Last Allocated Document: SP-140642

Temporary Documents List - Ordered by Agenda Item

Colour Key:
Agenda Item, Agenda Title
No Conclusion
Conclusion Reached
Document Revised
Document Withdrawn
Document Not Handled

The Hyperlinks are to the FTP server: ftp://ftp.3gpp.org/tsg_sa/TSG_SA/TSGS_65/Docs/

Created: 2014-10-08 09:51     START OF LIST

Agenda TD LongTitle Source Summary Doc_Type Doc_For Decision Rev_By Rev_Of LS_Source_file Comment
1 - Opening of the Meeting - - - - - - - - -
2 - Approval of Agenda - - - - - - - - -
2 SP-140404 Draft agenda for TSG SA meeting #65 TSG SA Chairman Draft agenda for TSG SA meeting #65 Agenda Approval Revised SP-140531
2 SP-140531 Draft agenda for TSG SA meeting #65 TSG SA Chairman Draft agenda for TSG SA meeting #65 Agenda Approval Approved SP-140404 The agenda was reviewed and approved.
3 - IPR Reminder - - - - - - - - -
4 - Reports from Previous Meetings - - - - - - - - -
4.1 - Report from TSG SA#63 - - - - - - - - -
4.1 SP-140405 Draft Report of TSG SA meeting #64 TSG SA Secretary Draft Report of TSG SA meeting #64 containing revision marks of changes on the distributed draft. Report Approval Approved The report was reviewed and approved.
4.2 - Reports from TSG SA ad-hoc meetings and workshops (Reports related to features will be covered under the feature related agenda item) - - - - - - - - -
5 - Items for early consideration (Please contact chairman in advance) - - - - - - - - -
5 SP-140452 Outcome of Critical Communication workshop TSG SA Chairman Presentation of the outcome of a Critical Communication workshop OTHER Presentation Noted This was presented and noted.
5 SP-140492 MCPTT Work Organization TSG SA Chairman, TSG CT Chairman It is proposed to create a new Working Group in 3GPP to take responsibility for MCPTT application level work: stage 1 service description, stage 2 architecture, stage 2.5 details (flows, functional split, funct [...]. OTHER Decision Noted Discussed and noted
5 SP-140532 Proposal for the formation of an interim Critical Communications Standards Group ETSI TC TCCE Chairman At the recent joint Critical Communications workshop, held between representatives of 3GPP, OMA and ETSI TCCE, it was agreed that there was a pressing need for a centralised specialist group to undertake the de [...]. OTHER Discussion Noted Discussed and noted
5 SP-140599 On MCPTT work organization Alcatel-Lucent This paper discusses possible ways to accommodate the MCPTT work in 3GPP and proposes a way forward OTHER Discussion Noted Discussed and noted
5 SP-140610 MCPTT way forward Blackberry This paper outlines the BlackBerry view on critical communications and how to progress the MCPTT work in 3GPP. Discussion Approval Noted Discussed and noted
5 SP-140524 Mission Critical Standards Development Motorola Solutions Way forward proposal: Global Mission Critical Needs: - Global Mission Critical LTE transport layer and application layer Mission Critical standards - Application layer standards that work with a multitude of na [...]. Presentation Discussion Noted Discussed and noted
5 SP-140448 LS from MSIP: Request on prioritization and expeditious completion of 3GPP Work Items and Study Items related to Public Safety LTE Korean Ministry of Science, ICT and Future Planning (MSIP) MSIP in Korea strongly urge the continued prioritization and expeditious completion of 3GPP Release 13 Work Items and Study Items that directly impact the availability of PS-LTE. This prompt action is going to [...]. LS In Approval Noted 20140826_MSIP_Liasion_Statesment_V4_SA_Final-R2 This was reviewed and noted.
5 SP-140449 3GPP Work Items for Public Safety LTE and PPDR Broadband network in Korea TTA, ETRI 3GPP LTE supports most of the Korean 37 functional requirements, it doesn't still support several items, especially including Direct Communication / MS Repeater, Standalone BS Operation Mode and Group call. The [...]. DISCUSSION Approval Noted This was discussed and noted.
5 SP-140533 Critical Communications Priorities TETRA and Critical Communications Association (TCCA) TCCA fully supports the creation of a separate dedicated group for MCPTT. However, we wish to remind 3GPP that the original requirement was for Mission Critical Data services over LTE and this has not changed. [...]. OTHER Discussion Noted Discussed and noted.
5 SP-140488 Roadmap for critical communication application French MoI This contribution proposes to discuss a roadmap for Critical Communication Application and define the next steps to be done for building the standard in 3GPP OTHER Discussion Noted Discussed and noted.
5 SP-140489 Video services for critical communications French MoI This contribution proposes a first split for the work on video services. OTHER Discussion Noted Discussed and noted.
5 SP-140616 Development of MCPTT in 3GPP (U.K) Home Office Suggestions and assumptions for doing the MCPTT work in 3GPP, along with some proposed next steps. OTHER Discussion Noted Discussed and noted.
5 SP-140413 LS from SA WG2: LS Response on MCPTT Work SA WG2 SA WG 2 thanks TSG SA for its LS on MCPTT work. The following initial conclusions are provided by SA WG2 for TSG SA's consideration: - SA WG2's development of candidate MCPTT architecture solutions and conclu [...]. LS In Information Noted S2-142870 This LS was reviewed and noted.
5 SP-140615 MCPTT Work Schedule and Coordination Considerations SA WG2 Chairman, TSG SA Chairman, TSG CT Chairman This paper explores work scheduling and coordination implications of stage 2 work on the MCPTT item in the form of a cross-TSG 3GPP-wide plan. OTHER Discussion Noted Discussed and noted.
5 SP-140623 Summary output of break-out drafting session on MCPTT TSG SA Chairman, TSG SA Chairman, TSG CT Chairman The following guidance was considered for the temporary ad-hoc activity with regards to SP-0140xxx: Temporary ad-hoc aspects: 3GPP encourages OMA and ETSI to continue working together, alongside interested 3GPP [...]. OTHER Discussion Noted LS drafted in SP-140634. This document was then noted.
