3GPP TDocs (written contributions) at meeting
Meeting: R4-65 - 2012-11-12 to 2012-11-16, New Orleans
meeting id: R4-65 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑126077 | Meeting Agenda | WG Chairman | imported from 3GU |
R4‑126078 | RAN4-64Bis Meeting report | ETSI Secretariat | imported from 3GU |
R4‑126079 | MIMO 2x2 Absolute Data Throughput preliminary results | Motorola Mobility | imported from 3GU |
R4‑126080 | BS classes Work Item TR 37.809 v1.2.0 | Ericsson | imported from 3GU |
R4‑126081 | BS PIM Work Item TR 37.808 v0.4.0 | Ericsson | imported from 3GU |
R4‑126082 | Impact of Insertion Loss on RRM CA Test Cases | Alcatel-Lucent, Anritsu | imported from 3GU |
R4‑126083 | Further Discussion of MSD Impact on CA RRM Requirements | Alcatel-Lucent | imported from 3GU |
R4‑126084 | Impact of CA harmonic product on RRM Requirements (Rel-11) | Alcatel-Lucent | imported from 3GU |
R4‑126085 | Discussion of UE Rx-Tx time difference measurement in Handover | Alcatel-Lucent | imported from 3GU |
R4‑126086 | UE Rx-Tx time difference measurement in Handover (Rel-10) | Alcatel-Lucent | imported from 3GU |
R4‑126087 | Dependency of CA Intra-frequency RSTD Measurement Accuracy on Serving Cell Bandwidths | Alcatel-Lucent | imported from 3GU |
R4‑126088 | Clarification of CA Intra-frequency RSTD Measurement Accuracy | Alcatel-Lucent | imported from 3GU |
R4‑126089 | CA RSRP & RSRQ test cases band dependency and Test coverage | Anritsu | imported from 3GU |
R4‑126090 | Making CA RSRP and RSRQ measurement accuracy test cases band-agnostic | Anritsu | imported from 3GU |
R4‑126091 | Making CA RSRP and RSRQ measurement accuracy test cases band-agnostic | Anritsu | imported from 3GU |
R4‑126092 | Wideband RSRQ Test Parameters | Anritsu | imported from 3GU |
R4‑126093 | Band-dependent RRM requirements for CA | Anritsu | imported from 3GU |
R4‑126094 | Band-dependent RRM requirements for CA | Anritsu | imported from 3GU |
R4‑126095 | LTE in the 600MHz UHF Band | Landover Wireless Corp | imported from 3GU |
R4‑126096 | Discussion on MIMO Channel Model Validation in Multi Probe Chamber | CATR | imported from 3GU |
R4‑126097 | TMC MIMO OTA Comparison Testing for MIMO Devices in CTIA IL/IT Part 2 Reverberation | CATR | imported from 3GU |
R4‑126098 | TP for TR 36.8xx (Inter-Band CA Rel-12): LTE_CA_B3_B26 Core Requirements | KT | imported from 3GU |
R4‑126099 | Maintenance of Band 23 UE Coexistence | DISH Network | imported from 3GU |
R4‑126100 | Corrections to Random Uncertainty for LME | ZTE | imported from 3GU |
R4‑126101 | WF on the study of relative phase discontinuity for LTE UL MIMO | Nokia Siemens Networks, Nokia | imported from 3GU |
R4‑126102 | CR 36.141: Conformance test requirements of PUCCH format 2 with DTX detection | Nokia Siemens Networks | imported from 3GU |
R4‑126103 | feICIC Cell detection performance with interference cancellation | Nokia Siemens Networks, Nokia | imported from 3GU |
R4‑126104 | Introduction of new BS classes to MSR specification (general parts) | Nokia Siemens Networks, Alcatel-Lucent, CATT, Ericsson, Huawei, ZTE | imported from 3GU |
R4‑126105 | Introduction of multi-band operation to MSR specification (section 4) | Nokia Siemens Networks, CATT, Ericsson, Huawei, ZTE | imported from 3GU |
R4‑126106 | Harmonics and intermodulation products generated by the BS supporting non-contiguous CA of Band 4 | Nokia Siemens Networks | imported from 3GU |
R4‑126107 | Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 2 and Band 4 | Nokia Siemens Networks | imported from 3GU |
R4‑126108 | MIMO Performance Evaluations using Single Cluster Channel Models | ETS-Lindgren | imported from 3GU |
R4‑126109 | CR to add the rated ouput power for 8 Tx antennas | ZTE Corporation | imported from 3GU |
R4‑126110 | CR to add the rated ouput power for 8 Tx antennas | ZTE Corporation | imported from 3GU |
R4‑126111 | Some corrections for intra-band non-contiguous spectrum operation in TS36.141 | ZTE Corporation | imported from 3GU |
R4‑126112 | CR for TS37.104(Clause 1-3) due to introduction of multi-band MSR operation | ZTE, Alcatel-Lucent, CATT, Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑126113 | TP on manufacturer’s declaration for MB-MSR | ZTE Corporation | imported from 3GU |
R4‑126114 | Further explanation on the near-field coupling test fixture | ZTE Corporation | imported from 3GU |
R4‑126115 | TP on improved diagram of the coupling test | ZTE Corporation | imported from 3GU |
R4‑126116 | Correction to test requirement of operating band unwanted emissions | ZTE Corporation | imported from 3GU |
R4‑126117 | Correction to test requirement of operating band unwanted emissions | ZTE Corporation | imported from 3GU |
R4‑126118 | Correction to test requirement of operating band unwanted emissions | ZTE Corporation | imported from 3GU |
R4‑126119 | Correction to test requirement of operating band unwanted emissions | ZTE Corporation | imported from 3GU |
R4‑126120 | Further corrections for NC CA in LTE LA BS | ZTE Corporation | imported from 3GU |
R4‑126121 | Further corrections for NC CA in LTE LA BS | ZTE Corporation | imported from 3GU |
R4‑126122 | CR for TS 36.141 transmitter characteristics (Clause 6) due to introduction of Medium Range BS | ZTE, Alcatel-Lucent, CATT, Ericsson, Huawei, Nokia Siemens Networks | imported from 3GU |
R4‑126123 | Corrections to ACLR for Rel-10 CA | CATR | imported from 3GU |
R4‑126124 | Corrections to ACLR for Rel-11 CA | CATR | imported from 3GU |
R4‑126125 | SCell Activation Delay Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126126 | CR on RLM Requirements for FeICIC | Qualcomm Incorporated | imported from 3GU |
R4‑126127 | System Level Simulations for Demod Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126128 | RRM Measurements for FeICIC | Qualcomm Incorporated | imported from 3GU |
R4‑126129 | In-Device Coexistence Impact on RRM Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126130 | RSRQ Issues | Qualcomm Incorporated | imported from 3GU |
R4‑126131 | Cdma2000 1xRTT measurements for SON ANR | Qualcomm Incorporated | imported from 3GU |
R4‑126132 | RSRP Accuracy for FeICIC | Qualcomm Incorporated | imported from 3GU |
R4‑126133 | General MPR mask for intra non-contiguous CA | LG Electronics | imported from 3GU |
R4‑126134 | CR for general MPR mask for multi-clustered transmission in single CC | LG Electronics | imported from 3GU |
R4‑126135 | Cancellation proposal for inter-band CA of Band1 and Band7 WI | China Telecom | imported from 3GU |
R4‑126136 | Further evaluation for CA PDSCH with power imbalance | Huawei, HiSilicon | imported from 3GU |
R4‑126137 | Analysis of bandwidth coverage for CA UE demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑126138 | Way forward on bandwidth coverage for CA UE demodulation performance | Huawei, HiSilicon | imported from 3GU |
R4‑126139 | UE performance requirements for high band under high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑126140 | Way forward on UE demodulation performance for high frequency band under high speed scenario | Huawei, HiSilicon | imported from 3GU |
R4‑126141 | Further discussion on eICIC RI testing | Huawei, HiSilicon | imported from 3GU |
R4‑126142 | CR on eICIC RI testing (Rel-10) | Huawei, HiSilicon | imported from 3GU |
R4‑126143 | CR on eICIC RI testing (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑126144 | Correction of power allocation for eICIC performance requirements (Rel-10) | Huawei, HiSilicon | imported from 3GU |
R4‑126145 | Correction of power allocation for eICIC performance requirements (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑126146 | Discussion on the framework of FeICIC demodulation and CSI testing | Huawei, HiSilicon | imported from 3GU |
R4‑126147 | Interference level for FeICIC demodulation performance and CSI testing | Huawei, HiSilicon | imported from 3GU |
R4‑126148 | Correction of R-PDCCH conformance test | Huawei | imported from 3GU |
R4‑126149 | Correction of relay demodulation requirements | Huawei | imported from 3GU |
R4‑126150 | Discussion on the performance requirements for ePDCCH | Huawei, HiSilicon | imported from 3GU |
R4‑126151 | CSI reporting for IDC | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑126152 | Discussion on time drift for Multiflow | Huawei, HiSilicon | imported from 3GU |
R4‑126153 | Discussion on UE performance requirements for Multiflow | Huawei, HiSilicon | imported from 3GU |
R4‑126154 | General discussion on DL CoMP test case design | Huawei, HiSilicon | imported from 3GU |
R4‑126155 | Consideration on CSI tests for DL CoMP | Huawei, HiSilicon | imported from 3GU |
R4‑126156 | Correction on FRC table | Huawei, HiSilicon | imported from 3GU |
R4‑126157 | Correction on FRC table | Huawei, HiSilicon | imported from 3GU |
R4‑126158 | Lower part of B1 usage in Japan | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126159 | Discussion on the Test case of RSRQ measurement | ZTE Corporation | imported from 3GU |
R4‑126160 | Consideration on DL CoMP demodulation tests | ZTE Corporation | imported from 3GU |
R4‑126161 | Simulation Results on Cell Identification for FeICIC | ZTE Corporation | imported from 3GU |
R4‑126162 | On FeICIC RLM tests | ZTE Corporation | imported from 3GU |
R4‑126163 | Simulation results for eICIC RI tests | ZTE Corporation | imported from 3GU |
R4‑126164 | Correction to PCMAX tolerance | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126165 | Correction to PCMAX tolerance | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126166 | Way forward on DL-CoMP RRM core requirements | ZTE Corporation | imported from 3GU |
R4‑126167 | B14 HPUE GPS considerations | Motorola Solutions | imported from 3GU |
R4‑126168 | B14 PSBB HPUE blocking B13 eNB | Motorola Solutions | imported from 3GU |
R4‑126169 | Power Control Sets: A (1A/2A) and B (2A/2B) | Motorola Solutions | imported from 3GU |
R4‑126170 | B14 PSBB HPUE UL to B13 eNodeB co-existence results | Motorola Solutions | imported from 3GU |
R4‑126171 | B14 HPUE way forward | Motorola Solutions | imported from 3GU |
R4‑126172 | Remaining UE core requirements due to introduction of MIMO for HSUPA | Nokia Siemens Networks | imported from 3GU |
R4‑126173 | TP for B14 PSBB HPUE Maximum Output Power (MOP) | Motorola Solutions | imported from 3GU |
R4‑126174 | CR for LTE B14 HPUE (Power Class 1 ) | Motorola Solutions | imported from 3GU |
R4‑126175 | Introduction of UL MIMO to TS 25.101 | Nokia Siemens Networks | imported from 3GU |
R4‑126176 | Introduction of UL MIMO to TS 25.133 | Nokia Siemens Networks | imported from 3GU |
R4‑126177 | Discussion on BS demodulation performance requirements for HSUPA with MIMO | Nokia Siemens Networks | imported from 3GU |
R4‑126178 | Discussion on detailed timing requirements for HSDPA Multiflow | Nokia Siemens Networks | imported from 3GU |
R4‑126179 | Extension of LTE_FDD_1670_US to 1670-1680MHz | LightSquared Inc | imported from 3GU |
R4‑126180 | The special cases for protection of UTRA Band III and Band X in co-existence and co-location with UTRA Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126181 | The special cases for protection of UTRA Band III and Band X in co-existence and co-location with UTRA Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126182 | UTRA FDD Repeater co-existence and co-location with UTRA-TDD and/or E-UTRA TDD Systems: the special case of protection of UTRA TDD Band d) (or E-UTRA Band 38) and E-UTRA Band 43 | Andrew Wireless Systems | imported from 3GU |
R4‑126183 | UTRA FDD Repeater co-existence and co-location with UTRA-TDD and/or E-UTRA TDD Systems: the special case of protection of UTRA TDD Band d) (or E-UTRA Band 38) and E-UTRA Band 43 | Andrew Wireless Systems | imported from 3GU |
R4‑126184 | The special cases for protection of UTRA Band III and Band X in co-existence and co-location with UTRA Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126185 | The special cases for protection of UTRA Band III and Band X in co-existence and co-location with UTRA Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126186 | UTRA FDD Repeater co-existence and co-location with UTRA-TDD and/or E-UTRA TDD Systems: the special case of protection of UTRA TDD Band d) (or E-UTRA Band 38) and E-UTRA Band 43 | Andrew Wireless Systems | imported from 3GU |
