ETSI logo

www.3gpp.org / FTP / tsg_ran / WG2_RL2 / TSGR2_109_e / Inbox / Drafts / [Offline-306][NBIOT EMTC] WUS Finalise the signalling (QC)

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon R2-200xxxx WUS Finalise signalling - r1 - HW.doc 2020/02/28 12:41 250 KB
icon R2-200xxxx WUS Finalise signalling - r1-HW-QC.doc 2020/03/02 10:44 260 KB
icon R2-200xxxx WUS Finalise signalling - r1.doc 2020/02/28 10:48 251 KB
icon R2-200xxxx WUS Finalise signalling - r2.doc 2020/03/04 9:15 295,5 KB
icon R2-200xxxx WUS Finalise signalling.doc 2020/02/25 15:42 243,5 KB

5 items.