1 | Opening of the meeting | R5‑195500 | Agenda - opening session | WG Chairman | agenda | Information | Yes |
Yesrevised to update the US EAR.
| revised | No | R5‑196955 | |
R5‑196955 | Agenda - opening session | WG Chairman | agenda | Information | Yes |
YesThe RAN5 Chair opened the RAN5#84 meeting in Ljubljana, Slovenia and welcomed all delegates thanking the European Friends of 3GPP for hosting.
Vodafone welcomed the delegates to the meeting on behalf of the European Friends of 3GPP and expleined the meeting's practicalities.
The RAN5 Chair then reminded the delegates about the ETSI IPR policy.
The attention of the delegates to the meeting of this Technical Specification Group was drawn to the fact that 3GPP Individual Members have the obligation under the IPR Policies of their respective Organizational Partners to inform their respective Organizational Partners of Essential IPRs they become aware of.
The delegates were asked to take note that they were thereby invited:
- to investigate whether their organization or any other organization owns IPRs which were, or were likely to become Essential in respect of the work of 3GPP.
- to notify their respective Organizational Partners of all potential IPRs, e.g., for ETSI, by means of the IPR Information Statement and the Licensing declaration forms.
The RAN5 Chair further explained.
The attention of the delegates to the meeting was drawn to the fact that 3GPP activities were subject to all applicable antitrust and competition laws and that compliance with said laws was therefore required by any participant of the meeting, including the Chairman and Vice-Chairmen and were invited to seek any clarification needed with their legal counsel. The leadership would conduct the present meeting with impartiality and in the interests of 3GPP. Delegates were reminded that timely submission of work items in advance of TSG/WG meetings was important to allow for full and fair consideration of such matters.
Statement Regarding Engagement with Companies Added to the U.S. Export Administration Regulations (EAR) Entity List in 3GPP Activities
June 3, 2019 updated August 20, 2019
1. Public Information is Not Subject to EAR
3GPP is an open platform where all contributions (including technology protected or not by patent) made by the different Individual Members under the membership of each respective Organizational Partner are publicly available. Indeed, contributions by all and any Individual Members are uploaded to a public file server when received and then the documents are effectively in the public domain.
In addition, since membership of email distribution lists is open to all, documents and emails distributed by that means are considered to be publicly available.
As a result, information contained in 3GPP contributions, documents, and emails distributed at 3GPP meetings or by 3GPP email distribution lists, because it is made available to the public without restrictions upon its further dissemination, is not subject to the export restrictions of the EAR.
Meeting minutes are maintained for 3GPP meetings. Such meeting minutes for 3GPP meetings are made available to the public without restrictions upon its further dissemination. As a result, information, including conveyed orally, contained in 3GPP meetings is not subject to the export restriction of the EAR.
2. Non-Public Information
Non-public information refers to the information not contained or not intended to be contained in 3GPP contributions, documents or emails. Such non-public information may be disclosed during informal meetings, exchanges, discussions or any form of other communication outside the 3GPP meetings and email distribution lists.
For the duration of the Temporary General License (TGL) issued by the Bureau of Industry and Security (BIS) of the US Department of Commerce on May 20, 2019 and extended on August 19, 2019, there are no restrictions on the release of non-public information to companies added to the Entity List on May 16, 2019 and August 19, 2019, to the extent that information is necessary to maintain, service, or support existing handsets, networks or equipment, or as necessary for development of 5G standards.
3. Other Information
Certain encryption software controlled under the International Traffic in Arms Regulations (ITAR), even if publicly available, may still be subject to US export controls other than the EAR.
4. Conduct of Meetings
Until further notice, the situation should be considered as "business as usual" during all the meetings called by 3GPP.
5. Responsibility of Individual Members
It should be remembered that contributions, meetings, exchanges, discussions or any form of other communication in or outside the 3GPP meetings are of the accountability, integrity and the responsibility of each Individual Member. In addition, Individual Members remain responsible for ensuring that none of their technical contributions include classified encryption software or other information that is subject to US export control under the ITAR or other applicable US export control regulations.
Individual Members with questions regarding the impact of laws and regulations on their participation in 3GPP should contact their companies legal counsels.
Then, an election for the position of the RAN5 Chair was carried out.
Mr. Jacob John from Motorola Mobility was re-elected as a RAN5 Chair by acclamation, there being no other candidate.
Afterwards an election for the position of a RAN5 Vice Chair was carried out.
Mr. Xiaozhong Chen from CATT was re-elected as a RAN5 Vice Chair by acclamation, there being no other candidate.
Then the RAN5 Chair presented the agenda.
Then new delegates from Huawei, China Unicom, KDDI, Anritsu introduced themselves and were welcomed by the group.
| approved | No | R5‑195500 | |||
R5‑195501 | Agenda - mid week session | WG Chairman | agenda | Information | Yes |
Yes
| noted | No | ||||
R5‑195502 | Agenda - closing session | WG Chairman | agenda | Information | Yes |
YesThe RAN5 Chair thanked all the delegates and rapporteurs for the cooperation.
Concerning the upcoming elections for the 2. RAN5 Vice Chair, the presente Vice Chair Mr. Pradeep Gowda (Qualcomm) indicated he would candidate again.
| noted | No | ||||
1.1 | Welcoming brief by the host | R5‑196956 | Nomination of candidate for Chairman position | ETSI Secretariat | other | Information | Yes |
Yes
| noted | No | ||
R5‑196957 | Nomination of candidate for Vice Chairman position | ETSI Secretariat | other | Information | Yes |
Yes
| noted | No | ||||
2 | Reports |   | ||||||||||
2.1 | Live Reports | R5‑195503 | RAN5#84 Session Programme | WG Chairman | agenda | Information | Yes |
Yes
| noted | No | ||
R5‑195504 | RAN5 Leadership Team | WG Chairman | other | Information | Yes |
Yes
| noted | No | ||||
R5‑195505 | RAN5#83 WG Minutes | ETSI Secretariat | report | Approval | Yes |
Yesneeds revision for text of R5-194627.
| approved | No | ||||
R5‑195506 | RAN5#83 WG Action Points | ETSI Secretariat | report | Information | Yes |
Yes
| noted | No | ||||
R5‑195507 | Latest RAN Plenary notes | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||||
R5‑195508 | Latest RAN Plenary draft Report | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||||
R5‑195509 | Post Plenary Active Work Item update | ETSI Secretariat | other | Information | No |
Yeswill be updated with the new SI next time.
| withdrawn | Yes | ||||
R5‑195942 | MCC TF160 Status Report | MCC TF160 | report | Approval | Yes |
Yes
| revised | No | R5‑196964 | |||
2.2 | General Reports for information | R5‑195510 | RAN5 SR to RP#84 | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||
R5‑195511 | TF160 SR to RP#84 | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||||
R5‑195512 | RAN Chair Report to SA#84 | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||||
R5‑196275 | GCF 3GPP TCL after GCF CAG#59 | Ericsson | report | Information | Yes |
Yes
| revised | No | R5‑196963 | |||
R5‑196963 | GCF 3GPP TCL after GCF CAG#59 | Ericsson | report | Information | Yes |
Yes
| noted | No | R5‑196275 | |||
3 | Incoming Liaison Statements | R5‑195517 | Reply to RAN5 LS "Study on 5G NR Application Layer Data Throughput Performance" | Global TD-LTE Initiative | LS in | Information | Yes |
Yes
| noted | No | ||
R5‑195518 | Reply LS on Request for specific 5G information for inclusion in the GSMA developed Generic Test Profile | TSG WG CT6 | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑195519 | Response to LS on testability of FR2 transmitter and reception tests. | PTCRB PVG | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑195524 | 5G-NR FR2 Transmitter & Receiver Testability Issues | TSG RAN | LS in | Information | Yes |
Yes"/*DUPLICATED-REPL*/
Document replicated in two AIs: [3]-[5.2].
Conclusion changes to one of the replicas will be replicated to the other.
FCC does not have any of the lsited tests in their regulatory campaigns and hence may not respond
ETSI groups will be sent a reminder by Telecom Italia to respond to the LS
ARIB has responded with a late LS response 6960"
| noted | No | ||||
R5‑195525 | LS to WP 5D: Test methods for over-the-air TRP measurements of IMT radio equipment utilizing active antennas | ITU WP 1C | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑195526 | LS TO 3GPP RAN4: TEST METHODS FOR OVER-THE-AIR TOTAL RADIATED POWER FIELD MEASUREMENTS FOR IMT RADIO EQUIPMENT UTILIZING ACTIVE ANTENNAS | ITU-R WP 5D | LS in | Information | Yes |
Yes
| noted | No | ||||
4 | RAN5 General Issues |   | ||||||||||
4.1 | New Work Item proposals - for intro only | R5‑195727 | New WID: HP UE on B40 | Huawei, HiSilicon | WID new | Endorsement | Yes |
Yesr1 was presented.
| revised | No | R5‑196968 | |
4.2 | General Discussion Papers | R5‑196967 | Proposal for RAN5 basket WI for Rel-16 NR bands and BW extensions | Ericsson | discussion | discussion | Yes |
Yesa drat was presented.
A draft WID will be done until Wed.
Conclusion: All proposals are accepted.
| noted | No | ||
4.2.1 | 5GS | R5‑196958 | Feature priority inputs for the RAN5 5GS work plan | MCC TF160 | discussion | Information | Yes |
Yesr1 was presented.
Further follow-up of action to the 5GS leadership team.
Comment from CATT impact on GCF PVG Wis inter-RAT.
| revised | No | R5‑196969 | |
R5‑196969 | Feature priority inputs for the RAN5 5GS work plan | MCC TF160 | discussion | Information | Yes |
Yes
| noted | No | R5‑196958 | |||
4.2.2 | All other topics |   | ||||||||||
4.3 | RAN5 PRDs/Templates | R5‑195513 | RAN5#84 LS Template | WG Chairman | other | Information | Yes |
Yes
| noted | No | ||
R5‑196636 | Update of PRD18 for 5G specs and relations between the specs in a group | Samsung | other | Approval | Yes |
Yesr1 will be produced.
| revised | No | R5‑196970 | |||
4.4 | Meeting schedule for 2019-20 | R5‑195514 | Meeting schedule for 2019-20 | WG Chairman | other | Information | Yes |
Yes
| noted | No | ||
4.5 | Tdocs for mid-week joint session |   | ||||||||||
4.5.1 | RF group docs for WG review/verdict - original A.I. retained | R5‑196136 | Addition new NR cell for SS-RSRP RRM tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
4.5.2 | Sig group docs for WG review/verdict - original A.I. retained | R5‑196030 | Handling of thresholds in FR2 when Events A3 and A6 are inter-frequency | ANRITSU LTD | CR | Agreement | Yes |
YesAI 6.3.5.1
agreed in SIG.
| agreed | No | ||
R5‑196148 | Update of Annex C for selecting SSB location for cells not selectable as PCell | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196315 | Update of test frequency parameters for NR CA configuration CA_n260(A-I) | Ericsson | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
R5‑196318 | Correction of test frequency parameters for EN-DC configuration DC_(n)41AA | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196467 | Introduction of test frequencies for NR CA configuration CA_n257G to CA_n257M | Ericsson | CR | Agreement | Yes |
Yesr2 was presented on Wed in the joint.
| revised | No | R5‑197104 | |||
R5‑197104 | Introduction of test frequencies for NR CA configuration CA_n257G to CA_n257M | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196467 | |||
R5‑196474 | Update of NR CA inter-band configurations in clause 4.3.1 | Ericsson | CR | Agreement | Yes |
Yeslate doc
Qualcomm requested to add FR2 2CC combinations.
| revised | No | R5‑197105 | |||
R5‑197105 | Update of NR CA inter-band configurations in clause 4.3.1 | Ericsson | CR | Agreement | Yes |
Yesagreed in the joint on Wed.
Later revised agein to correct coversheet.
| revised | No | R5‑197139 | R5‑196474 | ||
R5‑197139 | Update of NR CA inter-band configurations in clause 4.3.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197105 | |||
R5‑196475 | Update of EN-DC inter-band configurations in clause 4.3.1 | Ericsson | CR | Agreement | Yes |
Yesremove the colour.
| revised | No | R5‑197106 | |||
R5‑197106 | Update of EN-DC inter-band configurations in clause 4.3.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196475 | |||
R5‑196825 | Addition of default test control messages | Ericsson | CR | Agreement | Yes |
Yesagreed in SIG.
| agreed | No | ||||
4.5.3 | Other open issues from joint sessions - original A.I. retained | R5‑196276 | 3GPP RAN5 CA status list (pre-RAN5#84 meeting) | Ericsson | other | Information | Yes |
Yes
| noted | No | ||
4.5.4 | UE Application Layer Data Throughput Performance TEI11_Test / TEI15_Test (TR 37.901) |   | ||||||||||
4.5.5 | GCF Test Optimisation |   | ||||||||||
4.5.6 | 5GS | R5‑196959 | Discussion on interworking test cases definition for 5GS | CATT | discussion | discussion | No |
Yes
| withdrawn | Yes | ||
4.5.7 | Other |   | ||||||||||
5 | RF Functional Area |   | ||||||||||
5.1 | Review action points (fm A.I. 2.1) |   | ||||||||||
5.2 | Review incoming LS (fm A.I. 3) & new subject discussion papers | R5‑195520 | Reply LS on MOP for UL MIMO | TSG WG RAN4 | LS in | Information | Yes |
Yesmoved to RF.
| noted | No | ||
R5‑195521 | Reply LS on SA Option 2 Core Requirement Dependencies | TSG WG RAN4 | LS in | Information | Yes |
Yesmoved to RF.
| noted | No | ||||
R5‑195522 | Reply LS on applicability of LTE anchor agnostic to specific RF test cases | TSG WG RAN4 | LS in | Information | Yes |
Yesmoved to RF.
| noted | No | ||||
R5‑195523 | LS on FR2 maxUplinkdutycycle | TSG WG RAN4 | LS in | Information | Yes |
Yesmoved to RF.
"/*DUPLICATED-REPL*/
Document replicated in two AIs: [3]-[5.2].
Conclusion changes to one of the replicas will be replicated to the other.
To RAN2, copy to RAN5
CR's to update RMC to handle the dutycycle of 15%, 6501
however there is no test procedure update planned to handle the LS , suggest to add an editors note to handle it in future meeting"
| noted | No | ||||
R5‑195527 | Reply LS to LS on multi-band test cases for FR2 Ues | GCF CAG | LS in | Information | Yes |
Yesmoved to RF.
| noted | No | ||||
R5‑196960 | Reply LS on 5G-NR FR2 Transmitter & Receiver Testability Issues | ARIB | LS in | discussion | Yes |
Yesmoved to RF.
| noted | No | ||||
R5‑196966 | Reply LS to 3GPP RAN5 regarding MB relaxation (R5-195451) | PTCRB PVG | LS in | Information | Yes |
Yesmoved to RF.
"/*DUPLICATED-REPL*/
Document replicated in two AIs: [3]-[5.2].
Conclusion changes to one of the replicas will be replicated to the other.
PTCRB still discussing the LS and will come back with response by RAN5#85 meeting (November)
"
| noted | No | ||||
5.3 | Open Work Items |   | ||||||||||
5.3.1 | Rel-13 LTE CA configurations (UID - 700065) LTE_CA_Rel13-UEConTest |   | ||||||||||
5.3.1.1 | TS 36.508 | R5‑196894 | Removing duplicate Table 4.3.1.2.9A-10: Test frequencies for CA_41F | Sprint Corporation | CR | Agreement | Yes |
YesRevised to: R5-196894r1.
"Revised from: R5-196894.
r1: fixed coversheet issues (WI code, CR revision, clauses effected)
Revised to: R5-197488.
"
| revised | No | R5‑197488 | |
R5‑197488 | Removing duplicate Table 4.3.1.2.9A-10: Test frequencies for CA_41F | Sprint Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196894 | |||
5.3.1.2 | TS 36.521-1 | R5‑195794 | Addition of CA configuration CA_20A_40A for Refsens test | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-195794r1.
"Revised from: R5-195794.
r1: Table number 7.3A.3.4.1-25c have been changed to 7.3A.3.4.1-25d to avoid a table number conflict with R5-196557.
Revised to: R5-197443.
"
| revised | No | R5‑197443 | |
R5‑197443 | Addition of CA configuration CA_20A_40A for Refsens test | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195794 | |||
R5‑195795 | Addition of inter_band CA configurations to the OOB blocking test which have restricted operating frequency range for Band 28 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196151 | Correction to transmit modulation test cases for 3UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196292 | Update editors note for several 3UL CA RF conformance test cases | 7LAYERS GmbH | CR | Agreement | Yes |
Yes"Update editors note for several 3UL CA RF conformance test cases.
<3GU title issue with Invalid characters>
Ingo: Apostrophe on the coversheet, may be removed as well. But only if you are already revising because of something else.
Revised to: R5-196292r1."
"Revised from: R5-196292.
r1: removed apostrophe from editors note in order to be in line with 3GU restricted rules for special characters
Revised to: R5-196292r2."
"Revised from: R5-196292r1.
r2: removed some heading formating issues
Revised to: R5-197421.
"
| revised | No | R5‑197421 | |||
R5‑197421 | Update editors note for several 3UL CA RF conformance test cases | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196292 | |||
R5‑196554 | Update REFSENS of CA_3A-7A-38A configuration in 7.3A.5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196555 | Update REFSENS of CA_3A-3A-8A configuration in 7.3A.5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196556 | Update REFSENS of CA_28A-40D configuration in 7.3A.9 | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-196556r1.
"Revised from: R5-196556.
r1: Correct the Spec # and Version to match with 3GU
Revised to: R5-197444.
"
| revised | No | R5‑197444 | |||
R5‑197444 | Update REFSENS of CA_28A-40D configuration in 7.3A.9 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196556 | |||
R5‑196895 | Adding minimum refsens requirements and UL config for CA_25A-41D | Sprint Corporation | CR | Agreement | Yes |
Yesincluded in Bureu Veritas' R5-196507
| withdrawn | Yes | ||||
R5‑196896 | Adding test points for CA_25A-41D to Table 7.3A.9.4.1-1: Test Configuration Table | Sprint Corporation | CR | Agreement | Yes |
YesRevised to: R5-196896r1.
"Revised from: R5-196896.
r1: fixed coversheet issues (.docx file type, WI code, CR revision)
Revised to: R5-197489.
"
| revised | No | R5‑197489 | |||
R5‑197489 | Adding test points for CA_25A-41D to Table 7.3A.9.4.1-1: Test Configuration Table | Sprint Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196896 | |||
5.3.1.3 | TS 36.521-2 | R5‑196127 | Correction 4CC and 5CC applicability | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196288 | Introduction of applicability expression for several 3UL CA RF conformance test cases | 7LAYERS GmbH | CR | Agreement | Yes |
Yes"Missing and added applicability expression for following 3UL CA RF test cases from 3GPP TS 36.521-1:
6.2.5A.5
6.6.1A.4
6.6.2.1A.4
6.6.2.2A.4
6.7A.4"
| agreed | No | ||||
R5‑196567 | Addition of Re-13 capabilitys of multiple CA in 36.521-2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.1.4 | TS 36.521-3 | R5‑196128 | Correction 4CC and 5CC applicability - Chapter 8 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"R&S: ANRITSU has sent couple of minor comments to include in a final
Revised to: R5-197475.
"
| revised | No | R5‑197475 | |
R5‑197475 | Correction 4CC and 5CC applicability - Chapter 8 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196128 | |||
R5‑196129 | Correction 4CC and 5CC applicability - Chapter 9 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"R&S: ANRITSU has sent couple of minor comments to include in a final
Revised to: R5-197476.
"
| revised | No | R5‑197476 | |||
R5‑197476 | Correction 4CC and 5CC applicability - Chapter 9 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196129 | |||
R5‑196452 | Update to 3DL/3UL TDD CA for Non-Contention Based Random Access Test for 2 SCells | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196453 | Update to 3DL/3UL TDD CA for UE Transmit Timing Accuracy Tests for 2 SCells | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.1.5 | TS 37.571-1 |   | ||||||||||
5.3.1.6 | TS 37.571-3 |   | ||||||||||
5.3.1.7 | TS 37.571-5 |   | ||||||||||
5.3.1.8 | TR 36.903 (E-UTRAN RRM TT analyses) | R5‑196398 | Addition of Test Tolerance Analysis for 3DL/3UL TDD CA UE Transmit Timing Accuracy | LG Electronics | CR | Agreement | Yes |
Yes"3GU WIC allocation does not match AI allocation!!!
3GU allocation: LTE_CA_Rel13-UEConTest / AI allocation: TEI
Agenda Allocation was changed: [5.4.1.5.2]->[5.3.1.8].
"
| agreed | No | ||
5.3.1.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.1.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑195796 | New CA band combination CA_20A_40A specific test points | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196564 | Addition of TP analysis for CA_3A-7A-38A to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196565 | Addition of TP analysis for CA_3A-3A-8A to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196566 | Addition of TP analysis for CA_28A-40D to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.1.11 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.2 | Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest |   | ||||||||||
5.3.2.1 | TS 36.508 |   | ||||||||||
5.3.2.2 | TS 36.521-1 | R5‑195530 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2 for 5B BW SET 1_2ND_CR | DEKRA | CR | Agreement | Yes |
Yes
| revised | No | R5‑195746 | |
R5‑195531 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195532 | Adding point on Min req for FDD CA on Table 7.3A.4.4.1-1 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195533 | Adding Test Parameter on Table 7.3A.2.4.1-1 for 5B BW SET 1 | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195746 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2 for 5B BW SET 1_2ND_CR | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195530 | |||
R5‑195783 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2, Table 8.1.2.3-1 and Table 9.1.1.2-1 | DEKRA | CR | Agreement | Yes |
Yes"Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2, Table 8.1.2.3-1 and Table 9.1.1.2-1 for 5B BW SET 1
Revised to: R5-195783r1."
"Revised from: R5-195783.
| revised | No | R5‑197454 | |||
R5‑197454 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2, Table 8.1.2.3-1 and Table 9.1.1.2-1 | DEKRA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195783 | |||
R5‑195784 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | Yes |
Yes"Adding Bandwidth combination for FDD CA - 10+15Mhz, 15-15MHz and 15-20MHz on Table 8.1.2.2-2.
Revised to: R5-195784r1."
"Revised from: R5-195784.
| revised | No | R5‑197455 | |||
R5‑197455 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | Yes |
Yesagreed. Later revised bec. of wrong Tdoc nr.
| revised | No | R5‑197629 | R5‑195784 | ||
R5‑197629 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197455 | |||
R5‑195785 | Adding point on Min req for FDD CA on Table 7.3A.4.4.1-1 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | Yes |
Yes"Add point 50 75 30 QPSK 50+75 QPSK P_50@0. on Table 7.3A.4.4.1-1 for 7A-7A BW SET 3 Intra band Non-Contiguous
Revised to: R5-195785r1."
"Revised from: R5-195785.
| revised | No | R5‑197456 | |||
R5‑197456 | Adding point on Min req for FDD CA on Table 7.3A.4.4.1-1 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195785 | |||
R5‑195786 | Adding Test Parameter on Table 7.3A.2.4.1-1 for 5B BW SET 1 | DEKRA | CR | Agreement | Yes |
Yes"Adding Test Parameters 15 25 QPSK 15+25 QPSK 15 P_15@0 & 25 15 QPSK 25+15 QPSK 25 P_25@0 on Table 7.3A.2.4.1-1
Revised to: R5-195786r1."
"Revised from: R5-195786.
| revised | No | R5‑197457 | |||
R5‑197457 | Adding Test Parameter on Table 7.3A.2.4.1-1 for 5B BW SET 1 | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195786 | |||
R5‑195797 | Addition of CA configuration CA_11A_41A and CA_11A_42A for Refsens test | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-195797r1.
"Revised from: R5-195797.
TP analysis 5801
r1: CA_11A-41A and CA_11A-42A CA uplink configuration added to Table 7.3A.3.5-2.
Revised to: R5-197458.
"
| revised | No | R5‑197458 | |||
R5‑197458 | Addition of CA configuration CA_11A_41A and CA_11A_42A for Refsens test | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195797 | |||
R5‑195802 | Addition of CA configuration CA_11A_41C and CA_11A_42C for Refsens test | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.2.3 | TS 36.521-2 | R5‑195798 | Introduction of CA_11A_41A, CA_11A_41C, CA_11A_42A, CA_11A_42C, CA_3A_41A_42C, CA_3A_41C_42A and CA_3A_41C_42C to Annex 4.6.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.2.4 | TS 36.521-3 |   | ||||||||||
5.3.2.5 | TS 37.571-1 |   | ||||||||||
5.3.2.6 | TS 37.571-3 |   | ||||||||||
5.3.2.7 | TS 37.571-5 |   | ||||||||||
5.3.2.8 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.2.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.2.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑195801 | Addition of Refsens test points analysis for CA_11A_41C and CA_11A_42C | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.2.11 | Discussion Papers, Work Plan, TC lists | R5‑196790 | Simplification of test point analysis for LTE CA | Ericsson | discussion | Endorsement | Yes |
Yes"A.I. shall be 5.3.2.11
Agenda Allocation was changed: [5.3.5.17]->[5.3.2.11].
Revised to: R5-196790r1."
"Revised from: R5-196790.
Ericsson: I would like to request that this TDoc gets online treatment. The reason is that there are proposals on TP analysis rules that need to be endorsed by the group. In r1 I will also add a proposal that we use this principle also for NR
Revised to: R5-197459.
"
| revised | No | R5‑197459 | |
R5‑197459 | Simplification of test point analysis for LTE CA | Ericsson | discussion | Endorsement | Yes |
Yes"Revised from: R5-196790r1.
3 proposals aer endorsed , prop3 change to include ENDC"
| noted | No | R5‑196790 | |||
5.3.3 | LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell (UID - 730074) LTE_CA_enh_b5C_PUCCH-UEConTest |   | ||||||||||
5.3.3.1 | TS 36.508 |   | ||||||||||
5.3.3.2 | TS 36.521-2 |   | ||||||||||
5.3.3.3 | TS 36.521-3 |   | ||||||||||
5.3.3.4 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.3.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.4 | Support for LTE-based V2X Services (UID - 760086) LTE_V2X-UEConTest |   | ||||||||||
5.3.4.1 | TS 36.508 |   | ||||||||||
5.3.4.2 | TS 36.509 |   | ||||||||||
5.3.4.3 | TS 36.521-1 | R5‑195713 | Update of V2X MOP test cases | Huawei, HiSilicon | CR | Agreement | Yes |
YesApplicability in R5-195723
| agreed | No | ||
R5‑195714 | Update of V2X MPR test cases | Huawei, HiSilicon | CR | Agreement | Yes |
YesMU and TT updated in R5-195722
| agreed | No | ||||
R5‑195715 | Update of V2X AMPR test cases | Huawei, HiSilicon | CR | Agreement | Yes |
YesTP analysis in R5-195716; MU&TT in R5-195722
| agreed | No | ||||
R5‑195717 | Cleaning up of V2X test cases for missing applicability | Huawei, HiSilicon | CR | Agreement | Yes |
YesMU and TT updated in R5-195722; Applicability in R5-195723
| agreed | No | ||||
R5‑195718 | Addition of V2X Carrier leakage test cases | Huawei, HiSilicon | CR | Agreement | Yes |
YesMU and TT updated in R5-195722; Applicability in R5-195723
| agreed | No | ||||
R5‑195719 | Addition of V2X ACLR for multi-carrier | Huawei, HiSilicon | CR | Agreement | Yes |
YesMU and TT updated in R5-195722; Applicability in R5-195723
| agreed | No | ||||
R5‑195720 | Update of V2X OOBB test cases | Huawei, HiSilicon | CR | Agreement | Yes |
YesApplicability in R5-195723
| agreed | No | ||||
R5‑195721 | Update of V2X Intermodulation test cases | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195722 | Addition of MU and TT information of V2X test cases in Annex F | Huawei, HiSilicon | CR | Agreement | Yes |
YesRelated TCs in R5-195714, R5-195715, R5-195717, R5-195718, R5-195719, R5-195724, R5-195725, R5-195726
| agreed | No | ||||
R5‑195724 | Addition of V2X demod case 14.5 and 14.6 | Huawei, HiSilicon | CR | Agreement | Yes |
YesMU and TT updated in R5-195722; Applicability in R5-195723
| agreed | No | ||||
R5‑195725 | Addition of V2X demod case 14.7 | Huawei, HiSilicon | CR | Agreement | Yes |
YesMU and TT updated in R5-195722; Applicability in R5-195723
| agreed | No | ||||
R5‑195726 | Addition of V2X demod case 14.9 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"MU and TT updated in R5-195722; Applicability in R5-195723
Revised to: R5-195726r1."
"Revised from: R5-195726.
r1: Correcting the CR number in Cover sheet
Revised to: R5-197460.
"
| revised | No | R5‑197460 | |||
R5‑197460 | Addition of V2X demod case 14.9 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195726 | |||
R5‑196364 | Update for Message contents for V2X Test case in non-concurrent mode | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196364r1.
"Revised from: R5-196364.
r1: removed new table added, modified sizeSubchannel-r14 to reflect what intended to change in the removed table; Corrected line format that caused 3GU inconsistency issue
Revised to: R5-197461.
"
| revised | No | R5‑197461 | |||
R5‑197461 | Update for Message contents for V2X Test case in non-concurrent mode | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196364 | |||
5.3.4.4 | TS 36.521-2 | R5‑195723 | Addition of test applicabilities for V2X test cases | Huawei, HiSilicon | CR | Agreement | Yes |
YesTest cases in R5-195713, R5-195717, R5-195718, R5-195719, R5-195720, R5-195724, R5-195725, R5-195726
| agreed | No | ||
5.3.4.5 | TS 36.521-3 |   | ||||||||||
5.3.4.6 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.4.7 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.4.8 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑195716 | Addition of test point analysis for V2X AMPR test cases | Huawei, HiSilicon | CR | Agreement | Yes |
YesTC in R5-195715
| agreed | No | ||
5.3.4.9 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.5 | 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest |   | ||||||||||
5.3.5.1 | TS 38.508-1 | R5‑195557 | 4x2 Connection Diagram for demodulation tests | Anritsu | CR | Agreement | Yes |
YesR5-197300
| revised | No | R5‑197300 | |
R5‑197300 | 4x2 Connection Diagram for demodulation tests | Anritsu | CR | Agreement | Yes |
Yes"Revised from: R5-195557.
update the splitter with multiple outputs rather than 1 output"
| agreed | No | R5‑195557 | |||
R5‑195731 | Update of 4.3.1.0A mid test CBW in 38.508-1 | CMCC, Sprint, R&S, Ericsson | CR | Agreement | Yes |
YesThe mid test CBW of n41 has been changed from 50MHz to 60MHz.
| agreed | No | ||||
R5‑196228 | Correction to Section 5.4.2 Message definition for Performance Test | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196228r1.
"Revised from: R5-196228.
r1: Change in Table 5.4.2-13 is reverted to solve confliction in R5-196539
Revised to: R5-197301.
"
| revised | No | R5‑197301 | |||
R5‑197301 | Correction to Section 5.4.2 Message definition for Performance Test | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196228 | |||
R5‑196441 | Update of ServingCellConfigCommon | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Discussion 6423
have the values as part of the test case"
| withdrawn | Yes | ||||
R5‑196442 | Update of SRS-Config | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Discussion 6423
SRS config (alpha) can be added as message exception for Tx tests rather than having it in 38.508 general section
w/draw since the change will be handled in the part1 spec"
| withdrawn | Yes | ||||
R5‑196443 | Addition of FR1 CA connection diagram | Huawei, HiSilicon | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
Revised to: R5-196443r1."
"LATE DOCUMENT
Revised from: R5-196443.
r1: Correcting the title in Cover sheet
Revised to: R5-196443r2."
"LATE DOCUMENT
Revised from: R5-196443r1.
Revised to: R5-197491.
"
| revised | No | R5‑197491 | |||
R5‑197491 | Addition of FR1 CA connection diagram | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"LATE DOCUMENT
Revised from: R5-196443r2.
Document was sent FOR E-MAIL AGREEMENT"
r2 was produced.
| revised | No | R5‑197638 | R5‑196443 | ||
R5‑197638 | Addition of FR1 CA connection diagram | Huawei, HiSilicon | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197491 | |||
R5‑196444 | Addition of FR2 CA connection diagram | Huawei, HiSilicon, Sporton, ECIT | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197302 | |||
R5‑197302 | Addition of FR2 CA connection diagram | Huawei, HiSilicon, Sporton, ECIT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196444 | |||
R5‑196539 | Update to 38.508-1 for Demod specific message contents | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
overlap resolved in 6228"
| agreed | No | ||||
R5‑196577 | Removing IOT bit information from test channel bandwith tables | Ericsson, Sprint | CR | Agreement | Yes |
Yes
| revised | No | R5‑197304 | |||
R5‑197304 | Removing IOT bit information from test channel bandwith tables | Ericsson, Sprint | CR | Agreement | Yes |
Yes"Revised from: R5-196577.
remove editors note and also restrict the Capability to REL15 only UE's "
| agreed | No | R5‑196577 | |||
R5‑196581 | Removing brackets from values for DCI formats | Ericsson | CR | Agreement | Yes |
YesNo overlap
| agreed | No | ||||
R5‑196654 | Editorial correction of reference test conditions | Ericsson | CR | Agreement | Yes |
YesNo overlap
| agreed | No | ||||
R5‑196655 | Addition of TDD UL DL Config for RRM test cases | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196655r1.
"Revised from: R5-196655.
r1: Updated to allign with R5-196882
Revised to: R5-196655r2."
"Revised from: R5-196655r1.
r2: included dl-UL-TransmissionPeriodicity-v1530 for ms4 configuration
Revised to: R5-196655r3."
"Revised from: R5-196655r2.
move the contents to RRM section 7, have the dl Periodicity IE condition when absent also included. Raise an AP to indicate the RRM testing message exception in section 7 for all RRM tests
Revised to: R5-197507.
"
| revised | No | R5‑197507 | |||
R5‑197507 | Addition of TDD UL DL Config for RRM test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196655 | |||
R5‑196656 | Addition of FilterCoefficient configuration for RRM test cases | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196656r1.
"Revised from: R5-196656.
move to section 7 and also check if this can be moved to Annex H
Revised to: R5-197508.
"
| revised | No | R5‑197508 | |||
R5‑197508 | Addition of FilterCoefficient configuration for RRM test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196656 | |||
R5‑196657 | Addition of SMTC Configuration for RRM test cases | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197305 | |||
R5‑197305 | Addition of SMTC Configuration for RRM test cases | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-196657.
move contents to Section 7"
| agreed | No | R5‑196657 | |||
R5‑196734 | Correction to SintraSearchP in SIB2 | Starpoint, HiSilicon | CR | Agreement | Yes |
Yes"<3GU Release issue>
3GU issues not handled , Huawei request on behalf of Starpoint to defer to handle the issue
Revised to: R5-196734r1."
"Revised from: R5-196734.
r1: Change release from Rel-15 to Rel-16
Revised to: R5-197450.
"
| revised | No | R5‑197450 | |||
R5‑197450 | Correction to SintraSearchP in SIB2 | Starpoint, HiSilicon | CR | Agreement | No |
Yes"Revised from: R5-196734r1.
Revised from: R5-196734r1.
merged into another CR"
| withdrawn | Yes | R5‑196734 | |||
R5‑196796 | Correction of clause 2 and 4.3 in 38.508-1 | ZTE Corporation | CR | Agreement | Yes |
Yesreissued as R5-196942 because of wrong Rel and ver.
| withdrawn | Yes | ||||
R5‑196942 | Correction of clause 2 and 4.3 in 38.508-1 | ZTE Corporation | CR | Agreement | Yes |
Yes"Correction of clause 2 and 4.3 in 38.508-1
no overlap"
| agreed | No | ||||
R5‑196855 | Corrections to test frequencies and formulas | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesRevised to: R5-196855r1.
"Revised from: R5-196855.
r1: removed the overlap
Revised to: R5-197303.
"
| revised | No | R5‑197303 | |||
R5‑197303 | Corrections to test frequencies and formulas | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196855 | |||
R5‑196864 | Updates to Address the Permitted OTA Test Methods | PCTEST Engineering Lab | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
5.3.5.2 | TS 38.508-2 | R5‑196541 | Update to 38.508-2 for 4Rx handling | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
Discussion paper 6540
Revised to: R5-197510."
| revised | No | R5‑197510 | |
R5‑197510 | Update to 38.508-2 for 4Rx handling | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes"LATE DOCUMENT
Revised from: R5-196541.
move derived caopabilities into 38.522"
| agreed | No | R5‑196541 | |||
R5‑197442 | Updates of SA and NSA information | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
R5-196391 and 6392 were merged into this CR to correct wrong WIC."
| agreed | No | ||||
5.3.5.3 | TS 38.509 | R5‑196534 | Update to 38.509 for SDR test case | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes"Discussion 6533
3GU and CR cover of category issue need to be confirmed
dependent on discussion paper 6533 also Coversheet category shall be B
no need as the proposal is to use UL PDCP SDU =0"
| withdrawn | Yes | ||
R5‑196546 | Update to 38.509 for SS-RSRPB report | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes
| revised | No | R5‑197306 | |||
R5‑197306 | Update to 38.509 for SS-RSRPB report | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196546 | |||
5.3.5.4 | TS 38.521-1 | R5‑196164 | Update UL-MIMO to UL MIMO to align with RAN4 terminology in FR1 | CAICT | CR | Agreement | Yes |
YesRevised to: R5-196164r1.
"Revised from: R5-196164.
revised to remove overlap
Revised to: R5-197307.
"
| revised | No | R5‑197307 | |
R5‑197307 | Update UL-MIMO to UL MIMO to align with RAN4 terminology in FR1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196164 | |||
5.3.5.4.1 | Tx Requirements (Clause 6) | R5‑195732 | Update Clause 6.2A.4.0.2 TIB for CA | CMCC | CR | Agreement | Yes |
Yes"The contents of Clause 6.2A.4.0.2.1 and 6.2A.4.0.2.2 have been revised from Void to FFS.
3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.3.1]->[5.3.5.4.1].
"
| agreed | No | ||
R5‑195803 | Update of Additional spectrum emission mask test case 6.5.2.3 | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-195803r1.
"Revised from: R5-195803.
r1: Removed update of Minimum requirements for NS_21 and NS_27 and correction of table number reference in step 3 of the test procedure
Revised to: R5-195803r2."
"Revised from: R5-195803r1.
r2: Added Message contents exceptions for network signalled value ""NS_21""
Revised to: R5-197312.
"
| revised | No | R5‑197312 | |||
R5‑197312 | Update of Additional spectrum emission mask test case 6.5.2.3 | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-195803r2.
revised to remove overlap"
| agreed | No | R5‑195803 | |||
R5‑195804 | Update of UE A_MPR test case in 6.2.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196191 | Update of Minimum conformance requirements and additon of test points in TC 6.2.2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196193 | Correction of uplink power setting for SA FR1 transmitter test cases | CAICT, Anritsu, Huawei | CR | Agreement | Yes |
YesRevised to: R5-196193r1.
"Revised from: R5-196193.
add MU table in Annex to identify the MU values for the power window and update the test procedure with a reference to the MU
Revised to: R5-197514.
"
| revised | No | R5‑197514 | |||
R5‑197514 | Correction of uplink power setting for SA FR1 transmitter test cases | CAICT, Anritsu, Huawei | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196193 | |||
R5‑196199 | Add TT to 6.3D.1 Minimum output power for UL-MIMO | China Telecom Corporation Ltd. | CR | Agreement | Yes |
YesRevised to: R5-196199r1.
"Revised from: R5-196199.
r1: fix file extension from *.docx to *.doc
Revised to: R5-197313."
| revised | No | R5‑197313 | |||
R5‑197313 | Add TT to 6.3D.1 Minimum output power for UL-MIMO | China Telecom Corporation Ltd. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196199 | |||
R5‑196229 | Correction to test configuration for power class 3 in TC 6.2.2 | Anritsu | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196230 | Correction to power control TC 6.3.4.2 and 6.3.4.4 | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196230r1.
"Revised from: R5-196230.
r1: Further update on editors note in 6.3.4.2; TBD is solved in Table 6.3.4.4.5-1.
Revised to: R5-197517.
"
| revised | No | R5‑197517 | |||
R5‑197517 | Correction to power control TC 6.3.4.2 and 6.3.4.4 | Anritsu | CR | Agreement | Yes |
YesRevised from: R5-196230r1. Update test procedure to indicate TT for absolute in steps 1.1 and 2.1. Overall test is a relative measurement where the TT is 0.7dB.
Document was sent FOR E-MAIL AGREEMENT
"
r2 was produced.
| revised | No | R5‑197639 | R5‑196230 | ||
R5‑197639 | Correction to power control TC 6.3.4.2 and 6.3.4.4 | Anritsu | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197517 | |||
R5‑196231 | Correction to 6.5.2.3 Additional spectrum emission mask | Anritsu | CR | Agreement | Yes |
Yes"Parallel RAN4 CR : R4-1907966
overlap resolve in 803, dependent on RAN4"
| agreed | No | ||||
R5‑196232 | Correction to PRACH configurations | Anritsu | CR | Agreement | Yes |
Yes"Revised to: R5-197314.
no overlap"
| revised | No | R5‑197314 | |||
R5‑197314 | Correction to PRACH configurations | Anritsu | CR | Agreement | Yes |
Yes"Revised from: R5-196232.
no overlap
remove FR2 message exception in table 633443-1"
| agreed | No | R5‑196232 | |||
R5‑196233 | Correction to 6.3.4.3 Power Control Relative power tolerance | Anritsu, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196234 | Correction to PUCCH format in EVM and In-band emissions test | Anritsu | CR | Agreement | Yes |
YesNo overlap
| agreed | No | ||||
R5‑196396 | Update of Minimum output power for CA FR1 | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196397 | Update of Transmit OFF power for CA FR1 | China Unicom | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196400 | Update of Transmit ON/OFF time mask for CA FR1 | China Unicom | CR | Agreement | Yes |
YesRevised to: R5-196400r1.
"Revised from: R5-196400.
update test procedure , MU/TT per carrier is same as single carrier case. Annex F is update in DCM CR
Revised to: R5-197518.
"
| revised | No | R5‑197518 | |||
R5‑197518 | Update of Transmit ON/OFF time mask for CA FR1 | China Unicom | CR | Agreement | Yes |
Yesagreed. Later revised bec of wrong rev on cover
| revised | No | R5‑197635 | R5‑196400 | ||
R5‑197635 | Update of Transmit ON/OFF time mask for CA FR1 | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197518 | |||
R5‑196402 | Update of NR test case 6.2A.1-UE maximum output power for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196403 | Addition of NR test case 6.2A.2-UE maximum output power reduction for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TP in R5-196404
Revised to: R5-196403r1."
"Revised from: R5-196403.
fix the Test poijnt overlap (17 &31 ), also update the test points to add one more aligned with TP analsyis discussion
Revised to: R5-197519.
"
| revised | No | R5‑197519 | |||
R5‑197519 | Addition of NR test case 6.2A.2-UE maximum output power reduction for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196403 | |||
R5‑196405 | Addition of NR test case 6.2A.3-UE additional maximum output power reduction for CA | Huawei, HiSilicon | CR | Agreement | Yes |
YesRevised to: R5-196405r1.
"Revised from: R5-196405.
r1: Adding Clauses affected in Coversheet
Revised to: R5-197316."
| revised | No | R5‑197316 | |||
R5‑197316 | Addition of NR test case 6.2A.3-UE additional maximum output power reduction for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196405r1.
update VOID to FFS, and add [] to test config since TP is pending"
| agreed | No | R5‑196405 | |||
R5‑196406 | Addition of NR test case 6.2A.4-Configured output power for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TP in R5-196407
Revised to: R5-196406r1."
"Revised from: R5-196406.
r1: Adding Clauses affected in Coversheet.
Revised to: R5-197318.
"
| revised | No | R5‑197318 | |||
R5‑197318 | Addition of NR test case 6.2A.4-Configured output power for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196406 | |||
R5‑196411 | Update of FR1 6.2D.1 MOP for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Disc in R5-196412
Revised to: R5-196411r1."
"Revised from: R5-196411.
r1: Removing overlapping with R5-195685
Revised to: R5-196411r2."
"Revised from: R5-196411r1.
update Enote to indicate 1.5dB MPR is already covered in MPR test and also have the revision to handle the updated tolerance limits that RAN4 is recommending
Revised to: R5-197520.
"
| revised | No | R5‑197520 | |||
R5‑197520 | Update of FR1 6.2D.1 MOP for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196411 | |||
R5‑196413 | Update of FR1 6.4D.1 Frequency error for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
YesTP in R5-196414
| agreed | No | ||||
R5‑196415 | Update of FR1 6.4D.2.1 EVM for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TP in R5-196416
Revised to: R5-196415r1."
"Revised from: R5-196415.
Revised to: R5-197319.
"
| revised | No | R5‑197319 | |||
R5‑197319 | Update of FR1 6.4D.2.1 EVM for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196415 | |||
R5‑196417 | Update of FR1 6.4D.2.2 Carrier leakage for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TP in R5-196418
Revised to: R5-196417r1."
"Revised from: R5-196417.
Revised to: R5-197321.
"
| revised | No | R5‑197321 | |||
R5‑197321 | Update of FR1 6.4D.2.2 Carrier leakage for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196417 | |||
R5‑196419 | Update of FR1 6.4D.2.3 Inband emission for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TP in R5-196420
Revised to: R5-196419r1."
"Revised from: R5-196419.
Revised to: R5-197324.
"
| revised | No | R5‑197324 | |||
R5‑197324 | Update of FR1 6.4D.2.3 Inband emission for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196419 | |||
R5‑196421 | Update of FR1 6.4D.2.4 EVM equalizer spectrum flatness for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
YesTP in R5-196422
| agreed | No | ||||
R5‑196424 | Update of UL power configuration for ON/OFF and Absolute power tolerance | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Disc in R5-196423
Revised to: R5-196424r1."
"Revised from: R5-196424.
r1: Correcting the title in Coversheet
overlap with 6488r1 , alpha value (new table) is calculated based on -106dBm, if the alpha value matches -100dBm suggested in this CR then we can w/draw 6488r1 ( QC to come back )
Revised to: R5-196424r2."
"Revised from: R5-196424r1.
remove the PUSCH-Config table
r2: Necessary parameter changes are introduced to test cases instead of 38.508-1
Revised to: R5-196424r3."
"Revised from: R5-196424r2.
r3: Updating power contrl to add parameters
Revised to: R5-197492.
"
| revised | No | R5‑197492 | |||
R5‑197492 | Update of UL power configuration for ON/OFF and Absolute power tolerance | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196424 | |||
R5‑196454 | Update for 6.5.3.1 General spurious emissions | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196454r1.
"Revised from: R5-196454.
core spec alignment , revised for 3GU issues
Revised to: R5-197308.
"
| revised | No | R5‑197308 | |||
R5‑197308 | Update for 6.5.3.1 General spurious emissions | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196454 | |||
R5‑196455 | Update for 6.5.3.2 Spurious emission for UE co-existence | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196455r1.
"Revised from: R5-196455.
core spec alignment , revised for 3GU issues
r1: Corrected line format that caused 3GU inconsistency issue
Revised to: R5-196455r2."
"Revised from: R5-196455r1.
core spec alignment , revised for 3GU issues
keep the changes only to rel15 bands
Revised to: R5-197521.
"
| revised | No | R5‑197521 | |||
R5‑197521 | Update for 6.5.3.2 Spurious emission for UE co-existence | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196455 | |||
R5‑196456 | Update for 6.5.3.3 Additional spurious emissions | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196456r1.
"Revised from: R5-196456.
core spec alignment , revised for 3GU issues
Revised to: R5-197309.
"
| revised | No | R5‑197309 | |||
R5‑197309 | Update for 6.5.3.3 Additional spurious emissions | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196456 | |||
R5‑196483 | Update to Occupied bandwidth for CA in NR SA FR1 | LG Electronics | CR | Agreement | Yes |
Yes"TP in 6465
Revised to: R5-196483r1."
"Revised from: R5-196483.
update seciton number to have FFS for intraband CA for min conformance
Revised to: R5-197522.
"
| revised | No | R5‑197522 | |||
R5‑197522 | Update to Occupied bandwidth for CA in NR SA FR1 | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196483 | |||
R5‑196488 | Correction for 6.3.3.2 General ON/OFF time mask | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196488r1.
"Revised from: R5-196488.
wdraw as tdoc 6424r3 contains the change needed.
Revised to: R5-197493.
"
| revised | No | R5‑197493 | |||
R5‑197493 | Correction for 6.3.3.2 General ON/OFF time mask | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑196488 | |||
R5‑196653 | Update TT for 6.3D.4.1 | China Telecom Corporation Ltd. | CR | Agreement | Yes |
YesNo overlap
| agreed | No | ||||
R5‑196699 | Update of Minimum conformance requirements in TC 6.3.2 | CAICT | CR | Agreement | Yes |
Yescore spec alignment
| agreed | No | ||||
R5‑196711 | Addition of TT for 6.3D.4.2 | China Telecom Corporation Ltd. | CR | Agreement | Yes |
YesNo overlap
| agreed | No | ||||
R5‑196726 | Addition of TT for 6.3D.4.3 | China Telecom Corporation Ltd. | CR | Agreement | Yes |
YesNo overlap
| agreed | No | ||||
R5‑196847 | Updating Test Case 6.3.4.2 Absolute Power Tolerance | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes"Updating Test Case 6.3.4.2 Absolute Power Tolerance
Intel: requested to deffer for more offline and overlap issue, request more time for offline
Intel: As the subject of our CR R5-196847 is already covered by CR R5-196424, I would like to withdraw R5-196847"
| withdrawn | Yes | ||||
5.3.5.4.2 | Rx Requirements (Clause 7) | R5‑196195 | Correction of uplink power setting for SA FR1 receiver test cases | CAICT, Anritsu, Huawei | CR | Agreement | Yes |
YesRevised to: R5-196195r1.