R4‑126187 | UTRA FDD Repeater co-existence and co-location with UTRA-TDD and/or E-UTRA TDD Systems: the special case of protection of UTRA TDD Band d) (or E-UTRA Band 38) and E-UTRA Band 43 | Andrew Wireless Systems | imported from 3GU |
R4‑126188 | The special cases for protection of E-UTRA Band 42 in co-existence and co-location with E-UTRA FDD Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126189 | The special cases for protection of E-UTRA Band 42 in co-existence and co-location with E-UTRA FDD Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126190 | The special cases for protection of E-UTRA Band 42 in co-existence and co-location with E-UTRA FDD Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126191 | The special cases for protection of E-UTRA Band 42 in co-existence and co-location with E-UTRA FDD Repeaters | Andrew Wireless Systems | imported from 3GU |
R4‑126192 | Adding references to the appropriate beamforming model (Rel-9) | Rohde & Schwarz | imported from 3GU |
R4‑126193 | Adding references to the appropriate beamforming model (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑126194 | Adding references to the appropriate beamforming model (Rel-11) | Rohde & Schwarz | imported from 3GU |
R4‑126195 | Proposal for Multi_Band and Multi_CA introduction in 36.101 | Vodafone | imported from 3GU |
R4‑126196 | Inter-band CA for Band 8 and Band 20 implementation at the UE and required relaxations | Vodafone | imported from 3GU |
R4‑126197 | Draft WID proposal: LTE Advanced Intra-Band Non-Contiguous Carrier Aggregation in Band 7 | Telecom Italia | imported from 3GU |
R4‑126198 | TP introducing relaxations for Band 8+20 (1UL) in 3GPP TR 36.850 | Vodafone | imported from 3GU |
R4‑126199 | Corrections to the RSTD intra-frequency measurement test parameters (Rel-9) | Rohde & Schwarz | imported from 3GU |
R4‑126200 | Corrections to the RSTD intra-frequency measurement test parameters (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑126201 | Introduction of CA_8_20 RF requirements into TS36.101 | Vodafone | imported from 3GU |
R4‑126202 | Corrections to the RSTD intra-frequency measurement test parameters (Rel-11) | Rohde & Schwarz | imported from 3GU |
R4‑126203 | Meeting minutes of MIMO OTA ad-hoc session RAN4#65 | Vodafone | imported from 3GU |
R4‑126204 | Updated TR 36.977 | Vodafone | imported from 3GU |
R4‑126205 | Proposal for LME LEE TRP requirements | Vodafone | imported from 3GU |
R4‑126206 | Proposal for LME LEE TRS requirements | Vodafone | imported from 3GU |
R4‑126207 | On Transmit Modulation for Intraband Non-Contiguous CA | Rohde & Schwarz | imported from 3GU |
R4‑126208 | Advanced Receiver Link Level Simulations and Impairment Results | Qualcomm Incorporated | imported from 3GU |
R4‑126209 | Evaluation of FRC options for CA power imbalance test | Qualcomm Incorporated | imported from 3GU |
R4‑126210 | Test metric for TM4 RI test | Qualcomm Incorporated | imported from 3GU |
R4‑126211 | Introduction of TM3 demodulation test in high Doppler channel | Qualcomm Incorporated | imported from 3GU |
R4‑126212 | Bandwidth combination for CA demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑126213 | Maintenance of Band 23 UE Coexistence | DISH Network | imported from 3GU |
R4‑126214 | UTRAN CSG Proximity Indication Requirements (Rel-9) | Alcatel-Lucent, Telecom Italia | imported from 3GU |
R4‑126215 | E-UTRAN CSG Proximity Indication Requirements (Rel-9) | Alcatel-Lucent, Telecom Italia | imported from 3GU |
R4‑126216 | Impairment results for advanced receiver in asychronous network | Huawei, HiSilicon | imported from 3GU |
R4‑126217 | Simulation results for advanced receiver type verification | Huawei, HiSilicon | imported from 3GU |
R4‑126218 | UE demodulation performance in non-colocated antenna deployments | Qualcomm Incorporated | imported from 3GU |
R4‑126219 | Introduction of CA_4-12 into TS 36.104 | Huawei, HiSilicon | imported from 3GU |
R4‑126220 | Introduction of CA_4-12 into TS 36.141 | Huawei, HiSilicon | imported from 3GU |
R4‑126221 | Addition of Annexes A.6.4.1.2 and A.6.4.2.2 considering CS+PS RAB combination parameters for "Transport format combination selection in UE" requirement. | AT&T, 7 Layers | imported from 3GU |
R4‑126222 | Introduction of CA_4-12 into TS 36.307 (Rel-10) | Huawei, HiSilicon | imported from 3GU |
R4‑126223 | Introduction of CA_4-12 into TS 36.307 (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑126224 | Introduction of CA_4-12 into TS 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑126225 | Correction of OCNG Patterns for UE Rx - Tx Time Difference Test Cases | Spirent Communications | imported from 3GU |
R4‑126226 | Correction of OCNG Patterns for UE Rx - Tx Time Difference Test Cases | Spirent Communications | imported from 3GU |
R4‑126227 | Correction of OCNG Patterns for UE Rx - Tx Time Difference Test Cases | Spirent Communications | imported from 3GU |
R4‑126228 | Correction of OCNG Patterns for UE Rx - Tx Time Difference Test Cases | Spirent Communications | imported from 3GU |
R4‑126229 | SNR measurement methods in Anechoic Chambers | Spirent Communications | imported from 3GU |
R4‑126230 | Requirements fior Lower Band 1 Usage in Japan | KDDI | imported from 3GU |
R4‑126231 | Requirements fior Lower Band 1 Usage in Japan | KDDI | imported from 3GU |
R4‑126232 | Requirements fior Lower Band 1 Usage in Japan | KDDI | imported from 3GU |
R4‑126233 | [Rel-8] Introduction of Lower Band 1 Requirements into TS36.101 | KDDI | imported from 3GU |
R4‑126234 | Introduction of inter-band CA_11-18 into TS36.101 | KDDI | imported from 3GU |
R4‑126235 | Harmonics and intermodulation products caused by intra-band non-contiguous CA_3 UE | Intel Corporation | imported from 3GU |
R4‑126236 | Introduction of inter-band CA_11-18 into TS36.104 | KDDI | imported from 3GU |
R4‑126237 | Harmonics and intermodulation products caused by intra-band non-contiguous CA_4 UE | Intel Corporation | imported from 3GU |
R4‑126238 | Emulation of DUT Rotation in the Conducted Test of the Absolute Throughput Framework | Intel Corporation | imported from 3GU |
R4‑126239 | TP for TR 37.977 on the Emulation of DUT Rotation in the Conducted Test of the Absolute Throughput Framework | Intel Corporation | imported from 3GU |
R4‑126240 | Introduction of inter-band CA_11-18 into TS36.141 | KDDI | imported from 3GU |
R4‑126241 | CTIA Inter-Lab/Inter-Technique Test Campaign Report: Channel Model Verification and OTA Results | Intel Corporation | imported from 3GU |
R4‑126242 | Necessary Changes for the Support of LTE-A Inter-band Carrier Aggregation of Band 1 and Band 8 | SOFTBANK MOBILE | imported from 3GU |
R4‑126243 | [Rel-10] Introduction of inter-band CA_11-18 into TS36.307 | KDDI | imported from 3GU |
R4‑126244 | On clarification of Japanese regulation on 2.5GHz TDD BS requirement | SOFTBANK MOBILE | imported from 3GU |
R4‑126245 | Further investigation on eICIC RI tests with different interference and noise levels | Intel Corporation | imported from 3GU |
R4‑126246 | Analysis of in-device coexistence | Intel Corporation | imported from 3GU |
R4‑126247 | Further consideration about CA power imbalance test | Intel Corporation | imported from 3GU |
R4‑126248 | [Rel-11] Introduction of inter-band CA_11-18 into TS36.307 | KDDI | imported from 3GU |
R4‑126249 | FeICIC RRM simulation results | Intel Corporation | imported from 3GU |
R4‑126250 | On the performance of cell detection for 9dB CRE | Intel Corporation | imported from 3GU |
R4‑126251 | TP for TR36.8xx (Release12): LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 28 (1UL) | eAccess | imported from 3GU |
R4‑126252 | [Rel-9] Introduction of Lower Band 1 Requirements into TS36.101 | KDDI | imported from 3GU |
R4‑126253 | [Rel-10] Introduction of Lower Band 1 Requirements into TS36.101 | KDDI | imported from 3GU |
R4‑126254 | [Rel-11] Introduction of Lower Band 1 Requirements into TS36.101 | KDDI | imported from 3GU |
R4‑126255 | Investigation of UE performance degradation due to timing offset between transmission points | Intel Corporation | imported from 3GU |
R4‑126256 | Investigation of UE performance degradation due to frequency offset between transmission points | Intel Corporation | imported from 3GU |
R4‑126257 | Cell identification performance with FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126258 | Cell identification requirements in FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126259 | Simulation results for RLM performance of FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126260 | Simulation results for RSRP/RSRQ performance of FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126261 | Discussion on the RSSI definition in FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126262 | Wayforward on RLM/RRM measurement in FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126263 | Wayforward on RRM Test Case Lists of FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126264 | RSRP/RSRQ measurement accuracy requirements in FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑126265 | Discussion on Scell Activation and Core Requirements in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑126266 | Scell Activation Requirements for secondary component carrier with deactivated SCell R10 | Huawei, HiSilicon | imported from 3GU |
R4‑126267 | Scell Activation Requirements for secondary component carrier with deactivated SCell R11 | Huawei, HiSilicon | imported from 3GU |
R4‑126268 | WF on warm start and cold start requirements in CA | Huawei, HiSilicon | imported from 3GU |
R4‑126269 | LS reply on activation time in CA | Huawei, HiSilicon | imported from 3GU |
R4‑126270 | Time offset correction in CA test cases R10 | Huawei, HiSilicon | imported from 3GU |
R4‑126271 | Time offset correction in CA test cases R11 | Huawei, HiSilicon | imported from 3GU |
R4‑126272 | Time offset correction in CA RSTD test cases R10 | Huawei, HiSilicon | imported from 3GU |
R4‑126273 | Time offset correction in CA RSTD test cases R11 | Huawei, HiSilicon | imported from 3GU |
R4‑126274 | Further discussion on the E-CID positioning under handover | Huawei, HiSilicon | imported from 3GU |
R4‑126275 | LS on eCID positioning under handover | Huawei, HiSilicon | imported from 3GU |
R4‑126276 | Discussion on applicable PRS BW for RSTD accuracy requirement | Huawei, HiSilicon | imported from 3GU |
R4‑126277 | Discussion on applicable PRS BW for RSTD accuracy requirement under handover and Pcell changing | Huawei, HiSilicon | imported from 3GU |
R4‑126278 | Clarification on inter-frequency RSTD measurement accuracy requirement R9 | Huawei, HiSilicon | imported from 3GU |
R4‑126279 | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R10 | Huawei, HiSilicon | imported from 3GU |
R4‑126280 | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R11 | Huawei, HiSilicon | imported from 3GU |
R4‑126281 | Clarification on RSTD measurement requirement under HO and Pcell changing R10 | Huawei, HiSilicon | imported from 3GU |
R4‑126282 | Clarification on RSTD measurement requirement under HO and Pcell changing R11 | Huawei, HiSilicon | imported from 3GU |
R4‑126283 | Discussion on the RRM measurements in Phase III in IDC | Huawei, HiSilicon | imported from 3GU |
R4‑126284 | Introduction the IDC requirements in 36.133 Rel-11 | Huawei, HiSilicon | imported from 3GU |
R4‑126285 | Preliminary analysis for ePDCCH impacts on the RRM specifications | Huawei, HiSilicon | imported from 3GU |
R4‑126286 | The correction for band 4-12 combination requirements in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑126287 | LTE Advanced Carrier Aggregation of Band 1 and Band 5 with 2UL | LG Uplus | imported from 3GU |
R4‑126288 | New WI proposal: LTE-Advanced Carrier Aggregation of Band 1 and Band 26 | KDDI | imported from 3GU |
