Tdoc List
2018-09-06 11:46
Agenda | Topic | TDoc | Title | Source | Type | For | Avail | Treated | Decision | Wdrn | Replaced-by | Replaces |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1.1 | Welcoming brief by the host |   | ||||||||||
2 | Reports |   | ||||||||||
2.1 | Live Reports | R5‑184003 | RAN5#80 Session Programme | WG Chairman | agenda | Information | Yes |
Yes
| noted | No | ||
R5‑184004 | RAN5 Leadership Team | WG Chairman | other | Information | Yes |
Yes
| noted | No | ||||
R5‑184005 | RAN5#79 WG Minutes | ETSI Secretariat | report | Approval | Yes |
Yes
| approved | No | ||||
R5‑184006 | RAN5#79 WG Action Points | ETSI Secretariat | report | Yes |
Yes
AP#78.01j from the joint RAN5#78 was closed last time. | revised | No | R5‑184998 | ||||
R5‑184998 | RAN5#79 WG Action Points | ETSI Secretariat | report | - | Yes |
Yes
| noted | No | R5‑184006 | |||
R5‑184007 | draft RAN5#80 meeting report | ETSI Secretariat | report | Information | No |
Yes
| noted | No | ||||
R5‑184008 | Latest RAN Plenary notes | WG Chairman | report | Yes |
Yes
| noted | No | |||||
R5‑184009 | Latest RAN Plenary draft Report | WG Chairman | report | Yes |
Yes
| noted | No | |||||
R5‑184010 | Post Plenary Active Work Item update | ETSI Secretariat | other | Information | Yes |
Yes
| noted | No | ||||
R5‑184070 | MCC TF160 Status Report | MCC TF160 | report | Agreement | Yes |
Yes
GCF will be asked for 4 MM for this year. | revised | No | R5‑184999 | |||
2.2 | General Reports for information | R5‑184011 | RAN5 SR to RP#80 | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||
R5‑184012 | TF160 SR to RP#80 | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||||
R5‑184013 | RAN Chair Report to SA#80 | WG Chairman | report | Information | Yes |
Yes
| noted | No | ||||
R5‑184433 | GCF 3GPP TCL after CAG#55 (GCF-CC v3.71.1 vs v3.70.2) | Ericsson | report | Information | Yes |
Yes
| noted | No | ||||
R5‑184447 | 3GPP RAN5 CA status list (pre-RAN5#80 meeting) | Ericsson | other | Information | Yes |
Yes
| noted | No | ||||
3 | Incoming Liaison Statements | R5‑184023 | LS on Introducing optional channel bandwidth | TSG WG RAN4 | LS in | Information | Yes |
Yes
comments wait for RAN2 action & response | noted | No | ||
R5‑184027 | dummy LS c | ETSI Secretariat | LS in | Information | No |
Yes
| withdrawn | Yes | ||||
R5‑184992 | CPWG180802-1 LS on Over-the-Air Radiated Performance Testing for 5G mm-Wave (FR2) User Equipment | CTIA 5G Millimeter-Wave OTA Sub-Working Group | LS in | Information | Yes |
Yes
CTIA work is aligned with 3GPP. | noted | No | ||||
R5‑184997 | LS from 5GAA for rel-15 2 RX vehicle mounted UE | 5GAA WG2 | LS in | Information | Yes |
Yes
| noted | No | ||||
4 | RAN5 General Issues |   | ||||||||||
4.1 | New Work Item proposals - for intro only | R5‑184432 | New WID for Rel-16 LTE CA | Ericsson | WID new | Endorsement | Yes |
Yes
NTT DOCOMO added. | revised | No | R5‑185000 | |
4.2 | General Discussion Papers |   | ||||||||||
4.2.1 | 5GS | R5‑184449 | Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal | Ericsson, Sprint, MCC TF160 | discussion | Endorsement | Yes |
Yes
Keysight commented that for specific test cases you need particular test frequency definition. | revised | No | R5‑185001 | |
4.2.2 | All other topics | R5‑184537 | Proposal for Work Plans | BlackBerry | discussion | Approval | Yes |
Yes
the proposal is endorsed.
The WP template should be updated. | noted | No | ||
4.3 | RAN5 PRDs/Templates | R5‑184014 | RAN5#80 LS Template | WG Chairman | other | Yes |
Yes
| noted | No | |||
R5‑184015 | RAN5 5GS Text Proposal / pCR cover sheet template | Ericsson | other | Information | Yes |
Yes
| noted | No | ||||
4.4 | Meeting schedule for 2018-19 | R5‑184016 | Meeting schedule for 2018-19 | WG Chairman | other | Yes |
Yes
| noted | No | |||
4.5 | Tdocs for mid-week joint session |   | ||||||||||
4.5.1 | RF group docs for WG review/verdict - original A.I. retained | R5‑184739 | Update of UE test loop mode E | Huawei,HiSilicon, CATT | CR | Agreement | Yes |
Yes
no CR#
/*DUPLICATED-REPL*/
Document replicated in two AIs: [5.3.12.2]-[4.5.1].
Conclusion changes to one of the replicas will be replicated to the other.
r1 was presented in the joint on Wed. | revised | No | R5‑185129 | |
R5‑185129 | Update of UE test loop mode E | Huawei,HiSilicon, CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184739 | |||
R5‑185130 | Update of UE test loop mode E | Huawei,HiSilicon, CATT | CR | Agreement | Yes |
Yes
/*DUPLICATED-REPL*/
Document replicated in two AIs: [4.5.1]-[5.3.12.2].
Conclusion changes to one of the replicas will be replicated to the other.
LATE DOCUMENT
shadow CR of R5-185129
| agreed | No | ||||
4.5.2 | Sig group docs for WG review/verdict - original A.I. retained | R5‑184188 | Reuse of demodulation setup for signalling tests in FR2 | ANRITSU LTD | discussion | Yes |
Yes
r1 was presented.
Rohde&schwarz suggested to put into the spec the minimum required.
Deferred. | revised | No | R5‑185131 | ||
R5‑185131 | Reuse of demodulation setup for signalling tests in FR2 | ANRITSU LTD | discussion | - | Yes |
Yes
Conclusion: minimum number of distinguishable power levels required for FR2 SIG test cases to be further alayzed and proposed at the next meeting. | noted | No | R5‑184188 | |||
R5‑185011 | Correction of clause 4.3.3.2.3 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185133 | |||
R5‑185133 | Correction of clause 4.3.3.2.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑185011 | |||
4.5.3 | Other open issues from joint sessions - original A.I. retained | R5‑184334 | New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE | Airbus DS SLC | WID new | Endorsement | Yes |
Yes
impact only on RF. | revised | No | R5‑185127 | |
R5‑184337 | New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE | Airbus DS SLC | WID new | Endorsement | Yes |
Yes
| revised | No | R5‑185128 | |||
R5‑185001 | Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal | Ericsson, Sprint, MCC TF160 | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184449 | |||
4.5.4 | UE Application Layer Data Throughput Performance TEI11_Test (TR 37.901) |   | ||||||||||
4.5.5 | GCF Test Optimisation |   | ||||||||||
4.5.6 | 5GS |   | ||||||||||
4.5.7 | Other |   | ||||||||||
5 | RF Functional Area |   | ||||||||||
5.1 | Review action points (fm A.I. 2.1) |   | ||||||||||
5.2 | Review incoming LS (fm A.I. 3) & new subject discussion papers | R5‑184019 | LS on Settings for verifying RF requirements for Coherent UL MIMO | TSG WG RAN4 | LS in | Information | Yes |
Yes
moved to RF. | noted | No | ||
R5‑184020 | LS on generic 3CC to 5CC RRM test cases | TSG WG RAN4 | LS in | Action | Yes |
Yes
moved to RF. | noted | No | ||||
R5‑184021 | Reply LS on the applicable requirements of the Power Class 2 capable UE | TSG WG RAN4 | LS in | Information | Yes |
Yes
moved to RF. | noted | No | ||||
R5‑184022 | LS on Measurement Grids | TSG WG RAN4 | LS in | Information | Yes |
Yes
moved to RF. | noted | No | ||||
R5‑184025 | LS reply on RAN4-RAN5 5G-NR RF pending issues: RMCs, OCNG patterns and FR2 RSRP accuracy | TSG WG RAN4 | LS in | Information | Yes |
Yes
| noted | No | ||||
R5‑184026 | LS reply on RAN4-RAN5 5G-NR RF pending issues | TSG WG RAN4 | LS in | Information | Yes |
Yes
moved to RF.
update from RAN4 Adhoc in July. | noted | No | ||||
5.3 | Open Work Items |   | ||||||||||
5.3.1 | Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA (UID - 700064) LTE_UTRA_IncMon-UEConTest |   | ||||||||||
5.3.1.1 | TS 34.108 |   | ||||||||||
5.3.1.2 | TS 34.121-1 |   | ||||||||||
5.3.1.3 | TS 34.121-2 |   | ||||||||||
5.3.1.4 | TS 36.508 | R5‑184502 | Addition of antenna diagrams for IncMon RRM test cases | Ericsson | CR | Agreement | Yes |
Yes
Revised to: R5-184502r1.
Revised from: R5-184502.
Revised to: R5-185454.
| revised | No | R5‑185454 | |
R5‑185454 | Addition of antenna diagrams for IncMon RRM test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184502 | |||
R5‑184515 | Addition of message content for RRM IncMon test cases | Ericsson | CR | Agreement | Yes |
Yes
no source.
Revised to: R5-184515r1.
Revised from: R5-184515.
Revised to: R5-185455.
| revised | No | R5‑185455 | |||
R5‑185455 | Addition of message content for RRM IncMon test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184515 | |||
5.3.1.5 | TS 36.521-2 | R5‑184519 | Addition of applicability of RRM IncMon test cases | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184519r1.
Revised from: R5-184519.
Revised to: R5-185453.
| revised | No | R5‑185453 | |
R5‑185453 | Addition of applicability of RRM IncMon test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184519 | |||
5.3.1.6 | TS 36.521-3 | R5‑184169 | Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances | Ericsson | CR | Agreement | Yes |
Yes
no source on cover.
Revised to: R5-184169r1.
Revised from: R5-184169.
Revised to: R5-184169r2.
Revised from: R5-184169r1.
Revised to: R5-185346.
Revised from: R5-184169r2.
Revised to: R5-185485.
| revised | No | R5‑185485 | |
R5‑185485 | Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184169 | |||
R5‑184589 | Addition of RRM IncMon new Test Case 8.4.8 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184589r1.
Revised from: R5-184589.
Revised to: R5-185457.
| revised | No | R5‑185457 | |||
R5‑185457 | Addition of RRM IncMon new Test Case 8.4.8 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184589 | |||
R5‑184590 | Addition of RRM IncMon new Test Case 8.4.9 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184590r1.
Revised from: R5-184590.
Revised to: R5-185458.
| revised | No | R5‑185458 | |||
R5‑185458 | Addition of RRM IncMon new Test Case 8.4.9 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184590 | |||
R5‑184716 | Addition of RRM IncMon new Test Case 8.5.8 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184716r1.
Revised from: R5-184716.
Revised to: R5-185459.
| revised | No | R5‑185459 | |||
R5‑185459 | Addition of RRM IncMon new Test Case 8.5.8 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184716 | |||
R5‑184717 | Addition of RRM IncMon new Test Case 8.6.3 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184717r1.
Revised from: R5-184717.
Revised to: R5-185460.
| revised | No | R5‑185460 | |||
R5‑185460 | Addition of RRM IncMon new Test Case 8.6.3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184717 | |||
R5‑184718 | Addition of RRM IncMon new Test Case 8.7.5 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184718r1.
Revised from: R5-184718.
Revised to: R5-185461.
| revised | No | R5‑185461 | |||
R5‑185461 | Addition of RRM IncMon new Test Case 8.7.5 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184718 | |||
R5‑184719 | Addition of RRM IncMon new Test Case 8.7A.1 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184719r1.
Revised from: R5-184719.
Revised to: R5-185462.
| revised | No | R5‑185462 | |||
R5‑185462 | Addition of RRM IncMon new Test Case 8.7A.1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184719 | |||
R5‑184720 | Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184720r1.
Revised from: R5-184720.
Revised to: R5-185463.
| revised | No | R5‑185463 | |||
R5‑185463 | Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184720 | |||
R5‑184721 | Addition of RRM IncMon new Test Case 4.3.1.5 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184721r1.
Revised from: R5-184721.
Revised to: R5-185464.
| revised | No | R5‑185464 | |||
R5‑185464 | Addition of RRM IncMon new Test Case 4.3.1.5 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184721 | |||
R5‑184722 | Addition of RRM IncMon new Test Case 4.3.2A | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184722r1.
Revised from: R5-184722.
Revised to: R5-185465.
| revised | No | R5‑185465 | |||
R5‑185465 | Addition of RRM IncMon new Test Case 4.3.2A | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184722 | |||
R5‑184723 | Addition of RRM IncMon new Test Case 4.3.3A | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184723r1.
Revised from: R5-184723.
Revised to: R5-185466.
| revised | No | R5‑185466 | |||
R5‑185466 | Addition of RRM IncMon new Test Case 4.3.3A | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184723 | |||
R5‑184724 | Addition of RRM IncMon new Test Case 4.3.4.4 | Ericsson | CR | Agreement | Yes |
Yes
no source
Revised to: R5-184724r1.
Revised from: R5-184724.
Revised to: R5-185467.
| revised | No | R5‑185467 | |||
R5‑185467 | Addition of RRM IncMon new Test Case 4.3.4.4 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184724 | |||
5.3.1.7 | TR 36.903 (E-UTRAN RRM TT analyses) | R5‑184171 | TC Group definition for RRM IncMon test cases | Ericsson | CR | Agreement | Yes |
Yes
no source on cover.
Revised to: R5-184171r1.
Revised from: R5-184171.
Revised to: R5-185456.
| revised | No | R5‑185456 | |
R5‑185456 | TC Group definition for RRM IncMon test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184171 | |||
R5‑184172 | Add Test Tolerances analysis for E-UTRAN RRM IncMon TCs 8.3.7 and 8.4.7 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184173 | Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.8 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184174 | Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.9 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.1.8 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.2 | Rel-13 LTE CA configurations (UID - 700065) LTE_CA_Rel13-UEConTest |   | ||||||||||
5.3.2.1 | TS 36.508 | R5‑184237 | Correction to Figure A.64 to cater for CC >= 3 | Anritsu | CR | Agreement | Yes |
Yes
Revised to: R5-184237r1.
Revised from: R5-184237.
Revised to: R5-185449.
| revised | No | R5‑185449 | |
R5‑185449 | Correction to Figure A.64 to cater for CC >= 3 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184237 | |||
R5‑184282 | Update of test frequencies for CA_42A-42A | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.2.2 | TS 36.521-1 | R5‑184065 | Resubmission of Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) | ETSI MCC (SGS Wireless) | CR | Agreement | Yes |
Yes
already covered by R5-184842 | withdrawn | Yes | ||
R5‑184240 | Correction to cqi-pmi-ConfigurationIndex for 5DL CA CQI Reporting tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184241 | Correction to message exception for 8.2.1.4.2_A.4 | Anritsu | CR | Agreement | Yes |
Yes
Revised to: R5-184241r1.
Revised from: R5-184241.
Revised to: R5-185450.
| revised | No | R5‑185450 | |||
R5‑185450 | Correction to message exception for 8.2.1.4.2_A.4 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184241 | |||
R5‑184247 | Correction to 4CA and 5CA PDSCH demodulation tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184248 | Corrections to CA Test Configuration Table in section 7 | Anritsu | CR | Agreement | Yes |
Yes
Revised to: R5-184248r1.
Revised from: R5-184248.
Revised to: R5-185452.
| revised | No | R5‑185452 | |||
R5‑185452 | Corrections to CA Test Configuration Table in section 7 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184248 | |||
R5‑184250 | Correction to Test Tolerance for 4DL and 5DL Reference Sensitivity Test | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184252 | Correction of connection diagram for 4Rx 3CC/4CC/5CC Rx tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184254 | Editorial correction to test points for CA_2A-12A-66A in 7.3A.5 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184283 | Correction of test configuration of CA_20A-42A REFSENS | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184283r1.
Revised from: R5-184283.
Revised to: R5-185493.
| revised | No | R5‑185493 | |||
R5‑185493 | Correction of test configuration of CA_20A-42A REFSENS | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184283 | |||
R5‑184284 | Update of 7.3A.5 REFSENS for Rel-13 CA configurations | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184284r1.
Revised from: R5-184284.
Revised to: R5-185494.
| revised | No | R5‑185494 | |||
R5‑185494 | Update of 7.3A.5 REFSENS for Rel-13 CA configurations | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184284 | |||
R5‑184285 | Addition of REFSENS test configuration of CA_1A-3A-7A-8A | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184385 | Update of TC 6.6.2.3A.4 Adjacent Channel Leakage power Ratio for CA (3UL CA) | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184388 | Update of TC 6.6.3.1A.4 Transmitter Spurious emissions for CA ( 3UL CA) | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184412 | Update to test case 6.5.2A.1.4 for 3UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184413 | Update to test case 6.5.2A.2.4 for 3UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184414 | Update to test case 6.5.2A.3.4 for 3UL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184415 | Update to test case 7.6.3A.8 and 7.8.1A.8 for 5DL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184416 | Cleanning up SDR test cases for 4CC and 5CC using UL RMC | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184539 | Update of DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 | SRTC | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184585 | Updated test requirement to RF clause 7 test cases for CA band | Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184601 | Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184601r1.
Revised from: R5-184601.
Revised to: R5-185538.
| revised | No | R5‑185538 | |||
R5‑185538 | Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184601 | |||
R5‑184602 | Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184602r1.
Revised from: R5-184602.
Revised to: R5-185539.
| revised | No | R5‑185539 | |||
R5‑185539 | Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184602 | |||
R5‑184604 | Introduction of new test case TC 6.6.2.2A.4 Additional Spectrum Emission Mask for CA (3UL CA) | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184605 | Update of test case TC 6.6.1A.4 “Occupied bandwidth for CA (3DL CA and 3UL CA)” | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184606 | Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184606r1.
Revised from: R5-184606.
Revised to: R5-185540.
| revised | No | R5‑185540 | |||
R5‑185540 | Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" | 7LAYERS GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184606 | |||
R5‑184639 | CA_1A-3A-26A(1UL) –Updates of 7.3A.5 REFSENS | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184832 | Addition of Test point and test requirements for CA_3A-41A, 41A-42A,3A-42A spurious test cases | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184840 | Update of TX Minimum Ouput Power for CA (3UL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184841 | Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
Revised to: R5-184841r1.
Revised from: R5-184841.
Revised to: R5-185508.
| revised | No | R5‑185508 | |||
R5‑185508 | Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184841 | |||
R5‑184842 | Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184843 | Introduction of General ON/OFF time mask for CA (3UL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
Revised to: R5-184843r1.
Revised from: R5-184843.
Revised to: R5-185509.
| revised | No | R5‑185509 | |||
R5‑185509 | Introduction of General ON/OFF time mask for CA (3UL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184843 | |||
R5‑184988 | Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 | CGC Inc. | CR | Agreement | Yes |
Yes
/*DUPLICATED-REPL*/
Document replicated in two AIs: [5.3.2.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Replaces R5-184903 because of wrong spec
r1 was presented on Fri in the joint. | revised | No | R5‑185175 | |||
R5‑185175 | Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 | CGC Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184988 | |||
5.3.2.3 | TS 36.521-2 | R5‑184086 | Applicability and ICS for CA RF and RRM test cases | Ericsson | CR | Agreement | No |
Yes
LATE DOCUMENT
replaced by R5-184906 to updated WIC
| withdrawn | Yes | ||
R5‑184286 | Addition of multiple CA configurations to capability tables in TS 36.521-2 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
merged into common CR R5-185442 | withdrawn | Yes | ||||
R5‑184542 | Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 | SRTC | CR | Agreement | Yes |
Yes
Revised to: R5-184542r1.
Revised from: R5-184542.
Revised to: R5-185488.
| revised | No | R5‑185488 | |||
R5‑185488 | Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 | SRTC | CR | Agreement | Yes |
Yes
Revised from: R5-184542r1.
merged into common CR R5-185442 | withdrawn | Yes | R5‑184542 | |||
R5‑184846 | Additional of test applicability for CA (3UL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
merged into common CR R5-185442 | withdrawn | Yes | ||||
R5‑184903 | Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 | CGC Inc. | CR | Agreement | Yes |
Yes
reissued as R5-184988 as wrong spec | withdrawn | Yes | ||||
R5‑184906 | Add 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 in 36.521-2 | CGC Inc. | CR | Agreement | Yes |
Yes
R5merged into R5-184846 | withdrawn | Yes | ||||
R5‑185442 | Applicability and ICS for CA RF and RRM test cases | Bureau Veritas, Ericsson LM, KT Corp., Vodafone GmbH, Huawei,HiSilicon, SRTC, KDDI Corporation, SGS Wireless, CGC Inc. | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
5.3.2.4 | TS 36.521-3 | R5‑184102 | Editorial corrections 8.16.73 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184103 | Editorial corrections 9.1.46 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| revised | No | R5‑185483 | |||
R5‑185483 | Editorial corrections 9.1.46 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
Revised from: R5-184103.
There is a reference to E-5 which should be E-6 and one +TT which should be removed | agreed | No | R5‑184103 | |||
R5‑184104 | Editorial corrections 9.1.50 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| revised | No | R5‑185484 | |||
R5‑185484 | Editorial corrections 9.1.50 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
Revised from: R5-184104.
There is a reference to E-5 which should be E-6 and one +TT which should be removed | agreed | No | R5‑184104 | |||
R5‑184107 | New generic CA RSRP test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184108 | New generic CA RSRQ test cases | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184256 | Correction to 5CA FDD-TDD Chapter 8 Tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184259 | Correction to connection figure for 4 DL and 5 DL CA Event Triggered Reporting tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184260 | Correction to cell configuration mapping table for 8.16.70 and 8.16.78 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184868 | New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
wrong spec on title!
all tables & headers wrong!
New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes
Revised to: R5-184868r1.
Revised from: R5-184868.
Revised to: R5-184868r2.
Revised from: R5-184868r1.
Revised to: R5-185544.
| revised | No | R5‑185544 | |||
R5‑185544 | New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184868 | |||
R5‑184870 | New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
wrong spec on title!
all tables & headers wrong!
New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes
Revised to: R5-184870r1.
Revised from: R5-184870.
Revised to: R5-184870r2.
Revised from: R5-184870r1.
Revised to: R5-185545.
| revised | No | R5‑185545 | |||
R5‑185545 | New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184870 | |||
R5‑184871 | New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
wrong spec on title!
all tables & headers wrong!
New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes
Revised to: R5-184871r1.
Revised from: R5-184871.
Revised to: R5-184871r2.
Revised from: R5-184871r1.
Revised to: R5-184871r3.
Revised from: R5-184871r2.
Revised to: R5-185546.
| revised | No | R5‑185546 | |||
R5‑185546 | New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184871 | |||
R5‑184873 | New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
LATE DOCUMENT
New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes
Revised to: R5-184873r1.
LATE DOCUMENT
Revised from: R5-184873.
Revised to: R5-184873r2.
LATE DOCUMENT
Revised from: R5-184873r1.
Revised to: R5-184873r3.
LATE DOCUMENT
Revised from: R5-184873r2.
Revised to: R5-185547.
| revised | No | R5‑185547 | |||
R5‑185547 | New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184873r3.
Document was sent FOR E-MAIL AGREEMENT | agreed | No | R5‑184873 | |||
5.3.2.5 | TS 37.571-1 |   | ||||||||||
5.3.2.6 | TS 37.571-3 |   | ||||||||||
5.3.2.7 | TS 37.571-5 |   | ||||||||||
5.3.2.8 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.2.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.2.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑184277 | Update of TP analysis of CA_3A-7A-8A | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184278 | Addition of TP analysis of CA_1A-7A-8A in 36.905 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184279 | Addition of TP analysis of CA_1A-3A-7A-8A in 36.905 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184280 | Addition of TP analysis of CA_7A-42A-42A in 36.905 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184281 | Addition of TP analysis of CA_20A-42A-42A in 36.905 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184638 | CA_1A-3A-26A(1UL) - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184833 | Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184833r1.
Revised from: R5-184833.
Revised to: R5-185437.
| revised | No | R5‑185437 | |||
R5‑185437 | Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184833 | |||
5.3.2.11 | General Papers / Work Plan / TC lists | R5‑184766 | Optimization of test configuration table for Rx CA test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
Revised to: R5-184766r1.
Revised from: R5-184766.
Revised to: R5-185513.
| revised | No | R5‑185513 | |
R5‑185513 | Optimization of test configuration table for Rx CA test cases | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184766 | |||
5.3.3 | WLAN/3GPP Radio Level Integration and Interworking Enhancements (UID - 710070) LTE_WLAN_radio-UEConTest |   | ||||||||||
5.3.3.1 | TS 36.508 |   | ||||||||||
5.3.3.2 | TS 36.521-2 |   | ||||||||||
5.3.3.3 | TS 36.521-3 |   | ||||||||||
5.3.3.4 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.4 | Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest |   | ||||||||||
5.3.4.1 | TS 36.508 |   | ||||||||||
5.3.4.2 | TS 36.521-1 | R5‑184117 | New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens | Vodafone GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184117r1.
Revised from: R5-184117.
Revised to: R5-185343.
| revised | No | R5‑185343 | |
R5‑185343 | New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens | Vodafone GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184117 | |||
R5‑184249 | Editorial correction to Table 6.2.5.3-3 Delta TIB (three bands) | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184839 | Update of TDD PDSCH Closed Loop Multi Layer Multiplexing 4x2 for CA (5DL CA) | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184989 | Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. | CGC Inc. | CR | Agreement | Yes |
Yes
/*DUPLICATED-REPL*/
Document replicated in two AIs: [5.3.4.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Replaces R5-184911 because of wrong spec
| revised | No | R5‑185176 | |||
R5‑185176 | Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. | CGC Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184989 | |||
R5‑184993 | Addition of test points for UL-CA_2A-12A in TC 6.3.2A.2 | Dekra | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184994 | Addition of test points for UL-CA_2A-12A in TC 6.3.5A.2.2 | Dekra | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑185330 | Addition of test points for UL-CA_4A-12A in TC 6.3.2A.2 | DEKRA | CR | discussion | Yes |
Yes
late doc | agreed | No | ||||
R5‑185331 | Addition of test points for UL-CA_4A-12A in TC 6.3.5A.2.2 | DEKRA | CR | discussion | Yes |
Yes
late doc | agreed | No | ||||
5.3.4.3 | TS 36.521-2 | R5‑184118 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 | Vodafone GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184118r1.
Revised from: R5-184118.
Revised to: R5-185344.
| revised | No | R5‑185344 | |
R5‑185344 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 | Vodafone GmbH | CR | Agreement | No |
Yes
Revised from: R5-184118r1.
meged into common CR R5-185442 | withdrawn | Yes | R5‑184118 | |||
R5‑184765 | Introduction CA_3A-7A-20A-32A 4DL/1UL to Annex A | Ericsson LM | CR | Agreement | Yes |
Yes
merged into common CR R5-185442 | withdrawn | Yes | ||||
R5‑184911 | Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. | CGC Inc. | CR | Agreement | Yes |
Yes
reissued as R5-184989 because of wrong spec | withdrawn | Yes | ||||
5.3.4.4 | TS 36.521-3 | R5‑184288 | Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| revised | No | R5‑185342 | |
R5‑185342 | Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184288 | |||
R5‑184421 | Update to RRM test case 8.16.70 and 8.16.74 for 5DL CA | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.4.5 | TS 37.571-1 |   | ||||||||||
5.3.4.6 | TS 37.571-3 |   | ||||||||||
5.3.4.7 | TS 37.571-5 |   | ||||||||||
5.3.4.8 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.4.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.4.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑184120 | New CA band combination CA_1A-3A-7A-20A - Update of test point analysis | Vodafone GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184120r1.
Revised from: R5-184120.
Revised to: R5-185345.
| revised | No | R5‑185345 | |
R5‑185345 | New CA band combination CA_1A-3A-7A-20A - Update of test point analysis | Vodafone GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184120 | |||
5.3.4.11 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.5 | Support for V2V services based on LTE sidelink (UID - 730073) LTE_SL_V2V-UEConTest |   | ||||||||||
5.3.5.1 | TS 36.508 |   | ||||||||||
5.3.5.2 | TS 36.509 |   | ||||||||||
5.3.5.3 | TS 36.521-1 | R5‑184064 | Resubmission of a change of Cleaning up TC 6.5.2.4G.1 for V2V | ETSI MCC (Huawei, Hisilicon) | CR | Agreement | Yes |
Yes
This is the resubmission of one forgotten change of the approved R5-183789 CR# 4197 rev 1. | withdrawn | Yes | ||
R5‑184066 | Resubmission of the Annexes of TC 6.5.2.3G.1 for V2V | ETSI MCC (Huawei, Hisilicon) | CR | Agreement | Yes |
Yes
This is the resubmission of the Annexes addition of the approved R5-183879 CR#4195 rev.1. | agreed | No | ||||
R5‑184181 | Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184181r1.
Revised from: R5-184181.
Revised to: R5-185354.
| revised | No | R5‑185354 | |||
R5‑185354 | Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184181 | |||
R5‑184418 | Update to test case 6.3.2G.1 for V2V services based on LTE sidelink | KTL | CR | Agreement | Yes |
Yes
Revised to: R5-184418r1.
Revised from: R5-184418.
Revised to: R5-185355.
| revised | No | R5‑185355 | |||
R5‑185355 | Update to test case 6.3.2G.1 for V2V services based on LTE sidelink | KTL | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184418 | |||
R5‑184653 | Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions | LG Electronics | CR | Agreement | Yes |
Yes
Revised to: R5-184653r1.
Revised from: R5-184653.
Revised to: R5-185356.
| revised | No | R5‑185356 | |||
R5‑185356 | Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184653 | |||
R5‑184660 | Update to Maximum Power Reduction (MPR) for V2X Communication / Power class 3 / Contiguous allocation of PSCCH and PSSCH / Non-concurrent with E-UTRA uplink transmissions | LG Electronics. | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
R5‑184662 | Update to Annex G for V2V/V2X Demod Perf tests | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184662r1.
Revised from: R5-184662.
Revised to: R5-185357.
| revised | No | R5‑185357 | |||
R5‑185357 | Update to Annex G for V2V/V2X Demod Perf tests | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184662 | |||
R5‑184728 | Update of TC7.6.2G.1 Out-of-band blocking for V2X Communication | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184729 | Update of TC 7.8.1G.1 Wide band Intermodulation for V2X | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184733 | Update of TC7.9G Spurious emissions for V2X | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184740 | Update of multiple V2V RF test cases for proper test mode setting | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184740r1.
Revised from: R5-184740.
Revised to: R5-184740r2.
Revised from: R5-184740r1.
