DOCUMENT:
|
Common Agenda
|
Doc.Name
|
R5-086000
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086000.zip
|
|
|
Source:
|
Motorola, NEC, Agilent Technologies
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Signalling Group Timetable
|
Doc.Name
|
R5-086001
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086001.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
RF Group Timetable
|
Doc.Name
|
R5-086002
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086002.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Previous RAN Plenary Notes
|
Doc.Name
|
R5-086003
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086003.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
36.523-3 v050
|
Doc.Name
|
R5-086004
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086004.zip
|
|
|
Source:
|
Rapporteur
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of TC 9.1.2.1 Authentication accepted
|
Doc.Name
|
R5-086005
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086005.zip
|
|
|
Source:
|
Samsung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - New TC 9.1.2.2 Authentication not accepted by the network, GUTI used, identification procedure and authentica tion restart
|
Doc.Name
|
R5-086006
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086006.zip
|
|
|
Source:
|
Samsung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - New TC 9.1.2.5 Authentication not accepted by the UE, SQN failure
|
Doc.Name
|
R5-086007
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086007.zip
|
|
|
Source:
|
Sasmung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - New TC 9.3.2.1 Paging procedure
|
Doc.Name
|
R5-086008
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086008.zip
|
|
|
Source:
|
Samsung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Adding new Batch 1 TCs applicability
|
Doc.Name
|
R5-086009
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086009.zip
|
|
|
Source:
|
Samsung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Removal of TC 9.1.4.1 Identification procedure, IM SI requested
|
Doc.Name
|
R5-086010
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086010.zip
|
|
|
Source:
|
Samsung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP for In-band emissions
|
Doc.Name
|
R5-086011
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086011.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP for Spectrum flatness
|
Doc.Name
|
R5-086012
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086012.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TP for IQ-component
|
Doc.Name
|
R5-086013
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086013.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
36.521 followup database
|
Doc.Name
|
R5-086015
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086015.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RB allocation for frequency error and EVM
|
Doc.Name
|
R5-086016
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086016.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New Batch 2 test case: 9.2.2.1.6 UE initiated detach / Abnor mal case / local detach after 5 attempts due to no network r esponse
|
Doc.Name
|
R5-086017
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086017.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposed for 3G LTE Protocol Te sting for EMM (EPS Mobility Management)
|
Doc.Name
|
R5-086018
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086018.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
MCC TF160 Dec report
|
Doc.Name
|
R5-086019
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086019.zip
|
|
|
Source:
|
MCC TF160
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Introduction of half cell configurations in eUTRA SS
|
Doc.Name
|
R5-086021
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086021.zip
|
|
|
Source:
|
MCC TF160
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Using AT commands for test automation
|
Doc.Name
|
R5-086022
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086022.zip
|
|
|
Source:
|
MCC TF160
|
Abstract:
|
A discussion paper from TTCN workshop
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to RLC test case 7.2.3.10
|
Doc.Name
|
R5-086023
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086023.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to MAC test case 7.1.4.3
|
Doc.Name
|
R5-086024
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086024.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for RLC
|
Doc.Name
|
R5-086025
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086025.zip
|
|
|
Source:
|
Qualcomm Europe
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Addition of the test case to test case 10.7.1
|
Doc.Name
|
R5-086026
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086026.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 8.4.1.2
|
Doc.Name
|
R5-086027
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086027.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Addition of new test case 6.1.2.14
|
Doc.Name
|
R5-086028
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086028.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Addition of new test case 8.4.1.8
|
Doc.Name
|
R5-086029
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086029.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Update to test case 6.1.2.15
|
Doc.Name
|
R5-086030
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086030.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 6.1.2.4
|
Doc.Name
|
R5-086031
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086031.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 6.1.2.5
|
Doc.Name
|
R5-086032
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086032.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 8.1.1.1
|
Doc.Name
|
R5-086033
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086033.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.1.2.5
|
Doc.Name
|
R5-086034
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086034.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 8.1.2.7
|
Doc.Name
|
R5-086035
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086035.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Update to test case 8.1.3.3
|
Doc.Name
|
R5-086036
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086036.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 8.1.3.5
|
Doc.Name
|
R5-086037
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086037.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 8.2.4.1
|
Doc.Name
|
R5-086038
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086038.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.2
|
Doc.Name
|
R5-086039
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086039.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Update to test case 8.2.4.5
|
Doc.Name
|
R5-086040
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086040.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2- Update to test case 8.2.4.6
|
Doc.Name
|
R5-086041
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086041.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2- Update to test case 8.2.4.7
|
Doc.Name
|
R5-086042
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086042.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3- Update to test case 8.2.4.8
|
Doc.Name
|
R5-086043
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086043.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.9
|
Doc.Name