R4‑126289 | Investigation on Rel-10 eICIC RI test 1 and 3 | NEC | imported from 3GU |
R4‑126290 | PDSCH demodulation in Rel-11 FeICIC | NEC | imported from 3GU |
R4‑126291 | Advanced receiver performance impairment results in asynchronous networks | NEC | imported from 3GU |
R4‑126292 | On DL CoMP UE demodulation and CSI performance requirements | NEC | imported from 3GU |
R4‑126293 | P-MPR definition and applicability for HSPA | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126294 | MPR for CLTD activate state 1 | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126295 | On common E-RGCH performance requirement in FE-Cell_FACH | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126296 | Corrections on Relay backhaul link R-PDCCH performance | CATT | imported from 3GU |
R4‑126297 | Corrections on Relay backhaul link R-PDCCH performance | CATT | imported from 3GU |
R4‑126298 | Considerations on TM4 rank indicator test | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126299 | Further simulation results for Rel-10 eICIC RI Test 1 | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126300 | Simulation results for UE performance in non-quasi-colocated antenna deployments | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126301 | Simulation results and considerations on Rel-11 feICIC RLM | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126302 | On the impact of time and frequency tracking to CRS-IC | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126303 | Alignment simulation results for Test 1 of Advanced receiver (FDD) | LG Electronics | imported from 3GU |
R4‑126304 | Framework document for advanced receivers work item (rev. 4) | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126305 | Simulation results for additional requirements for enhanced receiver Type A (FDD) | LG Electronics | imported from 3GU |
R4‑126306 | Summary of alignment and impairment results (FDD) | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126307 | Summary of alignment and impairment results (TDD) | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126308 | Summary of results for receiver type verification for demodulation and CSI reporting | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126309 | Alignment and impairment results for advanced receivers (FDD/TDD) | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126310 | Finalization of the framework receiver type verification and CSI reporting | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126311 | Introduction of advanced receivers demodulation performance (FDD) | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126312 | Contiguous allocation MPR for Non-contiguous intra-band CA | ZTE | imported from 3GU |
R4‑126313 | Introduction of performance requirements for verifying the receiver type for advanced receivers (FDD/TDD) | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126314 | MPR mask for Non-contiguous intra-band CA clusters transmission | ZTE | imported from 3GU |
R4‑126315 | TP on MPR mask for NC intra-band CA | ZTE | imported from 3GU |
R4‑126316 | Transmit intermodulation for non-contiguous intra-band CA | ZTE | imported from 3GU |
R4‑126317 | TP on transmit intermodulation for non-contiguous intra-band CA | ZTE | imported from 3GU |
R4‑126318 | REFSENS with one 1 UL for non-contiguous intra-band CA | ZTE | imported from 3GU |
R4‑126319 | On RF requirements with consideration of structures for MB-MSR BS and other BS | NTT DOCOMO | imported from 3GU |
R4‑126320 | Introduction of new BS classes to TS37.141 (Transmitter part) | Huawei, Alcatel-Lucent, CATT, Ericsson, Nokia Siemens Networks, ZTE | imported from 3GU |
R4‑126321 | ACS for non-contiguous intra-band CA | ZTE | imported from 3GU |
R4‑126322 | TP on ACS for non-contiguous intra-band CA | ZTE | imported from 3GU |
R4‑126323 | TR37.840 ver 040 | Huawei | imported from 3GU |
R4‑126324 | Update of the SI plan | Huawei | imported from 3GU |
R4‑126325 | Review of the requirements and antenna for legacy BS | Huawei | imported from 3GU |
R4‑126326 | Summary of the methodologies for AAS study | Huawei | imported from 3GU |
R4‑126327 | CR for 36.133 Introduction of test cases of RSRQ WB measurement | ZTE | imported from 3GU |
R4‑126328 | Output power requirements for AAS | Huawei | imported from 3GU |
R4‑126329 | ACLR requirements for AAS | Huawei | imported from 3GU |
R4‑126330 | Spurious emission requirements for AAS | Huawei | imported from 3GU |
R4‑126331 | EVM requirements for AAS | Huawei | imported from 3GU |
R4‑126332 | Reference sensitivity requirements for AAS | Huawei | imported from 3GU |
R4‑126333 | In-band blocking requirements for AAS | Huawei | imported from 3GU |
R4‑126334 | TP on reverberation chamber OTA test for AAS | Huawei | imported from 3GU |
R4‑126335 | CR to remove the square bracket of A-MPR in TS36.101 | Huawei, HiSilicon, and Nokia | imported from 3GU |
R4‑126336 | CR to capture the simulation results of A-MPR to TR36.830 | Huawei, HiSilicon, and Nokia | imported from 3GU |
R4‑126337 | Updated TR 37.812 v0.3.0 | Huawei | imported from 3GU |
R4‑126338 | Update of MSR specification (Section 1) due to introduction of MB-MSR BS | Huawei | imported from 3GU |
R4‑126339 | How to apply MB-MSR requirements to the antenna connector(s) | Huawei | imported from 3GU |
R4‑126340 | Introduction of MB-MSR to MSR specification (Clause 6) | Huawei, Alcatel-Lucent, CATT, Ericsson, Nokia Siemens Networks, ZTE | imported from 3GU |
R4‑126341 | TP on open issue of In-band blocking for MB-MSR BS | Huawei | imported from 3GU |
R4‑126342 | TP on Manufacturer's declaration | Huawei | imported from 3GU |
R4‑126343 | General consideration on MB-MSR test method | Huawei | imported from 3GU |
R4‑126344 | Simulation results for RSRP and RSRQ measurement accuracy of FeICIC | LG Electronics | imported from 3GU |
R4‑126345 | Further consideration on MB-MSR BS test configurations | Huawei | imported from 3GU |
R4‑126346 | TP on RF channels for MB-MSR BS | Huawei | imported from 3GU |
R4‑126347 | Simulation Results for RLM in FeICIC | LG Electronics | imported from 3GU |
R4‑126348 | Correction of some errors in reference sensitivity for CA in TS 36.101 (R11) | Huawei, HiSilicon | imported from 3GU |
R4‑126349 | Handling of Band34 protection limit | NTT DOCOMO | imported from 3GU |
R4‑126350 | MDT Impact Rel-11 | MediaTek | imported from 3GU |
R4‑126351 | Introduction of MDT enhancements | MediaTek | imported from 3GU |
R4‑126352 | Introduction of MDT enhancements | MediaTek | imported from 3GU |
R4‑126353 | Introduction of MDT enhancements | MediaTek | imported from 3GU |
R4‑126354 | Handling of Class A1 and A5 CA combination | NTT DOCOMO | imported from 3GU |
R4‑126355 | Transmitter IM correction for MSR-NC | Ericsson | imported from 3GU |
R4‑126356 | Transmitter IM correction for MSR-NC | Ericsson | imported from 3GU |
R4‑126357 | Transmitter IM correction for MSR-NC | Ericsson | imported from 3GU |
R4‑126358 | Transmitter IM correction for MSR-NC | Ericsson | imported from 3GU |
R4‑126359 | Correction on test cases for handover to UTRAN TDD for Rel-8 | CATT | imported from 3GU |
R4‑126360 | Correction on test cases for handover to UTRAN TDD for Rel-9 | CATT | imported from 3GU |
R4‑126361 | Correction on test cases for handover to UTRAN TDD for Rel-10 | CATT | imported from 3GU |
R4‑126362 | Consideration on MOP lower tolerance for multiple bands | NTT DOCOMO | imported from 3GU |
R4‑126363 | Correction on test cases for handover to UTRAN TDD for Rel-11 | CATT | imported from 3GU |
R4‑126364 | Further discussion on SCell activation delay | CATT | imported from 3GU |
R4‑126365 | Introduction of new BS classes to MSR test specification (receiver part) | Ericsson, Huawei, Nokia Siemens Networks, Alcatel-Lucent, ZTE, CATT | imported from 3GU |
R4‑126366 | Introduction of new BS classes to E-UTRA core specification (performance part) | Ericsson, NTT DOCOMO | imported from 3GU |
R4‑126367 | Introduction of new BS classes to E-UTRA test specification (performance part) | Ericsson, NTT DOCOMO | imported from 3GU |
R4‑126368 | Out of band blocking for inter band CA | NTT DOCOMO | imported from 3GU |
R4‑126369 | Modificaiton on ACLR requirement | CATT | imported from 3GU |
R4‑126370 | Introduction of MB-MSR to MSR core specification (Clause 7) | Ericsson, Huawei, Nokia Siemens Networks, ZTE, CATT | imported from 3GU |
R4‑126371 | TP for Mapping of requirements on antenna ports | Ericsson | imported from 3GU |
R4‑126372 | Out of band blocking for inter band CA | NTT DOCOMO | imported from 3GU |
R4‑126373 | Out of band blocking for inter band CA | NTT DOCOMO | imported from 3GU |
R4‑126374 | TP on PIM requirement for BS | Ericsson | imported from 3GU |
R4‑126375 | TP on Testing aspects for PIM | Ericsson | imported from 3GU |
R4‑126376 | Removal of conflicts in ACLR requirement | CATT | imported from 3GU |
R4‑126377 | Removal of conflicts in ACLR requirement | CATT | imported from 3GU |
R4‑126378 | E-UTRA MR BS receiver requirement | CATT, Alcatel-Lucent, Ericsson, Huawei, Nokia Siemens Networks, ZTE | imported from 3GU |
R4‑126379 | Applicability of requirements for MB-MSR | CATT, Ericsson, Huawei, Nokia Siemens Networks, ZTE | imported from 3GU |
R4‑126380 | Modificaiton on ACLR requirement | CATT | imported from 3GU |
R4‑126381 | PHS protection from LTE Band 1 | NTT DOCOMO | imported from 3GU |
R4‑126382 | Discussion on CLTD MPR requirement | Huawei, HiSilicon | imported from 3GU |
R4‑126383 | More considerations on additional channel bandwidths to existing bands | CHTTL | imported from 3GU |
R4‑126384 | CR to TS 25.101 due to introduction of CLTD | Huawei, HiSilicon | imported from 3GU |
R4‑126385 | Updated LTE450 TR | Huawei, HiSilicon | imported from 3GU |
R4‑126386 | Correction for IDC CSI reporting | Huawei, HiSilicon, CMCC | imported from 3GU |
R4‑126387 | BS Coexistence with TV repeater | Huawei | imported from 3GU |
R4‑126388 | Further consideration on the frequency band arrangement | Huawei | imported from 3GU |
R4‑126389 | Discussion on BS RF requirements | Huawei | imported from 3GU |
R4‑126390 | Discussion on impact of timing error due to non-co-located antennas | Huawei, HiSilicon | imported from 3GU |
R4‑126391 | Initial discussion on UE RF requirements | Huawei, HiSilicon | imported from 3GU |
R4‑126392 | Introduction of Advanced Receivers Test Cases for TDD | CATT | imported from 3GU |
R4‑126393 | Discussion on impact of frequency error due to non-co-located antennas | Huawei, HiSilicon | imported from 3GU |
R4‑126394 | Framework document for geographically separated antenna and impact on UE demod/CSI requirements (Version 1) | Huawei, HiSilicon | imported from 3GU |
R4‑126395 | Half-duplex and full-duplex UEs for inter-band B39+B41 | Huawei, HiSilicon | imported from 3GU |
R4‑126396 | Text proposal for TR37.840 Subclause 9 | Huawei | imported from 3GU |
R4‑126397 | Simulation results for advanced receiver TDD CSI test | CATT | imported from 3GU |
R4‑126398 | Additional IL for band 39+41 | Huawei, HiSilicon | imported from 3GU |
R4‑126399 | Discussion on TM4 rank indicator test | Huawei, HiSilicon | imported from 3GU |
R4‑126400 | Additional IL for band 2+4 | Huawei, HiSilicon | imported from 3GU |
R4‑126401 | WF on performance requirements for CLTD | Huawei, HiSilicon | imported from 3GU |
R4‑126402 | B1 emission requirements for protecting PHS in Japan | Huawei, HiSilicon | imported from 3GU |
R4‑126403 | Relation between Pcmax tolerance and MOP relaxation | NTT DOCOMO | imported from 3GU |
R4‑126404 | B1 and PHS coexistence emission requirements for 36.101 | Huawei, HiSilicon | imported from 3GU |
R4‑126405 | Simulation results for coexistence studies of Band 14 +31dBm HPUE | General Dynamics Broadband | imported from 3GU |
R4‑126406 | A-MPR simulation results for 15MHz and 20MHz in Band 23 | Huawei, HiSilicon | imported from 3GU |
R4‑126407 | Interband CA B2+B4 UE issues | Nokia Corporation | imported from 3GU |