5 SP-140634 [DRAFT] LS on 3GPP work organization for Mission Critical Push to Talk TSG SA To: OMA, ETSI TCCE, TSG CT, SA WG1, SA WG2, SA WG3, SA WG4, SA WG5 CC: TSG RAN LS OUT Approval Revised SP-140640
5 SP-140640 LS on 3GPP work organization for Mission Critical Push to Talk TSG SA To: OMA, ETSI TC TCCE, TSG CT, SA WG2. CC: , TSG RAN, CT WG1, CT WG3, CT WG4, CT WG6, SA WG1, SA WG2, SA WG3, SA WG4, SA WG5, PCG, TCCA LS OUT Approval Approved SP-140634 This outgoing LS was approved
5.1 - Challenges to working agreements (Must have been previously requested) - - - - - - - - -
6 - General Incoming Liaisons (Liaisons related to specific features will be covered under the feature related agenda item) - - - - - - - - -
6 SP-140438 LS from ITU-T SG2: LS on Evolution of Recommendation E.212 ITU-T SG2 ITU-T Study Group 2 has started a study on Evolution of Recommendation E.212 in order to take into account new services and providers. Attached is a first draft revision of Recommendation E.212 (TD 0405-GEN), o [...]. LS In Action Noted ITU-T_COM2-LS055 Additional Attachment in SP-140451 This incoming LS was noted
6 SP-140451 Attachment to LS from ITU-T SG2: Suggested changes to E.212 after June 2014 ITU-T SG2 meeting ITU-T SG2 Additional Attachment to LS in SP-140438: Suggested changes to E.212 after June 2014 ITU-T SG2 meeting OTHER Noted Attachment to SP-140438 This contribution was noted
6 SP-140440 LS from ETSI ISG NFV: Outgoing LS: Availability of the ETSI ISG NFV deliverables ETSI ISG NFV ETSI NFV ISG would like to inform your group(s) that the latest draft versions of the following documents are now available on the ETSI Portal at the following link: http://docbox.etsi.org/ISG/NFV/Open/Latest_D [...]. LS In Information Noted NFV(14)000140r1 This incoming LS was noted
6 SP-140603 LS from ITU-T Study Group 12 on Proposed organization of a co-located workshop ITU-T SG12 QSDG / 3GPP / ETSI TB STQ on Quality of Service (QoS) and Quality of Experience (QoE) of 'big data' services in 3G/4G Mobile Networks ITU-T Study Group 12 From TD 500 Rev. 3 (GEN/12) Progress Report on the QSDG Activities and Work plan of year 2015, there is one proposed workshop on Performance, Quality of Service (QoS) and Quality of Experience (QoE) scheduled f [...]. LS In Action Response in SP-140639 TD 536 rev 1 Response drafted in SP-140624. Final response in SP-140639.
6 SP-140624 [DRAFT] Reply LS on Proposed organization of a co-located workshop ITU-T SG12 QSDG / 3GPP / ETSI TB STQ on Quality of Service (QoS) and Quality of Experience (QoE) of 'big data' services in 3G/4G Mobile Networks TSG SA To: ITU-T SG12 QSDG, ETSI TB STQ LS OUT Approval Revised SP-140639 This was reviewed and revised to remove 'draft' in SP-140639
6 SP-140639 Reply LS on Proposed organization of a co-located workshop ITU-T SG12 QSDG / 3GPP / ETSI TB STQ on Quality of Service (QoS) and Quality of Experience (QoE) of 'big data' services in 3G/4G Mobile Networks TSG SA To: ITU-T SG12 QSDG, ETSI TB STQ LS OUT Approval Approved SP-140624 This outgoing LS was approved
7 - Reports from SA Working Groups and other TSGs - - - - - - - - -
7.1 - SA WG1 Report and Questions for Advice - - - - - - - - -
7.1 SP-140493 SA WG1 Report to TSG SA#65 SA WG1 Chairman SA WG1 Chairman's report of SA WG1 activities Report Presentation Noted This Report was noted
7.2 - SA WG2 Report and Questions for Advice - - - - - - - - -
7.2 SP-140415 SA WG2 chairman's report to TSG SA#65 SA WG2 Chairman SA WG2 Chairman's report of SA WG2 activities Report Presentation Noted This Report was noted
7.2 SP-140416 Release 13 Prioritization SA WG2 Chairman TSG SA is asked to decide how to prioritize SA WG2 work so that it fits in available time resources during the Release 13 time frame. Report Approval Noted This Report was noted
7.2 SP-140602 Prioritization and Slot Allocation for TEI-13 Cat B/C for 3GPP Access in SA WG2 NTT DOCOMO In conjunction with SA WG2 Release Prioritization SP-140416, this paper requests adequate time slot assigned for TEI-13 Cat B/C for 3GPP access in SA WG2 Discussion Decision Noted This contribution was noted
7.3 - SA WG3 Report and Questions for Advice - - - - - - - - -
7.3 SP-140572 SA WG3 Status Report SA WG3 Chairman SA WG3 Chairman's report of SA WG3 activities REPORT Presentation Noted This REPORT was noted
7.4 - SA WG4 Report and Questions for Advice - - - - - - - - -
7.4 SP-140453 SA WG4 Status Report at TSG SA#65 SA WG4 Chairman SA WG4 Chairman's report of SA WG4 activities Report Presentation Noted This Report was noted
7.5 - SA WG5 Report and Questions for Advice - - - - - - - - -
7.5 SP-140534 SA WG5 Status Report SA WG5 Chairman SA WG5 Chairman's report of SA WG5 activities Report Presentation Revised SP-140617
7.5 SP-140617 SA WG5 Status Report SA WG5 Chairman SA WG5 Chairman's report of SA WG5 activities Report Presentation Noted SP-140534 This Report was noted
7.6 - TSG RAN report and Questions for Advice - - - - - - - - -
7.6 SP-140618 TSG RAN Status Report to TSG SA#65 TSG RAN Chairman TSG RAN chairman's report for presentation Report Presentation Noted This Report was noted
7.6 SP-140619 Draft report of TSG RAN meeting #65 TSG RAN Secretary (MCC) Draft version of the TSG RAN #65 report provided for information Report Information Noted This Report was noted
7.6 SP-140406 LS from ITU-R: Working document towards a preliminary draft new ITU-R Report on the Smart Grid project ITU-R Working Party 1A wishes to inform the relevant External Organizations of a further development of the document attached to this liaison statement. Working Party 1A would therefore appreciate any comments and ad [...]. LS In Information Postponed 1A/TEMP/61 This was postponed to TSG SA meeting #66
7.6 SP-140407 LS from ITU-R: ARCHITECTURE AND TOPOLOGY OF IMT NETWORKS ITU-R Working Party 5D (WP 5D) wishes to inform the relevant External Organizations that it is continuing development of a working document toward a preliminary draft new Report ITU R M.[IMT.ARCH], 'Architecture and [...]. LS In Information Response in SP-140626 5D/TEMP/404 This was reviewed and a response LS provided in SP-140626.
7.6 SP-140607 LS from TSG CT: Reply LS on Liaison statement to External Organizations on Architecture and Topology of IMT Networks TSG CT TSG CT had no comments to the current proposal. Action: TSG CT asks TSG SA to take note of this in their consolidated reply to ITU-R LS In Action Noted CP-140728 This LS was reviewed and noted.
