Tdoc List
2016-02-24 08:32
Tdoc |
Title |
Source |
Doc-type |
Doc-for |
Agenda |
Avail |
Treated |
Decision |
Wdrn |
Replaced-by |
Replaces |
C4-161000 |
Agenda |
CT4 Chairman |
agenda |
Information |
2 |
Yes |
Yes |
noted |
No |
|
| C4-161001 |
Detailed agenda & time plan for CT4#72: status at document deadline |
CT4 Chairman |
agenda |
Information |
2 |
Yes |
Yes |
noted |
No |
|
| C4-161002 |
Detailed agenda & time plan for CT4#71: status on eve of meeting |
CT4 Chairman |
agenda |
Information |
2 |
Yes |
Yes |
noted |
No |
|
| C4-161003 |
Proposed allocation of documents to agenda items for CT4#71: status at document deadline |
CT4 Chairman |
agenda |
Information |
2 |
Yes |
Yes |
noted |
No |
|
| C4-161004 |
Proposed allocation of documents to agenda items for CT4#68bis: status on eve of meeting |
Alcatel-Lucent Telecom Ltd |
agenda |
Approval |
2 |
Yes |
Yes |
noted |
No |
|
| C4-161005 |
CT4 previous meeting report for approval |
MCC |
report |
Approval |
3 |
Yes |
Yes |
approved |
No |
|
| C4-161006 |
CT/SA #70 Status report |
Chairman |
report |
Information |
3 |
Yes |
Yes |
noted |
No |
|
| C4-161007 |
Release of WebRTC Data Channels |
Alcatel-Lucent |
CR |
Approval |
7.1.8 |
Yes |
Yes |
revised |
No |
C4-161273 |
| C4-161008 |
WebRTC Data Channels |
Alcatel-Lucent |
CR |
Approval |
7.1.8 |
Yes |
Yes |
revised |
No |
C4-161274 |
| C4-161009 |
WebRTC gateway configuration for end-to-end WebRTC calls (stage 2) |
Alcatel-Lucent |
CR |
Approval |
7.2.12 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161010 |
WebRTC gateway configuration for end-to-end WebRTC calls (stage 3) |
Alcatel-Lucent |
CR |
Approval |
7.2.12 |
Yes |
Yes |
revised |
No |
C4-161369 |
| C4-161011 |
TrGW configuration for end-to-end WebRTC calls (stage 3) |
Alcatel-Lucent |
CR |
Approval |
7.2.12 |
Yes |
Yes |
revised |
No |
C4-161370 |
| C4-161012 |
H.248 WebRTC gateway bearer plane interworking for end-to-end WebRTC traffic |
Alcatel-Lucent |
discussion |
Information |
7.2.12 |
Yes |
Yes |
noted |
No |
|
| C4-161013 |
QoS end-to-end MTSI extensions: possible impact on H.248 packet gateways |
Alcatel-Lucent |
discussion |
Discussion |
7.2.3 |
Yes |
Yes |
noted |
No |
|
| C4-161014 |
IMS-WebRTC Rel-14: potential enhancements for IMS-WebRTC gateways |
Alcatel-Lucent |
discussion |
Discussion |
8.2.5 |
Yes |
Yes |
noted |
No |
|
| C4-161015 |
Alternate IP Connectivity: upgrade options for ALTC support by H.248 gateways |
Alcatel-Lucent |
discussion |
Information |
8.1.16 |
Yes |
Yes |
noted |
No |
|
| C4-161016 |
Clarification of EVS codec support by 3GPP H.248 Media Gateways |
Alcatel-Lucent |
discussion |
Discussion |
8.1.19 |
Yes |
Yes |
noted |
No |
|
| C4-161017 |
LS on NBIFOM procedure in SCM and RAN rules handling parameter |
3GPP TSG CT WG1 |
LS in |
Discussion |
7.2.6 |
Yes |
Yes |
noted |
No |
|
| C4-161018 |
Reply LS on Disconnection of NBIFOM PDN Connection with the Cause "Reactivation Requested" |
3GPP TSG CT WG1 |
LS in |
Discussion |
7.2.6 |
Yes |
Yes |
noted |
No |
|
| C4-161019 |
Reply LS on Mapping table between GTPv2 S2a and WLCPDiameter |
3GPP TSG CT WG1 |
LS in |
Discussion |
8.3.1 |
Yes |
Yes |
noted |
No |
|
| C4-161020 |
LS on issues related to MT SMS over SGs delivery in eDRX |
3GPP TSG CT WG1 |
LS in |
| 7.2.10 |
Yes |
Yes |
noted |
No |
|
| C4-161021 |
LS on MCPTT Group data and affiliation |
3GPP TSG CT WG1 |
LS in |
Discussion |
7.2.11 |
Yes |
Yes |
noted |
No |
|
| C4-161022 |
LS on questions on CIoT |
3GPP TSG CT WG1 |
LS in |
Discussion |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161023 |
Reply LS on OCS address for Gy and Gyn inter-PLMN |
3GPP TSG CT WG3 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161024 |
LS on the decision of NBIFOM mode |
3GPP TSG CT WG3 |
LS in |
Discussion |
7.2.6 |
Yes |
Yes |
noted |
No |
|
| C4-161025 |
LS on Request for Diameter Command Code and Application ID for new St Interface |
3GPP TSG CT WG3 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161026 |
Reply LS on the Setting of Delay Tolerant Connection Indication |
3GPP TSG CT WG3 |
LS in |
Discussion |
7.2.10 |
Yes |
Yes |
noted |
No |
|
| C4-161027 |
Reply LS on Multi-stream Multiparty Conferencing Media Handling |
3GPP TSG CT WG3 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161028 |
NG PACKET LS to Standardization groups on PMIP removal |
GSMA PACKET #83 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161029 |
LS on extension to field length of PDCP Sequence Number |
3GPP TSG RAN WG2 |
LS in |
Discussion |
7.3.11 |
Yes |
Yes |
noted |
No |
|
| C4-161030 |
LS on extension to field length of PDCP Sequence Number |
3GPP TSG RAN WG2 |
LS in |
Discussion |
7.3.11 |
Yes |
Yes |
replied to |
No |
|
| C4-161031 |
Reply LS on 3GPP Work on Explicit Congestion Notification for Lower Layer Protocols |
3GPP TSG RAN WG2 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161032 |
Response LS on Conclusions from TR 23.712 on Warning Status Reporting |
3GPP TSG RAN WG3 |
LS in |
Discussion |
7.2.4 |
Yes |
Yes |
noted |
No |
|
| C4-161033 |
LS on S1 signalling solutions for non-NB-IoT UEs |
3GPP TSG RAN |
LS in |
Discussion |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161034 |
Reply LS on clarification on requirements for AESE |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.2.8 |
Yes |
Yes |
noted |
No |
|
| C4-161035 |
Reply LS on clarification on requirements for MONTE |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.1.9 |
Yes |
Yes |
replied to |
No |
|
| C4-161036 |
LS on Network asserted WLAN Location Information for PDN connection establishment over S2b |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.2.9 |
Yes |
Yes |
noted |
No |
|
| C4-161037 |
LS on Mobile Equipment Identity Signalling over WLAN |
3GPP TSG SA WG2 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161038 |
LS on Retrieval of UE Usage Type from HSS |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.1.18 |
Yes |
Yes |
noted |
No |
|
| C4-161039 |
Reply LS on proposed extension to GUSS to include AS address |
3GPP TSG SA WG2 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161040 |
LS on Packet switched conversational multimedia applications TS 26.235 and TS 26.236 |
3GPP TSG SA WG4 |
LS in |
Discussion |
7.3.9 |
Yes |
Yes |
noted |
No |
|
| C4-161041 |
Reply LS on 3GPP Work on Explicit Congestion Notification for Lower Layer Protocols |
3GPP TSG SA |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161042 |
Reply LS on questions on CIoT |
3GPP TSG RAN WG2 NB-IOT Ad-hoc |
LS in |
Discussion |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161043 |
Multi-stream Multiparty Conferencing Media Handling |
Ericsson |
discussion |
Discussion |
5 |
Yes |
Yes |
noted |
No |
|
| C4-161044 |
CT aspects of MTSI Extension on Multi-stream Multiparty Conferencing Media Handling |
Ericsson |
WID new |
Agreement |
5 |
Yes |
Yes |
revised |
No |
C4-161301 |
| C4-161045 |
Removal of references to TS 26.235 |
Ericsson |
CR |
| 7.3.9 |
Yes |
Yes |
revised |
No |
C4-161371 |
| C4-161046 |
Removal of references to TS 26.235 |
Ericsson |
CR |
| 7.3.9 |
Yes |
Yes |
agreed |
No |
|
| C4-161047 |
Removal of references to TS 26.236 |
Ericsson |
CR |
| 7.3.9 |
Yes |
Yes |
revised |
No |
C4-161372 |
| C4-161048 |
Removal of references to TS 26.236 |
Ericsson |
CR |
| 7.3.9 |
Yes |
Yes |
agreed |
No |
|
| C4-161049 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
| 7.2.3 |
Yes |
Yes |
revised |
No |
C4-161330 |
| C4-161050 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
| 7.2.3 |
Yes |
Yes |
revised |
No |
C4-161331 |
| C4-161051 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
| 7.2.3 |
Yes |
Yes |
revised |
No |
C4-161332 |
| C4-161052 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
| 7.2.3 |
Yes |
Yes |
revised |
No |
C4-161333 |
| C4-161053 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
| 7.2.3 |
Yes |
Yes |
revised |
No |
C4-161334 |
| C4-161054 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
| 7.2.3 |
Yes |
Yes |
revised |
No |
C4-161335 |
| C4-161055 |
SCC AS Restoration |
China Mobile |
WID new |
| 5 |
Yes |
Yes |
revised |
No |
C4-161302 |
| C4-161056 |
eProSe-Ext-CT impacts |
Qualcomm Incorporated |
discussion |
Information |
7.2.7 |
Yes |
Yes |
noted |
No |
|
| C4-161057 |
Addition of ProSe Application Code Prefix and ProSe Application Code Suffix formats |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161374 |
| C4-161058 |
Resolution of Editor’s notes on EVS over UMTS CS |
Qualcomm Incorporated |
CR |
Agreement |
7.1.7 |
Yes |
Yes |
revised |
No |
C4-161327 |
| C4-161059 |
Resolution of Editor’s note on EVS over UMTS CS |
Qualcomm Incorporated |
CR |
Agreement |
7.1.7 |
Yes |
Yes |
agreed |
No |
|
| C4-161060 |
Pseudo-CR on Removing Editor's Note on IWK-SCEF Authorization and Configuration Failure at IWK-SCEF |
Cisco Systems Inc |
pCR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161462 |
| C4-161061 |
Notifying the status of MONTE event configuration at the IWK-SCEF to the HSS |
Cisco Systems Inc |
CR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161346 |
| C4-161062 |
Requested Retransmission Time in MT-Forward-SM response |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.2.10 |
Yes |
Yes |
agreed |
No |
|
| C4-161063 |
Application ID for St |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
agreed |
No |
|
| C4-161064 |
AVP code range reservation for 32.299 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
