DOCUMENT:
|
Common Agenda
|
Doc.Name
|
R5-082000
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082000.zip
|
|
|
Source:
|
Motorola, NEC, Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Signalling Group Timetable
|
Doc.Name
|
R5-082001
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082001.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
RF Group Timetable
|
Doc.Name
|
R5-082002
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082002.zip
|
|
|
Source:
|
Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Previous RAN Plenary Notes
|
Doc.Name
|
R5-082003
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082003.zip
|
|
|
Source:
|
WG Chairman
|
The file is uploaded
|
|
DOCUMENT:
|
Target of LTE TTCN development
|
Doc.Name
|
R5-082004
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082004.zip
|
|
|
Source:
|
MCC TF160
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion on Implementation Conformance Statement (ICS) use d for LTE FDD and TDD
|
Doc.Name
|
R5-082005
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082005.zip
|
|
|
Source:
|
CATT
|
The file is uploaded
|
|
DOCUMENT:
|
Update Radio Bearer Establishment: Success (Dedicated bearer )
|
Doc.Name
|
R5-082006
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082006.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Update Radio Bearer Establishment: Success (Dedicated bearer , NAS message piggybacked)
|
Doc.Name
|
R5-082007
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082007.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
New test case Radio Bearer Establishment: Success (Dedicated bearer, handover)
|
Doc.Name
|
R5-082008
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082008.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
New test case Radio Bearer Establishment: Success (Dedicated bearer, inter-frequency handover)
|
Doc.Name
|
R5-082009
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082009.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
New test case Radio Bearer Establishment: Success (SRB2)
|
Doc.Name
|
R5-082010
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082010.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Applicability for test cases 8.2.1.4-5, 8.2.1.8-9 and 8.2.1. 13
|
Doc.Name
|
R5-082011
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082011.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Cover for LTE Performance Requirement text proposal
|
Doc.Name
|
R5-082012
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082012.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
Cover for LTE E-UTRAN RRC_IDLE State Mobility text proposal
|
Doc.Name
|
R5-082013
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082013.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
Cover for LTE E-UTRAN RRC_CONNECTED State Mobility text prop osal
|
Doc.Name
|
R5-082014
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082014.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
Cover for LTE UE Transmit Timing Requirements text proposal
|
Doc.Name
|
R5-082015
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082015.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
Cover for LTE Propagation Conditions Text Proposal
|
Doc.Name
|
R5-082016
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082016.zip
|
|
|
Source:
|
Motorola
|
Abstract:
|
This is actually for agenda item 3.3.6
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of E-UTRA TDD Test frequencies for TS36.508
|
Doc.Name
|
R5-082017
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082017.zip
|
|
|
Source:
|
CMCC
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases and scenarios proposal for 3G LTE Protoco l Testing for PDCP
|
Doc.Name
|
R5-082018
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082018.zip
|
|
|
Source:
|
Huawei
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for LTE Tx Minimum Output Power
|
Doc.Name
|
R5-082019
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082019.zip
|
|
|
Source:
|
AT4 wireless, Agilent Technologies, NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Text proposal for LTE Tx Minimum Output Power Uncertainty
|
Doc.Name
|
R5-082020
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082020.zip
|
|
|
Source:
|
AT4 wireless, Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Text proposal for LTE Tx Minimum Output Power Tolerance
|
Doc.Name
|
R5-082021
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082021.zip
|
|
|
Source:
|
AT4 wireless, Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for Test Frequencies in TS 36.508
|
Doc.Name
|
R5-082023
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082023.zip
|
|
|
Source:
|
Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Draft TS 36.523-2 issues for consideration
|
Doc.Name
|
R5-082024
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082024.zip
|
|
|
Source:
|
Rapporteur
|
The file is not uploaded
|
|
DOCUMENT:
|
RAN5 PRD13 LTE/SAE TC prose specification requirements udate
|
Doc.Name
|
R5-082025
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082025.zip
|
|
|
Source:
|
Samsung Electronics
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for Chan bandwidths in TS 36.521-1