|
R5-086044
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086044.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update to test case 8.5.4.1
|
Doc.Name
|
R5-086045
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086045.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 7.2.2.8
|
Doc.Name
|
R5-086046
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086046.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Update to test case 8.1.1.2
|
Doc.Name
|
R5-086047
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086047.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Update to test case 8.1.1.3
|
Doc.Name
|
R5-086048
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086048.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Update to test case 8.1.1.4
|
Doc.Name
|
R5-086049
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086049.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Update to test case 8.1.2.8
|
Doc.Name
|
R5-086050
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086050.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Update to test case 8.2.1.2
|
Doc.Name
|
R5-086051
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086051.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Update to test case 8.2.1.4
|
Doc.Name
|
R5-086052
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086052.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.2.4.3
|
Doc.Name
|
R5-086053
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086053.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.1.10
|
Doc.Name
|
R5-086054
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086054.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.1.8
|
Doc.Name
|
R5-086055
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086055.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.1.9
|
Doc.Name
|
R5-086056
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086056.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to test case 8.3.2.3
|
Doc.Name
|
R5-086057
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086057.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to Idle Mode test method
|
Doc.Name
|
R5-086058
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086058.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Layer 2 test configuration working assumption
|
Doc.Name
|
R5-086059
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086059.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for LTE Protocol Testi ng in Idle Mode Operation
|
Doc.Name
|
R5-086060
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086060.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction of EARFCN numbering in 36.521-1
|
Doc.Name
|
R5-086061
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086061.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Mapping of default DL Physical Channels for TDD in 36.508
|
Doc.Name
|
R5-086062
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086062.zip
|
|
|
Source:
|
CATT
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: TX-RX channel freq separation
|
Doc.Name
|
R5-086063
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086063.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: UE max output power
|
Doc.Name
|
R5-086064
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086064.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: UE output power dynamics
|
Doc.Name
|
R5-086065
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086065.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TS 36.521-1 after RAN5#41Bis
|
Doc.Name
|
R5-086066
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086066.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
TS 36.521-3 after RAN5#41Bis
|
Doc.Name
|
R5-086067
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086067.zip
|
|
|
Source:
|
Agilent Technologies
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
TTCN Workshop - LTE Planning Outcome
|
Doc.Name
|
R5-086068
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086068.zip
|
|
|
Source:
|
WG Vice Chair
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to RLC (AM) test case 7.2.3.13
|
Doc.Name
|
R5-086069
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086069.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Abstract:
|
Resubmission of Batch 2 TC correction which was not handled at RAN5 #41
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 - Update to RLC (AM) test case 7.2.3.16
|
Doc.Name
|
R5-086070
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086070.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Abstract:
|
Resubmission of correction to Batch 2 TC which was not handled at RAN5 #41
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A – Update test case 8.2.1.1
|
Doc.Name
|
R5-086071
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086071.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2 – Update test case 8.2.1.3
|
Doc.Name
|
R5-086072
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086072.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 – Update test case 8.2.1.7
|
Doc.Name
|
R5-086073
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086073.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B – Update test case 8.2.2.1
|
Doc.Name
|
R5-086074
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086074.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A – Update test case 8.2.3.1
|
Doc.Name
|
R5-086075
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086075.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
CR to 36.508: Introduction of MeasGapConfig IE
|
Doc.Name
|
R5-086076
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086076.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Demodulation of PDSCH Test Requirements text proposal
|
Doc.Name
|
R5-086077
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086077.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM Cell Re-Selection text proposal
|
Doc.Name
|
R5-086078
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086078.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE RRM FDD/FDD Handover for intra/inter frequency text prop osal
|
Doc.Name
|
R5-086079
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086079.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRAN FDD intra-frequency measurements text proposal
|
Doc.Name
|
R5-086080
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086080.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RSRQ Accuracy Measurement Performance Requirements text prop osal
|
Doc.Name
|
R5-086081
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086081.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE UE Transmit Timing Requirements text proposal
|
Doc.Name
|
R5-086082
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086082.zip
|
|
|
Source:
|
Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-1B: Introduction of a new EMM test case for NW initiat ed detach procedure with Detach type IE = “IMSI detach”
|
Doc.Name
|
R5-086083
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086083.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-1A: Introduction of a new EMM test case for Service Re quest procedure with mobile originating CS fallback
|
Doc.Name
|
R5-086084
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086084.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Introduction of a new EMM test case for Paging pro cedure with mobile terminating CS fallback.
