measurement tests Annex E ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200610 Correct message contents measurement tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200743 Update to test applicability per permitted test method Anritsu CR Agreement Yes
Yeswrong spec on cover: r1 was produced.
revised No R5‑200916  
    R5‑200916 Update to test applicability per permitted test method Anritsu CR Agreement Yes
Yes
agreed No   R5‑200743
    R5‑200818 Correction to cell mapping Annex E Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200858 Corrections to Table H.3.1-8 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
5.3.2.10 TS 36.508                      
5.3.2.11 TS 36.521-3                      
5.3.2.12 TS 37.571-1                      
5.3.2.13 TS 37.571-3                      
5.3.2.14 TS 37.571-5                      
5.3.2.15 TR 38.903 ((NR MU & TT analyses) R5‑200163 Add Annex A.2 handling of common Test Tolerance Topics for FR2 ANRITSU LTD CR Agreement Yes
Yes
agreed No    
    R5‑200272 Test tolerance analysis inter-frequency SS-RSRP and intra-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. r2 was produced?
revised No R5‑201037  
    R5‑201037 Test tolerance analysis inter-frequency SS-RSRP and intra-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200272
    R5‑200273 Test tolerance analysis SS-RSRQ and inter-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yesdifferent title: inter-frequency SS-RSRP!!! r1 was produced. r2 was produced?
revised No R5‑201038  
    R5‑201038 Test tolerance analysis SS-RSRQ and inter-frequency SS-SINR ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200273
    R5‑200303 Test Tolerance analysis for CSI-RS-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
Yeswrong WIC or AI???? r1 was produced. Several corections. This CR is RAN4 dependant. r3 was produced. includes further editorial corrections of .xls.
revised No R5‑201042  
    R5‑201042 Test Tolerance analysis for CSI-RS-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 for email agreement Email agreed.
agreed No   R5‑200303
    R5‑200304 Test Tolerance analysis for SSB-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
Yeswrong WIC or AI? r1 was produced. Several corections. This CR is RAN4 dependant. r2 was produced. includes further editorial corrections of .xls.
revised No R5‑201043  
    R5‑201043 Test Tolerance analysis for SSB-Based L1-RSRP measurement test cases Ericsson CR Agreement Yes
YesRAN4 dependency R4-2001396 for email agreement Email agreed.
agreed No   R5‑200304
    R5‑200329 CR to 38.903 on XPD Verification Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑200335 Addition of MU table for FR2 Demod test cases Qualcomm Technologies Int CR Agreement No
Yeslate doc Addition of MU table for FR2 Demod scenarios depends on the FR2 MU elements discussion for mode 1/2 Document not produced before meeting start.
withdrawn Yes    
    R5‑200470 FR1 Test tolerance analysis for interruptions deactivated NR SCC Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency: R4-2001596 for email agreement Email agreed.
agreed No    
    R5‑200471 FR1 Test tolerance analysis for interruptions deactivated E-UTRAN SCC Huawei, HiSilicon CR Agreement Yes
Yesproblems have not been resolved in RAN4 and RAN5.
withdrawn Yes    
    R5‑200744 Update to FR2 TRx Measurement Uncertainties Anritsu CR Agreement Yes
Yeswrong spec on cover: r1 was produced. r2 was produced. Outcome of FR2 TRx MU discussion is reflected.
revised No R5‑200918  
    R5‑200918 Update to FR2 TRx Measurement Uncertainties Anritsu CR Agreement Yes
Yes
agreed No   R5‑200744
5.3.2.16 TR 38.905 (NR Test Points Radio Transmission and Reception ) R5‑200047 Update TPanalysis of TC 7.5B.1 ACS for for intra-band contiguous EN-DC within FR1 2CCs CMCC CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200402 Updating TP of MOP for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200403 Updating TP of configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. The structure of TP analysis is updated. Analysis of P-max selection is added. The number of test points is updated.
revised No R5‑201182  
    R5‑201182 Updating TP of configured output power for inter-band EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200403
    R5‑200406 Updating TP of MOP for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesfor email agreement Ericsson disagreed. See R5-201183.
withdrawn Yes    
    R5‑200407 Updating TP of configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. The structure of TP analysis is updated. The analysis of (n)71AA is corrected. The number of test points is updated. r2 was produced.
revised No R5‑201184  
    R5‑201184 Updating TP of configured output power for intra-band contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200407
    R5‑200410 Updating TP of MOP for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
YesRAN4 dependency R4-2001316 for email agreement Ericsson disagreed. See R5-201183.
withdrawn Yes    
    R5‑200411 Updating TP of configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. The structure of TP analysis is updated. Analysis of P-max selection is added. The number of test points is updated. r2 was produced.
revised No R5‑201186  
    R5‑201186 Updating TP of configured output power for intra-band non-contiguous EN-DC Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200411
    R5‑200412 Editorial change of replacing zip file of FR2 6.3.1 by v2 Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑200419 Update of test point analysis for 7.6A.3 Out-of-band blocking for CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200459 Update of test point analysis for 7.6A.4 Narrow band blocking for CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200460 Update of test point analysis for 7.8A Wide band Intermodulation for CA CAICT CR Agreement Yes
Yes
agreed No    
    R5‑200573 Update of 38.905 FR1 7.6A.2.1 Huawei,Hisilicon CR Agreement Yes
Yescover title: Addition of TP analysis for FR1 In-band blocking for CA (2DL CA) Reissued as R5-200885 because of title change.
withdrawn Yes    
    R5‑200885 Addition of TP analysis for FR1 In-band blocking for CA Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. zip TP file added.
revised No R5‑200990  
    R5‑200990 Addition of TP analysis for FR1 In-band blocking for CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200885
    R5‑200574 Addition of Test point selection for FR1 in SUL test cases Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200603 Test Point analysis for FR2 ref sens for CA Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No    
    R5‑200758 Correction of NS_05 test points analysis Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200760 Test points analysis for NS_37 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc
revised No R5‑201237  
    R5‑201237 Test points analysis for NS_37 A-MPR FR1 test case Ericsson CR Agreement Yes
Yes
agreed No   R5‑200760
    R5‑200762 Test points analysis for NS_38 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200764 Test points analysis for NS_39 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200766 Test points analysis for NS_43 A-MPR FR1 test case Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200768 Test points analysis for NS_43U A-MPR FR1 test case Ericsson, SoftBank Corp. CR Agreement Yes
Yeslate doc
agreed No    
    R5‑200770 Test points analysis for NS_18 A-MPR FR1 test case Ericsson CR Agreement Yes
Yeslate doc missing cl. aff. Revised after the meeting.
revised No R5‑201239  
    R5‑201239 Test points analysis for NS_18 A-MPR FR1 test case Ericsson CR Agreement Yes
Yes
agreed No   R5‑200770
    R5‑200799 Updated test point analysis for FR2 A-MPR test case Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200815 Update of Test Point Analysis for UE Coexistence for DC_3A-n41A and DC_8A-n41A ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
5.3.2.17 Discussion Papers / Work Plan / TC lists R5‑200020 IFF DFF Hybrid setup for FR2 RRM 2AoA Test Anritsu discussion Endorsement Yes
Yesr1 was produced. Outcome of offline discussion among MU crews.
revised No R5‑201154  
    R5‑201154 IFF DFF Hybrid setup for FR2 RRM 2AoA Test Anritsu discussion Endorsement Yes
YesNoted and endorsed
noted No   R5‑200020
    R5‑200035 Discussion on how to update Clause 4.1 in TS 38521-1-2-3-4 CMCC, Huawei, Hisilicon, Telecom Italia, China Unicom, CAICT discussion Endorsement Yes
Yesr1 was produced. Editorial wording changes.
revised No R5‑200919  
    R5‑200919 Discussion on how to update Clause 4.1 in TS 38521-1-2-3-4 CMCC, Huawei, Hisilicon, Telecom Italia, China Unicom, CAICT discussion Endorsement Yes
Yesfile was 0kB! Noted and proposal endorsed and implemented in CR 0038, 0040, 0042, 0045.
noted No   R5‑200035
    R5‑200046 Discussion on how to update TS 38.522 CMCC, Bureau Veritas, Huawei, Hisilicon, China Unicom, CAICT, TEJET, SRTC, Sporton discussion Endorsement Yes
YesRRM rapporteur Adrian's proposal of removing the original proposal 3 has also been accepted before the meeting. Deadline 21.2. for endorsement. Long discussion with Samsung. • R&S suggestion to remove Proposal 3--Accepted. Proposal 3 has been removed from R5-200046 already before the e-meeting started. • E///: some further confirmations are needed from Vijay. And the potential needed actions can be taken in the 38.522 Jumbo CR (R5-200145) directly without impacts on the paper (R5-200046). • Samsung: help to further clarify the problems/observations/suggestions. Problem/Observation 1, 2 and 3 have been addressed by implementing Proposal 1 and 2 in the Jumbo CR (R5-200145) already. -> ONLY Proposal 1 and 2 can be endorsed. r1 was produced. As per the offline discussion, consensus has been reached on Proposal 3. Due to the objection from Samsung, there are no consensus on Proposal 1 or 2.
revised No R5‑201017  
    R5‑201017 Discussion on how to update TS 38.522 CMCC, Bureau Veritas, Huawei, Hisilicon, China Unicom, CAICT, TEJET, SRTC, Sporton discussion Endorsement Yes
Yes
noted No   R5‑200046
    R5‑200116 On testability issue for FR2 NTT DOCOMO, INC. discussion Endorsement Yes
Yesr1 was produced. Concrete relaxation value is proposed according to submissions in this e-meeting.
revised No R5‑201034  
    R5‑201034 On testability issue for FR2 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
noted No   R5‑200116
    R5‑200117 Review on test point for FR1 TRx NTT DOCOMO, INC. discussion Endorsement No
Yes
withdrawn Yes    
    R5‑200159 FR2 RRM MU and choice of test cases to evaluate ANRITSU LTD discussion Endorsement Yes
Yesr1 was produced.
revised No R5‑201155  
    R5‑201155 FR2 RRM MU and choice of test cases to evaluate ANRITSU LTD discussion Endorsement Yes
YesNoted and endorsed
noted No   R5‑200159
    R5‑200160 FR2 TT analysis for 38.533 5.7.1.1+7.7.1.1 Intra-freq SS-RSRP ANRITSU LTD discussion Endorsement Yes
Yesnoted and proposals endorsed
noted No    
    R5‑200161 FR2 TT analysis for 38.533 5.7.1.2+7.7.1.2 Inter-freq SS-RSRP ANRITSU LTD discussion Endorsement Yes
Yesnoted and proposals endorsed
noted No    
    R5‑200316 On AP#85.28: n259 MU Estimate Keysight Technologies UK Ltd discussion Endorsement Yes
YesNoted. Any agreeable aspects were consolidated in R5-200118. noted no proposals endorsed
noted No    
    R5‑200317 On Beam Peak Searches for different test configurations Keysight Technologies UK Ltd discussion Endorsement Yes
Yes"This contribution addresses the need to perform TX and RX beam peak searches for different test configurations document out of scope scope of e-meeting , no associated CR KEYS agreed to withdraw"
withdrawn Yes    
    R5‑200318 CDF/PDF Scaling Factor Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and proposals endorsed
noted No    
    R5‑200321 NR FR2 Demodulation MU Table Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. Offline discussions with Qualcomm, Anritsu, and R&S.
revised No R5‑201156  
    R5‑201156 NR FR2 Demodulation MU Table Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200321
    R5‑200323 End-to-End System Simulations for Min. Isolation Requirements Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. changes were based on feedback from R&S and Qualcomm.
revised No R5‑201157  
    R5‑201157 End-to-End System Simulations for Min. Isolation Requirements Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200323
    R5‑200324 On PC1 MUs Keysight Technologies UK Ltd discussion Endorsement Yes
Yes"This contribution reviews the MU elements and values for PC1 devices. PC1 FR2 MU out of scope of e-meeting, KEYS agreed to withdraw"
withdrawn Yes    
    R5‑200325 On NR FR2 Demodulation MUs Keysight Technologies UK Ltd discussion Endorsement No
Yeslate doc. document not produced before meeting start
withdrawn Yes    
    R5‑200326 Quality of Quiet Zone MU and XPD MU for Spurious Emissions Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. Following offline discussions with TE vendors, it was agreed to adopt the QoQZ values proposed in R5-200735 instead.
revised No R5‑200998  
    R5‑200998 Quality of Quiet Zone MU and XPD MU for Spurious Emissions Keysight Technologies UK Ltd discussion Endorsement Yes
YesNoted and endorsed.
noted No   R5‑200326
    R5‑200327 On the MU Element “Uncertainty of an absolute gain of the calibration antenna” for Spurious Emissions Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
noted No    
    R5‑200328 On XPD Verification Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
noted No    
    R5‑200330 On RRM MUs including AP#85.22 Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced. With regards to P2, based on additional discussions and feedback received, more time is needed for a framework for 1 AoA TC MUs and whether this should be a function of the 2 AoA test system or not. The goal is to revisit this discussion in the next meeting. Close the official AP#85.22. r2 was produced.
revised No R5‑201053  
    R5‑201053 On RRM MUs including AP#85.22 Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200330
    R5‑200392 Discussion on MU and TT of FR1 CA Rx test cases Huawei, HiSilicon discussion Discussion Yes
YesNoted and proposal endorsed and implmented in CR 0393.
noted No    
    R5‑200394 Discussion on FR1 MOP testing for PC2 UE Huawei, HiSilicon, CMCC discussion Discussion Yes
YesKeysight disagreed. Noted and no proposal endorsed
noted No    
    R5‑200395 Discussion on handling of HP-UE requirements in FR1 Huawei, HiSilicon, CMCC discussion Discussion Yes
Yesr1 was produced. noted and proposal endorsed
revised No R5‑201181  
    R5‑201181 Discussion on handling of HP-UE requirements in FR1 Huawei, HiSilicon, CMCC discussion Discussion Yes
Yes
noted No   R5‑200395
    R5‑200398 On ACLR test metric for FR2 Huawei, HiSilicon discussion Discussion Yes
YesNo proposals endorsed. Noted.
noted No    
    R5‑200478 Discussion on FR1 UL CA power calculation for TC transmit on off time mask China Unicom discussion Discussion Yes
Yesr1 was produced. In Proposal 1. It is proposed to select PO_NominalWithGrant=-106dBm/180kHz for PCC and SCC in TC 6.3A.3.1. Becasue PO_NominalWithGrant value can only set to even ( step size 2) • Updated Table 2.1-1 for power calculation of transmit ON/OFF time mask for 2UL CA. The discussion paper is about recalculate the transmit on power for 2UL CA by reduce 6dB for PO_NominalWithGrant in Single carrier TC, to avoid impact of MPR on transmit on power. The associated CR is R5-200344r1.
revised No R5‑200920  
    R5‑200920 Discussion on FR1 UL CA power calculation for TC transmit on off time mask China Unicom discussion Discussion Yes
YesNoted and proposal endorsed and implemented in CR 0344.
noted No   R5‑200478
    R5‑200556 Discussion on FR2 absolute power control TP3 Samsung R&D Institute UK discussion Discussion Yes
Yesnoted and proposal1 endorsed
noted No    
    R5‑200560 Discussion on OFF Power for the SRS time mask with UL MIMO test case Samsung R&D Institute UK discussion   Yes
Yes"Discussion on EIRP OFF power document not produced before FR2 MU pre-meeting deadline, and has reference to UL-MIMO which is out of scope of e-meeting."
not treated No    
    R5‑200695 Discussion on uplink power control window size Qualcomm Korea discussion Endorsement Yes
Yesr1 was produced. Agreement to add a MUr (relative power control MU) to the range of measurement of UE tx power ( power window size), MUr value needs further analysis from TE vendors Document will be noted
revised No R5‑201188  
    R5‑201188 Discussion on uplink power control window size Qualcomm Korea discussion Endorsement Yes
Yes
noted No   R5‑200695
    R5‑200734 Noise impact for FR2 TRx test cases Anritsu discussion Endorsement Yes
Yesr1 was produced. Offline discussion among TE vendors on delta SNR.
revised No R5‑201163  
    R5‑201163 Noise impact for FR2 TRx test cases Anritsu discussion Endorsement Yes
Yesnoted and Proposal 1&2 endorsed.
noted No   R5‑200734
    R5‑200735 Quality of Quiet Zone for spurious emission Anritsu discussion Endorsement Yes
Yesnoted and proposals are endorsed.
noted No    
    R5‑200736 Measurement uncertainty for n259 Anritsu discussion Endorsement Yes
Yesnoted no proposals endorsed
noted No    
    R5‑200737 Proposal of MU elements for FR2 spurious emission Anritsu discussion Endorsement Yes
Yesr1 was produced. Outcome of offline discussion among TE vendors on spurious emission MUs.
revised No R5‑201164  
    R5‑201164 Proposal of MU elements for FR2 spurious emission Anritsu discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200737
    R5‑200738 On FR2 ACLR MUs Anritsu discussion Endorsement Yes
Yesnoted and Proposal 5&6 endorsed
noted No    
    R5‑200739 On FR2 OBW MU Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200741 Treatment FR2 RRM MU for different test setups Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200745 On FR2 OFF Power MU Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200746 On FR2 Rx Spurious MU Anritsu discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200777 Discussion Paper to clarify test config aspects for EN-DC tests with greater than two E-UTRA+NR carriers Qualcomm communications-France discussion Agreement Yes
Yesr1 was produced. r2 was produced.
revised No R5‑201199  
    R5‑201199 Discussion Paper to clarify test config aspects for EN-DC tests with greater than two E-UTRA+NR carriers Qualcomm communications-France discussion Agreement Yes
Yesnoted and proposals endorsed
noted No   R5‑200777
    R5‑200811 On RRM test cases list to start FR2 MU analysis Keysight Technologies UK Ltd discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200816 Estimate of Measurement Uncertainty for n259 ROHDE & SCHWARZ discussion Endorsement Yes
Yesnoted no proposals endorsed
noted No    
    R5‑200868 On the SNR for FR2 TRx test cases ROHDE & SCHWARZ discussion Endorsement Yes
Yesno proposals endorsed noted
noted No    
    R5‑200869 On the MU of FR2 OBW ROHDE & SCHWARZ discussion Endorsement Yes
Yesrelated to 200739 and 200874 no proposals endorsed
noted No    
    R5‑200873 FR2 Spurious MU: Noise Impact Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted no proposals endorsed
noted No    
    R5‑200874 On FR2 OBW MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesrelated to 200869 and 200874 noted no proposals endorsed
noted No    
    R5‑200875 FR2 Spurious MU: Network Analyzer Uncertainty Keysight Technologies UK Ltd discussion Endorsement No
Yeslate doc document not produced before meeting start
withdrawn Yes    
    R5‑200876 FR2 Spurious MU: RF power measurement MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesrelated to 200737 noted no proposals endorsed
noted No    
    R5‑200878 On FR2 Transmission OFF power MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesr1 was produced.
revised No R5‑201091  
    R5‑201091 On FR2 Transmission OFF power MU Keysight Technologies UK Ltd discussion Endorsement Yes
Yesnoted and endorsed
noted No   R5‑200878
    R5‑200879 On FR2 ACLR MU Keysight Technologies UK Ltd discussion Discussion No
Yeslate doc document not produced before meeting start
withdrawn Yes    
5.3.3 Elevation Beamforming/Full-Dimension MIMO for LTE (UID - 770062) LTE_EBF_FDMIMO-UEConTest R5‑200627 Update to CRI reporting cases for FD-MIMO Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesis LTE_EBF_FDMIMO-UEConTest r1 was produced.
revised No R5‑200890  
    R5‑200890 Update to CRI reporting cases for FD-MIMO Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No   R5‑200627
    R5‑200628 Update to CQI Reporting cases with single CSI Process Qualcomm Austria RFFE GmbH CR Agreement Yes
Yesis LTE_EBF_FDMIMO-UEConTest r1 was produced.
revised No R5‑200891  
    R5‑200891 Update to CQI Reporting cases with single CSI Process Qualcomm Austria RFFE GmbH CR Agreement Yes
YesWIC fixed in 3GU.
