3GPP TDocs (written contributions) at meeting
Meeting: SP-39 - 2008-03-10 to 2008-03-13, Puerto Vallarta
meeting id: SP-39 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
SP‑080001 | Draft agenda for TSG SA meeting #39 | TSG SA Chairman | Approved |
SP‑080002 | Draft report of TSG SA Meeting #38 | TSG SA Secretary | Approved |
SP‑080003 | TSG S4 Status Report at TSG-SA#39 | SA WG4 Chairman | Noted |
SP‑080004 | New WID on “Requirements and Test methods for Wideband Terminals” | SA WG4 | Approved |
SP‑080005 | CRs TS 26.114 on "Various Corrections for IMS Multimedia Telephony; Media Handling and Interaction (MTSI-MHI)" (Release 7) | SA WG4 | Approved |
SP‑080006 | CR TS 26.230 on Bug fix to baudot_tonemod function in baudot_functions.c for Cellular text telephone modem; Transmitter bit exact C-code (Release 7) | SA WG4 | Approved |
SP‑080007 | CRs TS 26.234 on "Various Corrections for Packet Switched Streaming Service (Enhancements) (PSSe)" (Release 6 and Release 7) | SA WG4 | Approved |
SP‑080008 | CR TS 26.235 on "Scope clarifications and editorial changes for IMS-Codec" (Release 7) | SA WG4 | Approved |
SP‑080009 | CR TS 26.236 on "Correction of RTP usage for audio for PS conversational multimedia applications for IMS-Codec" (Release 7) | SA WG4 | Approved |
SP‑080010 | CRs TS 26.346 on "Various Corrections for MBMS & MBMS User Service Extensions (MBMSUSE)" (Release 6 and Release 7) | SA WG4 | Approved |
SP‑080011 | CR TS 43.050 on "Correction of wrong references" (Release 7) | SA WG4 | Approved |
SP‑080012 | LS (from SA WG4) regarding 3GPP progress on eCall | SA WG4 | Noted |
SP‑080013 | WiMAX Forum Correspondence. Re: LS on EPC Interworking with WiMAX access networks | WiMAX Forum NWG | Noted |
SP‑080014 | WiMAX Forum Correspondence. Re: WiMAX Forum Multimedia Session Continuity Requirements Release 2.0 version 1.0.0 | WiMAX Forum SPWG Chair | Noted |
SP‑080015 | LS (from TSG GERAN) on the introduction of A interface user plane over IP | TSG GERAN | Noted |
SP‑080016 | Correspondence from ATIS PTSC: RE: Development of Common IMS Standards | ATIS PTSC | Noted |
SP‑080017 | LS (from CT WG1) on PNE Networks | CT WG1 | Noted |
SP‑080018 | LS from ITU-T SG19: Request for information for draft new Recommendation Q.1741.5 (referencing of 3GPP Release 7) | ITU-T SG19 | Noted |
SP‑080019 | LS (from TSG RAN) to TSG SA on the documents to be considered for the Revision 8 of Recommendation ITU-R M.1457 | TSG RAN | Noted |
SP‑080020 | LS (from ETSI TISPAN) on requirement on Overlap Signalling | ETSI TISPAN | Noted |
SP‑080021 | Reply LS (from SA WG1) on requirements for overlap signaling | SA WG1 | Noted |
SP‑080022 | LS (from SA WG1) on Transfer of Common IMS document to 3GPP SA WG1 regarding published Rel-1 documents | SA WG1 | Noted |
SP‑080023 | LS (from SA WG1) on Enhancing the SMS Default alphabet in TS 23.038 to include national characters not currently in the Default Alphabet. | SA WG1 | Noted |
SP‑080024 | LS (from SA WG1) on approval of Recommendation Q.1762/Y.2802 | SA WG1 | Noted |
SP‑080025 | Status Report from SA WG1 to TSG SA#39 | SA WG1 Chairman | Noted |
SP‑080026 | Stage 1 CRs on (NSP-CR) - Network Selection Enhancements | SA WG1 | Approved |
SP‑080027 | Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text | SA WG1 | Revised in SP-080191 |