"Revised from: R5-196195.
r1: Uplink power setting in 7.7A.1.4.2 and 7.7A.2.4.2 was removed to resolve overlaps with R5-196684.
Revised to: R5-197515."
| revised | No | R5‑197515 | |
R5‑197515 | Correction of uplink power setting for SA FR1 receiver test cases | CAICT, Anritsu, Huawei | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196195 | |||
R5‑196408 | Addition of FR1 7.4A Maximum input level for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Disc in R5-196410; TP in R5-196409
Revised to: R5-196408r1."
"Revised from: R5-196408.
update the test config to include only non-exceptional test points
Revised to: R5-197523.
"
| revised | No | R5‑197523 | |||
R5‑197523 | Addition of FR1 7.4A Maximum input level for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196408 | |||
R5‑196461 | Update for 7.3A Reference sensitivity for CA | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes"TP analysis in 6491
Revised to: R5-196461r1."
"Revised from: R5-196461.
r1: Corrected line format that caused 3GU inconsistency issue
Revised to: R5-196461r2."
"Revised from: R5-196461r1.
update the sections to align with WP
Revised to: R5-196461r3."
"Revised from: R5-196461r2.
revised to handle the TP changes
Revised to: R5-197525.
"
| revised | No | R5‑197525 | |||
R5‑197525 | Update for 7.3A Reference sensitivity for CA | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes"Revised from: R5-196461r3.
Document was sent FOR E-MAIL AGREEMENT
"
r3 was produced.
As not all changes could be made, an editor's note will be added.
| revised | No | R5‑197640 | R5‑196461 | ||
R5‑197640 | Update for 7.3A Reference sensitivity for CA | Qualcomm Wireless GmbH | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197525 | |||
R5‑196462 | Update for 7.3C.2 Reference sensitivity power level for SUL | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196462r1.
"Revised from: R5-196462.
r1: Corrected line format that caused 3GU inconsistency issue
Revised to: R5-196462r2."
"Revised from: R5-196462r1.
Revised to: R5-197608.
"
| revised | No | R5‑197608 | |||
R5‑197608 | Update for 7.3C.2 Reference sensitivity power level for SUL | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196462 | |||
R5‑196464 | Update for 7.3C.0 Minimum conformance requirements for SUL | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196464r1.
"Revised from: R5-196464.
Revised to: R5-197327.
"
| revised | No | R5‑197327 | |||
R5‑197327 | Update for 7.3C.0 Minimum conformance requirements for SUL | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196464 | |||
R5‑196477 | Update for 7.3A.0 Minimum conformance requirements for CA | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196477r1.
"Revised from: R5-196477.
Revised to: R5-197328.
"
| revised | No | R5‑197328 | |||
R5‑197328 | Update for 7.3A.0 Minimum conformance requirements for CA | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196477 | |||
R5‑196478 | Update for 7.3.2 Reference sensitivity power level | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196478r1.
"Revised from: R5-196478.
Revised to: R5-196478r2."
"Revised from: R5-196478r1.
remvoe the rel16 band related changes
Revised to: R5-197609.
"
| revised | No | R5‑197609 | |||
R5‑197609 | Update for 7.3.2 Reference sensitivity power level | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196478 | |||
R5‑196481 | Remove references to to 4Rx Reference Sensetivity test case 7.3.2_1 from Annex F | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196684 | Update of Minimum conformance requirements and Test requirement in TCs 7.6.3 7.6.4 and 7.7 | CAICT | CR | Agreement | Yes |
YesRevised to: R5-196684r1.
"Revised from: R5-196684.
revision to fix the 3Gu issues and overlap
core spec alignment
Revised to: R5-196684r2."
"Revised from: R5-196684r1.
r1; Invalid characters in file name were removed; CR Title was corrected; Uplink power setting in 7.7A.1.4.2 and 7.7A.2.4.2 was updated to resolve overlaps with R5-196195.
r2: NOTE2 was added to Table 7.6.4.4.1-1.
Revised to: R5-197329.
"
| revised | No | R5‑197329 | |||
R5‑197329 | Update of Minimum conformance requirements and Test requirement in TCs 7.6.3 7.6.4 and 7.7 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196684 | |||
R5‑196696 | Update of Minimum conformance requirements and Test requirement in TC 7.4 | CAICT | CR | Agreement | Yes |
Yescore spec alignment
| agreed | No | ||||
R5‑196729 | Update of 7.5A.0 | China Telecom Corporation Ltd. | CR | Agreement | Yes |
Yes"core spec alignment
Revised to: R5-197330.
"
| revised | No | R5‑197330 | |||
R5‑197330 | Update of 7.5A.0 | China Telecom Corporation Ltd. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196729 | |||
5.3.5.4.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑195685 | Updates of MU and TT in TS 38.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
YesRevised to: R5-195685r1.
"Revised from: R5-195685.
revised to implement the proposal in 6393 and also add any new tests MU/TT and update relative power tolerance TT based on discussion papers at this meeting
Revised to: R5-197610.
"
| revised | No | R5‑197610 | |
R5‑197610 | Updates of MU and TT in TS 38.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195685 | |||
R5‑196291 | Add Annex F.4 Uplink Power window explanation for SA test cases | ANRITSU LTD | CR | Agreement | Yes |
Yes"Add explanation of UE Uplink power window in new Annex F.4. The Annex points to the relevant NR clauses in TS 38.521-3, which contains details for both NR and E-UTRA carriers.
As handling of the NR uplink power window is identical for SA and NSA, this method avoids duplication and makes future maintenance easier."
| agreed | No | ||||
R5‑196425 | Update of DL RB allocation in Annex C | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196426 | Adding default PDCCH configuration for RF testing | Huawei, HiSilicon | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
Overlap with 6843"
| withdrawn | Yes | ||||
R5‑196499 | Updated to Annex A for RF FR1 tests | Bureau Veritas | CR | Agreement | Yes |
YesTS38.101-1 v15.6.0 alignment for Annex A Measurement channels
| agreed | No | ||||
R5‑196500 | General clause updated for FR1 spec | Bureau Veritas | CR | Agreement | Yes |
YesTS38.101-1 v15.6.0
| agreed | No | ||||
R5‑196843 | Addition of the connection setup in TS 38.521-1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Overlap with 6426
Revised to: R5-196843r1."
"Revised from: R5-196843.
check the contents of clause A and update specific changes in Clause C as needed
Revised to: R5-197526.
"
| revised | No | R5‑197526 | |||
R5‑197526 | Addition of the connection setup in TS 38.521-1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Revised from: R5-196843r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197641 | R5‑196843 | ||
R5‑197641 | Addition of the connection setup in TS 38.521-1 | ROHDE & SCHWARZ | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197526 | |||
5.3.5.5 | TS 38.521-2 | R5‑196163 | Update UL-MIMO to UL MIMO to align with RAN4 terminology in FR2 | CAICT | CR | Agreement | Yes |
YesRevised to: R5-196163r1.
"Revised from: R5-196163.
Revised to: R5-197384.
"
| revised | No | R5‑197384 | |
R5‑197384 | Update UL-MIMO to UL MIMO to align with RAN4 terminology in FR2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196163 | |||
R5‑196165 | Correction of wrong spec reference numbers for TS 38.508-1 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196586 | Update on FR2 MUs in 38.521-2 | Anritsu | CR | Agreement | Yes |
Yes"implementing endorsed papers
Document was sent FOR E-MAIL AGREEMENT
"
Email withdrawn.
no MU was finalized.
| withdrawn | Yes | ||||
5.3.5.5.1 | Tx Requirements (Clause 6) | R5‑195695 | Change of TS 38.521-2 UL CA MOP Minimum conformance requirements | East China Institute of Tel. | CR | Agreement | Yes |
Yeseditorial Huawei presented the CR on behalf of ECIT
| agreed | No | ||
R5‑195703 | Addition of new TC 6.2A.1.1.1 of TS 38.521-2 | East China Institute of Tel. | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195823 | New Introduction of TC 6.2A.1.2.1 UE Maximum output power Spherical coverage 2UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes*.docx!
Revised to: R5-195823r1.
"Revised from: R5-195823.
TP analysis in 5923
r1: To remove the bracket from the title from the coverpage, and revise word format to become *.doc.
Revised to: R5-195823r2."
"Revised from: R5-195823r1.
Update step7 TBD, also check tested channel BW and align with the TP analysis with justification why lowest is needed
TT table is not in the requirement , to add table with TBD
Revised to: R5-197529.
"
| revised | No | R5‑197529 | |||
R5‑197529 | New Introduction of TC 6.2A.1.2.1 UE Maximum output power Spherical coverage 2UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195823 | |||
R5‑195824 | New Introduction of TC 6.2A.1.2.2 UE Maximum output power Spherical coverage 3UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes*.docx!
Revised to: R5-195824r1.
"Revised from: R5-195824.
TP analysis in 5923
r1: To remove the bracket from the title from the coverpage, and revise word format to become *.doc.
Revised to: R5-195824r2."
"Revised from: R5-195824r1.
same comments as 5823r1, and also check on SCS capability
Revised to: R5-197530.
"
| revised | No | R5‑197530 | |||
R5‑197530 | New Introduction of TC 6.2A.1.2.2 UE Maximum output power Spherical coverage 3UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195824 | |||
R5‑195825 | New Introduction of TC 6.2A.1.2.3 UE Maximum output power Spherical coverage 4UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes*.docx!
Revised to: R5-195825r1.
"Revised from: R5-195825.
TP analysis in 5923
r1: To remove the bracket from the title from the coverpage, and revise word format to become *.doc.
Revised to: R5-195825r2."
"Revised from: R5-195825r1.
same comments as 5823r1
Revised to: R5-197531.
"
| revised | No | R5‑197531 | |||
R5‑197531 | New Introduction of TC 6.2A.1.2.3 UE Maximum output power Spherical coverage 4UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195825 | |||
R5‑195826 | New Introduction of TC 6.4A.2.2.1 Carrier leakage 2UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes*.docx!
Revised to: R5-195826r1.
"Revised from: R5-195826.
TP analysis in 5924
r1: To remove the bracket from the title from the coverpage, and revise word format to become *.doc.
Revised to: R5-195826r2."
"Revised from: R5-195826r1.
update CBW, update procedure to indicate if the requirement is tested per CC, check on UL power window TBD
check the config table format to see if band can be removed
Revised to: R5-197532.
"
| revised | No | R5‑197532 | |||
R5‑197532 | New Introduction of TC 6.4A.2.2.1 Carrier leakage 2UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195826 | |||
R5‑195827 | New Introduction of TC 6.4A.2.2.2 Carrier leakage 3UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes*.docx!
Revised to: R5-195827r1.
"Revised from: R5-195827.
TP analysis in 5924
r1: To remove the bracket from the title from the coverpage, and revise word format to become *.doc.
Revised to: R5-195827r2."
"Revised from: R5-195827r1.
same comment as 5826r2
Revised to: R5-197533.
"
| revised | No | R5‑197533 | |||
R5‑197533 | New Introduction of TC 6.4A.2.2.2 Carrier leakage 3UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195827 | |||
R5‑195828 | New Introduction of TC 6.4A.2.2.3 Carrier leakage 4UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes*.docx!
Revised to: R5-195828r1.
"Revised from: R5-195828.
TP analysis in 5924
r1: To remove the bracket from the title from the coverpage, and revise word format to become *.doc.
Revised to: R5-195828r2."
"Revised from: R5-195828r1.
same comment as 5826r2
Revised to: R5-197534.
"
| revised | No | R5‑197534 | |||
R5‑197534 | New Introduction of TC 6.4A.2.2.3 Carrier leakage 4UL CA | Sporton International Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195828 | |||
R5‑195919 | Addition of Table 6.1-2 PCC SCCs frequency mapping in TS 38.521-2 | East China Institute of Tel., Huawei HiSilicon, Sporton | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195936 | Rel-16_NR_38.521-2_Addition of new TC 6.2A.1.1.1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes"TP analysis in 5923
revise to update the channel BW lowest to align with TP analysis
test procedure update to handle UL CA testing is TBD
add TT table TBD for PC4
3GPP style is wrong through out the document
Config table for Intraband to be changed
Revised to: R5-195936r1."
"Revised from: R5-195936.
Revised to: R5-197535.
"
| revised | No | R5‑197535 | |||
R5‑197535 | Rel-16_NR_38.521-2_Addition of new TC 6.2A.1.1.1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195936 | |||
R5‑195978 | Spurious test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"TP analysis in 6365
no 0 MPR test point for CA have min MPR config considerd in TP analysis , config to update to include both CC
test procedure update to align with the discussion paper 196362r1/6816 (repositioning concept)
update test proc step6 and conclude if new beam peak search is needed for UL CA, also update Annex K , add editors note if not concluded
remove non contigous CA test point as it is not the same WI
Revised to: R5-195978r1."
"Revised from: R5-195978.
Revised to: R5-195978r2."
"Revised from: R5-195978r1.
remove the overlap with 7500 and clarify NOte2
Revised to: R5-197614.
"
| revised | No | R5‑197614 | |||
R5‑197614 | Spurious test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195978 | |||
R5‑196066 | Additions to the SRS time mask for UL-MIMO test case | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes"Discussion paper 6065
Revised to: R5-196066r1."
"Revised from: R5-196066.
add editors note to indicate the test aligned with On/OFF time mask remove the test config table
Revised to: R5-197536.
"
| revised | No | R5‑197536 | |||
R5‑197536 | Additions to the SRS time mask for UL-MIMO test case | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196066 | |||
R5‑196069 | Introduction of absolute power tolerance for CA test cases | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196072 | Additions to the beam correspondence test case | Samsung R&D Institute UK, Apple | CR | Agreement | Yes |
YesRevised to: R5-196072r1.
"Revised from: R5-196072.
Revised to: R5-196072r2."
"Revised from: R5-196072r1.
r2: includes Apple changes in R5-196881 to include in dBm highlighted in green. There was a question related to the tet requirements for TT or if it should be +TT, so it is highlighted in green. Change the naming of the test procedure to not use [bit-0] and [bit-1] which is highlighted in green.
Revised to: R5-196072r3."
"Revised from: R5-196072r2.
revised to r3 to undo FFS and also update the test config based on TP analysis update
Revised to: R5-196072r4."
"Revised from: R5-196072r3.
Revised to: R5-196072r5."
"Revised from: R5-196072r4.
Revised to: R5-197537.
"
| revised | No | R5‑197537 | |||
R5‑197537 | Additions to the beam correspondence test case | Samsung R&D Institute UK, Apple | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196072 | |||
R5‑196235 | Correction to 6.5.2.1 SEM and 6.5.2.3 ACLR to consider MPR values | Anritsu | CR | Agreement | Yes |
Yes"test procedure is referring to min req instead of test requirement and also refer to the table in MPR rather than the whole section
Document was sent FOR E-MAIL AGREEMENT
"
r2 was produced.
| revised | No | R5‑197642 | |||
R5‑197642 | Correction to 6.5.2.1 SEM and 6.5.2.3 ACLR to consider MPR values | Anritsu | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑196235 | |||
R5‑196236 | Correction to test procedure of TC 6.4.2.2 Carrier Leakage | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196237 | Correction to RB allocation in 6.2.2 UE maximum output power reduction | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196237r1.
"Revised from: R5-196237.
Revised to: R5-196237r2."
"Revised from: R5-196237r1.
update note2 with inner_full from E/// tdoc 785
Revised to: R5-197538.
"
| revised | No | R5‑197538 | |||
R5‑197538 | Correction to RB allocation in 6.2.2 UE maximum output power reduction | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196237 | |||
R5‑196238 | Correction to number of measurements of 6.4.2.3 In-band emissions | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196238r1.
"Revised from: R5-196238.
Incorporates some changes from R5-196155, R5-196788
check if r1 is needed bsaed on offline between KTL, E/// and ANR premeeting
Revised to: R5-197539.
"
| revised | No | R5‑197539 | |||
R5‑197539 | Correction to number of measurements of 6.4.2.3 In-band emissions | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196238 | |||
R5‑196239 | Correction to UBF in transmit modulation quality test cases | Anritsu | CR | Agreement | Yes |
Yes"check to see if TxRx is needed
Revised to: R5-196239r1."
"Revised from: R5-196239.
Revised to: R5-197540.
"
| revised | No | R5‑197540 | |||
R5‑197540 | Correction to UBF in transmit modulation quality test cases | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196239 | |||
R5‑196240 | Clarification on EVM test requirement for PUCCH and PRACH | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196427 | Update of FR2 6.2.4 Configured transmitted power | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196428 | Update of FR2 6.3.3.2 General ON_OFF time mask | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196429 | Addition of FR2 6.2A.2 MPR for 2 UL CA | Huawei, HiSilicon, Sporton, ECIT | CR | Agreement | Yes |
Yes"TP in R5-196430
Revised to: R5-196429r1."
"Revised from: R5-196429.
check to split DL Non Contigous into a different test
Revised to: R5-197527.
"
| revised | No | R5‑197527 | |||
R5‑197527 | Addition of FR2 6.2A.2 MPR for 2 UL CA | Huawei, HiSilicon, Sporton, ECIT | CR | Agreement | Yes |
Yes"Revised from: R5-196429r1.
Document was sent FOR E-MAIL AGREEMENT
"
add editor's note
r2 was produced.
| revised | No | R5‑197643 | R5‑196429 | ||
R5‑197643 | Addition of FR2 6.2A.2 MPR for 2 UL CA | Huawei, HiSilicon, Sporton, ECIT | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197527 | |||
R5‑196431 | Addition of FR2 6.2A.4 Configured transmitted power for 2UL CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196432 | Addition of FR2 6.3A.3 ON_OFF time mask for 2 UL CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197393 | |||
R5‑197393 | Addition of FR2 6.3A.3 ON_OFF time mask for 2 UL CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196432 | |||
R5‑196433 | Addition of FR2 6.2D.4 Configured transmitted power for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196434 | Addition of FR2 6.3D.1 Minimum output power for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
YesTP in R5-196435
| agreed | No | ||||
R5‑196436 | Addition of FR2 6.3D.3 General ON_OFF power for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197394 | |||
R5‑197394 | Addition of FR2 6.3D.3 General ON_OFF power for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196436.
update the test procedure to add a ntoe if UL MIMO can be handled with existing steps"
| agreed | No | R5‑196436 | |||
R5‑196593 | Addition of new test case 6.4A.2.1.1 Error vector magnitude for 2UL CA in FR2 | TTA | CR | Agreement | Yes |
YesRevised to: R5-196593r1.
"Revised from: R5-196593.
r1: Swapped step 6 and step 7 in the test procedure; Changed Tx only to TxRx for UBF activation in step 8 and step 12.
Revised to: R5-197388.
"
| revised | No | R5‑197388 | |||
R5‑197388 | Addition of new test case 6.4A.2.1.1 Error vector magnitude for 2UL CA in FR2 | TTA | CR | Agreement | Yes |
Yes"Revised from: R5-196593r1.
add editors note for TT, remove change on change"
| agreed | No | R5‑196593 | |||
R5‑196594 | Addition of new test case 6.4A.2.1.2 Error vector magnitude for 3UL CA in FR2 | TTA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196595 | Addition of new test case 6.4A.2.1.3 Error vector magnitude for 4UL CA in FR2 | TTA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196623 | Update of TC 6.3A.1.1 Minimum output power for 2UL CA | TTA | CR | Agreement | Yes |
Yes
| revised | No | R5‑197389 | |||
R5‑197389 | Update of TC 6.3A.1.1 Minimum output power for 2UL CA | TTA | CR | Agreement | Yes |
Yes"Revised from: R5-196623.
add TT table, update test config table to remove band, update test procedure with a note to indicate the test procedure steps for UL CA to be revisited"
| agreed | No | R5‑196623 | |||
R5‑196626 | Addition of new test case 6.3A.1.2 Minimum output power for 3UL CA in FR2 | TTA | CR | Agreement | Yes |
Yes
| revised | No | R5‑197390 | |||
R5‑197390 | Addition of new test case 6.3A.1.2 Minimum output power for 3UL CA in FR2 | TTA | CR | Agreement | Yes |
Yes"Revised from: R5-196626.
same comments as 7389"
| agreed | No | R5‑196626 | |||
R5‑196628 | Addition of new test case 6.3A.1.3 Minimum output power for 4UL CA in FR2 | TTA | CR | Agreement | Yes |
Yes
| revised | No | R5‑197391 | |||
R5‑197391 | Addition of new test case 6.3A.1.3 Minimum output power for 4UL CA in FR2 | TTA | CR | Agreement | Yes |
Yes"Revised from: R5-196628.
same comments as 7389"
| agreed | No | R5‑196628 | |||
R5‑196650 | Update of Minimum conformance requirements and test configurations in TC 6.2.2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196784 | Update of FR2 A-MPR test case | Ericsson | CR | Agreement | Yes |
Yes"revise to remove test config for AMPR aligned with TP analysis not needing AMPR test to be covered due to RAN4 requirements
Revised to: R5-196784r1."
"Revised from: R5-196784.
Revised to: R5-197541.
"
| revised | No | R5‑197541 | |||
R5‑197541 | Update of FR2 A-MPR test case | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196784 | |||
R5‑196785 | Update of Common Uplink Configuration table for PC3 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197392 | |||
R5‑197392 | Update of Common Uplink Configuration table for PC3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196785 | |||
R5‑196812 | Update of Spurious Emissions TRP test procedure | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes"Agreements captured in R5-195123 have been implemented in this CR
Revised to: R5-196812r1."
"Revised from: R5-196812.
r1: Agreements to focus on single region in R5-196362r1; repositioning concept discussed in R5-196816
Revised to: R5-197500.
"
| revised | No | R5‑197500 | |||
R5‑197500 | Update of Spurious Emissions TRP test procedure | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes"Revised from: R5-196812r1.
update step 2 of test procedure"
| agreed | No | R5‑196812 | |||
R5‑196840 | Update of FR2 MUs in TS 38.521-2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"This CR depends on discussion paper R5-196854.
Revised to: R5-196840r1."
"Revised from: R5-196840.
r1: removed changes to Table 6.2A.1.1.1.5-1a and Table 6.2A.1.1.1.5-1b in order to resolve overlap with ECIT CR R5-195936
Revised to: R5-196840r2."
"Revised from: R5-196840r1.
r2: revised to keep the 15cm values according to updated discussion paper R5-196854r1
Revised to: R5-197501.
"
| revised | No | R5‑197501 | |||
R5‑197501 | Update of FR2 MUs in TS 38.521-2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196840 | |||
R5‑196856 | Update to spurious emission test points | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Test point analysis is in R5-196859.
Document was sent FOR E-MAIL AGREEMENT
"
Email withdrawn.
| withdrawn | Yes | ||||
R5‑196881 | Environmental Conditions for Beam Correspondence test case | Apple Europe Limited | CR | Agreement | Yes |
Yesreissued as R5-196953 because of wrong Rel and ver
| withdrawn | Yes | ||||
R5‑196953 | Environmental Conditions for Beam Correspondence test case | Apple Europe Limited | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196885 | Update OBW FR2 test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196885r1.
"Revised from: R5-196885.
r1: fixes release version in coverpage
Revised to: R5-197385.
"
| revised | No | R5‑197385 | |||
R5‑197385 | Update OBW FR2 test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196885 | |||
5.3.5.5.2 | Rx Requirements (Clause 7) | R5‑195976 | Refsens test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
YesRevised to: R5-195976r1.
"Revised from: R5-195976.
Revised to: R5-195976r2."
"Revised from: R5-195976r1.
add note to update test procedure used for single carrier finding beam peak applies to CA , check if UL RB allocation needs ot be changed
update the config table to handle multiple Carriers config
Revised to: R5-197543.
"
| revised | No | R5‑197543 | |
R5‑197543 | Refsens test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195976 | |||
5.3.5.5.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑195686 | Updates of MU and TT in TS 38.521-2 | NTT DOCOMO, INC. | CR | Agreement | Yes |
YesRevised to: R5-195686r1.
"Revised from: R5-195686.
r1: ACS, IBB was updated based on R5-195134 and R5-196853r1.
Spurious TCs (General Spur, co-existence, A-Spur) are introduced. (R5-195978)
Revised to: R5-197502.
"
| revised | No | R5‑197502 | |
R5‑197502 | Updates of MU and TT in TS 38.521-2 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes"Revised from: R5-195686r1.
update wanted signal also with relaxation and refer NOTE4 in for all the parameters where the value is relaxed in the table
Document was sent FOR E-MAIL AGREEMENT"
r2 was produced.
| revised | No | R5‑197644 | R5‑195686 | ||
R5‑197644 | Updates of MU and TT in TS 38.521-2 | NTT DOCOMO, INC. | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197502 | |||
R5‑195914 | CR on DUT turnover in measurement procedure | Anritsu | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195922 | CR on DUT turnover in measurement procedure | Anritsu | CR | Agreement | Yes |
Yes"Capture a concept of DUT turnover into the measurement procedure of Tx/Rx beam peak search, Tx/Rx spherical coverage and TRP.
Associated discussion paper. R5-195912.
Agenda Allocation was changed: [5.3.5.5.3]->[5.3.5.5.3].
Wednesday MU Ad-Hoc:
Based on outcome of R5-195912, this CR can be withdrawn."
| withdrawn | Yes | ||||
R5‑195980 | Annex K updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yeschanges captured in 6813r2
| withdrawn | Yes | ||||
R5‑196073 | Introduction of beam correspondence to direct far field (DFF) | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes"core spec alignment
Revised to: R5-196073r1."
"Revised from: R5-196073.
r1: removed Otherwise, this step can be skipped. In step 2. This was only included because I wanted to clarify that if its not beam correspondence this step should not be executed
Revised to: R5-196073r2."
"Revised from: R5-196073r1.
r2: Qualcomm incorporated additional clarification updates
Revised to: R5-196073r3."
"Revised from: R5-196073r2.
r3: removed the section K.1.1 to be incorporated into Keysight contribution. Added total in section K.1.9 to be in alignment with K.1.5
Revised to: R5-196073r4."
"Revised from: R5-196073r3.
remove total for EIRP, update K.1.9 to only have test procedure and chagne the title of the clause
Revised to: R5-197544.
"
| revised | No | R5‑197544 | |||
R5‑197544 | Introduction of beam correspondence to direct far field (DFF) | Samsung R&D Institute UK, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196073 | |||
R5‑196167 | Addition of new Annex N (normative): UE coordinate system | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑197395 | |||
R5‑197395 | Addition of new Annex N (normative): UE coordinate system | CAICT | CR | Agreement | Yes |
Yes"Revised from: R5-196167.
update the reference to IEEE spec"
| agreed | No | R5‑196167 | |||
R5‑196187 | Alignment of clause 2 to 5 with the core spec | CAICT, Bureau Veritas | CR | Agreement | Yes |
YesRevised to: R5-196187r1.
"Revised from: R5-196187.
Revised to: R5-197386.
"
| revised | No | R5‑197386 | |||
R5‑197386 | Alignment of clause 2 to 5 with the core spec | CAICT, Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196187 | |||
R5‑196366 | Correction of the FR2 RMC slot patterns for MOP test cases | Apple Europe Limited | CR | Agreement | Yes |
Yesreissued as R5-196954 because of wrong Rel and ver
| withdrawn | Yes | ||||
R5‑196954 | Correction of the FR2 RMC slot patterns for MOP test cases | Apple Europe Limited | CR | Agreement | No |
Yesalready included in R5-196501.
| withdrawn | Yes | ||||
R5‑196501 | Updated to Annex A for RF FR2 tests | Bureau Veritas, Apple Inc. | CR | Agreement | Yes |
Yes"TS38.101-2 v15.6.0 alignment for Annex A Measurement channels
Revised to: R5-196501r1."
"Revised from: R5-196501.
core spec alignment , related to LS 5523
Revised to: R5-197545.
"
| revised | No | R5‑197545 | |||
R5‑197545 | Updated to Annex A for RF FR2 tests | Bureau Veritas, Apple Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196501 | |||
R5‑196502 | General clause updated for FR2 spec | Bureau Veritas | CR | Agreement | Yes |
Yesalready covered by R5-196187
| withdrawn | Yes | ||||
R5‑196805 | Corrections on clause 2 and 3 in 38.521-2 | ZTE Corporation | CR | Agreement | Yes |
Yesreissued as R5-196950 because of Rel and ver change.
| withdrawn | Yes | ||||
R5‑196950 | Corrections on clause 2 and 3 in 38.521-2 | ZTE Corporation | CR | Agreement | Yes |
YesCorrections on clause 2 and 3 in 38.521-2
| agreed | No | ||||
R5‑196810 | Update to TRP measurement grid section in TS 38.521-2 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196811 | Update of TRP measurement grids for spurious emissions | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes"Agreements captured in R5-193689, R5-195123 (corrected MUs presented in R5-196821) have been implemented in this CR
Revised to: R5-196811r1."
"Revised from: R5-196811.
r1: Agreements to move Spurious Grids to Annex M and focus on single region in R5-196362r1
Revised to: R5-197503.
"
| revised | No | R5‑197503 | |||
R5‑197503 | Update of TRP measurement grids for spurious emissions | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196811 | |||
R5‑196813 | Integrating the Re-Positioning Concept into Annex K | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196813r1.
"Revised from: R5-196813.
Revised to: R5-196813r2."
"Revised from: R5-196813r1.
revised to address the overlap
Revised to: R5-196813r3."
"Revised from: R5-196813r2.
Swap step3/4 and also check if note2 is in proper style and place
Revised to: R5-197546.
"
| revised | No | R5‑197546 | |||
R5‑197546 | Integrating the Re-Positioning Concept into Annex K | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196813 | |||
R5‑196844 | Addition of the connection setup in TS 38.521-2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesRevised to: R5-196844r1.
"Revised from: R5-196844.
check to ensure alignment with Annex A
Revised to: R5-197528.
"
| revised | No | R5‑197528 | |||
R5‑197528 | Addition of the connection setup in TS 38.521-2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Revised from: R5-196844r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197645 | R5‑196844 | ||
R5‑197645 | Addition of the connection setup in TS 38.521-2 | ROHDE & SCHWARZ | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197528 | |||
R5‑196849 | Update to Annex on measurement grids | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"handled in 6810
"
| withdrawn | Yes | ||||
R5‑197387 | Integrating the QoQZ Procedures into 38.521-2 | Keysight Technologies | CR | discussion | Yes |
Yeslate doc
"LATE DOCUMENT
Spurious emissions QoQZ procedure proposed in R5-196815; TRP grid in R5-196814"
| agreed | No | ||||
5.3.5.6 | TS 38.521-3 | R5‑196588 | Update on FR2 MUs in 38.521-3 | Anritsu | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
5.3.5.6.1 | Tx Requirements (Clause 6) | R5‑195691 | Correction of test case numbering for UL CA | NTT DOCOMO, INC. | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||
R5‑195805 | Update of UE A_MPR intra band contiguous EN DC test case in 6.2B.3.1 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197346 | |||
R5‑197346 | Update of UE A_MPR intra band contiguous EN DC test case in 6.2B.3.1 | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-195805.
change the 3gpp style"
| agreed | No | R5‑195805 | |||
R5‑195806 | Update of UE A_MPR intra band non contiguous EN DC test case in 6.2B.3.2 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197347 | |||
R5‑197347 | Update of UE A_MPR intra band non contiguous EN DC test case in 6.2B.3.2 | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-195806.
change the 3gpp style"
| agreed | No | R5‑195806 | |||
R5‑195807 | Update of UE A_MPR inter band for EN DC test case in 6.2B.3.3 | Ericsson | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195808 | Addition of test case 6.5B.2.1.2 Additional Spectrum emissions mask for intra band contiguous EN DC | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197348 | |||
R5‑197348 | Addition of test case 6.5B.2.1.2 Additional Spectrum emissions mask for intra band contiguous EN DC | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-195808.
change the 3gpp style"
| agreed | No | R5‑195808 | |||
R5‑195809 | Addition of test case 6.5B.2.2.2 Additional Spectrum emissions mask for intra band non contiguous EN DC | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197349 | |||
R5‑197349 | Addition of test case 6.5B.2.2.2 Additional Spectrum emissions mask for intra band non contiguous EN DC | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-195809.
change the 3gpp style"
| agreed | No | R5‑195809 | |||
R5‑195810 | Addition of test case 6.5B.2.3.2 Additional Spectrum emissions mask for Inter band EN DC within FR1 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197350 | |||
R5‑197350 | Addition of test case 6.5B.2.3.2 Additional Spectrum emissions mask for Inter band EN DC within FR1 | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-195810.
change the 3gpp style"
| agreed | No | R5‑195810 | |||
R5‑195979 | Spurious test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| revised | No | R5‑197351 | |||
R5‑197351 | Spurious test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195979 | |||
R5‑196064 | Correction to ACLR inter-band EN-DC FR1 test case | Samsung R&D Institute UK | CR | Agreement | Yes |
YesRevised to: R5-196064r1.
"Revised from: R5-196064.
revised for overlap
Revised to: R5-197331.
"
| revised | No | R5‑197331 | |||
R5‑197331 | Correction to ACLR inter-band EN-DC FR1 test case | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196064 | |||
R5‑196160 | Clean up test cases 6.4B.2.2 Transmit Modulation Quality | KTL | CR | Agreement | Yes |
Yesdeferred delegate not present
| agreed | No | ||||
R5‑196200 | Correction of uplink power setting for NSA transmitter test cases | CAICT, Anritsu, Huawei | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196241 | Correction to FR1 Transmit OFF Power | Anritsu | CR | Agreement | Yes |
YesNo overlap
| agreed | No | ||||
R5‑196243 | Correction to NR RB allocations in FR1 maximum output power | Anritsu | CR | Agreement | Yes |
Yesbecause of R5-196281.
| withdrawn | Yes | ||||
R5‑196244 | Correction to FR1 PRACH time mask for EN-DC | Anritsu, Rohde&Schwarz | CR | Agreement | Yes |
YesRevised to: R5-196244r1.
"Revised from: R5-196244.
r1: Merge overlapped CR R5-196846; Added R&S as co-source
Revised to: R5-197352.
"
| revised | No | R5‑197352 | |||
R5‑197352 | Correction to FR1 PRACH time mask for EN-DC | Anritsu, Rohde&Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196244 | |||
R5‑196281 | Correction of NR uplink RB allocation for FR1 Inter-Band EN-DC MOP | CMCC, vivo, Anritsu | CR | Agreement | Yes |
Yesmerged with R5-196243 to solve overlapping issue.
"1 RB allocation for NR Maximum Output Power test in TS 38.521-3 has been changed from Edge_1RB_Left/Right into Inner_1RB_Left/Right as per Table 6.2.1.4.1-1 in TS 38.521-1 (g00).
Revised to: R5-196281r1."
"Revised from: R5-196281.
r1: Add Anritsu as co-sourcer
Revised to: R5-197353.
"
| revised | No | R5‑197353 | |||
R5‑197353 | Correction of NR uplink RB allocation for FR1 Inter-Band EN-DC MOP | CMCC, vivo, Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196281 | |||
R5‑196438 | Update of 6.2B.1.1 MOP for Intra-band contiguous EN-DC | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Discussion in R5-196437
3GU Spec allocation does not match AI allocation!!!
3GU allocation: 38.521-3 / AI allocation: 38.521-2
Agenda Allocation was changed: [5.3.5.5.1]->[5.3.5.6.1].
Revised to: R5-196438r1."
"Revised from: R5-196438.
to update editors note to indicate the band config also waiting for discussion 437 to conlcude
Revised to: R5-197549.
"
| revised | No | R5‑197549 | |||
R5‑197549 | Update of 6.2B.1.1 MOP for Intra-band contiguous EN-DC | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196438r1.
send an LS to RAN4 asking for non testable requirement clarity"
| agreed | No | R5‑196438 | |||
R5‑196439 | Update of 6.2B.1.2 MOP for Intra-band non-contiguous EN-DC | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Discussion in R5-196437
3GU Spec allocation does not match AI allocation!!!
3GU allocation: 38.521-3 / AI allocation: 38.521-2
Agenda Allocation was changed: [5.3.5.5.1]->[5.3.5.6.1].
Revised to: R5-196439r1."
"Revised from: R5-196439.
to update editors note to indicate the band config also waiting for discussion 437 to conlcude
Revised to: R5-197550.
"
| revised | No | R5‑197550 | |||
R5‑197550 | Update of 6.2B.1.2 MOP for Intra-band non-contiguous EN-DC | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196439 | |||
R5‑196440 | Editorial update of EN-DC 6.5B.3.3.2 SE co-existence for inter-band within FR1 | Huawei, HiSilicon | CR | Agreement | Yes |
Yescovered by 6458
| withdrawn | Yes | ||||
R5‑196457 | Update for 6.5B.3.1.2 Spurious emission band UE co-existence for intra-band contiguous EN-DC | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196457r1.
"Revised from: R5-196457.
r1: Corrected line format that caused 3GU inconsistency issue
Revised to: R5-197354.
"
| revised | No | R5‑197354 | |||
R5‑197354 | Update for 6.5B.3.1.2 Spurious emission band UE co-existence for intra-band contiguous EN-DC | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196457 | |||
R5‑196458 | Update for 6.5B.3.3.2 Spurious emission band UE co-existence for Inter-band within FR1 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196458r1.
"Revised from: R5-196458.
r1: Corrected line format that caused 3GU inconsistency issue
Revised to: R5-196458r2."
"Revised from: R5-196458r1.
Revised to: R5-197553.
"
| revised | No | R5‑197553 | |||
R5‑197553 | Update for 6.5B.3.3.2 Spurious emission band UE co-existence for Inter-band within FR1 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196458 | |||
R5‑196591 | Updates to 6.2B.2.4, UE Maximum Output Power reduction for Inter-Band EN-DC including FR2 | Ericsson | CR | Agreement | Yes |
Yesreissued as R5-196940 because of wrong spec
| withdrawn | Yes | ||||
R5‑196940 | Updates to 6.2B.2.4, UE Maximum Output Power reduction for Inter-Band EN-DC including FR2 | Ericsson | CR | Agreement | Yes |
Yes"Agenda Allocation was changed: [5.3.5.6.1]->[5.3.5.6.1].
Revised to: R5-196940r1."
"Revised from: R5-196940.
Revised to: R5-197559.
"
| revised | No | R5‑197559 | |||
R5‑197559 | Updates to 6.2B.2.4, UE Maximum Output Power reduction for Inter-Band EN-DC including FR2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196940 | |||
R5‑196622 | Removing test points for CP-OFDM PI/2 BPSK in test case 6.5B.2.1.1 | Ericsson | CR | Agreement | Yes |
Yesreissued as R5-196941 because of wrong spec
| withdrawn | Yes | ||||
R5‑196941 | Removing test points for CP-OFDM PI/2 BPSK in test case 6.5B.2.1.1 | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196941r1.
"Revised from: R5-196941.
Revised to: R5-197560.
"
| revised | No | R5‑197560 | |||
R5‑197560 | Removing test points for CP-OFDM PI/2 BPSK in test case 6.5B.2.1.1 | Ericsson | CR | Agreement | Yes |
Yesagreeed.
reissued as R5-197633 because of wrong spec in 3GU.
| withdrawn | Yes | R5‑196941 | |||
R5‑197633 | Removing test points for CP-OFDM PI/2 BPSK in test case 6.5B.2.1.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196707 | Updates to 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC | Ericsson | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
TP in 6797
Revised to: R5-196707r1."
"LATE DOCUMENT
Revised from: R5-196707.
remove editors note to handle EUTRA and NR MCG/SCG time difference and also add additional tp for all MPR values
Revised to: R5-197554.
"
| revised | No | R5‑197554 | |||
R5‑197554 | Updates to 6.2B.2.1, UE Maximum Output Power reduction for Intra-Band Contiguous EN-DC | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196707 | |||
R5‑196714 | Update of TC 6.3B.1.1 Minimum Output Power for intra-band contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
YesRevised to: R5-196714r1.
"Revised from: R5-196714.
update min conf requirements to include anchor agnostic approach and also update LTE Config table
Revised to: R5-197555.
"
| revised | No | R5‑197555 | |||
R5‑197555 | Update of TC 6.3B.1.1 Minimum Output Power for intra-band contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196714 | |||
R5‑196715 | Update of TC 6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
YesRevised to: R5-196715r1.
"Revised from: R5-196715.
update min conf requirements to include anchor agnostic approach and also update LTE Config table
update test procedure step1.1 and1.2 to handle the anchor agnostic tetsing
Revised to: R5-197556.
"
| revised | No | R5‑197556 | |||
R5‑197556 | Update of TC 6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196715 | |||
R5‑196716 | Update of TC 6.3B.2.1 Transmit OFF Power for intra-band contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes
| revised | No | R5‑197340 | |||
R5‑197340 | Update of TC 6.3B.2.1 Transmit OFF Power for intra-band contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes"Revised from: R5-196716.
to fix 3GPP style"
| agreed | No | R5‑196716 | |||
R5‑196717 | Update of TC 6.3B.2.2 Transmit OFF Power for intra-band non-contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes
| revised | No | R5‑197341 | |||
R5‑197341 | Update of TC 6.3B.2.2 Transmit OFF Power for intra-band non-contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes"Revised from: R5-196717.
to fix 3GPP style"
| agreed | No | R5‑196717 | |||
R5‑196718 | Update of TC 6.3B.2.3 Transmit OFF Power for inter-band EN-DC within FR1 | SGS Wireless | CR | Agreement | Yes |
Yeseditorial CR, contents is included in 241
| withdrawn | Yes | ||||
R5‑196719 | Update of TC 6.4B.1.1 Frequency error for Intra-band contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes
| revised | No | R5‑197342 | |||
R5‑197342 | Update of TC 6.4B.1.1 Frequency error for Intra-band contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes"Revised from: R5-196719.
to fix 3GPP style"
| agreed | No | R5‑196719 | |||
R5‑196720 | Update of TC 6.4B.1.2 Frequency error for Intra-band non-contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
YesRevised to: R5-196720r1.
"Revised from: R5-196720.
to fix 3GPP style and add max WGAP
Revised to: R5-196720r2."
"Revised from: R5-196720r1.
Revised to: R5-197557.
"
| revised | No | R5‑197557 | |||
R5‑197557 | Update of TC 6.4B.1.2 Frequency error for Intra-band non-contiguous EN-DC | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196720 | |||
R5‑196721 | Update of TC 6.4B.1.3 Frequency error for Inter-band EN-DC within FR1 | SGS Wireless | CR | Agreement | Yes |
Yes
| revised | No | R5‑197343 | |||
R5‑197343 | Update of TC 6.4B.1.3 Frequency error for Inter-band EN-DC within FR1 | SGS Wireless | CR | Agreement | Yes |
Yes"Revised from: R5-196721.
to fix 3GPP style"
| agreed | No | R5‑196721 | |||
R5‑196798 | Corrections on UE maximum output power for DC in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yesreissued as R5-196946 because of wrong Rel and ver.
| withdrawn | Yes | ||||
R5‑196946 | Corrections on UE maximum output power for DC in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
YesCorrections on UE maximum output power for DC in 38.521-3
| agreed | No | ||||
R5‑196800 | Corrections on Minimum conformance requirements of A-MPR for DC_(n)71AA in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yesreissued as R5-196947 because of wrong Rel and ver.
| withdrawn | Yes | ||||
R5‑196947 | Corrections on Minimum conformance requirements of A-MPR in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197332 | |||
R5‑197332 | Corrections on Minimum conformance requirements of A-MPR in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196947 | |||
R5‑196842 | Editorial corrections to Additional Spurious Emission test case | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196846 | Correction to PRACH time mask test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yescovered by 6244
| withdrawn | Yes | ||||
R5‑196848 | Correction to EN-DC Spurious Emissions | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"This CR depends on R4-1908138.
no overlap
Revised to: R5-196848r1."
"Revised from: R5-196848.
to remove the editor's note and wait for RAN4
Revised to: R5-197558.
"
| revised | No | R5‑197558 | |||
R5‑197558 | Correction to EN-DC Spurious Emissions | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesfirst agreed in RF, then in the joint on Fri put
for email agreement
Email agreed.
| agreed | No | R5‑196848 | |||
R5‑196887 | Update OBW EN-DC intraband non-contiguous | Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196888 | Update SEM EN-DC intraband non-contiguous | Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196889 | Update ACLR EN-DC intraband non-contiguous | Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196890 | Update OBW EN-DC FR2 test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196890r1.
"Revised from: R5-196890.
r1: fixes release version in coverpage
Revised to: R5-197345.
"
| revised | No | R5‑197345 | |||
R5‑197345 | Update OBW EN-DC FR2 test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196890 | |||
R5‑196914 | TS 38.521-3 updates across section 6 test cases | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yesno cl. aff. +R5
Revised to: R5-196914r1.
"Revised from: R5-196914.
r1: Updated clause affected and checked Source to TSG
capture the updates during the meet
Revised to: R5-197542.
"
| revised | No | R5‑197542 | |||
R5‑197542 | TS 38.521-3 updates across section 6 test cases | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes"Revised from: R5-196914r1.
Document was sent FOR E-MAIL AGREEMENT"
Email agreed.
| agreed | No | R5‑196914 | |||
5.3.5.6.2 | Rx Requirements (Clause 7) | R5‑195977 | Refsens test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
YesRevised to: R5-195977r1.
"Revised from: R5-195977.
update number of CC to only point to NR, update test procedure to handle multiple NR CC, handle the LTE CA config editors note , 2CC test procedure needs to be anchor agnostic , and initial conditions needs to be AA
Revised to: R5-197561.
"
| revised | No | R5‑197561 | |
R5‑197561 | Refsens test case updates | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195977 | |||
R5‑196201 | Correction of uplink power setting for NSA receiver test cases | CAICT, Anritsu, Huawei | CR | Agreement | Yes |
YesRevised to: R5-196201r1.
"Revised from: R5-196201.
update MU values in Annex and refernece in Test procedure
Revised to: R5-197516.
"
| revised | No | R5‑197516 | |||
R5‑197516 | Correction of uplink power setting for NSA receiver test cases | CAICT, Anritsu, Huawei | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196201 | |||
R5‑196242 | Correction to NR power control in FR1 Out-of-band blocking | Anritsu | CR | Agreement | Yes |
Yes"update test procedure to handle power window aligned to CACT CR
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197646 | |||
R5‑197646 | Correction to NR power control in FR1 Out-of-band blocking | Anritsu | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑196242 | |||
R5‑196280 | Correction to 7.8B.2.6 Wideband Intermodulation for EN-DC including FR1 - 3 CCs | Anritsu | CR | Agreement | Yes |
Yes"update test procedure to handle power window aligned to CACT CR
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197647 | |||
R5‑197647 | Correction to 7.8B.2.6 Wideband Intermodulation for EN-DC including FR1 - 3 CCs | Anritsu | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑196280 | |||
R5‑196296 | Addition of Clause 7.5A in TS 38.521-3 | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196459 | Update for 7.3B.2.0 Minimum Conformance Requirements of Reference sensitivity for EN-DC | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196459r1.
"Revised from: R5-196459.
Revised to: R5-197333.
"
| revised | No | R5‑197333 | |||
R5‑197333 | Update for 7.3B.2.0 Minimum Conformance Requirements of Reference sensitivity for EN-DC | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196459 | |||
R5‑196460 | Update for 7.3B.2.3 Ref sensitivity for Inter-band EN-DC within FR1 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196460r1.
"Revised from: R5-196460.
r1: Corrected line format that caused 3GU inconsistency issue
Removed changes for tables 7.3B.2.3.4.2.1-2b, 7.3B.2.3.4.2.1-2d, 7.3B.2.3.4.2.1-2f, 7.3B.2.3.4.2.1-2h, 7.3B.2.3.4.2.1-2u. to resolve overlap with R5-196459
Revised to: R5-196460r2."
"Revised from: R5-196460r1.
update test config to handle BW's based on UE cap and few other changes based on KEYS comment
Revised to: R5-197551.
"
| revised | No | R5‑197551 | |||
R5‑197551 | Update for 7.3B.2.3 Ref sensitivity for Inter-band EN-DC within FR1 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yesfirst agreed. Later revised to resolve overlappings with R&S's R5-197562.
| revised | No | R5‑197636 | R5‑196460 | ||
R5‑197636 | Update for 7.3B.2.3 Ref sensitivity for Inter-band EN-DC within FR1 | Qualcomm Wireless GmbH | CR | Agreement | No |
Yes
| agreed | No | R5‑197551 | |||
R5‑196463 | Update for 7.3B.2.1 Reference sensitivity for Intra-band Contiguous EN-DC | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196463r1.
"Revised from: R5-196463.
r1: Corrected line format that caused 3GU inconsistency issue; corrected 7.3B.2.1.5 heading format
Revised to: R5-197359.
"
| revised | No | R5‑197359 | |||
R5‑197359 | Update for 7.3B.2.1 Reference sensitivity for Intra-band Contiguous EN-DC | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196463 | |||
R5‑196482 | Update for 7.3B.3.2 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196482r1.
"Revised from: R5-196482.
Revised to: R5-197334.
"
| revised | No | R5‑197334 | |||
R5‑197334 | Update for 7.3B.3.2 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196482 | |||
R5‑196484 | Update for 7.3B.3 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196484r1.
"Revised from: R5-196484.
Revised to: R5-197335.
"
| revised | No | R5‑197335 | |||
R5‑197335 | Update for 7.3B.3 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196484 | |||
R5‑196486 | Update for 7.3B.3.3 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
YesRevised to: R5-196486r1.
"Revised from: R5-196486.
Revised to: R5-197337.
"
| revised | No | R5‑197337 | |||
R5‑197337 | Update for 7.3B.3.3 | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196486 | |||
R5‑196700 | Update of TCs in 7.6B and 7.7B | CAICT | CR | Agreement | Yes |
YesRevised to: R5-196700r1.
"Revised from: R5-196700.
r1: Invalid characters in file name were removed.
Revised to: R5-197336.
"
| revised | No | R5‑197336 | |||
R5‑197336 | Update of TCs in 7.6B and 7.7B | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196700 | |||
R5‑196839 | Corrections to Reference sensitivity for EN-DC | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesRevised to: R5-196839r1.