7.6 SP-140620 LS from TSG RAN: Draft Letter to ITU on LS on Architecture and Topology of IMT Networks TSG RAN ITU-R Working Party 5D (WP 5D) asked 3GPP to provide a description of the Architecture and Topology of IMT Networks (UTRA and E-UTRA radio access networks and relevant Core Networks in 3GPP case). 3GPP provided [...]. LS In Action Response in SP-140626 RP-141647 Response LS was provided in SP-140626 to inform the ITU-R of this (to be forwarded by the ITU-R Ad-Hoc Group Chairman)
7.6 SP-140410 LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE WORK PLAN, TIMELINE, PROCESS AND DELIVERABLES FOR THE FUTURE DEVELOPMENT OF INTERNATIONAL MOBILE TELECOMMUNICATIONS (IMT) ITU-R Working Party 5D is studying the definition of a work plan, timeline, process and required deliverables for the future development of IMT, necessary to provide by 2020 timeframe the expected ITU-R outcome of ev [...]. LS In Action LS to PCG in SP-140628 5D/TEMP/455 An LS to the PCG was provided in SP-140628.
7.6 SP-140609 LS from TSG CT: Reply LS to LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS ON THE WORK PLAN, TIMELINE, PROCESS AND DELIVERABLES FOR THE FUTURE DEVELOPMENT OF INTERNATIONAL MOBILE TELECOMMUNICATIONS (IMT) TSG CT TSG CT had no comments to the current proposal. Action: TSG CT asks TSG SA to take note of this in their consolidated reply to ITU-R LS In Action Noted CP-140730 This incoming LS was noted
7.6 SP-140622 LS from TSG RAN: Draft Letter to ITU on the work plan, timeline, process and deliverables for the future development of International Mobile Telecommunications (IMT) TSG RAN ITU-R Working Party 5D (WP 5D) provided 3GPP the work plan, timeline, process and deliverables for the future development of International Mobile Telecommunications (IMT). The answer below states that: - 3GPP [...]. LS In Action Response LS in SP-140628 RP-141650 Response LS in SP-140628
7.6 SP-140408 LS from ITU-R: LIAISON STATEMENT TO GCS PROPONENTS AND TRANSPOSING ORGANIZATIONS ON THE PROVISION OF TRANSPOSITION REFERENCES AND CERTIFICATION C FOR DRAFT REVISION 12 OF RECOMMENDATION ITU-R M.1457 ITU-R Working Party 5D thanks the relevant GCS Proponents for their successful work in regards to completion of the milestone identified by Item 8 of Table 1 for the draft Revision 12 update of Recommendation ITU-R M [...]. LS In Information Forwarded to PCG in SP-140408 5D/TEMP/407 A LS to forward this to the PCG was provided in SP-140627.
7.6 SP-140608 LS from TSG CT: Reply LS LIAISON STATEMENT TO GCS PROPONENTS AND TRANSPOSING ORGANIZATIONS ON THE PROVISION OF TRANSPOSITION REFERENCES AND CERTIFICATION C FOR DRAFT REVISION 12 OF RECOMMENDATION ITU-R M.1457 TSG CT TSG CT had no comments to the current proposal. Action: TSG CT asks TSG SA to take note of this in their consolidated reply to ITU-R LS In Action Noted CP-140729 This LS was reviewed and noted.
7.6 SP-140621 LS from TSG RAN: Draft Letter to ITU on LS to GCS Proponents and Transposing Organizations on the provision of transposition references and Certification C for Draft Revision 12 of Recommendation ITU-R M.1457 TSG RAN ITU-R Working Party 5D (WP 5D) asked 3GPP to review the current draft of M.1457 (Revision 12) 'Detailed specifications of the terrestrial radio interfaces of International Mobile Telecommunications-2000 (IMT-20 [...]. LS In Action Forwarded to PCG in SP-140627 RP-141648 An LS to the PCG was provided in SP-140627.
7.6 SP-140626 Letter to ITU on LS on Architecture and Topology of IMT Networks TSG SA - LS OUT Approval Approved This outgoing LS was approved
7.6 SP-140627 LS Forwarded to PCG: Draft Letter to ITU on LS to GCS Proponents and Transposing Organizations on the provision of transposition references and Certification C for Draft Revision 12 of Recommendation ITU-R M.1457 TSG SA To: PCG LS OUT Approval Approved This outgoing LS was approved
7.6 SP-140628 LS Forwarded to PCG: Draft Letter to ITU on the work plan, timeline, process and deliverables for the future development of International Mobile Telecommunications (IMT) TSG SA To: PCG LS OUT Approval Approved This outgoing LS was approved
7.6 SP-140642 Draft Letter to ITU on Comments on Working document towards a Handbook on Global Trends in IMT ITU-R M.[IMT.HANDBOOK] TSG RAN For e-mail approval and forwarding to PCG. LS In Approval e-mail agreed. Forwarded to PCG For e-mail approval and forwarding to PCG.