Revised to: R5-185358.
| revised | No | R5‑185358 | |||
R5‑185358 | Update of multiple V2V RF test cases for proper test mode setting | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184740 | |||
5.3.5.4 | TS 36.521-2 |   | ||||||||||
5.3.5.5 | TS 36.521-3 |   | ||||||||||
5.3.5.6 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.5.7 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.5.8 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.6 | LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell (UID - 730074) LTE_CA_enh_b5C_PUCCH-UEConTest |   | ||||||||||
5.3.6.1 | TS 36.508 |   | ||||||||||
5.3.6.2 | TS 36.521-2 | R5‑184294 | Addition of test applicability for Rel-13 B5C new TC 8.16.47-50 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.6.3 | TS 36.521-3 | R5‑184289 | Addition of Rel-13 B5C new TC 8.16.47 | Huawei,HiSilicon, Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184290 | Addition of Rel-13 B5C new TC 8.16.48 | Huawei,HiSilicon, Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184291 | Addition of Rel-13 B5C new TC 8.16.49 | Huawei,HiSilicon, Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184292 | Addition of Rel-13 B5C new TC 8.16.50 | Huawei,HiSilicon, Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184293 | Update of Annex E and Annex F to add cell mapping and TT for 8.16.47-50 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.6.4 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.6.5 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.7 | Enhanced LAA for LTE (UID - 730075) LTE_eLAA-UEConTest |   | ||||||||||
5.3.7.1 | TS 36.508 |   | ||||||||||
5.3.7.2 | TS 36.521-1 | R5‑184194 | eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 | Tejet | CR | Agreement | Yes |
Yes
Revised to: R5-184194r1.
Revised from: R5-184194.
Revised to: R5-185431.
| revised | No | R5‑185431 | |
R5‑185431 | eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 | Tejet | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184194 | |||
R5‑184195 | eLAA_Update to 6.6.2.3A.2 | Tejet | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184196 | eLAA_Update to 6.6.3.1A.2 | Tejet | CR | Agreement | Yes |
Yes
Revised to: R5-184196r1.
Revised from: R5-184196.
Revised to: R5-185432.
| revised | No | R5‑185432 | |||
R5‑185432 | eLAA_Update to 6.6.3.1A.2 | Tejet | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184196 | |||
R5‑184694 | eLAA: Updates to Adjacent Channel Leakage power Ratio for CA | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Revised to: R5-184694r1.
Revised from: R5-184694.
Revised to: R5-184694r2.
Revised from: R5-184694r1.
Revised to: R5-185433.
| revised | No | R5‑185433 | |||
R5‑185433 | eLAA: Updates to Adjacent Channel Leakage power Ratio for CA | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184694 | |||
5.3.7.3 | TS 36.521-2 |   | ||||||||||
5.3.7.4 | TS 36.521-3 |   | ||||||||||
5.3.7.5 | TR 36.905 | R5‑184197 | CA band combination CA_2A-46A CA_26A-46A - Updates of test points analysis | Tejet | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.7.6 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.8 | Interference Mitigation for Downlink Control Channels of LTE (UID - 750051) LTE_IM_DLCCH-UEConTest |   | ||||||||||
5.3.8.1 | TS 36.508 |   | ||||||||||
5.3.8.2 | TS 36.521-1 |   | ||||||||||
5.3.8.3 | TS 36.521-2 |   | ||||||||||
5.3.8.4 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.8.5 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.9 | Performance enhancements for high speed scenario in LTE (UID - 750056) LTE_high_speed-UEConTest |   | ||||||||||
5.3.9.1 | TS 36.508 |   | ||||||||||
5.3.9.2 | TS 36.521-1 |   | ||||||||||
5.3.9.3 | TS 36.521-2 |   | ||||||||||
5.3.9.4 | TS 36.521-3 | R5‑184151 | Test tolerance update of eHST FDD event reporting test case | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.9.5 | TR 36.903 (E-UTRAN RRM TT analyses) | R5‑184148 | Addition of TT analysis of eHST FDD Intra-frequency event reporting. | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Rel, ver, cl. Affected wrong.
Revised to: R5-185424.
| revised | No | R5‑185424 | |
R5‑185424 | Addition of TT analysis of eHST FDD Intra-frequency event reporting. | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184148 | |||
5.3.9.6 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.9.7 | UE Application Layer Data Throughput Performance (TR 37.901) |   | ||||||||||
5.3.9.8 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.10 | 4 Rx antenna ports with CA for LTE DL (UID - 750058) LTE_4Rx_AP_DL_CA-UEConTest |   | ||||||||||
5.3.10.1 | TS 36.508 |   | ||||||||||
5.3.10.2 | TS 36.521-1 | R5‑184239 | Correction to 4x4 CA demodulation tests | Anritsu | CR | Agreement | Yes |
Yes
Revised to: R5-184239r1.
Revised from: R5-184239.
r1: Overlap with R5-184417(TT related changes in 8.13.1.1.3, 8.13.1.1.4 and Annex F) is removed
Revised to: R5-185375.
| revised | No | R5‑185375 | |
R5‑185375 | Correction to 4x4 CA demodulation tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184239 | |||
R5‑184243 | Removal of the editor’s note regarding the faders in 4x4 CA demod tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184316 | Update of TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184317 | Update of TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184417 | Update to Performance test cases for LTE DL CA 4 Rx antenna ports | KTL | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184695 | Resubmission of update of TC8.13.3.6.1 and 8.13.3.6.2 | ETSI MCC (TTA) | CR | Agreement | Yes |
Yes
This is a resubmission of the Annexes addition of the approved R5-183275, CR#3991 | agreed | No | ||||
R5‑184798 | Corrections to 4Rx demodulation TCs | Rohde & Schwarz | CR | Agreement | Yes |
Yes
Document was sent FOR E-MAIL AGREEMENT
after discussions with Anritsu further clarifications are required | withdrawn | Yes | ||||
5.3.10.3 | TS 36.521-2 | R5‑184905 | Add a new test condition for test case 8.13.3.1.2.5. | CGC Inc. | CR | Agreement | Yes |
Yes
source R5
Agenda Allocation was changed: [5.3.10]->[5.3.10.3].
Revised to: R5-184905r1.
Revised from: R5-184905.
Revised to: R5-185376.
| revised | No | R5‑185376 | |
R5‑185376 | Add a new test condition for test case 8.13.3.1.2.5. | CGC Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184905 | |||
5.3.10.4 | TS 36.521-3 |   | ||||||||||
5.3.10.5 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.10.6 | TR 36.904 (E-UTRAN Radio Reception TT analyses) | R5‑184314 | Update of Test Tolerance analyses for TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184315 | Update of Test Tolerance analyses for TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.10.7 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.11 | Requirements for a new UE category 1bis with single receiver based on category 1 for LTE (UID - 760085) LTE_UE_cat_1RX-UEConTest |   | ||||||||||
5.3.11.1 | TS 36.508 |   | ||||||||||
5.3.11.2 | TS 36.521-1 | R5‑184374 | Update of TC 8.9.1.2.2_1 TDD PDSCH Closed Loop Single Layer Spatial Multiplexing for UE category 1bis | CAICT | CR | Agreement | Yes |
Yes
re-submission from RAN5#79 R5-183824 | agreed | No | ||
R5‑184874 | TS 36.521-1 Annex F update for UE cat 1bis test cases | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-184874r1.
Revised to: R5-185377.
| revised | No | R5‑185377 | |||
R5‑185377 | TS 36.521-1 Annex F update for UE cat 1bis test cases | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184874 | |||
R5‑184876 | LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-184876r1.
Revised from: R5-184876.
Revised to: R5-185378.
| revised | No | R5‑185378 | |||
R5‑185378 | LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184876 | |||
R5‑184877 | LTE_New test case 6.3.5EB Power Control for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-184877r1.
Revised from: R5-184877.
r1: Correected change marks; Corrected clause number 6.3.3EB.1 , it should be 6.3.4EB.1
Revised to: R5-185379.
| revised | No | R5‑185379 | |||
R5‑185379 | LTE_New test case 6.3.5EB Power Control for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184877 | |||
R5‑184878 | LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-185382.
6.2.2EB title shall completed removed from the CR, no change needed | revised | No | R5‑185382 | |||
R5‑185382 | LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184878 | |||
R5‑184879 | LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-184879r1.
Revised from: R5-184879.
r1: deleted table 6.3.2EB.4.1-1 and refer to main section as they are the same
Revised to: R5-185380.
| revised | No | R5‑185380 | |||
R5‑185380 | LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184879 | |||
R5‑184880 | LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-185383.
same issue as R5-184878 | revised | No | R5‑185383 | |||
R5‑185383 | LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184880 | |||
R5‑184881 | LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-184881r1.
Revised from: R5-184881.
r1: corrected wrongly marked deletion of 6.2.3EB
Revised to: R5-185381.
| revised | No | R5‑185381 | |||
R5‑185381 | LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184881 | |||
R5‑184885 | LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Revised to: R5-185384.
change and change need to remove | revised | No | R5‑185384 | |||
R5‑185384 | LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184885 | |||
R5‑184886 | LTE_New test case 6.2.2EB UE Maximum Output Power for UE category 1bis | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184935 | Cat1bis new RF test case: Occupied bandwidth for UE category 1bis | Qualcomm Austria | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184936 | Cat1bis new RF test case: Spectrum Emission Mask for UE category 1bis | Qualcomm Austria | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184937 | Cat1bis new RF test case: Additional Spectrum Emission Mask for UE category 1bis | Qualcomm Austria | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184938 | Cat1bis new RF test case: Adjacent Channel Leakage power Ratio for UE category 1bis | Qualcomm Austria | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184939 | Cat1bis new RF test case: Spurious emission for UE category 1bis | Qualcomm Austria | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184940 | Cat1bis new RF test case: Transmit intermodulation for UE category 1bis | Qualcomm Austria | CR | Agreement | Yes |
Yes
Revised to: R5-185385.
| revised | No | R5‑185385 | |||
R5‑185385 | Cat1bis new RF test case: Transmit intermodulation for UE category 1bis | Qualcomm Austria | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184940 | |||
5.3.11.3 | TS 36.521-2 | R5‑184980 | Cat1bis test cases applicability | Qualcomm Austria RFFE GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184982 | Resubmission of Cat1bis applicability CR | ETSI MCC (Qualcomm Korea, Bureau Veritas, Rohde & Schwarz, CATR) | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.11.4 | TS 36.521-3 | R5‑184106 | RMC correction 8.1.12_1 (core spec alignment) | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184165 | Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Revised to: R5-185391.
| revised | No | R5‑185391 | |||
R5‑185391 | Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184165 | |||
R5‑184166 | Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Revised to: R5-185392.
| revised | No | R5‑185392 | |||
R5‑185392 | Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184166 | |||
R5‑184167 | Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Revised to: R5-185393.
| revised | No | R5‑185393 | |||
R5‑185393 | Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184167 | |||
R5‑184168 | Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Revised to: R5-185394.
| revised | No | R5‑185394 | |||
R5‑185394 | Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184168 | |||
R5‑184202 | Completion of Chapter 7 RRM cat 1bis test cases | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
RRM missing in coversheet title!
Revised to: R5-185386.
| revised | No | R5‑185386 | |||
R5‑185386 | Completion of Chapter 7 RRM cat 1bis test cases | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184202 | |||
R5‑184203 | Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184205 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184207 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184209 | Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184211 | Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
Revised to: R5-185337.
| revised | No | R5‑185337 | |||
R5‑185337 | Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184211 | |||
R5‑184375 | Introduction of TC 6.1.1_2 E-UTRAN FDD Intra-frequency RRC Re-establishment for UE Category 1bis | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184376 | Introduction of TC 6.1.2_2 E-UTRAN FDD Inter-frequency RRC Re-establishment for UE Category 1bis | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184377 | Introduction of TC 6.1.3_2 E-UTRAN TDD Intra-frequency RRC Re-establishment for UE Category 1bis | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184378 | Introduction of TC 6.1.4_2 E-UTRAN TDD Inter-frequency RRC Re-establishment for UE Category 1bis | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184379 | Annex E,F RRM Cat1bis 6.1.x tests | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184925 | Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184927 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184929 | Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184931 | Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184933 | Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
5.3.11.5 | TS 37.571-1 |   | ||||||||||
5.3.11.6 | TS 37.571-3 |   | ||||||||||
5.3.11.7 | TS 37.571-5 |   | ||||||||||
5.3.11.8 | TR 36.903 (E-UTRAN RRM TT analyses) | R5‑184147 | Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel-15 on cover! | revised | No | R5‑185395 | |
R5‑185395 | Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184147 | |||
R5‑184155 | Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185396 | |||
R5‑185396 | Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184155 | |||
R5‑184156 | Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185397 | |||
R5‑185397 | Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184156 | |||
R5‑184157 | Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185398 | |||
R5‑185398 | Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184157 | |||
R5‑184158 | Test Tolerance Analysis for RRM TC 9.1.5.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185399 | |||
R5‑185399 | Test Tolerance Analysis for RRM TC 9.1.5.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184158 | |||
R5‑184159 | Test Tolerance Analysis for RRM TC 9.1.5.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185400 | |||
R5‑185400 | Test Tolerance Analysis for RRM TC 9.1.5.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184159 | |||
R5‑184160 | Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184161 | Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185401 | |||
R5‑185401 | Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184161 | |||
R5‑184162 | Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185402 | |||
R5‑185402 | Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184162 | |||
R5‑184163 | Test Tolerance Analysis for RRM TC 9.2.4A.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185403 | |||
R5‑185403 | Test Tolerance Analysis for RRM TC 9.2.4A.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184163 | |||
R5‑184164 | Test Tolerance Analysis for RRM TC 9.2.4A.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185404 | |||
R5‑185404 | Test Tolerance Analysis for RRM TC 9.2.4A.2_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184164 | |||
R5‑184185 | Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
wrong Rel. On cover. | revised | No | R5‑185405 | |||
R5‑185405 | Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184185 | |||
R5‑184204 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184206 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184208 | Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184210 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184212 | Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184926 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
wrong Rel on cover | revised | No | R5‑185338 | |||
R5‑185338 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184926 | |||
R5‑184928 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
doc was 0kB. | revised | No | R5‑185339 | |||
R5‑185339 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184928 | |||
R5‑184930 | Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
wrong Rel on cover | revised | No | R5‑185340 | |||
R5‑185340 | Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184930 | |||
R5‑184932 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
wrong Rel on cover | revised | No | R5‑185341 | |||
R5‑185341 | Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184932 | |||
R5‑184934 | Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis | Qualcomm UK Ltd | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
5.3.11.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.11.10 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.12 | Support for LTE-based V2X Services (UID - 760086) LTE_V2X-UEConTest |   | ||||||||||
5.3.12.1 | TS 36.508 | R5‑184268 | Cleaning up the default message contents and test states of V2X | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.12.2 | TS 36.509 |   | ||||||||||
5.3.12.3 | TS 36.521-1 | R5‑184177 | Updation of V2X TC 6.6.2.1G.2 & 6.6.2.1G.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184178 | Introcution of V2X TC 6.5.2.4G.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184178r1.
Revised from: R5-184178.
Revised to: R5-185438.
| revised | No | R5‑185438 | |||
R5‑185438 | Introcution of V2X TC 6.5.2.4G.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184178 | |||
R5‑184179 | Updation of V2X TC 6.6.2.2G.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184179r1.
Revised from: R5-184179.
Revised to: R5-185439.
| revised | No | R5‑185439 | |||
R5‑185439 | Updation of V2X TC 6.6.2.2G.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184179 | |||
R5‑184180 | Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184180r1.
Revised from: R5-184180.
Revised to: R5-185440.
| revised | No | R5‑185440 | |||
R5‑185440 | Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184180 | |||
R5‑184182 | TT statements for V2X TCs | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184182r1.
Revised from: R5-184182.
Revised to: R5-185441.
| revised | No | R5‑185441 | |||
R5‑185441 | TT statements for V2X TCs | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184182 | |||
R5‑184183 | Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184183r1.
Revised from: R5-184183.
r1: removed the overlap
Revised to: R5-185360.
| revised | No | R5‑185360 | |||
R5‑185360 | Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184183 | |||
R5‑184184 | Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184184r1.
Revised from: R5-184184.
Revised to: R5-185361.
| revised | No | R5‑185361 | |||
R5‑185361 | Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184184 | |||
R5‑184193 | Correction to 36521-1-chapter 6_V2V and V2X | Tejet | CR | Agreement | Yes |
Yes
Revised to: R5-184193r1.
Revised from: R5-184193.
Revised to: R5-185362.
| revised | No | R5‑185362 | |||
R5‑185362 | Correction to 36521-1-chapter 6_V2V and V2X | Tejet | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184193 | |||
R5‑184267 | Cleaning up V2X test cases in TS 36.521-1 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184267r1.
Revised from: R5-184267.
Revised to: R5-185363.
| revised | No | R5‑185363 | |||
R5‑185363 | Cleaning up V2X test cases in TS 36.521-1 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184267 | |||
R5‑184419 | Update to test case 6.3.2G.2 for LTE-based V2X Services | KTL | CR | Agreement | Yes |
Yes
Revised to: R5-184419r1.
Revised to: R5-185364. | revised | No | R5‑185364 | |||
R5‑185364 | Update to test case 6.3.2G.2 for LTE-based V2X Services | KTL | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184419 | |||
R5‑184420 | Update to test case 6.3.2G.3 for LTE-based V2X Services | KTL | CR | Agreement | Yes |
Yes
Revised to: R5-184420r1.
Revised to: R5-185365.
| revised | No | R5‑185365 | |||
R5‑185365 | Update to test case 6.3.2G.3 for LTE-based V2X Services | KTL | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184420 | |||
R5‑184540 | Update MU and TT of V2X test case 6.5.1G.2 Frequency error for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184544 | Update of V2X test case 6.7G.2 | SRTC | CR | Agreement | Yes |
Yes
Revised to: R5-184544r1.
Revised from: R5-184544.
Revised to: R5-185366.
| revised | No | R5‑185366 | |||
R5‑185366 | Update of V2X test case 6.7G.2 | SRTC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184544 | |||
R5‑184545 | Addition of new TC 6.6.2.3G.2 | SRTC | CR | Agreement | Yes |
Yes
Revised to: R5-184545r1.
Revised from: R5-184545.
Revised to: R5-185367.
| revised | No | R5‑185367 | |||
R5‑185367 | Addition of new TC 6.6.2.3G.2 | SRTC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184545 | |||
R5‑184546 | Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-184546r1.
Revised from: R5-184546.
Revised to: R5-185368.
| revised | No | R5‑185368 | |||
R5‑185368 | Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184546 | |||
R5‑184548 | Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation | CAICT | CR | Agreement | Yes |
Yes
Revised to: R5-184548r1.
Revised from: R5-184548.
Revised to: R5-185369.
| revised | No | R5‑185369 | |||
R5‑185369 | Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184548 | |||
R5‑184655 | Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | LG Electronics | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Revised to: R5-184655r1.
LATE DOCUMENT
Revised from: R5-184655.
Revised to: R5-185370.
| revised | No | R5‑185370 | |||
R5‑185370 | Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | LG Electronics | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184655 | |||
R5‑184656 | Update to Configured UE transmitted Output Power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmission | LG Electronics | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184657 | Update to UE Transmit OFF power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | LG Electronics. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184658 | Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | LG Electronics. | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Revised to: R5-184658r1.
LATE DOCUMENT
Revised from: R5-184658.
r1: Undeleted the editor’s note because of conflict the Huawei’s CR 4372
Revised to: R5-185535.
| revised | No | R5‑185535 | |||
R5‑185535 | Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | LG Electronics. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184658 | |||
R5‑184776 | Updates to Align Initial Conditions with Other V2X Test Cases | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes
Revised to: R5-185371.
| revised | No | R5‑185371 | |||
R5‑185371 | Updates to Align Initial Conditions with Other V2X Test Cases | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184776 | |||
R5‑184848 | Update of V2X Receiver Test Cases | SGS Wireless | CR | Agreement | Yes |
Yes
Revised to: R5-184848r1.
Revised from: R5-184848.
Revised to: R5-185372.
| revised | No | R5‑185372 | |||
R5‑185372 | Update of V2X Receiver Test Cases | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184848 | |||
5.3.12.4 | TS 36.521-2 | R5‑184269 | Addition of test applicabilities of multiple V2X test cases | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
cases missing on cover title.
Revised to: R5-184269r1.
Revised from: R5-184269.
Revised to: R5-185374.
| revised | No | R5‑185374 | |
R5‑185374 | Addition of test applicabilities of multiple V2X test cases | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184269 | |||
R5‑184654 | Update to applicability V2X communication test cases for simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions | LG Electronics | CR | Agreement | Yes |
Yes
conflicted with R5-185374 | withdrawn | Yes | ||||
5.3.12.5 | TS 36.521-3 | R5‑184034 | Correction of GNSS information for V2X tests | Spirent Communications, European Commission | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑184035 | Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 | Spirent Communications, European Commission | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184039 | Correction of GNSS information for V2X tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
Revised to: R5-184039r1.
Revised from: R5-184039.
r1: removed TC11.2.4 of GNSS usage is no needed
Revised to: R5-185536.
| revised | No | R5‑185536 | |||
R5‑185536 | Correction of GNSS information for V2X tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184039 | |||
R5‑184040 | Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184150 | Test tolerance update of V2X uplink timing test cases | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Revised to: R5-184150r1.
Revised from: R5-184150.
Revised to: R5-185554.
| revised | No | R5‑185554 | |||
R5‑185554 | Test tolerance update of V2X uplink timing test cases | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184150 | |||
R5‑184273 | Addition of V2X new TC 12.2.1 | Huawei,HiSilicon, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184274 | Addition of V2X new TC 12.2.2 | Huawei,HiSilicon, Rohde & Schwarz | CR | Agreement | Yes |
Yes
RAN4 dependency
Document was sent FOR E-MAIL AGREEMENT
r1 was produced. | revised | No | R5‑185184 | |||
R5‑185184 | Addition of V2X new TC 12.2.2 | Huawei,HiSilicon, Rohde & Schwarz | CR | Agreement | No |
Yes
Email agreed | agreed | No | R5‑184274 | |||
R5‑184275 | Addition of V2X new TC 12.4 | Huawei,HiSilicon, Rohde & Schwarz | CR | Agreement | Yes |
Yes
merged into to R5-184847 | withdrawn | Yes | ||||
R5‑184276 | Update of Annex F for TC 12.2.1, 12.2.2 and 12.4 | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184847 | Update of V2X RRM | SGS Wireless | CR | Agreement | Yes |
Yes
Revised to: R5-184847r1.
Revised from: R5-184847.
r1: Update editor’s note; test purpose, applicability of requirements, minimum conformance requirements, initial condition & test procedure
Revised to: R5-185373.
| revised | No | R5‑185373 | |||
R5‑185373 | Update of V2X RRM | SGS Wireless, Huawei | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184847 | |||
5.3.12.6 | TR 36.903 (E-UTRAN RRM TT analyses) | R5‑184149 | Addition of TT analysis of V2X uplink timing test case | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Rel, ver, cl. Affected wrong.
| revised | No | R5‑185425 | |
R5‑185425 | Addition of TT analysis of V2X uplink timing test case | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184149 | |||
R5‑184270 | Addition of TT analysis of V2X TC 12.2.1 | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184271 | Addition of TT analysis of V2X TC 12.2.2 | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184272 | Addition of TT analysis of V2X TC 12.4 | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184409 | Addition of TT analysis of V2X TC 12.2.1 | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184410 | Addition of TT analysis of V2X TC 12.2.2 | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184411 | Addition of TT analysis of V2X TC 12.4 | Huawei,HiSilicon, Anritsu, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.12.7 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.12.8 | TR 36.905 | R5‑184821 | Inter-band con-current V2X configurations- Updates of test points analysis | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
associated CR R5-184184 | agreed | No | ||
5.3.12.9 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.13 | 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest |   | ||||||||||
5.3.13.1 | TS 38.508-1 | R5‑184296 | Update of test frequencies of Band n41 and n77 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑184297 | Addition of Mid channel bandwidth definition for several missing bands | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184327 | Adding condition for CP-OFDM waveform | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184330 | Adding support for test SCS definition | Ericsson | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184450 | Introduction of test frequencies for NR band n1 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185250 | |||
R5‑185250 | Introduction of test frequencies for NR band n1 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184450 | |||
R5‑184451 | Introduction of test frequencies for NR band n2 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185251 | |||
R5‑185251 | Introduction of test frequencies for NR band n2 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184451 | |||
R5‑184452 | Introduction of test frequencies for NR band n3 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185252 | |||
R5‑185252 | Introduction of test frequencies for NR band n3 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184452 | |||
R5‑184453 | Introduction of test frequencies for NR band n5 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185253 | |||
R5‑185253 | Introduction of test frequencies for NR band n5 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184453 | |||
R5‑184454 | Introduction of test frequencies for NR band n7 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185254 | |||
R5‑185254 | Introduction of test frequencies for NR band n7 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184454 | |||
R5‑184455 | Introduction of test frequencies for NR band n8 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185255 | |||
R5‑185255 | Introduction of test frequencies for NR band n8 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184455 | |||
R5‑184456 | Introduction of test frequencies for NR band n12 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185256 | |||
R5‑185256 | Introduction of test frequencies for NR band n12 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184456 | |||
R5‑184457 | Introduction of test frequencies for NR band n20 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185257 | |||
R5‑185257 | Introduction of test frequencies for NR band n20 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184457 | |||
R5‑184458 | Introduction of test frequencies for NR band n25 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185258 | |||
R5‑185258 | Introduction of test frequencies for NR band n25 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184458 | |||
R5‑184459 | Introduction of test frequencies for NR band n28 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185259 | |||
R5‑185259 | Introduction of test frequencies for NR band n28 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184459 | |||
R5‑184460 | Introduction of test frequencies for NR band n34 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185260 | |||
R5‑185260 | Introduction of test frequencies for NR band n34 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184460 | |||
R5‑184461 | Introduction of test frequencies for NR band n38 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185261 | |||
R5‑185261 | Introduction of test frequencies for NR band n38 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184461 | |||
R5‑184462 | Introduction of test frequencies for NR band n39 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185262 | |||
R5‑185262 | Introduction of test frequencies for NR band n39 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184462 | |||
R5‑184463 | Introduction of test frequencies for NR band n40 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185263 | |||
R5‑185263 | Introduction of test frequencies for NR band n40 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184463 | |||
R5‑184464 | Update of test frequencies for NR band n41 | Ericsson, Sprint | CR | Agreement | Yes |
Yes
| revised | No | R5‑185264 | |||
R5‑185264 | Update of test frequencies for NR band n41 | Ericsson, Sprint | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184464 | |||
R5‑184465 | Introduction of test frequencies for NR band n51 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185265 | |||
R5‑185265 | Introduction of test frequencies for NR band n51 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184465 | |||
R5‑184466 | Introduction of test frequencies for NR band n66 | Ericsson, Dish Network | CR | Agreement | Yes |
Yes
| revised | No | R5‑185266 | |||
R5‑185266 | Introduction of test frequencies for NR band n66 | Ericsson, Dish Network | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184466 | |||
R5‑184467 | Introduction of test frequencies for NR band n70 | Ericsson, Dish Network | CR | Agreement | Yes |
Yes
| revised | No | R5‑185267 | |||
R5‑185267 | Introduction of test frequencies for NR band n70 | Ericsson, Dish Network | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184467 | |||
R5‑184468 | Update of test frequencies for NR band n71 | Ericsson, Dish Network | CR | Agreement | Yes |
Yes
| revised | No | R5‑185268 | |||
R5‑185268 | Update of test frequencies for NR band n71 | Ericsson, Dish Network | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184468 | |||
R5‑184469 | Introduction of test frequencies for NR band n75 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185269 | |||
R5‑185269 | Introduction of test frequencies for NR band n75 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184469 | |||
R5‑184470 | Introduction of test frequencies for NR band n76 | Ericsson | CR | Agreement | Yes |
Yes
| revised | No | R5‑185270 | |||
R5‑185270 | Introduction of test frequencies for NR band n76 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | R5‑184470 | |||
R5‑184471 | Introduction of test frequencies for NR band n77 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | ||||
R5‑184472 | Introduction of test frequencies for NR band n78 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | ||||
R5‑184473 | Introduction of test frequencies for NR band n79 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | ||||
R5‑184474 | Introduction of test frequencies for NR band n257 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | ||||
R5‑184475 | Introduction of test frequencies for NR band n258 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | ||||
R5‑184476 | Introduction of test frequencies for NR band n260 | Ericsson, Bureau Veritas | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | ||||
R5‑184477 | Introduction of test frequencies for NR band n261 | Ericsson | CR | Agreement | Yes |
Yes
block agreed on Fri. | agreed | No | ||||
R5‑184486 | Correction to power level for FR1 RF tests | Anritsu | CR | Agreement | Yes |
Yes
Revised to: R5-184486r1.
Revised from: R5-184486.
r1: Signal level for 90MHz BW is added.
Revised to: R5-184486r2.
Revised from: R5-184486r1.
r2 : Typo corrected in the titles of Table 5.2.1.1-1, 5.2.1.1-2
the same content is present in 38.521-1 Annex C.0 , need offline to align the tables if possible and keep it in one spec
Revised to: R5-184486r3.
Revised from: R5-184486r2.
r3: Removed the contents of 5.2.1.1. Add statement that DL signal level is defined in repsecive test speficiation
Revised to: R5-185443.
| revised | No | R5‑185443 | |||
R5‑185443 | Correction to power level for FR1 RF tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184486 | |||
R5‑184806 | Mid test CH BW for n71 | Dish Network | CR | Agreement | Yes |
Yes
Mid test CH BW for n71 changed to 10 MHz | agreed | No | ||||
R5‑184909 | FR2_UE_BeamlockProcedure_38.508-1 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
changed title: "UE Beamlock test Function Procedures for 38.508-1"
no CR#, no Tdoc #
Revised to: R5-184909r1.
Revised from: R5-184909.
Add UE Beamlock test function procdures to 38.508-1
r1 produced to fix 3GU Issues
KEYS needs more time to understand the UE BEAM Lock parameter and the call flow to see if any other way can be used to handle this
Revised to: R5-184909r2.
Revised from: R5-184909r1.
Revised to: R5-185557.
| revised | No | R5‑185557 | |||
R5‑185557 | FR2_UE_BeamlockProcedure_38.508-1 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
Revised from: R5-184909r2.
Document was sent FOR E-MAIL AGREEMENT
| agreed | No | R5‑184909 | |||
5.3.13.2 | TS 38.508-2 |   | ||||||||||
5.3.13.3 | TS 38.509 | R5‑184908 | FR2_UE_BeamlockMode_IE_38.509 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
changed title: "Beamlock Mode IE definition for Beamlock messages in 38.509"
no CR#, no Tdoc #
Revised to: R5-184908r1.
associated pCR R5-184373, R5-184810
Revised to: R5-184908r2.
Revised to: R5-185523.
| revised | No | R5‑185523 | |
R5‑185523 | FR2_UE_BeamlockMode_IE_38.509 | Qualcomm Europe Inc. (Spain) | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184908 | |||
5.3.13.4 | TS 38.521-1 | R5‑184085 | TP to TS38.521-1:Operating bands and channel arrangement | China Unicom | pCR | Approval | Yes |
Yes
Revised to: R5-184085r1.
