ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_115-e / Inbox / Drafts / [Offline-017][NR15] UE Capabilties III (ZTE) / Phase 2 CRs / Intra-band and Inter-band BC capability

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon draft_R2-2109063.docx 2021/08/23 7:49 42,2 KB
icon draft_R2-2109063_v01.docx 2021/08/25 2:58 42,3 KB
icon draft_R2-2109063_v02_ZTE.docx 2021/08/26 8:04 40,9 KB
icon draft_R2-2109063_v03_ZTE.docx 2021/08/26 8:53 40,8 KB
icon Draft_R2-2109064.docx 2021/08/23 7:49 41,4 KB
icon Draft_R2-2109064_v01.docx 2021/08/25 2:58 41,7 KB
icon Draft_R2-2109064_v02_Eri.docx 2021/08/25 21:46 59,8 KB
icon Draft_R2-2109064_v03_ZTE.docx 2021/08/26 8:04 51 KB
icon Draft_R2-2109064_v04_ZTE.docx 2021/08/26 8:53 51,2 KB

9 items.