|
Doc.Name
|
R5-086085
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086085.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-1B: Correction to 9.2.3.1.1 “Normal tracking area upda te / accepted”
|
Doc.Name
|
R5-086086
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086086.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-1B: Correction to 9.2.3.1.5 “Periodic tracking area up date / accepted”
|
Doc.Name
|
R5-086087
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086087.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-3: Correction to 9.2.2.2.4 “Detach / re-attach not req uired / IMSI invalid
|
Doc.Name
|
R5-086088
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086088.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-3: Correction to “Detach / re-attach not required” tes t cases (clause 9.2.2.2.6-9.2.2.2.8)
|
Doc.Name
|
R5-086089
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086089.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Applicability table for EPS mobility management te st cases
|
Doc.Name
|
R5-086090
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086090.zip
|
|
|
Source:
|
Sony Ericsson Mobile
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Removing applicability for TC 9.1.4.1 Identification procedu re, IMSI requested
|
Doc.Name
|
R5-086091
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086091.zip
|
|
|
Source:
|
Samsung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Clarification of measurement bandwidth in spectrum emission mask test
|
Doc.Name
|
R5-086092
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086092.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Clarification of measurement period in minimum output power test procedure
|
Doc.Name
|
R5-086093
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086093.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Clarification of measurement period in transmit OFF power te st procedure
|
Doc.Name
|
R5-086094
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086094.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Cell configuration reference correction for RRM tests in 36. 521-3 section 3A.3
|
Doc.Name
|
R5-086095
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086095.zip
|
|
|
Source:
|
AT4 wireless
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of the default message AUTHENTICATION FAILURE
|
Doc.Name
|
R5-086096
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086096.zip
|
|
|
Source:
|
Samsung
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Demodulation of TDD PDSCH test requirements text proposal
|
Doc.Name
|
R5-086097
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086097.zip
|
|
|
Source:
|
CATT,Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Demodulation of TDD PHICH test requirements text proposal
|
Doc.Name
|
R5-086098
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086098.zip
|
|
|
Source:
|
CATT,Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Demodulation of TDD PCFICH/PDCCH test requirements text prop osal
|
Doc.Name
|
R5-086099
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086099.zip
|
|
|
Source:
|
CATT,Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Update of E-UTRA PDCP test case 7.3.4.1
|
Doc.Name
|
R5-086100
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086100.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B - Update of E-UTRA PDCP test case 7.3.4.2
|
Doc.Name
|
R5-086101
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086101.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Update of 7.3.5.2 PDCP handover / Lossless handover / PDCP Sequence Number maintenance
|
Doc.Name
|
R5-086102
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086102.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Update of 7.3.5.3 PDCP handover / Non-lossless han dover / PDCP Sequence Number maintenanc
|
Doc.Name
|
R5-086103
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086103.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition new test case: PDCP status report to conve y the information on missing or acknowledged PDCP SDUs at ha ndover
|
Doc.Name
|
R5-086104
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086104.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Update of test case In-order delivery and duplicat e elimination in the downlink
|
Doc.Name
|
R5-086105
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086105.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Update of 7.3.6.1 PDCP Discard
|
Doc.Name
|
R5-086106
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086106.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the LTE Features and Test Prioritisation List
|
Doc.Name
|
R5-086107
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086107.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TS 36.508 after RAN5#41bis
|
Doc.Name
|
R5-086108
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086108.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction to the definition of simulated cells in TS 36.508
|
Doc.Name
|
R5-086109
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086109.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Modification for 7.1.3.5 Correct HARQ process handling [CCCH ]
|
Doc.Name
|
R5-086110
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086110.zip
|
|
|
Source:
|
Huawei
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the default system informations in TS 36.508
|
Doc.Name
|
R5-086111
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086111.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the default RRC message contents in TS 36.508
|
Doc.Name
|
R5-086112
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086112.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the default NAS message contents in TS 36.508
|
Doc.Name
|
R5-086113
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086113.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the default radio bearer configurations in TS 36.508
|
Doc.Name
|
R5-086114
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086114.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to the definition of simulated NAS cells in TS 36 .508
|
Doc.Name
|
R5-086115
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086115.zip
|
|
|
Source:
|
NTT DOCOMO, Sony Ericsson Mobile Communications Japan, Inc
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on Access Class Barring test case with access pro bability factor
|
Doc.Name
|
R5-086116
