3GPP TDocs (written contributions) at meeting
Meeting: R1-82 - 2015-08-24 to 2015-08-28, Beijing
meeting id: R1-82 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R1‑153700 | Draft Agenda | RAN1 Chair | imported from 3GU |
R1‑153701 | Final Report of RAN1#81 meeting | ETSI | imported from 3GU |
R1‑153702 | Selected highlights from RAN#68 of relevance to RAN1 | RAN1 Chair | imported from 3GU |
R1‑153703 | LS on Efficient Small Data Transfer | GERAN2, Ericsson | imported from 3GU |
R1‑153704 | Reply to LS on C-IoT/MTC data transmission targets for security-related procedures | GERAN, Vodafone | imported from 3GU |
R1‑153705 | Response LS on the issue of 1.4MHz MBMS test | RAN2, Ericsson | imported from 3GU |
R1‑153706 | LS on Text Proposal for TR 25.705 | RAN2, Ericsson | imported from 3GU |
R1‑153707 | Reply LS on Type 2 Power Headroom reporting | RAN2, Intel | imported from 3GU |
R1‑153708 | LS on measurements cell selection and reselection for MTC LC/EC | RAN2, MediaTek | imported from 3GU |
R1‑153709 | LS on system information broadcast, mobility support, and random access for Rel-13 LC/CE UEs | RAN2, Ericsson | imported from 3GU |
R1‑153710 | Response LS on Paging Optimisation | RAN3, Ericsson | imported from 3GU |
R1‑153711 | Response LS on Paging for MTC | RAN3, Alcatel-Lucent | imported from 3GU |
R1‑153712 | LS Out on work on time synchronization and future target requirements | RAN4, Ericsson | imported from 3GU |
R1‑153713 | LS to RAN2 on HSPA DB UL CA agreements | RAN4, Qualcomm | imported from 3GU |
R1‑153714 | LS Out on TDD + FDD dual UL UE behavior | RAN4, Ericsson | imported from 3GU |
R1‑153715 | LS regarding rank3/4 in TM3 and TM4 for additional UE categories | RAN4, Nokia Networks | imported from 3GU |
R1‑153716 | LS response on measurement performance for MTC | RAN4, Ericsson | imported from 3GU |
R1‑153717 | LS Out on work on time synchronization and future target requirements | RAN, Ericsson | imported from 3GU |
R1‑153718 | Reply LS on LTE Rel-12 UE feature list | RAN, NTT DOCOMO | imported from 3GU |
R1‑153719 | LS response regarding rank3/4 in TM3 and TM4 for additional UE categories | RAN, Nokia Networks | imported from 3GU |
R1‑153720 | LS reply on ProSe Priorities | SA2, Intel | imported from 3GU |
R1‑153721 | LS reply on Public Safety discovery | SA2, Qualcomm | imported from 3GU |
R1‑153722 | LS on per-band UL 64 QAM support | RAN4, Vodafone | imported from 3GU |
R1‑153723 | PRB group definition for MTC | Ericsson | imported from 3GU |
R1‑153724 | Physical layer timing for MTC | Ericsson | imported from 3GU |
R1‑153725 | HARQ aspects for MTC | Ericsson | imported from 3GU |
R1‑153726 | Frequency hopping for MTC | Ericsson | imported from 3GU |
R1‑153727 | Retuning gaps for MTC | Ericsson | imported from 3GU |
R1‑153728 | MCS indication for MTC | Ericsson | imported from 3GU |
R1‑153729 | ECCE mapping for MTC | Ericsson | imported from 3GU |
R1‑153730 | M-PDCCH search space for MTC | Ericsson | imported from 3GU |
R1‑153731 | M-PDCCH initialization for MTC | Ericsson | imported from 3GU |
R1‑153732 | M-PDCCH link performance for MTC | Ericsson | imported from 3GU |
R1‑153733 | PDSCH transmission for MTC | Ericsson | imported from 3GU |
R1‑153734 | PUSCH link performance for MTC | Ericsson | imported from 3GU |
R1‑153735 | PUCCH physical resource mapping for MTC | Ericsson | imported from 3GU |
R1‑153736 | M-PDCCH-based PUCCH resource allocation for MTC | Ericsson | imported from 3GU |
R1‑153737 | CSI definition for MTC | Ericsson | imported from 3GU |
R1‑153738 | PRACH resource allocation for MTC | Ericsson | imported from 3GU |
R1‑153739 | Random access for MTC | Ericsson | imported from 3GU |
R1‑153740 | Paging for MTC | Ericsson | imported from 3GU |
R1‑153741 | Configuration of MTC | Ericsson | imported from 3GU |
R1‑153742 | Evaluation Results and Text Proposal for OTDOA with Enhancements | Ericsson | imported from 3GU |
R1‑153743 | Evaluation Results and Text Proposal on UE Receiver Model | Ericsson | imported from 3GU |
R1‑153744 | Text Proposal and Discussion on Further Enhancements for OTDOA | Ericsson | imported from 3GU |
R1‑153745 | Text Proposal and Discussion on Further Enhancements for E-CID | Ericsson | imported from 3GU |
R1‑153746 | Text Proposal and Discussion on Further Enhancements to WiFi/BT Based Positioning | Ericsson | imported from 3GU |
R1‑153747 | Text Proposal and Discussion on Indoor/outdoor Classification for Positioning Enhancements | Ericsson | imported from 3GU |
R1‑153748 | How to define the extent of coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑153749 | Ongoing RAN1 work with possible higher layer impact | Huawei, HiSilicon | imported from 3GU |
R1‑153750 | On the specification and use of narrowbands | Huawei, HiSilicon | imported from 3GU |
R1‑153751 | Number of HARQ processes | Huawei, HiSilicon | imported from 3GU |
R1‑153752 | Frequency hopping granularity | Huawei, HiSilicon | imported from 3GU |
R1‑153753 | Considerations on blind decoding for MTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑153754 | Configuring combinations of repetition level and aggregation level | Huawei, HiSilicon | imported from 3GU |
R1‑153755 | New DCI format to support efficient RAR detection for MTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑153756 | Principles of new DCI for MTC | Huawei, HiSilicon | imported from 3GU |
R1‑153757 | On initialization of physical downlink control channel for MTC | Huawei, HiSilicon | imported from 3GU |
R1‑153758 | On PDSCH narrowband location options | Huawei, HiSilicon | imported from 3GU |
R1‑153759 | PUSCH for MTC and Coverage Enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑153760 | ACK/NACK feedback for PUSCH | Huawei, HiSilicon | imported from 3GU |
R1‑153761 | PUCCH coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑153762 | CSI measurement and feedback for MTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑153763 | PRACH resource multiplexing and indication in coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑153764 | On transmit power and power ramping for PRACH in coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑153765 | On MTC SIB1 transmission | Huawei, HiSilicon | imported from 3GU |
R1‑153766 | On RAR transmission for MTC | Huawei, HiSilicon | imported from 3GU |
R1‑153767 | On Paging transmission for MTC | Huawei, HiSilicon | imported from 3GU |
R1‑153768 | Further considerations on simultaneous transmission for MTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑153769 | Details of PBCH mapping | Huawei, HiSilicon | imported from 3GU |
R1‑153770 | New PUCCH format design to support UCI transmission for up to 32 component carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153771 | HARQ-ACK Codebook determination for carrier aggregation enhancement beyond 5 carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153772 | Dynamic adaptation of PUCCH formats with HARQ-ACK feedback for carrier aggregation enhancement beyond 5 carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153773 | Periodic CSI feedback enhancement for carrier aggregation enhancement beyond 5 carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153774 | Aperiodic CSI feedback enhancement for carrier aggregation enhancement beyond 5 carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153775 | (E)PDCCH enhancements to support up to 32 carriers aggregation | Huawei, HiSilicon | imported from 3GU |
R1‑153776 | Power control to support up to 32 component carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153777 | Power offset between PSDCH and PSSCH | Huawei, HiSilicon | imported from 3GU |
R1‑153778 | Remaining details of PC5 measurements | Huawei, HiSilicon | imported from 3GU |
R1‑153779 | Additional coexistence evaluations for LAA DL | Huawei, HiSilicon | imported from 3GU |
R1‑153780 | LBT procedure and parameters for PDSCH transmission in LAA carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153781 | DL LBT scheme for DRS transmission in LAA carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153782 | Triggering mechanism for contention window size adaptation | Huawei, HiSilicon | imported from 3GU |
R1‑153783 | Principles of UL channel access for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑153784 | DRS design for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑153785 | RSSI-like measurement and report for LAA carriers | Huawei, HiSilicon | imported from 3GU |
R1‑153786 | Indication of DL transmission burst duration for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑153787 | Candidate starting positions of partial subframe and corresponding RS pattern for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑153788 | Support for UE synchronization on a LAA Scell | Huawei, HiSilicon | imported from 3GU |
R1‑153789 | LAA DL design impact for forward compatibility with LAA UL | Huawei, HiSilicon | imported from 3GU |
R1‑153790 | Transmission schemes and CSI support for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑153791 | Beamformed CSI-RS based CSI feedback framework | Huawei, HiSilicon | imported from 3GU |
R1‑153792 | CSI-RS design for 12 and 16 ports | Huawei, HiSilicon | imported from 3GU |
R1‑153793 | SRS capacity enhancements | Huawei, HiSilicon | imported from 3GU |
R1‑153794 | SRS with 4 antennas switching | Huawei, HiSilicon | imported from 3GU |
R1‑153795 | DMRS enhancements with 4 orthogonal ports | Huawei, HiSilicon | imported from 3GU |
R1‑153796 | Codebook for up to16 ports 2D antenna arrays | Huawei, HiSilicon | imported from 3GU |
R1‑153797 | Beamformed CSI-RS based feedback design for 3D MIMO | Huawei, HiSilicon | imported from 3GU |
R1‑153798 | Classification of MUST schemes | Huawei, HiSilicon | imported from 3GU |
R1‑153799 | System-level performance of MUST schemes | Huawei, HiSilicon | imported from 3GU |
R1‑153800 | Overview of V2X evaluation methodology | Huawei, HiSilicon | imported from 3GU |
R1‑153801 | DMRS enhancement for V2V | Huawei, HiSilicon | imported from 3GU |
R1‑153802 | System-level evaluation methodology for V2X | Huawei, HiSilicon | imported from 3GU |
R1‑153803 | Traffic model and performance metrics for V2X evaluation | Huawei, HiSilicon | imported from 3GU |
R1‑153804 | Introducing 4-layer MIMO transmission in TM3 and TM4 | Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R1‑153805 | Introducing 4-layer MIMO transmission in TM3 and TM4 | Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R1‑153806 | Introducing 4-layer MIMO transmission in TM3 and TM4 | Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R1‑153807 | LS on EVS over UTRAN | SA4, Ericsson | imported from 3GU |
R1‑153808 | LS/r on work on time synchronization and future target requirements (reply to 3GPP RAN-RP-151001) | ITU-T Study Group 15, Ericsson, IDT | imported from 3GU |
R1‑153809 | LS on usage of ProSe Per-Packet Priority in ProSe UE-Network Relay | SA2, Qualcomm | imported from 3GU |
R1‑153810 | Reply LS on Paging Optimisation | SA2, Alcatel-Lucent | imported from 3GU |
R1‑153811 | LS on ProSe coarse proximity estimation based on path loss | SA2, | imported from 3GU |
R1‑153812 | New transmission mode supporting 3D MIMO | Alcatel-Lucent,Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑153813 | Proposals of non-precoded CSI-RS design for 3D-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑153814 | Proposals for beamformed CSI-RS based 3D-MIMO transmission schemes | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑153815 | SRS enhancements for 3D-MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑153816 | DMRS enhancement for high dimensional multi-user MIMO | Alcatel-Lucent,Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑153817 | Proposals of 2D codebook design for 3D MIMO | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑153818 | Overview for CSI types and reporting modes for 3D MIMO | Alcatel-Lucent,Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑153819 | Proposed clarifications for system level evaluation and comparison for 3D-MIMO | Alcatel-Lucent,Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑153820 | Discussion on downlink multiuser superposition schemes and designs | Alcatel-Lucent,Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑153821 | System level simulations for downlink MUST | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑153822 | Link level simulations for downlink MUST | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑153823 | Frequency Hopping for UEs in Coverage Enhancement | Nokia Networks | imported from 3GU |
R1‑153824 | Timing Relationship Considerations for MTC | Nokia Networks | imported from 3GU |
R1‑153825 | Narrowband Definition for MTC | Nokia Networks | imported from 3GU |
R1‑153826 | Retuning Gaps for MTC | Nokia Networks | imported from 3GU |
R1‑153827 | Number of HARQ Processes for MTC | Nokia Networks | imported from 3GU |
R1‑153828 | EREG to ECCE mapping for MTC | Nokia Networks | imported from 3GU |
R1‑153829 | DCI Design for MTC | Nokia Networks | imported from 3GU |
R1‑153830 | M-PDCCH Search Space | Nokia Networks | imported from 3GU |
R1‑153831 | HARQ ACK/NACK for PUSCH | Nokia Networks | imported from 3GU |
R1‑153832 | PDSCH/PUSCH Repetition Level Indication | Nokia Networks | imported from 3GU |
R1‑153833 | Remaining PDSCH Issues for MTC | Nokia Networks | imported from 3GU |
R1‑153834 | Remaining PUSCH Issues for MTC | Nokia Networks | imported from 3GU |
R1‑153835 | PUCCH Consideration for MTC | Nokia Networks | imported from 3GU |
R1‑153836 | CQI Consideration for MTC | Nokia Networks | imported from 3GU |
R1‑153837 | PRACH Configuration for MTC | Nokia Networks | imported from 3GU |
R1‑153838 | Remaining Issues on Random Access Procedure for MTC | Nokia Networks | imported from 3GU |
R1‑153839 | MTC SIB Transmission | Nokia Networks | imported from 3GU |
R1‑153840 | RAR & Paging Transmission for MTC | Nokia Networks | imported from 3GU |
R1‑153841 | MTC UE Behavior for Simultaneous Reception of Multiple Transport Blocks | Nokia Networks | imported from 3GU |
R1‑153842 | Convolution versus Turbo Coding for PUSCH Bundling | Nokia Networks | imported from 3GU |
R1‑153843 | Downlink Channel Access For LAA | Cisco Systems | imported from 3GU |
R1‑153844 | Uplink Channel Access for LAA | Cisco Systems | imported from 3GU |
R1‑153845 | Physical channel time and frequency relationship | Qualcomm Inc. | imported from 3GU |
R1‑153846 | Physical downlink control channels | Qualcomm Inc. | imported from 3GU |
R1‑153847 | PDSCH design options | Qualcomm Inc. | imported from 3GU |
R1‑153848 | PUSCH design options | Qualcomm Inc. | imported from 3GU |
R1‑153849 | Physical uplink control channels | Qualcomm Inc. | imported from 3GU |
R1‑153850 | PRACH repetition for MTC | Qualcomm Inc. | imported from 3GU |
R1‑153851 | PBCH repetition for MTC | Qualcomm Inc. | imported from 3GU |
R1‑153852 | Common control messages | Qualcomm Inc. | imported from 3GU |
R1‑153853 | Power consumption reduction | Qualcomm Inc. | imported from 3GU |
R1‑153854 | UE behavior for simultaneous - non-simultaneous reception | Qualcomm Inc. | imported from 3GU |
R1‑153855 | PUCCH formats | Qualcomm Inc. | imported from 3GU |
R1‑153856 | HARQ-ACK feedback | Qualcomm Inc. | imported from 3GU |
R1‑153857 | CSI feedback | Qualcomm Inc. | imported from 3GU |
R1‑153858 | UCI transmission on PUSCH | Qualcomm Inc. | imported from 3GU |
R1‑153859 | Potential enhancements to DL control signalling | Qualcomm Inc. | imported from 3GU |
R1‑153860 | Potential enhancements to physical layer procedure other than DL and UL control | Qualcomm Inc. | imported from 3GU |
R1‑153861 | Support of Uu link quality in relay selection | Qualcomm Inc. | imported from 3GU |
R1‑153862 | Out-of-Coverage discovery for Public Safety | Qualcomm Inc. | imported from 3GU |
R1‑153863 | D2D discovery support in the presence of multiple carriers and PLMNs | Qualcomm Inc. | imported from 3GU |
R1‑153864 | Support of communication group priority and half duplex resolution | Qualcomm Inc., U.S. Department of Commerce | imported from 3GU |
R1‑153865 | Summary of open issues for eD2D | Qualcomm Inc. | imported from 3GU |
R1‑153866 | Remaining details of DL LBT operation | Qualcomm Inc. | imported from 3GU |
R1‑153867 | Remaining details of UL LBT opertaion | Qualcomm Inc. | imported from 3GU |
R1‑153868 | Multi-carrier LBT operation | Qualcomm Inc. | imported from 3GU |