"Revised from: R5-196839.
r1: deleted original version of Table 7.3B.2.3.4.2.1-2f;
removed changes to clauses 7.3B.2.0.3.1 and 7.3B.2.0.3.5.1 and partly Table 7.3B.2.3.2.5-1 to resolve overlap with R5-196460 and R5-196459;
added UL allocation for E-UTRA; merged UL allocation for NR carrier from R5-196460.
Revised to: R5-196839r2."
"Revised from: R5-196839r1.
revise to update CBW also few updates suggested by Anritsu and Qualcomm
Revised to: R5-197562.
"
| revised | No | R5‑197562 | |||
R5‑197562 | Corrections to Reference sensitivity for EN-DC | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196839 | |||
R5‑196845 | Correction to test case 7.4B.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| revised | No | R5‑197360 | |||
R5‑197360 | Correction to test case 7.4B.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Revised from: R5-196845.
update test step7"
| agreed | No | R5‑196845 | |||
R5‑196915 | TS 38.521-3 updates across section 7 test cases | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
YesRevised to: R5-196915r1.
"Revised from: R5-196915.
Revised to: R5-197563.
"
| revised | No | R5‑197563 | |||
R5‑197563 | TS 38.521-3 updates across section 7 test cases | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196915 | |||
5.3.5.6.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑195687 | Updates of MU and TT in TS 38.521-3 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes"to implement MU/TT agreed at this meeting
Document was sent FOR E-MAIL AGREEMENT
"
no contribution to update MU and TT for TS 38.521-3 during the meeting.
Email withdrawn.
| withdrawn | Yes | ||
R5‑196161 | Update to Annex F for Tx modulation quality test cases | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196290 | Add Annex F.4 Uplink Power window explanation for interworking test cases | ANRITSU LTD | CR | Agreement | Yes |
Yes"Add explanation and illustration of UE Uplink power window in new Annex F.4. The Annex has subclauses for both Tx Test cases and Rx Test cases, covering both NR and E-UTRA carriers.
update MU values for power window setting"
| agreed | No | ||||
R5‑196449 | Correction to description of Table 4.5.1-2 | Tejet | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196494 | Updated to EN-DC band information | Bureau Veritas | CR | Agreement | Yes |
Yes"TS38.101-3 v15.6.0 alignment for EN-DC Band information
Revised to: R5-196494r1."
"Revised from: R5-196494.
Revised to: R5-197338.
"
| revised | No | R5‑197338 | |||
R5‑197338 | Updated to EN-DC band information | Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196494 | |||
R5‑196801 | Corrections on clause 5 in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yesreissued as R5-196948 because of wrong Rel and ver.
| withdrawn | Yes | ||||
R5‑196948 | Corrections on clause 5 in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yes"Corrections on clause 5 in 38.521-3
No overlap"
| agreed | No | ||||
R5‑196802 | Corrections on clause 2-4 in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yesreissued as R5-196949 because of wrong Rel and ver.
| withdrawn | Yes | ||||
R5‑196949 | Corrections on clause 2-4 in 38.521-3 | ZTE Corporation | CR | Agreement | Yes |
Yes"Corrections on clause 2-4 in 38.521-3
No overlap"
| agreed | No | ||||
R5‑196913 | TS 38.521-3 Section 5 updates to align with core specification | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yesno cl. aff.
Revised to: R5-196913r1.
"Revised from: R5-196913.
Revised to: R5-197339.
"
| revised | No | R5‑197339 | |||
R5‑197339 | TS 38.521-3 Section 5 updates to align with core specification | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196913 | |||
5.3.5.7 | TS 38.521-4 | R5‑196903 | Modification of FDD FR1 2Rx TypeA baseline and TypeX Rxvr | Qualcomm Finland RFFE Oy | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑196917 | Modification of FDD FR1 2Rx TypeA baseline and TypeX Rxvr | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yestitle changed!
Revised to: R5-196917r1.
"Revised from: R5-196917.
r1: Corrected the Title to match 3GU
Revised to: R5-196917r2."
"Revised from: R5-196917r1.
r2: added & Edited Test 5.2.2.2.2 to sync up with Core Spec, and also corrected some Message Exceptions.
Revised to: R5-197375.
"
| revised | No | R5‑197375 | |||
R5‑197375 | Modification of FDD FR1 2Rx TypeA baseline and TypeX Rxvr | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196917 | |||
R5‑196918 | Modification of 2Rx TDD FR1 PDSCH mapping Type A and CSI-RS overlapped with PDSCH performance - baseline Rx | Qualcomm Finland RFFE Oy | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196919 | Modification of 4Rx FDD FR1 PDSCH mapping Type A performance - 2x4 MIMO with baseline receiver for both SA and NSA | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
YesRevised to: R5-196919r1.
"Revised from: R5-196919.
Revised to: R5-197372.
"
| revised | No | R5‑197372 | |||
R5‑197372 | Modification of 4Rx FDD FR1 PDSCH mapping Type A performance - 2x4 MIMO with baseline receiver for both SA and NSA | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196919 | |||
R5‑196920 | Modification of 4Rx FDD FR1 PDSCH mapping Type A performance - 4x4 MIMO with baseline receiver for both SA and NSA | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
YesRevised to: R5-196920r1.
"Revised from: R5-196920.
Revised to: R5-196920r2."
"Revised from: R5-196920r1.
Revised to: R5-196920r3."
"Revised from: R5-196920r2.
Revised to: R5-197572.
"
| revised | No | R5‑197572 | |||
R5‑197572 | Modification of 4Rx FDD FR1 PDSCH mapping Type A performance - 4x4 MIMO with baseline receiver for both SA and NSA | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196920 | |||
5.3.5.7.1 | Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6) | R5‑195558 | Correction to 5.2.2.1.4_1 2Rx FR1 PDSCH LTE-NR coexistence performance | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑195594 | Addition of 5.2.3.2.2_1 4RX TDD FR1 PDSCH mapping Type A | Huawei,Hisilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195595 | Addition of 6.2.3.2.1.1 4Rx TDD FR1 periodic CQI reporting | Huawei,Hisilicon | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196153 | Clean up test cases 5.3.2.2.1 and 5.3.2.2.2 for 2Rx PDCCH | KTL | CR | Agreement | Yes |
YesRevised to: R5-196153r1.
"Revised from: R5-196153.
r1: Test requirement values were modified in considered to TT of endorsed proposals of R5-194978(QC discu.) which applies regardless of Doppler frequency for PDCCH
Revised to: R5-197376.
"
| revised | No | R5‑197376 | |||
R5‑197376 | Clean up test cases 5.3.2.2.1 and 5.3.2.2.2 for 2Rx PDCCH | KTL | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196153 | |||
R5‑196154 | Clean up test cases 5.3.3.1.1, 5.3.3.1.2, 5.3.3.2.1 and 5.3.3.2.2 for 4Rx PDCCH | KTL | CR | Agreement | Yes |
YesRevised to: R5-196154r1.
"Revised from: R5-196154.
r1: Test requirement values were modified in considered to TT of endorsed proposals of R5-194978(QC discu.) which applies regardless of Doppler frequency for PDCCH
Revised to: R5-197373.
"
| revised | No | R5‑197373 | |||
R5‑197373 | Clean up test cases 5.3.3.1.1, 5.3.3.1.2, 5.3.3.2.1 and 5.3.3.2.2 for 4Rx PDCCH | KTL | CR | Agreement | Yes |
Yes"Revised from: R5-196154r1.
remove the message contents that is in 38.508-1"
| agreed | No | R5‑196154 | |||
R5‑196188 | Updates to 6.2.2.1.2.1, 2Rx FDD FR1 periodic wideband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196188r1.
"Revised from: R5-196188.
r1: Solving cover page issues
Revised to: R5-197370.
"
| revised | No | R5‑197370 | |||
R5‑197370 | Updates to 6.2.2.1.2.1, 2Rx FDD FR1 periodic wideband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-196188r1.
remove editors note and remove row5 and few editorial changes"
| agreed | No | R5‑196188 | |||
R5‑196189 | Updates to 6.2.2.2.2.1, 2Rx TDD FR1 periodic wideband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196189r1.
"Revised from: R5-196189.
Revised to: R5-197371.
"
| revised | No | R5‑197371 | |||
R5‑197371 | Updates to 6.2.2.2.2.1, 2Rx TDD FR1 periodic wideband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196189 | |||
R5‑196190 | Updates to 6.2.2.1.2.2, 2Rx FDD FR1 periodic subband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196190r1.
"Revised from: R5-196190.
Revised to: R5-196190r2."
"Revised from: R5-196190r1.
same comments as 188r1 and RAN4 depedency
Revised to: R5-197615.
"
| revised | No | R5‑197615 | |||
R5‑197615 | Updates to 6.2.2.1.2.2, 2Rx FDD FR1 periodic subband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-196190r2.
RAN4 agreed"
| agreed | No | R5‑196190 | |||
R5‑196192 | Updates to 6.2.2.2.2.2, 2Rx TDD FR1 periodic subband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196192r1.
"Revised from: R5-196192.
Revised to: R5-196192r2."
"Revised from: R5-196192r1.
same comments as 188r1 and RAN4 depedency
Revised to: R5-197616.
"
| revised | No | R5‑197616 | |||
R5‑197616 | Updates to 6.2.2.2.2.2, 2Rx TDD FR1 periodic subband CQI reporting under fading conditions for both SA and NSA | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196192 | |||
R5‑196245 | Correction to 2Rx TDD FR1 periodic CQI reporting under AWGN conditions for both SA and NSA | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196246 | Correction to 2Rx TDD FR1 PDSCH mapping Type A performance | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196246r1.
"Revised from: R5-196246.
r1: Overlapping part with R5-196857 (step 2 in 5.2.2.2.1_1.3.2)is removed; Overlapping part with R5-196495 (Annex A changes)is removed.
Revised to: R5-197573.
"
| revised | No | R5‑197573 | |||
R5‑197573 | Correction to 2Rx TDD FR1 PDSCH mapping Type A performance | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196246 | |||
R5‑196247 | Correction to 5.3.2.2.1 and 5.3.3.2.1 TDD FR1 PDCCH 1Tx performance | Anritsu | CR | Agreement | Yes |
Yes"check if message contents are covered in 6539 if so remove it
Document was sent FOR E-MAIL AGREEMENT
"
Email agreed.
| agreed | No | ||||
R5‑196248 | Correction to FR1 FDD PDSCH mapping Type A performance test cases | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196248r1.
"Revised from: R5-196248.
r1: Overlapping part with R5-196283(Anritsu) and R5-196857(R&S) are removed.
Revised to: R5-197377.
"
| revised | No | R5‑197377 | |||
R5‑197377 | Correction to FR1 FDD PDSCH mapping Type A performance test cases | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196248 | |||
R5‑196283 | Correction to MU and TT for FR1 demodulation test cases | Anritsu, KTL, Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196283r1.
"Revised from: R5-196283.
r1: Revert the proposal for fading power profile uncertainity; Overlap with R5-196248, R5-196155 and R5-196788 are merged; Added KTL and Ericsson as co-source
Revised to: R5-197378.
"
| revised | No | R5‑197378 | |||
R5‑197378 | Correction to MU and TT for FR1 demodulation test cases | Anritsu, KTL, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196283 | |||
R5‑196487 | Update to 4Rx FDD FR1 PDSCH mapping Type A performance | LG Electronics | CR | Agreement | Yes |
Yes"No overlap
Revised to: R5-197379.
"
| revised | No | R5‑197379 | |||
R5‑197379 | Update to 4Rx FDD FR1 PDSCH mapping Type A performance | LG Electronics | CR | Agreement | Yes |
Yes"Revised from: R5-196487.
add editors note to indicate test1-5 is incomplete, Min test time is FFS, RAN4 SNR [] needs to be removed"
| agreed | No | R5‑196487 | |||
R5‑196498 | Updated to General clauses for Demod and CSI requirements | Bureau Veritas | CR | Agreement | Yes |
YesTS38.101-4 v15.2.0 alignment for clause 5.1 and 5.2 for Demod and CSI requirements
| agreed | No | ||||
R5‑196535 | Update to SA SDR test case | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes"Discussion paper 6533
Revised to: R5-196535r1."
"Revised from: R5-196535.
depends on 6533 , revised to handle the changes to testloop A function
Revised to: R5-197512.
"
| revised | No | R5‑197512 | |||
R5‑197512 | Update to SA SDR test case | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196535 | |||
R5‑196544 | Update to TDD FR1 2Rx TypeA Baseline and Type X receiver Demod test cases | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
YesRevised to: R5-196544r1.
"Revised from: R5-196544.
no document ready
Revised to: R5-197574.
"
| revised | No | R5‑197574 | |||
R5‑197574 | Update to TDD FR1 2Rx TypeA Baseline and Type X receiver Demod test cases | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196544 | |||
R5‑196545 | Update to FDD and TDD CQI reporting test cases | QUALCOMM Europe Inc. - Italy | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196590 | Editorial and updates to TS 38.521-4 test case 6.3.2.1.1 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes"Editorial and updates to TS 38.521-4 test case 6.3.2.1.1
Revised to: R5-196590r1."
"Revised from: R5-196590.
remove editors note and update test desc, test procedure
Revised to: R5-197575.
"
| revised | No | R5‑197575 | |||
R5‑197575 | Editorial and updates to TS 38.521-4 test case 6.3.2.1.1 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196590 | |||
R5‑196609 | Updates to TS 38.521-4 test case 6.3.2.1.2 | 7LAYERS GmbH | CR | Agreement | Yes |
Yescover Rel-15
"Updates to TS 38.521-4 test case 6.3.2.1.2
Revised to: R5-196609r1."
"Revised from: R5-196609.
r1: corrects the coversheet release information from Rel-15 to Rel-16
Revised to: R5-196609r2."
"Revised from: R5-196609r1.
remove editors note and update the test desc, test procedure towards completion
Revised to: R5-197576.
"
| revised | No | R5‑197576 | |||
R5‑197576 | Updates to TS 38.521-4 test case 6.3.2.1.2 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196609 | |||
R5‑196612 | Updates to TS 38.521-4 test case 6.3.3.1.1 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes"Updates to TS 38.521-4 test case 6.3.3.1.1
Revised to: R5-196612r1."
"Revised from: R5-196612.
same comments as 6609r2
Revised to: R5-197577.
"
| revised | No | R5‑197577 | |||
R5‑197577 | Updates to TS 38.521-4 test case 6.3.3.1.1 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196612 | |||
R5‑196615 | Update to TS 38.521-4 test case 6.3.3.1.2 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes"Update to TS 38.521-4 test case 6.3.3.1.2.
Revised to: R5-196615r1."
"Revised from: R5-196615.
same comments as 6609r2
Revised to: R5-197578.
"
| revised | No | R5‑197578 | |||
R5‑197578 | Update to TS 38.521-4 test case 6.3.3.1.2 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196615 | |||
R5‑196625 | Editorial and update to TS 38.521-4 test case 6.3.3.2.1 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes"Editorial and update to TS 38.521-4 test case 6.3.3.2.1
Revised to: R5-196625r1."
"Revised from: R5-196625.
same comments as 6609r2
Revised to: R5-197579.
"
| revised | No | R5‑197579 | |||
R5‑197579 | Editorial and update to TS 38.521-4 test case 6.3.3.2.1 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196625 | |||
R5‑196630 | Editorial and update to TS 38.521-4 test case 6.3.3.2.2 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes"Editorial and update to TS 38.521-4 test case 6.3.3.2.2
Revised to: R5-196630r1."
"Revised from: R5-196630.
same comments as 6609r2
Revised to: R5-197580.
"
| revised | No | R5‑197580 | |||
R5‑197580 | Editorial and update to TS 38.521-4 test case 6.3.3.2.2 | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196630 | |||
R5‑196695 | Modification on 2Rx TDD FR1 Single PMI with 4Tx Type1 - SinglePanel codebook for both SA and NSA | Samsung | CR | Agreement | Yes |
Yesreissued as R5-196951 because of wrong Rel and ver
| withdrawn | Yes | ||||
R5‑196951 | Modification on 2Rx TDD FR1 Single PMI with 4Tx Type1 - SinglePanel codebook for both SA and NSA | Samsung | CR | Agreement | Yes |
YesRevised to: R5-196951r1.
"Revised from: R5-196951.
to remove G.x as it is covered in another CR, also remove [] and add TT to the requirement
Revised to: R5-196951r2."
"Revised from: R5-196951r1.
Revised to: R5-197566.
"
| revised | No | R5‑197566 | |||
R5‑197566 | Modification on 2Rx TDD FR1 Single PMI with 4Tx Type1 - SinglePanel codebook for both SA and NSA | Samsung | CR | Agreement | Yes |
Yes"Revised from: R5-196951r2.
update row5 in message content table"
| agreed | No | R5‑196951 | |||
R5‑196698 | Introduce 2Rx TDD FR1 Single PMI with 8Tx Type1 - SinglePanel codebook for both SA and NSA | Samsung | CR | Agreement | Yes |
Yesreissued as R5-196952 because of wrong Rel and ver
| withdrawn | Yes | ||||
R5‑196952 | Introduce 2Rx TDD FR1 Single PMI with 8Tx Type1 - SinglePanel codebook for both SA and NSA | Samsung | CR | Agreement | Yes |
YesRevised to: R5-196952r1.
"Revised from: R5-196952.
Same comments as 6951
Revised to: R5-196952r2."
"Revised from: R5-196952r1.
Revised to: R5-197567.
"
| revised | No | R5‑197567 | |||
R5‑197567 | Introduce 2Rx TDD FR1 Single PMI with 8Tx Type1 - SinglePanel codebook for both SA and NSA | Samsung | CR | Agreement | Yes |
Yes"Revised from: R5-196952r2.
update row5 in message content table"
| agreed | No | R5‑196952 | |||
R5‑196884 | Correction of PRACH-ConfigurationIndex for TC 5.2.2.2.1_1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196884r1.
"Revised from: R5-196884.
r1: fixes release version in coverpage
Revised to: R5-196884r2."
"Revised from: R5-196884r1.
condition and check if the value can be used for all subtests or only for test2
Revised to: R5-197581.
"
| revised | No | R5‑197581 | |||
R5‑197581 | Correction of PRACH-ConfigurationIndex for TC 5.2.2.2.1_1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196884 | |||
R5‑196916 | Update to RI Reporting Accuracy test | Qualcomm communications-France | CR | Agreement | Yes |
YesRevised to: R5-196916r1.
"Revised from: R5-196916.
Revised to: R5-197582.
"
| revised | No | R5‑197582 | |||
R5‑197582 | Update to RI Reporting Accuracy test | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196916 | |||
5.3.5.7.2 | Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8) | R5‑196543 | Update to FR2 Demod test case | QUALCOMM Europe Inc. - Italy | CR | Agreement | No |
Yeslate doc
"LATE DOCUMENT
associated with discussion paper 6542"
| withdrawn | Yes | ||
R5‑196857 | Corrections to PDSCH demod TCs | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesoverlap resolved in other CR's,
| agreed | No | ||||
5.3.5.7.3 | Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10) | R5‑196536 | Update to NSA SDR test case | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
YesRevised to: R5-196536r1.
"Revised from: R5-196536.
depends on discussion paper for test loop function
Revised to: R5-197513.
"
| revised | No | R5‑197513 | |
R5‑197513 | Update to NSA SDR test case | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196536 | |||
5.3.5.7.4 | Other Clauses (i.e. Clauses 1-4, Annexes) | R5‑196155 | Correction of Annex F for PDCCH test cases | KTL | CR | Agreement | Yes |
YesMerged into R5-196238r1
| withdrawn | Yes | ||
R5‑196249 | Correction to title of minimum test time table | Anritsu | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196495 | Updated to Annex A for performance tests | Bureau Veritas | CR | Agreement | Yes |
YesTS38.101-4 v15.2.0 alignment for Annex A Measurement channels
| agreed | No | ||||
R5‑196496 | Updated to Annex B for performance tests | Bureau Veritas | CR | Agreement | Yes |
YesTS38.101-4 v15.2.0 alignment for Annex B Propagation conditions
| agreed | No | ||||
R5‑196497 | Updated to General clauses for performance tests | Bureau Veritas | CR | Agreement | Yes |
Yes"TS38.101-4 v15.2.0 alignment for Clause 4 General Information & new Reference use in the test spec
Revised to: R5-197374.
"
| revised | No | R5‑197374 | |||
R5‑197374 | Updated to General clauses for performance tests | Bureau Veritas | CR | Agreement | Yes |
Yes"Revised from: R5-196497.
remove the statement under Noc as it is not needed"
| agreed | No | R5‑196497 | |||
R5‑196538 | Update to Annex G for min test time for demod | QUALCOMM Europe Inc. - Italy | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
depends on Discussion paper 6537"
| withdrawn | Yes | ||||
R5‑196786 | Update to Annex G to restructure minimum test time tables for Demodulation test cases | Ericsson | CR | Agreement | Yes |
Yes"depends on Discussion paper 6537
Revised to: R5-196786r1."
"Revised from: R5-196786.
Revised to: R5-197564.
"
| revised | No | R5‑197564 | |||
R5‑197564 | Update to Annex G to restructure minimum test time tables for Demodulation test cases | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-196786r1.
Document was sent FOR E-MAIL AGREEMENT
"
r2 was produced.
| revised | No | R5‑197648 | R5‑196786 | ||
R5‑197648 | Update to Annex G to restructure minimum test time tables for Demodulation test cases | Ericsson | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197564 | |||
R5‑196787 | Update to Annex G to add minimum test time for CSI test cases | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196787r1.
"Revised from: R5-196787.
update coversheet and also add addiitonal tests to be included for min test time
Revised to: R5-197565.
"
| revised | No | R5‑197565 | |||
R5‑197565 | Update to Annex G to add minimum test time for CSI test cases | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-196787r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197649 | R5‑196787 | ||
R5‑197649 | Update to Annex G to add minimum test time for CSI test cases | Ericsson | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197565 | |||
R5‑196788 | Update of Annex F to add new CSI test cases | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196788r1.
"Revised from: R5-196788.
Removes overlaps wit R5-196238
Revised to: R5-197380.
"
| revised | No | R5‑197380 | |||
R5‑197380 | Update of Annex F to add new CSI test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196788 | |||
R5‑196850 | Update on beam direction | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"check to see if Annex H can be retained as there are still pending discussions on alternate method
test procedure of using Rx beam peak follows what RAn4 has currently concluded"
| withdrawn | Yes | ||||
5.3.5.8 | TS 38.522 | R5‑195733 | TP for TS 38.522 | CMCC, Sporton, Huawei, HiSilicon, Sprint, Ericsson, Qualcomm | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
Document was sent FOR E-MAIL AGREEMENT
need more time to implement all the applicability updates from RAN5#84
Associated discussion paper is noted and is implemented in the CR".
r3 was produced.
| revised | No | R5‑197650 | |
R5‑197650 | TP for TS 38.522 | CMCC, Sporton, Huawei, HiSilicon, Sprint, Ericsson, Qualcomm | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑195733 | |||
R5‑196658 | Addition of RRM Test Cases Applicability | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
5.3.5.9 | TS 38.533 | R5‑196879 | Addition RRM FR2 test setups into TS 38.533 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196879r1.
"Revised from: R5-196879.
R&S: Give new Tdoc and block approve
Revised to: R5-197423.
"
| revised | No | R5‑197423 | |
R5‑197423 | Addition RRM FR2 test setups into TS 38.533 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196879 | |||
R5‑196880 | Addition Annex for RRM OTA procedures in TS 38.533 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196880r1.
"Revised from: R5-196880.
r1: fixes release version in coverpage
depends on discussion paper 6878
R&S: Give new Tdoc and block approve
prop2&3 of 6878 is implemented , check to see if other procedures are not precluded
Revised to: R5-197584.
"
| revised | No | R5‑197584 | |||
R5‑197584 | Addition Annex for RRM OTA procedures in TS 38.533 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196880 | |||
R5‑196882 | Update TDD UL-DL Config based on TS 38.133 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196882r1.
"Revised from: R5-196882.
R&S: Give new Tdoc and block approve
Revised to: R5-197424.
"
| revised | No | R5‑197424 | |||
R5‑197424 | Update TDD UL-DL Config based on TS 38.133 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196882 | |||
R5‑196883 | Update NSA Event trigger reporting test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRevised to: R5-196883r1.
"Revised from: R5-196883.
r1: fixes release version in coverpage
R&S: Overlap with R5-196250. Handle
Revised to: R5-197396.
"
| revised | No | R5‑197396 | |||
R5‑197396 | Update NSA Event trigger reporting test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196883 | |||
R5‑196921 | Modification of EN-DC FR1 UE Transmit Timing Section 4.4.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes_
"
| revised | No | R5‑197425 | |||
R5‑197425 | Modification of EN-DC FR1 UE Transmit Timing Section 4.4.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196921 | |||
R5‑196922 | Modification of EN-DC FR1 TAAA Section 4.4.3.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes_
"
| revised | No | R5‑197617 | |||
R5‑197617 | Modification of EN-DC FR1 TAAA Section 4.4.3.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"Revised from: R5-196922r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197651 | R5‑196922 | ||
R5‑197651 | Modification of EN-DC FR1 TAAA Section 4.4.3.1 | Qualcomm Finland RFFE Oy | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197617 | |||
R5‑196923 | Modification of EN-DC FR1 SSB-RLM OOS Section 4.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"analysis 6934
Revised to: R5-196923r1."
"Revised from: R5-196923.
T4/T5 needs to be removed
RAN4 dependency
Off power value needs to be updated in the test procedure
R&S: Needs discussion. Also R4 dependency
Revised to: R5-197618.
"
| revised | No | R5‑197618 | |||
R5‑197618 | Modification of EN-DC FR1 SSB-RLM OOS Section 4.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"Revised from: R5-196923r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197652 | R5‑196923 | ||
R5‑197652 | Modification of EN-DC FR1 SSB-RLM OOS Section 4.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197618 | |||
R5‑196924 | Modification of EN-DC FR1 SSB-RLM OOS DRX Section 4.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"analysis 6934
Revised to: R5-196924r1."
"Revised from: R5-196924.
RAN4 dependency
same comment as 6923r1
R&S: Needs discussion. Also R4 dependency
Revised to: R5-197619.
"
| revised | No | R5‑197619 | |||
R5‑197619 | Modification of EN-DC FR1 SSB-RLM OOS DRX Section 4.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"Revised from: R5-196924r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197653 | R5‑196924 | ||
R5‑197653 | Modification of EN-DC FR1 SSB-RLM OOS DRX Section 4.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197619 | |||
R5‑196925 | Modification of EN-DC FR2 TAAA Section 5.4.3.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196926 | Modification of EN-DC FR2 SSB-RLM OOS Section 5.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes'C' in CR#
Revised to: R5-196926r1.
"Revised from: R5-196926.
R&S: Same as R5-196923, same correction needed
r1: Corrected Title Page CR number, 3GU Issue.
Revised to: R5-196926r2."
"Revised from: R5-196926r1
r2: Updated Figure 5.5.1.1.4-1 and took off sqauer bracket from CSI
Revised to: R5-197397.
"
| revised | No | R5‑197397 | |||
R5‑197397 | Modification of EN-DC FR2 SSB-RLM OOS Section 5.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196926 | |||
R5‑196927 | Modification of EN-DC FR2 SSB-RLM OOS in DRX Section 5.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"R&S: Same as R5-196923, same correction needed
Revised to: R5-196927r1."
"Revised from: R5-196927.
r1: Took care of couple of editorial mistakes on CR cover, and updated Figure 5.5.1.3.4-1 and updated Step 5 of Test Procedure.
Revised to: R5-197398.
"
| revised | No | R5‑197398 | |||
R5‑197398 | Modification of EN-DC FR2 SSB-RLM OOS in DRX Section 5.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196927 | |||
R5‑196928 | Modification of Synchronous EN-DC FR2 RRC DL BWP Switch in non-DRX Section 5.5.6.2.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes_
"R&S: Needs revision for editorials, give new tdoc
Revised to: R5-197399.
"
| revised | No | R5‑197399 | |||
R5‑197399 | Modification of Synchronous EN-DC FR2 RRC DL BWP Switch in non-DRX Section 5.5.6.2.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196928 | |||
R5‑196929 | Modification of SA FR1 Handover with unknown Target Cell Section 6.3.1.2 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes_
"
| revised | No | R5‑197400 | |||
R5‑197400 | Modification of SA FR1 Handover with unknown Target Cell Section 6.3.1.2 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196929 | |||
R5‑196930 | Modification of SA FR1-FR1 Handover with unknown Target Cell Section 6.3.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"
| revised | No | R5‑197401 | |||
R5‑197401 | Modification of SA FR1-FR1 Handover with unknown Target Cell Section 6.3.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196930 | |||
R5‑196931 | Modification of SA FR1 TAAA Section 6.4.3.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yescoversheet ver & CR#
"Analysis 6398
Revised to: R5-196931r1."
"Revised from: R5-196931.
Revised to: R5-197361.
"
| revised | No | R5‑197361 | |||
R5‑197361 | Modification of SA FR1 TAAA Section 6.4.3.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196931 | |||
R5‑196932 | Modification of SA FR1 SSB RLM OOS in non-DRX Section 6.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"analysis 6934
Revised to: R5-196932r1."
"Revised from: R5-196932.
RAN4 dependency
Same comment as 6923r1
Revised to: R5-197620.
"
| revised | No | R5‑197620 | |||
R5‑197620 | Modification of SA FR1 SSB RLM OOS in non-DRX Section 6.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"Revised from: R5-196932r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197654 | R5‑196932 | ||
R5‑197654 | Modification of SA FR1 SSB RLM OOS in non-DRX Section 6.5.1.1 | Qualcomm Finland RFFE Oy | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197620 | |||
R5‑196933 | Modification of SA FR1 SSB RLM OOS in DRX Section 6.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"analysis 6934
Revised to: R5-196933r1."
"Revised from: R5-196933.
RAN4 dependency
Same comment as 6923r1
Revised to: R5-197621.
"
| revised | No | R5‑197621 | |||
R5‑197621 | Modification of SA FR1 SSB RLM OOS in DRX Section 6.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"Revised from: R5-196933r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197655 | R5‑196933 | ||
R5‑197655 | Modification of SA FR1 SSB RLM OOS in DRX Section 6.5.1.3 | Qualcomm Finland RFFE Oy | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197621 | |||
5.3.5.9.1 | EN-DC with all NR cells in FR1 (Clause 4) | R5‑195559 | Update of 4.6.1.3 event with gap non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195559r1.
"Revised from: R5-195559.
r1: Correct the IE RRCConnectionReconfiguration to release PScell in test procedure
R&S: Handle as test completed
remove BWP from the test procedure since it is already part of test config
Revised to: R5-197402.
"
| revised | No | R5‑197402 | |
R5‑197402 | Update of 4.6.1.3 event with gap non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195559 | |||
R5‑195560 | Update of 4.6.1.4 event with gap in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195560r1.
"Revised from: R5-195560.
r1: Correct the number of table 4.6.1.4.4.1-2
Revised to: R5-195560r2."
"Revised from: R5-195560r1.
r2: Correct the IE RRCConnectionReconfiguration to release PScell in test procedure
R&S: Handle as test completed
same comment as 5559r1
Revised to: R5-197403.
"
| revised | No | R5‑197403 | |||
R5‑197403 | Update of 4.6.1.4 event with gap in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195560 | |||
R5‑195561 | Update of 4.6.1.5 event without gap with ssb index | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195561r1.
"Revised from: R5-195561.
r1: Correct the IE RRCConnectionReconfiguration to release PScell in test procedure
R&S: Handle as test completed
Revised to: R5-197404.
"
| revised | No | R5‑197404 | |||
R5‑197404 | Update of 4.6.1.5 event without gap with ssb index | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195561 | |||
R5‑195562 | Update of 4.6.1.6 event with gap with ssb index | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195562r1.
"Revised from: R5-195562.
r1: Correct the IE RRCConnectionReconfiguration to release PScell in test procedure
R&S: Handle as test completed
same comment as 5559r1
Revised to: R5-197405.
"
| revised | No | R5‑197405 | |||
R5‑197405 | Update of 4.6.1.6 event with gap with ssb index | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195562 | |||
R5‑195612 | Addition of minimum confomance requirements for FR1 EN-DC CSI-RS based RLM | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195613 | Correction of NR test case 4.5.1.5-CSI-RS RLM OOS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195613r1.
"Revised from: R5-195613.
R&S: Give new Tdoc and block approve
Revised to: R5-197426.
"
| revised | No | R5‑197426 | |||
R5‑197426 | Correction of NR test case 4.5.1.5-CSI-RS RLM OOS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195613 | |||
R5‑195614 | Correction of NR test case 4.5.1.6-CSI-RS RLM IS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195614r1.
"Revised from: R5-195614.
R&S: Give new Tdoc and block approve
Revised to: R5-197427.
"
| revised | No | R5‑197427 | |||
R5‑197427 | Correction of NR test case 4.5.1.6-CSI-RS RLM IS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195614 | |||
R5‑195615 | Correction of NR test case 4.5.1.7-CSI-RS RLM OOS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195615r1.
"Revised from: R5-195615.
R&S: Give new Tdoc and block approve
Revised to: R5-197428.
"
| revised | No | R5‑197428 | |||
R5‑197428 | Correction of NR test case 4.5.1.7-CSI-RS RLM OOS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195615 | |||
R5‑195616 | Correction of NR test case 4.5.1.8-CSI-RS RLM IS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195616r1.
"Revised from: R5-195616.
R&S: Give new Tdoc and block approve
Revised to: R5-197429.
"
| revised | No | R5‑197429 | |||
R5‑197429 | Correction of NR test case 4.5.1.8-CSI-RS RLM IS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195616 | |||
R5‑195617 | Correction of NR test case 4.5.2.1-interruption transition DRX sync | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195617r1.
"Revised from: R5-195617.
R&S: Give new Tdoc and block approve
Revised to: R5-197430.
"
| revised | No | R5‑197430 | |||
R5‑197430 | Correction of NR test case 4.5.2.1-interruption transition DRX sync | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195617 | |||
R5‑195618 | Correction of NR test case 4.5.2.2-interruption transition DRX async | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195618r1.
"Revised from: R5-195618.
R&S: Give new Tdoc and block approve
Revised to: R5-197431.
"
| revised | No | R5‑197431 | |||
R5‑197431 | Correction of NR test case 4.5.2.2-interruption transition DRX async | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195618 | |||
R5‑195619 | Correction of NR test case 4.5.2.3-interruption NR deactivated SCell sync | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195619r1.
"Revised from: R5-195619.
Revised to: R5-195619r2."
"Revised from: R5-195619r1.
R&S: Give new Tdoc and block approve
Revised to: R5-197432.
"
| revised | No | R5‑197432 | |||
R5‑197432 | Correction of NR test case 4.5.2.3-interruption NR deactivated SCell sync | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195619 | |||
R5‑195620 | Correction of NR test case 4.5.2.4-interruption NR deactivated SCell async | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195620r1.
"Revised from: R5-195620.
R&S: Give new Tdoc and block approve
Revised to: R5-197433.
"
| revised | No | R5‑197433 | |||
R5‑197433 | Correction of NR test case 4.5.2.4-interruption NR deactivated SCell async | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195620 | |||
R5‑195621 | Correction of NR test case 4.5.2.5-interruption LTE deactivated SCell sync | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195621r1.
"Revised from: R5-195621.
R&S: Give new Tdoc and block approve
Revised to: R5-197434.
"
| revised | No | R5‑197434 | |||
R5‑197434 | Correction of NR test case 4.5.2.5-interruption LTE deactivated SCell sync | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195621 | |||
R5‑195622 | Correction of NR test case 4.5.2.6-interruption LTE deactivated SCell async | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195622r1.
"Revised from: R5-195622.
R&S: Give new Tdoc and block approve
Revised to: R5-197435.
"
| revised | No | R5‑197435 | |||
R5‑197435 | Correction of NR test case 4.5.2.6-interruption LTE deactivated SCell async | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195622 | |||
R5‑196137 | FR1 Test tolerance update for SS-RSRP NSA FR1 test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Analysis 6141
Revised to: R5-196137r1."
"Revised from: R5-196137.
to align with revision of TT analysis CR
Revised to: R5-197568.
"
| revised | No | R5‑197568 | |||
R5‑197568 | FR1 Test tolerance update for SS-RSRP NSA FR1 test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Revised from: R5-196137r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197656 | R5‑196137 | ||
R5‑197656 | FR1 Test tolerance update for SS-RSRP NSA FR1 test cases | ROHDE & SCHWARZ | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197568 | |||
R5‑196250 | Correction to EN-DC FR1 event-triggered reporting without gap TC 4.6.1.1 and 4.6.1.2 | Anritsu | CR | Agreement | Yes |
YesR&S: 100% Overlap with R5-196883. Handle
| agreed | No | ||||
R5‑196252 | Correction to EN-DC FR1 UE transmit timing accuracy TC 4.4.1.1 | Anritsu | CR | Agreement | Yes |
Yes"R&S: KS requested revision
overlap with tdoc 6921
Revised to: R5-196252r1."
Revised from: R5-196252.
| revised | No | R5‑196253 | |||
R5‑196253 | Correction to EN-DC FR1 UE transmit timing accuracy TC 4.4.1.1 | Anritsu | CR | Agreement | Yes |
Yes"R&S: Overlap. KS wants to handle
content handled in tdoc 6922"
| withdrawn | Yes | R5‑196252 | |||
R5‑196254 | Correction to EN-DC FR1 radio link monitoring TC 4.5.1.1 and 4.5.1.2 | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196254r1.
"Revised from: R5-196254.
Parallel RAN4 CR : R4-1907977, R4-1909753
r1: Overlapping part from R5-195791 is removed. UL power detection threshold in 4.5.1.1 is canged to fixed value -50dBm according to 38.133(RAN4 dependency)
R&S: RAN4 dependency
Revised to: R5-197623.
"
| revised | No | R5‑197623 | |||
R5‑197623 | Correction to EN-DC FR1 radio link monitoring TC 4.5.1.1 and 4.5.1.2 | Anritsu | CR | Agreement | Yes |
Yes"Revised from: R5-196254r1.
Document was sent FOR E-MAIL AGREEMENT
"
r2 was produced.
| revised | No | R5‑197657 | R5‑196254 | ||
R5‑197657 | Correction to EN-DC FR1 radio link monitoring TC 4.5.1.1 and 4.5.1.2 | Anritsu | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197623 | |||
R5‑196503 | Updated to EN-DC FR1 RRM tests in clause 4.5.3 | Bureau Veritas | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196601 | Correction of the reference for test frequencies and test mode - Chapter 4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.1]->[5.3.5.9.1].
R&S: Block approve"
| agreed | No | ||||
R5‑196664 | Correction of 5G RRM Inter Frequency measurements EN-DC test cases | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196664r1.
"Revised from: R5-196664.
R&S: Overlap and revision
r1: Corrected message content to consider changes introduced in other CRs (R5-196655, R5-196656, R5-196657)to introduce RRM specific message content clause 7.3 in 38.508-1
Revised to: R5-197406.
"
| revised | No | R5‑197406 | |||
R5‑197406 | Correction of 5G RRM Inter Frequency measurements EN-DC test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196664 | |||
R5‑196674 | Addition of minimum conformance requirements for L1-RSRP measurement RRM FR1 test cases | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196675 | Addition of SSB based L1-RSRP measurement RRM test case 4.6.3.1 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196676 | Addition of SSB based L1-RSRP measurement RRM test case 4.6.3.2 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196677 | Addition of CSI-RS based L1-RSRP measurement RRM test case 4.6.3.3 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196678 | Addition of CSI-RS based L1-RSRP measurement RRM test case 4.6.3.4 | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196678r1.
"Revised from: R5-196678.
R&S: Give new Tdoc and block approve
Revised to: R5-197436.
"
| revised | No | R5‑197436 | |||
R5‑197436 | Addition of CSI-RS based L1-RSRP measurement RRM test case 4.6.3.4 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196678 | |||
R5‑196737 | New test 4.5.7.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.1]->[5.3.5.9.1].
R&S: Block approve"
| agreed | No | ||||
R5‑196738 | New test 4.5.5.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.1]->[5.3.5.9.1].
R&S: Block approve "
| agreed | No | ||||
R5‑196739 | New test 4.5.5.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.1]->[5.3.5.9.1].
R&S: Block approve "
| agreed | No | ||||
R5‑196740 | New test 4.7.3.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.1]->[5.3.5.9.1].
R&S: Block approve "
| agreed | No | ||||
R5‑196741 | New test 4.7.3.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.1]->[5.3.5.9.1].
R&S: Block approve"
| agreed | No | ||||
5.3.5.9.2 | EN-DC with at least 1 NR Cell in FR2 (Clause5) | R5‑195563 | Addition of 5.6.1.0 minimum requirements | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||
R5‑195564 | Addition of 5.6.1.1 event without gap non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Handle
add editors note the FR2 test procedure needs to be updated, , editors note that PC1,2,4 no test framework exists
Revised to: R5-197407."
| revised | No | R5‑197407 | |||
R5‑197407 | Addition of 5.6.1.1 event without gap non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195564 | |||
R5‑195565 | Addition of 5.6.1.2 event without gap in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195594
Revised to: R5-197408.
"
| revised | No | R5‑197408 | |||
R5‑197408 | Addition of 5.6.1.2 event without gap in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195565 | |||
R5‑195566 | Addition of 5.6.1.3 event with gap non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195594
Revised to: R5-197409.
"
| revised | No | R5‑197409 | |||
R5‑197409 | Addition of 5.6.1.3 event with gap non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195566 | |||
R5‑195567 | Addition of 5.6.1.4 event with gap in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195594
Revised to: R5-197410.
"
| revised | No | R5‑197410 | |||
R5‑197410 | Addition of 5.6.1.4 event with gap in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195567 | |||
R5‑195596 | Addition of minimum confomance requirements for FR2 EN-DC CSI-RS based RLM | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195597 | Addition of NR test case 5.5.1.5-CSI-RS RLM OOS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Handle
correct the test procedure to refer to 38.521-2 for OFF power and not to 38.521-1
Revised to: R5-197411.
"
| revised | No | R5‑197411 | |||
R5‑197411 | Addition of NR test case 5.5.1.5-CSI-RS RLM OOS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195597 | |||
R5‑195598 | Addition of NR test case 5.5.1.6-CSI-RS RLM IS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195597
Revised to: R5-197412.
"
| revised | No | R5‑197412 | |||
R5‑197412 | Addition of NR test case 5.5.1.6-CSI-RS RLM IS non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195598 | |||
R5‑195599 | Addition of NR test case 5.5.1.7-CSI-RS RLM OOS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195597
Revised to: R5-197413.
"
| revised | No | R5‑197413 | |||
R5‑197413 | Addition of NR test case 5.5.1.7-CSI-RS RLM OOS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195599 | |||
R5‑195600 | Addition of NR test case 5.5.1.8-CSI-RS RLM IS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195597
Revised to: R5-197414.
"
| revised | No | R5‑197414 | |||
R5‑197414 | Addition of NR test case 5.5.1.8-CSI-RS RLM IS DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195600 | |||
R5‑195601 | Addition of minimum confomance requirements for FR2 EN-DC CSI-RS based BFD | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195602 | Addition of NR test case 5.5.5.3-CSI-RS BFD non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195597
Revised to: R5-197415.
"
| revised | No | R5‑197415 | |||
R5‑197415 | Addition of NR test case 5.5.5.3-CSI-RS BFD non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195602 | |||
R5‑195603 | Addition of NR test case 5.5.5.4-CSI-RS BFD DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"R&S: Same corrections as R5-195597
Revised to: R5-197416.
"
| revised | No | R5‑197416 | |||
R5‑197416 | Addition of NR test case 5.5.5.4-CSI-RS BFD DRX | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195603 | |||
R5‑195623 | Correction of NR test case 5.5.2.1-interruption transition DRX sync | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195624 | Correction of NR test case 5.5.2.2-interruption transition DRX async | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195625 | Correction of NR test case 5.5.2.3-interruption NR deactivated SCell sync | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195626 | Correction of NR test case 5.5.2.4-interruption NR deactivated SCell async | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195627 | Correction of NR test case 5.5.2.5-interruption LTE deactivated SCell sync | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195628 | Correction of NR test case 5.5.2.6-interruption LTE deactivated SCell async | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196504 | Updated to EN-DC FR2 RRM tests in clause 5.5.3 | Bureau Veritas | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196603 | Editorial Corrections to section 5.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.2]->[5.3.5.9.2].
R&S: Block approve"
| agreed | No | ||||
R5‑196666 | Correction of RRM Test Case 5.6.2.1 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196667 | Correction of RRM Test Case 5.6.2.2 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196668 | Correction of RRM Test Case 5.6.2.3 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196669 | Correction of RRM Test Case 5.6.2.4 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196670 | Correction of RRM Test Case 5.6.2.5 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196671 | Correction of RRM Test Case 5.6.2.6 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196672 | Correction of RRM Test Case 5.6.2.7 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196673 | Correction of RRM Test Case 5.6.2.8 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196679 | Addition of minimum conformance requirements for L1-RSRP measurement RRM FR2 test cases | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196680 | Addition of SSB based L1-RSRP measurement RRM test case 5.6.3.1 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196681 | Addition of SSB based L1-RSRP measurement RRM test case 5.6.3.2 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196682 | Addition of CSI-RS based L1-RSRP measurement RRM test case 5.6.3.3 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196683 | Addition of CSI-RS based L1-RSRP measurement RRM test case 5.6.3.3 | Ericsson | CR | Agreement | Yes |
Yesreissued as R5-196943 because of title change
| withdrawn | Yes | ||||
R5‑196943 | Addition of CSI-RS based L1-RSRP measurement RRM test case 5.6.3.4 | Ericsson | CR | Agreement | Yes |
YesR&S: Handle
| agreed | No | ||||
5.3.5.9.3 | NR Standalone in FR1 (Clause 6) | R5‑195568 | Update of 6.1.1.2 inter-freq cell re-selection | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"Analysis 5585
RAN4 dependency"
| agreed | No | ||
R5‑195569 | Update of 6.1.2.1 inter-RAT cell re-selection to higher priority | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"Analysis 5586
RAN4 dependency"
| agreed | No | ||||
R5‑195570 | Update Test Tolerance of 6.1.2.2 inter-RAT cell re-selection to lower priority | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"Analysis 5587
Revised to: R5-195570r1."
"Revised from: R5-195570.
r1: Correct the value of Noc in Table 6.1.2.2.5-1
Revised to: R5-197366.
"
| revised | No | R5‑197366 | |||
R5‑197366 | Update Test Tolerance of 6.1.2.2 inter-RAT cell re-selection to lower priority | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195570 | |||
R5‑195571 | Update of 6.3.1.4 inter-RAT handover to known cell | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195572 | Update of 6.3.1.5 inter-RAT handover to unknown cell | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"Analysis 5589
RAN4 dependency
Revised to: R5-195572r1."
"Revised from: R5-195572.
change test procedure step 1 to add test mode
RAN4 CR is agreed
Revised to: R5-197611.
"
| revised | No | R5‑197611 | |||
R5‑197611 | Update of 6.3.1.5 inter-RAT handover to unknown cell | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195572 | |||
R5‑195573 | Update Test Tolerance of 6.3.2.1.1 intra-freq RRC re-establishment | Huawei,Hisilicon | CR | Agreement | Yes |
YesAnalysis 5590
| agreed | No | ||||
R5‑195574 | Update Test Tolerance of 6.3.2.1.2 inter-freq RRC re-establishment | Huawei,Hisilicon | CR | Agreement | Yes |
YesAnalysis 5591
| agreed | No | ||||
R5‑195575 | Update Test Tolerance of 6.3.2.3.1 NR RRC redirection | Huawei,Hisilicon | CR | Agreement | Yes |
YesAnalysis 5592
| agreed | No | ||||
R5‑195576 | Update Test Tolerance of 6.3.2.3.2 inter-RAT RRC redirection | Huawei,Hisilicon | CR | Agreement | Yes |
YesAnalysis 5593
| agreed | No | ||||
R5‑195577 | Update of 6.5.1.5 RLM out-of-sync non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195578 | Update of 6.5.1.6 RLM in-sync non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195579 | Update of 6.5.1.7 RLM out-of-sync in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195580 | Update of 6.5.1.8 RLM in-sync in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195581 | Update of 6.5.5.3 CSI-RS-based BFD non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195582 | Update of 6.5.5.4 CSI-RS-based BFD in DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195790 | Update of NR UE Tx Timing Accuracy Test | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yesrtf
"Analysis 5789
| revised | No | R5‑197364 | |||
R5‑197364 | Update of NR UE Tx Timing Accuracy Test | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195790 | |||
R5‑195791 | Update of SSB-based RLM in-sync test cases | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yesrtf"Analysis 5788
| revised | No | R5‑197612 | |||
R5‑197612 | Update of SSB-based RLM in-sync test cases | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195791 | |||
R5‑196138 | FR1 Test tolerance update for SS-RSRP SA FR1 test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Analysis 6141
Revised to: R5-196138r1."
"Revised from: R5-196138.
Revise to align with TT analysis CR
Revised to: R5-197569.
"
| revised | No | R5‑197569 | |||
R5‑197569 | FR1 Test tolerance update for SS-RSRP SA FR1 test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Revised from: R5-196138r1.
Document was sent FOR E-MAIL AGREEMENT
"
r1 was produced.
| revised | No | R5‑197658 | R5‑196138 | ||
R5‑197658 | FR1 Test tolerance update for SS-RSRP SA FR1 test cases | ROHDE & SCHWARZ | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197569 | |||
R5‑196602 | Correction of the reference for test frequencies and test mode - Chapter 6 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.3]->[5.3.5.9.3].
R&S: Block approve"
| agreed | No | ||||
R5‑196665 | Correction of 5G RRM Inter Frequency measurements SA test cases | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196665r1.
"Revised from: R5-196665.
R&S: Give new Tdoc and block approve
Revised to: R5-197437.
"
| revised | No | R5‑197437 | |||
R5‑197437 | Correction of 5G RRM Inter Frequency measurements SA test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196665 | |||
R5‑196742 | New test 6.7.3.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.3]->[5.3.5.9.3].