agreed No   R5‑200628
5.3.3.1 TS 36.508                      
5.3.3.2 TS 36.521-1 R5‑200798 Update of FD-MIMO PMI test cases Ericsson CR Agreement Yes
Yes
agreed No    
5.3.3.3 TS 36.521-2                      
5.3.3.4 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.3.5 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.3.6 Discussion Papers / Work Plan / TC lists                      
5.3.4 Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest                      
5.3.4.1 TS 36.508                      
5.3.4.2 TS 36.521-1 R5‑200291 Addition of new test case 8.11.1.2.3.2, TDD PDSCH 2 Tx Antenna Port supporting wideband transmission for UE category M2 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200292 Addition of new test case 8.11.1.2.3.2_1, TDD PDSCH 2 Tx Antenna Port supporting wideband transmission for UE category M2 (CEModeB) Ericsson CR Agreement Yes
Yes
agreed No    
5.3.4.3 TS 36.521-2 R5‑200300 Adding test case 8.11.1.2.3.2 and 8.11.1.2.3.2_1 to applicability Ericsson CR Agreement Yes
Yesr1 was produced. Based on comment by R&S, C316y has been introduced in Table 4.1-1a. r2 was produced. Comment for test case 8.11.1.2.3.2 is corrected.
revised No R5‑200991  
    R5‑200991 Adding test case 8.11.1.2.3.2 and 8.11.1.2.3.2_1 to applicability Ericsson CR Agreement Yes
Yes
agreed No   R5‑200300
    R5‑200535 Applicability of RRM feMTC Test Cases Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200665 Adding missing cat M2 test cases to applicability Ericsson CR Agreement Yes
Yesr1 was produced.
revised No R5‑200994  
    R5‑200994 Adding missing cat M2 test cases to applicability Ericsson CR Agreement Yes
Yes
agreed No   R5‑200665
5.3.4.4 TS 36.521-3 R5‑200536 Correction of definitions of Bandwidth-reduced Low-complexity or Coverage Enhanced UE Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200537 Cell configuration mapping for RRM feMTC Test Cases Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200538 Addition of a new RRM feMTC Test Case 5.1.28 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200539 Addition of a new RRM feMTC Test Case 5.1.34 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200540 Addition of a new RRM feMTC Test Case 6.1.18 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200541 Addition of a new RRM feMTC Test Case 7.3.69 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200542 Correction of RRM feMTC Test Case 8.3.16 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200543 Correction of RRM feMTC Test Case 8.3.17 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200544 Correction of RRM feMTC Test Case 8.3.18 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200545 Correction of RRM feMTC Test Case 8.3.19 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200546 Correction of RRM feMTC Test Case 8.4.12 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200547 Correction of RRM feMTC Test Case 8.4.13 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200548 Correction of RRM feMTC Test Case 8.4.14 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200549 Correction of RRM feMTC Test Case 8.4.15 Ericsson CR Agreement Yes
Yes
agreed No    
5.3.4.5 TS 37.571-1                      
5.3.4.6 TS 37.571-3                      
5.3.4.7 TS 37.571-5                      
5.3.4.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.4.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.4.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.4.11 Discussion Papers / Work Plan / TC lists                      
5.3.5 Rel-15 LTE CA configurations (UID - 770064) LTE_CA_R15-UEConTest                      
5.3.5.1 TS 36.508                      
5.3.5.2 TS 36.521-1                      
5.3.5.3 TS 36.521-2                      
5.3.5.4 TS 36.521-3                      
5.3.5.5 TS 37.571-1                      
5.3.5.6 TS 37.571-3                      
5.3.5.7 TS 37.571-5                      
5.3.5.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.5.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.5.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.5.11 Discussion Papers / Work Plan / TC lists                      
5.3.6 Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest                      
5.3.6.1 TS 36.521-1                      
5.3.6.2 TS 36.521-2                      
5.3.6.3 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.6.4 Discussion Papers / Work Plan / TC lists                      
5.3.7 Rel-16 CA configurations (UID - 810061) LTE_CA_R16-UEConTest                      
5.3.7.1 TS 36.508                      
5.3.7.2 TS 36.521-1                      
5.3.7.3 TS 36.521-2                      
5.3.7.4 TS 36.521-3                      
5.3.7.5 TS 37.571-1                      
5.3.7.6 TS 37.571-3                      
5.3.7.7 TS 37.571-5                      
5.3.7.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.7.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.7.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.7.11 Discussion Papers / Work Plan / TC lists                      
5.3.8 Shortened TTI and processing time for LTE (UID - 820064) LTE_sTTIandPT-UEConTest                      
5.3.8.1 TS 36.508                      
5.3.8.2 TS 36.521-1                      
5.3.8.3 TS 36.521-2                      
5.3.8.4 TS 36.521-3                      
5.3.8.5 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.8.6 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.8.7 Discussion Papers / Work Plan / TC lists                      
5.3.9 Enhancing LTE CA Utilization (UID - 820066) LTE_euCA-UEConTest                      
5.3.9.1 TS 36.508                      
5.3.9.2 TS 36.521-2                      
5.3.9.3 TS 36.521-3                      
5.3.9.4 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.9.5 Discussion Papers / Work Plan / TC lists                      
5.3.10 REL-16 NR CA and DC; and NR and LTE DC Configurations (UID-830083) NR_CADC_NR_LTE_DC_R16-UEConTest                      
5.3.10.1 TS 38.508-1                      
5.3.10.2 TS 38.508-2 R5‑200773 Correction the typo for Table A.4.3.2A.2.2-2 and Table A.4.3.2A.3.2-2 SGS Wireless CR Agreement Yes
YesBureau Veritas: WIC shall be “5GS_NR_LTE-UEConTest”! Conflicts with R5-200576. Merged into R5-200576 clause A.4.3.2A.3.2.
withdrawn Yes    
5.3.10.3 TS 38.521-1                      
5.3.10.3.1 Tx Requirements (Clause 6)                      
5.3.10.3.2 Rx Requirements (Clause 7)                      
5.3.10.3.3 Clauses 1-5 / Annexes R5‑200342 Update of new R16 CADC combos to clause 5 in TS 38.521-1 China Unicom CR Agreement No
YesCommon part alignment for R16 active CADC combos
withdrawn Yes    
5.3.10.4 TS 38.521-2                      
5.3.10.4.1 Tx Requirements (Clause 6)                      
5.3.10.4.2 Rx Requirements (Clause 7)                      
5.3.10.4.3 Clauses 1-5 / Annexes                      
5.3.10.5 TS 38.521-3                      
5.3.10.5.1 Tx Requirements (Clause 6) R5‑200413 Addition of a few R16 EN-DC configurations Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Missing test configurations for DC_12A-n78A exceptional requirements are added based on Qualcomm.
revised No R5‑201187  
    R5‑201187 Addition of a few R16 EN-DC configurations Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200413
    R5‑200599 Update of 6.2B.1.3 on inter-band EN-DC MOP in 38.521-3 ZTE Corporation CR Agreement Yes
Yeswas wrong AI. R5-200686r1 has removed the overlapping part.
agreed No    
    R5‑200686 Add TX test for Rel16_DC_2_n41 and 66_n41 Qualcomm Korea CR Agreement Yes
Yesr1 was produced.
revised No R5‑201066  
    R5‑201066 Add TX test for Rel16_DC_2_n41 and 66_n41 Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑200686
    R5‑200722 Update test point of 3A_n41A SE-coex Huawei, HiSilicon CR Agreement Yes
YesConflict with R5-200814 from R&S.
withdrawn Yes    
5.3.10.5.2 Rx Requirements (Clause 7) R5‑200600 Update of 7.3B.2.3 on inter-band EN-DC REFSENS in 38.521-3 ZTE Corporation CR Agreement Yes
Yeswas wrong AI merged changes to 0687.
withdrawn Yes    
    R5‑200687 Add RX test for Rel16_DC_2_n41 and 66_n41 Qualcomm Korea CR Agreement Yes
Yesr1 was produced. Removed update of some Rel15 requirement alignment since it is covered by CR R5-200751 which has exactly the same change based on offline discussions.
revised No R5‑201067  
    R5‑201067 Add RX test for Rel16_DC_2_n41 and 66_n41 Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑200687
5.3.10.5.3 Clauses 1-5 / Annexes R5‑200351 Updated to EN-DC band information Rel-16 Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑200386 Update of clause 5 for Rel-16 EN-DC configurations in 38.521-3 NTT DOCOMO INC. CR Agreement Yes
YesAll the band combos included in this CR are still in “pending” status in WP.
withdrawn Yes    
    R5‑200604 Update of general sections on EN-DC configurations in 38.521-3 ZTE Corporation CR Agreement Yes
Yeswas wrong AI r1 was produced. Removed the overlapping parts with R5-200351 and R5-200687r1.
revised No R5‑201019  
    R5‑201019 Update of general sections on EN-DC configurations in 38.521-3 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200604
5.3.10.6 TS 38.521-4                      
5.3.10.6.1 Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)                      
5.3.10.6.2 Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)                      
5.3.10.6.3 Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10)                      
5.3.10.6.4 Clauses 1-4 / Annexes                      
5.3.10.7 TS 38.522                      
5.3.10.8 TS 38.533                      
5.3.10.9 TR 38.903 (NR MU & TT analyses)                      
5.3.10.10 TR 38.905 (NR Test Points Radio Transmission and Reception) R5‑200723 Update of TP analysis for 3A_n41A SE-coex Huawei, HiSilicon CR Agreement Yes
YesConflict with R5-200815 from R&S.
withdrawn Yes    
5.3.10.11 Discussion Papers / Work Plan / TC lists                      
5.3.11 Enhancements on Full-Dimension (FD) MIMO for LTE (UID - 830085) LTE_eFDMIMO-UEConTest                      
5.3.11.1 TS 36.508                      
5.3.11.2 TS 36.521-1                      
5.3.11.3 TS 36.521-2                      
5.3.11.4 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.11.5 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.11.6 Discussion Papers / Work Plan / TC lists                      
5.3.12 Study on 5G NR User Equipment (UE) Application Layer Data Throughput Performance (UID - 840090) FS_UE_5GNR_App_Data_Perf                      
5.3.12.1 TR 37.901-5 R5‑200752 Annex A.3.1.1.1 Test case Definition Keysight Technologies UK Ltd draft TR Approval No
Yes
withdrawn Yes    
    R5‑200781 Text Proposal to add TC A.2.1.2 Qualcomm communications-France pCR Approval Yes
Yes
approved No    
    R5‑200782 Text Proposal to add TC A.4.1.2 Qualcomm communications-France pCR Approval Yes
Yes
approved No    
    R5‑200783 Text Proposal to update TC A.7.1.1.1 Qualcomm communications-France pCR Approval Yes
Yes
approved No    
    R5‑200784 Text Proposal to update TC A.9.1.1.1 Qualcomm communications-France pCR Approval Yes
Yes
approved No    
    R5‑200789 Text Proposal to add TC A.3.1.1.1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No    
    R5‑200802 Text Proposal to add TC A.3.1.1.2 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No    
    R5‑200817 Text Proposal to add TC A.3.1.2.2 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No    
    R5‑200855 Text Proposal to add TC A.5.1.1.1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No    
    R5‑200860 Text Proposal to add TC A.5.1.1.2 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No    
    R5‑200865 Text Proposal to add TC A.5.1.2.1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No    
    R5‑200870 Text Proposal to add TC A.5.1.2.2 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No    
5.3.12.2 Discussion Papers / Work Plan / TC lists                      
5.3.13 LTE Advanced high power TDD UE (power class 2) for Rel-15 (UID - 850061) LTE_TDD_HPUE_R15-UEConTest                      
5.3.13.1 TS 36.521-1                      
5.3.13.2 TS 36.521-2                      
5.3.13.3 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.13.4 Discussion Papers / Work Plan / TC lists                      
5.3.14 New Rel-16 NR bands and extension of existing NR bands (UID - 850062) NR_bands_BW_R16-UEConTest                      
5.3.14.1 TS 38.508-1                      
5.3.14.2 TS 38.508-2                      
5.3.14.3 TS 38.521-1 R5‑200721 Addition of new Rel-16 70MHz CBW for 6.3.2 and 7.4 of SA FR1 CAICT CR Agreement Yes
Yesoffline discussion. CR R5-200343 from China Unicom introduced 70MHz ch BW into general clause.
agreed No    
5.3.14.3.1 Tx Requirements (Clause 6) R5‑200370 Introduction of n95 SUL band test cases CMCC, Ericsson CR Agreement Yes
Yeswas wrong AI r1 was produced.
revised No R5‑200895  
    R5‑200895 Introduction of n95 SUL band test cases CMCC, Ericsson CR Agreement Yes
Yes
agreed No   R5‑200370
    R5‑200754 Introduction of Rel-16 spurious emissions co-existence requirements for bands n48, n65 and n95 Ericsson, Dish Network, CMCC CR Agreement Yes
Yeslate doc r1 was produced. Update of Table 6.5.3.2.5-1 where Rel-15 co-existence requirements for band n48, n65 and n95 now points Rel-16 requirements.
revised No R5‑200922  
    R5‑200922 Introduction of Rel-16 spurious emissions co-existence requirements for bands n48, n65 and n95 Ericsson, Dish Network, CMCC CR Agreement Yes
Yes
agreed No   R5‑200754
    R5‑200810 Adding n65 A-MPR and Emission Requirements Dish Network CR Agreement Yes
Yesr1 was produced.
revised No R5‑201069  
    R5‑201069 Adding n65 A-MPR and Emission Requirements Dish Network CR Agreement Yes
Yes
agreed No   R5‑200810
5.3.14.3.2 Rx Requirements (Clause 7)                      
5.3.14.3.3 Clauses 1-5 / Annexes R5‑200343 Update of R16 new bands and CBWs to TS 38.521-1 clause 5 China Unicom CR Agreement Yes
Yesr1 was produced. Several changes. r2 was produced. Added Note 11 to indicate “this UE channel bandwidth is not applicable in R15” for newly introduced R16 CBW in Table 5.3.5-1.
revised No R5‑201054  
    R5‑201054 Update of R16 new bands and CBWs to TS 38.521-1 clause 5 China Unicom CR Agreement Yes
Yes
agreed No   R5‑200343
5.3.14.4 TS 38.521-2                      
5.3.14.4.1 Tx Requirements (Clause 6)                      
5.3.14.4.2 Rx Requirements (Clause 7)                      
5.3.14.4.3 Clauses 1-5 / Annexes R5‑200365 Updates of MU and TT in TS 38.521-2 for Rel-16 NTT DOCOMO, INC. CR Agreement Yes
Yes5GS WIC cover. r1 was produced. offline discussions: Need to include outcome from MU discussion papers.
revised No R5‑200992  
    R5‑200992 Updates of MU and TT in TS 38.521-2 for Rel-16 NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑200365
5.3.14.5 TS 38.521-4                      
5.3.14.5.1 Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6)                      
5.3.14.5.2 Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8)                      
5.3.14.5.3 Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10)                      
5.3.14.5.4 Clauses 1-4 / Annexes                      
5.3.14.6 TS 38.533                      
5.3.14.7 TS 37.571-1                      
5.3.14.8 TR 38.903 ((NR MU & TT analyses)                      
5.3.14.9 TR 38.905 (NR Test Points Radio Transmission and Reception)                      
5.3.14.10 Discussion Papers / Work Plan / TC lists R5‑200118 Test Tolerance of Band n259 NTT DOCOMO, INC. discussion Endorsement Yes
Yesr1 was produced. Proposed MU and Ratio values are updated based on the contributions for RAN5#86-e (0316, 0736, 0816). r2 was produced. Addressing Apple's concern, Wisuit’s concern, NOTE for NTC (Normal Temperature Condition) is added.
revised No R5‑201035  
    R5‑201035 Test Tolerance of Band n259 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
noted No   R5‑200118
    R5‑200119 Updated WF on Band n259 NTT DOCOMO, INC. discussion Endorsement No
YesLate document to capture endorsements during RAN5#86. Updated (Revised) WF will be applied based on the existing WF endorsed in previous meeting (R5-198071).
withdrawn Yes    
    R5‑200819 TP analysis for NS_24 A-MPR in FR1 Dish Network discussion Endorsement Yes
Yesnoted and proposals endorsed
noted No    
5.3.15 Addition of Power Class 2 UE for LTE bands 31 and 72 (UID – 860030) LTE_PC2_B31_B72-UEConTest                      
5.3.15.1 TS 36.521-1                      
5.3.15.2 TS 36.521-2                      
5.3.15.3 Discussion Papers / Work Plan / TC lists                      
5.3.16 Further NB-IoT enhancements (UID – 860031) NB_IOTenh2-UEConTest                      
5.3.16.1 TS 36.508                      
5.3.16.2 TS 36.521-1                      
5.3.16.3 TS 36.521-2                      
5.3.16.4 TS 36.521-3                      
5.3.16.5 TS 37.571-1                      
5.3.16.6 TS 37.571-3                      
5.3.16.7 TS 37.571-5                      
5.3.16.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.16.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.16.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.16.11 Discussion Papers / Work Plan / TC lists                      
5.3.17 Even further enhanced MTC for LTE (UID – 860032) LTE_eMTC4-UEConTest                      
5.3.17.1 TS 36.508                      
5.3.17.2 TS 36.521-1                      
5.3.17.3 TS 36.521-2                      
5.3.17.4 TS 36.521-3                      
5.3.17.5 TS 37.571-1                      
5.3.17.6 TS 37.571-3                      
5.3.17.7 TS 37.571-5                      
5.3.17.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.17.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.17.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.17.11 Discussion Papers / Work Plan / TC lists                      
5.4 Routine Maintenance for LTE only TEIx_Test                      
5.4.1 LTE RF                      
5.4.1.1 TS 36.508                      
5.4.1.2 TS 36.521-1                      
5.4.1.2.1 Tx Requirements (Clause 6)                      
5.4.1.2.2 Rx Requirements (Clause 7)                      
5.4.1.2.3 Clauses 1-5 / 8-10 / Annexes                      
5.4.1.3 TS 36.521-2 R5‑200378 Addition of TS36.521-2 CA Band 5A-29A and 2A-5A-29A Sporton International Inc. CR Agreement Yes
YesWIC -13 ! is not in the scope of the meeting.
withdrawn Yes    
5.4.1.4 TS 36.521-3                      
5.4.1.5 RRM Test & Radio Reception Test Tolerances                      
5.4.1.5.1 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.4.1.5.2 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.4.1.5.3 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.4.1.6 TS 34.121-1                      
5.4.1.7 TS 34.121-2                      
5.4.1.8 TS 34.122                      
5.4.1.9 TS 34.108                      
5.4.1.10 TR 34.902 (UTRAN RRM Test Tolerance analyses)                      
5.4.1.11 Discussion Papers / Work Plan / TC lists                      
5.5 Other Routine Maintenance TEIx_Test                      
5.5.1 TS 34.108                      
5.5.2 TS 34.121-1 All sections other than annexes                      
5.5.3 TS 34.121-1 Annexes only                      
5.5.4 TS 34.121-2                      
5.5.5 TS 34.122                      
5.5.6 TS 34.171                      
5.5.7 TS 34.172                      
5.5.8 TS 34.114                      
5.5.9 TS 37.571-1 R5‑200052 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yescoversheet revision.
revised No R5‑201013  
    R5‑201013 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yes
agreed No   R5‑200052
    R5‑200103 Update of the Note 1 in the Power level and satellite allocation tables for the Sensitivity Coarse time assistance requirements and tests for E-UTRA and NR. Spirent Communications CR Agreement Yes
Yesout of scope of e-meeting, Spirent agreed to withdraw
withdrawn Yes    
5.5.10 TS 37.571-3 R5‑200054 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yescoversheet revision.
revised No R5‑201014  
    R5‑201014 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yes
agreed No   R5‑200054
5.5.11 TS 37.571-5 R5‑200055 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yescoversheet revision.
revised No R5‑201015  
    R5‑201015 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yes
agreed No   R5‑200055
5.5.12 TS 51.010-1 (RF/Performance)                      
5.5.13 TS 51.010-2 (RF/Performance)                      
5.5.14 TS 51.010-7 (RF/Performance)                      
5.5.15 TS 37.544                      
5.5.16 Discussion Papers / Work Plan / TC lists                      
5.6 Outgoing liaison statements for provisional approval                      
5.7 AOB                      
6 Signalling Protocol Functional Area                      
6.1 Review action points (fm A.I. 2.1)                      
6.2 Review incoming LS (fm A.I. 3) & new subject discussion papers                      
6.3 Open Work Items                      
6.3.1 Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest                      
6.3.1.1 TS 36.508                      
6.3.1.2 TS 36.523-1                      
6.3.1.3 TS 36.523-2                      
6.3.1.4 TS 36.523-3                      
6.3.1.5 Discussion Papers / Work Plan / TC lists                      
6.3.2 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest                      
6.3.2.1 TS 38.508-1 R5‑200021 Update SIB1 Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200930  
    R5‑200930 Update SIB1 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200021
    R5‑200025 Update CounterCheck Ericsson CR Agreement Yes
Yescoversheet revision. r1 was produced.