revised |
No |
C4-161241 |
| C4-161065 |
Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration |
ZTE/Joy |
CR |
Agreement |
9.8 |
Yes |
Yes |
revised |
No |
C4-161449 |
| C4-161066 |
Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration |
ZTE/Joy |
CR |
Agreement |
9.8 |
Yes |
Yes |
revised |
No |
C4-161450 |
| C4-161067 |
Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration |
ZTE/Joy |
CR |
Agreement |
9.8 |
Yes |
Yes |
revised |
No |
C4-161451 |
| C4-161068 |
An Issue on HSS failure recover procedure |
NEC EUROPE LTD |
discussion |
Decision |
7.3.4 |
Yes |
Yes |
noted |
No |
|
| C4-161069 |
Fix the issue on HSS restart procedure |
NEC EUROPE LTD |
CR |
Decision |
7.3.4 |
Yes |
Yes |
not pursued |
No |
| C4-151951 |
C4-161070 |
Fix the issue on HSS restart procedure |
NEC EUROPE LTD |
CR |
Approval |
7.3.4 |
Yes |
Yes |
revised |
No |
C4-161360 |
| C4-161071 |
User Plane Integrity Protection Indicator |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.10 |
Yes |
Yes |
revised |
No |
C4-161316 |
| C4-161072 |
User Plane Integrity Protection Indicator |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.10 |
Yes |
Yes |
revised |
No |
C4-161317 |
| C4-161073 |
User Plane Integrity Protection Indicator |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.10 |
Yes |
Yes |
revised |
No |
C4-161318 |
| C4-161074 |
Implicit Identities for PSI |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.7 |
Yes |
Yes |
merged |
No |
C4-161344 |
| C4-161075 |
Discussion on status of MONTE work |
Huawei |
discussion |
Discussion |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161203 |
| C4-161076 |
Pseudo-CR on cleanup of 29.128 |
Huawei |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161288 |
| C4-161077 |
AVAILABILITY_AFTER_DDN_FAILURE reporting |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161348 |
| C4-161078 |
Reporting of overload by the SCEF |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161079 |
Clarification on usage of P and T needs |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161350 |
| C4-161080 |
Pseudo-CR on overload |
Huawei |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161352 |
| C4-161081 |
HSS restart MONTE impacts |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161354 |
| C4-161082 |
Restart of SCEF |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161358 |
| C4-161083 |
SCEF and HSS Restart |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161454 |
| C4-161084 |
Reporting of the start and stop of the reporting of monitoring events |
Huawei, Cisco Systems Inc |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161359 |
| C4-161085 |
Correction of AVP code and new AVP assignment |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161286 |
| C4-161086 |
Reporting of Monitoring update result |
Huawei |
CR |
Decision |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161243 |
| C4-161087 |
Corrections on TS numbers |
Huawei |
CR |
Decision |
7.3.2 |
Yes |
Yes |
revised |
No |
C4-161444 |
| C4-161088 |
Introduction of AAA-1 interface |
Huawei |
CR |
Decision |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161244 |
C4-160021 |
C4-161089 |
Data returned in IMSPublicIdentity correction, new EnhancedPublicIdentifiers class |
Ericsson |
CR |
| 7.3.7 |
Yes |
Yes |
revised |
No |
C4-161263 |
| C4-161090 |
De-registration of emergency registration correction |
Ericsson |
CR |
| 7.3.7 |
Yes |
Yes |
agreed |
No |
|
| C4-161091 |
Local Time Zone for CS retrieval |
Ericsson |
CR |
| 7.3.7 |
Yes |
Yes |
revised |
No |
C4-161387 |
| C4-161092 |
Remove the default access AVP |
Huawei |
CR |
| 7.2.6 |
Yes |
Yes |
agreed |
No |
|
| C4-161093 |
Remove the default access AVP |
Huawei |
CR |
| 7.2.6 |
Yes |
Yes |
agreed |
No |
|
| C4-161094 |
Update the reference for NBIFOM container |
Huawei |
CR |
| 7.2.6 |
Yes |
Yes |
agreed |
No |
|
| C4-161095 |
Specific AVP codes for NBIFOM |
Huawei |
CR |
| 7.2.6 |
Yes |
Yes |
agreed |
No |
|
| C4-161096 |
Add cause values to TWAN mapping table |
Huawei |
CR |
| 8.3.1 |
Yes |
Yes |
revised |
No |
C4-161356 |
| C4-161097 |
Add cause values to TWAN mapping table |
Huawei |
CR |
| 8.3.1 |
Yes |
Yes |
revised |
No |
C4-161357 |
| C4-161098 |
Extension on TWAN-S2a-Failure-Cause |
Huawei |
CR |
| 7.3.3 |
Yes |
Yes |
agreed |
No |
|
| C4-161099 |
Authorize the UE requested APN |
Huawei |
CR |
| 7.3.3 |
Yes |
Yes |
revised |
No |
C4-161312 |
| C4-161100 |
SCS Identity Format |
Hewlett-Packard Enterprise |
discussion |
Discussion |
9.13.2 |
Yes |
Yes |
noted |
No |
|
| C4-161101 |
SCS identity format |
Hewlett-Packard Enterprise |
CR |
Agreement |
9.13.2 |
Yes |
Yes |
noted |
No |
|
| C4-161102 |
SCS identity format |
Hewlett-Packard Enterprise |
CR |
Agreement |
9.13.2 |
Yes |
Yes |
postponed |
No |
|
| C4-161103 |
SCS identity format |
Hewlett-Packard Enterprise |
CR |
Agreement |
9.13.2 |
Yes |
Yes |
postponed |
No |
|
| C4-161104 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161386 |
| C4-161105 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161106 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
No |
Yes |
withdrawn |
Yes |
|
| C4-161107 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161108 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161109 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161389 |
| C4-161110 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161390 |
| C4-161111 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161112 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161113 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161114 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161115 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161391 |
| C4-161116 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161392 |
| C4-161117 |
Inter-PLMN discovery transmission support |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161375 |
| C4-161118 |
Adding security related parameters for restricted ProSe direct discovery authorization |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161376 |
| C4-161119 |
Support open discovery with application-controlled extension |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161377 |
| C4-161120 |
Discovery update for open and restricted ProSe direct discovery |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
agreed |
No |
|
| C4-161121 |
Octet number in MM context IE |
Huawei |
CR |
Agreement |
7.3.1 |
Yes |
Yes |
agreed |
No |
|
| C4-161122 |
Protocol Type in Create Session Request |
Huawei |
CR |
Agreement |
7.3.1 |
Yes |
Yes |
revised |
No |
C4-161349 |
| C4-161123 |
Correct the partial failure handling on SGW |
Huawei |
CR |
Agreement |
7.3.4 |
Yes |
Yes |
revised |
No |
C4-161361 |
| C4-161124 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161394 |
| C4-161125 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161396 |
| C4-161126 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161397 |
| C4-161127 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
revised |
No |
C4-161398 |
| C4-161128 |
Configure Monitoring Event to Multiple Serving Nodes |
ZTE |
CR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161419 |
| C4-161129 |
Inform the HSS of remaining number of reports |
ZTE |
CR |
Approval |
7.1.9 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161130 |
Count and Stop Monitoring Event Reports at SCEF |
ZTE |
CR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161423 |
| C4-161131 |
Allow SMS for NB-IoT UE without Combined Attach |
ZTE |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161323 |
| C4-161132 |
Clarification on Reporting Cell ID for NB-IoT |
ZTE |
CR |
Approval |
7.2.14 |
Yes |
Yes |
not pursued |
No |
|
| C4-161133 |
P-CSCF_RESELECTION_SUPPORT Private Status Type |
ZTE/Joy |
CR |
Agreement |
7.1.3 |
Yes |
Yes |
agreed |
No |
|
| C4-161134 |
Incorrect use of the term "full hexadecimal representation" to mean binary encoding |
Oracle Corporation |
CR |
Approval |
7.3.1 |
Yes |
Yes |
revised |
No |
C4-161342 |
| C4-161135 |
Incorrect use of the term "full hexadecimal representation" to mean binary encoding |
Oracle Corporation |
CR |
Approval |
7.3.1 |
Yes |
Yes |
revised |
No |
C4-161343 |
| C4-161136 |
Adjacent PLMNs |
Ericsson |
CR |
| 7.3.6 |
Yes |
Yes |
agreed |
No |
|
| C4-161137 |
Invocation of Alert procedure by HSS after ULR |
Ericsson |
CR |
| 7.3.6 |
Yes |
Yes |
revised |
No |
C4-161447 |
| C4-161138 |
Handover to Non-3GPP Access Not Allowed |
Ericsson |
CR |
| 7.3.5 |
Yes |
Yes |
revised |
No |
C4-161309 |
| C4-161139 |
Implementation Error in CR#29 |
Ericsson, Nextnav, MCC |
CR |
| 7.1.21 |
Yes |
Yes |
agreed |
No |
|
| C4-161140 |
Change of type of Monitoring-Duration AVP to represent an absolute time |
Ericsson |
CR |
| 7.1.9 |
Yes |
Yes |
revised |
No |
C4-161428 |
| C4-161141 |
Change of type of Monitoring-Duration AVP to represent an absolute time |
Ericsson |
CR |
| 7.1.9 |
Yes |
Yes |
agreed |
No |
|
| C4-161142 |
AVPs for the Rx Diameter application |
Ericsson |
CR |
| 7.3.2 |
Yes |
Yes |
agreed |
No |
|
| C4-161143 |
CT4 impacts for CIoT |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
discussion |
Discussion |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161144 |
GTP-U tunneling over S11 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
discussion |
Decision |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161145 |