7.7 - TSG CT report and Questions for Advice - - - - - - - - -
7.7 SP-140604 Status report of TSG CT#65 TSG CT Chairman TSG CT Status Report to TSG SA#65 Report Presentation Noted This Report was noted
7.7 SP-140605 Draft meeting report of TSG CT#65 MCC Draft report of TSG CT meeting #65 Report Information Noted This Report was noted
7.7 SP-140606 IETF Status report TSG CT Chairman IETF dependencies Status report Report Presentation Noted This Report was noted
7.8 - TSG GERAN report and Questions for Advice - - - - - - - - -
7.8 SP-140491 TSG GERAN Status Report to TSG SA#65 TSG GERAN Chairman TSG GERAN Status Report to TSG SA#65 Report Presentation Noted This Report was noted
8 - Documents related to Rel-8 or Earlier Features - - - - - - - - -
8.1 - Rel-4 CRs (Need to be very well justified!) - - - - - - - - -
8.2 - Rel-5 CRs (Need to be very well justified!) - - - - - - - - -
8.3 - Rel-6 CRs (Need to be very well justified!) - - - - - - - - -
8.4 - Rel-7 CRs (Need to be very well justified!) - - - - - - - - -
8.4 SP-140557 Rel-7 CRs on OAM Maintenance and small Enhancements (OAM7) SA WG5 32.405 CR0072R1; 32.405 CR0073R1; 32.405 CR0074R1; 32.405 CR0075; 32.405 CR0076; 32.406 CR0011R1; 32.406 CR0012R1; 32.406 CR0013R1; 32.406 CR0014; 32.406 CR0015 CR Pack Approval Approved This CR Pack was approved
8.5 - Rel-8 CRs (Need to be very well justified!) - - - - - - - - -
8.5 SP-140561 Rel-8 CRs on Charging Management (CH8) SA WG5 32.260 CR0272; 32.260 CR0273; 32.260 CR0274; 32.260 CR0275; 32.260 CR0276; 32.275 CR0053R1; 32.275 CR0054R1; 32.275 CR0055R1; 32.275 CR0056R1; 32.275 CR0058R1; 32.298 CR0471R1; 32.298 CR0472R1; 32.298 CR0473R1; [...]. CR Pack Approval Approved This CR Pack was approved
9 - Rel-9 CRs (Need to be very well justified!) - - - - - - - - -
9 SP-140569 Rel-9 CRs on MBMS support in EPS (MBMS_EPS) SA WG5 32.273 CR0028R1; 32.273 CR0029R1; 32.273 CR0030R1; 32.299 CR0605R1; 32.299 CR0606R1; 32.299 CR0607R1; 32.299 CR0608R1 CR Pack Approval Approved This CR Pack was approved
10 - Rel-10 CRs (Need to be very well justified!) - - - - - - - - -
10 SP-140454 CRs to TS 26.114 on 'Correction to GBR, MBR, and RTCP BW in Video QoS Profiles (TEI10)' (Release 10 to Release 12) SA WG4 26.114 CR0284R1; 26.114 CR0285R1; 26.114 CR0286R1 CR Pack Approval Approved This CR Pack was approved
11 - Rel-11 CRs - - - - - - - - -
11 SP-140417 3 CRs to 23.060 (NIMTC, Rel-10, Rel-11, Rel-12) SA WG2 23.060 CR1884R1; 23.060 CR1885R1; 23.060 CR1886R1 CR Pack Approval Approved This CR Pack was approved
11 SP-140585 Release 11 CRs on Lawful Interception (LI11) SA WG3 33.107 CR0155; 33.107 CR0156; 33.108 CR0231; 33.108 CR0230 CR Pack Approval Approved This CR Pack was approved
11 SP-140455 CRs to TS 26.268 on 'Update to Codec Inversion Detection Algorithm (TEI11)' (Release 11 and Release 12) SA WG4 26.268 CR0031R1; 26.268 CR0032R1 CR Pack Approval Approved This CR Pack was approved
11 SP-140456 CRs to TS 26.346 on 'Media- and Session-level FEC Redundancy Level Declaration (EMM-DDE)' (Release 11 and Release 12) SA WG4 26.346 CR0417R1; 26.346 CR0418R1 CR Pack Approval Approved This CR Pack was approved
11 SP-140597 Rel-11 CRs on IRP framework enhancements to support Management of Converged Networks (OAM-FMC-IRP) SA WG5 32.156 CR0002 CR Pack Approval Approved This CR Pack was approved
11 SP-140558 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) SA WG5 28.653 CR0006; 28.655 CR0004; 28.658 CR0009; 28.702 CR0004; 32.153 CR0004; 32.442 CR0232 CR Pack Approval Approved This CR Pack was approved
11 SP-140562 Rel-11 CRs on Charging Management (CH11) SA WG5 32.260 CR0283R1; 32.260 CR0284R1; 32.298 CR0476R1; 32.298 CR0494 CR Pack Approval Approved This CR Pack was approved
11 SP-140568 Rel-11 CRs on Charging for Network-provided Location information for IMS (NWK-PL2IMS_CH) SA WG5 32.260 CR0277R1; 32.260 CR0278R1; 32.298 CR0487R1; 32.298 CR0488R1 CR Pack Approval Approved This CR Pack was approved
11 SP-140570 Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) SA WG5 32.422 CR0271R1; 32.422 CR0272R1 CR Pack Approval Approved This CR Pack was approved
12 - Documents Related to Rel-12 Features - - - - - - - - -
12.1 - (SEQ_FA) - Sequential Flexible Alerting - - - - - - - - -
12.2 - (IMS_WebRTC) - Web Real Time Communication (WebRTC) Access to IMS - - - - - - - - -
12.2 SP-140418 6 CRs to 23.228 (IMS_WebRTC, Rel-12) SA WG2 23.228 CR1083R2; 23.228 CR1086R1; 23.228 CR1087R2; 23.228 CR1088R2; 23.228 CR1090; 23.228 CR1091R1 CR Pack Approval Approved This CR Pack was approved
12.2 SP-140582 TR 33.871: Web Real Time Communication (WebRTC) Access to IMS SA WG3 Abstract of document: TR 33.871 contains a study on security for WebRTC access to IMS, based on the architecture and stage 2 procedures defined in Annex U of TS 23.228. The document is addressing: - WebRTC IMS [...]. TR Approval Approved This TR was approved and placed under Change control. SA WG3 to check reference [7]
12.2 SP-140588 Release 12 CRs on Web Real Time Communication Access to IMS (IMS_WebRTC) SA WG3 33.203 CR0221R1; 33.203 CR0222; 33.203 CR0223; 33.203 CR0224R1; 33.203 CR0225R1 CR Pack Approval Approved This CR Pack was approved
12.3 - (LangInfo) - Language and Modality Information for communications - - - - - - - - -
12.4 - (EVS_codec) - Codec for Enhanced Voice Services - - - - - - - - -
