ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_114-e / Inbox / Drafts / [Offline-005][NR15] Connection Control II (Apple) / Phase 2

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon PSCell SMTC CR 2021/05/27 2:13
icon R2-210xxxx_38.331CR2598_(Rel-16)_Clarification on the Timing Reference of PSCell SMTC Configuration_v0.docx 2021/05/24 1:38 77,1 KB
icon R2-21xxxxx_[AT114-e][005][NR15] Connection Control II (Apple) phase 2_00.docx 2021/05/24 13:45 1457,4 KB
icon R2-21xxxxx_[AT114-e][005][NR15] Connection Control II (Apple) phase 2_01_Huawei.docx 2021/05/24 14:18 1456,7 KB
icon R2-21xxxxx_[AT114-e][005][NR15] Connection Control II (Apple) phase 2_02_MTK.docx 2021/05/24 14:43 1456,9 KB
icon R2-21xxxxx_[AT114-e][005][NR15] Connection Control II (Apple) phase 2_03_ZTE.docx 2021/05/25 6:26 1460 KB
icon R2-21xxxxx_[AT114-e][005][NR15] Connection Control II (Apple) phase 2_04_Nokia.docx 2021/05/25 11:53 1459,1 KB
icon R2-21xxxxx_[AT114-e][005][NR15] Connection Control II (Apple) phase 2_05_ Apple.docx 2021/05/25 16:25 1458,3 KB

8 items.