R&S: Block approve "
| agreed | No | ||||
R5‑196743 | New test 6.7.3.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.3]->[5.3.5.9.3].
R&S: Block approve "
| agreed | No | ||||
5.3.5.9.4 | NR standalone with at least one NR cell in FR2 (Clause7) | R5‑195604 | Addition of minimum conformance requirements for SA FR2 reselection | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||
R5‑195605 | Addition of NR test case 7.1.1.1-intra freq reselection | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195606 | Addition of NR test case 7.1.1.2-inter freq reselection | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195629 | Correction of NR test case 7.5.5.1-SSB BFD non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195630 | Correction of NR test case 7.5.5.2-SSB BFD DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195631 | Correction of NR test case 7.5.5.3-CSI-RS BFD non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195632 | Correction of NR test case 7.5.5.4-CSI-RS BFD DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195633 | Correction of NR test case 7.6.1.1-without gap non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195634 | Correction of NR test case 7.6.1.2-without gap DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195635 | Correction of NR test case 7.6.1.3-with gap non-DRX. | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195635r1.
"Revised from: R5-195635.
R&S: Give new Tdoc and block approve
Revised to: R5-197438.
"
"Revised from: R5-195635r1.
incorrect file uploaded, new final assigned
Revised to: R5-197607.
"
| revised | No | R5‑197607 | |||
R5‑197607 | Correction of NR test case 7.6.1.3-with gap non-DRX. | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195635 | |||
R5‑195636 | Correction of NR test case 7.6.1.4-with gap DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196660 | Correction of RRM Test Case 7.3.2.1.1 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196661 | Correction of RRM Test Case 7.3.2.1.2 | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196735 | Editorial to fix conversion issues with two equations | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.4]->[5.3.5.9.4].
R&S: Block approve "
| agreed | No | ||||
5.3.5.9.5 | Other Clauses (i.e. Clauses 1-3, Annexes) | R5‑195607 | Addition of minimum conformance requirements for inter-RAT NR measurements | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195607r1.
"Revised from: R5-195607.
R&S: Issue Tdoc to remove overlap with R5-196736
Revised to: R5-197417.
"
| revised | No | R5‑197417 | |
R5‑197417 | Addition of minimum conformance requirements for inter-RAT NR measurements | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195607 | |||
R5‑195608 | Addition of NR test case 8.4.2.1-without SBI non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195609 | Addition of NR test case 8.4.2.2-without SBI DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195610 | Addition of NR test case 8.4.2.3-with SBI non-DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195611 | Addition of NR test case 8.4.2.4-with SBI DRX | Huawei,Hisilicon | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑195637 | Correction of default configuration in annex H | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-195637r1.
"Revised from: R5-195637.
r1: To solve the overlap with R5-196663
R&S: Handle
Revised to: R5-197418.
"
| revised | No | R5‑197418 | |||
R5‑197418 | Correction of default configuration in annex H | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195637 | |||
R5‑196139 | Annex E and F FR1 Test tolerance update for SS-RSRP | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Analysis 6141
Revised to: R5-196139r1."
"Revised from: R5-196139.
Revise to align with TT analysis CR
Revised to: R5-197570.
"
| revised | No | R5‑197570 | |||
R5‑197570 | Annex E and F FR1 Test tolerance update for SS-RSRP | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Revised from: R5-196139r1.
Document was sent FOR E-MAIL AGREEMENT
"
Email agreed.
| agreed | No | R5‑196139 | |||
R5‑196140 | Update NR operating band groups | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196251 | Correction to PRACH configurations for FR1 | Anritsu | CR | Agreement | Yes |
Yes"R&S: Issue with PRACH config index being corrected in RAN4. KS asked to handle
RAN4 has a change to PRACH index to make the config work with TDD slot config , revise and wait for RAN4
Revised to: R5-196251r1."
"Revised from: R5-196251.
RAN4 dependency
Revised to: R5-197624.
"
| revised | No | R5‑197624 | |||
R5‑197624 | Correction to PRACH configurations for FR1 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196251 | |||
R5‑196505 | Updated to cell configuration mapping table for RRM tests | Bureau Veritas, Huawei, HiSilicon, Anritsu, Ericsson | CR | Agreement | Yes |
Yes"Common CR for cell configuration mapping table used for TS38.533 test cases
Revised to: R5-196505r1."
"Revised from: R5-196505.
r1: merged R5-196662 content; added co-source
Revised to: R5-197419.
"
| revised | No | R5‑197419 | |||
R5‑197419 | Updated to cell configuration mapping table for RRM tests | Bureau Veritas, Huawei, HiSilicon, Anritsu, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196505 | |||
R5‑196547 | Update of FR1 Test tolerance and uncertainties in AnnexF | Huawei,Hisilicon | CR | Agreement | Yes |
YesAnalysis 5590,5591,5592,5593
| agreed | No | ||||
R5‑196600 | Clarification on NE-DC tests for RRM | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.5]->[5.3.5.9.5].
R&S: Block approve
Revised to: R5-197422.
"
| revised | No | R5‑197422 | |||
R5‑197422 | Clarification on NE-DC tests for RRM | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196600 | |||
R5‑196659 | Editorial corrections of Annex A | Ericsson | CR | Agreement | Yes |
YesR&S: Block approve
| agreed | No | ||||
R5‑196662 | Correction of cell configuration mapping for RRM Test Cases in Annex E.3 | Ericsson | CR | Agreement | Yes |
Yes"R&S: Handle together with R5-196505
merged content into 6505r1"
| agreed | No | ||||
R5‑196663 | Correction of default message content for RRM in Annex H | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196663r1.
"Revised from: R5-196663.
r1: resolved overlap; Removed SMTC configuration as it is already covered in 38.508-1 clause 7.3
R&S: Handle with R5-195637
Revised to: R5-197420.
"
| revised | No | R5‑197420 | |||
R5‑197420 | Correction of default message content for RRM in Annex H | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196663 | |||
R5‑196736 | Adding Chapter 8 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesAI ->5.3.5.9.1?
"3GU WIC allocation does not match AI allocation!!!
3GU allocation: 5GS_NR_LTE-UEConTest / AI allocation: NR_CADC_NR_LTE_DC_R16-UEConTest
Agenda Allocation was changed: [5.3.15.8.5]->[5.3.5.9.5].
R&S: Block approve, overlap removed in R5-195607"
| agreed | No | ||||
5.3.5.10 | TS 36.508 | R5‑196126 | Addition of new SIB combination for RRM EN-DC tests | ROHDE & SCHWARZ | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||
5.3.5.11 | TS 36.521-3 |   | ||||||||||
5.3.5.12 | TS 37.571-1 | R5‑195934 | Alignment of NR terminology | Spirent Communications, European Commission | CR | Agreement | Yes |
YesRevised to: R5-195934r1.
"Revised from: R5-195934.
r1: Problem with zip process
Revised to: R5-197471.
"
| revised | No | R5‑197471 | |
R5‑197471 | Alignment of NR terminology | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195934 | |||
R5‑196130 | Add default conditions for FR2 positioning tests for performance | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"<3GU title issue>
Revised to: R5-196130r1."
"Revised from: R5-196130.
r1: corrected the title in the coverpage
Revised to: R5-196130r2."
"Revised from: R5-196130r1.
r2: added OTA to abbreviations and minor editorials
Revised to: R5-197472.
"
| revised | No | R5‑197472 | |||
R5‑197472 | Add default conditions for FR2 positioning tests for performance | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| revised | No | R5‑197473 | R5‑196130 | ||
R5‑197473 | Add default conditions for FR2 positioning tests for performance | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197472 | |||
R5‑196131 | Clarify LPP transport for min perf positioning | ROHDE & SCHWARZ, Spirent Communications | CR | Agreement | Yes |
YesRevised to: R5-196131r1.
"Revised from: R5-196131.
r1: modified the wording in Test Procedure step 3. Added the changes for the other NR tests
Revised to: R5-197477.
"
| revised | No | R5‑197477 | |||
R5‑197477 | Clarify LPP transport for min perf positioning | ROHDE & SCHWARZ, Spirent Communications | CR | Agreement | Yes |
Yes"Revised from: R5-196131r1.
add ediors note to indicate perf of U-plane and C-plane similarity to the requirement needs to be checked further ."
| agreed | No | R5‑196131 | |||
R5‑197355 | Correct MBS Applicability Table and Editorial Updates | PCTEST Engineering Lab | CR | Agreement | Yes |
Yeslate doc
| revised | No | R5‑197478 | |||
R5‑197478 | Correct MBS Applicability Table and Editorial Updates | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes"LATE DOCUMENT
Revised from: R5-197355.
update editors note format"
| agreed | No | R5‑197355 | |||
5.3.5.13 | TS 37.571-3 |   | ||||||||||
5.3.5.14 | TS 37.571-5 |   | ||||||||||
5.3.5.15 | TR 38.903 ((NR MU & TT analyses) | R5‑195583 | Update FR1 Test tolerance of 4.5.3.1-4.5.3.3 Scell activation | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"No test case CR
RAN4 dependency"
| agreed | No | ||
R5‑195584 | Update FR1 Test tolerance of 6.1.1.1 FR1 cell re-selection | Huawei,Hisilicon | CR | Agreement | Yes |
Yes"No test case CR
RAN4 dependency"
| agreed | No | ||||
R5‑195585 | Update FR1 Test tolerance of 6.1.1.2 FR1-FR1 cell re-selection | Huawei,Hisilicon | CR | Agreement | Yes |
YesRAN4 dependency
| agreed | No | ||||
R5‑195586 | Update FR1 Test tolerance of 6.1.2.1 inter-RAT cell re-selection to higher priority | Huawei,Hisilicon | CR | Agreement | Yes |
YesRAN4 dependency
| agreed | No | ||||
R5‑195587 | Update FR1 Test tolerance of 6.1.2.2 inter-RAT cell re-selection to lower priority | Huawei,Hisilicon | CR | Agreement | Yes |
YesRAN4 dependency
| agreed | No | ||||
R5‑195588 | Update FR1 Test tolerance of 6.3.1.4 inter-RAT handover to known cell | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195589 | Addition FR1 Test tolerance of 6.3.1.5 inter-RAT handover to unknown cell | Huawei,Hisilicon | CR | Agreement | Yes |
YesRAN4 dependency is clear
| agreed | No | ||||
R5‑195590 | Addition FR1 Test tolerance of 6.3.2.1.1 intra-freq RRC re-establishment | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195591 | Addition FR1 Test tolerance of 6.3.2.1.2 inter-freq RRC re-establishment | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195592 | Addition FR1 Test tolerance of 6.3.2.3.1 NR RRC redirection | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195593 | Addition FR1 Test tolerance of 6.3.2.3.2 inter-RAT RRC redirection | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195788 | FR1 Test Tolerance Analysis for SSB-based RLM IS Tests | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes"TC in 5791
Revised to: R5-195788r1."
"Revised from: R5-195788.
Revised to: R5-197362.
"
| revised | No | R5‑197362 | |||
R5‑197362 | FR1 Test Tolerance Analysis for SSB-based RLM IS Tests | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes"Revised from: R5-195788r1.
Document was sent FOR E-MAIL AGREEMENT
"
Email agreed.
| agreed | No | R5‑195788 | |||
R5‑195789 | FR1 Test Tolerance Analysis for SA Tx Timing Accuracy 6.4.1.1 | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes"TC in 5790
Revised to: R5-195789r1."
"Revised from: R5-195789.
Revised to: R5-197363.
"
| revised | No | R5‑197363 | |||
R5‑197363 | FR1 Test Tolerance Analysis for SA Tx Timing Accuracy 6.4.1.1 | Qualcomm Technologies Netherlands B.V. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195789 | |||
R5‑195913 | CR on DUT turnover and relations with QoQZ MU | Anritsu | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195917 | CR on spurious emission MU in FR2 | Anritsu | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195920 | CR on spurious emission MU in FR2 | Anritsu | CR | Agreement | Yes |
Yes"Capture the agreement of MU budget table for Tx/Rx spurious emission in TR 38.903.
Associated discussion paper. R5-195915 ,R5-195916 , R5-195918.
need more time to implement the endorsed discussion paper
Revised to: R5-195920r1."
"Revised from: R5-195920.
Revised to: R5-197585.
"
| revised | No | R5‑197585 | |||
R5‑197585 | CR on spurious emission MU in FR2 | Anritsu | CR | Agreement | Yes |
Yes"Revised from: R5-195920r1.
Document was sent FOR E-MAIL AGREEMENT
"
r2 was produced.
| revised | No | R5‑197659 | R5‑195920 | ||
R5‑197659 | CR on spurious emission MU in FR2 | Anritsu | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197585 | |||
R5‑195921 | CR on DUT turnover and relations with QoQZ MU | Anritsu | CR | Agreement | Yes |
Yes"It is necessary to clarify a difinition of DUT turnover and its applicability to multiple measurement cases, relations with the quality of quiet zone MU during the over the air measurement.
Associated discussion paper. R5-195912.
Wednesday MU Ad-Hoc:
Based on outcome of R5-195912, this CR will be revised.
Revised to: R5-195921r1."
"Revised from: R5-195921.
r1: Removed the description of Annex F; Modified the description in B.2.1.31 to clarify the applicable test cases.
Revised to: R5-197494.
"
| revised | No | R5‑197494 | |||
R5‑197494 | CR on DUT turnover and relations with QoQZ MU | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195921 | |||
R5‑196141 | TT Analysis for SS-RSRP FR1 tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"TC in 6137, 6138, 6139 (Annex F)
Revised to: R5-196141r1."
"Revised from: R5-196141.
Revised to: R5-197571.
"
| revised | No | R5‑197571 | |||
R5‑197571 | TT Analysis for SS-RSRP FR1 tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Revised from: R5-196141r1.
Document was sent FOR E-MAIL AGREEMENT
"
Email agreed.
| agreed | No | R5‑196141 | |||
R5‑196579 | CR on FR2 EIRP spherical coverage MU | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196579r1.
"Revised from: R5-196579.
Revised to: R5-197504.
"
| revised | No | R5‑197504 | |||
R5‑197504 | CR on FR2 EIRP spherical coverage MU | Anritsu | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑196579 | |||
R5‑196580 | CR on FR2 OFF Power MU | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196580r1.
"Revised from: R5-196580.
r1: Typo corrected. Need to take max of MU for IFF=15cm and IFF=30cm according to Note 1 in Table B.8-1, then MU threshold is 5.32dB.
check the impact of relaxation , R&S also has concerns on some values. Update further based on offline
Revised to: R5-196580r2."
"Revised from: R5-196580r1.
Revised to: R5-197625.
"
| revised | No | R5‑197625 | |||
R5‑197625 | CR on FR2 OFF Power MU | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196580 | |||
R5‑196841 | Update of FR2 MUs in TR 38.903 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"This CR depends on discussion paper R5-196854.
Revised to: R5-196841r1."
"Revised from: R5-196841.
r1: Revised to keep the 15cm tables and apply these up to 30cm according to updated discussion paper R5-196854r1; Removed changes to spurious emissions related tables in order to remove the overlap with CR R5-195920. A revision of the latter, will cover the removal and updates to the spurious emissions tables.
Revised to: R5-197505.
"
| revised | No | R5‑197505 | |||
R5‑197505 | Update of FR2 MUs in TR 38.903 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196841 | |||
R5‑196886 | Update TR 38.903 implementing agreements at RAN5 84 | Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196934 | TT_Analysis_ENDC_FR1_RLM_OOS | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"TC in 6923, 6924, 6932, 6933
Revised to: R5-196934r1."
"Revised from: R5-196934.
r1: Combined all RLM OOS (4.5.1.1, 4.5.1.3, 6.5.1.1 & 6.5.1.3) in one CR as agreed with TT Analysis Reviewer
Revised to: R5-197365.
"
| revised | No | R5‑197365 | |||
R5‑197365 | TT_Analysis_ENDC_FR1_RLM_OOS | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"Revised from: R5-196934r1.
Test case 6923, 6924, 6932, 6933
Clause 4511 T4/T5 is not needed to align with RAN4 spec
Document was sent FOR E-MAIL AGREEMENT
"
Email agreed.
| agreed | No | R5‑196934 | |||
R5‑196935 | TT_Analysis_ENDC_FR1_RLM_OOS_DRX | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196936 | TT_Analysis_SA_FR1_RLM_OOS | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yestitle change!
Revised to: R5-196936r1.
"Revised from: R5-196936.
Revised to: R5-197367.
"
| revised | No | R5‑197367 | |||
R5‑197367 | TT_Analysis_SA_FR1_RLM_OOS | Qualcomm Finland RFFE Oy | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑196936 | |||
R5‑196937 | TT_Analysis_SA_FR1_RLM_OOS_DRX | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yestitle change!
Revised to: R5-196937r1.
"Revised from: R5-196937.
Revised to: R5-197368.
"
| revised | No | R5‑197368 | |||
R5‑197368 | TT_Analysis_SA_FR1_RLM_OOS_DRX | Qualcomm Finland RFFE Oy | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑196937 | |||
R5‑196938 | TT_Analysis_SA_FR1_TAAA | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yestitle change!"TC in 6931
Revised to: R5-196938r1."
"Revised from: R5-196938.
r1: Corrected CR title inconsistency
Revised to: R5-196938r2."
"Revised from: R5-196938r1.
r2: Removed Other comments from Cover Page, as per TT Analysis reviewer. Also removed the comment to add .zip file to 38.903, as analysis is same as 4.4.3.1. Added entry to the Table for grouping of tests as shwon below.
Revised to: R5-197369.
"
| revised | No | R5‑197369 | |||
R5‑197369 | TT_Analysis_SA_FR1_TAAA | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196938 | |||
5.3.5.16 | TR 38.905 (NR Test Points Radio Transmission and Reception ) | R5‑195923 | New addition of TP analysis for MOP & MOP Spherical Coverage for UL CA in SA FR2 | Sporton International Inc., Huawei, HiSilicon, ECIT | CR | Agreement | Yes |
YesRevised to: R5-195923r1.
"Revised from: R5-195923.
TC in 5823, 5824, 5825, 5936
r1: To revise word format to become *.doc.
Revised to: R5-195923r2."
"Revised from: R5-195923r1.
remove the header , file name change, indicate the TP is derived from SC case, update CBW to remove lowest since lowest is same as SC align prop in conclusion with analysis section
Revised to: R5-197589.
"
| revised | No | R5‑197589 | |
R5‑197589 | New addition of TP analysis for MOP & MOP Spherical Coverage for UL CA in SA FR2 | Sporton International Inc., Huawei, HiSilicon, ECIT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195923 | |||
R5‑195924 | New addition of TP analysis for Carrier leakage for UL CA in SA FR2 | Sporton International Inc. | CR | Agreement | Yes |
YesRevised to: R5-195924r1.
"Revised from: R5-195924.
TC in 5826, 5827, 5828
r1: To revise word format to become *.doc.
Revised to: R5-195924r2."
"Revised from: R5-195924r1.
similar comments as 5923r2
CR 5826,5827,5828
Revised to: R5-197590.
"
| revised | No | R5‑197590 | |||
R5‑197590 | New addition of TP analysis for Carrier leakage for UL CA in SA FR2 | Sporton International Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195924 | |||
R5‑195990 | Adding test case 6.5B.2.1.3 to 38.905 | Ericsson | CR | Agreement | Yes |
Yes"<3GU rev issue>
Revised to: R5-195990r1."
"Revised from: R5-195990.
Revised to: R5-197591.
"
| revised | No | R5‑197591 | |||
R5‑197591 | Adding test case 6.5B.2.1.3 to 38.905 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195990 | |||
R5‑196067 | Addition of TP analysis of FR2 6.3D.3.4 SRS time mask for UL-MIMO | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes"3GU Spec allocation does not match AI allocation!!!
3GU allocation: 38.905 / AI allocation: 38.509
Agenda Allocation was changed: [5.3.5.3]->[5.3.5.16].
TC in 6066
Decision is to not test the test case , as such no need to have TP analysis"
| withdrawn | Yes | ||||
R5‑196070 | Addition of TP analysis of FR2 6.3A.4.2.1 Absolute Power Control Tolerance for CA | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes"3GU Spec allocation does not match AI allocation!!!
3GU allocation: 38.905 / AI allocation: 38.509
Agenda Allocation was changed: [5.3.5.3]->[5.3.5.16].
TC in 6069
CA test points not finalized"
| withdrawn | Yes | ||||
R5‑196074 | Addition of TP analysis of FR2 6.6 Beam Correspondence | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes"3GU Spec allocation does not match AI allocation!!!
3GU allocation: 38.905 / AI allocation: 38.509
Agenda Allocation was changed: [5.3.5.3]->[5.3.5.16].
TC in 6072
Update prop2 to mid and prop4 to highest
Revised to: R5-196074r1."
"Revised from: R5-196074.
update prop2/4 with analysis why low and high freq with high BW covers the whole freq , no need to include mid freq and also zip the TP analysis file
Revised to: R5-197592.
"
| revised | No | R5‑197592 | |||
R5‑197592 | Addition of TP analysis of FR2 6.6 Beam Correspondence | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196074 | |||
R5‑196365 | Test Point analysis update for FR2 TxSpurious test case | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes"Revised to: R5-196365r1.
TC in 5978"
"Revised from: R5-196365.
r1: Fixed 3GU issue (changed Rel-15 to Rel-16); Corrected Proposal 6 & 7 to be the same as that in earlier section of discussion paper.
Revised to: R5-196365r2."
"Revised from: R5-196365r1.
update file name in the table , consider the test BW selection to improve the test , update the paper to indicate which 2 of the Spurious tests it applies, prop5 to be revisited
Revised to: R5-196365r3."
"Revised from: R5-196365r2.
Revised to: R5-197593.
"
| revised | No | R5‑197593 | |||
R5‑197593 | Test Point analysis update for FR2 TxSpurious test case | Qualcomm Finland RFFE Oy | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196365 | |||
R5‑196404 | Addtion of TP analysis for FR1 MPR for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196403
Revised to: R5-197315.
"
| revised | No | R5‑197315 | |||
R5‑197315 | Addtion of TP analysis for FR1 MPR for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196404.
update test case title and also add 1 more TP aligned to LTE test points"
| agreed | No | R5‑196404 | |||
R5‑196407 | Addtion of TP analysis for FR1 ConfigTP for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196406
Revised to: R5-197317.
"
| revised | No | R5‑197317 | |||
R5‑197317 | Addtion of TP analysis for FR1 ConfigTP for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196407.
remove [] for powerboosting cap"
| agreed | No | R5‑196407 | |||
R5‑196409 | Addition of TP analysis of FR1 Maximum input level for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196408
Revised to: R5-196409r1."
"Revised from: R5-196409.
update the TP to handle only non-exceptional test points from REF sense
Revised to: R5-197594.
"
| revised | No | R5‑197594 | |||
R5‑197594 | Addition of TP analysis of FR1 Maximum input level for CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196409 | |||
R5‑196414 | Addition of TP analysis of FR1 6.4D.1 Frequency error for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196413
Revised to: R5-196414r1."
"Revised from: R5-196414.
to have a clean and revised mark documents for better tracking and also change the header
Revised to: R5-197595.
"
| revised | No | R5‑197595 | |||
R5‑197595 | Addition of TP analysis of FR1 6.4D.1 Frequency error for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196414 | |||
R5‑196416 | Addition of TP analysis of FR1 6.4D.2.1 EVM for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196415
Revised to: R5-197320.
"
| revised | No | R5‑197320 | |||
R5‑197320 | Addition of TP analysis of FR1 6.4D.2.1 EVM for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196416.
same changes as 6414r1"
| agreed | No | R5‑196416 | |||
R5‑196418 | Addition of TP analysis of FR1 6.4D.2.2 Carrier leakage for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196417
Revised to: R5-197322.
"
| revised | No | R5‑197322 | |||
R5‑197322 | Addition of TP analysis of FR1 6.4D.2.2 Carrier leakage for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196418.
same changes as 6414r1 and fix the file name"
| agreed | No | R5‑196418 | |||
R5‑196420 | Addition of TP analysis of FR1 6.4D.2.3 Inband emission for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196419
Revised to: R5-197323.
"
| revised | No | R5‑197323 | |||
R5‑197323 | Addition of TP analysis of FR1 6.4D.2.3 Inband emission for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"Revised from: R5-196420.
same changes as 6414r1"
| agreed | No | R5‑196420 | |||
R5‑196422 | Addition of TP analysis of FR1 6.4D.2.4 EVM equalizer spectrum flatness for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196421
Revised to: R5-197325.
"
| revised | No | R5‑197325 | |||
R5‑197325 | Addition of TP analysis of FR1 6.4D.2.4 EVM equalizer spectrum flatness for UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196422 | |||
R5‑196430 | Addition of TP analysis of FR2 6.2A.2 MPR for 2 UL CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yes"TC in R5-196429
prop5 needs more thought since it is not testing max MPR
prop3 needs more thought since it is a new test point with DL non contigous and ul Contigous CA , splitting the test may help
Revised to: R5-196430r1."
"Revised from: R5-196430.
Revised to: R5-197596.
"
| revised | No | R5‑197596 | |||
R5‑197596 | Addition of TP analysis of FR2 6.2A.2 MPR for 2 UL CA | Huawei, HiSilicon | CR | Agreement | Yes |
Yesagreed.
Was considered revising to r1 to update the TP analysis.
| agreed | No | R5‑196430 | |||
R5‑196435 | Update of TP analysis of FR2 minimum output power to add UL MIMO | Huawei, HiSilicon | CR | Agreement | Yes |
YesTC in R5-196434
| agreed | No | ||||
R5‑196465 | Test Point analysis for Occupied bandwidth for 2UL CA in FR1 | LG Electronics | CR | Agreement | Yes |
Yes"TC in 6483
Revised to: R5-197326.
"
| revised | No | R5‑197326 | |||
R5‑197326 | Test Point analysis for Occupied bandwidth for 2UL CA in FR1 | LG Electronics | CR | Agreement | Yes |
Yes"Revised from: R5-196465.
update the content to indicate it is Interband CA
Test case in 6483"
| agreed | No | R5‑196465 | |||
R5‑196491 | TP_analysis_38.905_7.3A._CA_ref_sensitivity | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes"TC in 6461
Revised to: R5-196491r1."
"Revised from: R5-196491.
Revised to: R5-196491r2."
"Revised from: R5-196491r1.
remove the folder inside the zip file
associated CR 6461
Revised to: R5-196491r3."
"Revised from: R5-196491r2.
update default name in the file to indicate this TP is only for default, update interband and intraband BW configs, correct typo LTE in Section 2.2
Revised to: R5-197524.
"
| revised | No | R5‑197524 | |||
R5‑197524 | TP_analysis_38.905_7.3A._CA_ref_sensitivity | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yesagreed. Later revised to correct Rel on cover.
| revised | No | R5‑197632 | R5‑196491 | ||
R5‑197632 | TP_analysis_38.905_7.3A._CA_ref_sensitivity | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197524 | |||
R5‑196722 | Update of test points analysis for SA FR1 6.2.2 | CAICT | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196724 | Update of test points analysis for SA FR1 6.2.2 | CAICT | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196782 | Clarification of test point selection guidelines for MPR vs ACLR and SEM test cases | Ericsson | CR | Agreement | No |
Yeslate doc
"LATE DOCUMENT
Discussion 6780"
| withdrawn | Yes | ||||
R5‑196783 | Addition of TP analysis for FR2 AMPR with NS_201 | Ericsson | CR | Agreement | Yes |
Yes"to be updated in alignmnet with 6365 for Apur, for AMPR no test coverage needed
Revised to: R5-196783r1."
"Revised from: R5-196783.
Revised to: R5-197597.
"
| revised | No | R5‑197597 | |||
R5‑197597 | Addition of TP analysis for FR2 AMPR with NS_201 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196783 | |||
R5‑196797 | Updates of TP analysis for EN-DC MPR test case 6.2.B.2.1 | Ericsson | CR | Agreement | Yes |
Yeslate doc
"LATE DOCUMENT
TC in 6707
Revised to: R5-196797r1."
"LATE DOCUMENT
Revised from: R5-196797.
remove meeting heading in the TP analysis
add addiitonal TP for all MPR values suggested in RAN4 core
Revised to: R5-197598.
"
| revised | No | R5‑197598 | |||
R5‑197598 | Updates of TP analysis for EN-DC MPR test case 6.2.B.2.1 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑197628 | R5‑196797 | ||
R5‑197628 | Updates of TP analysis for EN-DC MPR test case 6.2.B.2.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197598 | |||
R5‑196859 | Update to FR2 spurious emission test point analysis | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes"Associated CR is R5-196856.
Document was sent FOR E-MAIL AGREEMENT
"
Email withdrawn.
| withdrawn | Yes | ||||
5.3.5.17 | Discussion Papers, Work Plan, TC lists | R5‑195688 | On FR2 spherical coverage MU | Anritsu | discussion | Agreement | Yes |
Yes"Monday MU Ad-Hoc:
KS: we need more time.
Huawei: what about Multi-Band Relaxation? Does this impact the noise impact?
Apple: we agree to derive based on 50% point.
Anritsu requests more time to see if any proposals can be endorsed"
| noted | No | ||
R5‑195689 | On UL-MIMO core requirements | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes"FR1, FR2, NSA TRx
Revised to: R5-197344.
"
| revised | No | R5‑197344 | |||
R5‑197344 | On UL-MIMO core requirements | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes"Revised from: R5-195689.
to fix the single UL to no UL CA. noted, proposal is endorsed to allow rapp to update WP aligned to RAN4 spec for RAn5#85"
| noted | No | R5‑195689 | |||
R5‑195690 | On TRx applicability rule | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes"FR1, FR2, NSA TRx
Revised to: R5-195690r1."
"Revised from: R5-195690.
need more time to discuss
Revised to: R5-195690r2."
"Revised from: R5-195690r1.
Revised to: R5-197599.
"
| revised | No | R5‑197599 | |||
R5‑197599 | On TRx applicability rule | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes"Revised from: R5-195690r2.
proposal is endorsed with a change"" To conduct following TCs with LTE anchor agnostic approach in addition to testing exceptional requirements .
Delete observation1"
| noted | No | R5‑195690 | |||
R5‑195736 | WF update for Rel-16 NR CADC band combinations WI | CMCC, Ericsson, Huawei, Qualcomm, R&S | discussion | Yes |
YesRevised to: R5-195736r1.
"Revised from: R5-195736.
Revised to: R5-195736r2."
"Revised from: R5-195736r1.
Revised to: R5-197600.
"
| revised | No | R5‑197600 | ||||
R5‑197600 | WF update for Rel-16 NR CADC band combinations WI | CMCC, Ericsson, Huawei, Qualcomm, R&S | discussion | - | Yes |
Yes"Revised from: R5-195736r2.
noted and agreement in slide 5/6 is agreed as a working assumption"
| noted | No | R5‑195736 | |||
R5‑195737 | Solution to expanding R15 38521-3 WP with placeholders | CMCC, Ericsson, Qualcomm | discussion | Yes |
Yes"This document discusses about how to expand the existing Rel-15 38.521-3 WP with placeholders to cater for the new configuration requirements of ""LTE+n*FR2 up to 5CCs"".
Revised to: R5-195737r1."
"Revised from: R5-195737.
Revised to: R5-197439.
"
| revised | No | R5‑197439 | ||||
R5‑197439 | Solution to expanding R15 38521-3 WP with placeholders | CMCC, Ericsson, Qualcomm | discussion | - | Yes |
Yes"Revised from: R5-195737r1.
The solution is implemented in the WP update for 38.521-3
same solution is to be used for WP update for -1/-2 specs"
| noted | No | R5‑195737 | |||
R5‑195912 | DUT repositioning and its relations with QoQZ for OTA measurement | Anritsu | discussion | Endorsement | Yes |
Yes"In this contribution we would clarify a definition and an applicability of DUT repositioning from multiple measurement cases and also consider its relations with the quality of quiet zone (QoQZ) MU during the OTA measurement.
Associated CR. R5-195921, R5-195922.
Wednesday MU Ad-Hoc:
Anritsu: offline discussions were held with KS. KS paper is more comprehensive.
KS: it is too late to introduce another term.
PCTEST: this document can be noted. CR in 195921 will be revised. CR in 195922 can be withdrawn."
| noted | No | ||||
R5‑195915 | DUT turnover MU for spurious region | Anritsu | discussion | Endorsement | Yes |
Yes"In this contribution we discuss an applicability of DUT turnover measurement uncertainties (MUs) to spurious emission TRP measurement. And we also discuss on assumptions to derive the DUT turnover MU.
Associated CR. R5-195920
Wednesday MU Ad-Hoc:
KS: should expect the operator to be able to flip the DUTwithin the 1 degree repositioning error used for other procedures. Need to define the error within reason.
Anritsu: only applies to spurious emissions.
KS: agree to a new MU element but we need a better definition and would like to use a different term than ""DUT Turnover"".
PCTEST: agree to P1 in principle. Will determine what term to use for ""DUT Turnover"" and will define when the MU term applies and when it does not. When it does not, need to specify what terms apply. Anritsu will revise their CR.
proposal 1 can be agreed , can be endorsed and implementation in cr 195920 to be checked to confirm "
| noted | No | ||||
R5‑195916 | Uncertainty of the absolute gain of the calibration antenna at spurious region | Anritsu | discussion | Endorsement | Yes |
Yes"In this contribution we introduce a measurement uncertainty (MU) value of the absolute gain of the calibration antenna at spurious region.
Associated CR. R5-195920.
Wednesday MU Ad-Hoc:
KS: we see MU values better than this. Cal reports show much better values than this.
PCTEST: Proposal 1 is endorsed.
[Pradeep]"
| noted | No | ||||
R5‑195918 | Mismatch MU for spurious emission measurement | Anritsu | discussion | Endorsement | Yes |
Yes"In addition to the previous proposal for spurious region (below 23.45 GHz, and 40.8 GHz to 66 GHz), we discuss on the MU value of mismatch at in-band frequency range (23.45 GHz to 40.8GHz) for spurious emission measurement.
Associated CR. R5-195920.
Wednesday MU Ad-Hoc:
No comments.
PCTEST: Proposal 1 is endorsed.
prop1 endorsed"
| noted | No | ||||
R5‑195991 | FR2 NR TT Way Forward update | Telecom Italia | discussion | Information | Yes |
YesDeferred to see if there's further updated
| noted | No | ||||
R5‑195994 | FR1 TT Way Forward update | Telecom Italia | discussion | Information | Yes |
Yescheck for update from RAN5#84
| noted | No | ||||
R5‑196028 | FR2 SNR range for RRM and Demodulation | ANRITSU LTD | discussion | Information | Yes |
Yes"The RAN4 study on NR testability TR 38.810 includes spreadsheets which predict the achievable SNR range for RRM and Demodulation test cases. RAN4 work has progressed since the achievable SNR ranges were originally estimated, so the achievable SNR range for RRM and Demodulation are being updated. The TR 38.810 update in R4-1907970 is provided here to RAN5 for information, and is subject to agreement at RAN4#92.
Agenda Allocation was changed: [5.3.5.7.2]->[5.3.5.17].
Wednesday MU Ad-Hoc:
Anritsu wanted to defer this document until Ian could be present.
Noted, no proposal to endorsed, just for information"
| noted | No | ||||
R5‑196065 | Considerations on FR2 SRS time mask for UL-MIMO TTs | Samsung R&D Institute UK | discussion | Yes |
Yes"TP analysis 6067
OFF power is TRP where as ON/OFF is EIRP as such prop1 cannot be used
also OFF power and UL-MIMO FR2 analysis is pending , wait for the conclusion of the OFF power and UL-MIMO FR2 test methods finalization before adapting to this test, indicate in the test CR (6066) that test is not testable"
| noted | No | |||||
R5‑196068 | Considerations on FR2 absolute power control method | Samsung R&D Institute UK | discussion | Yes |
Yes"TP analysis 6070
test case CR 6069, prop1, 2 can be endorsed , prop6 needs to be reworded to indicate it is for Non UL CA
step1.6 need to be discussed in another paper if needed since the beam lock unlock is already in the spec
Revised to: R5-197382."
| revised | No | R5‑197382 | ||||
R5‑197382 | Considerations on FR2 absolute power control method | Samsung R&D Institute UK | discussion | - | Yes |
Yes"Revised from: R5-196068.
prop1, 2 , 6 endorsed "
| noted | No | R5‑196068 | |||
R5‑196071 | Considerations on FR2 beam correspondence test case | Samsung R&D Institute UK | discussion | Yes |
YesTP analysis 6074
| noted | No | |||||
R5‑196282 | On fading profile power uncertainty | Anritsu | discussion | No |
Yes
| withdrawn | Yes | |||||
R5‑196360 | AP#82.22 Assumption for the CDF curve | Apple Europe Limited | discussion | Endorsement | Yes |
Yes"Monday MU Ad-Hoc:
Apple: the UE used was a metal phone with LCD. Note that the cdf is not symmetric above and below 50% and the dynamic range is quite wide.
PCTEST: can P1 be agreed?
KS: we still have issues.
Revised to: R5-197495.
"
| revised | No | R5‑197495 | |||
R5‑197495 | AP#82.22 Assumption for the CDF curve | Apple Europe Limited | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑196360 | |||
R5‑196361 | AP#83.22 Maximum difference in direction between the beam peak at NTC when compared to ETC | Apple Europe Limited | discussion | Endorsement | Yes |
Yes"Ron: Apple paper in R5-196361 can be moved from FR2 MU3 to the main FR2 RF session
Multipanel is not considered, temp compensation calibration is not considered.
Better to do a full sphere search rather than conical for ETC "
| noted | No | ||||
R5‑196362 | Discussion on AP#83.21 Spurious emission testing region | Qualcomm Finland RFFE Oy | discussion | Yes |
YesRevised to: R5-196362r1.
"Revised from: R5-196362.
Wednesday MU Ad-Hoc:
PCTEST: how does P3 hold w/o further analysis?
QC: can apply the same value. Need to evaluate the new values but it applies across the entire region.
KS: P3 seems optimistic to apply as is at all frquencies.
R&S: other uncertainties depend on frequency. we shouldn't compress into one range. Should not apply one value across all frequencies. Is the antenna assumption still valid?
QC: still valid as 8x2 is worst case. we can consider rewording P3 to be clearer.
Apple: is observation 1 based on any data or simulation?
QC: references 3&4 in this paper provide this information.
PCTEST: this document can be endorsed.
Revised to: R5-197496.
"
| revised | No | R5‑197496 | ||||
R5‑197496 | Discussion on AP#83.21 Spurious emission testing region | Qualcomm Finland RFFE Oy | discussion | - | Yes |
Yes"Revised from: R5-196362r1.
all proposals are endorsed"
| noted | No | R5‑196362 | |||
R5‑196367 | Consideration of FR2 Test Tolerance values for Spherical Coverage | Apple Europe Limited | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196393 | On FR1 TT for CA receiver tests | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes"Proposal 1 : TTDL CA (inter-band) = TT Single DL for FR1 receiver tests
equivalent CR 5685
proposal is endorsed"
| noted | No | ||||
R5‑196394 | Handling of FR1 DL CA and EN-DC in TRx tests | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yesdeferred for more time
| noted | No | ||||
R5‑196399 | FR2 environmental condition on Carrier Leakage | Apple Europe Limited | discussion | Yes |
Yes
| noted | No | |||||
R5‑196401 | FR2 environmental condition on Beam Correspondence | Apple Europe Limited | discussion | Yes |
YesRAN4 already has implemnented NTC for BC in RAN4 spec , RAN5 to follow RAN4 spec to align
| noted | No | |||||
R5‑196410 | Discussion on test configuration of FR1 Rx CA test cases | Huawei, HiSilicon | discussion | Discussion | Yes |
Yes"TC in R5-196408
Revised to: R5-196410r1."
"Revised from: R5-196410.
update the proposal to include this option for only Intraband tests where there is no additional test points for Ref sense , otherwise you will have additional test points for all Rx tests which is not justified
Revised to: R5-197602.
"
| revised | No | R5‑197602 | |||
R5‑197602 | Discussion on test configuration of FR1 Rx CA test cases | Huawei, HiSilicon | discussion | Discussion | Yes |
Yes"Revised from: R5-196410r1.
proposal is endorsed
"
| noted | No | R5‑196410 | |||
R5‑196412 | Discussion on MOP testing principle when lack of proper test point | Huawei, HiSilicon, CMCC | discussion | Endorsement | Yes |
Yes"TC in R5-196411
to see how to handle the updated tolerance from the LS which would make the MPR test limits stricter than what is in the spec today.
Noted and proposal is endorsed"
| noted | No | ||||
R5‑196423 | Discussion on FR1 UL power calculation with open loop power control | Huawei, HiSilicon | discussion | Discussion | Yes |
Yes"TC in R5-196424, common CR in R5-196441, 6442
Revised to: R5-196423r1."
"Revised from: R5-196423.
to indicate prop1,2 is only for Tx tests
Revised to: R5-197490.
"
| revised | No | R5‑197490 | |||
R5‑197490 | Discussion on FR1 UL power calculation with open loop power control | Huawei, HiSilicon | discussion | Discussion | Yes |
Yes"Revised from: R5-196423r1.
noted and proposals are endorsed"
| noted | No | R5‑196423 | |||
R5‑196437 | Discussion on EN-DC MOP for intra-band configurations | Huawei, HiSilicon | discussion | Discussion | Yes |
Yes"TC in R5-196438,R5-196439
Apple needs more time to understand the MPR calculation for 0dB
Revised to: R5-196437r1."
"Revised from: R5-196437.
Revised to: R5-197548.
"
| revised | No | R5‑197548 | |||
R5‑197548 | Discussion on EN-DC MOP for intra-band configurations | Huawei, HiSilicon | discussion | Discussion | Yes |
Yes
| noted | No | R5‑196437 | |||
R5‑196527 | NSA TT Way Forward update | Telecom Italia | discussion | Information | Yes |
YesRevised to: R5-196527r1.
"Revised from: R5-196527.
correct the error FR1 in slide 5 and also update the xls with any changes from this meeting for MU/TT
Revised to: R5-197603.
"
| revised | No | R5‑197603 | |||
R5‑197603 | NSA TT Way Forward update | Telecom Italia | discussion | Information | Yes |
Yes
| noted | No | R5‑196527 | |||
R5‑196533 | Discussion on FR1 SDR test procedure | QUALCOMM Europe Inc. - Italy | discussion | Endorsement | Yes |
Yeslate doc
"LATE DOCUMENT
implemented CR 6534
check if prop1 is needed (Justification) or we can have Test loop mode A with PDCP SDU size=0
Revised to: R5-196533r1."
"LATE DOCUMENT
Revised from: R5-196533.
Revised to: R5-197511.
"
| revised | No | R5‑197511 | |||
R5‑197511 | Discussion on FR1 SDR test procedure | QUALCOMM Europe Inc. - Italy | discussion | Endorsement | Yes |
Yes"LATE DOCUMENT
Revised from: R5-196533r1.
proposals are endorsed"
| noted | No | R5‑196533 | |||
R5‑196537 | Discussion on restructuring of min test time tables for Demod tests in Annex G | QUALCOMM Europe Inc. - Italy, Ericsson | discussion | Endorsement | Yes |
Yes"LATE DOCUMENT
update option3 with scaling factor , understanding is opiton3 is ok to be endorsed
implemented in CR 196786/7"
| noted | No | ||||
R5‑196540 | Discussion on handling 4Rx for Demod test cases | QUALCOMM Europe Inc. - Italy | discussion | Endorsement | Yes |
Yes"LATE DOCUMENT
DCM: need more time
Revised to: R5-196540r1."
"LATE DOCUMENT
Revised from: R5-196540.
have few comments on other way to implement prop1, 2, 5, reword test cases to test points, add prop3a to the body and update it to indicate those test points which dont have 4Rx requirements.
RRM proposal needs to be udpated
Revised to: R5-197509.
"
| revised | No | R5‑197509 | |||
R5‑197509 | Discussion on handling 4Rx for Demod test cases | QUALCOMM Europe Inc. - Italy | discussion | Endorsement | Yes |
Yes"LATE DOCUMENT
Revised from: R5-196540r1.
update table of derived capabilities into 38.522 spec , also add BFD tests in addition to RLM tests in section 2.4"
| noted | No | R5‑196540 | |||
R5‑196542 | Discussion on UE positioning procedure for FR2 Demod tests | QUALCOMM Europe Inc. - Italy | discussion | Endorsement | Yes |
Yes"R&S : Step6 is TE implementation specific, Step9 would be handled in isolation check
Anritsu: Does the procedure require isolation check ,
E/// : Step3 needs vendor declaration ?
Revised to: R5-196542r1."
"Revised from: R5-196542.
Revised to: R5-197552.
"
| revised | No | R5‑197552 | |||
R5‑197552 | Discussion on UE positioning procedure for FR2 Demod tests | QUALCOMM Europe Inc. - Italy | discussion | Endorsement | Yes |
Yes"Revised from: R5-196542r1.
proposals not endorsed, depdendent on RAN4 discussions"
| noted | No | R5‑196542 | |||
R5‑196572 | Impact of noise for FR2 ACLR | Anritsu | discussion | Endorsement | Yes |
Yes"Monday MU Ad-Hoc:
KS: Some comment on antenna assumptions. We didnt take into account antenna directivity for MOP and SEM. Do we need to consider?
Anritsu: core requirement is defined for MOP and SEM. Need to assume some level for ACLR because there are no core assumptions of the power level.
R&S: Anritsu had a paper to discuss the noise impact for TRP.
KS: for wanted channel, the measurement should be the same.
Anritsu: there is no core requirement for minimum TRP to use.
discussion is still pending agreement in RAN4 decision to change the type of measurmeent (TRP, EIRP)
proposals cannot be endorsed at this meeting"
| noted | No | ||||
R5‑196573 | Impact of noise for FR2 OBW | Anritsu | discussion | Endorsement | Yes |
Yes"Monday MU Ad-Hoc:
Anritsu: feedback received offline and discussions are still ongoing.
KS: Need to check with regulatory specs to see if this is possible to reduce the span. Option 3 doesn't seem to make sense. This analysis depends on the slope of the adjacent channel piece. Need UE vendor feedback. May need to use flat assumption if no feedback.
Anritsu: steeper slope is worst case so maybe it should be used as opposed to flat assumption.
Revised to: R5-196573r1."
"Revised from: R5-196573.
prop1 to be further discussed , prop2 , 3 are endorsable
no CR's implementing any of the proposals at this meeting
Revised to: R5-196573r2."
"Revised from: R5-196573r1.
Revised to: R5-197626.
"
| revised | No | R5‑197626 | |||
R5‑197626 | Impact of noise for FR2 OBW | Anritsu | discussion | Endorsement | Yes |
Yes"Revised from: R5-196573r2.
noted , prop1, 2 endorsed ."
| noted | No | R5‑196573 | |||
R5‑196576 | Discussion on common aspect of FR2 CA testing | Sporton International Inc., Huawei, HiSilicon, ECIT | discussion | Endorsement | Yes |
Yeslate doc
"LATE DOCUMENT
Revised to: R5-196576r1."
"LATE DOCUMENT
Revised from: R5-196576.
Revised to: R5-197383."
| revised | No | R5‑197383 | |||
R5‑197383 | Discussion on common aspect of FR2 CA testing | Sporton International Inc., Huawei, HiSilicon, ECIT | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑196576 | |||
R5‑196578 | DUT turnover MU for spherical coverage | Anritsu | discussion | Endorsement | Yes |
Yes"Wednesday MU Ad-Hoc:
R&S: can we make this a fixed MU and show in the description
Anritsu: Yes.
KS: not in beam lock mode during the flip in this case. Need to apply the 1 degree as with initial positioning.
Apple: agree with KS. However, the problem is after moving the device, it can move after you start the test.
KS: can we defer this document.
Revised to: R5-196578r1."
"Revised from: R5-196578.
Revised to: R5-196578r2."
"Revised from: R5-196578r1.
need more time to agree on proposals in r2
Change proposal 1 to
For EIRP and EIS spherical coverage, agree the MU term misalignment of DUT due to change of DUT orientation is negligible as far as the misalignment is within the accuracy of DUT re-positioning.
Revised to: R5-197604.
"
| revised | No | R5‑197604 | |||
R5‑197604 | DUT turnover MU for spherical coverage | Anritsu | discussion | Endorsement | Yes |
Yes"Revised from: R5-196578r2.
Noted and proposal 1 is endorsed"
| noted | No | R5‑196578 | |||
R5‑196582 | On FR2 Demodulation MU | Anritsu | discussion | Endorsement | Yes |
Yes"Wednesday MU Ad-Hoc:
R&S: issues 1&2 also depend on the UE baseband. Max SNR is not needed since the test equipment needs to be able to execute the test.
E///: better to define achievable SNR.
KS: validation can occur with exceptions.
QC: 38.810 has guidelines to determine max achievable SNR. Need to look at this and evaluate.
PCTEST: proposal is endorsed.
proposal is endorsed"
| noted | No | ||||
R5‑196585 | On the measurement grid MU for spurious emission | Anritsu | discussion | Endorsement | No |
Yes"LATE DOCUMENT
Wednesday MU Ad-Hoc:
This paper can be withdrawn."
| withdrawn | Yes | ||||
R5‑196589 | Testability of FR2 ACS and IBB | Anritsu | discussion | Endorsement | Yes |
Yes"Wednesday MU Ad-Hoc:
Merged with R5-19589, R5-196853, and R5-196870 in R5-196853r1. This document can be noted.
merged with 6853/6870, no endorsement"
| noted | No | ||||
R5‑196780 | Discussion on the relation between MPR and SEM/ACLR test cases | Ericsson | discussion | Endorsement | Yes |
Yes"CR implement 6782
deferred to have more time to check if UE power needs to be measured for ACLR and SEM , also consider having editors note to have TP analsyis to be revisited and until then the existing TP can be used.
Revised to: R5-196780r1."
"Revised from: R5-196780.
Revised to: R5-197586.