12.4 SP-140457 TS 26.441 Codec for Enhanced Voice Services (EVS); General Overview (Release 12), v. 2.0.0 SA WG4 Abstract of document: The present document is an introduction to the audio processing parts of the Enhanced Voice Services coder. A general overview of the audio processing functions is given, with reference to [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140458 TS 26.442 Codec for Enhanced Voice Services (EVS); ANSI C code (fixed-point) (Release 12), v. 1.0.0 SA WG4 Abstract of document: The present document contains an electronic copy of the ANSI C code for the Enhanced Voice Services (EVS) Codec. The ANSI C code is necessary for a bit exact implementation of the EVS Code [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140459 TS 26.444 Codec for Enhanced Voice Services (EVS); Test Sequences (Release 12), v. 1.0.0 SA WG4 Abstract of document: This present document specifies the digital test sequences for the codec for Enhanced Voice Services. These sequences test for a bit-exact implementation of the Enhanced Voice Services tra [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140460 TS 26.445 Codec for Enhanced Voice Services (EVS); Detailed Algorithmic Description (Release 12), v. 1.0.0 SA WG4 Abstract of document: The present document is a detailed description of the signal processing algorithms of the Enhanced Voice Services coder. The detailed mapping from 20ms input blocks of audio samples in 16 [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140461 TS 26.446 Codec for Enhanced Voice Services (EVS); AMR-WB Backward Compatible Functions (Release 12), v. 1.0.0 SA WG4 Abstract of document: This document specifies the AMR-WB interoperable functions of the EVS coder. The present document is a high level overview of the functionality with reference to the Codec Detailed Algorit [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140462 TS 26.447 Codec for Enhanced Voice Services (EVS); Error Concealment of Lost Packets (Release 12), v. 1.0.0 SA WG4 Abstract of document: This document defines a frame loss concealment procedure, also termed frame substitution and muting procedure, which is executed by the Enhanced Voice Services (EVS) decoder when one or mo [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140463 TS 26.448 Codec for Enhanced Voice Services (EVS); Jitter Buffer Management (Release 12), v. 1.0.0 SA WG4 Abstract of document: This present document defines the Jitter Buffer Management solution of the Codec for Enhanced Voice Services (EVS). Jitter Buffers are required in packet-based communications, such as 3GPP [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140464 TS 26.449 Codec for Enhanced Voice Services (EVS); Comfort Noise Generation (CNG) Aspects (Release 12), v. 1.0.0 SA WG4 Abstract of document: This document gives an overview for the requirements of the background acoustic noise evaluation, noise parameter encoding/decoding and comfort noise generation for the Enhanced Voice Serv [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140465 TS 26.450 Codec for Enhanced Voice Services (EVS); Discontinuous Transmission (DTX) (Release 12), v. 1.0.0 SA WG4 Abstract of document: The present document is a summary of the discontinuous transmission (DTX) function of the EVS codec. The DTX algorithms are described in TS 26.445. This document points to the appropriate [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140466 TS 26.451 Codec for Enhanced Voice Services (EVS); Voice Activity Detection (VAD) (Release 12), v. 1.0.0 SA WG4 Abstract of document: This document specifies the Voice Activity Detector (VAD) to be used in the Discontinuous Transmission (DTX) of the EVS Codec. Although the main application of the VAD algorithm is the det [...]. TS Approval Approved This TS was approved and placed under Change control
12.4 SP-140467 Exception sheet for the WI EVS_codec SA WG4 Abstract of document: The normative parts of the fixed point implementation of the EVS Codec will be available without this Work Item Exception but the EVS RTP payload format (Annex A of TS 26.445), the floatin [...]. Exception sheet Approval Approved This Exception sheet was approved
12.4 SP-140468 CR to TS 26.114 on 'Introducing EVS into MTSI (EVS_codec)' (Release 12) SA WG4 26.114 CR0296R3 CR Pack Approval Approved This CR Pack was approved
12.5 - (IMS_TELEP) - IMS-based Telepresence - - - - - - - - -
12.6 - (SMURFs) - Service and Media Reachability for Users over Restrictive Firewalls - - - - - - - - -
12.7 - (MOSAP) - Interworking between Mobile Operators using the Evolved Packet System and Data Application Providers - - - - - - - - -
12.8 - (IPXSNAT) - IPXS for national interconnect - - - - - - - - -
12.9 - (INIPUI) - IMS Network-Independent Public User Identities (including FS_INIPUI) - - - - - - - - -
12.10 - (ECTB) - ECT Blind service interactions - - - - - - - - -
12.11 - (PMOC) - Prevention of mobile-originating signalling and/or data traffic of UE in connected mode - - - - - - - - -
12.12 - (ESID) - Emergency Session Identification - - - - - - - - -
12.13 - (IMS_Corp2) - Transfer of ETSI business trunking specifications - - - - - - - - -
12.13 SP-140500 TS 22.519 v.2.0.0 on Transfer of ETSI business trunking specifications (IMS_Corp2) SA WG1 Abstract of document: This document is the result of transferring the technical contents of ETSI TS 181 019 to a 3GPP TS for ongoing maintenance. A 3GPP version of the defined business trunking document has bee [...]. TS Approval Approved This TS was approved and placed under Change control
12.13 SP-140499 Stage 1 CRs on Transfer of ETSI business trunking specifications (IMS_Corp2) SA WG1 22.228 CR0204R1; 22.228 CR0205R1 CR Pack Approval Approved This CR Pack was approved
12.14 - (ProSe and FS_ProSe) - Proximity based Services (including FS phase) - - - - - - - - -
12.14 SP-140495 Stage 1 CR on ProSe stage-1 alignment with stage 2&3 SA WG1 22.278 CR0213R2 CR Pack Approval Approved This CR Pack was approved
12.14 SP-140498 Stage 1 CR on ProSe Operation in Limited Service Mode SA WG1 22.278 CR0212R5 CR Pack Approval Approved This CR Pack was approved
12.14 SP-140419 11 CRs to 23.303 (ProSe, Rel-12) SA WG2 23.303 CR0067R1; 23.303 CR0071R2; 23.303 CR0079R3; 23.303 CR0095R1; 23.303 CR0099R1; 23.303 CR0100R2; 23.303 CR0101; 23.303 CR0102R4; 23.303 CR0103R3; 23.303 CR0104R2; 23.303 CR0108R1 CR Pack Approval Approved, except 23.303 CR0102R4 Proposed revision of 23203 CR0102R4 in SP-140598. Approved, except 23.303 CR0102R4
12.14 SP-140442 23.303 CR0102R5: Precedence of ProSe configuration information (ProSe, Rel-12) Ericsson, Qualcomm Incorporated, Huawei, Telefonica 23.303 CR0102R5 CR Pack Approval Revised SP-140598 Proposed update to 23.303 CR0102R4 in SP-140419
12.14 SP-140598 23.303 CR0102R6: Precedence of ProSe configuration information (ProSe, Rel-12) Ericsson, Qualcomm Incorporated, Huawei 23.303 CR0102R6 CR Pack Approval Approved SP-140442 Proposed update to 23.303 CR0102R4 in SP-140419 This CR Pack was approved. Further alignment may be needed based on RAN WG2 results from their next meeting.