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086116.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 3 - Addition of a new test case RRC Connection Establi shment: 0% access probability for MO calls, non zero percent access probability for MO signalling: 8.1.2.9
|
Doc.Name
|
R5-086117
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086117.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of 6.7 Transmit intermodulation test
|
Doc.Name
|
R5-086118
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086118.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of initial conditions for Tx and Rx test cases
|
Doc.Name
|
R5-086119
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086119.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Max.input level test
|
Doc.Name
|
R5-086120
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086120.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Rationale for DL level uncertainties in RAN5
|
Doc.Name
|
R5-086121
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086121.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Correction of RS_EPRE powers for default DL signal levels
|
Doc.Name
|
R5-086122
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086122.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of RS_EPRE powers to default DL signal levels
|
Doc.Name
|
R5-086123
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086123.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
UL Reference Measurement Channels
|
Doc.Name
|
R5-086124
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086124.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Addition of UL Reference Measurement Channels in Annex A2
|
Doc.Name
|
R5-086125
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086125.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of DL Reference Measurement Channels in Annex A3
|
Doc.Name
|
R5-086126
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086126.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Applicability new LTE test cases
|
Doc.Name
|
R5-086127
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086127.zip
|
|
|
Source:
|
NTT DOCOMO
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New Batch 1A test case: 9.2.1.1.7 Attach Procedure / Success / list of equivalent PLMNs in the ATTACH ACCEPT message
|
Doc.Name
|
R5-086128
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086128.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for RRC part 2
|
Doc.Name
|
R5-086129
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086129.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Corrections to 36.509
|
Doc.Name
|
R5-086130
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086130.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of E-UTRA MAC test case: 7.1.3.3
|
Doc.Name
|
R5-086131
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086131.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - Update of E-UTRA RLC test case: 7.2.3.12
|
Doc.Name
|
R5-086132
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086132.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 1A - New E-UTRA RLC test case - 7.2.3.11 AM RLC / Oper ation of the RLC reestablishment procedure / UE Originated
|
Doc.Name
|
R5-086133
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086133.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 2 - New E-UTRA test case - 7.2.3.21 AM RLC / RLC re-es tablishment at inter eNB HO
|
Doc.Name
|
R5-086134
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086134.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Applicability of new E-UTRA RLC test cases
|
Doc.Name
|
R5-086135
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086135.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 2 - Update of E-UTRA MAC test case: 7.1.2.9
|
Doc.Name
|
R5-086136
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086136.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1A - New test case for E-UTRA radio bearer testing
|
Doc.Name
|
R5-086137
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086137.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability of new E-UTRA Radio Bearer test case
|
Doc.Name
|
R5-086138
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086138.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
correction of Band 13 Rx sensitivity
|
Doc.Name
|
R5-086139
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086139.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Updates to Demodulation of PCFICH/PDCCH test case
|
Doc.Name
|
R5-086140
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086140.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Text proposal for Reporting of Channel State Information
|
Doc.Name
|
R5-086141
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086141.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Measurement Reference Channels and OCNG for RRM testing
|
Doc.Name
|
R5-086142
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086142.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of applicability statements for new EMM tests
|
Doc.Name
|
R5-086143
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086143.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Text proposal for RSRP measurement accuracy test cases
|
Doc.Name
|
R5-086144
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086144.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of General text in clause 6
|
Doc.Name
|
R5-086145
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086145.zip
|
|
|
Source:
|
CMCC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Adjacent Channel Leakage power Ratio
|
Doc.Name
|
R5-086146
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086146.zip
|
|
|
Source:
|
CMCC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Text for 4.2.2: Minimum funtional requirements
|
Doc.Name
|
R5-086147
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086147.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Connection diagrams for RRM
|
Doc.Name
|
R5-086148
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086148.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
References to connection diagrams
|
Doc.Name
|
R5-086149
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086149.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Statistical testing in RRM tests
|
Doc.Name
|
R5-086150
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086150.zip
|
|
|
Source:
|
Rohde & Schawrz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update to Annex E
|
Doc.Name
|
R5-086151
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086151.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RB allocation for the Global In-Channel TX-Test.