Revised to: R5-185321.
| revised | No | R5‑185321 | |
R5‑185321 | TP to TS38.521-1:Operating bands and channel arrangement | China Unicom | pCR | Approval | Yes |
Yes
| approved | No | R5‑184085 | |||
R5‑184152 | TP to TS8.521-1: Operating bands and Channel arrangement | China Unicom | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184298 | Update of common uplink configuration in 6.1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑184299 | Update of FR1 test case 6.2.1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-184299r1.
Revised from: R5-184299.
Revised to: R5-185305.
| revised | No | R5‑185305 | |||
R5‑185305 | Update of FR1 test case 6.2.1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184299 | |||
R5‑184300 | Addition of FR1 test case 6.2.4 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-185322.
| revised | No | R5‑185322 | |||
R5‑185322 | Addition of FR1 test case 6.2.4 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184300 | |||
R5‑184301 | Update of FR1 test case 6.3.1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-185323.
| revised | No | R5‑185323 | |||
R5‑185323 | Update of FR1 test case 6.3.1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184301 | |||
R5‑184302 | Update of FR1 test case 6.3.3.2 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-184302r1.
need more disucssion on TT for ON power since there is no min requirmeent for ON power , one option is to use open loop power tolerance (9dB) , or check the min req for power tolerance test and add TT to that (6dB?), update editors notes
Revised from: R5-184302.
need more disucssion on TT for ON power since there is no min requirmeent for ON power , one option is to use open loop power tolerance (9dB) , or check the min req for power tolerance test and add TT to that (6dB?), update editors notes
Revised to: R5-185495.
| revised | No | R5‑185495 | |||
R5‑185495 | Update of FR1 test case 6.3.3.2 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised from: R5-184302r1.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184302 | |||
R5‑184392 | Updates of FR1 TRx MU in Annex F | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
FR1_MU
Revised to: R5-184392r1.
revise to update MU for the sections from this meeitng contributions
Revised from: R5-184392.
associated with R5-184484
Revised to: R5-185444.
| revised | No | R5‑185444 | |||
R5‑185444 | Updates of FR1 TRx MU in Annex F | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
| approved | No | R5‑184392 | |||
R5‑184395 | Updates of FR1 TRx TT in Annex F | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
FR1_TT
to update contents with TT from other CR in this meeting
Revised to: R5-184395r1.
Revised from: R5-184395.
depends on R5-184068
Revised to: R5-185565.
| revised | No | R5‑185565 | |||
R5‑185565 | Updates of FR1 TRx TT in Annex F | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
| agreed | No | R5‑184395 | |||
R5‑184479 | Update to FR1 test case 6.5.4 Transmit intermodulation | KTL | pCR | Approval | Yes |
Yes
change step3 to include time to skip rather than skipping transient period , add editors note for SA message contents, remove MU/TT editor note and include TT=0 in the test reuqirement , check initial condition TBD and update
Revised to: R5-184479r1.
Revised from: R5-184479.
r1: Removing initial condition and MU, TT in the editor’s note; No changes on TDD transient periods and remain the editor’s note; Adding editor’s note for SA message contents; Co-source company is added
Revised to: R5-185445.
| revised | No | R5‑185445 | |||
R5‑185445 | Update to FR1 test case 6.5.4 Transmit intermodulation | KTL, MTCC | pCR | Approval | Yes |
Yes
| approved | No | R5‑184479 | |||
R5‑184490 | Introduction of TC 7.6.3 Out-of-band blocking | CAICT | pCR | Approval | Yes |
Yes
Revised to: R5-184490r1.
Revised from: R5-184490.
revised to remove editors note for MU/TT , add RAn4 clarity for UL Power level editors note , add message contents TBD for SA in editors note
Revised to: R5-184490r2.
Revised from: R5-184490r1.
Revised to: R5-185524.
| revised | No | R5‑185524 | |||
R5‑185524 | Introduction of TC 7.6.3 Out-of-band blocking | CAICT | pCR | Approval | Yes |
Yes
| approved | No | R5‑184490 | |||
R5‑184572 | General clauses updated for TS38.521-1 | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑184573 | DL and UL RMC updated for FR1 tests | Bureau Veritas | pCR | Approval | Yes |
Yes
Revised to: R5-184573r1.
pending disucssion on ANNEX structure
Revised to: R5-185390.
| revised | No | R5‑185390 | |||
R5‑185390 | DL and UL RMC updated for FR1 tests | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑184573 | |||
R5‑184574 | Downlink physical channel updated for FR1 tests | Huawei, Bureau Veritas | pCR | Approval | Yes |
Yes
C.0 content is pending discussions | approved | No | ||||
R5‑184575 | OCNG Patterns updated for FR1 tests | Bureau Veritas | pCR | Approval | Yes |
Yes
RAN4 dependency
Revised to: R5-184575r1.
Revised from: R5-184575.
add R4 tdoc infomration and remove highlighting and we wait for RAn4
Revised to: R5-185521.
| revised | No | R5‑185521 | |||
R5‑185521 | OCNG Patterns updated for FR1 tests | Bureau Veritas | pCR | Approval | Yes |
Yes
| approved | No | R5‑184575 | |||
R5‑184754 | TP for updating test case 6.2.3 UE AMPR | Ericsson LM | pCR | Approval | Yes |
Yes
revised to change editors note for SA , add test configiuration table title with NS_35, message contents for NS_35 to be referred with a look up value
Revised to: R5-184754r1.
Revised from: R5-184754.
change editor's note for SA, test configuration table, title, NS_35
Revised to: R5-185408.
| revised | No | R5‑185408 | |||
R5‑185408 | TP for updating test case 6.2.3 UE AMPR | Ericsson LM | pCR | Approval | Yes |
Yes
| approved | No | R5‑184754 | |||
R5‑184755 | TP for updating test case 6.5.2.3 Additional spectrum emission mask | Ericsson LM | pCR | Approval | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184822 | Addition of notes for half pi-BPSK test applicability | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑184823 | Introduction of 6.2C.1 Configured transmitted power for SUL | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
Revised to: R5-184823r1.
Revised from: R5-184823.
change section number as it is already existing, update editors note to remove TBD's, check with MOP for SUL needs to be tested
Revised to: R5-185446.
| revised | No | R5‑185446 | |||
R5‑185446 | Introduction of 6.2C.1 Configured transmitted power for SUL | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184823 | |||
R5‑184824 | Addition of Uplink Physical Channels in Annex | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
Revised to: R5-185324.
| revised | No | R5‑185324 | |||
R5‑185324 | Addition of Uplink Physical Channels in Annex | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184824 | |||
R5‑184825 | Addition of downlink physicanl channels in annex | Huawei, Hisilicon | pCR | Approval | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184859 | 5G_NR FR1_Text_update for_RX_sensitivity | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised to: R5-184859r1.
various comments , add test requirement table for deltaRIB, update ANNEX C.0 to reflect the offline discussions, remove [] in annex C, add editors note for SA messages, replace the table for adding 90MHz column
Revised from: R5-184859.
Revised to: R5-185447.
| revised | No | R5‑185447 | |||
R5‑185447 | 5G_NR FR1_Text_update for_RX_sensitivity | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
| approved | No | R5‑184859 | |||
R5‑184863 | Update of FR1 test case 6.2.2 | CAICT | pCR | Approval | Yes |
Yes
Revised to: R5-184863r1.
add editors note for PC1/4 RAN4 dependent , remove editors note for start position, remove note1 for test procedure, clarify editors note for PC2
Revised from: R5-184863.
Revised to: R5-185411.
| revised | No | R5‑185411 | |||
R5‑185411 | Update of FR1 test case 6.2.2 | CAICT | pCR | Approval | Yes |
Yes
| approved | No | R5‑184863 | |||
R5‑184865 | 5G NR_FR1_Text_update for TX Spurious Emission | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised to: R5-184865r1.
update editors note, add message exception for CP-OFDM QPSK, correct the reference to SCS also correct the SCS selection, update CD, change the coversheet
Revised from: R5-184865.
Revised to: R5-185413.
| revised | No | R5‑185413 | |||
R5‑185413 | 5G NR_FR1_Text_update for TX Spurious Emission | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
| approved | No | R5‑184865 | |||
R5‑184867 | 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised to: R5-184867r1.
Revised from: R5-184867.
revised as same issue with R5-184865
Revised to: R5-185496.
| revised | No | R5‑185496 | |||
R5‑185496 | 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
| approved | No | R5‑184867 | |||
R5‑184875 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
Revised to: R5-184875r1.
several comments aligned to previous papers regarding SA message content, Message exception, reference to DL signal annex, remove ANNEX F as it is covered in DCM tdoc
Revised from: R5-184875.
r1: -emove Annex F. It is covered in R5-184395; Remove editor notes for 200ms; Added editor notes: PC1 and PC4 requirements are missing in TS 38.101-1
Revised to: R5-185414.
| revised | No | R5‑185414 | |||
R5‑185414 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
| approved | No | R5‑184875 | |||
R5‑184888 | Introduction of maximum output power test cases | Ericsson | pCR | Approval | Yes |
Yes
was wrong spec on cover+3GU, reissued as R5-184983. | withdrawn | Yes | ||||
R5‑184919 | 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised to: R5-185325.
| revised | No | R5‑185325 | |||
R5‑185325 | 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
| approved | No | R5‑184919 | |||
R5‑184920 | 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Agenda Allocation was changed: [5.3.14.3]->[5.3.13.4].
RAN4 dependency R4-1810898
Revised to: R5-184920r1.
Revised from: R5-184920.
table format wrong coversheet error, RAN4 dependent
r1: Removed PTRS channel from table C.2-1; Updated table C.0-1 with for SCS = 30 and 60 kHz.
Revised to: R5-184920r2.
Revised from: R5-184920r1.
Revised to: R5-185500.
| revised | No | R5‑185500 | |||
R5‑185500 | 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
| approved | No | R5‑184920 | |||
R5‑184921 | 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Agenda Allocation was changed: [5.3.14.3]->[5.3.13.4].
Revised to: R5-184921r1.
Revised from: R5-184921.
several comments on the content, coversheet, and references
Revised to: R5-185501.
| revised | No | R5‑185501 | |||
R5‑185501 | 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
| approved | No | R5‑184921 | |||
R5‑184942 | Update to carrier leakage test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| revised | No | R5‑185312 | |||
R5‑185312 | Update to carrier leakage test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184942 | |||
R5‑184945 | Update to EVM test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185326.
| revised | No | R5‑185326 | |||
R5‑185326 | Update to EVM test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184945 | |||
R5‑184947 | Update to EVM equalizer spectrum flatness test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185315.
| revised | No | R5‑185315 | |||
R5‑185315 | Update to EVM equalizer spectrum flatness test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184947 | |||
R5‑184950 | Update to Frequency Error test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185317.
| revised | No | R5‑185317 | |||
R5‑185317 | Update to Frequency Error test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184950 | |||
R5‑184953 | Addition of Annex Global In-Channel TX-Test to 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-184953r1.
Revised from: R5-184953.
Revised to: R5-185327.
| revised | No | R5‑185327 | |||
R5‑185327 | Addition of Annex Global In-Channel TX-Test to 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184953 | |||
R5‑184955 | Update to In-band Emissions test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185320.
| revised | No | R5‑185320 | |||
R5‑185320 | Update to In-band Emissions test case in TS 38.521-1 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184955 | |||
5.3.13.5 | TS 38.521-2 | R5‑184367 | FR2_RefSens_TestConfig_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185187 | |
R5‑185187 | FR2_RefSens_TestConfig_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184367 | |||
R5‑184368 | Discussion_FR2_StoreTxRxBeamPeakCoordinates | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
Associated pCR R5-184370
Needs more discussion on how to verify if the stored values are OK before using it
Also dependent on 365 agreement since EIS based storing is needed also
Revised to: R5-184368r1.
Revised from: R5-184368.
Revised to: R5-184368r2.
Revised from: R5-184368r1.
Revised to: R5-184368r3.
Revised from: R5-184368r2.
Revised to: R5-185561.
| revised | No | R5‑185561 | |||
R5‑185561 | Discussion_FR2_StoreTxRxBeamPeakCoordinates | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184368 | |||
R5‑184369 | FR2_StoreTxRxBeamPeakCoordinates_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Revised to: R5-184369r1.
Revised to: R5-185562.
| revised | No | R5‑185562 | |||
R5‑185562 | FR2_StoreTxRxBeamPeakCoordinates_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | No |
Yes
| approved | No | R5‑184369 | |||
R5‑184371 | FR2_TxSpurious_TestPointAnalysis | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
Associated pCR R5-184372, R5-184924
Revised to: R5-184371r1.
Revised from: R5-184371.
Revised to: R5-184371r2.
Revised from: R5-184371r1.
Revised to: R5-184371r3.
Revised from: R5-184371r2.
Revised to: R5-185489.
| revised | No | R5‑185489 | |||
R5‑185489 | FR2_TxSpurious_TestPointAnalysis | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Revised from: R5-184371r3.
Except proposal 5, other Proposals are endorsed | noted | No | R5‑184371 | |||
R5‑184372 | FR2_TxSpurious_TestConfig_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
depends on R5-18371
Revised to: R5-184372r1.
Revised from: R5-184372.
Revised to: R5-184372r2.
Revised from: R5-184372r1.
change to reflect the discussion in R5-185489
Revised to: R5-185490.
| revised | No | R5‑185490 | |||
R5‑184373 | FR2_UE_BeamlockInvoke_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Revised to: R5-184373r1.
Revised to: R5-184373r2.
Revised from: R5-184373r1.
Revised to: R5-185555.
| revised | No | R5‑185555 | |||
R5‑185555 | FR2_UE_BeamlockInvoke_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Revised from: R5-184373r2.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184373 | |||
R5‑184398 | Updates of FR2 TRx MU and TT in Annex | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
FR2_MU_TT
Revised to: R5-184398r1.
Revised from: R5-184398.
Revised to: R5-185519.
| revised | No | R5‑185519 | |||
R5‑185519 | Updates of FR2 TRx MU and TT in Annex | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
Revised from: R5-184398r1.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184398 | |||
R5‑184428 | TP to remove editor's note on frequency range of Tx Spurious emission | Anritsu | pCR | Approval | Yes |
Yes
This contribution propose to fix the frequency range of Tx spurious emission in FR2.
Document was sent FOR E-MAIL APPROVAL
withdrawn after offline discussion with Keysight.
As for the requirement of frequency range for spurious emission, have to come back in the next meeting to complete the test case by Nov.
| withdrawn | Yes | ||||
R5‑184576 | DL and UL RMC updated for FR2 tests | Bureau Veritas | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185188 | |||
R5‑185188 | DL and UL RMC updated for FR2 tests | Bureau Veritas | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184576 | |||
R5‑184577 | Downlink physical channel updated for FR2 tests | Bureau Veritas | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185189 | |||
R5‑185189 | Downlink physical channel updated for FR2 tests | Bureau Veritas | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184577 | |||
R5‑184578 | OCNG Patterns updated for FR2 tests | Bureau Veritas | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185190 | |||
R5‑185190 | OCNG Patterns updated for FR2 tests | Bureau Veritas | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184578 | |||
R5‑184634 | Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement | Anritsu | pCR | Approval | Yes |
Yes
Revised to: R5-185348.
| revised | No | R5‑185348 | |||
R5‑185348 | Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement | Anritsu | pCR | Approval | Yes |
Yes
Revised from: R5-184634.
change the wording form should to shall also change offset dB. Remove the Typo effet
| approved | No | R5‑184634 | |||
R5‑184665 | Flexible loop nest for FR2 TRx tests | Anritsu | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184742 | Update of FR2 test case 6.3.1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Document was sent FOR E-MAIL APPROVAL
| approved | No | ||||
R5‑184743 | Update of FR2 test case 6.3.3.2 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Document was sent FOR E-MAIL APPROVAL
| approved | No | ||||
R5‑184850 | Update of Initial condition for FR2 | SGS Wireless | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
| withdrawn | Yes | ||||
R5‑184856 | General sections updated to 38.521-2 | CAICT | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
| approved | No | ||||
R5‑184983 | Introduction of maximum output power test cases | Ericsson | pCR | Approval | Yes |
Yes
Replaces R5-184888 (wrong spec allocation)
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185197 | |||
R5‑185197 | Introduction of maximum output power test cases | Ericsson | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184983 | |||
R5‑184904 | Update to ACS and in-band blocking test cases in TS 38.521-1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
Revised to: R5-184904r1.
same changes needed as 875r1
Revised from: R5-184904.
r1: Update editor notes of ul power level TBD in TS 38.101-1; Remove Annex F. It is covered in R5-184395
Revised to: R5-185415.
| revised | No | R5‑185415 | |||
R5‑185415 | Update to ACS and in-band blocking test cases in TS 38.521-1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
| approved | No | R5‑184904 | |||
R5‑184907 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185191 | |||
R5‑185191 | Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 | Keysight Technologies UK Ltd | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184907 | |||
R5‑184912 | Update to ACS and inband blocking test cases in TS 38.521-2 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185192 | |||
R5‑185192 | Update to ACS and inband blocking test cases in TS 38.521-2 | Keysight Technologies UK Ltd | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184912 | |||
R5‑184954 | Addition of Annex Global In-Channel TX-Test to 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-184954r1.
Revised from: R5-184954.
Revised to: R5-185353.
| revised | No | R5‑185353 | |||
R5‑185353 | Addition of Annex Global In-Channel TX-Test to 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised from: R5-184954r1.
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185193 | R5‑184954 | ||
R5‑185193 | Addition of Annex Global In-Channel TX-Test to 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑185353 | |||
R5‑184959 | Update to Test frequencies for SEM in TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185194 | |||
R5‑185194 | Update to Test frequencies for SEM in TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184959 | |||
R5‑184960 | Addition of Frequency Error test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185350.
| revised | No | R5‑185350 | |||
R5‑185350 | Addition of Frequency Error test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184960 | |||
R5‑184963 | Addition of EVM test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185195 | |||
R5‑185195 | Addition of EVM test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184963 | |||
R5‑184966 | Addition of Carrier Leakage test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185196 | |||
R5‑185196 | Addition of Carrier Leakage test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184966 | |||
R5‑184969 | Addition of In-band Emissions test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184972 | Addition of EVM equalizer spectral flatness test case to TS 38.521-2 | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
5.3.13.6 | TS 38.521-3 | R5‑184125 | Add Clause 7.5 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
Revised to: R5-184125r1.
Revised from: R5-184125.
Revised to: R5-185329.
| revised | No | R5‑185329 | |
R5‑185329 | Add Clause 7.5 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
| withdrawn | Yes | R5‑184125 | |||
R5‑184362 | FR2_38.521-3_Applicability_SpuriousEmissions | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
waiting for discussion paper R5-184361
Revised to: R5-184362r1.
Revised from: R5-184362.
Revised to: R5-184362r2.
Revised from: R5-184362r1.
Revised to: R5-185559.
| revised | No | R5‑185559 | |||
R5‑185559 | FR2_38.521-3_Applicability_SpuriousEmissions | Qualcomm Europe Inc. (Spain) | pCR | Approval | No |
Yes
| withdrawn | Yes | R5‑184362 | |||
R5‑184370 | FR2_StoreTxRxBeamPeakCoordinates_38.521-3 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Revised to: R5-184370r1.
Revised to: R5-185563.
| revised | No | R5‑185563 | |||
R5‑185563 | FR2_StoreTxRxBeamPeakCoordinates_38.521-3 | Qualcomm Europe Inc. (Spain) | pCR | Approval | No |
Yes
| approved | No | R5‑184370 | |||
R5‑184402 | Addition of TRx MU and TT in TS 38.521-3 Annex | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
IW_MU_TT
Revised to: R5-184402r1.
related to 4400
Revised from: R5-184402.
Revised to: R5-185520.
| revised | No | R5‑185520 | |||
R5‑185520 | Addition of TRx MU and TT in TS 38.521-3 Annex | NTT DOCOMO, INC. | pCR | Approval | Yes |
Yes
Revised from: R5-184402r1.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184402 | |||
R5‑184491 | Clean up EN-DC FR1 TRx TCs | Anritsu | pCR | Approval | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184563 | Add Clause 7.5B.1 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
late doc
LATE DOCUMENT
Revised to: R5-184563r1.
LATE DOCUMENT
Revised from: R5-184563.
Revised to: R5-184563r2.
LATE DOCUMENT
Revised from: R5-184563r1.
Needs to be revised to align with the way fwd of testing NR and tetsing LTE in ENDC spec , update test description and test requirements and editors notes
Revised to: R5-185503.
| revised | No | R5‑185503 | |||
R5‑185503 | Add Clause 7.5B.1 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184563r2.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184563 | |||
R5‑184564 | Add Clause 7.5B.2 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
late doc
LATE DOCUMENT
Revised to: R5-184564r1.
LATE DOCUMENT
Revised from: R5-184564.
same comment as R5-184563r1
Revised to: R5-184564r2.
LATE DOCUMENT
Revised from: R5-184564r1.
same comments as 563r2
Revised to: R5-185504.
| revised | No | R5‑185504 | |||
R5‑185504 | Add Clause 7.5B.2 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184564r2.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184564 | |||
R5‑184565 | Add Clause 7.5B.3 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
late doc
LATE DOCUMENT
Revised to: R5-184565r1.
LATE DOCUMENT
Revised from: R5-184565.
same comment as R5-184563r1
Revised to: R5-184565r2.
LATE DOCUMENT
Revised from: R5-184565r1.
same comments as 563r2
Revised to: R5-185505.
| revised | No | R5‑185505 | |||
R5‑185505 | Add Clause 7.5B.3 into TS 38.521-3 | CMCC | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184565r2.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184565 | |||
R5‑184579 | Updated EN-DC configuration information in clause 5 | Bureau Veritas | pCR | Approval | Yes |
Yes
Impacted clause 5.3A; 5.3A.1; 5.3B (New); 5.5A.1 (New); 5.5B.2; 5.5B.3; 5.5B.4; 5.5B.5; 5.5B.6 (New) | approved | No | ||||
R5‑184580 | TIB value add for EN-DC band in 38.521-3 | Bureau Veritas | pCR | Approval | Yes |
Yes
Impacted clause 6.2B.4.2.3; 6.2B.4.2.4 | approved | No | ||||
R5‑184671 | Update of References in Section 2 of 38.521-3 spec | Qualcomm Wireless GmbH | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑184672 | Updates to Operating Bands in Section 5.2 | Qualcomm Wireless GmbH | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑184737 | Dual uplink interferer updated to 38.521-3 | Bureau Veritas | pCR | Approval | Yes |
Yes
waits for annex structure finalization | approved | No | ||||
R5‑184744 | Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-185332.
| revised | No | R5‑185332 | |||
R5‑185332 | Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184744 | |||
R5‑184745 | Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-185333.
| revised | No | R5‑185333 | |||
R5‑185333 | Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184745 | |||
R5‑184746 | Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-184746r1.
focus only on 1 CC test for now not needed to have more than 1 CC test points in the test as per 5G-NR RAN5 phases, also complete the test except Pcmax , leveraging SA test points as per the joint discussion suggestion . LTE test points need not be tested as per Joint discussion , and should be pursued with that background
Revised from: R5-184746.
Revised to: R5-185507.
| revised | No | R5‑185507 | |||
R5‑185507 | Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184746 | |||
R5‑184747 | Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185198 | |||
R5‑185198 | Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 | Huawei,HiSilicon | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184747 | |||
R5‑184748 | Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced.
| revised | No | R5‑185199 | |||
R5‑185199 | Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 | Huawei,HiSilicon | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184748 | |||
R5‑184757 | TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC | Ericsson LM | pCR | Approval | Yes |
Yes
Revised to: R5-184757r1.
Revised from: R5-184757.
Revised to: R5-185469.
| revised | No | R5‑185469 | |||
R5‑185469 | TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC | Ericsson LM | pCR | Approval | No |
Yes
Revised from: R5-184757r1.
associated TP pCR R5-185469
Document was sent FOR E-MAIL APPROVAL | approved | No | R5‑184757 | |||
R5‑184758 | TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC | Ericsson LM | pCR | Approval | Yes |
Yes
Revised to: R5-184758r1.
same comments as 757
Revised from: R5-184758.
Revised to: R5-185470.
| revised | No | R5‑185470 | |||
R5‑185470 | TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC | Ericsson LM | pCR | Approval | No |
Yes
Revised from: R5-184758r1.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184758 | |||
R5‑184759 | TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC | Ericsson LM | pCR | Approval | Yes |
Yes
Revised to: R5-184759r1.
same comments as 757 , try and complete the test except for RAN4 dependency. As per latest 38.101-3 RAN4 req is completed for NS_35
Revised to: R5-185471.
| revised | No | R5‑185471 | |||
R5‑185471 | TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC | Ericsson LM | pCR | Approval | No |
Yes
Revised from: R5-184759r1.
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185200 | R5‑184759 | ||
R5‑185200 | TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC | Ericsson LM | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑185471 | |||
R5‑184810 | FR2_UE_BeamlockInvoke_38.521-3 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Revised to: R5-184810r1.
Check if STATE3A-RF step is needed
Revised to: R5-184810r2.
Revised to: R5-185556.
| revised | No | R5‑185556 | |||
R5‑185556 | FR2_UE_BeamlockInvoke_38.521-3 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Revised from: R5-184810r2.
Document was sent FOR E-MAIL APPROVAL
| approved | No | R5‑184810 | |||
R5‑184826 | Update of TC 6.2B.1.1 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised to: R5-184826r1.
LATE DOCUMENT
Revised from: R5-184826.
same comments as 757 for LTE test points. Also MU is pending for ENDC needs to be coinfirmed what TT should be used since the BW will be > than SA. LTE tets point analysis and references needs to be completed
Revised to: R5-185472.
| revised | No | R5‑185472 | |||
R5‑185472 | Update of TC 6.2B.1.1 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184826r1.
| approved | No | R5‑184826 | |||
R5‑184827 | Introduction of TC 6.2B.1.2 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
Revised to: R5-184827r1.
Revised from: R5-184827.
Revised to: R5-184827r2.
Revised from: R5-184827r1.
same comments as 826 to complete test point aspects of LTE ,
Revised to: R5-185473.
| revised | No | R5‑185473 | |||
R5‑185473 | Introduction of TC 6.2B.1.2 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184827 | |||
R5‑184828 | Update of 6.2B.1.3 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised to: R5-184828r1.
LATE DOCUMENT
Revised from: R5-184828.
Same comments as 826 , along with Dynamic power sharing aspects, core requirements is complete
Revised to: R5-185474.
same comment as 5472
| revised | No | R5‑185474 | |||
R5‑185474 | Update of 6.2B.1.3 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
| approved | No | R5‑184828 | |||
R5‑184829 | Introduction of TC 7.4B.1 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised to: R5-184829r1.
LATE DOCUMENT
Revised from: R5-184829.
Revised to: R5-184829r2.
LATE DOCUMENT
Revised from: R5-184829r1.
revised to align the contents to 38.101-1 and also update editors notes
Revised to: R5-185475.
| revised | No | R5‑185475 | |||
R5‑185475 | Introduction of TC 7.4B.1 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184829r2.
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185201 | R5‑184829 | ||
R5‑185201 | Introduction of TC 7.4B.1 | Huawei, Hisilicon | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑185475 | |||
R5‑184830 | Introduction of 7.4B.2 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised to: R5-184830r1.
LATE DOCUMENT
Revised from: R5-184830.
same issue as R5-184829
Revised to: R5-184830r2.
LATE DOCUMENT
Revised from: R5-184830r1.
Revised to: R5-185476.
| revised | No | R5‑185476 | |||
R5‑185476 | Introduction of 7.4B.2 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184830r2.
Document was sent FOR E-MAIL APPROVAL
r1 was produced.
| revised | No | R5‑185202 | R5‑184830 | ||
R5‑185202 | Introduction of 7.4B.2 | Huawei, Hisilicon | pCR | Approval | No |
Yes
| approved | No | R5‑185476 | |||
R5‑184831 | Introduction of 7.4B.3 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised to: R5-184831r1.
LATE DOCUMENT
Revised from: R5-184831.
same issue as R5-184829
Revised to: R5-184831r2.
LATE DOCUMENT
Revised from: R5-184831r1.
leverage test procedure from part1 and also decide what to test for LTE , also update same notes as 830r2
Revised to: R5-185477.
| revised | No | R5‑185477 | |||
R5‑185477 | Introduction of 7.4B.3 | Huawei, Hisilicon | pCR | Approval | Yes |
Yes
LATE DOCUMENT
Revised from: R5-184831r2.
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185203 | R5‑184831 | ||
R5‑185203 | Introduction of 7.4B.3 | Huawei, Hisilicon | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑185477 | |||
R5‑184855 | Update Occupied Bandwidth for interband EN-DC within FR1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
depends on R5-184852
Revised to: R5-185479.
| revised | No | R5‑185479 | |||
R5‑185479 | Update Occupied Bandwidth for interband EN-DC within FR1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
Revised from: R5-184855.
Add editor's note to indicate LTE testing is FFS, working assumption is LTE not tested. LTE test procedure is FFS. | approved | No | R5‑184855 | |||
R5‑184857 | Update SEM interband EN-DC within FR1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
depends on R5-184852
Revised to: R5-184857r1.
Revised from: R5-184857.
Revised to: R5-185480.
| revised | No | R5‑185480 | |||
R5‑185480 | Update SEM interband EN-DC within FR1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
Revised from: R5-184857r1.
same comment as R5-185479 | approved | No | R5‑184857 | |||
R5‑184860 | Update ACLR for interband EN-DC within FR1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
depends on R5-184852
Revised to: R5-184860r1.
Revised from: R5-184860.
Revised to: R5-185481.
| revised | No | R5‑185481 | |||
R5‑185481 | Update ACLR for interband EN-DC within FR1 | Keysight Technologies UK Ltd | pCR | Approval | Yes |
Yes
Revised from: R5-184860r1.
same comment as R5-185479 | approved | No | R5‑184860 | |||
R5‑184869 | 5G NR_EN_DC with FR1_Text update for RX sensitivity | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised to: R5-184869r1.
Revised from: R5-184869.
depends on R5-184922
Revised to: R5-184869r2.
Revised from: R5-184869r1.
Revised to: R5-185482.
| revised | No | R5‑185482 | |||
R5‑185482 | 5G NR_EN_DC with FR1_Text update for RX sensitivity | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised from: R5-184869r2.
formatting issue, handling multiple LTE band, minimum requirement in general section
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185204 | R5‑184869 | ||
R5‑185204 | 5G NR_EN_DC with FR1_Text update for RX sensitivity | Qualcomm Incorporated | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑185482 | |||
R5‑184872 | 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised to: R5-184872r1.
add LTE test point analysis and IC also compelte the message contents TBD. RAn4 has completed the requirements except for LTE test point and NC Config
Revised to: R5-185487.
| revised | No | R5‑185487 | |||
R5‑185487 | 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission | Qualcomm Incorporated | pCR | Approval | Yes |
Yes
Revised from: R5-184872r1.
depends on R5-185334
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185205 | R5‑184872 | ||
R5‑185205 | 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission | Qualcomm Incorporated | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑185487 | |||
R5‑184882 | Alignment of Annex numbering with core spec | Qualcomm Wireless GmbH | pCR | Approval | Yes |
Yes
Pending RAN4 CR approval
Revised to: R5-184882r1.