S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161378 |
| C4-161146 |
RAT-Type extension for NB-IoT |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161399 |
| C4-161147 |
S11-U tunneling for MO/MT data transport in control plane (SGi based) |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161379 |
| C4-161148 |
End Marker handling by MME |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161381 |
| C4-161149 |
S11-U Error Indication handling |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161383 |
| C4-161150 |
S11-U Path Failure handling |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
not pursued |
No |
|
| C4-161151 |
New Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone |
discussion |
Decision |
7.2.10 |
Yes |
Yes |
noted |
No |
|
| C4-161152 |
Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone |
CR |
Approval |
7.2.10 |
Yes |
Yes |
agreed |
No |
|
| C4-161153 |
Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone |
CR |
Approval |
7.2.10 |
Yes |
Yes |
agreed |
No |
|
| C4-161154 |
Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone |
CR |
Approval |
7.2.10 |
Yes |
Yes |
revised |
No |
C4-161271 |
| C4-161155 |
Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Approval |
7.2.10 |
Yes |
Yes |
agreed |
No |
|
| C4-161156 |
Correction of CR Implementation on Emergency PDN connection over untrusted WLAN |
MCC, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.9 |
Yes |
Yes |
agreed |
No |
|
| C4-161157 |
ePDG retrieval of WLAN Location Information |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.9 |
Yes |
Yes |
revised |
No |
C4-161157 |
| C4-161158 |
ePDG retrieval of WLAN Location Information |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.9 |
Yes |
Yes |
agreed |
No |
|
| C4-161159 |
Use case for inclusion of the RAN/NAS Cause in Delete Bearer Response |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.3.1 |
Yes |
Yes |
agreed |
No |
|
| C4-161160 |
GTP-C Load Control - Mix of NAPTR records with "s" and "a" flags |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.3.1 |
Yes |
Yes |
revised |
No |
C4-161351 |
| C4-161161 |
Time Zone in MAP-Any-Time-Interrogation |
Ericsson |
CR |
| 7.3.8 |
Yes |
Yes |
agreed |
No |
|
| C4-161162 |
Configuration for NIDD procedure over S6t |
Huawei |
CR |
Decision |
7.2.14 |
No |
Yes |
revised |
No |
C4-161193 |
| C4-161163 |
Configuration for NIDD procedureover S6a |
Huawei |
CR |
Decision |
7.2.14 |
No |
No |
withdrawn |
Yes |
|
| C4-161164 |
Pseudo-CR on NIDD configuration over T6a |
Huawei |
pCR |
Decision |
7.2.14 |
No |
No |
withdrawn |
Yes |
|
| C4-161165 |
Definition of AVP configuration of NIDD |
Huawei |
CR |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161325 |
| C4-161166 |
Storage of data for configuration of NIDD |
Huawei |
CR |
Decision |
7.2.14 |
No |
No |
withdrawn |
Yes |
|
| C4-161167 |
PDN Connection Charging ID |
Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.2.6 |
Yes |
Yes |
agreed |
No |
|
| C4-161168 |
Transferring AAA identifier from the ePDG to the PGW |
Ericsson |
CR |
| 7.3.1 |
Yes |
Yes |
revised |
No |
C4-161276 |
| C4-161169 |
Clarification on the use of UE Usage Type |
Ericsson, NTT DOCOMO |
CR |
| 7.1.18 |
Yes |
Yes |
revised |
No |
C4-161364 |
| C4-161170 |
Cleanup of the editor's notes for reporting remote UE |
Ericsson |
CR |
| 7.2.7 |
Yes |
Yes |
revised |
No |
C4-161385 |
| C4-161171 |
Comprehension requirement for PDCP PDU Number |
Ericsson |
CR |
| 7.3.1 |
Yes |
Yes |
revised |
No |
C4-161355 |
| C4-161172 |
Delay Tolerant Connection Indication |
Ericsson, MCC |
CR |
| 7.2.10 |
Yes |
Yes |
revised |
No |
C4-161338 |
| C4-161173 |
Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure for GTPv1 |
Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone |
CR |
| 7.2.10 |
Yes |
Yes |
revised |
No |
C4-161339 |
| C4-161174 |
Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure |
Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone |
CR |
| 7.2.10 |
Yes |
Yes |
revised |
No |
C4-161340 |
| C4-161175 |
Subscription data for combined MME/SGSN |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.6 |
Yes |
Yes |
revised |
No |
C4-161493 |
| C4-161176 |
DNS procedures for Decor |
DOCOMO Communications Lab. |
CR |
Agreement |
7.1.18 |
Yes |
Yes |
revised |
No |
C4-161363 |
| C4-161177 |
AVP codes for 32.299 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
revised |
No |
C4-161277 |
| C4-161178 |
AVP code range reservation for 32.299 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
8.3.7 |
Yes |
Yes |
revised |
No |
C4-161442 |
| C4-161179 |
P-CSCF restoration not prioritized for WLAN |
Nokia Networks |
CR |
| 7.1.3 |
Yes |
Yes |
revised |
No |
C4-161400 |
| C4-161180 |
Result-Codes for P-CSCF Restoration |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Bell |
CR |
| 7.1.3 |
Yes |
Yes |
revised |
No |
C4-161402 |
| C4-161181 |
Prolonging PDCP PDU numbers to 18 bits |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
discussion |
| 7.3.11 |
Yes |
Yes |
noted |
No |
|
| C4-161182 |
18 bits PDCP PDU Number |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.3.11 |
Yes |
Yes |
revised |
No |
C4-161336 |
| C4-161183 |
Introduction of SGSN Group ID for Decor |
DOCOMO Communications Lab. |
CR |
Agreement |
7.1.18 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161184 |
Transfer AAA information to avoid SWx redirection |
ORANGE |
CR |
Approval |
7.3.3 |
No |
Yes |
withdrawn |
Yes |
|
| C4-161185 |
WebRTC media plane optimization procedure |
Nokia Networks |
CR |
Agreement |
7.2.12 |
Yes |
Yes |
revised |
No |
C4-161272 |
| C4-161186 |
Provide AAA information to the PGW |
ORANGE |
CR |
Approval |
7.3.1 |
Yes |
Yes |
merged |
No |
|
| C4-161187 |
Transfer AAA information to avoid HSS overload |
ORANGE |
discussion |
Decision |
7.3.3 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161188 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks |
CR |
Agreement |
8.1.19 |
Yes |
Yes |
revised |
No |
C4-161416 |
| C4-161189 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks |
CR |
Agreement |
8.1.19 |
Yes |
Yes |
revised |
No |
C4-161417 |
| C4-161190 |
Indication of P-CSCF restoration extension support over IKEv2 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Agreement |
7.1.3 |
Yes |
Yes |
agreed |
No |
|
| C4-161191 |
Diameter message priority over S6m, S6n, S6t |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
revised |
No |
C4-161406 |
| C4-161192 |
Diameter message priority over S6c, SGd, GddDiameter message priority over S6c, SGd, Gdd |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
revised |
No |
C4-161407 |
| C4-161193 |
Authorisation for NIDD procedure over S6t |
Huawei |
CR |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161242 |
C4-161162 |
C4-161194 |
Diameter message priority over T4 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
revised |
No |
C4-161408 |
| C4-161195 |
Diameter message priority over S7a/d, S13, S13’ |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
revised |
No |
C4-161411 |
| C4-161196 |
Diameter message priority over PC4a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
revised |
No |
C4-161412 |
| C4-161197 |
Diameter message priority over PC6/PC7 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
revised |
No |
C4-161413 |
| C4-161198 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks |
CR |
Agreement |
8.1.19 |
Yes |
Yes |
revised |
No |
C4-161418 |
| C4-161199 |
Diameter message priority over T6a, T6ai, T6b, T6bi, T7 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
pCR |
Agreement |
7.1.20 |
Yes |
Yes |
revised |
No |
C4-161414 |
| C4-161200 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks |
CR |
| 8.1.19 |
Yes |
Yes |
revised |
No |
C4-161420 |
| C4-161201 |
Adding eNB change reporting in Location Change Reporting |
China Mobile Com. Corporation, ZTE, Allot Communications, China Unicom |
CR |
| 6 |
Yes |
Yes |
postponed |
No |
| C4-152135 |
C4-161202 |
MCPTT data model |
Ericsson |
CR |
| 7.2.11 |
Yes |
Yes |
revised |
No |
C4-161293 |
| C4-161203 |
Discussion on status of MONTE work |
Huawei |
discussion |
Discussion |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161285 |
C4-161075 |
C4-161204 |
Result-Codes for P-CSCF Restoration |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.1.3 |
Yes |
Yes |
revised |
No |
C4-161405 |
| C4-161205 |
New study item on PCRF failure and restoration enhancement |
China Mobile Com. Corporation |
SID new |
| 5 |
Yes |
Yes |
postponed |
No |
|
| C4-161206 |
Transfer of non IP PDN to peer MME during mobility |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161401 |
| C4-161207 |
Discussion on non IP data transfer over T6a |
Cisco Systems Inc |
discussion |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161290 |
| C4-161208 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Vodafone, Deutsche Telekom, Huawei |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161321 |
| C4-161209 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
No |
withdrawn |
Yes |
|
| C4-161210 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161320 |
| C4-161211 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161319 |
| C4-161212 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161322 |
| C4-161213 |
No Delete Session Request for non-existing PDN connection |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161432 |