revised No R5‑200931  
    R5‑200931 Update CounterCheck Ericsson CR Agreement Yes
Yes
agreed No   R5‑200025
    R5‑200026 Editorial update DLInformationTransfer Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200932  
    R5‑200932 Editorial update DLInformationTransfer Ericsson CR Agreement Yes
Yes
agreed No   R5‑200026
    R5‑200027 Editorial update FailureInformation Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200933  
    R5‑200933 Editorial update FailureInformation Ericsson CR Agreement Yes
Yes
agreed No   R5‑200027
    R5‑200028 Editorial update MeasurementReport Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200934  
    R5‑200934 Editorial update MeasurementReport Ericsson CR Agreement Yes
Yes
agreed No   R5‑200028
    R5‑200029 Editorial update MobilityFromNRCommand Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200935  
    R5‑200935 Editorial update MobilityFromNRCommand Ericsson CR Agreement Yes
Yes
agreed No   R5‑200029
    R5‑200030 Editorial update Paging Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200936  
    R5‑200936 Editorial update Paging Ericsson CR Agreement Yes
Yes
agreed No   R5‑200030
    R5‑200049 Editorial update RRCReestablishment Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200937  
    R5‑200937 Editorial update RRCReestablishment Ericsson CR Agreement Yes
Yes
agreed No   R5‑200049
    R5‑200050 Update RRCReconfiguration Ericsson CR Agreement Yes
Yesr1 was produced. Missing condition EN-DC added. Condition to add SCG (NR-DC) rephrased. r2 was produced.
revised No R5‑201221  
    R5‑201221 Update RRCReconfiguration Ericsson CR Agreement Yes
Yes
agreed No   R5‑200050
    R5‑200051 Editorial update RRCReconfigurationComplete Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200938  
    R5‑200938 Editorial update RRCReconfigurationComplete Ericsson CR Agreement Yes
Yes
agreed No   R5‑200051
    R5‑200056 Editorial update RRCReject Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200939  
    R5‑200939 Editorial update RRCReject Ericsson CR Agreement Yes
Yes
agreed No   R5‑200056
    R5‑200079 Editorial update RRCRelease Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200940  
    R5‑200940 Editorial update RRCRelease Ericsson CR Agreement Yes
Yes
agreed No   R5‑200079
    R5‑200080 Editorial update RRCResumeComplete Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200941  
    R5‑200941 Editorial update RRCResumeComplete Ericsson CR Agreement Yes
Yes
agreed No   R5‑200080
    R5‑200081 Editorial update RRCSetup Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200942  
    R5‑200942 Editorial update RRCSetup Ericsson CR Agreement Yes
Yes
agreed No   R5‑200081
    R5‑200082 Update RRCSystemInfoRequest Ericsson CR Agreement Yes
YesR&S: The proposal from the TF160 manager would be to move to Rel-16 Jun 2020 baseline in Aug as part of 20wk32 ATS release? Please consider deferring these changes until the baseline move is planned, i.e for next May meeting. Coversheet revision.
revised No R5‑201174  
    R5‑201174 Update RRCSystemInfoRequest Ericsson CR Agreement Yes
Yes
agreed No   R5‑200082
    R5‑200083 Editorial update SCGFailureInformation Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200943  
    R5‑200943 Editorial update SCGFailureInformation Ericsson CR Agreement Yes
Yes
agreed No   R5‑200083
    R5‑200099 Editorial update SecurityMode Ericsson CR Agreement Yes
Yes
revised No R5‑200944  
    R5‑200944 Editorial update SecurityMode Ericsson CR Agreement Yes
Yes
agreed No   R5‑200099
    R5‑200104 Update SystemInformation Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200945  
    R5‑200945 Update SystemInformation Ericsson CR Agreement Yes
Yes
agreed No   R5‑200104
    R5‑200106 Editorial update UEAssistanceInformation Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200946  
    R5‑200946 Editorial update UEAssistanceInformation Ericsson CR Agreement Yes
Yes
agreed No   R5‑200106
    R5‑200107 Editorial update UECapability Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200947  
    R5‑200947 Editorial update UECapability Ericsson CR Agreement Yes
Yes
agreed No   R5‑200107
    R5‑200110 Editorial update ULInformation Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200948  
    R5‑200948 Editorial update ULInformation Ericsson CR Agreement Yes
Yes
agreed No   R5‑200110
    R5‑200111 Editorial update IE PUSCH-TimeDomainResourceAllocationList Ericsson CR Agreement Yes
Yesr1 was produced. Samsung: The CR does not follow the PRD13 recommendations on how to specify multiple entries in a SEQUENCE.
revised No R5‑201122  
    R5‑201122 Editorial update IE PUSCH-TimeDomainResourceAllocationList Ericsson CR Agreement Yes
Yes
withdrawn Yes   R5‑200111
    R5‑200112 Editorial update IE RLC-BearerConfig Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200949  
    R5‑200949 Editorial update IE RLC-BearerConfig Ericsson CR Agreement Yes
Yes
agreed No   R5‑200112
    R5‑200113 Editorial update IE PUCCH-Config Ericsson CR Agreement Yes
Yescoversheet revision. Samsung disagreed: The off-line discussion related to the CR suggesting alignment of how RRC 'SEQUENCE of structures (e.g. IEs)' are defined in 38.508-1. The suggested alignment however contradicts what we have in PRD13 on this topic which has already been used in multiple places in TS 38.508-1 and what we use in TS 38.508. For reference, this is the so called in 38.508-1 one or many "entries" which in PRD13 are referred to as "pools/records" and are addressed in subclause 7.2.1.5 introductory text, and, Example 3. We still have many places in 38.508-1 where RRC messages are defined in a way contradicting PRD13. Samsung suggests to raise an AP for the next meeting (RAN5#87) for an update of 38.508 to comply with PRD13: AP#86.03: Align TS 38.508-1 RRC IE/messages definitions with the PRD13 rule on "How to specify SEQUENCE of structures (e.g. IEs); the so called one or many "entries/pools/records" as specified in subclause 7.2.1.5 text and Example 3. If necessary, update PRD13 with more examples clarifying the rule. On: Samsung, Ericsson, TF160
revised No R5‑200950  
    R5‑200950 Editorial update IE PUCCH-Config Ericsson CR Agreement Yes
Yes
withdrawn Yes   R5‑200113
    R5‑200114 Update IE MeasObjectNR Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200120 Update IE RLF-TimersAndConstants Ericsson CR Agreement Yes
Yessee R5-200082. Coversheet revision.
revised No R5‑201175  
    R5‑201175 Update IE RLF-TimersAndConstants Ericsson CR Agreement Yes
Yes
agreed No   R5‑200120
    R5‑200121 Update IE SCS-SpecificCarrier Ericsson CR Agreement Yes
Yessee R5-200082. Coversheet revision.
revised No R5‑201176  
    R5‑201176 Update IE SCS-SpecificCarrier Ericsson CR Agreement Yes
Yes
agreed No   R5‑200121
    R5‑200122 Add IE TDD-UL-DL-ConfigDedicated Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200951  
    R5‑200951 Add IE TDD-UL-DL-ConfigDedicated Ericsson CR Agreement Yes
Yes
agreed No   R5‑200122
    R5‑200123 Update chapter 4.6.0 Ericsson CR Agreement Yes
Yesr1 was produced. Condition names rephrased. r2 was produced. Based on R&S's comment Table name and explanation rephrased. Coversheet revision.
revised No R5‑201177  
    R5‑201177 Update chapter 4.6.0 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200123
    R5‑200124 Update IE ServingCellConfigCommon Ericsson CR Agreement Yes
Yesr1 was produced. Comments from TF160 manager. ssb-PositionsInBurst update postponed to next mtg. Comments from R&S, Motorola Mobility. r2 was produced. Condition explanation updated. TF160: update to No_UL definition. Coversheet revision.
revised No R5‑201178  
    R5‑201178 Update IE ServingCellConfigCommon Ericsson CR Agreement Yes
Yesrev 1 missing. Revised after the meeting.
revised No R5‑201234 R5‑200124
    R5‑201234 Update IE ServingCellConfigCommon Ericsson CR Agreement Yes
Yes
agreed No   R5‑201178
    R5‑200125 Update IE ServingCellConfig Ericsson CR Agreement Yes
Yescoversheet revision. TF160: Update to No_UL definition. r1 was produced. Condition explanation updated.
revised No R5‑200952  
    R5‑200952 Update IE ServingCellConfig Ericsson CR Agreement Yes
Yes
agreed No   R5‑200125
    R5‑200126 Update IE ServingCellConfigCommonSIB Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200953  
    R5‑200953 Update IE ServingCellConfigCommonSIB Ericsson CR Agreement Yes
Yes
agreed No   R5‑200126
    R5‑200127 Update IE DMRS-DownlinkConfig Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200954  
    R5‑200954 Update IE DMRS-DownlinkConfig Ericsson CR Agreement Yes
Yes
agreed No   R5‑200127
    R5‑200128 Update IE FrequencyInfoUL Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200955  
    R5‑200955 Update IE FrequencyInfoUL Ericsson CR Agreement Yes
Yes
agreed No   R5‑200128
    R5‑200129 Update IE MeasObjectNR Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200130 Update IE MeasObjectNR Ericsson CR Agreement Yes
Yessee R5-200082. Coversheet revision.
revised No R5‑201179  
    R5‑201179 Update IE MeasObjectNR Ericsson CR Agreement Yes
Yes
agreed No   R5‑200130
    R5‑200131 Update IE TDD-UL-DL-Config Ericsson CR Agreement Yes
YesTF160 manager: With this CR, you are changing the TDD UL/DL configuration in a significant way. It has a big impact on the SIG test model and on all the TDD SIG test case verifications done to date. The initial TDD-UL-DL-ConfigCommon configuration was provided by NTT DOCOMO in R5-187669 at RAN5#81, and we believe it is technically correct. So we do not agree to your CR in its current form. Qualcomm agreed to this. r1 was produced. SIG and RF specific values added. SCS condition rephrased.
revised No R5‑201173  
    R5‑201173 Update IE TDD-UL-DL-Config Ericsson CR Agreement Yes
Yes
agreed No   R5‑200131
    R5‑200133 Update chapter 4.5.1 General Ericsson CR Agreement Yes
Yescoversheet revision. TF160 disagreed: - to the addition of the new row “Split”. In our opinion it is unnecessary because we already have the Bearers->”MCG(s) and split” that can be used for that purpose. - In the (flagged) e-mail thread on this CR, our questions have remained unanswered by the CR author. - At the start of RAN5#86-e meeting it had been agreed by the RAN5 Leadership that CRs on NR-DC were in scope, “condition being included are they can be agreed without any contentious discussion”. I believe this criteria is not fulfilled here. - Underlying procedures/default messages for use of the split option are still FFS at the end of RAN5#86-e, so there is no urgency at RAN5#86-e to conclude on the ‘split’ aspect of R5-200133. - Beyond the addition of the ‘Split’ row, which is the contentious point, the rest of the R5-200133 is editorial. We can continue discussions on whether and how to update 38.508-1 subclause 4.5.1 up to and at RAN5#87. First withdrawn, then agreed.
revised No R5‑200956  
    R5‑200956 Update chapter 4.5.1 General Ericsson CR Agreement Yes
Yes
agreed No   R5‑200133
    R5‑200134 Update chapter 4.5.4 RRC_CONNECTED Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200135 Removal of Correction to SIG OTA UE Orientation procedure ETSI CR Agreement Yes
Yes
agreed No    
    R5‑200136 Update IE CellGroupConfig Ericsson CR Agreement Yes
Yesr1 was produced. TF160 disagreed. r2 was produced.
revised No R5‑201222  
    R5‑201222 Update IE CellGroupConfig Ericsson CR Agreement Yes
Yes
agreed No   R5‑200136
    R5‑200137 Update chapter 4.5.4 RRC_CONNECTED Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200957  
    R5‑200957 Update chapter 4.5.4 RRC_CONNECTED Ericsson CR Agreement Yes
Yes
agreed No   R5‑200137
    R5‑200138 Updates to NR FR1 and LTE Power levels in OTA ANRITSU LTD CR Agreement Yes
Yesr1 was produced. Based on feedback from TF160, the revision includes additional changes to consider LTE OTA uncalibrated link in case of NR5GC and editorial updates.
revised No R5‑201092  
    R5‑201092 Updates to NR FR1 and LTE Power levels in OTA ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑200138
    R5‑200139 Correction to PUCCH-Config for Format1 and Format2 ANRITSU LTD CR Agreement Yes
Yescoversheet revision.
revised No R5‑200996  
    R5‑200996 Correction to PUCCH-Config for Format1 and Format2 ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑200139
    R5‑200140 Update IE CellGroupId Ericsson CR Agreement Yes
Yescoversheet revision. r1 was produced. Condition to add SCG (NR-DC) rephrased based on comments received from MCC TF160.
revised No R5‑200958  
    R5‑200958 Update IE CellGroupId Ericsson CR Agreement Yes
Yes
agreed No   R5‑200140
    R5‑200141 Update IE ServCellIndex Ericsson CR Agreement Yes
Yescoversheet revision. r1 was produced. Condition to add SCG (NR-DC) rephrased Based on the comments received from MCC TF160. r2 was produced. Editorial.
revised No R5‑200959  
    R5‑200959 Update IE ServCellIndex Ericsson CR Agreement Yes
Yes
agreed No   R5‑200141
    R5‑200142 Update IE SK-Counter Ericsson CR Agreement Yes
Yescoversheet revision.
revised No R5‑200960  
    R5‑200960 Update IE SK-Counter Ericsson CR Agreement Yes
Yes
agreed No   R5‑200142
    R5‑200143 Update IE SDAP-Config Ericsson CR Agreement Yes
Yescoversheet revision. TF160 disagreed: when we run an NR-DC test case, defaultDRB will be set to false for all DRBs. This is technically incorrect. Later TF160 commented that the wording “at most” seems to enable such configuration, and agreed.
revised No R5‑200961  
    R5‑200961 Update IE SDAP-Config Ericsson CR Agreement Yes
Yes
agreed No   R5‑200143
    R5‑200146 Update to PDCP-Config MediaTek Inc. CR Agreement Yes
Yesdiscussion with Mediatek and TF160. Ericsson disagreed. r1 was produced. TF160 agreed. new condition added for split SRB.
revised No R5‑201203  
    R5‑201203 Update to PDCP-Config MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑200146
    R5‑200147 Update to USIM config 6.4.1-11 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200158 Update of Annex C on calculation of test frequencies to achieve full bandwidth testing of NR bands Ericsson CR Agreement Yes
Yesr1 was produced. r2 was produced. Additional comments from R&S. 1. Corrected formulas for High range test frequencies (missing opening paranthese in the Floor function) 2. Corrected formulas for UL test frequencies (FTx-Rx_separation to be substracted from associated DL test freqeuncy not added); and updated description for parameter FTx-Rx_separation to not refer to TS 38.101-2, clause 5.4.4 as the clause does not exist in TS 38.101-2 (all FR2 bands are TDD Bands for which FTx-Rx_separation = 0).
revised No R5‑201005  
    R5‑201005 Update of Annex C on calculation of test frequencies to achieve full bandwidth testing of NR bands Ericsson CR Agreement Yes
Yes
agreed No   R5‑200158
    R5‑200244 Correction to nAndPagingFrameOffset ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑200247 Updates to default SSB index of intra-frequency NR cells MCC TF160 CR Agreement Yes
Yesr1 was produced. The SSB Index for NR Cell 489 (used only by RRM) is changed from 1 to 0. The reason for this change is that we have RRM measurement accuracy tests, where the two intra-frequency cells are NR Cell 1 and NR Cell 489. We would need to have different Cell Indexes in these two. Since NR Cell 1 has SSB Index 1 and is used also by SIG, changing NR Cell 489 is easier.
revised No R5‑201148  
    R5‑201148 Updates to default SSB index of intra-frequency NR cells MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200247
    R5‑200296 Addition of generic procedure for IMS MO speech setup Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200297 Addition of generic procedure for IMS MT speech setup Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200298 Addition of generic procedure for IMS MO call release Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200299 Addition of generic procedure for IMS MT call release Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200349 Correction to frequencyBandList in SIB4 StarPoint, Qualcomm CR Agreement Yes
Yes
agreed No    
    R5‑200350 Correction to EUTRA-AllowedMeasBandwidth Starpoint,Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. 1. Use a different way to define allowedmeasBandwidth. 2 Modify Table 4.6.3-74 to harmonize. r2 was produced.
revised No R5‑201108  
    R5‑201108 Correction to EUTRA-AllowedMeasBandwidth Starpoint,Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200350
    R5‑200477 Update to Registration REQ and Authentication Response message ROHDE & SCHWARZ, Anritsu CR Agreement Yes
YesFalsely withdrawn by Anritsu after offline discussion with DCM/Huawei/E///. Re-agreed after the meeting.
agreed No    
    R5‑200497 Update SIG test frequencies in clause 6.2.3.x Ericsson CR Agreement Yes
Yesr1 was produced. The revision is based on that R5-200497 required update of SIG test frequency table values based on the updated procedure to calculate test frequencies in R5-200157 and a need to update the CR cover sheet. r2 was produced. Adding test frequencies for protocol testing and CA configurations CA_n260G and CA_n261G to clause 6.2.3.4.
revised No R5‑201020  
    R5‑201020 Update SIG test frequencies in clause 6.2.3.x Ericsson CR Agreement Yes
Yes
agreed No   R5‑200497
    R5‑200498 Editorial correction to test frequency tables for multiple NR bands Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200499 Correction of test frequency tables for NR band n1 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200500 Correction of test frequency tables for NR band n2 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200501 Correction of test frequency tables for NR band n3 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200502 Correction of test frequency tables for NR band n7 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200503 Correction of test frequency tables for NR band n25 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200504 Correction of test frequency tables for NR band n28 Ericsson, Sony Mobile CR Agreement Yes
Yes
agreed No    
    R5‑200505 Correction of test frequency tables for NR band n34 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200506 Correction of test frequency tables for NR band n38 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200507 Correction of test frequency tables for NR band n39 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200508 Correction of test frequency tables for NR band n40 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200509 Correction of test frequency tables for NR band n41 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n41 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201021  
    R5‑201021 Correction of test frequency tables for NR band n41 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200509
    R5‑200510 Correction of test frequency tables for NR band n50 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200511 Correction of test frequency tables for NR band n66 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200512 Correction of test frequency tables for NR band n70 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200513 Correction of test frequency tables for NR band n71 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200514 Correction of test frequency tables for NR band n74 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200515 Correction of test frequency tables for NR band n75 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200516 Correction of test frequency tables for NR band n77 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n77 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201022  
    R5‑201022 Correction of test frequency tables for NR band n77 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200516
    R5‑200517 Correction of test frequency tables for NR band n78 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n78 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201023  
    R5‑201023 Correction of test frequency tables for NR band n78 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200517
    R5‑200518 Correction of test frequency tables for NR band n79 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n79 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201024  
    R5‑201024 Correction of test frequency tables for NR band n79 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200518
    R5‑200519 Correction of test frequency tables for NR band n257 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n257 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201025  
    R5‑201025 Correction of test frequency tables for NR band n257 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200519
    R5‑200520 Correction of test frequency tables for NR band n258 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n258 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201026  
    R5‑201026 Correction of test frequency tables for NR band n258 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200520
    R5‑200521 Correction of test frequency tables for NR band n260 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n260 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201027  
    R5‑201027 Correction of test frequency tables for NR band n260 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200521
    R5‑200522 Correction of test frequency tables for NR band n261 Ericsson CR Agreement Yes
Yesr1 was produced. Comment from Rohde & Schwarz to add indication of ?FRaster used in test frequency calculations for n261 as the band has two possible values (60kHz or 120kHz).