R4‑126408 | CA enhancements TR 36.823 v0.3.0 | Nokia Corporation | imported from 3GU |
R4‑126409 | Adoption of TDD frequency arrangement in 2.6GHz band in China | CMCC | imported from 3GU |
R4‑126410 | Data browsing mode measurement uncertainty | Nokia Corporation | imported from 3GU |
R4‑126411 | Data browsing mode measurement uncertainty | Nokia Corporation | imported from 3GU |
R4‑126412 | Revise WID: LTE-Advanced Carrier Aggregation of Band 39 and Band 41 | CMCC | imported from 3GU |
R4‑126413 | UE MOP and REFSENS relaxations due to interband multi combo, multi RAT relaxations and multiband support | Nokia Corporation, Renesas Mobile Europe | imported from 3GU |
R4‑126414 | UE MOP and REFSENS relaxations due to interband multi combo, multi RAT relaxations and multiband support REL-11 CAT -A | Nokia Corporation, Renesas Mobile Europe | imported from 3GU |
R4‑126415 | NC-Intraband CA MPR simulations vs. measurements | Nokia Corporation | imported from 3GU |
R4‑126416 | NC-intraband CA MOP | Nokia Corporation | imported from 3GU |
R4‑126417 | NC-intraband CA frequency error | Nokia Corporation | imported from 3GU |
R4‑126418 | CA_NS_02 and CA_NS_03 update REL-10 | Nokia Corporation | imported from 3GU |
R4‑126419 | CA_NS_02 and CA_NS_03 update | Nokia Corporation | imported from 3GU |
R4‑126420 | FDD and TDD impairment results for adavanced receiver | Samsung | imported from 3GU |
R4‑126421 | BW combination set table clean-up REL-11 | Nokia Corporation | imported from 3GU |
R4‑126422 | Discussion and simulation results for timing offset on non-collocated antennas | Samsung | imported from 3GU |
R4‑126423 | Adjacent UL/DL bands | Motorola Solutions | imported from 3GU |
R4‑126424 | Discussion and simulation results for frequency offset on non-collocated antennas | Samsung | imported from 3GU |
R4‑126425 | System simulation input on UE performance requirements for Mulitflow | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126426 | MIMO OTA test method completion in release 11 | Nokia Corporation | imported from 3GU |
R4‑126427 | MIMO OTA AWGN measurements | Nokia Corporation | imported from 3GU |
R4‑126428 | Clarifications of applicability of requirements for multi-carrier BS | Alcatel-Lucent | imported from 3GU |
R4‑126429 | NC-intraband CA ON/OFF time mask | Nokia Corporation | imported from 3GU |
R4‑126430 | Initial Cell Identificaiton performance with FeICIC | Samsung | imported from 3GU |
R4‑126431 | NC-Intraband CA un-equal PSD MPR | Nokia Corporation | imported from 3GU |
R4‑126432 | Text Proposal on Coexistence Studies of Harmonics and Intermodulation Products for Band Combination (3 + 5) | Alcatel-Lucent, SK Telecom | imported from 3GU |
R4‑126433 | New study item proposal Positioning enhancements for E-UTRA | Huawei, HiSilicon | imported from 3GU |
R4‑126434 | NC-intraband CA zero gap | Nokia Corporation | imported from 3GU |
R4‑126435 | NC-Intraband CA 1 UL REFSENS | Nokia Corporation | imported from 3GU |
R4‑126436 | Simulation results for intra-band CA power imbalance with new FRCs | CMCC | imported from 3GU |
R4‑126437 | MIMO 64-QAM: Rel-11 limited scope to QPSK and 16-QAM modulations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126438 | Introduction of medium range BS class to TS 36.141 (clause 1-5) | Alcatel-Lucent, CATT, Ericsson, Huawei, Nokia Siemens Networks, ZTE | imported from 3GU |
R4‑126439 | Considerations on activation time for CA | Samsung | imported from 3GU |
R4‑126440 | Overview of UL MIMO performance requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126441 | Way forward on RFPM SI | Huawei, HiSilicon, Polaris Wireless | imported from 3GU |
R4‑126442 | Way Forward on UL CLTD BS performance requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126443 | Discussion on wider bandwidth RSRQ measurement | Huawei, HiSilicon | imported from 3GU |
R4‑126444 | Introduction of multi-band BS to TS 36.104 | Alcatel-Lucent, Nokia Siemens Networks | imported from 3GU |
R4‑126445 | Recommendations on ACLR for Public Safety Broadband High Power UE | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑126446 | Additional simulation results on BS blocking for Public Safety Broadband High Power UE | Alcatel-Lucent | imported from 3GU |
R4‑126447 | Simulation results for eICIC RI reporting test | Fujitsu | imported from 3GU |
R4‑126448 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (3 + 26) | Alcatel-Lucent, KT | imported from 3GU |
R4‑126449 | Simulation results for TM4 RI reporting test | Fujitsu | imported from 3GU |
R4‑126450 | Recommendations on PIM requirements for BS | Alcatel-Lucent | imported from 3GU |
R4‑126451 | Simulation results for CA power imbalance requirement | Fujitsu | imported from 3GU |
R4‑126452 | Draft LS on activation time and pre-activation in CA | Samsung | imported from 3GU |
R4‑126453 | Alignment and impairment results for advanced receiver demodulation tests | Fujitsu | imported from 3GU |
R4‑126454 | Framework of CSI test for downlink CoMP | Samsung | imported from 3GU |
R4‑126455 | Simulation results for advanced receiver type verification | Fujitsu | imported from 3GU |
R4‑126456 | Link level simulation results for feICIC cell detection | Fujitsu | imported from 3GU |
R4‑126457 | Link level simulation results for feICIC measurement | Fujitsu | imported from 3GU |
R4‑126458 | Guideline for specifying AAS requirements | Huawei | imported from 3GU |
R4‑126459 | Considerations on requirements for 2/10ms TTI selection | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126460 | Cell phase syncronisation for feICIC | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126461 | Evaluation of feICIC Cell Search with PSS/SSS cancellation | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126462 | Analysis of RAN4 requirements for in device coexistence (IDC) | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126463 | Measurement performance requirements for configured carriers in multicarrier HSDPA without compressed mode | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126464 | Proposals for completion of work on SCell activation timing | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126465 | Further considerations on UE capabilies for release 11 in RAN4 | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126466 | Requirements and testing for wideband RSRQ | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126467 | RSRQ defintion for wideband RSRQ | Renesas Mobile Europe Ltd | imported from 3GU |
R4‑126468 | Analysis on typical value for DL CoMP test cases | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑126469 | Allowing two antenna ports configuration in TAE test procedure for MIMO and Tx diversity | Nokia Siemens Networks, Rohde&Schwarz, CATT, CATR | imported from 3GU |
R4‑126470 | Considerations on the non-collocation test cases | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑126471 | Discussion on PBCH IC performance test case assumptions | Nokia Siemens Networks, Nokia Corporation | imported from 3GU |
R4‑126472 | Simulation results of new FRC proposals for power imbalance test under CA | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126473 | Summary of alignment results for new FRC proposals on power imbalance test for CA | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126474 | Proposal on CA demodulation test for more bandwidth combinations in Rel-11 | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126475 | Impairment results for TM2/TM3 test for advanced receiver under asynchronous network | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126476 | Alignment results for additional test to verify receiver type | ST-Ericsson, Ericsson | imported from 3GU |
R4‑126477 | Issue on RSRQ measurement accuracy in RRC_IDLE state | NTT DOCOMO | imported from 3GU |
R4‑126478 | Discussion for measurements without gaps testing | NTT DOCOMO | imported from 3GU |
R4‑126479 | Test specification for measurements without gaps | NTT DOCOMO | imported from 3GU |
R4‑126480 | Test specification for measurements without gaps | NTT DOCOMO | imported from 3GU |
R4‑126481 | TP of a file format example header for TR 37.977 on antenna pattern data format (TR Clause 9.3.2) | ATR | imported from 3GU |
R4‑126482 | DL CoMP impact on BS performance | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126483 | Analysis of RRM requirements under IDC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126484 | Measurement gap clarification in case of carrier aggregation | Nokia Corporation | imported from 3GU |
R4‑126485 | Simulation results on asynchronous network for MMSE IRC receiver | NTT DOCOMO | imported from 3GU |
R4‑126486 | RRM requirements under IDC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126487 | Simulation results for receiver type testing for MMSE IRC receiver | NTT DOCOMO | imported from 3GU |
R4‑126488 | Discussion for wideband RSRQ measurement for IDLE states | NTT DOCOMO | imported from 3GU |
R4‑126489 | Proximity Indication | Nokia Corporation | imported from 3GU |
R4‑126490 | Discussion for test condition on wideband RSRQ measurement | NTT DOCOMO | imported from 3GU |
R4‑126491 | LS on wideband RSRQ measurement | NTT DOCOMO | imported from 3GU |
R4‑126492 | LS on CA activation/ de-activation time | NTT DOCOMO | imported from 3GU |
R4‑126493 | Further simulation results on FeICIC cell detection | MediaTek | imported from 3GU |
R4‑126494 | Link level simulation results on PBCH-IC receiver | MediaTek | imported from 3GU |
R4‑126495 | Discussion for receiver timing window on intra-band non-contiguous CA | NTT DOCOMO | imported from 3GU |
R4‑126496 | LS for receiver timing window on intra-band non-contiguous CA | NTT DOCOMO | imported from 3GU |
R4‑126497 | Simulation results for RI testing | NTT DOCOMO | imported from 3GU |
R4‑126498 | Scell activation time discussion | Nokia Corporation | imported from 3GU |
R4‑126499 | Discussion for CoMP deployment scenarios and BS requirements | NTT DOCOMO | imported from 3GU |
R4‑126500 | Discussion for RSRQ definition on FeICIC | NTT DOCOMO | imported from 3GU |
R4‑126501 | Clarification of configured maximum output power for LTE CA inter-band case with multiple timing advance groups (TAGs) | InterDigital | imported from 3GU |
R4‑126502 | Wider bandwidth RSRQ Measurements for Idle mode | Nokia Corporation, Nokia Siemens Networks | imported from 3GU |
R4‑126503 | P-MPR for HSPA – applicability, proposed definition | InterDigital, Deutche Telekom | imported from 3GU |
R4‑126504 | Discussion on RSRQ Measurements | Nokia Corporation | imported from 3GU |
R4‑126505 | P-MPR for HSPA – specifications impact text proposals | InterDigital | imported from 3GU |
R4‑126506 | [draft] LS on P-PMR adoption impact on specifications | InterDigital | imported from 3GU |
R4‑126507 | Capturing RRM measurement requirements in IDC situation | Nokia Corporation | imported from 3GU |
R4‑126508 | Draft TR for intra-band, non-contiguous CA in band 3 | SK Telecom | imported from 3GU |
R4‑126509 | 1)^^Link level performance for asynchronous FDD with TM2 and impairments, using interference rejection UE receivers | Nokia Corporation | imported from 3GU |
R4‑126510 | Signaling Updates for EPDCCH | Alcatel-Lucent | imported from 3GU |
R4‑126511 | RRM Core Requirements for EPDCCH | Alcatel-Lucent | imported from 3GU |
R4‑126512 | RF Core Requirements for EPDCCH | Alcatel-Lucent | imported from 3GU |
R4‑126513 | Way forward of LTE_CA_C_B3 | China Unicom | imported from 3GU |
R4‑126514 | TP on In-band blocking wanted signal level | Ericsson | imported from 3GU |
R4‑126515 | AAS Requirements | Alcatel-Lucent | imported from 3GU |
R4‑126516 | Spectrum and regulation review for LTE_CA_C_B3 | China Unicom | imported from 3GU |
R4‑126517 | Discussion on inter-band carrier aggregation of band 3 and band 5 with 2UL | SK Telecom | imported from 3GU |
R4‑126518 | In-Band Blocking Simulation Results | Alcatel-Lucent | imported from 3GU |
R4‑126519 | Draft LS response to WP5D on the use of IMT for broadband PPDR applications | Motorola Solutions | imported from 3GU |