| C4-161214 |
No Create Session Request for Attach without PDN connection |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161434 |
| C4-161215 |
No PCI in DDN for non-IP PDN connections |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161435 |
| C4-161216 |
Behaviours upon receipt of unknown NIDD |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161436 |
| C4-161217 |
Dedicated Bearer NOT allowed for Non-IP PDN connections |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
not pursued |
No |
|
| C4-161218 |
Enhance restoration procedure to be compatible with PDN connection to the SCEF |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161437 |
| C4-161219 |
TAC Allocation as detailed in 3GPP TS 23.003 |
GSMA TSG |
LS in |
Discussion |
4 |
Yes |
Yes |
replied to |
No |
|
| C4-161220 |
Reply LS to CT4 LS on progress of the work on Diameter Base Protocol Update |
3GPP TSG SA WG5 |
LS in |
Discussion |
7.1.19 |
Yes |
Yes |
noted |
No |
|
| C4-161221 |
LS on Charging Id assignment for NBIFOM |
3GPP TSG SA WG5 |
LS in |
Discussion |
7.2.6 |
Yes |
Yes |
replied to |
No |
|
| C4-161222 |
LS on Addition of AVP code definitions |
3GPP TSG SA WG5 |
LS in |
Discussion |
7.3.2 |
Yes |
Yes |
replied to |
No |
|
| C4-161223 |
LS on EVS over CS |
3GPP TSG SA WG4 |
LS in |
Discussion |
7.1.7 |
Yes |
Yes |
noted |
No |
|
| C4-161224 |
Reply LS on Multi-stream Multiparty Conferencing Media Handling |
3GPP TSG SA WG4 |
LS in |
Discussion |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161225 |
LS on Completion of QOSE2EMTSI work item |
3GPP TSG SA WG4 |
LS in |
Discussion |
7.2.3 |
Yes |
Yes |
noted |
No |
|
| C4-161226 |
Reply LS to CT4 on RTCP Handling for FECC |
3GPP TSG SA WG4 |
LS in |
Discussion |
7.1.15 |
Yes |
Yes |
noted |
No |
|
| C4-161227 |
LS on guidance by SA2 on CIOT |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161228 |
Response to LS on questions on CIoT |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161229 |
Reply LS on NBIFOM procedure in SCM and RAN rules handling parameter |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.2.6 |
Yes |
Yes |
noted |
No |
|
| C4-161230 |
LS on the Revocation of Discovery Filters |
3GPP TSG SA WG2 |
LS in |
Discussion |
8.2.4 |
Yes |
Yes |
noted |
No |
|
| C4-161231 |
LS on issues related to MT SMS over SGs delivery in eDRX |
3GPP TSG SA WG2 |
LS in |
Discussion |
7.2.10 |
Yes |
Yes |
noted |
No |
|
| C4-161232 |
New PDN-Type for Celular IoT |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161308 |
| C4-161233 |
MO Non-IP Data procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161303 |
| C4-161234 |
MT Non-IP Data procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161304 |
| C4-161235 |
Connection management procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161306 |
| C4-161236 |
Protocol for Non IP-Data over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161307 |
| C4-161237 |
Sh* application for MCPTT-2 and CSC-13 interfaces |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
discussion |
Decision |
7.2.11 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161238 |
Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
discussion |
Decision |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161479 |
| C4-161239 |
Storage for CIoT control plane optimization related information at MME |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161403 |
| C4-161240 |
Data model for new Application FEs’ data clarification |
Ericsson |
CR |
| 7.2.11 |
Yes |
Yes |
revised |
No |
C4-161433 |
| C4-161241 |
AVP code range reservation for 32.299 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
merged |
No |
C4-161277 |
C4-161064 |
C4-161242 |
Authorisation for NIDD procedure over S6t |
Huawei, Vodafone |
CR |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161324 |
C4-161193 |
C4-161243 |
Monitoring update and Reporting of update result |
Huawei, Orange, Telecom Italia |
CR |
Decision |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161287 |
C4-161086 |
C4-161244 |
Introduction of AAA-1 interface |
Huawei |
CR |
Decision |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161362 |
C4-161088 |
C4-161245 |
AVP Codes for 29.12 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
8.3.7 |
Yes |
Yes |
revised |
No |
C4-161440 |
| C4-161246 |
Monitoring update and Reporting of update result |
Huawei |
CR |
Decision |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161380 |
| C4-161247 |
Codes for 29.212 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
revised |
No |
C4-161445 |
| C4-161248 |
Allocation of new Diameter Application ID and commands code for PC2 protocol |
Huawei |
CR |
Decision |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161382 |
| C4-161249 |
S11-U tunneling for MO/MT data transport in control plane (SGi based) – reusing S1-U F-TEIDs |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
withdrawn |
Yes |
|
| C4-161250 |
Revised WID on Controlling IMS Media Plane with SDP Capability Negotiation |
Huawei |
WID revised |
Agreement |
5 |
Yes |
Yes |
withdrawn |
Yes |
| CP-150238 |
C4-161251 |
Iq stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
| 7.1.12 |
Yes |
Yes |
revised |
No |
C4-161421 |
| C4-161252 |
Ix stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
Agreement |
7.1.12 |
Yes |
Yes |
revised |
No |
C4-161422 |
| C4-161253 |
Mp stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
| 7.1.12 |
Yes |
Yes |
revised |
No |
C4-161424 |
| C4-161254 |
Mn stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
| 7.1.12 |
Yes |
Yes |
revised |
No |
C4-161426 |
| C4-161255 |
Mc stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
Agreement |
7.1.12 |
Yes |
Yes |
revised |
No |
C4-161429 |
| C4-161256 |
Discussion on the possible solution for GW selection |
Ericsson |
discussion |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161292 |
| C4-161257 |
Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161291 |
| C4-161258 |
DNS service for NB-IoT and Non-IP |
Ericsson |
CR |
| 7.2.14 |
Yes |
No |
withdrawn |
Yes |
|
| C4-161259 |
Protocol change for Connection Suspend and Resume Procedure |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161408 |
| C4-161260 |
Connection Resume procedure used during restoration |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161410 |
| C4-161261 |
Protocol change for introducing new non-IP PDN type |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161404 |
| C4-161262 |
ePDG selection with DNS-based Discovery of Regulatory Requirements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.3.5 |
Yes |
Yes |
revised |
No |
C4-161310 |
| C4-161263 |
Data returned in IMSPublicIdentity correction, new EnhancedPublicIdentifiers class |
Ericsson |
CR |
| 7.3.7 |
Yes |
Yes |
revised |
No |
C4-161344 |
C4-161089 |
C4-161264 |
New PDN-Type for Cellular IoT |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161313 |
| C4-161265 |
New PDN-Type for Celullar IoT |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161314 |
| C4-161266 |
New PDN-Type for Celular IoT |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161315 |
| C4-161267 |
Reply LS on CT4 assumptions on AAA-1, MCPTT-2 and CSC-13 reference points |
3GPP TSG CT WG1 |
LS in |
Discussion |
7.2.11 |
Yes |
Yes |
noted |
No |
|
| C4-161268 |
LS Response on User Databases interfaces for MCPTT |
3GPP TSG SA WG6 |
LS in |
Discussion |
7.2.11 |
Yes |
Yes |
noted |
No |
|
| C4-161269 |
LS Response on CT4 assumptions on AAA-1, MCPTT-2 and CSC-13 reference points |
3GPP TSG SA WG6 |
LS in |
Discussion |
7.2.11 |
Yes |
Yes |
noted |
No |
|
| C4-161270 |
new Diameter application for MCPTT-2 and CSC-13 reference points |
ORANGE |
pCR |
Approval |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161298 |
| C4-161271 |
Alert procedure from MME/SGSN to SMS-GMSC for MT SMS to UE using eDRX |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Ericsson, Verizon, AT&T, Vodafone |
CR |
Approval |
7.2.10 |
Yes |
Yes |
agreed |
No |
| C4-161154 |
C4-161272 |
WebRTC media plane optimization procedure |
Nokia Networks, Alcatel-Lucent |
CR |
Agreement |
7.2.12 |
Yes |
Yes |
revised |
No |
C4-161368 |
C4-161185 |
C4-161273 |
Release of WebRTC Data Channels |
Alcatel-Lucent, Nokia Networks |
CR |
Approval |
7.1.8 |
Yes |
Yes |
revised |
No |
C4-161328 |
C4-161007 |
C4-161274 |
WebRTC Data Channels |
Alcatel-Lucent, Nokia Networks |
CR |
Approval |
7.1.8 |
Yes |
Yes |
revised |
No |
C4-161329 |
C4-161008 |
C4-161275 |
CT4 aspect of the Workplan |
CT4 Chairman |
Work Plan |
Approval |
11 |
Yes |
Yes |
revised |
No |
C4-161547 |
| C4-161276 |
Transferring AAA identifier to the PGW |
Ericsson, Orange |
CR |
| 7.3.1 |
Yes |
Yes |
revised |
No |
C4-161353 |
C4-161168 |
C4-161277 |
AVP codes for 32.299 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
revised |
No |
C4-161441 |
C4-161177 |
C4-161278 |
Editorial clean-up |
ORANGE |
pCR |
Approval |
7.1.19 |
Yes |
Yes |
approved |
No |
|
| C4-161279 |
Changes in the Command's CCF specifications |
ORANGE |
pCR |
Approval |
7.1.19 |
Yes |
Yes |
revised |
No |
C4-161452 |
| C4-161280 |
Proposed Conclusions |
ORANGE |
pCR |
Approval |
7.1.19 |
Yes |
Yes |
postponed |
No |
|
| C4-161281 |
Proposed recommendations |
ORANGE |
pCR |
Approval |
7.1.19 |
Yes |
Yes |
postponed |
No |
|
| C4-161282 |
Proposed text for the introduction of clause 5 |
ORANGE |
pCR |
Approval |
7.1.19 |
Yes |
Yes |
