|
2019-07-01 Industrial Indoor Measurements.pptx
|
2020/02/05 7:34
|
3554,3 KB
|
|
2019-07-01_Fraunhofer_HHI_welcome.pptx
|
2020/02/05 7:34
|
3407,4 KB
|
|
2019-07-01_Industrial_Indoor_Measurements.pptx
|
2020/02/05 7:34
|
3554,3 KB
|
|
2019-07-02_Fraunhofer_HHI_Directional Wideband Channel Measurements at 28GHz.pptx
|
2020/02/05 7:34
|
3346,1 KB
|
|
2019-07-02_Fraunhofer_HHI_Directional_Wideband_Channel_Measurements_at_28GHz.pptx
|
2020/02/05 7:34
|
3346,1 KB
|
|
Berlin_Meeting_NLOS_Relative_Delay_Results_v1.pptx
|
2020/02/05 7:34
|
1284 KB
|
|
Berlin_Meeting_NLOS_Relative_Delay_Results_v2.pptx
|
2020/02/05 7:34
|
1284 KB
|
|
CEA_PL_raw_data.xlsx
|
2020/02/05 7:34
|
126,3 KB
|
|
CEA_PL_raw_data_v2.xlsx
|
2020/02/05 7:34
|
154 KB
|
|
datapoints_hhi_28ghz.xlsx
|
2020/02/05 7:34
|
15,9 KB
|
|
datapoints_ref16.xlsx
|
2020/02/05 7:34
|
287,1 KB
|
|
datapoints_ref29.xlsx
|
2020/02/05 7:34
|
32,1 KB
|
|
datapoints_ref45.xlsx
|
2020/02/05 7:34
|
19 KB
|
|
datapoints_ref49.xlsx
|
2020/02/05 7:34
|
17,2 KB
|
|
datapoints_ref52.xlsx
|
2020/02/05 7:34
|
13,2 KB
|
|
datapoints_ref53.xlsx
|
2020/02/05 7:34
|
13,4 KB
|
|
datapoints_ref69.xlsx
|
2020/02/05 7:34
|
36,2 KB
|
|
datapoints_ref7.xlsx
|
2020/02/05 7:34
|
190,1 KB
|
|
datapoints_ref83.xlsx
|
2020/02/05 7:34
|
26,7 KB
|
|
datapoints_ref84.xlsx
|
2020/02/05 7:34
|
13,9 KB
|
|
datapoints_ref85.xlsx
|
2020/02/05 7:34
|
26,8 KB
|
|
datapoints_ref86.xlsx
|
2020/02/05 7:34
|
14,5 KB
|
|
Delay spread vs hall volume_v1.pptx
|
2020/02/05 7:34
|
507 KB
|
|
Delay spread vs hall volume_v2.pptx
|
2020/02/05 7:34
|
506,3 KB
|
|
Delay spread vs hall volume_v3.pptx
|
2020/02/05 7:34
|
507,2 KB
|
|
Delay spread vs hall volume_v4.pptx
|
2020/02/05 7:34
|
511,2 KB
|
|
draft R1-19xxxxx Industrial channel model - meeting report_v1.docx
|
2020/02/05 7:34
|
38,1 KB
|
|
draft R1-19xxxxx Industrial channel model - meeting report_v2.docx
|
2020/02/05 7:34
|
39,8 KB
|
|
draft R1-19xxxxx Industrial channel model - meeting report_v3.docx
|
2020/02/05 7:34
|
48 KB
|
|
draft R1-19xxxxx Industrial channel model - meeting report_v4.docx
|
2020/02/05 7:34
|
51,1 KB
|
|
draft R1-19xxxxx Industrial channel model - meeting report_v5.docx
|
2020/02/05 7:34
|
91,9 KB
|
|
draft R1-19xxxxx Industrial channel model - meeting report_v6.docx
|
2020/02/05 7:34
|
110,3 KB
|
|
FHIIS_LOS_NLOS_7GHz.xlsx
|
2020/02/05 7:34
|
14,5 KB
|
|
IIot Path Loss measured data expressions and curves_v1.3.xlsx
|
2020/02/05 7:34
|
996,9 KB
|
|
IIot Path Loss measured data expressions and curves_v1.4.xlsx
|
2020/02/05 7:34
|
913,4 KB
|
|
IIot Path Loss measured data expressions and curves_v1.5 CMCC CEA HHI.xlsx
|
2020/02/05 7:34
|
1913,8 KB
|
|