R4‑126520 | Combined OTA-Conducted Test | Alcatel-Lucent | imported from 3GU |
R4‑126521 | Calibration and measurement uncertainty in the two-channel method | Rohde & Schwarz | imported from 3GU |
R4‑126522 | TR 36.8xx V0.1.0(2012-11) for LTE_CA_C_B3 | China Unicom | imported from 3GU |
R4‑126523 | Side conditions defining in FeICIC performance tests | Ericsson, ST Ericsson | imported from 3GU |
R4‑126524 | Link level simulation results for RLM | Ericsson, ST Ericsson | imported from 3GU |
R4‑126525 | Requirements for Network Controlled Mobility in Enhanced CELL_FACH | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126526 | 2/10msec TTI selection in Enhanced CELL_FACH | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126527 | 2/10msec TTI selection in Enhanced CELL_FACH | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126528 | The transmission issue of PSS/SSS/PBCH/SIB-1 in ABS for FeICIC requirements definition | Ericsson, ST Ericsson | imported from 3GU |
R4‑126529 | Performance requirement for 2/10msec TTI selection when operating Enhanced Uplink in CELL_FACH or idle mode | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126530 | Remaining work for Enhanced CELL_FACH in RAN4 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126531 | Further discussion on reference Receiver for FeICIC | Ericsson, ST Ericsson | imported from 3GU |
R4‑126532 | AAS classification | Nokia Siemens Networks | imported from 3GU |
R4‑126533 | Simulation results for RI in eICIC | Ericsson, ST Ericsson | imported from 3GU |
R4‑126534 | Reference sensitivity requirement definition | Ericsson | imported from 3GU |
R4‑126535 | Reference point for AAS receiver requirements | Nokia Siemens Networks | imported from 3GU |
R4‑126536 | AAS test methods comparison | Nokia Siemens Networks | imported from 3GU |
R4‑126537 | AAS study item completion | Nokia Siemens Networks | imported from 3GU |
R4‑126538 | PIM in AAS deployments | Nokia Siemens Networks | imported from 3GU |
R4‑126539 | PIM in Local Area and Medium Range BS deployments | Nokia Siemens Networks | imported from 3GU |
R4‑126540 | RFPM Simulation Results | Polaris Wireless | imported from 3GU |
R4‑126541 | Output power requirements definition | Ericsson | imported from 3GU |
R4‑126542 | Protection of legacy Band 25 UE's from simulated Band 23 UE's | Sprint | imported from 3GU |
R4‑126543 | Receiver blocking requirements definition | Ericsson | imported from 3GU |
R4‑126544 | ACLR requirement definition | Ericsson | imported from 3GU |
R4‑126545 | Unwanted emissions requirements definition | Ericsson | imported from 3GU |
R4‑126546 | Band 23 / 25 open issues | Sprint | imported from 3GU |
R4‑126547 | Way forward for AAS | Ericsson | imported from 3GU |
R4‑126548 | On the inclusion of radiating elements for AAS | Ericsson | imported from 3GU |
R4‑126549 | Further elaboration on spatial EVM for AAS | Ericsson | imported from 3GU |
R4‑126550 | EVM requirements definition | Ericsson | imported from 3GU |
R4‑126551 | TP: Requirement and test point approach for AAS | Ericsson | imported from 3GU |
R4‑126552 | UTRAN FDD Proximity Indication Test Case (Rel-9) | Alcatel-Lucent | imported from 3GU |
R4‑126553 | E-UTRAN FDD Proximity Indication Test Case (Rel-9) | Alcatel-Lucent | imported from 3GU |
R4‑126554 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126555 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126556 | Establish OOBE limit from Band 23 into Band 25 | Sprint | imported from 3GU |
R4‑126557 | Text Proposal for TR 37.977 on the Definition of 3D Isotropic Channel Models | Bluetest AB | imported from 3GU |
R4‑126558 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126559 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126560 | Text Proposal for TR 37.977 on the Verification Procedure for the 3D Isotropic Channel Models | Bluetest AB | imported from 3GU |
R4‑126561 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126562 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T, Nokia Corporation | imported from 3GU |
R4‑126563 | Correction to RRM Measurement Requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126564 | Advanced Receiver CSI Simulations and Impairment Results | Qualcomm Incorporated | imported from 3GU |
R4‑126565 | Correction to RRM Measurement Requirements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126566 | Agreements on Wideband RSRQ | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126567 | Wideband RSRQ in Low Activity States | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126568 | Analysis of Requirements for Wideband RSRQ | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126569 | Need for E-CID Test Cases for eICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126570 | E-CID Test Case List for eICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126571 | TP on Section 5.4.4.2. for general parameters on the AAS antenna model | Kathrein | imported from 3GU |
R4‑126572 | SCell Activation Delay in CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126573 | Low-channel Band 1 coexistence with PHS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126574 | Approach for defining RRM Test Cases for 20 MHz in CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126575 | RRM Test Case List for 20 MHz in CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126576 | Low-channel Band 1 coexistence with PHS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126577 | TP on Section 6.2. Measurements results for a conversion factor between CW-carriers and modulated carriers | Kathrein | imported from 3GU |
R4‑126578 | Low-channel Band 1 coexistence with PHS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126579 | Low-channel Band 1 coexistence with PHS | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126580 | First Measurement results on 2nd Order Passive Inter Modulation | Kathrein | imported from 3GU |
R4‑126581 | Replace TBD with final requirements for PUCCH format 2 with DTX detection | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126582 | Pcmax for bands with reduced MOP lower tolerance | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126583 | Removal of brackets around medium correlation in table | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126584 | Removal of brackets around medium correlation in table | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126585 | Modification of Pcmax to account for reduced maximum power tolerance | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126586 | REFSENS with one UL carrier for NC intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126587 | Removal of brackets around medium correlation in table | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126588 | ACS requirements for NC intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126589 | In-band blocker requirements for NC intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126590 | Modification of Pcmax to account for reduced maximum power tolerance | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126591 | Removal of brackets around medium correlation in table | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126592 | Out-of-band blocking for inter-band CA and the test time | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126593 | Transmitter intermodulation for NC intra-band CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126594 | Frequency error for NC intra-band CA | Ericsson, ST-Ericsson, Nokia Corporation | imported from 3GU |
R4‑126595 | Change to CA combination list from table to reference | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126596 | Band 26: A-MPR for 'NS_15' further simplified | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126597 | Clarification on RPD distribution | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126598 | Band 26: modification of A-MPR for 'NS_15' | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126599 | Change to CA combination list from table to reference | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126600 | Update CA reference to include Non Contiguous CA band combinations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126601 | Completion of the tables of bandwidth combinations specified for CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126602 | TAE for interband CA | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126603 | More on MOP requirements for UE supporting multiple CA combinations | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126604 | Exceptions to REFSENS requrirements for class A2 CA combinations | Ericsson, ST-Ericsson, Qualcomm Incorporated | imported from 3GU |
R4‑126605 | TP to 36.850: additional insertion loss for configuration CA_4A-7A | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126606 | eICIC RI test with low interference level | Qualcomm Incorporated | imported from 3GU |
R4‑126607 | Introduction of carrier aggregation configuration CA_4-7 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126608 | FeICIC link level simulations and framework for demod/CSI | Qualcomm Incorporated | imported from 3GU |
R4‑126609 | Cell identification simulations based on proposed side conditions | Qualcomm Incorporated | imported from 3GU |
R4‑126610 | RLM evaluation results for feICIC | Qualcomm Incorporated | imported from 3GU |
R4‑126611 | Simulation Assumptions for PBCH requirement in FeICIC | Qualcomm Incorporated | imported from 3GU |
R4‑126612 | On DL CoMP Performance Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126613 | Release-independent implementation of carrier aggregation configuration CA_4-7 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126614 | Release-independent implementation of carrier aggregation configuration CA_4-7 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126615 | More on the in-band blocking requirement for the DL700 band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126616 | Theoretical aspects of PIM generation | Nokia Siemens Networks, Kathrein | imported from 3GU |
R4‑126617 | On inter-frequency RSTD | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126618 | LS on inter-frequency RSTD measurements | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126619 | Editorial corrections RRM | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126620 | Editorial corrections RRM | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126621 | Conditions in CSG reselection requirements | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126622 | Conditions in CSG reselection requirements | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126623 | TP for Relay Conformance Testing Updates | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126624 | Conditions in CSG reselection requirements | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126625 | Conditions in CSG reselection requirements | Ericsson, ST-Ericsson, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126626 | Pilots power accuracy | Ericsson | imported from 3GU |
R4‑126627 | Updated version of Relay Conformance Test Specification | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126628 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | Ericsson, ST-Ericsson, CATT, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126629 | Consideration on manufacturer's declaration and test configuration for MB-MSR | CATT | imported from 3GU |
R4‑126630 | Relative Code Domain Error | Ericsson | imported from 3GU |
R4‑126631 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | Ericsson, ST-Ericsson, CATT, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126632 | Introduction of 4X4MIMO | Ericsson | imported from 3GU |