12.14 SP-140573 Revised WID: Enhancements to Proximity-based Services – Extensions SA WG3 Objective: The SA WG2 objectives are as follows: 1. As part of the TR phase a. Study architecture enhancements in order to support: i. Restricted ProSe Direct Discovery for non-Public Safety use; ii. ProSe Dire [...]. WID Approval Approved This WID was approved
12.14 SP-140574 Revised WID: Proximity-based Services (ProSe) SA WG3 Objective: The SA WG1 objective is to specify service requirements for: - ProSe Discovery over E-UTRA; o within network coverage and o outside network coverage, only for Public Safety Discovery within network c [...]. WID Approval Approved This WID was approved
12.14 SP-140575 Revised WID: Study on Security for Proximity-based Services SA WG3 Objective: The purpose of this study item is consider the security aspects of Proximity Services and document possible security solutions that may later be added to normative specification under other work item [...]. WID Approval Revised SP-140629 Revised in SP-140629 as a new Study WID (see agenda item 13.6)
12.14 SP-140584 Exception Sheet on Security for Proximity Services SA WG3 Abstract of document: This document contains the normative specification TS 33.303 on Security for Proximity-based Services including: 1) security for direct discovery, 2) EPC-level discovery and 3) one-to-m [...]. Exception sheet Approval Approved This Exception sheet was approved
12.14 SP-140591 Release 12 CRs on Proximity based Services (ProSe) SA WG3 33.303 CR0001R1; 33.303 CR0002R1; 33.303 CR0003R2; 33.303 CR0004R1; 33.303 CR0005R1; 33.303 CR0006R1; 33.303 CR0007; 33.303 CR0008R1; 33.303 CR0009R1; 33.303 CR0011R1; 33.303 CR0012R2; 33.303 CR0014R1; 33.303 C [...]. CR Pack Approval Approved This CR Pack was approved
12.14 SP-140543 Exception sheet for Charging Aspects of Proximity Based Services SA WG5 Abstract of document: Exception sheet for Rel-12 Work Item Proximity-based Services Charging. Contentious Issues: None. Exception sheet Approval Approved This Exception sheet was approved. It was agreed that the exception is also granted to work on TR 32.844.
12.14 SP-140550 TR 32.844 on Charging support for ProSe one-to-many Direct Communication for Public Safety use SA WG5 Abstract of document: The document intends to study the charging architecture for the one-to-many ProSe Direct Communication for ProSe-enabled Public Safety UE. The study covers the ProSe Direct Communication f [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG5
12.14 SP-140551 TS 32.277 on Charging Aspects of Proximity-based Services SA WG5 Abstract of document: This document specifies the Offline and Online Charging description for the Proximity-based Services (ProSe), based on the stage 2 description of ProSe in TS 23.303. This charging descript [...]. TS Information Noted This TS was noted. Companies are invited to review thisTS and send comments to SA WG5
12.15 - (GCSE_LTE) - Group Communication System Enablers for LTE - - - - - - - - -
12.15 SP-140496 Stage 1 CRs on GCSE_LTE SA WG1 22.468 CR0005R1; 22.468 CR0006R1; 22.468 CR0010; 22.468 CR0011R2; 22.468 CR0012 CR Pack Approval Approved This CR Pack was approved
12.15 SP-140420 3 CRs to 23.203, 23.468 (GCSE_LTE, Rel-12) SA WG2 23.203 CR0901R4; 23.468 CR0022R2; 23.468 CR0044R1 CR Pack Approval Approved Mirror CR to 23203 CR0901R4 provided in SP-140441 This CR Pack was approved
12.15 SP-140441 23.203 CR0914: QCI values for Public Safety Services (GCSE_LTE, Rel-13) Vodafone 23.203 CR0914 CR Pack Approval Approved Mirror CR to Rel-12 CR (23203 CR0901R4) in SP-140420 This CR Pack was approved
12.15 SP-140412 LS from CT WG1: New QCIs for MCPTT Signalling and Voice CT WG1 CT WG1 would like to inform RAN WG2 that CT WG1 has agreed the attached CR that introduces new QCI(s) for MCPTT feature based on SA WG2 agreed CR (S2-142925 CR #0901). In case, RAN WG2 has any feedback on the n [...]. LS In Information Noted C1-143362 This incoming LS was noted
12.15 SP-140433 Updated WID: GCSE_LTE WID change of Rapporteur SA WG2 Objective: The SA WG1 objective is to specify the system enablers' Stage 1 service requirements to the 3GPP system to support group communication over LTE for critical communications such as Public Safety. The [...]. WID Approval Approved This WID was approved
12.16 - (IMSSat) - IMS access via Digital Video Broadcast - Return Channel via Satellite - - - - - - - - -
12.17 - (IMS_RegCon) - IMS Registration Control - - - - - - - - -
12.18 - (SIPTO_SC, LIMONET) - SIPTO Service Continuity, LIPA Mobility and SIPTO at the Local Network - - - - - - - - -
12.19 - (OPIIS) - Operator Policies for IP Interface Selection - - - - - - - - -
12.20 - (P4C) - Policy and Charging Control for supporting fixed broadband access networks (including all building blocks in all WGs) - - - - - - - - -
12.20 SP-140567 Rel-12 CRs on Policy and Charging Enforcement Function (PCEF) based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks (P4C-F-CH_P) SA WG5 32.251 CR0381R1; 32.251 CR0383R1; 32.298 CR0484R1; 32.298 CR0485; 32.298 CR0489R2; 32.299 CR0604 CR Pack Approval Approved This CR Pack was approved
12.21 - (SMSMI) - SMS submit and delivery without MSISDN in IMS - - - - - - - - -
12.22 - (MTCe) - Machine-Type and other mobile data applications Communications Enhancements - - - - - - - - -
12.22 SP-140526 Standardization of Machine-type Communications MCC Work Plan Manager Status of Standardization of Machine-type Communications OTHER Information Noted This contribution was noted
12.23 - (WLAN_NS) - WLAN Network Selection for 3GPP Terminals - - - - - - - - -
12.24 - (LTE_HRPD_SON) - LTE-HRPD (High Rate Packet Data in 3GPP2) inter-RAT SON - - - - - - - - -
12.25 - (CNO_ULI) - User Location Information reporting improvements - - - - - - - - -
12.25 SP-140421 4 CRs to 23.060, 23.203, 23.401 (CNO_ULI, Rel-12) SA WG2 23.060 CR1878R2; 23.203 CR0906R2; 23.203 CR0907R2; 23.401 CR2727R2 CR Pack Approval 23.203 CR0906R2 and 23.203 CR0907R2 were approved Revision of 23.060 CR1878R2 and 23.401 CR2727R2 proposed in SP-140490 23.203 CR0906R2 and 23.203 CR0907R2 were approved.
12.25 SP-140490 Updated CRs to 23.060 and 23.401 on 'Clarifications for PRA reporting' (CNO_ULI, Rel-12) Alcatel-Lucent, Huawei, HiSilicon 23.060 CR1878R3; 23.401 CR2727R3 CR Pack Approval Approved Proposed revision of 2 CRs in SP-140421 This CR Pack was approved
12.25 SP-140541 New WID Charging aspects of Core Network Overload – User Location Information reporting improvements SA WG5 Objective: The objective of this work item is to specify the charging aspects corresponding to the 'Presence Reporting Area' reporting functionality specified in TS 23.401, TS 23.060 and TS 23.203: - For PGW/TD [...]. WID Approval Approved This WID was approved
12.25 SP-140565 Rel-12 CRs on Charging aspects of Core Network Overload – User Location Information reporting improvements (CNO_ULI-CH) SA WG5 32.251 CR0378R1; 32.298 CR0470R1; 32.299 CR0596R1 CR Pack Approval Approved This CR Pack was approved
12.26 - (eSAMOG and FS_SAMOG) - S2a Mobility Based on Trusted WLAN access to EPC (including FS) - - - - - - - - -
12.26 SP-140422 1 CR to 23.402 (eSaMOG, Rel-12) SA WG2 23.402 CR1296R1 CR Pack Approval Approved This CR Pack was approved
12.26 SP-140592 Rel-12 CRs on Enhanced S2a Mobility Over trusted WLAN access to EPC (eSaMOG) SA WG3 33.402 CR0119R1 CR Pack Approval Revised SP-140636 The SA WG3 was asked to check the need for this off-line.