revised No R5‑201028  
    R5‑201028 Correction of test frequency tables for NR band n261 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200522
    R5‑200523 Corrections of test frequency tables for NR Intra-Band Contiguous CA configuration n41C Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200524 Corrections of test frequency tables for NR Intra-Band Contiguous CA configuration n78C Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200525 Update and corrections of test frequency tables for NR Intra-Band Contiguous CA configurations for NR band n257 Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200526 Update and corrections of test frequency tables for NR Intra-Band Contiguous CA configurations for NR band n258 Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200527 Update and corrections of test frequency tables for NR Intra-Band Contiguous CA configurations for NR band n260 Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200528 Update and corrections of test frequency tables for NR Intra-Band Contiguous CA configurations for NR band n261 Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200534 Update of clause 4.4.2 on simulated cells Ericsson CR Agreement Yes
Yesr1 was produced. According to comment from TF160 removed brackets in the reference in Note 1 in Table 4.4.2-1.
revised No R5‑201029  
    R5‑201029 Update of clause 4.4.2 on simulated cells Ericsson CR Agreement Yes
Yes
agreed No   R5‑200534
    R5‑200584 Correction to Default contents of DCI 0_1 Qualcomm Technologies Int CR Agreement Yes
YesTF160 manager: change not implementable as doesn't specify which (set of) value(s) shall be used by the SS under which conditions. Continue discussions on this matter up to RAN5#87 where the necessary set of CRs can be submitted. ->Raised a formal RAN5 Action Point AP#86.01: Study into impact on 5G Test Model and ASP when DAI value is not hard coded. On Qualcomm, TF160, R&S, Keysight, Anritsu. Qualcomm: need to look into the 5G Test Model and ASP impact when the DAI value is not hardcoded.
withdrawn Yes    
    R5‑200591 Updates to test case specific USIM Configuration Qualcomm Technologies Int CR Agreement No
Yeslate doc Mediatek can merge with HiSilicon and submit the changes.
withdrawn Yes    
    R5‑200617 Updates to 4.7.3 Contents of EAP-AKA messages in 38.508-1 ZTE, CMCC, TEJET, SRTC CR Agreement Yes
Yes>' r1 was produced.
revised No R5‑201116  
    R5‑201116 Updates to 4.7.3 Contents of EAP-AKA messages in 38.508-1 ZTE, CMCC, TEJET, SRTC CR Agreement Yes
Yes
agreed No   R5‑200617
    R5‑200631 Update to Switch Off/ Power off procedure in RRC_CONNECTED mode ROHDE & SCHWARZ CR Agreement Yes
Yescl aff. r1 was produced. Based on comments from Samsung and TF160 removed timer T3522 and reformatted table and step numbering.
revised No R5‑201202  
    R5‑201202 Update to Switch Off/ Power off procedure in RRC_CONNECTED mode ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200631
    R5‑200645 Updates to 4.6.4 UE Capability Information Elements Ericsson CR Agreement Yes
Yessame issue as R5-200082.
agreed No    
    R5‑200646 Correction to QoS rule number 7 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200647 Correction to IMS emergency call release procedures Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200678 Update of IE ControlResourceSet to introduce band and channel bandwidth specific values for frequencyDomainResources Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200679 Editorial correction to EN-DC inter-band test frequency tables Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200685 Message content Updates for Carrier Aggregation Anritsu Ltd, Qualcomm CR Agreement Yes
Yesreissued as R5-200882 because of wrong spec.
withdrawn Yes    
    R5‑200882 Message content Updates for Carrier Aggregation Anritsu Ltd, Qualcomm CR Agreement Yes
Yeslate doc TF160 manager: wrong spec on cover. Clashes with R5-200124. r1 was produced. Removed the change which make uplinkConfigCommon as mandatory. PDCCH-ConfigCommon uses SCell_Add condition but this condition is not referred by DownlinkConfig-Common and BWP-DownlinkCommon. Complex comments from Ericsson. r2 was produced. Includes change for SCellIndex to cover addition of multiple SCells. r3 was produced. TF160 agreed. Removed change for SCellIndex as this change is covered in R5-200136r2.
revised No R5‑201093  
    R5‑201093 Message content Updates for Carrier Aggregation Anritsu Ltd, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑200882
    R5‑200702 Correction to RRCReconfiguration message Huawei,Hisilicon CR Agreement Yes
Yescovered by R5-200050.
withdrawn Yes    
    R5‑200703 Correction to IE BeamFailureRecoveryConfig Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200774 Editorial update IE MeasConfig MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200775 Editorial update IE radioLinkMonitoringRS-Id MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200790 Updates to PDU session modification procedures MCC TF160, Mediatek CR Agreement Yes
YesRel-15! r1 was produced. The proposal is to extend the existing test procedure 4.9.9 for inter-system change from S1 to N1, to handle the possible PDU session modification and IMS re-registration signalling.
revised No R5‑201217  
    R5‑201217 Updates to PDU session modification procedures MCC TF160, Mediatek CR Agreement Yes
Yes
agreed No   R5‑200790
    R5‑200804 Correction of test frequency tables for NR band n5 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200805 Correction of test frequency tables for NR band n8 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200806 Correction of test frequency tables for NR band n12 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200807 Correction of test frequency tables for NR band n20 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200808 Correction of test frequency tables for NR band n51 Ericsson CR Agreement Yes
Yes
agreed No    
6.3.2.2 TS 38.508-2 R5‑200194 Correction to NR TC PICs Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. 1. Change to to the name of PIC pc_pusch_256QAM_FR1 is cancelled, and its Implementation Capabilities is changed to “Support 256QAM for PUSCH for at least one NR FR1 band” 2. A new PIC pc_pusch_256QAM_FR2 is added to cover FR2 case.
revised No R5‑201123  
    R5‑201123 Correction to NR TC PICs Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200194
    R5‑200636 Corrections and Addition of NR PICS Motorola Mobility, Anritsu and MCC TF 160 CR Agreement Yes
Yes
agreed No    
6.3.2.3 TS 38.509 R5‑200132 Corrections to NSSAI Test messages Qualcomm Technologies Int CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200193 Correction to SS-RSRPB reporting Huawei,Hisilicon CR Agreement No
Yes
withdrawn Yes    
    R5‑200269 Correction to SS-RSRPB REPORT RESPONSE ROHDE & SCHWARZ CR Agreement Yes
Yesalready covered in R5-200239 from Huawei,Hisilicon
withdrawn Yes    
    R5‑200270 Correction to NSSAI DELETE REQUEST ROHDE & SCHWARZ, Qualcomm CR Agreement Yes
Yesr1 was produced.
revised No R5‑201207  
    R5‑201207 Correction to NSSAI DELETE REQUEST ROHDE & SCHWARZ, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑200270
    R5‑200577 Correction to NSSAI Test Mode Command Qualcomm Technologies Int CR Agreement No
Yes
withdrawn Yes    
    R5‑200681 Correction to NSSAI Test Mode Command Qualcomm Technologies Int CR Agreement No
Yeslate doc
withdrawn Yes    
6.3.2.4 TS 38.523-1                      
6.3.2.4.1 Clauses 1 - 5 R5‑200225 Adding generic test parameters references and updating subclause 5 Samsung, MCC TF160 CR Agreement Yes
Yesr1 was produced. Typo.
revised No R5‑201031  
    R5‑201031 Adding generic test parameters references and updating subclause 5 Samsung, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200225
    R5‑200226 Adding core specs to section References Samsung CR Agreement Yes
Yes
agreed No    
6.3.2.4.2 Idle Mode (Clause 6) R5‑200084 Correction to Inter-frequency Cell reselection test case 6.1.2.20 Keysight Technologies UK Ltd, Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced.
revised No R5‑201208  
    R5‑201208 Correction to Inter-frequency Cell reselection test case 6.1.2.20 Keysight Technologies UK Ltd, Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200084
    R5‑200085 Correction to NR Idle mode test case 6.1.2.9 Keysight Technologies UK Ltd, Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. Merged R5-200689. • Merged R5-200689 • Added the delays for FR2 • Added a note explaining the delay calculations
revised No R5‑201209  
    R5‑201209 Correction to NR Idle mode test case 6.1.2.9 Keysight Technologies UK Ltd, Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200085
    R5‑200148 Correction to test case 6.1.1.6 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200149 Correction to test case 6.4.2.1 MediaTek Inc. CR Agreement Yes
Yesmerged into R5-200176.
withdrawn Yes    
    R5‑200164 Correction to NR TC 6.1.1.1-PLMN selection with Automatic mode Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yesr1 was produced. Correct the reference generic procedure for registration. r2 was produced. Correct conditional branches and their steps numbering according to comments from Samsung.
revised No R5‑201206  
    R5‑201206 Correction to NR TC 6.1.1.1-PLMN selection with Automatic mode Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yes
agreed No   R5‑200164
    R5‑200165 Correction to NR TC 6.1.1.2-PLMN selection of Other PLMN Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yesr1 was produced. Editorial changes.
revised No R5‑201125  
    R5‑201125 Correction to NR TC 6.1.1.2-PLMN selection of Other PLMN Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yes
agreed No   R5‑200165
    R5‑200166 Correction to NR TC 6.1.1.4-PLMN selection in shared network environment with Automatic mode Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yesr1 was produced.
revised No R5‑201126  
    R5‑201126 Correction to NR TC 6.1.1.4-PLMN selection in shared network environment with Automatic mode Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yes
agreed No   R5‑200166
    R5‑200167 Correction to NR TC 6.1.1.5-PLMN selection with Automatic mode and user reselection Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yestitle: no user resel.! r1 was produced. Motorola Mobility: The only way forward to make progress looks we need to allow both Rel-15 and Rel-16 behavior, this being an e-meeting. If RAN5 feels necessary, an LS to CT1 can be drafted, and continue discussion in RAN5 in RAN5#87. The branching can be done based on 5GS registration type in Registration Request, no need to define a PICS. r2 was produced. Correct the reference generic procedure for registration. RAN5 Chair: Thanks for finding a way forward by catering for both Rel-15 and Rel-16 behaviours in the test definition and implementation. This is a common practice followed in RAN5 when core spec makes clarification/improvement of core requirements in a later release (in this case Rel-16) version of the spec but leaves older version (in this case Rel-15) as it is. It is important from RAN5 perspective to make sure conformant UE doesn’t incorrectly fail a conformance test case applied in certification. From what we understand CT1 didn’t update Rel-15 version as it wasn’t deemed as an essential correction rather as an improvement/optimization, so we have to assume no interoperability issues in expected in real network operation. Unlike in the case of RAN Groups where explicit statement about improvement/optimization in later release to be allowed in earlier release is captured in the CR cover page or meeting minutes, CT1 doesn’t follow this practice. However it is widely understood and expected device may implement later release behaviour which should be catered by the network. Based on this there wouldn't be a compelling reason to send a LS to CT1 on this topic. Needs more discussion. r3 was produced. Correct conditional branches and their steps numbering according to comments from Samsung. Mediatek suggested to assign an action point for RAN5#87 to update affected test cases and make sure that Rel-16 UEs follow the Rel-16 spec.
revised No R5‑201127  
    R5‑201127 Correction to NR TC 6.1.1.5-PLMN selection with Automatic mode and user reselection Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
YesAP#86.02 raised & LS to CT1 under consdieration
agreed No   R5‑200167
    R5‑200168 Correction to NR TC 6.1.1.6-Periodic PLMN reselection with MinimumPeriodicSearchTimer Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Correct the PLMN settings and coversheet. Already taken care of by Samsung’s CR R5-200225.
revised No R5‑201003  
    R5‑201003 Correction to NR TC 6.1.1.6-Periodic PLMN reselection with MinimumPeriodicSearchTimer Huawei,Hisilicon CR Agreement Yes
Yes
withdrawn Yes   R5‑200168
    R5‑200169 Correction to NR TC 6.1.2.21-Cell reselection Huawei,Hisilicon CR Agreement Yes
Yesupdate cover page
revised No R5‑201112  
    R5‑201112 Correction to NR TC 6.1.2.21-Cell reselection Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200169
    R5‑200170 Correction to NR TC 6.1.2.22-Inter frequency cell reselection based on common priority information Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yesr1 was produced. WIC _ r2 was produced. Reason for change.
revised No R5‑201128  
    R5‑201128 Correction to NR TC 6.1.2.22-Inter frequency cell reselection based on common priority information Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yes
agreed No   R5‑200170
    R5‑200171 Correction to NR TC 6.2.3.2-Inter-RAT cell reselection L2N Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Cover. r2 was produced. Add NOTE at step 11 to align with R5-200790r1.
revised No R5‑201129  
    R5‑201129 Correction to NR TC 6.2.3.2-Inter-RAT cell reselection L2N Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200171
    R5‑200172 Correction to NR TC 6.2.3.5-Inter-RAT cell reselection N2L by dedicated signalling Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. WIC _ r2 was produced.
revised No R5‑201130  
    R5‑201130 Correction to NR TC 6.2.3.5-Inter-RAT cell reselection N2L by dedicated signalling Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200172
    R5‑200173 Correction to NR TC 6.2.3.6-Inter-RAT cell reselection Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Add NOTE at step 3 to align with R5-200790r1.
revised No R5‑201131  
    R5‑201131 Correction to NR TC 6.2.3.6-Inter-RAT cell reselection Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200173
    R5‑200174 Correction to NR TC 6.2.3.8-Inter-RAT cell reselection L2N Snonintrasearch Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Add NOTE at step 2 to align with R5-200790r1.
revised No R5‑201132  
    R5‑201132 Correction to NR TC 6.2.3.8-Inter-RAT cell reselection L2N Snonintrasearch Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200174
    R5‑200175 Correction to NR TC 6.2.3.9-Speed Dependent Cell Reselection N2L Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200176 Correction to NR TC 6.4.2.1-Inactive-Reselection Huawei, HiSilicon, StarPoint, MediaTek CR Agreement Yes
Yesr1 was produced.
revised No R5‑201133  
    R5‑201133 Correction to NR TC 6.4.2.1-Inactive-Reselection Huawei, HiSilicon, StarPoint, MediaTek CR Agreement Yes
Yes
agreed No   R5‑200176
    R5‑200242 Correction to NR TC 6.1.2.4-Cell Reselection for interband operation Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yesupdate cover page
revised No R5‑201113  
    R5‑201113 Correction to NR TC 6.1.2.4-Cell Reselection for interband operation Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yes
agreed No   R5‑200242
    R5‑200243 Correction to NR TC 6.1.2.5-Cell reselection for interband operation Between FDD and TDD Huawei,Hisilicon CR Agreement Yes
Yesupdate cover page
revised No R5‑201114  
    R5‑201114 Correction to NR TC 6.1.2.5-Cell reselection for interband operation Between FDD and TDD Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200243
    R5‑200338 Correction to NR TC 6.1.1.3-Cell reselection of ePLMN in manual mode Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200339 Correction to NR TC 6.4.1.2-Cell reselection of ePLMN in manual mode INACTIVE Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200340 Correction to NR TC 6.1.2.18-Cell reselection with parameters Sintrasearch and Snonintrasearch Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yesupdate cover page
revised No R5‑201115  
    R5‑201115 Correction to NR TC 6.1.2.18-Cell reselection with parameters Sintrasearch and Snonintrasearch Huawei, HiSilicon, Datang Linktester, CATT CR Agreement Yes
Yes
agreed No   R5‑200340
    R5‑200359 Update of 5G Idle test case 6.1.2.23 CATT, TDIA, Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. The revision is adding step 75A to complete the inter band test purpose which is based on comments from MCC TF160, and correcting the wait time for performing cell reselection for merging R5-200691 from Huawei.
revised No R5‑201223  
    R5‑201223 Update of 5G Idle test case 6.1.2.23 CATT, TDIA, Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200359
    R5‑200364 Correction to NR test case 6.2.3.1 Starpoint,Huawei, HiSilicon CR Agreement Yes
Yeschanges over changes. r1 was produced.
revised No R5‑201171  
    R5‑201171 Correction to NR test case 6.2.3.1 Starpoint,Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200364
    R5‑200366 Correction of NR test case 6.4.3.1-Inter-RAT cell reselection in RRC_INACTIVE StarPoint, Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200612 Addition of Idle Mode SoR Test Case 6.3.1.5 in 38.523-1 ZTE CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200613 Addition of Idle Mode SoR Test Case 6.3.1.7 in 38.523-1 ZTE CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200622 Inclusion of 5G-NR Idle Mode TC 6.1.2.19 - Speed-dependent cell reselection Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑200675 Correction to NR Idle mode test case 6.1.2.1 ANRITSU LTD, Qualcomm CR Agreement Yes
Yes
agreed No    
    R5‑200689 Correction to NR TC 6.1.2.9-Cell reselection using Qhyst Qoffset and Treselection Huawei,Hisilicon CR Agreement Yes
Yes'of'. r1 was produced.
revised No R5‑200993  
    R5‑200993 Correction to NR TC 6.1.2.9-Cell reselection using Qhyst Qoffset and Treselection Huawei,Hisilicon CR Agreement Yes
Yes
withdrawn Yes   R5‑200689
    R5‑200690 Correction to NR TC 6.1.2.11-Area Specific SIBs using systemInformationAreaID Huawei,Hisilicon CR Agreement Yes
Yesof r1 was produced. 1. Modify the cover sheet. 2. Steps 0 and 0A added to the beginning to notify the UE about the SIB change 3. Step 1 moved after step 3 and marked as Void. 4. Modify the Table 6.1.2.11.3.3-1. 5. Correct SI combination to NR-4. r2 was produced. 1. Replace “NR: Paging” with “NR: ShortMessage” 2. Change System information combination from NR-4 into NR-2 3. Remove step 4B which is used to check whether UE send RRCSystemInfoRequest message to NR Cell 3 to request SIB4. TF160 agreed.
revised No R5‑201006  
    R5‑201006 Correction to NR TC 6.1.2.11-Area Specific SIBs using systemInformationAreaID Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200690
    R5‑200691 Correction to NR TC 6.1.2.23-Cell reselection MFBI Huawei,Hisilicon CR Agreement Yes
Yes'of' CATT merged the changes into R5-200359r1 with Huawei as co-source.
withdrawn Yes    
    R5‑200749 Correction to NR Idle mode test case 6.1.2.3 MediaTek Inc. CR Agreement Yes
Yes.docx; +NR r1 was produced. Undone the changes of cell power due to the changes in R5-200749. r2 was produced.
revised No R5‑201228  
    R5‑201228 Correction to NR Idle mode test case 6.1.2.3 MediaTek Inc., Datang LinkTester CR Agreement Yes
Yesrev 2. Revised after the meeting.
revised No R5‑201235 R5‑200749
    R5‑201235 Correction to NR Idle mode test case 6.1.2.3 MediaTek Inc., Datang LinkTester CR Agreement No
Yes
agreed No   R5‑201228
6.3.2.4.3 Layer 2                      
6.3.2.4.3.1 NR Layer 2                      
6.3.2.4.3.1.1 Common Test Case Specific Values for Layer 2 (Clause 7.1.0)                      
6.3.2.4.3.1.2 MAC R5‑200086 Correction to NR MAC test case 7.1.1.1.2 Keysight Technologies UK Ltd CR Agreement Yes
Yesr1 was produced. • Added back the existing spec text which was removed without track change. • Clarified the text in Step 5 to distinguish the frame numbers for FR1 FDD, FR1 TDD and FR2.
revised No R5‑201210  
    R5‑201210 Correction to NR MAC test case 7.1.1.1.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200086
    R5‑200177 Correction to NR TC 7.1.1.1.4-Beam Failure Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. 1. RLM-RS is explicitly configured in Table 7.1.1.1.4.3.3-7 to simplify message contents. 2. Configuration of PDCCH TCI-state is removed from PDCCH-Config in step 8 and 17 to simplify message contents. 3. Typos are corrected.