|
Doc.Name
|
R5-086152
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086152.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Multitude of measurement results within Transmit Modulation
|
Doc.Name
|
R5-086153
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086153.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
New Batch 2 test case: 9.2.1.1.25 Attach / Abnormal case / M obile originated detach required
|
Doc.Name
|
R5-086154
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086154.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Update of test case 6.1.2.6
|
Doc.Name
|
R5-086155
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086155.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Update to test case 8.3.1.1 Measurement configurat ion control and reporting/ intra E-UTRAN measurements: event A1
|
Doc.Name
|
R5-086156
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086156.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Update to test case 8.3.1.2 Measurement configurat ion control and reporting/ intra E-UTRAN measurements: event A2
|
Doc.Name
|
R5-086157
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086157.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 9.2.1.1.17 for Attach / rejecte d / no suitable cells in this tracking area
|
Doc.Name
|
R5-086158
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086158.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Corrections to TS36.509 v2.0.0
|
Doc.Name
|
R5-086159
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086159.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
correction for Maximum Power Reduction (MPR)
|
Doc.Name
|
R5-086160
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086160.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RRM Initial configurations
|
Doc.Name
|
R5-086161
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086161.zip
|
|
|
Source:
|
Anritsu
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Results of Investigation into Combinations of Channel Bandwi dth, Modulation & Resource Blocks when MPR applied
|
Doc.Name
|
R5-086163
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086163.zip
|
|
|
Source:
|
NTT DOCOMO, Fujitsu & Panasonic
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Summary of Investigation into Combinations of Channel Bandwi dth, Modulation & Resource Blocks when MPR applied
|
Doc.Name
|
R5-086164
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086164.zip
|
|
|
Source:
|
NTT DOCOMO, Fujitsu & Panasonic
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Signalling Protocol Test Case Prioritisation - Status af ter RAN5#41bis
|
Doc.Name
|
R5-086165
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086165.zip
|
|
|
Source:
|
T-Mobile
|
Abstract:
|
Batch list update will be provided at the last day of RAN5#41bis or shortly afte r the meeting.