|
Doc.Name
|
R5-082026
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082026.zip
|
|
|
Source:
|
Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for Occupied bandwidth in TS 36.521-1
|
Doc.Name
|
R5-082027
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082027.zip
|
|
|
Source:
|
Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Restructure of TS 36.521-1 and RRM proposal
|
Doc.Name
|
R5-082028
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082028.zip
|
|
|
Source:
|
Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
TS 36.521 after RAN5#39 BIS
|
Doc.Name
|
R5-082029
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082029.zip
|
|
|
Source:
|
Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
LTE-RF channel bandwidth proposal
|
Doc.Name
|
R5-082030
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082030.zip
|
|
|
Source:
|
Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Updates of reference test conditions for TS 36.508
|
Doc.Name
|
R5-082031
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082031.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Features and Test Prioritisation
|
Doc.Name
|
R5-082032
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082032.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for LTE Adjacent Channel Leakage power Ratio
|
Doc.Name
|
R5-082033
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082033.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for LTE Tx Spurious Emissions
|
Doc.Name
|
R5-082034
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082034.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for LTE UE Maximum Output Power
|
Doc.Name
|
R5-082035
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082035.zip
|
|
|
Source:
|
NTT DOCOMO, RIM, ZTE
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for LTE Occupied Bandwidth
|
Doc.Name
|
R5-082036
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082036.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for LTE Spectrum Emission Mask
|
Doc.Name
|
R5-082037
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082037.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Introduction of a new EMM testcase, Network initiated detach procedure with “re-attach required”
|
Doc.Name
|
R5-082038
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082038.zip
|
|
|
Source:
|
Sony Ericsson Mobile Communications Japan
|
The file is uploaded
|
|
DOCUMENT:
|
Update of Applicability table for EPS mobility management te st case
|
Doc.Name
|
R5-082039
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082039.zip
|
|
|
Source:
|
Sony Ericsson Mobile Communications Japan
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC / Paging for notification of BCCH modification in idle mode
|
Doc.Name
|
R5-082040
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082040.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC / Paging for Connection in i dle mode
|
Doc.Name
|
R5-082041
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082041.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC / Paging for Connection in i dle mode (multiple paging records)
|
Doc.Name
|
R5-082042
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082042.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC / Paging for Connection in i dle mode (Shared Network environment)
|
Doc.Name
|
R5-082043
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082043.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Update of the new test case RRC Connection Establishment dur ing Cell reselection: Failure
|
Doc.Name
|
R5-082044
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082044.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Update of the test case RRC Connection Reconfiguration / Han dover: Success (Dedicated preamble)
|
Doc.Name
|
R5-082045
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082045.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Update of the test case RRC Connection Reconfiguration / Han dover: Success (Common preamble)
|
Doc.Name
|
R5-082046
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082046.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Update of the test case RRC Connection Reconfiguration / Han dover: Success (inter-frequency)
|
Doc.Name
|
R5-082047
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082047.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Update of the test case RRC Connection Reconfiguration / Han dover: Failure (Re-establishment successful)
|
Doc.Name
|
R5-082048
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082048.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case UM RLC/ Reassembly / 10-bit SN / 11-bit 'Length Indicators' / LI value > PDU size
|
Doc.Name
|
R5-082049
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082049.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case UM RLC/ In sequence delivery of upper layer PDUs without residual loss of RLC PDUs/ Maximum re-ordering delay exceeds the T_reordering time
|
Doc.Name
|
R5-082050