Revised from: R5-184882.
Revised to: R5-185422.
| revised | No | R5‑185422 | |||
R5‑185422 | Alignment of Annex numbering with core spec | Qualcomm Wireless GmbH | pCR | Approval | Yes |
Yes
| approved | No | R5‑184882 | |||
R5‑184897 | Updates to Channel Arrangement section in 38.521-3 | Qualcomm Wireless GmbH | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑185302 | Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC | SGS Wireless | pCR | discussion | Yes |
Yes
LATE DOCUMENT
Revised to: R5-185302r1.
LATE DOCUMENT
Revised from: R5-185302.
update intraband contigous ENDC test similar to other Intraband Contig ENDC tests
Revised to: R5-185302r2.
LATE DOCUMENT
Revised from: R5-185302r1.
r2: Update editor’s note for test point analysis; Add reference in minimum requirement
Revised to: R5-185510.
| revised | No | R5‑185510 | |||
R5‑185510 | Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC | SGS Wireless | pCR | discussion | Yes |
Yes
LATE DOCUMENT
Revised from: R5-185302r2.
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185206 | R5‑185302 | ||
R5‑185206 | Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC | SGS Wireless | pCR | discussion | No |
Yes
Email approved | approved | No | R5‑185510 | |||
R5‑185303 | Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC | SGS Wireless | pCR | discussion | Yes |
Yes
LATE DOCUMENT
Revised to: R5-185303r1.
LATE DOCUMENT
Revised from: R5-185303.
need clarity on LTE test measurement from RAN4 and also decide on the LTE test points along with updates similar to 302r1
Revised to: R5-185303r2.
LATE DOCUMENT
Revised from: R5-185303r1.
Revised to: R5-185511.
| revised | No | R5‑185511 | |||
R5‑185511 | Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC | SGS Wireless | pCR | discussion | Yes |
Yes
LATE DOCUMENT
Revised from: R5-185303r2.
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185207 | R5‑185303 | ||
R5‑185207 | Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC | SGS Wireless | pCR | discussion | No |
Yes
Email approved | approved | No | R5‑185511 | |||
R5‑185304 | Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 | SGS Wireless | pCR | discussion | Yes |
Yes
LATE DOCUMENT
Revised to: R5-185304r1.
LATE DOCUMENT
Revised from: R5-185304.
add similar updates as other interband within FR1 tests
Revised to: R5-185512.
| revised | No | R5‑185512 | |||
R5‑185512 | Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 | SGS Wireless | pCR | discussion | Yes |
Yes
LATE DOCUMENT
Revised from: R5-185304r1.
Document was sent FOR E-MAIL APPROVAL
r2 was produced.
| revised | No | R5‑185208 | R5‑185304 | ||
R5‑185208 | Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 | SGS Wireless | pCR | discussion | No |
Yes
Email approved | approved | No | R5‑185512 | |||
R5‑185351 | Update across EN-DC RF test cases in TS 38.521-3 | Qualcomm Wireless GmbH | pCR | discussion | Yes |
Yes
LATE DOCUMENT
Document was sent FOR E-MAIL APPROVAL
| approved | No | ||||
5.3.13.7 | TS 38.521-4 |   | ||||||||||
5.3.13.8 | TS 38.522 | R5‑184121 | TP for Clause 4.1.1 of TS 38.522 | CMCC | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r5 was produced. | revised | No | R5‑185209 | |
R5‑185209 | TP for Clause 4.1.1 of TS 38.522 | CMCC | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184121 | |||
R5‑184122 | TP for Clause 4.1.2 of TS 38.522 | CMCC | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r4 was produced. | revised | No | R5‑185210 | |||
R5‑185210 | TP for Clause 4.1.2 of TS 38.522 | CMCC | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184122 | |||
R5‑184123 | TP for Clause 4.1.3 of TS 38.522 | CMCC | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r3 was produced.
| revised | No | R5‑185211 | |||
R5‑185211 | TP for Clause 4.1.3 of TS 38.522 | CMCC | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184123 | |||
R5‑184363 | FR2_38.522_Applicability_SpuriousEmissions | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
waiting for discussion paper R5-184361, 4362
Revised to: R5-184363r1.
Revised from: R5-184363.
Revised to: R5-185560.
| revised | No | R5‑185560 | |||
R5‑185560 | FR2_38.522_Applicability_SpuriousEmissions | Qualcomm Europe Inc. (Spain) | pCR | Approval | No |
Yes
| withdrawn | Yes | R5‑184363 | |||
5.3.13.9 | TS 38.533 |   | ||||||||||
5.3.13.10 | TS 36.508 |   | ||||||||||
5.3.13.11 | TS 36.521-3 |   | ||||||||||
5.3.13.12 | TS 37.571-1 |   | ||||||||||
5.3.13.13 | TS 37.571-3 |   | ||||||||||
5.3.13.14 | TS 37.571-5 |   | ||||||||||
5.3.13.15 | TR 38.903 (Derivation of test tolerances and measurement uncertainty for User Equipment (UE) conformance tests) | R5‑184430 | TP on common test setup in FR2 | Anritsu | pCR | Approval | Yes |
Yes
TP for common test setup in FR2.
no conclusion to reach the common assumption by different TE vendors | withdrawn | Yes | ||
R5‑184703 | MU budget for EIRP/TRP measurements with Near Field test range at mmWave | MVG Industries | discussion | Discussion | Yes |
Yes
wrong content type | withdrawn | Yes | ||||
R5‑184738 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave | MVG Industries | pCR | Discussion | Yes |
Yes
Revised to: R5-185352.
| revised | No | R5‑185352 | |||
R5‑185352 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave | MVG Industries | pCR | Discussion | Yes |
Yes
Revised from: R5-184738.
add track mark
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185212 | R5‑184738 | ||
R5‑185212 | pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave | MVG Industries | pCR | Discussion | No |
Yes
Email approved | approved | No | R5‑185352 | |||
R5‑184817 | Making Measurement Uncertainty Terms Common between methods in TR 38.90 | MVG Industries | discussion | Approval | Yes |
Yes
wrong content type | withdrawn | Yes | ||||
R5‑184819 | pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 | MVG Industries | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r2 was produced.
| revised | No | R5‑185213 | |||
R5‑185213 | pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 | MVG Industries | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184819 | |||
R5‑184913 | Update MU factors for IFF | Keysight Technologies UK Ltd | pCR | Approval | No |
Yes
LATE DOCUMENT
depends on R5-184858 | withdrawn | Yes | ||||
R5‑184976 | TP on Measurement Uncertainty Contributions in FR2 | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r2 was produced. | revised | No | R5‑185214 | |||
R5‑185214 | TP on Measurement Uncertainty Contributions in FR2 | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184976 | |||
5.3.13.16 | TR 38.905 (Derivation of test points for Radio Transmission and Reception User Equipment (UE) conformance tests) | R5‑184303 | Test Point analysis for FR1 Configured Output Power | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
associated pCR R5-184300 | approved | No | ||
R5‑184751 | TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 | Ericsson LM | pCR | Approval | Yes |
Yes
Revised to: R5-185307.
| revised | No | R5‑185307 | |||
R5‑185307 | TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 | Ericsson LM | pCR | Approval | Yes |
Yes
Revised from: R5-184751.
Added zip file to the zip folder, justified the file name as added in the table
| approved | No | R5‑184751 | |||
R5‑184837 | Test Point analysis for FR1 Configured Output Power for SUL | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised to: R5-185309.
| revised | No | R5‑185309 | |||
R5‑185309 | Test Point analysis for FR1 Configured Output Power for SUL | Huawei,HiSilicon | pCR | Approval | Yes |
Yes
Revised from: R5-184837.
Added line to include the zip file into TR38.905 | approved | No | R5‑184837 | |||
R5‑184923 | Test Point analysis for FR2 RefSense test case | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
| approved | No | ||||
R5‑184924 | Test Point analysis for FR2 TxSpurious test case | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
depends on R5-184371
Revised to: R5-184924r1.
Revised from: R5-184924.
Revised to: R5-184924r2.
Revised from: R5-184924r1.
Revised to: R5-185491.
| revised | No | R5‑185491 | |||
R5‑185491 | Test Point analysis for FR2 TxSpurious test case | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
Revised from: R5-184924r2.
change to reflect the final endorsed in R5-185489 | approved | No | R5‑184924 | |||
R5‑184943 | TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185311.
| revised | No | R5‑185311 | |||
R5‑185311 | TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184943 | |||
R5‑184946 | TP for updating TR 38.905 with EVM test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
need to correct an error in the filename of the zipped discussion paper for the TR 38.905, # of test point will be updated accordingly
Revised to: R5-185412.
| revised | No | R5‑185412 | |||
R5‑185412 | TP for updating TR 38.905 with EVM test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184946 | |||
R5‑184948 | TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185314.
| revised | No | R5‑185314 | |||
R5‑185314 | TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184948 | |||
R5‑184951 | TP for updating TR 38.905 with FR1 Frequency Error test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185316.
| revised | No | R5‑185316 | |||
R5‑185316 | TP for updating TR 38.905 with FR1 Frequency Error test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised from: R5-184951.
merged the 3 TP analysis doc in the zip file
| approved | No | R5‑184951 | |||
R5‑184956 | TP for updating TR 38.905 with FR1 In-band Emissions test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Revised to: R5-185319.
| revised | No | R5‑185319 | |||
R5‑185319 | TP for updating TR 38.905 with FR1 In-band Emissions test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
| approved | No | R5‑184956 | |||
R5‑184958 | TP for updating TR 38.905 with FR2 SEM test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
Document was sent FOR E-MAIL APPROVAL
r1 was produced.
| revised | No | R5‑185215 | |||
R5‑185215 | TP for updating TR 38.905 with FR2 SEM test point analysis | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑184958 | |||
R5‑184961 | TP for updating TR 38.905 with FR2 Frequency Error test point analysis | ROHDE & SCHWARZ | pCR | Approval | Yes |
Yes
LATE DOCUMENT
included the changed as R5-185349 | approved | No | ||||
R5‑184964 | TP for updating TR 38.905 with FR2 EVM test point analysis | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184967 | TP for updating TR 38.905 with FR2 Carrier Leakage test point analysis | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184970 | TP for updating TR 38.905 with FR2 In-band Emissions test point analysis | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184973 | TP for updating TR 38.905 with FR2 EVM equalizer spectral flatness test point analysis | ROHDE & SCHWARZ | pCR | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑185430 | TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC | Ericsson LM | pCR | Approval | No |
Yes
late doc
Document was sent FOR E-MAIL APPROVAL
r1 was produced. | revised | No | R5‑185216 | |||
R5‑185216 | TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC | Ericsson LM | pCR | Approval | No |
Yes
Email approved | approved | No | R5‑185430 | |||
5.3.13.17 | General Papers / Work Plan / TC lists | R5‑184068 | FR1 TT Way Forward update | Telecom Italia S.p.A. | discussion | Information | Yes |
Yes
document will be maintained by TI at the end of each meeting to update FR1/FR2 TT/MU dependencies until completion.
Revised to: R5-184068r1.
Revised from: R5-184068.
Revised to: R5-184068r2.
Revised from: R5-184068r1.
Revised to: R5-184068r3.
Revised from: R5-184068r2.
Revised to: R5-185564.
| revised | No | R5‑185564 | |
R5‑185564 | FR1 TT Way Forward update | Telecom Italia S.p.A. | discussion | Information | Yes |
Yes
| noted | No | R5‑184068 | |||
R5‑184124 | Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 | CMCC, HUAWEI | discussion | Endorsement | Yes |
Yes
Revised from: R5-184124.
Agenda Allocation was changed: [5.3.13.6]->[5.3.13.17].
Revised from: R5-184124.
Agenda Allocation was changed: [5.3.13.6]->[5.3.13.17].
Revised to: R5-185328.
| revised | No | R5‑185328 | |||
R5‑185328 | Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 | CMCC, HUAWEI | discussion | Endorsement | Yes |
Yes
| approved | No | R5‑184124 | |||
R5‑184133 | Discussion on RRM 5G progress | ROHDE & SCHWARZ | discussion | Yes |
Yes
LATE DOCUMENT
waiting for update from RAN4 | noted | No | |||||
R5‑184295 | Discussion on test frequency definition in FR1 | Huawei,HiSilicon | discussion | Endorsement | Yes |
Yes
same content as 4449, noted. 4296 can be w/drawn associated CR | noted | No | ||||
R5‑184361 | Discussion_38.521-3_ApplicabilityRules | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.3.13.6]->[5.3.13.17].
wrong Agenda shuld be 5.3.13.17, same comments as 485 , try to retain the contents common between 485 and 361 in one place , and keep 361 with unique points as applicable to the proposal
associated pCR R5-184362, R5-184363
Revised to: R5-184361r1.
Revised from: R5-184361.
Revised to: R5-184361r2.
Revised from: R5-184361r1.
Revised to: R5-184361r3.
Revised from: R5-184361r2.
Revised to: R5-184361r4.
Revised from: R5-184361r3.
Revised to: R5-185558.
| revised | No | R5‑185558 | |||
R5‑185558 | Discussion_38.521-3_ApplicabilityRules | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Revised from: R5-184361r4.
No proposal endorsed | noted | No | R5‑184361 | |||
R5‑184364 | Discussion_FR2_EVM_UBF_usage | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
associated pCR R5-184963
proposal endorsed | noted | No | ||||
R5‑184365 | Discussion_FR2_RefSens_RSRP_vs_EIS | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
RAN4 discussion paper related to this topic R4-1811035 | noted | No | ||||
R5‑184366 | Discussion_FR2_RefSens_TestPointAnalysis | Qualcomm Europe Inc. (Spain) | discussion | Endorsement | Yes |
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
Associated pCR R5-184923, R5-184367
Proposal endorsed | noted | No | ||||
R5‑185490 | FR2_TxSpurious_TestConfig_38.521-2 | Qualcomm Europe Inc. (Spain) | pCR | Approval | Yes |
Yes
| approved | No | R5‑184372 | |||
R5‑184394 | Proposal on Test Tolerance table format in TS 38.521-1 Annex F | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
FR1_TT
Proposal: Use proposed TT table format in section 2.2 for TS 38.521-1 Annex F.3.
Proposal endorsed and implemented in R5-184395 | noted | No | ||||
R5‑184397 | Proposal on MU and TT table format in TS 38.521-2 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
FR2_MU_TT
associated pCR R5-184398
Revised to: R5-184397r1.
Revised from: R5-184397.
Revised to: R5-185518.
| revised | No | R5‑185518 | |||
R5‑185518 | Proposal on MU and TT table format in TS 38.521-2 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184397 | |||
R5‑184400 | MU and TT of EN-DC test cases in TS 38.521-3 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
IW_MU_TT
Revised to: R5-184400r1.
Revised from: R5-184400.
associated pCR 4402
Revised to: R5-184400r2.
Revised from: R5-184400r1.
Revised to: R5-185531.
| revised | No | R5‑185531 | |||
R5‑185531 | MU and TT of EN-DC test cases in TS 38.521-3 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184400 | |||
R5‑184407 | Discussion on the structure of Clause 7.3A Reference sensitivity for CA in TS 38.521-1 | CMCC, Huawei | discussion | Endorsement | Yes |
Yes
Proposal 1: Adopt Option 1a as the principle to structure Clause 7.3A in TS 38.521-1.
proposal endorsed.
TS38.521-2 and -3 WP will follow the same structure | noted | No | ||||
R5‑184408 | Discussion on the structure of Clause 7.7A Spurious response for CA in TS 38.521-1 | CMCC, Huawei | discussion | Endorsement | Yes |
Yes
Proposal 1: Adopt Option 1a as the principle to structure Clause 7.7A in TS 38.521-1.
Proposal endorsed.
TS38.521-2 and -3 WP will follow the same structure | noted | No | ||||
R5‑184422 | Treatment of power supply cable for FR2 UE tests | Anritsu | discussion | Agreement | Yes |
Yes
This contribution raises an issue of a treatment of power supply cable physically attached to a UE.
Revised to: R5-184422r1.
Revised from: R5-184422.
Revised to: R5-185525.
| revised | No | R5‑185525 | |||
R5‑185525 | Treatment of power supply cable for FR2 UE tests | Anritsu | discussion | Agreement | Yes |
Yes
Revised from: R5-184422r1.
Proposal endorsed | noted | No | R5‑184422 | |||
R5‑184423 | Meeting notes of offline call on FR2 UE common test setup | Anritsu | other | Information | Yes |
Yes
Meeting notes of offline call on FR2 UE common test setup | noted | No | ||||
R5‑184424 | Common test setup for FR2 measurement uncertainty estimation | Anritsu | discussion | Agreement | Yes |
Yes
This contribution introduces our views for a further discussion of common test setup in FR2. | noted | No | ||||
R5‑184425 | Testability issue of maximum input level and ACS (case 2) in FR2 | Anritsu | discussion | Agreement | Yes |
Yes
In this contribution, we introduce our latest result of the study and propose a relaxation of the test requirement of maximum input level and ACS (case 2) interferer level in FR2.
| noted | No | ||||
R5‑184426 | Estimation of measurement uncertainty for FR2 TRx test cases | Anritsu | discussion | Discussion | Yes |
Yes
This contribution introduces estimation of measurement uncertainty (MU) for FR2 test cases with IFF1 test system.
Revised to: R5-184426r1.
Revised from: R5-184426.
Revised to: R5-185335.
| revised | No | R5‑185335 | |||
R5‑185335 | Estimation of measurement uncertainty for FR2 TRx test cases | Anritsu | discussion | Discussion | Yes |
Yes
| noted | No | R5‑184426 | |||
R5‑184427 | Removing brackets from MU values in FR2 | Anritsu | discussion | Agreement | Yes |
Yes
This contribution introduce our views on MU values which are still in square brackets yet.
Revised to: R5-184427r1.
Revised from: R5-184427.
Proposal 1: Remove square brackets (marked blue in the table) from MU contributions in category 1 above and capture it in TR 38.903.
(Highlighted in blue in Table B.1.1.3-1 and Table B.1.1.3-2 at Appendix A below.)
Revised to: R5-185336.
| revised | No | R5‑185336 | |||
R5‑185336 | Removing brackets from MU values in FR2 | Anritsu | discussion | Agreement | Yes |
Yes
| noted | No | R5‑184427 | |||
R5‑184429 | Offset in quality of quiet zone evaluation | Anritsu | discussion | Agreement | Yes |
Yes
This paper points out a overlooked point of the current quality of quiet zone evaluation method specified in Annex D of TR38.810.
Revised to: R5-184429r1.
Revised from: R5-184429.
Revised to: R5-185526.
| revised | No | R5‑185526 | |||
R5‑185526 | Offset in quality of quiet zone evaluation | Anritsu | discussion | Agreement | Yes |
Yes
| noted | No | R5‑184429 | |||
R5‑184431 | Testability issue of low PSD test cases in FR2 | Anritsu | discussion | Agreement | Yes |
Yes
Proposal of relaxation of Tx RF test requirements in FR2
Revised to: R5-184431r1.
Revised from: R5-184431.
Revised to: R5-185527.
| revised | No | R5‑185527 | |||
R5‑185527 | Testability issue of low PSD test cases in FR2 | Anritsu | discussion | Agreement | Yes |
Yes
| noted | No | R5‑184431 | |||
R5‑184484 | Proposal for remaining Maximum Test System Uncertainty for NR FR1 TRx tests | Anritsu, ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Proposal 1) To adopt maximum test system uncertainty factors specified in Table 1 for NR FR1 TRx tests
Proposal endorsed | noted | No | ||||
R5‑184485 | Test approach of EN-DC Rx tests with multiple LTE/NR CCs | Anritsu | discussion | Endorsement | Yes |
Yes
Revised to: R5-184485r1.
Revised from: R5-184485.
Revised to: R5-184485r2.
Revised from: R5-184485r1.
Revised to: R5-185529.
| revised | No | R5‑185529 | |||
R5‑185529 | Test approach of EN-DC Rx tests with multiple LTE/NR CCs | Anritsu | discussion | Endorsement | Yes |
Yes
Revised from: R5-184485r2.
Proposal 1b endorsed | noted | No | R5‑184485 | |||
R5‑184487 | Discussion on FR2 TRx spurious test procedure | Anritsu | discussion | Endorsement | Yes |
Yes
Revised to: R5-185347.
| revised | No | R5‑185347 | |||
R5‑185347 | Discussion on FR2 TRx spurious test procedure | Anritsu | discussion | Endorsement | No |
Yes
Revised from: R5-184487.
associated pCR R5-184634
proposal endorsed | noted | No | R5‑184487 | |||
R5‑184488 | Discussion on UL RMC for FR2 spurious test | Anritsu | discussion | Endorsement | Yes |
Yes
Revised to: R5-184488r1.
Revised from: R5-184488.
r1: removed all the proposal and added observation 2 for further study
Revised to: R5-185533.
| revised | No | R5‑185533 | |||
R5‑185533 | Discussion on UL RMC for FR2 spurious test | Anritsu | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184488 | |||
R5‑184489 | Discussion on test point selection for NR Out-of-band in FR1 | CAICT | discussion | Yes |
Yes
associated pCR R5-184490
Revised to: R5-185301.
| revised | No | R5‑185301 | ||||
R5‑185301 | Discussion on test point selection for NR Out-of-band in FR1 | CAICT | discussion | - | Yes |
Yes
Revised from: R5-184489.
All proposal endorsed | noted | No | R5‑184489 | |||
R5‑184497 | Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 | KTL | discussion | Endorsement | Yes |
Yes
Proposal 1: Select DFT-s-OFDM PI/2 BPSK with Inner Full allocation and DFT-s-OFDM QPSK with Inner Full allocation.
Revised to: R5-184497r1.
Revised from: R5-184497.
revised to include previous test point proposal so as to enable common zip file in TR38.905 implementation
associated pCR R5-184479
Revised to: R5-185423.
| revised | No | R5‑185423 | |||
R5‑185423 | Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 | KTL | discussion | Endorsement | Yes |
Yes
Revised from: R5-184497r1.
Proposed endorsed | noted | No | R5‑184497 | |||
R5‑184509 | Handling on TT defining from MU in FR2 | NTT DOCOMO, INC. | discussion | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184741 | Discussion on starting point of 200ms in FR1 RF test procedures | Huawei,HiSilicon, Keysight | discussion | Endorsement | Yes |
Yes
Proposal 1: Using 200ms in test cases to ensure UE adjusts its power to the target power.
Proposal 2: The 200ms starts from the first TPC-command.
Revised to: R5-185306.
Revised to final to change the cover page and include Tdoc # | revised | No | R5‑185306 | |||
R5‑185306 | Discussion on starting point of 200ms in FR1 RF test procedures | Huawei,HiSilicon, Keysight | discussion | Endorsement | Yes |
Yes
Revised from: R5-184741.
Proposal endorsed | noted | No | R5‑184741 | |||
R5‑184752 | Discussion on test point selection for NS_35 A-MPR in FR1 | Ericsson LM | discussion | Endorsement | Yes |
Yes
associated pCR R5-184751, R5-184754
Proposal endorsed | noted | No | ||||
R5‑184801 | Discussion on UE device size for FR2 | Rohde & Schwarz | discussion | Discussion | Yes |
Yes
| noted | No | ||||
R5‑184802 | Discussion on treatment of multi-panel UEs | Rohde & Schwarz | discussion | Approval | Yes |
Yes
proposal endorsed | noted | No | ||||
R5‑184803 | Discussion on Test Tolerance for FR2 | Intel Corporation (UK) Ltd, Apple Inc. | discussion | Endorsement | Yes |
Yes
Discussion on Test Tolerance for FR2
Revised to: R5-184803r1.
Revised from: R5-184803.
r1: removed proposal 1
Revised to: R5-185534.
| revised | No | R5‑185534 | |||
R5‑185534 | Discussion on Test Tolerance for FR2 | Intel Corporation (UK) Ltd, Apple Inc. | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184803 | |||
R5‑184804 | Discussion on TT for Max Output Power TC Requirements for FR2 | Intel Corporation (UK) Ltd, Apple Inc. | discussion | Endorsement | Yes |
Yes
Discussion on TT for Max Output Power TC Requirements for FR2
Revised to: R5-184804r1.
Revised from: R5-184804.
Revised to: R5-184804r2.
Revised from: R5-184804r1.
Revised to: R5-184804r3.
Revised from: R5-184804r2.
Revised to: R5-185566.
| revised | No | R5‑185566 | |||
R5‑185566 | Discussion on TT for Max Output Power TC Requirements for FR2 | Intel Corporation (UK) Ltd, Apple Inc. | discussion | Endorsement | Yes |
Yes
Revised from: R5-184804r3.
Proposal endorsed | noted | No | R5‑184804 | |||
R5‑184834 | Discussion on the test applicability for the modulation of Pi/2-BPSK | Huawei, Hisilicon | discussion | Endorsement | Yes |
Yes
Revised to: R5-185308.
associated pCR R5-184822 | revised | No | R5‑185308 | |||
R5‑185308 | Discussion on the test applicability for the modulation of Pi/2-BPSK | Huawei, Hisilicon | discussion | Endorsement | Yes |
Yes
Revised from: R5-184834.
Proposal: The UE capabilities of pusch-HalfPi-BPSK and pucch-F3-4-HalfPi-BPSK shall be considered in the test applicability and test point selection analysis for all other relevant FR1 RF test cases.
Proposal endorsed | noted | No | R5‑184834 | |||
R5‑184835 | Discussion on test point selection for Configured transmitted power for SUL test case in FR1 | Huawei, Hisilicon | discussion | Endorsement | Yes |
Yes
associated pCR R5-184837, R5-184823
Proposal endorsed | noted | No | ||||
R5‑184852 | Discussion on OBW, SEM and ACLR for EN-DC interband FR1 | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
associated pCR R5-184855
need more time to disucss the leverage for interband tests from LTE testing PoV
LTE Config prop9 needs to be revisited
Revised to: R5-184852r1.
Revised from: R5-184852.
Revised to: R5-185478.
| revised | No | R5‑185478 | |||
R5‑185478 | Discussion on OBW, SEM and ACLR for EN-DC interband FR1 | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
Revised from: R5-184852r1.
except proposal 2, 4 and 6, other Proposals are endorsed | noted | No | R5‑184852 | |||
R5‑184858 | Quality of Quiet Zone Results for IFF | Keysight Technologies UK Ltd | other | Approval | Yes |
Yes
This contribution is presenting Quality of Quiet Zone measurement results performed in an Indirect Far-Field (IFF) system.
Revised to: R5-184858r1.
Revised from: R5-184858.
associated pCR R5-184913
Revised to: R5-185492.
| revised | No | R5‑185492 | |||
R5‑185492 | Quality of Quiet Zone Results for IFF | Keysight Technologies UK Ltd | other | Approval | Yes |
Yes
| noted | No | R5‑184858 | |||
R5‑184883 | Proposal for 5G NR EVM Test Tolerance | Qualcomm Incorporated | discussion | Endorsement | Yes |
Yes
Revised to: R5-184883r1.
Revised from: R5-184883.
Tighter EVM requirement with high test system measurement uncertainty poses challenge to accurately measure UE EVM without report a false failure. Based on above analysis, we propose a minimum of TT of 0.8 to be considered for 256 QAM modulation scheme.
Revised to: R5-184883r2.
Revised from: R5-184883r1.
update proposal2 to be optional
Revised to: R5-185532.
| revised | No | R5‑185532 | |||
R5‑185532 | Proposal for 5G NR EVM Test Tolerance | Qualcomm Incorporated | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184883 | |||
R5‑184887 | On the relation between MU and TT for RF and RRM conformance testing | Ericsson | discussion | Discussion | Yes |
Yes
| noted | No | ||||
R5‑184910 | Discussion of test frequencies | Sprint Corporation | discussion | No |
Yes
LATE DOCUMENT
discussing the required signaling and related ASN.1 messages and IEs to ensure the needed values are captured in 38.508-1, but not additional values. | withdrawn | Yes | |||||
R5‑184914 | Discussion on MU factor for IFF | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184915 | Discussion on low-PSD scenarios | Keysight Technologies UK Ltd | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184916 | Discussion on Dwell time | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
LATE DOCUMENT
proposal endorsed | noted | No | ||||
R5‑184922 | Test Point Analysis for Reference sensitivity level for EN-DC | Qualcomm Incorporated | discussion | Endorsement | Yes |
Yes
Revised to: R5-184922r1.
Revised from: R5-184869 and R5-184905.
associated pCR R5-1849
prop2 to include LTE and FR1 freq at freq corners and have it swapped for deciding on the test points
Anritsu commented if the choice of freq then we may not test the exceptions
Revised to: R5-184922r2.
Revised from: R5-184922r1.
Revised to: R5-185429.
| revised | No | R5‑185429 | |||
R5‑185429 | Test Point Analysis for Reference sensitivity level for EN-DC | Qualcomm Incorporated | discussion | Endorsement | Yes |
Yes
Revised from: R5-184922r2.
Proposal endorsed
| noted | No | R5‑184922 | |||
R5‑184944 | Discussion on test point selection for Carrier Leakage in FR1 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Revised to: R5-185310.
associated pCR R5-184943 and R5-184942 | revised | No | R5‑185310 | |||
R5‑185310 | Discussion on test point selection for Carrier Leakage in FR1 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Revised from: R5-184944.
All proposal endorsed | noted | No | R5‑184944 | |||
R5‑184949 | Discussion on test point selection for EVM equalizer spectrum flatness in FR1 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
associated pCR R5-184948 and R5-184947
Revised to: R5-185313.
| revised | No | R5‑185313 | |||
R5‑185313 | Discussion on test point selection for EVM equalizer spectrum flatness in FR1 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Revised from: R5-184949.
Editorial correction
All proposal endorsed | noted | No | R5‑184949 | |||
R5‑184952 | Discussion on test point selection for Frequency Error test case in FR1 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
associated pCR R5-184951 and R5-184950
Proposal endorsed | noted | No | ||||
R5‑184957 | Discussion on test point selection for In-band Emissions test case in FR1 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
associated pCR R5-184956 and R5-184955
Revised to: R5-185318.
| revised | No | R5‑185318 | |||
R5‑185318 | Discussion on test point selection for In-band Emissions test case in FR1 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Revised from: R5-184957.
