ETSI logo

www.3gpp.org / FTP / tsg_ran / WG1_RL1 / TSGR1_101-e / Inbox / drafts / 7.2.3 Maintenance of Integrated Access and Backhaul for NR

upload
Drag and drop documents here or click to upload
  sort by name/desc           sort by date/desc           sort by size/desc
icon Draft FL summary [101-e-NR-IAB-05] - Updates to TS38.300 - v001.docx 2020/05/25 3:26 34,8 KB
icon Draft FL summary [101-e-NR-IAB-05] - Updates to TS38.300 - v002_ZTE.docx 2020/05/26 7:27 34,7 KB
icon Draft FL summary [101-e-NR-IAB-05] - Updates to TS38.300 - v003.docx 2020/05/27 19:21 42,5 KB
icon Draft FL summary [101-e-NR-IAB-05] - Updates to TS38.300 - v003_ATT.docx 2020/05/27 20:36 44 KB
icon Draft FL summary [101-e-NR-IAB-05] - Updates to TS38.300 - v004.docx 2020/05/27 23:08 47,4 KB
icon Draft LS on IAB updates to 38.300.docx 2020/06/02 3:18 99,5 KB

6 items.