revised |
No |
C4-161448 |
| C4-161283 |
3GPP Work on ECN for Lower Layer Protocols: possible impact on H.248 gateways |
Alcatel-Lucent |
discussion |
Information |
10.7 |
Yes |
Yes |
noted |
No |
|
| C4-161284 |
Protocol selection for T6a/b to support NIDD procedures |
Ericsson |
discussion |
Decision |
7.2.14 |
Yes |
Yes |
noted |
No |
|
| C4-161285 |
Discussion on status of MONTE work |
Huawei |
discussion |
Discussion |
7.1.9 |
Yes |
Yes |
noted |
No |
| C4-161203 |
C4-161286 |
New AVP assignment for MONTE |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161425 |
C4-161085 |
C4-161287 |
Monitoring update and Reporting of update result |
Huawei, Orange, Telecom Italia |
CR |
Decision |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161373 |
C4-161243 |
C4-161288 |
Pseudo-CR on cleanup of 29.128 |
Huawei |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161347 |
C4-161076 |
C4-161289 |
Clarifications on Editor's notes on MONTE |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161430 |
| C4-161290 |
Discussion on non IP data transfer over T6a |
Cisco Systems Inc |
discussion |
Decision |
7.2.14 |
Yes |
Yes |
noted |
No |
| C4-161207 |
C4-161291 |
Impacts on the DNS procedures for CIoT |
Ericsson |
CR |
| 7.2.14 |
Yes |
Yes |
revised |
No |
C4-161395 |
C4-161257 |
C4-161292 |
Discussion on the possible solution for GW selection |
Ericsson |
discussion |
| 7.2.14 |
Yes |
Yes |
noted |
No |
| C4-161256 |
C4-161293 |
MCPTT data model |
Ericsson |
CR |
| 7.2.11 |
Yes |
Yes |
revised |
No |
C4-161366 |
C4-161202 |
C4-161294 |
Subsciption for allowed services |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161431 |
| C4-161295 |
Length Correction for tVPLMNID and tTimeZone |
Nokia Networks |
CR |
Agreement |
7.3.7 |
Yes |
Yes |
revised |
No |
C4-161388 |
| C4-161296 |
LS Response on MCPTT Group data and affiliation |
3GPP TSG SA WG6 |
LS in |
Discussion |
7.2.11 |
Yes |
Yes |
noted |
No |
|
| C4-161297 |
Future meeting calendar for information |
MCC |
other |
Information |
13 |
Yes |
Yes |
noted |
No |
|
| C4-161298 |
new Diameter application for MCPTT-2 and CSC-13 reference points |
ORANGE, HP |
pCR |
Approval |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161439 |
C4-161270 |
C4-161299 |
Reply to: TAC Allocation as detailed in 3GPP TS 23.003 |
current meeting |
LS out |
approval |
4 |
Yes |
Yes |
revised |
No |
C4-161506 |
| C4-161300 |
Clarification of TAC allocation |
Vodafone |
CR |
Agreement |
4 |
Yes |
Yes |
revised |
No |
C4-161505 |
| C4-161301 |
CT aspects of MTSI Extension on Multi-stream Multiparty Conferencing Media Handling |
Ericsson |
WID new |
Agreement |
5 |
Yes |
Yes |
agreed |
No |
| C4-161044 |
C4-161302 |
SCC AS Restoration |
China Mobile |
WID new |
- |
5 |
Yes |
Yes |
agreed |
No |
| C4-161055 |
C4-161303 |
MO Non-IP Data procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161483 |
C4-161233 |
C4-161304 |
MT Non-IP Data procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161484 |
C4-161234 |
C4-161305 |
Questions on non-IP data delivery procedures |
CT4 |
LS out |
discussion |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161485 |
| C4-161306 |
Connection management procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161487 |
C4-161235 |
C4-161307 |
Protocol for Non IP-Data over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161488 |
C4-161236 |
C4-161308 |
New PDN-Type for Celular IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161490 |
C4-161232 |
C4-161309 |
Handover to Non-3GPP Access Not Allowed |
Ericsson, Orange |
CR |
- |
7.3.5 |
Yes |
Yes |
agreed |
No |
| C4-161138 |
C4-161310 |
ePDG selection with DNS-based Discovery of Regulatory Requirements |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.3.5 |
Yes |
Yes |
agreed |
No |
| C4-161262 |
C4-161311 |
LS on New subdomain name for ePDG selection with DNS-based discovery of regulatory requirements |
CT4 |
LS out |
Approval |
7.3.5 |
Yes |
Yes |
revised |
No |
C4-161504 |
| C4-161312 |
Authorize the UE requested APN |
Huawei |
CR |
- |
7.3.3 |
Yes |
Yes |
agreed |
No |
| C4-161099 |
C4-161313 |
New PDN-Type for Cellular IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161527 |
C4-161264 |
C4-161314 |
New PDN-Type for Celullar IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161528 |
C4-161265 |
C4-161315 |
New PDN-Type for Celular IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161529 |
C4-161266 |
C4-161316 |
User Plane Integrity Protection Indicator |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.10 |
Yes |
Yes |
agreed |
No |
| C4-161071 |
C4-161317 |
User Plane Integrity Protection Indicator |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.10 |
Yes |
Yes |
agreed |
No |
| C4-161072 |
C4-161318 |
User Plane Integrity Protection Indicator |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.10 |
Yes |
Yes |
agreed |
No |
| C4-161073 |
C4-161319 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161491 |
C4-161211 |
C4-161320 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161492 |
C4-161210 |
C4-161321 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Vodafone, Deutsche Telekom, Huawei |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161208 |
C4-161322 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161212 |
C4-161323 |
Allow SMS for NB-IoT UE without Combined Attach |
ZTE |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161131 |
C4-161324 |
Authorisation for NIDD procedure over S6t |
Huawei, Vodafone |
CR |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161530 |
C4-161242 |
C4-161325 |
Definition of AVP configuration of NIDD |
Huawei |
CR |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161326 |
C4-161165 |
C4-161326 |
Definition of AVP configuration of NIDD |
Huawei |
CR |
Decision |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161325 |
C4-161327 |
Resolution of Editor’s notes on EVS over UMTS CS |
Qualcomm Incorporated |
CR |
Agreement |
7.1.7 |
Yes |
Yes |
agreed |
No |
| C4-161058 |
C4-161328 |
Release of WebRTC Data Channels |
Alcatel-Lucent, Nokia Networks |
CR |
Approval |
7.1.8 |
Yes |
Yes |
agreed |
No |
| C4-161273 |
C4-161329 |
WebRTC Data Channels |
Alcatel-Lucent, Nokia Networks |
CR |
Approval |
7.1.8 |
Yes |
Yes |
agreed |
No |
| C4-161274 |
C4-161330 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
- |
7.2.3 |
Yes |
Yes |
revised |
No |
C4-161496 |
C4-161049 |
C4-161331 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
- |
7.2.3 |
Yes |
Yes |
agreed |
No |
| C4-161050 |
C4-161332 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
- |
7.2.3 |
Yes |
Yes |
agreed |
No |
| C4-161051 |
C4-161333 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
- |
7.2.3 |
Yes |
Yes |
agreed |
No |
| C4-161052 |
C4-161334 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
- |
7.2.3 |
Yes |
Yes |
agreed |
No |
| C4-161053 |
C4-161335 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
- |
7.2.3 |
Yes |
Yes |
agreed |
No |
| C4-161054 |
C4-161336 |
18 bits PDCP PDU Number |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
- |
7.3.11 |
Yes |
Yes |
revised |
No |
C4-161498 |
C4-161182 |
C4-161337 |
Reply to: LS on extension to field length of PDCP Sequence Number |
current meeting |
LS out |
approval |
7.3.11 |
Yes |
Yes |
revised |
No |
C4-161463 |
| C4-161338 |
Delay Tolerant Connection Indication |
Ericsson, MCC |
CR |
- |
7.2.10 |
Yes |
Yes |
agreed |
No |
| C4-161172 |
C4-161339 |
Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure for GTPv1 |
Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone, Verizon, Nokia Networks |
CR |
- |
7.2.10 |
Yes |
Yes |
agreed |
No |
| C4-161173 |
C4-161340 |
Triggering MT SM retransmission by the SMS GMSC to a UE in eDRX during inter MME/SGSN mobility procedure |
Ericsson, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Vodafone, Verizon, Nokia Networks |
CR |
- |
7.2.10 |
Yes |
Yes |
agreed |
No |
| C4-161174 |
C4-161341 |
ePDG retrieval of WLAN Location Information |
Alcatel-Lucent |
CR |
Approval |
7.2.9 |
Yes |
Yes |
agreed |
No |
| C4-161157 |
C4-161342 |
Incorrect use of the term "full hexadecimal representation" to mean binary encoding |
Oracle Corporation |
CR |
Approval |
7.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161134 |
C4-161343 |
Incorrect use of the term "full hexadecimal representation" to mean binary encoding |
Oracle Corporation |
CR |
Approval |
7.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161135 |
C4-161344 |
Data returned in IMSPublicIdentity correction, new EnhancedPublicIdentifiers class |
Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Hewlett Packard Enterprise |
CR |
| 7.3.7 |
Yes |
Yes |
agreed |
No |
| C4-161263 |
C4-161345 |
Pseudo-CR on Removing Editor's Note on IWK-SCEF Authorization and Configuration Failure at IWK-SCEF |
Cisco Systems Inc |
pCR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161462 |
C4-161060 |
C4-161346 |
Notifying the status of MONTE event configuration at the IWK-SCEF to the HSS |
Cisco Systems Inc |
CR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161465 |
C4-161061 |
C4-161347 |
Pseudo-CR on cleanup of 29.128 |
Huawei |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161467 |
C4-161288 |
C4-161348 |
AVAILABILITY_AFTER_DDN_FAILURE reporting |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161468 |
C4-161077 |
C4-161349 |
Protocol Type in Create Session Request |
Huawei |
CR |