R1‑153869 | DRS design details | Qualcomm Inc. | imported from 3GU |
R1‑153870 | Discovery and RRM procedure for LAA | Qualcomm Inc. | imported from 3GU |
R1‑153871 | Procedures for PLMN ID detection | Qualcomm Inc. | imported from 3GU |
R1‑153872 | Adaptive frame structure and DL-UL configuration for LAA | Qualcomm Inc. | imported from 3GU |
R1‑153873 | Reservation signal design for LAA | Qualcomm Inc. | imported from 3GU |
R1‑153874 | LAA DRX operation and PHY layer aspects | Qualcomm Inc. | imported from 3GU |
R1‑153875 | Multi-carrier operation for LAA | Qualcomm Inc. | imported from 3GU |
R1‑153876 | CSI measurements and reporting for LAA | Qualcomm Inc. | imported from 3GU |
R1‑153877 | Transmission mode for FD-MIMO | Qualcomm Inc. | imported from 3GU |
R1‑153878 | Discussion on CSI feedback enhancements | Qualcomm Inc. | imported from 3GU |
R1‑153879 | Non-precoded CSI-RS for FD-MIMO | Qualcomm Inc. | imported from 3GU |
R1‑153880 | Beamformed CSI-RS for support of FD-MIMO | Qualcomm Inc. | imported from 3GU |
R1‑153881 | SRS capacity enhancements | Qualcomm Inc. | imported from 3GU |
R1‑153882 | DM-RS enhancements for higher order MU-MIMO | Qualcomm Inc. | imported from 3GU |
R1‑153883 | General views on codebook enhancements for FD-MIMO | Qualcomm Inc. | imported from 3GU |
R1‑153884 | Codebook design for 8Tx with 2D x-pol array | Qualcomm Inc. | imported from 3GU |
R1‑153885 | Codebook design for 12 and 16Tx with 2D x-pol array | Qualcomm Inc. | imported from 3GU |
R1‑153886 | CSI types and reporting modes | Qualcomm Inc. | imported from 3GU |
R1‑153887 | Evaluation Results and Text Proposal for TBS | Qualcomm Inc. | imported from 3GU |
R1‑153888 | Evaluation Results and Text Proposal for Randomization of PRS Frequency Shift | Qualcomm Inc. | imported from 3GU |
R1‑153889 | Evaluation Results and Text Proposal for UE Inter-Frequency RSTD Calibration Accuracy Reporting | Qualcomm Inc. | imported from 3GU |
R1‑153890 | Evaluation Results and Text Proposal for PRS Transmission Enhancements for the same PCI case | Qualcomm Inc. | imported from 3GU |
R1‑153891 | Multiuser superposition schemes | Qualcomm Inc. | imported from 3GU |
R1‑153892 | MUST link level results | Qualcomm Inc. | imported from 3GU |
R1‑153893 | V2V deployment models | Qualcomm Inc. | imported from 3GU |
R1‑153894 | V2V traffic models and performance metrics | Qualcomm Inc. | imported from 3GU |
R1‑153895 | V2V performance initial evaluation results | Qualcomm Inc. | imported from 3GU |
R1‑153896 | Narrowband definition for Rel-13 MTC UEs | CATT | imported from 3GU |
R1‑153897 | Remaining issues on HARQ for Rel-13 MTC UEs | CATT | imported from 3GU |
R1‑153898 | TDD frequency hopping design | CATT | imported from 3GU |
R1‑153899 | HARQ-ACK transmission for PUSCH | CATT | imported from 3GU |
R1‑153900 | M-PDCCH design details | CATT | imported from 3GU |
R1‑153901 | DCI design for Rel-13 MTC UEs and UEs in enhanced coverage | CATT | imported from 3GU |
R1‑153902 | PUSCH repetition with frequency offset | CATT | imported from 3GU |
R1‑153903 | UCI transmission for Rel-13 low complexity UEs and UEs in enhanced coverage | CATT | imported from 3GU |
R1‑153904 | PUCCH resource allocation and frequency hopping for Rel-13 MTC UEs | CATT | imported from 3GU |
R1‑153905 | PRACH design for Rel-13 MTC UEs and UEs in enhanced coverage | CATT | imported from 3GU |
R1‑153906 | PRACH frequency hopping design | CATT | imported from 3GU |
R1‑153907 | Remaining issues on MTC system information transmission | CATT | imported from 3GU |
R1‑153908 | Random access response for Rel-13 low complexity UEs and UEs in enhanced coverage | CATT | imported from 3GU |
R1‑153909 | Msg 3 and 4 transmission for Rel-13 low complexity UEs and UEs in enhanced coverage | CATT | imported from 3GU |
R1‑153910 | Remaining issues on paging transmission for Rel-13 low complexity UEs and UEs in enhanced coverage | CATT | imported from 3GU |
R1‑153911 | New PUCCH format for up to 32 CCs | CATT | imported from 3GU |
R1‑153912 | HARQ-ACK codebook size determination for up to 32 CCs | CATT | imported from 3GU |
R1‑153913 | Additional TDD HARQ-ACK bundling | CATT | imported from 3GU |
R1‑153914 | Periodic CSI feedback for up to 32 CCs | CATT | imported from 3GU |
R1‑153915 | Aperiodic CSI feedback for up to 32 CCs | CATT | imported from 3GU |
R1‑153916 | UCI feedback on PUSCH for up to 32 CCs | CATT | imported from 3GU |
R1‑153917 | Discussion on joint DCI for Rel-13 CA | CATT | imported from 3GU |
R1‑153918 | Remaining issues on PUCCH on SCell for Rel-13 CA | CATT | imported from 3GU |
R1‑153919 | Design of LBT category 4 in LAA DL | CATT | imported from 3GU |
R1‑153920 | Support of frequency reuse one for LAA DL | CATT | imported from 3GU |
R1‑153921 | LBT for LAA multi-carrier transmission in LAA DL | CATT | imported from 3GU |
R1‑153922 | UL LBT framework for LAA | CATT | imported from 3GU |
R1‑153923 | Design of LAA DRS | CATT | imported from 3GU |
R1‑153924 | RRM measurement for LAA | CATT | imported from 3GU |
R1‑153925 | RSSI measurement for LAA | CATT | imported from 3GU |
R1‑153926 | Discussion on LAA DL transmission methods | CATT | imported from 3GU |
R1‑153927 | Discussion on LAA DL scheduling methods | CATT | imported from 3GU |
R1‑153928 | Discussion on LAA transmission burst | CATT | imported from 3GU |
R1‑153929 | Discussion on LAA CSI measurement and reporting | CATT | imported from 3GU |
R1‑153930 | On transmission modes for EB/FD-MIMO | CATT | imported from 3GU |
R1‑153931 | On the definition of CSI-RS resource and CSI-process for EB/FD-MIMO | CATT | imported from 3GU |
R1‑153932 | On the design of CSI-RS with 12 and 16 ports | CATT | imported from 3GU |
R1‑153933 | Introduction of CSI-RS in DwPTS for TDD | CATT | imported from 3GU |
R1‑153934 | CSI-RS transmission for beamformed CSI-RS | CATT | imported from 3GU |
R1‑153935 | CSI-RS measurement for beamformed CSI-RS | CATT | imported from 3GU |
R1‑153936 | SRS enhancements for EB/FD-MIMO | CATT | imported from 3GU |
R1‑153937 | DMRS design for high-order MU-MIMO | CATT | imported from 3GU |
R1‑153938 | DL control signaling for high-order MU-MIMO with additional port | CATT | imported from 3GU |
R1‑153939 | Codebook structure for FD-MIMO | CATT | imported from 3GU |
R1‑153940 | Codebook enhancement for 16 Tx | CATT | imported from 3GU |
R1‑153941 | Codebook enhancement for 12 Tx | CATT | imported from 3GU |
R1‑153942 | Aperiodic feedback for non-precoded CSI-RS | CATT | imported from 3GU |
R1‑153943 | Periodic feedback for non-precoded CSI-RS | CATT | imported from 3GU |
R1‑153944 | Codebook subset restriction for EB/FD-MIMO | CATT | imported from 3GU |
R1‑153945 | CSI feedback for beamformed CSI-RS on PUCCH | CATT | imported from 3GU |
R1‑153946 | CSI feedback for beamformed CSI-RS on PUSCH | CATT | imported from 3GU |
R1‑153947 | Overall work and priority for FD-MIMO in Rel-13 | CATT | imported from 3GU |
R1‑153948 | Discussion on downlink superposition transmission schemes | CATT | imported from 3GU |
R1‑153949 | Initial system level evaluation results of superposition coding | CATT | imported from 3GU |
R1‑153950 | Initial link-level evaluation results of superposition transmission | CATT | imported from 3GU |
R1‑153951 | Deployment scenario and evaluation modelling for PC5 V2V | CATT | imported from 3GU |
R1‑153952 | Channel modelling for PC5 V2V | CATT | imported from 3GU |
R1‑153953 | Discussion and proposals on traffic models for PC5 V2V | CATT | imported from 3GU |
R1‑153954 | Discussions on performance metrics for PC5 V2V | CATT | imported from 3GU |
R1‑153955 | Simulation results for V2X based on R12 D2D | CATT | imported from 3GU |
R1‑153956 | Considerations on technique schemes for PC5 V2V | CATT | imported from 3GU |
R1‑153957 | 37.857 v0.4.0 Study on Indoor Positioning Enhancements for UTRA and LTE | NextNav | imported from 3GU |
R1‑153958 | TBS Option #2 Simulation Results | BROADCOM CORPORATION | imported from 3GU |
R1‑153959 | Design of frequency hopping for MTC | Panasonic | imported from 3GU |
R1‑153960 | MTC Narrowband definition and collision handling | Panasonic | imported from 3GU |
R1‑153961 | Search space for MTC | Panasonic | imported from 3GU |
R1‑153962 | DCI design for MTC | Panasonic | imported from 3GU |
R1‑153963 | Performance evaluation on M-PDCCH | Panasonic | imported from 3GU |
R1‑153964 | MPDCCH allocation in narrowband | Panasonic | imported from 3GU |
R1‑153965 | Valid subframe indication of PDSCH/PUSCH in MTC | Panasonic | imported from 3GU |
R1‑153966 | Evaluation on PDSCH with more frequency hopping points | Panasonic | imported from 3GU |
R1‑153967 | Resource allocation of PDSCH/PUSCH for Rel.13 MTC | Panasonic | imported from 3GU |
R1‑153968 | Handling of collisions between MTC channels and legacy SRS | Panasonic | imported from 3GU |
R1‑153969 | Multiple subframe code spreading for MTC UEs | Panasonic | imported from 3GU |
R1‑153970 | Discussion and evaluation on PUCCH for MTC | Panasonic | imported from 3GU |
R1‑153971 | CSI report/measurement in MTC | Panasonic | imported from 3GU |
R1‑153972 | RAR and paging for MTC | Panasonic | imported from 3GU |
R1‑153973 | CSI Reporting Granularity for eCA | Panasonic | imported from 3GU |
R1‑153974 | Discussion on PDCCH false alarm issue for eCA | Panasonic | imported from 3GU |
R1‑153975 | Indication methods for partial subframe | Panasonic | imported from 3GU |
R1‑153976 | Impact of LAA Beamforming on LBT Behaviour | Panasonic | imported from 3GU |
R1‑153977 | TBS Selection for Downlink Partial Subframes | Panasonic | imported from 3GU |
R1‑153978 | Self-scheduling and cross-scheduling options for unlicensed carrier access | Panasonic | imported from 3GU |
R1‑153979 | Frequency scheduling options for unlicensed carriers | Panasonic | imported from 3GU |
R1‑153980 | CSI Reporting Granularity for LAA | Panasonic | imported from 3GU |
R1‑153981 | CSI-RS structure with more than 8 antenna ports | Intel Corporation | imported from 3GU |
R1‑153982 | On the enhancements for beamformed CSI-RS | Intel Corporation | imported from 3GU |
R1‑153983 | Codebook structure for FD-MIMO | Intel Corporation | imported from 3GU |
R1‑153984 | Support of the additional DM-RS ports for MU-MIMO | Intel Corporation | imported from 3GU |
R1‑153985 | Discussion on downlink multiuser superposition schemes and signalling assitance | Intel Corporation | imported from 3GU |
R1‑153986 | System-level modelling of the downlink multi-user superposition transmission schemes | Intel Corporation | imported from 3GU |
R1‑153987 | System-level performance of downlink multi-user superposition transmission schemes | Intel Corporation | imported from 3GU |
R1‑153988 | Link-level performance of downlink multi-user superposition transmission schemes | Intel Corporation | imported from 3GU |
R1‑153989 | OTDOA Performance for Intra-Band Contiguous CA Operation and Text Proposal for TR37.857 | Intel Corporation | imported from 3GU |
R1‑153990 | Evaluation of PRS-IC Techniques for OTDOA Based Positioning | Intel Corporation | imported from 3GU |
R1‑153991 | Analysis of anchored and non-anchored D2D aided positioning | Intel Corporation | imported from 3GU |
R1‑153992 | Analysis of proximity detection for D2D aided positioning | Intel Corporation | imported from 3GU |
R1‑153993 | Discussion on V2X Deployment Scenarios and Modeling Aspects | Intel Corporation | imported from 3GU |
R1‑153994 | Traffic Models and Performance Metrics for V2X Evaluations | Intel Corporation | imported from 3GU |
R1‑153995 | Time-frequency relationships for physical channels for MTC | Intel Corporation | imported from 3GU |
R1‑153996 | Remaining details of M-PDCCH | Intel Corporation | imported from 3GU |
R1‑153997 | Coverage enhancements for PUSCH | Intel Corporation | imported from 3GU |
R1‑153998 | On CSI measurements and UCI feedback for MTC | Intel Corporation | imported from 3GU |
R1‑153999 | On paging for MTC | Intel Corporation | imported from 3GU |
R1‑154000 | Enhancements to RAR transmissions for MTC | Intel Corporation | imported from 3GU |
R1‑154001 | Discussion on PUCCH format for enhanced CA | Intel Corporation | imported from 3GU |
R1‑154002 | Views on HARQ-ACK feedback for CA enhancement | Intel Corporation | imported from 3GU |
R1‑154003 | Discussion on potential CSI enhancements for CA with up to 32 component carriers | Intel Corporation | imported from 3GU |
R1‑154004 | HARQ-ACK transmission on PUSCH for up to 32 CCs | Intel Corporation | imported from 3GU |
R1‑154005 | Consideration on joint DCI for CA with up to 32 CCs | Intel Corporation | imported from 3GU |
R1‑154006 | On number of soft channel bits and soft buffer management for CA with up to 32 component carriers | Intel Corporation | imported from 3GU |
R1‑154007 | Deployment considerations for V2V | VODAFONE Group Plc | imported from 3GU |
R1‑154008 | RRM Measurements for Carrier Selection | Kyocera Corporation | imported from 3GU |
R1‑154009 | DL Transmission Design for LAA | Kyocera Corporation | imported from 3GU |
R1‑154010 | Multiple Transmissions to Different Destinations from the UE-to-Network Relay | Kyocera Corporation | imported from 3GU |
R1‑154011 | UE-to-Network Relay Resource Allocation | Kyocera Corporation | imported from 3GU |
R1‑154012 | CSI Measurement and Feedback for Elevation BF/FD-MIMO | Kyocera Corporation | imported from 3GU |
R1‑154013 | Analysis and text proposal for D2D-assisting positioning | ZTE Corporation | imported from 3GU |
R1‑154014 | Editorial change to TR37.857 Indoor Positioning Enhancements | ZTE Corporation | imported from 3GU |
R1‑154015 | Compact ACK/NACK feedback for PUSCH | Panasonic | imported from 3GU |
R1‑154016 | Rel.13 MTC impact to PBCH | Panasonic | imported from 3GU |
R1‑154017 | MTC terminology on normal coverage | Panasonic | imported from 3GU |
R1‑154018 | DRS design for LAA | Panasonic | imported from 3GU |
R1‑154019 | Two design directions related to burst structure indication | Panasonic | imported from 3GU |
R1‑154020 | AGC and time/frequency synchronization for transmission burst | Panasonic | imported from 3GU |
R1‑154021 | Introduction of the Multiflow 3F-4C configuration | Nokia Networks | imported from 3GU |
R1‑154022 | Introduction of 3F-4C Multiflow 3F-4C configuration | Nokia Networks | imported from 3GU |
R1‑154023 | On signalling alternatives for MUST | Sequans Communications | imported from 3GU |
R1‑154024 | DL control channel false detection | Fujitsu | imported from 3GU |
R1‑154025 | Application of DAI to CA | Fujitsu | imported from 3GU |
R1‑154026 | Discussion on non-precoded CSI-RS based schemes | Fujitsu | imported from 3GU |
R1‑154027 | Discussion on beamformed CSI-RS-based schemes | Fujitsu | imported from 3GU |
R1‑154028 | Discussion on DMRS enhancement | Fujitsu | imported from 3GU |
R1‑154029 | Discussion on Multiuser Superposition Transmission Schemes | Fujitsu | imported from 3GU |
R1‑154030 | Discussion on CSI enhancement for Multiuser Superposition Transmission Schemes | Fujitsu | imported from 3GU |
R1‑154031 | CSI enhancement for CA with up to 32 CCs | ZTE | imported from 3GU |
R1‑154032 | DL control enhancements for Carrier Aggregation | ZTE | imported from 3GU |
R1‑154033 | UCI transmission on PUSCH for eCA | ZTE | imported from 3GU |
R1‑154034 | HARQ-ACK bundling for eCA | ZTE | imported from 3GU |
R1‑154035 | Further considerations on the new PUCCH formats design | ZTE | imported from 3GU |
R1‑154036 | Adaptive HARQ-ACK codebook size determination | ZTE | imported from 3GU |
R1‑154037 | MBSFN subframe impact on timing relationship for MTC enhancement | ZTE | imported from 3GU |
R1‑154038 | Considerations on PDSCH for MTC enhancement | ZTE | imported from 3GU |
R1‑154039 | Further considerations on SIB(s) for MTC enhancement | ZTE | imported from 3GU |
R1‑154040 | Further considerations on PUCCH for MTC enhancement | ZTE | imported from 3GU |
R1‑154041 | Further considerations design on M-PDCCH for MTC | ZTE | imported from 3GU |
R1‑154042 | Narrowband definition and frequency hopping patterns for MTC enhancement | ZTE | imported from 3GU |
R1‑154043 | Resource allocation for Rel-13 low complexity UEs | ZTE | imported from 3GU |
R1‑154044 | Discussion on PRACH coverage enhancement for MTC | ZTE | imported from 3GU |
R1‑154045 | Further considerations on RAR and Paging for MTC enhancement | ZTE | imported from 3GU |
R1‑154046 | Considerations on CSI feedback for MTC enhancement | ZTE | imported from 3GU |