R4‑126633 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | Ericsson, ST-Ericsson, CATT, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126634 | TP for Additional Relay Conformance Testing Upates | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126635 | Discussion on BS performance requirements for multiflow | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126636 | Correcting inconsistency between inter-RAT UTRA measurements and requirements | Ericsson, ST-Ericsson, CATT, Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126637 | Refsens requirements for CA capable UE | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126638 | Performance requirements for non contiguous carrier aggregation | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126639 | Throughput measurements with Band 7 phones using MOSG Reference Antennas | Sony Europe, Elektrobit Corporation | imported from 3GU |
R4‑126640 | Rank Test for TM4 | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126641 | Refsens requirements for CA capable UE | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126642 | High Doppler test | Ericsson/St-Ericsson | imported from 3GU |
R4‑126643 | On interruption with RSTD measurements for CA UEs | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126644 | Clean up CR for Rel-8 | Ericsson/ST-Ericcson | imported from 3GU |
R4‑126645 | Interruption with RSTD measurements for CA UEs | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126646 | Throughput measurements with Band 13 phones under SCME UMi & UMa channel models | Sony Europe, Elektrobit Corporation | imported from 3GU |
R4‑126647 | Simulation results for FDD test 1 with impairment | Intel Corporation | imported from 3GU |
R4‑126648 | Clean up CR for Rel_9 | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126649 | Simulation results and proposed test point for receiver type verification and CSI reporting | Intel Corporation | imported from 3GU |
R4‑126650 | Performance results for timing offset under non colocation assumptions | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126651 | Two-stage MIMO Reference Antenna Test Results update | Agilent Technologies, CATR | imported from 3GU |
R4‑126652 | Interruption with RSTD measurements for CA UEs | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126653 | Band 1 coexistence with Band34 | Fujitsu | imported from 3GU |
R4‑126654 | On intra-frequency RSTD accuracy requirements account for serving cell bandwidth | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126655 | Performance results for frequency error under non colocation assumptions | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126656 | Intra-frequency RSTD accuracy requirements account for serving cell bandwidth | Ericsson, ST-Ericsson, Qualcomm Inc., LGE, Renesas Mobile Europe Ltd., Motorola Mobility, Samsung | imported from 3GU |
R4‑126657 | Working Assumption on Maximum TA for TDD based on SSC | Fujitsu | imported from 3GU |
R4‑126658 | Clarification on the total number of cells for RSTD inter-frequency measurement | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126659 | Way forward for BS core requirements under Comp | Ericsson/St-Ericsson | imported from 3GU |
R4‑126660 | Link simulation results for cell detection with FeICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126661 | Way forward for definition of performance requirements for Comp and Quasi colocated antennas | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126662 | Clarification of Doppler shift for moving propagation conditions test | Agilent Technologies | imported from 3GU |
R4‑126663 | Proposal for PDSCH performance requirement definition | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126664 | Summary of cell detection results with FeICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126665 | Proposal for CSI performance definition | Ericsson/St-Ericsson | imported from 3GU |
R4‑126666 | Framework for analyzing the cost of MIMO OTA test methods | Agilent Technologies | imported from 3GU |
R4‑126667 | Link simulation results for RSRP and RSRQ with FeICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126668 | Om measurement requirements with FeICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126669 | Simulation results for CA power imbalanced cases | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126670 | Overview of ePDCCH impact on requirements | Ericsson/St-Ericsson | imported from 3GU |
R4‑126671 | Reducing MPR for Multi-Cluster Transmissions | Motorola Mobility | imported from 3GU |
R4‑126672 | On RLM requirements with FeICIC | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126673 | Test coverage for new band combinations | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126674 | Simulation results for average received timing for Comp scenarios | Ericsson/ST-Ericsson | imported from 3GU |
R4‑126675 | Clarification of the TDM pattern conditions | Ericsson, ST-Ericsson, ALU, Samsung | imported from 3GU |
R4‑126676 | Consideration on tests for HSPA multiflow | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126677 | Clarification of the TDM pattern conditions | Ericsson, ST-Ericsson, ALU, Samsung | imported from 3GU |
R4‑126678 | DL CoMP performance requirements | Renesas Mobile Europe Ltd. | imported from 3GU |
R4‑126679 | On MDT requirements in Rel-11 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126680 | MDT requirements in Rel-11 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126681 | MDT requirements in Rel-11 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126682 | MDT requirements in Rel-11 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126683 | Way forward for the support of multiple LTE bands and multiple LTE carrier aggregation combinations | Orange, TeliaSonera, Vodafone, Telefonica, Telecom Italia, Deutsche Telekom | imported from 3GU |
R4‑126684 | RFPM WF | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126685 | TP: TP on spatial domain impacts of AAS | Ericsson | imported from 3GU |
R4‑126686 | TP: Adding Near-Field Probe Scanner Test method to section 8. | Ericsson | imported from 3GU |
R4‑126687 | On RRM framework | Ericsson | imported from 3GU |
R4‑126688 | TP: Aligning section 3 with TR 37.840 version 0.4.0 | Ericsson | imported from 3GU |
R4‑126689 | TP: Adding directivity and gain to definitions in section 3 of 37.840. | Ericsson | imported from 3GU |
R4‑126690 | Consideration of higher order PIM | Orange | imported from 3GU |
R4‑126691 | On UL RTOA measurements | Ericsson | imported from 3GU |
R4‑126692 | TP: Adding directivity analysis to Annex C or TR 37.840 | Ericsson | imported from 3GU |
R4‑126693 | On LMU information | Ericsson | imported from 3GU |
R4‑126694 | On RF framework | Ericsson | imported from 3GU |
R4‑126695 | LS response on UL RTOA measurements | Ericsson | imported from 3GU |
R4‑126696 | New Work Item Proposal: Intra-band Contiguous Carrier Aggregation for Band 27 | NII Holdings | imported from 3GU |
R4‑126697 | Extending the high band diplexer to mid bands | Qualcomm Incorporated | imported from 3GU |
R4‑126698 | Clarification of BS RF channels to be tested for ACLR | Ericsson | imported from 3GU |
R4‑126699 | Clarification of BS RF channels to be tested for ACLR | Ericsson | imported from 3GU |
R4‑126700 | Further analysis on CM and MPR for DC-HSUPA with 16QAM | Qualcomm Incorporated | imported from 3GU |
R4‑126701 | Correction of BS test configuration table | Ericsson | imported from 3GU |
R4‑126702 | Errors and Uncertanities in the MIMO OTA measurements | Elektrobit Corporation, Motorola Mobility, ETS-Lindgren, Satimo Industries | imported from 3GU |
R4‑126703 | PA comparison between UMTS and LTE | Qualcomm Incorporated | imported from 3GU |
R4‑126704 | Open issues in inter frequency search requirements for configured frequencies without compressed mode | Qualcomm Incorporated | imported from 3GU |
R4‑126705 | Additional IL for Band 8 + Band 20 combination | Qualcomm Incorporated | imported from 3GU |
R4‑126706 | Clarification of BS output power test under extreme power supply conditions | Ericsson | imported from 3GU |
R4‑126707 | Open issues in UE maximum output power for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑126708 | Clarification of BS output power test under extreme power supply conditions | Ericsson | imported from 3GU |
R4‑126709 | Considerations for single-chip implementations of carrier aggregation | Qualcomm Incorporated | imported from 3GU |
R4‑126710 | F-TPICH out of quality handling for CLTD | Qualcomm Incorporated | imported from 3GU |
R4‑126711 | Inter-band Carrier Aggregation TR 36.850 v0.6.0 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126712 | On the need of F-TPICH demodulation performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126713 | Reference sensitivity for 1UL non-contiguous intra-band CA in Band 25 | Qualcomm Incorporated | imported from 3GU |
R4‑126714 | UL CLTD performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126715 | Inter-band Carrier Aggregation TR 36.8xx v0.2.0 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126716 | Additional regulatory requirements for 450 MHz in Brazil | CPqD, Qualcomm Incorporated | imported from 3GU |
R4‑126717 | CR for MPR for multi-cluster transimission in single CC for rel-11 | Qualcomm Incorporated, Nokia Corporation | imported from 3GU |
R4‑126718 | Introduction of inter-band CA_4-7 into TS 36.104 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126719 | Introduction of inter-band CA_4-7 into TS 36.141 | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126720 | On the accuracy of 2ms/10ms TTI selection for FE-FACH | Qualcomm Incorporated | imported from 3GU |
R4‑126721 | MIMO OTA simulation resutls | Agilent Technologies | imported from 3GU |
R4‑126722 | Editorial corrections to Band 27 specifications | Qualcomm Incorporated, NII | imported from 3GU |
R4‑126723 | UE requirement for determination of common E-RGCH radio link(s) in FE-FACH | Qualcomm Incorporated | imported from 3GU |
R4‑126724 | Jammers on UE demodulation performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126725 | TP on Manufacturer’s declaration for MB-MSR | Ericsson | imported from 3GU |
R4‑126726 | On the tolerance of timing drift for MF-HSDPA | Qualcomm Incorporated | imported from 3GU |
R4‑126727 | TP on MB-MSR test method and test configurations | Ericsson | imported from 3GU |
R4‑126728 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126729 | UE performance requirements for Multiflow HSDPA | Qualcomm Incorporated | imported from 3GU |
R4‑126730 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126731 | Guard bands for band XXVI additional coexistence requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126732 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126733 | Simulations results for Band 14 HPUE with MOP=31dBm | EADS | imported from 3GU |
R4‑126734 | Introduction of Band 29 into TS 36.113 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126735 | UL MIMO performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑126736 | Introduction of Band 29 into TS 36.124 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126737 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126738 | Introduction of Band 29 into TS 25.461 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126739 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126740 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126741 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126742 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126743 | B14 HPUE blocking B13 eNodeB | EADS | imported from 3GU |
R4‑126744 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126745 | Simulation Parameters for 36.111 Section 5 RF Requirements | TruePosition | imported from 3GU |
R4‑126746 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T | imported from 3GU |
R4‑126747 | Discussion on 36.111 Section 5 RF Requirements | TruePosition | imported from 3GU |
R4‑126748 | Text Proposal for TS 36.111 Section 5 RF Requirements | TruePosition | imported from 3GU |
R4‑126749 | Band 28 AMPR for DTV protection | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126750 | Band 28 UE emissions at 692-698 MHz and AMPR for DTV protection | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126751 | Discussion on 36.111 Section 6 Measurement Time Requirements | TruePosition | imported from 3GU |
