ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_113bis-e / Inbox / Drafts / [Offline-006][NR15] Connection Control II (Huawei) / Phase II / Summary

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon R2-210xxxx-Phase 2 of [AT113bis-e][006][NR15] Conn Control II_summary_v0.docx 2021/04/19 3:05 57,9 KB
icon R2-210xxxx-Phase 2 of [AT113bis-e][006][NR15] Conn Control II_summary_v1_rap.docx 2021/04/19 8:47 63,2 KB
icon R2-210xxxx-Phase 2 of [AT113bis-e][006][NR15] Conn Control II_summary_v2_rap.docx 2021/04/19 12:24 61,7 KB
icon R2-210xxxx-Phase 2 of [AT113bis-e][006][NR15] Conn Control II_summary_v3_rap.docx 2021/04/19 13:51 61 KB

4 items.