R1‑154047 | Discussion on the UL LBT for LAA | ZTE | imported from 3GU |
R1‑154048 | UL framework for LAA | ZTE | imported from 3GU |
R1‑154049 | Remaining issues on relay UE selection | ZTE | imported from 3GU |
R1‑154050 | Resource scheme for UE-to-network Relay UE and Remote UE | ZTE | imported from 3GU |
R1‑154051 | Condition parameters configuration of SLSS transmission. | ZTE | imported from 3GU |
R1‑154052 | D2D group priority | ZTE | imported from 3GU |
R1‑154053 | Discussions on Simulation evaluation methodology for V2X | ZTE | imported from 3GU |
R1‑154054 | Traffic Models and Performance Metric for V2X | ZTE | imported from 3GU |
R1‑154055 | Potential transmission schemes for MUST | ZTE | imported from 3GU |
R1‑154056 | Symbol superposition based Gray mapping scheme for MUST to be captured in TR | ZTE | imported from 3GU |
R1‑154057 | Preliminary system level simulation results for MUST | ZTE | imported from 3GU |
R1‑154058 | Preliminary link level simulation results for MUST | ZTE | imported from 3GU |
R1‑154059 | Frequency Allocation for M-PDCCH | SHARP Corporation | imported from 3GU |
R1‑154060 | Evaluation results of PUCCH payload size for CA beyond 5 carriers | SHARP Corporation | imported from 3GU |
R1‑154061 | Multiplexing of multiple periodic CSIs with HARQ-ACK bits | SHARP Corporation | imported from 3GU |
R1‑154062 | Enhancements of aperiodic CSI reporting for CA beyond 5 carriers | SHARP Corporation | imported from 3GU |
R1‑154063 | Considerations on False Detection for CA Beyond 5 Carriers | SHARP Corporation | imported from 3GU |
R1‑154064 | Contention Window Size Adjustment for LAA | SHARP Corporation | imported from 3GU |
R1‑154065 | CCA slot structure and alignment in LAA channel access | SHARP Corporation | imported from 3GU |
R1‑154066 | Backoff counter handling for intra-operator LAA frequency reuse | SHARP Corporation | imported from 3GU |
R1‑154067 | DRS design for LAA | SHARP Corporation | imported from 3GU |
R1‑154068 | On RSSI measurement for LAA | SHARP Corporation | imported from 3GU |
R1‑154069 | Subframe structure for LAA discontinuous transmission | SHARP Corporation | imported from 3GU |
R1‑154070 | Consideration of CSI measurement, CSI reporting, and transmission schemes for LAA | SHARP Corporation | imported from 3GU |
R1‑154071 | A Unified Framework for Discussing NOMA Schemes | SHARP Corporation | imported from 3GU |
R1‑154072 | SI Acquisition Across Windows | Nokia Networks | imported from 3GU |
R1‑154073 | On LAA CSI related issues | ZTE Corporation | imported from 3GU |
R1‑154074 | On LAA RRM measurement and carrier selection | ZTE Corporation | imported from 3GU |
R1‑154075 | Details of DRS design for LAA | ZTE Corporation | imported from 3GU |
R1‑154076 | UE processing time relaxation on Type 2 Power Headroom Reporting | Intel Corporation | imported from 3GU |
R1‑154077 | [Draft] Reply LS on Type 2 Power Headroom reporting | Intel Corporation | imported from 3GU |
R1‑154078 | LBT updates for LAA DL: post random backoff | Intel Corporation | imported from 3GU |
R1‑154079 | Multi-carrier LBT design and performance evaluation for LAA DL | Intel Corporation | imported from 3GU |
R1‑154080 | LBT design and performance evaluation for LAA UL | Intel Corporation | imported from 3GU |
R1‑154081 | On the contention window adaptation for DL only LAA | Intel Corporation | imported from 3GU |
R1‑154082 | On the starting and ending positions for LAA DL sub-frame | Intel Corporation | imported from 3GU |
R1‑154083 | LBT for cross-carrier UL scheduling | Intel Corporation | imported from 3GU |
R1‑154084 | Energy detection threshold for LAA DL and UL LBT | Intel Corporation | imported from 3GU |
R1‑154085 | DL sub-frame structure and sheduling: partial/super/floating subframe and (e)PDCCH | Intel Corporation | imported from 3GU |
R1‑154086 | Initial signal for LAA | Intel Corporation | imported from 3GU |
R1‑154087 | On the dynamic power sharing among multiple LAA SCells for DL-only transmission | Intel Corporation | imported from 3GU |
R1‑154088 | Support of dynamic point switching CoMP for LAA DL | Intel Corporation | imported from 3GU |
R1‑154089 | Support for up to 4 layers for TM3 and TM4 | Samsung | imported from 3GU |
R1‑154090 | [Draft] reply LS on enhanced signalling for inter-eNB CoMP | Samsung | imported from 3GU |
R1‑154091 | DL/UL HARQ timing for low cost MTC UEs in enhanced coverage | Samsung | imported from 3GU |
R1‑154092 | Definition and Signaling of Narrow-bands | Samsung | imported from 3GU |
R1‑154093 | Time and Frequency Resource Allocation for DL/UL Channels | Samsung | imported from 3GU |
R1‑154094 | Frequency Hopping for Rel-13 Low Cost UEs | Samsung | imported from 3GU |
R1‑154095 | M-PDCCH Design | Samsung | imported from 3GU |
R1‑154096 | CSS for M-PDCCH | Samsung | imported from 3GU |
R1‑154097 | Compact DCI Formats | Samsung | imported from 3GU |
R1‑154098 | PHICH Functionality for Low Cost UEs | Samsung | imported from 3GU |
R1‑154099 | Reduction of DL Control Signaling for Low Cost UEs | Samsung | imported from 3GU |
R1‑154100 | PDSCH Transmission with Repetitions | Samsung | imported from 3GU |
R1‑154101 | UE Transmit power control for a UE operating in enhanced coverage | Samsung | imported from 3GU |
R1‑154102 | CSI Measurements and Reporting | Samsung | imported from 3GU |
R1‑154103 | UCI Transmission for Low Cost UEs | Samsung | imported from 3GU |
R1‑154104 | HARQ-ACK Information in Coverage Enhanced Operation | Samsung | imported from 3GU |
R1‑154105 | RA Preamble Transmission | Samsung | imported from 3GU |
R1‑154106 | SIB-1 Transmission for Low Cost UEs | Samsung | imported from 3GU |
R1‑154107 | RAR/Msg3/Msg4 Transmission | Samsung | imported from 3GU |
R1‑154108 | Scheduling for RAR and Paging | Samsung | imported from 3GU |
R1‑154109 | TDD configuration adaptation for Low Cost UEs | Samsung | imported from 3GU |
R1‑154110 | DC subcarrier handling for Rel-13 Low-cost UE | Samsung | imported from 3GU |
R1‑154111 | UE behaviour for simultaneous/non-simultaneous reception | Samsung | imported from 3GU |
R1‑154112 | PUCCH Format(s) for Enhanced CA | Samsung | imported from 3GU |
R1‑154113 | Coding and RE mapping for multiple UCI for eCA | Samsung | imported from 3GU |
R1‑154114 | Power control for eCA | Samsung | imported from 3GU |
R1‑154115 | HARQ-ACK Encoding and Rate Matching | Samsung | imported from 3GU |
R1‑154116 | HARQ-ACK Coverage Enhancements | Samsung | imported from 3GU |
R1‑154117 | Discussion on HARQ-ACK codebook determination for eCA | Samsung | imported from 3GU |
R1‑154118 | Multiplexing of periodic CSI reports for CA with up to 32 CCs | Samsung | imported from 3GU |
R1‑154119 | Transmission of P-CSI for multiple cells for eCA | Samsung | imported from 3GU |
R1‑154120 | Priority rules for CSI feedback for eCA | Samsung | imported from 3GU |
R1‑154121 | Multiplexing of periodic CSI reports and HARQ-ACK feedback | Samsung | imported from 3GU |
R1‑154122 | HARQ-ACK Transmission in PUSCH | Samsung | imported from 3GU |
R1‑154123 | A-CSI Transmission for Enhanced CA | Samsung | imported from 3GU |
R1‑154124 | Remaining issues for cross-carrier scheduling in CA with up to 32 CCs | Samsung | imported from 3GU |
R1‑154125 | Other DL control enhancements for CA with up to 32 CCs | Samsung | imported from 3GU |
R1‑154126 | Other enhancements for eCA | Samsung | imported from 3GU |
R1‑154127 | Evaluation results of relay selection schemes | Samsung | imported from 3GU |
R1‑154128 | eD2D discovery in partial and out-of-coverage scenarios | Samsung | imported from 3GU |
R1‑154129 | Power limitation handling in the presence of multiple carriers | Samsung | imported from 3GU |
R1‑154130 | eD2D power control in a non-serving carrier | Samsung | imported from 3GU |
R1‑154131 | Timing synchronization for discovery transmission in a non-serving carrier | Samsung | imported from 3GU |
R1‑154132 | Concurrent transmission handling for inter-frequency discovery | Samsung | imported from 3GU |
R1‑154133 | Discussion on ProSe Gap for discovery transmission | Samsung | imported from 3GU |
R1‑154134 | Support of different priorities for D2D communication | Samsung | imported from 3GU |
R1‑154135 | Discussion on Category 4 LBT for DL transmission | Samsung | imported from 3GU |
R1‑154136 | Discussion on Category 4 LBT for UL transmission | Samsung | imported from 3GU |
R1‑154137 | LBT procedure for multiple-carrier transmission | Samsung | imported from 3GU |
R1‑154138 | Discussion on Category 2 LBT for UL transmission | Samsung | imported from 3GU |
R1‑154139 | CCA threshold and transmission power for LAA | Samsung | imported from 3GU |
R1‑154140 | Discussion on self-deferral procedure for LBT Cat. 4 | Samsung | imported from 3GU |
R1‑154141 | Performance of frequency reuse for different CW adaptation schemes | Samsung | imported from 3GU |
R1‑154142 | Design options for LAA frequency reuse | Samsung | imported from 3GU |
R1‑154143 | DRS design and LBT procedure | Samsung | imported from 3GU |
R1‑154144 | LAA RRM measurement | Samsung | imported from 3GU |
R1‑154145 | LAA RSSI measurement | Samsung | imported from 3GU |
R1‑154146 | LAA synchronization | Samsung | imported from 3GU |
R1‑154147 | LAA transmission burst structure and signaling | Samsung | imported from 3GU |
R1‑154148 | LAA DL transmission burst detection | Samsung | imported from 3GU |
R1‑154149 | LAA fast carrier selection | Samsung | imported from 3GU |
R1‑154150 | Partial subframe for LAA | Samsung | imported from 3GU |
R1‑154151 | Initial signal for LAA | Samsung | imported from 3GU |
R1‑154152 | LAA HARQ procedure | Samsung | imported from 3GU |
R1‑154153 | LAA CSI measurements | Samsung | imported from 3GU |
R1‑154154 | Discussion on CSI reporting for LAA | Samsung | imported from 3GU |
R1‑154155 | Discussion on Transmission Mode for FD-MIMO | Samsung | imported from 3GU |
R1‑154156 | CSI process and CSI-RS configuration for Rel.13 FD-MIMO | Samsung | imported from 3GU |
R1‑154157 | Antenna configurations and antenna port numbering for FD-MIMO | Samsung | imported from 3GU |
R1‑154158 | Utilization of beamformed CSI-RS for FD-MIMO | Samsung | imported from 3GU |
R1‑154159 | Discussion on NZP CSI-RS resource configuration for 12 and 16 ports | Samsung | imported from 3GU |
R1‑154160 | CSI-RS transmission on special subframes | Samsung | imported from 3GU |
R1‑154161 | Discussion on measurement restriction for beamformed CSI-RS | Samsung | imported from 3GU |
R1‑154162 | Discussions on Hybrid CSI-RS configurations | Samsung | imported from 3GU |
R1‑154163 | Configuration of beamformed CSI-RS for FD-MIMO | Samsung | imported from 3GU |
R1‑154164 | Discussions on SRS capacity improvement options | Samsung | imported from 3GU |
R1‑154165 | Discussions on 4Tx switching SRS | Samsung | imported from 3GU |
R1‑154166 | Discussion on DMRS enhancement for FD-MIMO | Samsung | imported from 3GU |
R1‑154167 | Design of DCI for Additional DMRS Ports | Samsung | imported from 3GU |
R1‑154168 | Discussion on vertical domain power control for FD-MIMO | Samsung | imported from 3GU |
R1‑154169 | Support of 8 port codebook for FD-MIMO | Samsung | imported from 3GU |
R1‑154170 | Codebook structure for non-precoded and beamformed CSI-RS | Samsung | imported from 3GU |
R1‑154171 | Rank-1 codebook design | Samsung | imported from 3GU |
R1‑154172 | High-rank codebook design | Samsung | imported from 3GU |
R1‑154173 | Initial performance evaluation of FD-MIMO codebooks | Samsung | imported from 3GU |
R1‑154174 | FD-MIMO codebook framework for 12 and 16 port CSI-RS | Samsung | imported from 3GU |
R1‑154175 | Rank-1/2 codebook design for beamformed CSI-RS | Samsung | imported from 3GU |
R1‑154176 | High-rank codebook design for beamformed CSI-RS | Samsung | imported from 3GU |
R1‑154177 | Discussions on periodic CSI reporting for FD-MIMO | Samsung | imported from 3GU |
R1‑154178 | Evaluation results on wideband CSI reporting for FD-MIMO | Samsung | imported from 3GU |
R1‑154179 | Evaluation results on subband CSI reporting for FD-MIMO | Samsung | imported from 3GU |
R1‑154180 | Extension of Rel.12 CSI reporting modes for Rel.13 FD-MIMO | Samsung | imported from 3GU |
R1‑154181 | UE and eNB complexity and overhead analysis related to CSI reporting | Samsung | imported from 3GU |
R1‑154182 | Discussions on hybrid CSI-RS based schemes | Samsung | imported from 3GU |
R1‑154183 | Discussion on non-codebook based CSI reporting | Samsung | imported from 3GU |
R1‑154184 | Bit to Symbol Mapping for Multiuser Superposition Transmission | Samsung | imported from 3GU |
R1‑154185 | Bit-swapping Rule for maintaining Gray mapping in MUST | Samsung | imported from 3GU |
R1‑154186 | Considerations for User Power Allocation in MUST | Samsung | imported from 3GU |
R1‑154187 | Preliminary Link-level Results for Superposition Transmission | Samsung | imported from 3GU |
R1‑154188 | V2X deployment scenarios and vehicle density and mobility modeling | Samsung | imported from 3GU |
R1‑154189 | Traffic models and performance metrics for V2X | Samsung | imported from 3GU |
R1‑154190 | Overview of V2X features and specification impact | Samsung | imported from 3GU |
R1‑154191 | PUCCH resource indication for CA up to 32 CCs | NEC | imported from 3GU |
R1‑154192 | Network coordination of WAN and D2D communications in UE-to-Network Relay | NEC | imported from 3GU |
R1‑154193 | Discussion on Implementing Superposition Transmission in LTE Downlink | NEC | imported from 3GU |
R1‑154194 | Deployment scenarios of LTE-based V2X | NEC | imported from 3GU |
R1‑154195 | Definition of Narrowbands across System BW for LTE Rel-13 MTC | NEC | imported from 3GU |
R1‑154196 | Details of the Frequency hopping schemes for LTE Rel-13 MTC | NEC | imported from 3GU |
R1‑154197 | RAR and Paging transmission for Rel-13 MTC | NEC | imported from 3GU |
R1‑154198 | DMRS based PDSCH transmission in LAA SCell | NEC | imported from 3GU |
R1‑154199 | Consideration on CSI-RS configuration and pattern for Non-precoded CSI-RS-based scheme | NEC | imported from 3GU |
R1‑154200 | Discussion on power boosting for Non-precoded CSI-RS | NEC | imported from 3GU |
R1‑154201 | Discussion on beamformed CSI-RS-based scheme | NEC | imported from 3GU |
R1‑154202 | Discussion on DMRS enhancement for higher order MU-MIMO | NEC | imported from 3GU |
R1‑154203 | Discussion on CSI feedback for FD-MIMO | NEC | imported from 3GU |
R1‑154204 | Discussion on LAA frame structure | NEC | imported from 3GU |
R1‑154205 | Discussion on DRS enhancement for LAA | NEC | imported from 3GU |
R1‑154206 | Discussion on UE RRM measurement/reporting for LAA | NEC | imported from 3GU |
R1‑154207 | Discussion on downlink scheduling for LAA | NEC | imported from 3GU |
R1‑154208 | Discussion on initial signal design for LAA | NEC | imported from 3GU |
R1‑154209 | Discussion on starting and ending of LAA transmission | NEC | imported from 3GU |
R1‑154210 | Uplink Reference Signal Enhancement for Rel-13 low complexity MTC | NEC | imported from 3GU |
R1‑154211 | Cross PRB Channel Estimation for M-PDCCH | Sony Corporation | imported from 3GU |
R1‑154212 | Distributed vs Localised Mappings For 24 eCCE M-PDCCH | Sony Corporation | imported from 3GU |
R1‑154213 | Valid subframes for M-PDCCH and PDSCH for MTC | Sony Corporation | imported from 3GU |
R1‑154214 | M-PDCCH Repetition for LC-MTC | Sony Corporation | imported from 3GU |
R1‑154215 | CSI Measurement for LC-MTC | Sony Corporation | imported from 3GU |
R1‑154216 | On Coverage Level, Coverage Mode & Repetition Level in LC-MTC | Sony Corporation | imported from 3GU |
R1‑154217 | Carrier selection procedure | Sony Corporation | imported from 3GU |
R1‑154218 | Beamformed CSI-RS implementation for FD-MIMO | Sony Corporation | imported from 3GU |
R1‑154219 | Inter-cell SRS coordination | Sony Corporation | imported from 3GU |
R1‑154220 | Block Error Rate evaluation of Link-level simulation | Sony Corporation | imported from 3GU |
R1‑154221 | Bitrate evaluation of Link-level simulation | Sony Corporation | imported from 3GU |
R1‑154222 | Retransmission issues in MUST | Sony Corporation | imported from 3GU |
R1‑154223 | Considerations on LTE-based V2X deployment scenarios | Sony Corporation | imported from 3GU |
R1‑154224 | Considerations on performance metrics and traffic models for LTE-based V2X | Sony Corporation | imported from 3GU |
R1‑154225 | New functionality required to operate commercial V2X services | Sony Corporation | imported from 3GU |