Proposal endorsed | noted | No | R5‑184957 | |||
R5‑184962 | Discussion on test point selection for Frequency Error in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Revised to: R5-185349.
associated pCR R5-184961, R5-184960 | revised | No | R5‑185349 | |||
R5‑185349 | Discussion on test point selection for Frequency Error in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Revised from: R5-184962.
proposal endorsed | noted | No | R5‑184962 | |||
R5‑184965 | Discussion on test point selection for EVM in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184968 | Discussion on test point selection for Carrier Leakage in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184971 | Discussion on test point selection for In-band Emissions in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184974 | Discussion on test point selection for EVM equalizer spectral flatness in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184975 | Discussion on Measurement Uncertainty in FR2 | ROHDE & SCHWARZ | discussion | Endorsement | No |
Yes
late doc | withdrawn | Yes | ||||
R5‑184978 | Discussion on TT for EN-DC test cases | Huawei,HiSilicon | discussion | Discussion | No |
Yes
| withdrawn | Yes | ||||
R5‑184979 | Discussion on Test configuraion table for EN-DC test cases | Huawei,HiSilicon | discussion | Discussion | No |
Yes
| withdrawn | Yes | ||||
R5‑185334 | Discussion of LTE Test point selection for EN-DC with FR1 Tx Spurious emission Test | Qualcomm Inc. | discussion | discussion | Yes |
Yes
LATE DOCUMENT
associated pCR R5-185487
Document was sent FOR E-MAIL APPROVAL
| approved | No | ||||
R5‑185410 | Discussion on approach for defining EN-DC tests in TS 38.521-3 | Qualcomm Wireless GmbH | discussion | discussion | Yes |
Yes
LATE DOCUMENT
Revised to: R5-185410r1.
LATE DOCUMENT
Revised from: R5-185410.
Revised to: R5-185410r2.
LATE DOCUMENT
Revised from: R5-185410r1.
Revised to: R5-185468.
| revised | No | R5‑185468 | |||
R5‑185468 | Discussion on approach for defining EN-DC tests in TS 38.521-3 | Qualcomm Wireless GmbH | discussion | discussion | Yes |
Yes
LATE DOCUMENT
Revised from: R5-185410r2.
Proposal endorsed | noted | No | R5‑185410 | |||
5.3.14 | Enhancements of NB-IoT (UID - 770061) NB_IOTenh-UEConTest |   | ||||||||||
5.3.14.1 | TS 36.508 |   | ||||||||||
5.3.14.2 | TS 36.509 |   | ||||||||||
5.3.14.3 | TS 36.521-1 | R5‑184403 | New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑185497 | |
R5‑185497 | New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184403 | |||
R5‑184405 | New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑185498 | |||
R5‑185498 | New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184405 | |||
R5‑184406 | New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
| revised | No | R5‑185499 | |||
R5‑185499 | New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184406 | |||
R5‑184480 | New test case 6.5.2.1FA.1 Error Vector Magnitude (EVM) for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
title of Following Docs need to be changed, will submit by RAN5#81 | withdrawn | Yes | ||||
R5‑184481 | New test case 6.5.2.2FA Carrier leakage for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
title of Following Docs need to be changed, will submit by RAN5#81 | withdrawn | Yes | ||||
R5‑184482 | New test case 6.5.2.3FA In-band emissions for non allocated RB for category NB1 and NB2/Power Class 6 | CAICT | CR | Agreement | Yes |
Yes
title of Following Docs need to be changed, will submit by RAN5#81 | withdrawn | Yes | ||||
R5‑184651 | Update of TC8.12.1.1.3 | TTA | CR | Agreement | Yes |
Yes
1. Removed Editor’s note in corresponding test case.
2. Updated Annex F.1.4, F.3.4, G.3.5 | agreed | No | ||||
5.3.14.4 | TS 36.521-2 |   | ||||||||||
5.3.14.5 | TS 36.521-3 |   | ||||||||||
5.3.14.6 | TS 37.571-1 | R5‑184112 | Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
Revised to: R5-184112r1.
Revised from: R5-184112.
Revised to: R5-185416.
| revised | No | R5‑185416 | |
R5‑185416 | Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184112 | |||
R5‑184113 | NB-IOT OTDOA reporting delay test cases not testable | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
Revised to: R5-184113r1.
Revised from: R5-184113.
Revised to: R5-184113r2.
Revised from: R5-184113r1.
Revised to: R5-184113r3.
Revised from: R5-184113r2.
Revised to: R5-185417.
| revised | No | R5‑185417 | |||
R5‑185417 | NB-IOT OTDOA reporting delay test cases not testable | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184113 | |||
5.3.14.7 | TS 37.571-3 | R5‑184132 | Correction of the applicability for OTDOA IOT tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
cl. Affected missing. | revised | No | R5‑185418 | |
R5‑185418 | Correction of the applicability for OTDOA IOT tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
reissued as R5-185359 because of title change. | withdrawn | Yes | R5‑184132 | |||
R5‑185359 | Correction of the title for OTDOA IOT tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.14.8 | TS 37.571-5 |   | ||||||||||
5.3.14.9 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.14.10 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.14.11 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.3.14.12 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.15 | Elevation Beamforming/Full-Dimension MIMO for LTE (UID - 770062) LTE_EBF_FDMIMO-UEConTest |   | ||||||||||
5.3.15.1 | TS 36.508 |   | ||||||||||
5.3.15.2 | TS 36.521-1 | R5‑184644 | Editorial: Cleaning up the style of Annex B.4.1A in TS 36.521-1 | TTA | CR | Agreement | Yes |
Yes
Style error of Annex B.4.1A in TS 36.521-1 was corrected | agreed | No | ||
R5‑184646 | Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO | TTA | CR | Agreement | Yes |
Yes
Addition of the new test case in 8.3.1.1.9
Revised to: R5-184646r1.
Revised from: R5-184646.
r1: Added test applicability for dmrs-Enhancements-r13; Fixed normative reference correctly.
Revised to: R5-185387.
| revised | No | R5‑185387 | |||
R5‑185387 | Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO | TTA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184646 | |||
R5‑184648 | Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO | TTA | CR | Agreement | Yes |
Yes
Addition of the new test case in 8.3.2.1.10
Revised to: R5-184648r1.
Revised from: R5-184648.
r1: Added test applicability for dmrs-Enhancements-r13
Revised to: R5-185388.
| revised | No | R5‑185388 | |||
R5‑185388 | Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO | TTA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184648 | |||
5.3.15.3 | TS 36.521-2 | R5‑184649 | Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 | TTA | CR | Agreement | Yes |
Yes
Addition the applicability following test cases:
• FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO
• TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO
Revised to: R5-184649r1.
Revised from: R5-184649.
Revised to: R5-185389.
| revised | No | R5‑185389 | |
R5‑185389 | Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 | TTA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184649 | |||
5.3.15.4 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.15.5 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) |   | ||||||||||
5.3.15.6 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.16 | Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest |   | ||||||||||
5.3.16.1 | TS 36.508 |   | ||||||||||
5.3.16.2 | TS 36.521-1 | R5‑184313 | Demodulation test case 8.11.1.1.1 and 8.11.1.1.2 updated for category M2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184380 | New feMTC test case 7.5EC Adjacent Channel Selectivity (ACS) for UE category M2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184381 | New feMTC test case 7.6.1EC In-band blocking for UE category M2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184382 | New feMTC test case 7.6.3EC Narrow band blocking for UE category M2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184383 | New feMTC test case 7.8.1EC Wide band intermodulation for UE category M2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184384 | Update of Annexes F.1.3 and F.3.3 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184559 | Updates to feMTC tc 6.2.2EC UE Maximum Output Power for UE category M2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.16.3 | TS 36.521-2 | R5‑184325 | 36.521-2 updates for category M2 test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.16.4 | TS 36.521-3 | R5‑184736 | Introduce Intra frequency handover for Cat-M2 UEs in CEModeA | Bureau Veritas | CR | Agreement | Yes |
Yes
legacy test cases used for Cat-M2 UE need to be re-considered the applicability | withdrawn | Yes | ||
5.3.16.5 | TS 37.571-1 | R5‑184114 | Changes to eMTC OTDOA tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
Revised to: R5-184114r1.
Revised from: R5-184114.
Revised to: R5-185419.
| revised | No | R5‑185419 | |
R5‑185419 | Changes to eMTC OTDOA tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184114 | |||
5.3.16.6 | TS 37.571-3 |   | ||||||||||
5.3.16.7 | TS 37.571-5 | R5‑184131 | Addition of Assistance Data for OTDOA eMTC tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
Revised to: R5-184131r1.
Revised from: R5-184131.
Revised to: R5-185420.
| revised | No | R5‑185420 | |
R5‑185420 | Addition of Assistance Data for OTDOA eMTC tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184131 | |||
5.3.16.8 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.16.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.16.10 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.17 | Rel-15 CA configurations (UID - 770064) LTE_CA_R15-UEConTest |   | ||||||||||
5.3.17.1 | TS 36.508 |   | ||||||||||
5.3.17.2 | TS 36.521-1 | R5‑184396 | New CA band combination CA_8A-27A - Updates of 7.3A Refsens | KT Corp. | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184511 | Updates of receiver test cases for CA_XA-YE | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
CA_1A-42E, CA_3A-42E
Revised to: R5-184511r1.
Revised from: R5-184511.
Revised to: R5-185514.
| revised | No | R5‑185514 | |||
R5‑185514 | Updates of receiver test cases for CA_XA-YE | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184511 | |||
R5‑184516 | Updates of receiver test cases for CA_XA-YD | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
CA_1A-42D, CA_3A-42D
Revised to: R5-184516r1.
Revised from: R5-184516.
Revised to: R5-185515.
| revised | No | R5‑185515 | |||
R5‑185515 | Updates of receiver test cases for CA_XA-YD | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184516 | |||
R5‑184586 | Align CA information in clause 5 with TS36.101 v15.3.0 | Bureau Veritas | CR | Agreement | Yes |
Yes
Alignment clause 5 CR with TS36.101 v15.3.0 | agreed | No | ||||
R5‑184642 | CA_3A-18A - Updates of some Tx test cases | KDDI Corporation | CR | Agreement | Yes |
Yes
cover title adds "CA band combination"
Revised to: R5-184642r1.
Revised from: R5-184642.
Revised to: R5-184642r2.
Revised from: R5-184642r1.
Revised to: R5-185542.
| revised | No | R5‑185542 | |||
R5‑185542 | CA_3A-18A - Updates of some Tx test cases | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184642 | |||
R5‑184647 | Correction of test requirements in 7.3.5A REFSENSE | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184762 | Aligning CA delta TiB in sub-clause 6.2.5.3 with TS 36.101 v15.3.0 | Ericsson LM | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Document was sent FOR E-MAIL AGREEMENT
| agreed | No | ||||
R5‑184764 | Aligning CA delta RiB in sub-clause 7.3.3 with TS 36.101 v15.3.0 | Ericsson LM | CR | Agreement | Yes |
Yes
LATE DOCUMENT
Document was sent FOR E-MAIL AGREEMENT
| agreed | No | ||||
R5‑184775 | Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A | WE Certification Oy, DISH Network | CR | Agreement | Yes |
Yes
wrong Tdoc# | revised | No | R5‑185174 | |||
R5‑185174 | Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A | WE Certification Oy, DISH Network | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184775 | |||
R5‑184844 | Addition of new 2CA band combination for CA REFSENS | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184845 | Addition of new 3CA band combination for CA REFSENS | SGS Wireless | CR | Agreement | Yes |
Yes
Revised to: R5-184845r1.
Revised from: R5-184845.
Revised to: R5-185506.
| revised | No | R5‑185506 | |||
R5‑185506 | Addition of new 3CA band combination for CA REFSENS | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184845 | |||
5.3.17.3 | TS 36.521-2 | R5‑184401 | New CA band combination CA_8A-27A - Updates of Table A.4.6.3-3 | KT Corp. | CR | Agreement | Yes |
Yes
merged into common CR R5-185442 | withdrawn | Yes | ||
R5‑184587 | Addition of new R15 CA configurations to 36.521-2 | Bureau Veritas | CR | Agreement | Yes |
Yes
merged into common CR R5-185442 | withdrawn | Yes | ||||
R5‑184645 | CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 | KDDI Corporation | CR | Agreement | Yes |
Yes
cover title adds "CA band combinations"
WIC typo
Revised to: R5-184645r1.
Revised from: R5-184645.
r1: Title and Work item code are corrected; Clarify number of uplink component carrier in Table A.4.6.3-3.
Revised to: R5-185486.
| revised | No | R5‑185486 | |||
R5‑185486 | CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 | KDDI Corporation | CR | Agreement | Yes |
Yes
Revised from: R5-184645r1.
merged into common CR R5-185442 | withdrawn | Yes | R5‑184645 | |||
5.3.17.4 | TS 36.521-3 |   | ||||||||||
5.3.17.5 | TS 37.571-1 |   | ||||||||||
5.3.17.6 | TS 37.571-3 |   | ||||||||||
5.3.17.7 | TS 37.571-5 |   | ||||||||||
5.3.17.8 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.3.17.9 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.3.17.10 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑184641 | CA_3A-18A - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
Yes
cover title adds "CA band combination"
Revised to: R5-184641r1.
Revised from: R5-184641.
Revised to: R5-184641r2.
Revised from: R5-184641r1.
Revised to: R5-185543.
| revised | No | R5‑185543 | |
R5‑185543 | CA_3A-18A - Updates of test points analysis | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184641 | |||
R5‑184773 | RF TP analysis for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A | WE Certification Oy, DISH Network | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184838 | Addition of new CA band combination – Updates of test points analysis | SGS Wireless | CR | Agreement | Yes |
Yes
Revised to: R5-184838r1.
Revised from: R5-184838.
Revised to: R5-185502.
| revised | No | R5‑185502 | |||
R5‑185502 | Addition of new CA band combination – Updates of test points analysis | SGS Wireless | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184838 | |||
5.3.17.11 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.18 | FDD operating band in the L-band for LTE (UID - 780062) LTE_FDD_L_band-UEConTest |   | ||||||||||
5.3.18.1 | TS 34.121-1 | R5‑184389 | Addition of Band 74 information into TS 34.121-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Revised to: R5-184389r1.
Revised from: R5-184389.
Revised to: R5-185516.
| revised | No | R5‑185516 | |
R5‑185516 | Addition of Band 74 information into TS 34.121-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184389 | |||
5.3.18.2 | TS 36.508 |   | ||||||||||
5.3.18.3 | TS 36.521-1 | R5‑184390 | Updates of Band 74 information about Tx test cases in TS 36.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
Revised to: R5-184390r1.
Revised from: R5-184390.
Revised to: R5-185517.
| revised | No | R5‑185517 | |
R5‑185517 | Updates of Band 74 information about Tx test cases in TS 36.521-1 | NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184390 | |||
5.3.18.4 | TS 36.521-2 |   | ||||||||||
5.3.18.5 | TS 36.521-3 | R5‑184264 | Correction to minimum conformance requirements for FDD_B1 and FDD_B2 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||
5.3.18.6 | TS 37.571-1 |   | ||||||||||
5.3.18.7 | TR 36.903 |   | ||||||||||
5.3.18.8 | TR 36.905 |   | ||||||||||
5.3.18.9 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.19 | Uplink capacity enhancements for LTE (UID - 780063) LTE_UL_CAP_enh-UEConTest |   | ||||||||||
5.3.19.1 | TS 36.508 |   | ||||||||||
5.3.19.2 | TS 36.521-1 | R5‑184326 | New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM | Ericsson | CR | Agreement | Yes |
Yes
Revised to: R5-184326r1.
Revised from: R5-184326.
Revised to: R5-185426.
| revised | No | R5‑185426 | |
R5‑185426 | New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184326 | |||
R5‑184556 | Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous | CETECOM GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184556r1.
Revised from: R5-184556.
Revised to: R5-185434.
| revised | No | R5‑185434 | |||
R5‑185434 | Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous | CETECOM GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184556 | |||
R5‑184557 | Addition of new UL 256QAM test case - A-MPR for 2UL CA inter-band | CETECOM GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184558 | Addition of new UL 256QAM test case - Annex F | CETECOM GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184640 | Introduction of Additional spurious emissions for UL 256QAM | TTA | CR | Agreement | Yes |
Yes
Addition of the new test case in 6.6.3.3_2
Revised to: R5-184640r1.
Revised from: R5-184640.
Revised to: R5-185406.
| revised | No | R5‑185406 | |||
R5‑185406 | Introduction of Additional spurious emissions for UL 256QAM | TTA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184640 | |||
R5‑184697 | New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM | Ericsson | CR | Agreement | Yes |
Yes
Revised to: R5-184697r1.
Revised from: R5-184697.
Revised to: R5-185427.
| revised | No | R5‑185427 | |||
R5‑185427 | New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184697 | |||
5.3.19.3 | TS 36.521-2 | R5‑184643 | Addition of applicability for TC6.6.3.3_2 | TTA | CR | Agreement | Yes |
Yes
Addition the applicability following test cases
Revised to: R5-184643r1.
Revised from: R5-184643.
Revised to: R5-185407.
| revised | No | R5‑185407 | |
R5‑185407 | Addition of applicability for TC6.6.3.3_2 | TTA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184643 | |||
R5‑184698 | Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 | Ericsson | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184725 | Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 | Ericsson | CR | Agreement | Yes |
Yes
Revised to: R5-184725r1.
Revised from: R5-184725.
Revised to: R5-185428.
| revised | No | R5‑185428 | |||
R5‑185428 | Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184725 | |||
5.3.19.4 | TS 36.521-3 |   | ||||||||||
5.3.19.5 | TR 36.904 |   | ||||||||||
5.3.19.6 | TR 36.905 |   | ||||||||||
5.3.19.7 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.20 | Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest |   | ||||||||||
5.3.20.1 | TS 36.521-1 |   | ||||||||||
5.3.20.2 | TS 36.521-2 |   | ||||||||||
5.3.20.3 | TR 36.905 |   | ||||||||||
5.3.20.4 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.21 | LTE bands with UE category M2 and/or NB2 in Rel-15 (UID - 780067) LTE_bands_R15_M2_NB2-UEConTest |   | ||||||||||
5.3.21.1 | TS 36.508 |   | ||||||||||
5.3.21.2 | TS 36.521-1 |   | ||||||||||
5.3.21.3 | TS 36.521-2 |   | ||||||||||
5.3.21.4 | TS 36.521-3 |   | ||||||||||
5.3.21.5 | TS 37.571-1 |   | ||||||||||
5.3.21.6 | General Papers / Work Plan / TC lists |   | ||||||||||
5.3.22 | 450 MHz Band for LTE in Region 3 (UID - 790058) LTE450_Reg3-UEConTest |   | ||||||||||
5.3.22.1 | TS 34.121-1 |   | ||||||||||
5.3.22.2 | TS 36.508 |   | ||||||||||
5.3.22.3 | TS 36.521-1 | R5‑184099 | Introduction of band 73 to UE maximum output power in TS36.521-1 | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184130 | Introduction of band 73 to Spurious emission in TS36.521-1 | China Unicom | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.3.22.4 | TS 36.521-2 |   | ||||||||||
5.3.22.5 | TS 36.521-3 |   | ||||||||||
5.3.22.6 | TS 37.571-1 |   | ||||||||||
5.3.22.7 | General Papers / Work Plan / TC lists |   | ||||||||||
5.4 | Routine Maintenance for LTE only TEIx_Test |   | ||||||||||
5.4.1 | LTE RF |   | ||||||||||
5.4.1.1 | TS 36.508 | R5‑184110 | Correction to NB-IOT In-Band Test Frequencies | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184111 | Addition of NB-IOT Guardband Test Frequencies for 10 MHz | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
Revised to: R5-184111r1.
Revised from: R5-184111.
Revised to: R5-184111r2.
Revised from: R5-184111r1.
Revised to: R5-185409.
| revised | No | R5‑185409 | |||
R5‑185409 | Addition of NB-IOT Guardband Test Frequencies for 10 MHz | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184111 | |||
R5‑184234 | Correction to message contents for UL64QAM | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184235 | Correction to default message for UL CA tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184236 | Editorial correction to FDD Mode test frequencies | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184569 | Add Band 31 Test Frequencies for NB-IoT Inter-frequency Test cases | ANRITSU LTD | CR | Agreement | Yes |
Yes
Update Tables 8.1.3.1.1.31-2 and 8.1.4.3.2-1 to include an entry for PRB 22. | agreed | No | ||||
5.4.1.2 | TS 36.521-1 | R5‑184098 | Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
WIC added. Old date.
Addition of TPs for power class 5 in 6.2.5EA Configured UE transmitted Output Power for UE category M1
Revised to: R5-184098r1.
Revised from: R5-184098.
Revised to: R5-185522.
| revised | No | R5‑185522 | |
R5‑185522 | Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184098 | |||
R5‑184335 | Band 41 HPUE Maximum Output Power | CMCC | CR | Agreement | Yes |
Yes
Revised to: R5-184335r1.
Revised from: R5-184335.
Revised to: R5-184335r2.
Revised from: R5-184335r1.
Revised to: R5-184335r3.
Revised from: R5-184335r2.
Revised to: R5-185548.
| revised | No | R5‑185548 | |||
R5‑185548 | Band 41 HPUE Maximum Output Power | CMCC | CR | Agreement | Yes |
Yes
Revised from: R5-184335r3.
Document was sent FOR E-MAIL AGREEMENT
r1 was produced. | revised | No | R5‑185185 | R5‑184335 | ||
R5‑185185 | Band 41 HPUE Maximum Output Power | CMCC | CR | Agreement | No |
Yes
Email agreed | agreed | No | R5‑185548 | |||
R5‑184492 | Add Test Tolerance and Annex F for NAICS feature applicable in test case 8.3.1.1.7 and 8.3.2.1.8. | TEOCO | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184541 | Correction to eMTC tc 6.2.2EA, UE Maximum Output Power for UE category M1 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184669 | Clarification on frame structure in 4Rx performance and CSI test principles sections | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
no cl. Affected
Revised to: R5-184669r1.
Revised from: R5-184669.
Revised to: R5-185530.
| revised | No | R5‑185530 | |||
R5‑185530 | Clarification on frame structure in 4Rx performance and CSI test principles sections | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184669 | |||
R5‑184898 | Proposal for LTE 256QAM EVM Test Tolerance | Qualcomm Incorporated | discussion | Endorsement | Yes |
Yes
Revised to: R5-184898r1.
Revised from: R5-184898.
Revised to: R5-185553.
| revised | No | R5‑185553 | |||
R5‑185553 | Proposal for LTE 256QAM EVM Test Tolerance | Qualcomm Incorporated | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184898 | |||
5.4.1.2.1 | Tx Requirements (Clause 6) | R5‑184242 | Correction to p-Max in configured UE transmitted output power tests for CA | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184244 | Editorial correction to inter-band UL CA tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184251 | Editorial correction to 6.6.3.3 | Anritsu | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184253 | Clarify the definition of active time slot in out of band and spurious emission tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184554 | Correction of test points and test requirements for TC 6.2.4A.2 | CETECOM GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184554r1.
Revised from: R5-184554.
Revised to: R5-185436.
| revised | No | R5‑185436 | |||
R5‑185436 | Correction of test points and test requirements for TC 6.2.4A.2 | CETECOM GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184554 | |||
R5‑184555 | Correction of test points and test requirements for TC 6.2.4A.2_1 | CETECOM GmbH | CR | Agreement | Yes |
Yes
Revised to: R5-184555r1.
Revised from: R5-184555.
Revised to: R5-185435.
| revised | No | R5‑185435 | |||
R5‑185435 | Correction of test points and test requirements for TC 6.2.4A.2_1 | CETECOM GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184555 | |||
R5‑184799 | Corrections to A-MPR values for NS_27 | Rohde & Schwarz | CR | Agreement | Yes |
Yes
Revised to: R5-184799r1.
Revised from: R5-184799.
Revised to: R5-185448.
| revised | No | R5‑185448 | |||
R5‑185448 | Corrections to A-MPR values for NS_27 | Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184799 | |||
R5‑184812 | Correction to Power Control for CA Test Procedure of TCs 6.3.5A.1.1, 6.3.5A.1.2 and 6.3.5A.1.4 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
Correction to Power Control for CA Test Procedure of TCs 6.3.5A.1.1, 6.3.5A.1.2 and 6.3.5A.1.4 | agreed | No | ||||
R5‑184818 | Correction to Message Content for TC 6.2.4EA A-MPR for UE Category M1 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
Correction to Message Content for TC 6.2.4EA A-MPR for UE Category M1 | agreed | No | ||||
R5‑184941 | Editorial correction of NS requirements | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.4.1.2.2 | Rx Requirements (Clause 7) | R5‑184650 | Editorial correction of Table 7.6.3A.5.4.1-1 | KDDI Corporation | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184811 | Correction to Note 1 of Table 7.3A.0-0bB Reference sensitivity level for CA | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
Correction to Note 1 of Table 7.3A.0-0bB Reference sensitivity level for CA | agreed | No | ||||
R5‑184836 | Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
changed title: "Correction to UL Allocation in Reference sensitivity level for CA Table 7.3A.1.4.1-1"
changed to TEI10!
reissued as R5-184991 because of title change | withdrawn | Yes | ||||
R5‑184991 | Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.4.1.2.3 | Other Clauses (I.e. Clauses 1-5 /8-10 / Annexes) | R5‑184233 | CR of CQI reporting test case 9.2.1.1.4.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Revised to: R5-184233r1.
Revised from: R5-184233.
Revised to: R5-184233r2.
Revised from: R5-184233r1.
Revised to: R5-185537.
| revised | No | R5‑185537 | |
R5‑185537 | CR of CQI reporting test case 9.2.1.1.4.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑184233 | |||
R5‑184238 | Correction to LAA CQI reporting tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184245 | Editorial correction to RMC name in PHICH demodulation test | Anritsu | CR | Agreement | Yes |
Yes
Revised to: R5-184245r1.
Revised from: R5-184245.
Revised to: R5-185451.
| revised | No | R5‑185451 | |||
R5‑185451 | Editorial correction to RMC name in PHICH demodulation test | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184245 | |||
R5‑184246 | Editorial correction to test points for 8.7.5.1 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184360 | Test Engineer | TEOCO | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184797 | Clarification for chapter 8 & 9 general sections | Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184891 | 4Rx support in some 4DL CA and 5DL CA Demodulation test cases | Ericsson | CR | Agreement | Yes |
Yes
Document was sent FOR E-MAIL AGREEMENT
r1 was produced. | revised | No | R5‑185186 | |||
R5‑185186 | 4Rx support in some 4DL CA and 5DL CA Demodulation test cases | Ericsson | CR | Agreement | No |
Yes
Email agreed | agreed | No | R5‑184891 | |||
5.4.1.3 | TS 36.521-2 | R5‑184109 | Applicability correction for eMTC tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
overlap with R5-184269 | withdrawn | Yes | ||
R5‑184336 | Correction of applicability to TS 36.521-2 for HPUE RF test cases | CMCC | CR | Agreement | Yes |
Yes
Revised to: R5-184336r1.
Revised from: R5-184336.
Revised to: R5-184336r2.
Revised from: R5-184336r1.
Revised to: R5-185541.
| revised | No | R5‑185541 | |||
R5‑185541 | Correction of applicability to TS 36.521-2 for HPUE RF test cases | CMCC | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184336 | |||
R5‑184581 | Applicability C20 updated for intra-band contigous DL CA tests | Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184582 | Updated to Tested CA Configurations Selection Criteria | Bureau Veritas | CR | Agreement | Yes |
Yes
merged into common CR R5-185442 | withdrawn | Yes | ||||
R5‑184583 | Table format correct and removed redundant line for RF clause 7 test cases | Bureau Veritas | CR | Agreement | Yes |
Yes
Revised to: R5-184583r1.
Revised from: R5-184583.
Revised to: R5-185528.
| revised | No | R5‑185528 | |||
R5‑185528 | Table format correct and removed redundant line for RF clause 7 test cases | Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184583 | |||
R5‑184584 | Table format correct and removed redundant line for RF clause 6 test cases | Bureau Veritas | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184808 | Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2
Revised to: R5-184808r1.
Revised from: R5-184808.
Revised to: R5-184808r2.
Revised from: R5-184808r1.
Revised to: R5-185549.
| revised | No | R5‑185549 | |||
R5‑185549 | Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
Revised from: R5-184808r2.
Document was sent FOR E-MAIL AGREEMENT
| agreed | No | R5‑184808 | |||
R5‑184809 | Correction to Applicability Condition of TS 36.521-1 Test Cases 6.6.2.2A.1 and 6.6.3.3A.1 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
Correction to Applicability Condition of TS 36.521-1 Test Cases 6.6.2.2A.1 and 6.6.3.3A.1 | agreed | No | ||||
R5‑184890 | Test optimization for CA fallback cases in 3DL CA and 4DL CA Receiver test cases | Ericsson | CR | Agreement | Yes |
Yes
merged into common CR R5-185442 | withdrawn | Yes | ||||
R5‑184892 | 4Rx branches in some 4DL CA and 5DL CA Demodulation test cases | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.4.1.4 | TS 36.521-3 | R5‑184100 | Applicability correction for event triggered eMTC tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑184101 | Applicability correction for HO eMTC tests | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184105 | Editorial corrections 7.3.49 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184129 | Editorial Correction to note 7 in Table E-1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184255 | Editorial correction to Reference NPRACH Configuration | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184257 | Correction to LAA CSI-RS measurement test | Anritsu | CR | Agreement | No |
Yes
not available | withdrawn | Yes | ||||
R5‑184258 | Editorial correction to LAA Listen-before-talk model | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184261 | Correction to cell configuration mapping for 8.26.3 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184262 | Correction to test procedure for FS3 event triggered reporting tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184263 | Correction to test requirement of FS3 event triggered reporting tests | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184265 | Editorial correction to Noc for Cell2 on FDD_B1 or FDD_B2 | Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184570 | Corrections for 5MHz Channel BW in 4.2.19, 6.x.y and 7.3.x NB-IoT Test cases | ANRITSU LTD | CR | Agreement | Yes |
Yes
a) In Test case 4.2.19, change PRB location to 17 for the 5MHz eCell scenario.
b) In Test Case 6.1.16, remove the editor’s note.
c) Update Test cases 6.2.16, 6.2.17, 7.3.60 to 7.3.65 and 7.3.67 to cover the 5MHz eCell Channel BW | agreed | No | ||||
R5‑184667 | Correction to LAA inter-frequency event-triggered reporting test cases | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184917 | Correction on 4Rx RLM TC in-sync parameters | Qualcomm Wireless GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.4.1.5 | RRM Test & Radio Reception Test Tolerances |   | ||||||||||
5.4.1.5.1 | TS 36.521-3 (TT CR’s) |   | ||||||||||
5.4.1.5.2 | TR 36.903 (E-UTRAN RRM TT analyses) |   | ||||||||||
5.4.1.5.3 | TR 36.904 (E-UTRAN Radio Reception TT analyses) |   | ||||||||||
5.4.1.5.4 | TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) | R5‑184553 | Update of (NS_01/NS_17), (NS_03/NS_07), (NS_05/NS_01) and (NS_05/NS_17) TP analysis for A-MPR test case for inter-band UL CA | CETECOM GmbH | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184800 | Update to test point analysis for NS_27 | Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
5.4.1.6 | TS 34.121-1 |   | ||||||||||
5.4.1.7 | TS 34.121-2 |   | ||||||||||
5.4.1.8 | TS 34.122 |   | ||||||||||
5.4.1.9 | TS 34.108 |   | ||||||||||
5.4.1.10 | TR 34.902 (UTRAN RRM Test Tolerance analyses) |   | ||||||||||
5.4.1.11 | General Papers / Work Plan / TC lists | R5‑184232 | Discussion on CQI reporting on highest MCS value case | Huawei, Hisilicon | discussion | Discussion | Yes |
Yes
| noted | No | ||
R5‑184889 | Discussion on testing of fallback CA configurations in Rx CA test cases | Ericsson | discussion | Endorsement | Yes |
Yes
Revised to: R5-184889r1.