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082050.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case UM RLC/ In sequence delivery of upper layer PDUs with residual loss of RLC PDUs/ Maximum re- ordering delay exceeds the T_reordering time
|
Doc.Name
|
R5-082051
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082051.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC Connection Reconfiguration / Radio Bearer Release /Handover: Success
|
Doc.Name
|
R5-082052
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082052.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC Connection Reconfiguration / Handover: success (intra-cell, security reconfiguration)
|
Doc.Name
|
R5-082053
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082053.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC Connection Reconfiguration / Handover (no delta configuration)
|
Doc.Name
|
R5-082054
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082054.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC Connection Reconfiguration / Handover: Failure (re-establishment failure)
|
Doc.Name
|
R5-082055
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082055.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion paper on test loops for E-UTRA and EPC testing
|
Doc.Name
|
R5-082056
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082056.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposed for 3G LTE Protocol Te sting for EMM (EPS Mobility Management)
|
Doc.Name
|
R5-082057
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082057.zip
|
|
|
Source:
|
Nokia
|
The file is uploaded
|
|
DOCUMENT:
|
Update of LTE Signalling Protocol Test Case Prioritisation
|
Doc.Name
|
R5-082058
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082058.zip
|
|
|
Source:
|
T-Mobile, NTT DoCoMo
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for RRC part 3 (Measurement Configuration Control and Reporting)
|
Doc.Name
|
R5-082059
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082059.zip
|
|
|
Source:
|
Nokia
|
The file is uploaded
|
|
DOCUMENT:
|
Proposal of LTE reference system configurations for TS 36.50 8
|
Doc.Name
|
R5-082060
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082060.zip
|
|
|
Source:
|
NTT DOCOMO, Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Connection Diagrams for TX and RX tests
|
Doc.Name
|
R5-082061
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082061.zip
|
|
|
Source:
|
Rohde & Schwarz
|
The file is uploaded
|
|
DOCUMENT:
|
Statistical testing of receiver characteristics
|
Doc.Name
|
R5-082062
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082062.zip
|
|
|
Source:
|
Rohde & Schwarz
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion paper on data generation mechanisms for DRB testi ng
|
Doc.Name
|
R5-082063
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082063.zip
|
|
|
Source:
|
Rohde & Schwarz, MCC-TF160
|
The file is uploaded
|
|
DOCUMENT:
|
Proposal for ASP structure (incl. example)
|
Doc.Name
|
R5-082064
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082064.zip
|
|
|
Source:
|
Rohde & Schwarz
|
The file is uploaded
|
|
DOCUMENT:
|
Discussion paper on structuring RAN5 test specification for FDD and TDD
|
Doc.Name
|
R5-082065
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082065.zip
|
|
|
Source:
|
Ericsson, CMCC, Huawei, ZTE
|
The file is uploaded
|
|
DOCUMENT:
|
New test case AM RLC /Concatenation and Reassembly (7.2.3.1)
|
Doc.Name
|
R5-082066
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082066.zip
|
|
|
Source:
|
Ericsson
|
The file is not uploaded
|
|
DOCUMENT:
|
New test case AM RLC / Segmentation and Reassembly / 11 bit 'Length Indicators' / No PDU segmentation (7.2.3.2)
|
Doc.Name
|
R5-082067
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082067.zip
|
|
|
Source:
|
Ericsson
|
The file is not uploaded
|
|
DOCUMENT:
|
New test case AM RLC / Operation of the RLC re-establishment procedure / UE Originated (7.2.3.12)
|
Doc.Name
|
R5-082068
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082068.zip
|
|
|
Source:
|
Ericsson
|
The file is not uploaded
|
|
DOCUMENT:
|
New test case AM RLC / Operation of the RLC re-establishment procedure / UE Terminated (7.2.3.13)
|
Doc.Name
|
R5-082069
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082069.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
New test case AM RLC / Duplicate detection of RLC PDU segmen ts (7.2.3.20)
|
Doc.Name
|
R5-082070
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082070.zip
|
|
|
Source:
|
Ericsson
|
The file is not uploaded
|
|
DOCUMENT:
|
New test case AM RLC / Duplicate detection of RLC PDUs (7.2. 3.21)
|
Doc.Name
|
R5-082071
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082071.zip
|
|
|
Source:
|
Ericsson
|
The file is not uploaded
|
|
DOCUMENT:
|
New test case AM RLC / RLC re-establishment at inter eNB HO (7.2.3.22)
|
Doc.Name
|
R5-082072
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082072.zip
|
|
|
Source:
|
Ericsson
|
The file is not uploaded
|
|
DOCUMENT:
|
Applicability of new AM RLC test cases
|
Doc.Name
|
R5-082073
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082073.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Update of 36.521-1: Introduction of HRPD and CDMA2000 in RRM test cases