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Removal of Redundant Environmental Conditions
|
Doc.Name
|
R5-086166
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086166.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: TDD applicability and CR for Blocking Characteristic s and Spurious Response
|
Doc.Name
|
R5-086167
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086167.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF: TDD applicability and CR for Spurious Emissions
|
Doc.Name
|
R5-086168
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086168.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
RAN5 Status Report at previous Plenary
|
Doc.Name
|
R5-086169
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086169.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TF 160 Status Report - previous Plenary
|
Doc.Name
|
R5-086170
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086170.zip
|
|
|
Source:
|
WG Chairman
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Proposed new test cases for 3G / Long-Term Evolution Termina l Protocol Conformance Test Specifications
|
Doc.Name
|
R5-086171
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086171.zip
|
|
|
Source:
|
Vodafone + others
|
Abstract:
|
Following on from R5-085320, this document proposes about 30 new test cases for the SAE/LTE NAS functionality. Note: the prioritisation by some operators (in R5 -085159) of the existing test cases highlighted more than 20 tests whose applica bility to batches 1-3 is questioned. Two of the proposed new SAE tests are for “SR-VCC from UMTS to GSM” and are targ eted at 34.123
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Removal of [ ] from Clause 7 Receiver Characteristics
|
Doc.Name
|
R5-086172
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086172.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
E-UTRAN FDD- FDD Inter-Frequency Measurements text proposal
|
Doc.Name
|
R5-086173
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086173.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Terminal Pr otocol Conformance Test Specifications - RRC part 1 (8.1 RRC connection management procedures, 8.5 RRC Others)
|
Doc.Name
|
R5-086174
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086174.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Work plan for 3G Long-Term Evolution Terminal Protocol Confo rmance Test Specifications - Status after RAN5#41bis
|
Doc.Name
|
R5-086175
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086175.zip
|
|
|
Source:
|
NEC, Motorola
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 1B: new EMM TC 9.2.1.1.15 for Attach / rejected / roam ing not allowed in this tracking area
|
Doc.Name
|
R5-086176
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086176.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of E-UTRAN test case 6.1.1.1 for PLMN sel ection of RPLMN, HPLMN, UPLMN and OPLMN: Automatic mode
|
Doc.Name
|
R5-086177
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086177.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of E-UTRAN test case 6.1.2.8 for Cell rese lection using cell status and cell reservations (access cont rol class 0-9)
|
Doc.Name
|
R5-086178
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086178.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of E-UTRAN test case 6.1.2.9 for Cell rese lection using cell status and cell reservations (access cont rol class 11-15)
|
Doc.Name
|
R5-086179
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086179.zip
|
|
|
Source:
|
Anritsu Ltd
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 9.2.1.2.2 Combined attach proce dure / Success / EPS services only / IMSI unknown in HLR
|
Doc.Name
|
R5-086180
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086180.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
TS 36.509 after RAN5 #41'bis'
|
Doc.Name
|
R5-086181
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086181.zip
|
|
|
Source:
|
Rohde & Schwarz
|
Abstract:
|
TS 36.509 (v8.0.1 ?) capturing the results of RAN5 #41'bis' discussions
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Terminal Pr otocol Conformance Test Specifications - RRC part 3 (Measure ment Configuration Control and Reporting)
|
Doc.Name
|
R5-086182
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086182.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch-2: Update to RRC part 3 test case 8.3.1.3
|
Doc.Name
|
R5-086183
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086183.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-2: Update to RRC part 3 test case 8.3.1.5
|
Doc.Name
|
R5-086184
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086184.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch-3: Update to RRC part 3 test case 8.3.1.6
|
Doc.Name
|
R5-086185
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086185.zip
|
|
|
Source:
|
Nokia
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of new LTE test case UM RLC / Segmentatio n and Reassembly / 5-bit SN / 11-bit 'Length Indicators' / ' Framing Info Field'
|
Doc.Name
|
R5-086186
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086186.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.1 UM RLC / Segmentation and Reassembly / 5-bit SN / 11-bit "Length Indicat ors" / "Framing Info Field"
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of new LTE test case UM RLC / Segmentatio n and Reassembly / 10-bit SN / 11-bit 'Length Indicators' / 'Framing Info Field'
|
Doc.Name
|
R5-086187
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086187.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.2 UM RLC / Segmentation and Reassembly / 10-bit SN / 11-bit "Length Indica tors" / "Framing Info Field"
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of new LTE test case UM RLC / Reassembly / 5-bit SN / 11-bit 'Length Indicators' / LI value > PDU siz e
|
Doc.Name
|
R5-086188
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086188.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.3 UM RLC / Reassembly / 5-bit SN / 11-bit "Length Indicators" / LI value > PDU size
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of new LTE test case UM RLC / 5-bit SN / Correct use of Sequence Numbering
|
Doc.Name
|
R5-086189
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086189.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.5.1 UM RLC / 5-bit SN / Correct use of Sequence Numbering
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of new LTE test case UM RLC / 10 bit- SN / Correct use of Sequence Numbering
|
Doc.Name
|
R5-086190
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086190.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.5.2 UM RLC / 10-bit SN / Correct use of Sequence Numbering
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of new LTE test case UM RLC / Concatenati on, Segmentation and Reassembly
|
Doc.Name
|
R5-086191
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086191.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.6 UM RLC / Concatenation, Segmentation and Reassembly
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of new LTE test case UM RLC / In sequence delivery of upper layers PDUs without residual loss of RLC PDUs / Maximum re-ordering delay below the T_reordering time
|
Doc.Name
|
R5-086192
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086192.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.7 UM RLC / In sequence delivery of upper layers PDUs without residual loss of RLC PDUs / Maximum re-ordering delay below the T_reordering time.