Agreement |
7.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161122 |
C4-161350 |
Clarification on usage of P and T needs |
Huawei Tech.(UK) Co., Ltd |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161079 |
C4-161351 |
GTP-C Load Control - Mix of NAPTR records with "s" and "a" flags |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161160 |
C4-161352 |
Pseudo-CR on overload |
Huawei Tech.(UK) Co., Ltd |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
approved |
No |
| C4-161080 |
C4-161353 |
Transferring AAA identifier to the PGW |
Ericsson, Orange, Telia Sonera |
CR |
- |
7.3.1 |
Yes |
Yes |
revised |
No |
C4-161459 |
C4-161276 |
C4-161354 |
HSS restart MONTE impacts |
Huawei Tech.(UK) Co., Ltd |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161470 |
C4-161081 |
C4-161355 |
Comprehension requirement for PDCP PDU Number |
Ericsson |
CR |
- |
7.3.1 |
Yes |
Yes |
revised |
No |
C4-161461 |
C4-161171 |
C4-161356 |
Add cause values to TWAN mapping table |
Huawei |
CR |
- |
8.3.1 |
Yes |
Yes |
revised |
No |
C4-161464 |
C4-161096 |
C4-161357 |
Add cause values to TWAN mapping table |
Huawei |
CR |
- |
8.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161097 |
C4-161358 |
Restart of SCEF |
Huawei Tech.(UK) Co., Ltd |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161472 |
C4-161082 |
C4-161359 |
Reporting of the start and stop of the reporting of monitoring events |
Huawei Tech.(UK) Co., Ltd |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161508 |
C4-161084 |
C4-161360 |
Fix the issue on HSS restart procedure |
NEC EUROPE LTD |
CR |
Approval |
7.3.4 |
Yes |
Yes |
agreed |
No |
| C4-161070 |
C4-161361 |
Correct the partial failure handling on SGW |
Huawei |
CR |
Agreement |
7.3.4 |
Yes |
Yes |
agreed |
No |
| C4-161123 |
C4-161362 |
Introduction of AAA-1 interface |
Huawei |
CR |
Decision |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161502 |
C4-161244 |
C4-161363 |
DNS procedures for Decor |
DOCOMO Communications Lab. |
CR |
Agreement |
7.1.18 |
Yes |
Yes |
revised |
No |
C4-161365 |
C4-161176 |
C4-161364 |
Clarification on the use of UE Usage Type |
Ericsson, NTT DOCOMO |
CR |
- |
7.1.18 |
Yes |
Yes |
agreed |
No |
| C4-161169 |
C4-161365 |
DNS procedures for Decor |
DOCOMO Communications Lab. |
CR |
Agreement |
7.1.18 |
Yes |
Yes |
revised |
No |
C4-161482 |
C4-161363 |
C4-161366 |
MCPTT data model |
Ericsson |
CR |
| 7.2.11 |
No |
Yes |
withdrawn |
Yes |
| C4-161293 |
C4-161367 |
PDN Connection Charging ID for NBIFOM |
CT4 |
LS out |
Decision |
7.2.6 |
Yes |
Yes |
revised |
No |
C4-161466 |
| C4-161368 |
WebRTC media plane optimization procedure |
Nokia Networks, Alcatel-Lucent |
CR |
Agreement |
7.2.12 |
Yes |
Yes |
agreed |
No |
| C4-161272 |
C4-161369 |
WebRTC gateway configuration for end-to-end WebRTC calls (stage 3) |
Alcatel-Lucent |
CR |
Approval |
7.2.12 |
Yes |
Yes |
agreed |
No |
| C4-161010 |
C4-161370 |
TrGW configuration for end-to-end WebRTC calls (stage 3) |
Alcatel-Lucent |
CR |
Approval |
7.2.12 |
Yes |
Yes |
agreed |
No |
| C4-161011 |
C4-161371 |
Removal of references to TS 26.235 |
Ericsson |
CR |
- |
7.3.9 |
Yes |
Yes |
agreed |
No |
| C4-161045 |
C4-161372 |
Removal of references to TS 26.236 |
Ericsson |
CR |
- |
7.3.9 |
Yes |
Yes |
agreed |
No |
| C4-161047 |
C4-161373 |
Monitoring update and Reporting of update result |
Huawei, Orange, Telecom Italia |
CR |
Decision |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161287 |
C4-161374 |
Addition of ProSe Application Code Prefix and ProSe Application Code Suffix formats |
QUALCOMM Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161057 |
C4-161375 |
Inter-PLMN discovery transmission support |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161117 |
C4-161376 |
Adding security related parameters for restricted ProSe direct discovery authorization |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161118 |
C4-161377 |
Support open discovery with application-controlled extension |
Qualcomm Incorporated |
CR |
Agreement |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161119 |
C4-161378 |
S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Verizon, AT&T, Orange, China Mobile |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161469 |
C4-161145 |
C4-161379 |
S11-U tunneling for MO/MT data transport in control plane (SGi based) |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161147 |
C4-161380 |
Monitoring update and Reporting of update result |
Huawei |
CR |
Decision |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161246 |
C4-161381 |
End Marker handling by MME |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161148 |
C4-161382 |
Allocation of new Diameter Application ID and commands code for PC2 protocol |
Huawei |
CR |
Decision |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161536 |
C4-161248 |
C4-161383 |
S11-U Error Indication handling |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
C4-161384 |
C4-161149 |
C4-161384 |
S11-U Error Indication handling |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
No |
Yes |
withdrawn |
Yes |
| C4-161149 |
C4-161385 |
Cleanup of the editor's notes for reporting remote UE |
Ericsson |
CR |
| 7.2.7 |
Yes |
Yes |
revised |
No |
C4-161507 |
C4-161170 |
C4-161386 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
not pursued |
No |
| C4-161104 |
C4-161387 |
Local Time Zone for CS retrieval |
Ericsson |
CR |
| 7.3.7 |
Yes |
Yes |
agreed |
No |
| C4-161091 |
C4-161388 |
Length Correction for tVPLMNID and tTimeZone |
Nokia Solutions & Networks (S) |
CR |
Agreement |
7.3.7 |
Yes |
Yes |
agreed |
No |
| C4-161295 |
C4-161389 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161109 |
C4-161390 |
Encoding of IP-SM-GW Number |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161110 |
C4-161391 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161115 |
C4-161392 |
IP-SW-GW number format |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161116 |
C4-161393 |
Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP |
Ericsson LM |
LS out |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161471 |
| C4-161394 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161124 |
C4-161395 |
Impacts on the DNS procedures for CIoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161473 |
C4-161291 |
C4-161396 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161125 |
C4-161397 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161126 |
C4-161398 |
Encoding of SC Address |
Hewlett-Packard Enterprise |
CR |
Agreement |
10.18 |
Yes |
Yes |
agreed |
No |
| C4-161127 |
C4-161399 |
RAT-Type extension for NB-IoT |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161146 |
C4-161400 |
P-CSCF restoration not prioritized for WLAN |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.1.3 |
Yes |
Yes |
agreed |
No |
| C4-161179 |
C4-161401 |
Transfer of non IP PDN to peer MME during mobility |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161480 |
C4-161206 |
C4-161402 |
Result-Codes for P-CSCF Restoration |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Bell |
CR |
| 7.1.3 |
Yes |
Yes |
agreed |
No |
| C4-161180 |
C4-161403 |
Storage for CIoT control plane optimization related information at MME |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161239 |
C4-161404 |
Protocol change for introducing new non-IP PDN type |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161476 |
C4-161261 |
C4-161405 |
Result-Codes for P-CSCF Restoration |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.1.3 |
Yes |
Yes |
agreed |
No |
| C4-161204 |
C4-161406 |
Diameter message priority over S6m, S6n, S6t |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
agreed |
No |
| C4-161191 |
C4-161407 |
Diameter message priority over S6c, SGd, GddDiameter message priority over S6c, SGd, Gdd |
Alcatel-Lucent |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
agreed |
No |
| C4-161192 |
C4-161408 |
Diameter message priority over T4 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
No |
Yes |
revised |
No |
C4-161409 |
C4-161194 |
C4-161409 |
Diameter message priority over T4 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
agreed |
No |
| C4-161194 |
C4-161410 |
Connection Resume procedure used during restoration |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161477 |
C4-161260 |
C4-161411 |
Diameter message priority over S7a/d, S13, S13’ |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
agreed |
No |
| C4-161195 |
C4-161412 |
Diameter message priority over PC4a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
agreed |
No |
| C4-161196 |
C4-161413 |
Diameter message priority over PC6/PC7 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
CR |
Agreement |
7.1.20 |
Yes |
Yes |
agreed |
No |
| C4-161197 |
C4-161414 |
Diameter message priority over T6a, T6ai, T6b, T6bi, T7 |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, ACS, OEC |
pCR |
Agreement |
7.1.20 |
Yes |
Yes |
approved |
No |
| C4-161199 |
C4-161415 |
Protocol change for Connection Suspend and Resume Procedure |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161259 |
C4-161416 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks, Alcatel Lucent |
CR |
Agreement |
8.1.19 |
Yes |
Yes |
agreed |
No |
| C4-161188 |
C4-161417 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks |
CR |
Agreement |
8.1.19 |
Yes |
Yes |
agreed |
No |
| C4-161189 |
