Tdoc List

2018-09-06 11:46

Agenda Topic TDoc Title Source Type For Avail Treated Decision Wdrn Replaced-by Replaces
1.1 Welcoming brief by the host                      
2 Reports                      
2.1 Live Reports R5‑184003 RAN5#80 Session Programme WG Chairman agenda Information Yes
Yes
noted No    
    R5‑184004 RAN5 Leadership Team WG Chairman other Information Yes
Yes
noted No    
    R5‑184005 RAN5#79 WG Minutes ETSI Secretariat report Approval Yes
Yes
approved No    
    R5‑184006 RAN5#79 WG Action Points ETSI Secretariat report   Yes
Yes
AP#78.01j from the joint RAN5#78 was closed last time.
revised No R5‑184998  
    R5‑184998 RAN5#79 WG Action Points ETSI Secretariat report - Yes
Yes
noted No   R5‑184006
    R5‑184007 draft RAN5#80 meeting report ETSI Secretariat report Information No
Yes
noted No    
    R5‑184008 Latest RAN Plenary notes WG Chairman report   Yes
Yes
noted No    
    R5‑184009 Latest RAN Plenary draft Report WG Chairman report   Yes
Yes
noted No    
    R5‑184010 Post Plenary Active Work Item update ETSI Secretariat other Information Yes
Yes
noted No    
    R5‑184070 MCC TF160 Status Report MCC TF160 report Agreement Yes
Yes
GCF will be asked for 4 MM for this year.
revised No R5‑184999  
2.2 General Reports for information R5‑184011 RAN5 SR to RP#80 WG Chairman report Information Yes
Yes
noted No    
    R5‑184012 TF160 SR to RP#80 WG Chairman report Information Yes
Yes
noted No    
    R5‑184013 RAN Chair Report to SA#80 WG Chairman report Information Yes
Yes
noted No    
    R5‑184433 GCF 3GPP TCL after CAG#55 (GCF-CC v3.71.1 vs v3.70.2) Ericsson report Information Yes
Yes
noted No    
    R5‑184447 3GPP RAN5 CA status list (pre-RAN5#80 meeting) Ericsson other Information Yes
Yes
noted No    
3 Incoming Liaison Statements R5‑184023 LS on Introducing optional channel bandwidth TSG WG RAN4 LS in Information Yes
Yes
comments wait for RAN2 action & response
noted No    
    R5‑184027 dummy LS c ETSI Secretariat LS in Information No
Yes
withdrawn Yes    
    R5‑184992 CPWG180802-1 LS on Over-the-Air Radiated Performance Testing for 5G mm-Wave (FR2) User Equipment CTIA 5G Millimeter-Wave OTA Sub-Working Group LS in Information Yes
Yes
CTIA work is aligned with 3GPP.
noted No    
    R5‑184997 LS from 5GAA for rel-15 2 RX vehicle mounted UE 5GAA WG2 LS in Information Yes
Yes
noted No    
4 RAN5 General Issues                      
4.1 New Work Item proposals - for intro only R5‑184432 New WID for Rel-16 LTE CA Ericsson WID new Endorsement Yes
Yes
NTT DOCOMO added.
revised No R5‑185000  
4.2 General Discussion Papers                      
4.2.1 5GS R5‑184449 Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal Ericsson, Sprint, MCC TF160 discussion Endorsement Yes
Yes
Keysight commented that for specific test cases you need particular test frequency definition.
revised No R5‑185001  
4.2.2 All other topics R5‑184537 Proposal for Work Plans BlackBerry discussion Approval Yes
Yes
the proposal is endorsed.
The WP template should be updated.
noted No    
4.3 RAN5 PRDs/Templates R5‑184014 RAN5#80 LS Template WG Chairman other   Yes
Yes
noted No    
    R5‑184015 RAN5 5GS Text Proposal / pCR cover sheet template Ericsson other Information Yes
Yes
noted No    
4.4 Meeting schedule for 2018-19 R5‑184016 Meeting schedule for 2018-19 WG Chairman other   Yes
Yes
noted No    
4.5 Tdocs for mid-week joint session                      
4.5.1 RF group docs for WG review/verdict - original A.I. retained R5‑184739 Update of UE test loop mode E Huawei,HiSilicon, CATT CR Agreement Yes
Yes
no CR#
/*DUPLICATED-REPL*/
Document replicated in two AIs: [5.3.12.2]-[4.5.1].
Conclusion changes to one of the replicas will be replicated to the other.
 
r1 was presented in the joint on Wed.
revised No R5‑185129  
    R5‑185129 Update of UE test loop mode E Huawei,HiSilicon, CATT CR Agreement Yes
Yes
agreed No   R5‑184739
    R5‑185130 Update of UE test loop mode E Huawei,HiSilicon, CATT CR Agreement Yes
Yes
/*DUPLICATED-REPL*/
Document replicated in two AIs: [4.5.1]-[5.3.12.2].
Conclusion changes to one of the replicas will be replicated to the other.
LATE DOCUMENT
shadow CR of R5-185129
   
agreed No    
4.5.2 Sig group docs for WG review/verdict - original A.I. retained R5‑184188 Reuse of demodulation setup for signalling tests in FR2 ANRITSU LTD discussion   Yes
Yes
r1 was presented.
Rohde&schwarz suggested to put into the spec the minimum required.
Deferred.
revised No R5‑185131  
    R5‑185131 Reuse of demodulation setup for signalling tests in FR2 ANRITSU LTD discussion - Yes
Yes
Conclusion: minimum number of distinguishable power levels required for FR2 SIG test cases to be further alayzed and proposed at the next meeting.
noted No   R5‑184188
    R5‑185011 Correction of clause 4.3.3.2.3 Ericsson CR Agreement Yes
Yes
revised No R5‑185133  
    R5‑185133 Correction of clause 4.3.3.2.3 Ericsson CR Agreement Yes
Yes
agreed No   R5‑185011
4.5.3 Other open issues from joint sessions - original A.I. retained R5‑184334 New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE Airbus DS SLC WID new Endorsement Yes
Yes
impact only on RF.
revised No R5‑185127  
    R5‑184337 New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE Airbus DS SLC WID new Endorsement Yes
Yes
revised No R5‑185128  
    R5‑185001 Discussion paper on principles for defining NR test frequencies and selecting associated parameters for SS to signal Ericsson, Sprint, MCC TF160 discussion Endorsement Yes
Yes
noted No   R5‑184449
4.5.4 UE Application Layer Data Throughput Performance TEI11_Test (TR 37.901)                      
4.5.5 GCF Test Optimisation                      
4.5.6 5GS                      
4.5.7 Other                      
5 RF Functional Area                      
5.1 Review action points (fm A.I. 2.1)                      
5.2 Review incoming LS (fm A.I. 3) & new subject discussion papers R5‑184019 LS on Settings for verifying RF requirements for Coherent UL MIMO TSG WG RAN4 LS in Information Yes
Yes
moved to RF.
noted No    
    R5‑184020 LS on generic 3CC to 5CC RRM test cases TSG WG RAN4 LS in Action Yes
Yes
moved to RF.
noted No    
    R5‑184021 Reply LS on the applicable requirements of the Power Class 2 capable UE TSG WG RAN4 LS in Information Yes
Yes
moved to RF.
noted No    
    R5‑184022 LS on Measurement Grids TSG WG RAN4 LS in Information Yes
Yes
moved to RF.
noted No    
    R5‑184025 LS reply on RAN4-RAN5 5G-NR RF pending issues: RMCs, OCNG patterns and FR2 RSRP accuracy TSG WG RAN4 LS in Information Yes
Yes
noted No    
    R5‑184026 LS reply on RAN4-RAN5 5G-NR RF pending issues TSG WG RAN4 LS in Information Yes
Yes
moved to RF.
update from RAN4 Adhoc in July.
noted No    
5.3 Open Work Items                      
5.3.1 Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA (UID - 700064) LTE_UTRA_IncMon-UEConTest                      
5.3.1.1 TS 34.108                      
5.3.1.2 TS 34.121-1                      
5.3.1.3 TS 34.121-2                      
5.3.1.4 TS 36.508 R5‑184502 Addition of antenna diagrams for IncMon RRM test cases Ericsson CR Agreement Yes
Yes
 
Revised to: R5-184502r1.
 
 
Revised from: R5-184502.
Revised to: R5-185454.
 
 
 
revised No R5‑185454  
    R5‑185454 Addition of antenna diagrams for IncMon RRM test cases Ericsson CR Agreement Yes
Yes
agreed No   R5‑184502
    R5‑184515 Addition of message content for RRM IncMon test cases Ericsson CR Agreement Yes
Yes
no source.
Revised to: R5-184515r1.
 
 
Revised from: R5-184515.
Revised to: R5-185455.
 
 
 
revised No R5‑185455  
    R5‑185455 Addition of message content for RRM IncMon test cases Ericsson CR Agreement Yes
Yes
agreed No   R5‑184515
5.3.1.5 TS 36.521-2 R5‑184519 Addition of applicability of RRM IncMon test cases Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184519r1.
 
 
Revised from: R5-184519.
Revised to: R5-185453.
 
 
 
revised No R5‑185453  
    R5‑185453 Addition of applicability of RRM IncMon test cases Ericsson CR Agreement Yes
Yes
agreed No   R5‑184519
5.3.1.6 TS 36.521-3 R5‑184169 Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances Ericsson CR Agreement Yes
Yes
no source on cover.
 
Revised to: R5-184169r1.
 
 
Revised from: R5-184169.
Revised to: R5-184169r2.
 
 
Revised from: R5-184169r1.
Revised to: R5-185346.
 
 
 
Revised from: R5-184169r2.
 
Revised to: R5-185485.
 
 
 
revised No R5‑185485  
    R5‑185485 Update of RRM IncMon test cases 8.3.7, 8.3.8, 8.3.9, 8.4.7 including test tolerances Ericsson CR Agreement Yes
Yes
agreed No   R5‑184169
    R5‑184589 Addition of RRM IncMon new Test Case 8.4.8 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184589r1.
 
 
Revised from: R5-184589.
Revised to: R5-185457.
 
 
 
revised No R5‑185457  
    R5‑185457 Addition of RRM IncMon new Test Case 8.4.8 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184589
    R5‑184590 Addition of RRM IncMon new Test Case 8.4.9 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184590r1.
 
 
Revised from: R5-184590.
Revised to: R5-185458.
 
 
 
revised No R5‑185458  
    R5‑185458 Addition of RRM IncMon new Test Case 8.4.9 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184590
    R5‑184716 Addition of RRM IncMon new Test Case 8.5.8 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184716r1.
 
 
Revised from: R5-184716.
Revised to: R5-185459.
 
 
 
revised No R5‑185459  
    R5‑185459 Addition of RRM IncMon new Test Case 8.5.8 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184716
    R5‑184717 Addition of RRM IncMon new Test Case 8.6.3 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184717r1.
 
 
Revised from: R5-184717.
Revised to: R5-185460.
 
 
 
revised No R5‑185460  
    R5‑185460 Addition of RRM IncMon new Test Case 8.6.3 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184717
    R5‑184718 Addition of RRM IncMon new Test Case 8.7.5 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184718r1.
 
 
Revised from: R5-184718.
Revised to: R5-185461.
 
 
 
revised No R5‑185461  
    R5‑185461 Addition of RRM IncMon new Test Case 8.7.5 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184718
    R5‑184719 Addition of RRM IncMon new Test Case 8.7A.1 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184719r1.
 
 
Revised from: R5-184719.
Revised to: R5-185462.
 
 
 
revised No R5‑185462  
    R5‑185462 Addition of RRM IncMon new Test Case 8.7A.1 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184719
    R5‑184720 Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184720r1.
 
 
Revised from: R5-184720.
Revised to: R5-185463.
 
 
 
revised No R5‑185463  
    R5‑185463 Addition of RRM IncMon new Test Cases 4.2.1 and 4.2.11 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184720
    R5‑184721 Addition of RRM IncMon new Test Case 4.3.1.5 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184721r1.
 
 
Revised from: R5-184721.
Revised to: R5-185464.
 
 
 
revised No R5‑185464  
    R5‑185464 Addition of RRM IncMon new Test Case 4.3.1.5 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184721
    R5‑184722 Addition of RRM IncMon new Test Case 4.3.2A Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184722r1.
 
 
Revised from: R5-184722.
Revised to: R5-185465.
 
 
 
revised No R5‑185465  
    R5‑185465 Addition of RRM IncMon new Test Case 4.3.2A Ericsson CR Agreement Yes
Yes
agreed No   R5‑184722
    R5‑184723 Addition of RRM IncMon new Test Case 4.3.3A Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184723r1.
 
 
Revised from: R5-184723.
Revised to: R5-185466.
 
 
 
revised No R5‑185466  
    R5‑185466 Addition of RRM IncMon new Test Case 4.3.3A Ericsson CR Agreement Yes
Yes
agreed No   R5‑184723
    R5‑184724 Addition of RRM IncMon new Test Case 4.3.4.4 Ericsson CR Agreement Yes
Yes
no source
 
Revised to: R5-184724r1.
 
 
Revised from: R5-184724.
Revised to: R5-185467.
 
 
 
revised No R5‑185467  
    R5‑185467 Addition of RRM IncMon new Test Case 4.3.4.4 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184724
5.3.1.7 TR 36.903 (E-UTRAN RRM TT analyses) R5‑184171 TC Group definition for RRM IncMon test cases Ericsson CR Agreement Yes
Yes
no source on cover.
 
Revised to: R5-184171r1.
 
 
Revised from: R5-184171.
Revised to: R5-185456.
 
 
 
revised No R5‑185456  
    R5‑185456 TC Group definition for RRM IncMon test cases Ericsson CR Agreement Yes
Yes
agreed No   R5‑184171
    R5‑184172 Add Test Tolerances analysis for E-UTRAN RRM IncMon TCs 8.3.7 and 8.4.7 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184173 Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.8 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184174 Add Test Tolerances analysis for E-UTRAN IncMon TC 8.3.9 Ericsson CR Agreement Yes
Yes
agreed No    
5.3.1.8 General Papers / Work Plan / TC lists                      
5.3.2 Rel-13 LTE CA configurations (UID - 700065) LTE_CA_Rel13-UEConTest                      
5.3.2.1 TS 36.508 R5‑184237 Correction to Figure A.64 to cater for CC >= 3 Anritsu CR Agreement Yes
Yes
 
Revised to: R5-184237r1.
 
 
Revised from: R5-184237.
Revised to: R5-185449.
 
 
 
revised No R5‑185449  
    R5‑185449 Correction to Figure A.64 to cater for CC >= 3 Anritsu CR Agreement Yes
Yes
agreed No   R5‑184237
    R5‑184282 Update of test frequencies for CA_42A-42A Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.2.2 TS 36.521-1 R5‑184065 Resubmission of Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) ETSI MCC (SGS Wireless) CR Agreement Yes
Yes
already covered by R5-184842
withdrawn Yes    
    R5‑184240 Correction to cqi-pmi-ConfigurationIndex for 5DL CA CQI Reporting tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184241 Correction to message exception for 8.2.1.4.2_A.4 Anritsu CR Agreement Yes
Yes
 
Revised to: R5-184241r1.
 
 
Revised from: R5-184241.
Revised to: R5-185450.
 
 
 
revised No R5‑185450  
    R5‑185450 Correction to message exception for 8.2.1.4.2_A.4 Anritsu CR Agreement Yes
Yes
agreed No   R5‑184241
    R5‑184247 Correction to 4CA and 5CA PDSCH demodulation tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184248 Corrections to CA Test Configuration Table in section 7 Anritsu CR Agreement Yes
Yes
 
Revised to: R5-184248r1.
 
 
Revised from: R5-184248.
Revised to: R5-185452.
 
 
 
revised No R5‑185452  
    R5‑185452 Corrections to CA Test Configuration Table in section 7 Anritsu CR Agreement Yes
Yes
agreed No   R5‑184248
    R5‑184250 Correction to Test Tolerance for 4DL and 5DL Reference Sensitivity Test Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184252 Correction of connection diagram for 4Rx 3CC/4CC/5CC Rx tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184254 Editorial correction to test points for CA_2A-12A-66A in 7.3A.5 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184283 Correction of test configuration of CA_20A-42A REFSENS Huawei,HiSilicon CR Agreement Yes
Yes
 
Revised to: R5-184283r1.
 
 
Revised from: R5-184283.
Revised to: R5-185493.
 
 
 
revised No R5‑185493  
    R5‑185493 Correction of test configuration of CA_20A-42A REFSENS Huawei,HiSilicon CR Agreement Yes
Yes
agreed No   R5‑184283
    R5‑184284 Update of 7.3A.5 REFSENS for Rel-13 CA configurations Huawei,HiSilicon CR Agreement Yes
Yes
 
Revised to: R5-184284r1.
 
 
Revised from: R5-184284.
Revised to: R5-185494.
 
 
 
revised No R5‑185494  
    R5‑185494 Update of 7.3A.5 REFSENS for Rel-13 CA configurations Huawei,HiSilicon CR Agreement Yes
Yes
agreed No   R5‑184284
    R5‑184285 Addition of REFSENS test configuration of CA_1A-3A-7A-8A Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184385 Update of TC 6.6.2.3A.4 Adjacent Channel Leakage power Ratio for CA (3UL CA) CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184388 Update of TC 6.6.3.1A.4 Transmitter Spurious emissions for CA ( 3UL CA) CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184412 Update to test case 6.5.2A.1.4 for 3UL CA KTL CR Agreement Yes
Yes
agreed No    
    R5‑184413 Update to test case 6.5.2A.2.4 for 3UL CA KTL CR Agreement Yes
Yes
agreed No    
    R5‑184414 Update to test case 6.5.2A.3.4 for 3UL CA KTL CR Agreement Yes
Yes
agreed No    
    R5‑184415 Update to test case 7.6.3A.8 and 7.8.1A.8 for 5DL CA KTL CR Agreement Yes
Yes
agreed No    
    R5‑184416 Cleanning up SDR test cases for 4CC and 5CC using UL RMC KTL CR Agreement Yes
Yes
agreed No    
    R5‑184539 Update of DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 SRTC CR Agreement Yes
Yes
agreed No    
    R5‑184585 Updated test requirement to RF clause 7 test cases for CA band Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑184601 Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) 7LAYERS GmbH CR Agreement Yes
Yes
 
Revised to: R5-184601r1.
 
 
Revised from: R5-184601.
Revised to: R5-185538.
 
 
 
revised No R5‑185538  
    R5‑185538 Introduction of new test case TC 6.2.5A.4 Configured UE transmitted Output Power for CA (3UL CA) 7LAYERS GmbH CR Agreement Yes
Yes
agreed No   R5‑184601
    R5‑184602 Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) 7LAYERS GmbH CR Agreement Yes
Yes
 
Revised to: R5-184602r1.
 
 
Revised from: R5-184602.
Revised to: R5-185539.
 
 
 
revised No R5‑185539  
    R5‑185539 Introduction of new test case TC 6.6.2.1A.4 Spectrum emission mask for CA (3UL CA) 7LAYERS GmbH CR Agreement Yes
Yes
agreed No   R5‑184602
    R5‑184604 Introduction of new test case TC 6.6.2.2A.4 Additional Spectrum Emission Mask for CA (3UL CA) 7LAYERS GmbH CR Agreement Yes
Yes
agreed No    
    R5‑184605 Update of test case TC 6.6.1A.4 “Occupied bandwidth for CA (3DL CA and 3UL CA)” 7LAYERS GmbH CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184606 Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" 7LAYERS GmbH CR Agreement Yes
Yes
 
Revised to: R5-184606r1.
 
 
Revised from: R5-184606.
Revised to: R5-185540.
 
 
 
revised No R5‑185540  
    R5‑185540 Update of test case TC 6.7A.4 "Transmit intermodulation for CA (3DL CA and 3UL CA)" 7LAYERS GmbH CR Agreement Yes
Yes
agreed No   R5‑184606
    R5‑184639 CA_1A-3A-26A(1UL) –Updates of 7.3A.5 REFSENS KDDI Corporation CR Agreement Yes
Yes
agreed No    
    R5‑184832 Addition of Test point and test requirements for CA_3A-41A, 41A-42A,3A-42A spurious test cases Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑184840 Update of TX Minimum Ouput Power for CA (3UL CA) SGS Wireless CR Agreement Yes
Yes
agreed No    
    R5‑184841 Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) SGS Wireless CR Agreement Yes
Yes
 
Revised to: R5-184841r1.
 
 
Revised from: R5-184841.
Revised to: R5-185508.
 
 
 
revised No R5‑185508  
    R5‑185508 Introduction of Additional Maximum Power Reduction (A-MPR) for CA (3UL CA) SGS Wireless CR Agreement Yes
Yes
agreed No   R5‑184841
    R5‑184842 Introduction of Maximum Power Reduction (MPR) for CA (3UL CA) SGS Wireless CR Agreement Yes
Yes
agreed No    
    R5‑184843 Introduction of General ON/OFF time mask for CA (3UL CA) SGS Wireless CR Agreement Yes
Yes
 
Revised to: R5-184843r1.
 
 
Revised from: R5-184843.
Revised to: R5-185509.
 
 
 
revised No R5‑185509  
    R5‑185509 Introduction of General ON/OFF time mask for CA (3UL CA) SGS Wireless CR Agreement Yes
Yes
agreed No   R5‑184843
    R5‑184988 Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 CGC Inc. CR Agreement Yes
Yes
/*DUPLICATED-REPL*/
Document replicated in two AIs: [5.3.2.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Replaces R5-184903 because of wrong spec
 
 r1 was presented on Fri in the joint.
revised No R5‑185175  
    R5‑185175 Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 CGC Inc. CR Agreement Yes
Yes
agreed No   R5‑184988
5.3.2.3 TS 36.521-2 R5‑184086 Applicability and ICS for CA RF and RRM test cases Ericsson CR Agreement No
Yes
LATE DOCUMENT
replaced by R5-184906 to updated WIC
 
withdrawn Yes    
    R5‑184286 Addition of multiple CA configurations to capability tables in TS 36.521-2 Huawei,HiSilicon CR Agreement Yes
Yes
merged into common CR R5-185442
withdrawn Yes    
    R5‑184542 Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 SRTC CR Agreement Yes
Yes
 
Revised to: R5-184542r1.
 
 
Revised from: R5-184542.
Revised to: R5-185488.
 
 
 
revised No R5‑185488  
    R5‑185488 Applicability for DL256QAM RF test cases 7.4A.7_H,7.4A.8_H,8.7.1.1_H.4 and 8.7.1.1_H.5 SRTC CR Agreement Yes
Yes
Revised from: R5-184542r1.
merged into common CR R5-185442
withdrawn Yes   R5‑184542
    R5‑184846 Additional of test applicability for CA (3UL CA) SGS Wireless CR Agreement Yes
Yes
merged into common CR R5-185442
withdrawn Yes    
    R5‑184903 Update 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 CGC Inc. CR Agreement Yes
Yes
reissued as R5-184988 as wrong spec
withdrawn Yes    
    R5‑184906 Add 3UL CA test cases 6.2.2A.4 and 6.5.1A.4 in 36.521-2 CGC Inc. CR Agreement Yes
Yes
R5merged into R5-184846
withdrawn Yes    
    R5‑185442 Applicability and ICS for CA RF and RRM test cases Bureau Veritas, Ericsson LM, KT Corp., Vodafone GmbH, Huawei,HiSilicon, SRTC, KDDI Corporation, SGS Wireless, CGC Inc. CR Agreement Yes
Yes
late doc
agreed No    
5.3.2.4 TS 36.521-3 R5‑184102 Editorial corrections 8.16.73 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184103 Editorial corrections 9.1.46 ROHDE & SCHWARZ CR Agreement Yes
Yes
revised No R5‑185483  
    R5‑185483 Editorial corrections 9.1.46 ROHDE & SCHWARZ CR Agreement Yes
Yes
Revised from: R5-184103.
There is a reference to E-5 which should be E-6 and one +TT which should be removed
agreed No   R5‑184103
    R5‑184104 Editorial corrections 9.1.50 ROHDE & SCHWARZ CR Agreement Yes
Yes
revised No R5‑185484  
    R5‑185484 Editorial corrections 9.1.50 ROHDE & SCHWARZ CR Agreement Yes
Yes
Revised from: R5-184104.
There is a reference to E-5 which should be E-6 and one +TT which should be removed
agreed No   R5‑184104
    R5‑184107 New generic CA RSRP test cases ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184108 New generic CA RSRQ test cases ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184256 Correction to 5CA FDD-TDD Chapter 8 Tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184259 Correction to connection figure for 4 DL and 5 DL CA Event Triggered Reporting tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184260 Correction to cell configuration mapping table for 8.16.70 and 8.16.78 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184868 New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
wrong spec on title!
all tables & headers wrong!
 
New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes
Revised to: R5-184868r1.
 
 
Revised from: R5-184868.
Revised to: R5-184868r2.
 
 
Revised from: R5-184868r1.
Revised to: R5-185544.
 
 
 
revised No R5‑185544  
    R5‑185544 New TC 8.16.83: 3 DL CA Event Triggered Reporting under Deactivated SCells in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
agreed No   R5‑184868
    R5‑184870 New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
wrong spec on title!
all tables & headers wrong!
 
New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes
Revised to: R5-184870r1.
 
 
Revised from: R5-184870.
Revised to: R5-184870r2.
 
 
Revised from: R5-184870r1.
Revised to: R5-185545.
 
 
 
 
revised No R5‑185545  
    R5‑185545 New TC 8.16.84: 3 DL CA Event Triggered Reporting on Deactivated SCell with PCell and SCell Interruptions in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
agreed No   R5‑184870
    R5‑184871 New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
wrong spec on title!
all tables & headers wrong!
 
New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes
Revised to: R5-184871r1.
 
 
Revised from: R5-184871.
Revised to: R5-184871r2.
 
 
Revised from: R5-184871r1.
Revised to: R5-184871r3.
 
 
Revised from: R5-184871r2.
Revised to: R5-185546.
 
 
 
revised No R5‑185546  
    R5‑185546 New TC 8.16.85: 3 DL CA Activation and Deactivation of Known SCell in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
agreed No   R5‑184871
    R5‑184873 New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
 
LATE DOCUMENT
New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes
Revised to: R5-184873r1.
 
 
LATE DOCUMENT
Revised from: R5-184873.
Revised to: R5-184873r2.
 
 
LATE DOCUMENT
Revised from: R5-184873r1.
Revised to: R5-184873r3.
 
 
LATE DOCUMENT
Revised from: R5-184873r2.
 
Revised to: R5-185547.
 
 
 
revised No R5‑185547  
    R5‑185547 New TC 8.16.86: 3 DL CA Activation and Deactivation of Unknown SCell in Non-DRX with generic duplex modes Intel Corporation (UK) Ltd CR Agreement Yes
Yes
LATE DOCUMENT
Revised from: R5-184873r3.
 
Document was sent FOR E-MAIL AGREEMENT
agreed No   R5‑184873
5.3.2.5 TS 37.571-1                      
5.3.2.6 TS 37.571-3                      
5.3.2.7 TS 37.571-5                      
5.3.2.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.2.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.2.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) R5‑184277 Update of TP analysis of CA_3A-7A-8A Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184278 Addition of TP analysis of CA_1A-7A-8A in 36.905 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184279 Addition of TP analysis of CA_1A-3A-7A-8A in 36.905 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184280 Addition of TP analysis of CA_7A-42A-42A in 36.905 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184281 Addition of TP analysis of CA_20A-42A-42A in 36.905 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184638 CA_1A-3A-26A(1UL) - Updates of test points analysis KDDI Corporation CR Agreement Yes
Yes
agreed No    
    R5‑184833 Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184833r1.
 
 
Revised from: R5-184833.
Revised to: R5-185437.
 
 
 
revised No R5‑185437  
    R5‑185437 Test point and test requirements analysis for CA_3A-41A, 41A-42A,3A-42A spurious test cases Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184833
5.3.2.11 General Papers / Work Plan / TC lists R5‑184766 Optimization of test configuration table for Rx CA test cases NTT DOCOMO, INC. discussion Endorsement Yes
Yes
 
Revised to: R5-184766r1.
 
 
Revised from: R5-184766.
Revised to: R5-185513.
 
 
 
revised No R5‑185513  
    R5‑185513 Optimization of test configuration table for Rx CA test cases NTT DOCOMO, INC. discussion Endorsement Yes
Yes
noted No   R5‑184766
5.3.3 WLAN/3GPP Radio Level Integration and Interworking Enhancements (UID - 710070) LTE_WLAN_radio-UEConTest                      
5.3.3.1 TS 36.508                      
5.3.3.2 TS 36.521-2                      
5.3.3.3 TS 36.521-3                      
5.3.3.4 General Papers / Work Plan / TC lists                      
5.3.4 Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest                      
5.3.4.1 TS 36.508                      
5.3.4.2 TS 36.521-1 R5‑184117 New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens Vodafone GmbH CR Agreement Yes
Yes
 
Revised to: R5-184117r1.
 
 
Revised from: R5-184117.
Revised to: R5-185343.
 
 
 
revised No R5‑185343  
    R5‑185343 New CA band combination CA_1A-3A-7A-20A - Update of table 7.3A.5, 7.3A.9 and refsens Vodafone GmbH CR Agreement Yes
Yes
agreed No   R5‑184117
    R5‑184249 Editorial correction to Table 6.2.5.3-3 Delta TIB (three bands) Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184839 Update of TDD PDSCH Closed Loop Multi Layer Multiplexing 4x2 for CA (5DL CA) SGS Wireless CR Agreement Yes
Yes
agreed No    
    R5‑184989 Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. CGC Inc. CR Agreement Yes
Yes
/*DUPLICATED-REPL*/
Document replicated in two AIs: [5.3.4.2]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
Replaces R5-184911 because of wrong spec
 
   
revised No R5‑185176  
    R5‑185176 Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. CGC Inc. CR Agreement Yes
Yes
agreed No   R5‑184989
    R5‑184993 Addition of test points for UL-CA_2A-12A in TC 6.3.2A.2 Dekra CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184994 Addition of test points for UL-CA_2A-12A in TC 6.3.5A.2.2 Dekra CR Agreement Yes
Yes
withdrawn Yes    
    R5‑185330 Addition of test points for UL-CA_4A-12A in TC 6.3.2A.2 DEKRA CR discussion Yes
Yes
late doc
agreed No    
    R5‑185331 Addition of test points for UL-CA_4A-12A in TC 6.3.5A.2.2 DEKRA CR discussion Yes
Yes
late doc
agreed No    
5.3.4.3 TS 36.521-2 R5‑184118 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 Vodafone GmbH CR Agreement Yes
Yes
 
Revised to: R5-184118r1.
 
 
Revised from: R5-184118.
Revised to: R5-185344.
 
 
 
revised No R5‑185344  
    R5‑185344 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.6.3-5 Vodafone GmbH CR Agreement No
Yes
Revised from: R5-184118r1.
meged into common CR R5-185442
withdrawn Yes   R5‑184118
    R5‑184765 Introduction CA_3A-7A-20A-32A 4DL/1UL to Annex A Ericsson LM CR Agreement Yes
Yes
merged into common CR R5-185442
withdrawn Yes    
    R5‑184911 Update to test configuration tables and requirement tables for 12A-66A 2ULCA test cases. CGC Inc. CR Agreement Yes
Yes
reissued as R5-184989 because of wrong spec
withdrawn Yes    
5.3.4.4 TS 36.521-3 R5‑184288 Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 Huawei,HiSilicon CR Agreement Yes
Yes
revised No R5‑185342  
    R5‑185342 Editorial cleaning up of Rel-14 CA 5DL RSRP measurement TC 9.1.51 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No   R5‑184288
    R5‑184421 Update to RRM test case 8.16.70 and 8.16.74 for 5DL CA KTL CR Agreement Yes
Yes
agreed No    
5.3.4.5 TS 37.571-1                      
5.3.4.6 TS 37.571-3                      
5.3.4.7 TS 37.571-5                      
5.3.4.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.4.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.4.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) R5‑184120 New CA band combination CA_1A-3A-7A-20A - Update of test point analysis Vodafone GmbH CR Agreement Yes
Yes
 
Revised to: R5-184120r1.
 
 
Revised from: R5-184120.
Revised to: R5-185345.
 
 
 
revised No R5‑185345  
    R5‑185345 New CA band combination CA_1A-3A-7A-20A - Update of test point analysis Vodafone GmbH CR Agreement Yes
Yes
agreed No   R5‑184120
5.3.4.11 General Papers / Work Plan / TC lists                      
5.3.5 Support for V2V services based on LTE sidelink (UID - 730073) LTE_SL_V2V-UEConTest                      
5.3.5.1 TS 36.508                      
5.3.5.2 TS 36.509                      
5.3.5.3 TS 36.521-1 R5‑184064 Resubmission of a change of Cleaning up TC 6.5.2.4G.1 for V2V ETSI MCC (Huawei, Hisilicon) CR Agreement Yes
Yes
This is the resubmission of one forgotten change of the approved R5-183789 CR# 4197 rev 1.
withdrawn Yes    
    R5‑184066 Resubmission of the Annexes of TC 6.5.2.3G.1 for V2V ETSI MCC (Huawei, Hisilicon) CR Agreement Yes
Yes
This is the resubmission of the Annexes addition of the approved R5-183879 CR#4195 rev.1.
agreed No    
    R5‑184181 Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184181r1.
 
 
Revised from: R5-184181.
Revised to: R5-185354.
 
 
 
revised No R5‑185354  
    R5‑185354 Update of V2V TCs 6.5.2.3G.1 & 6.5.2.4G & 6.6.2.2G.1& 6.6.3G.1 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184181
    R5‑184418 Update to test case 6.3.2G.1 for V2V services based on LTE sidelink KTL CR Agreement Yes
Yes
 
Revised to: R5-184418r1.
 
 
Revised from: R5-184418.
Revised to: R5-185355.
 
 
 
revised No R5‑185355  
    R5‑185355 Update to test case 6.3.2G.1 for V2V services based on LTE sidelink KTL CR Agreement Yes
Yes
agreed No   R5‑184418
    R5‑184653 Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions LG Electronics CR Agreement Yes
Yes
 
Revised to: R5-184653r1.
 
 
Revised from: R5-184653.
Revised to: R5-185356.
 
 
 
revised No R5‑185356  
    R5‑185356 Update of Additional Maximum Power Reduction (A-MPR) for V2X Communication / Non-concurrent with E-UTRA uplink transmissions LG Electronics CR Agreement Yes
Yes
agreed No   R5‑184653
    R5‑184660 Update to Maximum Power Reduction (MPR) for V2X Communication / Power class 3 / Contiguous allocation of PSCCH and PSSCH / Non-concurrent with E-UTRA uplink transmissions LG Electronics. CR Agreement Yes
Yes
late doc
agreed No    
    R5‑184662 Update to Annex G for V2V/V2X Demod Perf tests Qualcomm Wireless GmbH CR Agreement Yes
Yes
 
Revised to: R5-184662r1.
 
 
Revised from: R5-184662.
Revised to: R5-185357.
 