"
| revised | No | R5‑197586 | |||
R5‑197586 | Discussion on the relation between MPR and SEM/ACLR test cases | Ericsson | discussion | Endorsement | Yes |
Yes"Revised from: R5-196780r1.
noted , proposals endorsed"
| noted | No | R5‑196780 | |||
R5‑196781 | Discussion on test coverage for EN-DC configured power test case | Ericsson | discussion | Endorsement | No |
Yes"LATE DOCUMENT
"
| withdrawn | Yes | ||||
R5‑196789 | Discussion on MU, TT and UE fail rate for EIRP CDF | Ericsson | discussion | Endorsement | Yes |
Yes"Monday MU Ad-Hoc:
KS: not sure that we can agree on P1. Need UE vendor assumptions.
Anritsu: in our paper in R5-195688, we show that if we assume 100% correlation that we do not need the cdf curve assumptions. We are concerned with P3.
E///: MU really shoudl be an assymetrical quantity since the noise impact component can only add. MTSU definition should be clearer.
R&S: can you clarify P3? Assymetrical MU?
E///: Yes.
Apple: concerned with P2. 100% correlated is an extreme case.
Huawei: For P4, is influence of noise a constant value or statistical?
no endorsements"
| noted | No | ||||
R5‑196791 | Discussion on the practical outcome of Multiband relaxation in certification | Ericsson | discussion | Endorsement | Yes |
YesRevised to: R5-196791r1.
"Revised from: R5-196791.
revised to add the note about unable to share the relaxation values among different test labs
To be handled with 5527 and possibly move to JOINT on FRI
Revised to: R5-197627.
"
| revised | No | R5‑197627 | |||
R5‑197627 | Discussion on the practical outcome of Multiband relaxation in certification | Ericsson | discussion | Endorsement | Yes |
Yes"Revised from: R5-196791r1.
noted, LS to RAN4 to be sent post PVG LS response rxval"
| noted | No | R5‑196791 | |||
R5‑196814 | On TRP Grids for Spurious Emissions QoQZ | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"Wednesday MU Ad-Hoc:
Anritsu: need more time.
Thursday Update:
KS indicated that Anritsu agreed offline. If agreed, P1 and P2 are endorsed. Implemented in CR in R5-197387.
implemented in 7387 , prop1 and prop2 endorsed"
| noted | No | ||||
R5‑196815 | Proposed Text for Spurious Emissions QoQZ Procedure | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yesprefer to add the text in TS38521-2 as an ANNEX, request for late tdoc as needed for this meeting
| noted | No | ||||
R5‑196816 | On the Re-Positioning Concept for NR FR2 Test Cases | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196817 | Wireless Cable Mode Procedure for Demodulation Tests | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"The proposal is needed after Rx Beam peak direction is found
Anritsu : Step5 needs some information from UE on phases via test function which is not defined.
KEYS: Channel inversion does not necessarily need phase info , it would take longer time to get the channel inverted without phase info
R&S : Agrees with the proposal
Revised to: R5-196817r1."
"Revised from: R5-196817.
Revised to: R5-197506.
"
| revised | No | R5‑197506 | |||
R5‑197506 | Wireless Cable Mode Procedure for Demodulation Tests | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"Revised from: R5-196817r1.
noted and proposal is endorsed only for Rx beam peak"
| noted | No | R5‑196817 | |||
R5‑196818 | Min. Isolation Requirements for Wireless Cable Mode | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"This will allow replacing step9 in doc 542 ( RI =2 check)
R&S: prefers to leave the isolation limit as TBD"
| noted | No | ||||
R5‑196819 | AoA Direction Search for RRM Setups | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"more offline to check on the proposals and also ensure what can be implemented at this meeting as a proposal
only prop2 is endorsed"
| noted | No | ||||
R5‑196820 | On MU Elements for Demodulation test cases | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"Wednesday MU Ad-Hoc:
Anritsu: seems that many items in Table 1 will cancel.
KS: impact of QoQZ to frequency flatness should be studied. Should keep terms in the list and study.
Orange: why do we have DUT repositioning?
QC: how much time will it take to evaluate? can we use EIS MU values?
RAN5 RF Chair: is anyone doing an analysis of IFF v. DFF?
PCTEST: Proposals are endorsed.
QC: perhaps we can set up an MU spreadsheet with the terms as a working document.
PCTEST: QC will prepare the spreadsheet as a document for email approval.
noted and proposals are endorsed. Qualcomm to produce a MU elements xls summarizing the contents of the endorsed proposals"
| noted | No | ||||
R5‑196821 | On the MU Term Influence of TRP for spurious emissions | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"Wednesday MU Ad-Hoc:
This paper can be noted.
no endorsements"
| noted | No | ||||
R5‑196851 | Discussion on FR2 Demod MU contributors | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes"Wednesday MU Ad-Hoc:
KS: verification of channel models - can we do this in RAN5? This should be handed back to RAN4. Impact on ATF is not applicable. Keep door open for DFF&IFF as baseline for FR2.
QC: why do we need to perform channel model validation for FR2?
KS: need to do something to confirm the OTA part.
Anritsu: couldn't the channel model aspects just be handled as MU?
PCTEST: All proposals endorsed except for P5 since this conflicts with agreed proposal to keep IFF&DFF as baseline at this time in KS paper.
all props are endorsed except prop5"
| noted | No | ||||
R5‑196852 | On the SNR for FR2 TRx test cases | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes"Monday MU Ad-Hoc:
KS: Question the spherical coverage approach. It is weird to consider TT for some test cases to derive MU but not others. ACLR asssumptions may not be agreeable by UE vendors.
E///: P1 may change based on E/// paper.
no endorsements"
| noted | No | ||||
R5‑196853 | Discussion on testability of ACS and IBB | Rohde & Schwarz, Anritsu, Keysight Technologies | discussion | Endorsement | Yes |
Yes"Monday MU Ad-Hoc:
NTT DOCOMO: where is the feasible interferer level coming from for each proposal?
R&S: test equipment implementations.
PCTEST: can we agree to use the lowest interferer assumptions for each FR2 band. -53 for FR2a and -56 for FR2b and have test equipment vendors provide analysis on relaxation amount? No confirmation.
NTT DOCOMO: need to check if the 50 and 100 MHz limitations are acceptable.
R&S: we agreed to these assumptions in the last meeting.
Revised to: R5-196853r1."
"Revised from: R5-196853.
Wednesday MU Ad-Hoc:
R&S: Offline discussions were held and proposals in R5-19589, R5-196853, and R5-196870 have been merged.
PCTEST: Document is endorsed.
Revised to: R5-197497.
"
| revised | No | R5‑197497 | |||
R5‑197497 | Discussion on testability of ACS and IBB | Rohde & Schwarz, Anritsu, Keysight Technologies | discussion | Endorsement | Yes |
Yes"Revised from: R5-196853r1.
proposal is endorsed"
| noted | No | R5‑196853 | |||
R5‑196854 | Discussion on Quiet Zone sizes and measurement uncertainties | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes"Associated CRs are R5-196840 and R5-196841.
Wednesday MU Ad-Hoc:
KS: we agree with the proposals. Need an editor's note in the CRs to clarify.
PCTEST: all methods need to meet the same MTSU limit. Don't understand proposal 2.
KS: 38.903 needs to maintain different values for 15cm and 30cm for DFF.
PCTEST: If we have one table, we can't just take the 30cm table since these are not the worst case values for IFF.
R&S: OK to use worst case value.
PCTEST: Proposals are endorsed. P1 endorsed with the understanding that the worst case value will be used. R&S will prepare a revision to clarify.
Revised to: R5-196854r1."
"Revised from: R5-196854.
Revised to: R5-196854r2."
"Revised from: R5-196854r1.
Revised to: R5-197498.
"
| revised | No | R5‑197498 | |||
R5‑197498 | Discussion on Quiet Zone sizes and measurement uncertainties | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes"Revised from: R5-196854r2.
2 proposals are endorsed"
| noted | No | R5‑196854 | |||
R5‑196868 | On noise impact | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
YesRevised to: R5-196868r1.
"Revised from: R5-196868.
Monday MU Ad-Hoc:
No comments.
Revised to: R5-197499.
"
| revised | No | R5‑197499 | |||
R5‑197499 | On noise impact | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"Revised from: R5-196868r1.
no endorsements"
| noted | No | R5‑196868 | |||
R5‑196869 | FR2 OBW measurement uncertainty | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes"LATE DOCUMENT
"
| noted | No | ||||
R5‑196870 | Discussion paper on FR2 ACS and IIB | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"LATE DOCUMENT
Wednesday MU Ad-Hoc:
Merged with R5-19589, R5-196853, and R5-196870 in R5-196853r1. This document can be noted.
merged with 589 and 683
no endorsements"
| noted | No | ||||
R5‑196871 | FR2 Tx spherical coverage noise impact | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes"LATE DOCUMENT
Monday MU Ad-Hoc:
This paper can be withdrawn."
| withdrawn | Yes | ||||
R5‑196872 | FR2 ACLR noise impact | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes"LATE DOCUMENT
"
| withdrawn | Yes | ||||
R5‑196878 | Discussion on RRM FR2 test setups | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"have more offline discussions on the proposals
Revised to: R5-196878r1."
"Revised from: R5-196878.
Revised to: R5-197583.
"
| revised | No | R5‑197583 | |||
R5‑197583 | Discussion on RRM FR2 test setups | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes"Revised from: R5-196878r1.
note and proposals endorsed"
| noted | No | R5‑196878 | |||
R5‑197469 | Summary of the main changes to TS 38.522 | CMCC | discussion | discussion | Yes |
Yes"LATE DOCUMENT
The 3 proposals of the paper have been implemented in the 38.522 jumbo CR 5733"
| noted | No | ||||
R5‑197588 | WF on TX spherical coverage noise impact | Keysight Technologies, Anritsu, Rohde&Schwarz, Ericsson | discussion | discussion | Yes |
Yes"LATE DOCUMENT
way fowrad and endorsed. AP82.23 deadline is RAN5#85 for TEV to complete the simulation assumptions for influence of noise, based on AP82.22 feedback
"
| noted | No | ||||
R5‑197613 | FR2 Measurement Uncertainty (MU) / Test Tolerances (TT) Target Completion Update | PCTEST Engineering Lab | discussion | discussion | Yes |
Yes"LATE DOCUMENT
noted , target date extension endorsed in RAN5 "
| noted | No | ||||
5.3.6 | Elevation Beamforming/Full-Dimension MIMO for LTE (UID - 770062) LTE_EBF_FDMIMO-UEConTest |   | ||||||||||
5.3.6.1 | TS 36.508 |   | ||||||||||
5.3.6.2 | TS 36.521-1 | R5‑196620 | Addition of FD-MIMO test cases 9.2.4.1A & 9.2.4.2A | Qualcomm UK Ltd | CR | Agreement | Yes |
Yescover says 36.521-3!
"<3GU spec & rev issue>
Revised to: R5-196620r1."
"Revised from: R5-196620.
r1: R5-197469
Revised to: R5-197470.
"
| revised | No | R5‑197470 | |
R5‑197470 | Addition of FD-MIMO test cases 9.2.4.1A & 9.2.4.2A | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196620 | |||
5.3.6.3 | TS 36.521-2 | R5‑196701 | Addition of applicability of FD-MIMO CQI test cases | Qualcomm UK Ltd | CR | Agreement | Yes |
Yescoversheet says part-2!
reissued as R5-196945 because of wrong spec
| withdrawn | Yes | ||
R5‑196945 | Addition of applicability of FD-MIMO CQI test cases | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.6.4 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.6.5 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.3.6.6 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.7 | Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest |   | ||||||||||
5.3.7.1 | TS 36.508 |   | ||||||||||
5.3.7.2 | TS 36.521-1 | R5‑196596 | Adding feMTC test case 7.6.2EC, Out-of-band blocking for UE category M2 | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196596r1.
"Revised from: R5-196596.
r1: Solving cover page issue
Revised to: R5-197467.
"
| revised | No | R5‑197467 | |
R5‑197467 | Adding feMTC test case 7.6.2EC, Out-of-band blocking for UE category M2 | Ericsson | CR | Agreement | Yes |
Yes"Revised from: R5-196596r1.
update the test requirement to handle 16RB's "
| agreed | No | R5‑196596 | |||
5.3.7.3 | TS 36.521-2 | R5‑196607 | Adding applicability for feMTC test case 7.6.2EC, Out-of-band blocking for UE category M2 | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196607r1.
"Revised from: R5-196607.
Revised to: R5-197468.
"
| revised | No | R5‑197468 | |
R5‑197468 | Adding applicability for feMTC test case 7.6.2EC, Out-of-band blocking for UE category M2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196607 | |||
5.3.7.4 | TS 36.521-3 | R5‑196685 | Cell configuration mapping for RRM feMTC Test Cases | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑196686 | Correction of RRM feMTC Test Case 4.2.28 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196687 | Correction of RRM feMTC Test Case 4.2.29 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196688 | Correction of RRM feMTC Test Case 4.2.30 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196689 | Test system uncertainties and the Test Tolerances for RRM feMTC Test Cases | Ericsson | CR | Agreement | Yes |
Yesno overlap
| agreed | No | ||||
R5‑196691 | Addition of RRM feMTC Test Case 8.1.41 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196692 | Addition of RRM feMTC Test Case 8.1.42 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196693 | Addition of RRM feMTC Test Case 8.2.14 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.7.5 | TS 37.571-1 |   | ||||||||||
5.3.7.6 | TS 37.571-3 |   | ||||||||||
5.3.7.7 | TS 37.571-5 |   | ||||||||||
5.3.7.8 | TR 36.903 (E-UTRAN RRM TT analyses) | R5‑196690 | Test Tolerances analysis for E-UTRAN RRM feMTC Test Cases | Ericsson | CR | Agreement | Yes |
Yesreissued as R5-196944 because of wrong Rel.
| withdrawn | Yes | ||
R5‑196944 | Test Tolerances analysis for E-UTRAN RRM feMTC Test Cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.7.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.7.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.3.7.11 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.8 | Rel-15 LTE CA configurations (UID - 770064) LTE_CA_R15-UEConTest |   | ||||||||||
5.3.8.1 | TS 36.508 | R5‑196558 | Addition of test freq for CA_1A-1A to 36.508 | Huawei,Hisilicon | CR | Agreement | Yes |
YesRevised to: R5-196558r1.
"Revised from: R5-196558.
r1: Correct the typo of CC1 BW
Revised to: R5-197453.
"
| revised | No | R5‑197453 | |
R5‑197453 | Addition of test freq for CA_1A-1A to 36.508 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196558 | |||
5.3.8.2 | TS 36.521-1 | R5‑195534 | Adding CA_66B and CA_66C on Table 6.2.2A.0-2 | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑195535 | Adding CA_66B and CA_66C on Table 6.2.2A.1.5-1: CA UE Power Class test requirements | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195536 | adding Test points on Table 6.2.5A.1.4.1-1: Test Configuration Table for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195537 | Addind test points on on Table 6.3.5A.3.1.4.1-1, Table 6.3.5A.3.1.4.1-2 and correction of test point on 6.3.5A.3.1.4.1-2 | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195538 | Adding points 25 25 & 75 25 on Table 6.3.5A.2.1.4.1-1 Test Configuration Table for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195539 | Adding points 25 25 & 75 25 that are missing on Table 6.5.2A.3.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195540 | Adding missing test points on Table 6.2.2A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195541 | Adding points 25 25, & 75 25 that are missing on Table 6.6.2.3A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195542 | Adding points 25 25, & 75 25 that are missing on Table 6.6.2.3A.1_1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195543 | Adding points 25 25, & 75 25 that are missing on Table 6.6.3.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195544 | Adding points 25 25, & 75 25 that are missing on Table 6.7A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195545 | Adding points 25 25, & 75 25 that are missing on Table 7.3A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195546 | Adding points 25 25, & 75 25 that are missing on Table 7.4A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195547 | Adding points 25 25, & 75 25 that are missing on Table 7.5A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195548 | Adding points 25 25, & 75 25 that are missing on Table 7.6.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195549 | Adding points 25 25, & 75 25 that are missing on Table 7.6.2A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195550 | Adding points 25 25, & 75 25 that are missing on Table 7.8.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195551 | Adding points 25 25, 15 75 &75 25 on Table 6.5.2A.2.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195552 | Adding points 25 25, 25 75 & 75 25 that are missing on Table 6.6.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195553 | Adding Test Points on Table 6.3.2A.1.4.1-1: Test Configuration Table for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195554 | aDDING TEST POINTS on Table 6.3.4A.1.1.4.1-1: Test Configuration Tablefor UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195555 | Adding test points on Table 6.3.5A.1.1.4.1-1: Test Configuration Table for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195556 | Adding Test points on Table 6.5.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195704 | Addition of new TC 6.2.2A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195705 | Addition of new TC 6.2.3A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
YesRevised to: R5-195705r1.
"Revised from: R5-195705.
Revised to: R5-195705r2."
"Revised from: R5-195705r1.
Revised to: R5-197449.
"
| revised | No | R5‑197449 | |||
R5‑197449 | Addition of new TC 6.2.3A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yesagreed. Later revised bec of wrong rev.
| revised | No | R5‑197298 | R5‑195705 | ||
R5‑197298 | Addition of new TC 6.2.3A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197449 | |||
R5‑195706 | Addition of new TC 6.2.4A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195707 | Addition of new TC 6.2.5A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195708 | Addition of new TC 6.3.2A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195709 | Addition of new TC 6.3.3A.5 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195710 | Update table 6.2.2A.0-1 of TS 36.521-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195745 | Adding Bandwidth combination for FDD CA on Table 8.1.2.2-2 for 7A-7A BW SET 3 | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195759 | Adding CA_66B and CA_66C on Table 6.2.2A.0-2: CA UE Power Class for intraband contiguous CA | DEKRA | CR | Agreement | Yes |
Yesmerged into Anritsu R5-196221(WI: TEI10_Test) to solve overlaps
| withdrawn | Yes | ||||
R5‑195760 | Adding CA_66B and CA_66C on Table 6.2.2A.1.5-1 CA UE Power Class test requirements | DEKRA | CR | Agreement | Yes |
Yesr2 was presented.
| revised | No | R5‑197268 | |||
R5‑197268 | Adding CA_66B and CA_66C on Table 6.2.2A.1.5-1 CA UE Power Class test requirements | DEKRA | CR | Agreement | Yes |
Yesblock agreed in the joint on Fri.
| agreed | No | R5‑195760 | |||
R5‑195761 | Adding points 25 25 QPSK 8 P_8@0 S_0@0 - - 75 25 QPSK 8 P_8@0 S_0@0 on Table 6.2.5A.1.4.1-1: | DEKRA | CR | Agreement | Yes |
Yesmerged into Anritsu R5-196221(WI: TEI10_Test) to solve overlaps
| withdrawn | Yes | ||||
R5‑195762 | Adding test points on on Table 6.3.5A.3.1.4.1-2 Correction on Table 6.3.5A.3.1.4.1-2 changing the point 2575 into 75 | DEKRA | CR | Agreement | Yes |
Yesr2 was produced.
| revised | No | R5‑197269 | |||
R5‑197269 | Adding test points on on Table 6.3.5A.3.1.4.1-2 Correction on Table 6.3.5A.3.1.4.1-2 changing the point 2575 into 75 | DEKRA | CR | Agreement | Yes |
Yesblock agreed in the joint on Fri.
| agreed | No | R5‑195762 | |||
R5‑195763 | Adding points 25 25 & 75 25 on Table 6.3.5A.2.1.4.1-1: Test Configuration Table for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195763r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195763.
| revised | No | R5‑197275 | |||
R5‑197275 | Adding points 25 25 & 75 25 on Table 6.3.5A.2.1.4.1-1: Test Configuration Table for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195763 | |||
R5‑195764 | Adding points 25 25 & 75 25 that are missing on Table 6.5.2A.3.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195764r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195764.
| revised | No | R5‑197276 | |||
R5‑197276 | Adding points 25 25 & 75 25 that are missing on Table 6.5.2A.3.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195764 | |||
R5‑195765 | Adding missing Test Points on Table 6.2.2A.1.4.1-1 | DEKRA | CR | Agreement | Yes |
Yesmerged into Anritsu R5-196221(WI: TEI10_Test) to solve overlaps
| withdrawn | Yes | ||||
R5‑195766 | Adding points 25 25, & 75 25 that are missing on Table 6.6.2.3A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesmerged into Anritsu R5-196221(WI: TEI10_Test) to solve overlaps
| withdrawn | Yes | ||||
R5‑195767 | Adding points 25 25, & 75 25 that are missing on Table 6.6.2.3A.1_1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesmerged into Anritsu R5-196221(WI: TEI10_Test) to solve overlaps
| withdrawn | Yes | ||||
R5‑195768 | Adding points 25 25, & 75 25 that are missing on Table 6.6.3.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesmerged into Anritsu R5-196221(WI: TEI10_Test) to solve overlaps
| withdrawn | Yes | ||||
R5‑195769 | Adding points 25 25, & 75 25 that are missing on Table 6.7A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195769r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195769.
| revised | No | R5‑197277 | |||
R5‑197277 | Adding points 25 25, & 75 25 that are missing on Table 6.7A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195769 | |||
R5‑195770 | Adding points 25 25, & 75 25 that are missing on Table 7.3A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195770r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195770.
| revised | No | R5‑197278 | |||
R5‑197278 | Adding points 25 25, & 75 25 that are missing on Table 7.3A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195770 | |||
R5‑195771 | Adding points 25 25, & 75 25 that are missing on Table 7.4A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195771r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195771.
| revised | No | R5‑197279 | |||
R5‑197279 | Adding points 25 25, & 75 25 that are missing on Table 7.4A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195771 | |||
R5‑195772 | Adding points 25 25, & 75 25 that are missing on Table 7.5A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195772r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195772.
| revised | Yes | R5‑197280 | |||
R5‑197280 | Adding points 25 25, & 75 25 that are missing on Table 7.5A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195772 | |||
R5‑195773 | Adding points 25 25, & 75 25 that are missing on Table 7.6.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195773r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195773.
| revised | No | R5‑197281 | |||
R5‑197281 | Adding points 25 25, & 75 25 that are missing on Table 7.6.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195773 | |||
R5‑195774 | Adding points 25 25, & 75 25 that are missing on Table 7.6.2A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195774r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195774.
| revised | No | R5‑197282 | |||
R5‑197282 | Adding points 25 25, & 75 25 that are missing on Table 7.6.2A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195774 | |||
R5‑195775 | Adding points 25 25, & 75 25 that are missing on Table 7.8.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195775r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195775.
| revised | No | R5‑197283 | |||
R5‑197283 | Adding points 25 25, & 75 25 that are missing on Table 7.8.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195775 | |||
R5‑195776 | Adding points 25 25, 15 75 &75 25 on Table 6.5.2A.2.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195776r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195776.
| revised | No | R5‑197284 | |||
R5‑197284 | Adding points 25 25, 15 75 &75 25 on Table 6.5.2A.2.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195776 | |||
R5‑195777 | Adding points 25 25, 25 75 & 75 25 that are missing on Table 6.6.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Revised to: R5-195777r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195777.
| revised | No | R5‑197285 | |||
R5‑197285 | Adding points 25 25, 25 75 & 75 25 that are missing on Table 6.6.1A.1.4.1-1 for UL-CA_66B | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195777 | |||
R5‑195778 | Adding missing test points on Table 6.3.2A.1.4.1-1 | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Adding points 25 25 QPSK 50 P_25@0 S_25@0 - - 75 25 QPSK 100 P_75@0 S_25@0 on Table 6.3.2A.1.4.1-1: Test Configuration Table for UL-CA_66B
Revised to: R5-195778r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195778.
| revised | No | R5‑197286 | |||
R5‑197286 | Adding missing test points on Table 6.3.2A.1.4.1-1 | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195778 | |||
R5‑195779 | Adding missing test points on Table 6.3.4A.1.1.4.1-1: | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
adding points 25 25 QPSK 50 P_25@0 S_25@0 - - 75 25 QPSK 100 P_75@0 S_25@0 on Table 6.3.4A.1.1.4.1-1: Test Configuration Tablefor UL-CA_66B
Revised to: R5-195779r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195779.
| revised | No | R5‑197287 | |||
R5‑197287 | Adding missing test points on Table 6.3.4A.1.1.4.1-1: | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195779 | |||
R5‑195780 | Adding missing test points on Table 6.3.5A.1.1.4.1-1 | DEKRA | CR | Agreement | Yes |
Yesr1 was produced. Withdrawn.
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
adding points 25 25 QPSK 50 P_25@0 S_25@0 - - 75 25 QPSK 100 P_75@0 S_25@0 on Table 6.3.5A.1.1.4.1-1: Test Configuration Table for UL-CA_66B
Revised to: R5-195780r1."
"/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.8.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Revised from: R5-195780.
| revised | Yes | R5‑197288 | |||
R5‑197288 | Adding missing test points on Table 6.3.5A.1.1.4.1-1 | DEKRA | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑195780 | |||
R5‑195781 | adding missing test points on Table 6.5.1A.1.4.1-1 | DEKRA | CR | Agreement | Yes |
Yesmerged into Anritsu R5-196221(WI: TEI10_Test) to solve overlaps
r1 was produced. Withdrawn.
| withdrawn | Yes | ||||
R5‑195852 | Correction of Test Setting CA_1A-3A-41C | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196061 | Introduction of Aggregate Power Control Tolerance for 4UL CA test case | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196062 | Introduction of power control absolute power tolerance for 4UL CA test case | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196063 | Introduction of transmit intermodulation for 4UL CA test case | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196083 | Introduction of uncertainties and TTs in Annex F for some 4UL CA test cases | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes"<3GU title issue>
TdocList_master_local_R5#84_2608 updated title to align tdoc 6083, no action need"
| agreed | No | ||||
R5‑196142 | New Tx test case 6.5.1A.5 Frequency Error for 4UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196143 | New Tx test case 6.5.2A.1.5 Error Vector Magnitude (EVM) for 4UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196144 | New Tx test case 6.5.2A.2.5 Carrier leakage for 4UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196145 | New Tx test case 6.5.2A.3.5 In-band emissions for non allocated RB for 4UL CA | KTL, MTCC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196146 | New Tx test case 6.6.1A.5 Occupied bandwidth for 4UL CA | KTL, MTCC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196147 | Addition of Annex F of Tx test cases for 4UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196221 | Correction to test configuration tables for intra-contiguous 2CA Tx tests | AnritsuAnritsu, Dekra Testing and Certification | CR | Agreement | Yes |
YesTEI10->CA_R15 to include Dekra CRs.
"Content from DEKRA's CR will be moved into the revision of 6221
Agenda Allocation was changed: [5.4.1.2.1]->[5.3.8.2].
Revised to: R5-196221r1."
"Revised from: R5-196221.
Content from DEKRA R5-195765, R5-195759, R5-195761, R5-195781, R5-195766, R5-195767, R5-195768 merged in
Revised to: R5-197605.
"
| revised | No | R5‑197605 | |||
R5‑197605 | Correction to test configuration tables for intra-contiguous 2CA Tx tests | AnritsuAnritsu, Dekra Testing and Certification | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196221 | |||
R5‑196450 | Introduction of FDD PDSCH Closed Loop Multi Layer Spatial Multiplexing 4x2 for 6DL CA | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196451 | Update to FDD 6 DL CA Single Antenna and Open Loop Spatial Multiplexing 2x2 Performance test cases | LG Electronics | CR | Agreement | Yes |
YesRevised to: R5-196451r1.
"Revised from: R5-196451.
Revised to: R5-197448.
"
| revised | No | R5‑197448 | |||
R5‑197448 | Update to FDD 6 DL CA Single Antenna and Open Loop Spatial Multiplexing 2x2 Performance test cases | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196451 | |||
R5‑196513 | Introduction of TDD FDD CA PDSCH Single Antenna Port Performance for FDD PCell 6DL CA | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196515 | Introduction of TDD FDD CA PDSCH Single Antenna Port Performance for TDD PCell 6DL CA | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196548 | Update REFSENS of CA_8A-40C configuration in 7.3A.5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196549 | Update REFSENS of CA_8A-20A-28A configuration in 7.3A.5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196550 | Update REFSENS of CA_3A-28A-38A configuration in 7.3A.5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196551 | Update REFSENS of CA_1A-8A-38A configuration in 7.3A.5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196552 | Update REFSENS of CA_1A-1A configuration in 7.3A.4 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196553 | Update REFSENS of CA_1A-1A-7A configuration in 7.3A.5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196557 | Update REFSENS of 2DL CA for multiple CA configurations in 7.3A.3 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.8.3 | TS 36.521-2 | R5‑196059 | Introduction of Power Control and Transmit Intermodulation for 4UL CA applicability | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196152 | Applicability and ICS for 4UL CA Tx test cases | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196568 | Addition of Re-15 capabilitys of multiple CA in 36.521-2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.8.4 | TS 36.521-3 |   | ||||||||||
5.3.8.5 | TS 37.571-1 |   | ||||||||||
5.3.8.6 | TS 37.571-3 |   | ||||||||||
5.3.8.7 | TS 37.571-5 |   | ||||||||||
5.3.8.8 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.8.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.8.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑196559 | Addition of TP analysis for CA_8A-40C to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196560 | Addition of TP analysis for CA_8A-20A-28A to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196561 | Addition of TP analysis for CA_3A-28A-38A to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196562 | Addition of TP analysis for CA_1A-8A-38A to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196563 | Addition of TP analysis for CA_1A-1A-7A to 36.905 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.8.11 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.9 | Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest |   | ||||||||||
5.3.9.1 | TS 36.521-1 | R5‑196893 | A-MPR for CA -- intra-band contiguous DL CA and UL CA | Sprint Corporaton | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||
5.3.9.2 | TS 36.521-2 |   | ||||||||||
5.3.9.3 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.3.9.4 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.10 | LTE bands with UE category M2 and/or NB2 in Rel-15 (UID - 780067) LTE_bands_R15_M2_NB2-UEConTest |   | ||||||||||
5.3.10.1 | TS 36.508 |   | ||||||||||
5.3.10.2 | TS 36.521-1 |   | ||||||||||
5.3.10.3 | TS 36.521-2 |   | ||||||||||
5.3.10.4 | TS 36.521-3 |   | ||||||||||
5.3.10.5 | TS 37.571-1 |   | ||||||||||
5.3.10.6 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.11 | 450 MHz Band for LTE in Region 3 (UID - 790058) LTE450_Reg3-UEConTest | R5‑196027 | Addition of Band 73 to signalling ICS | China Unicom | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑196808 | Addition of Band 73 to signalling ICS | China Unicom | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196809 | Addition of Band 73 to signalling ICS | China Unicom | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
5.3.11.1 | TS 34.121-1 | R5‑196608 | Band 73 information to E-UTRA band group in 34.121-1 | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196629 | Band 73 protection to 34.121-1 spurious emissions | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.11.2 | TS 36.508 |   | ||||||||||
5.3.11.3 | TS 36.521-1 |   | ||||||||||
5.3.11.4 | TS 36.521-2 |   | ||||||||||
5.3.11.5 | TS 36.521-3 | R5‑196634 | Band 73 information to E-UTRA band group in 36.521-3 | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.11.6 | TS 37.571-1 |   | ||||||||||
5.3.11.7 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.12 | Rel-16 CA configurations (UID - 810061) LTE_CA_R16-UEConTest |   | ||||||||||
5.3.12.1 | TS 36.508 |   | ||||||||||
5.3.12.2 | TS 36.521-1 | R5‑195840 | CA_1A-18A-42A - Updates of 7.3A.5 REFSENS | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑195846 | CA_18A-42C - Updates of 7.3A.5 REFSENS | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195849 | CA_1A-3A-18A-42A - Updates of 7.3A.9 REFSENS | KDDI Corporation | CR | Agreement | Yes |
YesRevised to: R5-195849r1.
"Revised from: R5-195849.
TP analysis in 5850
r1: Correction of ref sense value in Table 7.3A.9.5-3.
Revised to: R5-197465.
"
| revised | No | R5‑197465 | |||
R5‑197465 | CA_1A-3A-18A-42A - Updates of 7.3A.9 REFSENS | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195849 | |||
R5‑196080 | Aligning CA delta TiB in clause 6.2.5.3 with TS 36.101 v16.2.0 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196081 | Aligning CA delta RiB in clause 7.3.3 with TS 36.101 v16.2.0 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196506 | Align CA information in clause 5 with core specificaiton | Bureau Veritas | CR | Agreement | Yes |
YesTS36.101 v16.2.0 alignment for clause 5 CA band and bandwidth information
| agreed | No | ||||
R5‑196507 | Align clause 7.3A.0 with core specificaiton | Bureau Veritas | CR | Agreement | Yes |
YesTS36.101 v16.2.0 alignment for clause 7.3A.0 minimum conformance requirements for RefSens CA
| agreed | No | ||||
R5‑196571 | Correction of table 7.3A.0-3 in 36.521-1 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197466 | |||
R5‑197466 | Correction of table 7.3A.0-3 in 36.521-1 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196571 | |||
R5‑196619 | Updates of Rel-16 CA configuration | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.12.3 | TS 36.521-2 |   | ||||||||||
5.3.12.4 | TS 36.521-3 |   | ||||||||||
5.3.12.5 | TS 37.571-1 |   | ||||||||||
5.3.12.6 | TS 37.571-3 |   | ||||||||||
5.3.12.7 | TS 37.571-5 |   | ||||||||||
5.3.12.8 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.12.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.12.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑195843 | New CA band combination CA_1A-18A-42A - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
YesRevised to: R5-195843r1.
"Revised from: R5-195843.
TC in 5840
r1: Correct the wrong work item code in this cover sheet.
Revised to: R5-197462.
"
| revised | No | R5‑197462 | |
R5‑197462 | New CA band combination CA_1A-18A-42A - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195843 | |||
R5‑195847 | New CA band combination CA_18A-42C - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
YesRevised to: R5-195847r1.
"Revised from: R5-195847.
TC in 5846
r1: Correct the wrong work item code in this cover sheet.
Revised to: R5-197463.
"
| revised | No | R5‑197463 | |||
R5‑197463 | New CA band combination CA_18A-42C - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195847 | |||
R5‑195850 | New CA band combination CA_1A-3A-18A-42A - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
YesRevised to: R5-195850r1.
"Revised from: R5-195850.
TC in 5849
r1: Correct the wrong work item code in this cover sheet.
Revised to: R5-197464.
"
| revised | No | R5‑197464 | |||
R5‑197464 | New CA band combination CA_1A-3A-18A-42A - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195850 | |||
5.3.12.11 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.13 | Shortened TTI and processing time for LTE (UID - 820064) LTE_sTTIandPT-UEConTest |   | ||||||||||
5.3.13.1 | TS 36.508 |   | ||||||||||
5.3.13.2 | TS 36.521-1 |   | ||||||||||
5.3.13.3 | TS 36.521-2 |   | ||||||||||
5.3.13.4 | TS 36.521-3 |   | ||||||||||
5.3.13.5 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.13.6 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.3.13.7 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.14 | Enhancing LTE CA Utilization (UID - 820066) LTE_euCA-UEConTest |   | ||||||||||
5.3.14.1 | TS 36.508 |   | ||||||||||
5.3.14.2 | TS 36.521-2 |   | ||||||||||
5.3.14.3 | TS 36.521-3 |   | ||||||||||
5.3.14.4 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.14.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.15 | REL-16 NR CA and DC; and NR and LTE DC Configurations (UID-830083) NR_CADC_NR_LTE_DC_R16-UEConTest |   | ||||||||||
5.3.15.1 | TS 38.508-1 |   | ||||||||||
5.3.15.2 | TS 38.508-2 | R5‑196258 | Addition of NR FR1 intraband non-contiguous and interband CA tables with combinations CA_66(2A), CA_n66A-n70A, CA_n66A-n71A, CA_n70A-n71a, CA_n66B-n70A, CA_n66(2A)-n70A, CA_n66(2A)-n71A to 38.508-2 | WE Certification Oy, DISH Network | CR | Agreement | Yes |
YesRevised to: R5-196258r1.
"Revised from: R5-196258.
r1: Document format changed from docx to doc
Revised to: R5-197440.
"
| revised | No | R5‑197440 | |
R5‑197440 | Addition of NR FR1 intraband non-contiguous and interband CA tables with combinations CA_66(2A), CA_n66A-n70A, CA_n66A-n71A, CA_n70A-n71a, CA_n66B-n70A, CA_n66(2A)-n70A, CA_n66(2A)-n71A to 38.508-2 | WE Certification Oy, DISH Network | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196258 | |||
R5‑196391 | Updates of SA information | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes"wrong WIC, shall be Rel-15 5G NR WI, request the late tdoc
"
| withdrawn | Yes | ||||
R5‑196392 | Updates of NSA information | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yesmerged in R5-197442
| withdrawn | Yes | ||||
5.3.15.3 | TS 38.521-1 |   | ||||||||||
5.3.15.3.1 | Tx Requirements (Clause 6) |   | ||||||||||
5.3.15.3.2 | Rx Requirements (Clause 7) |   | ||||||||||
5.3.15.3.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑196026 | Update of operating bands and channel arrangement to TS38.521-1 g00 | China Unicom, WE Certification, DISH Network | CR | Agreement | Yes |
Yes"Agenda Allocation was changed: [5.3.5.4.3]->[5.3.15.3.3].
And Change of WIC
Revised to: R5-196026r1."
"Revised from: R5-196026.
r1: editorial and coversheet corrections; Removed all NR R16 new bands and related CA configurations to make sure R16 new bands introduction are aligned with new NR band WI
Revised to: R5-196026r2."
"Revised from: R5-196026r1.
r2: Addition of Co-source company; Removed all CA configurations of R16 new band n48 since it is not introduced in RAN5 yet
Revised to: R5-196026r3."
"Revised from: R5-196026r2.
r3: Removed all unassigned R16 CA combos from NR_CADC_NR_LTE_DC_R16-UEConTest WP at RAN5#84
Revised to: R5-197587.
"
| revised | No | R5‑197587 | |
R5‑197587 | Update of operating bands and channel arrangement to TS38.521-1 g00 | China Unicom, WE Certification, DISH Network | CR | Agreement | Yes |
Yesagreed. rev wrong on cover.
| revised | No | R5‑197634 | R5‑196026 | ||
R5‑197634 | Update of operating bands and channel arrangement to TS38.521-1 g00 | China Unicom, WE Certification, DISH Network | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197587 | |||
R5‑196257 | Addition of NR CA combinations CA_n66B, CA_66(2A), CA_n66A-n70A, CA_n66A-n71A, CA_n70A-n71a, CA_n66B-n70A, CA_n66(2A)-n70A, CA_n66(2A)-n71A to 38.521-1 | WE Certification Oy, DISH Network | CR | Agreement | Yes |
Yes"
| withdrawn | Yes | ||||
5.3.15.4 | TS 38.521-2 |   | ||||||||||
5.3.15.4.1 | Tx Requirements (Clause 6) |   | ||||||||||
5.3.15.4.2 | Rx Requirements (Clause 7) |   | ||||||||||
5.3.15.4.3 | Other Clauses (i.e. Clauses 1-5, Annexes) |   | ||||||||||
5.3.15.5 | TS 38.521-3 |   | ||||||||||
5.3.15.5.1 | Tx Requirements (Clause 6) | R5‑195697 | Correction of test case numbering for UL CA | NTT DOCOMO, INC. | CR | Agreement | Yes |
YesRevised to: R5-195697r1.
"Revised from: R5-195697.
r1: Header of MOP TCs was corrected
Revised to: R5-197441.
"
| revised | No | R5‑197441 | |
R5‑197441 | Correction of test case numbering for UL CA | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195697 | |||
5.3.15.5.2 | Rx Requirements (Clause 7) |   | ||||||||||
5.3.15.5.3 | Other Clauses (i.e. Clauses 1-5, Annexes) | R5‑196446 | Editorial update of general sections adding Rel-16 EN-DC configurations | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.15.6 | TS 38.521-4 |   | ||||||||||
5.3.15.6.1 | Conducted Demod Performance and CSI Reporting Requirements (Clauses 5&6) |   | ||||||||||
5.3.15.6.2 | Radiated Demod Performance and CSI Reporting Requirements (Clauses 7&8) |   | ||||||||||
5.3.15.6.3 | Interworking Demod Performance and CSI Reporting Requirements (Clauses 9&10) |   | ||||||||||
5.3.15.6.4 | Other Clauses (i.e. Clauses 1-4, Annexes) |   | ||||||||||
5.3.15.7 | TS 38.522 |   | ||||||||||
5.3.15.8 | TS 38.533 |   | ||||||||||
5.3.15.8.1 | EN-DC with all NR cells in FR1 (Clause 4) |   | ||||||||||
5.3.15.8.2 | EN-DC with at least 1 NR Cell in FR2 (Clause5) |   | ||||||||||
5.3.15.8.3 | NR Standalone in FR1 (Clause 6) |   | ||||||||||
5.3.15.8.4 | NR standalone with at least one NR cell in FR2 (Clause7) |   | ||||||||||
5.3.15.8.5 | Other Clauses (i.e. Clauses 1-3, Annexes) |   | ||||||||||
5.3.15.9 | TR 38.903 ((NR MU & TT analyses) |   | ||||||||||
5.3.15.10 | TR 38.905 (NR Test Points Radio Transmission and Reception) | R5‑196445 | Correction of 4.5 to add DC_3A-n41 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.15.11 | Discussion Papers, Work Plan, TC lists | R5‑195739 | Checklist - NR_Rel-16_CA_DC for RAN5#84 | CMCC, Ericsson, Huawei, Qualcomm | discussion | Yes |
Yes"LATE DOCUMENT
noted as a working assumption , any changes to the checklist in future will be adapted"
| noted | No | |||
5.3.16 | Enhancements on Full-Dimension (FD) MIMO for LTE (UID - 830085) LTE_eFDMIMO-UEConTest |   | ||||||||||
5.3.16.1 | TS 36.508 |   | ||||||||||
5.3.16.2 | TS 36.521-1 |   | ||||||||||
5.3.16.3 | TS 36.521-2 |   | ||||||||||
5.3.16.4 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.16.5 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.3.16.6 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.3.17 | Study on 5G NR UE Application Layer Data Throughput Performance (UID - 840090) FS_UE_5GNR_App_Data_Perf |   | ||||||||||
5.3.17.1 | 5G NR UE Application Layer Data Throughput Performance (TR 37.901-5) |   | ||||||||||
5.3.17.2 | Discussion Papers, Work Plan, TC lists | R5‑196898 | Skeleton and Initial Baseline Text for TR 37.901-5 | Qualcomm communications-France | discussion | Agreement | Yes |
YesRevised to: R5-196898r1.
"Revised from: R5-196898.
Revised to: R5-197487.
"
| revised | No | R5‑197487 | |
R5‑197487 | Skeleton and Initial Baseline Text for TR 37.901-5 | Qualcomm communications-France | discussion | Agreement | Yes |
Yes"Revised from: R5-196898r1.
just noted , 912 was endorsed to be implemtend into 37.901-5"
| noted | No | R5‑196898 | |||
R5‑196900 | Discussion on Work Plan for TR 37.901-5 | Qualcomm communications-France, PCTest Engineering Lab | discussion | Agreement | Yes |
YesRevised to: R5-196900r1.
"Revised from: R5-196900.
Revised to: R5-196900r2."
"Revised from: R5-196900r1.
Revised to: R5-197479.
"
| revised | No | R5‑197479 | |||
R5‑197479 | Discussion on Work Plan for TR 37.901-5 | Qualcomm communications-France, PCTest Engineering Lab | discussion | Agreement | No |
Yes"Revised from: R5-196900r2.
noted proposals are endorsed in the WP 901"
| noted | No | R5‑196900 | |||
R5‑196901 | Work Plan for TR 37.901-5 | Qualcomm communications-France | Work Plan | Agreement | Yes |
YesRevised to: R5-196901r1.
"Revised from: R5-196901.
Revised to: R5-196901r2."
"Revised from: R5-196901r1.
Revised to: R5-197480.
"
| revised | No | R5‑197480 | |||
R5‑197480 | Work Plan for TR 37.901-5 | Qualcomm communications-France | Work Plan | Agreement | Yes |
Yes"Revised from: R5-196901r2.
WP is endorsed as starting point , expectation is it will evolve as needed during the course of the SI
"
| noted | No | R5‑196901 | |||
R5‑196904 | TP for TR 37.901-5 on Definition of 5G NR UE Application Layer Data Throughput | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
YesRevised to: R5-196904r1.
"Revised from: R5-196904.
Revised to: R5-197482.
"
| revised | No | R5‑197482 | |||
R5‑197482 | TP for TR 37.901-5 on Definition of 5G NR UE Application Layer Data Throughput | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes"Revised from: R5-196904r1.
Noted, content of 5.1 is endorsed"
| noted | No | R5‑196904 | |||
R5‑196905 | TP for TR 37.901-5 on Parameters for Measurement | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yescontent of section 5.2 is endorsed to be implenmented in draft spec 37.901-5
| noted | No | ||||
R5‑196906 | TP for TR 37.901-5 on Test Configurations | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes"LATE DOCUMENT
Revised to: R5-196906r1."
"LATE DOCUMENT
Revised from: R5-196906.
Revised to: R5-197483.
"
| revised | No | R5‑197483 | |||
R5‑197483 | TP for TR 37.901-5 on Test Configurations | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes"LATE DOCUMENT
Revised from: R5-196906r1.
content of section 5.3 is endorsed to be implenmented in draft spec 37.901-5"
| noted | No | R5‑196906 | |||
R5‑196907 | TP for TR 37.901-5 on Transport and Application Layer Protocols | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
YesRevised to: R5-196907r1.
"Revised from: R5-196907.
Revised to: R5-197484.
"
| revised | No | R5‑197484 | |||
R5‑197484 | TP for TR 37.901-5 on Transport and Application Layer Protocols | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes"Revised from: R5-196907r1.
content of section 5.4 is endorsed to be implenmented in draft spec 37.901-5"
| noted | No | R5‑196907 | |||
R5‑196908 | TP for TR 37.901-5 on Test Environment | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yescontent of section 5.5 is endorsed to be implemented in draft spec 37.901-5
| noted | No | ||||
R5‑196909 | TP for TR 37.901-5 on Data Transfer Scenarios | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
YesRevised to: R5-196909r1.
"Revised from: R5-196909.
Revised to: R5-197485.
"
| revised | No | R5‑197485 | |||
R5‑197485 | TP for TR 37.901-5 on Data Transfer Scenarios | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes"Revised from: R5-196909r1.
content of section 5.6 is endorsed to be implenmented in draft spec 37.901-5"
| noted | No | R5‑196909 | |||
R5‑196910 | TP for TR 37.901-5 on Test Procedure Structure and Content for App Tput measurements | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes"LATE DOCUMENT
contents of section A.2.1.1 is endorsed to be implemented in draft 37.901-5"
| noted | No | ||||
R5‑196911 | TP for TR 37.901-5 on Test System Uncertainty and Test Tolerance | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yescontents of section 5.9 is endorsed to be implemented in draft 37.901-5 with a change to split FR1 and FR2 test tolerances in separate subsections
| noted | No | ||||
R5‑196912 | TP for TR 37.901-5 to update with test case structure | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes
| revised | No | R5‑197481 | |||
R5‑197481 | TP for TR 37.901-5 to update with test case structure | Qualcomm Technologies Netherlands B.V. | discussion | Agreement | Yes |
Yes"LATE DOCUMENT
Revised from: R5-196912.
Revised from: R5-196912. noted and endorsed, update the secitons to align with WP"
| noted | No | R5‑196912 | |||
5.4 | Routine Maintenance for LTE only TEIx_Test |   | ||||||||||
5.4.1 | LTE RF |   | ||||||||||
5.4.1.1 | TS 36.508 | R5‑196125 | Addition of NB-IOT test frequencies for band FDD85 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesRevised to: R5-196125r1.
"Revised from: R5-196125.
r1: added Ext_B12_LTE-UEConTest WI to the WIC (already closed in RAN5 #83, but added for reference); Corrected NB-IOT Guardband frequencies to match R5-196836
Revised to: R5-196125r2."
"Revised from: R5-196125r1.
r2: added band FDD 85 to Table 8.3.2.3.1-1 for signalling
R&S: need final and move to joint. Signalling wants to see this, TF160 shared interest
Revised to: R5-197474.
"
| revised | No | R5‑197474 | |
R5‑197474 | Addition of NB-IOT test frequencies for band FDD85 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesagreed in the joint on Fri.
| agreed | No | R5‑196125 | |||
R5‑196599 | Correction SIB5-NB for RRM inter-frequency tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196760 | Addition of TDD reference test frequencies for CA in operating band 41 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196838 | Typo corrections on NB-IoT test frequencies | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.4.1.2 | TS 36.521-1 |   | ||||||||||
5.4.1.2.1 | Tx Requirements (Clause 6) | R5‑196222 | Correction on NPRACH CP length configuration | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196225 | Correction to protected band configuration for band 85 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196861 | Updating test case 6.2.4A.2_2 | Intel | CR | Agreement | Yes |
YesModifying the incorrect RB numbers.
| agreed | No | ||||
R5‑196863 | Updating test case 6.6.1A.4 | Intel | CR | Agreement | Yes |
YesChanging TBDs to SCC NRB.
| agreed | No | ||||
5.4.1.2.2 | Rx Requirements (Clause 7) | R5‑196186 | Editorial change, correcting reference in 7.3F.1.5 test requirement | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196186r1.
"Revised from: R5-196186.
Revised to: R5-197446.
"
| revised | No | R5‑197446 | |
R5‑197446 | Editorial change, correcting reference in 7.3F.1.5 test requirement | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196186 | |||
R5‑196223 | Correction to test configuration for 4CA reference sensitivity | Anritsu | CR | Agreement | Yes |
YesRevised to: R5-196223r1.
"Revised from: R5-196223.
Revised to: R5-197606.
"
| revised | No | R5‑197606 | |||
R5‑197606 | Correction to test configuration for 4CA reference sensitivity | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196223 | |||
R5‑196224 | Editorial correction to reference sensitivity for 4CA | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196587 | Editorial change - moving test case 7.6.2AE to correct place | Ericsson | CR | Agreement | Yes |
YesRevised to: R5-196587r1.