R1‑154226 | Discussion on the feedback framework for beamformed CSI-RS | CATT | imported from 3GU |
R1‑154227 | Discussions on narrowband definition and hopping pattern across narrowbands | LG Electronics | imported from 3GU |
R1‑154228 | Cross-subframe details for normal and enhanced coverage for Rel-13 MTC UEs | LG Electronics | imported from 3GU |
R1‑154229 | Discussion on Resource configuration for low complexity MTC UEs | LG Electronics | imported from 3GU |
R1‑154230 | Measurement Gap Configuration and Measurement for MTC UEs | LG Electronics | imported from 3GU |
R1‑154231 | Details on M-PDCCH search space design | LG Electronics | imported from 3GU |
R1‑154232 | Discussion on M-PDCCH transmission | LG Electronics | imported from 3GU |
R1‑154233 | Configurations for M-PDCCH search space | LG Electronics | imported from 3GU |
R1‑154234 | Details on DCI contents for MTC | LG Electronics | imported from 3GU |
R1‑154235 | Discussion on PDSCH transmission | LG Electronics | imported from 3GU |
R1‑154236 | Further details on CQI/MCS/TBS table design for MTC | LG Electronics | imported from 3GU |
R1‑154237 | Discussion on PUSCH transmissions for MTC | LG Electronics | imported from 3GU |
R1‑154238 | Details on PUCCH and UCI for MTC UE | LG Electronics | imported from 3GU |
R1‑154239 | Details on SR and SRS transmission for MTC UE | LG Electronics | imported from 3GU |
R1‑154240 | CSI feedback for low complexity UEs | LG Electronics | imported from 3GU |
R1‑154241 | Details on RACH procedure for MTC UE | LG Electronics | imported from 3GU |
R1‑154242 | Further discussion on Common Control Messages for MTC UEs | LG Electronics | imported from 3GU |
R1‑154243 | Repetition level configuration for MTC UEs in enhanced coverage | LG Electronics | imported from 3GU |
R1‑154244 | Discussion on data overlapping and simultaneous transmission and reception for MTC UEs | LG Electronics | imported from 3GU |
R1‑154245 | Design on new PUCCH format for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154246 | Evaluation on new PUCCH format for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154247 | HARQ-ACK payload adaptation for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154248 | Periodic CSI feedback enhancement for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154249 | Aperiodic CSI feedback enhancement for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154250 | Enhancement to UCI on PUSCH for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154251 | SRS transmission handling for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154252 | DL control enhancement for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154253 | DCI false detection handling for Rel-13 CA | LG Electronics | imported from 3GU |
R1‑154254 | Discussion on PC5 measurement for UE-to-Network relay operation | LG Electronics | imported from 3GU |
R1‑154255 | Discussion on relay and synchronization source selection for UE-to-Network relay operation | LG Electronics | imported from 3GU |
R1‑154256 | Multiple scheduling assignment transmission within a SC period | LG Electronics | imported from 3GU |
R1‑154257 | Remaining issues of Type 1 discovery Enhancement | LG Electronics | imported from 3GU |
R1‑154258 | On supporting discovery in a carrier other than Pcell | LG Electronics | imported from 3GU |
R1‑154259 | Discussion on support of prioritization for D2D communication | LG Electronics | imported from 3GU |
R1‑154260 | On D2D transmission power control in a multicarrier scenario | LG Electronics | imported from 3GU |
R1‑154261 | DL LBT design in LAA | LG Electronics | imported from 3GU |
R1‑154262 | Multi-carrier DL TX in LAA | LG Electronics | imported from 3GU |
R1‑154263 | UL LBT design in LAA | LG Electronics | imported from 3GU |
R1‑154264 | DRS design in LAA | LG Electronics | imported from 3GU |
R1‑154265 | RRM measurement in LAA | LG Electronics | imported from 3GU |
R1‑154266 | DL transmission structure in LAA | LG Electronics | imported from 3GU |
R1‑154267 | DL synchronization and AGC issues in LAA | LG Electronics | imported from 3GU |
R1‑154268 | Reservation signal design in LAA | LG Electronics | imported from 3GU |
R1‑154269 | Notion of DL TX burst structure at UE side in LAA | LG Electronics | imported from 3GU |
R1‑154270 | Transmission modes and CSI report in LAA | LG Electronics | imported from 3GU |
R1‑154271 | Discussion on EBF/FD-MIMO transmission mode | LG Electronics | imported from 3GU |
R1‑154272 | CSI process and CSI-RS configurations for supporting EBF/FD-MIMO | LG Electronics | imported from 3GU |
R1‑154273 | Discussion on 12 and 16 port non-precoded CSI-RS design | LG Electronics | imported from 3GU |
R1‑154274 | Beamformed CSI-RS related enhancements based on the identified approaches | LG Electronics | imported from 3GU |
R1‑154275 | Discussion on SRS capacity improvement | LG Electronics | imported from 3GU |
R1‑154276 | Discussion on DMRS enhancement for EBF/FD-MIMO | LG Electronics | imported from 3GU |
R1‑154277 | Discussion on 2D codebook design options for EBF/FD-MIMO | LG Electronics | imported from 3GU |
R1‑154278 | Enhancements on non-precoded CSI-RS based CSI reporting | LG Electronics | imported from 3GU |
R1‑154279 | Enhancements on beamformed CSI-RS based CSI reporting | LG Electronics | imported from 3GU |
R1‑154280 | System level evaluation results for D2D aided positioning | LG Electronics | imported from 3GU |
R1‑154281 | Text proposal on potential OTDOA enhancements for indoor positioning | LG Electronics | imported from 3GU |
R1‑154282 | Discussion on multiuser superposition schemes and signaling schemes | LG Electronics | imported from 3GU |
R1‑154283 | Initial System Level Evaluation Result of MUST | LG Electronics | imported from 3GU |
R1‑154284 | Initial Link Level Performance of ML and CWIC for MUST | LG Electronics | imported from 3GU |
R1‑154285 | 3GPP TR 36.885 v.0.0.1 (skeleton) Study on LTE-based V2X Services | LG Electronics, CATT, Huawei | imported from 3GU |
R1‑154286 | Proposed work plan for LTE-based V2X study item | LG Electronics, CATT, Huawei | imported from 3GU |
R1‑154287 | Discussion on channel model and other simulation parameters | LG Electronics | imported from 3GU |
R1‑154288 | Discussion on the deployment scenarios of V2X evaluation methodology | LG Electronics | imported from 3GU |
R1‑154289 | Discussion on traffic models and performance metric | LG Electronics | imported from 3GU |
R1‑154290 | Potential enhencements for PC5-based V2V | LG Electronics | imported from 3GU |
R1‑154291 | Potential enhancement areas for Uu-based V2V and Uu/PC5-based V2I/N/P | LG Electronics | imported from 3GU |
R1‑154292 | CSI Feedback Design for Real FD-MIMO Deployment | KT Corporation | imported from 3GU |
R1‑154293 | PUCCH format design for 32 CCs | CMCC | imported from 3GU |
R1‑154294 | Discussion on broadcast and control signaling transmission for LAA | CMCC | imported from 3GU |
R1‑154295 | Discussion on issues related to UL channel access for LAA | CMCC | imported from 3GU |
R1‑154296 | Discussion on discovery signal design for LAA | CMCC | imported from 3GU |
R1‑154297 | Discussion on fractional subframe design for LAA | CMCC | imported from 3GU |
R1‑154298 | General views on 3D-MIMO WI | CMCC | imported from 3GU |
R1‑154299 | 3D-MIMO measurement resources and CSI process definition | CMCC | imported from 3GU |
R1‑154300 | Transmission of non-precoded CSI-RS | CMCC | imported from 3GU |
R1‑154301 | Spec impact of beamformed CSI-RS | CMCC | imported from 3GU |
R1‑154302 | Further evaluations of UE-specific beamformed CSI-RS | CMCC | imported from 3GU |
R1‑154303 | Discussion on SRS capacity improvement | CMCC | imported from 3GU |
R1‑154304 | Spec impact of additional DMRS ports | CMCC | imported from 3GU |
R1‑154305 | KP-based 2D codebook and performance evaluations | CMCC | imported from 3GU |
R1‑154306 | Views On Superposition Transmission Schemes | CMCC | imported from 3GU |
R1‑154307 | Discussion on Mixed Transmission Schemes in MUST | CMCC | imported from 3GU |
R1‑154308 | On V2X Operating Scenario | CMCC | imported from 3GU |
R1‑154309 | HARQ-ACK codebook determination | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑154310 | Mitigation of DCI false detection problem | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑154311 | Additional Simulation Results for TBS Option 2 | NextNav | imported from 3GU |
R1‑154312 | Discussion on number of control symbols in subframes without PHICH | Qualcomm Incorporated | imported from 3GU |
R1‑154313 | Different TDD configurations for OTDOA in CA | Ericsson | imported from 3GU |
R1‑154314 | Clarification on Different TDD configurations for OTDOA in CA | Ericsson, LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154315 | Clarification on Different TDD configurations for OTDOA in CA | Ericsson, LG Electronics, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154316 | Summary of Indoor Positioning Study | Ericsson | imported from 3GU |
R1‑154317 | Contention window size adaptation for DL LBT in LAA | ZTE | imported from 3GU |
R1‑154318 | Design of DL LBT | ZTE | imported from 3GU |
R1‑154319 | Considerations on the design of partial subframe | ZTE | imported from 3GU |
R1‑154320 | Discussion on Scheduling Combinations for LAA | ZTE | imported from 3GU |
R1‑154321 | Details of Initial Signal Design | ZTE | imported from 3GU |
R1‑154322 | Frequency Reuse on Unlicensed Carrier | ZTE | imported from 3GU |
R1‑154323 | Clarifications for scheduling behavior related to the collision between port 5, 7-14 DMRS and PSS/SSS/PBCH | Huawei, HiSilicon | imported from 3GU |
R1‑154324 | Support for carrier selection/switching in CA enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑154325 | Downlink resource allocation for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑154326 | L1 indication for UE support of fast carrier selection | Huawei, HiSilicon | imported from 3GU |
R1‑154327 | UE support of carrier selection for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑154328 | Retuning for PSS/SSS, PBCH and possibly other channels | Huawei, HiSilicon | imported from 3GU |
R1‑154329 | Support of AL<24 for M-PDCCH | Huawei, HiSilicon | imported from 3GU |
R1‑154330 | Mapping of 24 ECCEs for MTC UEs | Huawei, HiSilicon | imported from 3GU |
R1‑154331 | On MTC SI transmission | Huawei, HiSilicon | imported from 3GU |
R1‑154332 | UE power consumption reduction techniques | Huawei, HiSilicon | imported from 3GU |
R1‑154333 | Maximum number of HARQ-ACK bits for TDD | Huawei, HiSilicon | imported from 3GU |
R1‑154334 | Design for Multi-PRB PUCCH format based on PUCCH format 3 | Huawei, HiSilicon | imported from 3GU |
R1‑154335 | PUCCH resource allocation | Huawei, HiSilicon | imported from 3GU |
R1‑154336 | CRC code and higher order modulation for uplink control information | Huawei, HiSilicon | imported from 3GU |
R1‑154337 | UCI on PUSCH for carrier aggregation enhancement beyond 5 carriers | Huawei, HiSilicon | imported from 3GU |
R1‑154338 | Inclusion of Uu link quality for relay selection | Huawei, HiSilicon | imported from 3GU |
R1‑154339 | Discussion on group priority for D2D communication | Huawei, HiSilicon | imported from 3GU |
R1‑154340 | Updates on the progress in ETSI BRAN | Huawei, HiSilicon | imported from 3GU |
R1‑154341 | Hidden node detection methods for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑154342 | Multicarrier operation for LAA DL | Huawei, HiSilicon | imported from 3GU |
R1‑154343 | CCA measurement to support frequency reuse | Huawei, HiSilicon | imported from 3GU |
R1‑154344 | Preamble for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑154345 | LAA downlink subframe timing | Huawei, HiSilicon | imported from 3GU |
R1‑154346 | Scheduling design for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑154347 | Carrier configuration for UE support of carrier selection | Huawei, HiSilicon | imported from 3GU |
R1‑154348 | Transmission bandwidth for LAA | Huawei, HiSilicon | imported from 3GU |
R1‑154349 | Beamformed CSI-RS design | Huawei, HiSilicon | imported from 3GU |
R1‑154350 | TP for adding proper references for TR36.855 into TR37.857 | Huawei, HiSilicon | imported from 3GU |
R1‑154351 | TP for conclusions of indoor positioning enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑154352 | TP for UTRAN indoor positioning | Huawei, HiSilicon | imported from 3GU |
R1‑154353 | TP for updating Baseline performance | Huawei, HiSilicon | imported from 3GU |
R1‑154354 | Text Proposal on updating Enhancements for OTDOA | Huawei, HiSilicon | imported from 3GU |
R1‑154355 | Text Proposal on updating Enhancements for E-CID | Huawei, HiSilicon | imported from 3GU |
R1‑154356 | Text Proposal on updating other positioning technology enhancements for indoor positioning | Huawei, HiSilicon | imported from 3GU |
R1‑154357 | TP for classification of MUST schemes | Huawei, HiSilicon | imported from 3GU |
R1‑154358 | System level simulation results for the superposition of PMCH and PMCH | Huawei, HiSilicon | imported from 3GU |
R1‑154359 | Link-level configurations of MUST schemes in MIMO transmission | Huawei, HiSilicon | imported from 3GU |
R1‑154360 | Link-level performance of MUST schemes | Huawei, HiSilicon | imported from 3GU |
R1‑154361 | Impact of SA transmissions | Huawei, HiSilicon | imported from 3GU |
R1‑154362 | Variable number of V2V packet transmissions | Huawei, HiSilicon | imported from 3GU |
R1‑154363 | Valid measurement samples to RRC | NEC | imported from 3GU |
R1‑154364 | Resource Configurations for Non-Precoded CSI-RS with 12 or 16 Antenna Ports | ITRI | imported from 3GU |
R1‑154365 | Discussions of CSI Reporting for FD-MIMO | ITRI | imported from 3GU |
R1‑154366 | Evaluation Results of Codebook Proposals for FD-MIMO | ITRI | imported from 3GU |
R1‑154367 | Configurations of Beamformed CSI-RS | ITRI | imported from 3GU |
R1‑154368 | On the LAA DL transmission | ITRI | imported from 3GU |
R1‑154369 | Further evaluation results for LAA frequency reuse | ITRI | imported from 3GU |
R1‑154370 | Evaluation results of UL LBT procedures | ITRI | imported from 3GU |
R1‑154371 | Considerations for the remaining details of PC5 measurements | ITRI | imported from 3GU |
R1‑154372 | Discussion on the multiple-carrier discovery for intra/inter-PLMN ProSe | ITRI | imported from 3GU |
R1‑154373 | Discussion on V2X communications in mobility scenario | ITRI | imported from 3GU |
R1‑154374 | Using big number devices to enhance accuracy | III | imported from 3GU |
R1‑154375 | Category 4 LBT for LAA Downlink | KDDI Corporation | imported from 3GU |
R1‑154376 | Discussion on RRM measurement enhancement for LAA | KDDI Corporation | imported from 3GU |
R1‑154377 | Transmission Mode for EBF/FD MIMO | ZTE | imported from 3GU |
R1‑154378 | Discussion on CSI Process and CSI-RS Resource Definitions | ZTE | imported from 3GU |
R1‑154379 | Feedback Enhancements for Beamformed CSI-RS based Schemes | ZTE | imported from 3GU |
R1‑154380 | Enhanced CSI Schemes for TDD EBF/FD-MIMO System | ZTE | imported from 3GU |
R1‑154381 | Extension of Non-Precoded CSI-RS for 12 and 16 Ports | ZTE | imported from 3GU |
R1‑154382 | Discussion on 2D Codebook Design for EBF/FD-MIMO System | ZTE | imported from 3GU |
R1‑154383 | Specification Impacts of Beamformed CSI-RS Configuration | ZTE | imported from 3GU |
R1‑154384 | Discussion on SRS Capacity Improvement | ZTE | imported from 3GU |
R1‑154385 | Discussion on DMRS Enhancement for EBF/FD-MIMO | ZTE | imported from 3GU |
R1‑154386 | Channel coding for MTC PUSCH | ETRI | imported from 3GU |
R1‑154387 | Higher order modulation schemes for new PUCCH format | ETRI | imported from 3GU |
R1‑154388 | Channel access procedure for LAA | ETRI | imported from 3GU |
R1‑154389 | Extended DRS design for LTE-LAA | ETRI | imported from 3GU |
R1‑154390 | Discussion on congestion measurement for LAA | ETRI | imported from 3GU |
R1‑154391 | Discussion on downlink scheduling for LAA | ETRI | imported from 3GU |
R1‑154392 | CSI measurement and report for LAA | ETRI | imported from 3GU |
R1‑154393 | Proposals on the correction for TXRU virtualization model in TR 36.897 | ETRI | imported from 3GU |
R1‑154394 | Discussion on configuration of CSI measurement and feedback for EB/FD-MIMO | ETRI | imported from 3GU |
R1‑154395 | Effect of antenna virtualization on CSI-RS coverage in EBF/FD-MIMO | ETRI | imported from 3GU |
R1‑154396 | Discussion on CSI-RS enhancements for non-precoded CSI-RS | ETRI | imported from 3GU |