R4‑126752 | HPUE ACLR | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126753 | Text Proposal for TS 36.111 Section 6 UL RTOA Measurement Time Requirements | TruePosition | imported from 3GU |
R4‑126754 | Use of Band 13 in Canada | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126755 | Band 26 emissions limits below the band | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126756 | UE-UE coexistence between bands with small frequency separation | Ericsson, ST-Ericsson | imported from 3GU |
R4‑126757 | An initial evaluation of UE coexistence for LTE 450 | Qualcomm Incorporated | imported from 3GU |
R4‑126758 | UE-UE coexistence between bands with small frequency separation | Ericsson, ST-Ericsson, Nokia Corporation, Motorola Solutions | imported from 3GU |
R4‑126759 | Discussion on LS on SLmAP from RAN3 | TruePosition | imported from 3GU |
R4‑126760 | Draft LS Response on Uplink Positioning Parameters | TruePosition | imported from 3GU |
R4‑126761 | UE-UE coexistence between bands with small frequency separation | Ericsson, ST-Ericsson, Nokia Corporation, Motorola Solutions | imported from 3GU |
R4‑126762 | UE-UE coexistence between bands with small frequency separation | Ericsson, ST-Ericsson, Nokia Corporation, Motorola Solutions | imported from 3GU |
R4‑126763 | UE-UE coexistence between bands with small frequency separation | Ericsson, ST-Ericsson, Nokia Corporation, Motorola Solutions | imported from 3GU |
R4‑126764 | LS Out: ITU-R response to R4-124920, part 2. | Ericsson | imported from 3GU |
R4‑126765 | LS Out: ITU-R response to 91Rev1 | Ericsson | imported from 3GU |
R4‑126766 | B12 coexistence/colocation with D-block DL only band | US Cellular | imported from 3GU |
R4‑126767 | Adding UE-UE Coexistence Requirement for Band 3 and Band 26 | KT | imported from 3GU |
R4‑126768 | Adding UE-UE Coexistence Requirement for Band 8 and Band 27 | KT | imported from 3GU |
R4‑126769 | NS-07 Performance with High Efficiency PA | Qualcomm Incorporated | imported from 3GU |
R4‑126770 | Network impact of CA with small bandwidth | Qualcomm Incorporated | imported from 3GU |
R4‑126771 | Isotropic Channel Model Based on SCME | Azimuth Systems | imported from 3GU |
R4‑126772 | Text Proposal for TR 37.977 for Definition of 3D Isotropic Channel Models | Azimuth Systems | imported from 3GU |
R4‑126773 | Simulation results for UE performance in non-colocated antenna | LG Electronics | imported from 3GU |
R4‑126774 | Applicable OFDM symbols of Noc_2 for PDCCH/PCFICH ABS-MBSFN test cases | Samsung | imported from 3GU |
R4‑126775 | TP for TR 36.850 (Inter-Band CA) regarding CA_4-13 | Verizon | - |
R4‑126776 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method (R2-125156 Source: TSG RAN WG2, To: TSG RAN WG4, Cc: TSG RAN WG5,TSG RAN WG1) | TSG RAN WG2 | - |
R4‑126777 | LS on MIB detection in feICIC (R1-124666 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑126778 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method (R1-124665 Source: TSG RAN WG1 [Nokia Corporation], To: TSG RAN WG4, Cc: TSG RAN,TSG RAN WG2,TSG RAN WG5) | TSG RAN WG1 [Nokia Corporation] | - |
R4‑126779 | LS on LTE Rel-11 UE capability list (R1-124593 Source: TSG RAN WG1, To: TSG RAN,TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑126780 | PARAMETERS FOR LTE-ADVANCED AND WIRELESSMAN ADVANCED FOR USE IN SHARING STUDIES (091Rev1e_done_3GPP-IEEE. Source: ITU- Working Party 5D, To: , Cc: ) | ITU- Working Party 5D | - |
R4‑126781 | TECHNICAL AND OPERATIONAL ASPECTS OF PASSIVE AND ACTIVE BASE STATION ANTENNAS FOR IMT SYSTEMS (056Rev1e_done_EOs. Source: ITU - Working Party 5D, To: , Cc: ) | ITU - Working Party 5D | - |
R4‑126782 | LTE in the 600MHz UHF Band | Landover Wireless Corp | - |
R4‑126783 | CR for MPR for multi-cluster transimission in single CC for rel-11 | Qualcomm Incorporated, Nokia Corporation | - |
R4‑126784 | Low-channel Band 1 coexistence with PHS | Ericsson, ST-Ericsson | - |
R4‑126785 | Release 11 Feature Lists – Testing and Certification Aspects (R5-125691 Source: TSG RAN WG5 (RAN5), To: TSG RAN WG1 (RAN1),TSG RAN WG2 (RAN2),TSG RAN WG4 (RAN4), Cc: TSG RAN) | TSG RAN WG5 (RAN5) | - |
R4‑126786 | Reply LS on UE measurements in support of the two-stage MIMO OTA test method (R5125709_LS_RAN4_reply_OTA_TwoStages Source: TSG RAN WG5, To: TSG RAN WG4, Cc: TSG RAN WG2,TSG RAN WG1) | TSG RAN WG5 | - |
R4‑126787 | Liaison Statement to 3GPP RAN4 (copy to ETSI TFES and ETSI ERM) on ACS values for different types of base stations in the 3.4-3.8 GHz band^^ (ECC PT1(12)093_LS to 3GPP RAN4 Source: ECC PT1, To: RAN4, Cc: ) | ECC PT1 | - |
R4‑126788 | Way forward on Maximum TA for TDD based on SSC | Fujitsu, Mstar | - |
R4‑126789 | Way forward on TM4 RI tests | Renesas | - |
R4‑126790 | Clean up CR for Rel-8 | Ericsson/ST-Ericcson | - |
R4‑126791 | CR on eICIC RI testing (Rel-10) | Huawei, HiSilicon | - |
R4‑126792 | UE demodulation performance in non-colocated antenna deployments | Qualcomm Incorporated | - |
R4‑126793 | Way forward on wideband RSRQ | NTT DOCOMO | - |
R4‑126794 | Meeting minutes for geographically non-collocated antennas ad hoc | Huawei | - |
R4‑126795 | Meeting minutes for CA and eDL-MIMO demod ad hoc | Intel | - |
R4‑126796 | Reply LS on muli-flow timing | Nokia Siemens Networks | - |
R4‑126797 | Way forward to UE performance for multi-flow | Qualcom | - |
R4‑126798 | WF on inter frequency search requirements for configured frequencies without compressed | Ericsson | - |
R4‑126799 | Correction to RRM Measurement Requirements | Ericsson, ST-Ericsson | - |
R4‑126800 | Correction to RRM Measurement Requirements | Ericsson, ST-Ericsson | - |
R4‑126801 | Way forward on antenna quasi-non colocation | Qualcomm | - |
R4‑126802 | Time offset correction in CA test cases R10 | Huawei, HiSilicon | - |
R4‑126803 | Time offset correction in CA RSTD test cases R10 | Huawei, HiSilicon | - |
R4‑126804 | Way forward on UE demodulation performance for high frequency band under high speed scenario | Huawei, HiSilicon | - |
R4‑126805 | Way forward on bandwidth coverage for CA UE demodulation performance | Huawei, HiSilicon | - |
R4‑126806 | Corrections on Relay backhaul link R-PDCCH performance | CATT | - |
R4‑126807 | Correction of R-PDCCH conformance test | Huawei | - |
R4‑126808 | Way forward on time and frequency tracking to CRS-IC | Renesas | - |
R4‑126809 | Introduction of UL MIMO to TS 25.133 | Nokia Siemens Networks | - |
R4‑126810 | Performance requirement for 2/10msec TTI selection when operating Enhanced Uplink in CELL_FACH or idle mode | Ericsson, ST-Ericsson | - |
R4‑126811 | Requirements for Network Controlled Mobility in Enhanced CELL_FACH | Ericsson, ST-Ericsson | - |
R4‑126812 | Way forward on common E-RGCH in CELL_FACH | Qualcomm | - |
R4‑126813 | Meeting minutes for CA RRM ad hoc | Renesas | - |
R4‑126814 | Meeting minutes for advanced receiver ad hoc | Renesas | - |
R4‑126815 | Corrections to TM4 rank indicator Test 3 | Renesas Mobile Europe Ltd | - |
R4‑126816 | Corrections to TM4 rank indicator Test 3 | Renesas Mobile Europe Ltd | - |
R4‑126817 | Introduction of advanced receivers demodulation performance (FDD) | Renesas Mobile Europe Ltd | - |
R4‑126818 | Introduction of performance requirements for verifying the receiver type for advanced receivers (FDD/TDD) | Renesas Mobile Europe Ltd | - |
R4‑126819 | Introduction of Advanced Receivers Test Cases for TDD | CATT | - |
R4‑126820 | Way forward on Core requirements impact of ePDCCH | Alcatel Lucent | - |
R4‑126821 | Way forward on the RRM and CSI Core requirements for DL-CoMP | Samsung | - |
R4‑126822 | LS response on UL RTOA measurements | Ericsson | - |
R4‑126823 | Text Proposal for TS 36.111 Section 6 UL RTOA Measurement Time Requirements | TruePosition | - |
R4‑126824 | LS on CA activation/ de-activation time | NTT DOCOMO | - |
R4‑126825 | Addition of Annexes A.6.4.1.2 and A.6.4.2.2 considering CS+PS RAB combination parameters for “Transport format combination selection in UE†requirement. | AT&T, 7 Layers | - |
R4‑126826 | Meeting minutes for CoMP ad hoc | Samsung | - |
R4‑126827 | Meeting minutes for feICIC ad hoc | Huawei | - |
R4‑126828 | Way forward for PBCH-IC | Nokia Siemens Networks | - |
R4‑126829 | Way forward for IDC | CMCC | - |
R4‑126830 | Introduction the IDC requirements in 36.133 Rel-11 | Huawei, HiSilicon | - |
R4‑126831 | Introduction the IDC requirements in 36.133 Rel-11 | Huawei, HiSilicon | - |
R4‑126832 | MDT requirements in Rel-11 | Ericsson, ST-Ericsson | - |
R4‑126833 | MDT requirements in Rel-11 | Ericsson, ST-Ericsson | - |
R4‑126834 | MDT requirements in Rel-11 | Ericsson, ST-Ericsson | - |
R4‑126835 | Way forward on cell detection for feICIC | Ericsson | - |
R4‑126836 | UTRAN CSG Proximity Indication Requirements (Rel-9) | Alcatel-Lucent, Telecom Italia | - |
R4‑126837 | E-UTRAN CSG Proximity Indication Requirements (Rel-9) | Alcatel-Lucent, Telecom Italia | - |
R4‑126838 | Impact of CA harmonic product on RRM Requirements (Rel-11) | Alcatel-Lucent | - |
R4‑126839 | UE Rx-Tx time difference measurement in Handover (Rel-10) | Alcatel-Lucent | - |
R4‑126840 | UE-UE coexistence between bands with small frequency separation | Ericsson, ST-Ericsson, Nokia Corporation, Motorola Solutions | - |
R4‑126841 | Band 1 coexistence with Band34 | Fujitsu | - |
R4‑126842 | Modificaiton on ACLR requirement | CATT | - |
R4‑126843 | Modificaiton on ACLR requirement | CATT | - |
R4‑126844 | CR to add the rated ouput power for 8 Tx antennas | ZTE Corporation | - |
R4‑126845 | Transmitter IM correction for MSR-NC | Ericsson | - |
R4‑126846 | Transmitter IM correction for MSR-NC | Ericsson | - |
R4‑126847 | LS to ECC PT1 on on ACS values for different types of base stations in the 3.4-3.8 GHz band | Ericsson | - |
R4‑126848 | LS to GERAN on CRs for MSR specifications | Ericsson | - |
R4‑126849 | LS to GERAN on Status of the work on BS classes for MSR | Ericsson | - |
R4‑126850 | BS classes Work Item TR 37.809 v1.3.0 | Ericsson | - |
R4‑126851 | Clarification of BS output power test under extreme power supply conditions | Ericsson | - |
R4‑126852 | LS Out: ITU-R response to R4-124920, part 2. | Ericsson | - |
R4‑126853 | LS Out: ITU-R response to 91Rev1 | Ericsson | - |
R4‑126854 | CR for TS37.104(Clause 1-3) due to introduction of multi-band MSR operation | ZTE, CATT, Ericsson, Huawei, Nokia Siemens Networks | - |
R4‑126855 | Further corrections for NC CA in LTE LA BS | ZTE Corporation | - |
R4‑126856 | Further corrections for NC CA in LTE LA BS | ZTE Corporation | - |
R4‑126857 | Introduction of multi-band operation to MSR specification (section 4) | Nokia Siemens Networks, CATT, Ericsson, Huawei, ZTE | - |
R4‑126858 | Reducing MPR for Multi-Cluster Transmissions | Motorola Mobility | - |
R4‑126859 | Introduction of MB-MSR to MSR specification (Clause 6) | Huawei, CATT, Ericsson, Nokia Siemens Networks, ZTE | - |
R4‑126860 | MB-MSR adhoc minutes | Huawei | - |
R4‑126861 | Way forward on mapping requirements to antenna connector(s) | Huawei | - |
R4‑126862 | Inter-band CA for Band 8 and Band 20 implementation at the UE and required relaxations | Vodafone | - |
R4‑126863 | Completion of the tables of bandwidth combinations specified for CA | Ericsson, ST-Ericsson | - |
R4‑126864 | Correction of BS test configuration table | Ericsson, ZTE | - |
R4‑126865 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | - |
R4‑126866 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | - |
R4‑126867 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | - |
R4‑126868 | Band 41 operation in the AXPG band | Ericsson, ST-Ericsson | - |
R4‑126869 | Introduction of inter-band CA_11-18 into TS36.101 | KDDI | - |
R4‑126870 | Way forward on specification of requirements for single-RAT multi-band capable BS in the single-RAT specification series | Alcatel-Lucent, CATT, Nokia Siemens Networks, ZTE | - |
R4‑126871 | Introduction of MB-MSR to MSR core specification (Clause 7) | Ericsson, Huawei, Nokia Siemens Networks, ZTE, CATT | - |