revised No R5‑201134  
    R5‑201134 Correction to NR TC 7.1.1.1.4-Beam Failure Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200177
    R5‑200178 Correction to NR TC 7.1.1.9.1-MAC reset Huawei,Hisilicon CR Agreement Yes
YesMotorola Mobility: the proposed change is not needed, rather will pass a non-conformant UE.
withdrawn Yes    
    R5‑200248 Update to NR MAC test case 7.1.1.1.5 MCC TF160 CR Agreement Yes
Yesr1 was produced. The trigger for the UE to start the Random Access procedure has been simplified to be solely based on SR-TransMax being reached. r2 was produced. Removed the note from step 5 that had been added in r1, upon request from Motorola Mobility.
revised No R5‑201149  
    R5‑201149 Update to NR MAC test case 7.1.1.1.5 MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200248
    R5‑200611 Corrections to MAC TC 7.1.1.1.2 Qualcomm Technologies Int CR Agreement Yes
Yesr1 was produced.
revised No R5‑201100  
    R5‑201100 Corrections to MAC TC 7.1.1.1.2 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑200611
    R5‑200634 Corrections to NR MAC Test Case Motorola Mobility and MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200637 Correction to DRX MAC test cases Motorola Mobility and MCC TF160 CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200697 Correction to NR MAC test case 7.1.1.1.1a Keysight Technologies UK Ltd CR Agreement Yes
Yes.docx, R5. No changes, is a dummy coveersheet. maybe withdrawn acc. to Motorola Mobility. Was provided during the meeting. Motorola disagreed with changes.
withdrawn Yes    
6.3.2.4.3.1.3 RLC R5‑200048 Correction to NR RLC test case 7.1.2.3.5 Keysight Technologies UK Ltd CR Agreement Yes
Yescoversheet revision.
revised No R5‑200999  
    R5‑200999 Correction to NR RLC test case 7.1.2.3.5 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200048
    R5‑200087 Correction to NR RLC test case 7.1.2.2.6 Keysight Technologies UK Ltd CR Agreement Yes
Yesr1 was produced.
revised No R5‑201211  
    R5‑201211 Correction to NR RLC test case 7.1.2.2.6 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200087
    R5‑200100 Correction to NR RLC test case 7.1.2.3.7 Keysight Technologies UK Ltd CR Agreement Yes
Yesmerged into R&S R5-200220r1.
withdrawn Yes    
    R5‑200220 Correction to NR RLC testcase 7.1.2.3.7 ROHDE & SCHWARZ, TF160, Qualcomm CR Agreement Yes
Yesr1 was produced. Comments from TF160 and Qulacomm added as co-source r1 updates Steps 10 /step 36 /39 to clarify the UL grant bits. r2 was produced.
revised No R5‑201153  
    R5‑201153 Correction to NR RLC testcase 7.1.2.3.7 ROHDE & SCHWARZ, TF160, Qualcomm, Keysight CR Agreement Yes
Yes
agreed No   R5‑200220
    R5‑200221 Correction to NR RLC testcase 7.1.2.3.10 ROHDE & SCHWARZ, Qualcomm CR Agreement Yes
Yes
agreed No    
    R5‑200249 Corrections to NR RLC test case 7.1.2.3.6 MCC TF160 CR Agreement No
Yeslate doc not needed
withdrawn Yes    
    R5‑200250 Corrections to NR RLC test case 7.1.2.3.8 MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200345 Correction to NR test case 7.1.2.3.6 Starpoint CR Agreement Yes
Yesr1 was produced. Comments from TF160: Configured default uplink grants in step 14.
revised No R5‑201117  
    R5‑201117 Correction to NR test case 7.1.2.3.6 Starpoint CR Agreement Yes
Yes
agreed No   R5‑200345
    R5‑200550 Correction to EN-DC RLC test case 7.1.2.3.11 ANRITSU LTD, MCC TF160 CR Agreement Yes
Yesr1 was produced. Additional changes received from TF160 which modifies RLC timers.
revised No R5‑201094  
    R5‑201094 Correction to EN-DC RLC test case 7.1.2.3.11 ANRITSU LTD, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200550
    R5‑200554 Correction to NR RLC test case 7.1.2.3.11 ANRITSU LTD CR Agreement No
Yes
withdrawn Yes    
    R5‑200578 Corrections to RLC TC 7.1.2.3.5 and 7.1.2.2.5 Qualcomm Technologies Int CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200676 Correction to NR RLC AM test case 7.1.2.3.9 ANRITSU LTD, MCC TF160 CR Agreement Yes
Yesr1 was produced. The revision includes additional changes received from TF160 which modified TBS size due to DCI x_1 formats, NOTE added to provide description about strict timing difference required in context of t-statusProhibit timer and not to make UE to RACH due to sr-TransMax.
revised No R5‑201095  
    R5‑201095 Correction to NR RLC AM test case 7.1.2.3.9 ANRITSU LTD, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200676
6.3.2.4.3.1.4 PDCP R5‑200088 Correction to NR PDCP test case 7.1.3.4.1 Keysight Technologies UK Ltd CR Agreement Yes
Yesmerged into R5-200252.
withdrawn Yes    
    R5‑200109 Correction to NR PDCP test case 7.1.3.5.3 Keysight Technologies UK Ltd CR Agreement Yes
Yescoversheet revision.
revised No R5‑201000  
    R5‑201000 Correction to NR PDCP test case 7.1.3.5.3 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200109
    R5‑200251 Enhancement of NR PDCP test cases 7.1.3.1.x MCC TF160 CR Agreement Yes
YesNR PDCP missing. r1 was produced. Removed requirement of sending a PDCP PDUSs in MAC PDU is out of the scope of the test purpose. CR title aligned with 3GU.
revised No R5‑201218  
    R5‑201218 Enhancement of NR PDCP test cases 7.1.3.1.x MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200251
    R5‑200252 Corrections to NR PDCP test case 7.1.3.4.1 MCC TF160, Qualcomm, Keysight CR Agreement Yes
Yesr1 was produced. Keysight CR R5-200088 has been merged into this CR.
revised No R5‑201219  
    R5‑201219 Corrections to NR PDCP test case 7.1.3.4.1 MCC TF160, Qualcomm, Keysight CR Agreement Yes
Yes
agreed No   R5‑200252
    R5‑200551 Correction to NR PDCP test case 7.1.3.5.5 ANRITSU LTD CR Agreement Yes
Yes
agreed No    
    R5‑200553 Correction to NR PDCP Test cases 7.1.3.2.1, 7.1.3.2.2 and 7.1.3.2.3 Anritsu Ltd, Keysight Technologies CR Agreement Yes
Yesr1 was produced. Editorial correction to table name.
revised No R5‑201096  
    R5‑201096 Correction to NR PDCP Test cases 7.1.3.2.1, 7.1.3.2.2 and 7.1.3.2.3 Anritsu Ltd, Keysight Technologies CR Agreement Yes
Yes
agreed No   R5‑200553
6.3.2.4.3.1.5 SDAP R5‑200089 Correction to NR SDAP test case 7.1.4.2 Keysight Technologies UK Ltd CR Agreement Yes
Yescoversheet revision.
revised No R5‑201001  
    R5‑201001 Correction to NR SDAP test case 7.1.4.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200089
6.3.2.4.4 RRC                      
6.3.2.4.4.1 NR RRC                      
6.3.2.4.4.2 MR-DC RRC                      
6.3.2.4.4.1.1 RRC Connection Management Procedures (clause 8.1.1) R5‑200090 Correction to NR RRC test case 8.1.1.4.1 Keysight Technologies UK Ltd CR Agreement Yes
Yesr2 was produced.
revised No R5‑201212  
    R5‑201212 Correction to NR RRC test case 8.1.1.4.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200090
    R5‑200091 Correction to NR RRC test case 8.1.1.3.3 Keysight Technologies UK Ltd CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200179 Correction to NR TC 8.1.1.3.1-Redirection Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. • Index of DRB and PDU session are changed to the more generic description; • Message contents are updated accordingly.
revised No R5‑201135  
    R5‑201135 Correction to NR TC 8.1.1.3.1-Redirection Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200179
    R5‑200180 Correction to NR TC 8.1.1.3.3-With priority information of NR Cell Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. Set the NR Cell 3 power level as -94 dB. • Power level for NR Cell 3 and Cell 6 in T1/T2 is updated according to comments received; r3 was produced. • Test steps are renumbered. • Formats are corrected. • Index of DRB and PDU session is updated for sake of generality. • RadioBearerConfig and CellGroupConfig in table Table 8.1.1.3.3.3.3-5 are updated accordingly
revised No R5‑201136  
    R5‑201136 Correction to NR TC 8.1.1.3.3-With priority information of NR Cell Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200180
    R5‑200181 Correction to NR TC 8.1.1.3.4-With priority information of LTE Cell Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Data path verification for NR cell is added. TF160/Keysight: expected you to add the IP check when the UE moves back to the NR cell during the expected sequence -i.e. after step 5. I don't think there's any need to add the check before the UE moves anywhere. r2 was produced. r3 was produced??????????
revised No R5‑201137  
    R5‑201137 Correction to NR TC 8.1.1.3.4-With priority information of LTE Cell Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200181
    R5‑200354 Correction to 5G RRC test case 8.1.1.2.3 TDIA, CATT CR Agreement Yes
Yes
agreed No    
    R5‑200355 Correction to 5G RRC test case 8.1.1.4.1 TDIA, CATT CR Agreement Yes
Yes
agreed No    
    R5‑200585 Correction to RRC TC 8.1.1.1.1 Qualcomm Technologies Int CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200590 Editorial Correction to TC 8.1.1.1.2 Qualcomm Technologies Int CR Agreement Yes
Yes-ct_
revised No R5‑201007  
    R5‑201007 Editorial Correction to TC 8.1.1.1.2 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑200590
    R5‑200674 Correction to NR5GC RRC test case 8.1.1.2.1 Keysight Technologies UK Ltd, Mediatek CR Agreement Yes
Yesr1 was produced. TF160 agreed.
revised No R5‑201216  
    R5‑201216 Correction to NR5GC RRC test case 8.1.1.2.1 Keysight Technologies UK Ltd, Mediatek CR Agreement Yes
Yes
agreed No   R5‑200674
6.3.2.4.4.1.2 RRC Reconfiguration (clause 8.1.2) R5‑200182 Correction to NR TC 8.1.2.1.2-uplinkTxDirectCurrentList Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.2.1 RRC UE Capability / Others (clause 8.2.1) R5‑200189 Correction to NR TC 8.2.1.1.1-UE Capability Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced.
revised No R5‑201141  
    R5‑201141 Correction to NR TC 8.2.1.1.1-UE Capability Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200189
6.3.2.4.4.1.3 RRC Measurement Configuration Control and Reporting (clause 8.1.3) R5‑200092 Correction to NR5GC IRAT test case 8.1.3.2.1 Keysight Technologies UK Ltd CR Agreement Yes
Yesr1 was produced. • Used the condition NR_MEAS in Table 8.1.3.2.1.3.3-1, removed the 2 newly added tables. This is to specify the same contents in a more compact way. • Updated the conformance requirement to remove gapFR1 and gapFR2 references as it is not needed
revised No R5‑201213  
    R5‑201213 Correction to NR5GC IRAT test case 8.1.3.2.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200092
    R5‑200108 Correction to NR5GC RRC test case 8.1.3.1.2 Keysight Technologies UK Ltd CR Agreement Yes
Yesr1 was produced. • Reverted the change to remove reportQuantityCell in Table 8.1.3.1.2.3.3-4 based on MCC TF160 comment. • Updated Table 8.1.3.1.2.3.3-1 to specify it in a more compact way with the usage of NR_MEAS condition
revised No R5‑201214  
    R5‑201214 Correction to NR5GC RRC test case 8.1.3.1.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200108
    R5‑200150 Correction to test case 8.1.3.1.16 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.2.2 RRC Radio Bearer (clause 8.2.2) R5‑200151 Update to test case 8.2.2.2.1 MediaTek Inc. CR Agreement Yes
Yesr1 was produced. - corrected SRB2->SRB1 - checking properly that RRC message has been duplicated in UL on split SRB: o Added separate steps to stop and re-start RLC ACK on split SRB o Added a not to clarify that the UE RLC might re-transmit the UL RRC PDUs (with RRC messages) while DL RLC ACK is stopped r2 was produced. - align the name of the condition in table 8.2.2.2.1.3.3-5 with CR1254 (R5-200146)
revised No R5‑201204  
    R5‑201204 Update to test case 8.2.2.2.1 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑200151
    R5‑200152 Update to test case 8.2.2.3.1 MediaTek Inc. CR Agreement No
Yes
withdrawn Yes    
6.3.2.4.4.1.3 RRC Measurement Configuration Control and Reporting (clause 8.1.3) R5‑200183 Correction to NR TC 8.1.3.3.1-NR CGI Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. 1. resultsSSB-Cell for serving cell in step 7 is set to Not Checked. 2. reportConfigId for CGI report is corrected.
revised No R5‑201138  
    R5‑201138 Correction to NR TC 8.1.3.3.1-NR CGI Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200183
    R5‑200184 Correction to NR TC 8.1.3.3.2-LTE CGI Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. resultsSSB-Cell for serving cell in step 7 is set to Not Checked.
revised No R5‑201139  
    R5‑201139 Correction to NR TC 8.1.3.3.2-LTE CGI Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200184
6.3.2.4.4.2.2 RRC Radio Bearer (clause 8.2.2) R5‑200190 Correction to ENDC TC 8.2.2.2.1-Split SRB Huawei,Hisilicon CR Agreement Yes
YesSTF160 offline comments.
withdrawn Yes    
    R5‑200191 Correction to ENDC TC 8.2.2.3.1-SRB3 and Split SRB Huawei,Hisilicon CR Agreement Yes
YesSTF160 offline comments.
withdrawn Yes    
    R5‑200253 Corrections to EN-DC test case 8.2.2.3.1 MCC TF160 CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.1.3 RRC Measurement Configuration Control and Reporting (clause 8.1.3) R5‑200341 Correction to NR TC 8.1.3.1.17.1-Event A6 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200346 Correction to NR test case 8.1.3.2.2 Starpoint CR Agreement Yes
Yesr1 was produced. Deleted references to gapFR1 and gapFR2 from the conformance requirements to avoid confusion.
revised No R5‑201118  
    R5‑201118 Correction to NR test case 8.1.3.2.2 Starpoint CR Agreement Yes
Yes
agreed No   R5‑200346
    R5‑200352 Correction to NR RRC measurement Test cases 8.1.3.1.13 and 8.1.3.1.14A ANRITSU LTD CR Agreement Yes
Yescomment from TF160. r1 was produced. editorial change to Table 8.1.3.1.13.3.3-1. r2 was produced.
revised No R5‑201170  
    R5‑201170 Correction to NR RRC measurement Test cases 8.1.3.1.13 and 8.1.3.1.14A ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑200352
6.3.2.4.4.2.2 RRC Radio Bearer (clause 8.2.2) R5‑200579 Corrections to RRC TC 8.2.2.7.1 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No    
    R5‑200580 Corrections to RRC TC 8.2.2.8.1 Qualcomm Technologies Int CR Agreement Yes
Yesr1 was produced. 1. Removed nr-Config-r15 IE from Table 8.2.2.8.1.3.3-23 2. Removed pdcp-Config IE from Tables: 8.2.2.8.1.3.3-16, 8.2.2.8.1.3.3-26, 8.2.2.8.1.3.3-43 and 8.2.2.8.1.3.3-47. r2 was produced. TF160 agreed.
revised No R5‑201101  
    R5‑201101 Corrections to RRC TC 8.2.2.8.1 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑200580
    R5‑200583 Correction to RRC TC 8.2.2.5.1 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.1.3 RRC Measurement Configuration Control and Reporting (clause 8.1.3) R5‑200662 Correction to NR RRC measurement test case for SINR report of serving cell Anritsu Ltd, Qualcomm CR Agreement Yes
Yesr1 was produced. Comments received from TF160 to add SINR based condition for neighbour cells in measurement report for 8.1.3.1.15A, 8.1.3.1.17.1 and 8.1.3.1.18.1. Removed SINR condition for 8.1.3.1.12. r2 was produced after the deadline, so cannot be accepted. Discussion with TF160. Included appropriate applied conditioning NR_MEAS to RRCReconfiguration messages and added missing definitions of resultsCSI-RS-Cell, rsIndexResults and cgi-Info IEs in measResultNeighCells. Decision about r1.
revised No R5‑201097  
    R5‑201097 Correction to NR RRC measurement test case for SINR report of serving cell Anritsu Ltd, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑200662
    R5‑200791 Update of RRC TC 8.1.3.1.1 MediaTek Inc. CR Agreement Yes
Yesr1 was produced. Removed the overlapping to R5-200662. r2 was produced.
revised No R5‑201229  
    R5‑201229 Update of RRC TC 8.1.3.1.1 MediaTek Inc. CR Agreement Yes
Yesrev 2. Revised after the meeting.
revised No R5‑201236 R5‑200791
    R5‑201236 Update of RRC TC 8.1.3.1.1 MediaTek Inc. CR Agreement No
Yes
agreed No   R5‑201229
    R5‑200803 Correction to NR TC 8.1.3.1.23-Intra NR measurements Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.2.2 RRC Radio Bearer (clause 8.2.2) R5‑200821 Corrections to EN-DC RRC TC 8.2.2.1.1 MediaTek Inc. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201230  
    R5‑201230 Corrections to EN-DC RRC TC 8.2.2.1.1 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑200821
6.3.2.4.4.1.3 RRC Measurement Configuration Control and Reporting (clause 8.1.3) R5‑200854 Update of NR RRC Measurement TC MediaTek Inc. CR Agreement No
Yeslate doc
withdrawn Yes    
6.3.2.4.4.1.4 RRC Handover (clause 8.1.4) R5‑200093 Correction to NR5GC IRAT test case 8.1.4.2.1.1 Keysight Technologies UK Ltd CR Agreement Yes
Yesr1 was produced. r2 was produced.• Corrected the indentations of the IEs in Table 8.1.4.2.1.1.3.3-1 • Corrected the value of targetRAT-MessageContainer to align with core specifications
revised No R5‑201215  
    R5‑201215 Correction to NR5GC IRAT test case 8.1.4.2.1.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200093
6.3.2.4.4.2.3 RRC Measurement / Handovers (clause 8.2.3) R5‑200094 Correction to EN-DC RRC test cases 8.2.3.8.1a and 8.2.3.8.1b Keysight Technologies UK Ltd CR Agreement Yes
Yesmerged into R5-200619.
withdrawn Yes    
    R5‑200144 Correction to EN-DC RRC Test case 8.2.3.2.1 ANRITSU LTD CR Agreement Yes
Yescoversheet revision.
revised No R5‑200997  
    R5‑200997 Correction to EN-DC RRC Test case 8.2.3.2.1 ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑200144
6.3.2.4.4.1.4 RRC Handover (clause 8.1.4) R5‑200185 Correction to NR TC 8.1.4.1.6-Handover Failure Huawei, HiSilicon, StarPoint CR Agreement Yes
Yes
agreed No    
    R5‑200186 Correction to NRTC 8.1.4.1.7.1-PCell Change and SCell addition Intra-band Contiguous CA Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. r2 was produced. discussion with TF160. r3 was produced. • sCellConfigDedicated is explictly configured in Table 8.1.4.1.7.1.3.3-4 to avoid clash with other CRs according to the comments from TF160; r4 was produced. • Data path verification on SCell is removed; • Test steps and message contents are updated accordingly.
revised No R5‑201140  
    R5‑201140 Correction to NRTC 8.1.4.1.7.1-PCell Change and SCell addition Intra-band Contiguous CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200186
    R5‑200187 Correction to NR TC 8.1.4.1.8.1-SCell no change Intra-band Contiguous CA Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200188 Correction to NR TC 8.1.4.2.2.1-L2N Handover Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.2.3 RRC Measurement / Handovers (clause 8.2.3) R5‑200619 Correction to NR test case 8.2.3.8.1x Starpoint CR Agreement Yes
Yesadd Keysight.