Revised from: R5-184889.
Revised to: R5-185550.
| revised | No | R5‑185550 | |||
R5‑185550 | Discussion on testing of fallback CA configurations in Rx CA test cases | Ericsson | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184889 | |||
5.5 | Other Routine Maintenance TEIx_Test |   | ||||||||||
5.5.1 | TS 34.108 |   | ||||||||||
5.5.2 | TS 34.121-1 All sections other than annexes |   | ||||||||||
5.5.3 | TS 34.121-1 Annexes only |   | ||||||||||
5.5.4 | TS 34.121-2 |   | ||||||||||
5.5.5 | TS 34.122 |   | ||||||||||
5.5.6 | TS 34.171 |   | ||||||||||
5.5.7 | TS 34.172 |   | ||||||||||
5.5.8 | TS 34.114 |   | ||||||||||
5.5.9 | TS 37.571-1 | R5‑184041 | Clarifications and corrections to Bluetooth identification test | Spirent Communications | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184051 | Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE | Spirent Communications, European Commission | discussion | Yes |
Yes
Revised to: R5-184051r1.
Need to present
Revised from: R5-184051.
Proposal: the author proposes to add the table above to 37.571-1, either temporarily or permanently. A suitable CR is in Tdoc: R5-184083
Revised to: R5-185551.
| revised | No | R5‑185551 | ||||
R5‑185551 | Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE | Spirent Communications, European Commission | discussion | - | Yes |
Yes
| noted | No | R5‑184051 | |||
R5‑184083 | Applicability of tests for types and Categories of UE | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
Revised to: R5-184083r1.
Need to present
Revised from: R5-184083.
Revised to: R5-185552.
| revised | No | R5‑185552 | |||
R5‑185552 | Applicability of tests for types and Categories of UE | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184083 | |||
R5‑184189 | Band groups added to specification | PCTEST Engineering Laboratory, Inc. | CR | Agreement | Yes |
Yes
The band groups in 37.571-1 need updating to match the latest versions in 36.133. The “Category 0” table added is not yet used in the spec. The “Category M1” table is missing in the specification. | agreed | No | ||||
5.5.10 | TS 37.571-3 | R5‑184190 | Editorial - Updates for GNSS Signal Capabilities | PCTEST Engineering Laboratory, Inc. | CR | Agreement | Yes |
Yes
Incorporating several changes from the RAN2 updates in TS 36.355 and added these clarifications to the GNSS Signaling capabilities that affect 37.571-3. | agreed | No | ||
5.5.11 | TS 37.571-5 | R5‑184028 | Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 | Spirent Communications | CR | Agreement | Yes |
Yes
Revised to: R5-184028r1.
Revised from: R5-184028.
Revised to: R5-185421.
| revised | No | R5‑185421 | |
R5‑185421 | Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 | Spirent Communications | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184028 | |||
R5‑184029 | Addition of missing assistance data for the Galileo E5A signal for LTE minimum performance sub-tests 3 and 8 | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184082 | Editorial clean up for consistency and better clarity | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184191 | Editorial - Updates, corrections and clarifications to specification | PCTEST Engineering Laboratory, Inc. | CR | Agreement | Yes |
Yes
The 37.571-5 Specification has multiple errors in naming, notes, references, and tables. This CR updates, corrects, adds clarifications, and notes for the specification.
| agreed | No | ||||
5.5.12 | TS 51.010-1 (RF/Performance) |   | ||||||||||
5.5.13 | TS 51.010-2 (RF/Performance) |   | ||||||||||
5.5.14 | TS 51.010-7 (RF/Performance) |   | ||||||||||
5.6 | Outgoing liaison statements for provisional approval | R5‑184116 | LS on generic 3CC to 5CC RRM test cases | ROHDE & SCHWARZ | LS out | Approval | Yes |
Yes
| approved | No | ||
R5‑185300 | LS on RAN4-RAN5 5G-NR RF pending issues during RAN5#80 | TSG WG RAN5 | LS out | Approval | Yes |
Yes
| approved | No | ||||
5.7 | AOB |   | ||||||||||
6 | Signalling Protocol Functional Area |   | ||||||||||
6.1 | Review action points (fm A.I. 2.1) |   | ||||||||||
6.2 | Review incoming LS (fm A.I. 3) & new subject discussion papers |   | ||||||||||
6.3 | Open Work Items |   | ||||||||||
6.3.1 | Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA (UID - 700064) LTE_UTRA_IncMon-UEConTest |   | ||||||||||
6.3.1.1 | TS 34.108 |   | ||||||||||
6.3.1.2 | TS 34.123-1 |   | ||||||||||
6.3.1.3 | TS 34.123-2 |   | ||||||||||
6.3.1.4 | TS 34.123-3 |   | ||||||||||
6.3.1.5 | TS 36.508 |   | ||||||||||
6.3.1.6 | TS 36.523-1 |   | ||||||||||
6.3.1.7 | TS 36.523-2 |   | ||||||||||
6.3.1.8 | TS 36.523-3 |   | ||||||||||
6.3.1.9 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.2 | Rel-13 LTE CA configurations (UID - 700065) LTE_CA_Rel13-UEConTest |   | ||||||||||
6.3.2.1 | TS 36.508 |   | ||||||||||
6.3.2.2 | TS 36.523-1 |   | ||||||||||
6.3.2.3 | TS 36.523-2 | R5‑184287 | Addition of multiple CA configurations to capability tables in TS 36.523-2 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.2.4 | TS 36.523-3 |   | ||||||||||
6.3.2.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.3 | WLAN/3GPP Radio Level Integration and Interworking Enhancements (UID - 710070) LTE_WLAN_radio-UEConTest |   | ||||||||||
6.3.3.1 | TS 36.508 |   | ||||||||||
6.3.3.2 | TS 36.523-1 | R5‑184145 | Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
no formatting!!! | revised | No | R5‑185105 | |
R5‑185105 | Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184145 | |||
R5‑184192 | Correction of Test Cases 8.2.5.4 and 8.2.5.5 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
no formatting!!! | revised | No | R5‑185106 | |||
R5‑185106 | Correction of Test Cases 8.2.5.4 and 8.2.5.5 | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184192 | |||
6.3.3.3 | TS 36.523-2 | R5‑184146 | Addition of Applicability statement for WLAN/3GPP Radio Level Integration and Interworking Enhancement test case: ”LWA / T351 Expiry” | Intel Corporation (UK) Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.3.4 | TS 36.523-3 |   | ||||||||||
6.3.3.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.4 | Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest |   | ||||||||||
6.3.4.1 | TS 36.508 |   | ||||||||||
6.3.4.2 | TS 36.523-1 |   | ||||||||||
6.3.4.3 | TS 36.523-2 | R5‑184119 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 | Vodafone GmbH | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185140 | |
R5‑185140 | New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 | Vodafone GmbH | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184119 | |||
6.3.4.4 | TS 36.523-3 |   | ||||||||||
6.3.4.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.5 | Support for V2V services based on LTE sidelink (UID - 730073) LTE_SL_V2V-UEConTest |   | ||||||||||
6.3.5.1 | TS 36.508 |   | ||||||||||
6.3.5.2 | TS 36.509 |   | ||||||||||
6.3.5.3 | TS 36.523-1 | R5‑184986 | Correction to V2V TC 24.1.2 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
AT command part removed. | revised | No | R5‑185141 | |
R5‑185141 | Correction to V2V TC 24.1.2 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184986 | |||
6.3.5.4 | TS 36.523-2 |   | ||||||||||
6.3.5.5 | TS 36.523-3 |   | ||||||||||
6.3.5.6 | TS 37.571-4 |   | ||||||||||
6.3.5.7 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.6 | LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell (UID - 730074) LTE_CA_enh_b5C_PUCCH-UEConTest |   | ||||||||||
6.3.6.1 | TS 36.508 |   | ||||||||||
6.3.6.2 | TS 36.523-1 |   | ||||||||||
6.3.6.3 | TS 36.523-2 |   | ||||||||||
6.3.6.4 | TS 36.523-3 |   | ||||||||||
6.3.6.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.7 | Enhanced LAA for LTE (UID - 730075) LTE_eLAA-UEConTest |   | ||||||||||
6.3.7.1 | TS 36.508 | R5‑184820 | Addition of default laa-SCellConfiguration setting for eLAA | Huawei, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.7.2 | TS 36.523-1 |   | ||||||||||
6.3.7.3 | TS 36.523-2 |   | ||||||||||
6.3.7.4 | TS 36.523-3 | R5‑184074 | eLAA: Test Model | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.7.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.8 | Interference Mitigation for Downlink Control Channels of LTE (UID - 750051) LTE_IM_DLCCH-UEConTest |   | ||||||||||
6.3.8.1 | TS 36.508 |   | ||||||||||
6.3.8.2 | TS 36.523-1 |   | ||||||||||
6.3.8.3 | TS 36.523-2 |   | ||||||||||
6.3.8.4 | TS 36.523-3 |   | ||||||||||
6.3.8.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.9 | Performance enhancements for high speed scenario in LTE (UID - 750056) LTE_high_speed-UEConTest |   | ||||||||||
6.3.9.1 | TS 36.508 |   | ||||||||||
6.3.9.2 | TS 36.523-1 |   | ||||||||||
6.3.9.3 | TS 36.523-2 |   | ||||||||||
6.3.9.4 | TS 36.523-3 |   | ||||||||||
6.3.9.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.10 | 4 Rx antenna ports with CA for LTE DL (UID - 750058) LTE_4Rx_AP_DL_CA-UEConTest |   | ||||||||||
6.3.10.1 | TS 36.508 |   | ||||||||||
6.3.10.2 | TS 36.523-1 |   | ||||||||||
6.3.10.3 | TS 36.523-2 |   | ||||||||||
6.3.10.4 | TS 36.523-3 |   | ||||||||||
6.3.10.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.11 | Requirements for a new UE category 1bis with single receiver based on category 1 for LTE (UID - 760085) LTE_UE_cat_1RX-UEConTest |   | ||||||||||
6.3.11.1 | TS 36.508 |   | ||||||||||
6.3.11.2 | TS 36.523-1 |   | ||||||||||
6.3.11.3 | TS 36.523-2 |   | ||||||||||
6.3.11.4 | TS 36.523-3 |   | ||||||||||
6.3.11.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.12 | Support for LTE-based V2X Services (UID - 760086) LTE_V2X-UEConTest |   | ||||||||||
6.3.12.1 | TS 36.508 | R5‑184987 | Addition of reference dedicated EPS bearer context #7 for V2X testing | CATT | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185104 | |
R5‑185104 | Addition of reference dedicated EPS bearer context #7 for V2X testing | CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184987 | |||
6.3.12.2 | TS 36.509 |   | ||||||||||
6.3.12.3 | TS 36.523-1 | R5‑184549 | Correction to V2X TC 24.1.2, 24.1.16 & 24.1.19 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
2 WICs!!!
LTE_SL_V2V-UEConTest, LTE_V2X-UEConTest
Reissued as R5-184985-6. | withdrawn | Yes | ||
R5‑184985 | Correction to V2X TC 24.1.16 & 24.1.19 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Wed and Thu. | revised | No | R5‑185112 | |||
R5‑185112 | Correction to V2X TC 24.1.16 & 24.1.19 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184985 | |||
R5‑184632 | Addition of new V2X test case 24.2.4 | CAICT | CR | Agreement | Yes |
Yes
r2 was presented on Wed.
The TF160 manager wondered about the resolution of the FFS. | revised | No | R5‑185107 | |||
R5‑185107 | Addition of new V2X test case 24.2.4 | CAICT | CR | Agreement | Yes |
Yes
first agreed, then r1 was produced in order to incorporate a comment from Tf160. | revised | No | R5‑185160 | R5‑184632 | ||
R5‑185160 | Addition of new V2X test case 24.2.4 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑185107 | |||
R5‑184636 | Correction to V2X test case 24.1.12 | CAICT | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185108 | |||
R5‑185108 | Correction to V2X test case 24.1.12 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184636 | |||
R5‑184652 | Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 | CAICT | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185109 | |||
R5‑185109 | Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184652 | |||
R5‑184778 | Updates to Align the GNSS Moving Scenario Details with Other V2X Test Cases | PCTEST Engineering Lab | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184792 | Addition of reference dedicated EPS bearer context #7 for V2X testing | CATT | CR | Agreement | Yes |
Yes
is 36.508! Wrong in 3GU.
Reissued as R5-184987 because of wrong spec. | withdrawn | Yes | ||||
R5‑184793 | Remove test step 0 in test case 24.1.15 | CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184794 | Remove test step 0 in test case 24.1.18 | CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184795 | Correction on V2X Sidelink test case 24.3.1 | CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184796 | Update Table 24.3.3.3.3-1 in test case 24.3.3 | CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184813 | New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP | Sporton, TTA | CR | Agreement | Yes |
Yes
r1 was presented on Wed.
Real title is "New test case for V2X Sidelink with SL SPS Transmission". | revised | No | R5‑185110 | |||
R5‑185110 | New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP | Sporton, TTA | CR | Agreement | No |
Yes
reissued as R5-185111 because of title change | withdrawn | Yes | R5‑184813 | |||
R5‑185111 | New test case for V2X Sidelink with SL SPS Transmission | Sporton, TTA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.12.4 | TS 36.523-2 | R5‑184637 | Addition of test applicability for new V2X TC24.2.4 and Specific ICS for V2X TC24.2.1 and TC24.2.2 | CAICT | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184814 | Addition of test applicability for new V2X TC 24.1.13 | Sporton | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.12.5 | TS 36.523-3 | R5‑184071 | V2X: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.12.6 | TS 37.571-4 |   | ||||||||||
6.3.12.7 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.13 | 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest |   | ||||||||||
6.3.13.1 | TS 38.508-1 | R5‑184043 | Update RRC CONNECTED state | Ericsson | CR | Agreement | Yes |
Yes
Qualcomm commented that multiple PDN may be needed. The DRBs have to be reestablished again. Motorola Mobility recommended DRB 2,0.
Postponed. | withdrawn | Yes | ||
R5‑184055 | Add SRB1 and SRB2 with NR PDCP | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Qualcomm asked for more time.
Deferred | revised | No | R5‑185028 | |||
R5‑185028 | Add SRB1 and SRB2 with NR PDCP | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184055 | |||
R5‑184084 | Update serving cell | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185029 | |||
R5‑185029 | Update serving cell | Ericsson, DOCOMO Communications Lab | CR | Agreement | Yes |
Yes
R5-184629 merged into here. | agreed | No | R5‑184084 | |||
R5‑184087 | Update chapter 3 | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184097 | Introduce SA RRC messages | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185030 | |||
R5‑185030 | Introduce SA RRC messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184097 | |||
R5‑184126 | Correct IE FrequencyInfoDL | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185031 | |||
R5‑185031 | Correct IE FrequencyInfoDL | Ericsson, DOCOMO Communications Lab | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184126 | |||
R5‑184127 | Introduce SA system information blocks | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185032 | |||
R5‑185032 | Introduce SA system information blocks | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184127 | |||
R5‑184134 | Introduce SA other information elements | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185033 | |||
R5‑185033 | Introduce SA other information elements | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184134 | |||
R5‑184176 | Updates to PDCCH and SearchSpace configurations | MCC TF160 | CR | Agreement | Yes |
Yes
r3 was presented on Tue.
r4 was presented on Thu. | revised | No | R5‑185034 | |||
R5‑185034 | Updates to PDCCH and SearchSpace configurations | MCC TF160, NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
rev was wrong. | revised | No | R5‑185171 | R5‑184176 | ||
R5‑185171 | Updates to PDCCH and SearchSpace configurations | MCC TF160, NTT DOCOMO, INC. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑185034 | |||
R5‑184186 | Proposal for Signalling Test Setup in FR2 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184318 | Correct IE GSCN-ValueNR | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185035 | |||
R5‑185035 | Correct IE GSCN-ValueNR | Ericsson, DOCOMO Communications Lab | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184318 | |||
R5‑184346 | Modified RRC_Connected procedure for Multi PDN throughout the test case. | Qualcomm Korea | CR | Agreement | Yes |
Yes
merged with R5-184043.
Deferred.
r1 was presented on Thu. | revised | No | R5‑185163 | |||
R5‑185163 | Modified RRC_Connected procedure for Multi PDN throughout the test case. | Qualcomm Korea, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184346 | |||
R5‑184347 | Modified RRC_IDLE procedure to allow multi PDN configuration throughout the test case | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184348 | Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case | Qualcomm Korea | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185165 | |||
R5‑185165 | Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184348 | |||
R5‑184358 | Addition of IP Connectivity check procedure | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185037 | |||
R5‑185037 | Addition of IP Connectivity check procedure | Qualcomm Tech. Netherlands B.V, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184358 | |||
R5‑184560 | Introduce SA radio resource control information elements | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Anritsu/TF160 wondered whether the table order will be able to be aligned with the core specs in the future.
Need to align with NTT DOCOMO's CR concerning table numbering. | revised | No | R5‑185038 | |||
R5‑185038 | Introduce SA radio resource control information elements | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184560 | |||
R5‑184597 | Update IE PhysicalCellGroupConfig | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185039 | |||
R5‑185039 | Update IE PhysicalCellGroupConfig | Ericsson, DOCOMO Communications Lab | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184597 | |||
R5‑184598 | Introduce cell configurations and timer tolerances chapter headers | Ericsson | CR | Agreement | Yes |
Yes
TT tolerance to be added. | revised | No | R5‑185040 | |||
R5‑185040 | Introduce cell configurations and timer tolerances chapter headers | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184598 | |||
R5‑184599 | Add IE SS-RSSI-Measurement | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184600 | Add IE SSB-MTC | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185041 | |||
R5‑185041 | Add IE SSB-MTC | Ericsson, DOCOMO Communications Lab | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184600 | |||
R5‑184616 | Update BWP | DOCOMO Communications Lab, Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185042 | |||
R5‑185042 | Update BWP | DOCOMO Communications Lab, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184616 | |||
R5‑184617 | Update MIB | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184618 | Update PDSCH-Config | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Anritsu/TF160 wondered about the default values.
The TF160 manager recommended to delete again the added bitmap. | revised | No | R5‑185043 | |||
R5‑185043 | Update PDSCH-Config | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
a last-minute change was included. | agreed | No | R5‑184618 | |||
R5‑184619 | Update PhysicalCellGroupConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
merged | withdrawn | Yes | ||||
R5‑184620 | Update PUCCH and PUSCH configuration | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185044 | |||
R5‑185044 | Update PUCCH and PUSCH configuration | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184620 | |||
R5‑184621 | Update RACH configuration | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185045 | |||
R5‑185045 | Update RACH configuration | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184621 | |||
R5‑184622 | Update SearchSpace | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184623 | Update CellGroupConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185046 | |||
R5‑185046 | Update CellGroupConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184623 | |||
R5‑184624 | Update CSI-MeasConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185047 | |||
R5‑185047 | Update CSI-MeasConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184624 | |||
R5‑184625 | Update MeasConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185048 | |||
R5‑185048 | Update MeasConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184625 | |||
R5‑184626 | Update other information elements | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
r2 to remove FFS. Presented on Thu. | revised | No | R5‑185049 | |||
R5‑185049 | Update other information elements | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184626 | |||
R5‑184627 | Update PDCCH-Config | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
merged with TF160. | withdrawn | Yes | ||||
R5‑184628 | Update RadioBearerConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185050 | |||
R5‑185050 | Update RadioBearerConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184628 | |||
R5‑184629 | Update ServingCellConfig | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
merged with Ericsson CR. | withdrawn | Yes | ||||
R5‑184630 | Editorial Update in clause 4.6.3 | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184675 | Specifying content for MeasResultSCG-Failure | Samsung | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185051 | |||
R5‑185051 | Specifying content for MeasResultSCG-Failure | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184675 | |||
R5‑184701 | Addition of RLC Config for UM | Motorola Mobility | CR | Agreement | No |
Yes
late doc
changes already covered | withdrawn | Yes | ||||
R5‑184706 | Editorial correction to band representation of non-contiguous EN-DC band combination | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
table number is missing | revised | No | R5‑185052 | |||
R5‑185052 | Editorial correction to band representation of non-contiguous EN-DC band combination | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184706 | |||
R5‑184713 | Correction to RLC-Config IE | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185053 | |||
R5‑185053 | Correction to RLC-Config IE | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184713 | |||
R5‑184714 | Correction to RadioBearerConfig-DRB | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185054 | |||
R5‑185054 | Correction to RadioBearerConfig-DRB | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184714 | |||
R5‑184715 | Corrections ard updates to BandCombinationList and Feature Set IEs | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185055 | |||
R5‑185055 | Corrections ard updates to BandCombinationList and Feature Set IEs | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184715 | |||
R5‑184783 | Introduce 5GMM messages | Ericsson | CR | Agreement | Yes |
Yes
the TF160 manager recommended to follow the alphabetical order. | agreed | No | ||||
R5‑184785 | Introduce 5GSM messages | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184851 | Introduction of OTA signaling test environment | Keysight Technologies UK Ltd, Anritsu Ltd | CR | Agreement | Yes |
Yes
late doc | revised | No | R5‑185168 | |||
R5‑185168 | Introduction of OTA signaling test environment | Keysight Technologies UK Ltd, Anritsu Ltd | CR | Agreement | Yes |
Yes
for email agreement | agreed | No | R5‑184851 | |||
R5‑184902 | Corrections and updates to UE Capability IEs | Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185056 | |||
R5‑185056 | Corrections and updates to UE Capability IEs | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184902 | |||
R5‑185085 | Addition of UM condition to RLC-Bearer-Config IE | Ericsson | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
6.3.13.2 | TS 38.508-2 | R5‑184699 | Addition of PICS | Motorola Mobility | CR | Agreement | Yes |
Yes
late doc
Deferred.
r1 and r2 were presented on Thu. | revised | No | R5‑185161 | |
R5‑185161 | Addition of PICS | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184699 | |||
6.3.13.3 | TS 38.509 | R5‑184673 | Editorial updates to 38.509 | Samsung, MCC TF160 | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185057 | |
R5‑185057 | Editorial updates to 38.509 | Samsung, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184673 | |||
R5‑184700 | Addition of Test Loop for SDAP testing | Motorola Mobility | CR | Agreement | Yes |
Yes
late doc
Modified title: Addition of new Test Loop Mode above SDAP Layer
r1 was presented on Tue and Thu. | revised | No | R5‑185058 | |||
R5‑185058 | Addition of Test Loop for SDAP testing | Motorola Mobility | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑184700 | |||
6.3.13.4 | TS 38.523-1 | R5‑184175 | Correction to NR MAC test case 7.1.1.3.2 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185059 | |
R5‑185059 | Correction to NR MAC test case 7.1.1.3.2 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184175 | |||
R5‑184218 | Addition of Correct HARQ process handling BCCH test case 7.1.1.2.4 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Motorola Mobility reminded that only 25% of the test case is defined. No RRC connection request, sys info, etc.
Postponed to next meeting. | withdrawn | Yes | ||||
R5‑184219 | Addition of Correct HARQ process handling CCCH test case 7.1.1.2.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
same as R5-184218.
Motorola Mobility reminded that the test case was not coordinated with the rapporteur. | withdrawn | Yes | ||||
R5‑184220 | Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
otorola Mobility recommeneded that the 5.1.2.1 core spec subclause title should be removed. | revised | No | R5‑185060 | |||
R5‑185060 | Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184220 | |||
R5‑184221 | Addition of NR CA reconfiguration test case 8.2.4.2.1.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Qualcomm reported some more offline comments. Preamble is not aligned.
r2 | revised | No | R5‑185061 | |||
R5‑185061 | Addition of NR CA reconfiguration test case 8.2.4.2.1.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184221 | |||
R5‑184222 | Addition of NR CA reconfiguration test case 8.2.4.2.1.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Comments from Motorola Mobility and Qualcomm that SCGFailureInformation should not be there.
Some part of the test case can be reused.
Deferred.
r2 was presented on Thu. | revised | No | R5‑185062 | |||
R5‑185062 | Addition of NR CA reconfiguration test case 8.2.4.2.1.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184222 | |||
R5‑184223 | Addition of NR CA reconfiguration test case 8.2.4.2.1.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑185148 | |||
R5‑185148 | Addition of NR CA reconfiguration test case 8.2.4.2.1.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184223 | |||
R5‑184224 | Addition of Random access procedure Successful Supplementary Uplink test case 7.1.1.1.5 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Offline comments from Motorola Mobility and Qualcomm. | withdrawn | Yes | ||||
R5‑184225 | Addition of Random access test case 7.1.1.1.4 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Same as R5-184224. | revised | No | R5‑185063 | |||
R5‑185063 | Addition of Random access test case 7.1.1.1.4 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑184225 | |||
R5‑184226 | Addition of Correct handling of Configured UL grant Type 1 test case 7.1.1.6.2 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184227 | Addition of Correct handling of Configured UL grant Type 2 test case 7.1.1.6.3 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184228 | CR of Correct handling of DL assignment Semi persistent test case 7.1.1.6.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184229 | CR of UE power headroom reporting test case 7.1.1.3.7 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184230 | CR of BSR report test case 7.1.1.3.4 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184324 | Addition of 5GS NR SDAP test case 7.1.4.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r2 was presented on Tue.
Is mainly option 2.
Formatting fix. Add note J. | revised | No | R5‑185064 | |||
R5‑185064 | Addition of 5GS NR SDAP test case 7.1.4.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184324 | |||
R5‑184338 | Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself | Qualcomm Korea | CR | Agreement | Yes |
Yes
the TF160 manager wondered that many changes in the conformance requirements led to no change in the test case. | revised | No | R5‑185065 | |||
R5‑185065 | Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184338 | |||
R5‑184340 | Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC | Qualcomm Korea | CR | Agreement | Yes |
Yes
Editor's note. | revised | No | R5‑185066 | |||
R5‑185066 | Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184340 | |||
R5‑184341 | Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation | Qualcomm Korea | CR | Agreement | Yes |
Yes
rev N/A wrong. | revised | No | R5‑185067 | |||
R5‑185067 | Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184341 | |||
R5‑184342 | Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure | Qualcomm Korea | CR | Agreement | Yes |
Yes
| revised | No | R5‑185068 | |||
R5‑185068 | Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184342 | |||
R5‑184343 | Correction to 5GS PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in the downlink | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184344 | Correction to 5GS PDCP Test case 7.1.3.5.4 PDCP reordering / Maximum re-ordering delay below t-Reordering / t-Reordering timer operations | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184345 | Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 | Qualcomm Korea | CR | Agreement | Yes |
Yes
r1 was presented on Tue and Thu. | revised | No | R5‑185069 | |||
R5‑185069 | Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184345 | |||
R5‑184353 | Corrections to RRC TC - BandwidthPart Configuration / SCG / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184354 | Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185149 | |||
R5‑185149 | Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184354 | |||
R5‑184355 | Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185150 | |||
R5‑185150 | Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184355 | |||
R5‑184356 | Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185151 | |||
R5‑185151 | Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184356 | |||
R5‑184357 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
rev:1 on coversheet! | revised | No | R5‑185070 | |||
R5‑185070 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC | Qualcomm Tech. Netherlands B.V | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184357 | |||
R5‑184495 | Addition of new 5GC TC 9.1.2.1 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184498 | Correction to 5GS RRC TC 8.2.4.3.1.1 | TDIA, CATT | CR | Agreement | Yes |
Yes
autobulleting from the core spec should be removed. | revised | No | R5‑185071 | |||
R5‑185071 | Correction to 5GS RRC TC 8.2.4.3.1.1 | TDIA, CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184498 | |||
R5‑184499 | Addition of 5GS RRC TC 8.2.4.3.1.2 | TDIA, CATT | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Qualcomm commented that the original test case which is referred to need an update. | revised | No | R5‑185072 | |||
R5‑185072 | Addition of 5GS RRC TC 8.2.4.3.1.2 | TDIA, CATT | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184499 | |||
R5‑184500 | Addition of new 5GS RRC TC 8.2.4.3.1.3 | TDIA, CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184517 | Correction to NR PDCP test case 7.1.3.4.2 | Keysight Technologies UK Ltd, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184520 | Corrections to Layer 2 test cases | Motorola Mobility | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185073 | |||
R5‑185073 | Corrections to Layer 2 test cases | Motorola Mobility, Huawei | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184520 | |||
R5‑184521 | Corrections to MAC test case 7.1.2.2.1 | Motorola Mobility, MCC TF160 | CR | Agreement | Yes |
Yes
wrong Tdoc# | revised | No | R5‑185074 | |||
R5‑185074 | Corrections to MAC test case 7.1.2.2.1 | Motorola Mobility, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184521 | |||
R5‑184522 | Corrections to MAC test case 7.1.2.3.1 | Motorola Mobility, MCC TF160 | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185075 | |||
R5‑185075 | Corrections to MAC test case 7.1.2.3.1 | Motorola Mobility, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184522 | |||
R5‑184523 | Corrections to MAC TBS test cases | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184524 | Addition of new MAC RACH test case for PDCCH order | Motorola Mobility | CR | Agreement | Yes |
Yes
| revised | No | R5‑185076 | |||
R5‑185076 | Addition of new MAC RACH test case for PDCCH order | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184524 | |||
R5‑184525 | Addition of new MAC test case for Power Headroom report | Motorola Mobility | CR | Agreement | Yes |
Yes
Rohde&Schwarz offline comments.
r1 was presented on Thu. | revised | No | R5‑185152 | |||
R5‑185152 | Addition of new MAC test case for Power Headroom report | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184525 | |||
R5‑184526 | Addition of new MAC test case for Scell Activation Deactivation | Motorola Mobility | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Should be split into 3 sub tests.
r2 was presented on Thu. | revised | No | R5‑185077 | |||
R5‑185077 | Addition of new MAC test case for Scell Activation Deactivation | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184526 | |||
R5‑184527 | Addition of new MAC test case for Reset | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184528 | Addition of new MAC UL TBS test case with transform precoding configured | Motorola Mobility | CR | Agreement | Yes |
Yes
wrong spec# on cover | revised | No | R5‑185078 | |||
R5‑185078 | Addition of new MAC UL TBS test case with transform precoding configured | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184528 | |||
R5‑184552 | Correction to default pre-test conditions for UM RLC test cases | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185079 | |||
R5‑185079 | Correction to default pre-test conditions for UM RLC test cases | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184552 | |||
R5‑184591 | New NAS test case 9.1.5.1.12 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Delete Editor's note and add title for 9.1.5.
Resolve the [x] and put -1 or -2.
Further issues pointed out by the TF160 manager.
RRC messages probably not needed.
r2 was presented on Thu.
ETSI MCC recommended to fix the 38.508 [X]. | revised | No | R5‑185080 | |||
R5‑185080 | New NAS test case 9.1.5.1.12 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184591 | |||
R5‑184593 | New NAS test case 9.1.6.1.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r2 was presented on Tue.
r3 was presented on Thu.