R4‑126872 | AAS Ad Hoc minutes | Huawei | - |
R4‑126873 | Way forward on specification of requirements for single-RAT multi-band capable BS in the single-RAT specification series | Alcatel-Lucent, CATT, Nokia Siemens Networks, ZTE | - |
R4‑126874 | LS on MB-MSR | Huawei | - |
R4‑126875 | Proposal for Multi_Band and Multi_CA introduction in 36.101 | Vodafone | - |
R4‑126876 | Maintenance of Band 23 UE Coexistence | DISH Network | - |
R4‑126877 | TP on Manufacturer's declaration | Huawei | - |
R4‑126878 | E-UTRA MR BS receiver requirement | CATT, Alcatel-Lucent, Ericsson, Huawei, Nokia Siemens Networks, ZTE | - |
R4‑126879 | E-UTRA MR BS receiver requirements | CATT, Alcatel Lucent, Ericsson, Huawei, Nokia Siemens Networks, ZTE | - |
R4‑126880 | TP on RF channels for MB-MSR BS | Huawei | - |
R4‑126881 | Non-contiguous intraband CA UE RF Ad-Hoc Minutes | Nokia Corporation | - |
R4‑126882 | AAS Ad Hoc minutes | Huawei | - |
R4‑126883 | Update of the SI plan | Huawei | - |
R4‑126884 | Text proposal for TR37.840 Subclause 9 | Huawei | - |
R4‑126885 | AAS classification | Nokia Siemens Networks | - |
R4‑126886 | TP on Section 5.4.4.2. for general parameters on the AAS antenna model | Kathrein | - |
R4‑126887 | TP: Adding directivity and gain to definitions in section 3 of 37.840. | Ericsson | - |
R4‑126888 | TP: TP on spatial domain impacts of AAS | Ericsson | - |
R4‑126889 | TP: Adding directivity analysis to Annex C or TR 37.840 | Ericsson | - |
R4‑126890 | TP: Aligning section 3 with TR 37.840 version 0.4.0 | Ericsson | - |
R4‑126891 | AAS test methods comparison | Nokia Siemens Networks | - |
R4‑126892 | Combined OTA-Conducted Test | Alcatel-Lucent | - |
R4‑126893 | TP: Adding Near-Field Probe Scanner Test method to section 8. | Ericsson | - |
R4‑126894 | Introduction of multi-band BS to TS 36.104 | Alcatel-Lucent, Nokia Siemens Networks | - |
R4‑126895 | Introduction of multi-band BS to TS 25.104 | Alcatel Lucent | - |
R4‑126896 | TP for AAS ACLR | ZTE | - |
R4‑126897 | In-band blocking requirements for AAS | Huawei | - |
R4‑126898 | TP: Way forward for output power requirement | Ericsson | - |
R4‑126899 | TP: Way forward for reference sensitivity requirement | Ericsson | - |
R4‑126900 | Introduction of requirements for BS capable of multi-band operation | CATT | - |
R4‑126901 | LS on Uplink Positioning Parameters (R3-122373 Source: TSG RAN WG3, To: TSG RAN WG4, Cc: TSG RAN WG2) | TSG RAN WG3 | - |
R4‑126902 | B14 PSBB HPUE blocking B13 eNB | Motorola Solutions | - |
R4‑126903 | TP for B14 PSBB HPUE Maximum Output Power (MOP) | Motorola Solutions | - |
R4‑126904 | CR for LTE B14 HPUE (Power Class 1 ) | Motorola Solutions | - |
R4‑126905 | WF on CoMP for LTE DL | Ericsson | - |
R4‑126906 | Introduction of 4X4MIMO | Ericsson | - |
R4‑126907 | F-TPICH out of quality handling for CLTD | Qualcomm Incorporated | - |
R4‑126908 | CR to TS 25.101 due to introduction of CLTD | Huawei, HiSilicon | - |
R4‑126909 | Introduction of UL MIMO to TS 25.101 | Nokia Siemens Networks, Ericsson, ST-Ericsson, Qualcomm | - |
R4‑126910 | TR36.837 v.1.0 Band 14 Public safety broadband high power User Equipment | Motorola Solutions | - |
R4‑126911 | TP for TR 37.977 on the Emulation of DUT Rotation in the Conducted Test of the Absolute Throughput Framework | Intel Corporation | - |
R4‑126912 | LS to RAN1 - Proposal of Additional Channel Models for MIMO Performance Characterization | Intel | - |
R4‑126913 | UE-UE coexistence between bands with small frequency separation | Ericsson, ST-Ericsson, Nokia Corporation, Motorola Solutions | - |
R4‑126914 | Text Proposal for TR 37.977 on the Definition of 3D Isotropic Channel Models | Azimuth Systems, Bluetest, EMITE | - |
R4‑126915 | CTIA MIMO OTA Sub Group (MOSG) Report to RAN4 | AT&T | - |
R4‑126916 | TP of a file format example header for TR 37.977 on antenna pattern data format (TR Clause 9.3.1.2) | ATR | - |
R4‑126917 | Summary of the methodologies for AAS study | Huawei | - |
R4‑126918 | CR for TS 36.141 transmitter characteristics (Clause 6) due to introduction of Medium Range BS | ZTE, Alcatel-Lucent, CATT, Ericsson, Huawei, Nokia Siemens Networks | - |
R4‑126919 | CR for TS 36.104 transmitter characteristics (Clause 6) due to introduction of Medium Range BS | ZTE, Alcatel-Lucent, CATT, Ericsson, Huawei, Nokia Siemens Networks | - |
R4‑126920 | TP on Section 6.2. Measurements results for a conversion factor between CW-carriers and modulated carriers | Kathrein | - |
R4‑126921 | PIM in Local Area and Medium Range BS deployments | Nokia Siemens Networks | - |
R4‑126922 | TP on PIM requirement for BS | Ericsson | - |
R4‑126923 | Introduction of Band 29 | Ericsson, ST-Ericsson, AT&T, Nokia Corporation | - |
R4‑126924 | Introduction of Band 29 into TS 36.113 | Ericsson, ST-Ericsson, AT&T | - |
R4‑126925 | Introduction of Band 29 into TS 36.124 | Ericsson, ST-Ericsson, AT&T | - |
R4‑126926 | TP of a file format example header for TR 37.977 on antenna pattern data format (TR Clause 9.3.1.2) | ATR | - |
R4‑126927 | Additional regulatory requirements for 450 MHz in Brazil | CPqD, Qualcomm Incorporated | - |
R4‑126928 | LS on inter-frequency RSTD measurements | Ericsson, ST-Ericsson | - |
R4‑126929 | Editorial corrections RRM | Ericsson, ST-Ericsson | - |
R4‑126930 | Intra-frequency RSTD accuracy requirements account for serving cell bandwidth | Ericsson, ST-Ericsson, Qualcomm Inc., LGE, Renesas Mobile Europe Ltd., Motorola Mobility, Samsung | - |
R4‑126931 | Clarification on the total number of cells for RSTD inter-frequency measurement | Ericsson, ST-Ericsson | - |
R4‑126932 | Addition of Annexes A.6.4.1.2 and A.6.4.2.2 considering CS+PS RAB combination parameters for “Transport format combination selection in UE†requirement. | AT&T, 7 Layers | - |
R4‑126933 | Way forward on PSS/SSS/PBCH/SIB-1 in ABS for FeICIC requirements definition | Ericsson | - |
R4‑126934 | Way forward on feICIC demod and CSI framework | Huawei | - |
R4‑126935 | Correction of test configuraitons and FRC for CA demodulation with power imbalance | Ericsson | - |
R4‑126936 | Correction of test configuraitons and FRC for CA demodulation with power imbalance | Ericsson | - |
R4‑126937 | Clarification of the TDM pattern conditions | Ericsson, ST-Ericsson, ALU, Samsung | - |
R4‑126938 | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R10 | Huawei, HiSilicon | - |
R4‑126939 | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R11 | Huawei, HiSilicon | - |
R4‑126940 | Clarification on RSTD measurement requirement under HO and Pcell changing R10 | Huawei, HiSilicon | - |
R4‑126941 | Clarification on RSTD measurement requirement under HO and Pcell changing R11 | Huawei, HiSilicon | - |
R4‑126942 | Way forward on the interference side conditions for feICIC demod/CSI tests | Ericsson | - |
R4‑126943 | Simulation Assumptions for PBCH requirement in FeICIC | Qualcomm Incorporated | - |
R4‑126944 | Clarification on intra-frequency and inter-frequency RSTD measurement accuracy requirement R10 | Huawei, HiSilicon | - |
R4‑126945 | Complementary Way forward on non-quasi-colocated antennas/CoMP | Ericsson | - |
R4‑126946 | CR on RLM Requirements for FeICIC | Qualcomm Incorporated | - |
R4‑126947 | Clarification of the TDM pattern conditions | Ericsson, ST-Ericsson, ALU, Samsung | - |
R4‑126948 | Clarification of the TDM pattern conditions | Ericsson, ST-Ericsson, ALU, Samsung | - |
R4‑126949 | Applicable OFDM symbols of Noc_2 for PDCCH/PCFICH ABS-MBSFN test cases | Samsung | - |
R4‑126950 | Impact of Insertion Loss on RRM CA Test Cases | Alcatel-Lucent, Anritsu | - |
R4‑126951 | Replace TBD with final requirements for PUCCH format 2 with DTX detection | Ericsson, ST-Ericsson | - |
R4‑126952 | Clarification of the TDM pattern conditions | Ericsson, ST-Ericsson, ALU, Samsung | - |
R4‑126953 | Way forward on cell detection for feICIC | Ericsson | - |
R4‑126954 | Correction to RRM Measurement Requirements | Ericsson | - |
R4‑126955 | Correction to RRM Measurement Requirements | Ericsson | - |
R4‑126956 | Addition of Annexes A.6.4.1.2 and A.6.4.2.2 considering CS+PS RAB combination parameters for "Transport format combination selection in UE" requirement | AT&T, 7 Layers | - |
R4‑126957 | Way forward on issues of RSRQ measurement accuracy in RRC_IDLE state | NTT Docomo | - |
R4‑126958 | Way forward on wideband RSRQ | NTT DOCOMO | - |
R4‑126959 | Data browsing mode measurement uncertainty | Nokia Corporation | - |
R4‑126960 | Additional information for required TAE for some inter-band CA scenarios | Ericsson, NTT DOCOMO, Telia Sonera | - |
R4‑126961 | Meeting minutes of MIMO OTA ad-hoc session RAN4#65 | Vodafone | - |
R4‑126962 | TP for TR 36.850 (Inter-Band CA) regarding CA_4-13 | Verizon | - |
R4‑126963 | ACS requirements for NC intra-band CA | Ericsson, ST-Ericsson, ZTE | - |
R4‑126964 | REFSENS with one UL carrier for NC intra-band CA | Ericsson, ST-Ericsson | - |
R4‑126965 | In-band blocker requirements for NC intra-band CA | Ericsson, ST-Ericsson | - |
R4‑126966 | Modification to increase GSM Carrier Power in MSR BS for Band Category 2 | Ericsson | - |
R4‑126967 | Modification to increase GSM Carrier Power in MSR BS for Band Category 2 | Ericsson | - |
R4‑126968 | TP on transmit intermodulation for non-contiguous intra-band CA | ZTE | - |
R4‑126969 | New study item proposal Positioning enhancements for E-UTRA | Huawei, HiSilicon | - |
R4‑126970 | Draft LS response to WP5D on the use of IMT for broadband PPDR applications | Motorola Solutions | - |
R4‑126971 | F-TPICH out of quality handling for UL CLTD and UL MIMO | Qualcomm | - |
R4‑126972 | LS on the verification of out of band blocking requirement for CA | Ericsson | - |
R4‑126973 | Low-channel Band 1 coexistence with PHS | Ericsson, ST-Ericsson | - |
R4‑126974 | Exceptions to REFSENS requrirements for class A2 CA combinations | Ericsson, ST-Ericsson, Qualcomm Incorporated | - |
R4‑126975 | Ad-hoc on MOP for multi-RAT, multi-band and multi-CA terminals | TeliaSonera | - |
R4‑126976 | MIMO OTA Way Forward | Vodafone | - |
R4‑126977 | TP on Section 5.4.4.2. for general parameters on the AAS antenna model | Kathrein | - |
R4‑126978 | LS response on UL RTOA measurements | Ericsson | - |
R4‑126979 | LS on inter-frequency RSTD measurements | Ericsson, ST-Ericsson | - |
R4‑126980 | Way forward on time and frequency tracking to CRS-IC | Renesas | - |
R4‑126981 | Wayforward on RLM/RRM measurement in FeICIC | Huawei, HiSilicon | - |
R4‑126982 | Cell identification requirements in FeICIC | Huawei, HiSilicon | - |
R4‑126983 | Way forward on feICIC demod and CSI framework | Huawei | - |
R4‑126984 | Draft LS to GERAN2 on wideband RSRQ measurements | NTT Docomo | - |
R4‑126985 | Way forward on core requirements for feICIC | Ericsson | - |
R4‑126986 | Way forward on core requirements for feICIC | Ericsson | - |
R4‑126987 | LS to GERAN2 on wideband RSRQ measurements | NTT Docomo | - |
R4‑126988 | Doc for RRM session | - | - |
R4‑126989 | Doc for RRM session | - | - |
R4‑126990 | Doc for RRM session | - | - |
R4‑126991 | Doc for RRM session | - | - |
R4‑126992 | Doc for RRM session | - | - |
R4‑126993 | Doc for RRM session | - | - |
R4‑126994 | Doc for RRM session | - | - |
R4‑126995 | Doc for RRM session | - | - |
R4‑126996 | MIMO OTA Way Forward | Vodafone | - |
R4‑126997 | Inter-band CA for Band 8 and Band 20 implementation at the UE and required relaxations | Vodafone | - |
R4‑126998 | TP introducing relaxations for Band 8+20 (1UL) in 3GPP TR 36.850 | Vodafone | - |
R4‑126999 | Introduction of CA_8_20 RF requirements into TS36.101 | Vodafone | - |
R4‑127000 | Updated on AAS TR TR37.840 v0.5.0 | Huawei | - |
R4‑127001 | Updated TR 37.812 v0.3.0 | Huawei | - |
R4‑127002 | Introduction of multi-band BS to TS 36.104 | Alcatel-Lucent, Nokia Siemens Networks | - |
R4‑127003 | Introduction of multi-band BS to TS 25.104 | Alcatel Lucent | - |
R4‑127004 | Introduction of requirements for BS capable of multi-band operation | CATT | imported from 3GU |
page generated from database: 2024-09-26 11:02:35