IIot Path Loss measured data expressions and curves_v1.5 CMCC CEA.xlsx
|
2020/02/05 7:34
|
1853,1 KB
|
|
IIot Path Loss measured data expressions and curves_v2.0_HUAWEI_MERGE.XLSX
|
2020/02/05 7:34
|
5286,7 KB
|
|
ModDualMobility_Huawei_Draft.docx
|
2020/02/05 7:34
|
193,3 KB
|
|
Nokia_data_combine_for_all_subscenarios_sc1_2_with_formulas_v1.xlsx
|
2020/02/05 7:34
|
705,9 KB
|
|
Nokia_data_combine_for_all_subscenarios_sc3_4_with_formulas_v1.xlsx
|
2020/02/05 7:34
|
421,6 KB
|
|
R1-19xxxxx Email discussion on industrial channel model and calibration_v2_nokia_ZTE_QC_FHG_CMCC(v2)_DCM_HW.docx
|
2020/02/05 7:34
|
263,9 KB
|
|
R1-19xxxxx Email discussion on industrial channel model and calibration_v3.zip
|
2020/02/05 7:34
|
775,1 KB
|
|
R1-19xxxxx Email discussion on industrial channel model and calibration_v3_CEA.docx
|
2020/02/05 7:34
|
211,8 KB
|
|
R1-19xxxxx LSP parameter proposals_v3_CEA.xlsx
|
2020/02/05 7:34
|
114,6 KB
|
|
R1-19xxxxx LSP parameter proposals_v3_CEA_HW.xlsx
|
2020/02/05 7:34
|
126,7 KB
|
|
R1-19xxxxx LSP parameter proposals_v3_CEA_HW2.xlsx
|
2020/02/05 7:34
|
127,5 KB
|
|
R1-19xxxxx LSP parameter proposals_v3_CEA_HW_HHI.xlsx
|
2020/02/05 7:34
|
139,1 KB
|
|
R1-19xxxxx LSP parameter proposals_v3_CEA_HW_HHI2.xlsx
|
2020/02/05 7:34
|
141,3 KB
|
|
R1-19xxxxx LSP parameter proposals_v3_CEA_HW_HHI2_MUC_SH.XLSX
|
2020/02/05 7:34
|
142 KB
|
|
R1-19xxxxx LSP parameter proposals_v4.XLSX
|
2020/02/05 7:34
|
156,4 KB
|
|
R1-19xxxxx LSP parameter proposals_v4_HHI.XLSX
|
2020/02/05 7:34
|
168,2 KB
|
|
R1-19xxxxx LSP parameter proposals_v4_HHI_ZTE.xlsx
|
2020/02/05 7:34
|
1847,9 KB
|
|
R1-19xxxxx Path loss model parameters_v2_nokia_zte_qc_FHG.xlsx
|
2020/02/05 7:34
|
44,2 KB
|
|
R1-19xxxxx Path loss model parameters_v3_CEA.xlsx
|
2020/02/05 7:34
|
43,4 KB
|
|
R1-19xxxxx Path loss model parameters_v3_CEA_HHI.xlsx
|
2020/02/05 7:34
|
44 KB
|
|
R1-19xxxxx Path loss model parameters_v3_CEA_HHI2.xlsx
|
2020/02/05 7:34
|
44,1 KB
|
|
R1-19xxxxx Path loss model parameters_v3_CEA_HHI3.xlsx
|
2020/02/05 7:34
|
44,1 KB
|
|
R1-19xxxxx Path loss model parameters_v4.xlsx
|
2020/02/05 7:34
|
43,8 KB
|
|
R1-XXXX-Single-band.docx
|
2020/02/05 7:34
|
2282,4 KB
|
|
R1-xxxxxxxx_scenario_parametrization_nokia_v2.docx
|
2020/02/05 7:34
|
58,5 KB
|
|
Reicovair_PL_Data.xlsx
|
2020/02/05 7:34
|
394,7 KB
|
|
Status of SI progress – rapporteur’s view (after F2F).pptx
|
2020/02/05 7:34
|
828,6 KB
|
|
Status of SI progress – rapporteur’s view.pptx
|
2020/02/05 7:34
|
812,6 KB
|
|
ZTE - Relative Delay Raw data for after F2F informal meeting.xlsx
|
2020/02/05 7:34
|
178,5 KB
|
|
ZTE_LOS probability.docx
|
2020/02/05 7:34
|
2110,7 KB
|
|
ZTE_Support of IIOT by map-based hybrid model.docx
|
2020/02/05 7:34
|
123,6 KB
|