revised No R5‑201018  
    R5‑201018 Correction to NR test case 8.2.3.8.1x Starpoint, Keysight CR Agreement Yes
Yes
agreed No   R5‑200619
    R5‑200625 Update of RRC TC 8.2.3.12.1 Intertek CR Agreement Yes
Yes
agreed No    
    R5‑200856 Update of MR-DC RRC Measurement TC MediaTek Inc. CR Agreement No
Yeslate doc
withdrawn Yes    
6.3.2.4.4.1.5 RRC Others (clause 8.1.5) R5‑200347 Correction to NR test case 8.1.5.2.1 StarPoint, Huawei, HiSilicon CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.2.4 RRC Carrier Aggregation (clause 8.2.4) R5‑200353 Correction to 5G RRC test case 8.2.4.3.1 TDIA, CATT CR Agreement Yes
Yesr1 was produced. Comments from MCC160.
revised No R5‑201224  
    R5‑201224 Correction to 5G RRC test case 8.2.4.3.1 TDIA, CATT CR Agreement Yes
Yes
agreed No   R5‑200353
6.3.2.4.4.1.5 RRC Others (clause 8.1.5) R5‑200623 Update of RRC TC 8.1.5.6.5.1 Intertek CR Agreement Yes
Yes
agreed No    
6.3.2.4.4.2.4 RRC Carrier Aggregation (clause 8.2.4) R5‑200698 Correction to 5G RRC test case 8.2.4.3.1.3 TDIA, CATT CR Agreement Yes
Yesr1 was produced. Comments from MCC160.
revised No R5‑201225  
    R5‑201225 Correction to 5G RRC test case 8.2.4.3.1.3 TDIA, CATT CR Agreement Yes
Yes
agreed No   R5‑200698
    R5‑200699 Correction NR CA Test case 8.2.4.1.1.1 Anritsu Ltd, Qualcomm CR Agreement Yes
Yesr1 was produced. Contents for SRS-TPC-CommandConfig are not fully updated as default contents are FFS in Table 4.6.3-183 of TS38.508-1. Having a value for startingBitOfFormat2-3 without defining fieldTypeFormat2-3 does not make valid configuration
revised No R5‑201098  
    R5‑201098 Correction NR CA Test case 8.2.4.1.1.1 Anritsu Ltd, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑200699
6.3.2.4.4.2.5 RRC Reconfiguration / Radio Link Failure (clause 8.2.5)                      
6.3.2.4.4.2.6 RRC Others (clause 8.2.6)                      
6.3.2.4.5 5GS Mobility Management                      
6.3.2.4.5.1 MM Primary authentication and key agreement (clause 9.1.1) R5‑200195 Correction to NR TC 9.1.1.1-EAP-AKA related procedures Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200196 Correction to NR TC 9.1.1.2-Authentication Reject Huawei,Hisilicon, ZTE CR Agreement Yes
Yesr1 was produced. Merged R5-200747 into it after discussion with ZTE. r2 was produced. r3 was produced.
revised No R5‑201142  
    R5‑201142 Correction to NR TC 9.1.1.2-Authentication Reject Huawei,Hisilicon, ZTE CR Agreement Yes
Yes
agreed No   R5‑200196
    R5‑200197 Correction to NR TC 9.1.1.6-5G AKA abnormal Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Offline discussion with Samsung.
revised No R5‑201084  
    R5‑201084 Correction to NR TC 9.1.1.6-5G AKA abnormal Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200197
    R5‑200616 Update to 5GC test case 9.1.1.3 in 38.523-1 ZTE, CMCC CR Agreement Yes
Yes
agreed No    
    R5‑200747 Correction to test case 9.1.1.2 ZTE Corporation CR Agreement Yes
Yeswas wrong AI Merged into R5-200196r2.
withdrawn Yes    
6.3.2.4.5.2 MM Security mode control / Identification & Generic UE configuration update (clauses 9.1.2 / 9.1.3 & 9.1.4) R5‑200095 Correction to 5GMM test case 9.1.2.1 Keysight Technologies UK Ltd CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200198 Correction to NR TC 9.1.2.2-Initial NAS msg ciphering Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Included discussion result with TF160.
revised No R5‑201085  
    R5‑201085 Correction to NR TC 9.1.2.2-Initial NAS msg ciphering Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200198
    R5‑200199 Correction to NR TC 9.1.4.1-Generic UE configuration update Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Add NR-4 to be broardcasted. Add step 48A to Release RRC connection. r2 was produced. Change for incorporating both initial and mobile registration. r3 was produced. Changed the branch description and step numbering according to Samsung's comments.
revised No R5‑201143  
    R5‑201143 Correction to NR TC 9.1.4.1-Generic UE configuration update Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200199
6.3.2.4.5.3 MM Registration & De-registration (clauses 9.1.5 & 9.1.6) R5‑200096 Correction to 5GMM test case 9.1.5.1.8 Keysight Technologies UK Ltd CR Agreement Yes
Yescoversheet revision.
revised No R5‑201002  
    R5‑201002 Correction to 5GMM test case 9.1.5.1.8 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑200096
    R5‑200097 Correction to 5GMM test case 9.1.5.2.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200098 Correction to NR5GC test case 9.1.6.1.2 Keysight Technologies UK Ltd CR Agreement Yes
Yesmerged into Huawei's R5-200207.
withdrawn Yes    
    R5‑200200 Correction to NR TC 9.1.5.1.2-Equivalent PLMN list handling Huawei,Hisilicon, Keysight CR Agreement Yes
Yesr1 was produced. Incorporated discussion result with TF160.
revised No R5‑201086  
    R5‑201086 Correction to NR TC 9.1.5.1.2-Equivalent PLMN list handling Huawei,Hisilicon, Keysight CR Agreement Yes
Yes
agreed No   R5‑200200
    R5‑200201 Correction to NR TC 9.1.5.1.3-Registration Request NSSAI Huawei,Hisilicon CR Agreement No
Yes
withdrawn Yes    
    R5‑200202 Correction to NR TC 9.1.5.1.3a-Valid USIM NSSAI Huawei,Hisilicon CR Agreement No
Yes
withdrawn Yes    
    R5‑200203 Correction to NR TC 9.1.5.1.9-Change of cell into a new tracking area Huawei, HiSilicon, CATT, MCC TF160, StartPoint CR Agreement Yes
Yesr1 was produced. Offline discussions. Comments from Samsung about TC title, step 1 Cell B to be 'Non-suitable cell', and step 29, not checking here RRC. Qualcomm was removed. r3 was produced. Change the description of RRCReconfiguration-HO and add related message contents.
revised No R5‑201087  
    R5‑201087 Correction to NR TC 9.1.5.1.9-Change of cell into a new tracking area Huawei, HiSilicon, CATT, MCC TF160, StartPoint CR Agreement Yes
Yes
agreed No   R5‑200203
    R5‑200204 Correction to NR TC 9.1.5.1.14-RegisterReject 22 and T3346 Huawei,Hisilicon, ZTE CR Agreement Yes
Yesr1 was produced. Comments from TF160/Keysight and Samsung about how to test that a registration is for Emergency services. Need more discussion.
revised No R5‑201144  
    R5‑201144 Correction to NR TC 9.1.5.1.14-RegisterReject 22 and T3346 Huawei,Hisilicon, ZTE CR Agreement Yes
Yes
agreed No   R5‑200204
    R5‑200205 Correction to NR TC 9.1.5.2.2-Periodic Register T3512 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200206 Correction to NR TC 9.1.5.2.8-Registration Reject 10 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200207 Correction to NR TC 9.1.6.1.2-UE initialed deregistration procedure Huawei, HiSilicon, Datang Linktester, CATT, Keysight CR Agreement Yes
Yesr1 was produced. Merged Keysight's R5-200098.
revised No R5‑201145  
    R5‑201145 Correction to NR TC 9.1.6.1.2-UE initialed deregistration procedure Huawei, HiSilicon, Datang Linktester, CATT, Keysight CR Agreement Yes
Yes
agreed No   R5‑200207
    R5‑200208 Correction to NR TC 9.1.6.1.3-Deregistration in new TA Huawei, HiSilicon, Starpoint, Qualcomm CR Agreement Yes
YesQualcomm's R5-200582 was merged into.
agreed No    
    R5‑200254 Corrections to 5GC test case 9.1.5.1.1 MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200348 Correction to NR test case 9.1.5.2.6 StarPoint, Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. fix changes over changes.
revised No R5‑201119  
    R5‑201119 Correction to NR test case 9.1.5.2.6 StarPoint, Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200348
    R5‑200581 Correction to NSSAI TC 9.1.5.1.3 Qualcomm Technologies Int CR Agreement No
Yes
withdrawn Yes    
    R5‑200582 Correction to 5GC TC 9.1.6.1.3 Qualcomm Technologies Int CR Agreement Yes
Yesmerged into Huawei's by R5-200208.
withdrawn Yes    
    R5‑200586 Corrections to 5GC TC 9.1.5.2.8 Qualcomm Technologies Int CR Agreement Yes
YesTF160: is no need to added SIB2 in the test case.
withdrawn Yes    
    R5‑200587 Correction to 5G TC 9.1.5.2.1 Qualcomm Technologies Int CR Agreement Yes
Yescomments from TF160.
agreed No    
    R5‑200588 Correction to 5G TC 9.1.5.1.9 Qualcomm Technologies Int CR Agreement Yes
Yesmerged into Huawei's R5-200203.
withdrawn Yes    
    R5‑200614 Correction to NR5GC test case 9.1.5.1.14 in 38.523-1 ZTE CR Agreement Yes
Yesmerged into R5-200204r1.
withdrawn Yes    
    R5‑200680 Correction to NSSAI TC 9.1.5.1.3 Qualcomm Technologies Int CR Agreement Yes
YesTF160 checked.
agreed No    
6.3.2.4.5.4 MM Service Request (clause 9.1.7) R5‑200155 Correction to test case 9.1.7.2 MediaTek Inc. CR Agreement Yes
Yesmerged into R5-200209.
withdrawn Yes    
    R5‑200209 Correction to NR TC 9.1.7.2-Service Request Huawei, HiSilicon, Datang Linktester, CATT, MediaTek, MCC TF160 CR Agreement Yes
Yesr1 was produced. Merged Mediatek's R5-200155 and comments from TF160. r2 was produced. Changed DRB 1 to DRB n according to comments from TF160/Keysight.
revised No R5‑201088  
    R5‑201088 Correction to NR TC 9.1.7.2-Service Request Huawei, HiSilicon, Datang Linktester, CATT, MediaTek, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200209
    R5‑200589 Correction to 5G TC 9.1.7.1 Qualcomm Technologies Int CR Agreement Yes
Yeslate doc r1 was produced. Offline discussion with Mediatek, Samsung and TF160. r2 was produced. Change reason 3 is added to cover additional optional steps after T3525 expiry.
revised No R5‑201102  
    R5‑201102 Correction to 5G TC 9.1.7.1 Qualcomm Technologies Int CR Agreement Yes
Yeswrong spec on cover. No cl. aff.
revised No R5‑201241 R5‑200589
    R5‑201241 Correction to 5G TC 9.1.7.1 Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑201102
6.3.2.4.5.5 MM SMS Over NAS (clause 9.1.8) R5‑200210 Correction to NR TC 9.1.8.1-SMS Huawei,Hisilicon, MCC TF160 CR Agreement Yes
Yesr1 was produced. We merge R5-200255 after discussion with MCC TF160.
revised No R5‑201089  
    R5‑201089 Correction to NR TC 9.1.8.1-SMS Huawei,Hisilicon, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200210
    R5‑200255 Corrections to 5GC test case 9.1.8.1 MCC TF160 CR Agreement Yes
Yesmerged into R5-200210r1
withdrawn Yes    
6.3.2.4.5.6 Inter-system Mobility (clause 9.3) R5‑200211 Correction to NR TC 9.3.1.1-5GC to EPC Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200212 Correction to NR TC 9.3.1.2-Inter-system mobility registration update EPC to 5GC Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. Change to align with latest R5-200790.
revised No R5‑201200  
    R5‑201200 Correction to NR TC 9.3.1.2-Inter-system mobility registration update EPC to 5GC Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200212
6.3.2.4.6 5GS Session Management                      
6.3.2.4.6.1 SM PDU session authentication and authorization (clause 10.1.1) R5‑200213 Correction to NR TC 10.1.1.1-Authentication during PDU establish Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑200214 Correction to NR TC 10.1.1.2-Authentication after PDU establish Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
6.3.2.4.6.2 SM Network-requested PDU session modification & release (clauses 10.1.2 & 10.1.3) R5‑200162 Correction to 5GC TC 10.1.3.2 CAICT CR Agreement Yes
Yesr1 was produced.
revised No R5‑201107  
    R5‑201107 Correction to 5GC TC 10.1.3.2 CAICT CR Agreement Yes
Yes
agreed No   R5‑200162
    R5‑200215 Correction to NR TC 10.1.2.2-PDU modify Huawei,Hisilicon CR Agreement Yes
YesR5-200417 covers everything.
withdrawn Yes    
    R5‑200360 Update of 5GC test case 10.1.3.1 CATT, TDIA CR Agreement Yes
Yes
agreed No    
    R5‑200361 Addition of new 5GC test case 10.1.2.3 CATT, TDIA CR Agreement Yes
Yesfurther technical discussion is needed.
withdrawn Yes    
    R5‑200417 Correction to 5GC test case 10.1.2.2 CATT, TDIA CR Agreement Yes
Yesr1 was produced. Correcting the format of reference [TS 24.501, clause 7.3.2] in conformance requirements part based the comments from Huawei.
revised No R5‑201226  
    R5‑201226 Correction to 5GC test case 10.1.2.2 CATT, TDIA CR Agreement Yes
Yes
agreed No   R5‑200417
6.3.2.4.6.3 SM UE-requested PDU session establishment / modification & release (clauses 10.1.4 / 10.1.5 & 10.1.6) R5‑200216 Correction to NR TC 10.1.4.1-T3580 Huawei,Hisilicon CR Agreement Yes
Yesr2 was produced. r3 was produced?
revised No R5‑201146  
    R5‑201146 Correction to NR TC 10.1.4.1-T3580 Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200216
    R5‑200673 Editorial correction: Assign title to section 10.1.4 ANRITSU LTD CR Agreement Yes
YesThis is a editorial change, however, it is still not clear what is content of R5-200216r1 as we need clarification from CT1. If R5-200216r1 is withdrawn, I will submit R5-200673. If R5-200216r1 not withdrawn, I will withdraw R5-200673 after merging the editorial change.
agreed No    
6.3.2.4.7 EN-DC Session Management                      
6.3.2.4.8 5GS Multilayer and Services                      
6.3.2.4.8.1 EPS Fallback R5‑200748 Correction to test case 11.1.2 ZTE Corporation CR Agreement Yes
Yeswas wrong AI r1 was produced.
revised No R5‑201103  
    R5‑201103 Correction to test case 11.1.2 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200748
    R5‑200867 Correction to Multilayer TC 11.1.1 MediaTek Inc. CR Agreement Yes
Yesr1 was produced.
revised No R5‑201231  
    R5‑201231 Correction to Multilayer TC 11.1.1 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑200867
    R5‑200872 Correction to Multilayer TC 11.1.5 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑200877 Correction to Multilayer TC 11.1.6 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
6.3.2.4.8.2 RAT Fallback                      
6.3.2.4.8.3 Unified Access Control (UAC) R5‑200217 Addition of NR TC 11.3.1-UAC AI0 MTSI MO speech call SMSoIP Uplink data transfer Huawei,Hisilicon CR Agreement No
Yes
withdrawn Yes    
    R5‑200218 Addition of NR TC 11.3.5-UAC AI1 AC5 MMTEL Video call Huawei,Hisilicon CR Agreement No
Yes
withdrawn Yes    
    R5‑200219 Addition of NR TC 11.3.9-UAC Operator Defined Access Category Huawei,Hisilicon CR Agreement Yes
YesRapporteur: is not an immediate priority.
withdrawn Yes    
    R5‑200356 Correction to 5G UAC test case 11.3.6 TDIA, MCC TF160, Huawei, HiSilicon, CATT CR Agreement Yes
Yesr1 was produced. Comments from R&S.
revised No R5‑201227  
    R5‑201227 Correction to 5G UAC test case 11.3.6 TDIA, MCC TF160, Huawei, HiSilicon, CATT CR Agreement Yes
Yes
agreed No   R5‑200356
    R5‑200357 Correction to 5G UAC test case 11.3.3 CATT, TDIA CR Agreement Yes
Yes
agreed No    
    R5‑200358 Correction to 5G UAC test case 11.3.4 CATT, TDIA CR Agreement Yes
Yes
agreed No    
6.3.2.4.8.4 Emergency Services R5‑200227 Corrections to IMS Emergency Services TC 11.4.1 Samsung CR Agreement Yes
Yes
agreed No    
    R5‑200228 Update to IMS Emergency Services TC 11.4.1 for adding new TPs Samsung CR Agreement Yes
Yesr1 was produced. Comments from TFC160 for a possible improvement of the step sequence to avoid a redundant from the TP's point of view set up and release of the IMS emergency call.
revised No R5‑201032  
    R5‑201032 Update to IMS Emergency Services TC 11.4.1 for adding new TPs Samsung CR Agreement Yes
Yes
agreed No   R5‑200228
    R5‑200229 Corrections to IMS Emergency Services TC 11.4.2 Samsung, MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200230 Corrections to IMS Emergency Services TC 11.4.4 Samsung CR Agreement Yes
Yes
agreed No    
    R5‑200231 Update of TC 11.4.4 5G Emergency Services to add a new TP Samsung CR Agreement Yes
Yesr1 was produced. Comments from R&S for the need of improvement of the text in one of the steps.
revised No R5‑201033  
    R5‑201033 Update of TC 11.4.4 5G Emergency Services to add a new TP Samsung CR Agreement Yes
Yes
agreed No   R5‑200231
    R5‑200232 Corrections to IMS Emergency Services TC 11.4.6 Samsung CR Agreement Yes
Yes
agreed No    
    R5‑200233 Introduction of new TC 11.4.7 Handling of Local and extended emergency numbers / Mobility Samsung CR Agreement Yes
Yes
agreed No    
    R5‑200234 Introduction of new TC 11.4.8 Handling of Local and extended emergency numbers / Switch-off and maximum local numbers storage Samsung CR Agreement Yes
Yes
agreed No    
6.3.2.5 TS 38.523-2 R5‑200192 Correction to NR TC applicaibility-Split SRB Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. 1. Comment column in test case table for TC 8.2.2.2.1 and 8.2.2.3.1 is also corrected, Thanks to TF160 manager's comments. 2. It is found that UL CA related capability is needed for TC 8.1.4.1.7.1/2/3 during the email discussion with TF160/Keysight, So I also use R5-200192 to capture the needed changes of Test case Selection Expression for TC 8.1.4.1.7.1/2/3 Need more discussion. r2 was produced. • Undone the changes to TC 8.1.4.1.7.1/2/3 is removed since there is mismatch with the CR title according to comments from TF160; r4 was produced? Motorola Mobility and TF160 agreed.
revised No R5‑201147  
    R5‑201147 Correction to NR TC applicaibility-Split SRB Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200192
    R5‑200235 Adding and modifying test applicability IMS Emergency Services Samsung CR Agreement Yes
Yes
agreed No    
    R5‑200240 Addition of applicability for test cases Huawei,Hisilicon CR Agreement Yes
YesAddtion depending from R5-200219.
withdrawn Yes    
    R5‑200367 Update test applicability for 5GC test cases CATT, TDIA CR Agreement Yes
Yes
withdrawn Yes    
    R5‑200618 Update of 5G-NR test cases applicability Qualcomm Incorporated, CATT, TDIA, ZTE, MCC TF160 CR Agreement Yes
Yesr1 was produced. Offline discussion with TF160. Huawei agreed.
revised No R5‑201109  
    R5‑201109 Update of 5G-NR test cases applicability Qualcomm Incorporated, CATT, TDIA, ZTE, MCC TF160 CR Agreement Yes
Yesr1 was produced.