SP‑080028 | Stage 1 CR on TCRT: Removal of requirement on sending SMS to non established group calls | SA WG1 | Approved |
SP‑080029 | Stage 1 CRs on (CAT) - Customised Alerting Tone | SA WG1 | Approved |
SP‑080030 | Stage 1 CR on charging requirement for multi-phase services | SA WG1 | Noted |
SP‑080031 | Stage 1 CRs on (CIMS8-TIS) - Service and Capability for Core IMS - inclusion of TISPAN requirements | SA WG1 | Approved (Except CR0066R1) |
SP‑080032 | Stage 1 CRs on (Edata) - eCall Data Transfer | SA WG1 | Approved |
SP‑080033 | Stage 1 CR on (EVA) - Enhancements to VGCS Applications | SA WG1 | Approved |
SP‑080034 | Stage 1 CRs on Home(e)NB | SA WG1 | Approved |
SP‑080035 | Stage 1 CR on HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA | SA WG1 | Noted |
SP‑080036 | Stage 1 CRs on (ICE) - Storage and easy access of ICE information on USIM | SA WG1 | Approved |
SP‑080037 | Stage 1 CR on ETSI TISPAN OSA transfer to 3GPP CT5 | SA WG1 | Approved |
SP‑080038 | Stage 1 CRs on (MESSIW) - Service-Level Interworking for Messaging Services | SA WG1 | Approved |
SP‑080039 | Stage 1 CR on (ICSRA) - IMS Centralized Service Control | SA WG1 | Approved |
SP‑080040 | Stage 1 CRs on (IPInterc) - IP Interconnect | SA WG1 | Approved |
SP‑080041 | Stage 1 corrections to TEI-8 items | SA WG1 | Approved |
SP‑080042 | Stage 1 CRs on (SAES) - 3GPP System Architecture Evolution Specification - Evolved Packet System (non RAN aspects) | SA WG1 | Approved |
SP‑080043 | Stage 1 CRs on (TEI8) - Technical Enhancements and Improvements | SA WG1 | Approved |
SP‑080044 | CR 22.173 Stage 1 for Flexible Alerting (FA) Service | SA WG1 | Approved |
SP‑080045 | Stage 1 CRs on Any other Studies (new proposed SIDs here) | SA WG1 | Approved |
SP‑080046 | Stage 1 CR on Correcting a reference in VAS4SMS TR 22.942 | SA WG1 | Approved |
SP‑080047 | VAS4SMS TS 22.142 v.2.0.0 and cover page | SA WG1 | Approved |
SP‑080048 | ETWS TS 22.168v.2.0.0 | SA WG1 | Revised in SP-080185 |
SP‑080049 | PWS TR 22.968v.2.0.0 | SA WG1 | Approved |
SP‑080050 | ICS TR 22.892 and Cover Page | SA WG1 | Approved |
SP‑080051 | Enhancements to Multimedia Priority Service (TS 22.153) | SA WG1 | Approved |
SP‑080052 | 3GPP2 Input to Common IMS | SA WG1 | Noted |
SP‑080053 | Charging for multi-phases services | SA WG1 | Approved |
SP‑080054 | Study on support of a Public Warning System | SA WG1 | Approved |
SP‑080055 | Status report of SA WG5 | SA WG5 Chairman | Noted |
SP‑080056 | R6/7 CRs on OAM&P (OAM-NIM) | SA WG5 | CR5, 6, 7 Approved. CR8 revised in SP-080204 |
SP‑080057 | R7 CRs on Charging Management (CH7) | SA WG5 | Revised in SP-080190 |
SP‑080058 | R7/8 CRs on OAM&P (OAM7, OAM7-NIM, OAM7-PM, OAM7-Trace) | SA WG5 | Approved |
SP‑080059 | R8 CRs on IBCF Charging (IMSTSS) | SA WG5 | Approved |
SP‑080060 | R8 CRs on EPC Charging (EPC-CH) | SA WG5 | Approved |
SP‑080061 | New WID on EPC Performance measurements | SA WG5 | Approved |
SP‑080062 | New WID on E-UTRAN Performance measurements | SA WG5 | Approved |
SP‑080063 | New WID Key Performance Indicators (KPIs) for E-UTRAN | SA WG5 | Approved |
SP‑080064 | New BB-level WID on Management of Self-Organizing Networks (SON) | SA WG5 | Approved |
SP‑080065 | New WT-level WID on Self-Establishment of eNBs | SA WG5 | Approved |