R1‑154397 | Codebook proposal for 2D cross-polarized ULA | ETRI | imported from 3GU |
R1‑154398 | Periodic CSI reporting for elevation beamforming | ETRI | imported from 3GU |
R1‑154399 | LTE-based V2X Deployment Scenarios | ETRI | imported from 3GU |
R1‑154400 | Considerations on evaluation of DMRS for V2V | ETRI | imported from 3GU |
R1‑154401 | CSI feedback enhancements for EB/FD-MIMO | China Telecommunications | imported from 3GU |
R1‑154402 | Preliminary system-level evaluation results for superposition transmission | China Telecommunications | imported from 3GU |
R1‑154403 | Views on DL LBT mechanism and contention window size adaptation | NTT DOCOMO, INC. | imported from 3GU |
R1‑154404 | Discussion on channel access framework for potential LAA UL | NTT DOCOMO, INC. | imported from 3GU |
R1‑154405 | Discussion on DRS design for LAA | NTT DOCOMO, INC. | imported from 3GU |
R1‑154406 | Discussion on discontinuous transmission and scheduling design for LAA DL | NTT DOCOMO, INC. | imported from 3GU |
R1‑154407 | Discussion on CSI measurement design for LAA DL | NTT DOCOMO, INC. | imported from 3GU |
R1‑154408 | Support Full-Duplex Radio (FDR) Operation for LAA | III | imported from 3GU |
R1‑154409 | On the LAA DRS design | Intel Corporation | imported from 3GU |
R1‑154410 | On the LAA DRS transmission | Intel Corporation | imported from 3GU |
R1‑154411 | RRM measurements for LAA | Intel Corporation | imported from 3GU |
R1‑154412 | Introduction of MIMO capability signalling for intra-band contiguous CA | Intel Corporation | imported from 3GU |
R1‑154413 | TP for TR37.857 on CRS+PRS (Section 7.1.1.1.10) | Intel Corporation | imported from 3GU |
R1‑154414 | TP for TR37.857 on EB/FD-MIMO based positioning (Section 7.1.1.1.9) | Intel Corporation | imported from 3GU |
R1‑154415 | TP for TR37.857 on Same Cell ID Case (Section 7.1.1.1.5) | Intel Corporation | imported from 3GU |
R1‑154416 | Discussion on LAA scheduling | Fiberhome Technologies Group | imported from 3GU |
R1‑154417 | MBS simulation results | TeleCommunication Systems, Inc. | imported from 3GU |
R1‑154418 | Further consideration on joint grant for up to 32 CCs | Ericsson | imported from 3GU |
R1‑154419 | PUCCH format design for CA enhancement | Ericsson | imported from 3GU |
R1‑154420 | HARQ-ACK transmission for Rel-13 CA enhancement | Ericsson | imported from 3GU |
R1‑154421 | HARQ on PUSCH for Rel-13 CA enhancement | Ericsson | imported from 3GU |
R1‑154422 | CSI feedback enhancements for up to 32 CCs | Ericsson | imported from 3GU |
R1‑154423 | CRC for HARQ-ACK transmission for Rel-13 CA enhancement | Ericsson | imported from 3GU |
R1‑154424 | Carrier selection for Rel-13 CA enhancement | Ericsson | imported from 3GU |
R1‑154425 | PUCCH resource allocation for Rel-13 CA enhancement | Ericsson | imported from 3GU |
R1‑154426 | Discussion of V2P scenario | III | imported from 3GU |
R1‑154427 | 36.211 CR0203(Rel-12,F)Clarification on SRS BW configuration | Huawei, HiSilicon | imported from 3GU |
R1‑154428 | PUCCH formats for CA with up to 32 CCs | NTT DOCOMO, INC. | imported from 3GU |
R1‑154429 | HARQ-ACK feedback for CA with up to 32 CCs | NTT DOCOMO, INC. | imported from 3GU |
R1‑154430 | CSI feedback for CA with up to 32 CCs | NTT DOCOMO, INC. | imported from 3GU |
R1‑154431 | UCI on PUSCH for CA with up to 32 CCs | NTT DOCOMO, INC. | imported from 3GU |
R1‑154432 | Further considerations on M-PDCCH for MTC | ZTE Corporation | imported from 3GU |
R1‑154433 | Discussion on narrow-band resource allocation | KDDI Corporation | imported from 3GU |
R1‑154434 | Considerations on the LTE V2X Feasibility Study | Ericsson | imported from 3GU |
R1‑154435 | Configuration parameters, traffic models, and performance metrics for V2X simulators | Ericsson | imported from 3GU |
R1‑154436 | Deployment scenarios, vehicle density modelling, and mobility | Ericsson | imported from 3GU |
R1‑154437 | Remaining Details of D2D Link Measurements Procedures | Ericsson | imported from 3GU |
R1‑154438 | Handling collisions between communication and discovery resources | Ericsson | imported from 3GU |
R1‑154439 | Floor control and pre-emption for ProSe | Ericsson | imported from 3GU |
R1‑154440 | On the Concurrent Operation at the Relay UE | Ericsson | imported from 3GU |
R1‑154441 | UE-NW Relay Selection/Reselection Rules for Out-of-coverage Remote UE | Ericsson | imported from 3GU |
R1‑154442 | Deployment considerations for V2V | Vodafone GmbH | imported from 3GU |
R1‑154443 | Performance analysis of PUCCH format designs | Nokia Networks | imported from 3GU |
R1‑154444 | On HARQ-ACK feedback enhancements | Nokia Networks | imported from 3GU |
R1‑154445 | CSI reporting for Carrier Aggregation Enhancement Beyond 5 Carriers | Nokia Networks | imported from 3GU |
R1‑154446 | HARQ feedback on PUSCH for up to 32 CCs | Nokia Networks | imported from 3GU |
R1‑154447 | On LAA DL design enabling frequency reuse | Nokia Networks | imported from 3GU |
R1‑154448 | LBT for LAA UL operation | Nokia Networks | imported from 3GU |
R1‑154449 | Subframe type coordination for forward compatible DL/UL operation | Nokia Networks | imported from 3GU |
R1‑154450 | DRS Occasion Design for LTE LAA | Nokia Networks | imported from 3GU |
R1‑154451 | On DRS Transmission Timing for LTE LAA | Nokia Networks | imported from 3GU |
R1‑154452 | On CSI Reporting and Transmission Modes for LTE LAA | Nokia Networks | imported from 3GU |
R1‑154453 | Indication of DL/UL transmission burst | Nokia Networks | imported from 3GU |
R1‑154454 | Multiuser superposition transmission scheme for LTE | MediaTek Inc. | imported from 3GU |
R1‑154455 | Further details on evaluation assumptions for DL MUST | MediaTek Inc. | imported from 3GU |
R1‑154456 | System Level Evaluation on MUST | MediaTek Inc. | imported from 3GU |
R1‑154457 | Preliminary system-level evaluation of superposition transmission in PMCH | MediaTek Inc. | imported from 3GU |
R1‑154458 | Link-abstraction method for ML receiver in MUST | MediaTek Inc. | imported from 3GU |
R1‑154459 | Search space design for MPDCCH | Spreadtrum Communications | imported from 3GU |
R1‑154460 | Discussion on open issues in MTC PDSCH | Spreadtrum Communications | imported from 3GU |
R1‑154461 | Aspects of CSI feedback in MTC enhancement | Spreadtrum Communications | imported from 3GU |
R1‑154462 | Realizing off-network MCPTT priority and associated pre-emption on PC5 | U.S. Department of Commerce | imported from 3GU |
R1‑154463 | Revised Work Plan for LTE Carrier Aggregation Enhancement Beyond 5 Carriers | Nokia Networks, NTT DOCOMO Inc. | imported from 3GU |
R1‑154464 | Coexistence evaluation results for Wi-Fi and UL+DL LAA | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑154465 | On further DL control signalling enhancements for up to 32 CCs | Nokia Networks | imported from 3GU |
R1‑154466 | On the false detection problem with an increasing number of DL component carriers | Nokia Networks | imported from 3GU |
R1‑154467 | On reducing the number of DL control blind decodes | Nokia Networks | imported from 3GU |
R1‑154468 | On joint grants for CA enhancements up to 32 CCs | Nokia Networks | imported from 3GU |
R1‑154469 | Detailed design of category 4 LBT mechanism | Nokia Networks | imported from 3GU |
R1‑154470 | LAA coexistence results with different HARQ-ACK combiners | Nokia Networks | imported from 3GU |
R1‑154471 | On LAA DL scheduling and HARQ operation | Nokia Networks | imported from 3GU |
R1‑154472 | On data transmission in partial subframe | Nokia Networks | imported from 3GU |
R1‑154473 | On LAA fractional symbol design | Nokia Networks | imported from 3GU |
R1‑154474 | On LAA multi-carrier power allocation | Nokia Networks | imported from 3GU |
R1‑154475 | MTC Timing Relationship Between MPDCCH and PDSCH | Marvell Switzerland | imported from 3GU |
R1‑154476 | Number of HARQ Processes When in Coverage Enhancement | Marvell Switzerland | imported from 3GU |
R1‑154477 | MTC Downlink HARQ Timing with Cross-Subframe Scheduling | Marvell Switzerland | imported from 3GU |
R1‑154478 | MTC Downlink Narrowband Locations | Marvell Switzerland | imported from 3GU |
R1‑154479 | Carrier Frequency and Phase Continuity for MTC UE | Marvell Switzerland | imported from 3GU |
R1‑154480 | Power control impacts on PC5 measurements for relay selection | Nokia Networks | imported from 3GU |
R1‑154481 | On support of different priorities and preemption | Nokia Networks | imported from 3GU |
R1‑154482 | Deployment scenarios for V2V communication simulations | Nokia Networks | imported from 3GU |
R1‑154483 | Considerations on traffic models and performance metrics for V2X simulations | Nokia Networks | imported from 3GU |
R1‑154484 | Experimental Results on Coexistence of DL LAA and Commodity WiFi Network with Cat 2 LBT | National Instruments Corp. | imported from 3GU |
R1‑154485 | On the LAA channel access framework | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑154486 | On LAA scheduling | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑154487 | HARQ and Cross SF scheduling for HD-FDD UEs in Normal Coverage | Sierra Wireless, S.A. | imported from 3GU |
R1‑154488 | Increased PSS Density | Sierra Wireless, S.A. | imported from 3GU |
R1‑154489 | Performance of Time Diversity for PUSCH and HARQ Impacts | Sierra Wireless, S.A. | imported from 3GU |
R1‑154490 | Scheduling of MTC SIBs in Normal Coverage | Sierra Wireless, S.A. | imported from 3GU |
R1‑154491 | Way Forward on TR37.857 conclusions | NextNav | imported from 3GU |
R1‑154492 | V2X deployment scenarios and modelling | GM - OnStar Europe | imported from 3GU |
R1‑154493 | V2X Traffic models and performance metric | GM - OnStar Europe | imported from 3GU |
R1‑154494 | Discussion on LAA UL LBT design | Broadcom Corporation | imported from 3GU |
R1‑154495 | Discussion on the false detection problem in Rel-13 eCA | Fiberhome Technologies Group | imported from 3GU |
R1‑154496 | Definition of narrow bands for Rel-13 MTC UEs | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154497 | Frequency hopping for Rel-13 MTC UEs | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154498 | Discussion on LAA LBT Category 4 design for DL | Broadcom Corporation | imported from 3GU |
R1‑154499 | DL and UL scheduling timing for Rel-13 MTC UEs | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154500 | Design of M-PDCCH for Rel-13 MTC UEs | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154501 | Discussion on HARQ processes for Rel-13 MTC UEs | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154502 | PUCCH design for Rel-13 MTC UEs | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154503 | HARQ-ACK codebook determination for Rel-13 eCA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154504 | Discussion on HARQ-ACK bundling for Rel-13 eCA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154505 | Enhancements on TDD HARQ timing for Rel-13 eCA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154506 | Aperiodic CSI for Rel-13 eCA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154507 | Discussion on reducing the number of PDCCH blind decodings for Rel-13 eCA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154508 | LBT scheme for LAA DL and UL | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154509 | Frame structure for LAA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154510 | LAA discovery signal design | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154511 | DL scheduling options for LAA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154512 | Data transmission in partial subframes for LAA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154513 | Discussion on CSI feedback for LAA | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154514 | Deployment scenarios and modeling for V2X | Lenovo (Beijing) Ltd | imported from 3GU |
R1‑154515 | Transmission mode for elevation BF and FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154516 | Beam index feedback and CSI process configuration | Nokia Networks | imported from 3GU |
R1‑154517 | Non-precoded CSI-RS for elevation BF/FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154518 | Measurement restrictions for CSI-RS and IMR | Nokia Networks | imported from 3GU |
R1‑154519 | DMRS enhancement for FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154520 | 2D codebook design for elevation BF and FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154521 | CSI types and reporting modes design for FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154522 | Resource allocation for new PUCCH format | Innovative Technology Lab Co. | imported from 3GU |
R1‑154523 | Views on time and frequency relationship for MPDSCH and PDSCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑154524 | Resource allocation for PDSCH and CSI measurement | NTT DOCOMO, INC. | imported from 3GU |
R1‑154525 | Views on MPDCCH for Rel-13 low complexity MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑154526 | MPDCCH set initialization for Rel-13 low complexity MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑154527 | Views on frequency hopping for PDSCH | NTT DOCOMO, INC. | imported from 3GU |
R1‑154528 | Details on PUSCH for Rel-13 low complexity MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑154529 | Views on UL HARQ feedback for Rel-13 low complexity MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑154530 | Views on PUCCH for Rel-13 low complexity MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑154531 | Views on PRACH repetition in Rel-13 low complexity UE | NTT DOCOMO, INC. | imported from 3GU |
R1‑154532 | Discussion on scheduling of RAR | NTT DOCOMO, INC. | imported from 3GU |
R1‑154533 | Views on multiple information reception for Rel-13 MTC UE | NTT DOCOMO, INC. | imported from 3GU |
R1‑154534 | Remaining issues on CFI indication for Rel-13 low complexity MTC | NTT DOCOMO, INC. | imported from 3GU |
R1‑154535 | Candidate non-orthogonal multiplexing access scheme | NTT DOCOMO, INC. | imported from 3GU |
R1‑154536 | System level evaluation reults for downlink multiuser superposition schemes | NTT DOCOMO, INC. | imported from 3GU |
R1‑154537 | Link-level evaluation results for downlink multiuser superposition schemes | NTT DOCOMO, INC. | imported from 3GU |
R1‑154538 | TBS handling of DL transmission modes with 4/8 CSI-RS antenna ports | NTT DOCOMO, INC. | imported from 3GU |
R1‑154539 | Adding a note explaining the TBS value for NPRB=1 and ITBS =6 | NTT DOCOMO, INC. | imported from 3GU |
R1‑154540 | Aperiodic CSI triggering for Rel-13 eCA | Innovative Technology Lab Co. | imported from 3GU |
R1‑154541 | On discontinuous transmission bursts for LAA | Innovative Technology Lab Co. | imported from 3GU |
R1‑154542 | On the CSI measurement and reports for LAA | Innovative Technology Lab Co. | imported from 3GU |
R1‑154543 | MuST Link to System Mapping for MMSE, SLIC, and CWIC | Ericsson | imported from 3GU |
R1‑154544 | Initial System Level Simulations for MuST | Ericsson | imported from 3GU |
R1‑154545 | MuST Link Level Performance and Receiver Modeling | Ericsson | imported from 3GU |
R1‑154546 | UE specific precoded CSI-RS for FD MIMO | Innovative Technology Lab Co. | imported from 3GU |
R1‑154547 | High Level Signalling of NOMA for Multiuser Superposition Transmission | Innovative Technology Lab Co. | imported from 3GU |
R1‑154548 | Considerations on resource allocation for UE-to-Network relays | Innovative Technology Lab Co. | imported from 3GU |
R1‑154549 | On FD-MIMO transmission mode | Ericsson | imported from 3GU |
R1‑154550 | CSI feedback for FD-MIMO | Ericsson | imported from 3GU |
R1‑154551 | CSI-RS Design for FD-MIMO | Ericsson | imported from 3GU |
R1‑154552 | On CSI-RS in beamforming operation | Ericsson | imported from 3GU |
R1‑154553 | On hybrid mode operation for FD-MIMO | Ericsson | imported from 3GU |
R1‑154554 | On SRS enhancements in Rel.13 | Ericsson | imported from 3GU |
R1‑154555 | On DMRS enhancements in Rel.13 | Ericsson | imported from 3GU |
R1‑154556 | FD-MIMO codebook design considerations | Ericsson | imported from 3GU |
R1‑154557 | FD-MIMO codebook structure, design features, and dimensioning | Ericsson | imported from 3GU |
R1‑154558 | CSI reporting for FD-MIMO | Ericsson | imported from 3GU |