 
 
revised No R5‑185357  
    R5‑185357 Update to Annex G for V2V/V2X Demod Perf tests Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑184662
    R5‑184728 Update of TC7.6.2G.1 Out-of-band blocking for V2X Communication CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184729 Update of TC 7.8.1G.1 Wide band Intermodulation for V2X CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184733 Update of TC7.9G Spurious emissions for V2X CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184740 Update of multiple V2V RF test cases for proper test mode setting Huawei,HiSilicon CR Agreement Yes
Yes
 
Revised to: R5-184740r1.
 
 
Revised from: R5-184740.
Revised to: R5-184740r2.
 
 
Revised from: R5-184740r1.
Revised to: R5-185358.
 
 
 
revised No R5‑185358  
    R5‑185358 Update of multiple V2V RF test cases for proper test mode setting Huawei,HiSilicon CR Agreement Yes
Yes
agreed No   R5‑184740
5.3.5.4 TS 36.521-2                      
5.3.5.5 TS 36.521-3                      
5.3.5.6 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.5.7 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.5.8 General Papers / Work Plan / TC lists                      
5.3.6 LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell (UID - 730074) LTE_CA_enh_b5C_PUCCH-UEConTest                      
5.3.6.1 TS 36.508                      
5.3.6.2 TS 36.521-2 R5‑184294 Addition of test applicability for Rel-13 B5C new TC 8.16.47-50 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.6.3 TS 36.521-3 R5‑184289 Addition of Rel-13 B5C new TC 8.16.47 Huawei,HiSilicon, Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑184290 Addition of Rel-13 B5C new TC 8.16.48 Huawei,HiSilicon, Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑184291 Addition of Rel-13 B5C new TC 8.16.49 Huawei,HiSilicon, Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑184292 Addition of Rel-13 B5C new TC 8.16.50 Huawei,HiSilicon, Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑184293 Update of Annex E and Annex F to add cell mapping and TT for 8.16.47-50 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.6.4 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.6.5 General Papers / Work Plan / TC lists                      
5.3.7 Enhanced LAA for LTE (UID - 730075) LTE_eLAA-UEConTest                      
5.3.7.1 TS 36.508                      
5.3.7.2 TS 36.521-1 R5‑184194 eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 Tejet CR Agreement Yes
Yes
 
Revised to: R5-184194r1.
 
 
Revised from: R5-184194.
Revised to: R5-185431.
 
 
 
revised No R5‑185431  
    R5‑185431 eLAA_correction to 6.3.5A.1.2 and 6.3.5A.2.2 Tejet CR Agreement Yes
Yes
agreed No   R5‑184194
    R5‑184195 eLAA_Update to 6.6.2.3A.2 Tejet CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184196 eLAA_Update to 6.6.3.1A.2 Tejet CR Agreement Yes
Yes
 
Revised to: R5-184196r1.
 
 
Revised from: R5-184196.
Revised to: R5-185432.
 
 
 
revised No R5‑185432  
    R5‑185432 eLAA_Update to 6.6.3.1A.2 Tejet CR Agreement Yes
Yes
agreed No   R5‑184196
    R5‑184694 eLAA: Updates to Adjacent Channel Leakage power Ratio for CA Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
 
Revised to: R5-184694r1.
 
 
Revised from: R5-184694.
Revised to: R5-184694r2.
 
 
Revised from: R5-184694r1.
Revised to: R5-185433.
 
 
 
revised No R5‑185433  
    R5‑185433 eLAA: Updates to Adjacent Channel Leakage power Ratio for CA Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184694
5.3.7.3 TS 36.521-2                      
5.3.7.4 TS 36.521-3                      
5.3.7.5 TR 36.905 R5‑184197 CA band combination CA_2A-46A CA_26A-46A - Updates of test points analysis Tejet CR Agreement Yes
Yes
agreed No    
5.3.7.6 General Papers / Work Plan / TC lists                      
5.3.8 Interference Mitigation for Downlink Control Channels of LTE (UID - 750051) LTE_IM_DLCCH-UEConTest                      
5.3.8.1 TS 36.508                      
5.3.8.2 TS 36.521-1                      
5.3.8.3 TS 36.521-2                      
5.3.8.4 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.8.5 General Papers / Work Plan / TC lists                      
5.3.9 Performance enhancements for high speed scenario in LTE (UID - 750056) LTE_high_speed-UEConTest                      
5.3.9.1 TS 36.508                      
5.3.9.2 TS 36.521-1                      
5.3.9.3 TS 36.521-2                      
5.3.9.4 TS 36.521-3 R5‑184151 Test tolerance update of eHST FDD event reporting test case Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No    
5.3.9.5 TR 36.903 (E-UTRAN RRM TT analyses) R5‑184148 Addition of TT analysis of eHST FDD Intra-frequency event reporting. Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
Rel, ver, cl. Affected wrong.
Revised to: R5-185424.
 
revised No R5‑185424  
    R5‑185424 Addition of TT analysis of eHST FDD Intra-frequency event reporting. Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184148
5.3.9.6 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.9.7 UE Application Layer Data Throughput Performance (TR 37.901)                      
5.3.9.8 General Papers / Work Plan / TC lists                      
5.3.10 4 Rx antenna ports with CA for LTE DL (UID - 750058) LTE_4Rx_AP_DL_CA-UEConTest                      
5.3.10.1 TS 36.508                      
5.3.10.2 TS 36.521-1 R5‑184239 Correction to 4x4 CA demodulation tests Anritsu CR Agreement Yes
Yes
 
Revised to: R5-184239r1.
 
 
Revised from: R5-184239.
r1: Overlap with R5-184417(TT related changes in 8.13.1.1.3, 8.13.1.1.4 and Annex F) is removed
Revised to: R5-185375.
 
 
 
revised No R5‑185375  
    R5‑185375 Correction to 4x4 CA demodulation tests Anritsu CR Agreement Yes
Yes
agreed No   R5‑184239
    R5‑184243 Removal of the editor’s note regarding the faders in 4x4 CA demod tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184316 Update of TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑184317 Update of TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑184417 Update to Performance test cases for LTE DL CA 4 Rx antenna ports KTL CR Agreement Yes
Yes
agreed No    
    R5‑184695 Resubmission of update of TC8.13.3.6.1 and 8.13.3.6.2 ETSI MCC (TTA) CR Agreement Yes
Yes
This is a resubmission of the Annexes addition of the approved R5-183275, CR#3991
agreed No    
    R5‑184798 Corrections to 4Rx demodulation TCs Rohde & Schwarz CR Agreement Yes
Yes
Document was sent FOR E-MAIL AGREEMENT
 
after discussions with Anritsu further clarifications are required
withdrawn Yes    
5.3.10.3 TS 36.521-2 R5‑184905 Add a new test condition for test case 8.13.3.1.2.5. CGC Inc. CR Agreement Yes
Yes
source R5
Agenda Allocation was changed: [5.3.10]->[5.3.10.3].
Revised to: R5-184905r1.
 
 
Revised from: R5-184905.
Revised to: R5-185376.
 
 
 
revised No R5‑185376  
    R5‑185376 Add a new test condition for test case 8.13.3.1.2.5. CGC Inc. CR Agreement Yes
Yes
agreed No   R5‑184905
5.3.10.4 TS 36.521-3                      
5.3.10.5 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.10.6 TR 36.904 (E-UTRAN Radio Reception TT analyses) R5‑184314 Update of Test Tolerance analyses for TDD-FDD CA PDSCH Closed Loop Single Layer Spatial Multiplexing 2x4 with TM4 Interference Model-Enhanced Performance Requirement Type A (2DL CA) LG Electronics CR Agreement Yes
Yes
agreed No    
    R5‑184315 Update of Test Tolerance analyses for TDD-FDD CA PDSCH Single-layer Spatial Multiplexing 2x4 on antenna ports 7 or 8 with TM9 Interference Model-Enhanced Performance Requirement Type A (2DL CA) LG Electronics CR Agreement Yes
Yes
agreed No    
5.3.10.7 General Papers / Work Plan / TC lists                      
5.3.11 Requirements for a new UE category 1bis with single receiver based on category 1 for LTE (UID - 760085) LTE_UE_cat_1RX-UEConTest                      
5.3.11.1 TS 36.508                      
5.3.11.2 TS 36.521-1 R5‑184374 Update of TC 8.9.1.2.2_1 TDD PDSCH Closed Loop Single Layer Spatial Multiplexing for UE category 1bis CAICT CR Agreement Yes
Yes
re-submission from RAN5#79 R5-183824
agreed No    
    R5‑184874 TS 36.521-1 Annex F update for UE cat 1bis test cases Qualcomm Incorporated CR Agreement Yes
Yes
Revised to: R5-184874r1.
Revised to: R5-185377.
 
 
 
revised No R5‑185377  
    R5‑185377 TS 36.521-1 Annex F update for UE cat 1bis test cases Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184874
    R5‑184876 LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
 
Revised to: R5-184876r1.
 
 
Revised from: R5-184876.
Revised to: R5-185378.
 
 
 
revised No R5‑185378  
    R5‑185378 LTE_New test case LTE_New test case 6.3.4EB ONOFF time mask for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184876
    R5‑184877 LTE_New test case 6.3.5EB Power Control for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
 
Revised to: R5-184877r1.
 
 
Revised from: R5-184877.
r1: Correected change marks; Corrected clause number 6.3.3EB.1  , it should be 6.3.4EB.1
 
Revised to: R5-185379.
 
 
 
revised No R5‑185379  
    R5‑185379 LTE_New test case 6.3.5EB Power Control for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184877
    R5‑184878 LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
Revised to: R5-185382.
6.2.2EB title shall completed removed from the CR, no change needed
revised No R5‑185382  
    R5‑185382 LTE_New test case 6.3.3EB UE Transmit OFF power for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184878
    R5‑184879 LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
 
Revised to: R5-184879r1.
 
 
Revised from: R5-184879.
r1: deleted table 6.3.2EB.4.1-1 and refer to main section as they are the same
Revised to: R5-185380.
 
 
 
revised No R5‑185380  
    R5‑185380 LTE_New test case 6.3.2EB Minimum Output Power for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184879
    R5‑184880 LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
Revised to: R5-185383.
same issue as R5-184878
revised No R5‑185383  
    R5‑185383 LTE_New test case 6.2.5EB Configured UE transmitted Power for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184880
    R5‑184881 LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
 
Revised to: R5-184881r1.
 
 
Revised from: R5-184881.
r1: corrected wrongly marked deletion of 6.2.3EB
Revised to: R5-185381.
 
 
 
revised No R5‑185381  
    R5‑185381 LTE_New test case 6.2.4EB Additional Maximum Power Reduction (A-MPR) for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184881
    R5‑184885 LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
Revised to: R5-185384.
change and change need to remove
revised No R5‑185384  
    R5‑185384 LTE_New test case 6.2.3EB Maximum Power Reduction (MPR) for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184885
    R5‑184886 LTE_New test case 6.2.2EB UE Maximum Output Power for UE category 1bis Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184935 Cat1bis new RF test case: Occupied bandwidth for UE category 1bis Qualcomm Austria CR Agreement Yes
Yes
agreed No    
    R5‑184936 Cat1bis new RF test case: Spectrum Emission Mask for UE category 1bis Qualcomm Austria CR Agreement Yes
Yes
agreed No    
    R5‑184937 Cat1bis new RF test case: Additional Spectrum Emission Mask for UE category 1bis Qualcomm Austria CR Agreement Yes
Yes
agreed No    
    R5‑184938 Cat1bis new RF test case: Adjacent Channel Leakage power Ratio for UE category 1bis Qualcomm Austria CR Agreement Yes
Yes
agreed No    
    R5‑184939 Cat1bis new RF test case: Spurious emission for UE category 1bis Qualcomm Austria CR Agreement Yes
Yes
agreed No    
    R5‑184940 Cat1bis new RF test case: Transmit intermodulation for UE category 1bis Qualcomm Austria CR Agreement Yes
Yes
Revised to: R5-185385.
 
revised No R5‑185385  
    R5‑185385 Cat1bis new RF test case: Transmit intermodulation for UE category 1bis Qualcomm Austria CR Agreement Yes
Yes
agreed No   R5‑184940
5.3.11.3 TS 36.521-2 R5‑184980 Cat1bis test cases applicability Qualcomm Austria RFFE GmbH CR Agreement Yes
Yes
agreed No    
    R5‑184982 Resubmission of Cat1bis applicability CR ETSI MCC (Qualcomm Korea, Bureau Veritas, Rohde & Schwarz, CATR) CR Agreement Yes
Yes
agreed No    
5.3.11.4 TS 36.521-3 R5‑184106 RMC correction 8.1.12_1 (core spec alignment) ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184165 Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
Revised to: R5-185391.
 
revised No R5‑185391  
    R5‑185391 Test Tolerance: Updates to Cat1bis inter frequency RSRP accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184165
    R5‑184166 Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
Revised to: R5-185392.
 
revised No R5‑185392  
    R5‑185392 Test Tolerance: Updates to Cat1bis inter frequency RSRQ accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184166
    R5‑184167 Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
Revised to: R5-185393.
 
revised No R5‑185393  
    R5‑185393 Test Tolerance: Updates to Cat1bis intra frequency RSRP accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184167
    R5‑184168 Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
Revised to: R5-185394.
 
revised No R5‑185394  
    R5‑185394 Test Tolerance: Updates to Cat1bis intra frequency RSRQ accuracy tests and Annex F Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184168
    R5‑184202 Completion of Chapter 7 RRM cat 1bis test cases Qualcomm UK Ltd CR Agreement Yes
Yes
RRM missing in coversheet title!
Revised to: R5-185386.
 
revised No R5‑185386  
    R5‑185386 Completion of Chapter 7 RRM cat 1bis test cases Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184202
    R5‑184203 Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑184205 Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑184207 Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑184209 Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No    
    R5‑184211 Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F Qualcomm UK Ltd CR Agreement Yes
Yes
Revised to: R5-185337.
 
revised No R5‑185337  
    R5‑185337 Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184211
    R5‑184375 Introduction of TC 6.1.1_2 E-UTRAN FDD Intra-frequency RRC Re-establishment for UE Category 1bis CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184376 Introduction of TC 6.1.2_2 E-UTRAN FDD Inter-frequency RRC Re-establishment for UE Category 1bis CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184377 Introduction of TC 6.1.3_2 E-UTRAN TDD Intra-frequency RRC Re-establishment for UE Category 1bis CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184378 Introduction of TC 6.1.4_2 E-UTRAN TDD Inter-frequency RRC Re-establishment for UE Category 1bis CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184379 Annex E,F RRM Cat1bis 6.1.x tests CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184925 Test Tolerance: Updates to Cat1bis chapter 8 inter-frequency event triggered reporting tests Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184927 Test Tolerance: Updates to Cat1bis Event triggered reporting tests under AWGN propagation conditions in asynchronous cells with DRX when L3 filtering is used Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184929 Test Tolerance: Updates to Cat1bis Event triggered reporting tests with fading, Annex E and Annex F Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184931 Test Tolerance: Updates to Cat1bis intra-frequency Event triggered reporting tests, Annex E and Annex F Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184933 Test Tolerance: Updates to Cat1bis intra-frequency CGI Event triggered reporting tests, Annex E and Annex F Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
5.3.11.5 TS 37.571-1                      
5.3.11.6 TS 37.571-3                      
5.3.11.7 TS 37.571-5                      
5.3.11.8 TR 36.903 (E-UTRAN RRM TT analyses) R5‑184147 Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel-15 on cover!
revised No R5‑185395  
    R5‑185395 Test Tolerance Analysis for RRM TC 9.1.1.1_2 and 9.1.2.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184147
    R5‑184155 Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185396  
    R5‑185396 Test Tolerance Analysis for RRM TC 9.1.1.2_2 and 9.1.2.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184155
    R5‑184156 Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185397  
    R5‑185397 Test Tolerance Analysis for RRM TC 9.1.3.1_2 and 9.1.4.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184156
    R5‑184157 Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185398  
    R5‑185398 Test Tolerance Analysis for RRM TC 9.1.3.2_2 and 9.1.4.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184157
    R5‑184158 Test Tolerance Analysis for RRM TC 9.1.5.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185399  
    R5‑185399 Test Tolerance Analysis for RRM TC 9.1.5.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184158
    R5‑184159 Test Tolerance Analysis for RRM TC 9.1.5.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185400  
    R5‑185400 Test Tolerance Analysis for RRM TC 9.1.5.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184159
    R5‑184160 Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 Qualcomm Europe Inc. (Spain) CR Agreement No
Yes
withdrawn Yes    
    R5‑184161 Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185401  
    R5‑185401 Test Tolerance Analysis for RRM TC 9.2.3.1_2 and 9.2.4.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184161
    R5‑184162 Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185402  
    R5‑185402 Test Tolerance Analysis for RRM TC 9.2.3.2_2 and 9.2.4.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184162
    R5‑184163 Test Tolerance Analysis for RRM TC 9.2.4A.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185403  
    R5‑185403 Test Tolerance Analysis for RRM TC 9.2.4A.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184163
    R5‑184164 Test Tolerance Analysis for RRM TC 9.2.4A.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185404  
    R5‑185404 Test Tolerance Analysis for RRM TC 9.2.4A.2_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184164
    R5‑184185 Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
wrong Rel. On cover.
revised No R5‑185405  
    R5‑185405 Test Tolerance Analysis for RRM TC 9.2.1.1_2 and 9.2.2.1_2 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184185
    R5‑184204 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184206 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184208 Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184210 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184212 Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
    R5‑184926 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis Qualcomm UK Ltd CR Agreement Yes
Yes
wrong Rel on cover
revised No R5‑185338  
    R5‑185338 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.1_2, 8.3.2_2, 8.4.1_2, 8.4.2_2 and 8.4.6_2 for UE category 1bis Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184926
    R5‑184928 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used Qualcomm UK Ltd CR Agreement Yes
Yes
doc was 0kB.
revised No R5‑185339  
    R5‑185339 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD inter-frequency TC 8.3.3_2 and 8.4.3_2 for UE category 1bis when L3 filtering is used Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184928
    R5‑184930 Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis Qualcomm UK Ltd CR Agreement Yes
Yes
wrong Rel on cover
revised No R5‑185340  
    R5‑185340 Test Tolerances analysis for E-UTRAN FDD-FDD intra-frequency event triggered reporting under fading propagation conditions in asynchronous cells for UE category 1bis Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184930
    R5‑184932 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis Qualcomm UK Ltd CR Agreement Yes
Yes
wrong Rel on cover
revised No R5‑185341  
    R5‑185341 Test Tolerances analysis for E-UTRAN FDD-FDD and TDD-TDD intra-frequency TC 8.1.12_2, 8.1.13_2, 8.1.17_2, 8.1.18_2 for UE category 1bis Qualcomm UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184932
    R5‑184934 Test Tolerances analysis for E-UTRAN FDD and TDD Intra-frequency CGI TC 8.1.19_2, 8.1.20_2, 8.2.7_2, 8.2.8_2 for UE category 1bis Qualcomm UK Ltd CR Agreement No
Yes
withdrawn Yes    
5.3.11.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.11.10 General Papers / Work Plan / TC lists                      
5.3.12 Support for LTE-based V2X Services (UID - 760086) LTE_V2X-UEConTest                      
5.3.12.1 TS 36.508 R5‑184268 Cleaning up the default message contents and test states of V2X Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
5.3.12.2 TS 36.509                      
5.3.12.3 TS 36.521-1 R5‑184177 Updation of V2X TC 6.6.2.1G.2 & 6.6.2.1G.3 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑184178 Introcution of V2X TC 6.5.2.4G.3 Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184178r1.
 
 
Revised from: R5-184178.
Revised to: R5-185438.
 
 
 
revised No R5‑185438  
    R5‑185438 Introcution of V2X TC 6.5.2.4G.3 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184178
    R5‑184179 Updation of V2X TC 6.6.2.2G.2 Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184179r1.
 
 
Revised from: R5-184179.
Revised to: R5-185439.
 
 
 
revised No R5‑185439  
    R5‑185439 Updation of V2X TC 6.6.2.2G.2 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184179
    R5‑184180 Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184180r1.
 
 
Revised from: R5-184180.
Revised to: R5-185440.
 
 
 
revised No R5‑185440  
    R5‑185440 Updation of V2X TCs 6.5.2.3G.2 and 6.5.2.3G.3 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184180
    R5‑184182 TT statements for V2X TCs Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184182r1.
 
 
Revised from: R5-184182.
Revised to: R5-185441.
 
 
 
revised No R5‑185441  
    R5‑185441 TT statements for V2X TCs Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184182
    R5‑184183 Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184183r1.
 
 
Revised from: R5-184183.
r1: removed the overlap
Revised to: R5-185360.
 
 
 
revised No R5‑185360  
    R5‑185360 Update of V2X TCs 6.6.3G.2_1 & 6.6.3G.3_1 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184183
    R5‑184184 Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184184r1.
 
 
Revised from: R5-184184.
Revised to: R5-185361.
 
 
 
revised No R5‑185361  
    R5‑185361 Update of V2X TCs 6.6.3G.2 & 6.6.3G.3 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184184
    R5‑184193 Correction to 36521-1-chapter 6_V2V and V2X Tejet CR Agreement Yes
Yes
 
Revised to: R5-184193r1.
 
 
Revised from: R5-184193.
Revised to: R5-185362.
 
 
 
revised No R5‑185362  
    R5‑185362 Correction to 36521-1-chapter 6_V2V and V2X Tejet CR Agreement Yes
Yes
agreed No   R5‑184193
    R5‑184267 Cleaning up V2X test cases in TS 36.521-1 Huawei,HiSilicon CR Agreement Yes
Yes
 
Revised to: R5-184267r1.
 
 
Revised from: R5-184267.
Revised to: R5-185363.
 
 
 
revised No R5‑185363  
    R5‑185363 Cleaning up V2X test cases in TS 36.521-1 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No   R5‑184267
    R5‑184419 Update to test case 6.3.2G.2 for LTE-based V2X Services KTL CR Agreement Yes
Yes
Revised to: R5-184419r1.
 Revised to: R5-185364.
revised No R5‑185364  
    R5‑185364 Update to test case 6.3.2G.2 for LTE-based V2X Services KTL CR Agreement Yes
Yes
agreed No   R5‑184419
    R5‑184420 Update to test case 6.3.2G.3 for LTE-based V2X Services KTL CR Agreement Yes
Yes
Revised to: R5-184420r1.
Revised to: R5-185365.
 
 
 
revised No R5‑185365  
    R5‑185365 Update to test case 6.3.2G.3 for LTE-based V2X Services KTL CR Agreement Yes
Yes
agreed No   R5‑184420
    R5‑184540 Update MU and TT of V2X test case 6.5.1G.2 Frequency error for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184544 Update of V2X test case 6.7G.2 SRTC CR Agreement Yes
Yes
 
Revised to: R5-184544r1.
 
 
Revised from: R5-184544.
Revised to: R5-185366.
 
 
 
revised No R5‑185366  
    R5‑185366 Update of V2X test case 6.7G.2 SRTC CR Agreement Yes
Yes
agreed No   R5‑184544
    R5‑184545 Addition of new TC 6.6.2.3G.2 SRTC CR Agreement Yes
Yes
 
Revised to: R5-184545r1.
 
 
Revised from: R5-184545.
Revised to: R5-185367.
 
 
 
revised No R5‑185367  
    R5‑185367 Addition of new TC 6.6.2.3G.2 SRTC CR Agreement Yes
Yes
agreed No   R5‑184545
    R5‑184546 Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CAICT CR Agreement Yes
Yes
 
Revised to: R5-184546r1.
 
 
Revised from: R5-184546.
Revised to: R5-185368.
 
 
 
revised No R5‑185368  
    R5‑185368 Introduction of new V2X test case 6.5.2.1G.2 Error Vector Magnitude (EVM) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions CAICT CR Agreement Yes
Yes
agreed No   R5‑184546
    R5‑184548 Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation CAICT CR Agreement Yes
Yes
 
Revised to: R5-184548r1.
 
 
Revised from: R5-184548.
Revised to: R5-185369.
 
 
 
revised No R5‑185369  
    R5‑185369 Introduction of new V2X test case 6.5.2.1G.3 Error Vector Magnitude (EVM) for V2X Communication / Intra-band contiguous multi-carrier operation CAICT CR Agreement Yes
Yes
agreed No   R5‑184548
    R5‑184655 Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions LG Electronics CR Agreement Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-184655r1.
 
 
LATE DOCUMENT
Revised from: R5-184655.
Revised to: R5-185370.
 
 
 
revised No R5‑185370  
    R5‑185370 Update to Additional Maximum Power Reduction (A-MPR) for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions LG Electronics CR Agreement Yes
Yes
agreed No   R5‑184655
    R5‑184656 Update to Configured UE transmitted Output Power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmission LG Electronics CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184657 Update to UE Transmit OFF power for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions LG Electronics. CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184658 Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions LG Electronics. CR Agreement Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-184658r1.
 
 
LATE DOCUMENT
Revised from: R5-184658.
r1: Undeleted the editor’s note because of conflict the Huawei’s CR 4372
Revised to: R5-185535.
 
 
 
revised No R5‑185535  
    R5‑185535 Update to General ON/OFF time mask for V2X Communication / Simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions LG Electronics. CR Agreement Yes
Yes
agreed No   R5‑184658
    R5‑184776 Updates to Align Initial Conditions with Other V2X Test Cases PCTEST Engineering Lab CR Agreement Yes
Yes
Revised to: R5-185371.
 
revised No R5‑185371  
    R5‑185371 Updates to Align Initial Conditions with Other V2X Test Cases PCTEST Engineering Lab CR Agreement Yes
Yes
agreed No   R5‑184776
    R5‑184848 Update of V2X Receiver Test Cases SGS Wireless CR Agreement Yes
Yes
 
Revised to: R5-184848r1.
 
 
Revised from: R5-184848.
Revised to: R5-185372.
 
 
 
revised No R5‑185372  
    R5‑185372 Update of V2X Receiver Test Cases SGS Wireless CR Agreement Yes
Yes
agreed No   R5‑184848
5.3.12.4 TS 36.521-2 R5‑184269 Addition of test applicabilities of multiple V2X test cases Huawei,HiSilicon CR Agreement Yes
Yes
cases missing on cover title.
 
Revised to: R5-184269r1.
 
 
Revised from: R5-184269.
Revised to: R5-185374.
 
 
 
revised No R5‑185374  
    R5‑185374 Addition of test applicabilities of multiple V2X test cases Huawei,HiSilicon CR Agreement Yes
Yes
agreed No   R5‑184269
    R5‑184654 Update to applicability V2X communication test cases for simultaneous E-UTRA V2X sidelink and E-UTRA uplink transmissions LG Electronics CR Agreement Yes
Yes
conflicted with R5-185374
withdrawn Yes    
5.3.12.5 TS 36.521-3 R5‑184034 Correction of GNSS information for V2X tests Spirent Communications, European Commission CR Agreement No
Yes
withdrawn Yes    
    R5‑184035 Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 Spirent Communications, European Commission CR Agreement No
Yes
withdrawn Yes    
    R5‑184039 Correction of GNSS information for V2X tests Spirent Communications, European Commission CR Agreement Yes
Yes
 
Revised to: R5-184039r1.
 
 
Revised from: R5-184039.
r1: removed TC11.2.4 of GNSS usage is no needed
Revised to: R5-185536.
 
 
 
revised No R5‑185536  
    R5‑185536 Correction of GNSS information for V2X tests Spirent Communications, European Commission CR Agreement Yes
Yes
agreed No   R5‑184039
    R5‑184040 Deletion of Conditions for GNSS Reliability Requirements for V2X from Annex I.6 Spirent Communications, European Commission CR Agreement Yes
Yes
agreed No    
    R5‑184150 Test tolerance update of V2X uplink timing test cases Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
 
Revised to: R5-184150r1.
 
 
Revised from: R5-184150.
Revised to: R5-185554.
 
 
 
revised No R5‑185554  
    R5‑185554 Test tolerance update of V2X uplink timing test cases Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184150
    R5‑184273 Addition of V2X new TC 12.2.1 Huawei,HiSilicon, Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑184274 Addition of V2X new TC 12.2.2 Huawei,HiSilicon, Rohde & Schwarz CR Agreement Yes
Yes
RAN4 dependency
 
Document was sent FOR E-MAIL AGREEMENT
 
r1 was produced.
revised No R5‑185184  
    R5‑185184 Addition of V2X new TC 12.2.2 Huawei,HiSilicon, Rohde & Schwarz CR Agreement No
Yes
Email agreed
agreed No   R5‑184274
    R5‑184275 Addition of V2X new TC 12.4 Huawei,HiSilicon, Rohde & Schwarz CR Agreement Yes
Yes
merged into to R5-184847
withdrawn Yes    
    R5‑184276 Update of Annex F for TC 12.2.1, 12.2.2 and 12.4 Huawei,HiSilicon, Anritsu, Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑184847 Update of V2X RRM SGS Wireless CR Agreement Yes
Yes
 
Revised to: R5-184847r1.
 
 
Revised from: R5-184847.
r1: Update editor’s note; test purpose, applicability of requirements, minimum conformance requirements, initial condition & test procedure
 
 
Revised to: R5-185373.
 
 
 
revised No R5‑185373  
    R5‑185373 Update of V2X RRM SGS Wireless, Huawei CR Agreement Yes
Yes
agreed No   R5‑184847
5.3.12.6 TR 36.903 (E-UTRAN RRM TT analyses) R5‑184149 Addition of TT analysis of V2X uplink timing test case Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
Rel, ver, cl. Affected wrong.
 
revised No R5‑185425  
    R5‑185425 Addition of TT analysis of V2X uplink timing test case Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184149
    R5‑184270 Addition of TT analysis of V2X TC 12.2.1 Huawei,HiSilicon, Anritsu, Rohde & Schwarz CR Agreement No
Yes
withdrawn Yes    
    R5‑184271 Addition of TT analysis of V2X TC 12.2.2 Huawei,HiSilicon, Anritsu, Rohde & Schwarz CR Agreement No
Yes
withdrawn Yes    
    R5‑184272 Addition of TT analysis of V2X TC 12.4 Huawei,HiSilicon, Anritsu, Rohde & Schwarz CR Agreement No
Yes
withdrawn Yes    
    R5‑184409 Addition of TT analysis of V2X TC 12.2.1 Huawei,HiSilicon, Anritsu, Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑184410 Addition of TT analysis of V2X TC 12.2.2 Huawei,HiSilicon, Anritsu, Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑184411 Addition of TT analysis of V2X TC 12.4 Huawei,HiSilicon, Anritsu, Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
5.3.12.7 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.12.8 TR 36.905 R5‑184821 Inter-band con-current V2X configurations- Updates of test points analysis Huawei, Hisilicon CR Agreement Yes
Yes
associated CR R5-184184
agreed No    
5.3.12.9 General Papers / Work Plan / TC lists                      
5.3.13 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest                      
5.3.13.1 TS 38.508-1 R5‑184296 Update of test frequencies of Band n41 and n77 Huawei,HiSilicon CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184297 Addition of Mid channel bandwidth definition for several missing bands Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184327 Adding condition for CP-OFDM waveform Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184330 Adding support for test SCS definition Ericsson CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184450 Introduction of test frequencies for NR band n1 Ericsson CR Agreement Yes
Yes
revised No R5‑185250  
    R5‑185250 Introduction of test frequencies for NR band n1 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184450
    R5‑184451 Introduction of test frequencies for NR band n2 Ericsson CR Agreement Yes
Yes
revised No R5‑185251  
    R5‑185251 Introduction of test frequencies for NR band n2 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184451
    R5‑184452 Introduction of test frequencies for NR band n3 Ericsson CR Agreement Yes
Yes
revised No R5‑185252  
    R5‑185252 Introduction of test frequencies for NR band n3 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184452
    R5‑184453 Introduction of test frequencies for NR band n5 Ericsson CR Agreement Yes
Yes
revised No R5‑185253  
    R5‑185253 Introduction of test frequencies for NR band n5 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184453
    R5‑184454 Introduction of test frequencies for NR band n7 Ericsson CR Agreement Yes
Yes
revised No R5‑185254  
    R5‑185254 Introduction of test frequencies for NR band n7 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184454
    R5‑184455 Introduction of test frequencies for NR band n8 Ericsson CR Agreement Yes
Yes
revised No R5‑185255  
    R5‑185255 Introduction of test frequencies for NR band n8 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184455
    R5‑184456 Introduction of test frequencies for NR band n12 Ericsson CR Agreement Yes
Yes
revised No R5‑185256  
    R5‑185256 Introduction of test frequencies for NR band n12 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184456
    R5‑184457 Introduction of test frequencies for NR band n20 Ericsson CR Agreement Yes
Yes
revised No R5‑185257  
    R5‑185257 Introduction of test frequencies for NR band n20 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184457
    R5‑184458 Introduction of test frequencies for NR band n25 Ericsson CR Agreement Yes
Yes
revised No R5‑185258  
    R5‑185258 Introduction of test frequencies for NR band n25 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184458
    R5‑184459 Introduction of test frequencies for NR band n28 Ericsson CR Agreement Yes
Yes
revised No R5‑185259  
    R5‑185259 Introduction of test frequencies for NR band n28 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184459
    R5‑184460 Introduction of test frequencies for NR band n34 Ericsson CR Agreement Yes
Yes
revised No R5‑185260  
    R5‑185260 Introduction of test frequencies for NR band n34 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184460
    R5‑184461 Introduction of test frequencies for NR band n38 Ericsson CR Agreement Yes
Yes
revised No R5‑185261  
    R5‑185261 Introduction of test frequencies for NR band n38 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184461
    R5‑184462 Introduction of test frequencies for NR band n39 Ericsson CR Agreement Yes
Yes
revised No R5‑185262  
    R5‑185262 Introduction of test frequencies for NR band n39 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184462
    R5‑184463 Introduction of test frequencies for NR band n40 Ericsson CR Agreement Yes
Yes
revised No R5‑185263  
    R5‑185263 Introduction of test frequencies for NR band n40 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184463
    R5‑184464 Update of test frequencies for NR band n41 Ericsson, Sprint CR Agreement Yes
Yes
revised No R5‑185264  
    R5‑185264 Update of test frequencies for NR band n41 Ericsson, Sprint CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184464
    R5‑184465 Introduction of test frequencies for NR band n51 Ericsson CR Agreement Yes
Yes
revised No R5‑185265  
    R5‑185265 Introduction of test frequencies for NR band n51 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184465
    R5‑184466 Introduction of test frequencies for NR band n66 Ericsson, Dish Network CR Agreement Yes
Yes
revised No R5‑185266  
    R5‑185266 Introduction of test frequencies for NR band n66 Ericsson, Dish Network CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184466
    R5‑184467 Introduction of test frequencies for NR band n70 Ericsson, Dish Network CR Agreement Yes
Yes
revised No R5‑185267  
    R5‑185267 Introduction of test frequencies for NR band n70 Ericsson, Dish Network CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184467
    R5‑184468 Update of test frequencies for NR band n71 Ericsson, Dish Network CR Agreement Yes
Yes
revised No R5‑185268  
    R5‑185268 Update of test frequencies for NR band n71 Ericsson, Dish Network CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184468
    R5‑184469 Introduction of test frequencies for NR band n75 Ericsson CR Agreement Yes
Yes
revised No R5‑185269  
    R5‑185269 Introduction of test frequencies for NR band n75 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184469
    R5‑184470 Introduction of test frequencies for NR band n76 Ericsson CR Agreement Yes
Yes
revised No R5‑185270  
    R5‑185270 Introduction of test frequencies for NR band n76 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No   R5‑184470
    R5‑184471 Introduction of test frequencies for NR band n77 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No    
    R5‑184472 Introduction of test frequencies for NR band n78 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No    
    R5‑184473 Introduction of test frequencies for NR band n79 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No    
    R5‑184474 Introduction of test frequencies for NR band n257 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No    
    R5‑184475 Introduction of test frequencies for NR band n258 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No    
    R5‑184476 Introduction of test frequencies for NR band n260 Ericsson, Bureau Veritas CR Agreement Yes
Yes
block agreed on Fri.
agreed No    
    R5‑184477 Introduction of test frequencies for NR band n261 Ericsson CR Agreement Yes
Yes
block agreed on Fri.
agreed No    
    R5‑184486 Correction to power level for FR1 RF tests Anritsu CR Agreement Yes
Yes
 
Revised to: R5-184486r1.
 