SP‑080066 | New WT-level WID on SON Automatic Neighbour Relation (ANR) Management | SA WG5 | Approved |
SP‑080067 | New WT-level WID on SON Self-Optimization & Self-Healing handling | SA WG5 | Approved |
SP‑080068 | New WID Alignment with eTOM and NGNM | SA WG5 | Approved |
SP‑080069 | R8 CRs on OAM&P (OAM8) | SA WG5 | Approved |
SP‑080070 | TS 32.153-100 Telecommunication management; Integration Reference Point (IRP) technology specific templates, rules and guidelines - for SA Information | SA WG5 | Noted |
SP‑080071 | TS 32.121-200 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); Requirements - for SA Approval | SA WG5 | Approved |
SP‑080072 | TS 32.122-200 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); Information Service - for SA Approval | SA WG5 | Approved |
SP‑080073 | TS 32.123-100 Telecommunication management; Advanced Alarm Management (AAM) Integration Reference Point (IRP); CORBA Solution Set - for SA Information | SA WG5 | Noted |
SP‑080074 | R8 CRs on Charging Management (CH8) | SA WG5 | Approved |
SP‑080075 | TR 32.819-100 Telecommunications management; Element management layer - Operation System Function (E-OSF) definition - for SA Information | SA WG5 | Noted |
SP‑080076 | New WID on Study of Self-healing of SON (OAM8-Studies) | SA WG5 | Approved |
SP‑080077 | 22.011 CR0109R3: HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA (Rel-8) | Alcatel-Lucent, Nokia Siemens Networks, Motorola, RIM, T-Mobile, Vodafone | Revised in SP-080188 |
SP‑080078 | CR ro 21.801: Correction of ambiguous text | MCC (JMM) | Approved |
SP‑080079 | CR to 21.900: Clarification of version nomenclature | MCC (JMM) | Approved |
SP‑080080 | Reaction to LS from ITU-T: Request for information for draft new Recommendation Q.1741.5 (referencing of 3GPP Release 7) | MCC (JMM) | Noted |
SP‑080081 | Support Team Report | MCC (JMM) | Noted |
SP‑080082 | Specs status at end of SA meeting | MCC (JMM) | Noted |
SP‑080083 | LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE SCHEDULE FOR UPDATING RECOMMENDATION ITU-R M.1457 TO REVISION 9 | ITU-R WP5D | Noted |
SP‑080084 | 3GPP2 Correspondence: RE: Common IMS Requirements | 3GPP2 TSG-S | Noted |
SP‑080085 | LS (from SA WG2) on Renaming SAE Interfaces | SA WG2 | Noted |
SP‑080086 | LS response on Core Network Centric Intra Domain Connection of RAN Nodes to Multiple CN Nodes | SA WG2 | Noted |
SP‑080087 | WiMAX Forum Correspondence. Re: WiMAX Forum Multimedia Session Continuity Requirements Release 2.0 version 1.0.0 | WiMAX Forum SPWG Chair | Noted. Response in SP-080212 |
SP‑080088 | Report of TSG GERAN activities to TSG SA #39 | TSG GERAN Chairman | Noted |
SP‑080089 | Report of SA WG2 activities to TSG SA #39 | SA WG2 Chairman | Noted |
SP‑080090 | New WID: System enhancements for the use of IMS services through local breakout | SA WG2 | Approved: BB under SAES |
SP‑080091 | Updated Study WID: System enhancements for the use of IMS services in local breakout and optimal routing of media | SA WG2 | Approved |
SP‑080092 | New WID: IMS Service Continuity | SA WG2 | Approved |
SP‑080093 | New WID: MBMS support in EPS for E-UTRAN | SA WG2 | Noted (returned to SA WG2) |
SP‑080094 | New Study WID: Intra Domain Connection of RAN Nodes to Multiple CN Nodes | SA WG2 | Approved |
