ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_119-e / Inbox / Drafts / [Offline-007][NR1516] RRC Conn Control I (Nokia) / Phase-2 NR DC power control

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft R2-2208979 R16 CR 38.306 power sharing UE capability_v03_Rapp.docx 2022/08/25 10:32 38,9 KB
icon Draft R2-2208980 R17 CR 38.306 power sharing UE capability_v01_Rapp.docx 2022/08/25 10:32 35,4 KB
icon R2-220xxxx Draft R16 CR 38.331 NR DC power control v002.docx 2022/08/23 12:11 57,6 KB
icon R2-220xxxx Draft R16 CR 38.331 NR DC power control v03 HW.docx 2022/08/24 8:23 45,8 KB
icon R2-220xxxx Draft R16 CR 38.331 NR DC power control v04 E.docx 2022/08/25 12:59 57,5 KB
icon R2-220xxxx Draft R16 CR 38.331 NR DC power control.docx 2022/08/23 6:55 57,5 KB
icon R2-220xxxx Draft R17 CR 38.331 NR DC power control v002.docx 2022/08/23 12:11 62 KB
icon R2-220xxxx Draft R17 CR 38.331 NR DC power control.docx 2022/08/23 6:55 62 KB
icon R2-22xxxxx Draft R16 CR 38.306 powe sharing UE capability.docx 2022/08/23 8:31 34,6 KB
icon R2-22xxxxx Draft R16 CR 38.306 powe sharing UE capability_v01 HW.docx 2022/08/24 8:22 34,6 KB
icon R2-22xxxxx Draft R16 CR 38.306 powe sharing UE capability_v02 E.docx 2022/08/24 11:13 39,2 KB
icon R2-22xxxxx Draft R17 CR 38.306 powe sharing UE capability.docx 2022/08/23 8:31 35,5 KB

12 items.