|
Doc.Name
|
R5-082074
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082074.zip
|
|
|
Source:
|
Nortel
|
The file is uploaded
|
|
DOCUMENT:
|
Update of 36.521-1: Correction of Additional channel bandwid th of E-UTRA Band 1
|
Doc.Name
|
R5-082075
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082075.zip
|
|
|
Source:
|
Nortel
|
The file is uploaded
|
|
DOCUMENT:
|
Default downlink signal channel powers for LTE UE test
|
Doc.Name
|
R5-082076
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082076.zip
|
|
|
Source:
|
Anritsu
|
The file is uploaded
|
|
DOCUMENT:
|
Summary of TT and System uncertainties for regulatory TCs
|
Doc.Name
|
R5-082077
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082077.zip
|
|
|
Source:
|
Anritsu
|
The file is uploaded
|
|
DOCUMENT:
|
UE Spurious Emissions Measurement uncertainty & Test Toleran ces
|
Doc.Name
|
R5-082078
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082078.zip
|
|
|
Source:
|
Anritsu
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Spectrum Emission Mask test uncertainties and TTs
|
Doc.Name
|
R5-082079
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082079.zip
|
|
|
Source:
|
Anritsu
|
The file is uploaded
|
|
DOCUMENT:
|
LTE UE Max Power and ACLR tests, uncertainties and TTs
|
Doc.Name
|
R5-082080
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082080.zip
|
|
|
Source:
|
Anritsu
|
The file is uploaded
|
|
DOCUMENT:
|
LTE UE Max Rx Input and ACS test cases update
|
Doc.Name
|
R5-082081
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082081.zip
|
|
|
Source:
|
Anritsu
|
The file is uploaded
|
|
DOCUMENT:
|
LTE Rx Intermodulation test case uncertainties and TTs
|
Doc.Name
|
R5-082082
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082082.zip
|
|
|
Source:
|
Anritsu
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to 6.1.2.3: Cell Configuration for multi Cell env ironment
|
Doc.Name
|
R5-082083
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082083.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Correction to 8.1.3.7 and 8.1.3.9: Cell Configuration for mu lti Cell environment
|
Doc.Name
|
R5-082084
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082084.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Cell Environment for multi Cell Configuration
|
Doc.Name
|
R5-082085
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082085.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Cell and UE configuration for TS 36.508
|
Doc.Name
|
R5-082086
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082086.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of Applicability new LTE test cases
|
Doc.Name
|
R5-082087
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082087.zip
|
|
|
Source:
|
NTT DOCOMO
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for LTE - Layer 2 (MAC )
|
Doc.Name
|
R5-082088
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082088.zip
|
|
|
Source:
|
Motorola
|
The file is uploaded
|
|
DOCUMENT:
|
Proposed update of LTE test case list RRC part 2 (RRC Connec tion Reconfiguration)
|
Doc.Name
|
R5-082089
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082089.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Update of default RRC message contents
|
Doc.Name
|
R5-082090
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082090.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of SRB and DRB radio bearer combinations to 36.508
|
Doc.Name
|
R5-082091
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082091.zip
|
|
|
Source:
|
Ericsson
|
The file is uploaded
|
|
DOCUMENT:
|
Text proposal for LTE Transmit OFF Power
|
Doc.Name
|
R5-082092
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082092.zip
|
|
|
Source:
|
AT4 wireless, Agilent Technologies
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for TS36.521-1 TC7.6 Blocking Characteristics
|
Doc.Name
|
R5-082093
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082093.zip
|
|
|
Source:
|
Nokia
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for TS36.521-1 TC7.7 Spurious Response
|
Doc.Name
|
R5-082094
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082094.zip
|
|
|
Source:
|
Nokia
|
The file is uploaded
|
|
DOCUMENT:
|
36.523-3 v020
|
Doc.Name
|
R5-082096
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082096.zip
|
|
|
Source:
|
Rapporteur
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for Annex C Downlink Physical Channels (AI 3.3 .6)
|
Doc.Name
|
R5-082097
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082097.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Text Proposal for LTE Demodulation of PCFICH/PDCCH and PHICH
|
Doc.Name
|
R5-082098
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082098.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case EMM Attach Procedure / Success ( valid GUTI)
|
Doc.Name
|
R5-082099
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082099.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Proposal on Structure of Default Message Contents for TS 36. 508
|
Doc.Name
|
R5-082100
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082100.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC Measurement configuration co ntrol and reporting / intra LTE measurements (event A1)