SP‑080095 | Updated WID: IMS System enhancements for corporate network access | SA WG2 | Approved SA1 Chair to report this to SA1 |
SP‑080096 | New WID: 3GPP2 Input to Common IMS | SA WG2 | Revised |
SP‑080097 | New WID: CS Fallback in EPS (TS also sent to TSG SA for information) | SA WG2 | Approved |
SP‑080098 | TS 23.272, Version 1.0.0: Circuit Switched Fallback in Evolved Packet System; Stage 2 Specification (Release 8) - For Information | SA WG2 | Presentation Cover sheet revised in SP-080165 |
SP‑080099 | TS 23.216, Version 1.0.0: Single Radio Voice Call Continuity (SRVCC); Stage 2 (Release 8) - For Information | SA WG2 | Noted |
SP‑080100 | TR 23.893, Version 1.2.1: Feasibility Study on Multimedia Session Continuity; Stage 2 (Release 8) - For Information | SA WG2 | Noted |
SP‑080101 | TR 23.811, Version 2.0.0: Service Level Interworking for Messaging Services; Stage 2 (Release 8) - For Approval | SA WG2 | Approved |
SP‑080102 | TR 23.892, Version 2.0.0: IP Multimedia System (IMS) centralized services (Release 8) - For Approval | SA WG2 | Approved |
SP‑080103 | 1 CR to 23.060: GGSN selection based on subscription information (TEI8, Rel-8) | SA WG2 | Approved |
SP‑080104 | 1 CR to 23.141: Update to the Presence Spec in support of the Common IMS (IMS_Common, Rel-8) | SA WG2 | Approved |
SP‑080105 | 2 CRs to 23.167 (EMC1, Rel-7) | SA WG2 | Approved |
SP‑080106 | 2 CRs to 23.203: Clarification for PCRF initiated IP-CAN session termination (PCC, Rel-7, Rel-8) | SA WG2 | Approved |
SP‑080107 | 10 CRs to 23.203 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080108 | 2 CRs to 23.204: Correction to Reference (TEI7, Rel-7, Rel-8) | SA WG2 | Approved |
SP‑080109 | 9 CRs to 23.204 (MESSIW-St2, Rel-8) | SA WG2 | Approved |
SP‑080110 | 1 CR to 23.221: Any IP version support (TEI8, Rel-8) | SA WG2 | Approved |
SP‑080111 | 2 CRs to 23.228: Cleanup of incorrect P-CSCF behaviour (EMC1, Rel-7, Rel-8) | SA WG2 | Approved |
SP‑080112 | 1 CR to 23.228: Cleanup of incorrect P-CSCF interaction (TEI7, Rel-7) | SA WG2 | Approved |
SP‑080113 | 4 CRs to 23.228: (TEI8, Rel-8) | SA WG2 | Approved |
SP‑080114 | 5 CRs to 23.228: (IMS_Common, Rel-8) | SA WG2 | CR0772 revised in SP-080206, CR0783 revised in SP-080207 |
SP‑080115 | 7 Category B CRs to 23.401 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080116 | 18 Category C CRs to 23.401 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080117 | 1 Category D CR to 23.401: The editorial modification for attach procedure (SAES, Rel-8) | SA WG2 | Approved |
SP‑080118 | 15 Category F CRs to 23.401 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080119 | 15 Category F CRs to 23.401 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080120 | 10 Category F CRs to 23.401 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080121 | 9 Category B CRs to 23.402 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080122 | 15 Category C CRs to 23.402 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080123 | 16 Category C CRs to 23.402 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080124 | 12 Category F CRs to 23.402 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080125 | 11 Category F CRs to 23.402 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080126 | 1 Category B CR to 23.401: Subscriber Type on S1 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080127 | 1 Category F CR to 23.401: MME Overload handling (SAES, Rel-8) | SA WG2 | Approved |