 
Revised from: R5-184486.
r1: Signal level for 90MHz BW is added.
Revised to: R5-184486r2.
 
 
Revised from: R5-184486r1.
 
r2 : Typo corrected in the titles of Table 5.2.1.1-1, 5.2.1.1-2
 
the same content is present in 38.521-1 Annex C.0 , need offline to align the tables if possible and keep it in one spec
 
Revised to: R5-184486r3.
 
 
Revised from: R5-184486r2.
r3: Removed the contents of 5.2.1.1. Add statement that DL signal level is defined in repsecive test speficiation
Revised to: R5-185443.
 
 
 
revised No R5‑185443  
    R5‑185443 Correction to power level for FR1 RF tests Anritsu CR Agreement Yes
Yes
agreed No   R5‑184486
    R5‑184806 Mid test CH BW for n71 Dish Network CR Agreement Yes
Yes
Mid test CH BW for n71 changed to 10 MHz
agreed No    
    R5‑184909 FR2_UE_BeamlockProcedure_38.508-1 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
changed title: "UE Beamlock test Function Procedures for 38.508-1"
no CR#, no Tdoc #
 
Revised to: R5-184909r1.
 
 
Revised from: R5-184909.
 
Add UE Beamlock test function procdures to 38.508-1
r1 produced to fix 3GU Issues
KEYS needs more time to understand the UE BEAM Lock parameter and the call flow to see if any other way can be used to handle this
Revised to: R5-184909r2.
 
 
Revised from: R5-184909r1.
 
Revised to: R5-185557.
 
 
 
 
revised No R5‑185557  
    R5‑185557 FR2_UE_BeamlockProcedure_38.508-1 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
Revised from: R5-184909r2.
 
Document was sent FOR E-MAIL AGREEMENT
 
agreed No   R5‑184909
5.3.13.2 TS 38.508-2                      
5.3.13.3 TS 38.509 R5‑184908 FR2_UE_BeamlockMode_IE_38.509 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
changed title: "Beamlock Mode IE definition for Beamlock messages in 38.509"
no CR#, no Tdoc #
 
Revised to: R5-184908r1.
associated pCR R5-184373, R5-184810
 
Revised to: R5-184908r2.
Revised to: R5-185523.
 
 
 
revised No R5‑185523  
    R5‑185523 FR2_UE_BeamlockMode_IE_38.509 Qualcomm Europe Inc. (Spain) CR Agreement Yes
Yes
agreed No   R5‑184908
5.3.13.4 TS 38.521-1 R5‑184085 TP to TS38.521-1:Operating bands and channel arrangement China Unicom pCR Approval Yes
Yes
Revised to: R5-184085r1.
Revised to: R5-185321.
 
 
 
revised No R5‑185321  
    R5‑185321 TP to TS38.521-1:Operating bands and channel arrangement China Unicom pCR Approval Yes
Yes
approved No   R5‑184085
    R5‑184152 TP to TS8.521-1: Operating bands and Channel arrangement China Unicom pCR Approval No
Yes
withdrawn Yes    
    R5‑184298 Update of common uplink configuration in 6.1 Huawei,HiSilicon pCR Approval Yes
Yes
approved No    
    R5‑184299 Update of FR1 test case 6.2.1 Huawei,HiSilicon pCR Approval Yes
Yes
 
Revised to: R5-184299r1.
 
 
Revised from: R5-184299.
Revised to: R5-185305.
 
 
 
revised No R5‑185305  
    R5‑185305 Update of FR1 test case 6.2.1 Huawei,HiSilicon pCR Approval Yes
Yes
approved No   R5‑184299
    R5‑184300 Addition of FR1 test case 6.2.4 Huawei,HiSilicon pCR Approval Yes
Yes
Revised to: R5-185322.
 
revised No R5‑185322  
    R5‑185322 Addition of FR1 test case 6.2.4 Huawei,HiSilicon pCR Approval Yes
Yes
approved No   R5‑184300
    R5‑184301 Update of FR1 test case 6.3.1 Huawei,HiSilicon pCR Approval Yes
Yes
Revised to: R5-185323.
 
revised No R5‑185323  
    R5‑185323 Update of FR1 test case 6.3.1 Huawei,HiSilicon pCR Approval Yes
Yes
approved No   R5‑184301
    R5‑184302 Update of FR1 test case 6.3.3.2 Huawei,HiSilicon pCR Approval Yes
Yes
 
Revised to: R5-184302r1.
need more disucssion on TT for ON power since there is no min requirmeent for ON power , one option is to use open loop power tolerance (9dB) , or check the min req for power tolerance test and add TT to that (6dB?), update editors notes
 
 
Revised from: R5-184302.
need more disucssion on TT for ON power since there is no min requirmeent for ON power , one option is to use open loop power tolerance (9dB) , or check the min req for power tolerance test and add TT to that (6dB?), update editors notes
Revised to: R5-185495.
 
 
 
revised No R5‑185495  
    R5‑185495 Update of FR1 test case 6.3.3.2 Huawei,HiSilicon pCR Approval Yes
Yes
Revised from: R5-184302r1.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184302
    R5‑184392 Updates of FR1 TRx MU in Annex F NTT DOCOMO, INC. pCR Approval Yes
Yes
 
FR1_MU
Revised to: R5-184392r1.
revise to update MU for the sections from this meeitng contributions
 
 
Revised from: R5-184392.
associated with R5-184484
Revised to: R5-185444.
 
 
 
revised No R5‑185444  
    R5‑185444 Updates of FR1 TRx MU in Annex F NTT DOCOMO, INC. pCR Approval Yes
Yes
approved No   R5‑184392
    R5‑184395 Updates of FR1 TRx TT in Annex F NTT DOCOMO, INC. pCR Approval Yes
Yes
 
FR1_TT
to update contents with TT from other CR in this meeting
 
Revised to: R5-184395r1.
 
 
Revised from: R5-184395.
depends on R5-184068
Revised to: R5-185565.
 
 
 
revised No R5‑185565  
    R5‑185565 Updates of FR1 TRx TT in Annex F NTT DOCOMO, INC. pCR Approval Yes
Yes
agreed No   R5‑184395
    R5‑184479 Update to FR1 test case 6.5.4 Transmit intermodulation KTL pCR Approval Yes
Yes
 
change step3 to include time to skip rather than skipping transient period , add editors note for SA message contents, remove MU/TT editor note and include TT=0 in the test reuqirement , check initial condition TBD and update
 
Revised to: R5-184479r1.
 
 
Revised from: R5-184479.
r1: Removing initial condition and MU, TT in the editor’s note; No changes on TDD transient periods and remain the editor’s note; Adding editor’s note for SA message contents; Co-source company is added
 
Revised to: R5-185445.
 
 
 
revised No R5‑185445  
    R5‑185445 Update to FR1 test case 6.5.4 Transmit intermodulation KTL, MTCC pCR Approval Yes
Yes
approved No   R5‑184479
    R5‑184490 Introduction of TC 7.6.3 Out-of-band blocking CAICT pCR Approval Yes
Yes
 
Revised to: R5-184490r1.
 
 
Revised from: R5-184490.
 
revised to remove editors note for MU/TT , add RAn4 clarity for UL Power level editors note , add message contents TBD for SA in editors note
Revised to: R5-184490r2.
 
 
Revised from: R5-184490r1.
Revised to: R5-185524.
 
 
 
revised No R5‑185524  
    R5‑185524 Introduction of TC 7.6.3 Out-of-band blocking CAICT pCR Approval Yes
Yes
approved No   R5‑184490
    R5‑184572 General clauses updated for TS38.521-1 Bureau Veritas pCR Approval Yes
Yes
approved No    
    R5‑184573 DL and UL RMC updated for FR1 tests Bureau Veritas pCR Approval Yes
Yes
Revised to: R5-184573r1.
pending disucssion on ANNEX structure
Revised to: R5-185390.
 
 
 
revised No R5‑185390  
    R5‑185390 DL and UL RMC updated for FR1 tests Bureau Veritas pCR Approval Yes
Yes
approved No   R5‑184573
    R5‑184574 Downlink physical channel updated for FR1 tests Huawei, Bureau Veritas pCR Approval Yes
Yes
C.0 content is pending discussions
approved No    
    R5‑184575 OCNG Patterns updated for FR1 tests Bureau Veritas pCR Approval Yes
Yes
 
RAN4 dependency
Revised to: R5-184575r1.
 
 
Revised from: R5-184575.
add R4 tdoc infomration and remove highlighting and we wait for RAn4
Revised to: R5-185521.
 
 
 
revised No R5‑185521  
    R5‑185521 OCNG Patterns updated for FR1 tests Bureau Veritas pCR Approval Yes
Yes
approved No   R5‑184575
    R5‑184754 TP for updating test case 6.2.3 UE AMPR Ericsson LM pCR Approval Yes
Yes
 
revised to change editors note for SA , add test configiuration table title with NS_35, message contents for NS_35 to be referred with a look up value
 
Revised to: R5-184754r1.
 
 
Revised from: R5-184754.
change editor's note for SA, test configuration table, title, NS_35
Revised to: R5-185408.
 
 
 
revised No R5‑185408  
    R5‑185408 TP for updating test case 6.2.3 UE AMPR Ericsson LM pCR Approval Yes
Yes
approved No   R5‑184754
    R5‑184755 TP for updating test case 6.5.2.3 Additional spectrum emission mask Ericsson LM pCR Approval Yes
Yes
withdrawn Yes    
    R5‑184822 Addition of notes for half pi-BPSK test applicability Huawei, Hisilicon pCR Approval Yes
Yes
approved No    
    R5‑184823 Introduction of 6.2C.1 Configured transmitted power for SUL Huawei, Hisilicon pCR Approval Yes
Yes
 
Revised to: R5-184823r1.
 
 
Revised from: R5-184823.
change section number as it is already existing, update editors note to remove TBD's, check with MOP for SUL needs to be tested
Revised to: R5-185446.
 
 
 
revised No R5‑185446  
    R5‑185446 Introduction of 6.2C.1 Configured transmitted power for SUL Huawei, Hisilicon pCR Approval Yes
Yes
approved No   R5‑184823
    R5‑184824 Addition of Uplink Physical Channels in Annex Huawei, Hisilicon pCR Approval Yes
Yes
Revised to: R5-185324.
 
revised No R5‑185324  
    R5‑185324 Addition of Uplink Physical Channels in Annex Huawei, Hisilicon pCR Approval Yes
Yes
approved No   R5‑184824
    R5‑184825 Addition of downlink physicanl channels in annex Huawei, Hisilicon pCR Approval No
Yes
late doc
withdrawn Yes    
    R5‑184859 5G_NR FR1_Text_update for_RX_sensitivity Qualcomm Incorporated pCR Approval Yes
Yes
 
Revised to: R5-184859r1.
various comments , add test requirement table for deltaRIB, update ANNEX C.0 to reflect the offline discussions, remove [] in annex C, add editors note for SA messages, replace the table for adding 90MHz column
 
 
Revised from: R5-184859.
Revised to: R5-185447.
 
 
 
revised No R5‑185447  
    R5‑185447 5G_NR FR1_Text_update for_RX_sensitivity Qualcomm Incorporated pCR Approval Yes
Yes
approved No   R5‑184859
    R5‑184863 Update of FR1 test case 6.2.2 CAICT pCR Approval Yes
Yes
 
Revised to: R5-184863r1.
add editors note for PC1/4 RAN4 dependent , remove editors note for start position, remove note1 for test procedure, clarify editors note for PC2  
 
 
Revised from: R5-184863.
Revised to: R5-185411.
 
 
 
revised No R5‑185411  
    R5‑185411 Update of FR1 test case 6.2.2 CAICT pCR Approval Yes
Yes
approved No   R5‑184863
    R5‑184865 5G NR_FR1_Text_update for TX Spurious Emission Qualcomm Incorporated pCR Approval Yes
Yes
 
Revised to: R5-184865r1.
update editors note, add message exception for CP-OFDM QPSK, correct the reference to SCS also correct the SCS selection, update CD, change the coversheet
 
 
Revised from: R5-184865.
Revised to: R5-185413.
 
 
 
revised No R5‑185413  
    R5‑185413 5G NR_FR1_Text_update for TX Spurious Emission Qualcomm Incorporated pCR Approval Yes
Yes
approved No   R5‑184865
    R5‑184867 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist Qualcomm Incorporated pCR Approval Yes
Yes
 
Revised to: R5-184867r1.
 
 
Revised from: R5-184867.
revised as same issue with R5-184865
Revised to: R5-185496.
 
 
 
revised No R5‑185496  
    R5‑185496 5G NR_FR1_Text_update for TX Spurious Emission UE-Co-exist Qualcomm Incorporated pCR Approval Yes
Yes
approved No   R5‑184867
    R5‑184875 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
 
Revised to: R5-184875r1.
several comments aligned to previous papers regarding SA message content, Message exception, reference to DL signal annex, remove ANNEX F as it is covered in DCM tdoc
 
 
Revised from: R5-184875.
r1: -emove Annex F. It is covered in R5-184395; Remove editor notes for 200ms; Added editor notes: PC1 and PC4 requirements are missing in TS 38.101-1
 
Revised to: R5-185414.
 
 
 
revised No R5‑185414  
    R5‑185414 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No   R5‑184875
    R5‑184888 Introduction of maximum output power test cases Ericsson pCR Approval Yes
Yes
was wrong spec on cover+3GU, reissued as R5-184983.
withdrawn Yes    
    R5‑184919 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation Qualcomm Incorporated pCR Approval Yes
Yes
Revised to: R5-185325.
 
revised No R5‑185325  
    R5‑185325 5G_FR1_Text_update for_RF_sensitivity_for_SUL_operation Qualcomm Incorporated pCR Approval Yes
Yes
approved No   R5‑184919
    R5‑184920 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels Qualcomm Incorporated pCR Approval Yes
Yes
 
Agenda Allocation was changed: [5.3.14.3]->[5.3.13.4].
RAN4 dependency R4-1810898
Revised to: R5-184920r1.
 
 
Revised from: R5-184920.
table format wrong coversheet error, RAN4 dependent
 
r1: Removed PTRS channel from table C.2-1; Updated table C.0-1 with for SCS = 30 and 60 kHz.
 
Revised to: R5-184920r2.
 
 
Revised from: R5-184920r1.
Revised to: R5-185500.
 
 
 
revised No R5‑185500  
    R5‑185500 5G NR_Proposal of TS38.521-1 annex C.0_Downlink signal levels Qualcomm Incorporated pCR Approval Yes
Yes
approved No   R5‑184920
    R5‑184921 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions Qualcomm Incorporated pCR Approval Yes
Yes
 
Agenda Allocation was changed: [5.3.14.3]->[5.3.13.4].
   
Revised to: R5-184921r1.
 
 
Revised from: R5-184921.
several comments on the content, coversheet, and references
Revised to: R5-185501.
 
 
 
revised No R5‑185501  
    R5‑185501 5G NR_FR1_Text_Update_for_TX_ Additional spurious emissions Qualcomm Incorporated pCR Approval Yes
Yes
approved No   R5‑184921
    R5‑184942 Update to carrier leakage test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
revised No R5‑185312  
    R5‑185312 Update to carrier leakage test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184942
    R5‑184945 Update to EVM test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185326.
 
revised No R5‑185326  
    R5‑185326 Update to EVM test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184945
    R5‑184947 Update to EVM equalizer spectrum flatness test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185315.
 
revised No R5‑185315  
    R5‑185315 Update to EVM equalizer spectrum flatness test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184947
    R5‑184950 Update to Frequency Error test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185317.
 
revised No R5‑185317  
    R5‑185317 Update to Frequency Error test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184950
    R5‑184953 Addition of Annex Global In-Channel TX-Test to 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
 
Revised to: R5-184953r1.
 
 
Revised from: R5-184953.
Revised to: R5-185327.
 
 
 
revised No R5‑185327  
    R5‑185327 Addition of Annex Global In-Channel TX-Test to 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184953
    R5‑184955 Update to In-band Emissions test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185320.
 
revised No R5‑185320  
    R5‑185320 Update to In-band Emissions test case in TS 38.521-1 ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184955
5.3.13.5 TS 38.521-2 R5‑184367 FR2_RefSens_TestConfig_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185187  
    R5‑185187 FR2_RefSens_TestConfig_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval No
Yes
Email approved
approved No   R5‑184367
    R5‑184368 Discussion_FR2_StoreTxRxBeamPeakCoordinates Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
 
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
Associated pCR R5-184370
 
Needs more discussion on how to verify if the stored values are OK before using it
Also dependent on 365 agreement since EIS based storing is needed also
Revised to: R5-184368r1.
 
 
Revised from: R5-184368.
Revised to: R5-184368r2.
 
 
Revised from: R5-184368r1.
Revised to: R5-184368r3.
 
 
Revised from: R5-184368r2.
Revised to: R5-185561.
 
 
 
revised No R5‑185561  
    R5‑185561 Discussion_FR2_StoreTxRxBeamPeakCoordinates Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
noted No   R5‑184368
    R5‑184369 FR2_StoreTxRxBeamPeakCoordinates_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Revised to: R5-184369r1.
 
Revised to: R5-185562.
 
 
 
revised No R5‑185562  
    R5‑185562 FR2_StoreTxRxBeamPeakCoordinates_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval No
Yes
approved No   R5‑184369
    R5‑184371 FR2_TxSpurious_TestPointAnalysis Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
 
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
Associated pCR R5-184372, R5-184924
Revised to: R5-184371r1.
 
 
Revised from: R5-184371.
Revised to: R5-184371r2.
 
 
Revised from: R5-184371r1.
Revised to: R5-184371r3.
 
 
Revised from: R5-184371r2.
Revised to: R5-185489.
 
 
 
revised No R5‑185489  
    R5‑185489 FR2_TxSpurious_TestPointAnalysis Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
Revised from: R5-184371r3.
Except proposal 5, other Proposals are endorsed
noted No   R5‑184371
    R5‑184372 FR2_TxSpurious_TestConfig_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
 
depends on R5-18371
Revised to: R5-184372r1.
 
 
Revised from: R5-184372.
Revised to: R5-184372r2.
 
 
Revised from: R5-184372r1.
change to reflect the discussion in R5-185489
Revised to: R5-185490.
 
 
 
revised No R5‑185490  
    R5‑184373 FR2_UE_BeamlockInvoke_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Revised to: R5-184373r1.
 
Revised to: R5-184373r2.
 
 
Revised from: R5-184373r1.
Revised to: R5-185555.
 
 
 
revised No R5‑185555  
    R5‑185555 FR2_UE_BeamlockInvoke_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Revised from: R5-184373r2.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184373
    R5‑184398 Updates of FR2 TRx MU and TT in Annex NTT DOCOMO, INC. pCR Approval Yes
Yes
 
FR2_MU_TT
Revised to: R5-184398r1.
 
 
Revised from: R5-184398.
Revised to: R5-185519.
 
 
 
revised No R5‑185519  
    R5‑185519 Updates of FR2 TRx MU and TT in Annex NTT DOCOMO, INC. pCR Approval Yes
Yes
Revised from: R5-184398r1.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184398
    R5‑184428 TP to remove editor's note on frequency range of Tx Spurious emission Anritsu pCR Approval Yes
Yes
This contribution propose to fix the frequency range of Tx spurious emission in FR2.
 
Document was sent FOR E-MAIL APPROVAL
 
withdrawn after offline discussion with Keysight.
As for the requirement of frequency range for spurious emission, have to come back in the next meeting to complete the test case by Nov.
 
withdrawn Yes    
    R5‑184576 DL and UL RMC updated for FR2 tests Bureau Veritas pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185188  
    R5‑185188 DL and UL RMC updated for FR2 tests Bureau Veritas pCR Approval No
Yes
Email approved
approved No   R5‑184576
    R5‑184577 Downlink physical channel updated for FR2 tests Bureau Veritas pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185189  
    R5‑185189 Downlink physical channel updated for FR2 tests Bureau Veritas pCR Approval No
Yes
Email approved
approved No   R5‑184577
    R5‑184578 OCNG Patterns updated for FR2 tests Bureau Veritas pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185190  
    R5‑185190 OCNG Patterns updated for FR2 tests Bureau Veritas pCR Approval No
Yes
Email approved
approved No   R5‑184578
    R5‑184634 Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement Anritsu pCR Approval Yes
Yes
Revised to: R5-185348.
 
revised No R5‑185348  
    R5‑185348 Correction to FR2 Spurious TC and inroduction of TRP measurement grid requirement Anritsu pCR Approval Yes
Yes
Revised from: R5-184634.
change the wording form should to shall also change offset dB. Remove the Typo effet
 
approved No   R5‑184634
    R5‑184665 Flexible loop nest for FR2 TRx tests Anritsu pCR Approval No
Yes
withdrawn Yes    
    R5‑184742 Update of FR2 test case 6.3.1 Huawei,HiSilicon pCR Approval Yes
Yes
LATE DOCUMENT
 
Document was sent FOR E-MAIL APPROVAL
 
 
 
approved No    
    R5‑184743 Update of FR2 test case 6.3.3.2 Huawei,HiSilicon pCR Approval Yes
Yes
LATE DOCUMENT
 
Document was sent FOR E-MAIL APPROVAL
 
approved No    
    R5‑184850 Update of Initial condition for FR2 SGS Wireless pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
withdrawn Yes    
    R5‑184856 General sections updated to 38.521-2 CAICT pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
approved No    
    R5‑184983 Introduction of maximum output power test cases Ericsson pCR Approval Yes
Yes
Replaces R5-184888 (wrong spec allocation)
 
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185197  
    R5‑185197 Introduction of maximum output power test cases Ericsson pCR Approval No
Yes
Email approved
approved No   R5‑184983
    R5‑184904 Update to ACS and in-band blocking test cases in TS 38.521-1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
 
Revised to: R5-184904r1.
same changes needed as 875r1
 
 
Revised from: R5-184904.
r1: Update editor notes of ul power level TBD in TS 38.101-1; Remove Annex F. It is covered in R5-184395
 
Revised to: R5-185415.
 
 
 
revised No R5‑185415  
    R5‑185415 Update to ACS and in-band blocking test cases in TS 38.521-1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
approved No   R5‑184904
    R5‑184907 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 Keysight Technologies UK Ltd pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185191  
    R5‑185191 Update to Occupied Bandwidth, SEM and ACLR test cases in TS 38.521-2 Keysight Technologies UK Ltd pCR Approval No
Yes
Email approved
approved No   R5‑184907
    R5‑184912 Update to ACS and inband blocking test cases in TS 38.521-2 Keysight Technologies UK Ltd pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185192  
    R5‑185192 Update to ACS and inband blocking test cases in TS 38.521-2 Keysight Technologies UK Ltd pCR Approval No
Yes
Email approved
approved No   R5‑184912
    R5‑184954 Addition of Annex Global In-Channel TX-Test to 38.521-2 ROHDE & SCHWARZ pCR Approval Yes
Yes
 
Revised to: R5-184954r1.
 
 
Revised from: R5-184954.
Revised to: R5-185353.
 
 
 
revised No R5‑185353  
    R5‑185353 Addition of Annex Global In-Channel TX-Test to 38.521-2 ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised from: R5-184954r1.
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185193 R5‑184954
    R5‑185193 Addition of Annex Global In-Channel TX-Test to 38.521-2 ROHDE & SCHWARZ pCR Approval No
Yes
Email approved
approved No   R5‑185353
    R5‑184959 Update to Test frequencies for SEM in TS 38.521-2 ROHDE & SCHWARZ pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185194  
    R5‑185194 Update to Test frequencies for SEM in TS 38.521-2 ROHDE & SCHWARZ pCR Approval No
Yes
Email approved
approved No   R5‑184959
    R5‑184960 Addition of Frequency Error test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185350.
 
revised No R5‑185350  
    R5‑185350 Addition of Frequency Error test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184960
    R5‑184963 Addition of EVM test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185195  
    R5‑185195 Addition of EVM test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval No
Yes
Email approved
approved No   R5‑184963
    R5‑184966 Addition of Carrier Leakage test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185196  
    R5‑185196 Addition of Carrier Leakage test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval No
Yes
Email approved
approved No   R5‑184966
    R5‑184969 Addition of In-band Emissions test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval No
Yes
withdrawn Yes    
    R5‑184972 Addition of EVM equalizer spectral flatness test case to TS 38.521-2 ROHDE & SCHWARZ pCR Approval No
Yes
withdrawn Yes    
5.3.13.6 TS 38.521-3 R5‑184125 Add Clause 7.5 into TS 38.521-3 CMCC pCR Approval Yes
Yes
 
Revised to: R5-184125r1.
 
 
Revised from: R5-184125.
Revised to: R5-185329.
 
 
 
revised No R5‑185329  
    R5‑185329 Add Clause 7.5 into TS 38.521-3 CMCC pCR Approval Yes
Yes
withdrawn Yes   R5‑184125
    R5‑184362 FR2_38.521-3_Applicability_SpuriousEmissions Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
 
waiting for discussion paper R5-184361
Revised to: R5-184362r1.
 
 
Revised from: R5-184362.
Revised to: R5-184362r2.
 
 
Revised from: R5-184362r1.
Revised to: R5-185559.
 
 
 
revised No R5‑185559  
    R5‑185559 FR2_38.521-3_Applicability_SpuriousEmissions Qualcomm Europe Inc. (Spain) pCR Approval No
Yes
withdrawn Yes   R5‑184362
    R5‑184370 FR2_StoreTxRxBeamPeakCoordinates_38.521-3 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Revised to: R5-184370r1.
 
Revised to: R5-185563.
 
revised No R5‑185563  
    R5‑185563 FR2_StoreTxRxBeamPeakCoordinates_38.521-3 Qualcomm Europe Inc. (Spain) pCR Approval No
Yes
approved No   R5‑184370
    R5‑184402 Addition of TRx MU and TT in TS 38.521-3 Annex NTT DOCOMO, INC. pCR Approval Yes
Yes
 
IW_MU_TT
Revised to: R5-184402r1.
related to 4400
 
 
Revised from: R5-184402.
Revised to: R5-185520.
 
 
 
revised No R5‑185520  
    R5‑185520 Addition of TRx MU and TT in TS 38.521-3 Annex NTT DOCOMO, INC. pCR Approval Yes
Yes
Revised from: R5-184402r1.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184402
    R5‑184491 Clean up EN-DC FR1 TRx TCs Anritsu pCR Approval No
Yes
late doc
withdrawn Yes    
    R5‑184563 Add Clause 7.5B.1 into TS 38.521-3 CMCC pCR Approval Yes
Yes
late doc
 
LATE DOCUMENT
 
Revised to: R5-184563r1.
 
 
LATE DOCUMENT
Revised from: R5-184563.
Revised to: R5-184563r2.
 
 
LATE DOCUMENT
Revised from: R5-184563r1.
 
Needs to be revised to align with the way fwd of testing NR and tetsing LTE in ENDC spec , update test description and test requirements and editors notes
Revised to: R5-185503.
 
 
 
revised No R5‑185503  
    R5‑185503 Add Clause 7.5B.1 into TS 38.521-3 CMCC pCR Approval Yes
Yes
LATE DOCUMENT
Revised from: R5-184563r2.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184563
    R5‑184564 Add Clause 7.5B.2 into TS 38.521-3 CMCC pCR Approval Yes
Yes
late doc
 
LATE DOCUMENT
 
Revised to: R5-184564r1.
 
 
LATE DOCUMENT
Revised from: R5-184564.
same comment as R5-184563r1
Revised to: R5-184564r2.
 
 
LATE DOCUMENT
Revised from: R5-184564r1.
same comments as 563r2
Revised to: R5-185504.
 
 
 
revised No R5‑185504  
    R5‑185504 Add Clause 7.5B.2 into TS 38.521-3 CMCC pCR Approval Yes
Yes
LATE DOCUMENT
Revised from: R5-184564r2.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184564
    R5‑184565 Add Clause 7.5B.3 into TS 38.521-3 CMCC pCR Approval Yes
Yes
late doc
 
LATE DOCUMENT
 
Revised to: R5-184565r1.
 
 
LATE DOCUMENT
Revised from: R5-184565.
same comment as R5-184563r1
Revised to: R5-184565r2.
 
 
LATE DOCUMENT
Revised from: R5-184565r1.
same comments as 563r2
Revised to: R5-185505.
 
 
 
revised No R5‑185505  
    R5‑185505 Add Clause 7.5B.3 into TS 38.521-3 CMCC pCR Approval Yes
Yes
LATE DOCUMENT
Revised from: R5-184565r2.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184565
    R5‑184579 Updated EN-DC configuration information in clause 5 Bureau Veritas pCR Approval Yes
Yes
Impacted clause 5.3A; 5.3A.1; 5.3B (New); 5.5A.1 (New); 5.5B.2; 5.5B.3; 5.5B.4; 5.5B.5; 5.5B.6 (New)
approved No    
    R5‑184580 TIB value add for EN-DC band in 38.521-3 Bureau Veritas pCR Approval Yes
Yes
Impacted clause 6.2B.4.2.3; 6.2B.4.2.4
approved No    
    R5‑184671 Update of References in Section 2 of 38.521-3 spec Qualcomm Wireless GmbH pCR Approval Yes
Yes
approved No    
    R5‑184672 Updates to Operating Bands in Section 5.2 Qualcomm Wireless GmbH pCR Approval Yes
Yes
approved No    
    R5‑184737 Dual uplink interferer updated to 38.521-3 Bureau Veritas pCR Approval Yes
Yes
waits for annex structure finalization
approved No    
    R5‑184744 Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC Huawei,HiSilicon pCR Approval Yes
Yes
Revised to: R5-185332.
 
revised No R5‑185332  
    R5‑185332 Addition of 6.2B.4.1.1 Configured OP for Intra-Band Contiguous EN-DC Huawei,HiSilicon pCR Approval Yes
Yes
approved No   R5‑184744
    R5‑184745 Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC Huawei,HiSilicon pCR Approval Yes
Yes
Revised to: R5-185333.
 
revised No R5‑185333  
    R5‑185333 Addition of 6.2B.4.1.2 Configured OP for Intra-Band Non-Contiguous EN-DC Huawei,HiSilicon pCR Approval Yes
Yes
approved No   R5‑184745
    R5‑184746 Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 Huawei,HiSilicon pCR Approval Yes
Yes
 
Revised to: R5-184746r1.
focus only on 1 CC test for now not needed to have more than 1 CC test points in the test as per 5G-NR RAN5 phases, also complete the test except Pcmax , leveraging SA test points as per the joint discussion suggestion . LTE test points need not be tested as per Joint discussion , and should be pursued with that background
 
 
Revised from: R5-184746.
Revised to: R5-185507.
 
 
 
revised No R5‑185507  
    R5‑185507 Addition of 6.2B.4.1.3 Configured OP for Intre-Band within FR1 Huawei,HiSilicon pCR Approval Yes
Yes
approved No   R5‑184746
    R5‑184747 Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 Huawei,HiSilicon pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185198  
    R5‑185198 Addition of 6.2B.4.1.4 Configured OP for Inter-Band EN-DC including FR2 Huawei,HiSilicon pCR Approval No
Yes
Email approved
approved No   R5‑184747
    R5‑184748 Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 Huawei,HiSilicon pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
 
revised No R5‑185199  
    R5‑185199 Addition of 6.2B.4.1.5 Configured OP for Inter-Band EN-DC including both FR1 and FR2 Huawei,HiSilicon pCR Approval No
Yes
Email approved
approved No   R5‑184748
    R5‑184757 TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC Ericsson LM pCR Approval Yes
Yes
 
Revised to: R5-184757r1.
 
 
Revised from: R5-184757.
Revised to: R5-185469.
 
 
 
revised No R5‑185469  
    R5‑185469 TP for updating test case 6.2B.3.1 UE AMPR for Intra-band contigous EN-DC Ericsson LM pCR Approval No
Yes
Revised from: R5-184757r1.
associated TP pCR R5-185469
 
Document was sent FOR E-MAIL APPROVAL
approved No   R5‑184757
    R5‑184758 TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC Ericsson LM pCR Approval Yes
Yes
 
Revised to: R5-184758r1.
same comments as 757
 
 
Revised from: R5-184758.
Revised to: R5-185470.
 
 
 
revised No R5‑185470  
    R5‑185470 TP for updating test case 6.2B.3.2 UE AMPR for Intra-band non-contigous EN-DC Ericsson LM pCR Approval No
Yes
Revised from: R5-184758r1.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184758
    R5‑184759 TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC Ericsson LM pCR Approval Yes
Yes
Revised to: R5-184759r1.
same comments as 757 , try and complete the test except for RAN4 dependency. As per latest 38.101-3 RAN4 req is completed for NS_35
 
Revised to: R5-185471.
 
 
 
revised No R5‑185471  
    R5‑185471 TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC Ericsson LM pCR Approval No
Yes
Revised from: R5-184759r1.
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185200 R5‑184759
    R5‑185200 TP for updating test case 6.5B.2.1.2 Additional spectrum emission mask for intra-band contigous EN-DC Ericsson LM pCR Approval No
Yes
Email approved
approved No   R5‑185471
    R5‑184810 FR2_UE_BeamlockInvoke_38.521-3 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Revised to: R5-184810r1.
 
Check if STATE3A-RF step is needed
Revised to: R5-184810r2.
Revised to: R5-185556.
 
 
 
revised No R5‑185556  
    R5‑185556 FR2_UE_BeamlockInvoke_38.521-3 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Revised from: R5-184810r2.
 
Document was sent FOR E-MAIL APPROVAL
 
approved No   R5‑184810
    R5‑184826 Update of TC 6.2B.1.1 Huawei, Hisilicon pCR Approval Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-184826r1.
 
 
LATE DOCUMENT
Revised from: R5-184826.
same comments as 757 for LTE test points. Also MU is pending for ENDC needs to be coinfirmed what TT should be used since the BW will be > than SA. LTE tets point analysis and references needs to be completed
Revised to: R5-185472.
 
