ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_116-e / Inbox / Drafts / [Offline-001][NR15] Connection Control (ZTE) / Phase2

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v00_rapp.docx 2021/11/04 17:29 181,5 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v01_Samsung.docx 2021/11/05 4:31 171,4 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v02_Huawei.docx 2021/11/05 5:18 158,4 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v03_Nokia.docx 2021/11/05 6:53 182,9 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v04_Intel.docx 2021/11/07 18:12 180,2 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v05_vivo.docx 2021/11/08 3:30 186,3 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v06_NEC.docx 2021/11/08 5:24 181,2 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v07_Apple.docx 2021/11/09 8:29 183,9 KB
icon R2-211xxxx-[AT116-e][001][NR15] Connection Control_Ph2_v08_CATT.docx 2021/11/10 8:34 207,6 KB

9 items.