R1‑154559 | On Necessity of Distributed M-PDCCH for 6PRB | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154560 | MIB contents for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154561 | Performance of PRB bundling for M-PDCCH in CE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154562 | M-PDCCH Search Space for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154563 | On narrowband configuration for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154564 | Remaining Issues on Paging for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154565 | Remaining Issues on PDSCH for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154566 | PRACH for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154567 | On PUCCH for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154568 | Remaining Issues on PUSCH for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154569 | Remaining Issues on RAR for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154570 | Physical Channel Timing and Frequency Relationship for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154571 | On UCI for MTC UE | INTERDIGITAL COMMUNICATION | imported from 3GU |
R1‑154572 | LBT and Frame Structure Design for DL-Only LAA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154573 | Multi-carrier LBT operation for LAA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154574 | UL LBT and DL/UL Frame Structure for LAA | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154575 | DRS Design for LAA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154576 | RRM Measurement for LAA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154577 | DL Control Signaling for LAA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154578 | PDSCH and DCI Transmissions in LAA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154579 | CSI Measurement and Reporting for LAA | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154580 | On design and configuration of M-PDCCH search spaces | Intel Corporation | imported from 3GU |
R1‑154581 | Coverage enhancements and remaining details for PDSCH | Intel Corporation | imported from 3GU |
R1‑154582 | Remaining details of coverage enhancements for PRACH | Intel Corporation | imported from 3GU |
R1‑154583 | Draft Reply LS on ProSe coarse proximity estimation based on path loss | Intel Corporation | imported from 3GU |
R1‑154584 | Remaining details of PC5 measurements | Intel Corporation | imported from 3GU |
R1‑154585 | Discussion on Uu link quality for UE-to-NW relay operation | Intel Corporation | imported from 3GU |
R1‑154586 | Handling of UE-to-NW Relay Concurrent Processes | Intel Corporation | imported from 3GU |
R1‑154587 | Priority Support for D2D Communication | Intel Corporation | imported from 3GU |
R1‑154588 | Text Proposal on D2D-Aided Positioning for the 3GPP TR 37.857 | Intel Corporation | imported from 3GU |
R1‑154589 | UL Channel Access for LAA | Motorola Mobility | imported from 3GU |
R1‑154590 | CSI measurement and reporting for LAA | Motorola Mobility | imported from 3GU |
R1‑154591 | Transmission options for DL subframes in LAA | Motorola Mobility | imported from 3GU |
R1‑154592 | UE operation for DL and DL+UL reception for LAA | Motorola Mobility | imported from 3GU |
R1‑154593 | Activation/Deactivation procedures for LAA Scells | Motorola Mobility | imported from 3GU |
R1‑154594 | New PUCCH format design for supporting CA with up to 32 CCs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154595 | CSI feedback enhancement for supporting CA with up to 32 CCs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154596 | Discovery resource allocation schemes and performance of PC5 measurements | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154597 | Consideration of use of Uu link quality for Relay UE selection | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154598 | Discovery transmission in multiple carriers | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154599 | Support for PC5 priority | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154600 | Carrier type definition and configuration considering LAA carriers | Huawei, HiSilicon | imported from 3GU |
R1‑154601 | CQI and MCS tables | Huawei, HiSilicon | imported from 3GU |
R1‑154602 | DCI content for MTC and coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R1‑154603 | Determining starting PRACH resource set | Huawei, HiSilicon | imported from 3GU |
R1‑154604 | On coverage enhancement determination during random access procedure | Huawei, HiSilicon | imported from 3GU |
R1‑154605 | Remaining details of PUCCH configuration | Huawei, HiSilicon | imported from 3GU |
R1‑154606 | Valid subframes for MTC transmission | Huawei, HiSilicon | imported from 3GU |
R1‑154607 | General views on the physical layer design of Dual Connectivity | Huawei, HiSilicon | imported from 3GU |
R1‑154608 | Considerations on the contents and scheduling of RAR for MTC | Huawei, HiSilicon | imported from 3GU |
R1‑154609 | QoS Handling in DL LBT Operation | Huawei, HiSilicon | imported from 3GU |
R1‑154610 | M-PDCCH starting subframes | Huawei, HiSilicon | imported from 3GU |
R1‑154611 | On frequency hopping relations between channels | Huawei, HiSilicon | imported from 3GU |
R1‑154612 | On PRBs not in any narrowband | Huawei, HiSilicon | imported from 3GU |
R1‑154613 | HARQ-ACK transmission for up to 32 CCs | Potevio | imported from 3GU |
R1‑154614 | Support of communication group priority and half duplex resolution | Qualcomm Incorporated | imported from 3GU |
R1‑154615 | Alignment of Group destination ID terminology with Sidelink Control Layer-1 ID | Intel Corporation | imported from 3GU |
R1‑154616 | Alignment of Group destination ID terminology with Sidelink Control Layer-1 ID | Intel Corporation | imported from 3GU |
R1‑154617 | Discussion on the enhancements of category 2 LBT scheme | Shenzhen Coolpad Technologies | imported from 3GU |
R1‑154618 | Discussion on the enhancements of category 4 LBT scheme | Shenzhen Coolpad Technologies | imported from 3GU |
R1‑154619 | LAA Workplan | Ericsson, Huawei | imported from 3GU |
R1‑154620 | Discussion on framework and parameter setting for Category 4 LBT for LAA | Ericsson | imported from 3GU |
R1‑154621 | Parameters for DRS Transmissions without PDSCH | Ericsson | imported from 3GU |
R1‑154622 | On LBT and Scheduling Design for LAA Uplink | Ericsson | imported from 3GU |
R1‑154623 | Coexistence Evaluation Results for LAA with DL and UL Traffic | Ericsson | imported from 3GU |
R1‑154624 | Discussion on Wi-Fi and DL-only LAA Coexistence for Multi-channel Transmission | Ericsson | imported from 3GU |
R1‑154625 | Wi-Fi and DL-only LAA Coexistence Performance Using a Bandwidth of 80 MHz based on Aligned Wi-Fi Primary Channels | Ericsson | imported from 3GU |
R1‑154626 | Coexistence Performance of DL-only LAA Networks Using a Bandwidth of 80 MHz | Ericsson | imported from 3GU |
R1‑154627 | Discussion on the Number of UEs for DL-only LAA Using a Bandwidth of 80 MHz | Ericsson | imported from 3GU |
R1‑154628 | Coexistence Evaluation Results for Video Conference Services | Ericsson | imported from 3GU |
R1‑154629 | On DRS Design and Structure | Ericsson | imported from 3GU |
R1‑154630 | Detection Performance of DRS Designs | Ericsson | imported from 3GU |
R1‑154631 | On RRM Measurements and Reporting for LAA | Ericsson | imported from 3GU |
R1‑154632 | On Transmission Mode and Transmission Scheme support in LAA | Ericsson | imported from 3GU |
R1‑154633 | On Support of Multiple DL Data Transmission Starting Points | Ericsson | imported from 3GU |
R1‑154634 | On Dynamic DL/UL Scheduling | Ericsson | imported from 3GU |
R1‑154635 | Carrier Selection for LAA | Ericsson | imported from 3GU |
R1‑154636 | DL Power Control for LAA | Ericsson | imported from 3GU |
R1‑154637 | Discussion on CSI Measurement and Reporting for LAA | Ericsson | imported from 3GU |
R1‑154638 | Initial evaluation result of downlink Multiuser Superposition Transmission Scheme | CATR | imported from 3GU |
R1‑154639 | Considerations of beamformed CSI-RS based scheme | CATR | imported from 3GU |
R1‑154640 | Consideration on enhancement to PUCCH for CA with up to 32 CCs | CATR | imported from 3GU |
R1‑154641 | Discussions on necessity of signaling of Uu link quality to remote UE | CATR | imported from 3GU |
R1‑154642 | The vehicular traffic modeling in LTE based V2X communications | CATR | imported from 3GU |
R1‑154643 | Discussions on the design of initial signal for LAA | CATR | imported from 3GU |
R1‑154644 | Deployment scenario and evaluation model for V2x | NTT DOCOMO INC. | imported from 3GU |
R1‑154645 | Initial evaluation on D2D DM-RS design for V2V | NTT DOCOMO INC. | imported from 3GU |
R1‑154646 | Remaining issues on resource allocation for UE-to-network relay | NTT DOCOMO INC. | imported from 3GU |
R1‑154647 | On PUCCH Format 4 design | Nokia Networks | imported from 3GU |
R1‑154648 | Enhanced DRS for LAA | Mediatek Inc. | imported from 3GU |
R1‑154649 | RRM Measurement for LAA Carrier Selection | Mediatek Inc. | imported from 3GU |
R1‑154650 | LBT design for Licensed-Assisted Access | Mediatek Inc. | imported from 3GU |
R1‑154651 | eNB and UE complexities with respect to partial subframes | Mediatek Inc. | imported from 3GU |
R1‑154652 | CSI feedback in LAA | Mediatek Inc. | imported from 3GU |
R1‑154653 | LAA downlink transmissions | Mediatek Inc. | imported from 3GU |
R1‑154654 | Using big number devices to enhance accuracy | III | imported from 3GU |
R1‑154655 | Correction of ProSe parameters | Nokia Networks Oy | imported from 3GU |
R1‑154656 | Discussion on the DL superposed transmissions schemes | Nokia Networks | imported from 3GU |
R1‑154657 | System-level evaluation of MUST | Nokia Networks | imported from 3GU |
R1‑154658 | On the supported transmission modes in MUST | Nokia Networks | imported from 3GU |
R1‑154659 | Narrowband LTE – Concept Description | Ericsson LM; Nokia Networks, AT&T, Alcatel-Lucent; Alcatel-Lucent Shanghai Bell, Intel, Sierra Wireless S.A.; Sequans Communications, ZTE Corporation, SHARP Corporation, Gemalto N.V., Sprint Corporation | imported from 3GU |
R1‑154660 | Views on non-precoded CSI-RS design | NTT DOCOMO, INC. | imported from 3GU |
R1‑154661 | Views on beamformed CSI-RS based enhancement | NTT DOCOMO, INC. | imported from 3GU |
R1‑154662 | Feedback design for beamformed CSI-RS based 3D MIMO | NTT DOCOMO, INC. | imported from 3GU |
R1‑154663 | SRS Enhancement for Elevation BF and FD-MIMO | NTT DOCOMO, INC. | imported from 3GU |
R1‑154664 | High Order MU-MIMO for Elevation BF and FD-MIMO | NTT DOCOMO, INC. | imported from 3GU |
R1‑154665 | 2D Codebook Design for Elevation Beamforming and FD-MIMO | NTT DOCOMO, INC. | imported from 3GU |
R1‑154666 | 2D Codebook Design and PMI feedback for Elevation Beamforming and FD-MIMO | NTT DOCOMO, INC. | imported from 3GU |
R1‑154667 | HARQ-ACK codebook size determination for CA with up to 32 CCs | III | imported from 3GU |
R1‑154668 | Adding a note explaining the TBS value for NPRB=1 and ITBS =6 | NTT DOCOMO INC. | imported from 3GU |
R1‑154669 | Geographical Analysis for Positioning Accuracy | Intel Corporation | imported from 3GU |
R1‑154670 | Discovery assisted Preemption and Prioritization for Communication | III | imported from 3GU |
R1‑154671 | HARQ-ACK transmissions for Rel-13 CA | HTC | imported from 3GU |
R1‑154672 | Discussion on DL control enhancement for Rel-13 CA | HTC | imported from 3GU |
R1‑154673 | DL control grouping for LAA | HTC | imported from 3GU |
R1‑154674 | LAA DRS Transmission and Design | WILUS Inc. | imported from 3GU |
R1‑154675 | Discussion on Scheduling Information for MUST Receivers | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑154676 | Uplink aspects of LAA | BlackBerry UK Limited | imported from 3GU |
R1‑154677 | 36.213 CR0528(Rel-12,F) Clarification on Power control for PCM2 | Huawei,HiSilicon | imported from 3GU |
R1‑154678 | Physical channel relationship for low complexity UE | ASUSTEK COMPUTER (SHANGHAI) | imported from 3GU |
R1‑154679 | View on Multiflow based Offloading | Ericsson | imported from 3GU |
R1‑154680 | Text proposal on Multiflow based Offloading | Ericsson | imported from 3GU |
R1‑154681 | Signaling for NAICS | Ericsson | imported from 3GU |
R1‑154682 | Text Proposal on Signaling for NAICS | Ericsson | imported from 3GU |
R1‑154683 | View on the conclusions for the Network Assisted Interference Cancellation and Suppression Study Item | Ericsson | imported from 3GU |
R1‑154684 | Text proposal on a view towards the conclusions for the Network Assisted Interference Cancellation and Suppression Study Item | Ericsson | imported from 3GU |
R1‑154685 | L1 aspects on the potential new Rel-13 power control algorithm for processing DL TPC commands | Ericsson | imported from 3GU |
R1‑154686 | Further considerations on the potential new Rel-13 power control algorithm for processing DL TPC commands | Ericsson | imported from 3GU |
R1‑154687 | Considerations on D2D synchronization procedure in out-of-coverage discovery | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑154688 | Discussion on CSI Report for Non-precoding CSI-RS in FD-MIMO | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑154689 | Discussion on Non-precoded CSI-RS enhancement in FD-MIMO | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑154690 | Considerations on downlink TPC enhancement solutions | Huawei, HiSilicon | imported from 3GU |
R1‑154691 | Work plan for downlink TPC enhancements for UMTS | Huawei, HiSilicon | imported from 3GU |
R1‑154692 | Enhanced offloading based on simplified SF-DC functionality | Huawei, HiSilicon | imported from 3GU |
R1‑154693 | TP on enhanced offloading based on simplified SF-DC functionality | Huawei, HiSilicon | imported from 3GU |
R1‑154694 | Summary of the enhanced offloading solutions | Huawei, HiSilicon | imported from 3GU |
R1‑154695 | TP on summary of the enhanced offloading solutions | Huawei, HiSilicon | imported from 3GU |
R1‑154696 | Impact to specifications | Huawei, HiSilicon | imported from 3GU |
R1‑154697 | Impact to implementation of legacy terminals | Huawei, HiSilicon | imported from 3GU |
R1‑154698 | Conclusions for NAICS | Huawei, HiSilicon | imported from 3GU |
R1‑154699 | TP on conclusions for NAICS | Huawei, HiSilicon | imported from 3GU |
R1‑154700 | Discussion on indoor positioning enhancement aided by EB/FD-MIMO | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑154701 | Candidate schemes for superposition transmission based on dirty paper coding | Beijing Xinwei Telecom Techn. | imported from 3GU |
R1‑154702 | 25.214 CR0740 (Rel-13, B) Introduction of downlink TPC enhancements for UMTS | HuaWei Technologies Co., Ltd | imported from 3GU |
R1‑154703 | Views on TBS determination for Rel-13 MTC | KT Corp. | imported from 3GU |
R1‑154704 | Views on HARQ ACK/NACK feedback for PUSCH | KT Corp. | imported from 3GU |
R1‑154705 | Proposed way forward for CIoT Clean Slate normative phase | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson LM, Mediatek Inc., Panasonic, Sierra Wireless SA, ZTE Corporation, AT&T, Nokia Networks, Marvell, Intel Corporation, Verizon Wireless, Sequans, Sharp Corporation, Gemalto N.V., Sprint Corporation | imported from 3GU |
R1‑154706 | Draft WID proposal Clean Slate Cellular IoT for RAN TSG | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson LM, Mediatek Inc., Panasonic, Sierra Wireless SA, ZTE Corporation, Nokia Networks, Marvell, Intel Corporation, Sequans, Sharp Corporation, Gemalto N.V., Sprint Corporation | imported from 3GU |
R1‑154707 | Considering on initial signal design for LAA | China Unicom | imported from 3GU |
R1‑154708 | Considering on CSI measurement and reporting | China Unicom | imported from 3GU |
R1‑154709 | Discussion on CSI measurement and reporting | MediaTek Inc. | imported from 3GU |
R1‑154710 | Discussion on longer TTI for PUSCH in CE mode | MediaTek Inc. | imported from 3GU |
R1‑154711 | Resource allocation and DCI format design | MediaTek Inc. | imported from 3GU |
R1‑154712 | Paging design for LC/CE UEs | MediaTek Inc. | imported from 3GU |
R1‑154713 | RAR design for LC/CE UEs | MediaTek Inc. | imported from 3GU |
R1‑154714 | Discussion on UE behavior for handling simultaneous reception | MediaTek Inc. | imported from 3GU |
R1‑154715 | PHICH functionality support based on compact DCI | MediaTek Inc. | imported from 3GU |
R1‑154716 | Discussion on need of handover in the connected mode for eMTC | MediaTek Inc. | imported from 3GU |
R1‑154717 | Discussion on CQI definition for Rel-13 MTC | MediaTek Inc. | imported from 3GU |