 
 
revised No R5‑185472  
    R5‑185472 Update of TC 6.2B.1.1 Huawei, Hisilicon pCR Approval Yes
Yes
LATE DOCUMENT
Revised from: R5-184826r1.
 
approved No   R5‑184826
    R5‑184827 Introduction of TC 6.2B.1.2 Huawei, Hisilicon pCR Approval Yes
Yes
 
Revised to: R5-184827r1.
 
 
Revised from: R5-184827.
Revised to: R5-184827r2.
 
 
Revised from: R5-184827r1.
same comments as 826 to complete test point aspects of LTE ,
Revised to: R5-185473.
 
 
 
revised No R5‑185473  
    R5‑185473 Introduction of TC 6.2B.1.2 Huawei, Hisilicon pCR Approval Yes
Yes
approved No   R5‑184827
    R5‑184828 Update of 6.2B.1.3 Huawei, Hisilicon pCR Approval Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-184828r1.
 
 
LATE DOCUMENT
Revised from: R5-184828.
Same comments as 826  , along with Dynamic power sharing aspects, core requirements is complete
Revised to: R5-185474.
same comment as 5472
 
 
 
revised No R5‑185474  
    R5‑185474 Update of 6.2B.1.3 Huawei, Hisilicon pCR Approval Yes
Yes
approved No   R5‑184828
    R5‑184829 Introduction of TC 7.4B.1 Huawei, Hisilicon pCR Approval Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-184829r1.
 
 
LATE DOCUMENT
Revised from: R5-184829.
Revised to: R5-184829r2.
 
 
LATE DOCUMENT
Revised from: R5-184829r1.
revised to align the contents to 38.101-1 and also update editors notes
Revised to: R5-185475.
 
 
 
revised No R5‑185475  
    R5‑185475 Introduction of TC 7.4B.1 Huawei, Hisilicon pCR Approval Yes
Yes
LATE DOCUMENT
Revised from: R5-184829r2.
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185201 R5‑184829
    R5‑185201 Introduction of TC 7.4B.1 Huawei, Hisilicon pCR Approval No
Yes
Email approved
approved No   R5‑185475
    R5‑184830 Introduction of 7.4B.2 Huawei, Hisilicon pCR Approval Yes
Yes
LATE DOCUMENT
 
Revised to: R5-184830r1.
 
 
LATE DOCUMENT
Revised from: R5-184830.
same issue as R5-184829
Revised to: R5-184830r2.
 
 
LATE DOCUMENT
Revised from: R5-184830r1.
Revised to: R5-185476.
 
 
 
revised No R5‑185476  
    R5‑185476 Introduction of 7.4B.2 Huawei, Hisilicon pCR Approval Yes
Yes
LATE DOCUMENT
Revised from: R5-184830r2.
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
 
revised No R5‑185202 R5‑184830
    R5‑185202 Introduction of 7.4B.2 Huawei, Hisilicon pCR Approval No
Yes
approved No   R5‑185476
    R5‑184831 Introduction of 7.4B.3 Huawei, Hisilicon pCR Approval Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-184831r1.
 
 
LATE DOCUMENT
Revised from: R5-184831.
same issue as R5-184829
Revised to: R5-184831r2.
 
 
LATE DOCUMENT
Revised from: R5-184831r1.
leverage test procedure from part1 and also decide what to test for LTE , also update same notes as 830r2
Revised to: R5-185477.
 
 
 
revised No R5‑185477  
    R5‑185477 Introduction of 7.4B.3 Huawei, Hisilicon pCR Approval Yes
Yes
LATE DOCUMENT
Revised from: R5-184831r2.
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185203 R5‑184831
    R5‑185203 Introduction of 7.4B.3 Huawei, Hisilicon pCR Approval No
Yes
Email approved
approved No   R5‑185477
    R5‑184855 Update Occupied Bandwidth for interband EN-DC within FR1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
depends on R5-184852
Revised to: R5-185479.
 
revised No R5‑185479  
    R5‑185479 Update Occupied Bandwidth for interband EN-DC within FR1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
Revised from: R5-184855.
Add editor's note to indicate LTE testing is FFS, working assumption is LTE not tested. LTE test procedure is FFS.
approved No   R5‑184855
    R5‑184857 Update SEM interband EN-DC within FR1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
 
depends on R5-184852
Revised to: R5-184857r1.
 
 
Revised from: R5-184857.
Revised to: R5-185480.
 
 
 
revised No R5‑185480  
    R5‑185480 Update SEM interband EN-DC within FR1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
Revised from: R5-184857r1.
same comment as R5-185479
approved No   R5‑184857
    R5‑184860 Update ACLR for interband EN-DC within FR1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
 
depends on R5-184852
Revised to: R5-184860r1.
 
 
Revised from: R5-184860.
Revised to: R5-185481.
 
 
 
revised No R5‑185481  
    R5‑185481 Update ACLR for interband EN-DC within FR1 Keysight Technologies UK Ltd pCR Approval Yes
Yes
Revised from: R5-184860r1.
same comment as R5-185479
approved No   R5‑184860
    R5‑184869 5G NR_EN_DC with FR1_Text update for RX sensitivity Qualcomm Incorporated pCR Approval Yes
Yes
 
Revised to: R5-184869r1.
 
 
Revised from: R5-184869.
depends on R5-184922
Revised to: R5-184869r2.
 
 
Revised from: R5-184869r1.
Revised to: R5-185482.
 
 
 
revised No R5‑185482  
    R5‑185482 5G NR_EN_DC with FR1_Text update for RX sensitivity Qualcomm Incorporated pCR Approval Yes
Yes
Revised from: R5-184869r2.
formatting issue, handling multiple LTE band, minimum requirement in general section
 
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185204 R5‑184869
    R5‑185204 5G NR_EN_DC with FR1_Text update for RX sensitivity Qualcomm Incorporated pCR Approval No
Yes
Email approved
approved No   R5‑185482
    R5‑184872 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission Qualcomm Incorporated pCR Approval Yes
Yes
Revised to: R5-184872r1.
 
add LTE test point analysis and IC also compelte the message contents TBD. RAn4 has completed the requirements except for LTE test point and NC Config
Revised to: R5-185487.
 
 
 
revised No R5‑185487  
    R5‑185487 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission Qualcomm Incorporated pCR Approval Yes
Yes
Revised from: R5-184872r1.
depends on R5-185334
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185205 R5‑184872
    R5‑185205 5G NR_EN_DC with FR1_Text_proposal for_TX_Spurious_emission Qualcomm Incorporated pCR Approval No
Yes
Email approved
approved No   R5‑185487
    R5‑184882 Alignment of Annex numbering with core spec Qualcomm Wireless GmbH pCR Approval Yes
Yes
 
Pending RAN4 CR approval
Revised to: R5-184882r1.
 
 
Revised from: R5-184882.
Revised to: R5-185422.
 
 
 
revised No R5‑185422  
    R5‑185422 Alignment of Annex numbering with core spec Qualcomm Wireless GmbH pCR Approval Yes
Yes
approved No   R5‑184882
    R5‑184897 Updates to Channel Arrangement section in 38.521-3 Qualcomm Wireless GmbH pCR Approval Yes
Yes
approved No    
    R5‑185302 Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC SGS Wireless pCR discussion Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-185302r1.
 
 
LATE DOCUMENT
Revised from: R5-185302.
update intraband contigous ENDC test similar to other Intraband Contig ENDC tests
Revised to: R5-185302r2.
 
 
LATE DOCUMENT
Revised from: R5-185302r1.
r2: Update editor’s note for test point analysis; Add reference in minimum requirement
 
Revised to: R5-185510.
 
 
 
revised No R5‑185510  
    R5‑185510 Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC SGS Wireless pCR discussion Yes
Yes
LATE DOCUMENT
Revised from: R5-185302r2.
 
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185206 R5‑185302
    R5‑185206 Addition of TC6.3B.1.1 Minimum Output power for intra-band contiguous EN-DC SGS Wireless pCR discussion No
Yes
Email approved
approved No   R5‑185510
    R5‑185303 Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC SGS Wireless pCR discussion Yes
Yes
LATE DOCUMENT
 
Revised to: R5-185303r1.
 
 
LATE DOCUMENT
Revised from: R5-185303.
need clarity on LTE test measurement from RAN4 and also decide on the LTE test points along with updates similar to 302r1
Revised to: R5-185303r2.
 
 
LATE DOCUMENT
Revised from: R5-185303r1.
Revised to: R5-185511.
 
 
 
revised No R5‑185511  
    R5‑185511 Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC SGS Wireless pCR discussion Yes
Yes
LATE DOCUMENT
Revised from: R5-185303r2.
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185207 R5‑185303
    R5‑185207 Addition of TC6.3B.1.2 Minimum output power for intra-band non-contiguous EN-DC SGS Wireless pCR discussion No
Yes
Email approved
approved No   R5‑185511
    R5‑185304 Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 SGS Wireless pCR discussion Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-185304r1.
 
 
LATE DOCUMENT
Revised from: R5-185304.
add similar updates as other interband within FR1 tests
Revised to: R5-185512.
 
 
 
revised No R5‑185512  
    R5‑185512 Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 SGS Wireless pCR discussion Yes
Yes
LATE DOCUMENT
Revised from: R5-185304r1.
 
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
 
revised No R5‑185208 R5‑185304
    R5‑185208 Addition of TC6.3B.1.3 Minimum output power for inter-band EN-DC within FR1 SGS Wireless pCR discussion No
Yes
Email approved
approved No   R5‑185512
    R5‑185351 Update across EN-DC RF test cases in TS 38.521-3 Qualcomm Wireless GmbH pCR discussion Yes
Yes
LATE DOCUMENT
 
Document was sent FOR E-MAIL APPROVAL
 
approved No    
5.3.13.7 TS 38.521-4                      
5.3.13.8 TS 38.522 R5‑184121 TP for Clause 4.1.1 of TS 38.522 CMCC pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r5 was produced.
revised No R5‑185209  
    R5‑185209 TP for Clause 4.1.1 of TS 38.522 CMCC pCR Approval No
Yes
Email approved
approved No   R5‑184121
    R5‑184122 TP for Clause 4.1.2 of TS 38.522 CMCC pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r4 was produced.
revised No R5‑185210  
    R5‑185210 TP for Clause 4.1.2 of TS 38.522 CMCC pCR Approval No
Yes
Email approved
approved No   R5‑184122
    R5‑184123 TP for Clause 4.1.3 of TS 38.522 CMCC pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r3 was produced.
 
revised No R5‑185211  
    R5‑185211 TP for Clause 4.1.3 of TS 38.522 CMCC pCR Approval No
Yes
Email approved
approved No   R5‑184123
    R5‑184363 FR2_38.522_Applicability_SpuriousEmissions Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
 
waiting for discussion paper R5-184361, 4362
Revised to: R5-184363r1.
 
 
Revised from: R5-184363.
Revised to: R5-185560.
 
 
 
revised No R5‑185560  
    R5‑185560 FR2_38.522_Applicability_SpuriousEmissions Qualcomm Europe Inc. (Spain) pCR Approval No
Yes
withdrawn Yes   R5‑184363
5.3.13.9 TS 38.533                      
5.3.13.10 TS 36.508                      
5.3.13.11 TS 36.521-3                      
5.3.13.12 TS 37.571-1                      
5.3.13.13 TS 37.571-3                      
5.3.13.14 TS 37.571-5                      
5.3.13.15 TR 38.903 (Derivation of test tolerances and measurement uncertainty for User Equipment (UE) conformance tests) R5‑184430 TP on common test setup in FR2 Anritsu pCR Approval Yes
Yes
TP for common test setup in FR2.
no conclusion to reach the common assumption by different TE vendors
withdrawn Yes    
    R5‑184703 MU budget for EIRP/TRP measurements with Near Field test range at mmWave MVG Industries discussion Discussion Yes
Yes
wrong content type
withdrawn Yes    
    R5‑184738 pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave MVG Industries pCR Discussion Yes
Yes
Revised to: R5-185352.
 
revised No R5‑185352  
    R5‑185352 pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave MVG Industries pCR Discussion Yes
Yes
Revised from: R5-184738.
add track mark
 
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185212 R5‑184738
    R5‑185212 pCR Adding MU values for EIRPTRP measurements with Near Field test range at mmWave MVG Industries pCR Discussion No
Yes
Email approved
approved No   R5‑185352
    R5‑184817 Making Measurement Uncertainty Terms Common between methods in TR 38.90 MVG Industries discussion Approval Yes
Yes
wrong content type
withdrawn Yes    
    R5‑184819 pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 MVG Industries pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
 
revised No R5‑185213  
    R5‑185213 pCR Making Measurement Uncertainty Terms Common between methods in TR 38.90 MVG Industries pCR Approval No
Yes
Email approved
approved No   R5‑184819
    R5‑184913 Update MU factors for IFF Keysight Technologies UK Ltd pCR Approval No
Yes
LATE DOCUMENT
depends on R5-184858
withdrawn Yes    
    R5‑184976 TP on Measurement Uncertainty Contributions in FR2 ROHDE & SCHWARZ pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r2 was produced.
revised No R5‑185214  
    R5‑185214 TP on Measurement Uncertainty Contributions in FR2 ROHDE & SCHWARZ pCR Approval No
Yes
Email approved
approved No   R5‑184976
5.3.13.16 TR 38.905 (Derivation of test points for Radio Transmission and Reception User Equipment (UE) conformance tests) R5‑184303 Test Point analysis for FR1 Configured Output Power Huawei,HiSilicon pCR Approval Yes
Yes
associated pCR R5-184300
approved No    
    R5‑184751 TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 Ericsson LM pCR Approval Yes
Yes
Revised to: R5-185307.
 
revised No R5‑185307  
    R5‑185307 TP for updating TR38.905 with FR1 AMPR test point analyses with NS_35 Ericsson LM pCR Approval Yes
Yes
Revised from: R5-184751.
Added zip file to the zip folder, justified the file name as added in the table
 
approved No   R5‑184751
    R5‑184837 Test Point analysis for FR1 Configured Output Power for SUL Huawei,HiSilicon pCR Approval Yes
Yes
Revised to: R5-185309.
 
revised No R5‑185309  
    R5‑185309 Test Point analysis for FR1 Configured Output Power for SUL Huawei,HiSilicon pCR Approval Yes
Yes
Revised from: R5-184837.
Added line to include the zip file into TR38.905
approved No   R5‑184837
    R5‑184923 Test Point analysis for FR2 RefSense test case Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
approved No    
    R5‑184924 Test Point analysis for FR2 TxSpurious test case Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
 
depends on R5-184371
Revised to: R5-184924r1.
 
 
Revised from: R5-184924.
Revised to: R5-184924r2.
 
 
Revised from: R5-184924r1.
Revised to: R5-185491.
 
 
 
revised No R5‑185491  
    R5‑185491 Test Point analysis for FR2 TxSpurious test case Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
Revised from: R5-184924r2.
change to reflect the final endorsed in R5-185489
approved No   R5‑184924
    R5‑184943 TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185311.
 
revised No R5‑185311  
    R5‑185311 TP for updating TR 38.905 with FR1 Carrier Leakage test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184943
    R5‑184946 TP for updating TR 38.905 with EVM test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
need to correct an error in the filename of the zipped discussion paper for the TR 38.905, # of test point will be updated accordingly
Revised to: R5-185412.
 
revised No R5‑185412  
    R5‑185412 TP for updating TR 38.905 with EVM test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184946
    R5‑184948 TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185314.
 
revised No R5‑185314  
    R5‑185314 TP for updating TR 38.905 with FR1 EVM equalizer spectrum flatness test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184948
    R5‑184951 TP for updating TR 38.905 with FR1 Frequency Error test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185316.
 
revised No R5‑185316  
    R5‑185316 TP for updating TR 38.905 with FR1 Frequency Error test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised from: R5-184951.
merged the 3 TP analysis doc in the zip file
 
approved No   R5‑184951
    R5‑184956 TP for updating TR 38.905 with FR1 In-band Emissions test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
Revised to: R5-185319.
 
revised No R5‑185319  
    R5‑185319 TP for updating TR 38.905 with FR1 In-band Emissions test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
approved No   R5‑184956
    R5‑184958 TP for updating TR 38.905 with FR2 SEM test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
 
revised No R5‑185215  
    R5‑185215 TP for updating TR 38.905 with FR2 SEM test point analysis ROHDE & SCHWARZ pCR Approval No
Yes
Email approved
approved No   R5‑184958
    R5‑184961 TP for updating TR 38.905 with FR2 Frequency Error test point analysis ROHDE & SCHWARZ pCR Approval Yes
Yes
LATE DOCUMENT
included the changed as R5-185349
approved No    
    R5‑184964 TP for updating TR 38.905 with FR2 EVM test point analysis ROHDE & SCHWARZ pCR Approval No
Yes
withdrawn Yes    
    R5‑184967 TP for updating TR 38.905 with FR2 Carrier Leakage test point analysis ROHDE & SCHWARZ pCR Approval No
Yes
withdrawn Yes    
    R5‑184970 TP for updating TR 38.905 with FR2 In-band Emissions test point analysis ROHDE & SCHWARZ pCR Approval No
Yes
withdrawn Yes    
    R5‑184973 TP for updating TR 38.905 with FR2 EVM equalizer spectral flatness test point analysis ROHDE & SCHWARZ pCR Approval No
Yes
withdrawn Yes    
    R5‑185430 TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC Ericsson LM pCR Approval No
Yes
late doc
 
Document was sent FOR E-MAIL APPROVAL
 
r1 was produced.
revised No R5‑185216  
    R5‑185216 TP for updating TR38.905 with UE AMPR for NS_04 Intra-band contigous EN-DC Ericsson LM pCR Approval No
Yes
Email approved
approved No   R5‑185430
5.3.13.17 General Papers / Work Plan / TC lists R5‑184068 FR1 TT Way Forward update Telecom Italia S.p.A. discussion Information Yes
Yes
document will be maintained by TI at the end of each meeting to update FR1/FR2 TT/MU dependencies until completion.
 
Revised to: R5-184068r1.
 
 
Revised from: R5-184068.
Revised to: R5-184068r2.
 
 
Revised from: R5-184068r1.
Revised to: R5-184068r3.
 
 
Revised from: R5-184068r2.
Revised to: R5-185564.
 
 
 
revised No R5‑185564  
    R5‑185564 FR1 TT Way Forward update Telecom Italia S.p.A. discussion Information Yes
Yes
noted No   R5‑184068
    R5‑184124 Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 CMCC, HUAWEI discussion Endorsement Yes
Yes
 
Revised from: R5-184124.
Agenda Allocation was changed: [5.3.13.6]->[5.3.13.17].
    
 
 
Revised from: R5-184124.
Agenda Allocation was changed: [5.3.13.6]->[5.3.13.17].
   
Revised to: R5-185328.
 
 
 
revised No R5‑185328  
    R5‑185328 Discussion on the way to write Clause 7.4 Maximum Input Level and Clause 7.5 Adjacent Channel Selectivity in TS 38.521-3 CMCC, HUAWEI discussion Endorsement Yes
Yes
approved No   R5‑184124
    R5‑184133 Discussion on RRM 5G progress ROHDE & SCHWARZ discussion   Yes
Yes
LATE DOCUMENT
waiting for update from RAN4
noted No    
    R5‑184295 Discussion on test frequency definition in FR1 Huawei,HiSilicon discussion Endorsement Yes
Yes
same content as 4449, noted. 4296 can be w/drawn associated CR
noted No    
    R5‑184361 Discussion_38.521-3_ApplicabilityRules Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
 
Agenda Allocation was changed: [5.3.13.6]->[5.3.13.17].
wrong Agenda shuld be 5.3.13.17, same comments as 485 , try to retain the contents common between 485 and 361 in one place , and keep 361 with unique points as applicable to the proposal
 
associated pCR R5-184362, R5-184363
Revised to: R5-184361r1.
 
 
Revised from: R5-184361.
Revised to: R5-184361r2.
 
 
Revised from: R5-184361r1.
Revised to: R5-184361r3.
 
 
Revised from: R5-184361r2.
Revised to: R5-184361r4.
 
 
Revised from: R5-184361r3.
Revised to: R5-185558.
 
 
 
revised No R5‑185558  
    R5‑185558 Discussion_38.521-3_ApplicabilityRules Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
Revised from: R5-184361r4.
No proposal endorsed
noted No   R5‑184361
    R5‑184364 Discussion_FR2_EVM_UBF_usage Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
associated pCR R5-184963
 
proposal endorsed
noted No    
    R5‑184365 Discussion_FR2_RefSens_RSRP_vs_EIS Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
 
RAN4 discussion paper related to this topic R4-1811035
noted No    
    R5‑184366 Discussion_FR2_RefSens_TestPointAnalysis Qualcomm Europe Inc. (Spain) discussion Endorsement Yes
Yes
Agenda Allocation was changed: [5.3.13.5]->[5.3.13.17].
 
Associated pCR R5-184923, R5-184367
 
Proposal endorsed
noted No    
    R5‑185490 FR2_TxSpurious_TestConfig_38.521-2 Qualcomm Europe Inc. (Spain) pCR Approval Yes
Yes
approved No   R5‑184372
    R5‑184394 Proposal on Test Tolerance table format in TS 38.521-1 Annex F NTT DOCOMO, INC. discussion Endorsement Yes
Yes
FR1_TT
Proposal: Use proposed TT table format in section 2.2 for TS 38.521-1 Annex F.3.
Proposal endorsed and implemented in R5-184395
noted No    
    R5‑184397 Proposal on MU and TT table format in TS 38.521-2 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
 
FR2_MU_TT
associated pCR R5-184398
Revised to: R5-184397r1.
 
 
Revised from: R5-184397.
Revised to: R5-185518.
 
 
 
revised No R5‑185518  
    R5‑185518 Proposal on MU and TT table format in TS 38.521-2 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
noted No   R5‑184397
    R5‑184400 MU and TT of EN-DC test cases in TS 38.521-3 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
 
IW_MU_TT
 
Revised to: R5-184400r1.
 
 
Revised from: R5-184400.
associated pCR 4402
Revised to: R5-184400r2.
 
 
Revised from: R5-184400r1.
Revised to: R5-185531.
 
 
 
revised No R5‑185531  
    R5‑185531 MU and TT of EN-DC test cases in TS 38.521-3 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
noted No   R5‑184400
    R5‑184407 Discussion on the structure of Clause 7.3A Reference sensitivity for CA in TS 38.521-1 CMCC, Huawei discussion Endorsement Yes
Yes
Proposal 1: Adopt Option 1a as the principle to structure Clause 7.3A in TS 38.521-1.
proposal endorsed.
TS38.521-2 and -3 WP will follow the same structure
noted No    
    R5‑184408 Discussion on the structure of Clause 7.7A Spurious response for CA in TS 38.521-1 CMCC, Huawei discussion Endorsement Yes
Yes
Proposal 1: Adopt Option 1a as the principle to structure Clause 7.7A in TS 38.521-1.
Proposal endorsed.
TS38.521-2 and -3 WP will follow the same structure
noted No    
    R5‑184422 Treatment of power supply cable for FR2 UE tests Anritsu discussion Agreement Yes
Yes
 
This contribution raises an issue of a treatment of power supply cable physically attached to a UE.
Revised to: R5-184422r1.
 
 
Revised from: R5-184422.
Revised to: R5-185525.
 
 
 
revised No R5‑185525  
    R5‑185525 Treatment of power supply cable for FR2 UE tests Anritsu discussion Agreement Yes
Yes
Revised from: R5-184422r1.
Proposal endorsed
noted No   R5‑184422
    R5‑184423 Meeting notes of offline call on FR2 UE common test setup Anritsu other Information Yes
Yes
Meeting notes of offline call on FR2 UE common test setup
noted No    
    R5‑184424 Common test setup for FR2 measurement uncertainty estimation Anritsu discussion Agreement Yes
Yes
This contribution introduces our views for a further discussion of common test setup in FR2.
noted No    
    R5‑184425 Testability issue of maximum input level and ACS (case 2) in FR2 Anritsu discussion Agreement Yes
Yes
In this contribution, we introduce our latest result of the study and propose a relaxation of the test requirement of maximum input level and ACS (case 2) interferer level in FR2.
 
noted No    
    R5‑184426 Estimation of measurement uncertainty for FR2 TRx test cases Anritsu discussion Discussion Yes
Yes
 
This contribution introduces estimation of measurement uncertainty (MU) for FR2 test cases with IFF1 test system.
Revised to: R5-184426r1.
 
 
Revised from: R5-184426.
Revised to: R5-185335.
 
 
 
revised No R5‑185335  
    R5‑185335 Estimation of measurement uncertainty for FR2 TRx test cases Anritsu discussion Discussion Yes
Yes
noted No   R5‑184426
    R5‑184427 Removing brackets from MU values in FR2 Anritsu discussion Agreement Yes
Yes
 
This contribution introduce our views on MU values which are still in square brackets yet.
Revised to: R5-184427r1.
 
 
Revised from: R5-184427.
 
Proposal 1: Remove square brackets (marked blue in the table) from MU contributions in category 1 above and capture it in TR 38.903.
(Highlighted in blue in Table B.1.1.3-1 and Table B.1.1.3-2 at Appendix A below.)
 
Revised to: R5-185336.
 
 
 
revised No R5‑185336  
    R5‑185336 Removing brackets from MU values in FR2 Anritsu discussion Agreement Yes
Yes
noted No   R5‑184427
    R5‑184429 Offset in quality of quiet zone evaluation Anritsu discussion Agreement Yes
Yes
 
This paper points out a overlooked point of the current quality of quiet zone evaluation method specified in Annex D of TR38.810.
Revised to: R5-184429r1.
 
 
Revised from: R5-184429.
Revised to: R5-185526.
 
 
 
revised No R5‑185526  
    R5‑185526 Offset in quality of quiet zone evaluation Anritsu discussion Agreement Yes
Yes
noted No   R5‑184429
    R5‑184431 Testability issue of low PSD test cases in FR2 Anritsu discussion Agreement Yes
Yes
 
Proposal of relaxation of Tx RF test requirements in FR2
Revised to: R5-184431r1.
 
 
Revised from: R5-184431.
Revised to: R5-185527.
 
 
 
revised No R5‑185527  
    R5‑185527 Testability issue of low PSD test cases in FR2 Anritsu discussion Agreement Yes
Yes
noted No   R5‑184431
    R5‑184484 Proposal for remaining Maximum Test System Uncertainty for NR FR1 TRx tests Anritsu, ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Proposal 1) To adopt maximum test system uncertainty factors specified in Table 1 for NR FR1 TRx tests
Proposal endorsed
noted No    
    R5‑184485 Test approach of EN-DC Rx tests with multiple LTE/NR CCs Anritsu discussion Endorsement Yes
Yes
 
 
 
Revised to: R5-184485r1.
 
 
Revised from: R5-184485.
Revised to: R5-184485r2.
 
 
Revised from: R5-184485r1.
Revised to: R5-185529.
 
 
 
revised No R5‑185529  
    R5‑185529 Test approach of EN-DC Rx tests with multiple LTE/NR CCs Anritsu discussion Endorsement Yes
Yes
Revised from: R5-184485r2.
Proposal 1b endorsed
noted No   R5‑184485
    R5‑184487 Discussion on FR2 TRx spurious test procedure Anritsu discussion Endorsement Yes
Yes
Revised to: R5-185347.
 
revised No R5‑185347  
    R5‑185347 Discussion on FR2 TRx spurious test procedure Anritsu discussion Endorsement No
Yes
Revised from: R5-184487.
associated pCR R5-184634
proposal endorsed
noted No   R5‑184487
    R5‑184488 Discussion on UL RMC for FR2 spurious test Anritsu discussion Endorsement Yes
Yes
 
Revised to: R5-184488r1.
 
 
Revised from: R5-184488.
r1: removed all the proposal and added observation 2 for further study
Revised to: R5-185533.
 
 
 
revised No R5‑185533  
    R5‑185533 Discussion on UL RMC for FR2 spurious test Anritsu discussion Endorsement Yes
Yes
noted No   R5‑184488
    R5‑184489 Discussion on test point selection for NR Out-of-band in FR1 CAICT discussion   Yes
Yes
associated pCR R5-184490
Revised to: R5-185301.
 
revised No R5‑185301  
    R5‑185301 Discussion on test point selection for NR Out-of-band in FR1 CAICT discussion - Yes
Yes
Revised from: R5-184489.
 
All proposal endorsed
noted No   R5‑184489
    R5‑184497 Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 KTL discussion Endorsement Yes
Yes
 
Proposal 1: Select DFT-s-OFDM PI/2 BPSK with Inner Full allocation and DFT-s-OFDM QPSK with Inner Full allocation.
Revised to: R5-184497r1.
 
 
Revised from: R5-184497.
 
revised to include previous test point proposal so as to enable common zip file in TR38.905 implementation
 
associated pCR R5-184479
Revised to: R5-185423.
 
 
 
revised No R5‑185423  
    R5‑185423 Discussion on Uplink configuration for NR Transmit Intermodulation in FR1 KTL discussion Endorsement Yes
Yes
Revised from: R5-184497r1.
Proposed endorsed
noted No   R5‑184497
    R5‑184509 Handling on TT defining from MU in FR2 NTT DOCOMO, INC. discussion Endorsement Yes
Yes
noted No    
    R5‑184741 Discussion on starting point of 200ms in FR1 RF test procedures Huawei,HiSilicon, Keysight discussion Endorsement Yes
Yes
Proposal 1: Using 200ms in test cases to ensure UE adjusts its power to the target power.
Proposal 2: The 200ms starts from the first TPC-command.
Revised to: R5-185306.
Revised to final to change the cover page and include Tdoc #
revised No R5‑185306  
    R5‑185306 Discussion on starting point of 200ms in FR1 RF test procedures Huawei,HiSilicon, Keysight discussion Endorsement Yes
Yes
Revised from: R5-184741.
 
Proposal endorsed
noted No   R5‑184741
    R5‑184752 Discussion on test point selection for NS_35 A-MPR in FR1 Ericsson LM discussion Endorsement Yes
Yes
associated pCR R5-184751, R5-184754
 
Proposal endorsed
noted No    
    R5‑184801 Discussion on UE device size for FR2 Rohde & Schwarz discussion Discussion Yes
Yes
noted No    
    R5‑184802 Discussion on treatment of multi-panel UEs Rohde & Schwarz discussion Approval Yes
Yes
proposal endorsed
noted No    
    R5‑184803 Discussion on Test Tolerance for FR2 Intel Corporation (UK) Ltd, Apple Inc. discussion Endorsement Yes
Yes
 
Discussion on Test Tolerance for FR2
Revised to: R5-184803r1.
 
 
Revised from: R5-184803.
r1: removed proposal 1
Revised to: R5-185534.
 
 
 
revised No R5‑185534  
    R5‑185534 Discussion on Test Tolerance for FR2 Intel Corporation (UK) Ltd, Apple Inc. discussion Endorsement Yes
Yes
noted No   R5‑184803
    R5‑184804 Discussion on TT for Max Output Power TC Requirements for FR2 Intel Corporation (UK) Ltd, Apple Inc. discussion Endorsement Yes
Yes
 
Discussion on TT for Max Output Power TC Requirements for FR2
Revised to: R5-184804r1.
 
 
Revised from: R5-184804.
Revised to: R5-184804r2.
 
 
Revised from: R5-184804r1.
Revised to: R5-184804r3.
 
 
Revised from: R5-184804r2.
Revised to: R5-185566.
 
 
 
revised No R5‑185566  
    R5‑185566 Discussion on TT for Max Output Power TC Requirements for FR2 Intel Corporation (UK) Ltd, Apple Inc. discussion Endorsement Yes
Yes
Revised from: R5-184804r3.
Proposal endorsed
noted No   R5‑184804
    R5‑184834 Discussion on the test applicability for the modulation of Pi/2-BPSK Huawei, Hisilicon discussion Endorsement Yes
Yes
Revised to: R5-185308.
associated pCR R5-184822
revised No R5‑185308  
    R5‑185308 Discussion on the test applicability for the modulation of Pi/2-BPSK Huawei, Hisilicon discussion Endorsement Yes
Yes
Revised from: R5-184834.
 
Proposal: The UE capabilities of pusch-HalfPi-BPSK and pucch-F3-4-HalfPi-BPSK shall be considered in the test applicability and test point selection analysis for all other relevant FR1 RF test cases.
 
Proposal endorsed
noted No   R5‑184834
    R5‑184835 Discussion on test point selection for Configured transmitted power for SUL test case in FR1 Huawei, Hisilicon discussion Endorsement Yes
Yes
associated pCR R5-184837, R5-184823
 
Proposal endorsed
noted No    
    R5‑184852 Discussion on OBW, SEM and ACLR for EN-DC interband FR1 Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
 
associated pCR R5-184855
need more time to disucss the leverage for interband tests from LTE testing PoV
LTE Config prop9 needs to be revisited
Revised to: R5-184852r1.
 
 
Revised from: R5-184852.
Revised to: R5-185478.
 
 
 
revised No R5‑185478  
    R5‑185478 Discussion on OBW, SEM and ACLR for EN-DC interband FR1 Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
Revised from: R5-184852r1.
except proposal 2, 4 and 6, other Proposals are endorsed
noted No   R5‑184852
    R5‑184858 Quality of Quiet Zone Results for IFF Keysight Technologies UK Ltd other Approval Yes
Yes
 
This contribution is presenting Quality of Quiet Zone measurement results performed in an Indirect Far-Field (IFF) system.
Revised to: R5-184858r1.
 
 
Revised from: R5-184858.
associated pCR R5-184913
Revised to: R5-185492.
 
 
 
revised No R5‑185492  
    R5‑185492 Quality of Quiet Zone Results for IFF Keysight Technologies UK Ltd other Approval Yes
Yes
noted No   R5‑184858
    R5‑184883 Proposal for 5G NR EVM Test Tolerance Qualcomm Incorporated discussion Endorsement Yes
Yes
 
Revised to: R5-184883r1.
 
 
Revised from: R5-184883.
 
Tighter EVM requirement with high test system measurement uncertainty poses challenge to accurately measure UE EVM without report a false failure.  Based on above analysis, we propose a minimum of TT of 0.8 to be considered for 256 QAM modulation scheme.
Revised to: R5-184883r2.
 
 
Revised from: R5-184883r1.
update proposal2 to be optional
Revised to: R5-185532.
 
 
 
revised No R5‑185532  
    R5‑185532 Proposal for 5G NR EVM Test Tolerance Qualcomm Incorporated discussion Endorsement Yes
Yes
noted No   R5‑184883
    R5‑184887 On the relation between MU and TT for RF and RRM conformance testing Ericsson discussion Discussion Yes
Yes
noted No    
    R5‑184910 Discussion of test frequencies Sprint Corporation discussion   No
Yes
LATE DOCUMENT
discussing the required signaling and related ASN.1 messages and IEs to ensure the needed values are captured in 38.508-1, but not additional values.
withdrawn Yes    
    R5‑184914 Discussion on MU factor for IFF Keysight Technologies UK Ltd discussion Endorsement No
Yes
late doc
withdrawn Yes    
    R5‑184915 Discussion on low-PSD scenarios Keysight Technologies UK Ltd discussion Endorsement No
Yes
late doc
withdrawn Yes    
    R5‑184916 Discussion on Dwell time Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
LATE DOCUMENT
 
proposal endorsed
noted No    
    R5‑184922 Test Point Analysis for Reference sensitivity level for EN-DC Qualcomm Incorporated discussion Endorsement Yes
Yes
 
Revised to: R5-184922r1.
 
