ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG1_RL1 / TSGR1_102-e / Inbox / drafts / 6.2.1 / 102-e-LTE-eMTC5-04 / CR

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft R1-2007307 Number of HARQ processes in multi-TB scheduling in CE mode B in TDD in LTE-MTC.docx 2020/08/26 22:39 222,5 KB
icon Draft R1-2007308 Multi-TB scheduling and PUR spanning PUSCH transmission in LTE-MTC.docx 2020/08/26 22:39 132,9 KB
icon Draft R1-2007309 Missing ELSE in RV determination in UL multi-TB scheduling in LTE-MTC.docx 2020/08/26 22:39 99,6 KB

3 items.