revised No R5‑201201 R5‑200618
    R5‑201201 Update of 5G-NR test cases applicability Qualcomm Incorporated, CATT, TDIA, ZTE, MCC TF160 CR Agreement Yes
Yesafter the meeting, the TF160 manager recommended a late revision to remove applicability of TCs 6.3.1.5, 6.3.1.7 & 10.1.2.3. r1 was produced.
revised No R5‑201233 R5‑201109
    R5‑201233 Update of 5G-NR test cases applicability Qualcomm Incorporated, CATT, TDIA, ZTE, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑201201
6.3.2.6 TS 38.523-3 R5‑200256 5G Test Models updates MCC TF160 CR Agreement Yes
Yesr1 was produced. R5-200244 (Correction to nAndPagingFrameOffset) has got impact
revised No R5‑201150  
    R5‑201150 5G Test Models updates MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200256
6.3.2.7 TS 34.229-1                      
6.3.2.8 TS 34.229-2                      
6.3.2.9 TS 34.229-3 R5‑200257 IMS over NR/5GC: Initial Test Model MCC TF160 CR Agreement Yes
Yes
agreed No    
6.3.2.10 TS 34.229-5 (pCRs only)                      
6.3.2.11 TS 36.508 R5‑200295 Updates to condition for UEs indicating support of N1 Ericsson CR Agreement Yes
Yestypo RR5!
revised No R5‑201008  
    R5‑201008 Updates to condition for UEs indicating support of N1 Ericsson CR Agreement Yes
Yes
agreed No   R5‑200295
    R5‑200648 Updates to PDN Connectivity Request message Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200649 Updates to ESM Information Response message Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200704 Correction to QuantityConfig-DEFAULT Huawei,Hisilicon CR Agreement Yes
Yes
agreed No    
6.3.2.12 TS 36.509                      
6.3.2.13 TS 36.523-1                      
6.3.2.14 TS 36.523-2                      
6.3.2.15 TS 36.523-3                      
6.3.2.16 TS 37.571-2 R5‑200101 ECID test cases deleted for NR Test Configuration B up to and including LPP Rel-15 Spirent Communications CR Agreement Yes
Yescoversheet revision.
revised No R5‑201010  
    R5‑201010 ECID test cases deleted for NR Test Configuration B up to and including LPP Rel-15 Spirent Communications CR Agreement Yes
Yes
agreed No   R5‑200101
6.3.2.17 TS 37.571-3 R5‑200102 Applicabilities for ECID signalling test cases deleted for NR Test Configuration B Spirent Communications CR Agreement Yes
Yescoversheet revision.
revised No R5‑201011  
    R5‑201011 Applicabilities for ECID signalling test cases deleted for NR Test Configuration B Spirent Communications CR Agreement Yes
Yes
agreed No   R5‑200102
6.3.2.18 TS 37.571-4                      
6.3.2.19 TS 37.571-5                      
6.3.2.20 Discussion Papers / Work Plan / TC lists R5‑200692 RLC UM and AM Window Size Operation Tests Qualcomm Technologies Int discussion Agreement Yes
Yeshas to be resubmitted to RAN5#87. First withdrawn, then postponed. RAN5 Chair: the issues raised in the paper have been acknowledged by interested companies but couldn’t agree on a way forward. Proposals not accepted but issues raised have been acknowledged and RAN5 expects further discussion and test optimization to be proposed at RAN5#87.
noted No    
6.3.3 Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest                      
6.3.3.1 TS 36.508                      
6.3.3.2 TS 36.523-1                      
6.3.3.3 TS 36.523-2                      
6.3.3.4 TS 36.523-3                      
6.3.3.5 Discussion Papers / Work Plan / TC lists                      
6.3.4 Rel-15 CA configurations (UID - 770064) LTE_CA_R15-UEConTest                      
6.3.4.1 TS 36.508                      
6.3.4.2 TS 36.523-1                      
6.3.4.3 TS 36.523-2                      
6.3.4.4 TS 36.523-3                      
6.3.4.5 Discussion Papers / Work Plan / TC lists                      
6.3.5 Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest                      
6.3.5.1 TS 36.523-1                      
6.3.5.2 TS 36.523-2                      
6.3.5.3 TS 36.523-3                      
6.3.5.4 Discussion Papers / Work Plan / TC lists                      
6.3.6 Mission Critical Improvements (UID - 790052) MCImp-UEConTest                      
6.3.6.1 TS 36.579-1                      
6.3.6.2 TS 36.579-2                      
6.3.6.3 TS 36.579-3                      
6.3.6.4 TS 36.579-4                      
6.3.6.5 TS 36.579-5                      
6.3.6.6 TS 36.579-6                      
6.3.6.7 TS 36.579-7                      
6.3.6.8 TS 36.508                      
6.3.6.9 TS 36.509                      
6.3.6.10 TS 36.523-1                      
6.3.6.11 TS 36.523-2                      
6.3.6.12 TS 36.523-3                      
6.3.6.13 Discussion Papers / Work Plan / TC lists                      
6.3.7 5G System Non-3GPP Access (UID - 800081) 5GS_Ph1-CT_n3GPPA-UEConTest                      
6.3.7.1 TS 38.508-1                      
6.3.7.2 TS 38.508-2                      
6.3.7.3 TS 38.523-1 R5‑200635 Correction to Non 3GPP Access test cases Motorola Mobility CR Agreement Yes
Yesr1 was produced. Removed MCC 160 as co-source.
revised No R5‑201009  
    R5‑201009 Correction to Non 3GPP Access test cases Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑200635
6.3.7.4 TS 38.523-2                      
6.3.7.5 TS 38.523-3                      
6.3.7.6 Discussion Papers / Work Plan / TC lists                      
6.3.8 Rel-16 LTE CA configurations (UID - 810061) LTE_CA_R16-UEConTest                      
6.3.8.1 TS 36.508                      
6.3.8.2 TS 36.523-1                      
6.3.8.3 TS 36.523-2                      
6.3.8.4 TS 36.523-3                      
6.3.8.5 Discussion Papers / Work Plan / TC lists                      
6.3.9 Shortened TTI and processing time for LTE (UID - 820064) LTE_sTTIandPT-UEConTest                      
6.3.9.1 TS 36.508                      
6.3.9.2 TS 36.509                      
6.3.9.3 TS 36.523-1                      
6.3.9.4 TS 36.523-2                      
6.3.9.5 TS 36.523-3                      
6.3.9.6 Discussion Papers / Work Plan / TC lists                      
6.3.10 Enhancing LTE CA Utilization (UID - 820066) LTE_euCA-UEConTest                      
6.3.10.1 TS 36.508                      
6.3.10.2 TS 36.523-1                      
6.3.10.3 TS 36.523-2                      
6.3.10.4 Discussion Papers / Work Plan / TC lists                      
6.3.11 REL-16 NR CA and DC; and NR and LTE DC Configurations (UID-830083) NR_CADC_NR_LTE_DC_R16-UEConTest                      
6.3.11.1 TS 38.508-1 R5‑200529 Corrections of test frequency tables for NR Intra-Band Contiguous CA configuration n66B Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
    R5‑200530 Introduction of test frequencies for Rel-16 NR CA configuration CA_n66(2A) in cl 6.2.3 Ericsson CR Agreement No
Yeslate doc
withdrawn Yes    
6.3.11.2 TS 38.508-2                      
6.3.11.3 TS 38.523-1                      
6.3.11.4 TS 38.523-2                      
6.3.11.5 TS 38.523-3                      
6.3.11.6 Discussion Papers / Work Plan / TC lists                      
6.3.12 LTE Advanced high power TDD UE (power class 2) for Rel-15 (UID - 850061) LTE_TDD_HPUE_R15-UEConTest                      
6.3.12.1 TS 36.523-1                      
6.3.12.2 TS 36.523-2                      
6.3.12.3 TS 36.523-3                      
6.3.12.4 Discussion Papers / Work Plan / TC lists                      
6.3.13 New Rel-16 NR bands and extension of existing NR bands (UID - 850062) NR_bands_BW_R16-UEConTest                      
6.3.13.1 TS 38.508-1 R5‑200531 Correction of test frequency tables for NR band n29 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200532 Correction of test frequency tables for NR band n48 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑200533 Correction of test frequency tables for NR band n65 Ericsson CR Agreement Yes
Yes
agreed No    
6.3.13.2 TS 38.508-2                      
6.3.13.3 TS 38.523-3                      
6.3.13.4 Discussion Papers / Work Plan / TC lists                      
6.3.14 Further NB-IoT enhancements (UID – 860031) NB_IOTenh2-UEConTest                      
6.3.14.1 TS 36.508                      
6.3.14.2 TS 36.509                      
6.3.14.3 TS 36.523-1                      
6.3.14.4 TS 36.523-2                      
6.3.14.5 TS 36.523-3                      
6.3.14.6 Discussion Papers / Work Plan / TC lists                      
6.3.15 Even further enhanced MTC for LTE (UID – 860032) LTE_eMTC4-UEConTest                      
6.3.15.1 TS 36.508                      
6.3.15.2 TS 36.509                      
6.3.15.3 TS 36.523-1                      
6.3.15.4 TS 36.523-2                      
6.3.15.5 TS 36.523-3                      
6.3.15.6 Discussion Papers / Work Plan / TC lists                      
6.4 Routine Maintenance for TS 36 Series TEIx_Test                      
6.4.1 Routine Maintenance for TS 36.508 R5‑200624 Addition of new Generic Test Procedure for IMS Re-registration in E-UTRAN and updates to clause 4.5A.3 Qualcomm Incorporated, ROHDE & SCHWARZ, Anritsu Ltd. CR Agreement Yes
Yesr1 was produced. r2 was produced. Comments from R&S, MCC TF 160. Maybe replacement CR is needed because of the need of a new title.
revised No R5‑201110  
    R5‑201110 Addition of new Generic Test Procedure for IMS Re-registration in E-UTRAN and updates to clause 4.5A.3 Qualcomm Incorporated, ROHDE & SCHWARZ, Anritsu Ltd. CR Agreement Yes
Yes
agreed No   R5‑200624
6.4.2 Routine Maintenance for TS 36.509                      
6.4.3 Routine Maintenance for TS 36.523-1                      
6.4.3.1 Idle Mode R5‑200677 Update of RRC Idle mode test cases to handle IMS Re-registration ANRITSU LTD CR Agreement Yes
Yesr1 was produced. Based on discussion with QC, TF160 and RnS , the revision includes removed the test cases which are not impacted for IMS de-registration and other editorial updates.
revised No R5‑201099  
    R5‑201099 Update of RRC Idle mode test cases to handle IMS Re-registration ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑200677
6.4.3.2 Layer 2                      
6.4.3.2.1 MAC R5‑200638 Corrections to LTE 256 QAM MAC Test Case Motorola Mobility and MCC TF160 CR Agreement Yes
Yes
agreed No    
6.4.3.2.2 RLC                      
6.4.3.2.3 PDCP                      
6.4.3.3 RRC                      
6.4.3.3.1 RRC Part 1 (clauses 8.1 and 8.5)                      
6.4.3.3.2 RRC Part 2 (clause 8.2) R5‑200222 Correction to test case 8.2.4.3 for CAT-M1 UEs ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
6.4.3.3.3 RRC Part 3 (clause 8.3)                      
6.4.3.3.4 Inter-RAT (clauses 8.4 & 8.4A)                      
6.4.3.3.5 RRC LTE MDT (clause 8.6) R5‑200626 Update of MDT test cases to handle IMS Re-registration Qualcomm Incorporated CR Agreement Yes
Yesr1 was produced.
revised No R5‑201111  
    R5‑201111 Update of MDT test cases to handle IMS Re-registration Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑200626
6.4.3.3.6 RRC ANR for UTRAN (clause 8.7)                      
6.4.3.4 EPS Mobility Management R5‑200750 Addition of a new test case of SIP registration via a new P-CSCF address discovery DOCOMO Communications Lab. CR Agreement Yes
Yesr1 was produced. In original version, IMS registration was repeated twice. To resolve this issue, the main behaviour is modified and the parallel behaviour table is added. In original version, steps 24-26 uses generic procedure 4.5A.16, but this procedure is for “additional” PDN. So, it is removed and the detailed procedure for PDN re-establishment is described. - Added a NOTE to align with the existing TC 9.2.1.1.28b. - Modified the step 6-17 description to align with the existing TC 9.2.1.1.28b. - Added “P-CSCF IPv6” and “P-CSCF IPv4” condition to Table 9.2.1.1.28b.3.3-3 - Resolved an editorial issue. r2 was produced. TF160 agreed. The procedure for IMS PDN re-establishment is moved from parallel bahaviour to main behaviour. A new parallel heaviour table for IMS registration after IMS PDN re-establishment is added.
revised No R5‑201172  
    R5‑201172 Addition of a new test case of SIP registration via a new P-CSCF address discovery DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑200750
6.4.3.5 EPS Session Management                      
6.4.3.6 General Tests                      
6.4.3.7 Interoperability Radio Bearers                      
6.4.3.8 Multilayer Procedures                      
6.4.3.9 PWS - ETWS / CMAS                      
6.4.3.10 Non-3GPP                      
6.4.3.11 Others (TS 36.523-1 clauses not covered by other AIs under AI 6.4.3 / e.g. eMBMS / Home (e)NB / MBMS in LTE / D2D / SC-PTM / NB-IoT / CIoT...) R5‑200153 Correction to NBIOT testcase 22.5.7b ROHDE & SCHWARZ CR Agreement Yes
Yescl aff.! r1 was produced.
revised No R5‑201205  
    R5‑201205 Correction to NBIOT testcase 22.5.7b ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200153
    R5‑200621 Update to Aerial vehicle test cases Qualcomm Incorporated, MCC TF 160 CR Agreement Yes
Yeswrong WIC and AI! (wrong AI allocation: LTE_eMTC4-UEConTest)
revised No R5‑201016  
    R5‑201016 Update to Aerial vehicle test cases Qualcomm Incorporated, MCC TF 160 CR Agreement Yes
Yes
agreed No   R5‑200621
6.4.4 Routine Maintenance for TS 36.523-2 R5‑200379 Addition of TS36.523-2 CA Band 5A-29A and 2A-5A-29A Sporton International Inc. CR Agreement Yes
YesWIC -13 ! RAN5 chair: is outside the scope.
withdrawn Yes    
    R5‑200753 Addition of a new test applicability for new P-CSCF discovery test case DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No    
6.4.5 Routine Maintenance for TS 36.523-3 R5‑200258 Routine maintenance for TS 36.523-3 MCC TF160 CR Agreement Yes
Yes
agreed No    
6.4.6 Discussion Papers / Work Plan / TC lists R5‑200289 TS 36.523-1 Status before RAN5#86-e Rapporteur (BlackBerry) other Information Yes
Yes
noted No    
    R5‑200290 TS 36.523-1 Status after RAN5#86-e Rapporteur (BlackBerry) other Information No
Yespost meeting doc.
postponed No    
6.5 Other Maintenance TEIx_Test                      
6.5.1 Routine Maintenance for TDD (HCR & LCR)                      
6.5.1.1 TS 34.108                      
6.5.1.2 TS 34.123-1                      
6.5.1.3 TS 34.123-2                      
6.5.1.4 TS 34.123-3                      
6.5.1.5 Discussion Papers / Work Plan / TC list & CR summary                      
6.5.2 Routine Maintenance for TS 34.108                      
6.5.3 Routine Maintenance for TS 34.109                      
6.5.4 Routine Maintenance for TS 34.123                      
6.5.4.1 TS 34.123-1 R5‑200154 Corrections to SSNITZ test cases ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
6.5.4.2 TS 34.123-2                      
6.5.4.3 TS 34.123-3                      
6.5.5 Discussion Papers / Work Plan / TC lists                      
6.5.6 Routine Maintenance for TS 34.229                      
6.5.6.1 TS 34.229-1 R5‑200105 Corrections to IMS test case 22.2 ROHDE & SCHWARZ, Qualcomm CR Agreement Yes
Yesr1 was produced. r2 was produced. Meeting header.
revised No R5‑201120  
    R5‑201120 Corrections to IMS test case 22.2 ROHDE & SCHWARZ, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑200105
    R5‑200259 Corrections to SMS test case 18.1b MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200387 Corrections for re-registration on V-PLMN and UTRAN ROHDE & SCHWARZ, Qualcomm, Anritsu CR Agreement Yes
Yesr1 was produced. r2 was produced. Title correction.
revised No R5‑201121  
    R5‑201121 Corrections to A.1.1 and C.46 for re-registration scenarios ROHDE & SCHWARZ, Qualcomm, Anritsu CR Agreement Yes
Yes
agreed No   R5‑200387
    R5‑200457 Corrections to Via header in PRACK, UPDATE, and BYE ROHDE & SCHWARZ, MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200458 Corrections to Contact header in UPDATE ROHDE & SCHWARZ, MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200864 Addition of SIP_305 Use Proxy message DOCOMO Communications Lab. CR Agreement Yes
YesR&S agreed.
agreed No    
6.5.6.2 TS 34.229-2                      
6.5.6.3 TS 34.229-3 R5‑200260 Routine maintenance for TS 34.229-3 MCC TF160 CR Agreement Yes
YesComment from R&S.
agreed No    
6.5.6.4 TS 34.229-4                      
6.5.6.5 Discussion Papers / Work Plan / TC lists                      
6.5.7 Routine Maintenance for TS 37.571                      
6.5.7.1 TS 37.571-2 R5‑200053 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yescoversheet revision.
revised No R5‑201012  
    R5‑201012 Editorial changes to TS 37.571-X titles to remove references to individual RATs Rapporteur CR Agreement Yes
Yes
agreed No   R5‑200053
6.5.7.2 TS 37.571-3                      
6.5.7.3 TS 37.571-4 R5‑200261 Routine maintenance for TS 37.571-4 MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200262 Editorial changes to TS 37.571-X titles to remove references to individual RATs MCC TF160 (Rapporteur) CR Agreement Yes
Yes
agreed No    
6.5.7.4 TS 37.571-5                      
6.5.7.5 Discussion Papers / Work Plan / TC lists                      
6.5.8 Routine Maintenance for TS 51.010                      
6.5.8.1 TS 51.010-1 (Signalling)                      
6.5.8.2 TS 51.010-2 (Signalling)                      
6.5.8.3 TS 51.010-5 (Signalling)                      
6.5.8.4 TS 51.010-7 (Signalling)                      
6.5.8.5 Discussion Papers / Work Plan / TC list & CR summary                      
6.5.9 Routine Maintenance for MCPTT                      
6.5.9.1 TS 36.579-1 R5‑200263 Corrections to MCPTT UE registration procedures MCC TF160 CR Agreement Yes
Yesr1 was produced. Editorial corrections to comply to RAN5 PRD13, following review comments from Samsung.
revised No R5‑201220  
    R5‑201220 Corrections to MCPTT UE registration procedures MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200263
    R5‑200264 Corrections to default SIP message and other information elements MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200265 Addition of further references MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200301 Corrections to default HTTP message and other information elements MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200385 Corrections to default MCPTT configuration management messages and other information elements MCC TF160 CR Agreement Yes
Yes
agreed No    
6.5.9.2 TS 36.579-2 R5‑200266 Addition of further references MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑200267 Corrections to MCPTT test case 5.1 MCC TF160 CR Agreement Yes
Yesr1 was produced. Test case main behaviour table has been updated following review comments from Samsung.
revised No R5‑201151  
    R5‑201151 Corrections to MCPTT test case 5.1 MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200267
6.5.9.3 TS 36.579-3                      
6.5.9.4 TS 36.579-4                      
6.5.9.5 TS 36.579-5 R5‑200268 Routine maintenance for TS 36.579-5 MCC TF160 CR Agreement Yes
Yesr1 was produced.