 
Revised from: R5-184869 and R5-184905.
associated pCR R5-1849
 
prop2 to include LTE and FR1 freq at freq corners and have it swapped for deciding on the test points
Anritsu commented if the choice of freq then we may not test the exceptions
 
Revised to: R5-184922r2.
 
 
Revised from: R5-184922r1.
Revised to: R5-185429.
 
 
 
revised No R5‑185429  
    R5‑185429 Test Point Analysis for Reference sensitivity level for EN-DC Qualcomm Incorporated discussion Endorsement Yes
Yes
Revised from: R5-184922r2.
Proposal endorsed
 
noted No   R5‑184922
    R5‑184944 Discussion on test point selection for Carrier Leakage in FR1 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Revised to: R5-185310.
 
associated pCR R5-184943 and R5-184942
revised No R5‑185310  
    R5‑185310 Discussion on test point selection for Carrier Leakage in FR1 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Revised from: R5-184944.
 
All proposal endorsed
noted No   R5‑184944
    R5‑184949 Discussion on test point selection for EVM equalizer spectrum flatness in FR1 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
associated pCR R5-184948 and R5-184947
 
Revised to: R5-185313.
 
revised No R5‑185313  
    R5‑185313 Discussion on test point selection for EVM equalizer spectrum flatness in FR1 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Revised from: R5-184949.
Editorial correction
All proposal endorsed
noted No   R5‑184949
    R5‑184952 Discussion on test point selection for Frequency Error test case in FR1 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
associated pCR R5-184951 and R5-184950
 
Proposal endorsed
noted No    
    R5‑184957 Discussion on test point selection for In-band Emissions test case in FR1 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
associated pCR R5-184956 and R5-184955
 
Revised to: R5-185318.
 
revised No R5‑185318  
    R5‑185318 Discussion on test point selection for In-band Emissions test case in FR1 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Revised from: R5-184957.
 
Proposal endorsed
noted No   R5‑184957
    R5‑184962 Discussion on test point selection for Frequency Error in FR2 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Revised to: R5-185349.
associated pCR R5-184961, R5-184960
revised No R5‑185349  
    R5‑185349 Discussion on test point selection for Frequency Error in FR2 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Revised from: R5-184962.
 
proposal endorsed
noted No   R5‑184962
    R5‑184965 Discussion on test point selection for EVM in FR2 ROHDE & SCHWARZ discussion Endorsement No
Yes
late doc
withdrawn Yes    
    R5‑184968 Discussion on test point selection for Carrier Leakage in FR2 ROHDE & SCHWARZ discussion Endorsement No
Yes
late doc
withdrawn Yes    
    R5‑184971 Discussion on test point selection for In-band Emissions in FR2 ROHDE & SCHWARZ discussion Endorsement No
Yes
late doc
withdrawn Yes    
    R5‑184974 Discussion on test point selection for EVM equalizer spectral flatness in FR2 ROHDE & SCHWARZ discussion Endorsement No
Yes
late doc
withdrawn Yes    
    R5‑184975 Discussion on Measurement Uncertainty in FR2 ROHDE & SCHWARZ discussion Endorsement No
Yes
late doc
withdrawn Yes    
    R5‑184978 Discussion on TT for EN-DC test cases Huawei,HiSilicon discussion Discussion No
Yes
withdrawn Yes    
    R5‑184979 Discussion on Test configuraion table for EN-DC test cases Huawei,HiSilicon discussion Discussion No
Yes
withdrawn Yes    
    R5‑185334 Discussion of LTE Test point selection for EN-DC with FR1 Tx Spurious emission Test Qualcomm Inc. discussion discussion Yes
Yes
LATE DOCUMENT
associated pCR R5-185487
 
Document was sent FOR E-MAIL APPROVAL
 
approved No    
    R5‑185410 Discussion on approach for defining EN-DC tests in TS 38.521-3 Qualcomm Wireless GmbH discussion discussion Yes
Yes
 
LATE DOCUMENT
 
Revised to: R5-185410r1.
 
 
LATE DOCUMENT
Revised from: R5-185410.
Revised to: R5-185410r2.
 
 
LATE DOCUMENT
Revised from: R5-185410r1.
Revised to: R5-185468.
 
 
 
revised No R5‑185468  
    R5‑185468 Discussion on approach for defining EN-DC tests in TS 38.521-3 Qualcomm Wireless GmbH discussion discussion Yes
Yes
LATE DOCUMENT
Revised from: R5-185410r2.
Proposal endorsed
noted No   R5‑185410
5.3.14 Enhancements of NB-IoT (UID - 770061) NB_IOTenh-UEConTest                      
5.3.14.1 TS 36.508                      
5.3.14.2 TS 36.509                      
5.3.14.3 TS 36.521-1 R5‑184403 New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
revised No R5‑185497  
    R5‑185497 New test case 6.3.5FA.1 Power Control Absolute power tolerance for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
agreed No   R5‑184403
    R5‑184405 New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
revised No R5‑185498  
    R5‑185498 New test case 6.3.5FA.2 Power Control Relative power tolerance for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
agreed No   R5‑184405
    R5‑184406 New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
revised No R5‑185499  
    R5‑185499 New test case 6.3.5FA.3 Aggregate power control tolerance for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
agreed No   R5‑184406
    R5‑184480 New test case 6.5.2.1FA.1 Error Vector Magnitude (EVM) for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
title of Following Docs need to be changed, will submit by RAN5#81
withdrawn Yes    
    R5‑184481 New test case 6.5.2.2FA Carrier leakage for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
title of Following Docs need to be changed, will submit by RAN5#81
withdrawn Yes    
    R5‑184482 New test case 6.5.2.3FA In-band emissions for non allocated RB for category NB1 and NB2/Power Class 6 CAICT CR Agreement Yes
Yes
title of Following Docs need to be changed, will submit by RAN5#81
withdrawn Yes    
    R5‑184651 Update of TC8.12.1.1.3 TTA CR Agreement Yes
Yes
1. Removed Editor’s note in corresponding test case.
2. Updated Annex F.1.4, F.3.4, G.3.5
agreed No    
5.3.14.4 TS 36.521-2                      
5.3.14.5 TS 36.521-3                      
5.3.14.6 TS 37.571-1 R5‑184112 Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
 
Revised to: R5-184112r1.
 
 
Revised from: R5-184112.
Revised to: R5-185416.
 
 
 
revised No R5‑185416  
    R5‑185416 Correction to nrs-CRS-PowerOffset-r13 for NB-IOT OTDOA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184112
    R5‑184113 NB-IOT OTDOA reporting delay test cases not testable ROHDE & SCHWARZ CR Agreement Yes
Yes
 
Revised to: R5-184113r1.
 
 
Revised from: R5-184113.
Revised to: R5-184113r2.
 
 
Revised from: R5-184113r1.
Revised to: R5-184113r3.
 
 
Revised from: R5-184113r2.
Revised to: R5-185417.
 
 
 
revised No R5‑185417  
    R5‑185417 NB-IOT OTDOA reporting delay test cases not testable ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184113
5.3.14.7 TS 37.571-3 R5‑184132 Correction of the applicability for OTDOA IOT tests ROHDE & SCHWARZ CR Agreement Yes
Yes
cl. Affected missing.
revised No R5‑185418  
    R5‑185418 Correction of the applicability for OTDOA IOT tests ROHDE & SCHWARZ CR Agreement Yes
Yes
reissued as R5-185359 because of title change.
withdrawn Yes   R5‑184132
    R5‑185359 Correction of the title for OTDOA IOT tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
5.3.14.8 TS 37.571-5                      
5.3.14.9 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.14.10 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.14.11 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.14.12 General Papers / Work Plan / TC lists                      
5.3.15 Elevation Beamforming/Full-Dimension MIMO for LTE (UID - 770062) LTE_EBF_FDMIMO-UEConTest                      
5.3.15.1 TS 36.508                      
5.3.15.2 TS 36.521-1 R5‑184644 Editorial: Cleaning up the style of Annex B.4.1A in TS 36.521-1 TTA CR Agreement Yes
Yes
Style error of Annex B.4.1A in TS 36.521-1 was corrected
agreed No    
    R5‑184646 Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO TTA CR Agreement Yes
Yes
 
Addition of the new test case in 8.3.1.1.9
Revised to: R5-184646r1.
 
 
Revised from: R5-184646.
r1: Added test applicability for dmrs-Enhancements-r13; Fixed normative reference correctly.
 
Revised to: R5-185387.
 
 
 
revised No R5‑185387  
    R5‑185387 Introduction of FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO TTA CR Agreement Yes
Yes
agreed No   R5‑184646
    R5‑184648 Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO TTA CR Agreement Yes
Yes
 
Addition of the new test case in 8.3.2.1.10
Revised to: R5-184648r1.
 
 
Revised from: R5-184648.
r1: Added test applicability for dmrs-Enhancements-r13
Revised to: R5-185388.
 
 
 
revised No R5‑185388  
    R5‑185388 Introduction of TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO TTA CR Agreement Yes
Yes
agreed No   R5‑184648
5.3.15.3 TS 36.521-2 R5‑184649 Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 TTA CR Agreement Yes
Yes
 
Addition the applicability following test cases:
• FDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO
• TDD PDSCH Single-layer Spatial Multiplexing for FD-MIMO
Revised to: R5-184649r1.
 
 
Revised from: R5-184649.
Revised to: R5-185389.
 
 
 
revised No R5‑185389  
    R5‑185389 Applicabilities addition of test cases 8.3.1.1.9 and 8.3.2.1.10 TTA CR Agreement Yes
Yes
agreed No   R5‑184649
5.3.15.4 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.15.5 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception )                      
5.3.15.6 General Papers / Work Plan / TC lists                      
5.3.16 Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest                      
5.3.16.1 TS 36.508                      
5.3.16.2 TS 36.521-1 R5‑184313 Demodulation test case 8.11.1.1.1 and 8.11.1.1.2 updated for category M2 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184380 New feMTC test case 7.5EC Adjacent Channel Selectivity (ACS) for UE category M2 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184381 New feMTC test case 7.6.1EC In-band blocking for UE category M2 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184382 New feMTC test case 7.6.3EC Narrow band blocking for UE category M2 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184383 New feMTC test case 7.8.1EC Wide band intermodulation for UE category M2 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184384 Update of Annexes F.1.3 and F.3.3 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184559 Updates to feMTC tc 6.2.2EC UE Maximum Output Power for UE category M2 Ericsson CR Agreement Yes
Yes
agreed No    
5.3.16.3 TS 36.521-2 R5‑184325 36.521-2 updates for category M2 test cases Ericsson CR Agreement Yes
Yes
agreed No    
5.3.16.4 TS 36.521-3 R5‑184736 Introduce Intra frequency handover for Cat-M2 UEs in CEModeA Bureau Veritas CR Agreement Yes
Yes
legacy test cases used for Cat-M2 UE need to be re-considered the applicability
withdrawn Yes    
5.3.16.5 TS 37.571-1 R5‑184114 Changes to eMTC OTDOA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
 
Revised to: R5-184114r1.
 
 
Revised from: R5-184114.
Revised to: R5-185419.
 
 
 
revised No R5‑185419  
    R5‑185419 Changes to eMTC OTDOA tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184114
5.3.16.6 TS 37.571-3                      
5.3.16.7 TS 37.571-5 R5‑184131 Addition of Assistance Data for OTDOA eMTC tests ROHDE & SCHWARZ CR Agreement Yes
Yes
 
Revised to: R5-184131r1.
 
 
Revised from: R5-184131.
Revised to: R5-185420.
 
 
 
revised No R5‑185420  
    R5‑185420 Addition of Assistance Data for OTDOA eMTC tests ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184131
5.3.16.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.16.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.16.10 General Papers / Work Plan / TC lists                      
5.3.17 Rel-15 CA configurations (UID - 770064) LTE_CA_R15-UEConTest                      
5.3.17.1 TS 36.508                      
5.3.17.2 TS 36.521-1 R5‑184396 New CA band combination CA_8A-27A - Updates of 7.3A Refsens KT Corp. CR Agreement Yes
Yes
agreed No    
    R5‑184511 Updates of receiver test cases for CA_XA-YE NTT DOCOMO, INC. CR Agreement Yes
Yes
 
CA_1A-42E, CA_3A-42E
Revised to: R5-184511r1.
 
 
Revised from: R5-184511.
Revised to: R5-185514.
 
 
 
revised No R5‑185514  
    R5‑185514 Updates of receiver test cases for CA_XA-YE NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑184511
    R5‑184516 Updates of receiver test cases for CA_XA-YD NTT DOCOMO, INC. CR Agreement Yes
Yes
 
CA_1A-42D, CA_3A-42D
Revised to: R5-184516r1.
 
 
Revised from: R5-184516.
Revised to: R5-185515.
 
 
 
revised No R5‑185515  
    R5‑185515 Updates of receiver test cases for CA_XA-YD NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑184516
    R5‑184586 Align CA information in clause 5 with TS36.101 v15.3.0 Bureau Veritas CR Agreement Yes
Yes
Alignment clause 5 CR with TS36.101 v15.3.0
agreed No    
    R5‑184642 CA_3A-18A - Updates of some Tx test cases KDDI Corporation CR Agreement Yes
Yes
cover title adds "CA band combination"
 
Revised to: R5-184642r1.
 
 
Revised from: R5-184642.
Revised to: R5-184642r2.
 
 
Revised from: R5-184642r1.
Revised to: R5-185542.
 
 
 
revised No R5‑185542  
    R5‑185542 CA_3A-18A - Updates of some Tx test cases KDDI Corporation CR Agreement Yes
Yes
agreed No   R5‑184642
    R5‑184647 Correction of test requirements in 7.3.5A REFSENSE KDDI Corporation CR Agreement Yes
Yes
agreed No    
    R5‑184762 Aligning CA delta TiB in sub-clause 6.2.5.3 with TS 36.101 v15.3.0 Ericsson LM CR Agreement Yes
Yes
LATE DOCUMENT
 
Document was sent FOR E-MAIL AGREEMENT
 
agreed No    
    R5‑184764 Aligning CA delta RiB in sub-clause 7.3.3 with TS 36.101 v15.3.0 Ericsson LM CR Agreement Yes
Yes
LATE DOCUMENT
 
Document was sent FOR E-MAIL AGREEMENT
 
agreed No    
    R5‑184775 Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A WE Certification Oy, DISH Network CR Agreement Yes
Yes
wrong Tdoc#
revised No R5‑185174  
    R5‑185174 Reference sensitivity requirements for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A WE Certification Oy, DISH Network CR Agreement Yes
Yes
agreed No   R5‑184775
    R5‑184844 Addition of new 2CA band combination for CA REFSENS SGS Wireless CR Agreement Yes
Yes
agreed No    
    R5‑184845 Addition of new 3CA band combination for CA REFSENS SGS Wireless CR Agreement Yes
Yes
 
Revised to: R5-184845r1.
 
 
Revised from: R5-184845.
Revised to: R5-185506.
 
 
 
revised No R5‑185506  
    R5‑185506 Addition of new 3CA band combination for CA REFSENS SGS Wireless CR Agreement Yes
Yes
agreed No   R5‑184845
5.3.17.3 TS 36.521-2 R5‑184401 New CA band combination CA_8A-27A - Updates of Table A.4.6.3-3 KT Corp. CR Agreement Yes
Yes
merged into common CR R5-185442
withdrawn Yes    
    R5‑184587 Addition of new R15 CA configurations to 36.521-2 Bureau Veritas CR Agreement Yes
Yes
merged into common CR R5-185442
withdrawn Yes    
    R5‑184645 CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 KDDI Corporation CR Agreement Yes
Yes
cover title adds "CA band combinations"
WIC typo
 
Revised to: R5-184645r1.
 
 
Revised from: R5-184645.
r1: Title and Work item code are corrected; Clarify number of uplink component carrier  in Table A.4.6.3-3.
 
Revised to: R5-185486.
 
 
 
revised No R5‑185486  
    R5‑185486 CA_3A-18A and 1A-3A-18A - Updates of A.4.6.3 KDDI Corporation CR Agreement Yes
Yes
Revised from: R5-184645r1.
merged into common CR R5-185442
withdrawn Yes   R5‑184645
5.3.17.4 TS 36.521-3                      
5.3.17.5 TS 37.571-1                      
5.3.17.6 TS 37.571-3                      
5.3.17.7 TS 37.571-5                      
5.3.17.8 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.3.17.9 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.3.17.10 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) R5‑184641 CA_3A-18A - Updates of test points analysis KDDI Corporation CR Agreement Yes
Yes
cover title adds "CA band combination"
 
Revised to: R5-184641r1.
 
 
Revised from: R5-184641.
Revised to: R5-184641r2.
 
 
Revised from: R5-184641r1.
Revised to: R5-185543.
 
 
 
revised No R5‑185543  
    R5‑185543 CA_3A-18A - Updates of test points analysis KDDI Corporation CR Agreement Yes
Yes
agreed No   R5‑184641
    R5‑184773 RF TP analysis for CA_66A-66A-70C-71A, CA_66A-66A-70A-71A, CA_66A-70C-71A, CA_66A-70A-71A, CA_66A-66A-71A, CA_70A-71A, CA_66A-71A, CA_66C-70C-71A, CA_66C-70A-71A, CA_70C-71A, CA_66C-71A WE Certification Oy, DISH Network CR Agreement Yes
Yes
agreed No    
    R5‑184838 Addition of new CA band combination – Updates of test points analysis SGS Wireless CR Agreement Yes
Yes
 
Revised to: R5-184838r1.
 
 
Revised from: R5-184838.
Revised to: R5-185502.
 
 
 
revised No R5‑185502  
    R5‑185502 Addition of new CA band combination – Updates of test points analysis SGS Wireless CR Agreement Yes
Yes
agreed No   R5‑184838
5.3.17.11 General Papers / Work Plan / TC lists                      
5.3.18 FDD operating band in the L-band for LTE (UID - 780062) LTE_FDD_L_band-UEConTest                      
5.3.18.1 TS 34.121-1 R5‑184389 Addition of Band 74 information into TS 34.121-1 NTT DOCOMO, INC. CR Agreement Yes
Yes
 
Revised to: R5-184389r1.
 
 
Revised from: R5-184389.
Revised to: R5-185516.
 
 
 
revised No R5‑185516  
    R5‑185516 Addition of Band 74 information into TS 34.121-1 NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑184389
5.3.18.2 TS 36.508                      
5.3.18.3 TS 36.521-1 R5‑184390 Updates of Band 74 information about Tx test cases in TS 36.521-1 NTT DOCOMO, INC. CR Agreement Yes
Yes
 
Revised to: R5-184390r1.
 
 
Revised from: R5-184390.
Revised to: R5-185517.
 
 
 
revised No R5‑185517  
    R5‑185517 Updates of Band 74 information about Tx test cases in TS 36.521-1 NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑184390
5.3.18.4 TS 36.521-2                      
5.3.18.5 TS 36.521-3 R5‑184264 Correction to minimum conformance requirements for FDD_B1 and FDD_B2 Anritsu CR Agreement Yes
Yes
agreed No    
5.3.18.6 TS 37.571-1                      
5.3.18.7 TR 36.903                      
5.3.18.8 TR 36.905                      
5.3.18.9 General Papers / Work Plan / TC lists                      
5.3.19 Uplink capacity enhancements for LTE (UID - 780063) LTE_UL_CAP_enh-UEConTest                      
5.3.19.1 TS 36.508                      
5.3.19.2 TS 36.521-1 R5‑184326 New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM Ericsson CR Agreement Yes
Yes
 
Revised to: R5-184326r1.
 
 
Revised from: R5-184326.
Revised to: R5-185426.
 
 
 
revised No R5‑185426  
    R5‑185426 New test case: 6.2.3A.3_2, Maximum Power Reduction (MPR) for CA (intra-band non-contiguous DL CA and UL CA) for UL 256QAM Ericsson CR Agreement Yes
Yes
agreed No   R5‑184326
    R5‑184556 Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous CETECOM GmbH CR Agreement Yes
Yes
 
Revised to: R5-184556r1.
 
 
Revised from: R5-184556.
Revised to: R5-185434.
 
 
 
revised No R5‑185434  
    R5‑185434 Addition of new UL 256QAM test case - A-MPR for 2UL CA intra-band contiguous CETECOM GmbH CR Agreement Yes
Yes
agreed No   R5‑184556
    R5‑184557 Addition of new UL 256QAM test case - A-MPR for 2UL CA inter-band CETECOM GmbH CR Agreement Yes
Yes
agreed No    
    R5‑184558 Addition of new UL 256QAM test case - Annex F CETECOM GmbH CR Agreement Yes
Yes
agreed No    
    R5‑184640 Introduction of Additional spurious emissions for UL 256QAM TTA CR Agreement Yes
Yes
 
Addition of the new test case in 6.6.3.3_2
Revised to: R5-184640r1.
 
 
Revised from: R5-184640.
Revised to: R5-185406.
 
 
 
revised No R5‑185406  
    R5‑185406 Introduction of Additional spurious emissions for UL 256QAM TTA CR Agreement Yes
Yes
agreed No   R5‑184640
    R5‑184697 New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM Ericsson CR Agreement Yes
Yes
 
Revised to: R5-184697r1.
 
 
Revised from: R5-184697.
Revised to: R5-185427.
 
 
 
revised No R5‑185427  
    R5‑185427 New UL 256QAM test case: 6.6.2.2_2 Additional Spectrum Emission Mask for UL 256QAM Ericsson CR Agreement Yes
Yes
agreed No   R5‑184697
5.3.19.3 TS 36.521-2 R5‑184643 Addition of applicability for TC6.6.3.3_2 TTA CR Agreement Yes
Yes
 
Addition the applicability following test cases
Revised to: R5-184643r1.
 
 
Revised from: R5-184643.
Revised to: R5-185407.
 
 
 
revised No R5‑185407  
    R5‑185407 Addition of applicability for TC6.6.3.3_2 TTA CR Agreement Yes
Yes
agreed No   R5‑184643
    R5‑184698 Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 Ericsson CR Agreement No
Yes
withdrawn Yes    
    R5‑184725 Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 Ericsson CR Agreement Yes
Yes
 
Revised to: R5-184725r1.
 
 
Revised from: R5-184725.
Revised to: R5-185428.
 
 
 
revised No R5‑185428  
    R5‑185428 Applicability for New UL 256QAM test cases: 6.6.2.2_2 and 6.6.2.3A.3_2 Ericsson CR Agreement Yes
Yes
agreed No   R5‑184725
5.3.19.4 TS 36.521-3                      
5.3.19.5 TR 36.904                      
5.3.19.6 TR 36.905                      
5.3.19.7 General Papers / Work Plan / TC lists                      
5.3.20 Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest                      
5.3.20.1 TS 36.521-1                      
5.3.20.2 TS 36.521-2                      
5.3.20.3 TR 36.905                      
5.3.20.4 General Papers / Work Plan / TC lists                      
5.3.21 LTE bands with UE category M2 and/or NB2 in Rel-15 (UID - 780067) LTE_bands_R15_M2_NB2-UEConTest                      
5.3.21.1 TS 36.508                      
5.3.21.2 TS 36.521-1                      
5.3.21.3 TS 36.521-2                      
5.3.21.4 TS 36.521-3                      
5.3.21.5 TS 37.571-1                      
5.3.21.6 General Papers / Work Plan / TC lists                      
5.3.22 450 MHz Band for LTE in Region 3 (UID - 790058) LTE450_Reg3-UEConTest                      
5.3.22.1 TS 34.121-1                      
5.3.22.2 TS 36.508                      
5.3.22.3 TS 36.521-1 R5‑184099 Introduction of band 73 to UE maximum output power in TS36.521-1 China Unicom CR Agreement Yes
Yes
agreed No    
    R5‑184130 Introduction of band 73 to Spurious emission in TS36.521-1 China Unicom CR Agreement Yes
Yes
agreed No    
5.3.22.4 TS 36.521-2                      
5.3.22.5 TS 36.521-3                      
5.3.22.6 TS 37.571-1                      
5.3.22.7 General Papers / Work Plan / TC lists                      
5.4 Routine Maintenance for LTE only TEIx_Test                      
5.4.1 LTE RF                      
5.4.1.1 TS 36.508 R5‑184110 Correction to NB-IOT In-Band Test Frequencies ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184111 Addition of NB-IOT Guardband Test Frequencies for 10 MHz ROHDE & SCHWARZ CR Agreement Yes
Yes
 
Revised to: R5-184111r1.
 
 
Revised from: R5-184111.
Revised to: R5-184111r2.
 
 
Revised from: R5-184111r1.
Revised to: R5-185409.
 
 
 
revised No R5‑185409  
    R5‑185409 Addition of NB-IOT Guardband Test Frequencies for 10 MHz ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184111
    R5‑184234 Correction to message contents for UL64QAM Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184235 Correction to default message for UL CA tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184236 Editorial correction to FDD Mode test frequencies Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184569 Add Band 31 Test Frequencies for NB-IoT Inter-frequency Test cases ANRITSU LTD CR Agreement Yes
Yes
Update Tables 8.1.3.1.1.31-2 and 8.1.4.3.2-1 to include an entry for PRB 22.
agreed No    
5.4.1.2 TS 36.521-1 R5‑184098 Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 Qualcomm Incorporated CR Agreement Yes
Yes
WIC added. Old date.
Addition of TPs for power class 5 in 6.2.5EA Configured UE transmitted Output Power for UE category M1
Revised to: R5-184098r1.
 
 
Revised from: R5-184098.
Revised to: R5-185522.
 
 
 
revised No R5‑185522  
    R5‑185522 Update Clause in 6.2.5EA Configured UE transmitted Power for UE category M1 Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184098
    R5‑184335 Band 41 HPUE Maximum Output Power CMCC CR Agreement Yes
Yes
 
Revised to: R5-184335r1.
 
 
Revised from: R5-184335.
Revised to: R5-184335r2.
 
 
Revised from: R5-184335r1.
Revised to: R5-184335r3.
 
 
Revised from: R5-184335r2.
Revised to: R5-185548.
 
 
 
revised No R5‑185548  
    R5‑185548 Band 41 HPUE Maximum Output Power CMCC CR Agreement Yes
Yes
Revised from: R5-184335r3.
 
Document was sent FOR E-MAIL AGREEMENT
 
r1 was produced.
revised No R5‑185185 R5‑184335
    R5‑185185 Band 41 HPUE Maximum Output Power CMCC CR Agreement No
Yes
Email agreed
agreed No   R5‑185548
    R5‑184492 Add Test Tolerance and Annex F for NAICS feature applicable in test case 8.3.1.1.7 and 8.3.2.1.8. TEOCO CR Agreement No
Yes
withdrawn Yes    
    R5‑184541 Correction to eMTC tc 6.2.2EA, UE Maximum Output Power for UE category M1 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184669 Clarification on frame structure in 4Rx performance and CSI test principles sections Qualcomm Wireless GmbH CR Agreement Yes
Yes
no cl. Affected
 
Revised to: R5-184669r1.
 
 
Revised from: R5-184669.
Revised to: R5-185530.
 
 
 
revised No R5‑185530  
    R5‑185530 Clarification on frame structure in 4Rx performance and CSI test principles sections Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No   R5‑184669
    R5‑184898 Proposal for LTE 256QAM EVM Test Tolerance Qualcomm Incorporated discussion Endorsement Yes
Yes
 
Revised to: R5-184898r1.
 
 
Revised from: R5-184898.
Revised to: R5-185553.
 
 
 
revised No R5‑185553  
    R5‑185553 Proposal for LTE 256QAM EVM Test Tolerance Qualcomm Incorporated discussion Endorsement Yes
Yes
noted No   R5‑184898
5.4.1.2.1 Tx Requirements (Clause 6) R5‑184242 Correction to p-Max in configured UE transmitted output power tests for CA Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184244 Editorial correction to inter-band UL CA tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184251 Editorial correction to 6.6.3.3 Anritsu CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184253 Clarify the definition of active time slot in out of band and spurious emission tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184554 Correction of test points and test requirements for TC 6.2.4A.2 CETECOM GmbH CR Agreement Yes
Yes
 
Revised to: R5-184554r1.
 
 
Revised from: R5-184554.
Revised to: R5-185436.
 
 
 
revised No R5‑185436  
    R5‑185436 Correction of test points and test requirements for TC 6.2.4A.2 CETECOM GmbH CR Agreement Yes
Yes
agreed No   R5‑184554
    R5‑184555 Correction of test points and test requirements for TC 6.2.4A.2_1 CETECOM GmbH CR Agreement Yes
Yes
 
Revised to: R5-184555r1.
 
 
Revised from: R5-184555.
Revised to: R5-185435.
 
 
 
revised No R5‑185435  
    R5‑185435 Correction of test points and test requirements for TC 6.2.4A.2_1 CETECOM GmbH CR Agreement Yes
Yes
agreed No   R5‑184555
    R5‑184799 Corrections to A-MPR values for NS_27 Rohde & Schwarz CR Agreement Yes
Yes
 
Revised to: R5-184799r1.
 
 
Revised from: R5-184799.
Revised to: R5-185448.
 
 
 
revised No R5‑185448  
    R5‑185448 Corrections to A-MPR values for NS_27 Rohde & Schwarz CR Agreement Yes
Yes
agreed No   R5‑184799
    R5‑184812 Correction to Power Control for CA Test Procedure of TCs 6.3.5A.1.1, 6.3.5A.1.2 and 6.3.5A.1.4 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
Correction to Power Control for CA Test Procedure of TCs 6.3.5A.1.1,  6.3.5A.1.2 and 6.3.5A.1.4
agreed No    
    R5‑184818 Correction to Message Content for TC 6.2.4EA A-MPR for UE Category M1 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
Correction to Message Content for TC 6.2.4EA  A-MPR for UE Category M1
agreed No    
    R5‑184941 Editorial correction of NS requirements ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
5.4.1.2.2 Rx Requirements (Clause 7) R5‑184650 Editorial correction of Table 7.6.3A.5.4.1-1 KDDI Corporation CR Agreement Yes
Yes
agreed No    
    R5‑184811 Correction to Note 1 of Table 7.3A.0-0bB Reference sensitivity level for CA Intel Corporation (UK) Ltd CR Agreement Yes
Yes
Correction to Note 1 of Table 7.3A.0-0bB Reference sensitivity level for CA
agreed No    
    R5‑184836 Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
changed title: "Correction to UL Allocation in Reference sensitivity level for CA Table 7.3A.1.4.1-1"
changed to TEI10!
reissued as R5-184991 because of title change
withdrawn Yes    
    R5‑184991 Correction to Reference sensitivity level for CA UL Allocation in Table 7.3A.1.4.1-1 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
agreed No    
5.4.1.2.3 Other Clauses (I.e. Clauses 1-5 /8-10 / Annexes) R5‑184233 CR of CQI reporting test case 9.2.1.1.4.2 Huawei, Hisilicon CR Agreement Yes
Yes
 
Revised to: R5-184233r1.
 
 
Revised from: R5-184233.
Revised to: R5-184233r2.
 
 
Revised from: R5-184233r1.
Revised to: R5-185537.
 
 
 
revised No R5‑185537  
    R5‑185537 CR of CQI reporting test case 9.2.1.1.4.2 Huawei, Hisilicon CR Agreement Yes
Yes
withdrawn Yes   R5‑184233
    R5‑184238 Correction to LAA CQI reporting tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184245 Editorial correction to RMC name in PHICH demodulation test Anritsu CR Agreement Yes
Yes
 
Revised to: R5-184245r1.
 
 
Revised from: R5-184245.
Revised to: R5-185451.
 
 
 
revised No R5‑185451  
    R5‑185451 Editorial correction to RMC name in PHICH demodulation test Anritsu CR Agreement Yes
Yes
agreed No   R5‑184245
    R5‑184246 Editorial correction to test points for 8.7.5.1 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184360 Test Engineer TEOCO CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184797 Clarification for chapter 8 & 9 general sections Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
    R5‑184891 4Rx support in some 4DL CA and 5DL CA Demodulation test cases Ericsson CR Agreement Yes
Yes
Document was sent FOR E-MAIL AGREEMENT
 
r1 was produced.
revised No R5‑185186  
    R5‑185186 4Rx support in some 4DL CA and 5DL CA Demodulation test cases Ericsson CR Agreement No
Yes
Email agreed
agreed No   R5‑184891
5.4.1.3 TS 36.521-2 R5‑184109 Applicability correction for eMTC tests ROHDE & SCHWARZ CR Agreement Yes
Yes
overlap with R5-184269
withdrawn Yes    
    R5‑184336 Correction of applicability to TS 36.521-2 for HPUE RF test cases CMCC CR Agreement Yes
Yes
 
Revised to: R5-184336r1.
 
 
Revised from: R5-184336.
Revised to: R5-184336r2.
 
 
Revised from: R5-184336r1.
Revised to: R5-185541.
 
 
 
revised No R5‑185541  
    R5‑185541 Correction of applicability to TS 36.521-2 for HPUE RF test cases CMCC CR Agreement Yes
Yes
agreed No   R5‑184336
    R5‑184581 Applicability C20 updated for intra-band contigous DL CA tests Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑184582 Updated to Tested CA Configurations Selection Criteria Bureau Veritas CR Agreement Yes
Yes
merged into common CR R5-185442
withdrawn Yes    
    R5‑184583 Table format correct and removed redundant line for RF clause 7 test cases Bureau Veritas CR Agreement Yes
Yes
 
Revised to: R5-184583r1.
 
 
Revised from: R5-184583.
Revised to: R5-185528.
 
 
 
revised No R5‑185528  
    R5‑185528 Table format correct and removed redundant line for RF clause 7 test cases Bureau Veritas CR Agreement Yes
Yes
agreed No   R5‑184583
    R5‑184584 Table format correct and removed redundant line for RF clause 6 test cases Bureau Veritas CR Agreement Yes
Yes
agreed No    
    R5‑184808 Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
 
Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2
Revised to: R5-184808r1.
 
 
Revised from: R5-184808.
Revised to: R5-184808r2.
 
 
Revised from: R5-184808r1.
Revised to: R5-185549.
 
 
 
revised No R5‑185549  
    R5‑185549 Correction to band selection criteria applicability for HPUE devices that support Power Class 1 & 2 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
Revised from: R5-184808r2.
 
