ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG2_RL2 / TSGR2_113-e / Inbox / Drafts / [Offline-005][NR15] Connection Control II (Apple) / Phase-2

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft LS reply on RRC BWP Switch for SCell_v0.docx 2021/02/02 19:27 27,7 KB
icon Draft LS reply on RRC BWP Switch for SCell_v1 Nok.docx 2021/02/03 14:50 29,1 KB
icon Draft LS reply on RRC BWP Switch for SCell_v2 Nok.docx 2021/02/03 15:08 29,4 KB
icon Draft LS reply on RRC BWP Switch for SCell_v3_Apple.docx 2021/02/03 16:26 34 KB
icon Draft LS reply on RRC BWP Switch for SCell_v4_Nokia.docx 2021/02/04 14:39 34,1 KB
icon Draft LS reply on RRC BWP Switch for SCell_v5_Apple.docx 2021/02/04 15:15 34,7 KB
icon R2-210xxx-[AT113-e][005][NR15] Connection Control II (Apple)_Phase-2.docx 2021/02/02 19:27 116,7 KB

7 items.