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 10.2.1for Dedicated EPS bearer context activation / Success
|
Doc.Name
|
R5-086193
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086193.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of new LTE test case UM RLC / Duplicated d etection of RLC PDUs
|
Doc.Name
|
R5-086194
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086194.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.10 UM RLC / Duplicated detection of RLC PDUs
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of new LTE test case 7.2.2.11 UM RLC / RLC re-establishment procedure
|
Doc.Name
|
R5-086195
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086195.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of a new test case:
7.2.2.11 UM RLC / RLC re-establishment procedure
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of applicabilities for new UM RLC test cases
|
Doc.Name
|
R5-086196
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086196.zip
|
|
|
Source:
|
CETECOM GmbH
|
Abstract:
|
Addition of new test cases 7.2.2.1, 7.2.2.2, 7.2.2.3, 7.2.2.5.1, 7.2.2.5.2, 7.2. 2.6, 7.2.2.7, 7.2.2.10 and 7.2.2.11 into the applicability table of TS 36.523-2.
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 10.3.1 for EPS bearer context m odification / Success
|
Doc.Name
|
R5-086197
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086197.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 10.4.1 for EPS bearer context d eactivation / Success
|
Doc.Name
|
R5-086198
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086198.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 1B: Addition of EMM TC 10.5.1 for UE requested PDN con nectivity accepted by the network
|
Doc.Name
|
R5-086199
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086199.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of ESM TC 10.5.2 for UE requested PDN conn ectivity accepted by the network / no PDN address allocated
|
Doc.Name
|
R5-086200
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086200.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of ESM TC 10.5.3 for UE requested PDN conn ectivity not accepted
|
Doc.Name
|
R5-086201
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086201.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of reference EPS bearer contexts
|
Doc.Name
|
R5-086203
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086203.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
update of reference configuration systems for CDMA2000 in 36 .508
|
Doc.Name
|
R5-086204
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086204.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Updated of common and default parameters for CDMA2000 cells
|
Doc.Name
|
R5-086205
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086205.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of SPS Configuration field for default RRC message co ntents
|
Doc.Name
|
R5-086206
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086206.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
LTE/HRPD Interworking Conformance Test Cases
|
Doc.Name
|
R5-086207
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086207.zip
|
|
|
Source:
|
Alcatel-Lucent
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|
DOCUMENT:
|
Batch 2: Addition of ESM TC 10.6.1 for UE requested PDN disc onnect procedure accepted by the network
|
Doc.Name
|
R5-086208
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086208.zip
|
|
|
Source:
|
NEC
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of SystemInformationBlockType8 in 36.508
|
Doc.Name
|
R5-086209
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086209.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Measurement Information Elements for CDMA2000
|
Doc.Name
|
R5-086210
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086210.zip
|
|
|
Source:
|
Nortel
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
LS on RSRP and RSRQ test conditions
|
Doc.Name
|
R5-086211
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086211.zip
|
|
|
Source:
|
TSG WG RAN4
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Guidance for “report-CGI” measurement
|
Doc.Name
|
R5-086212
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086212.zip
|
|
|
Source:
|
TSG WG RAN2
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is uploaded
|
|
DOCUMENT:
|
Update of generic setup procedure for state 4 (Loopback Acti vated)
|
Doc.Name
|
R5-086213
|
Allocations:
|
Content Type:
|
File Name:
|
R5-086213.zip
|
|
|
Source:
|
Ericsson
|
Late Contribution Date:
|
2008-12-08 22:00:00
|
The file is not uploaded
|
|