Document was sent FOR E-MAIL AGREEMENT
 
agreed No   R5‑184808
    R5‑184809 Correction to Applicability Condition of TS 36.521-1 Test Cases 6.6.2.2A.1 and 6.6.3.3A.1 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
Correction to Applicability Condition of TS 36.521-1 Test Cases 6.6.2.2A.1 and 6.6.3.3A.1
agreed No    
    R5‑184890 Test optimization for CA fallback cases in 3DL CA and 4DL CA Receiver test cases Ericsson CR Agreement Yes
Yes
merged into common CR R5-185442
withdrawn Yes    
    R5‑184892 4Rx branches in some 4DL CA and 5DL CA Demodulation test cases Ericsson CR Agreement Yes
Yes
agreed No    
5.4.1.4 TS 36.521-3 R5‑184100 Applicability correction for event triggered eMTC tests ROHDE & SCHWARZ CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184101 Applicability correction for HO eMTC tests ROHDE & SCHWARZ CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184105 Editorial corrections 7.3.49 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184129 Editorial Correction to note 7 in Table E-1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184255 Editorial correction to Reference NPRACH Configuration Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184257 Correction to LAA CSI-RS measurement test Anritsu CR Agreement No
Yes
not available
withdrawn Yes    
    R5‑184258 Editorial correction to LAA Listen-before-talk model Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184261 Correction to cell configuration mapping for 8.26.3 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184262 Correction to test procedure for FS3 event triggered reporting tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184263 Correction to test requirement of FS3 event triggered reporting tests Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184265 Editorial correction to Noc for Cell2 on FDD_B1 or FDD_B2 Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184570 Corrections for 5MHz Channel BW in 4.2.19, 6.x.y and 7.3.x NB-IoT Test cases ANRITSU LTD CR Agreement Yes
Yes
a) In Test case 4.2.19, change PRB location to 17 for the 5MHz eCell scenario.
b) In Test Case 6.1.16, remove the editor’s note.
c) Update Test cases 6.2.16, 6.2.17, 7.3.60 to 7.3.65 and 7.3.67 to cover the 5MHz eCell Channel BW
agreed No    
    R5‑184667 Correction to LAA inter-frequency event-triggered reporting test cases Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No    
    R5‑184917 Correction on 4Rx RLM TC in-sync parameters Qualcomm Wireless GmbH CR Agreement Yes
Yes
agreed No    
5.4.1.5 RRM Test & Radio Reception Test Tolerances                      
5.4.1.5.1 TS 36.521-3 (TT CR’s)                      
5.4.1.5.2 TR 36.903 (E-UTRAN RRM TT analyses)                      
5.4.1.5.3 TR 36.904 (E-UTRAN Radio Reception TT analyses)                      
5.4.1.5.4 TR 36.905 (E-UTRAN Test Points Radio Transmission and Reception ) R5‑184553 Update of (NS_01/NS_17), (NS_03/NS_07), (NS_05/NS_01) and (NS_05/NS_17) TP analysis for A-MPR test case for inter-band UL CA CETECOM GmbH CR Agreement Yes
Yes
agreed No    
    R5‑184800 Update to test point analysis for NS_27 Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
5.4.1.6 TS 34.121-1                      
5.4.1.7 TS 34.121-2                      
5.4.1.8 TS 34.122                      
5.4.1.9 TS 34.108                      
5.4.1.10 TR 34.902 (UTRAN RRM Test Tolerance analyses)                      
5.4.1.11 General Papers / Work Plan / TC lists R5‑184232 Discussion on CQI reporting on highest MCS value case Huawei, Hisilicon discussion Discussion Yes
Yes
noted No    
    R5‑184889 Discussion on testing of fallback CA configurations in Rx CA test cases Ericsson discussion Endorsement Yes
Yes
 
Revised to: R5-184889r1.
 
 
Revised from: R5-184889.
Revised to: R5-185550.
 
 
 
revised No R5‑185550  
    R5‑185550 Discussion on testing of fallback CA configurations in Rx CA test cases Ericsson discussion Endorsement Yes
Yes
noted No   R5‑184889
5.5 Other Routine Maintenance TEIx_Test                      
5.5.1 TS 34.108                      
5.5.2 TS 34.121-1 All sections other than annexes                      
5.5.3 TS 34.121-1 Annexes only                      
5.5.4 TS 34.121-2                      
5.5.5 TS 34.122                      
5.5.6 TS 34.171                      
5.5.7 TS 34.172                      
5.5.8 TS 34.114                      
5.5.9 TS 37.571-1 R5‑184041 Clarifications and corrections to Bluetooth identification test Spirent Communications CR Agreement Yes
Yes
agreed No    
    R5‑184051 Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE Spirent Communications, European Commission discussion   Yes
Yes
 
Revised to: R5-184051r1.
Need to present
 
 
Revised from: R5-184051.
 
Proposal: the author proposes to add the table above to 37.571-1, either temporarily or permanently. A suitable CR is in Tdoc: R5-184083
Revised to: R5-185551.
 
 
 
revised No R5‑185551  
    R5‑185551 Discussion paper on the applicability of the tests in 37.571-1 for all types and categories of UE Spirent Communications, European Commission discussion - Yes
Yes
noted No   R5‑184051
    R5‑184083 Applicability of tests for types and Categories of UE Spirent Communications, European Commission CR Agreement Yes
Yes
 
Revised to: R5-184083r1.
Need to present
 
 
Revised from: R5-184083.
Revised to: R5-185552.
 
 
 
revised No R5‑185552  
    R5‑185552 Applicability of tests for types and Categories of UE Spirent Communications, European Commission CR Agreement Yes
Yes
agreed No   R5‑184083
    R5‑184189 Band groups added to specification PCTEST Engineering Laboratory, Inc. CR Agreement Yes
Yes
The band groups in 37.571-1 need updating to match the latest versions in 36.133. The “Category 0” table added is not yet used in the spec.  The “Category  M1” table is missing in the specification.  
agreed No    
5.5.10 TS 37.571-3 R5‑184190 Editorial - Updates for GNSS Signal Capabilities PCTEST Engineering Laboratory, Inc. CR Agreement Yes
Yes
Incorporating several changes from the RAN2 updates in TS 36.355 and added these clarifications to the GNSS Signaling capabilities that affect 37.571-3.
agreed No    
5.5.11 TS 37.571-5 R5‑184028 Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 Spirent Communications CR Agreement Yes
Yes
 
Revised to: R5-184028r1.
 
 
Revised from: R5-184028.
Revised to: R5-185421.
 
 
 
revised No R5‑185421  
    R5‑185421 Addition of missing assistance data for modernized GPS and the GPS L5 signal for LTE minimum performance sub-test 4 Spirent Communications CR Agreement Yes
Yes
agreed No   R5‑184028
    R5‑184029 Addition of missing assistance data for the Galileo E5A signal for LTE minimum performance sub-tests 3 and 8 Spirent Communications, European Commission CR Agreement Yes
Yes
agreed No    
    R5‑184082 Editorial clean up for consistency and better clarity Spirent Communications, European Commission CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184191 Editorial - Updates, corrections and clarifications to specification PCTEST Engineering Laboratory, Inc. CR Agreement Yes
Yes
The 37.571-5 Specification has multiple errors in naming, notes, references, and tables.  This CR updates, corrects, adds clarifications, and notes for the specification.
 
agreed No    
5.5.12 TS 51.010-1 (RF/Performance)                      
5.5.13 TS 51.010-2 (RF/Performance)                      
5.5.14 TS 51.010-7 (RF/Performance)                      
5.6 Outgoing liaison statements for provisional approval R5‑184116 LS on generic 3CC to 5CC RRM test cases ROHDE & SCHWARZ LS out Approval Yes
Yes
approved No    
    R5‑185300 LS on RAN4-RAN5 5G-NR RF pending issues during RAN5#80 TSG WG RAN5 LS out Approval Yes
Yes
approved No    
5.7 AOB                      
6 Signalling Protocol Functional Area                      
6.1 Review action points (fm A.I. 2.1)                      
6.2 Review incoming LS (fm A.I. 3) & new subject discussion papers                      
6.3 Open Work Items                      
6.3.1 Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA (UID - 700064) LTE_UTRA_IncMon-UEConTest                      
6.3.1.1 TS 34.108                      
6.3.1.2 TS 34.123-1                      
6.3.1.3 TS 34.123-2                      
6.3.1.4 TS 34.123-3                      
6.3.1.5 TS 36.508                      
6.3.1.6 TS 36.523-1                      
6.3.1.7 TS 36.523-2                      
6.3.1.8 TS 36.523-3                      
6.3.1.9 General Papers / Work Plan / TC lists                      
6.3.2 Rel-13 LTE CA configurations (UID - 700065) LTE_CA_Rel13-UEConTest                      
6.3.2.1 TS 36.508                      
6.3.2.2 TS 36.523-1                      
6.3.2.3 TS 36.523-2 R5‑184287 Addition of multiple CA configurations to capability tables in TS 36.523-2 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
6.3.2.4 TS 36.523-3                      
6.3.2.5 General Papers / Work Plan / TC lists                      
6.3.3 WLAN/3GPP Radio Level Integration and Interworking Enhancements (UID - 710070) LTE_WLAN_radio-UEConTest                      
6.3.3.1 TS 36.508                      
6.3.3.2 TS 36.523-1 R5‑184145 Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item Intel Corporation (UK) Ltd CR Agreement Yes
Yes
no formatting!!!
revised No R5‑185105  
    R5‑185105 Addition of Test Case:” LWA / T351 Expiry” to WLAN/3GPP Radio Level Integration and Interworking Enhancement Interworking Work Item Intel Corporation (UK) Ltd CR Agreement Yes
Yes
agreed No   R5‑184145
    R5‑184192 Correction of Test Cases 8.2.5.4 and 8.2.5.5 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
no formatting!!!
revised No R5‑185106  
    R5‑185106 Correction of Test Cases 8.2.5.4 and 8.2.5.5 Intel Corporation (UK) Ltd CR Agreement Yes
Yes
agreed No   R5‑184192
6.3.3.3 TS 36.523-2 R5‑184146 Addition of Applicability statement for WLAN/3GPP Radio Level Integration and Interworking Enhancement test case: ”LWA / T351 Expiry” Intel Corporation (UK) Ltd CR Agreement Yes
Yes
agreed No    
6.3.3.4 TS 36.523-3                      
6.3.3.5 General Papers / Work Plan / TC lists                      
6.3.4 Rel-14 LTE CA configurations (UID - 720098) LTE_CA_R14-UEConTest                      
6.3.4.1 TS 36.508                      
6.3.4.2 TS 36.523-1                      
6.3.4.3 TS 36.523-2 R5‑184119 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 Vodafone GmbH CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185140  
    R5‑185140 New CA band combination CA_1A-3A-7A-20A - Update of table A.4.3.3.3-5 Vodafone GmbH CR Agreement Yes
Yes
agreed No   R5‑184119
6.3.4.4 TS 36.523-3                      
6.3.4.5 General Papers / Work Plan / TC lists                      
6.3.5 Support for V2V services based on LTE sidelink (UID - 730073) LTE_SL_V2V-UEConTest                      
6.3.5.1 TS 36.508                      
6.3.5.2 TS 36.509                      
6.3.5.3 TS 36.523-1 R5‑184986 Correction to V2V TC 24.1.2 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
r1 was presented on Thu.
AT command part removed.
revised No R5‑185141  
    R5‑185141 Correction to V2V TC 24.1.2 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184986
6.3.5.4 TS 36.523-2                      
6.3.5.5 TS 36.523-3                      
6.3.5.6 TS 37.571-4                      
6.3.5.7 General Papers / Work Plan / TC lists                      
6.3.6 LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell (UID - 730074) LTE_CA_enh_b5C_PUCCH-UEConTest                      
6.3.6.1 TS 36.508                      
6.3.6.2 TS 36.523-1                      
6.3.6.3 TS 36.523-2                      
6.3.6.4 TS 36.523-3                      
6.3.6.5 General Papers / Work Plan / TC lists                      
6.3.7 Enhanced LAA for LTE (UID - 730075) LTE_eLAA-UEConTest                      
6.3.7.1 TS 36.508 R5‑184820 Addition of default laa-SCellConfiguration setting for eLAA Huawei, MCC TF160 CR Agreement Yes
Yes
agreed No    
6.3.7.2 TS 36.523-1                      
6.3.7.3 TS 36.523-2                      
6.3.7.4 TS 36.523-3 R5‑184074 eLAA: Test Model MCC TF160 CR Agreement Yes
Yes
agreed No    
6.3.7.5 General Papers / Work Plan / TC lists                      
6.3.8 Interference Mitigation for Downlink Control Channels of LTE (UID - 750051) LTE_IM_DLCCH-UEConTest                      
6.3.8.1 TS 36.508                      
6.3.8.2 TS 36.523-1                      
6.3.8.3 TS 36.523-2                      
6.3.8.4 TS 36.523-3                      
6.3.8.5 General Papers / Work Plan / TC lists                      
6.3.9 Performance enhancements for high speed scenario in LTE (UID - 750056) LTE_high_speed-UEConTest                      
6.3.9.1 TS 36.508                      
6.3.9.2 TS 36.523-1                      
6.3.9.3 TS 36.523-2                      
6.3.9.4 TS 36.523-3                      
6.3.9.5 General Papers / Work Plan / TC lists                      
6.3.10 4 Rx antenna ports with CA for LTE DL (UID - 750058) LTE_4Rx_AP_DL_CA-UEConTest                      
6.3.10.1 TS 36.508                      
6.3.10.2 TS 36.523-1                      
6.3.10.3 TS 36.523-2                      
6.3.10.4 TS 36.523-3                      
6.3.10.5 General Papers / Work Plan / TC lists                      
6.3.11 Requirements for a new UE category 1bis with single receiver based on category 1 for LTE (UID - 760085) LTE_UE_cat_1RX-UEConTest                      
6.3.11.1 TS 36.508                      
6.3.11.2 TS 36.523-1                      
6.3.11.3 TS 36.523-2                      
6.3.11.4 TS 36.523-3                      
6.3.11.5 General Papers / Work Plan / TC lists                      
6.3.12 Support for LTE-based V2X Services (UID - 760086) LTE_V2X-UEConTest                      
6.3.12.1 TS 36.508 R5‑184987 Addition of reference dedicated EPS bearer context #7 for V2X testing CATT CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185104  
    R5‑185104 Addition of reference dedicated EPS bearer context #7 for V2X testing CATT CR Agreement Yes
Yes
agreed No   R5‑184987
6.3.12.2 TS 36.509                      
6.3.12.3 TS 36.523-1 R5‑184549 Correction to V2X TC 24.1.2, 24.1.16 & 24.1.19 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
2 WICs!!!
LTE_SL_V2V-UEConTest, LTE_V2X-UEConTest
Reissued as R5-184985-6.
withdrawn Yes    
    R5‑184985 Correction to V2X TC 24.1.16 & 24.1.19 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
r1 was presented on Wed and Thu.
revised No R5‑185112  
    R5‑185112 Correction to V2X TC 24.1.16 & 24.1.19 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184985
    R5‑184632 Addition of new V2X test case 24.2.4 CAICT CR Agreement Yes
Yes
r2 was presented on Wed.
The TF160 manager wondered about the resolution of the FFS.
revised No R5‑185107  
    R5‑185107 Addition of new V2X test case 24.2.4 CAICT CR Agreement Yes
Yes
first agreed, then r1 was produced in order to incorporate a comment from Tf160.
revised No R5‑185160 R5‑184632
    R5‑185160 Addition of new V2X test case 24.2.4 CAICT CR Agreement Yes
Yes
agreed No   R5‑185107
    R5‑184636 Correction to V2X test case 24.1.12 CAICT CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185108  
    R5‑185108 Correction to V2X test case 24.1.12 CAICT CR Agreement Yes
Yes
agreed No   R5‑184636
    R5‑184652 Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 CAICT CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185109  
    R5‑185109 Correction to V2X test case 24.1.1, 24.1.3, 24.1.5, 24.1.6, 24.1.10 and 24.1.11 CAICT CR Agreement Yes
Yes
agreed No   R5‑184652
    R5‑184778 Updates to Align the GNSS Moving Scenario Details with Other V2X Test Cases PCTEST Engineering Lab CR Agreement Yes
Yes
agreed No    
    R5‑184792 Addition of reference dedicated EPS bearer context #7 for V2X testing CATT CR Agreement Yes
Yes
is 36.508! Wrong in 3GU.
Reissued as R5-184987 because of wrong spec.
withdrawn Yes    
    R5‑184793 Remove test step 0 in test case 24.1.15 CATT CR Agreement Yes
Yes
agreed No    
    R5‑184794 Remove test step 0 in test case 24.1.18 CATT CR Agreement Yes
Yes
agreed No    
    R5‑184795 Correction on V2X Sidelink test case 24.3.1 CATT CR Agreement Yes
Yes
agreed No    
    R5‑184796 Update Table 24.3.3.3.3-1 in test case 24.3.3 CATT CR Agreement Yes
Yes
agreed No    
    R5‑184813 New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP Sporton, TTA CR Agreement Yes
Yes
r1 was presented on Wed.
Real title is "New test case for V2X Sidelink with SL SPS Transmission".
revised No R5‑185110  
    R5‑185110 New test case for V2X Sidelink using Tx parameters based on measured CBR and PPPP Sporton, TTA CR Agreement No
Yes
reissued as R5-185111 because of title change
withdrawn Yes   R5‑184813
    R5‑185111 New test case for V2X Sidelink with SL SPS Transmission Sporton, TTA CR Agreement Yes
Yes
agreed No    
6.3.12.4 TS 36.523-2 R5‑184637 Addition of test applicability for new V2X TC24.2.4 and Specific ICS for V2X TC24.2.1 and TC24.2.2 CAICT CR Agreement Yes
Yes
agreed No    
    R5‑184814 Addition of test applicability for new V2X TC 24.1.13 Sporton CR Agreement Yes
Yes
agreed No    
6.3.12.5 TS 36.523-3 R5‑184071 V2X: Test Model updates MCC TF160 CR Agreement Yes
Yes
agreed No    
6.3.12.6 TS 37.571-4                      
6.3.12.7 General Papers / Work Plan / TC lists                      
6.3.13 5G system with NR and LTE (UID - 760087) 5GS_NR_LTE-UEConTest                      
6.3.13.1 TS 38.508-1 R5‑184043 Update RRC CONNECTED state Ericsson CR Agreement Yes
Yes
Qualcomm commented that multiple PDN may be needed. The DRBs have to be reestablished again. Motorola Mobility recommended DRB 2,0.
Postponed.
withdrawn Yes    
    R5‑184055 Add SRB1 and SRB2 with NR PDCP Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
Qualcomm asked for more time.
Deferred
revised No R5‑185028  
    R5‑185028 Add SRB1 and SRB2 with NR PDCP Ericsson CR Agreement Yes
Yes
agreed No   R5‑184055
    R5‑184084 Update serving cell Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185029  
    R5‑185029 Update serving cell Ericsson, DOCOMO Communications Lab CR Agreement Yes
Yes
R5-184629 merged into here.
agreed No   R5‑184084
    R5‑184087 Update chapter 3 Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184097 Introduce SA RRC messages Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185030  
    R5‑185030 Introduce SA RRC messages Ericsson CR Agreement Yes
Yes
agreed No   R5‑184097
    R5‑184126 Correct IE FrequencyInfoDL Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185031  
    R5‑185031 Correct IE FrequencyInfoDL Ericsson, DOCOMO Communications Lab CR Agreement Yes
Yes
agreed No   R5‑184126
    R5‑184127 Introduce SA system information blocks Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185032  
    R5‑185032 Introduce SA system information blocks Ericsson CR Agreement Yes
Yes
agreed No   R5‑184127
    R5‑184134 Introduce SA other information elements Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185033  
    R5‑185033 Introduce SA other information elements Ericsson CR Agreement Yes
Yes
agreed No   R5‑184134
    R5‑184176 Updates to PDCCH and SearchSpace configurations MCC TF160 CR Agreement Yes
Yes
r3 was presented on Tue.
r4 was presented on Thu.
revised No R5‑185034  
    R5‑185034 Updates to PDCCH and SearchSpace configurations MCC TF160, NTT DOCOMO, INC. CR Agreement Yes
Yes
rev was wrong.
revised No R5‑185171 R5‑184176
    R5‑185171 Updates to PDCCH and SearchSpace configurations MCC TF160, NTT DOCOMO, INC. CR Agreement Yes
Yes
agreed No   R5‑185034
    R5‑184186 Proposal for Signalling Test Setup in FR2 ANRITSU LTD CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184318 Correct IE GSCN-ValueNR Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185035  
    R5‑185035 Correct IE GSCN-ValueNR Ericsson, DOCOMO Communications Lab CR Agreement Yes
Yes
agreed No   R5‑184318
    R5‑184346 Modified RRC_Connected procedure for Multi PDN throughout the test case. Qualcomm Korea CR Agreement Yes
Yes
merged with R5-184043.
Deferred.
r1 was presented on Thu.
revised No R5‑185163  
    R5‑185163 Modified RRC_Connected procedure for Multi PDN throughout the test case. Qualcomm Korea, Ericsson CR Agreement Yes
Yes
agreed No   R5‑184346
    R5‑184347 Modified RRC_IDLE procedure to allow multi PDN configuration throughout the test case Qualcomm Korea CR Agreement Yes
Yes
agreed No    
    R5‑184348 Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case Qualcomm Korea CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185165  
    R5‑185165 Update EN-DC Generic Procedure Parameter for Multi-PDN addition throughout Test Case Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184348
    R5‑184358 Addition of IP Connectivity check procedure Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185037  
    R5‑185037 Addition of IP Connectivity check procedure Qualcomm Tech. Netherlands B.V, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑184358
    R5‑184560 Introduce SA radio resource control information elements Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
Anritsu/TF160 wondered whether the table order will be able to be aligned with the core specs in the future.
Need to align with NTT DOCOMO's CR concerning table numbering.
revised No R5‑185038  
    R5‑185038 Introduce SA radio resource control information elements Ericsson CR Agreement Yes
Yes
agreed No   R5‑184560
    R5‑184597 Update IE PhysicalCellGroupConfig Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185039  
    R5‑185039 Update IE PhysicalCellGroupConfig Ericsson, DOCOMO Communications Lab CR Agreement Yes
Yes
agreed No   R5‑184597
    R5‑184598 Introduce cell configurations and timer tolerances chapter headers Ericsson CR Agreement Yes
Yes
TT tolerance to be added.
revised No R5‑185040  
    R5‑185040 Introduce cell configurations and timer tolerances chapter headers Ericsson CR Agreement Yes
Yes
agreed No   R5‑184598
    R5‑184599 Add IE SS-RSSI-Measurement Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184600 Add IE SSB-MTC Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185041  
    R5‑185041 Add IE SSB-MTC Ericsson, DOCOMO Communications Lab CR Agreement Yes
Yes
agreed No   R5‑184600
    R5‑184616 Update BWP DOCOMO Communications Lab, Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185042  
    R5‑185042 Update BWP DOCOMO Communications Lab, Ericsson CR Agreement Yes
Yes
agreed No   R5‑184616
    R5‑184617 Update MIB DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No    
    R5‑184618 Update PDSCH-Config DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
Anritsu/TF160 wondered about the default values.
The TF160 manager recommended to delete again the added bitmap.
revised No R5‑185043  
    R5‑185043 Update PDSCH-Config DOCOMO Communications Lab. CR Agreement Yes
Yes
a last-minute change was included.
agreed No   R5‑184618
    R5‑184619 Update PhysicalCellGroupConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
merged
withdrawn Yes    
    R5‑184620 Update PUCCH and PUSCH configuration DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185044  
    R5‑185044 Update PUCCH and PUSCH configuration DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑184620
    R5‑184621 Update RACH configuration DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185045  
    R5‑185045 Update RACH configuration DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑184621
    R5‑184622 Update SearchSpace DOCOMO Communications Lab. CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184623 Update CellGroupConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185046  
    R5‑185046 Update CellGroupConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑184623
    R5‑184624 Update CSI-MeasConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185047  
    R5‑185047 Update CSI-MeasConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑184624
    R5‑184625 Update MeasConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185048  
    R5‑185048 Update MeasConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑184625
    R5‑184626 Update other information elements DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
r2 to remove FFS. Presented on Thu.
revised No R5‑185049  
    R5‑185049 Update other information elements DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑184626
    R5‑184627 Update PDCCH-Config DOCOMO Communications Lab. CR Agreement Yes
Yes
merged with TF160.
withdrawn Yes    
    R5‑184628 Update RadioBearerConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185050  
    R5‑185050 Update RadioBearerConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No   R5‑184628
    R5‑184629 Update ServingCellConfig DOCOMO Communications Lab. CR Agreement Yes
Yes
merged with Ericsson CR.
withdrawn Yes    
    R5‑184630 Editorial Update in clause 4.6.3 DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No    
    R5‑184675 Specifying content for MeasResultSCG-Failure Samsung CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185051  
    R5‑185051 Specifying content for MeasResultSCG-Failure Samsung CR Agreement Yes
Yes
agreed No   R5‑184675
    R5‑184701 Addition of RLC Config for UM Motorola Mobility CR Agreement No
Yes
late doc
changes already covered
withdrawn Yes    
    R5‑184706 Editorial correction to band representation of non-contiguous EN-DC band combination Keysight Technologies UK Ltd CR Agreement Yes
Yes
table number is missing
revised No R5‑185052  
    R5‑185052 Editorial correction to band representation of non-contiguous EN-DC band combination Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184706
    R5‑184713 Correction to RLC-Config IE Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185053  
    R5‑185053 Correction to RLC-Config IE Ericsson CR Agreement Yes
Yes
agreed No   R5‑184713
    R5‑184714 Correction to RadioBearerConfig-DRB Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185054  
    R5‑185054 Correction to RadioBearerConfig-DRB Ericsson CR Agreement Yes
Yes
agreed No   R5‑184714
    R5‑184715 Corrections ard updates to BandCombinationList and Feature Set IEs Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185055  
    R5‑185055 Corrections ard updates to BandCombinationList and Feature Set IEs Ericsson CR Agreement Yes
Yes
agreed No   R5‑184715
    R5‑184783 Introduce 5GMM messages Ericsson CR Agreement Yes
Yes
the TF160 manager recommended to follow the alphabetical order.
agreed No    
    R5‑184785 Introduce 5GSM messages Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184851 Introduction of OTA signaling test environment Keysight Technologies UK Ltd, Anritsu Ltd CR Agreement Yes
Yes
late doc
revised No R5‑185168  
    R5‑185168 Introduction of OTA signaling test environment Keysight Technologies UK Ltd, Anritsu Ltd CR Agreement Yes
Yes
for email agreement
agreed No   R5‑184851
    R5‑184902 Corrections and updates to UE Capability IEs Ericsson CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185056  
    R5‑185056 Corrections and updates to UE Capability IEs Ericsson CR Agreement Yes
Yes
agreed No   R5‑184902
    R5‑185085 Addition of UM condition to RLC-Bearer-Config IE Ericsson CR Agreement Yes
Yes
late doc
agreed No    
6.3.13.2 TS 38.508-2 R5‑184699 Addition of PICS Motorola Mobility CR Agreement Yes
Yes
late doc
Deferred.
r1 and r2 were presented on Thu.
revised No R5‑185161  
    R5‑185161 Addition of PICS Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑184699
6.3.13.3 TS 38.509 R5‑184673 Editorial updates to 38.509 Samsung, MCC TF160 CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185057  
    R5‑185057 Editorial updates to 38.509 Samsung, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑184673
    R5‑184700 Addition of Test Loop for SDAP testing Motorola Mobility CR Agreement Yes
Yes
late doc
Modified title: Addition of new Test Loop Mode above SDAP Layer
r1 was presented on Tue and Thu.
revised No R5‑185058  
    R5‑185058 Addition of Test Loop for SDAP testing Motorola Mobility CR Agreement Yes
Yes
withdrawn Yes   R5‑184700
6.3.13.4 TS 38.523-1 R5‑184175 Correction to NR MAC test case 7.1.1.3.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185059  
    R5‑185059 Correction to NR MAC test case 7.1.1.3.2 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184175
    R5‑184218 Addition of Correct HARQ process handling BCCH test case 7.1.1.2.4 Huawei, Hisilicon CR Agreement Yes
Yes
Motorola Mobility reminded that only 25% of the test case is defined. No RRC connection request, sys info, etc.
Postponed to next meeting.
withdrawn Yes    
    R5‑184219 Addition of Correct HARQ process handling CCCH test case 7.1.1.2.3 Huawei, Hisilicon CR Agreement Yes
Yes
same as R5-184218.
Motorola Mobility reminded that the test case was not coordinated with the rapporteur.
withdrawn Yes    
    R5‑184220 Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 Huawei, Hisilicon CR Agreement Yes
Yes
r1 was presented on Tue.
otorola Mobility recommeneded that the 5.1.2.1 core spec subclause title should be removed.
revised No R5‑185060  
    R5‑185060 Addition of Correct Handling of DL HARQ process PDSCH Aggregation test case 7.1.1.2.2 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184220
    R5‑184221 Addition of NR CA reconfiguration test case 8.2.4.2.1.1 Huawei, Hisilicon CR Agreement Yes
Yes
r1 was presented on Tue.
Qualcomm reported some more offline comments. Preamble is not aligned.
r2
revised No R5‑185061  
    R5‑185061 Addition of NR CA reconfiguration test case 8.2.4.2.1.1 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184221
    R5‑184222 Addition of NR CA reconfiguration test case 8.2.4.2.1.2 Huawei, Hisilicon CR Agreement Yes
Yes
r1 was presented on Tue.
Comments from Motorola Mobility and Qualcomm that SCGFailureInformation should not be there.
Some part of the test case can be reused.
Deferred.
r2 was presented on Thu.
revised No R5‑185062  
    R5‑185062 Addition of NR CA reconfiguration test case 8.2.4.2.1.2 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184222
    R5‑184223 Addition of NR CA reconfiguration test case 8.2.4.2.1.3 Huawei, Hisilicon CR Agreement Yes
Yes
r2 was presented on Thu.
revised No R5‑185148  
    R5‑185148 Addition of NR CA reconfiguration test case 8.2.4.2.1.3 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184223
    R5‑184224 Addition of Random access procedure Successful Supplementary Uplink test case 7.1.1.1.5 Huawei, Hisilicon CR Agreement Yes
Yes
Offline comments from Motorola Mobility and Qualcomm.
withdrawn Yes    
    R5‑184225 Addition of Random access test case 7.1.1.1.4 Huawei, Hisilicon CR Agreement Yes
Yes
r1 was presented on Tue.
Same as R5-184224.
revised No R5‑185063  
    R5‑185063 Addition of Random access test case 7.1.1.1.4 Huawei, Hisilicon CR Agreement Yes
Yes
withdrawn Yes   R5‑184225
    R5‑184226 Addition of Correct handling of Configured UL grant Type 1 test case 7.1.1.6.2 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑184227 Addition of Correct handling of Configured UL grant Type 2 test case 7.1.1.6.3 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑184228 CR of Correct handling of DL assignment Semi persistent test case 7.1.1.6.1 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑184229 CR of UE power headroom reporting test case 7.1.1.3.7 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No    
    R5‑184230 CR of BSR report test case 7.1.1.3.4 Huawei, Hisilicon CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184324 Addition of 5GS NR SDAP test case 7.1.4.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
r2 was presented on Tue.
Is mainly option 2.
Formatting fix. Add note J.
revised No R5‑185064  
    R5‑185064 Addition of 5GS NR SDAP test case 7.1.4.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184324
    R5‑184338 Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself Qualcomm Korea CR Agreement Yes
Yes
the TF160 manager wondered that many changes in the conformance requirements led to no change in the test case.
revised No R5‑185065  
    R5‑185065 Correction to 5GS MAC Test case 7.1.1.1.2 Random access procedure / Successful / C-RNTI Based / Preamble selected by MAC itself Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184338
    R5‑184340 Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC Qualcomm Korea CR Agreement Yes
Yes
Editor's note.
revised No R5‑185066  
    R5‑185066 Correction to 5GS MAC Test case 7.1.1.5.3 DRX operation / Short cycle configured / Parameters configured by RRC Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184340
    R5‑184341 Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation Qualcomm Korea CR Agreement Yes
Yes
rev N/A wrong.
revised No R5‑185067  
    R5‑185067 Correction to 5GS RLC Test case 7.1.2.3.10 AM RLC / Re-transmission of RLC PDU with and without re-segmentation Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184341
    R5‑184342 Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure Qualcomm Korea CR Agreement Yes
Yes
revised No R5‑185068  
    R5‑185068 Correction to 5GS RLC Test case 7.1.2.3.11 AM RLC / RLC re-establishment procedure Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184342
    R5‑184343 Correction to 5GS PDCP Test case 7.1.3.4.1 PDCP handover / Lossless handover / PDCP sequence number maintenance / PDCP status report to convey the information on missing or acknowledged PDCP SDUs at handover / In-order delivery and duplicate elimination in the downlink Qualcomm Korea CR Agreement Yes
Yes
agreed No    
    R5‑184344 Correction to 5GS PDCP Test case 7.1.3.5.4 PDCP reordering / Maximum re-ordering delay below t-Reordering / t-Reordering timer operations Qualcomm Korea CR Agreement Yes
Yes
agreed No    
    R5‑184345 Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 Qualcomm Korea CR Agreement Yes
Yes
r1 was presented on Tue and Thu.
revised No R5‑185069  
    R5‑185069 Addition of NR CA / NR SCell addition / modification / release / Success test cases 8.2.4.1.1.1, 8.2.4.1.1.2 and 8.2.4.1.1.3 Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184345
    R5‑184353 Corrections to RRC TC - BandwidthPart Configuration / SCG / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
agreed No    
    R5‑184354 Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185149  
    R5‑185149 Corrections to RRC TC - PSCell addition, modification and release / SCG DRB / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
agreed No   R5‑184354
    R5‑184355 Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185150  
    R5‑185150 Corrections to RRC TC - Bearer Modification / Handling for bearer type change with security key change / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
agreed No   R5‑184355
    R5‑184356 Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185151  
    R5‑185151 Corrections to RRC TC - Bearer Modification / Uplink data path / Split DRB Reconfiguration / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
agreed No   R5‑184356
    R5‑184357 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
r1 was presented on Tue.
rev:1 on coversheet!
revised No R5‑185070  
    R5‑185070 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / EN-DC Qualcomm Tech. Netherlands B.V CR Agreement Yes
Yes
agreed No   R5‑184357
    R5‑184495 Addition of new 5GC TC 9.1.2.1 CATT, TDIA CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184498 Correction to 5GS RRC TC 8.2.4.3.1.1 TDIA, CATT CR Agreement Yes
Yes
autobulleting from the core spec should be removed.
revised No R5‑185071  
    R5‑185071 Correction to 5GS RRC TC 8.2.4.3.1.1 TDIA, CATT CR Agreement Yes
Yes
agreed No   R5‑184498
    R5‑184499 Addition of 5GS RRC TC 8.2.4.3.1.2 TDIA, CATT CR Agreement Yes
Yes
r1 was presented on Tue.
Qualcomm commented that the original test case which is referred to need an update.
revised No R5‑185072  
    R5‑185072 Addition of 5GS RRC TC 8.2.4.3.1.2 TDIA, CATT CR Agreement Yes
Yes
agreed No   R5‑184499
    R5‑184500 Addition of new 5GS RRC TC 8.2.4.3.1.3 TDIA, CATT CR Agreement Yes
Yes
agreed No    
    R5‑184517 Correction to NR PDCP test case 7.1.3.4.2 Keysight Technologies UK Ltd, MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑184520 Corrections to Layer 2 test cases Motorola Mobility CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185073  
    R5‑185073 Corrections to Layer 2 test cases Motorola Mobility, Huawei CR Agreement Yes
Yes
agreed No   R5‑184520
    R5‑184521 Corrections to MAC test case 7.1.2.2.1 Motorola Mobility, MCC TF160 CR Agreement Yes
Yes
wrong Tdoc#
revised No R5‑185074  
    R5‑185074 Corrections to MAC test case 7.1.2.2.1 Motorola Mobility, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑184521
    R5‑184522 Corrections to MAC test case 7.1.2.3.1 Motorola Mobility, MCC TF160 CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185075  
    R5‑185075 Corrections to MAC test case 7.1.2.3.1 Motorola Mobility, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑184522
    R5‑184523 Corrections to MAC TBS test cases Motorola Mobility CR Agreement Yes
Yes
agreed No    
    R5‑184524 Addition of new MAC RACH test case for PDCCH order Motorola Mobility CR Agreement Yes
Yes
revised No R5‑185076  
    R5‑185076 Addition of new MAC RACH test case for PDCCH order Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑184524
    R5‑184525 Addition of new MAC test case for Power Headroom report Motorola Mobility CR Agreement Yes
Yes
Rohde&Schwarz offline comments.
r1 was presented on Thu.
revised No R5‑185152  
    R5‑185152 Addition of new MAC test case for Power Headroom report Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑184525
    R5‑184526 Addition of new MAC test case for Scell Activation Deactivation Motorola Mobility CR Agreement Yes
Yes
r1 was presented on Tue.
Should be split into 3 sub tests.
r2 was presented on Thu.
revised No R5‑185077  
    R5‑185077 Addition of new MAC test case for Scell Activation Deactivation Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑184526
    R5‑184527 Addition of new MAC test case for Reset Motorola Mobility CR Agreement Yes
Yes
agreed No    
    R5‑184528 Addition of new MAC UL TBS test case with transform precoding configured Motorola Mobility CR Agreement Yes
Yes
wrong spec# on cover
revised No R5‑185078  
    R5‑185078 Addition of new MAC UL TBS test case with transform precoding configured Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑184528
    R5‑184552 Correction to default pre-test conditions for UM RLC test cases Keysight Technologies UK Ltd CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185079  
    R5‑185079 Correction to default pre-test conditions for UM RLC test cases Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184552
    R5‑184591 New NAS test case 9.1.5.1.12 ROHDE & SCHWARZ CR Agreement Yes
Yes
r1 was presented on Tue.
Delete Editor's note and add title for 9.1.5.
Resolve the [x] and put -1 or -2.
Further issues pointed out by the TF160 manager.
RRC messages probably not needed.
r2 was presented on Thu.
ETSI MCC recommended to fix the 38.508 [X].
revised No R5‑185080  
    R5‑185080 New NAS test case 9.1.5.1.12 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184591
    R5‑184593 New NAS test case 9.1.6.1.4 ROHDE & SCHWARZ CR Agreement Yes
Yes
r2 was presented on Tue.
r3 was presented on Thu.
Comments from Motorola Mobility about switch off etc.
Will be presented again at the next meeting.
revised No R5‑185081  
    R5‑185081 New NAS test case 9.1.6.1.4 ROHDE & SCHWARZ CR Agreement Yes
Yes
withdrawn Yes   R5‑184593
    R5‑184603 Correction to NR PDCP test case 7.1.3.5.1 ANRITSU LTD CR Agreement Yes
Yes
r1 was presented on Tue.
Meeting nr. Wrong.
Some parts not revision marked.
revised No R5‑185082  
    R5‑185082 Correction to NR PDCP test case 7.1.3.5.1 ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑184603
    R5‑184612 Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 ANRITSU LTD CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185083  
    R5‑185083 Correction to NR RLC test case 7.1.2.3.3 and 7.1.2.3.4 ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑184612
    R5‑184613 Addition of RRC Default Pre-test conditions for NSA Qualcomm Korea CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185153  
    R5‑185153 Addition of RRC Default Pre-test conditions for NSA Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184613
    R5‑184615 CR of Correct handling of DL assignment / Semi-persistent test case 7.1.1.6.1 Huawei, Hisilicon CR Agreement Yes
Yes
already adressed
withdrawn Yes    
    R5‑184661 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC Intertek CR Agreement Yes
Yes
offline comments from Qualcomm and Adare.
revised No R5‑185089  
    R5‑185089 Corrections to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B2 / Measurement of NR cells / EN-DC Intertek CR Agreement Yes
Yes
agreed No   R5‑184661
    R5‑184670 CR of AM RLC test case 7.1.2.3.10 Huawei, Hisilicon CR Agreement Yes
Yes
Qualcomm had said maxRetxThreshold-1.
revised No R5‑185090  
    R5‑185090 CR of AM RLC test case 7.1.2.3.10 Huawei, Hisilicon CR Agreement Yes
Yes
agreed No   R5‑184670
    R5‑184676 Update of RRC SCG failure TC 8.2.5.1.1 Samsung, Qualcomm CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185091  
    R5‑185091 Update of RRC SCG failure TC 8.2.5.1.1 Samsung, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑184676
    R5‑184677 Update of RRC SCG failure TC 8.2.5.2.1 Samsung, Qualcomm CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185092  
    R5‑185092 Update of RRC SCG failure TC 8.2.5.2.1 Samsung, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑184677
    R5‑184678 Update of RRC SCG failure TC 8.2.5.3.1 Samsung, Qualcomm CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185093  
    R5‑185093 Update of RRC SCG failure TC 8.2.5.3.1 Samsung, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑184678
    R5‑184679 Update of RRC SCG failure TC 8.2.5.4.1 Samsung, Qualcomm CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185094  
    R5‑185094 Update of RRC SCG failure TC 8.2.5.4.1 Samsung, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑184679
    R5‑184680 Update of RRC SCG failure TC 8.2.5.5.1 Samsung, Qualcomm CR Agreement Yes
Yes
agreed No    
    R5‑184681 Update of RRC SCG failure TC 8.2.5.6.1 Samsung, Qualcomm CR Agreement Yes
Yes
agreed No    
    R5‑184702 Addition of 5GS NR SDAP test case 7.1.4.2 Motorola Mobility CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185095  
    R5‑185095 Addition of 5GS NR SDAP test case 7.1.4.2 Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑184702
    R5‑184756 Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC Qualcomm Incorporated CR Agreement Yes
Yes
late doc
r1 was presented on Thu.
revised No R5‑185154  
    R5‑185154 Correction to RRC TC - Measurement configuration control and reporting / Event A1 / Measurement of NR PSCell / EN-DC Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184756
    R5‑184760 Correction to RRC TC - PSCell addition, modification and release / Split DRB / EN-DC Qualcomm Incorporated CR Agreement Yes
Yes
late doc
agreed No    
    R5‑184761 Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Periodic reporting / Measurement of NR cells / EN-DC Qualcomm Incorporated CR Agreement Yes
Yes
late doc
agreed No    
    R5‑184763 Correction to RRC TC - Measurement configuration control and reporting / Inter-RAT measurements / Event B1 / Measurement of NR cells / RSRQ based measurements / EN-DC Qualcomm Incorporated CR Agreement Yes
Yes
late doc
agreed No    
    R5‑184767 Updates to NAS test case 10.2.1.2 Ericsson LM CR Agreement Yes
Yes
r1 and r2 were presented on Thu.
revised No R5‑185155  
    R5‑185155 Updates to NAS test case 10.2.1.2 Ericsson LM CR Agreement Yes
Yes
agreed No   R5‑184767
    R5‑184768 Update of 5GS NR RRC test case 8.2.2.6.1 ROHDE & SCHWARZ CR Agreement No
Yes
withdrawn Yes    
    R5‑184769 Update of 5GS NR RRC test case 8.2.2.6.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184770 Update of 5GS NR RRC test case 8.2.3.6.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185096  
    R5‑185096 Update of 5GS NR RRC test case 8.2.3.6.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184770
    R5‑184772 Addition of new 5GC TC 9.1.2.2 CATT, TDIA CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184774 Update of 5GS NR RRC test case 8.2.3.8.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185097  
    R5‑185097 Update of 5GS NR RRC test case 8.2.3.8.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184774
    R5‑184777 Update of 5GS NR RRC test case 8.2.1.1.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185098  
    R5‑185098 Update of 5GS NR RRC test case 8.2.1.1.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184777
    R5‑184853 Correction to NR RRC test case 8.2.3.14.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
reissued as R5-184984 bec. Of wrong spec
withdrawn Yes    
    R5‑184984 Correction to NR RRC test case 8.2.3.14.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185101  
    R5‑185101 Correction to NR RRC test case 8.2.3.14.1 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184984
    R5‑184977 L2 Preamble Parameter Update for Multi-PDN configuration Qualcomm Korea CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185099  
    R5‑185099 L2 Preamble Parameter Update for Multi-PDN configuration Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184977
    R5‑184981 Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 Keysight Technologies UK Ltd, MCC TF160 CR Agreement Yes
Yes
late doc
r1 was presented on Wed.
 