SP‑080128 | 1 Category C CR to 23.402: On IPMS on handover between accesses (SAES, Rel-8) | SA WG2 | Approved |
SP‑080129 | Stage 1 exception for 3GPP2 Common IMS | Telecom Italia, BT, Alcatel-Lucent, KDDI | Exceptions Granted |
SP‑080130 | SA3 Status Report to SA#39 | SA WG3 Chairman | Noted |
SP‑080131 | Draft Report of SA WG3 Meeting #50 | SA WG3 Secretary | Noted |
SP‑080132 | Updated WID: 3GPP System Architecture Evolution Specification (SAES) to include Security Building blocks based on SP-070933 after accepting revision marks | SA WG3 | Approved |
SP‑080133 | Generic Bootstrapping Architecture Push Function (GBAPush) | SA WG3 | Approved |
SP‑080134 | Security aspects of early IP Multimedia Subsystem (IMS) (Release 8) | SA WG3 | Noted |
SP‑080135 | 3GPP System Architecture Evolution: Security aspects of non-3GPP accesses; (Release 8) | SA WG3 | Noted |
SP‑080136 | WITHDRAWN: IMS media plane security (Release 8) | SA WG3 | WITHDRAWN |
SP‑080137 | CRs to 33.203 on IMS security enhancements | SA WG3 | WITHDRAWN |
SP‑080138 | CRs to 33.203 on IMS Security requirements for Packet Cable | SA WG3 | Approved |
SP‑080139 | CRs to 33.203 on correction of integrity protection indicator | SA WG3 | Approved |
SP‑080140 | CR to 33.920 on Addition of 2G GBA related CRs | SA WG3 | Approved |
SP‑080141 | CR to 33.220 on Simultaneous handling of Zh' and Zh in a BSF | SA WG3 | Approved |
SP‑080142 | CRs to 33.210 on adding support for EPS requirements | SA WG3 | Approved |
SP‑080143 | CR to 33.220 and 33.110 on Manual TLS handling | SA WG3 | Approved |
SP‑080144 | CR to 33.234 on using an unauthenticated Diffie_Hellman exchange for emergency calls | SA WG3 | Approved |
SP‑080145 | CR to 33.310 on Introducing a certificates-based Zb-interface and adding IKEv2 | SA WG3 | Approved |
SP‑080146 | CR to 33.259 on corrections on typos on references | SA WG3 | Approved |
SP‑080147 | CR to TS 22.022 on Control key length increase in OTA de-personalisation message | SA WG3 | Revised in SP-080194 |
SP‑080148 | CR to 33.110 on Removal of editor | SA WG3 | Approved |
SP‑080149 | CR to 33.246: Clarification of usage of SRTCP in MBMS | SA WG3 | Approved |
SP‑080150 | CR to 33.106 on Alignment of CC encryption statement in ETSI TS 101 671 | SA WG3 | Revised in SP-080171 |
SP‑080151 | CRs to 33.107 | SA WG3 | Revised in SP-080172 |
SP‑080152 | CR to 33.108 on editorial update | SA WG3 | Revised in SP-080173 |
SP‑080153 | IETF Status Report | TSG CT Chairman | Noted |
SP‑080154 | Report of TSG CT activities | TSG CT Chairman | Noted |
SP‑080155 | LS (from CT WG6) on Release 8 definition of a new framework for UICC services | CT WG6 | Noted |
SP‑080156 | LS (from ETSI TC SCP) on Release 8 definition of a new framework for services | TC SCP | Noted |
SP‑080157 | On release planning | Alcatel-Lucent | Discussed and noted |
SP‑080158 | New WID on 3GPP2 Input to Common IMS | Alcatel-Lucent | - |
SP‑080159 | WI Status Report: Evaluation of LCS Control Plane Solution for EPS | Rapporteur | WITHDRAWN |
SP‑080160 | 3GPP System Architecture Evolution: Security Architecture; (Release 8) | SA WG3 | Noted |