R1‑154718 | Discussion on narrow band PUCCH design for Rel-13 MTC | MediaTek Inc. | imported from 3GU |
R1‑154719 | Discussion on PUCCH resource allocation for Rel-13 MTC | MediaTek Inc. | imported from 3GU |
R1‑154720 | Conclusion on NB-CIoT "clean slate" solution from GERAN67 | Huawei, HiSilicon | imported from 3GU |
R1‑154721 | Support of Uu link quality in relay selection | Qualcomm Incorporated | imported from 3GU |
R1‑154722 | Out-of-Coverage discovery for Public Safety | Qualcomm Incorporated | imported from 3GU |
R1‑154723 | D2D discovery support in the presence of multiple carriers and PLMNs | Qualcomm Incorporated | imported from 3GU |
R1‑154724 | Support of communication group priority and half duplex resolution | Qualcomm Incorporated | imported from 3GU |
R1‑154725 | Summary of open issues for eD2D | Qualcomm Incorporated | imported from 3GU |
R1‑154726 | Considerations on EVSoCS mode sets and RABs | Qualcomm Incorporated | imported from 3GU |
R1‑154727 | Considerations on EVSoCS error protection | Qualcomm Incorporated | imported from 3GU |
R1‑154728 | Consideration on DCI for LC-MTC | Alcatel-Lucent Shanghai Bell, Alcatel-Lucent | imported from 3GU |
R1‑154729 | Considerations for M-PDCCH | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154730 | Support of different priorities for D2D communication | INTERDIGITAL COMMUNICATIONS | imported from 3GU |
R1‑154731 | PRACH for LC-MTC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154732 | LC-MTC UE behaviour on simultaneous reception of multiple TBs | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154733 | Considerations on Common Control Messages for LC-MTC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154734 | PDSCH for LC-MTC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154735 | [Draft] Reply LS on inter-eNB CoMP signalling | Nokia Networks Oy | imported from 3GU |
R1‑154736 | Potential enhancements for OTDOA | Nokia Networks Oy | imported from 3GU |
R1‑154737 | Draft Reply LS on EVSoCS | Qualcomm Incorporated | imported from 3GU |
R1‑154738 | Potential enhancements for OTDOA | Nokia Networks Oy | imported from 3GU |
R1‑154739 | Text Proposal for Legacy PRS with CRS for Improved OTDOA Positioning | Acorn Technologies | imported from 3GU |
R1‑154740 | Experimental Results on Coexistence of DL LAA and Commodity WiFi Network with Cat 2 LBT | National Instruments Corp. | imported from 3GU |
R1‑154741 | Discussion on congestion measurement for LAA | ETRI | imported from 3GU |
R1‑154742 | Floor control and pre-emption for ProSe | Ericsson | imported from 3GU |
R1‑154743 | Specification Impacts of Beamformed CSI-RS Configuration | ZTE | imported from 3GU |
R1‑154744 | Adding a note explaining the TBS value for NPRB=1 and ITBS =6 | NTT DOCOMO INC. | imported from 3GU |
R1‑154745 | CIoT – Normative work plan and potential meeting schedule | Vodafone Group plc | imported from 3GU |
R1‑154746 | Draft WID proposal for Clean Slate Cellular IoT | Vodafone Group plc | imported from 3GU |
R1‑154747 | General views on the physical layer design of Dual Connectivity | Huawei, HiSilicon | imported from 3GU |
R1‑154748 | CSI-RS structure with more than 8 antenna ports | Intel Corporation | imported from 3GU |
R1‑154749 | System level evaluation reults for downlink multiuser superposition schemes | NTT DOCOMO, INC. | imported from 3GU |
R1‑154750 | Design of DL LBT | ZTE | imported from 3GU |
R1‑154751 | Discussion on 2D Codebook Design for EBF/FD-MIMO System | ZTE | imported from 3GU |
R1‑154752 | CSI-RS measurement for beamformed CSI-RS | CATT | imported from 3GU |
R1‑154753 | On the LAA DRS design | Intel Corporation | imported from 3GU |
R1‑154754 | On the LAA DRS transmission | Intel Corporation | imported from 3GU |
R1‑154755 | FD-MIMO Rel.13 WI Work Plan | Samsung, Nokia Networks | imported from 3GU |
R1‑154756 | Discussion on Signaling for Inter-eNB CoMP | Samsung | imported from 3GU |
R1‑154757 | Initial System Level Evaluation Result of MUST | LG Electronics | imported from 3GU |
R1‑154758 | Non-precoded CSI-RS for elevation BF/FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154759 | 2D codebook design for elevation BF and FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154760 | LS on EVS over UTRAN | CT3, Qualcomm | imported from 3GU |
R1‑154761 | LS on Completion of Study Item on Cellular System Support for Ultra Low Complexity and Low Throughput Internet of Things (FS_IoT_LC) | GERAN, Vodafone | imported from 3GU |
R1‑154762 | Reply LS on EVS over UTRAN | CT4, Ericsson | imported from 3GU |
R1‑154763 | Evaluations of Richer UE feedback for OTDOA | Ericsson | imported from 3GU |
R1‑154764 | Reply LS on Type 2 Power Headroom reporting | RAN1, Intel Corporation | imported from 3GU |
R1‑154765 | Discussion on Category 4 LBT for DL transmission | Samsung | imported from 3GU |
R1‑154766 | TP for adding proper references for TR36.855 into TR37.857 | Huawei, HiSilicon | imported from 3GU |
R1‑154767 | DRS design and LBT procedure | Samsung | imported from 3GU |
R1‑154768 | Contention window size adaptation for DL LBT in LAA | ZTE | imported from 3GU |
R1‑154769 | FD-MIMO codebook design considerations | Ericsson | imported from 3GU |
R1‑154770 | LAA synchronization | Samsung | imported from 3GU |
R1‑154771 | Text Proposal on updating Enhancements for OTDOA | Huawei, HiSilicon | imported from 3GU |
R1‑154772 | TP for TR37.857 on EB/FD-MIMO based positioning | Nokia Networks | imported from 3GU |
R1‑154773 | WF on the maximum TBS handling | NTT DOCOMO, Ericsson, Huawei, HiSilicon, Qualcomm | imported from 3GU |
R1‑154774 | [Draft] Reply LS on TDD + FDD dual UL UE behavior | LG Electronics | imported from 3GU |
R1‑154775 | Search space design for MPDCCH | Spreadtrum Communications | imported from 3GU |
R1‑154776 | WF on Frequency Reuse | Samsung, NTT DoCoMo, CATT | imported from 3GU |
R1‑154777 | WF on Self-deferral for LBT Cat.4 | Samsung, NTT DoCoMo | imported from 3GU |
R1‑154778 | Performance of frequency reuse for different CW adaptation schemes | Samsung | imported from 3GU |
R1‑154779 | Updated baseline performance for indoor positioning | LG Electronics | imported from 3GU |
R1‑154780 | Discussion of V2P scenario | III | imported from 3GU |
R1‑154781 | WF on CSI process for PMI based Rel.13 FD-MIMO | Ericsson, Samsung, NTT Docomo | imported from 3GU |
R1‑154782 | Way Forward on UL HARQ-ACK codebook size for CA up to 32 CCs | ZTE, Samsung, Potevio, CATR, Qaulcomm, IDCC, Nokia, Nokia Networks, LGE | imported from 3GU |
R1‑154783 | WF on Categorizing MUST schemes | LG Electronics, NEC, ZTE, Samsung, Intel | imported from 3GU |
R1‑154784 | WF on SRS Capacity Enhancements | ZTE, CMCC, Alcatel Lucent, Alcatel-Lucent Shanghai Bell, CATR, CATT, ITRI, KT, Samsung | imported from 3GU |
R1‑154785 | WF on non-precoded CSI-RS design | LG Electronics, NTT DOCOMO, Qualcomm | imported from 3GU |
R1‑154786 | WF on remaining issues for narrowband definitions | NEC, LGE, Intel, InterDigital | imported from 3GU |
R1‑154787 | WF on narrowband frequency hopping | NEC | imported from 3GU |
R1‑154788 | WF on the new PUCCH format(s) for Rel-13 CA | Huawei, HiSilicon, CMCC,Potevio,CATR | imported from 3GU |
R1‑154789 | WF on potential MUST information | LG Electronics, Intel, MediaTek | imported from 3GU |
R1‑154790 | WF on CCA slot and Defer period | Ericsson, Broadcom | imported from 3GU |
R1‑154791 | WF on CW adjustment | Ericsson, Broadcom | imported from 3GU |
R1‑154792 | Introduction of the Multiflow 3F-4C configuration | Nokia Networks | imported from 3GU |
R1‑154793 | TP on enhanced offloading based on simplified SF-DC functionality | Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑154794 | TP on summary of the enhanced offloading solutions | Huawei, HiSilicon | imported from 3GU |
R1‑154795 | Text Proposal on Signaling for NAICS | Ericsson | imported from 3GU |
R1‑154796 | TP on impact to specifications and impact to implementation of legacy terminals | Huawei, HiSilicon | imported from 3GU |
R1‑154797 | TP on conclusions for NAICS | Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑154798 | Reply LS on EVSoCS | RAN1, Qualcomm | imported from 3GU |
R1‑154799 | TR 25.766 v1.0.1 on Network-Assisted Interference Cancellation and Suppression for UMTS | Ericsson | imported from 3GU |
R1‑154800 | LS on RAN1 Downlink TPC Enhancements agreements | RAN1, Huawei | imported from 3GU |
R1‑154801 | Chairpersons’ summary of the UMTS sessions | UMTS Session Chairpersons (Huawei, Ericsson) | imported from 3GU |
R1‑154802 | void | ETSI | imported from 3GU |
R1‑154803 | void | ETSI | imported from 3GU |
R1‑154804 | void | ETSI | imported from 3GU |
R1‑154805 | void | ETSI | imported from 3GU |
R1‑154806 | void | ETSI | imported from 3GU |
R1‑154807 | void | ETSI | imported from 3GU |
R1‑154808 | void | ETSI | imported from 3GU |
R1‑154809 | void | ETSI | imported from 3GU |
R1‑154810 | void | ETSI | imported from 3GU |
R1‑154811 | void | ETSI | imported from 3GU |
R1‑154812 | WF on new PUCCH formats for Rel-13 eCA | Lenovo, Ericsson, Samsung, Nokia Networks | imported from 3GU |
R1‑154813 | [Draft] Reply LS on enhanced signalling for inter-eNB CoMP | Samsung, NTT DOCOMO, KT, DT, CMCC, KDDI, Telecom Italia, China Telecom, Qualcomm, ETRI, Potevio, Intel, Nokia Networks, LGE, NEC, ZTE, CHTTL | imported from 3GU |
R1‑154814 | [Draft] Reply LS on TDD + FDD dual UL UE behavior | LG Electronics | imported from 3GU |
R1‑154815 | [Draft] Reply LS on TDD + FDD dual UL UE behavior | LG Electronics | imported from 3GU |
R1‑154816 | WF on traffic model for system-level evaluation | MediaTek, Huawei, HiSilicon | imported from 3GU |
R1‑154817 | WF on LAA DRS design and transmission timing | NTT DOCOMO, Panasonic, Samsung, Huawei, Sharp | imported from 3GU |
R1‑154818 | Analysis and text proposal for D2D-assisting positioning | ZTE Corporation | imported from 3GU |
R1‑154819 | WF on Physical Channel Timing Relationships | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154820 | WF on M-PDCCH search space details | LG Electronics, Sony, Ericsson, Panasonic | imported from 3GU |
R1‑154821 | WF on transmission schemes in LAA | Huawei, HiSilicon, Intel, Qualcomm, Samsung, Nokia Networks, CATT | imported from 3GU |
R1‑154822 | WF on Handling of Subframes Unavailable for Repetition | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm, Sequans, Verizon, AT&T, Gemalto | imported from 3GU |
R1‑154823 | WF on Number of HARQ processes | Ericsson, Nokia Networks, Alcatel-Lucent Shanghai Bell, Alcatel-Lucent, CATT, Verizon, Gemalto, Qualcomm, Sequans | imported from 3GU |
R1‑154824 | WF on frequency hopping patterns for MTC | Ericsson, NEC, NTT DoCoMo, Sony | imported from 3GU |
R1‑154825 | WF on M-PDCCH resource mapping | Ericsson, Intel, LG, Nokia Networks | imported from 3GU |
R1‑154826 | WF on PUCCH resource allocation for MTC | Ericsson, CATT, NEC, Samsung, Sony | imported from 3GU |
R1‑154827 | WF on LAA Energy Detection Threshold | Cisco, Broadcom, CableLabs | imported from 3GU |
R1‑154828 | WF on valid SF for downlink | LG Electronics, Sony, Panasonic, ZTE | imported from 3GU |
R1‑154829 | WF on PUCCH enhancement for MTC | ZTE, NEC, Sony, Mediatek, NTT DOCOMO, Panasonic | imported from 3GU |
R1‑154830 | Draft WF on Coverage Enhancement Level & Coverage Enhancement Mode & Repetitions | Sony, LGE, Panasonic | imported from 3GU |
R1‑154831 | Way Forward on UL LBT for LAA | Ericsson, Motorola | imported from 3GU |
R1‑154832 | Way Forward on non-LBT option for LAA UL LBT | Broadcom Corporation, Cisco, CableLabs, Intel, Samsung, KDDI, Sony, Orange, BlackBerry | imported from 3GU |
R1‑154833 | Discussion on V2X Fast Fading Modeling based on Field Measurements | Ericsson | imported from 3GU |
R1‑154834 | WF on start of DL TX burst in LAA | LG Electronics, ETRI, Intel, Samsung | imported from 3GU |
R1‑154835 | WF on M-PDCCH common search space | LG Electronics, Sony, Samsung | imported from 3GU |
R1‑154836 | Joint TP for a proper reference and enhancements of PRS transmit diversity | Huawei, HiSilicon, LGE, AT&T | imported from 3GU |
R1‑154837 | Joint TP for a proper reference and enhancements of wideband PRS | Huawei, HiSilicon, Intel, AT&T | imported from 3GU |
R1‑154838 | Text Proposal on D2D-Aided Positioning for the 3GPP TR 37.857 | Intel Corporation | imported from 3GU |
R1‑154839 | WF on Multi-Carrier LBT Alt 2 | Samsung, Intel | imported from 3GU |
R1‑154840 | WF on RSSI measurements for LAA | Samsung | imported from 3GU |
R1‑154841 | WF on post random backoff | Intel, Broadcom | imported from 3GU |
R1‑154842 | WF on multi-carrier LBT | Intel, Samsung, Broadcom | imported from 3GU |
R1‑154843 | WF on DL Dynamic Power Sharing Among Multiple Unlicensed Carriers | Intel, Samsung | imported from 3GU |
R1‑154844 | WF on frequency hopping patterns for MTC | Ericsson, NEC, NTT DoCoMo, Qualcomm, Sony | imported from 3GU |
R1‑154845 | Summary of Simulation Results for M-PDCCH | Sony | imported from 3GU |
R1‑154846 | WF on Transmission Mode Support of Rel-13 MTC UE | Qualcomm, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Ericsson, InterDigital, Verizon, ZTE | imported from 3GU |
R1‑154847 | WF on description of symbol level superposition of MUST | ZTE, LGE | imported from 3GU |
R1‑154848 | WF on RSRQ measurement for PC5 link | ZTE, Qualcomm Inc., Nokia Networks, LG Electronics, Samsung | imported from 3GU |
R1‑154849 | WF on Uu link RSRP forwarding | ZTE, Samsung, ITRI | imported from 3GU |
R1‑154850 | WF on FD-MIMO codebook | Samsung, ZTE, ALU, ASB, Ericsson, CATT | imported from 3GU |
R1‑154851 | Text Proposal for Annex A.3 of TR36.859 | MediaTek | imported from 3GU |
R1‑154852 | Table templates for system-level simulation results | MediaTek | imported from 3GU |
R1‑154853 | WF on candidate MUST categories | MediaTek, Huawei, HiSilicon, NTT DoCoMo | imported from 3GU |
R1‑154854 | WF on mixed transmission schemes | MediaTek, Alcatel-Lucent, CHTTL, CMCC, Nokia | imported from 3GU |
R1‑154855 | Discussion on SRS Capacity Improvement | ZTE | imported from 3GU |
R1‑154856 | CSI process configuration framework for EBF/FD-MIMO | Nokia Networks, Samsung, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Huawei, ZTE, Intel, NEC | imported from 3GU |
R1‑154857 | WF on post random backoff | Intel, Broadcom | imported from 3GU |
R1‑154858 | WF on eNB sensing based Cat4 LBT operation | Qualcomm, LGE, ZTE, Huawei, HiSilicon, ALU, ASB, CATT | imported from 3GU |
R1‑154859 | WF on multiplexing PDSCH and DRS | LGE | imported from 3GU |
R1‑154860 | WF on support of multiple transmissions to different destinations within a SC-Period | LG Electronics, NTT Docomo, ITRI, III, Kyocera, Sharp, USDoC | imported from 3GU |
R1‑154861 | WF on FD-MIMO codebook | Samsung, ZTE, ALU, ASB, Ericsson, CATT | imported from 3GU |
R1‑154862 | [Draft] Reply LS on enhanced signalling for inter-eNB CoMP | Samsung | imported from 3GU |
R1‑154863 | Offline discussion summary on V2X evaluation assumptions | LGE | imported from 3GU |
R1‑154864 | WF on MTC-SIB1 frequency hopping | Ericsson, CATT, ETRI, Huawei, HiSilicon, Intel, InterDigital, LG Electronics, Marvell, NEC, Nokia Networks, NTT DoCoMo, Panasonic, Qualcomm, Samsung, Sequans, Sierra Wireless, Sony | imported from 3GU |
R1‑154865 | WF on DMRS enhancement | Huawei, HiSilicon, CMCC, NEC, ITRI, CATT, ZTE, Nokia Networks, CATR, Samsung, China Telecom | imported from 3GU |
R1‑154866 | WF on DL TX burst indication | LG Electronics, CATT, Nokia Networks, Sharp | imported from 3GU |
R1‑154867 | WF on multiplexing PDSCH and DRS | LG Electronics, KT corp., Panasonic | imported from 3GU |
R1‑154868 | WF on Inter-Frequency Discovery | Qualcomm Inc., Ericsson, ITRI | imported from 3GU |
R1‑154869 | [Draft] reply LS on ProSe coarse proximity estimation based on path loss | Intel Corporation | imported from 3GU |
R1‑154870 | WF on 4Tx Switching SRS Transmission Enhancement | Huawei, HiSilicon, CMCC, Samsung | imported from 3GU |
R1‑154871 | Reply LS on ProSe coarse proximity estimation based on path loss | RAN1, Intel Corporation | imported from 3GU |
R1‑154872 | Summary of offline discussion for group priority | Qualcomm Inc. | imported from 3GU |
R1‑154873 | [Draft] LS on eD2D RAN1 agreements for Relay and PS discovery | Qualcomm Inc. | imported from 3GU |
R1‑154874 | WF on MCPTT priorities | USDoC | imported from 3GU |
R1‑154875 | [Draft] LS on eD2D ProSe Per Packet Priority | Qualcomm Inc. | imported from 3GU |