revised No R5‑185100  
    R5‑185100 Correction to NR RLC test cases 7.1.2.2.3 and 7.1.2.2.4 Keysight Technologies UK Ltd, MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑184981
    R5‑185086 Update to EPS SM Test case for Multi-PDN Qualcomm Inc. CR Agreement Yes
Yes
late doc
r1 was presented on Thu.
revised No R5‑185167  
    R5‑185167 Update to EPS SM Test case for Multi-PDN Qualcomm Inc. CR Agreement Yes
Yes
for email agreement
agreed No   R5‑185086
6.3.13.5 TS 38.523-2 R5‑184231 Addition and correction of test applicability of multiple signalling test cases Huawei, Hisilicon CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184496 Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 CATT, TDIA CR Agreement Yes
Yes
no cl. Affected
RRC applicability will be moved. Qualcomm update
revised No R5‑185102  
    R5‑185102 Addition of applicability and tests conditions for 5GC test cases 8.2.4.3.1.2, 8.2.4.3.1.3, 9.1.2.1 and 9.1.2.2 CATT, TDIA CR Agreement Yes
Yes
withdrawn Yes   R5‑184496
    R5‑184531 Addition of missing and new test cases applicabilities Motorola Mobility CR Agreement Yes
Yes
more applicabilities to be merged into.
r3 was presented on Thu.
revised No R5‑185162  
    R5‑185162 Addition of missing and new test cases applicabilities Motorola Mobility CR Agreement Yes
Yes
agreed No   R5‑184531
    R5‑184682 Update of test case title for TC 8.2.5.1.1 Samsung CR Agreement Yes
Yes
agreed No    
    R5‑184753 Update of NR test cases title and applicability Qualcomm Incorporated CR Agreement Yes
Yes
more applicabilities to be merged into?
r2 was presented on Thu.
The TF160 manager recommended to fix the FFS conditions.
ETSI MCC recommended to remove the x.y.z's.
revised No R5‑185157  
    R5‑185157 Update of NR test cases title and applicability Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184753
6.3.13.6 TS 38.523-3 R5‑184073 EN-DC: Test Model updates MCC TF160 CR Agreement Yes
Yes
sidebar
r1 was presented on Thu.
revised No R5‑185156  
    R5‑185156 EN-DC: Test Model updates MCC TF160 CR Agreement Yes
Yes
rev was wrong.
revised No R5‑185172 R5‑184073
    R5‑185172 EN-DC: Test Model updates MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑185156
    R5‑184333 Updates to Annex B MCC TF160 CR Agreement Yes
Yes
sidebar
agreed No    
    R5‑184696 EN-DC Test Model: Addition of further aspects MCC TF160 CR Agreement Yes
Yes
late doc
sidebar
for email agreement
agreed No    
6.3.13.7 TS 34.229-1                      
6.3.13.8 TS 34.229-2                      
6.3.13.9 TS 34.229-3                      
6.3.13.10 TS 36.508 R5‑184042 Update RRCConnectionReconfiguration message for EN-DC Ericsson, Qualcomm Inc. CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185164  
    R5‑185164 Update RRCConnectionReconfiguration message for EN-DC Ericsson, Qualcomm Inc. CR Agreement Yes
Yes
agreed No   R5‑184042
    R5‑184054 Add SRB with NR PDCP Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184349 Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases Qualcomm Korea CR Agreement Yes
Yes
r1 was presented on Thu.
Remove of not useful formattings.
revised No R5‑185166  
    R5‑185166 Modification of EPS & Data Radio Bearer ID mapping for EN-DC Test cases Qualcomm Korea CR Agreement Yes
Yes
agreed No   R5‑184349
    R5‑184614 Updates to EN-DC Conditions for Multi-PDN addition throughout Test Case Qualcomm Korea CR Agreement Yes
Yes
Rel-()
withdrawn Yes    
    R5‑184674 Specifying content for SCGFailureInformationNR Samsung CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185103  
    R5‑185103 Specifying content for SCGFailureInformationNR Samsung CR Agreement Yes
Yes
agreed No   R5‑184674
6.3.13.11 TS 36.509                      
6.3.13.12 TS 36.523-1                      
6.3.13.13 TS 36.523-2                      
6.3.13.14 TS 36.523-3                      
6.3.13.15 TS 37.571-2                      
6.3.13.16 TS 37.571-3                      
6.3.13.17 TS 37.571-4                      
6.3.13.18 TS 37.571-5                      
6.3.13.19 General Papers / Work Plan / TC lists R5‑184061 Impact of GSMA IR.92 profile extension for EN-DC ROHDE & SCHWARZ discussion Endorsement Yes
Yes
only SIG.
The TF160 manager commented that option b is with SCG bearers.
Anritsu/TF160 commented that there is no IMS requirement. Too many test cases could be added.
The RAN5 Chair recommended to discuss the matter first with the IMS and 5G rapporteurs of what is expected.
Sprint commented that the IR.92 statement is too vague. Input has to come for the operators.
KT commented that more bandwith will be given with the SCG bearer, so we have to think about that.
Motorola Mobility commented that even if there are market requirements IMS traffic is never tested, so repeating test cases does not make much sense.
 
noted No    
    R5‑184072 EN-DC: TS 38.508-1 / 36.508 issue list MCC TF160 discussion Information Yes
Yes
noted No    
    R5‑184170 Requirements for test frequencies for 5G signalling test cases MCC TF160 discussion Endorsement Yes
Yes
covered by Ericsson.
noted No    
    R5‑184350 Multi-PDN Handling in EN-DC Qualcomm Korea discussion Endorsement Yes
Yes
r1 was presented on Tue.
revised No R5‑185025  
    R5‑185025 Multi-PDN Handling in EN-DC Qualcomm Korea discussion Endorsement Yes
Yes
the way forward is agreed. Changes will be introduced through CRs.
noted No   R5‑184350
    R5‑184351 ASN.1 Version Handling for NSA and SA Qualcomm Korea discussion Endorsement Yes
Yes
r1 was presented on Tue.
Conclusion: the Oct. Delivery will move on to Sept. Asn.1.
The sept. Delivery will probably have the June version of EN-DC? See TF160 report.
revised No R5‑185026  
    R5‑185026 ASN.1 Version Handling for NSA and SA Qualcomm Korea discussion Endorsement Yes
Yes
noted No   R5‑184351
    R5‑184359 Handling of Unified Access Control test cases in SA Qualcomm Tech. Netherlands B.V discussion Discussion Yes
Yes
WP and TC definition to be discussed among 5G rapporteurs.
noted No    
    R5‑184568 OTA Chamber requirements for 5G NR Signalling test cases Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
r1 was presented.
Rohde&schwarz raised the question whether NWGN is supported also in SIG.
Deferred.
r2 was presented on Wed in the joint.
Conclusion: all proposals 1-6 are endorsed.
Corresponding CRs will be handled in SIG.
PCTest commented that the requirements for the anechoic chamber should be put into a TS, preferrably into the Annex.
revised No R5‑185132  
    R5‑185132 OTA Chamber requirements for 5G NR Signalling test cases Keysight Technologies UK Ltd discussion Endorsement Yes
Yes
noted No   R5‑184568
    R5‑184664 Default channel bandwidth of new NR bands for non-CA signaling test cases DOCOMO Communications Lab., KDDI Corporation, KT Corp. discussion Decision Yes
Yes
r1 was presented on Tue.
Proposal is accepted.
revised No R5‑185027  
    R5‑185027 Default channel bandwidth of new NR bands for non-CA signaling test cases NTT DOCOMO, INC., CMCC, KDDI Corporation, KT Corp., Orange, Telecom Italia S.p.A. discussion Decision Yes
Yes
noted No   R5‑184664
    R5‑184805 Discussion on SIG testcase optimization of 5GC CATT discussion Discussion Yes
Yes
noted No    
6.3.14 Voice and Video Enhancement for LTE (UID - 760089) LTE_VoLTE_ViLTE_enh-UEConTest                      
6.3.14.1 TS 34.229-1                      
6.3.14.2 TS 34.229-2                      
6.3.14.3 TS 34.229-3                      
6.3.14.4 TS 36.508                      
6.3.14.5 TS 36.523-1 R5‑184213 Removal of Testcase 8.2.2.6.4 CATT CR Agreement Yes
Yes
the TF160 manager reported a similar case in FeMTC.
Deferred.
On Thu Tf160 agreed.
agreed No    
    R5‑184214 Removal of Testcase 8.2.2.6.5 CATT CR Agreement Yes
Yes
same as above.
agreed No    
    R5‑184215 Update of the title of Testcase 7.1.5.6 CATT CR Agreement No
Yes
withdrawn Yes    
6.3.14.6 TS 36.523-2 R5‑184217 Update of applicability and tests conditions for LTE_VoLTE_ViLTE_enh test cases CATT CR Agreement Yes
Yes
agreed No    
6.3.14.7 TS 36.523-3                      
6.3.14.8 General Papers / Work Plan / TC lists                      
6.3.15 Enhancements of NB-IoT (UID - 770061) NB_IOTenh-UEConTest                      
6.3.15.1 TS 36.508 R5‑184791 Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content CATT, TDIA, Starpoint CR Agreement Yes
Yes
r3 was presented on Wed.
revised No R5‑185113  
    R5‑185113 Addition of NB_IOTenh-UEConTest test case scenarios and default SIB content CATT, TDIA, Starpoint, Sporton CR Agreement Yes
Yes
agreed No   R5‑184791
6.3.15.2 TS 36.509                      
6.3.15.3 TS 36.523-1 R5‑184095 Correction to eNB-IoT test case 22.3.2.7 MCC TF160 CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185114  
    R5‑185114 Correction to eNB-IoT test case 22.3.2.7 MCC TF160, TDIA CR Agreement Yes
Yes
agreed No   R5‑184095
    R5‑184493 Correction of NB-IoT test case 22.5.20 CATT, TDIA CR Agreement Yes
Yes
agreed No    
    R5‑184494 Correction of NB-IoT test case 22.5.21 CATT, TDIA CR Agreement Yes
Yes
agreed No    
    R5‑184501 Addition to NB-IoT testcase 22.3.1.6a TDIA, CATT, Starpoint CR Agreement Yes
Yes
r1 was presented on Wed.
no formatting!!!
revised No R5‑185115  
    R5‑185115 Addition to NB-IoT testcase 22.3.1.6a TDIA, CATT, Starpoint CR Agreement Yes
Yes
agreed No   R5‑184501
    R5‑184784 Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 CATT, TDIA, Starpoint CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185116  
    R5‑185116 Addition of new NB_IOTenh-UEConTest test case 22.3.1.8 CATT, TDIA, Starpoint CR Agreement Yes
Yes
agreed No   R5‑184784
    R5‑184786 Addition of new NB_IOTenh-UEConTest test case 22.3.1.9 CATT, TDIA, Starpoint CR Agreement Yes
Yes
agreed No    
    R5‑184787 Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 CATT, TDIA, Starpoint CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185117  
    R5‑185117 Addition of new NB_IOTenh-UEConTest test case 22.3.1.10 CATT, TDIA, Starpoint CR Agreement Yes
Yes
agreed No   R5‑184787
    R5‑184788 Addition of new NB_IOTenh-UEConTest test case 22.4.24 CATT, TDIA, Starpoint CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185118  
    R5‑185118 Addition of new NB_IOTenh-UEConTest test case 22.4.24 CATT, TDIA, Starpoint CR Agreement Yes
Yes
agreed No   R5‑184788
    R5‑184789 Addition of new NB_IOTenh-UEConTest test case 22.4.25 CATT, TDIA, Starpoint CR Agreement Yes
Yes
r2 was presented on Wed.
revised No R5‑185119  
    R5‑185119 Addition of new NB_IOTenh-UEConTest test case 22.4.25 CATT, TDIA, Starpoint CR Agreement Yes
Yes
agreed No   R5‑184789
    R5‑184790 Addition of new NB_IOTenh-UEConTest test case 22.4.25 CATT, TDIA, Starpoint CR Agreement No
Yes
withdrawn Yes    
    R5‑184815 New test case for NB-IoT UM RLC Sporton, TTA, TDIA CR Agreement Yes
Yes
late doc
r1 was presented on Wed.
revised No R5‑185120  
    R5‑185120 New test case for NB-IoT UM RLC Sporton, TTA, TDIA CR Agreement Yes
Yes
agreed No   R5‑184815
6.3.15.4 TS 36.523-2 R5‑185022 Correction to NB-IoT test case 22.4.20a execution guideline Anritsu Ltd, Qualcomm CR Agreement Yes
Yes
agreed No    
    R5‑184780 Update of applicability and tests conditions for NB_IOT enhancement test cases CATT, TDIA, Starpoint CR Agreement Yes
Yes
agreed No    
    R5‑184816 Addition of applicability and tests conditions for new Enhancements NB-IoT TC 24.1.13 Sporton CR Agreement Yes
Yes
wrong title!?  changed title!!
"New test case for V2X Sidelink with SL SPS Transmission"
reissued as R5-185121 because of title change.
withdrawn Yes    
    R5‑185121 Addition of applicability and tests conditions for new Enhancements NB-IoT TC 22.3.2.6 Sporton CR Agreement Yes
Yes
agreed No    
6.3.15.5 TS 36.523-3 R5‑184135 eNB-IoT: Test Model MCC TF160 CR Agreement Yes
Yes
agreed No    
6.3.15.6 TS 37.571-2                      
6.3.15.7 TS 37.571-3                      
6.3.15.8 TS 37.571-4                      
6.3.15.9 TS 37.571-5                      
6.3.15.10 General Papers / Work Plan / TC lists                      
6.3.16 Further enhanced MTC for LTE (UID - 770063) LTE_feMTC-UEConTest                      
6.3.16.1 TS 36.508                      
6.3.16.2 TS 36.523-1                      
6.3.16.3 TS 36.523-2 R5‑184901 Updates to feMTC TC 8.2.2.6.6 Ericsson CR Agreement Yes
Yes
update at the next meeting. Test case to be removed.
withdrawn Yes    
6.3.16.4 TS 36.523-3                      
6.3.16.5 General Papers / Work Plan / TC lists                      
6.3.17 Rel-15 CA configurations (UID - 770064) LTE_CA_R15-UEConTest                      
6.3.17.1 TS 36.508 R5‑184393 Updates of 6.2.3.2 Test Frequency for CA_8A-27A KT Corp. CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185023  
    R5‑185023 Updates of 6.2.3.2 Test Frequency for CA_8A-27A KT Corp. CR Agreement Yes
Yes
agreed No   R5‑184393
    R5‑184771 Addition of test frequencies for CA_66A-71A, CA_66C-71A, CA_70A-71A, CA_70C-71A to 36.508 WE Certification Oy, DISH Network CR Agreement Yes
Yes
agreed No    
6.3.17.2 TS 36.523-1                      
6.3.17.3 TS 36.523-2 R5‑184399 New CA band combination CA_8A-27A - Updates of Table A.4.3.3.3-3 KT Corp. CR Agreement Yes
Yes
agreed No    
    R5‑184588 Addition of new R15 CA configurations to 36.523-2 Bureau Veritas, Ericsson CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185024  
    R5‑185024 Addition of new R15 CA configurations to 36.523-2 Bureau Veritas, Ericsson CR Agreement Yes
Yes
agreed No   R5‑184588
6.3.17.4 TS 36.523-3                      
6.3.17.5 General Papers / Work Plan / TC lists                      
6.3.18 FDD operating band in the L-band for LTE (UID - 780062) LTE_FDD_L_band-UEConTest                      
6.3.18.1 TS 36.508                      
6.3.18.2 TS 36.523-2                      
6.3.18.3 TS 36.523-3                      
6.3.18.4 General Papers / Work Plan / TC lists                      
6.3.19 Uplink capacity enhancements for LTE (UID - 780063) LTE_UL_CAP_enh-UEConTest                      
6.3.19.1 TS 36.508                      
6.3.19.2 TS 36.523-1                      
6.3.19.3 TS 36.523-2                      
6.3.19.4 TS 36.523-3                      
6.3.19.5 General Papers / Work Plan / TC lists                      
6.3.20 Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation (UID - 780065) LTE_CA_C_B41_PC2-UEConTest                      
6.3.20.1 TS 36.523-1                      
6.3.20.2 TS 36.523-2                      
6.3.20.3 TS 36.523-3                      
6.3.20.4 General Papers / Work Plan / TC lists                      
6.3.21 LTE bands with UE category M2 and/or NB2 in Rel-15 (UID - 780067) LTE_bands_R15_M2_NB2-UEConTest                      
6.3.21.1 TS 36.508                      
6.3.21.2 TS 36.523-2                      
6.3.21.3 TS 36.523-3                      
6.3.21.4 General Papers / Work Plan / TC lists                      
6.3.22 Quality of Experience (QoE) Measurement Collection for streaming services in E-UTRAN (UID - 790051) LTE_QMC_Streaming-UEConTest                      
6.3.22.1 TS 36.508                      
6.3.22.2 TS 36.523-1                      
6.3.22.3 TS 36.523-2                      
6.3.22.4 TS 36.523-3                      
6.3.22.5 General Papers / Work Plan / TC lists                      
6.3.23 Mission Critical Improvements (UID - 790052) MCImp-UEConTest                      
6.3.23.1 TS 36.579-1 R5‑184685 Update of default message contents for new Rel-14 TCs for Private Call Call-Back and Ambient listening call Samsung CR Agreement Yes
Yes
will upgrade the spec to Rel-14.
agreed No    
6.3.23.2 TS 36.579-2 R5‑184686 Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment Samsung CR Agreement Yes
Yes
will upgrade the spec to Rel-14.
r1 was presented on Wed.
revised No R5‑185123  
    R5‑185123 Adding a new Rel-14 TC on Private Call Call-Back Request / Client Originated (CO) / Private call call-back fulfilment Samsung CR Agreement Yes
Yes
agreed No   R5‑184686
    R5‑184687 Adding a new Rel-14 TC on Private Call Call-Back Request / Client Terminated (CT) / Private call call-back fulfilment Samsung CR Agreement Yes
Yes
will upgrade the spec to Rel-14.
agreed No    
    R5‑184688 Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) Samsung CR Agreement Yes
Yes
no CR#, Tdoc#
will upgrade the spec to Rel-14.
r1 was presented on Wed.
revised No R5‑185124  
    R5‑185124 Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Originated (CO) Samsung CR Agreement Yes
Yes
agreed No   R5‑184688
    R5‑184689 Adding a new Rel-14 TC on Private Call / Remotely initiated Ambient listening call Client Terminated (CT) Samsung CR Agreement Yes
Yes
will upgrade the spec to Rel-14.
agreed No    
    R5‑184690 Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Originated (CO) Samsung CR Agreement Yes
Yes
will upgrade the spec to Rel-14.
agreed No    
    R5‑184691 Adding a new Rel-14 TC on Private Call / Locally initiated Ambient listening call / Client Terminated (CT) Samsung CR Agreement Yes
Yes
will upgrade the spec to Rel-14.
agreed No    
6.3.23.3 TS 36.579-3                      
6.3.23.4 TS 36.579-4 R5‑184693 Adding applicability for new MCPTT Rel-14 TCs Samsung CR Agreement Yes
Yes
will upgrade the spec to Rel-14.
agreed No    
6.3.23.5 TS 36.579-5                      
6.3.23.6 TS 36.579-6 R5‑184607 Draft TS 36.579-6 v0.0.2 NIST draft TS Agreement Yes
Yes
changed to Rel-14
approved No    
    R5‑184611 New Test Case for 36.579-6 - 6.1.1.8 NIST pCR Approval Yes
Yes
reissued as R5-184990 because of wrong release
withdrawn Yes    
    R5‑184990 New Test Case for 36.579-6 - 6.1.1.8 NIST pCR Approval Yes
Yes
approved No    
6.3.23.7 TS 36.579-7 R5‑184608 Draft TS 36.579-7 v0.0.2 NIST draft TS Agreement Yes
Yes
changed to Rel-14
approved No    
6.3.23.8 TS 36.508                      
6.3.23.9 TS 36.509                      
6.3.23.10 TS 36.523-1                      
6.3.23.11 TS 36.523-2                      
6.3.23.12 TS 36.523-3                      
6.3.23.13 General Papers / Work Plan / TC lists                      
6.3.24 450 MHz Band for LTE in Region 3 (UID - 790058) LTE450_Reg3-UEConTest                      
6.3.24.1 TS 36.508                      
6.3.24.2 TS 36.523-2                      
6.3.24.3 TS 36.523-3                      
6.3.24.4 General Papers / Work Plan / TC lists                      
6.3.25 UL Data Compression in LTE (UID - 800080) LTE_UDC-UEConTest                      
6.3.25.1 TS 36.508                      
6.3.25.2 TS 36.523-1                      
6.3.25.3 TS 36.523-2                      
6.3.25.4 TS 36.523-3                      
6.3.25.5 General Papers / Work Plan / TC lists                      
6.3.26 5G System Non-3GPP Access (UID - 800081) 5GS_Ph1-CT_n3GPPA-UEConTest                      
6.3.26.1 TS 38.508-1                      
6.3.26.2 TS 38.508-2                      
6.3.26.3 TS 38.523-1                      
6.3.26.4 TS 38.523-2                      
6.3.26.5 TS 38.523-3                      
6.3.26.6 General Papers / Work Plan / TC lists                      
6.4 Routine Maintenance for TS 36 Series TEIx_Test                      
6.4.1 Routine Maintenance for TS 36.508 R5‑184045 Update Reference Table 6.6.2-1A dedicated EPS bearer contexts FirstNet, AT&T CR Agreement Yes
Yes
WIC & cl. affected missing on cover!
The TF160 manager reported a possible clash in tables with another CR.
r1 was presented on Thu.
revised No R5‑185158  
    R5‑185158 Update Reference Table 6.6.2-1A dedicated EPS bearer contexts FirstNet, AT&T CR Agreement Yes
Yes
agreed No   R5‑184045
    R5‑184075 NB-IoT timer tolerances: extension of timer value range MCC TF160, Anritsu Ltd. CR Agreement Yes
Yes
agreed No    
    R5‑184094 Correction to ATTACH ACCEPT message for SMS only ROHDE & SCHWARZ CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185002  
    R5‑185002 Correction to ATTACH ACCEPT message for SMS only ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184094
    R5‑184404 Correction of 6.2.3.2 Test Frequency for CA_3A-27A KT Corp. CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185003  
    R5‑185003 Correction of 6.2.3.2 Test Frequency for CA_3A-27A KT Corp. CR Agreement Yes
Yes
agreed No   R5‑184404
    R5‑184668 Editorial correction of reference document Intertek CR Agreement Yes
Yes
agreed No    
    R5‑184884 Update to NB-IoT test conditions for in-band / guard band ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
6.4.2 Routine Maintenance for TS 36.509 R5‑184076 Corrections to UE Test Loop Mode H MCC TF160 CR Agreement Yes
Yes
offline comments from Rohde&Schwarz.
Mediatek recommended to align the loopback diagram.
r2 was presented on Wed.
revised No R5‑185125  
    R5‑185125 Corrections to UE Test Loop Mode H MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑184076
    R5‑184077 Corrections to UE Test Loop Mode H MCC TF160 CR Agreement Yes
Yes
late doc
doc not available
for email agreement
agreed No    
    R5‑184078 Corrections to UE Test Loop Mode H MCC TF160 CR Agreement Yes
Yes
late doc
doc not available
for email agreement
agreed No    
6.4.3 Routine Maintenance for TS 36.523-1                      
6.4.3.1 Idle Mode R5‑184331 Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell Keysight Technologies UK Ltd, Samsung CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185004  
    R5‑185004 Correction to Idle mode Inter-RAT G<>E test case 6.2.3.21 to allow optional IMS registration on EUTRAN cell Keysight Technologies UK Ltd, Samsung CR Agreement Yes
Yes
agreed No   R5‑184331
6.4.3.2 Layer 2                      
6.4.3.2.1 MAC R5‑184503 Update of number of DL PDCP SDUs in test cases 7.1.7.1.x MediaTek Inc. CR Agreement Yes
Yes
r2 was presented on Mon.
The TF160 manager wondered about the deleted categories.
Deferred.
r3 was presented on Thu.
revised No R5‑185005  
    R5‑185005 Update of number of DL PDCP SDUs in test cases 7.1.7.1.x MediaTek Inc. CR Agreement Yes
Yes
coversheet rev missing.
revised No R5‑185169 R5‑184503
    R5‑185169 Update of number of DL PDCP SDUs in test cases 7.1.7.1.x MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑185005
    R5‑184504 Update of DL 256QAM TCs for high UE DL Categories MediaTek Inc. CR Agreement Yes
Yes
r2 was presented on Mon.
revised No R5‑185006  
    R5‑185006 Update of DL 256QAM TCs for high UE DL Categories MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑184504
    R5‑184551 Correction to MAC test cases with TB Size selection ANRITSU LTD CR Agreement Yes
Yes
agreed No    
6.4.3.2.2 RLC                      
6.4.3.2.3 PDCP                      
6.4.3.3 RRC                      
6.4.3.3.1 RRC Part 1 (clauses 8.1 and 8.5) R5‑184505 Correction to RRC TC 8.5.4.1 MediaTek Inc. CR Agreement Yes
Yes
r1 was presented on Mon.
Rohde&Schwarz UK, Qualcomm and TF160 commented that some PICS must be added.
r2 and r4 was presented on Thu.
revised No R5‑185007  
    R5‑185007 Correction to RRC TC 8.5.4.1 MediaTek Inc. CR Agreement Yes
Yes
agreed No   R5‑184505
    R5‑184506 Correction to RRC TC 8.5.4.3 MediaTek Inc. CR Agreement No
Yes
withdrawn Yes    
6.4.3.3.2 RRC Part 2 (clause 8.2) R5‑184543 Correction to CAT-M1 Test case 8.2.4.27 Anritsu Ltd., Nordic Semiconductor ASA CR Agreement Yes
Yes
Rohde&Schwarz UK commented that this change will have impact on all handover test cases.
Deferred.
r1 was presented on Thu.
revised No R5‑185159  
    R5‑185159 Correction to CAT-M1 Test case 8.2.4.27 Anritsu Ltd., Nordic Semiconductor ASA CR Agreement Yes
Yes
agreed No   R5‑184543
6.4.3.3.3 RRC Part 3 (clause 8.3)                      
6.4.3.3.4 Inter-RAT (clauses 8.4 & 8.4A) R5‑184726 Removal of 1xPre-Registation 8.4.7.x test cases Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
6.4.3.3.5 RRC LTE MDT (clause 8.6)                      
6.4.3.3.6 RRC ANR for UTRAN (clause 8.7)                      
6.4.3.4 EPS Mobility Management R5‑184053 Correction to EMM test case 9.2.3.1.25 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
r1 was presented on Mon.
Editorial comments on the Notes form Samsung and ETSI MCC.
r2 was presented on Thu.
revised No R5‑185008  
    R5‑185008 Correction to EMM test case 9.2.3.1.25 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184053
    R5‑184187 Correction to testcase 9.2.2.1.9 for CAT-M1 UEs ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184507 Correction to EMM TC 9.2.1.1.24 MediaTek Inc. CR Agreement Yes
Yes
one empty row to be completely deleted
agreed No    
    R5‑184532 Correction to testcase 9.2.2.1.9 for CAT-M1 UEs ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
r2 was presented on Mon.
revised No R5‑185009  
    R5‑185009 Correction to testcase 9.2.2.1.9 for CAT-M1 UEs ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184532
    R5‑184707 Update of EMM test case 9.2.1.1.1b Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184708 Update of EMM test case 9.2.1.1.22 Qualcomm Incorporated, Anritsu CR Agreement Yes
Yes
agreed No    
    R5‑184709 Update of EMM test case 9.2.3.2.17 Qualcomm Incorporated CR Agreement Yes
Yes
r1 was presented on Mon.
Keysight UK requested more time.
Deferred.
revised No R5‑185010  
    R5‑185010 Update of EMM test case 9.2.3.2.17 Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184709
6.4.3.5 EPS Session Management R5‑184044 Update EPS Session Management test case in section 10 of TS 36.523-1. FirstNet, AT&T CR Agreement Yes
Yes
WIC & cl. affected missing on cover!
r1 was presented on Thu.
revised No R5‑185136  
    R5‑185136 Update EPS Session Management test case in section 10 of TS 36.523-1. FirstNet, AT&T CR Agreement Yes
Yes
withdrawn Yes   R5‑184044
    R5‑184067 Correction to 10.7.4 regarding CE mode ROHDE & SCHWARZ CR Agreement Yes
Yes
r2 was presented on Thu.
revised No R5‑185135  
    R5‑185135 Correction to 10.7.4 regarding CE mode ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184067
    R5‑184508 Correction to ESM TC 10.5.4 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
6.4.3.6 General Tests R5‑184781 Update to IMS eCall test case 11.3.2 Qualcomm Incorporated CR Agreement Yes
Yes
withdrawn Yes    
    R5‑184782 Update to IMS eCall test case 11.3.6 Qualcomm Incorporated CR Agreement Yes
Yes
withdrawn Yes    
6.4.3.7 Interoperability Radio Bearers                      
6.4.3.8 Multilayer Procedures R5‑184323 Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE Keysight Technologies UK Ltd CR Agreement Yes
Yes
comment from Qualcomm of other test cases impacted.
eCall to be removed from the coverpage.
revised No R5‑185126  
    R5‑185126 Correction to SSAC connected mode test cases 13.5.1a and 13.5.3a for IMS Enabled UE Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No   R5‑184323
    R5‑184510 Correction to CSFB TC 13.1.12 MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑184631 Adding TC 13.1.21 for emergency call via CS domain DOCOMO Communications Lab. CR Agreement Yes
Yes
Qualcomm: All emg tcs are in cl. 11.
agreed No    
    R5‑184727 Removal of Multi-Layer 1xPre-Registation 13.4.4.x and 1xCSFB 13.1.xx test cases Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184918 Correction to multi-layer test case 13.1.20 Keysight Technologies UK Ltd CR Agreement Yes
Yes
agreed No    
6.4.3.9 PWS - ETWS / CMAS                      
6.4.3.10 Non-3GPP                      
6.4.3.11 Others (TS 36.523-1 clauses not covered by other AIs under AI 6.4.3 e.g. eMBMS / Home (e)NB / MBMS in LTE / D2D / SC-PTM / NB-IoT / CIoT...) R5‑184079 Clarification for NB-IoT test case 22.3.1.1 MCC TF160, Rohde&Schwarz CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185012  
    R5‑185012 Clarification for NB-IoT test case 22.3.1.1 MCC TF160, Rohde&Schwarz CR Agreement Yes
Yes
agreed No   R5‑184079
    R5‑184089 Correction to NB-IoT test case 22.5.8 ROHDE & SCHWARZ CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185013  
    R5‑185013 Correction to NB-IoT test case 22.5.8 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184089
    R5‑184090 Correction to NB-IoT test case 22.5.14 ROHDE & SCHWARZ, Qualcomm CR Agreement Yes
Yes
r1 was presented on Mon.
revised No R5‑185014  
    R5‑185014 Correction to NB-IoT test case 22.5.14 ROHDE & SCHWARZ, Qualcomm CR Agreement Yes
Yes
agreed No   R5‑184090
    R5‑184091 Correction to NB-IoT test case 22.6.2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184092 Correction to NB-IoT test case 22.6.3 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184093 Correction to NB-IoT test case 22.1.1 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184216 Corrections to NBIOT NAS TC 22.5.7b CATT, TDIA, Starpoint CR Agreement Yes
Yes
TEI13 added.
rev 1, wrong date.
r2 was presented.
Qualcomm disagreed to this CR as some UEs are already passing with this TC.
Rohde&Schwarz remarked it depends on the UE.
Deferred.
revised No R5‑185015  
    R5‑185015 Corrections to NBIOT NAS TC 22.5.7b CATT, TDIA, Starpoint CR Agreement Yes
Yes
agreed No   R5‑184216
    R5‑184322 Correction to NB-IoT test cases 22.4.8 and 22.4.9 ANRITSU LTD CR Agreement Yes
Yes
cl. Affected missing.
r1 was presented on Mon.
some parts not revision marked.
22.4.4 missing from title.
revised No R5‑185016  
    R5‑185016 Correction to NB-IoT test cases 22.4.8 and 22.4.9 ANRITSU LTD CR Agreement Yes
Yes
withdrawn Yes   R5‑184322
    R5‑185017 Correction to NB-IoT test cases 22.4.4, 22.4.8 and 22.4.9 ANRITSU LTD, Qualcomm CR Agreement Yes
Yes
agreed No    
    R5‑184518 Correction to NB-IoT test case 22.2.9 ANRITSU LTD CR Agreement Yes
Yes
wrong Rel-14 on cover!
r1 was presented on Mon.
revised No R5‑185018  
    R5‑185018 Correction to NB-IoT test case 22.2.9 ANRITSU LTD CR Agreement Yes
Yes
agreed No   R5‑184518
    R5‑184710 Update of eMBMS test cases for UEs supporting AT command for eMBMS service activation Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184711 Update to NB-IOT test case 22.1.1 M2 Qualcomm Incorporated, Anritsu, Rohde & Schwarz CR Agreement Yes
Yes
the TF160 manager recommended to delete the sT15 also from TP (6).
revised No R5‑185019  
    R5‑185019 Update to NB-IOT test case 22.1.1 M2 Qualcomm Incorporated, Anritsu, Rohde & Schwarz CR Agreement Yes
Yes
agreed No   R5‑184711
    R5‑184712 Update to NB-IOT test case 22.3.1.2 Qualcomm Incorporated CR Agreement Yes
Yes
r1 was presented on Mon.
Anritsu/TF160 commented that this implementation is failing another UE in another TTCN implementation. Rohde&Schwarz had proposed it earlier.
revised No R5‑185020  
    R5‑185020 Update to NB-IOT test case 22.3.1.2 Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184712
    R5‑184807 Correction to NB-IoT testcase 22.3.3.5 ROHDE & SCHWARZ CR Agreement Yes
Yes
r1 was presented on Mon.
Deferred.
r2 was presented on Thu.
 