C4-161418 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks, Alcatel Lucent |
CR |
Agreement |
8.1.19 |
Yes |
Yes |
agreed |
No |
| C4-161198 |
C4-161419 |
Configure Monitoring Event to Multiple Serving Nodes |
ZTE |
CR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161510 |
C4-161128 |
C4-161420 |
Corrections to EVS AMR-WB IO mode-change-capability MIME parameter handling |
Nokia Networks, Alcatel Lucent |
CR |
- |
8.1.19 |
Yes |
Yes |
agreed |
No |
| C4-161200 |
C4-161421 |
Iq stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
- |
7.1.12 |
Yes |
Yes |
revised |
No |
C4-161494 |
C4-161251 |
C4-161422 |
Ix stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
Agreement |
7.1.12 |
Yes |
Yes |
agreed |
No |
| C4-161252 |
C4-161423 |
Count and Stop Monitoring Event Reports at SCEF |
ZTE |
CR |
Approval |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161130 |
C4-161424 |
Mp stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
- |
7.1.12 |
Yes |
Yes |
revised |
No |
C4-161495 |
C4-161253 |
C4-161425 |
New AVP assignment for MONTE |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161509 |
C4-161286 |
C4-161426 |
Mn stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
- |
7.1.12 |
Yes |
Yes |
agreed |
No |
C4-161427 |
C4-161254 |
C4-161427 |
Mn stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
| 7.1.12 |
No |
Yes |
withdrawn |
Yes |
| C4-161426 |
C4-161428 |
Change of type of Monitoring-Duration AVP to represent an absolute time |
Ericsson |
CR |
| 7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161140 |
C4-161429 |
Mc stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
Agreement |
7.1.12 |
Yes |
Yes |
agreed |
No |
| C4-161255 |
C4-161430 |
Definition of Monitoring-Type and clarifications on UE in MME and SGSN for MONTE |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161497 |
C4-161289 |
C4-161431 |
Subsciption for allowed services |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161501 |
C4-161294 |
C4-161432 |
No Delete Session Request for non-existing PDN connection |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161213 |
C4-161433 |
Data model for new Application FEs’ data clarification |
Ericsson |
CR |
| 7.2.11 |
No |
Yes |
revised |
Yes |
C4-161457 |
C4-161240 |
C4-161434 |
No Create Session Request for Attach without PDN connection |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161214 |
C4-161435 |
No Paging and Serving Information in a DDN for a non-IP PDN connections |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161478 |
C4-161215 |
C4-161436 |
Behaviours upon receipt of unknown NIDD |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161533 |
C4-161216 |
C4-161437 |
Enhance restoration procedure to be compatible with PDN connection to the SCEF |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161438 |
C4-161218 |
C4-161438 |
Enhance restoration procedure to be compatible with PDN connection to the SCEF |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
Yes |
C4-161481 |
C4-161437 |
C4-161439 |
new Diameter application for MCPTT-2 and CSC-13 reference points |
ORANGE, HPE, Motorola |
pCR |
Approval |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161515 |
C4-161298 |
C4-161440 |
AVP Codes for 29.12 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
8.3.7 |
Yes |
Yes |
agreed |
No |
| C4-161245 |
C4-161441 |
AVP codes for 32.299 |
Nokia Networks, Alcatel-Lucent, MCC, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
agreed |
No |
| C4-161277 |
C4-161442 |
AVP code range reservation for 32.299 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
8.3.7 |
Yes |
Yes |
agreed |
No |
| C4-161178 |
C4-161443 |
Addition of AVP code definitions |
CT4 |
LS out |
Information |
7.3.2 |
Yes |
Yes |
approved |
No |
|
| C4-161444 |
Corrections on TS numbers |
Huawei |
CR |
Decision |
7.3.2 |
Yes |
Yes |
agreed |
No |
| C4-161087 |
C4-161445 |
Codes for 29.212 |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.2 |
Yes |
Yes |
agreed |
No |
| C4-161247 |
C4-161446 |
Update Conclusion on Changes and Clarifications of the rules for Diameter Extensibility |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pCR |
Agreement |
7.1.19 |
Yes |
Yes |
revised |
No |
C4-161453 |
| C4-161447 |
Invocation of Alert procedure by HSS after ULR |
Ericsson |
CR |
| 7.3.6 |
Yes |
Yes |
agreed |
No |
| C4-161137 |
C4-161448 |
Proposed text for the introduction of clause 5 |
ORANGE |
pCR |
Approval |
7.1.19 |
Yes |
Yes |
approved |
No |
| C4-161282 |
C4-161449 |
Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration |
ZTE |
CR |
Agreement |
9.8 |
Yes |
Yes |
agreed |
No |
| C4-161065 |
C4-161450 |
Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration |
ZTE |
CR |
Agreement |
9.8 |
Yes |
Yes |
agreed |
No |
| C4-161066 |
C4-161451 |
Complete the EXTERNAL_SOURCE_IP4_NAT_INFO attribute information according to IANA registration |
ZTE |
CR |
Agreement |
9.8 |
Yes |
Yes |
agreed |
No |
| C4-161067 |
C4-161452 |
Changes in the Command's CCF specifications |
ORANGE |
pCR |
Approval |
7.1.19 |
Yes |
Yes |
approved |
No |
12791 |
C4-161279 |
C4-161453 |
Update Conclusion on Changes and Clarifications of the rules for Diameter Extensibility |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
pCR |
Agreement |
7.1.19 |
Yes |
Yes |
approved |
No |
| C4-161446 |
C4-161454 |
SCEF Restart |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161474 |
C4-161083 |
C4-161455 |
Pseudo-CR on SCEF restart |
Huawei |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161475 |
| C4-161456 |
Reply LS to CT4 LS on progress of the work on Diameter Base Protocol Update |
ORANGE |
LS out |
Decision |
7.1.19 |
Yes |
Yes |
revised |
No |
C4-161541 |
| C4-161457 |
MCPTT Application FEs |
Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.2.11 |
Yes |
Yes |
revised |
No |
C4-161489 |
C4-161433 |
C4-161458 |
CT aspects for Non-IP for Cellular Internet of Things for 2G/3G-GPRS |
Orange, Ericsson |
other |
Endorsement |
5 |
Yes |
Yes |
revised |
No |
C4-161503 |
| C4-161459 |
Transferring AAA identifier to the PGW |
Ericsson, Orange, Telia Sonera |
CR |
- |
7.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161353 |
C4-161460 |
Reply LS on clarification on requirements for MONTE |
Huawei |
LS out |
| 7.1.9 |
Yes |
Yes |
revised |
No |
C4-161537 |
| C4-161461 |
Comprehension requirement for PDCP PDU Number |
Ericsson |
CR |
- |
7.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161355 |
C4-161462 |
Pseudo-CR on Removing Editor's Note on IWK-SCEF Authorization and Configuration Failure at IWK-SCEF |
Cisco Systems Inc |
pCR |
Approval |
7.1.9 |
Yes |
Yes |
approved |
No |
| C4-161345 |
C4-161463 |
Reply to: LS on extension to field length of PDCP Sequence Number |
current meeting |
LS out |
approval |
7.3.11 |
Yes |
Yes |
revised |
No |
C4-161500 |
C4-161337 |
C4-161464 |
Add cause values to TWAN mapping table |
Huawei |
CR |
- |
8.3.1 |
Yes |
Yes |
agreed |
No |
| C4-161356 |
C4-161465 |
Notifying the status of MONTE event configuration at the IWK-SCEF to the HSS |
Cisco Systems Inc |
CR |
Approval |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161346 |
C4-161466 |
PDN Connection Charging ID for NBIFOM |
CT4 |
LS out |
Decision |
7.2.6 |
Yes |
Yes |
approved |
No |
| C4-161367 |
C4-161467 |
Pseudo-CR on cleanup of 29.128 |
Huawei |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
approved |
No |
| C4-161347 |
C4-161468 |
AVAILABILITY_AFTER_DDN_FAILURE reporting |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161348 |
C4-161469 |
S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Verizon, AT&T, Orange, China Mobile |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161531 |
C4-161378 |
C4-161470 |
HSS restart MONTE impacts |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
C4-161513 |
C4-161354 |
C4-161471 |
Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP |
Ericsson LM |
LS out |
Decision |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161519 |
C4-161393 |
C4-161472 |
Restart of SCEF |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
10822 |
C4-161358 |
C4-161473 |
Impacts on the DNS procedures for CIoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161395 |
C4-161474 |
SCEF Restart |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161454 |
C4-161475 |
Pseudo-CR on SCEF restart |
Huawei |
pCR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161455 |
C4-161476 |
Protocol change for introducing new non-IP PDN type |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161404 |
C4-161477 |
Connection Resume procedure used during restoration |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161410 |
C4-161478 |
No Paging and Serving Information in a DDN for a non-IP PDN connections |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161435 |
C4-161479 |
Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Orange, Motorola |
discussion |
Decision |
7.2.11 |
Yes |
Yes |
noted |
No |
C4-161514 |
C4-161238 |
C4-161480 |
Transfer of non IP PDN to peer MME during mobility |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161525 |
C4-161401 |
C4-161481 |
Enhance restoration procedure to be compatible with PDN connection to the SCEF |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
agreed |
Yes |
| C4-161438 |
C4-161482 |
DNS procedures for Decor |
NTT DOCOMO |
CR |
Agreement |
7.1.18 |
Yes |
Yes |
revised |
No |
C4-161513 |
C4-161365 |
C4-161483 |