Comments from Motorola Mobility about switch off etc.
Will be presented again at the next meeting. | revised | No | R5‑185081 | |||
R5‑185081 | New NAS test case 9.1.6.1.4 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑184593 | |||
R5‑184603 | Correction to NR PDCP test case 7.1.3.5.1 | ANRITSU LTD | CR | Agreement | Yes |
Yes
r1 was presented on Tue.
Meeting nr. Wrong.
Some parts not revision marked. | revised | No | R5‑185082 | |||
R5‑185082 | Correction to NR PDCP test case 7.1.3.5.1 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184603 | |||
R5‑184612 | Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 | ANRITSU LTD | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185083 | |||
R5‑185083 | Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184612 | |||
R5‑184613 | Addition of RRC Default Pre-test conditions for NSA | Qualcomm Korea | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185153 | |||
R5‑185153 | Addition of RRC Default Pre-test conditions for NSA | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184613 | |||
R5‑184615 | CR of Correct handling of DL assignment / Semi-persistent test case 7.1.1.6.1 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
already adressed | withdrawn | Yes | ||||
R5‑184661 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC | Intertek | CR | Agreement | Yes |
Yes
offline comments from Qualcomm and Adare. | revised | No | R5‑185089 | |||
R5‑185089 | Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC | Intertek | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184661 | |||
R5‑184670 | CR of AM RLC test case 7.1.2.3.10 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
Qualcomm had said maxRetxThreshold-1. | revised | No | R5‑185090 | |||
R5‑185090 | CR of AM RLC test case 7.1.2.3.10 | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184670 | |||
R5‑184676 | Update of RRC SCG failure TC 8.2.5.1.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185091 | |||
R5‑185091 | Update of RRC SCG failure TC 8.2.5.1.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184676 | |||
R5‑184677 | Update of RRC SCG failure TC 8.2.5.2.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185092 | |||
R5‑185092 | Update of RRC SCG failure TC 8.2.5.2.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184677 | |||
R5‑184678 | Update of RRC SCG failure TC 8.2.5.3.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185093 | |||
R5‑185093 | Update of RRC SCG failure TC 8.2.5.3.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184678 | |||
R5‑184679 | Update of RRC SCG failure TC 8.2.5.4.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185094 | |||
R5‑185094 | Update of RRC SCG failure TC 8.2.5.4.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184679 | |||
R5‑184680 | Update of RRC SCG failure TC 8.2.5.5.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184681 | Update of RRC SCG failure TC 8.2.5.6.1 | Samsung, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184702 | Addition of 5GS NR SDAP test case 7.1.4.2 | Motorola Mobility | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185095 | |||
R5‑185095 | Addition of 5GS NR SDAP test case 7.1.4.2 | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184702 | |||
R5‑184756 | Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Thu. | revised | No | R5‑185154 | |||
R5‑185154 | Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184756 | |||
R5‑184760 | Correction to RRC TC - PSCell addition, modification and release / Split DRB / EN-DC | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
R5‑184761 | Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of NR cells / EN-DC | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
R5‑184763 | Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / RSRQ based measurements / EN-DC | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
R5‑184767 | Updates to NAS test case 10.2.1.2 | Ericsson LM | CR | Agreement | Yes |
Yes
r1 and r2 were presented on Thu. | revised | No | R5‑185155 | |||
R5‑185155 | Updates to NAS test case 10.2.1.2 | Ericsson LM | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184767 | |||
R5‑184768 | Update of 5GS NR RRC test case 8.2.2.6.1 | ROHDE & SCHWARZ | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184769 | Update of 5GS NR RRC test case 8.2.2.6.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184770 | Update of 5GS NR RRC test case 8.2.3.6.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185096 | |||
R5‑185096 | Update of 5GS NR RRC test case 8.2.3.6.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184770 | |||
R5‑184772 | Addition of new 5GC TC 9.1.2.2 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184774 | Update of 5GS NR RRC test case 8.2.3.8.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185097 | |||
R5‑185097 | Update of 5GS NR RRC test case 8.2.3.8.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184774 | |||
R5‑184777 | Update of 5GS NR RRC test case 8.2.1.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185098 | |||
R5‑185098 | Update of 5GS NR RRC test case 8.2.1.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184777 | |||
R5‑184853 | Correction to NR RRC test case 8.2.3.14.1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
reissued as R5-184984 bec. Of wrong spec | withdrawn | Yes | ||||
R5‑184984 | Correction to NR RRC test case 8.2.3.14.1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185101 | |||
R5‑185101 | Correction to NR RRC test case 8.2.3.14.1 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184984 | |||
R5‑184977 | L2 Preamble Parameter Update for Multi-PDN configuration | Qualcomm Korea | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185099 | |||
R5‑185099 | L2 Preamble Parameter Update for Multi-PDN configuration | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184977 | |||
R5‑184981 | Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 | Keysight Technologies UK Ltd, MCC TF160 | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Wed.
| revised | No | R5‑185100 | |||
R5‑185100 | Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 | Keysight Technologies UK Ltd, MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184981 | |||
R5‑185086 | Update to EPS SM Test case for Multi-PDN | Qualcomm Inc. | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Thu. | revised | No | R5‑185167 | |||
R5‑185167 | Update to EPS SM Test case for Multi-PDN | Qualcomm Inc. | CR | Agreement | Yes |
Yes
for email agreement | agreed | No | R5‑185086 | |||
6.3.13.5 | TS 38.523-2 | R5‑184231 | Addition and correction of test applicability of multiple signalling test cases | Huawei, Hisilicon | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑184496 | Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 | CATT, TDIA | CR | Agreement | Yes |
Yes
no cl. Affected
RRC applicability will be moved. Qualcomm update | revised | No | R5‑185102 | |||
R5‑185102 | Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 | CATT, TDIA | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑184496 | |||
R5‑184531 | Addition of missing and new test cases applicabilities | Motorola Mobility | CR | Agreement | Yes |
Yes
more applicabilities to be merged into.
r3 was presented on Thu. | revised | No | R5‑185162 | |||
R5‑185162 | Addition of missing and new test cases applicabilities | Motorola Mobility | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184531 | |||
R5‑184682 | Update of test case title for TC 8.2.5.1.1 | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184753 | Update of NR test cases title and applicability | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
more applicabilities to be merged into?
r2 was presented on Thu.
The TF160 manager recommended to fix the FFS conditions.
ETSI MCC recommended to remove the x.y.z's. | revised | No | R5‑185157 | |||
R5‑185157 | Update of NR test cases title and applicability | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184753 | |||
6.3.13.6 | TS 38.523-3 | R5‑184073 | EN-DC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
sidebar
r1 was presented on Thu. | revised | No | R5‑185156 | |
R5‑185156 | EN-DC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
rev was wrong. | revised | No | R5‑185172 | R5‑184073 | ||
R5‑185172 | EN-DC: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑185156 | |||
R5‑184333 | Updates to Annex B | MCC TF160 | CR | Agreement | Yes |
Yes
sidebar | agreed | No | ||||
R5‑184696 | EN-DC Test Model: Addition of further aspects | MCC TF160 | CR | Agreement | Yes |
Yes
late doc
sidebar
for email agreement | agreed | No | ||||
6.3.13.7 | TS 34.229-1 |   | ||||||||||
6.3.13.8 | TS 34.229-2 |   | ||||||||||
6.3.13.9 | TS 34.229-3 |   | ||||||||||
6.3.13.10 | TS 36.508 | R5‑184042 | Update RRCConnectionReconfiguration message for EN-DC | Ericsson, Qualcomm Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185164 | |
R5‑185164 | Update RRCConnectionReconfiguration message for EN-DC | Ericsson, Qualcomm Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184042 | |||
R5‑184054 | Add SRB with NR PDCP | Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184349 | Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases | Qualcomm Korea | CR | Agreement | Yes |
Yes
r1 was presented on Thu.
Remove of not useful formattings. | revised | No | R5‑185166 | |||
R5‑185166 | Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases | Qualcomm Korea | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184349 | |||
R5‑184614 | Updates to EN-DC Conditions for Multi-PDN addition throughout Test Case | Qualcomm Korea | CR | Agreement | Yes |
Yes
Rel-() | withdrawn | Yes | ||||
R5‑184674 | Specifying content for SCGFailureInformationNR | Samsung | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185103 | |||
R5‑185103 | Specifying content for SCGFailureInformationNR | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184674 | |||
6.3.13.11 | TS 36.509 |   | ||||||||||
6.3.13.12 | TS 36.523-1 |   | ||||||||||
6.3.13.13 | TS 36.523-2 |   | ||||||||||
6.3.13.14 | TS 36.523-3 |   | ||||||||||
6.3.13.15 | TS 37.571-2 |   | ||||||||||
6.3.13.16 | TS 37.571-3 |   | ||||||||||
6.3.13.17 | TS 37.571-4 |   | ||||||||||
6.3.13.18 | TS 37.571-5 |   | ||||||||||
6.3.13.19 | General Papers / Work Plan / TC lists | R5‑184061 | Impact of GSMA IR.92 profile extension for EN-DC | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
only SIG.
The TF160 manager commented that option b is with SCG bearers.
Anritsu/TF160 commented that there is no IMS requirement. Too many test cases could be added.
The RAN5 Chair recommended to discuss the matter first with the IMS and 5G rapporteurs of what is expected.
Sprint commented that the IR.92 statement is too vague. Input has to come for the operators.
KT commented that more bandwith will be given with the SCG bearer, so we have to think about that.
Motorola Mobility commented that even if there are market requirements IMS traffic is never tested, so repeating test cases does not make much sense.
| noted | No | ||
R5‑184072 | EN-DC: TS 38.508-1 / 36.508 issue list | MCC TF160 | discussion | Information | Yes |
Yes
| noted | No | ||||
R5‑184170 | Requirements for test frequencies for 5G signalling test cases | MCC TF160 | discussion | Endorsement | Yes |
Yes
covered by Ericsson. | noted | No | ||||
R5‑184350 | Multi-PDN Handling in EN-DC | Qualcomm Korea | discussion | Endorsement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185025 | |||
R5‑185025 | Multi-PDN Handling in EN-DC | Qualcomm Korea | discussion | Endorsement | Yes |
Yes
the way forward is agreed. Changes will be introduced through CRs. | noted | No | R5‑184350 | |||
R5‑184351 | ASN.1 Version Handling for NSA and SA | Qualcomm Korea | discussion | Endorsement | Yes |
Yes
r1 was presented on Tue.
Conclusion: the Oct. Delivery will move on to Sept. Asn.1.
The sept. Delivery will probably have the June version of EN-DC? See TF160 report. | revised | No | R5‑185026 | |||
R5‑185026 | ASN.1 Version Handling for NSA and SA | Qualcomm Korea | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184351 | |||
R5‑184359 | Handling of Unified Access Control test cases in SA | Qualcomm Tech. Netherlands B.V | discussion | Discussion | Yes |
Yes
WP and TC definition to be discussed among 5G rapporteurs. | noted | No | ||||
R5‑184568 | OTA Chamber requirements for 5G NR Signalling test cases | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
r1 was presented.
Rohde&schwarz raised the question whether NWGN is supported also in SIG.
Deferred.
r2 was presented on Wed in the joint.
Conclusion: all proposals 1-6 are endorsed.
Corresponding CRs will be handled in SIG.
PCTest commented that the requirements for the anechoic chamber should be put into a TS, preferrably into the Annex. | revised | No | R5‑185132 | |||
R5‑185132 | OTA Chamber requirements for 5G NR Signalling test cases | Keysight Technologies UK Ltd | discussion | Endorsement | Yes |
Yes
| noted | No | R5‑184568 | |||
R5‑184664 | Default channel bandwidth of new NR bands for non-CA signaling test cases | DOCOMO Communications Lab., KDDI Corporation, KT Corp. | discussion | Decision | Yes |
Yes
r1 was presented on Tue.
Proposal is accepted. | revised | No | R5‑185027 | |||
R5‑185027 | Default channel bandwidth of new NR bands for non-CA signaling test cases | NTT DOCOMO, INC., CMCC, KDDI Corporation, KT Corp., Orange, Telecom Italia S.p.A. | discussion | Decision | Yes |
Yes
| noted | No | R5‑184664 | |||
R5‑184805 | Discussion on SIG testcase optimization of 5GC | CATT | discussion | Discussion | Yes |
Yes
| noted | No | ||||
6.3.14 | Voice and Video Enhancement for LTE (UID - 760089) LTE_VoLTE_ViLTE_enh-UEConTest |   | ||||||||||
6.3.14.1 | TS 34.229-1 |   | ||||||||||
6.3.14.2 | TS 34.229-2 |   | ||||||||||
6.3.14.3 | TS 34.229-3 |   | ||||||||||
6.3.14.4 | TS 36.508 |   | ||||||||||
6.3.14.5 | TS 36.523-1 | R5‑184213 | Removal of Testcase 8.2.2.6.4 | CATT | CR | Agreement | Yes |
Yes
the TF160 manager reported a similar case in FeMTC.
Deferred.
On Thu Tf160 agreed. | agreed | No | ||
R5‑184214 | Removal of Testcase 8.2.2.6.5 | CATT | CR | Agreement | Yes |
Yes
same as above. | agreed | No | ||||
R5‑184215 | Update of the title of Testcase 7.1.5.6 | CATT | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
6.3.14.6 | TS 36.523-2 | R5‑184217 | Update of applicability and tests conditions for LTE_VoLTE_ViLTE_enh test cases | CATT | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.14.7 | TS 36.523-3 |   | ||||||||||
6.3.14.8 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.15 | Enhancements of NB-IoT (UID - 770061) NB_IOTenh-UEConTest |   | ||||||||||
6.3.15.1 | TS 36.508 | R5‑184791 | Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
r3 was presented on Wed. | revised | No | R5‑185113 | |
R5‑185113 | Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content | CATT, TDIA, Starpoint, Sporton | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184791 | |||
6.3.15.2 | TS 36.509 |   | ||||||||||
6.3.15.3 | TS 36.523-1 | R5‑184095 | Correction to eNB-IoT test case 22.3.2.7 | MCC TF160 | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185114 | |
R5‑185114 | Correction to eNB-IoT test case 22.3.2.7 | MCC TF160, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184095 | |||
R5‑184493 | Correction of NB-IoT test case 22.5.20 | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184494 | Correction of NB-IoT test case 22.5.21 | CATT, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184501 | Addition to NB-IoT testcase 22.3.1.6a | TDIA, CATT, Starpoint | CR | Agreement | Yes |
Yes
r1 was presented on Wed.
no formatting!!! | revised | No | R5‑185115 | |||
R5‑185115 | Addition to NB-IoT testcase 22.3.1.6a | TDIA, CATT, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184501 | |||
R5‑184784 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185116 | |||
R5‑185116 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184784 | |||
R5‑184786 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.9 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184787 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185117 | |||
R5‑185117 | Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184787 | |||
R5‑184788 | Addition of new NB_IOTenh-UEConTest test case 22.4.24 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185118 | |||
R5‑185118 | Addition of new NB_IOTenh-UEConTest test case 22.4.24 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184788 | |||
R5‑184789 | Addition of new NB_IOTenh-UEConTest test case 22.4.25 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
r2 was presented on Wed. | revised | No | R5‑185119 | |||
R5‑185119 | Addition of new NB_IOTenh-UEConTest test case 22.4.25 | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184789 | |||
R5‑184790 | Addition of new NB_IOTenh-UEConTest test case 22.4.25 | CATT, TDIA, Starpoint | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184815 | New test case for NB-IoT UM RLC | Sporton, TTA, TDIA | CR | Agreement | Yes |
Yes
late doc
r1 was presented on Wed. | revised | No | R5‑185120 | |||
R5‑185120 | New test case for NB-IoT UM RLC | Sporton, TTA, TDIA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184815 | |||
6.3.15.4 | TS 36.523-2 | R5‑185022 | Correction to NB-IoT test case 22.4.20a execution guideline | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184780 | Update of applicability and tests conditions for NB_IOT enhancement test cases | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184816 | Addition of applicability and tests conditions for new Enhancements NB-IoT TC 24.1.13 | Sporton | CR | Agreement | Yes |
Yes
wrong title!? changed title!!
"New test case for V2X Sidelink with SL SPS Transmission"
reissued as R5-185121 because of title change. | withdrawn | Yes | ||||
R5‑185121 | Addition of applicability and tests conditions for new Enhancements NB-IoT TC 22.3.2.6 | Sporton | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.15.5 | TS 36.523-3 | R5‑184135 | eNB-IoT: Test Model | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.3.15.6 | TS 37.571-2 |   | ||||||||||
6.3.15.7 | TS 37.571-3 |   | ||||||||||
6.3.15.8 | TS 37.571-4 |   | ||||||||||
6.3.15.9 | TS 37.571-5 |   | ||||||||||
6.3.15.10 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.16 | Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest |   | ||||||||||
6.3.16.1 | TS 36.508 |   | ||||||||||
6.3.16.2 | TS 36.523-1 |   | ||||||||||
6.3.16.3 | TS 36.523-2 | R5‑184901 | Updates to feMTC TC 8.2.2.6.6 | Ericsson | CR | Agreement | Yes |
Yes
update at the next meeting. Test case to be removed. | withdrawn | Yes | ||
6.3.16.4 | TS 36.523-3 |   | ||||||||||
6.3.16.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.17 | Rel-15 CA configurations (UID - 770064) LTE_CA_R15-UEConTest |   | ||||||||||
6.3.17.1 | TS 36.508 | R5‑184393 | Updates of 6.2.3.2 Test Frequency for CA_8A-27A | KT Corp. | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185023 | |
R5‑185023 | Updates of 6.2.3.2 Test Frequency for CA_8A-27A | KT Corp. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184393 | |||
R5‑184771 | Addition of test frequencies for CA_66A-71A, CA_66C-71A, CA_70A-71A, CA_70C-71A to 36.508 | WE Certification Oy, DISH Network | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.3.17.2 | TS 36.523-1 |   | ||||||||||
6.3.17.3 | TS 36.523-2 | R5‑184399 | New CA band combination CA_8A-27A - Updates of Table A.4.3.3.3-3 | KT Corp. | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184588 | Addition of new R15 CA configurations to 36.523-2 | Bureau Veritas, Ericsson | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185024 | |||
R5‑185024 | Addition of new R15 CA configurations to 36.523-2 | Bureau Veritas, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184588 | |||
6.3.17.4 | TS 36.523-3 |   | ||||||||||
6.3.17.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.18 | FDD operating band in the L-band for LTE (UID - 780062) LTE_FDD_L_band-UEConTest |   | ||||||||||
6.3.18.1 | TS 36.508 |   | ||||||||||
6.3.18.2 | TS 36.523-2 |   | ||||||||||
6.3.18.3 | TS 36.523-3 |   | ||||||||||
6.3.18.4 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.19 | Uplink capacity enhancements for LTE (UID - 780063) LTE_UL_CAP_enh-UEConTest |   | ||||||||||
6.3.19.1 | TS 36.508 |   | ||||||||||
6.3.19.2 | TS 36.523-1 |   | ||||||||||
6.3.19.3 | TS 36.523-2 |   | ||||||||||
6.3.19.4 | TS 36.523-3 |   | ||||||||||
6.3.19.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.20 | Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest |   | ||||||||||
6.3.20.1 | TS 36.523-1 |   | ||||||||||
6.3.20.2 | TS 36.523-2 |   | ||||||||||
6.3.20.3 | TS 36.523-3 |   | ||||||||||
6.3.20.4 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.21 | LTE bands with UE category M2 and/or NB2 in Rel-15 (UID - 780067) LTE_bands_R15_M2_NB2-UEConTest |   | ||||||||||
6.3.21.1 | TS 36.508 |   | ||||||||||
6.3.21.2 | TS 36.523-2 |   | ||||||||||
6.3.21.3 | TS 36.523-3 |   | ||||||||||
6.3.21.4 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.22 | Quality of Experience (QoE) Measurement Collection for streaming services in E-UTRAN (UID - 790051) LTE_QMC_Streaming-UEConTest |   | ||||||||||
6.3.22.1 | TS 36.508 |   | ||||||||||
6.3.22.2 | TS 36.523-1 |   | ||||||||||
6.3.22.3 | TS 36.523-2 |   | ||||||||||
6.3.22.4 | TS 36.523-3 |   | ||||||||||
6.3.22.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.23 | Mission Critical Improvements (UID - 790052) MCImp-UEConTest |   | ||||||||||
6.3.23.1 | TS 36.579-1 | R5‑184685 | Update of default message contents for new Rel-14 TCs for Private Call Call-Back and Ambient listening call | Samsung | CR | Agreement | Yes |
Yes
will upgrade the spec to Rel-14. | agreed | No | ||
6.3.23.2 | TS 36.579-2 | R5‑184686 | Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment | Samsung | CR | Agreement | Yes |
Yes
will upgrade the spec to Rel-14.
r1 was presented on Wed. | revised | No | R5‑185123 | |
R5‑185123 | Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184686 | |||
R5‑184687 | Adding a new Rel-14 TC on Private Call Call-Back Request / Client Terminated (CT) / Private call call-back fulfilment | Samsung | CR | Agreement | Yes |
Yes
will upgrade the spec to Rel-14. | agreed | No | ||||
R5‑184688 | Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) | Samsung | CR | Agreement | Yes |
Yes
no CR#, Tdoc#
will upgrade the spec to Rel-14.
r1 was presented on Wed. | revised | No | R5‑185124 | |||
R5‑185124 | Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184688 | |||
R5‑184689 | Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Terminated (CT) | Samsung | CR | Agreement | Yes |
Yes
will upgrade the spec to Rel-14. | agreed | No | ||||
R5‑184690 | Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Originated (CO) | Samsung | CR | Agreement | Yes |
Yes
will upgrade the spec to Rel-14. | agreed | No | ||||
R5‑184691 | Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Terminated (CT) | Samsung | CR | Agreement | Yes |
Yes
will upgrade the spec to Rel-14. | agreed | No | ||||
6.3.23.3 | TS 36.579-3 |   | ||||||||||
6.3.23.4 | TS 36.579-4 | R5‑184693 | Adding applicability for new MCPTT Rel-14 TCs | Samsung | CR | Agreement | Yes |
Yes
will upgrade the spec to Rel-14. | agreed | No | ||
6.3.23.5 | TS 36.579-5 |   | ||||||||||
6.3.23.6 | TS 36.579-6 | R5‑184607 | Draft TS 36.579-6 v0.0.2 | NIST | draft TS | Agreement | Yes |
Yes
changed to Rel-14 | approved | No | ||
R5‑184611 | New Test Case for 36.579-6 - 6.1.1.8 | NIST | pCR | Approval | Yes |
Yes
reissued as R5-184990 because of wrong release | withdrawn | Yes | ||||
R5‑184990 | New Test Case for 36.579-6 - 6.1.1.8 | NIST | pCR | Approval | Yes |
Yes
| approved | No | ||||
6.3.23.7 | TS 36.579-7 | R5‑184608 | Draft TS 36.579-7 v0.0.2 | NIST | draft TS | Agreement | Yes |
Yes
changed to Rel-14 | approved | No | ||
6.3.23.8 | TS 36.508 |   | ||||||||||
6.3.23.9 | TS 36.509 |   | ||||||||||
6.3.23.10 | TS 36.523-1 |   | ||||||||||
6.3.23.11 | TS 36.523-2 |   | ||||||||||
6.3.23.12 | TS 36.523-3 |   | ||||||||||
6.3.23.13 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.24 | 450 MHz Band for LTE in Region 3 (UID - 790058) LTE450_Reg3-UEConTest |   | ||||||||||
6.3.24.1 | TS 36.508 |   | ||||||||||
6.3.24.2 | TS 36.523-2 |   | ||||||||||
6.3.24.3 | TS 36.523-3 |   | ||||||||||
6.3.24.4 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.25 | UL Data Compression in LTE (UID - 800080) LTE_UDC-UEConTest |   | ||||||||||
6.3.25.1 | TS 36.508 |   | ||||||||||
6.3.25.2 | TS 36.523-1 |   | ||||||||||
6.3.25.3 | TS 36.523-2 |   | ||||||||||
6.3.25.4 | TS 36.523-3 |   | ||||||||||
6.3.25.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.3.26 | 5G System Non-3GPP Access (UID - 800081) 5GS_Ph1-CT_n3GPPA-UEConTest |   | ||||||||||
6.3.26.1 | TS 38.508-1 |   | ||||||||||
6.3.26.2 | TS 38.508-2 |   | ||||||||||
6.3.26.3 | TS 38.523-1 |   | ||||||||||
6.3.26.4 | TS 38.523-2 |   | ||||||||||
6.3.26.5 | TS 38.523-3 |   | ||||||||||
6.3.26.6 | General Papers / Work Plan / TC lists |   | ||||||||||
6.4 | Routine Maintenance for TS 36 Series TEIx_Test |   | ||||||||||
6.4.1 | Routine Maintenance for TS 36.508 | R5‑184045 | Update Reference Table 6.6.2-1A dedicated EPS bearer contexts | FirstNet, AT&T | CR | Agreement | Yes |
Yes
WIC & cl. affected missing on cover!
The TF160 manager reported a possible clash in tables with another CR.
r1 was presented on Thu. | revised | No | R5‑185158 | |
R5‑185158 | Update Reference Table 6.6.2-1A dedicated EPS bearer contexts | FirstNet, AT&T | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184045 | |||
R5‑184075 | NB-IoT timer tolerances: extension of timer value range | MCC TF160, Anritsu Ltd. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184094 | Correction to ATTACH ACCEPT message for SMS only | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185002 | |||
R5‑185002 | Correction to ATTACH ACCEPT message for SMS only | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184094 | |||
R5‑184404 | Correction of 6.2.3.2 Test Frequency for CA_3A-27A | KT Corp. | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185003 | |||
R5‑185003 | Correction of 6.2.3.2 Test Frequency for CA_3A-27A | KT Corp. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184404 | |||
R5‑184668 | Editorial correction of reference document | Intertek | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184884 | Update to NB-IoT test conditions for in-band / guard band | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.2 | Routine Maintenance for TS 36.509 | R5‑184076 | Corrections to UE Test Loop Mode H | MCC TF160 | CR | Agreement | Yes |
Yes
offline comments from Rohde&Schwarz.
Mediatek recommended to align the loopback diagram.
r2 was presented on Wed. | revised | No | R5‑185125 | |
R5‑185125 | Corrections to UE Test Loop Mode H | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184076 | |||
R5‑184077 | Corrections to UE Test Loop Mode H | MCC TF160 | CR | Agreement | Yes |
Yes
late doc
doc not available
for email agreement | agreed | No | ||||
R5‑184078 | Corrections to UE Test Loop Mode H | MCC TF160 | CR | Agreement | Yes |
Yes
late doc
doc not available
for email agreement | agreed | No | ||||
6.4.3 | Routine Maintenance for TS 36.523-1 |   | ||||||||||
6.4.3.1 | Idle Mode | R5‑184331 | Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell | Keysight Technologies UK Ltd, Samsung | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185004 | |
R5‑185004 | Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell | Keysight Technologies UK Ltd, Samsung | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184331 | |||
6.4.3.2 | Layer 2 |   | ||||||||||
6.4.3.2.1 | MAC | R5‑184503 | Update of number of DL PDCP SDUs in test cases 7.1.7.1.x | MediaTek Inc. | CR | Agreement | Yes |
Yes
r2 was presented on Mon.
The TF160 manager wondered about the deleted categories.
Deferred.
r3 was presented on Thu. | revised | No | R5‑185005 | |
R5‑185005 | Update of number of DL PDCP SDUs in test cases 7.1.7.1.x | MediaTek Inc. | CR | Agreement | Yes |
Yes
coversheet rev missing. | revised | No | R5‑185169 | R5‑184503 | ||
R5‑185169 | Update of number of DL PDCP SDUs in test cases 7.1.7.1.x | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑185005 | |||
R5‑184504 | Update of DL 256QAM TCs for high UE DL Categories | MediaTek Inc. | CR | Agreement | Yes |
Yes
r2 was presented on Mon. | revised | No | R5‑185006 | |||
R5‑185006 | Update of DL 256QAM TCs for high UE DL Categories | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184504 | |||
R5‑184551 | Correction to MAC test cases with TB Size selection | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.3.2.2 | RLC |   | ||||||||||
6.4.3.2.3 | PDCP |   | ||||||||||
6.4.3.3 | RRC |   | ||||||||||
6.4.3.3.1 | RRC Part 1 (clauses 8.1 and 8.5) | R5‑184505 | Correction to RRC TC 8.5.4.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
r1 was presented on Mon.
Rohde&Schwarz UK, Qualcomm and TF160 commented that some PICS must be added.
r2 and r4 was presented on Thu. | revised | No | R5‑185007 | |
R5‑185007 | Correction to RRC TC 8.5.4.1 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184505 | |||
R5‑184506 | Correction to RRC TC 8.5.4.3 | MediaTek Inc. | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
6.4.3.3.2 | RRC Part 2 (clause 8.2) | R5‑184543 | Correction to CAT-M1 Test case 8.2.4.27 | Anritsu Ltd., Nordic Semiconductor ASA | CR | Agreement | Yes |
Yes
Rohde&Schwarz UK commented that this change will have impact on all handover test cases.
Deferred.
r1 was presented on Thu. | revised | No | R5‑185159 | |
R5‑185159 | Correction to CAT-M1 Test case 8.2.4.27 | Anritsu Ltd., Nordic Semiconductor ASA | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184543 | |||
6.4.3.3.3 | RRC Part 3 (clause 8.3) |   | ||||||||||
6.4.3.3.4 | Inter-RAT (clauses 8.4 & 8.4A) | R5‑184726 | Removal of 1xPre-Registation 8.4.7.x test cases | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.4.3.3.5 | RRC LTE MDT (clause 8.6) |   | ||||||||||
6.4.3.3.6 | RRC ANR for UTRAN (clause 8.7) |   | ||||||||||
6.4.3.4 | EPS Mobility Management | R5‑184053 | Correction to EMM test case 9.2.3.1.25 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Mon.
Editorial comments on the Notes form Samsung and ETSI MCC.
r2 was presented on Thu. | revised | No | R5‑185008 | |
R5‑185008 | Correction to EMM test case 9.2.3.1.25 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184053 | |||
R5‑184187 | Correction to testcase 9.2.2.1.9 for CAT-M1 UEs | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
R5‑184507 | Correction to EMM TC 9.2.1.1.24 | MediaTek Inc. | CR | Agreement | Yes |
Yes
one empty row to be completely deleted | agreed | No | ||||
R5‑184532 | Correction to testcase 9.2.2.1.9 for CAT-M1 UEs | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r2 was presented on Mon. | revised | No | R5‑185009 | |||
R5‑185009 | Correction to testcase 9.2.2.1.9 for CAT-M1 UEs | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184532 | |||
R5‑184707 | Update of EMM test case 9.2.1.1.1b | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184708 | Update of EMM test case 9.2.1.1.22 | Qualcomm Incorporated, Anritsu | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184709 | Update of EMM test case 9.2.3.2.17 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Mon.