revised No R5‑185021  
    R5‑185021 Correction to NB-IoT testcase 22.3.3.5 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184807
    R5‑184854 Correction to NB-IoT testcase 22.3.2.2 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
6.4.4 Routine Maintenance for TS 36.523-2 R5‑184052 Labelling more LTE test cases as not applicable for CAT M1 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
the TF160 manager raised the concern whether there shall be no replacement for IMS Cat. M1.
Deferred.
Label more is not applicable. CRs will be brought to the next meeting to explain better.
withdrawn Yes    
    R5‑184060 Adding SMS over SGs configuration to applicabilities ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184069 Correction of the Update to applicability condition of test case 11.2.3 to include CSG PICS ETSI MCC (Qualcomm Incorporated) CR Agreement Yes
Yes
included already in a Qualcomm CR.
withdrawn Yes    
    R5‑184266 Correction of test case title of 8.2.2.5a.2 Huawei,HiSilicon CR Agreement Yes
Yes
agreed No    
    R5‑184512 Correction to applicability of TC 7.1.7.1.6a MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑184513 Correction to applicability of DL 256QAM TCs MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑184514 Editorial correction of referred table number MediaTek Inc. CR Agreement Yes
Yes
agreed No    
    R5‑184536 Correction to testcases 9.2.1.2.1c and 9.2.1.2.1d applicability conditions for CAT-M1 UEs ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184538 Correction to testcases 6.1.1.1, 6.1.1.1b and applicability conditions for CAT-M1 UEs ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
Discussion about excluding tests in order to reduce test duration and costs.
Deferred.
withdrawn Yes    
    R5‑184596 Correction to NB-IoT test case 22.4.20a execution guideline Anritsu Ltd, Qualcomm CR Agreement Yes
Yes
the TF160 manager commented that this is rather eNB-IoT.
Reissued as for R5-185022 because of WIC.
 
withdrawn Yes    
    R5‑184633 Addition of new applicability of emergency call via CS domain TC for IMS capable UE DOCOMO Communications Lab. CR Agreement Yes
Yes
agreed No    
    R5‑184730 Correction to Inter-RAT absolute priority based reselection test cases Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184731 Update to applicability condition of test case 11.2.3 to include CSG PICS Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184732 Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs Qualcomm Incorporated CR Agreement Yes
Yes
r1 was presented on Thu.
revised No R5‑185137  
    R5‑185137 Update to applicability condition of Intra-frequency measurement reporting test cases for CAT-M1 UEs Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184732
    R5‑184734 Update to applicability condition of Test case 6.1.1.7a for CAT-M1 UEs Qualcomm Incorporated, Rohde & Schwarz CR Agreement Yes
Yes
deferred.
withdrawn Yes    
    R5‑184735 Removal of 1xPre-Registation and 1xCSFB test cases applicability Qualcomm Incorporated CR Agreement Yes
Yes
Mototola Mobility remarked that CS fallback pics shall stay.
Deferred.
revised No R5‑185138  
    R5‑185138 Removal of 1xPre-Registation and 1xCSFB test cases applicability Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184735
    R5‑184849 Correction of condition for Measurement configuration and reporting SGS Wireless, Ericsson CR Agreement Yes
Yes
agreed No    
6.4.5 Routine Maintenance for TS 36.523-3 R5‑184080 Routine maintenance for TS 36.523-3 MCC TF160 CR Agreement Yes
Yes
wrong spec & ver on cover!
Wic says TEI13_Test, NB_IOT-UEConTest!?
r1 was presented on Thu.
revised No R5‑185139  
    R5‑185139 Routine maintenance for TS 36.523-3 MCC TF160 CR Agreement Yes
Yes
uploaded by mistake by Qualcomm
revised No R5‑185180 R5‑184080
    R5‑185180 Routine maintenance for TS 36.523-3 MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑185139
6.4.6 General Papers / Work Plan / TC lists R5‑184128 Discussion on Test Loop Mode H MCC TF160 discussion Endorsement Yes
Yes
Mediatek commented that the test point is not clear. Further unclear items.
Option 2, only Mediatek disagreed.
Option 2 is endorsed.
noted No    
    R5‑184534 TS 36.523-1 Status before RAN5#80 Rapporteur (BlackBerry) other   Yes
Yes
noted No    
    R5‑184535 TS 36.523-1 Status after RAN5#80 Rapporteur (BlackBerry) other   Yes
Yes
withdrawn Yes    
    R5‑184547 TS 36.523-1 Status after RAN5#80 Rapporteur (BlackBerry) other   No
Yes
post meeting doc
noted No    
    R5‑184635 Emergency call via CS domain TC in case of IMS voice not available DOCOMO Communications Lab. discussion Decision Yes
Yes
Rohde&schwarz commented that this scenario maybe only shows up when the network misbehaves.
Conclusion: the scenario is not yet covered.
the proposal is endorsed.
noted No    
6.5 Other Maintenance TEIx_Test                      
6.5.1 Routine Maintenance for TDD (HCR & LCR)                      
6.5.1.1 TS 34.108                      
6.5.1.2 TS 34.123-1                      
6.5.1.3 TS 34.123-2                      
6.5.1.4 TS 34.123-3                      
6.5.1.5 General Papers / Work Plan / TC list & CR summary                      
6.5.2 Routine Maintenance for TS 34.108                      
6.5.3 Routine Maintenance for TS 34.109                      
6.5.4 Routine Maintenance for TS 34.123                      
6.5.4.1 TS 34.123-1 R5‑184063 Resubmission of Correction to TC 8.1.5.7 ETSI MCC (MediaTek Inc.) CR Agreement Yes
Yes
agreed No    
    R5‑184088 Correction to Rel-99 NAS testcase 9.4.9 ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No    
    R5‑184144 Correction to test case 9.5.7.2 Intel Corporation (UK) Ltd, Rohde & Schwarz CR Agreement Yes
Yes
agreed No    
6.5.4.2 TS 34.123-2                      
6.5.4.3 TS 34.123-3                      
6.5.5 General Papers / Work Plan / TC lists                      
6.5.6 Routine Maintenance for TS 34.229                      
6.5.6.1 TS 34.229-1 R5‑184056 Corrections to G.15.4 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184062 Resubmission of Corrections to IMS test case 19.1.6 ETSI MCC (Rohde & Schwarz) CR Agreement Yes
Yes
agreed No    
    R5‑184096 Editorial corrections to IMS emergency call test cases in clauses 19 and 21 MCC TF160 CR Agreement Yes
Yes
agreed No    
    R5‑184483 Add and use reference to NG.108 ROHDE & SCHWARZ, Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184704 Update to IMS eCall test cases for eCall category bit usage Qualcomm Incorporated CR Agreement Yes
Yes
agreed No    
    R5‑184705 Update to Emergency Call test case 19.1.3 for eCall category bit usage Qualcomm Incorporated CR Agreement Yes
Yes
r1 was presented on Wed.
revised No R5‑185087  
    R5‑185087 Update to Emergency Call test case 19.1.3 for eCall category bit usage Qualcomm Incorporated CR Agreement Yes
Yes
agreed No   R5‑184705
    R5‑184779 Update to A.2.1 for Test eCall Request-URI Qualcomm Incorporated CR Agreement Yes
Yes
withdrawn Yes    
6.5.6.2 TS 34.229-2 R5‑184048 Addition of IR.92 to SM-over-IP roles ROHDE & SCHWARZ, Ericsson CR Agreement Yes
Yes
agreed No    
    R5‑184059 Adding SMS over IP configuration to applicabilities ROHDE & SCHWARZ CR Agreement Yes
Yes
the xxx has to be resolved from 36.523-2 CR 1185 !
revised No R5‑185088  
    R5‑185088 Adding SMS over IP configuration to applicabilities ROHDE & SCHWARZ CR Agreement Yes
Yes
agreed No   R5‑184059
6.5.6.3 TS 34.229-3                      
6.5.6.4 TS 34.229-4                      
6.5.6.5 General Papers / Work Plan / TC lists R5‑184057 Investigation on test coverage for IR.92 and IR.94 ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Conclusion:
For 2.1 new features in 12.0, RAN5 will look to provide test coverage if there is industry need.
For 2.2, 2.4, 2.5 there is no market interest.
2.3 needs to be corrected in the spec.
noted No    
    R5‑184058 Investigation on Supplementary Services ROHDE & SCHWARZ discussion Endorsement Yes
Yes
Conclusion: test coverage on WLAN may not be needed.
noted No    
6.5.7 Routine Maintenance for TS 37.571                      
6.5.7.1 TS 37.571-2 R5‑184032 Addition of PICS for support of LPP message segmentation in test 7.3.1.1 Spirent Communications CR Agreement No
Yes
withdrawn Yes    
    R5‑184037 Addition of PICS for support of LPP message segmentation in test 7.3.1.1 Spirent Communications CR Agreement Yes
Yes
agreed No    
6.5.7.2 TS 37.571-3 R5‑184033 Addition of PICS for support of LPP message segmentation Spirent Communications CR Agreement No
Yes
withdrawn Yes    
    R5‑184038 Addition of PICS for support of LPP message segmentation Spirent Communications CR Agreement Yes
Yes
agreed No    
6.5.7.3 TS 37.571-4                      
6.5.7.4 TS 37.571-5 R5‑184030 Addition of missing assistance data for modernized GPS and the GPS L5 signal for the LTE signalling tests Spirent Communications CR Agreement Yes
Yes
agreed No    
    R5‑184031 Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests Spirent Communications, European Commission CR Agreement No
Yes
withdrawn Yes    
    R5‑184036 Addition of missing assistance data for the Galileo E5A signal for LTE signalling tests Spirent Communications, European Commission CR Agreement Yes
Yes
agreed No    
6.5.7.5 General Papers / Work Plan / TC lists                      
6.5.8 Routine Maintenance for TS 51.010                      
6.5.8.1 TS 51.010-1 (Signalling)                      
6.5.8.2 TS 51.010-2 (Signalling)                      
6.5.8.3 TS 51.010-5 (Signalling)                      
6.5.8.4 TS 51.010-7 (Signalling)                      
6.5.8.5 General Papers / Work Plan / TC list & CR summary                      
6.5.9 Routine Maintenance for MCPTT                      
6.5.9.1 TS 36.579-1 R5‑184663 Corrections to MCPTT Authorization MCC TF160 CR Agreement Yes
Yes
r2 was presented on Wed.
revised No R5‑185122  
    R5‑185122 Corrections to MCPTT Authorization MCC TF160 CR Agreement Yes
Yes
agreed No   R5‑184663
    R5‑185084 Update to TLS setup MCC TF160, Motorola Solutions UK Ltd. CR Agreement Yes
Yes
late doc
agreed No    
6.5.9.2 TS 36.579-2 R5‑184692 Editorial updates to 36.579-2 Rel-13 TCs Samsung CR Agreement Yes
Yes
agreed No    
6.5.9.3 TS 36.579-3                      
6.5.9.4 TS 36.579-4                      
6.5.9.5 TS 36.579-5 R5‑184081 MCPTT: Test Model updates MCC TF160 CR Agreement Yes
Yes
MCPTT test suite is not yet released, but under development.
2 basic test cases.
No feedback yet from test industry.
agreed No    
6.5.9.6 TS 36.508                      
6.5.9.7 TS 36.509                      
6.5.9.8 TS 36.523-1                      
6.5.9.9 TS 36.523-2                      
6.5.9.10 TS 36.523-3                      
6.5.9.11 TS 34.229-1                      
6.5.9.12 TS 34.229-2                      
6.5.9.13 TS 34.229-3                      
6.5.9.14 General Papers / Work Plan / TC lists R5‑184666 MCPTT Client test cases: open issues in prose MCC TF160 discussion Discussion Yes
Yes
AP was raised on NIST.
noted No    
6.6 Outgoing liaison statements for provisional approval                      
6.7 AOB                      
7 Closing Joint Session                      
7.1 Pointer CRs R5‑184136 Removal of technical content in 34.108 v14.2.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
    R5‑184137 Removal of technical content in 34.121-2 v14.1.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
    R5‑184138 Removal of technical content in 34.123-1 v14.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
    R5‑184139 Removal of technical content in 34.123-2 v14.4.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
    R5‑184140 Removal of technical content in 36.521-3 v14.4.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
    R5‑184141 Removal of technical content in 36.523-3 v14.4.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
    R5‑184142 Removal of technical content in 36.903 v13.5.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
    R5‑184143 Removal of technical content in 36.905 v14.6.0 and substitution with pointer to the next Release ETSI Secretariat CR Agreement Yes
Yes
agreed No    
7.2 Open Issues                      
7.2.1 RF group docs still requiring WG verdict/confirmation - original A.I. retained R5‑184332 Test Frequencies Sprint Corporation, Ericsson CR Agreement Yes
Yes
/*DUPLICATED-ORIG*/
Document replicated in two AIs: [5.3.13.1]-[7.2.1].
Conclusion changes to one of the replicas will be replicated to the other.
LATE DOCUMENT
update to test frequencies
   
revised No R5‑185173  
    R5‑185173 Test Frequencies Sprint Corporation, Ericsson CR Agreement Yes
Yes
agreed No   R5‑184332
7.2.2 Sig group docs still requiring WG verdict/confirmation - original A.I. retained R5‑184339 Update of FR1 signal levels ANRITSU LTD CR Agreement Yes
Yes
r1 was presented on Tue.
revised No R5‑185036  
    R5‑185036 Update of FR1 signal levels ANRITSU LTD CR Agreement Yes
Yes
for email agreement
agreed No   R5‑184339
    R5‑184352 Addition of Test frequency for EN-DC B1_n78 Qualcomm Korea CR Agreement Yes
Yes
no source
r1 was presented on Fri.
Superseded by Ericsson's doc.
revised No R5‑185178  
    R5‑185178 Addition of Test frequency for EN-DC B1_n78 Qualcomm Korea CR Agreement No
Yes
withdrawn Yes   R5‑184352
    R5‑184478 Introduction of test frequencies for signalling testing in clause 6 Ericsson, TF160 CR Agreement Yes
Yes
editorial, table nr.s
revised No R5‑185177  
    R5‑185177 Introduction of test frequencies for signalling testing in clause 6 Ericsson, TF160 CR Agreement Yes
Yes
agreed No   R5‑184478
7.2.3 Other open issues from joint sessions - original A.I. retained R5‑184445 Update of RAN5 5G NR phases and target update RAN5#80 Ericsson discussion Endorsement Yes
Yes
a draft was presented.
for email approval
revised No R5‑185183  
    R5‑185183 Update of RAN5 5G NR phases and target update RAN5#80 Ericsson discussion Endorsement No
No
for email approval
for email approval No   R5‑184445
7.2.4 UE Application Layer Data Throughput Performance - original A.I. retained                      
7.2.5 Other R5‑185170 Meeting notes of offline discussion on FR2 UE common test setup Anritsu discussion discussion Yes
Yes
the agreements are noted.
revised No R5‑185179  
    R5‑185179 Meeting notes of offline discussion on FR2 UE common test setup Anritsu discussion discussion Yes
Yes
noted No   R5‑185170
7.3 iWD/PRD Updates R5‑184533 PRD-17 on Guidance to Work Item Codes version 3.13 (post RAN#81 version) Rapporteur (BlackBerry) other   No
Yes
noted No    
    R5‑184684 Update of PRD13 Samsung other Approval Yes
Yes
approved No    
7.4 Work Items/ Study Items                      
7.4.1 Final version of Work Item Proposals R5‑185127 New Work Item Proposal: UE Conformance Test Aspects - Addition of Power Class 1 UE to bands B31/B72 for LTE Airbus DS SLC WID new Endorsement Yes
Yes
agreed No   R5‑184334
    R5‑185128 New WID on UE Conformance Test Aspects - ProSe Support for Band 72 in LTE Airbus DS SLC WID new Endorsement Yes
Yes
agreed No   R5‑184337
    R5‑185000 New WID for Rel-16 LTE CA Ericsson WID new Endorsement Yes
Yes
agreed No   R5‑184432
7.4.2 Active Work Items/ Study Item: work plans (wp) / status reports (sr) / Work Item Descriptions (wid) R5‑184017 WI Progress and Target Completion Date Review WG Chairman other   No
Yes
noted No    
    R5‑184046 WP – UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) Ericsson Work Plan   Yes
Yes
noted No    
    R5‑184047 SR - UE Conformance Test Aspects - Uplink capacity enhancements for LTE (UL 256 QAM) Ericsson WI status report   Yes
Yes
noted No    
    R5‑184049 WP - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 Ericsson Work Plan   Yes
Yes
noted No    
    R5‑184050 SR - UE Conformance Test Aspects - LTE bands with UE category M2 and/or NB2 in Rel-15 Ericsson WI status report   Yes
Yes
noted No    
    R5‑184198 WP - UE Conformance Test Aspects - Voice and Video Enhancement for LTE CATT Work Plan Endorsement Yes
Yes
noted No    
    R5‑184199 SR - UE Conformance Test Aspects - Voice and Video Enhancement for LTE CATT WI status report Endorsement Yes
Yes
noted No    
    R5‑184200 WP - UE Conformance Test Aspects - UL Data Compression in LTE CATT Work Plan Endorsement Yes
Yes
noted No    
    R5‑184201 SR - UE Conformance Test Aspects - UL Data Compression in LTE CATT WI status report Endorsement Yes
Yes
noted No    
    R5‑184305 WP - Support for V2V services based on LTE sidelink Huawei Work Plan Information Yes
Yes
noted No    
    R5‑184306 SR - Support for V2V services based on LTE sidelink Huawei WI status report Endorsement Yes
Yes
noted No    
    R5‑184307 WP - Support for V2X services Huawei Work Plan Information Yes
Yes
noted No    
    R5‑184308 SR - Support for V2X services Huawei WI status report Endorsement Yes
Yes
noted No    
    R5‑184309 WP - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell Huawei Work Plan Information Yes
Yes
noted No    
    R5‑184310 SR - LTE Carrier Aggregation Enhancement Beyond 5 Carriers: PUCCH on Scell Huawei WI status report Endorsement Yes
Yes
noted No    
    R5‑184311 WP - Rel-14 eNB-IoT Huawei Work Plan Information Yes
Yes
noted No    
    R5‑184312 SR - Rel-14 eNB-IoT Huawei WI status report Endorsement Yes
Yes
noted No    
    R5‑184319 WP - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 (UID-790058) China Unicom Work Plan   Yes
Yes
noted No    
    R5‑184320 SR - UE Conformance Test Aspects - 450 MHz Band for LTE in Region 3 for RAN5#80 China Unicom WI status report   Yes
Yes
noted No    
    R5‑184321 SR - LTE_QMC_Streaming-UEConTest (UID-790051) for RAN5#80 China Unicom WI status report   Yes
Yes
noted No    
    R5‑184328 WP - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation Sprint Corporation Work Plan Information Yes
Yes
noted No    
    R5‑184329 SR - UE Conformance Test Aspects - Add UE Power Class 2 to band 41 intra-band contiguous LTE Carrier Aggregation Sprint Corporation WI status report   Yes
Yes
noted No    
    R5‑184386 WP UE Conformance Test Aspects - FDD operating band in the L-band for LTE NTT DOCOMO, INC. Work Plan Information Yes
Yes
noted No    
    R5‑184387 SR UE Conformance Test Aspects - FDD operating band in the L-band for LTE NTT DOCOMO, INC. WI status report Information Yes
Yes
noted No    
    R5‑184391 WP - LTE_QMC_Streaming-UEConTest (UID-790051) China Unicom Work Plan   Yes
Yes
noted No    
    R5‑184435 WP UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184436 SR UE Conformance Test Aspects - Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA Ericsson WI status report Information Yes
Yes
noted No    
    R5‑184437 WP UE Conformance Test Aspects - Rel-13 CA configurations Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184438 SR UE Conformance Test Aspects - Rel-13 CA configurations Ericsson WI status report Information Yes
Yes
noted No    
    R5‑184439 WP UE Conformance Test Aspects - Rel-14 CA configurations Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184440 SR UE Conformance Test Aspects - Rel-14 CA configurations Ericsson WI status report Information Yes
Yes
noted No    
    R5‑184441 WP UE Conformance Test Aspects - Rel-15 CA configurations Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184442 SR UE Conformance Test Aspects - Rel-15 CA configurations Ericsson WI status report Information Yes
Yes
noted No    
    R5‑184443 WP UE Conformance Test Aspects - 5G system with NR and LTE Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184444 SR UE Conformance Test Aspects - 5G system with NR and LTE Ericsson WI status report Information No
Yes
noted No    
    R5‑184446 Revised WID on: UE Conformance Test Aspects - 5G system with NR and LTE Ericsson WID revised Endorsement No
No
reserved No    
    R5‑184529 WP UE Conformance Test Aspects – 5G System Non-3GPP Access Motorola Mobility Work Plan Endorsement Yes
Yes
noted No    
    R5‑184530 SR UE Conformance Test Aspects – 5G System Non-3GPP Access Motorola Mobility WI status report Endorsement Yes
Yes
noted No    
    R5‑184561 WP - UE Conformance Test Aspects - eHST CMCC Work Plan   Yes
Yes
revised No R5‑185181  
    R5‑185181 WP - UE Conformance Test Aspects - eHST CMCC Work Plan - Yes
Yes
noted No   R5‑184561
    R5‑184562 SR - eHST after RAN5#80 CMCC WI status report   Yes
Yes
revised No R5‑185182  
    R5‑185182 SR - eHST after RAN5#80 CMCC WI status report - Yes
Yes
noted No   R5‑184562
    R5‑184592 WP UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE Qualcomm Europe Inc. (Spain) Work Plan   Yes
Yes
noted No    
    R5‑184594 SR UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE Qualcomm Europe Inc. (Spain) WI status report   Yes
Yes
noted No    
    R5‑184595 WID Update UE Conformance Test Aspects – enhanced Licensed-Assisted Access using LTE Qualcomm Europe Inc. (Spain) WID revised   Yes
Yes
noted No    
    R5‑184609 SR - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest NIST WI status report Endorsement Yes
Yes
noted No    
    R5‑184610 WP - UE Conformance Test Aspects - Mission Critical Improvements (UID - 790052) MCImp-UEConTest.doc NIST Work Plan Endorsement Yes
Yes
noted No    
    R5‑184749 Revised WID- Support for V2X services Huawei WID revised Endorsement Yes
Yes
noted No    
    R5‑184861 WP – UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE Intel Corporation (UK) Ltd Work Plan Information Yes
Yes
noted No    
    R5‑184862 SR- UE Conformance Test Aspects – Interference Mitigation for Downlink Control Channels of LTE Intel Corporation (UK) Ltd WI status report Information Yes
Yes
noted No    
    R5‑184864 WP – UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements Intel Corporation (UK) Ltd Work Plan Information Yes
Yes
noted No    
    R5‑184866 SR- UE Conformance Test Aspects - Wireless Local Area Network (WLAN) – 3GPP Radio Level Integration and Interworking Enhancements Intel Corporation (UK) Ltd WI status report Information Yes
Yes
noted No    
    R5‑184893 WP UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184894 SR UE Conformance Test Aspects – Rel-14 LTE DL CA 4 Rx antenna ports Ericsson WI status report Information Yes
Yes
noted No    
    R5‑184895 WP UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184896 SR UE Conformance Test Aspects – Rel13 Full Dimension MIMO for LTE Ericsson WI status report Information Yes
Yes
noted No    
    R5‑184899 WP UE Conformance Test Aspects – Further enhanced MTC for LTE Ericsson Work Plan Information Yes
Yes
noted No    
    R5‑184900 SR UE Conformance Test Aspects – Further enhanced MTC for LTE Ericsson WI status report Information Yes
Yes
noted No    
    R5‑184995 WP UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE Qualcomm Inc. Work Plan discussion Yes
Yes
noted No    
    R5‑184996 SR UE Conformance Test Aspects - Requirements for a new UE category 1bis with single receiver based on category 1 for LTE Qualcomm Inc. WI status report discussion Yes
Yes
noted No    
7.4.3 Work Plan updates of recently closed work items                      
7.5 Docs still needing agreement/endorsement/approval R5‑184024 Definition of and test methods for OTA unwanted emissions of IMT radio equipment ITU-R Working Party 5D LS in Information Yes
Yes
PCTest will coordinate the responses in RF.
Response back via the RAN plenary will be drafted early during the email agreement week.
R5-185147.
noted No    
    R5‑184999 MCC TF160 Status Report MCC TF160 report Agreement Yes
Yes
the task list and funding is endorsed.
approved No   R5‑184070
    R5‑184115 Draft TS 38.533 v0.0.2 ROHDE & SCHWARZ draft TS   No
No
for email approval No    
    R5‑184153 Draft TS 38.521-1 v1.0.1 China Unicom draft TS   No
Yes
withdrawn Yes    
    R5‑184154 Draft TS 38.521-1 v1.0.1 China Unicom draft TS   No
No
for email approval No    
    R5‑184304 Draft TR 38.903 v0.3.0 Huawei,HiSilicon draft TR Endorsement No
Yes
withdrawn Yes    
    R5‑184434 RAN5#80 summary of changes to RAN5 test cases with potential impact on GCF and PTCRB Ericsson, Samsung report Information No
Yes
noted No    
    R5‑184448 3GPP RAN5 CA status list (post-RAN5#80 meeting) Ericsson other Information Yes
Yes
noted No    
    R5‑184550 Draft TS 38.521-2 v0.6.0 CAICT draft TS   No
Yes
withdrawn Yes    
    R5‑184566 Draft TS 36.579-7 v0.0.1 Samsung draft TS Approval No
Yes
withdrawn Yes    
    R5‑184567 Draft TS 38.522 v1.0.1 CMCC draft TS   No
No
for email approval No    
    R5‑184571 Draft TS 36.579-6 v0.0.1 Samsung draft TS Approval No
Yes
withdrawn Yes    
    R5‑184659 Draft TS 38.521-3 v0.6.0 Qualcomm Wireless GmbH draft TS Approval No
Yes
withdrawn Yes    
    R5‑184683 5G work planning after RAN5#80 Samsung other Endorsement No
Yes
will not be maintained any more
withdrawn Yes    
    R5‑184750 Draft TR 38.905-1 v0.3.0 Ericsson LM draft TR Approval No
Yes
wrong spec title
withdrawn Yes    
    R5‑185134 Draft TR 38.905 v1.0.0 Ericsson LM draft TR Approval No
No
for email approval No    
    R5‑185142 Draft TS 36.579-6 v0.0.3 Samsung draft TS Approval Yes
No
for email approval No    
    R5‑185143 Draft TS 36.579-7 v0.0.3 Samsung draft TS Approval Yes
No
for email approval No    
    R5‑185144 Draft TS 38.521-2 v1.0.0 Rapp draft TS Approval No
No
for email approval No    
    R5‑185145 Draft TS 38.521-3 v1.0.0 Rapp draft TS Approval No
No
for email approval No    
    R5‑185146 Draft TR 38.903 v1.0.0 Rapp draft TR Approval No
No
for email approval No    
    R5‑185147 LS Concerning RAN5 Response to ITU-R Working Party 5D LS on definition of test methods for OTA unwanted emissions of IMT radio equipment TSG WG RAN5 LS out Approval No
No
available early in the email agreement week.
for email approval
for email approval No    
7.6 Confirmation of Future RAN5 Matters R5‑184018 Review deadlines for next quarter WG Chairman other   Yes
Yes
noted No    
7.7 AOB