12.26 SP-140636 Rel-12 CRs on Enhanced S2a Mobility Over trusted WLAN access to EPC (eSaMOG) TSG SA 33.402 CR0119R1 CR Pack Approval Approved SP-140592 This CR Pack was approved
12.27 - (WORM and FS_WORM) - optimized offloading to WLAN in 3GPP RAT mobility (including FS) - - - - - - - - -
12.28 - (UTRA_LTE_WLAN_interw) - SA2 aspects of WLAN/3GPP Radio Interworking - - - - - - - - -
12.28 SP-140414 LS from SA WG2: Reply LS on WLAN/3GPP Radio Interworking SA WG2 SA WG2 would like to thank RAN WG2 for the LS (S2-142303/R2-142955) on WLAN/3GPP radio interworking. SA WG2 discussed the actions required from RAN WG2: Action 1: RAN WG2 kindly asks SA WG2/CT WG1 to include i [...]. LS In Information Noted S2-142943 This incoming LS was noted
12.28 SP-140423 1 CR to 23.402 (UTRA_LTE_WLAN_interw-Core, Rel-12) SA WG2 23.402 CR1306R1 CR Pack Approval Approved This CR Pack was approved
12.28 SP-140424 7 CRs to 23.060, 23.401, 23.402 (UTRA_LTE_WLAN_interw-SA2, Rel-12) SA WG2 23.060 CR1880; 23.060 CR1883R2; 23.401 CR2735R3; 23.402 CR1302R2; 23.402 CR1303R1; 23.402 CR1305R3; 23.402 CR1308R3 CR Pack Approval Approved This CR Pack was approved
12.29 - (NETLOC_TWAN) - Network Provided Location Information for IMS (TWAN case) - - - - - - - - -
12.30 - (UMONC and FS_UMONC) - Usage Monitoring Control PCC Enhancement (including FS) - - - - - - - - -
12.31 - (ABC and FS_ABC) - Application Based Charging (including FS) - - - - - - - - -
12.32 - (BusTI) - IMS Business Trunking for IP-PBX in Static Mode of Operation - - - - - - - - -
12.33 - (PWS_Sec) - Public Warning System Security - - - - - - - - -
12.33 SP-140583 TR 33.969: Security aspects of Public Warning System SA WG3 Abstract of document: TR 33.969 contains a study on security features and mechanisms for protection against false Base Stations broadcasting False Warning Notifications. Work done against Feature-level Work it [...]. TR Approval Approved This TR was approved and placed under Change control
12.34 - (eMEDIASEC) - IMS media plane security extensions (including FS_eMEDIASEC) - - - - - - - - -
12.34 SP-140587 Rel-12 CRs on Extended IMS media plane security features (eMEDIASEC) SA WG3 33.328 CR0061R1; 33.328 CR0062 CR Pack Approval Approved This CR Pack was approved
12.35 - (SSO_int and FS_SSO-int) - Service requirements for integration of Single Sign-On (SSO) frameworks with 3GPP networks (including FS phase) - - - - - - - - -
12.35 SP-140576 Revised WID: Study on Security aspects of Integration of Single Sign-On (SSO) frameworks with 3GPP networks SA WG3 Objective: The objective of this Study Item is to investigate the security aspects of the service requirements specified by SA WG1 in TS 22.101, clause 26, on the integration of SSO frameworks with 3GPP network [...]. WID Approval Approved This WID was approved
12.36 - (Web_GBA) - Security enhancements for usage of GBA from the browser - - - - - - - - -
12.37 - (SECAS) - Security Assurance Specification for 3GPP Network Products - - - - - - - - -
12.38 - (STAS) - Specification of the TUAK algorithm set - - - - - - - - -
12.39 - (TURAN) - Tunnelling of UE Services over Restrictive Access Networks - - - - - - - - -
12.40 - (CVO) - Co-ordination of Video Orientation - - - - - - - - -
12.41 - (HEVC) - High Efficiency Video Coding - - - - - - - - -
12.42 - (IMS_SDE) - IMS-based Streaming and Download Delivery Enhancements - - - - - - - - -
12.43 - (M3DV_Ext) - Mobile stereoscopic 3D services extensions - - - - - - - - -
12.44 - (ART_LTE) - Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - - - - - - - - -
12.44 SP-140470 Exception sheet for the WI ART_LTE SA WG4 Abstract of document: ART_LTE WI is divided in three building blocks. Two of the building blocks: ART_LTE-NBWB and ART_LTE-UED, related to acoustic and delay test methods and requirements for narrowband and wid [...]. Exception sheet Approval Approved This Exception sheet was approved
12.44 SP-140469 CRs to TS 26.131 and TS 26.132 on 'LTE UE delay requirements and test methods (ART_LTE-UED)' (Release 12) SA WG4 26.131 CR0062R1; 26.132 CR0070R1 CR Pack Approval Approved This CR Pack was approved
12.45 - (MI) - MBMS Improvements - - - - - - - - -
12.45 SP-140471 Exception sheet for the WI MI SA WG4 Abstract of document: In order to complete the MI-EMO Building Block WI, the Technical Report and the specification TS26.346 will be updated addressing the following issues: - Improve MBMS OTA efficiency by ref [...]. Exception sheet Approval Approved This Exception sheet was approved
12.45 SP-140472 CRs to TS 26.346 on 'Enhanced MBMS Operation (MI-EMO)' (Release 12) SA WG4 26.346 CR0383R4; 26.346 CR0419R2; 26.346 CR0424 CR Pack Approval Approved This CR Pack was approved
12.45 SP-140473 CRs to TS 26.346 on 'MBMS operation on Demand (MI-MooD)' (Release 12) SA WG4 26.346 CR0421R3; 26.346 CR0422R2; 26.346 CR0429R3 CR Pack Approval Approved This CR Pack was approved
12.46 - (VTRI) - Video Telephony Robustness Improvements - - - - - - - - -
12.46 SP-140478 CR to TS 26.114 on 'Video telephony robustness improvements (VTRI)' (Release 12) SA WG4 26.114 CR0287R1 CR Pack Approval Approved This CR Pack was approved
12.47 - (VCEIMP) - Video Coding Enhancements in IMS Messaging and Presence - - - - - - - - -
12.48 - (LI12) - Lawful Interception in Rel-12 - - - - - - - - -
12.48 SP-140586 Release 12 CRs on Lawful Interception (LI12) SA WG3 33.106 CR0133; 33.106 CR0134; 33.106 CR0135; 33.107 CR0150; 33.107 CR0151; 33.107 CR0152; 33.107 CR0153; 33.107 CR0154; 33.107 CR0157; 33.107 CR0158; 33.108 CR0228R1; 33.108 CR0229; 33.108 CR0232; 33.108 CR0233 [...]. CR Pack Approval Approved This CR Pack was approved
12.49 - (CH12) - Charging Management Rel-12 (including all building blocks and work tasks) - - - - - - - - -
