ETSI logo

www.3gpp.org / ftp / TSG_RAN / WG1_RL1 / TSGR1_100b_e / Inbox / drafts / 5.1 RAN1 Aspects for RF requirements for NR frequency range 1 (FR1) / [100b-e-LS-TxSwitching-04]

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation.zip 2020/04/24 9:04 54,2 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_HW.zip 2020/04/29 0:07 57,4 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v1.zip 2020/04/29 9:52 53,9 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v2.zip 2020/04/29 20:28 53,9 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v2_Ericsson.zip 2020/04/30 0:17 55,3 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v2_Ericsson_ZTE.zip 2020/04/30 5:51 51,1 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v2_ZTE.zip 2020/04/29 11:42 53,2 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v3_ZTE.zip 2020/04/29 17:23 54,1 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v4-HW.zip 2020/04/30 12:39 54 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v4-HW2.zip 2020/04/30 12:49 54,3 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v4-HW3.zip 2020/04/30 18:48 54,5 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v4.zip 2020/04/30 11:40 54,6 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v4_ZTE.zip 2020/04/30 18:10 52,1 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v5.zip 2020/05/01 7:50 54,2 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v5_HW.zip 2020/05/01 12:05 54,2 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v5_HW_ZTE.zip 2020/05/01 12:59 51,9 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v5_ZTE.zip 2020/05/01 8:30 49,7 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v6.zip 2020/05/01 14:34 54,6 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v7.zip 2020/05/01 15:25 54,4 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v8.zip 2020/05/01 18:55 54,6 KB
icon draft_CR_R1-200xxxx_Introduction of switched uplink operation_v9.zip 2020/05/01 19:58 54,6 KB

21 items.