"Revised from: R5-196587.
Revised to: R5-196587r2."
"Revised from: R5-196587r1.
Revised to: R5-197447.
"
| revised | No | R5‑197447 | |||
R5‑197447 | Editorial change - moving test case 7.6.2AE to correct place | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196587 | |||
5.4.1.2.3 | Other Clauses (I.e. Clauses 1-5, 8-10, Annexes) | R5‑196226 | Editorial correction to G.3A.5 minimum test time | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196227 | Clarifying test applicability selection criteria in FDD SDR TC 8.7.1.1 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196757 | Addition of test cases 8.2.2.8.1 and 8.2.2.8.2 | Huawei, HiSilicon | CR | Agreement | Yes |
YesRevised to: R5-196757r1.
"Revised from: R5-196757.
| revised | No | R5‑197445 | |||
R5‑197445 | Addition of test cases 8.2.2.8.1 and 8.2.2.8.2 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196757 | |||
R5‑196758 | Addition of 8.2.2.8.1 and 8.2.2.8.2 into Annex F and Annex G | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196858 | Correction to RMC for Cat M1 CSI tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesThis CR depends on R4-1908123.
| agreed | No | ||||
R5‑197310 | Updating test cases to remove transient period for FGI 103 and 104 | Huawei, HiSilicon | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
5.4.1.3 | TS 36.521-2 | R5‑196058 | Correction to Applicability Conditions for TC8.10.1.2.6 and C183, C185m updates | Samsung R&D Institute UK | CR | Agreement | Yes |
Yeswithdrawn and reissued as R5-196939 because of title change.
| withdrawn | Yes | ||
R5‑196939 | Correction to Applicability Conditions for TC8.10.1.2.6 and C183, C183m updates | Samsung R&D Institute UK | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196583 | Correction to Applicability condition on Table 4.2-1 for TC4.2.31 | TTA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196712 | Addition of TC7.9F Applicability of RF conformance | SGS Wireless | CR | Agreement | Yes |
Yesblock agreed on Fri.
| agreed | No | ||||
R5‑196713 | Modify TC 4.2.31 the RRM conformance condition of applicability | SGS Wireless | CR | Agreement | Yes |
Yesblock agreed on Fri.
| agreed | No | ||||
R5‑196759 | Addition of test applicability for 8.2.2.8.1 and 8.2.2.8.2 | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196837 | Updates to Tested CA Configurations Selection Criteria | Intel Corporation (UK) Ltd, TTA | CR | Agreement | Yes |
Yes"Updates to Tested CA Configurations Selection Criteria
Revised to: R5-196837r1."
"Revised from: R5-196837.
r1: Added TTA as the co-signer
Revised to: R5-197486.
"
| revised | No | R5‑197486 | |||
R5‑197486 | Updates to Tested CA Configurations Selection Criteria | Intel Corporation (UK) Ltd, TTA | CR | Agreement | Yes |
Yesagreed.
empty file.
| revised | No | R5‑197631 | R5‑196837 | ||
R5‑197631 | Updates to Tested CA Configurations Selection Criteria | Intel Corporation (UK) Ltd, TTA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197486 | |||
R5‑196865 | Updating NOTE 1 and NOTE 2 in Section 4 of TS36.521-2 | Intel | CR | Agreement | Yes |
Yes"Modifying NOTE 1 and NOTE 2 in Section 4 to make it clear.
Revised to: R5-196865r1."
"Revised from: R5-196865.
r1: Remove the change in NOTE 1, and generalize the proposed changes in NOTE 2.
Revised to: R5-197452.
"
| revised | No | R5‑197452 | |||
R5‑197452 | Updating NOTE 1 and NOTE 2 in Section 4 of TS36.521-2 | Intel | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196865 | |||
R5‑196866 | Updating TS36.521-2 Table 4.1-1 Applicability of RF conformance test cases, ref. TS 36.521-1 | Intel | CR | Agreement | Yes |
YesAdding 6.3.3F to this table.
| agreed | No | ||||
R5‑196867 | Updating TS36.521-2 Table 4.2-1 Applicability of RRM conformance test cases, ref. TS 36.521-3 | Intel | CR | Agreement | Yes |
YesAdding 7.3.23_1 to this table.
| agreed | No | ||||
R5‑197311 | Updating the applicability table to remove transient period for FGI bits 103 and 104 | Huawei, HiSilicon | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
5.4.1.4 | TS 36.521-3 | R5‑195728 | Update of 6.2.16 and 6.2.17 for alignment with core specification | Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196526 | Corrections to test case for HD FDD Inter frequency case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes"<3GU title with Invalid characters & rev issue>
Revised to: R5-196526r1."
"Revised from: R5-196526.
Dependent on R4-19xxxxx.
r1: Modified the title inline with 3GU
Revised to: R5-197451.
"
| revised | No | R5‑197451 | |||
R5‑197451 | Corrections to test case for HD FDD Inter frequency case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes"Revised from: R5-196526r1.
RAN4 dependency
Document was sent FOR E-MAIL AGREEMENT
"
wrong title on cover, add HD FDD!
r1 was produced.
| revised | No | R5‑197660 | R5‑196526 | ||
R5‑197660 | Corrections to test case for HD FDD Inter frequency case for UE Category NB1 In-Band mode in enhanced coverage | Qualcomm UK Ltd | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197451 | |||
5.4.1.5 | RRM Test & Radio Reception Test Tolerances |   | ||||||||||
5.4.1.5.1 | TS 36.521-3 (TT CRs) |   | ||||||||||
5.4.1.5.2 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.4.1.5.3 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.4.1.5.4 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.4.1.6 | TS 34.121-1 |   | ||||||||||
5.4.1.7 | TS 34.121-2 |   | ||||||||||
5.4.1.8 | TS 34.122 |   | ||||||||||
5.4.1.9 | TS 34.108 |   | ||||||||||
5.4.1.10 | TR 34.902 (UTRAN RRM Test Tolerance analyses) |   | ||||||||||
5.4.1.11 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.5 | Other Routine Maintenance TEIx_Test |   | ||||||||||
5.5.1 | TS 34.108 |   | ||||||||||
5.5.2 | TS 34.121-1 All sections other than annexes |   | ||||||||||
5.5.3 | TS 34.121-1 Annexes only |   | ||||||||||
5.5.4 | TS 34.121-2 |   | ||||||||||
5.5.5 | TS 34.122 |   | ||||||||||
5.5.6 | TS 34.171 |   | ||||||||||
5.5.7 | TS 34.172 |   | ||||||||||
5.5.8 | TS 34.114 |   | ||||||||||
5.5.9 | TS 37.571-1 | R5‑195901 | Corrections to RSTD tests for NB-IoT | Spirent Communications | CR | Agreement | Yes |
YesRevised to: R5-195901r1.
"Revised from: R5-195901.
r1: Problem with zip process; Additional changes made to fix other errors and align with RAN 4 values following comments from R&S.
Revised to: R5-197381.
"
| revised | No | R5‑197381 | |
R5‑197381 | Corrections to RSTD tests for NB-IoT | Spirent Communications | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195901 | |||
R5‑196604 | Alignment of 9.5.3 and 9.6.3 to core spec | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑197356 | Missing Bands in Tables | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes"LATE DOCUMENT
Spirent: would like to discuss in the meeting
plan to remove the general section table of bands and point to RRM specs instead for ease of maintainenance "
| agreed | No | ||||
R5‑197357 | Corrections to GNSS Multi-path Tests | PCTEST Engineering Lab | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
R5‑197358 | Correct RSTD Test Parameter Values | PCTEST Engineering Lab | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
5.5.10 | TS 37.571-3 |   | ||||||||||
5.5.11 | TS 37.571-5 |   | ||||||||||
5.5.12 | TS 51.010-1 (RF/Performance) |   | ||||||||||
5.5.13 | TS 51.010-2 (RF/Performance) |   | ||||||||||
5.5.14 | TS 51.010-7 (RF/Performance) |   | ||||||||||
5.5.15 | TS 37.544 |   | ||||||||||
5.5.16 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
5.6 | Outgoing liaison statements for provisional approval | R5‑197601 | LS on MOP for intra-band EN-DC | TSG WG RAN5 | LS out | Approval | Yes |
Yes
| approved | No | ||
R5‑197547 | Response LS on MOP for UL MIMO | TSG WG RAN5 | LS out | Approval | Yes |
Yes
| approved | No | ||||
5.7 | AOB |   | ||||||||||
6 | Signalling Protocol Functional Area |   | ||||||||||
6.1 | Review action points (fm A.I. 2.1) |   | ||||||||||
6.2 | Review incoming LS (fm A.I. 3) & new subject discussion papers | R5‑196965 | PTCRB Input to TF160 and RAN5 Regarding TTCN Development Priorities for 2020 | PTCRB PVG | LS in | Action | Yes |
Yesmoved to SIG.
The TF160 manager reported that it is planned to align with everyhting which is proposed in this LS.
| noted | No | ||
6.3 | Open Work Items |   | ||||||||||
6.3.1 | Rel-13 LTE CA configurations (UID - 700065) LTE_CA_Rel13-UEConTest |   | ||||||||||
6.3.1.1 | TS 36.508 |   | ||||||||||
6.3.1.2 | TS 36.523-1 |   | ||||||||||
6.3.1.3 | TS 36.523-2 | R5‑196569 | Addition of Rel-13 capabilities of multiple CA in 36.523-2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes'capabilities'
| agreed | No | ||
6.3.1.4 | TS 36.523-3 |   | ||||||||||
6.3.1.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.2 | Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest |   | ||||||||||
6.3.2.1 | TS 36.508 | R5‑195800 | Addition of test frequencies for signalling testing of CA_11A_41A, CA_11A_41C, CA_11A_42A and CA_11A_42C | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.2.2 | TS 36.523-1 |   | ||||||||||
6.3.2.3 | TS 36.523-2 | R5‑195799 | Introduction of CA_11A_41A, CA_11A_41C, CA_11A_42A, CA_11A_42C, CA_3A_41A_42C, CA_3A_41C_42A and CA_3A_41C_42C to Annex A.4.3.3.3 | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Mon.
| revised | No | R5‑196976 | |
R5‑196976 | Introduction of CA_11A_41A, CA_11A_41C, CA_11A_42A, CA_11A_42C, CA_3A_41A_42C, CA_3A_41C_42A and CA_3A_41C_42C to Annex A.4.3.3.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195799 | |||
6.3.2.4 | TS 36.523-3 |   | ||||||||||
6.3.2.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.3 | LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell (UID - 730074) LTE_CA_enh_b5C_PUCCH-UEConTest |   | ||||||||||
6.3.3.1 | TS 36.508 |   | ||||||||||
6.3.3.2 | TS 36.523-1 |   | ||||||||||
6.3.3.3 | TS 36.523-2 |   | ||||||||||
6.3.3.4 | TS 36.523-3 |   | ||||||||||
6.3.3.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.4 | Support for LTE-based V2X Services (UID - 760086) LTE_V2X-UEConTest |   | ||||||||||
6.3.4.1 | TS 36.508 | R5‑196084 | Correction of USIM file format for V2X | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesr1 was presented on Mon.
| revised | No | R5‑196977 | |
R5‑196977 | Correction of USIM file format for V2X | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196084 | |||
6.3.4.2 | TS 36.509 |   | ||||||||||
6.3.4.3 | TS 36.523-1 |   | ||||||||||
6.3.4.4 | TS 36.523-2 |   | ||||||||||
6.3.4.5 | TS 36.523-3 |   | ||||||||||
6.3.4.6 | TS 37.571-4 |   | ||||||||||
6.3.4.7 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.5 | 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest |   | ||||||||||
6.3.5.1 | TS 38.508-1 | R5‑195528 | Using generic procedure for IMS registration to 5GS | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑196980 | |
R5‑196980 | Using generic procedure for IMS registration to 5GS | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195528 | |||
R5‑195638 | Update of SIB2 | Huawei,Hisilicon, Anritsu Ltd | CR | Agreement | Yes |
Yesr1 was presented on Tue.
The SUL explanation should be reverted.
| revised | No | R5‑196981 | |||
R5‑196981 | Update of SIB2 | Huawei,Hisilicon, Anritsu Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195638 | |||
R5‑195639 | Update of SIB4 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195640 | Update of SIB5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yesa line has to be drawn to separate 2 elements.
| revised | No | R5‑196982 | |||
R5‑196982 | Update of SIB5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195640 | |||
R5‑195641 | Update of EUTRA-AllowedMeasBandwidth | Huawei,Hisilicon, MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197241 | |||
R5‑197241 | Update of EUTRA-AllowedMeasBandwidth | Huawei,Hisilicon, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195641 | |||
R5‑195642 | Update of frequency definition for Inter-RAT test cases | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑196984 | |||
R5‑196984 | Update of frequency definition for Inter-RAT test cases | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195642 | |||
R5‑195693 | Update IE CellGroupConfig | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Qualcomm commented that this is a dangerous change.
The TF160 manager confirmed that this CR would break many test cases, so it is not acceptable in the curent form. More info on the coversheet would be needed.
RAN2 has changed something. HO is broken in SA option 2.
The TF160 manager commented that this CR is just consoldating RAN2 terminology, so it is not essential.
r2 was presented on Thu.
TF160 manager: will have to be reworked to support multiple PDU sessions.
| revised | No | R5‑196985 | |||
R5‑196985 | Update IE CellGroupConfig | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195693 | |||
R5‑195694 | Update IE RadioBearerConfig | Ericsson | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195696 | Update IE PDCP-Config | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195698 | Update RadioBearerConfig-DRB | Ericsson | CR | Agreement | Yes |
YesThe TF160 manager remarked that n and m >0 is not possible.
Postponed.
r4 was presented on Thu.
| revised | No | R5‑197235 | |||
R5‑197235 | Update RadioBearerConfig-DRB | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195698 | |||
R5‑195711 | Add IE CGI-InfoEUTRA | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195729 | Update IE CGI-Info | Ericsson | CR | Agreement | Yes |
YesThe TF160 manager commented that in TS 38.331 a numer of new IE's have been added and wondered whether these have to be tested.
Qualcomm said it's handled. The FFS is already defined.
| agreed | No | ||||
R5‑195730 | Update IE MeasResults | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195740 | Update IE MeasResultCellListSFTD | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195742 | Add IE MeasResultCellListSFTD-EUTRA | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195747 | Update IE MeasResultCellListSFTD | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195748 | Add IE MeasResultCellListSFTD-EUTRA | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195749 | Add IE MeasResult2EUTRA | Ericsson | CR | Agreement | Yes |
YesThe TF160 manager wondered whether this is used by the inter-RAT measurement test cases?
| agreed | No | ||||
R5‑195750 | Add IE MeasResult2NR | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195751 | Add IE SK-Counter | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195752 | Update IE SS-RSSI-Measurement | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195757 | Corrections to DCI_1_0 configuration | Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
wrong AI 38.508-1??
| withdrawn | Yes | ||||
R5‑195758 | Addition of Delta to signalling threshold in System Information in FR2 | ANRITSU LTD, Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Thu.
Align SUL definition with Huawei's R5-196981.
| revised | No | R5‑197243 | |||
R5‑197243 | Addition of Delta to signalling threshold in System Information in FR2 | ANRITSU LTD, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195758 | |||
R5‑195787 | AP#82.01: Update default DCI format to 0_1 / 1_1 in TS 38.508-1 for SIG test cases | Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195792 | Update MeasurementReport | Ericsson | CR | Agreement | Yes |
YesThe TF160 manager remarked that 30-40 tests may be impacted by the table renumbering.
| agreed | No | ||||
R5‑195822 | Addition of Band combination DC_5A_n78A and DC_7A_n78A | ROHDE & SCHWARZ | CR | Agreement | No |
Yeslate doc
covered by Ericcson.
| withdrawn | Yes | ||||
R5‑195865 | Update RRCReconfiguration | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197234 | |||
R5‑197234 | Update RRCReconfiguration | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195865 | |||
R5‑195885 | Update RRCResume | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195886 | Editorial update RRCReconfigurationComplete | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195887 | Editorial update RRCReject | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195888 | Editorial update RRCRelease | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195889 | Add SCGFailureInformation | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195890 | Add SCGFailureInformationEUTRA | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195895 | Update UECapabilityEnquiry | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195909 | Editorial update UECapabilityInformation | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195910 | Add ULInformationTransferMRDC | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195926 | Editorial update RRC IEs | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195927 | Editorial update S-NSSAI | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195941 | Update RRCReconfiguration-HO | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197236 | |||
R5‑197236 | Update RRCReconfiguration-HO | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195941 | |||
R5‑195944 | Correction to ReportConfigNR | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195945 | Updates to default configurations for 5GC NAS test cases | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196029 | Naming of cells in FR2 default levels table 6.2.2.2-2 | ANRITSU LTD | CR | Agreement | Yes |
YesRohde&Schwarz suggested to set uptables instead to show suitable and non-s. neighbour cells.
| withdrawn | Yes | ||||
R5‑196031 | Adding references to TS 38.508-1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196048 | Addition of IE MasterKeyUpdate | Huawei, Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Discussion with Ericsson.
r2 was presented on Thu.
| revised | No | R5‑196988 | |||
R5‑196988 | Addition of IE MasterKeyUpdate | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196048 | |||
R5‑196049 | Correction of CellGroupConfig | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196098 | USIM Configuration for Signaling Test Cases | Qualcomm communications-France | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑196990 | |||
R5‑196990 | USIM Configuration for Signaling Test Cases | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196098 | |||
R5‑196100 | Adddition of NSA FR1 FDD EN-DC band combination | Qualcomm communications-France | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196101 | Correction to SIG OTA UE Orientation procedure | Qualcomm communications-France | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Discussions, deferred to Thu.
| revised | No | R5‑196991 | |||
R5‑196991 | Correction to SIG OTA UE Orientation procedure | Qualcomm communications-France | CR | Agreement | Yes |
Yesfor email agreement
Email agreed.
| agreed | No | R5‑196101 | |||
R5‑196158 | Correction of references to test frequency tables | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196168 | Correction of test frequency parameters for SSB location for NR band n1 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196169 | Correction of test frequency parameters for SSB location for NR band n2 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196170 | Correction of test frequency parameters for SSB location for NR band n3 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196171 | Correction of test frequency parameters for SSB location for NR band n7 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196172 | Correction of test frequency parameters for SSB location for NR band n25 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196173 | Correction of test frequency parameters for SSB location for NR band n34 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
Later withdrawn, as empty.
| withdrawn | Yes | ||||
R5‑196174 | Correction of test frequency parameters for SSB location for NR band n38 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196175 | Correction of test frequency parameters for SSB location for NR band n39 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196176 | Correction of test frequency parameters for SSB location for NR band n40 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196177 | Correction of test frequency parameters for SSB location for NR band n41 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196178 | Correction of test frequency parameters for SSB location for NR band n50 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196179 | Correction of test frequency parameters for SSB location for NR band n66 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196180 | Correction of test frequency parameters for SSB location for NR band n70 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196181 | Correction of test frequency parameters for SSB location for NR band n74 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196182 | Correction of test frequency parameters for SSB location for NR band n75 and SCS 15kHz and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196183 | Correction of test frequency parameters for SSB location for NR band n77 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196184 | Correction of test frequency parameters for SSB location for NR band n78 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196185 | Correction of test frequency parameters for SSB location for NR band n79 and SCS 60kHz | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196194 | Update MIB | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑196986 | |||
R5‑196986 | Update MIB | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196194 | |||
R5‑196196 | Update IE BWP | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196197 | Update IE ServingCellConfigCommon | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196198 | Update IE SubcarrierSpacing | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196262 | Editorial update IE RLC-BearerConfig | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196289 | Update chapter 4.5A.2 UE-requested PDU session establishment procedure | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196293 | Update chapter 4.5.4 RRC_CONNECTED procedures | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Tue.
TF160 commented that the new table may not be needed.
r2 was presented on Thu.
| revised | No | R5‑196987 | |||
R5‑196987 | Update chapter 4.5.4 RRC_CONNECTED procedures | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196293 | |||
R5‑196304 | Correction to REGISTRATION REJECT message | MediaTek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197244 | |||
R5‑197244 | Correction to REGISTRATION REJECT message | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196304 | |||
R5‑196310 | Addition of SUL bands for protocol testing in clause 6.2.3.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196311 | Update of test frequency parameters for NR CA configuration CA_n41C | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196312 | Update of test frequency parameters for NR CA configuration CA_n257B and CA_n257C | Ericsson | CR | Agreement | Yes |
Yesr2 was produced.
| revised | No | R5‑197231 | |||
R5‑197231 | Update of test frequency parameters for NR CA configuration CA_n257B and CA_n257C | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196312 | |||
R5‑196313 | Introduction of test frequencies for for NR CA configuration CA_n260B and CA_n260C | Ericsson | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197232 | |||
R5‑197232 | Introduction of test frequencies for for NR CA configuration CA_n260B and CA_n260C | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196313 | |||
R5‑196314 | Update of test frequency parameters for NR CA configuration CA_n260I | Ericsson | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196316 | Introduction of test frequencies for NR CA configuration CA_n261B and CA_n261C | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu.
| agreed | No | ||||
R5‑196317 | Update of test frequency table for EN-DC configuration DC_41A_n41A for BCS1 | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196319 | Correction of test frequency parameters for EN-DC configuration DC_(n)71AA | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196320 | Update of test frequency parameters for EN-DC configuration DC_30A_n260(A-I) | Ericsson | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196395 | Addition of New Test Procedure - Response\No response to Paging for 5GC NAS testing | Qualcomm communications-France | CR | Agreement | Yes |
Yesr1 was presented on Tue.
4.9.13 is not needed.
| revised | No | R5‑196992 | |||
R5‑196992 | Addition of New Test Procedure - Response\No response to Paging for 5GC NAS testing | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196395 | |||
R5‑196466 | Introduction of test frequencies for NR CA configuration CA_n257D to CA_n257F | Ericsson | CR | Agreement | Yes |
Yesr2 was produced.
| revised | No | R5‑197230 | |||
R5‑197230 | Introduction of test frequencies for NR CA configuration CA_n257D to CA_n257F | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196466 | |||
R5‑196471 | Introduction of test frequencies for NR CA configuration CA_n260J to CA_n260M | Ericsson | CR | Agreement | Yes |
Yeslate doc
r1 was produced.
| revised | No | R5‑197233 | |||
R5‑197233 | Introduction of test frequencies for NR CA configuration CA_n260J to CA_n260M | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196471 | |||
R5‑196472 | Introduction of test frequencies for NR CA configuration CA_n261G to CA_n261I | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu.
| agreed | No | ||||
R5‑196473 | Introduction of test frequencies for NR CA configuration CA_n261O to CA_n261Q | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu.
| agreed | No | ||||
R5‑196476 | Update of procedure to configure SCC(s) for EN-DC RF CA testing in clause 5.5.2 | Ericsson | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196490 | Introduction of test frequencies for NR CA configuration CA_n78C | Ericsson | CR | Agreement | Yes |
Yesblock agreed on Thu.
| agreed | No | ||||
R5‑196592 | Update of PHR-Config | MediaTek Inc., Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesPostponed.
Mediatek shall get confirmation from RAN2 about core requirement.
| revised | No | R5‑197245 | |||
R5‑197245 | Update of PHR-Config | MediaTek Inc., Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesagreed. Later revised because of wrong rev.
| revised | No | R5‑197296 | R5‑196592 | ||
R5‑197296 | Update of PHR-Config | MediaTek Inc., Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197245 | |||
R5‑196597 | Cleanup of editor note of EFOPL5G | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196637 | Update of default messages for EMERGENCY services test scenarios | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196638 | Introduction of Test Procedure for IMS Emergency call establishment in 5GC NORMAL-SERVICE | Samsung | CR | Agreement | Yes |
Yesr1 was presented on Tue.
discussion with Ericsson and Rohde&Schwarz.
r2 was presented on Thu.
| revised | No | R5‑196997 | |||
R5‑196997 | Introduction of Test Procedure for IMS Emergency call establishment in 5GC NORMAL-SERVICE | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196638 | |||
R5‑196639 | Introduction of Test Procedure for IMS Emergency call establishment in 5GC LIMITED-SERVICE or NO-SUPI | Samsung | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197246 | |||
R5‑197246 | Introduction of Test Procedure for IMS Emergency call establishment in 5GC LIMITED-SERVICE or NO-SUPI | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196639 | |||
R5‑196640 | Update of Test procedure for UE for Tracking area updating / Inter-system change from N1 mode to S1 mode in 5GMM/EMM-IDLE mode | Samsung | CR | Agreement | Yes |
Yes
| revised | No | R5‑196998 | |||
R5‑196998 | Update of Test procedure for UE for Tracking area updating / Inter-system change from N1 mode to S1 mode in 5GMM/EMM-IDLE mode | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196640 | |||
R5‑196641 | Update of Test procedure for UE for Tracking area updating / Inter-system change from S1 mode to N1 mode in 5GMM/EMM-IDLE mode | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196744 | Corrections to DCI_1_0 configuration | Keysight Technologies UK Ltd, MediaTek, MCC TF160 | CR | Agreement | Yes |
Yescoversheet calc error.
| revised | No | R5‑196995 | |||
R5‑196995 | Corrections to DCI_1_0 configuration | Keysight Technologies UK Ltd, MediaTek, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196744 | |||
R5‑196751 | AP#82.01: Update default DCI format to 0_1 / 1_1 in TS 38.508-1 for SIG test cases | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesbased on the new DCI format the TF160 manager expects a new verification after the TTCN delivery.
| agreed | No | ||||
R5‑196799 | Update IE ServingCellConfig | MediaTek Inc. | CR | Agreement | Yes |
Yesr1 ws presented on Tue.
| revised | No | R5‑196994 | |||
R5‑196994 | Update IE ServingCellConfig | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196799 | |||
R5‑196804 | Update Default NR parameters for simulated NR cells | MediaTek Inc. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196807 | Adding MeasObjectId-SpCell | MediaTek Inc. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196824 | Updates to UE 4.6.4 UE Capability Information Elements | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196873 | Introduction of test frequencies for NR CA configuration CA_n258D to CA_n258F | Ericsson | CR | Agreement | Yes |
Yeslate doc
wrong AI
| agreed | No | ||||
R5‑196874 | Introduction of test frequencies for NR CA configuration CA_n260D to CA_n260F | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu.
| agreed | No | ||||
R5‑196875 | Introduction of test frequencies for NR CA configuration CA_n260O to CA_n260Q | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu.
| agreed | No | ||||
R5‑196876 | Introduction of test frequencies for NR CA configuration CA_n261D to CA_n260F | Ericsson | CR | Agreement | Yes |
Yeslate doc
260->261
| withdrawn | Yes | ||||
R5‑196877 | Introduction of test frequencies for NR CA configuration CA_n261J to CA_n260M | Ericsson | CR | Agreement | Yes |
Yeslate doc
260->261
| withdrawn | Yes | ||||
R5‑197014 | Addition of NR CA test frequencies for protocol testing in clause 6.2.3 | Ericsson, MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
R5‑197099 | Correction to Switch off-Power off procedure in RRC_CONNECTED | Huawei, HiSilicon, SamSung, MCC TF160 | CR | Agreement | Yes |
Yeslate doc
for email agreement
Email agreed.
| agreed | No | ||||
R5‑197200 | Updating ControlResourceSet | MediaTek Inc. | CR | Agreement | Yes |
Yeslate doc
discussion with Qualcomm could not come to a conclusion.
| withdrawn | Yes | ||||
6.3.5.2 | TS 38.508-2 | R5‑195982 | Addition and Update of PICS | Motorola Mobility, MCC TF160, Qualcomm, Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197225 | |
R5‑197225 | Addition and Update of PICS | Motorola Mobility, MCC TF160, Qualcomm, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195982 | |||
R5‑196479 | Update of NR CA Physical Layer Baseline Implementation Capabilities | Ericsson | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑196480 | Update of EN-DC Physical Layer Baseline Implementation Capabilities | Ericsson | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
6.3.5.3 | TS 38.509 | R5‑196103 | Addition of NSSAI Test Mode | Qualcomm communications-France | CR | Agreement | Yes |
Yesr1 was presented on Thu.
The TF160 manager recommended that the bits should be in logical order.
| revised | No | R5‑197184 | |
R5‑197184 | Addition of NSSAI Test Mode | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196103 | |||
6.3.5.4 | TS 38.523-1 |   | ||||||||||
6.3.5.4.1 | Clauses 1 - 5 | R5‑196642 | Adding specs to TS 38.523-1 References section | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.5.4.2 | Idle Mode (Clause 6) | R5‑195643 | Addition of NR test case 6.2.3.1-Inter-RAT Cell reselection L2NR by priority Srxlev based | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197185 | |
R5‑197185 | Addition of NR test case 6.2.3.1-Inter-RAT Cell reselection L2NR by priority Srxlev based | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195643 | |||
R5‑195644 | Addition of NR test case 6.2.3.2-Inter-RAT Cell reselection L2NR by priority Squal based | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197186 | |||
R5‑197186 | Addition of NR test case 6.2.3.2-Inter-RAT Cell reselection L2NR by priority Squal based | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195644 | |||
R5‑195645 | Addition of NR test case 6.2.3.4-Inter-RAT Cell reselection NR2L by priority Squal based | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197187 | |||
R5‑197187 | Addition of NR test case 6.2.3.4-Inter-RAT Cell reselection NR2L by priority Squal based | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195645 | |||
R5‑195646 | Addition of NR test case 6.2.3.6-Inter-RAT Cell reselection L2NR by priority from dedicated signalling | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197188 | |||
R5‑197188 | Addition of NR test case 6.2.3.6-Inter-RAT Cell reselection L2NR by priority from dedicated signalling | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195646 | |||
R5‑195647 | Addition of NR test case 6.2.3.8-Inter-RAT Cell reselection L2NR Snonintrasearch | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197189 | |||
R5‑197189 | Addition of NR test case 6.2.3.8-Inter-RAT Cell reselection L2NR Snonintrasearch | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195647 | |||
R5‑195648 | Addition of NR test case 6.2.3.9-Inter-RAT Cell reselection NR2L Speed Dependent | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197190 | |||
R5‑197190 | Addition of NR test case 6.2.3.9-Inter-RAT Cell reselection NR2L Speed Dependent | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195648 | |||
R5‑195649 | Addition of NR test case 6.4.1.1-HPLMN in Automatic PLMN Selection Mode in RRC_INACTIVE state | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195650 | Addition of NR test case 6.4.2.2-Inter-Freq Cell reselection by priority of SIBs | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195651 | Addition of NR test case 6.4.3.1-Inter-RAT Cell reselection NR2L Srxlev based | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197191 | |||
R5‑197191 | Addition of NR test case 6.4.3.1-Inter-RAT Cell reselection NR2L Srxlev based | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195651 | |||
R5‑195652 | Update of NR test case 6.1.2.22-Inter-frequency cell reselection with parameters | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197193 | |||
R5‑197193 | Update of NR test case 6.1.2.22-Inter-frequency cell reselection with parameters | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195652 | |||
R5‑195699 | Addition of test case 6.3.1.3 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197195 | |||
R5‑197195 | Addition of test case 6.3.1.3 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195699 | |||
R5‑195700 | Addition of test case 6.3.1.4 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yespls. delete void note.
| revised | No | R5‑197196 | |||
R5‑197196 | Addition of test case 6.3.1.4 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195700 | |||
R5‑195701 | Addition of test case 6.3.1.8 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yesr1 was presented on Thu.
Needs a whole review.
| revised | No | R5‑197197 | |||
R5‑197197 | Addition of test case 6.3.1.8 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195701 | |||
R5‑195702 | Addition of test case 6.3.1.9 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yes
| revised | No | R5‑197198 | |||
R5‑197198 | Addition of test case 6.3.1.9 of TS 38.523-1 | East China Institute of Tel. | CR | Agreement | Yes |
Yespart-2 CRs are needed as well.
| agreed | No | R5‑195702 | |||
R5‑195933 | Update to NR RRC Idle mode test cases for FR2 support | ANRITSU LTD | CR | Agreement | Yes |
Yes
| revised | No | R5‑197017 | |||
R5‑197017 | Update to NR RRC Idle mode test cases for FR2 support | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195933 | |||
R5‑195947 | Correction to references to test procedure for Switch off / Power off UE | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196043 | Addition of NR Idle test case 6.1.2.23 - Cell reselection/ MFBI | CATT, TDIA | CR | Agreement | Yes |
Yesr1 was presented on Thu.
Anritsu commented that 76 is used, for test cases this is not achevable.
Action point on Anritsu.
| revised | No | R5‑197199 | |||
R5‑197199 | Addition of NR Idle test case 6.1.2.23 - Cell reselection/ MFBI | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196043 | |||
R5‑196050 | Correction to NR test case 6.1.2.1-cell selection | Huawei, Hisilicon,Starpoint | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197019 | |||
R5‑197019 | Correction to NR test case 6.1.2.1-cell selection | Huawei, Hisilicon,Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196050 | |||
R5‑196051 | Correction to NR test case 6.1.2.13-Cell reselection CellReservedForOperatorUse with Access Identity 0-1-2-12-13-14 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197020 | |||
R5‑197020 | Correction to NR test case 6.1.2.13-Cell reselection CellReservedForOperatorUse with Access Identity 0-1-2-12-13-14 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196051 | |||
R5‑196087 | Correction to NR test case 6.1.2.1 | Starpoint, HiSilicon | CR | Agreement | Yes |
Yesmerged into another.
| withdrawn | Yes | ||||
R5‑196097 | Addition of Idle Mode Test Case -Cell reselection, Sintrasearch, Snonintrasearch | Qualcomm communications-France | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197203 | |||
R5‑197203 | Addition of Idle Mode Test Case -Cell reselection, Sintrasearch, Snonintrasearch | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196097 | |||
R5‑196156 | Correction to NR Idle test case 6.1.1.6 | CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196217 | Update of NR test case 6.1.2.2-Intra-NR Cell Selection Qqualmin based | Huawei, Hisilicon | CR | Agreement | Yes |
YesCoversheet does not tell all changes.
| agreed | No | ||||
R5‑196218 | Update of NR test case 6.1.2.21-Cell reselection, SIntraSearchQ and SnonIntraSeqrchQ | Huawei, Hisilicon | CR | Agreement | Yes |
YesCoversheet does not tell all changes.
Motorola Mobility commented that T1, T2, and T3 have the same values.
| agreed | No | ||||
R5‑196353 | Correction to test cases 6.1.1.8 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196354 | Update sub-clause 6.2.1 test cases with the latest generic procedure references | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196598 | Correction to Idle TC 6.1.1.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196610 | Correction to Idle TC 6.1.2.8 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196613 | Correction to Idle TC 6.2.1.2 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.3.5.4.3 | Layer 2 |   | ||||||||||
6.3.5.4.3.1 | NR Layer 2 |   | ||||||||||
6.3.5.4.3.1.1 | Common Test Case Specific Values for Layer 2 (Clause 7.1.0) |   | ||||||||||
6.3.5.4.3.1.2 | MAC | R5‑195653 | Correction to NR test case 7.1.1.1.4-BeamFailure | Huawei,Hisilicon, Anritsu Ltd | CR | Agreement | Yes |
Yesr3 was presented on Tue.
| revised | No | R5‑197021 | |
R5‑197021 | Correction to NR test case 7.1.1.1.4-BeamFailure | Huawei,Hisilicon, Anritsu Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195653 | |||
R5‑195821 | Correction to NR MAC test case 7.1.1.3.2 | Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195925 | Update to MAC test cases in EN-DC for FR2 support | ANRITSU LTD | CR | Agreement | Yes |
Yesmerged into Huawei/Hisilicons R5-195653r2->7021.
| withdrawn | Yes | ||||
R5‑195948 | Correction of power level units for test case 7.1.1.7.1 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195995 | Update MAC test case 7.1.1.1 | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197247 | |||
R5‑197247 | Update MAC test case 7.1.1.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195995 | |||
R5‑196052 | Correction to TC 7.1.1.3.5-Padding BSR | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑197022 | |||
R5‑197022 | Correction to TC 7.1.1.3.5-Padding BSR | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196052 | |||
R5‑196089 | Correction to NR test case 7.1.1.2.1 | Starpoint, HiSilicon, TDIA | CR | Agreement | Yes |
Yes
| revised | No | R5‑196999 | |||
R5‑196999 | Correction to NR test case 7.1.1.2.1 | Starpoint, HiSilicon, TDIA, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesfirst agreed, then unagreed to merge changes from Keysight into.
r1 was presented on Thu.
| revised | No | R5‑197263 | R5‑196089 | ||
R5‑197263 | Correction to NR test case 7.1.1.2.1 | Starpoint, HiSilicon, TDIA, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196999 | |||
R5‑196090 | Correction to NR test case 7.1.1.3.1 | Starpoint, HiSilicon, TDIA | CR | Agreement | Yes |
Yesoverlap with Keysight's R5-196308r1.
| revised | No | R5‑197000 | |||
R5‑197000 | Correction to NR test case 7.1.1.3.1 | Starpoint, HiSilicon, TDIA | CR | Agreement | Yes |
Yesfirst agreed, then unagreed to merge changes from Keysight into.
r1 was presented on Thu.
| revised | No | R5‑197264 | R5‑196090 | ||
R5‑197264 | Correction to NR test case 7.1.1.3.1 | Starpoint, HiSilicon, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197000 | |||
R5‑196121 | Correction of NR test case 7.1.1.3.3 | Starpoint, TDIA | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197001 | |||
R5‑197001 | Correction of NR test case 7.1.1.3.3 | Starpoint, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196121 | |||
R5‑196123 | Correction to test case 7.1.1.3.4 | Starpoint, HiSilicon, TDIA | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197002 | |||
R5‑197002 | Correction to test case 7.1.1.3.4 | Starpoint, HiSilicon, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196123 | |||
R5‑196124 | Correction to test case 7.1.1.3.5 | Starpoint, TDIA, HiSilicon, MediaTek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Same change in pre-test conditions as R5-196123 needed.
| revised | No | R5‑197003 | |||
R5‑197003 | Correction to test case 7.1.1.3.5 | Starpoint, TDIA, HiSilicon, MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196124 | |||
R5‑196259 | Correction to NR test case 7.1.1.3.2 - Logical channel prioritization handling | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196260 | Correction to NR test case 7.1.1.9.1 - MAC Reset | Huawei, Hisilicon | CR | Agreement | Yes |
Yesr2 was presented on Tue.
Motorola Mobility remarked.
r3 was presented on Thu.
ETSI MCC: Editorial issues.
| revised | No | R5‑197023 | |||
R5‑197023 | Correction to NR test case 7.1.1.9.1 - MAC Reset | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196260 | |||
R5‑196263 | Correction of NR test case 7.1.1.3.7-PHR | Huawei, Hisilicon | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197024 | |||
R5‑197024 | Correction of NR test case 7.1.1.3.7-PHR | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑196263 | |||
R5‑196294 | Correction to NR MAC test case 7.1.1.3.7 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196308 | Corrections to NR MAC test cases 7.1.1.2.1 and 7.1.1.3.1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197025 | |||
R5‑197025 | Corrections to NR MAC test cases 7.1.1.2.1 and 7.1.1.3.1 | Keysight Technologies UK Ltd | CR | Agreement | No |
Yesmerged into 6999 and 7000.
| withdrawn | Yes | R5‑196308 | |||
R5‑196521 | Correction to Several MAC test cases | Motorola Mobility, MCC TF160, KeySight, Huawei, HiSilicon | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197026 | |||
R5‑197026 | Correction to Several MAC test cases | Motorola Mobility, MCC TF160, KeySight, Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196521 | |||
R5‑196618 | Correction to MAC TC 7.1.1.1.3 | MediaTek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197027 | |||
R5‑197027 | Correction to MAC TC 7.1.1.1.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196618 | |||
R5‑196704 | Correction to pre-condition of MAC test cases | Starpoint | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196705 | Correction to NR MAC test case 7.1.1.3.2 | Keysight Technologies UK Ltd, Huawei, HiSilicon | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Huawei's CR is merged into here.
| revised | No | R5‑197028 | |||
R5‑197028 | Correction to NR MAC test case 7.1.1.3.2 | Keysight Technologies UK Ltd, Huawei, HiSilicon | CR | Agreement | Yes |
Yesagreed.
Later revised bec of wrong wordfile nr.
| revised | No | R5‑197299 | R5‑196705 | ||
R5‑197299 | Correction to NR MAC test case 7.1.1.3.2 | Keysight Technologies UK Ltd, Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197028 | |||
R5‑196745 | Correction to pre-condition of MAC test cases | Starpoint, TDIA | CR | Agreement | Yes |
YesThe TF160 mamager wondered how the new table is used.
| agreed | No | ||||
R5‑196836 | Update to NR MAC Bandwidth Part operation TC 7.1.1.8.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yeslate doc
for email agreement
r1 was produced.
| revised | No | R5‑197661 | |||
R5‑197661 | Update to NR MAC Bandwidth Part operation TC 7.1.1.8.1 | ROHDE & SCHWARZ | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑196836 | |||
R5‑196899 | Addition of new NR MAC test case 7.1.1.3.2b | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| revised | No | R5‑197202 | |||
R5‑197202 | Addition of new NR MAC test case 7.1.1.3.2b | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196899 | |||
R5‑197103 | Corrections to NR MAC test case 7.1.1.1.1a | Keysight Technologies, Qualcomm | CR | Agreement | Yes |
Yeslate doc
for email agreement
wrong Rel on cover
r1 was produced.
| revised | No | R5‑197662 | |||
R5‑197662 | Corrections to NR MAC test case 7.1.1.1.1a | Keysight Technologies, Qualcomm | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197103 | |||
6.3.5.4.3.1.3 | RLC | R5‑195744 | Correction of test case 7.1.2.3.8 | Intel Corporation (UK) Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑195753 | Correction to RLC AM test case 7.1.2.3.9 | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195754 | Correction to RLC UM test case 7.1.2.2.5 | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196036 | Update to NR RLC test case 7.1.2.3.9 | CATT, Datang Linktester | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196053 | Correction to TC 7.1.2.3.4-18 bit SN processing | Huawei, HiSilicon, CATT, Datang Linktester | CR | Agreement | Yes |
YesSee CATT's R5-196771.
r1 was presented on Thu.
| revised | No | R5‑197248 | |||
R5‑197248 | Correction to TC 7.1.2.3.4-18 bit SN processing | Huawei, HiSilicon, CATT, Datang Linktester | CR | Agreement | Yes |
Yesfor email agreement
r1 was produced.
| revised | No | R5‑197663 | R5‑196053 | ||
R5‑197663 | Correction to TC 7.1.2.3.4-18 bit SN processing | Huawei, HiSilicon, CATT, Datang Linktester | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197248 | |||
R5‑196082 | Correction to 5GS RLC test case 7.1.2.3.6 | MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197029 | |||
R5‑197029 | Correction to 5GS RLC test case 7.1.2.3.6 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196082 | |||
R5‑196085 | Correction of Test Case 7.1.2.3.8 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yesalready covered in CATT's R5-196776.
| withdrawn | Yes | ||||
R5‑196093 | Correction to RLC test case 7.1.2.3.11 | Qualcomm communications-France, Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196122 | Correction to test case 7.1.2.2.5 | Starpoint, TDIA, MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Changes over changes, cl. affected, blue colour.
r2 was produced.
Merged into Keysight CR.
| revised | No | R5‑197004 | |||
R5‑197004 | Correction to test case 7.1.2.2.5 | Starpoint, TDIA, MCC TF160 | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑196122 | |||
R5‑196213 | Correction to NR RLC Test case 7.1.2.3.8 | Anritsu Ltd, Qualcomm | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196214 | Correction to RLC Test case 7.1.2.3.8 in EN-DC | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yesmerged into a Datang CR.
| withdrawn | Yes | ||||
R5‑196215 | Correction to RLC test case 7.1.2.2.6 in EN-DC | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yesmaybe withdrawn.
| withdrawn | Yes | ||||
R5‑196216 | Correction to RLC test case 7.1.2.3.10 in EN-DC | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197008 | |||
R5‑197008 | Correction to RLC test case 7.1.2.3.10 in EN-DC | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196216 | |||
R5‑196363 | Correction to RLC test case 7.1.2.3.7 | Keysight Technologies UK Ltd, Qualcomm | CR | Agreement | Yes |
Yesr2 was presented on Tue.
The TF160 manager commented that their comments were not taken into account.
ETSI MCC recommended to fix the meeting date, date, CR cover ver.
r3 was presented on Thu.
| revised | No | R5‑197030 | |||
R5‑197030 | Correction to RLC test case 7.1.2.3.7 | Keysight Technologies UK Ltd, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196363 | |||
R5‑196605 | Correction to RLC AM test case 7.1.2.3.9 | Keysight Technologies Inc., Qualcomm Inc., Datang Linktester, MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Many formatting issues.
| revised | No | R5‑197007 | |||
R5‑197007 | Correction to RLC AM test case 7.1.2.3.9 | Keysight Technologies Inc., Qualcomm Inc., Datang Linktester, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196605 | |||
R5‑196616 | Correction to RLC UM test case 7.1.2.2.5 | Keysight Technologies Inc., Qualcomm Inc., MCC TF160, Starpoint, TDIA | CR | Agreement | Yes |
Yesr1 was presented on Tue.
r2 was produced.
| revised | No | R5‑197250 | |||
R5‑197250 | Correction to RLC UM test case 7.1.2.2.5 | Keysight Technologies Inc., Qualcomm Inc., MCC TF160, Starpoint, TDIA | CR | Agreement | Yes |
Yesfor email agreement
Email agreed.
| agreed | No | R5‑196616 | |||
R5‑196624 | Correction to RLC TC 7.1.2.2.5 and 7.1.2.2.6 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196627 | Correction to RLC TC 7.1.2.3.8 | MediaTek Inc., Datang Linktester Technology | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196708 | Correction to RLC AM test case 7.1.2.3.7 | Keysight Technologies UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196709 | Correction to RLC AM test case 7.1.2.3.7 | Keysight Technologies UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196753 | Correction to ENDC test case 7.1.2.2.6 | CATT, Datang Linktester , MediaTek Inc. | CR | Agreement | Yes |
YesAntitsu asked for more time to check.
Postponed.
first agreed, then TF160 needed more time to check
for email agreement
Email agreed.
| agreed | No | ||||
R5‑196768 | Correction to ENDC test case 7.1.2.3.3 | CATT, Datang Linktester | CR | Agreement | Yes |
Yes'6' octets must stay.
| revised | No | R5‑197009 | |||
R5‑197009 | Correction to ENDC test case 7.1.2.3.3 | CATT, Datang Linktester, Huawei, Hisilicon, MCC160 | CR | Agreement | Yes |
Yesfirst agreed, then pu to email
| revised | No | R5‑197249 | R5‑196768 | ||
R5‑197249 | Correction to ENDC test case 7.1.2.3.3 | CATT, Datang Linktester, Huawei, Hisilicon, MCC160 | CR | Agreement | Yes |
Yesfor email agreement
wrong rev on coversheet
r3 was produced.
| revised | No | R5‑197664 | R5‑197009 | ||
R5‑197664 | Correction to ENDC test case 7.1.2.3.3 | CATT, Datang Linktester, Huawei, Hisilicon, MCC160 | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197249 | |||
R5‑196771 | Correction to ENDC test case 7.1.2.3.4 | CATT, Datang Linktester | CR | Agreement | Yes |
Yesrestore deleted digit.
Merged into Huawei's R5-196053.
| withdrawn | Yes | ||||
R5‑196774 | Corrction to ENDC test case 7.1.2.3.5 | CATT, Datang Linktester | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197011 | |||
R5‑197011 | Corrction to ENDC test case 7.1.2.3.5 | CATT, Datang Linktester | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196774 | |||
R5‑196776 | Correction to test case 7.1.2.3.8 | CATT, Datang Linktester, Anritsu, Qualcomm | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197266 | |||
R5‑197266 | Correction to test case 7.1.2.3.8 | CATT, Datang Linktester, Anritsu, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196776 | |||
6.3.5.4.3.1.4 | PDCP | R5‑195756 | Correction to NR PDCP test case 7.1.3.4.2 | Keysight Technologies UK Ltd, MCC TF160, Qualcomm Incorporated, Anritsu, Anritsu, Qualcomm | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||
R5‑195929 | Update to PDCP test cases in EN-DC for FR2 support | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195996 | Update PDCP test case 7.1.3.2.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195997 | Update PDCP test case 7.1.3.3.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195998 | Update PDCP test case 7.1.3.4.1 | Ericsson | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197260 | |||
R5‑197260 | Update PDCP test case 7.1.3.4.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195998 | |||
R5‑195999 | Update PDCP test case 7.1.3.4.1 | Ericsson | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196003 | Update PDCP test case 7.1.3.4.2 | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196092 | Correction to PDCP test case 7.1.3.2.1 | Qualcomm communications-France, Anritsu | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197012 | |||
R5‑197012 | Correction to PDCP test case 7.1.3.2.1 | Qualcomm communications-France, Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196092 | |||
R5‑196117 | Correction to PDCP TC 7.1.3.5.3 | Qualcomm UK Ltd, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesdeferred.
r2 was presented on Thu.
| revised | No | R5‑197255 | |||
R5‑197255 | Correction to PDCP TC 7.1.3.5.3 | Qualcomm UK Ltd, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196117 | |||
R5‑196202 | Updates to 5GS PDCP test cases 7.1.3.1.1 and 7.1.3.1.2 | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| revised | No | R5‑197051 | |||
R5‑197051 | Updates to 5GS PDCP test cases 7.1.3.1.1 and 7.1.3.1.2 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196202 | |||
R5‑196261 | Correction to NR test case 7.1.3.4.1 - PDCP Lossless handover | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196702 | Correction to NR PDCP test case 7.1.3.4.2 | Keysight Technologies UK Ltd, Anritsu, MCC TF160, Qualcomm Incorporated | CR | Agreement | Yes |
Yesr2 was presented on Tue.