SP‑080161 | New WID: IMS initiated and controlled PSS and MBMS User Service | Ericsson, RealNetworks, Apple, Huawei Technologies, Orange, Telecom Italia, China Mobile | Revised |
SP‑080162 | Mobility Mode Protocol Choices in EPC | Intel Corp. | WITHDRAWN. Revision in SP-080163 |
SP‑080163 | Mobility Mode Protocol Choices in EPC | Intel Corp. | Revised in SP-080189 |
SP‑080164 | TR 22.983, version 2.0.0: Service alignment and migration | SA WG1 | Approved |
SP‑080165 | TS 23.272, Version 1.0.0: Circuit Switched Fallback in Evolved Packet System; Stage 2 Specification (Release 8) - For Information | SA WG2 | Noted |
SP‑080166 | Status Report on PCG/OP process discussions | TSG SA Chairman | Noted |
SP‑080167 | 2 CRs to 23.402 (SAES, Rel-8) | SA WG2 | Approved |
SP‑080168 | 3GPP/3GPP2 Common IMS Workshop Draft MEETING REPORT v1.0.0 | TSG SA Chairman | Approved |
SP‑080169 | Conclusions from 3GPP/3GPP2 Common IMS Workshop | TSG SA Chairman | Noted |
SP‑080170 | CRs to 33.203 on IMS security enhancements | SA WG3 | CR0129R1 -> SP-080211. Other CRs approved |
SP‑080171 | CR to 33.106 on Alignment of CC encryption statement in ETSI TS 101 671 | SA WG3 | Approved |
SP‑080172 | CRs to 33.107 | SA WG3 | Approved |
SP‑080173 | CR to 33.108 on editorial update | SA WG3 | Approved |
SP‑080174 | Focusing SAE work | SA WG2 chairman (Balazs Bertenyi), SA WG2 SAE Rapporteurs (Chris Pudney, Irfan Ali) TSG-CT chairman (Hannu Hietalahti) TSG-CT WG1 chairman (Atle Monrad) TSG-CT WG3 chairman (Ragnar Huslende) TSG-CT WG4 chairman (Peter Schmitt) | Discussed and noted |
SP‑080175 | 1 CR to 23.203: Role of the V-PCRF (SAES, Rel-8) | SA WG2 | Approved |
SP‑080176 | Proposed Follow-up LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") | Nortel, Alcatel-Lucent, Motorola, Verizon Wireless | Revised |
SP‑080177 | Planning of SAE workload and future 3GPP releases | Vodafone | Discussed and noted |
SP‑080178 | Draft report of TSG CT meeting #39 | TSG CT Secretary | Revised in SP-080183 |
SP‑080179 | LS (from TSG CT) Transfer of API work from 3GPP to OMA | TSG CT | Noted |
SP‑080180 | Proposal (from ETSI BOARD IMS-TEST Interest Group) for creation of new Technical Committee for IMS Network Testing (TC INT) | ETSI BOARD IMS-TEST Interest Group | Noted |
SP‑080181 | LS (from ETSI TISPAN) on transfer of charging in common IMS specifications | ETSI TISPAN | Noted |
SP‑080182 | Rel-8 SAE Essential and non Essential work the way forward | NTT DoCoMo | Discussed and noted |
SP‑080183 | Draft report of TSG CT meeting #39 | TSG CT Secretary | Noted |
SP‑080184 | Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) | TSG SA (Enrico) | Revised |
SP‑080185 | ETWS TS 22.168v.2.0.0 | SA WG1 | Approved |
SP‑080186 | Response LS on Transfer of API work from 3GPP to OMA | TSG SA | Approved |
SP‑080187 | Calendar of TSG meetings | TSG SA Secretary (MCC) | Noted |
SP‑080188 | 22.011 CR0109R4: HNB/HeNB - Closed Subscriber Group (CSG) requirements for UTRA and E-UTRA (Rel-8) | Alcatel-Lucent, Nokia Siemens Networks, Motorola, RIM, T-Mobile, Vodafone | Approved |
SP‑080189 | Mobility Mode Protocol Choices in EPC | Intel, NTT-DoCoMo, Sprint | Noted |
SP‑080190 | R7 CRs on Charging Management (CH7) | TSG SA | Approved |
SP‑080191 | Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text | SA WG1 | Revised in SP-080195 |
