ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_114-e / Inbox / Drafts / [Offline-004][NR15] Connection Control I (Huawei) / Phase 2 CRs

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Connection resume abortion CRs 2021/05/26 10:10
icon Draft R2-210xxxx 38.331_R15_CR2555r2_FullCfg_v01.docx 2021/05/24 5:48 76,6 KB
icon Draft R2-210xxxx 38.331_R16_CR2556r2_FullCfg_v01.docx 2021/05/24 5:48 76,4 KB
icon revised_R2-2105583 Clarification on the abortion of RRC connection resume_v00.doc 2021/05/24 9:17 117 KB
icon revised_R2-2105583 Clarification on the abortion of RRC connection resume_v01_rapp.doc 2021/05/26 7:13 116 KB
icon revR2-2106304.docx 2021/05/24 2:03 91,9 KB
icon revR2-2106304_v1.docx 2021/05/24 7:22 83,2 KB
icon revR2-2106305.docx 2021/05/24 2:03 92,3 KB
icon revR2-2106305_v1.docx 2021/05/24 7:22 92,3 KB

9 items.