Keysight UK requested more time.
Deferred. | revised | No | R5‑185010 | |||
R5‑185010 | Update of EMM test case 9.2.3.2.17 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184709 | |||
6.4.3.5 | EPS Session Management | R5‑184044 | Update EPS Session Management test case in section 10 of TS 36.523-1. | FirstNet, AT&T | CR | Agreement | Yes |
Yes
WIC & cl. affected missing on cover!
r1 was presented on Thu. | revised | No | R5‑185136 | |
R5‑185136 | Update EPS Session Management test case in section 10 of TS 36.523-1. | FirstNet, AT&T | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑184044 | |||
R5‑184067 | Correction to 10.7.4 regarding CE mode | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r2 was presented on Thu. | revised | No | R5‑185135 | |||
R5‑185135 | Correction to 10.7.4 regarding CE mode | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184067 | |||
R5‑184508 | Correction to ESM TC 10.5.4 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.3.6 | General Tests | R5‑184781 | Update to IMS eCall test case 11.3.2 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||
R5‑184782 | Update to IMS eCall test case 11.3.6 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.4.3.7 | Interoperability Radio Bearers |   | ||||||||||
6.4.3.8 | Multilayer Procedures | R5‑184323 | Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
comment from Qualcomm of other test cases impacted.
eCall to be removed from the coverpage. | revised | No | R5‑185126 | |
R5‑185126 | Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184323 | |||
R5‑184510 | Correction to CSFB TC 13.1.12 | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184631 | Adding TC 13.1.21 for emergency call via CS domain | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
Qualcomm: All emg tcs are in cl. 11. | agreed | No | ||||
R5‑184727 | Removal of Multi-Layer 1xPre-Registation 13.4.4.x and 1xCSFB 13.1.xx test cases | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184918 | Correction to multi-layer test case 13.1.20 | Keysight Technologies UK Ltd | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.3.9 | PWS - ETWS / CMAS |   | ||||||||||
6.4.3.10 | Non-3GPP |   | ||||||||||
6.4.3.11 | Others (TS 36.523-1 clauses not covered by other AIs under AI 6.4.3 e.g. eMBMS / Home (e)NB / MBMS in LTE / D2D / SC-PTM / NB-IoT / CIoT...) | R5‑184079 | Clarification for NB-IoT test case 22.3.1.1 | MCC TF160, Rohde&Schwarz | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185012 | |
R5‑185012 | Clarification for NB-IoT test case 22.3.1.1 | MCC TF160, Rohde&Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184079 | |||
R5‑184089 | Correction to NB-IoT test case 22.5.8 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185013 | |||
R5‑185013 | Correction to NB-IoT test case 22.5.8 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184089 | |||
R5‑184090 | Correction to NB-IoT test case 22.5.14 | ROHDE & SCHWARZ, Qualcomm | CR | Agreement | Yes |
Yes
r1 was presented on Mon. | revised | No | R5‑185014 | |||
R5‑185014 | Correction to NB-IoT test case 22.5.14 | ROHDE & SCHWARZ, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184090 | |||
R5‑184091 | Correction to NB-IoT test case 22.6.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184092 | Correction to NB-IoT test case 22.6.3 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184093 | Correction to NB-IoT test case 22.1.1 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184216 | Corrections to NBIOT NAS TC 22.5.7b | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
TEI13 added.
rev 1, wrong date.
r2 was presented.
Qualcomm disagreed to this CR as some UEs are already passing with this TC.
Rohde&Schwarz remarked it depends on the UE.
Deferred. | revised | No | R5‑185015 | |||
R5‑185015 | Corrections to NBIOT NAS TC 22.5.7b | CATT, TDIA, Starpoint | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184216 | |||
R5‑184322 | Correction to NB-IoT test cases 22.4.8 and 22.4.9 | ANRITSU LTD | CR | Agreement | Yes |
Yes
cl. Affected missing.
r1 was presented on Mon.
some parts not revision marked.
22.4.4 missing from title. | revised | No | R5‑185016 | |||
R5‑185016 | Correction to NB-IoT test cases 22.4.8 and 22.4.9 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| withdrawn | Yes | R5‑184322 | |||
R5‑185017 | Correction to NB-IoT test cases 22.4.4, 22.4.8 and 22.4.9 | ANRITSU LTD, Qualcomm | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184518 | Correction to NB-IoT test case 22.2.9 | ANRITSU LTD | CR | Agreement | Yes |
Yes
wrong Rel-14 on cover!
r1 was presented on Mon. | revised | No | R5‑185018 | |||
R5‑185018 | Correction to NB-IoT test case 22.2.9 | ANRITSU LTD | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184518 | |||
R5‑184710 | Update of eMBMS test cases for UEs supporting AT command for eMBMS service activation | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184711 | Update to NB-IOT test case 22.1.1 M2 | Qualcomm Incorporated, Anritsu, Rohde & Schwarz | CR | Agreement | Yes |
Yes
the TF160 manager recommended to delete the sT15 also from TP (6). | revised | No | R5‑185019 | |||
R5‑185019 | Update to NB-IOT test case 22.1.1 M2 | Qualcomm Incorporated, Anritsu, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184711 | |||
R5‑184712 | Update to NB-IOT test case 22.3.1.2 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Mon.
Anritsu/TF160 commented that this implementation is failing another UE in another TTCN implementation. Rohde&Schwarz had proposed it earlier. | revised | No | R5‑185020 | |||
R5‑185020 | Update to NB-IOT test case 22.3.1.2 | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184712 | |||
R5‑184807 | Correction to NB-IoT testcase 22.3.3.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
r1 was presented on Mon.
Deferred.
r2 was presented on Thu.
| revised | No | R5‑185021 | |||
R5‑185021 | Correction to NB-IoT testcase 22.3.3.5 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184807 | |||
R5‑184854 | Correction to NB-IoT testcase 22.3.2.2 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.4 | Routine Maintenance for TS 36.523-2 | R5‑184052 | Labelling more LTE test cases as not applicable for CAT M1 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
the TF160 manager raised the concern whether there shall be no replacement for IMS Cat. M1.
Deferred.
Label more is not applicable. CRs will be brought to the next meeting to explain better. | withdrawn | Yes | ||
R5‑184060 | Adding SMS over SGs configuration to applicabilities | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184069 | Correction of the Update to applicability condition of test case 11.2.3 to include CSG PICS | ETSI MCC (Qualcomm Incorporated) | CR | Agreement | Yes |
Yes
included already in a Qualcomm CR. | withdrawn | Yes | ||||
R5‑184266 | Correction of test case title of 8.2.2.5a.2 | Huawei,HiSilicon | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184512 | Correction to applicability of TC 7.1.7.1.6a | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184513 | Correction to applicability of DL 256QAM TCs | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184514 | Editorial correction of referred table number | MediaTek Inc. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184536 | Correction to testcases 9.2.1.2.1c and 9.2.1.2.1d applicability conditions for CAT-M1 UEs | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184538 | Correction to testcases 6.1.1.1, 6.1.1.1b and applicability conditions for CAT-M1 UEs | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Discussion about excluding tests in order to reduce test duration and costs.
Deferred. | withdrawn | Yes | ||||
R5‑184596 | Correction to NB-IoT test case 22.4.20a execution guideline | Anritsu Ltd, Qualcomm | CR | Agreement | Yes |
Yes
the TF160 manager commented that this is rather eNB-IoT.
Reissued as for R5-185022 because of WIC.
| withdrawn | Yes | ||||
R5‑184633 | Addition of new applicability of emergency call via CS domain TC for IMS capable UE | DOCOMO Communications Lab. | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184730 | Correction to Inter-RAT absolute priority based reselection test cases | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184731 | Update to applicability condition of test case 11.2.3 to include CSG PICS | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184732 | Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Thu. | revised | No | R5‑185137 | |||
R5‑185137 | Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184732 | |||
R5‑184734 | Update to applicability condition of Test case 6.1.1.7a for CAT-M1 UEs | Qualcomm Incorporated, Rohde & Schwarz | CR | Agreement | Yes |
Yes
deferred. | withdrawn | Yes | ||||
R5‑184735 | Removal of 1xPre-Registation and 1xCSFB test cases applicability | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
Mototola Mobility remarked that CS fallback pics shall stay.
Deferred. | revised | No | R5‑185138 | |||
R5‑185138 | Removal of 1xPre-Registation and 1xCSFB test cases applicability | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184735 | |||
R5‑184849 | Correction of condition for Measurement configuration and reporting | SGS Wireless, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.4.5 | Routine Maintenance for TS 36.523-3 | R5‑184080 | Routine maintenance for TS 36.523-3 | MCC TF160 | CR | Agreement | Yes |
Yes
wrong spec & ver on cover!
Wic says TEI13_Test, NB_IOT-UEConTest!?
r1 was presented on Thu. | revised | No | R5‑185139 | |
R5‑185139 | Routine maintenance for TS 36.523-3 | MCC TF160 | CR | Agreement | Yes |
Yes
uploaded by mistake by Qualcomm | revised | No | R5‑185180 | R5‑184080 | ||
R5‑185180 | Routine maintenance for TS 36.523-3 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑185139 | |||
6.4.6 | General Papers / Work Plan / TC lists | R5‑184128 | Discussion on Test Loop Mode H | MCC TF160 | discussion | Endorsement | Yes |
Yes
Mediatek commented that the test point is not clear. Further unclear items.
Option 2, only Mediatek disagreed.
Option 2 is endorsed. | noted | No | ||
R5‑184534 | TS 36.523-1 Status before RAN5#80 | Rapporteur (BlackBerry) | other | Yes |
Yes
| noted | No | |||||
R5‑184535 | TS 36.523-1 Status after RAN5#80 | Rapporteur (BlackBerry) | other | Yes |
Yes
| withdrawn | Yes | |||||
R5‑184547 | TS 36.523-1 Status after RAN5#80 | Rapporteur (BlackBerry) | other | No |
Yes
post meeting doc | noted | No | |||||
R5‑184635 | Emergency call via CS domain TC in case of IMS voice not available | DOCOMO Communications Lab. | discussion | Decision | Yes |
Yes
Rohde&schwarz commented that this scenario maybe only shows up when the network misbehaves.
Conclusion: the scenario is not yet covered.
the proposal is endorsed. | noted | No | ||||
6.5 | Other Maintenance TEIx_Test |   | ||||||||||
6.5.1 | Routine Maintenance for TDD (HCR & LCR) |   | ||||||||||
6.5.1.1 | TS 34.108 |   | ||||||||||
6.5.1.2 | TS 34.123-1 |   | ||||||||||
6.5.1.3 | TS 34.123-2 |   | ||||||||||
6.5.1.4 | TS 34.123-3 |   | ||||||||||
6.5.1.5 | General Papers / Work Plan / TC list & CR summary |   | ||||||||||
6.5.2 | Routine Maintenance for TS 34.108 |   | ||||||||||
6.5.3 | Routine Maintenance for TS 34.109 |   | ||||||||||
6.5.4 | Routine Maintenance for TS 34.123 |   | ||||||||||
6.5.4.1 | TS 34.123-1 | R5‑184063 | Resubmission of Correction to TC 8.1.5.7 | ETSI MCC (MediaTek Inc.) | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184088 | Correction to Rel-99 NAS testcase 9.4.9 | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184144 | Correction to test case 9.5.7.2 | Intel Corporation (UK) Ltd, Rohde & Schwarz | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.5.4.2 | TS 34.123-2 |   | ||||||||||
6.5.4.3 | TS 34.123-3 |   | ||||||||||
6.5.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.5.6 | Routine Maintenance for TS 34.229 |   | ||||||||||
6.5.6.1 | TS 34.229-1 | R5‑184056 | Corrections to G.15.4 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184062 | Resubmission of Corrections to IMS test case 19.1.6 | ETSI MCC (Rohde & Schwarz) | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184096 | Editorial corrections to IMS emergency call test cases in clauses 19 and 21 | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184483 | Add and use reference to NG.108 | ROHDE & SCHWARZ, Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184704 | Update to IMS eCall test cases for eCall category bit usage | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184705 | Update to Emergency Call test case 19.1.3 for eCall category bit usage | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
r1 was presented on Wed. | revised | No | R5‑185087 | |||
R5‑185087 | Update to Emergency Call test case 19.1.3 for eCall category bit usage | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184705 | |||
R5‑184779 | Update to A.2.1 for Test eCall Request-URI | Qualcomm Incorporated | CR | Agreement | Yes |
Yes
| withdrawn | Yes | ||||
6.5.6.2 | TS 34.229-2 | R5‑184048 | Addition of IR.92 to SM-over-IP roles | ROHDE & SCHWARZ, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184059 | Adding SMS over IP configuration to applicabilities | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
the xxx has to be resolved from 36.523-2 CR 1185 ! | revised | No | R5‑185088 | |||
R5‑185088 | Adding SMS over IP configuration to applicabilities | ROHDE & SCHWARZ | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184059 | |||
6.5.6.3 | TS 34.229-3 |   | ||||||||||
6.5.6.4 | TS 34.229-4 |   | ||||||||||
6.5.6.5 | General Papers / Work Plan / TC lists | R5‑184057 | Investigation on test coverage for IR.92 and IR.94 | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Conclusion:
For 2.1 new features in 12.0, RAN5 will look to provide test coverage if there is industry need.
For 2.2, 2.4, 2.5 there is no market interest.
2.3 needs to be corrected in the spec. | noted | No | ||
R5‑184058 | Investigation on Supplementary Services | ROHDE & SCHWARZ | discussion | Endorsement | Yes |
Yes
Conclusion: test coverage on WLAN may not be needed. | noted | No | ||||
6.5.7 | Routine Maintenance for TS 37.571 |   | ||||||||||
6.5.7.1 | TS 37.571-2 | R5‑184032 | Addition of PICS for support of LPP message segmentation in test 7.3.1.1 | Spirent Communications | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑184037 | Addition of PICS for support of LPP message segmentation in test 7.3.1.1 | Spirent Communications | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.5.7.2 | TS 37.571-3 | R5‑184033 | Addition of PICS for support of LPP message segmentation | Spirent Communications | CR | Agreement | No |
Yes
| withdrawn | Yes | ||
R5‑184038 | Addition of PICS for support of LPP message segmentation | Spirent Communications | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.5.7.3 | TS 37.571-4 |   | ||||||||||
6.5.7.4 | TS 37.571-5 | R5‑184030 | Addition of missing assistance data for modernized GPS and the GPS L5 signal for the LTE signalling tests | Spirent Communications | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184031 | Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests | Spirent Communications, European Commission | CR | Agreement | No |
Yes
| withdrawn | Yes | ||||
R5‑184036 | Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests | Spirent Communications, European Commission | CR | Agreement | Yes |
Yes
| agreed | No | ||||
6.5.7.5 | General Papers / Work Plan / TC lists |   | ||||||||||
6.5.8 | Routine Maintenance for TS 51.010 |   | ||||||||||
6.5.8.1 | TS 51.010-1 (Signalling) |   | ||||||||||
6.5.8.2 | TS 51.010-2 (Signalling) |   | ||||||||||
6.5.8.3 | TS 51.010-5 (Signalling) |   | ||||||||||
6.5.8.4 | TS 51.010-7 (Signalling) |   | ||||||||||
6.5.8.5 | General Papers / Work Plan / TC list & CR summary |   | ||||||||||
6.5.9 | Routine Maintenance for MCPTT |   | ||||||||||
6.5.9.1 | TS 36.579-1 | R5‑184663 | Corrections to MCPTT Authorization | MCC TF160 | CR | Agreement | Yes |
Yes
r2 was presented on Wed. | revised | No | R5‑185122 | |
R5‑185122 | Corrections to MCPTT Authorization | MCC TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184663 | |||
R5‑185084 | Update to TLS setup | MCC TF160, Motorola Solutions UK Ltd. | CR | Agreement | Yes |
Yes
late doc | agreed | No | ||||
6.5.9.2 | TS 36.579-2 | R5‑184692 | Editorial updates to 36.579-2 Rel-13 TCs | Samsung | CR | Agreement | Yes |
Yes
| agreed | No | ||
6.5.9.3 | TS 36.579-3 |   | ||||||||||
6.5.9.4 | TS 36.579-4 |   | ||||||||||
6.5.9.5 | TS 36.579-5 | R5‑184081 | MCPTT: Test Model updates | MCC TF160 | CR | Agreement | Yes |
Yes
MCPTT test suite is not yet released, but under development.
2 basic test cases.
No feedback yet from test industry. | agreed | No | ||
6.5.9.6 | TS 36.508 |   | ||||||||||
6.5.9.7 | TS 36.509 |   | ||||||||||
6.5.9.8 | TS 36.523-1 |   | ||||||||||
6.5.9.9 | TS 36.523-2 |   | ||||||||||
6.5.9.10 | TS 36.523-3 |   | ||||||||||
6.5.9.11 | TS 34.229-1 |   | ||||||||||
6.5.9.12 | TS 34.229-2 |   | ||||||||||
6.5.9.13 | TS 34.229-3 |   | ||||||||||
6.5.9.14 | General Papers / Work Plan / TC lists | R5‑184666 | MCPTT Client test cases: open issues in prose | MCC TF160 | discussion | Discussion | Yes |
Yes
AP was raised on NIST. | noted | No | ||
6.6 | Outgoing liaison statements for provisional approval |   | ||||||||||
6.7 | AOB |   | ||||||||||
7 | Closing Joint Session |   | ||||||||||
7.1 | Pointer CRs | R5‑184136 | Removal of technical content in 34.108 v14.2.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||
R5‑184137 | Removal of technical content in 34.121-2 v14.1.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184138 | Removal of technical content in 34.123-1 v14.5.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184139 | Removal of technical content in 34.123-2 v14.4.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184140 | Removal of technical content in 36.521-3 v14.4.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184141 | Removal of technical content in 36.523-3 v14.4.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184142 | Removal of technical content in 36.903 v13.5.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||||
R5‑184143 | Removal of technical content in 36.905 v14.6.0 and substitution with pointer to the next Release | ETSI Secretariat | CR | Agreement | Yes |
Yes
| agreed | No | ||||
7.2 | Open Issues |   | ||||||||||
7.2.1 | RF group docs still requiring WG verdict/confirmation - original A.I. retained | R5‑184332 | Test Frequencies | Sprint Corporation, Ericsson | CR | Agreement | Yes |
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.13.1]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
LATE DOCUMENT
update to test frequencies
| revised | No | R5‑185173 | |
R5‑185173 | Test Frequencies | Sprint Corporation, Ericsson | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184332 | |||
7.2.2 | Sig group docs still requiring WG verdict/confirmation - original A.I. retained | R5‑184339 | Update of FR1 signal levels | ANRITSU LTD | CR | Agreement | Yes |
Yes
r1 was presented on Tue. | revised | No | R5‑185036 | |
R5‑185036 | Update of FR1 signal levels | ANRITSU LTD | CR | Agreement | Yes |
Yes
for email agreement | agreed | No | R5‑184339 | |||
R5‑184352 | Addition of Test frequency for EN-DC B1_n78 | Qualcomm Korea | CR | Agreement | Yes |
Yes
no source
r1 was presented on Fri.
Superseded by Ericsson's doc. | revised | No | R5‑185178 | |||
R5‑185178 | Addition of Test frequency for EN-DC B1_n78 | Qualcomm Korea | CR | Agreement | No |
Yes
| withdrawn | Yes | R5‑184352 | |||
R5‑184478 | Introduction of test frequencies for signalling testing in clause 6 | Ericsson, TF160 | CR | Agreement | Yes |
Yes
editorial, table nr.s | revised | No | R5‑185177 | |||
R5‑185177 | Introduction of test frequencies for signalling testing in clause 6 | Ericsson, TF160 | CR | Agreement | Yes |
Yes
| agreed | No | R5‑184478 | |||
7.2.3 | Other open issues from joint sessions - original A.I. retained | R5‑184445 | Update of RAN5 5G NR phases and target update RAN5#80 | Ericsson | discussion | Endorsement | Yes |
Yes
a draft was presented.
for email approval | revised | No | R5‑185183 | |
R5‑185183 | Update of RAN5 5G NR phases and target update RAN5#80 | Ericsson | discussion | Endorsement | No |
No
for email approval | for email approval | No | R5‑184445 | |||
7.2.4 | UE Application Layer Data Throughput Performance - original A.I. retained |   | ||||||||||
7.2.5 | Other | R5‑185170 | Meeting notes of offline discussion on FR2 UE common test setup | Anritsu | discussion | discussion | Yes |
Yes
the agreements are noted. | revised | No | R5‑185179 | |
R5‑185179 | Meeting notes of offline discussion on FR2 UE common test setup | Anritsu | discussion | discussion | Yes |
Yes
| noted | No | R5‑185170 | |||
7.3 | iWD/PRD Updates | R5‑184533 | PRD-17 on Guidance to Work Item Codes version 3.13 (post RAN#81 version) | Rapporteur (BlackBerry) | other | No |
Yes
| noted | No | |||
R5‑184684 | Update of PRD13 | Samsung | other | Approval | Yes |
Yes
| approved | No | ||||
7.4 | Work Items/ Study Items |   | ||||||||||
7.4.1 | Final version of Work Item Proposals | R5‑185127 | New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE | Airbus DS SLC | WID new | Endorsement | Yes |
Yes
| agreed | No | R5‑184334 | |
R5‑185128 | New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE | Airbus DS SLC | WID new | Endorsement | Yes |
Yes
| agreed | No | R5‑184337 | |||
R5‑185000 | New WID for Rel-16 LTE CA | Ericsson | WID new | Endorsement | Yes |
Yes
| agreed | No | R5‑184432 | |||
7.4.2 | Active Work Items/ Study Item: work plans (wp) / status reports (sr) / Work Item Descriptions (wid) | R5‑184017 | WI Progress and Target Completion Date Review | WG Chairman | other | No |
Yes
| noted | No | |||
R5‑184046 | WP – UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) | Ericsson | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑184047 | SR - UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) | Ericsson | WI status report | Yes |
Yes
| noted | No | |||||
R5‑184049 | WP - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 | Ericsson | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑184050 | SR - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 | Ericsson | WI status report | Yes |
Yes
| noted | No | |||||
R5‑184198 | WP - UE Conformance Test Aspects - Voice and Video Enhancement for LTE | CATT | Work Plan | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184199 | SR - UE Conformance Test Aspects - Voice and Video Enhancement for LTE | CATT | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184200 | WP - UE Conformance Test Aspects - UL Data Compression in LTE | CATT | Work Plan | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184201 | SR - UE Conformance Test Aspects - UL Data Compression in LTE | CATT | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184305 | WP - Support for V2V services based on LTE sidelink | Huawei | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184306 | SR - Support for V2V services based on LTE sidelink | Huawei | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184307 | WP - Support for V2X services | Huawei | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184308 | SR - Support for V2X services | Huawei | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184309 | WP - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell | Huawei | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184310 | SR - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell | Huawei | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184311 | WP - Rel-14 eNB-IoT | Huawei | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184312 | SR - Rel-14 eNB-IoT | Huawei | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184319 | WP - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 (UID-790058) | China Unicom | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑184320 | SR - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 for RAN5#80 | China Unicom | WI status report | Yes |
Yes
| noted | No | |||||
R5‑184321 | SR - LTE_QMC_Streaming-UEConTest (UID-790051) for RAN5#80 | China Unicom | WI status report | Yes |
Yes
| noted | No | |||||
R5‑184328 | WP - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation | Sprint Corporation | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184329 | SR - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation | Sprint Corporation | WI status report | Yes |
Yes
| noted | No | |||||
R5‑184386 | WP UE Conformance Test Aspects - FDD operating band in the L-band for LTE | NTT DOCOMO, INC. | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184387 | SR UE Conformance Test Aspects - FDD operating band in the L-band for LTE | NTT DOCOMO, INC. | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184391 | WP - LTE_QMC_Streaming-UEConTest (UID-790051) | China Unicom | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑184435 | WP UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184436 | SR UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184437 | WP UE Conformance Test Aspects - Rel-13 CA configurations | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184438 | SR UE Conformance Test Aspects - Rel-13 CA configurations | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184439 | WP UE Conformance Test Aspects - Rel-14 CA configurations | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184440 | SR UE Conformance Test Aspects - Rel-14 CA configurations | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184441 | WP UE Conformance Test Aspects - Rel-15 CA configurations | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184442 | SR UE Conformance Test Aspects - Rel-15 CA configurations | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184443 | WP UE Conformance Test Aspects - 5G system with NR and LTE | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184444 | SR UE Conformance Test Aspects - 5G system with NR and LTE | Ericsson | WI status report | Information | No |
Yes
| noted | No | ||||
R5‑184446 | Revised WID on: UE Conformance Test Aspects - 5G system with NR and LTE | Ericsson | WID revised | Endorsement | No |
No
| reserved | No | ||||
R5‑184529 | WP UE Conformance Test Aspects – 5G System Non-3GPP Access | Motorola Mobility | Work Plan | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184530 | SR UE Conformance Test Aspects – 5G System Non-3GPP Access | Motorola Mobility | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184561 | WP - UE Conformance Test Aspects - eHST | CMCC | Work Plan | Yes |
Yes
| revised | No | R5‑185181 | ||||
R5‑185181 | WP - UE Conformance Test Aspects - eHST | CMCC | Work Plan | - | Yes |
Yes
| noted | No | R5‑184561 | |||
R5‑184562 | SR - eHST after RAN5#80 | CMCC | WI status report | Yes |
Yes
| revised | No | R5‑185182 | ||||
R5‑185182 | SR - eHST after RAN5#80 | CMCC | WI status report | - | Yes |
Yes
| noted | No | R5‑184562 | |||
R5‑184592 | WP UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE | Qualcomm Europe Inc. (Spain) | Work Plan | Yes |
Yes
| noted | No | |||||
R5‑184594 | SR UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE | Qualcomm Europe Inc. (Spain) | WI status report | Yes |
Yes
| noted | No | |||||
R5‑184595 | WID Update UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE | Qualcomm Europe Inc. (Spain) | WID revised | Yes |
Yes
| noted | No | |||||
R5‑184609 | SR - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest | NIST | WI status report | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184610 | WP - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest.doc | NIST | Work Plan | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184749 | Revised WID- Support for V2X services | Huawei | WID revised | Endorsement | Yes |
Yes
| noted | No | ||||
R5‑184861 | WP – UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE | Intel Corporation (UK) Ltd | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184862 | SR- UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE | Intel Corporation (UK) Ltd | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184864 | WP – UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements | Intel Corporation (UK) Ltd | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184866 | SR- UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements | Intel Corporation (UK) Ltd | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184893 | WP UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184894 | SR UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184895 | WP UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184896 | SR UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184899 | WP UE Conformance Test Aspects – Further enhanced MTC for LTE | Ericsson | Work Plan | Information | Yes |
Yes
| noted | No | ||||
R5‑184900 | SR UE Conformance Test Aspects – Further enhanced MTC for LTE | Ericsson | WI status report | Information | Yes |
Yes
| noted | No | ||||
R5‑184995 | WP UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE | Qualcomm Inc. | Work Plan | discussion | Yes |
Yes
| noted | No | ||||
R5‑184996 | SR UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE | Qualcomm Inc. | WI status report | discussion | Yes |
Yes
| noted | No | ||||
7.4.3 | Work Plan updates of recently closed work items |   | ||||||||||
7.5 | Docs still needing agreement/endorsement/approval | R5‑184024 | Definition of and test methods for OTA unwanted emissions of IMT radio equipment | ITU-R Working Party 5D | LS in | Information | Yes |
Yes
PCTest will coordinate the responses in RF.
Response back via the RAN plenary will be drafted early during the email agreement week.
R5-185147. | noted | No | ||
R5‑184999 | MCC TF160 Status Report | MCC TF160 | report | Agreement | Yes |
Yes
the task list and funding is endorsed. | approved | No | R5‑184070 | |||
R5‑184115 | Draft TS 38.533 v0.0.2 | ROHDE & SCHWARZ | draft TS | No |
No
| for email approval | No | |||||
R5‑184153 | Draft TS 38.521-1 v1.0.1 | China Unicom | draft TS | No |
Yes
| withdrawn | Yes | |||||
R5‑184154 | Draft TS 38.521-1 v1.0.1 | China Unicom | draft TS | No |
No
| for email approval | No | |||||
R5‑184304 | Draft TR 38.903 v0.3.0 | Huawei,HiSilicon | draft TR | Endorsement | No |
Yes
| withdrawn | Yes | ||||
R5‑184434 | RAN5#80 summary of changes to RAN5 test cases with potential impact on GCF and PTCRB | Ericsson, Samsung | report | Information | No |
Yes
| noted | No | ||||
R5‑184448 | 3GPP RAN5 CA status list (post-RAN5#80 meeting) | Ericsson | other | Information | Yes |
Yes
| noted | No | ||||
R5‑184550 | Draft TS 38.521-2 v0.6.0 | CAICT | draft TS | No |
Yes
| withdrawn | Yes | |||||
R5‑184566 | Draft TS 36.579-7 v0.0.1 | Samsung | draft TS | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184567 | Draft TS 38.522 v1.0.1 | CMCC | draft TS | No |
No
| for email approval | No | |||||
R5‑184571 | Draft TS 36.579-6 v0.0.1 | Samsung | draft TS | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184659 | Draft TS 38.521-3 v0.6.0 | Qualcomm Wireless GmbH | draft TS | Approval | No |
Yes
| withdrawn | Yes | ||||
R5‑184683 | 5G work planning after RAN5#80 | Samsung | other | Endorsement | No |
Yes
will not be maintained any more | withdrawn | Yes | ||||
R5‑184750 | Draft TR 38.905-1 v0.3.0 | Ericsson LM | draft TR | Approval | No |
Yes
wrong spec title | withdrawn | Yes | ||||
R5‑185134 | Draft TR 38.905 v1.0.0 | Ericsson LM | draft TR | Approval | No |
No
| for email approval | No | ||||
R5‑185142 | Draft TS 36.579-6 v0.0.3 | Samsung | draft TS | Approval | Yes |
No
| for email approval | No | ||||
R5‑185143 | Draft TS 36.579-7 v0.0.3 | Samsung | draft TS | Approval | Yes |
No
| for email approval | No | ||||
R5‑185144 | Draft TS 38.521-2 v1.0.0 | Rapp | draft TS | Approval | No |
No
| for email approval | No | ||||
R5‑185145 | Draft TS 38.521-3 v1.0.0 | Rapp | draft TS | Approval | No |
No
| for email approval | No | ||||
R5‑185146 | Draft TR 38.903 v1.0.0 | Rapp | draft TR | Approval | No |
No
| for email approval | No | ||||
R5‑185147 | LS Concerning RAN5 Response to ITU-R Working Party 5D LS on definition of test methods for OTA unwanted emissions of IMT radio equipment | TSG WG RAN5 | LS out | Approval | No |
No
available early in the email agreement week.
for email approval | for email approval | No | ||||
7.6 | Confirmation of Future RAN5 Matters | R5‑184018 | Review deadlines for next quarter | WG Chairman | other | Yes |
Yes
| noted | No | |||
7.7 | AOB |   |