R1‑154876 | LS on eD2D ProSe Per Packet Priority | RAN1, Qualcomm Inc. | imported from 3GU |
R1‑154877 | [Draft] LS on RAN1 agreements at RAN1#82 | Qualcomm Inc. | imported from 3GU |
R1‑154878 | List of RRC parameters for RAN2 | Qualcomm Inc. | imported from 3GU |
R1‑154879 | Summary of Ad-hoc session on Enhanced LTE Device to Device Proximity Services | Ad-Hoc Chairman (Alcatel Lucent) | imported from 3GU |
R1‑154880 | Summary of Ad-hoc session on Elevation Beamforming/Full-Dimension (FD) MIMO for LTE | Ad-Hoc Chairman (Alcatel Lucent) | imported from 3GU |
R1‑154881 | Summary of Ad-hoc session on Study on Indoor Positioning Enhancements for UTRA and LTE | Ad-Hoc Chairman (Qualcomm) | imported from 3GU |
R1‑154882 | void | ETSI | imported from 3GU |
R1‑154883 | void | ETSI | imported from 3GU |
R1‑154884 | void | ETSI | imported from 3GU |
R1‑154885 | void | ETSI | imported from 3GU |
R1‑154886 | void | ETSI | imported from 3GU |
R1‑154887 | void | ETSI | imported from 3GU |
R1‑154888 | WF on discovery transmission in non-primary carrier | LGE, ITRI | imported from 3GU |
R1‑154889 | TP for classification of MUST schemes | Huawei, HiSilicon, MediaTek, NTT DOCOMO | imported from 3GU |
R1‑154890 | WF on UE Relay | Huawei, HiSilicon, Ericsson, Qualcomm, ITRI | imported from 3GU |
R1‑154891 | LS on decisions regarding rank3/4 in TM3 and TM4 for additional UE categories | RAN2, Nokia Networks | imported from 3GU |
R1‑154892 | Reply LS on enhanced signalling for inter-eNB CoMP | RAN1, Samsung | imported from 3GU |
R1‑154893 | WF on DL transmission methods for LAA Scell | CATT, NTT DoCoMo, Huawei, ^^HiSilicon, Panasonic | imported from 3GU |
R1‑154894 | WF on mixed transmission schemes | MediaTek, Alcatel-Lucent, CHTTL, CMCC, Nokia | imported from 3GU |
R1‑154895 | Observation on Option 6 for rode grid size determination | LGE | imported from 3GU |
R1‑154896 | WF on UE support of carrier selection | Huawei, HiSilicon, Samsung, Sony | imported from 3GU |
R1‑154897 | WF on LAA DRS design and transmission timing | NTT DOCOMO | imported from 3GU |
R1‑154898 | WF on LAA DRS performance evaluation | Huawei, NTT DOCOMO, HiSilicon | imported from 3GU |
R1‑154899 | WF on LAA initial signal | Samsung, NTT DOCOMO, Huawei, HiSilicon, NEC | imported from 3GU |
R1‑154900 | WF on LAA Energy Detection Threshold | Cisco, Broadcom, Intel | imported from 3GU |
R1‑154901 | WF on subframes with MBSFN structure in LAA | Qualcomm | imported from 3GU |
R1‑154902 | CSI-Process Class B for FD-MIMO | CATT, AT&T, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CMCC, Ericsson, Huawei, Nokia, Qualcomm, NTT DOCOMO, Samsung, ZTE | imported from 3GU |
R1‑154903 | Offline discussion summary on HARQ-ACK for R13 CA | Huawei, HiSilicon | imported from 3GU |
R1‑154904 | [Draft] Reply LS on TDD + FDD dual UL UE behavior | Qualcomm | imported from 3GU |
R1‑154905 | Reply LS on TDD + FDD dual UL UE behavior | RAN1, Qualcomm | imported from 3GU |
R1‑154906 | WF on V2X scenario | NTT DOCOMO, CMCC, Vodafone | imported from 3GU |
R1‑154907 | WF on LAA Energy Detection Threshold | Cisco, Broadcom | imported from 3GU |
R1‑154908 | LS response on measurement performance for Rel-13-MTC | RAN4, Ericsson | imported from 3GU |
R1‑154909 | WF on remaining issues for narrowband definitions | NEC, LGE, Intel, InterDigital, CATT, Samsung | imported from 3GU |
R1‑154910 | Way forward on aperiodic CSI triggering for Rel-13 CA | LG Electronics, Ericsson, Samsung, ITL | imported from 3GU |
R1‑154911 | Introduction of MIMO capability signalling for intra-band contiguous CA | Intel Corporation | imported from 3GU |
R1‑154912 | Reply LS on PRACH coverage enhancement | RAN4, Huawei | imported from 3GU |
R1‑154913 | WF on Configuration of Number of Repetitions | Sequans, Ericsson, Panasonic, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, Gemalto | imported from 3GU |
R1‑154914 | WF on UE-specific MPDCCH initialization | NTT DOCOMO, Ericsson, Sony, Intel, CATT, ,ZTE, Sierra Wireless, Samsung, LG Electronics | imported from 3GU |
R1‑154915 | WF on PUSCH HARQ feedback | Sequans, Ericsson, Panasonic, Gemalto, Verizon | imported from 3GU |
R1‑154916 | WF on Search Space for MTC | LGE | imported from 3GU |
R1‑154917 | WF on RAR | LG Electronics, Panasonic, Samsung, Ericsson, NEC, Sony | imported from 3GU |
R1‑154918 | PUSCH Summary of Submitted Tdocs on RAN#82 | Sierra Wireless, S.A. | imported from 3GU |
R1‑154919 | WF on UCI transmission on PUSCH | LGE | imported from 3GU |
R1‑154920 | WF on Dynamic V2V Simulations | Qualcomm Inc., LGE, Huawei, HiSilicon, CATT, ITRI | imported from 3GU |
R1‑154921 | Additional Simulation Results for TBS Option 2 | NextNav | imported from 3GU |
R1‑154922 | Table templates for system-level simulation results | MediaTek | imported from 3GU |
R1‑154923 | TP for classification of MUST schemes | Huawei, HiSilicon, MediaTek, NTT DOCOMO , Sony, CHTTL, HTC, CATR | imported from 3GU |
R1‑154924 | WF on CSI Measurement Restriction | Samsung, Ericsson, CATT, NTT DOCOMO, KT, CMCC, ZTE, LGE | imported from 3GU |
R1‑154925 | WF on CSI Reporting for Rel.13 FD-MIMO | Samsung, CATT, CMCC, Ericsson, ETRI, Huawei, HiSilicon, Intel, LG Electronics, ZTE | imported from 3GU |
R1‑154926 | WF on CSI-RS configuration for Class B CSI reporting | LG Electronics, ETRI, Intel Corporation, KT Corporation, NEC, Samsung | imported from 3GU |
R1‑154927 | TP for categorization of MUST schemes | ZTE | imported from 3GU |
R1‑154928 | Text Proposal for Annex A.3 of TR36.859 | NTT DOCOMO, Intel | imported from 3GU |
R1‑154929 | WF on Frequency Hopping | LG Electronics, Panasonic, Samsung, Ericsson, NEC, Sony | imported from 3GU |
R1‑154930 | WF on end of DL TX burst in LAA | LG Electronics, Sharp, Samsung | imported from 3GU |
R1‑154931 | Way forward on Paging for MTC | InterDigital, Panasonic, Intel, Ericsson, Sony, LG Electronics, Samsung | imported from 3GU |
R1‑154932 | WF on DCI format | Panasonic, DOCOMO, Samsung, ^^LGE, Sony, ZTE, Qualcomm, InterDigital | imported from 3GU |
R1‑154933 | WF on MTC terminology "normal coverage" | Panasonic, Qualcomm, Samsung | imported from 3GU |
R1‑154934 | TP of PRS-IC on OTDOA based positioning | Intel | imported from 3GU |
R1‑154935 | LS on intra-band contiguous CA and intra-band non-contiguous CA | RAN2, Intel | imported from 3GU |
R1‑154936 | Joint TP for a proper reference and enhancements of PRS transmit diversity | Huawei, HiSilicon, LGE, AT&T, Intel | imported from 3GU |
R1‑154937 | WF on PBCH Repetition | Qualcomm, Sony, Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon, ZTE, LG, Samsung | imported from 3GU |
R1‑154938 | WF on Narrowband numbering and location of the remaining PRBs | NEC, Samsung, CATT, Ericsson | imported from 3GU |
R1‑154939 | WF on p-CSI transmission for R13 CA | Huawei, HiSilicon, Potevio,Qualcomm,CTC | imported from 3GU |
R1‑154940 | WF on p-CSI+HARQ-ACK transmission for R13 CA | Huawei, HiSilicon, Potevio, Qualcomm | imported from 3GU |
R1‑154941 | Summary of offline discussions on Joint Grants for eCA | Nokia Networks | imported from 3GU |
R1‑154942 | Summary of offline discussions on eCA UCI aspects | NTT DOCOMO | imported from 3GU |
R1‑154943 | Reply LS on retuning time between narrowband regions for MTC | RAN4, Ericsson | imported from 3GU |
R1‑154944 | Reply LS on the maximum power of the new UE power class for MTC | RAN4, Ericsson | imported from 3GU |
R1‑154945 | Joint TP for enhancements for E-CID enhancements | Huawei, HiSilicon, Ericsson | imported from 3GU |
R1‑154946 | CSI-IM configuration framework for EBF/FD-MIMO | Nokia Networks, CATT, CMCC, NTT-Docomo, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Intel | imported from 3GU |
R1‑154947 | WF on Physical Channel Timing Relationships | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R1‑154948 | WF on Additional TM Reduction for LC MTC UEs and UEs Operating in CE | Marvell, Ericsson, Intel, CATT, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, Samsung, Sequans, MediaTek, Panasonic, Sierra Wireless, Sony, NEC | imported from 3GU |
R1‑154949 | WF on CSI reporting without PMI for Rel.13 FD-MIMO | ZTE, CMCC, CATR, CATT, NEC, Nokia Networks, Samsung | imported from 3GU |
R1‑154950 | Simulation results Jumbo Text Proposal | NextNav | imported from 3GU |
R1‑154951 | Way Forward for Indoor Pos Conclusions | AT&T, NextNav | imported from 3GU |
R1‑154952 | WF on precoder and PMI construction for Rel-13 FD-MIMO | Samsung, LGE, CATT, Qualcomm, NTT DOCOMO | imported from 3GU |
R1‑154953 | WF on Resource allocations for LC MTC UEs | NEC | imported from 3GU |
R1‑154954 | WF on Configuration of Number of Repetitions | Sequans, Ericsson, Marvell, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Verizon | imported from 3GU |
R1‑154955 | WF on Coverage Enhancement Level & Coverage Enhancement Mode | Sony, Panasonic, Qualcomm, LG, NTT DOCOMO | imported from 3GU |
R1‑154956 | WF on Distinguishing Different MPDCCH Repetitions in a Search Space | Sony, Sierra Wireless, Qualcomm, Panasonic, Samsung, ZTE | imported from 3GU |
R1‑154957 | LS reply on measurements cell selection and reselection for MTC LC/EC | RAN4, Nokia Networks | imported from 3GU |
R1‑154958 | WF on CSI Measurement Restriction | Samsung, Ericsson, CATT, NTT DOCOMO, KT, CMCC, ZTE, LGE | imported from 3GU |
R1‑154959 | WF on CW adjustment based on HARQ-ACK feedback | Ericsson, Samsung | imported from 3GU |
R1‑154960 | WF on Narrowband numbering and location of the remaining PRBs | NEC, CATT, LGE, Intel, Ericsson, Nokia Networks, Qualcomm, NTT DOCOMO, Samsung, InterDigital, Marvell | imported from 3GU |
R1‑154961 | WF on LAA Energy Detection Threshold | Cisco Systems, Broadcom, Intel | imported from 3GU |
R1‑154962 | WF on resource allocations for PUSCH | ZTE, Ericsson | imported from 3GU |
R1‑154963 | [Draft] LS on decisions on EB/FD-MIMO | Nokia Networks | imported from 3GU |
R1‑154964 | WF on subframes with MBSFN structure in LAA | Qualcomm, ALU, ASB, Panasonic, Huawei, HiSilicon, Nokia Networks | imported from 3GU |
R1‑154965 | WF on DL TX burst indication | LGE, CATT, Nokia Networks, Sharp, CATR | imported from 3GU |
R1‑154966 | WF on end of DL TX burst in LAA | LG Electronics, Sharp, Samsung | imported from 3GU |
R1‑154967 | Introduction of Wideband-Only Aperiodic CSI Reporting Mode | Panasonic, Ericsson, Nokia Networks | imported from 3GU |
R1‑154968 | WF on candidate MUST categories | MediaTek | imported from 3GU |
R1‑154969 | Summary of eCA offline discussion on Thursday afternoon | NTT DOCOMO | imported from 3GU |
R1‑154970 | WF on ED adaptation | Ericsson, Qualcomm | imported from 3GU |
R1‑154971 | WF on CW adjustment based on eNB sensing | Qualcomm, Huawei, HiSilicon, LG, ZTE | imported from 3GU |
R1‑154972 | On remaining DL control issues for CA up to 32 CCs | Nokia Networks | imported from 3GU |
R1‑154973 | WF on Cross-subframe Channel Estimation for PDSCH | Ericsson, Sequans, Samsung, InterDigital, Intel, Sony, Sierra Wireless, CATT, LGE, Nokia Networks, Lenovo, ZTE | imported from 3GU |
R1‑154974 | WF on LAA cell detection and synchronization | Huawei, NTT DOCOMO | imported from 3GU |
R1‑154975 | WF on CW adjustment based on eNB sensing | Qualcomm, Huawei, HiSilicon, LG, ZTE | imported from 3GU |
R1‑154976 | WF on MTC-SIB1 repetitions | Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, LG Electronics, Marvell, Panasonic, Sequans, Verizon, ZTE | imported from 3GU |
R1‑154977 | Introducing 4-layer MIMO transmission in TM3 and TM4 | Huawei, HiSilicon, Nokia Networks, Samsung, Ericsson | imported from 3GU |
R1‑154978 | Introducing 4-layer MIMO transmission in TM3 and TM4 | Huawei, HiSilicon, Nokia Networks, Samsung, Ericsson | imported from 3GU |
R1‑154979 | Introducing 4-layer MIMO transmission in TM3 and TM4 | Huawei, HiSilicon, Nokia Networks, Samsung, Ericsson | imported from 3GU |
R1‑154980 | WF on PRACH transmit power | Huawei, HiSilicon, Intel, InterDigital, Samsung, Panasonic | imported from 3GU |
R1‑154981 | Updated offline discussion summary on V2X evaluation assumptions | LGE | imported from 3GU |
R1‑154982 | [Draft] LS on synchronization error assumption in LTE-based V2X | LGE | imported from 3GU |
R1‑154983 | [Draft] LS on traffic model assumption in LTE-based V2X | LGE | imported from 3GU |
R1‑154984 | TP for classification of MUST schemes | Huawei, HiSilicon, MediaTek, NTT DOCOMO, Sony, CHTTL, HTC, CATR, OPPO, ITRI | imported from 3GU |
R1‑154985 | Introduction of MIMO capability signalling for intra-band contiguous CA | Intel Corporation | imported from 3GU |
R1‑154986 | [Draft] LS on PC5-based V2V scenario | NTT DOCOMO | imported from 3GU |
R1‑154987 | WF on PC5-based V2V operation scenario | NTT DOCOMO, CATT, Huawei, LG Electronics, Qualcomm | imported from 3GU |
R1‑154988 | Jumbo TP for TR37.857 | NextNav | imported from 3GU |
R1‑154989 | RAN3 agreements on IndoorPositioning | NextNav | imported from 3GU |
R1‑154990 | 37.857 v0.5.0 Study on Indoor Positioning Enhancements for UTRA | NextNav | imported from 3GU |
R1‑154991 | 36.213 CR0528(Rel-12,F) Clarification on Power control for PCM2 | NTT DOCOMO | imported from 3GU |
R1‑154992 | WF on P-CSI dropping | NTT DOCOMO | imported from 3GU |
R1‑154993 | WF on DL LBT priority classes | Ericsson, Huawei, HiSilicon, NTT DOCOMO | imported from 3GU |
R1‑154994 | WF on configurable parameters for CSI reporting class B | LG Electronics, ETRI, Intel Corporation, ITRI, KT Corporation, NEC, ZTE | imported from 3GU |
R1‑154995 | LS on synchronization error assumption in LTE-based V2X | RAN1, LGE | imported from 3GU |
R1‑154996 | WF on timing between M-PDCCH and PDSCH | CATT, Ericsson, Huawei, HiSilicon, Intel, InterDigital, Lenovo, LGE, NEC, Nokia Networks, NTT DoCoMo, Qualcomm, Samsung, ZTE | imported from 3GU |
R1‑154997 | WF on Frequency Hopping for SIB | LGE | imported from 3GU |
R1‑154998 | WF on Default behavior regarding downlink valid subframe for MTC | LGE | imported from 3GU |
R1‑154999 | TP for classification of MUST schemes | Huawei, HiSilicon, MediaTek, NTT DOCOMO, Sony, CHTTL, HTC, CATR, OPPO, ITRI | imported from 3GU |
R1‑155000 | WF on MTC PRACH Configuration | Ericsson | imported from 3GU |
R1‑155001 | [Draft] LS on traffic model assumption in LTE-based V2X | LGE | imported from 3GU |
R1‑155002 | WF on PDSCH narrowband resource location | Huawei, HiSilicon, Panasonic | imported from 3GU |
R1‑155003 | [Draft] LS on RAN1 agreements on CA Enhancement Beyond 5 Carriers | Nokia Networks | imported from 3GU |
R1‑155004 | [Draft] LS on RAN1 agreements on CA Enhancement Beyond 5 Carriers | Nokia Networks | imported from 3GU |
R1‑155005 | WF on precoder and PMI construction for Rel-13 FD-MIMO | Samsung, LGE, CATT, Qualcomm, NTT DOCOMO, ZTE, Ericsson, ALU, ASB, AT&T, CMCC, KT | imported from 3GU |
R1‑155006 | Text Proposal for section 6 of TR36.859 | MediaTek, Huawei, HiSilicon | imported from 3GU |
R1‑155007 | Flow Chart for Cat 4 LBT for LAA DL | Intel, Ericsson | imported from 3GU |
R1‑155008 | WF on configurable parameters for CSI reporting class B | LG Electronics, CATR, ETRI, Intel Corporation, ITRI, KT Corporation, NEC, Samsung, ZTE | imported from 3GU |
R1‑155009 | LS on RAN1 agreements at RAN1#82 | RAN1, Qualcomm | imported from 3GU |
R1‑155010 | 25.766 v2.0.0 Network-Assisted Interference Cancellation and Suppression for UMTS | Ericsson | imported from 3GU |
R1‑155011 | LS on RAN1 agreements on CA Enhancement Beyond 5 Carriers | RAN1, Nokia Networks | imported from 3GU |
R1‑155012 | WF on subframes with MBSFN structure in LAA | Qualcomm, ALU, ASB, Nokia Networks, Huawei, HiSilicon, ETRI | imported from 3GU |
R1‑155013 | Jumbo TP for TR37.857 | NextNav | imported from 3GU |
R1‑155014 | LS on traffic model assumption in LTE-based V2X | RAN1, LGE | imported from 3GU |
R1‑155015 | 37.857 v0.6.0 Study on Indoor Positioning Enhancements for UTRA | NextNav | imported from 3GU |
R1‑155016 | 37.857 v1.0.0 Study on Indoor Positioning Enhancements for UTRA | NextNav | imported from 3GU |
R1‑155017 | 36.213 CR0528r2 (Rel-12,F) Clarification on Power control for PCM2 | NTT DOCOMO | imported from 3GU |
R1‑155018 | WF on precoder and PMI construction for Rel-13 FD-MIMO | Samsung, LGE, CATT, Qualcomm, NTT DOCOMO, ZTE, Ericsson, ALU, ASB, AT&T, CMCC, KT | imported from 3GU |
R1‑155019 | Summary of [82-14] Email approval on eNB location and channel model assumptions for V2X | LG Electronics | imported from 3GU |
R1‑155020 | 36.885 v.0.0.2 Study on LTE-based V2X Services | ETSI | imported from 3GU |
page generated from database: 2024-09-26 11:02:35