Need to resolve conditon.
r3 was presented on Thu.
| revised | No | R5‑197013 | |||
R5‑197013 | Correction to NR PDCP test case 7.1.3.4.2 | Keysight Technologies UK Ltd, Anritsu, MCC TF160, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196702 | |||
6.3.5.4.3.1.5 | SDAP |   | ||||||||||
6.3.5.4.4 | RRC |   | ||||||||||
6.3.5.4.4.1 | NR RRC |   | ||||||||||
6.3.5.4.4.2 | MR-DC RRC |   | ||||||||||
6.3.5.4.4.1.1 | RRC Connection Management Procedures (clause 8.1.1) | R5‑195654 | Addition of NR test case 8.1.1.2.2-RRC establish T300 expired | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑196054 | Correction to TC 8.1.1.3.4-NR2L reselection by RRCRelease | Huawei, Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197052 | |||
R5‑197052 | Correction to TC 8.1.1.3.4-NR2L reselection by RRCRelease | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196054 | |||
R5‑196060 | Correction to test case 8.1.1.4.2 | Starpoint, Hisilicon, TDIA | CR | Agreement | Yes |
Yesr1 was presented on Tue.
| revised | No | R5‑197005 | |||
R5‑197005 | Correction to test case 8.1.1.4.2 | Starpoint, Hisilicon, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196060 | |||
R5‑196104 | Addition of new 5GS SA RRC TC - RRC connection release / Success / Deprioritisation / T325 expiry | Qualcomm UK Ltd | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197204 | |||
R5‑197204 | Addition of new 5GS SA RRC TC - RRC connection release / Success / Deprioritisation / T325 expiry | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑196104 | |||
R5‑196106 | Updates to 5GS SA RRC TC 8.1.1.4.1 | Qualcomm UK Ltd, Starpoint | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197053 | |||
R5‑197053 | Updates to 5GS SA RRC TC 8.1.1.4.1 | Qualcomm UK Ltd, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196106 | |||
R5‑196109 | To void TC 8.1.1.3.5 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196110 | To void TC 8.1.1.3.6 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196111 | To void TC 8.1.1.4.3 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196219 | Correction to TC 8.1.1.2.1-T300 expiry | Huawei, Hisilicon | CR | Agreement | Yes |
Yesremove the tickbox
| revised | No | R5‑197054 | |||
R5‑197054 | Correction to TC 8.1.1.2.1-T300 expiry | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196219 | |||
R5‑196220 | Correction to TC 8.1.1.3.3-T320 expiry | Huawei, Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
tickbox unticked.
| revised | No | R5‑197055 | |||
R5‑197055 | Correction to TC 8.1.1.3.3-T320 expiry | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196220 | |||
R5‑196574 | Correction to NR5GC RRC TC 8.1.1.4.1 | TDIA, MCC TF160, CATT | CR | Agreement | Yes |
Yesr1 was produced.
already covered by Qualcomm.
| revised | No | R5‑197056 | |||
R5‑197056 | Correction to NR5GC RRC TC 8.1.1.4.1 | TDIA, MCC TF160, CATT | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑196574 | |||
R5‑196752 | Correction to NR5GC test case 8.1.1.4.1 | Starpoint, HiSilicon | CR | Agreement | Yes |
Yesoverlap with Qualcomm R5-196106.
TF160 manager: this verification will be cancelled.
| withdrawn | Yes | ||||
R5‑196769 | Correction to test cases 8.1.1.2.3 | MediaTek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197258 | |||
R5‑197258 | Correction to test cases 8.1.1.2.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196769 | |||
R5‑196772 | Correction to test cases 8.1.1.3.5 | MediaTek Inc. | CR | Agreement | No |
Yeslate doc
test case id voided.
| withdrawn | Yes | ||||
6.3.5.4.4.1.2 | RRC Reconfiguration (clause 8.1.2) | R5‑195655 | Addition of NR test case 8.1.2.1.2-uplinkTxDirectCurrentList | Huawei,Hisilicon | CR | Agreement | Yes |
YesRohde&Schwarz suggested to add that 2 beams are used for the SS.
Work with Qualcomm and to be re-submitted for the next meeting RAN5#85 in Reno.
| withdrawn | Yes | ||
6.3.5.4.4.2.1 | RRC UE Capability / Others (clause 8.2.1) | R5‑195755 | Correction to EN-DC RRC test case 8.2.1.1.1 | Keysight Technologies UK Ltd, Qualcomm Incorporated | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||
6.3.5.4.4.1.2 | RRC Reconfiguration (clause 8.1.2) | R5‑195937 | Add RRC reconfiguration test case 8.1.2.1.4 | Ericsson | CR | Agreement | Yes |
YesMotorola Mobility: need to specify the SIB combination.
| revised | No | R5‑197205 | |
R5‑197205 | Add RRC reconfiguration test case 8.1.2.1.4 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195937 | |||
R5‑195938 | Add RRC reconfiguration test case 8.1.2.1.5.1 | Ericsson | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197206 | |||
R5‑197206 | Add RRC reconfiguration test case 8.1.2.1.5.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195938 | |||
R5‑195939 | Add RRC reconfiguration test case 8.1.2.1.5.2 | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197207 | |||
R5‑197207 | Add RRC reconfiguration test case 8.1.2.1.5.2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195939 | |||
R5‑195940 | Add RRC reconfiguration test case 8.1.2.1.5.3 | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197208 | |||
R5‑197208 | Add RRC reconfiguration test case 8.1.2.1.5.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195940 | |||
R5‑196305 | Correction to NR RRC Test case 8.1.2.1.1 | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197057 | |||
R5‑197057 | Correction to NR RRC Test case 8.1.2.1.1 | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196305 | |||
R5‑196306 | Removal of NR RRC test case 8.1.2.1.3 | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.4.2.1 | RRC UE Capability / Others (clause 8.2.1) | R5‑196651 | Correction to EN-DC RRC test case 8.2.1.1.1 | Keysight Technologies UK Ltd, Qualcomm Incorporated, Rohde & Schwarz | CR | Agreement | Yes |
Yesr2 was presented on Wed.
| revised | No | R5‑197070 | |
R5‑197070 | Correction to EN-DC RRC test case 8.2.1.1.1 | Keysight Technologies UK Ltd, Qualcomm Incorporated, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196651 | |||
6.3.5.4.4.1.3 | RRC Measurement Configuration Control and Reporting (clause 8.1.3) | R5‑195656 | Addition of NR test case 8.1.3.1.16-whitelisting | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197209 | |
R5‑197209 | Addition of NR test case 8.1.3.1.16-whitelisting | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195656 | |||
R5‑195657 | Addition of NR test case 8.1.3.1.20-GapFR1 | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Thu.
TF160 and Anritsu stated the test case has to be reworked. No MeasurementReport could ever be received and the test still be PASS.
Postponed
| revised | No | R5‑197210 | |||
R5‑197210 | Addition of NR test case 8.1.3.1.20-GapFR1 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195657 | |||
R5‑195658 | Addition of NR test case 8.1.3.1.21-GapFR2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197211 | |||
R5‑197211 | Addition of NR test case 8.1.3.1.21-GapFR2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195658 | |||
R5‑195659 | Addition of NR test case 8.1.3.1.22-GapUE | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195660 | Addition of NR test case 8.1.3.1.23-Continue measurements after RRC Resume | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197212 | |||
R5‑197212 | Addition of NR test case 8.1.3.1.23-Continue measurements after RRC Resume | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑195660 | |||
R5‑195661 | Addition of NR test case 8.1.3.2.4-Event B2 SINR | Huawei,Hisilicon | CR | Agreement | Yes |
YesAnritsu responded upon Huawei's request that the power levels are not defined as it's uncalibrated.
EUTRA power levels shall be FFS in table.
| revised | No | R5‑197213 | |||
R5‑197213 | Addition of NR test case 8.1.3.2.4-Event B2 SINR | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195661 | |||
R5‑195671 | Correction to NR test case 8.1.3.1.11-two RSRQ A3 | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197058 | |||
R5‑197058 | Correction to NR test case 8.1.3.1.11-two RSRQ A3 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195671 | |||
R5‑195672 | Correction to NR test case 8.1.3.1.12-two SINR A5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197059 | |||
R5‑197059 | Correction to NR test case 8.1.3.1.12-two SINR A5 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195672 | |||
R5‑195673 | Correction to NR test case 8.1.3.1.17.3-A6 intraband non contiguous | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197060 | |||
R5‑197060 | Correction to NR test case 8.1.3.1.17.3-A6 intraband non contiguous | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195673 | |||
R5‑195674 | Correction to NR test case 8.1.3.1.18.3-A6 intraband non contiguous additional reporting | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197061 | |||
R5‑197061 | Correction to NR test case 8.1.3.1.18.3-A6 intraband non contiguous additional reporting | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195674 | |||
R5‑195675 | Correction to NR test case 8.1.3.2.5-A2 and B2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
Just 1 void in the title is enough.
All Huawei CRs need to untick the tickbox.
| revised | No | R5‑197062 | |||
R5‑197062 | Correction to NR test case 8.1.3.2.5-A2 and B2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195675 | |||
R5‑195793 | Editorial update MeasurementReport table | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195911 | Editorial update MeasurementReport table | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197063 | |||
R5‑197063 | Editorial update MeasurementReport table | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195911 | |||
R5‑195949 | Correction of power level units for test cases 8.1.3.1.11, 8.1.3.1.12, 8.1.3.1.15A, 8.1.3.2.3 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196105 | Addition of new SA RRC TC 8.1.3.1.23 | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
6.3.5.4.4.2.2 | RRC Radio Bearer (clause 8.2.2) | R5‑196114 | Correction to EN-DC RRC TCs 8.2.2.4.1 & 8.2.2.5.1 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196115 | Correction to EN-DC RRC TCs 8.2.2.7.1 & 8.2.2.8.1 | Qualcomm UK Ltd, Keysight Technologies UK Ltd | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
6.3.5.4.4.1.3 | RRC Measurement Configuration Control and Reporting (clause 8.1.3) | R5‑196606 | Addition of SA NR measurement test case TC 8.1.3.1.23 | Qualcomm, Tech Mahindra Limited | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197214 | |
R5‑197214 | Addition of SA NR measurement test case TC 8.1.3.1.23 | Qualcomm, Tech Mahindra Limited | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196606 | |||
6.3.5.4.4.2.2 | RRC Radio Bearer (clause 8.2.2) | R5‑196703 | Correction to EN-DC RRC test case 8.2.2.7.1 | Keysight Technologies UK Ltd, MediaTek Inc | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197071 | |
R5‑197071 | Correction to EN-DC RRC test case 8.2.2.7.1 | Keysight Technologies UK Ltd, MediaTek Inc | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196703 | |||
6.3.5.4.4.1.3 | RRC Measurement Configuration Control and Reporting (clause 8.1.3) | R5‑196778 | Correction to RRC TC 8.1.3.1.11, 8.1.3.1.12, 8.1.3.2.3 and 8.1.4.1.9.1 | Mediatek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197064 | |
R5‑197064 | Correction to RRC TC 8.1.3.1.11, 8.1.3.1.12, 8.1.3.2.3 and 8.1.4.1.9.1 | Mediatek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196778 | |||
R5‑196779 | Update to TC 8.1.3.1.15A | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.4.1.4 | RRC Handover (clause 8.1.4) | R5‑195662 | Addition of NR test case 8.1.4.1.7.1-PCell Change and SCell addition Intra-band Contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197215 | |
R5‑197215 | Addition of NR test case 8.1.4.1.7.1-PCell Change and SCell addition Intra-band Contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195662 | |||
R5‑195663 | Addition of NR test case 8.1.4.1.7.2-PCell Change and SCell addition Inter-band CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195664 | Addition of NR test case 8.1.4.1.7.3-PCell Change and SCell addition Intra-band non-contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195665 | Addition of NR test case 8.1.4.1.8.1-SCell no change Intra-band Contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197216 | |||
R5‑197216 | Addition of NR test case 8.1.4.1.8.1-SCell no change Intra-band Contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195665 | |||
R5‑195666 | Addition of NR test case 8.1.4.1.8.2-SCell no change Inter-band CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195667 | Addition of NR test case 8.1.4.1.8.3-SCell no change Intra-band non-contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195668 | Addition of NR test case 8.1.4.2.2.3.1-Inter-RAT handover Intra-band Contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195669 | Addition of NR test case 8.1.4.2.2.3.2-Inter-RAT handover Inter-band CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195670 | Addition of NR test case 8.1.4.2.2.3.3-Inter-RAT handover Intra-band non-contiguous CA | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.3.5.4.4.2.3 | RRC Measurement / Handovers (clause 8.2.3) | R5‑195678 | Correction to NR test case 8.2.3.15.1-A2 and A3 | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr4 was presentented on Wed.
| revised | No | R5‑197072 | |
R5‑197072 | Correction to NR test case 8.2.3.15.1-A2 and A3 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195678 | |||
R5‑195692 | Correction to MR-DC RRC test case 8.2.3.15.1 | MediaTek Inc. | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195712 | Update to RRC measurement test cases in EN-DC for FR2 support | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195907 | Correction to EN-DC RRC Measurement test case 8.2.3.15.1 | Keysight Technologies UK Ltd, Mediatek | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195908 | Correction to EN-DC RRC test case 8.2.3.4.1 and 8.2.3.7.1 | Keysight Technologies UK Ltd, Qualcomm Incorporated, Anritsu | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195950 | Correction to EN-DC RRC measurement test case 8.2.3.9.1 | MCC TF160, Anritsu Ltd | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197073 | |||
R5‑197073 | Correction to EN-DC RRC measurement test case 8.2.3.9.1 | MCC TF160, Anritsu Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195950 | |||
6.3.5.4.4.1.4 | RRC Handover (clause 8.1.4) | R5‑196000 | Update RRC handover test case 8.1.4.1.1 | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑196001 | Update RRC handover test case 8.1.4.1.2 | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.3.5.4.4.2.3 | RRC Measurement / Handovers (clause 8.2.3) | R5‑196002 | Update RRC measurement test case 8.2.3.14 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196056 | Updates to EN-DC RRC measurement test case 8.2.3.3.1 | Keysight Technologies UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196057 | Updates to EN-DC RRC measurement test case 8.2.3.3.1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesr1 was presented on Tue.
Motorola Mobility: table has to be reformatted and reference table -2.
| revised | No | R5‑197015 | |||
R5‑197015 | Updates to EN-DC RRC measurement test case 8.2.3.3.1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196057 | |||
6.3.5.4.4.1.4 | RRC Handover (clause 8.1.4) | R5‑196112 | To void TC 8.1.4.1.3 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196113 | To void TC 8.1.4.1.4 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.4.2.3 | RRC Measurement / Handovers (clause 8.2.3) | R5‑196116 | Correction to EN-DC RRC TC 8.2.3.15.1 | Qualcomm UK Ltd, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesmerged into Huawei's R5-195678.
| withdrawn | Yes | ||
R5‑196118 | Updates to EN-DC RRC TC 8.2.3.7.1a | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196119 | Updates to EN-DC RRC TC 8.2.3.7.1b | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.4.1.4 | RRC Handover (clause 8.1.4) | R5‑196611 | Corrections to TC 8.1.4.1.2 | Tech Mahindra, Qualcomm, Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197256 | |
R5‑197256 | Corrections to TC 8.1.4.1.2 | Tech Mahindra, Qualcomm, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196611 | |||
R5‑196614 | Deletion of TC 8.1.4.1.1 | Qualcomm, Tech Mahindra Limited | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.4.2.3 | RRC Measurement / Handovers (clause 8.2.3) | R5‑196728 | Correction to EN-DC RRC Measurement test case 8.2.3.15.1 | Keysight Technologies UK Ltd, MediaTek Inc | CR | Agreement | Yes |
Yesoverlaps with Qualcomm's R5-196116 and Huawei's R5-195678.
| withdrawn | Yes | ||
R5‑196733 | Correction to EN-DC RRC test case 8.2.3.4.1 and 8.2.3.7.1 | Keysight Technologies UK Ltd, Qualcomm Incorporated, Anritsu | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197016 | |||
R5‑197016 | Correction to EN-DC RRC test case 8.2.3.4.1 and 8.2.3.7.1 | Keysight Technologies UK Ltd, Qualcomm Incorporated, Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196733 | |||
R5‑196803 | Correction to EN-DC RRC measurement test case 8.2.3.10.1 | ANRITSU LTD | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197074 | |||
R5‑197074 | Correction to EN-DC RRC measurement test case 8.2.3.10.1 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196803 | |||
R5‑197100 | Correction to EN-DC RRC Test case 8.2.3.13.1 | Anritsu Ltd, Qualcomm, Keysight | CR | Agreement | Yes |
Yeslate doc
for email agreement
r2 was produced.
| revised | No | R5‑197665 | |||
R5‑197665 | Correction to EN-DC RRC Test case 8.2.3.13.1 | Anritsu Ltd, Qualcomm, Keysight | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197100 | |||
6.3.5.4.4.1.5 | RRC Others (clause 8.1.5) | R5‑195676 | Correction to NR test case 8.1.5.3.1-PWS reception in NR RRC_IDLE state | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑195677 | Correction to NR test case 8.1.5.3.3-PWS reception in NR RRC_CONNECTED state | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.4.2.4 | RRC Carrier Aggregation (clause 8.2.4) | R5‑195930 | Update to CA test cases in EN-DC for FR2 support | ANRITSU LTD | CR | Agreement | Yes |
YesR5-196157r1.
Fix the editor's note.
| revised | No | R5‑197018 | |
R5‑197018 | Update to CA test cases in EN-DC for FR2 support | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195930 | |||
R5‑195951 | Correction of power level units for test case 8.2.4.3.1.1 | MCC TF160 | CR | Agreement | Yes |
Yesmerge into Anritsu's R5-195958.
| withdrawn | Yes | ||||
6.3.5.4.4.1.5 | RRC Others (clause 8.1.5) | R5‑196046 | Correction to 5GC TC 8.1.5.1.1 | Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196107 | Updates to 5GS SA RRC TC 8.1.5.2.1 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197065 | |||
R5‑197065 | Updates to 5GS SA RRC TC 8.1.5.2.1 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196107 | |||
R5‑196108 | Updates to 5GS SA RRC TC 8.1.5.5.1 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yesr2 was presented on Wed.
| revised | No | R5‑197066 | |||
R5‑197066 | Updates to 5GS SA RRC TC 8.1.5.5.1 | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196108 | |||
6.3.5.4.4.2.4 | RRC Carrier Aggregation (clause 8.2.4) | R5‑196157 | Correction to EN-DC RRC test case 8.2.4.3.1.1 | CATT | CR | Agreement | Yes |
Yesr2 was presented on Wed.
| revised | No | R5‑197075 | |
R5‑197075 | Correction to EN-DC RRC test case 8.2.4.3.1.1 | CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196157 | |||
6.3.5.4.4.1.5 | RRC Others (clause 8.1.5) | R5‑196489 | Update of RRC TC 8.1.5.6.5.2 | Intertek | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196492 | New RRC TC 8.1.5.6.5.3 | Intertek | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196827 | Removal of Radio Link Failure test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196829 | Updates to RLF test case 8.1.5.6.1 | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197067 | |||
R5‑197067 | Updates to RLF test case 8.1.5.6.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196829 | |||
R5‑196830 | Updates to RLF test case 8.1.5.6.3 | Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197068 | |||
R5‑197068 | Updates to RLF test case 8.1.5.6.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196830 | |||
R5‑196835 | Update to 5GS NR RRC test case 8.1.5.4.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yeslate doc
for email agreement
Email agreed.
| agreed | No | ||||
R5‑197097 | Correction to NR test case 8.1.5.3.4-PWS reception using dedicatedSystemInformationDelivery | Huawei, Hisilicon | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
R5‑197192 | Correction to UE capabiliy transfer test case 8.1.5.1.1 | Rohde & Schwarz, MCC-TF160, Keysight Technologies, Qualcomm Incorporated | CR | discussion | Yes |
Yeslate doc
for email agreement
Email agreed.
| agreed | No | ||||
6.3.5.4.4.2.5 | RRC Reconfiguration / Radio Link Failure (clause 8.2.5) | R5‑196285 | Correction to EN-DC RRC test case 8.2.5.3.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.5.4.4.2.6 | RRC Others (clause 8.2.6) |   | ||||||||||
6.3.5.4.5 | 5GS Mobility Management | R5‑196831 | Updates to test cases using SERVICE REQUEST procedure | Ericsson | CR | Agreement | Yes |
YesETSI MCC recommended to fix the Table -3 duplication.
| revised | No | R5‑197076 | |
R5‑197076 | Updates to test cases using SERVICE REQUEST procedure | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196831 | |||
6.3.5.4.5.1 | MM Primary authentication and key agreement (clause 9.1.1) | R5‑195679 | Correction to NR test case 9.1.1.6-5G AKA authentication abnormal | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr3 was presented on Wed.
ETSI MCC recommended to firx the new table -4 duplication.
| revised | No | R5‑197077 | |
R5‑197077 | Correction to NR test case 9.1.1.6-5G AKA authentication abnormal | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195679 | |||
R5‑196044 | Addiation of 5GC test case 9.1.1.4 | Spreadtrum, CATT | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197217 | |||
R5‑197217 | Addiation of 5GC test case 9.1.1.4 | Spreadtrum, CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196044 | |||
R5‑196255 | Addition of 5GC test case 9.1.1.1 | ZTE, CMCC | CR | Agreement | Yes |
Yesr1 was presented on Wed.
Addi>a
| revised | No | R5‑197101 | |||
R5‑197101 | Addition of 5GC test case 9.1.1.1 | ZTE, CMCC | CR | Agreement | Yes |
Yesagreed. Later reissued after the meeting as R5-197292 because of wrong title.
| withdrawn | Yes | R5‑196255 | |||
R5‑197292 | Update of 5GC test case 9.1.1.1 | ZTE, CMCC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196256 | Addition of 5GC test case 9.1.1.3 | ZTE, CMCC | CR | Agreement | Yes |
Yesr1 was presented on Wed.
Addi>a
| revised | No | R5‑197102 | |||
R5‑197102 | Addition of 5GC test case 9.1.1.3 | ZTE, CMCC | CR | Agreement | Yes |
Yesagreed. Later reissued as R5-197297 because of title change.
| withdrawn | Yes | R5‑196256 | |||
R5‑197297 | Update of 5GC test case 9.1.1.3 | ZTE, CMCC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196747 | Update of 5GC test case 9.1.1.2 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197201 | |||
R5‑197201 | Update of 5GC test case 9.1.1.2 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196747 | |||
6.3.5.4.5.2 | MM Security mode control, Identification & Generic UE configuration update (clauses 9.1.2, 9.1.3 & 9.1.4) | R5‑196631 | Correction to 5GC TC 9.1.2.2 | MediaTek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197078 | |
R5‑197078 | Correction to 5GC TC 9.1.2.2 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196631 | |||
R5‑197098 | Correction to NR test case 9.1.3.1-Identification procedure | Huawei, Hisilicon | CR | Agreement | Yes |
Yeslate doc
for email agreement
r1 was produced.
| revised | No | R5‑197666 | |||
R5‑197666 | Correction to NR test case 9.1.3.1-Identification procedure | Huawei, Hisilicon | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197098 | |||
6.3.5.4.5.3 | MM Registration & De-registration (clauses 9.1.5 & 9.1.6) | R5‑195680 | Correction to NR test case 9.1.5.1.1-Initial registration | Huawei,Hisilicon | CR | Agreement | Yes |
YesSamsung recommended not to change the core spec parts, like a).
| revised | No | R5‑197079 | |
R5‑197079 | Correction to NR test case 9.1.5.1.1-Initial registration | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195680 | |||
R5‑195681 | Correction to NR test case 9.1.5.1.10-PLMN not allowed | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195682 | Correction to NR test case 9.1.5.2.4-Mobility registration update by lower layer failure | Huawei,Hisilicon, MediaTek | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197080 | |||
R5‑197080 | Correction to NR test case 9.1.5.2.4-Mobility registration update by lower layer failure | Huawei,Hisilicon, MediaTek | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195682 | |||
R5‑196038 | Addition of new 5GC TC 9.1.5.2.3 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196047 | Correction to 5GC TC 9.1.5.1.9 | Starpoint | CR | Agreement | Yes |
Yesr1 was presented on Wed.
ETSI MCC recommended to fix the changes over changes.
| revised | No | R5‑197081 | |||
R5‑197081 | Correction to 5GC TC 9.1.5.1.9 | Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196047 | |||
R5‑196094 | Correction to 5GC NAS test case 9.1.6.1.3 | Qualcomm communications-France | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197082 | |||
R5‑197082 | Correction to 5GC NAS test case 9.1.6.1.3 | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196094 | |||
R5‑196149 | Update of 5GC TC 9.1.5.1.11 | CAICT, CATT | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197083 | |||
R5‑197083 | Update of 5GC TC 9.1.5.1.11 | CAICT, CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196149 | |||
R5‑196150 | Update of 5GC TC 9.1.5.1.12 | CAICT, CATT | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197084 | |||
R5‑197084 | Update of 5GC TC 9.1.5.1.12 | CAICT, CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196150 | |||
R5‑196286 | Correction to NR5GC testcase 9.1.5.1.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197085 | |||
R5‑197085 | Correction to NR5GC testcase 9.1.5.1.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196286 | |||
R5‑196287 | Correction to NR5GC testcase 9.1.5.1.14 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Wed.
r2 was presented on Thu.
| revised | No | R5‑197086 | |||
R5‑197086 | Correction to NR5GC testcase 9.1.5.1.14 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196287 | |||
R5‑196355 | Update to test case 9.1.5.1.5 | MediaTek Inc. | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
R5‑196584 | Correction to 5GC test case 9.1.6.1.1 De-registration | CATT, Huawei, HiSilicon | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197087 | |||
R5‑197087 | Correction to 5GC test case 9.1.6.1.1 De-registration | CATT, Huawei, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196584 | |||
R5‑196632 | Editorial update of 5GC TC 9.1.6.1.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196633 | Correction to 5GC TC 9.1.6.1.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196755 | Corrction to NR5GC test case 9.1.5.2.8 | CATT, Datang Linktester, Starpoint, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196756 | Correction to test case 9.1.5.2.4 | MediaTek Inc. | CR | Agreement | Yes |
Yesmerged into R5-195682 from Huawei.
| withdrawn | Yes | ||||
6.3.5.4.5.4 | MM Service Request (clause 9.1.7) | R5‑195683 | Correction to NR test case 9.1.7.2-Data pending without user-plane resource | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr2 was presented on Wed.
Samsung: 7A, B should be normal numbers.
| revised | No | R5‑197088 | |
R5‑197088 | Correction to NR test case 9.1.7.2-Data pending without user-plane resource | Huawei,Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195683 | |||
R5‑196055 | Correction to TC 9.1.7.1-Service Request in Idle state | Huawei, Hisilicon, CAICT, CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.5.5 | MM SMS Over NAS (clause 9.1.8) |   | ||||||||||
6.3.5.4.5.6 | Inter-system Mobility (clause 9.3)) | R5‑196730 | Update of test case 9.3.1.1 Mobility registration update / Single-registration mode with N26 / 5GMM-IDLE / 5GC to EPC | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196731 | Update of test case 9.3.1.2 Mobility registration update / Single-registration mode with N26 / 5GMM-IDLE / EPC to 5GC | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196732 | Update of test case 9.3.1.3 Mobility and periodic registration update / Rejected / Single-registration mode with N26 / Handling of EPC relevant parameters | Samsung, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.4.6 | 5GS Session Management |   | ||||||||||
6.3.5.4.6.1 | SM PDU session authentication and authorization (clause 10.1.1) |   | ||||||||||
6.3.5.4.6.2 | SM Network-requested PDU session modification & release (clauses 10.1.2 & 10.1.3) | R5‑196037 | Addition of new 5GC TC 10.1.3.1 | CATT, TDIA | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197218 | |
R5‑197218 | Addition of new 5GC TC 10.1.3.1 | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196037 | |||
R5‑196039 | Addition of new 5GC TC 10.1.2.1 | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196040 | Addition of new 5GC TC 10.1.2.3 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196041 | Addition of new 5GC TC 10.1.2.4 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196042 | Addition of new 5GC TC 10.1.2.5 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.3.5.4.6.3 | SM UE-requested PDU session establishment, modification & release (clauses 10.1.4, 10.1.5 & 10.1.6) | R5‑195981 | Correction to 5GC TC 10.1.6.1 | CAICT,CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196075 | Correction to test case 10.1.5.1 | Starpoint, TDIA, Datang Linktester | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196076 | Correction to test case 10.1.5.1 | Starpoint, TDIA, Datang Linktester | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196077 | Correction to test case 10.1.5.1 | Starpoint, TDIA, Datang Linktester | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196078 | Correction to test case 10.1.5.1 | Starpoint, TDIA, Datang Linktester | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196079 | Correction to test case 10.1.5.1 | Starpoint, TDIA | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196091 | Correction to test case 10.1.5.1 | Starpoint, Hisilicon, Datang Linktester, TDIA | CR | Agreement | Yes |
YesTF160 manager remarked that the QoS rule #1.
Postponed.
r1 was presented on Thu.
| revised | No | R5‑197259 | |||
R5‑197259 | Correction to test case 10.1.5.1 | Starpoint, Hisilicon, Datang Linktester, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196091 | |||
6.3.5.4.7 | EN-DC Session Management | R5‑196088 | Correction to ENDC test case 10.2.2.1 | Starpoint, HiSilicon | CR | Agreement | Yes |
YesMotorola Mobility recommended to fix the Note1-2.
| revised | No | R5‑197006 | |
R5‑197006 | Correction to ENDC test case 10.2.2.1 | Starpoint, HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196088 | |||
6.3.5.4.8 | 5GS Multilayer and Services | R5‑196828 | Editorial changes to SERVICE REQUEST parameters for multi layer test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.5.4.8.1 | EPS Fallback | R5‑195952 | Correction of power level units for test case 11.1.1 | MCC TF160 | CR | Agreement | Yes |
Yesmerged into Qualcomm's R5-196102.
| withdrawn | Yes | ||
R5‑196102 | Corrections to 5GS Multilayer Test Case 11.1.1 | Qualcomm communications-France, MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197089 | |||
R5‑197089 | Corrections to 5GS Multilayer Test Case 11.1.1 | Qualcomm communications-France, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196102 | |||
R5‑196485 | Correction to 5GS\EPS Fallback test case 11.1.3 | MediaTek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
ETSI MCC suggested to rsolve also the TS 34.229-1 [TBD]. Samsung offered to help.
| revised | No | R5‑197090 | |||
R5‑197090 | Correction to 5GS\EPS Fallback test case 11.1.3 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196485 | |||
R5‑196643 | Update of 5GS\EPS Fallback test cases for System information, type of cells and more | Samsung, MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197091 | |||
R5‑197091 | Update of 5GS\EPS Fallback test cases for System information, type of cells and more | Samsung, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196643 | |||
R5‑196723 | Correction to 5GS\EPS Fallback test case 11.1.4 | MediaTek Inc. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197092 | |||
R5‑197092 | Correction to 5GS\EPS Fallback test case 11.1.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196723 | |||
R5‑196748 | Update multi-layer test case 11.1.2 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yesr2 was presented on Wed.
| revised | No | R5‑197093 | |||
R5‑197093 | Update multi-layer test case 11.1.2 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196748 | |||
R5‑196749 | Update multi-layer test case 11.1.5 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yesr2 was presented on Wed.
| revised | No | R5‑197094 | |||
R5‑197094 | Update multi-layer test case 11.1.5 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196749 | |||
R5‑196750 | Update multi-layer test case 11.1.6 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yesr2 was presented on Wed.
| revised | No | R5‑197095 | |||
R5‑197095 | Update multi-layer test case 11.1.6 | ZTE,TEJET,SRTC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196750 | |||
6.3.5.4.8.2 | RAT Fallback |   | ||||||||||
6.3.5.4.8.3 | Unified Access Control (UAC) | R5‑196095 | Addition of UAC Test Case 11.3.8 | Qualcomm communications-France | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||
6.3.5.4.8.4 | SDAP-5GSM Interaction |   | ||||||||||
6.3.5.4.8.5 | Emergency | R5‑196644 | Introduction of new TC 11.4.1 5GMM-REGISTERED.NORMAL-SERVICE / 5GMM-IDLE / Emergency call / Utilising emergency number stored on the USIM / New emergency PDU session | Samsung | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197219 | |
R5‑197219 | Introduction of new TC 11.4.1 5GMM-REGISTERED.NORMAL-SERVICE / 5GMM-IDLE / Emergency call / Utilising emergency number stored on the USIM / New emergency PDU session | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196644 | |||
R5‑196645 | Introduction of new TC 11.4.2 5GMM-DEREGISTERED.LIMITED-SERVICE / Emergency call / Handling of forbidden PLMNs | Samsung | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197220 | |||
R5‑197220 | Introduction of new TC 11.4.2 5GMM-DEREGISTERED.LIMITED-SERVICE / Emergency call / Handling of forbidden PLMNs | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196645 | |||
R5‑196646 | Introduction of new TC 11.4.3 5GMM-DEREGISTERED.NO-SUPI / Emergency call / Utilisation of emergency numbers stored on the ME / Initial registration for emergency services | Samsung | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197221 | |||
R5‑197221 | Introduction of new TC 11.4.3 5GMM-DEREGISTERED.NO-SUPI / Emergency call / Utilisation of emergency numbers stored on the ME / Initial registration for emergency services | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196646 | |||
6.3.5.5 | TS 38.523-2 | R5‑195684 | Addition of applicability for RRC test cases | Huawei,Hisilicon | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197262 | |
R5‑197262 | Addition of applicability for RRC test cases | Huawei,Hisilicon | CR | Agreement | Yes |
Yesfor email agreement
r2 was produced.
| revised | No | R5‑197667 | R5‑195684 | ||
R5‑197667 | Addition of applicability for RRC test cases | Huawei,Hisilicon | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197262 | |||
R5‑196020 | Update of 5G-NR test cases applicability | Qualcomm Incorporated, Rohde & Schwarz, Motorola Mobility, Ericsson, Tech Mahindra Limited, MediaTek Inc., Anritsu, Keysight, East China Institute of Tel. | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197261 | |||
R5‑197261 | Update of 5G-NR test cases applicability | Qualcomm Incorporated, Rohde & Schwarz, Motorola Mobility, Ericsson, Tech Mahindra Limited, MediaTek Inc., Anritsu, Keysight, East China Institute of Tel. | CR | Agreement | Yes |
Yesfor email agreement
r1 was produced.
| revised | No | R5‑197668 | R5‑196020 | ||
R5‑197668 | Update of 5G-NR test cases applicability | Qualcomm Incorporated, Rohde & Schwarz, Motorola Mobility, Ericsson, Tech Mahindra Limited, MediaTek Inc., Anritsu, Keysight, East China Institute of Tel. | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197261 | |||
R5‑196617 | Applicability for new TC 8.1.3.1.23 | Qualcomm, Tech Mahindra Limited | CR | Agreement | Yes |
Yeswas wrong AI part-1
| withdrawn | Yes | ||||
R5‑196621 | Removal of the applicability for TC 8.1.4.1.1 | Qualcomm, Tech Mahindra Limited | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196635 | Correction to applicability conditions C17, C18 and C19 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196652 | Update of applicability conditions for CA test cases | MediaTek Inc. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196832 | Removal of applicability of Radio Link Failure test cases | Ericsson | CR | Agreement | Yes |
Yesagreed, then revised after the meeting to correct the coversheet contents.
| revised | No | R5‑197291 | |||
R5‑197291 | Removal of applicability of Radio Link Failure test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196832 | |||
6.3.5.6 | TS 38.523-3 | R5‑195782 | Corrections to Paging calculation in clause 7.3.4 | Keysight Technologies UK Ltd, Mediatek | CR | Agreement | No |
Yeslate doc
| withdrawn | Yes | ||
R5‑195953 | Common aspects: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197222 | |||
R5‑197222 | Common aspects: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195953 | |||
R5‑195954 | NR/5GC: Test Model updates | MCC TF160, ROHDE & SCHWARZ, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197223 | |||
R5‑197223 | NR/5GC: Test Model updates | MCC TF160, ROHDE & SCHWARZ, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195954 | |||
R5‑195955 | EN-DC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196295 | Updates to FR2 Delta PIXITs for primary and secondary bands | ROHDE & SCHWARZ, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196754 | Corrections to Paging calculation in clause 7.3.4 | Keysight Technologies UK Ltd, Mediatek Inc | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.7 | TS 34.229-1 | R5‑195892 | Adding requirements for codec preference order and EVS configurations to C.21e | ROHDE & SCHWARZ, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196032 | Further changes to A.1.1 for 5G | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesRohde&Schwarz wondered if it can be always assumed to have an ISIM in 5G.
| revised | No | R5‑197048 | |||
R5‑197048 | Further changes to A.1.1 for 5G | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesfirst agreed, then withdrawn. Was only maintenance.
| withdrawn | Yes | R5‑196032 | |||
R5‑196033 | New IMS test case K.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Wed.
Discussion about mentioning the core spec version.
| revised | No | R5‑197049 | |||
R5‑197049 | New IMS test case K.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196033 | |||
R5‑196034 | New generic procedure for MO release of IMS call | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196767 | Adding C.21g for EPS fallback | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr2 was presented on Thu.
| revised | No | R5‑197224 | |||
R5‑197224 | Adding C.21g for EPS fallback | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196767 | |||
6.3.5.8 | TS 34.229-2 | R5‑195897 | Reference PICS from other specifications | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196706 | Applicabilities for new IMS test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.9 | TS 34.229-3 |   | ||||||||||
6.3.5.10 | TS 36.508 | R5‑196647 | Update of default messages in regard to NR relevant content | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196694 | Update of EMM message ATTACH REQUEST for NR | MediaTek Inc. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196697 | Update of RRC message SCGFailureInformationNR | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑197069 | Title: Update EN-DC PSCell handover condition in RRCConnectionReconfiguration | Qualcomm UK Ltd, MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| revised | No | R5‑197257 | |||
R5‑197257 | Title: Update EN-DC PSCell handover condition in RRCConnectionReconfiguration | Qualcomm UK Ltd, MCC TF160 | CR | Agreement | Yes |
Yesfor email agreement
Email agreed.
| agreed | No | R5‑197069 | |||
6.3.5.11 | TS 36.509 |   | ||||||||||
6.3.5.12 | TS 36.523-1 |   | ||||||||||
6.3.5.13 | TS 36.523-2 |   | ||||||||||
6.3.5.14 | TS 36.523-3 |   | ||||||||||
6.3.5.15 | TS 37.571-2 | R5‑195902 | Addition of sub-test information for NR tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197166 | |
R5‑197166 | Addition of sub-test information for NR tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195902 | |||
R5‑195935 | Alignment of NR terminology | Spirent Communications, European Commission | CR | Agreement | Yes |
Yesr1 was presented on Thu.
In TR 38.801 cl. 7.2 the options are explained.
| revised | No | R5‑197167 | |||
R5‑197167 | Alignment of NR terminology | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195935 | |||
R5‑196132 | Complete positioning protocol tests for NR | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197168 | |||
R5‑197168 | Complete positioning protocol tests for NR | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196132 | |||
R5‑196133 | Add default conditions for FR2 positioning tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Thu.
The TF160 manager commented that FR2 cables could cause interferences.
| revised | No | R5‑197169 | |||
R5‑197169 | Add default conditions for FR2 positioning tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196133 | |||
R5‑196860 | Clean Up of NR Positioning Test Cases | PCTEST Engineering Lab | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197170 | |||
R5‑197170 | Clean Up of NR Positioning Test Cases | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196860 | |||
6.3.5.16 | TS 37.571-3 | R5‑195904 | Addition of missing sub-tests for NR tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197171 | |
R5‑197171 | Addition of missing sub-tests for NR tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195904 | |||
R5‑195905 | Corrections of LPP release information for NR tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197172 | |||
R5‑197172 | Corrections of LPP release information for NR tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195905 | |||
R5‑195906 | Updates to NR test applicabilities for other NR scenarios | Spirent Communications, European Commission | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197173 | |||
R5‑197173 | Updates to NR test applicabilities for other NR scenarios | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195906 | |||
R5‑196862 | Update NR Signalling Test Case Titles to Align with TS 37.571-2 | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.5.17 | TS 37.571-4 | R5‑195946 | UE Positioning over NR: Initial Test Model | MCC TF160 | CR | Agreement | Yes |
Yesfigures not visible in fraft view + TH
| revised | No | R5‑197174 | |
R5‑197174 | UE Positioning over NR: Initial Test Model | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195946 | |||
6.3.5.18 | TS 37.571-5 |   | ||||||||||
6.3.5.19 | Discussion Papers, Work Plan, TC lists | R5‑195529 | FR2 Signalling Test cases update in 38.523-1 | ANRITSU LTD | discussion | Yes |
Yessee CR R5-196029.
| noted | No | |||
R5‑195898 | Discussion paper on security mechanisms for IMS over 5GS | ROHDE & SCHWARZ | discussion | Discussion | Yes |
YesThe proposal is accepted.
A LS to SA2 will be sent.
| noted | No | ||||
R5‑196035 | Discussion paper for generic procedures and environment for 0 and more than 2 PDU sessions/PDN connections | MediaTek Inc. | discussion | Decision | Yes |
YesEricsson commented on a 0 PDU device.
Huawei wondered whether a resolution for further action should be taken.
| noted | No | ||||
R5‑196099 | RRC WP Updates | Qualcomm communications-France | discussion | Endorsement | No |
Yesr1 was presented on Mon.
discussion with Anritsu and Motrola Mobility, about inter-/intra-frequency and A3,4,5.
Seeing further proposals in the final doc.
| revised | No | R5‑196978 | |||
R5‑196978 | RRC WP Updates | Qualcomm communications-France | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑196099 | |||
R5‑196120 | Discussion paper for 7.1.3.5.3 | Qualcomm UK Ltd | discussion | Endorsement | No |
Yes
| withdrawn | Yes | ||||
6.3.6 | Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest |   | ||||||||||
6.3.6.1 | TS 36.508 |   | ||||||||||
6.3.6.2 | TS 36.523-1 |   | ||||||||||
6.3.6.3 | TS 36.523-2 |   | ||||||||||
6.3.6.4 | TS 36.523-3 |   | ||||||||||
6.3.6.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.7 | Rel-15 CA configurations (UID - 770064) LTE_CA_R15-UEConTest |   | ||||||||||
6.3.7.1 | TS 36.508 |   | ||||||||||
6.3.7.2 | TS 36.523-1 |   | ||||||||||
6.3.7.3 | TS 36.523-2 | R5‑196570 | Addition of Re-15 capabilities of multiple CA in 36.523-2 | Huawei,Hisilicon | CR | Agreement | Yes |
Yes'capabilities'
| agreed | No | ||
6.3.7.4 | TS 36.523-3 |   | ||||||||||
6.3.7.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.8 | Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest |   | ||||||||||
6.3.8.1 | TS 36.523-1 |   | ||||||||||
6.3.8.2 | TS 36.523-2 |   | ||||||||||
6.3.8.3 | TS 36.523-3 |   | ||||||||||
6.3.8.4 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.9 | LTE bands with UE category M2 and/or NB2 in Rel-15 (UID - 780067) LTE_bands_R15_M2_NB2-UEConTest |   | ||||||||||
6.3.9.1 | TS 36.508 |   | ||||||||||
6.3.9.2 | TS 36.523-2 |   | ||||||||||
6.3.9.3 | TS 36.523-3 |   | ||||||||||
6.3.9.4 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.10 | Mission Critical Improvements (UID - 790052) MCImp-UEConTest |   | ||||||||||
6.3.10.1 | TS 36.579-1 | R5‑196648 | Update for MCVideo and MCData services | Samsung | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197133 | |
R5‑197133 | Update for MCVideo and MCData services | Samsung | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196648 | |||
6.3.10.2 | TS 36.579-2 |   | ||||||||||
6.3.10.3 | TS 36.579-3 |   | ||||||||||
6.3.10.4 | TS 36.579-4 |   | ||||||||||
6.3.10.5 | TS 36.579-5 |   | ||||||||||
6.3.10.6 | TS 36.579-6 | R5‑196368 | New MCVideo TC 6.4.8 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197160 | |
R5‑197160 | New MCVideo TC 6.4.8 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196368 | |||
R5‑196369 | New MCVideo TC 6.1.1.1 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197161 | |||
R5‑197161 | New MCVideo TC 6.1.1.1 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196369 | |||
R5‑196370 | New MCVideo TC 6.1.1.2 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197162 | |||
R5‑197162 | New MCVideo TC 6.1.1.2 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196370 | |||
R5‑196371 | Revised MCVideo TC 6.1.1.3 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197163 | |||
R5‑197163 | Revised MCVideo TC 6.1.1.3 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196371 | |||
R5‑196372 | Revised MCVideo TC 6.1.1.4 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197141 | |||
R5‑197141 | Revised MCVideo TC 6.1.1.4 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196372 | |||
R5‑196373 | New MCVideo TC 6.1.1.5 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197142 | |||
R5‑197142 | New MCVideo TC 6.1.1.5 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196373 | |||
R5‑196374 | New MCVideo TC 6.1.1.6 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197143 | |||
R5‑197143 | New MCVideo TC 6.1.1.6 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196374 | |||
R5‑196375 | New MCVideo TC 6.1.1.7 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197144 | |||
R5‑197144 | New MCVideo TC 6.1.1.7 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196375 | |||
R5‑196376 | New MCVideo TC 6.1.1.8 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197145 | |||
R5‑197145 | New MCVideo TC 6.1.1.8 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196376 | |||
R5‑196377 | New MCVideo TC 6.1.1.9 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197146 | |||
R5‑197146 | New MCVideo TC 6.1.1.9 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196377 | |||
R5‑196378 | New MCVideo TC 6.1.1.10 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197147 | |||
R5‑197147 | New MCVideo TC 6.1.1.10 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196378 | |||
R5‑196379 | New MCVideo TC 6.1.1.11 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197148 | |||
R5‑197148 | New MCVideo TC 6.1.1.11 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196379 | |||
R5‑196380 | New MCVideo TC 6.1.2.1 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197149 | |||
R5‑197149 | New MCVideo TC 6.1.2.1 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196380 | |||
R5‑196381 | New MCVideo TC 6.1.2.2 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197150 | |||
R5‑197150 | New MCVideo TC 6.1.2.2 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196381 | |||
R5‑196382 | New MCVideo TC 6.1.2.3 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197151 | |||
R5‑197151 | New MCVideo TC 6.1.2.3 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196382 | |||
R5‑196383 | New MCVideo TC 6.1.2.4 and TC 6.1.2.5 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197152 | |||
R5‑197152 | New MCVideo TC 6.1.2.4 and TC 6.1.2.5 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196383 | |||
R5‑196384 | New MCVideo TC 6.4.1 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197153 | |||
R5‑197153 | New MCVideo TC 6.4.1 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196384 | |||
R5‑196385 | New MCVideo TC 6.4.2 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197154 | |||
R5‑197154 | New MCVideo TC 6.4.2 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196385 | |||
R5‑196386 | New MCVideo TC 6.4.3 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197155 | |||
R5‑197155 | New MCVideo TC 6.4.3 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196386 | |||
R5‑196387 | New MCVideo TC 6.4.4 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197156 | |||
R5‑197156 | New MCVideo TC 6.4.4 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196387 | |||
R5‑196388 | New MCVideo TC 6.4.5 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197157 | |||
R5‑197157 | New MCVideo TC 6.4.5 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196388 | |||
R5‑196389 | New MCVideo TC 6.4.6 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197158 | |||
R5‑197158 | New MCVideo TC 6.4.6 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196389 | |||
R5‑196390 | New MCVideo TC 6.4.7 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197159 | |||
R5‑197159 | New MCVideo TC 6.4.7 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196390 | |||
6.3.10.7 | TS 36.579-7 | R5‑196333 | MCData TC for SDS 6.1.1 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197118 | |
R5‑197118 | MCData TC for SDS 6.1.1 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196333 | |||
R5‑196334 | MCData TC for SDS 6.1.2 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197119 | |||
R5‑197119 | MCData TC for SDS 6.1.2 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196334 | |||
R5‑196335 | MCData TC for SDS 6.1.3 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197120 | |||
R5‑197120 | MCData TC for SDS 6.1.3 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196335 | |||
R5‑196336 | MCData TC for SDS 6.1.4 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197121 | |||
R5‑197121 | MCData TC for SDS 6.1.4 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196336 | |||
R5‑196337 | MCData TC for SDS 6.1.5 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197122 | |||
R5‑197122 | MCData TC for SDS 6.1.5 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196337 | |||
R5‑196338 | MCData TC for SDS 6.1.6 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197123 | |||
R5‑197123 | MCData TC for SDS 6.1.6 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196338 | |||
R5‑196339 | MCData TC for SDS 6.1.7 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197124 | |||
R5‑197124 | MCData TC for SDS 6.1.7 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196339 | |||
R5‑196340 | MCData TC for SDS 6.1.8 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197125 | |||
R5‑197125 | MCData TC for SDS 6.1.8 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196340 | |||
R5‑196341 | MCData TC for SDS 6.1.9 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197126 | |||
R5‑197126 | MCData TC for SDS 6.1.9 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196341 | |||
R5‑196342 | MCData TC for SDS 6.1.10 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197127 | |||
R5‑197127 | MCData TC for SDS 6.1.10 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196342 | |||
R5‑196343 | MCData TC for SDS 6.1.11 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197128 | |||
R5‑197128 | MCData TC for SDS 6.1.11 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196343 | |||
R5‑196344 | MCData TC for SDS 6.1.12 | NIST | pCR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197129 | |||
R5‑197129 | MCData TC for SDS 6.1.12 | NIST | pCR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196344 | |||
6.3.10.8 | TS 36.508 |   | ||||||||||
6.3.10.9 | TS 36.509 |   | ||||||||||
6.3.10.10 | TS 36.523-1 |   | ||||||||||
6.3.10.11 | TS 36.523-2 |   | ||||||||||
6.3.10.12 | TS 36.523-3 |   | ||||||||||
6.3.10.13 | Discussion Papers, Work Plan, TC lists | R5‑196649 | Considerations on MCPTT IP testing | Samsung | discussion | Discussion | Yes |
Yes
| noted | No | ||
6.3.11 | 450 MHz Band for LTE in Region 3 (UID - 790058) LTE450_Reg3-UEConTest |   | ||||||||||
6.3.11.1 | TS 36.508 | R5‑196725 | Signalling Test environment for Band 73 | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.11.2 | TS 36.523-2 | R5‑196833 | Addition of Band 73 to signalling ICS | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.11.3 | TS 36.523-3 |   | ||||||||||
6.3.11.4 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.12 | 5G System Non-3GPP Access (UID - 800081) 5GS_Ph1-CT_n3GPPA-UEConTest |   | ||||||||||
6.3.12.1 | TS 38.508-1 | R5‑196159 | Correction of clause numbers for test frequencies for Non-3GPP Access | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196806 | changes for Non 3GPP Access over WLAN | Motorola Mobility Germany GmbH | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197226 | |||
R5‑197226 | changes for Non 3GPP Access over WLAN | Motorola Mobility Germany GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196806 | |||
R5‑196826 | Updates to generic procedure using SERVICE REQUEST procedure | Ericsson | CR | Agreement | Yes |
YesMotorola Mobility remarked to move it to another WIC because non-3GPP procedure.
| revised | No | R5‑196996 | |||
R5‑196996 | Updates to generic procedure using SERVICE REQUEST procedure | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196826 | |||
6.3.12.2 | TS 38.508-2 | R5‑196524 | Introduction of Non 3GPP Access over WLAN PICS | Motorola Mobility | CR | Agreement | No |
Yeslate doc
WIC change.
not needed
| withdrawn | Yes | ||
6.3.12.3 | TS 38.523-1 | R5‑196522 | Non 3GPP Access over WLAN test cases | Motorola Mobility | CR | Agreement | Yes |
Yeslate doc
r1 was presented on Thu.
| revised | No | R5‑197227 | |
R5‑197227 | Non 3GPP Access over WLAN test cases | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196522 | |||
6.3.12.4 | TS 38.523-2 | R5‑196523 | Non 3GPP Access over WLAN test case applicabilities | Motorola Mobility | CR | Agreement | Yes |
Yeslate doc
r1 was presented on Thu.
| revised | No | R5‑197228 | |
R5‑197228 | Non 3GPP Access over WLAN test case applicabilities | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196523 | |||
6.3.12.5 | TS 38.523-3 |   | ||||||||||
6.3.12.6 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.13 | Rel-16 LTE CA configurations (UID - 810061) LTE_CA_R16-UEConTest |   | ||||||||||
6.3.13.1 | TS 36.508 |   | ||||||||||
6.3.13.2 | TS 36.523-1 |   | ||||||||||
6.3.13.3 | TS 36.523-2 |   | ||||||||||
6.3.13.4 | TS 36.523-3 |   | ||||||||||
6.3.13.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.14 | Enhanced LTE Support for Aerial Vehicles (UID - 820062) LTE_Aerial-UEConTest |   | ||||||||||
6.3.14.1 | TS 36.508 | R5‑195931 | Modification of GNSS Scenarios for aerial testing | Spirent Communications, European Commission | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197176 | |
R5‑197176 | Modification of GNSS Scenarios for aerial testing | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑195931 | |||
R5‑196014 | Update of ReportConfigEUTRA default message | Qualcomm Incorporated | CR | Agreement | Yes |
YesETSI MCC reommended editorial fixes
| revised | No | R5‑197178 | |||
R5‑197178 | Update of ReportConfigEUTRA default message | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196014 | |||
6.3.14.2 | TS 36.509 |   | ||||||||||
6.3.14.3 | TS 36.523-1 | R5‑195932 | Modification of simulated aerial heights for aerial testing with GNSS | Spirent Communications, European Commission | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197177 | |
R5‑197177 | Modification of simulated aerial heights for aerial testing with GNSS | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195932 | |||
R5‑196015 | Addition of new Aerial vehicle Event A3 Inter-frequency measurement reporting TC 8.9.4a | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196016 | Addition of new Aerial vehicle Event A4 Inter-frequency measurement reporting TC 8.9.5a | Qualcomm Incorporated | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197179 | |||
R5‑197179 | Addition of new Aerial vehicle Event A4 Inter-frequency measurement reporting TC 8.9.5a | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196016 | |||
R5‑196770 | Update of Aerial vehicle Event A4 and Event A5 measurement reporting TCs 8.9.5 and 8.9.6 | Qualcomm Incorporated, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.14.4 | TS 36.523-2 | R5‑196017 | Addition of new Aerial vehicle test cases applicability | Qualcomm Incorporated, NTT DOCOMO | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197180 | |
R5‑197180 | Addition of new Aerial vehicle test cases applicability | Qualcomm Incorporated, NTT DOCOMO | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196017 | |||
6.3.14.5 | TS 36.523-3 |   | ||||||||||
6.3.14.6 | Discussion Papers, Work Plan, TC lists | R5‑195928 | Two issues with aerial testing with GNSS | Spirent Communications, European Commission | discussion | Endorsement | Yes |
YesSpirent mentioned the problem of defining sea level in RAN2. Therefore in Proposal1 40m are added.