MO Non-IP Data procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161303 |
C4-161484 |
MT Non-IP Data procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161304 |
C4-161485 |
Questions on non-IP data delivery procedures |
CT4 |
LS out |
discussion |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161535 |
C4-161305 |
C4-161486 |
Iq stage 2 for SDP Media Capabilities Negotiation |
Huawei |
CR |
Agreement |
7.1.12 |
Yes |
No |
withdrawn |
Yes |
|
| C4-161487 |
Connection management procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161518 |
C4-161306 |
C4-161488 |
Protocol for Non IP-Data over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161534 |
C4-161307 |
C4-161489 |
MCPTT Application FEs |
Ericsson, Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.2.11 |
Yes |
Yes |
agreed |
No |
| C4-161457 |
C4-161490 |
New PDN-Type for Cellular IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161526 |
C4-161308 |
C4-161491 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161319 |
C4-161492 |
Addition of NB-IoT radio access type to the Access-Restriction-Data feature |
Vodafone GmbH, Deutsche Telekom, Huawei |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161320 |
C4-161493 |
Subscription data for combined MME/SGSN |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.3.6 |
Yes |
Yes |
postponed |
No |
| C4-161175 |
C4-161494 |
Iq stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
- |
7.1.12 |
Yes |
Yes |
agreed |
No |
| C4-161421 |
C4-161495 |
Mp stage 3 to support SDP Capability Negotiation |
Huawei |
CR |
- |
7.1.12 |
Yes |
Yes |
agreed |
No |
| C4-161424 |
C4-161496 |
Support of enhanced bandwidth negotiation mechanism for MTSI sessions |
Ericsson |
CR |
- |
7.2.3 |
Yes |
Yes |
agreed |
No |
| C4-161330 |
C4-161497 |
Definition of Monitoring-Type and clarifications on UE in MME and SGSN for MONTE |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161511 |
C4-161430 |
C4-161498 |
18 bits PDCP PDU Number |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
- |
7.3.11 |
Yes |
Yes |
agreed |
No |
C4-161499 |
C4-161336 |
C4-161499 |
18 bits PDCP PDU Number |
Nokia Networks, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
| 7.3.11 |
No |
Yes |
withdrawn |
Yes |
| C4-161498 |
C4-161500 |
Reply to: LS on extension to field length of PDCP Sequence Number |
CT4 |
LS out |
approval |
7.3.11 |
Yes |
Yes |
approved |
No |
| C4-161463 |
C4-161501 |
Subsciption for allowed services |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161431 |
C4-161502 |
Introduction of AAA-1 interface |
Huawei |
CR |
Decision |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161517 |
C4-161362 |
C4-161503 |
CT aspects for Non-IP for Cellular Internet of Things for 2G/3G-GPRS |
Orange, Ericsson |
other |
Endorsement |
5 |
Yes |
Yes |
endorsed |
No |
| C4-161458 |
C4-161504 |
LS on New subdomain name for ePDG selection with DNS-based discovery of regulatory requirements |
CT4 |
LS out |
Approval |
7.3.5 |
Yes |
Yes |
approved |
No |
| C4-161311 |
C4-161505 |
Clarification of TAC allocation |
Vodafone |
CR |
Agreement |
4 |
Yes |
Yes |
agreed |
No |
| C4-161300 |
C4-161506 |
Reply to: TAC Allocation as detailed in 3GPP TS 23.003 |
current meeting |
LS out |
approval |
4 |
Yes |
Yes |
approved |
No |
| C4-161299 |
C4-161507 |
Cleanup of the editor's notes for reporting remote UE |
Ericsson |
CR |
- |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161385 |
C4-161508 |
Reporting of the start and stop of the reporting of monitoring events |
Huawei Tech.(UK) Co., Ltd |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161359 |
C4-161509 |
New AVP assignment for MONTE |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161425 |
C4-161510 |
Configure Monitoring Event to Multiple Serving Nodes |
ZTE |
CR |
Approval |
7.1.9 |
Yes |
Yes |
revised |
No |
C4-161540 |
C4-161419 |
C4-161511 |
Definition of Monitoring-Type and clarifications on UE in MME and SGSN for MONTE |
Huawei |
CR |
Decision |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161497 |
C4-161512 |
draft 29.128 |
rapporteur |
draft TS |
Agreement |
7.1.9 |
No |
Yes |
not concluded |
No |
|
| C4-161513 |
DNS procedures for Decor |
NTT DOCOMO, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell |
CR |
Agreement |
7.1.18 |
Yes |
Yes |
agreed |
No |
| C4-161482 |
C4-161514 |
Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Orange, Motorola |
pCR |
Decision |
7.2.11 |
Yes |
Yes |
revised |
Yes |
C4-161538 |
C4-161479 |
C4-161515 |
new Diameter application for MCPTT-2 and CSC-13 reference points |
ORANGE, HPE, Motorola |
draft TS |
Approval |
7.2.11 |
Yes |
Yes |
revised |
No |
C4-161516 |
C4-161439 |
C4-161516 |
new Diameter application for MCPTT-2 and CSC-13 reference points |
ORANGE, HPE, Motorola |
draft TS |
Approval |
7.2.11 |
No |
No |
reserved |
No |
| C4-161515 |
C4-161517 |
Introduction of AAA-1 interface |
Huawei, Ericsson |
CR |
Decision |
7.2.11 |
Yes |
Yes |
agreed |
No |
| C4-161502 |
C4-161518 |
Connection management procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161544 |
C4-161487 |
C4-161519 |
Impacts on the DNS procedures for CIoT with introduction of NB-IoT and Non-IP |
Ericsson LM |
LS out |
Decision |
7.2.14 |
Yes |
Yes |
approved |
No |
| C4-161471 |
C4-161520 |
LS on New AVPs and Experimental Result Code in TS 29.214 |
CT3 |
LS in |
Action |
7.3.2 |
Yes |
Yes |
noted |
No |
|
| C4-161521 |
LS on Allocation of new Diameter Application ID and commands code for PC2 protocol |
CT3 |
LS in |
Action |
7.2.7 |
Yes |
Yes |
noted |
No |
|
| C4-161522 |
LS on Request for Diameter Command Code for new St Interface |
CT3 |
LS in |
Action |
4 |
Yes |
Yes |
postponed |
No |
|
| C4-161523 |
LS on new AVPs in TS 29.212 |
CT3 |
LS in |
Action |
4 |
Yes |
Yes |
noted |
No |
|
| C4-161524 |
LS on EVS over CS (S4-160310/ C3-160189) |
CT3 |
LS in |
Action |
4 |
Yes |
Yes |
postponed |
No |
|
| C4-161525 |
Transfer of non IP PDN to peer MME during mobility |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161532 |
C4-161480 |
C4-161526 |
New PDN-Type for Cellular IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161490 |
C4-161527 |
New PDN-Type for Cellular IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161313 |
C4-161528 |
New PDN-Type for Celullar IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161314 |
C4-161529 |
New PDN-Type for Celular IoT |
Ericsson |
CR |
- |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161315 |
C4-161530 |
Authorisation for NIDD procedure over S6t |
Huawei, Vodafone |
CR |
Decision |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161324 |
C4-161531 |
S11-U tunneling for MO/MT data transport in control plane (SGi based) - with new S11-U F-TEIDs |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Verizon, AT&T, Orange, China Mobile, Deutsche Telekom, Huawei. |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161469 |
C4-161532 |
Transfer of non IP PDN to peer MME during mobility |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161539 |
C4-161525 |
C4-161533 |
Behaviours upon receipt of unknown NIDD |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161546 |
C4-161436 |
C4-161534 |
Protocol for Non IP-Data over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
approved |
No |
| C4-161488 |
C4-161535 |
Questions on non-IP data delivery procedures |
CT4 |
LS out |
discussion |
7.2.14 |
Yes |
Yes |
approved |
No |
| C4-161485 |
C4-161536 |
Allocation of new Diameter Application ID and commands code for PC2 protocol |
Huawei |
CR |
Decision |
7.2.7 |
Yes |
Yes |
revised |
No |
C4-161543 |
C4-161382 |
C4-161537 |
Reply LS on clarification on requirements for MONTE |
Huawei |
LS out |
- |
7.1.9 |
Yes |
Yes |
approved |
No |
| C4-161460 |
C4-161538 |
Skeleton for Sh* application for MCPTT-2 and CSC-13 interfaces |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Orange, Motorola |
pCR |
Decision |
7.2.11 |
Yes |
Yes |
withdrawn |
Yes |
| C4-161514 |
C4-161539 |
Transfer of non IP PDN to peer MME during mobility |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
revised |
No |
C4-161545 |
C4-161532 |
C4-161540 |
Configure Monitoring Event to Multiple Serving Nodes |
ZTE |
CR |
Approval |
7.1.9 |
Yes |
Yes |
agreed |
No |
| C4-161510 |
C4-161541 |
Reply LS to CT4 LS on progress of the work on Diameter Base Protocol Update |
ORANGE |
LS out |
Decision |
7.1.19 |
Yes |
Yes |
agreed |
No |
| C4-161456 |
C4-161542 |
draft TR 29.819 |
Lionel Monrad |
other |
Information |
7.1.19 |
No |
Yes |
not concluded |
No |
|
| C4-161543 |
Allocation of new Diameter Application ID and commands code for PC2 protocol |
Huawei |
CR |
Decision |
7.2.7 |
Yes |
Yes |
agreed |
No |
| C4-161536 |
C4-161544 |
Connection management procedures over T6a |
Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Nokia Networks, Cisco Systems Inc |
pCR |
Agreement |
7.2.14 |
Yes |
Yes |
approved |
No |
| C4-161518 |
C4-161545 |
Transfer of non IP PDN to peer MME during mobility |
Cisco Systems Inc |
CR |
Approval |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161539 |
C4-161546 |
Behaviours upon receipt of unknown NIDD |
Huawei |
CR |
Agreement |
7.2.14 |
Yes |
Yes |
agreed |
No |
| C4-161533 |
C4-161547 |
CT4 aspect of the Workplan |
CT4 Chairman |
Work Plan |
Approval |
11 |
Yes |
Yes |
approved |
No |
| C4-161275 |
C4-161548 |
List of output documents |
Chairman |
other |
Information |
14 |
Yes |
No |
available |
No |
|
| |