SP‑080192 | Stage 1 CR on charging requirement for multi-phase services | SA WG1 | Approved |
SP‑080193 | Stage 1 CR on (CIMS8-TIS) - Corrections to Interworking with PSTN/ISDN networks | SA WG1 | Revised in SP-080205 |
SP‑080194 | CR to TS 22.022 on Control key length increase in OTA de-personalisation message | TSG SA | Approved |
SP‑080195 | Stage 1 CRs on CR 22.273: Editorial corrections to align to the TISPAN text | TSG SA | Approved |
SP‑080196 | Report of TSG RAN activities to TSG SA #39 | TSG RAN Chairman | Revised |
SP‑080197 | Draft report of RAN meeting #39 | TSG RAN Secretary (MCC) | Noted |
SP‑080198 | LTE Open issue list | TSG RAN Chairman | Noted |
SP‑080199 | LTE-Advanced Work Item Description | TSG RAN | Noted |
SP‑080200 | Summary of discussion on LTE/SAE additional Feature List | Session Convenor (Dan Warren GSMA) | Discussed and noted |
SP‑080201 | New WID: IMS initiated and controlled PSS and MBMS User Service | Ericsson, RealNetworks, Apple, Huawei Technologies, Orange, Telecom Italia, China Mobile | Approved |
SP‑080202 | LS on Decision of MBMS and LCS in SAE Rel-8 Scope Discussions | TSG SA (NTT DoCoMo) | Revised |
SP‑080203 | LS informing WGs on the decision on SAE essential items list and procedure for items not included | TSG SA (Chairman) | Revised |
SP‑080204 | R7 CR on OAM&P (OAM-NIM) | SA WG5 | Approved |
SP‑080205 | Stage 1 CR on (CIMS8-TIS) - Corrections to Interworking with PSTN/ISDN networks | TSG SA | Approved |
SP‑080206 | 23.228 CR0772R3: (IMS_Common, Rel-8) | SA WG2 | Approved |
SP‑080207 | CR0772R3 to 23.228: (IMS_Common, Rel-8) | TSG SA | Approved |
SP‑080208 | LS informing WGs on the decision on SAE essential items list and procedure for items not included | TSG SA (Chairman) | Revised |
SP‑080209 | CR on P-CSCF behaviour | Ericsson, RIM | Approved |
SP‑080210 | LS to ATIS PTSC: RE: Handling of LS on Development of Common IMS Standards | TSG SA (D Knight) | Revised |
SP‑080211 | 33.203 CR0129R2 on IMS security enhancements | SA WG3 | Approved |
SP‑080212 | Response LS to WiMAX Forum: 3GPP SAE Rel-8 content | TSG SA | Approved |
SP‑080213 | Report of TSG RAN activities to TSG SA #39 | TSG RAN Chairman | Noted |
SP‑080214 | LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") | TSG SA | Revised |
SP‑080215 | 3GPP work Plan: Version 11 March 2008 | Work Plan Manager (MCC) | Noted |
SP‑080216 | Work Plan Slide Review | MCC | Revised |
SP‑080217 | Rel-7 Feature summary document | MCC | Noted |
SP‑080218 | LS informing WGs on the decision on SAE essential items list and procedure for items not included | TSG SA (Chairman) | Approved |
SP‑080219 | LS to ATIS PTSC: RE: Handling of LS on Development of Common IMS Standards | TSG SA | Approved |
SP‑080220 | New WID: 3GPP2 Input to Common IMS | SA WG2 | Approved |
SP‑080221 | Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) | TSG SA | Revised |
SP‑080222 | LS to 3GPP2 Regarding Development of TS 33.xyz(402) ("Security aspects of non-3GPP accesses") | TSG SA | Approved |
SP‑080223 | LS on Decision of MBMS and LCS in SAE Rel-8 Scope Discussions | TSG SA | Approved |
SP‑080224 | Response LS on the creation of new Technical Committee for IMS Network Testing (TC INT) | TSG SA | Approved |
SP‑080225 | Work Plan Slide Review | MCC | Noted |
page generated from database: 2024-09-26 11:02:35