This was accepted.
Proposal 2: there is no reason to use a reset. Current time shall be used.
The TF160 manager recommended to keep the test conditions reproducible. Ues should not fail because of modified inputs.
Rohde & Schwarz commented that cold start means that the UE uses new data and discards old data.
NTT DOCOMO's opinion was requested.
Proposal 2 needs further discussion.
| noted | No | ||
6.3.15 | Shortened TTI and processing time for LTE (UID - 820064) LTE_sTTIandPT-UEConTest |   | ||||||||||
6.3.15.1 | TS 36.508 |   | ||||||||||
6.3.15.2 | TS 36.509 |   | ||||||||||
6.3.15.3 | TS 36.523-1 |   | ||||||||||
6.3.15.4 | TS 36.523-2 |   | ||||||||||
6.3.15.5 | TS 36.523-3 |   | ||||||||||
6.3.15.6 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.16 | Bluetooth/WLAN measurement collection in LTE Minimization of Drive Tests (MDT) (UID - 820065) LTE_MDT_BT_WLAN-UEConTest |   | ||||||||||
6.3.16.1 | TS 36.508 | R5‑196024 | Update to Bluetooth and WLAN cells configuration | CMCC | CR | Agreement | Yes |
YesCell xx, fxx1-2 must be resolved.
TF160 manager: maybe Cell27a is already used.
Postponed.
r1 was presented on Thu.
| revised | No | R5‑197251 | |
R5‑197251 | Update to Bluetooth and WLAN cells configuration | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196024 | |||
R5‑196025 | Update to Bluetooth and WLAN cells configuration | CMCC | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
6.3.16.2 | TS 36.523-1 | R5‑195983 | Update to WLAN measurement collection in Logged Radio Link Failure | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑195984 | Update to WLAN measurement collection in LTE Immediate MDT | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195985 | Update to WLAN measurement collection in LTE Logged MDT | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195986 | Update to Bluetooth measurement collection in Logged Radio Link Failure | CMCC | CR | Agreement | Yes |
YesCell xx/-a
Postponed.
r1 was presented on Thu.
| revised | No | R5‑197252 | |||
R5‑197252 | Update to Bluetooth measurement collection in Logged Radio Link Failure | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195986 | |||
R5‑195987 | Update to WLAN measurement collection in LTE Immediate MDT | CMCC | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195988 | Update to Bluetooth measurement collection in LTE Immediate MDT | CMCC | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195989 | Update to Bluetooth measurement collection in LTE Immediate MDT | CMCC | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196021 | Update to Bluetooth measurement collection in LTE Immediate MDT | CMCC | CR | Agreement | Yes |
YesCell xx/-a
Postponed.
r1 was presented on Thu.
| revised | No | R5‑197253 | |||
R5‑197253 | Update to Bluetooth measurement collection in LTE Immediate MDT | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196021 | |||
R5‑196022 | Update to Bluetooth measurement collection in LTE Logged MDT | CMCC | CR | Agreement | Yes |
YesCell xx/-a
Postponed.
r1 was presented on Thu.
| revised | No | R5‑197254 | |||
R5‑197254 | Update to Bluetooth measurement collection in LTE Logged MDT | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196022 | |||
R5‑196023 | Update to Bluetooth measurement collection in LTE Logged MDT | CMCC | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
6.3.16.3 | TS 36.523-2 |   | ||||||||||
6.3.16.4 | TS 36.523-3 |   | ||||||||||
6.3.16.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.17 | Enhancing LTE CA Utilization (UID - 820066) LTE_euCA-UEConTest |   | ||||||||||
6.3.17.1 | TS 36.508 |   | ||||||||||
6.3.17.2 | TS 36.523-1 | R5‑196529 | Addition of SCell in dormant state | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yesno rev marks!! No cl. affected.
is .docx!
Wordfilename has no Tdoc nr.!
r2 was presented on Thu.
Several editorial problems.
r3 was presented on Thu.
| revised | No | R5‑197181 | |
R5‑197181 | Addition of SCell in dormant state | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196529 | |||
R5‑196532 | Modification of SCell in dormant state | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yesno rev marks!! No cl. affected.
WIC _ is missing!
is .docx!
Wordfilename has no Tdoc nr.!
r3 was presented on Thu.
| revised | No | R5‑197182 | |||
R5‑197182 | Modification of SCell in dormant state | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196532 | |||
6.3.17.3 | TS 36.523-2 | R5‑196746 | Addition of dormant mode SCell test case applicability | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yesno rev marks!! No cl. affected.
WIC no LTE!!
is .docx!
Wordfilename has no Tdoc nr.!
r2 was presented on Thu.
Editorial comments.
r3 was presented on Thu.
| revised | No | R5‑197183 | |
R5‑197183 | Addition of dormant mode SCell test case applicability | Nokia, Nokia Shanghai Bell | CR | Agreement | Yes |
Yestitle changed to: Addition of dormant SCell test case applicabilities
| agreed | No | R5‑196746 | |||
6.3.17.4 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.3.18 | REL-16 NR CA and DC; and NR and LTE DC Configurations (UID-830083) NR_CADC_NR_LTE_DC_R16-UEConTest |   | ||||||||||
6.3.18.1 | TS 38.508-1 | R5‑196468 | Introduction of test frequencies for NR CA configuration CA_n258B and CA_n258C | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu
| agreed | No | ||
R5‑196469 | Introduction of test frequencies for NR CA configuration CA_n258G to CA_n258M | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu
| agreed | No | ||||
R5‑196470 | Introduction of test frequencies for NR CA configuration CA_n260G to CA_n260I | Ericsson | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu
wrong AI
| agreed | No | ||||
6.3.18.2 | TS 38.508-2 |   | ||||||||||
6.3.18.3 | TS 38.523-1 |   | ||||||||||
6.3.18.4 | TS 38.523-2 |   | ||||||||||
6.3.18.5 | TS 38.523-3 |   | ||||||||||
6.3.18.6 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.4 | Routine Maintenance for TS 36 Series TEIx_Test |   | ||||||||||
6.4.1 | Routine Maintenance for TS 36.508 | R5‑195831 | Update to dataCodingScheme in SystemInformationBlockType11, required for ETWS test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesr1 was presented on Mon. Is *.docx.
| revised | No | R5‑196971 | |
R5‑196971 | Update to dataCodingScheme in SystemInformationBlockType11, required for ETWS test case | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195831 | |||
R5‑196004 | Update to 4.5A.16 generic procedure for UEs supporting Multi-PDN and Internet configured as secondary PDN with MobileData off | Qualcomm Incorporated, Anritsu Ltd. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196777 | Correction to NOTE on MCC/MNC setting for operation in EUTRA band 6 | ROHDE & SCHWARZ, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.2 | Routine Maintenance for TS 36.509 |   | ||||||||||
6.4.3 | Routine Maintenance for TS 36.523-1 |   | ||||||||||
6.4.3.1 | Idle Mode |   | ||||||||||
6.4.3.2 | Layer 2 |   | ||||||||||
6.4.3.2.1 | MAC | R5‑195829 | Correction to test case 7.1.3.3a for CAT-M1 UE | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196005 | Update to MAC DL TBS test cases - 7.1.7.x.x | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196006 | Update to MAC UL TBS test cases - 7.1.7.2.1, 7.1.7.2.4 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196284 | Correction eMTC Test case 7.2.3.21 and 7.3.5.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesoffline discussion with TF160
for email agreement
r1 was produced.
| revised | No | R5‑197669 | |||
R5‑197669 | Correction eMTC Test case 7.2.3.21 and 7.3.5.3 | ROHDE & SCHWARZ | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑196284 | |||
6.4.3.2.2 | RLC |   | ||||||||||
6.4.3.2.3 | PDCP |   | ||||||||||
6.4.3.3 | RRC |   | ||||||||||
6.4.3.3.1 | RRC Part 1 (clauses 8.1 and 8.5) | R5‑196979 | Updating 8.5.4.1 to remove transient period for FGI 103 and 104 | Huawei, HiSilicon | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||
6.4.3.3.2 | RRC Part 2 (clause 8.2), | R5‑196279 | Correction to test case 8.2.2.6.2 for Cat-M1 device | ANRITSU LTD | CR | Agreement | Yes |
YesRohde&Schwarz wondered why were the test cases allowed to run with Cat. M.
It was not clear. Deferred.
The TF160 manger reported that the spreadsheet said that Cat. M1 is allowed. Test case is not included in any GCF nor PTCRB list.
| agreed | No | ||
6.4.3.3.3 | RRC Part 3 (clause 8.3) |   | ||||||||||
6.4.3.3.4 | Inter-RAT (clauses 8.4 & 8.4A) |   | ||||||||||
6.4.3.3.5 | RRC LTE MDT (clause 8.6) |   | ||||||||||
6.4.3.3.6 | RRC ANR for UTRAN (clause 8.7) |   | ||||||||||
6.4.3.4 | EPS Mobility Management |   | ||||||||||
6.4.3.5 | EPS Session Management | R5‑195743 | Correction to test case 10.5.1b | Intel Corporation (UK) Ltd, Keysight Technologies Ltd. | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑196086 | Correction to test case 10.5.1b | Intel Corporation (UK) Ltd, Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesRel-15 coversheet.
r1 was presented on Mon.
Rohde&Schwarz wondered about TTCN impact?
Maybe update coverpage.
| revised | No | R5‑196975 | |||
R5‑196975 | Correction to test case 10.5.1b | Intel Corporation (UK) Ltd, Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196086 | |||
6.4.3.6 | General Tests | R5‑196019 | Update of IMS eCall test cases 11.3.2, 11.3.3 and 11.3.6 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196775 | Corrected PLMNs in IMS emergency test cases | ROHDE & SCHWARZ, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.3.7 | Interoperability Radio Bearers |   | ||||||||||
6.4.3.8 | Multilayer Procedures |   | ||||||||||
6.4.3.9 | PWS - ETWS, CMAS |   | ||||||||||
6.4.3.10 | Non-3GPP |   | ||||||||||
6.4.3.11 | Others (TS 36.523-1 clauses not covered by other AIs under AI 6.4.3, e.g. eMBMS, Home (e)NB, MBMS in LTE, D2D, SC-PTM, NB-IoT, CIoT...) | R5‑195992 | Correction to NB-IoT test case 22.1.1 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑195993 | Correction to CIoT test case 23.1.2 | MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Mon.
| revised | No | R5‑196972 | |||
R5‑196972 | Correction to CIoT test case 23.1.2 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195993 | |||
R5‑196007 | Correction to NB-IoT test case 22.2.1 | Qualcomm Incorporated | CR | Agreement | Yes |
Yesthe TF160 manager commented about the timer tolerance.
| agreed | No | ||||
R5‑196008 | Correction to NB-IoT test case 22.5.17 | Qualcomm Incorporated | CR | Agreement | Yes |
Yesfirst agreed, then r1 was produced.
| revised | No | R5‑197239 | |||
R5‑197239 | Correction to NB-IoT test case 22.5.17 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196008 | |||
R5‑196045 | Removal of NB-IoT test case 22.5.19 | CATT, TDIA | CR | Agreement | Yes |
YesAnritsu and Qualcomm wondered about the reasons.
Coverpage shall be updated with it.
| revised | No | R5‑196973 | |||
R5‑196973 | Removal of NB-IoT test case 22.5.19 | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196045 | |||
R5‑196206 | Correction to NBIOT testcase 22.2.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196207 | Correction to NBIOT testcase 22.2.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196208 | Correction to NBIOT testcase 22.2.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196209 | Correction to NBIOT testcase 22.4.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
YesTF160 still looking int this.
| agreed | No | ||||
R5‑196210 | Correction to NBIOT testcase 22.5.7b | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196211 | Correction to NBIOT R14 test case 22.4.24 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196212 | Correction to NBIOT testcase 22.5.21 | ROHDE & SCHWARZ, Qualcomm | CR | Agreement | Yes |
Yes
| revised | No | R5‑196974 | |||
R5‑196974 | Correction to NBIOT testcase 22.5.21 | ROHDE & SCHWARZ, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196212 | |||
R5‑196993 | Add and use reference to NG.108 | Qualcomm Incorporated, Rohde & Schwarz | CR | Agreement | Yes |
Yeslate doc
reissued as R5-197237 because it was decided to put the change in part-2.
| withdrawn | Yes | ||||
6.4.4 | Routine Maintenance for TS 36.523-2 | R5‑196009 | Update of applicability condition C139 and C231 for SRVCC HO support | Qualcomm Incorporated, Sporton | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑196166 | Removal of test applicability of NB-IoT test case 22.5.19 | CATT | CR | Agreement | Yes |
YesC340 also needs to be voided.
Postponed to check.
r1 was presented on Thu.
| revised | No | R5‑197238 | |||
R5‑197238 | Removal of test applicability of NB-IoT test case 22.5.19 | CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196166 | |||
R5‑197237 | Add and use reference to NG.108 | Qualcomm Incorporated, Rohde & Schwarz | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
6.4.5 | Routine Maintenance for TS 36.523-3 | R5‑195834 | Correction to test case execution guideline for eMBMS-SC test case 17.4.3a | Keysight Technologies UK Ltd | CR | Agreement | Yes |
YesTF160 had some concerns.
r2 was produced.
| revised | No | R5‑197240 | |
R5‑197240 | Correction to test case execution guideline for eMBMS-SC test case 17.4.3a | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yesfor email agreement
r1 was produced.
| revised | No | R5‑197670 | R5‑195834 | ||
R5‑197670 | Correction to test case execution guideline for eMBMS-SC test case 17.4.3a | Keysight Technologies UK Ltd | CR | Agreement | No |
YesEmail agreed.
| agreed | No | R5‑197240 | |||
R5‑195956 | Routine maintenance for TS 36.523-3 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196307 | Updating test execution guidelines for test case 8.2.4.21.2 (CA_14A_30). | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.6 | Discussion Papers, Work Plan, TC lists | R5‑196204 | TS 36.523-1 Status before RAN5#84 | Rapporteur (BlackBerry) | other | Information | Yes |
Yes
| noted | No | ||
R5‑196205 | TS 36.523-1 Status after RAN5#84 | Rapporteur (BlackBerry) | other | Approval | No |
Yespost meeting doc
| noted | No | ||||
R5‑196349 | Discussion Document on 2 Proposed Test Cases | NIST | discussion | Agreement | Yes |
Yescontinue discussions.
| noted | No | ||||
R5‑196528 | NG.108 scope update for test cases applicable to CAT-M1 UEs | Qualcomm Incorporated | discussion | Decision | Yes |
Yesa CR will be produced. Proposal still to be checked.
| noted | No | ||||
6.5 | Other Maintenance TEIx_Test |   | ||||||||||
6.5.1 | Routine Maintenance for TDD (HCR & LCR) |   | ||||||||||
6.5.1.1 | TS 34.108 |   | ||||||||||
6.5.1.2 | TS 34.123-1 |   | ||||||||||
6.5.1.3 | TS 34.123-2 |   | ||||||||||
6.5.1.4 | TS 34.123-3 |   | ||||||||||
6.5.1.5 | Discussion Papers, Work Plan, TC list & CR summary |   | ||||||||||
6.5.2 | Routine Maintenance for TS 34.108 | R5‑196834 | Updates to Test USIM parameters | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.5.3 | Routine Maintenance for TS 34.109 |   | ||||||||||
6.5.4 | Routine Maintenance for TS 34.123 |   | ||||||||||
6.5.4.1 | TS 34.123-1 |   | ||||||||||
6.5.4.2 | TS 34.123-2 |   | ||||||||||
6.5.4.3 | TS 34.123-3 |   | ||||||||||
6.5.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.5.6 | Routine Maintenance for TS 34.229 |   | ||||||||||
6.5.6.1 | TS 34.229-1 | R5‑195811 | Clean-up of Annex A.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||
R5‑195812 | Clean-up of Annex A.1.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195813 | Clean-up of Annex A.1.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195814 | Clean-up of Annex A.1.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195815 | Clean-up of Annex A.1.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195816 | Clean-up of Annex A.1.6 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195817 | Clean-up of Annex A.1.7 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195818 | Clean-up of Annex A.1.8 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195819 | Clean-up of Annex A.2.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195820 | Clean-up of Annex A.2.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195830 | Clean-up of Annex A.2.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195832 | Clean-up of Annex A.2.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195833 | Clean-up of Annex A.2.6 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195835 | Clean-up of Annex A.2.7 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195836 | Clean-up of Annex A.2.8 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195837 | Clean-up of Annex A.2.9 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195838 | Clean-up of Annex A.3.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195839 | Clean-up of Annex A.3.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195841 | Clean-up of Annex A.3.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195842 | Clean-up of Annex A.2.10 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195844 | Clean-up of Annex A.2.11 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195845 | Clean-up of Annex A.2.12 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195848 | Clean-up of Annex A.2.13 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195851 | Clean-up of Annex A.2.14 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195853 | Clean-up of Annex A.2.15 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195854 | Clean-up of Annex A.2.16 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197032 | |||
R5‑197032 | Clean-up of Annex A.2.16 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195854 | |||
R5‑195855 | Clean-up of Annex A.2.17 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195856 | Clean-up of Annex A.2.18 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195857 | Clean-up of Annex A.2.19 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195858 | Clean-up of Annex A.2.20 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195859 | Clean-up of Annex A.2.21 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195860 | Clean-up of Annex A.2.22 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195861 | Clean-up of Annex A.2.23 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195862 | Clean-up of Annex A.2.24 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195863 | Clean-up of Annex A.4.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195864 | Clean-up of Annex A.4.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195866 | Clean-up of Annex A.4.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195867 | Clean-up of Annex A.4.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195868 | Clean-up of Annex A.4.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195869 | Clean-up of Annex A.4.6 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195870 | Clean-up of Annex A.5.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195871 | Clean-up of Annex A.5.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195872 | Clean-up of Annex A.5.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195873 | Clean-up of Annex A.6.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195874 | Clean-up of Annex A.6.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195875 | Clean-up of Annex A.6.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195876 | Clean-up of Annex A.7.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195877 | Clean-up of Annex A.7.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195878 | Clean-up of Annex A.7.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195879 | Clean-up of Annex A.7.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195880 | Clean-up of Annex A.7.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195881 | Clean-up of Annex A.7.6 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesblock agreed on Wed.
| agreed | No | ||||
R5‑195882 | Clean-up of Annex A.8.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197033 | |||
R5‑197033 | Clean-up of Annex A.8.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195882 | |||
R5‑195883 | Clean-up of Annex A.8.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197034 | |||
R5‑197034 | Clean-up of Annex A.8.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195883 | |||
R5‑195884 | Editorials regarding PANI header in Annex A.2.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195891 | Generalization of C.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195893 | Adding requirement for codec preference order to C.44 | ROHDE & SCHWARZ, Ericsson | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197035 | |||
R5‑197035 | Adding requirement for codec preference order to C.44 | ROHDE & SCHWARZ, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195893 | |||
R5‑195894 | Revisiting the Scope section | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195957 | Correction of IMS test case 15.30 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑195958 | Correction of IMS session timer test cases 22.1, 22.2, 22.3, 22.5, 22.6, 22.7, 22.8 | MCC TF160 | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197036 | |||
R5‑197036 | Correction of IMS session timer test cases 22.1, 22.2, 22.3, 22.5, 22.6, 22.7, 22.8 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195958 | |||
R5‑196010 | Addition of new clause for generic test procedure to set up MTSI MO speech call without preconditions | Qualcomm Incorporated, AT&T, Rohde & Schwarz | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197037 | |||
R5‑197037 | Addition of new clause for generic test procedure to set up MTSI MO speech call without preconditions | Qualcomm Incorporated, AT&T, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196010 | |||
R5‑196011 | Addition of new MO voice call scenario without preconditions when 503 service unavailable | Qualcomm Incorporated, Rohde & Schwarz, AT&T | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196012 | Addition of new MO voice call scenario without preconditions when 504 server time-out | Qualcomm Incorporated, Rohde & Schwarz, AT&T | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196018 | Update of IMS eCall test cases 21.1 and 21.2 | Qualcomm Incorporated, CETECOM | CR | Agreement | Yes |
Yesr3 was presented on Wed.
| revised | No | R5‑197038 | |||
R5‑197038 | Update of IMS eCall test cases 21.1 and 21.2 | Qualcomm Incorporated, CETECOM | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196018 | |||
R5‑196162 | Updated of MO MTSI voice call without preconditions test case 12.12a | Qualcomm Incorporated, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑196493 | Addition of new test case 12.27 for codec change from AMR-WB to AMR-NB | NTT DOCOMO INC. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197039 | |||
R5‑197039 | Addition of new test case 12.27 for codec change from AMR-WB to AMR-NB | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196493 | |||
R5‑196508 | Addition of new test case 12.27a for codec change from EVS to AMR-NB | NTT DOCOMO INC. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197040 | |||
R5‑197040 | Addition of new test case 12.27a for codec change from EVS to AMR-NB | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196508 | |||
R5‑196509 | Addition of new test case 12.28 for canceling a voice call establishment by MO UE | NTT DOCOMO INC. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197041 | |||
R5‑197041 | Addition of new test case 12.28 for canceling a voice call establishment by MO UE | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196509 | |||
R5‑196510 | Addition of new test case 12.25a for MT UE not supporting EVS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
Rohde&Schwarz proposed to align the payload numbers along all th MT flows.
| revised | No | R5‑197042 | |||
R5‑197042 | Addition of new test case 12.25a for MT UE not supporting EVS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196510 | |||
R5‑196511 | Addition of new test case 18.1a for Mobile Originating Concatenated SMS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197043 | |||
R5‑197043 | Addition of new test case 18.1a for Mobile Originating Concatenated SMS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196511 | |||
R5‑196512 | Addition of new test case 18.2a for Mobile Terminating Concatenated SMS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197044 | |||
R5‑197044 | Addition of new test case 18.2a for Mobile Terminating Concatenated SMS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196512 | |||
R5‑197050 | Title: Unify usage of dynamic payload type numbers | Rohde & Schwarz | CR | Agreement | Yes |
Yeslate doc
for email agreement
Email agreed.
| agreed | No | ||||
6.5.6.2 | TS 34.229-2 | R5‑195896 | Miscellaneous fixes to test case applicabilities | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197047 | |
R5‑197047 | Miscellaneous fixes to test case applicabilities | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195896 | |||
R5‑196013 | Addition of applicability for new MO test cases with 503 and 504 response tested without preconditions | Qualcomm Incorporated, Rohde & Schwarz, AT&T | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197045 | |||
R5‑197045 | Addition of applicability for new MO test cases with 503 and 504 response tested without preconditions | Qualcomm Incorporated, Rohde & Schwarz, AT&T | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196013 | |||
R5‑196516 | Addition of new test applicability for IMS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yesr1 was presented on Wed.
| revised | No | R5‑197046 | |||
R5‑197046 | Addition of new test applicability for IMS | NTT DOCOMO INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196516 | |||
6.5.6.3 | TS 34.229-3 | R5‑195959 | Routine maintenance for TS 34.229-3 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.5.6.4 | TS 34.229-4 |   | ||||||||||
6.5.6.5 | Discussion Papers, Work Plan, TC lists | R5‑195899 | Discussion paper on splitting TS 34.229-1 | ROHDE & SCHWARZ | discussion | Discussion | Yes |
YesTF160/Anritsu proposed to have a new 5G spec.
Qualcomm agreed.
Rohde&Schwarz commented it impacts Annex K, C.
Conclusion: it was agreed to make a new IMS 5G spec, proposal is TS 34.229-5, rapporteur Rohde&Schwarz, approval in Dec. at RAN#86.
Applicability and TTCN will be kept in the old TS 34.229-2 and -3.
| noted | No | ||
R5‑195900 | Discussion paper on Conformance Requirements | ROHDE & SCHWARZ | discussion | Discussion | Yes |
Yesto be discussed
| noted | No | ||||
R5‑196514 | Proposing new IMS test cases | NTT DOCOMO INC. | discussion | Endorsement | Yes |
Yesthe proposals are accepted
| noted | No | ||||
6.5.7 | Routine Maintenance for TS 37.571 |   | ||||||||||
6.5.7.1 | TS 37.571-2 |   | ||||||||||
6.5.7.2 | TS 37.571-3 | R5‑195903 | Deletion of duplicated conditions for EUTRA tests | Spirent Communications | CR | Agreement | Yes |
Yesr1 was presented on Thu.
| revised | No | R5‑197165 | |
R5‑197165 | Deletion of duplicated conditions for EUTRA tests | Spirent Communications | CR | Agreement | Yes |
Yes
| agreed | No | R5‑195903 | |||
6.5.7.3 | TS 37.571-4 |   | ||||||||||
6.5.7.4 | TS 37.571-5 | R5‑196135 | Include GNSS-NavigationModel (Model-3) for modernized GPS | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yescat. B
| withdrawn | Yes | ||
6.5.7.5 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.5.8 | Routine Maintenance for TS 51.010 |   | ||||||||||
6.5.8.1 | TS 51.010-1 (Signalling) | R5‑196359 | Correction for test cases 26.6.6.1 and 26.6.13.3 | Keysight, Intel, Rohde & Schwarz | CR | Agreement | Yes |
Yesblock agreed on ?
wrong WIC. wrong lines!
r2 was presented on Thu.
| revised | No | R5‑197265 | |
R5‑197265 | Correction for test cases 26.6.6.1 and 26.6.13.3 | Keysight, Intel, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196359 | |||
6.5.8.2 | TS 51.010-2 (Signalling) |   | ||||||||||
6.5.8.3 | TS 51.010-5 (Signalling) |   | ||||||||||
6.5.8.4 | TS 51.010-7 (Signalling) |   | ||||||||||
6.5.8.5 | Discussion Papers, Work Plan, TC list & CR summary |   | ||||||||||
6.5.9 | Routine Maintenance for MCPTT |   | ||||||||||
6.5.9.1 | TS 36.579-1 | R5‑195960 | Correction of 200 OK default message contents | MCC TF160, UPV/EHU | CR | Agreement | Yes |
Yeslate doc
| withdrawn | Yes | ||
R5‑195961 | Correction of default contents in the SIP 401 (Unauthorized) message | MCC TF160 | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑195962 | Correction of default contents in the SIP ACK message from the UE | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195963 | Correction of default contents in the SIP INVITE from the SS | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195964 | Correction of default contents in the SIP INVITE from the UE | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195965 | Correction of default contents in the SIP NOTIFY from the SS | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195966 | Correction of default contents in the SIP REGISTER | MCC TF160 | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197229 | |||
R5‑197229 | Correction of default contents in the SIP REGISTER | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑195966 | |||
R5‑195967 | Correction of default contents in the SIP UPDATE message | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
| withdrawn | Yes | ||||
R5‑195968 | Corrections to references and values in TS 36.579-1 | MCC TF160 | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197134 | |||
R5‑197134 | Corrections to references and values in TS 36.579-1 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
reissued as R5-197294 because of title change
| withdrawn | Yes | R5‑195968 | |||
R5‑197294 | Correction and addition of references or values and editorial comments | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed
| agreed | No | ||||
R5‑196297 | Corrections to MCPTT UE registration procedures | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
r1 was produced.
| revised | No | R5‑197138 | |||
R5‑197138 | Corrections to MCPTT UE registration procedures | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
no cl. aff.
| revised | No | R5‑197295 | R5‑196297 | ||
R5‑197295 | Corrections to MCPTT UE registration procedures | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑197138 | |||
R5‑196346 | Update to Generic Procedure 5.3.3 | NIST | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196357 | Update to Generic Procedure 5.3.2 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu.
Later withdrawn.
already covered by R5-197138 from TF160.
| withdrawn | Yes | ||||
R5‑196358 | Update to Generic Procedure 5.3.3 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197132 | |||
R5‑197132 | Update to Generic Procedure 5.3.3 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
wrong rev on cover!
| revised | No | R5‑197293 | R5‑196358 | ||
R5‑197293 | Update to Generic Procedure 5.3.3 | NIST | CR | Agreement | Yes |
Yesblock agreed
| agreed | No | R5‑197132 | |||
R5‑196773 | Updates to conditions Table 5.5.1-1 | MCC TF160 | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu
| agreed | No | ||||
R5‑196983 | Correction of SIP messages | MCC TF160, Samsung | CR | Agreement | Yes |
Yeslate doc
block agreed on Thu
| agreed | No | ||||
6.5.9.2 | TS 36.579-2 | R5‑195969 | Correction of test case 5.3 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | ||
R5‑195970 | Correction of test case 5.4 | MCC TF160 | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195971 | Correction of test case 6.1.1.1 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | ||||
R5‑195972 | Correction of test case 6.1.1.11 | MCC TF160 | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197135 | |||
R5‑197135 | Correction of test case 6.1.1.11 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑195972 | |||
R5‑195973 | Correction of test case 6.1.1.13 | MCC TF160 | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197136 | |||
R5‑197136 | Correction of test case 6.1.1.13 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑195973 | |||
R5‑195974 | Correction of test case 6.1.2.1 | MCC TF160 | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑195975 | Corrections to references and values in TS 36.579-2 | MCC TF160 | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197137 | |||
R5‑197137 | Corrections to references and values in TS 36.579-2 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑195975 | |||
R5‑196298 | Correction of test case 6.1.2.5 | MCC TF160 | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196299 | Correction of test case 6.1.2.7 | MCC TF160 | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196300 | Correction of test case 6.1.2.9 | MCC TF160 | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑196301 | Correction of test case 6.2.1 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | ||||
R5‑196302 | Correction of test case 6.2.3 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | ||||
R5‑196303 | Correction of test case 6.2.5 | MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | ||||
R5‑196321 | Update to MCPTT Chat Group TC 6.1.2.1 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197107 | |||
R5‑197107 | Update to MCPTT Chat Group TC 6.1.2.1 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196321 | |||
R5‑196322 | Update to MCPTT Chat Group TC 6.1.2.3 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197108 | |||
R5‑197108 | Update to MCPTT Chat Group TC 6.1.2.3 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196322 | |||
R5‑196323 | Update to MCPTT Chat Group TC 6.1.2.4 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197109 | |||
R5‑197109 | Update to MCPTT Chat Group TC 6.1.2.4 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196323 | |||
R5‑196324 | Update to MCPTT Chat Group TC 6.1.2.5 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197110 | |||
R5‑197110 | Update to MCPTT Chat Group TC 6.1.2.5 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196324 | |||
R5‑196325 | Update to MCPTT Chat Group TC 6.1.2.6 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197111 | |||
R5‑197111 | Update to MCPTT Chat Group TC 6.1.2.6 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196325 | |||
R5‑196326 | Update to MCPTT Chat Group TC 6.1.2.7 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197112 | |||
R5‑197112 | Update to MCPTT Chat Group TC 6.1.2.7 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196326 | |||
R5‑196327 | Update to MCPTT Chat Group TC 6.1.2.8 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197113 | |||
R5‑197113 | Update to MCPTT Chat Group TC 6.1.2.8 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196327 | |||
R5‑196328 | Update to MCPTT Chat Group TC 6.1.2.9 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197114 | |||
R5‑197114 | Update to MCPTT Chat Group TC 6.1.2.9 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196328 | |||
R5‑196329 | Update to MCPTT Chat Group TC 6.1.2.10 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197115 | |||
R5‑197115 | Update to MCPTT Chat Group TC 6.1.2.10 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196329 | |||
R5‑196330 | New MCPTT Chat Group TC 6.1.2.11 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197116 | |||
R5‑197116 | New MCPTT Chat Group TC 6.1.2.11 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196330 | |||
R5‑196331 | New MCPTT Chat Group TC 6.1.2.12 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197117 | |||
R5‑197117 | New MCPTT Chat Group TC 6.1.2.12 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196331 | |||
R5‑196345 | Update to Generic Procedure 5.3.2 | NIST | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑196347 | Update to TC 5.4 | NIST, MCC TF160 | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197130 | |||
R5‑197130 | Update to TC 5.4 | NIST, MCC TF160 | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196347 | |||
R5‑196348 | Update to TC 6.1.1.5 | NIST | CR | Agreement | Yes |
Yesr1 was produced.
| revised | No | R5‑197131 | |||
R5‑197131 | Update to TC 6.1.1.5 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | R5‑196348 | |||
6.5.9.3 | TS 36.579-3 |   | ||||||||||
6.5.9.4 | TS 36.579-4 | R5‑196332 | Updates to Table 4-1 | NIST | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑196356 | Updates to Table 4-1 | NIST | CR | Agreement | Yes |
Yesblock agreed on Thu
| agreed | No | ||||
6.5.9.5 | TS 36.579-5 |   | ||||||||||
6.5.9.6 | Other Specs |   | ||||||||||
6.5.9.7 | Discussion Papers, Work Plan, TC lists |   | ||||||||||
6.6 | Outgoing liaison statements for provisional approval | R5‑197096 | LS on using GIBA for testing IMS over 5GS | TSG WG RAN5 | LS out | discussion | Yes |
Yes
| approved | No | ||
6.7 | AOB |   | ||||||||||
7 | Closing Joint Session |   | ||||||||||
7.1 | Pointer CRs |   | ||||||||||
7.2 | Open Issues |   | ||||||||||
7.2.1 | RF group docs still requiring WG verdict/confirmation - original A.I. retained |   | ||||||||||
7.2.2 | Sig group docs still requiring WG verdict/confirmation - original A.I. retained | R5‑196096 | Initial registration / 5GS services / NSSAI handling / NSSAI Storage | Qualcomm communications-France | CR | Agreement | Yes |
Yespostponed
numbering error
b
title change
r1 was presented on Fri.
| revised | No | R5‑197267 | |
R5‑197267 | Initial registration / 5GS services / NSSAI handling / NSSAI Storage | Qualcomm communications-France | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196096 | |||
R5‑196134 | Correction to Testcases 7.2.2.2, 7.3.4.2 and 7.3.4.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yesr1 was presented on Thu.
Agreed in the joint.
r2 was presented on Fri.
| revised | No | R5‑197164 | |||
R5‑197164 | Correction to Testcases 7.2.2.2, 7.3.4.2 and 7.3.4.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑196134 | |||
R5‑197175 | Missing Values from Request Assistance Data Table | PCTEST Engineering Lab | CR | Agreement | Yes |
Yeslate doc
| agreed | No | ||||
7.2.3 | Other open issues from joint sessions - original A.I. retained | R5‑196274 | Update of RAN5 5G NR phases and target update RAN5#84 | Ericsson | discussion | Endorsement | No |
Yesfor email approval
2 weeks
| for email approval | No | ||
R5‑196970 | Update of PRD18 for 5G specs and relations between the specs in a group | Samsung | other | Approval | Yes |
Yes
| approved | No | R5‑196636 | |||
R5‑196989 | NGMN Operators Joint Position on 5G Core Connectivity Options | NGMN Alliance Board Members | LS in | Information | Yes |
Yespresented by Telecom Italia.
Telecom Italia to confirm with NGNM whether a response is required. Based on that a response LS can be allocated.
| noted | No | ||||
7.2.4 | UE Application Layer Data Throughput Performance - original A.I. retained |   | ||||||||||
7.2.5 | Other |   | ||||||||||
7.3 | iWD/PRD Updates | R5‑196203 | PRD-17 on Guidance to Work Item Codes version 3.17 (post RAN#85 version) | Rapporteur (BlackBerry) | other | Approval | No |
Nofor email approval
4 weeks
| for email approval | No | ||
7.4 | Work Items/ Study Items |   | ||||||||||
7.4.1 | Final version of Work Item Proposals | R5‑196968 | New WID: HP UE on B40 | Huawei, HiSilicon | WID new | Endorsement | Yes |
Yes
| endorsed | No | R5‑195727 | |
R5‑196710 | New WID on UE Conformance Test Aspects - Introduction of NR supplementary DL band n29 | Dish Network | WID new | Endorsement | Yes |
Yesmerged in to the basket WI Rel-16 bands R5-197140.
| withdrawn | Yes | ||||
R5‑196727 | New WID on UE Conformance Test Aspects - Band 65 for New Radio | Dish Network | WID new | Endorsement | Yes |
Yesmerged in to the basket WI Rel-16 bands R5-197140.
| withdrawn | Yes | ||||
R5‑197140 | New WID on UE Conformance Test Aspects - Introduction of new Rel-16 NR bands and extension of existing NR bands | Ericsson | WID new | Endorsement | Yes |
Yesa draft_v2 was presented on Fri.
| endorsed | No | ||||
7.4.2 | Active Work Items/ Study Item: work plans (wp), status reports (sr), Work Item Descriptions (wid) | R5‑195515 | WI Progress and Target Completion Date Review | WG Chairman | other | Information | No |
Yespost meeting doc
| noted | No | ||
R5‑195734 | SR - MDT after RAN5#84 | CMCC | WI status report | Yes |
Yes
| noted | No | |||||
R5‑195735 | WP - MDT after RAN5#84 | CMCC | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑195738 | WP - NR_Rel-16_CA_DC after RAN5#84 | CMCC, Ericsson, China Unicom | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑195741 | SR - NR_Rel-16_CA_DC after RAN5#84 | CMCC, Ericsson, China Unicom | WI status report | Yes |
Yes
| noted | No | |||||
R5‑196264 | WP UE Conformance Test Aspects - Rel-13 LTE CA configurations | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196265 | SR UE Conformance Test Aspects - Rel-13 LTE CA configurations | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196266 | WP UE Conformance Test Aspects - Rel-14 LTE CA configurations | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196267 | SR UE Conformance Test Aspects - Rel-14 LTE CA configurations | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196268 | WP UE Conformance Test Aspects - Rel-15 LTE CA configurations | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196269 | SR UE Conformance Test Aspects - Rel-15 LTE CA configurations | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196270 | WP UE Conformance Test Aspects - Rel-16 LTE CA configurations | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196271 | SR UE Conformance Test Aspects - Rel-16 LTE CA configurations | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196272 | WP UE Conformance Test Aspects - 5G system with NR and LTE | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196273 | SR UE Conformance Test Aspects - 5G system with NR and LTE | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196309 | SR - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest | NIST | WI status report | Yes |
Yes
| noted | No | |||||
R5‑196350 | WP - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest | NIST | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑196447 | WP - LTE450_Reg3-UEConTest for RAN5#84 | China Unicom | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑196448 | SR - LTE450_Reg3-UEConTest for RAN5#84 | China Unicom | WI status report | Yes |
Yes
| noted | No | |||||
R5‑196517 | Revised WID on UE Conformance Test Aspects Enhanced LTE Support for Aerial Vehicles | NTT DOCOMO INC. | WID revised | Endorsement | Yes |
Yesr1 was presented on Fri.
To be submitted to the RAN#85 plnary.
| noted | No | R5‑197272 | |||
R5‑197272 | Revised WID on UE Conformance Test Aspects Enhanced LTE Support for Aerial Vehicles | NTT DOCOMO INC. | WID revised | Endorsement | Yes |
Yes
| noted | No | R5‑196517 | |||
R5‑196518 | WP UE Conformance Test Aspects Enhanced LTE Support for Aerial Vehicles | NTT DOCOMO INC. | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑196519 | WP UE Conformance Test Aspects 5G System Non-3GPP Access | Motorola Mobility | Work Plan | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196520 | SR UE Conformance Test Aspects 5G System Non-3GPP Access | Motorola Mobility | WI summary | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196525 | SR UE Conformance Test Aspects -Enhanced LTE Support for Aerial Vehicles | NTT DOCOMO INC. | WI status report | Yes |
Yes
| noted | No | |||||
R5‑196530 | WP - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 | Ericsson | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑196531 | SR - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 | Ericsson | WI status report | Yes |
Yes
| noted | No | |||||
R5‑196575 | Update of euCA work plan | Nokia Corporation | Work Plan | Yes |
Yes
| withdrawn | Yes | |||||
R5‑196761 | WP - Support for V2X services Status after RAN5#84 | LTE_V2X-UEConTest | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196762 | SR - Support for V2X services - Status after RAN5#84 | LTE_V2X-UEConTest | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196763 | WP - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell - Status after RAN5#84 | LTE_CA_enh_b5C_PUCCH-UEConTest | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196764 | SR - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell - Status after RAN5#84 | LTE_CA_enh_b5C_PUCCH-UEConTest | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196765 | WP - Shortened TTI and processing time for LTE - Status after RAN5#84 | LTE_sTTIandPT-UEConTest | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196766 | SR - Shortened TTI and processing time for LTE - Status after RAN5#84 | LTE_sTTIandPT-UEConTest | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196792 | WP UE Conformance Test Aspects Rel13 Full Dimension MIMO for LTE | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196793 | SR UE Conformance Test Aspects Rel13 Full Dimension MIMO for LTE | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196794 | WP UE Conformance Test Aspects Rel14 Enhanced Full Dimension MIMO for LTE | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196795 | SR UE Conformance Test Aspects Rel14 Enhanced Full Dimension MIMO for LTE | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196822 | WP UE Conformance Test Aspects Further enhanced MTC for LTE | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑196823 | SR UE Conformance Test Aspects Further enhanced MTC for LTE | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196891 | UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation | Sprint Corporaton | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196892 | UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation | Sprint Corporaton | Work Plan | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑196897 | Study on 5G NR UE Application Layer Data Throughput Performance | Qualcomm communications-France | SID revised | Approval | Yes |
Yesr1 was presented on Fri.
| noted | No | R5‑197274 | |||
R5‑197274 | Study on 5G NR UE Application Layer Data Throughput Performance | Qualcomm communications-France | SID revised | Approval | Yes |
Yes
| noted | No | R5‑196897 | |||
R5‑196902 | Status report of SI: Study on 5G NR UE Application Layer Data Throughput Performance | Qualcomm communications-France | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑196961 | WP UE Conformance Test Aspects Enhancing LTE CA Utilization Status after RAN5#84 | Nokia corporation | Work Plan | discussion | Yes |
Yes
| noted | No | ||||
R5‑196962 | SR UE Conformance Test Aspects Enhancing LTE CA Utilization Status after RAN5#84 | Nokia corporation | WI status report | discussion | Yes |
Yes
| noted | No | ||||
R5‑197031 | Revised WID on UE Conformance Test Aspects - Rel-16 NR CA and DC; and NR and LTE DC Configurations | CMCC, Ericsson, China Unicom | WID revised | discussion | Yes |
Yesr2 was presented on Fri.
| noted | No | R5‑197273 | |||
R5‑197273 | Revised WID on UE Conformance Test Aspects - Rel-16 NR CA and DC; and NR and LTE DC Configurations | CMCC, Ericsson, China Unicom | WID revised | discussion | Yes |
Yes
| noted | No | R5‑197031 | |||
R5‑197242 | Revised WID on UE Conformance Test Aspects 5G system with NR and LTE | Ericsson | WID revised | Endorsement | Yes |
Yes
| noted | No | ||||
7.4.3 | Work Plan updates of recently closed work items |   | ||||||||||
7.5 | Docs still needing agreement/endorsement/approval (e.g. Outgoing LS, Reports, New Specs, Info for certification bodies etc.) | R5‑196964 | MCC TF160 Status Report | MCC TF160 | report | Approval | Yes |
Yesrequests are endorsed by RAN5.
Add Rel-15 NB-IoT and Cat. M1.
| approved | No | R5‑195942 | |
R5‑195943 | RAN5 PRD12 version 6.2 | MCC TF160 | other | Approval | Yes |
Yes
| approved | No | ||||
R5‑196277 | 3GPP RAN5 CA status list (post-RAN5#84 meeting) | Ericsson | other | Information | No |
Yes
| noted | No | ||||
R5‑196278 | RAN5#84 summary of changes to RAN5 test cases with potential impact on GCF and PTCRB | Ericsson, Samsung | report | Information | No |
Yes
| noted | No | ||||
R5‑196351 | Draft TS 36.579-6 v0.1.0 | NIST | draft TS | Approval | No |
Yesonly for information in RAN5
for email approval 20.8.
| for email approval | No | ||||
R5‑196352 | Draft TS 36.579-7 v0.1.0 | NIST | draft TS | Approval | No |
Noonly for information in RAN5
for email approval 20.8.
| for email approval | No | ||||
R5‑197194 | Study on 5G NR User Equipment (UE) application layer data throughput performance | TSG WG RAN5 | draft TR | Agreement | Yes |
Noonly for information in RAN5
for email approval 20.8.
| for email approval | No | ||||
R5‑197270 | Update on GSMA generic UICC test profile and 5GS common test environment | TSG WG RAN5 | LS out | Approval | No |
Nofor email approval 3 weeks
| for email approval | No | ||||
R5‑197271 | 5GS SR Report RAN5#84 | Ericsson | report | Information | No |
Yes
| noted | No | ||||
R5‑197290 | Reply to RAN4 LS on FR2 RRM AoA setups | TSG WG RAN5 | LS out | Approval | No |
Nofor email approval
| for email approval | No | ||||
7.6 | Confirmation of Future RAN5 Matters | R5‑195516 | Review deadlines for next quarter | WG Chairman | other | Information | Yes |
Yes
| noted | No | ||
R5‑197637 | Response LS NGMN Operators Joint Position on 5GC Connectivity Options | TSG WG RAN5 | LS out | Approval | No |
No
| reserved | No | ||||
7.7 | AOB | R5‑197289 | draft RAN5#84 meeting report | ETSI Secretariat | report | Information | No |
Yes
| noted | No |