|
Doc.Name
|
R5-082101
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082101.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case RRC Measurement configuration co ntrol and reporting / intra LTE measurements (event A2)
|
Doc.Name
|
R5-082102
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082102.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Update to cell reselection test case 6.1.2.3
|
Doc.Name
|
R5-082103
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082103.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of a new test case Cell reselection using Qhyst, Qo ffset and Treselection
|
Doc.Name
|
R5-082104
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082104.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of new RLC test case for AM RLC / Polling for statu s
|
Doc.Name
|
R5-082105
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082105.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of new RLC test case for AM RLC / Receiver Status T riggers
|
Doc.Name
|
R5-082106
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082106.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of new MAC test case for Logical channel prioritiza tion handling
|
Doc.Name
|
R5-082107
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082107.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of applicability for new RLC test cases
|
Doc.Name
|
R5-082108
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082108.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of applicability for new MAC test case
|
Doc.Name
|
R5-082109
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082109.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Default RRC message contents for measurements
|
Doc.Name
|
R5-082111
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082111.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Defining default message contents for NAS messages
|
Doc.Name
|
R5-082112
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082112.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
Way forward before the alignment of LTE SIG work plan with f eature priorities
|
Doc.Name
|
R5-082113
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082113.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for RRC part 1 (Paging, RRC Connection establishment, release, RL failure)
|
Doc.Name
|
R5-082114
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082114.zip
|
|
|
Source:
|
NEC (Editor)
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for IDLE Mode
|
Doc.Name
|
R5-082115
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082115.zip
|
|
|
Source:
|
NEC
|
The file is not uploaded
|
|
DOCUMENT:
|
Correction of test case 8.1.2.7
|
Doc.Name
|
R5-082116
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082116.zip
|
|
|
Source:
|
NEC
|
The file is not uploaded
|
|
DOCUMENT:
|
Addition of new RLC test case for AM RLC / Correct use of Se quence Numbering
|
Doc.Name
|
R5-082117
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082117.zip
|
|
|
Source:
|
Rohde & Schwarz
|
The file is uploaded
|
|
DOCUMENT:
|
Addition of new RLC test case for AM RLC / Reassembly / 11-b it 'Length Indicators' / Reserved LI value
|
Doc.Name
|
R5-082118
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082118.zip
|
|
|
Source:
|
Rohde & Schwarz
|
The file is uploaded
|
|
DOCUMENT:
|
Future LTE bis meetings
|
Doc.Name
|
R5-082119
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082119.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G Long Term Evolu tion Terminal Protocol Conformance Test Specifications WI
|
Doc.Name
|
R5-082120
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082120.zip
|
|
|
Source:
|
NEC, Motorola
|
The file is not uploaded
|
|
DOCUMENT:
|
TS 36.523-1 after RAN5#39bis
|
Doc.Name
|
R5-082121
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082121.zip
|
|
|
Source:
|
NEC
|
The file is not uploaded
|
|
DOCUMENT:
|
Addition of applicability for new test cases
|
Doc.Name
|
R5-082122
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082122.zip
|
|
|
Source:
|
NEC
|
The file is uploaded
|
|
DOCUMENT:
|
LTE SIG work plan after RAN5#39bis
|
Doc.Name
|
R5-082124
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082124.zip
|
|
|
Source:
|
NEC, Motorola
|
The file is not uploaded
|
|
DOCUMENT:
|
TS 36.509 after RAN5 #39'bis'
|
Doc.Name
|
R5-082125
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082125.zip
|
|
|
Source:
|
Rohde & Schwarz
|
The file is not uploaded
|
|
DOCUMENT:
|
Invitation to RAN5 #40
|
Doc.Name
|
R5-082126
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082126.zip
|
|
|
Source:
|
Rohde & Schwarz
|
The file is not uploaded
|
|
DOCUMENT:
|
List of test cases/scenarios proposal for 3G LTE Protocol Te sting for RLC
|
Doc.Name
|
R5-082127
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082127.zip
|
|
|
Source:
|
Qualcomm Europe
|
The file is uploaded
|
|
DOCUMENT:
|
Comments on 36.523-1 v020
|
Doc.Name
|
R5-082128
|
Allocations:
|
Content Type:
|
File Name:
|
R5-082128.zip
|
|
|
Source:
|
Samsung Electronics
|
The file is uploaded
|
|