revised No R5‑201152  
    R5‑201152 Routine maintenance for TS 36.579-5 MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑200268
6.5.9.6 Other Specs                      
6.5.9.7 Discussion Papers / Work Plan / TC lists                      
6.6 Outgoing liaison statements for provisional approval                      
6.7 AOB                      
7 Closing Joint Session                      
7.1 Pointer CRs R5‑200057 Removal of technical content in 34.121-1 v15.3.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200058 Removal of technical content in 34.123-3 v14.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200059 Removal of technical content in 34.229-1 v14.7.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200060 Removal of technical content in 34.229-2 v14.7.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200061 Removal of technical content in 34.229-3 v14.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200062 Removal of technical content in 36.508 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200063 Removal of technical content in 36.521-1 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200064 Removal of technical content in 36.521-2 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200065 Removal of technical content in 36.521-3 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200066 Removal of technical content in 36.523-1 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200067 Removal of technical content in 36.523-2 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200068 Removal of technical content in 36.523-3 v15.3.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200069 Removal of technical content in 36.579-1 v13.2.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200070 Removal of technical content in 36.579-2 v13.2.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200071 Removal of technical content in 36.579-4 v13.1.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200072 Removal of technical content in 36.903 v14.3.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200073 Removal of technical content in 36.905 v15.4.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200074 Removal of technical content in 37.571-1 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200075 Removal of technical content in 37.571-2 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200076 Removal of technical content in 37.571-3 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200077 Removal of technical content in 37.571-4 v14.4.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
    R5‑200078 Removal of technical content in 37.571-5 v15.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yesblock agreed during email agreement
agreed No    
7.2 Open Issues                      
7.2.1 RF group docs still requiring WG verdict/confirmation - original A.I. retained R5‑200034 Additional UE Power Class declaration CMCC, Bureau Veritas CR Agreement Yes
Yesr1 was produced: coversheet header. r2 was produced.
revised No R5‑200903  
    R5‑200903 Additional UE Power Class declaration CMCC, Bureau Veritas CR Agreement Yes
Yes
agreed No   R5‑200034
    R5‑200237 Addition of Rel-16 inter-band CA and EN-DC FR1 two bands test configurations CMCC, Huawei, Hisilicon, Ericsson, CATT CR Agreement Yes
Yesr1 was produced.
revised No R5‑200921  
    R5‑200921 Addition of Rel-16 inter-band CA and EN-DC FR1 two bands test configurations CMCC, Huawei, Hisilicon, Ericsson, CATT CR Agreement Yes
Yes
agreed No   R5‑200237
    R5‑200285 Updates on inter-band EN-DC configurations for test frequencies in FR1 and FR2 in 38.508-1 NTT DOCOMO INC. CR Agreement Yes
Yes+FR1 . Agreed. After the meeting CMCC commented that most of the band combos are inactive. Withdrawn.
withdrawn Yes    
    R5‑200333 Configuring dualConnectivityPHR IE for EN-DC scenarios Qualcomm Technologies Int CR Agreement Yes
Yesr1 was produced.
revised No R5‑200989  
    R5‑200989 Configuring dualConnectivityPHR IE for EN-DC scenarios Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑200333
    R5‑200336 Update to Common Coreset RB IE and section 5-6 Demod message contents Qualcomm Technologies Int CR Agreement Yes
Yesoffline discussion among interested companies on moving some of the contents of this Demod CR (R5-200336) to common section of 38.508-1. r1 was produced. Moved the changes related to Common CORESET to section 4 of 38.508-1 instead of just restricting the changes to DEMOD specific section.
revised No R5‑201194  
    R5‑201194 Update to Common Coreset RB IE and section 5-6 Demod message contents Qualcomm Technologies Int CR Agreement Yes
Yes
agreed No   R5‑200336
    R5‑200371 Introduction of UE capabilities for n95 SUL band CMCC CR Agreement Yes
Yeswas wrong AI r1 was produced. Moved n95 from Table A.4.3.1-6 to Table A.4.3.1-5.
revised No R5‑200923  
    R5‑200923 Introduction of UE capabilities for n95 SUL band CMCC CR Agreement Yes
Yes
agreed No   R5‑200371
    R5‑200373 Updates on UE capabilities for Rel-16 EN-DC configurations NTT DOCOMO INC. CR Agreement Yes
Yesr1 was produced. Editorial correction according to R5-200592.
revised No R5‑201158  
    R5‑201158 Updates on UE capabilities for Rel-16 EN-DC configurations NTT DOCOMO INC. CR Agreement Yes
YesAgreed. After the meeting CMCC commented that most of the band combos are inactive. Withdrawn.
withdrawn Yes   R5‑200373
    R5‑200388 Adding missing R15 IEs into RRCConnectionReconfiguration Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced: as per TF160’s comment, the unused IEs are removed in r1, only nonCriticalExtension is kept with release information in ‘comment’ entry. r2 was produced. Release information is added to all the nonCriticalExtension belonging to RRCConnectionReconfiguration, and redundant ‘::=’ is removed in several places.
revised No R5‑200917  
    R5‑200917 Adding missing R15 IEs into RRCConnectionReconfiguration Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200388
    R5‑200389 Discussion on PDSCH to HARQ-ACK feedback timing and related PUCCH configuration Huawei, HiSilicon discussion Discussion Yes
YesQualcomm: Instead of specifying one common HARQ-ACK feedback timing for all scenarios, our preference is to specify per scenario. So for SCS 60 KHz with dmrs-additionalPosition pos 1, specify PUCCH HARQ-ACK to be transmitted with 20 symbol gap. Similarly for SCS 120 KHz with dmrs-additionalPosition pos1, it will be 24 symbols which is symbol 10 and 11 of the UL slot. Samsung: not sure. noted no proposals endorsed
noted No    
    R5‑200390 Update of DCI 1_0 and DCI_1_1 configuration Huawei, HiSilicon CR Agreement Yes
YesQualcomm would like to specify the HARQ-ACK timing per scenario instead of a common value proposed by Huawei. r1 was produced. r2 was produced. Qualcomm agreed.
revised No R5‑201195  
    R5‑201195 Update of DCI 1_0 and DCI_1_1 configuration Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200390
    R5‑200430 Correction to CORESET and search space configuration Anritsu, Qualcomm Technologies Inc CR Agreement Yes
Yesr1 was produced. RF changes only, based on offline discussion with Ericsson, MCC TF160. r2 was produced. Offline discussion with Qualcomm and E///.
revised No R5‑200965  
    R5‑200965 Correction to CORESET and search space configuration Anritsu CR Agreement Yes
Yes
agreed No   R5‑200430
    R5‑200431 Correction to CSI-FrequencyOccupation Anritsu CR Agreement Yes
YesRAN4 dependency, R4 spec correction needed as TRS config in R4 spec 38.101-1/2 causes TRS and SSB to collide in the same slot RAN4 dependency for email agreement Anritsu: changes in R5-200431 are independent from R4-2002735, then no revision is required, can be agreed as is. Email agreed.
agreed No    
    R5‑200432 Correction to default setting of additionalPmax Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑200436 Correction to test frequencies for n257 intra-band contiguous CA Anritsu, NTT DOCOMO INC., Ericsson CR Agreement Yes
Yesr1 was produced. Test frequencies specified in accordance to CR 1131 (Ericsson) to Annex C of 38.508-1, clause 2.4.2. r2 was produced????
revised No R5‑201159  
    R5‑201159 Correction to test frequencies for n257 intra-band contiguous CA Anritsu, NTT DOCOMO INC., Ericsson CR Agreement Yes
Yes
agreed No   R5‑200436
    R5‑200464 Editorial update of Beamlock deactivation Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced.
revised No R5‑200904  
    R5‑200904 Editorial update of Beamlock deactivation Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200464
    R5‑200468 Addition of a few R16s inter-band EN-DC FR1 test configurations Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. .docx
revised No R5‑201061  
    R5‑201061 Addition of a few R16s inter-band EN-DC FR1 test configurations Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200468
    R5‑200469 Introduction of UE capabilities for Rel-16 EN-DC configurations Huawei, HiSilicon CR Agreement Yes
Yesr1 was produced. .docx
revised No R5‑201062  
    R5‑201062 Introduction of UE capabilities for Rel-16 EN-DC configurations Huawei, HiSilicon CR Agreement Yes
Yes
agreed No   R5‑200469
    R5‑200558 Beam Correspondence Mnemonic name update Samsung R&D Institute UK CR Agreement Yes
Yescommon impact.
agreed No    
    R5‑200575 Addition of test channel bandwidth for NR bands in 38.508-1 ZTE Corporation CR Agreement Yes
YesEricsson: WIC shall be NR_bands_BW_R16-UEConTest. r1 was produced. r2 was produced. Defined different low, mid, high test channel bandwidth for band n48 according to the restrictions to the channel bandwidth in different configurations.
revised No R5‑201065  
    R5‑201065 Addition of test channel bandwidth for NR bands in 38.508-1 ZTE Corporation CR Agreement Yes
Yes
agreed No   R5‑200575
    R5‑200576 Corrections on categories of NR CA physical layer capabilities in 38.508-2 ZTE Corporation, SGS Wireless CR Agreement Yes
Yesr1 was produced. Merged the content of R5-200733 into clause A.4.3.2A.3.2.
revised No R5‑200969  
    R5‑200969 Corrections on categories of NR CA physical layer capabilities in 38.508-2 ZTE Corporation, SGS Wireless CR Agreement Yes
Yes
agreed No   R5‑200576
    R5‑200592 Corrections on categories of NR DC and EN-DC physical layer capabilities in 38.508-2 ZTE Corporation CR Agreement Yes
Yes
agreed No    
    R5‑200597 Introduction of test frequencies for inter-band Rel-16 EN-DC configurations in 38.508-1 ZTE Corporation CR Agreement Yes
Yeswas wrong AI
agreed No    
    R5‑200598 Introduction on supported inter-band EN-DC configurations in 38.508-2 ZTE Corporation CR Agreement Yes
Yeswas wrong AI
agreed No    
    R5‑200601 Clarification to high test channel bandwidth table Qualcomm Finland RFFE Oy CR Agreement Yes
Yesr1 was produced. R&S: Can you clarify why the new note for High CHBW is not aligned to the corresponding note in the Low and Mid CHBW tables? r2 was produced.
revised No R5‑200967  
    R5‑200967 Clarification to high test channel bandwidth table Qualcomm Finland RFFE Oy CR Agreement Yes
Yes
agreed No   R5‑200601
    R5‑200605 Addition of test frequencies for n95 SUL band CMCC, Ericsson CR Agreement Yes
Yeswas wrong AI
agreed No    
    R5‑200615 Addition of missing EN-DC test frequencies ROHDE & SCHWARZ CR Agreement Yes
Yesr1 was produced. Typo.
revised No R5‑200968  
    R5‑200968 Addition of missing EN-DC test frequencies ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑200615
    R5‑200629 Adding modified MPR behaviour to physical layer capabilities Ericsson CR Agreement Yes
Yesr1 was produced. Pics - >_
revised No R5‑200970  
    R5‑200970 Adding modified MPR behaviour to physical layer capabilities Ericsson CR Agreement Yes
Yes
agreed No   R5‑200629
7.2.2 Sig group docs still requiring WG verdict/confirmation - original A.I. retained R5‑200239 Correction to SS-RSRPB reporting Huawei,Hisilicon CR Agreement Yes
Yesr1 was produced. R&S disagreed: You are justifying the update of the definition of UE SS-RSRPB per receiver branch reporting by that RAN1 has received an LS from RAN4. However, in the current version of TS 38.215 (V16.0.1) the definition has not been updated. Thus, agreeing to your CR will create a misalignment between RAN1 and RAN5 specifications. Can you clarify if there is an agreed RAN1 CR to TS 38.215 capturing the update of the definition, please? If such a CR is not existing, it is premature to update the definition UE SS-RSRPB per receiver branch in RAN5 specification since RAN5 cannot anticipate decision of RAN1. Qualcomm also disagreed. RAN1 has not yet updated 38.215 spec with the changes proposed. r2 was produced. Need more discussion. r3 was produced. Qualcomm and R&S agreed.
revised No R5‑201124  
    R5‑201124 Correction to SS-RSRPB reporting Huawei,Hisilicon CR Agreement Yes
Yes
agreed No   R5‑200239
7.2.3 Other open issues from joint sessions - original A.I. retained R5‑200156 Update of RAN5_PRD13va0 Samsung R&D Institute India other Approval Yes
Yes
approved No    
    R5‑200236 Update of RAN5_PRD18v20 Samsung other Approval Yes
Yes
approved No    
    R5‑200246 RAN5 PRD12 version 6.2 MCC TF160 other Approval Yes
Yes
approved No    
7.2.4 UE Application Layer Data Throughput Performance - original A.I. retained                      
7.2.5 Other                      
7.3 iWD/PRD Updates R5‑200288 PRD-17 on Guidance to Work Item Codes, version 3.19 (post RAN#87-e version) Rapporteur (BlackBerry) other Approval No
Yespost meeting doc
noted No    
7.4 Work Items/ Study Items                      
7.4.1 Final version of Work Item Proposals R5‑200033 New WID on UE Conformance Test Aspects – EN-DC PC2 TDD-TDD UE CMCC WID new Approval Yes
Yesr1 was produced. Header update.
revised No R5‑200897  
    R5‑200897 New WID on UE Conformance Test Aspects – EN-DC PC2 TDD-TDD UE CMCC WID new Approval Yes
Yesendorsed
endorsed No   R5‑200033
    R5‑200414 New WID on: UE Conformance Test Aspects for RF requirements for NR frequency range 1 (FR1) Huawei, HiSilicon, China Telecom WID new Approval Yes
YesChina Unicom is added as co-rapporteur, Ericsson, dish are added as supporting company.
revised No R5‑200898  
    R5‑200898 New WID on: UE Conformance Test Aspects for RF requirements for NR frequency range 1 (FR1) Huawei, HiSilicon, China Telecom WID new Approval Yes
Yesendorsed
endorsed No   R5‑200414
7.4.2 Active Work Items/ Study Item: work plans (wp) / status reports (sr) / Work Item Descriptions (wid) R5‑200015 WI Progress and Target Completion Date Review WG Chairman other Information No
No
reserved No    
    R5‑200031 SR - NR_Rel-16_CA_DC after RAN5#86 CMCC WI status report Information Yes
Yes
noted No    
    R5‑200032 WP - NR_Rel-16_CA_DC after RAN5#86 CMCC Work Plan Information Yes
Yes
noted No    
    R5‑200293 WP UE Conformance Test Aspects – Further enhanced MTC for LTE Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200294 SR UE Conformance Test Aspects – Further enhanced MTC for LTE Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200362 WP UE Conformance Test Aspects - Further NB-IoT enhancements CATT Work Plan Information Yes
Yes
noted No    
    R5‑200363 SR UE Conformance Test Aspects - Further NB-IoT enhancements CATT other Information Yes
Yes
noted No    
    R5‑200415 WP - Shortened TTI and processing time for LTE - Status after RAN5#85 Huawei, HiSilicon Work Plan Information Yes
Yes
noted No    
    R5‑200416 SR - Shortened TTI and processing time for LTE - Status after RAN5#85 Huawei, HiSilicon WI status report Endorsement Yes
Yes
noted No    
    R5‑200482 WP UE Conformance Test Aspects - Rel-13 LTE CA configurations Ericsson Work Plan Information No
Yeswas already finished.
withdrawn Yes    
    R5‑200483 SR UE Conformance Test Aspects - Rel-13 LTE CA configurations Ericsson WI status report Information No
Yeswas already finished.
withdrawn Yes    
    R5‑200484 WP UE Conformance Test Aspects - Rel-14 LTE CA configurations Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200485 SR UE Conformance Test Aspects - Rel-14 LTE CA configurations Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200486 WP UE Conformance Test Aspects - Rel-15 LTE CA configurations Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200487 SR UE Conformance Test Aspects - Rel-15 LTE CA configurations Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200488 WP UE Conformance Test Aspects - Rel-16 LTE CA configurations Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200489 SR UE Conformance Test Aspects - Rel-16 LTE CA configurations Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200490 WP UE Conformance Test Aspects - 5G system with NR and LTE Ericsson Work Plan Information Yes
No
available No    
    R5‑200491 SR UE Conformance Test Aspects - 5G system with NR and LTE Ericsson WI status report Information Yes
No
available No    
    R5‑200494 WP UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200495 SR UE Conformance Test Aspects - New Rel-16 NR bands and extension of existing NR bands Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200496 Revised WID - New Rel-16 NR bands and extension of existing NR bands Ericsson WID revised Information Yes
Yesis endorsed.
endorsed No    
    R5‑200632 WP UE Conformance Test Aspects – 5G System Non-3GPP Access Motorola Mobility Work Plan Endorsement Yes
Yes
noted No    
    R5‑200633 SR UE Conformance Test Aspects – 5G System Non-3GPP Access Motorola Mobility WI summary Endorsement Yes
Yes
noted No    
    R5‑200643 WP UE Conformance Test Aspects - Even further enhanced MTC for LTE Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200644 SR UE Conformance Test Aspects - Even further enhanced MTC for LTE Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200719 WP - R15 TDD HPUE – Status after RAN5#86-e Huawei, HiSilicon Work Plan Information Yes
Yes
noted No    
    R5‑200720 SR - R15 TDD HPUE – Status after RAN5#86-e Huawei, HiSilicon WI status report Endorsement Yes
Yes
noted No    
    R5‑200778 Work Plan for TR 37.901-5 Qualcomm communications-France Work Plan Agreement Yes
Yes
noted No    
    R5‑200779 Status Report - Study on 5G NR UE Application Layer Data Throughput Performance Qualcomm communications-France WI status report Agreement Yes
Yes
noted No    
    R5‑200794 WP UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200795 SR UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200796 WP UE Conformance Test Aspects – Rel14 Enhanced Full Dimension MIMO for LTE Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑200797 SR UE Conformance Test Aspects – Rel14 Enhanced Full Dimension MIMO for LTE Ericsson WI status report Information Yes
Yes
noted No    
    R5‑200812 SR UE Conformance Test Aspects - Enhancing LTE CA Utilization Nokia, Nokia Shanghai Bell WI status report   Yes
Yes
noted No    
    R5‑200820 WP UE Conformance Test Aspects - Enhancing LTE CA Utilization Nokia, Nokia Shanghai Bell WI status report   Yes
Yes
noted No    
    R5‑200883 SR - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation Sprint Corporation WI status report Information Yes
Yes
noted No    
    R5‑200884 WP - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation Sprint Corporation Work Plan Information Yes
Yes
noted No    
    R5‑200886 SR - Addition of Power Class 2 UE for LTE bands 31 and 72 Airbus WI status report Information Yes
Yes
noted No    
    R5‑200887 WP - Addition of Power Class 2 UE for LTE bands 31 and 72 Airbus Work Plan Information No
Yeswas not produced.
withdrawn Yes    
    R5‑200888 SR - UE Conformance Test aspects - Mission Critical Improvements NIST WI status report Information Yes
Yes
noted No    
    R5‑200889 WP - UE Conformance Test aspects - Mission Critical Improvements NIST Work Plan Information Yes
Yes
noted No    
7.4.3 Work Plan updates of recently closed work items                      
7.5 Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.) R5‑200384 MCC TF160 Status Report MCC TF160 report Approval No
Yespost meeting doc
noted No    
    R5‑200480 3GPP RAN5 CA status list (post-RAN5#86-e meeting) Ericsson other Information No
Yesno contributions or changes to the list of LTE CA at RAN5#86-e meeting.
withdrawn Yes    
    R5‑200481 RAN5#86-e summary of changes to RAN5 test cases with potential impact on GCF and PTCRB Ericsson, Samsung report Information No
No
reserved No    
    R5‑200492 5GS progress report RAN5#86-e Ericsson WI status report Information Yes
No
available No    
    R5‑200493 Update of RAN5 5G NR phases and target update RAN5#86-e Ericsson discussion Endorsement No
No
reserved No    
    R5‑200552 FR2 Measurement Uncertainty (MU) / Test Tolerances (TT) Target Completion Update PCTEST Engineering Lab discussion Endorsement Yes
Yesoffline discussions. Is a post-meeting doc.
noted No    
    R5‑200780 draft TR 37.901-5 v1.1.0 Qualcomm communications-France draft TR Approval No
Nopost meeting doc
reserved No    
7.6 Confirmation of Future RAN5 Matters R5‑200016 Review deadlines for next quarter WG Chairman other Information Yes
Yes
noted No    
7.7 AOB