ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG4_Radio / TSGR4_95_e / Inbox / Drafts / 322 / draftCRs

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon DRAFT R4-2008827 CR to TS 38.141-1 NR PUSCH HST_v2.docx 2020/06/02 13:59 47,2 KB
icon DRAFT R4-2008828 CR to TS 38.141-1 NR PUSCH HST Annex_v2.docx 2020/06/02 14:00 492,4 KB
icon DRAFT R4-2008828 CR to TS 38.141-1 NR PUSCH HST Annex_v3.docx 2020/06/03 6:28 492,4 KB
icon Draft R4-2008829 CR on 38.104 Introduction of PRACH demodulation requirements for NR HST_v0.docx 2020/06/02 13:51 53,1 KB
icon Draft R4-2008829 CR on 38.104 Introduction of PRACH demodulation requirements for NR HST_v1.docx 2020/06/03 0:24 54,1 KB
icon Draft R4-2008829 CR on 38.104 Introduction of PRACH demodulation requirements for NR HST_v2.docx 2020/06/03 21:22 61,3 KB
icon Draft R4-2008830 CR on 38.141-1 Introduction of PRACH conducted conformance testing for NR HST_v0.docx 2020/06/02 13:51 120,6 KB
icon Draft R4-2008830 CR on 38.141-1 Introduction of PRACH conducted conformance testing for NR HST_v1.docx 2020/06/03 0:24 130,3 KB
icon Draft R4-2008830 CR on 38.141-1 Introduction of PRACH conducted conformance testing for NR HST_v2.docx 2020/06/03 21:22 129,8 KB
icon Draft R4-2008831 CR on 38.141-2 Introduction of PRACH radiated conformance testing for NR HST_v0.docx 2020/06/02 13:51 119,8 KB
icon Draft R4-2008831 CR on 38.141-2 Introduction of PRACH radiated conformance testing for NR HST_v1.docx 2020/06/03 0:24 129,2 KB
icon Draft R4-2008831 CR on 38.141-2 Introduction of PRACH radiated conformance testing for NR HST_v2.docx 2020/06/03 21:22 128,9 KB
icon Draft R4-2008832_CR for TS38.141-2 Introduction of NR PUSCH UL timing adjustment (performance requirments).docx 2020/06/02 1:36 70,3 KB
icon Draft R4-2008832_CR for TS38.141-2 Introduction of NR PUSCH UL timing adjustment (performance requirments)_v1.docx 2020/06/03 3:00 71,3 KB
icon Draft R4-2008833_CR for TS38.141-2 Appendix for NR PUSCH UL timing adjustment (Annex).docx 2020/06/02 1:36 354,2 KB
icon draft R4-2008836 CR for 38.104 Performance requirements for UL timing adjustment -r0.docx 2020/06/03 8:12 49,7 KB
icon Draft R4-2008871_CR for TS 38.141-1, Introduction of high speed support declaration for NR HST.docx 2020/06/02 2:24 69,3 KB
icon Draft R4-2008872_CR for TS 38.141-2, Introduction of high speed support declaration for NR HST.docx 2020/06/02 2:24 79 KB
icon draftR4-2008823 CR for 38104 HST PUSCH demodulation requirements V1.docx 2020/06/02 11:45 45,2 KB
icon draftR4-2008824 CR for 38104 HST PUSCH demodulation FRC and channel model annexes V1.docx 2020/06/02 11:45 409,8 KB
icon R4-2006836 CR for TS38141-2 Introduction of conformance tests for 350kph and 500kph HST.docx 2020/05/28 10:00 59,1 KB
icon R4-2006837 CR for 38141-2 HST PUSCH demodulation FRC and channel condition annex .docx 2020/05/28 10:00 421 KB
icon Revised R4-2008825 CR for TS38141-2 Introduction of conformance tests for 350kph and 500kph HST.docx 2020/06/02 21:26 53,2 KB
icon Revised R4-2008825 CR for TS38141-2 Introduction of conformance tests for 350kph and 500kph HST_v1.docx 2020/06/03 13:17 53,5 KB
icon Revised R4-2008826 CR for 38141-2 HST PUSCH demodulation FRC and channel condition annex .docx 2020/06/02 21:26 418,7 KB

25 items.