12.49 SP-140563 Rel-12 CRs on Charging Management (CH12) Batch 1 SA WG5 32.240 CR0377R1; 32.251 CR0380R1; 32.251 CR0382R1; 32.260 CR0279; 32.296 CR0038R2; 32.297 CR0016R1; 32.298 CR0479R1; 32.298 CR0486R1; 32.298 CR0490; 32.298 CR0492R1; 32.299 CR0603R1; 32.299 CR0609R2; 32.298 CR0 [...]. CR Pack Approval Approved This CR Pack was approved
12.49 SP-140564 Rel-12 CRs on Charging Management (CH12) Batch 2 SA WG5 32.240 CR0376R1; 32.250 CR0040R1; 32.251 CR0379R1; 32.260 CR0271R1; 32.270 CR0027R1; 32.271 CR0014R1; 32.272 CR0034R1; 32.273 CR0027R1; 32.274 CR0029R1; 32.275 CR0057R1; 32.280 CR0028R1; 32.295 CR0008R1; 32.296 [...]. CR Pack Approval Approved This CR Pack was approved
12.49 SP-140566 Rel-12 CRs on Charging per IP - Connectivity Access Network (IP-CAN) Session (Stage 2/3) (CHIPS) SA WG5 32.251 CR0384 CR Pack Approval Approved This CR Pack was approved
12.50 - (OAM12) - OAM&P Rel-12 (including all building blocks and work tasks) - - - - - - - - -
12.50 SP-140544 Exception sheet for Alarm Quality Improvements SA WG5 Abstract of document: Exception sheet for Rel-12 Work Item Alarm quality improvements targeting implementation of recommendations from the Alarm Management study TR32.859, into existing Fault Management Standa [...]. Exception sheet Approval Approved This Exception sheet was approved
12.50 SP-140545 Exception sheet for OAM aspects of Network Sharing SA WG5 Abstract of document: New TS 32.130 identifies network sharing management scenarios and requirements. In addition, this Work Item provides updates to the specifications listed above for the support of OAM capab [...]. Exception sheet Approval Approved This Exception sheet was approved
12.50 SP-140546 Exception sheet for Radio Planning Tool (RPT) interface SA WG5 Abstract of document: The objective is to standardize the interface between a RPT and the applications using the site and antenna data held by the RPT. Focus is on the standardisation of the data (semantics and [...]. Exception sheet Approval Approved This Exception sheet was approved
12.50 SP-140535 Revised WID WLAN Management SA WG5 Objective: SA WG5 has studied the impacts on Type-2 interface in supporting WLAN that is documented in TR 32.841 'Study on WLAN management'. This work item is to accomplish the following objectives, by taking i [...]. WID Approval Approved This WID was approved
12.50 SP-140536 Revised Study on WLAN Management SA WG5 Objective: The objective for this study item is to: 1. Study WLAN impacts to Type-2 management WID Approval Approved This WID was approved
12.50 SP-140537 Revised WID Energy Efficiency related Performance Measurements SA WG5 Objective: For the use cases, requirements and/or global KPIs provided by ETSI TC EE related to energy efficiency, by cooperation with RAN WG2 and if needed with other 3GPP WGs, to - identify whether or not the [...]. WID Approval Revised SP-140612
12.50 SP-140612 Revised WID Energy Efficiency related Performance Measurements SA WG5 Objective: For the use cases, requirements and/or global KPIs provided by ETSI TC EE related to energy efficiency, by cooperation with RAN WG2 and if needed with other 3GPP WGs, to - identify whether or not the [...]. WID Approval Approved SP-140537 This WID was approved
12.50 SP-140538 Revised WID Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations SA WG5 Objective: The objectives of this WI are: - Record the detailed gap analysis already performed by SA WG5 - Identify for each requirement the work already done by SA WG5 (WIs, CRs, etc) - Discuss and agree on th [...]. WID Approval Approved This WID was approved
12.50 SP-140539 Revised WID Study on Compliance of 3GPP SA5 specifications to the NGMN Next Generation Converged Operations Requirements (NGCOR SA WG5 Objective: The objectives of this Study are: - Record the detailed gap analysis already performed by SA WG5; - Identify for each requirement the work already done by SA WG5 ; - Discuss and agree on the work rem [...]. WID Approval Approved This WID was approved
12.50 SP-140540 Revised WID Converged Management PM Interface definitions SA WG5 Objective: The work item will address (in that priority order): 1. Requirements, Service Level Agreement (SLA), business objectives to be worked in interaction with NGCOR project, 2. Measurement & KPI definitio [...]. WID Approval Revised SP-140613
12.50 SP-140613 Revised WID Converged Management PM Interface definitions SA WG5 Objective: The work item will address (in that priority order): 1. Requirements, Service Level Agreement (SLA), business objectives to be worked in interaction with NGCOR project, 2. Measurement & KPI definitio [...]. WID Approval Approved SP-140540 This WID was approved
12.50 SP-140542 Revised WID Network Management for 3GPP Interworking WLAN SA WG5 Objective: The objectives for this work item are to: - Specify NRM IRP requirements for EPC and non-3GPP access network interworking; - Specify NRMs for EPC and non-3GPP access network interworking including th [...]. WID Approval Approved This WID was approved
12.50 SP-140547 TS 28.402 on Network Management for 3GPP Interworking WLAN (PM part) SA WG5 Abstract of document: This document defines the Performance measurements for Evolved Packet Core (EPC) and non-3GPP access Interworking System. Work done against Feature-level Work item in SP-140542: UID 53005 [...]. TS Approval Approved This TS was approved and placed under Change control
12.50 SP-140548 TR 32.841 on WLAN impacts to Type-2 management interface to the 3GPP Network Manager SA WG5 Abstract of document: This document is intended to enable operators to use a 3GPP OAM system to monitor WLAN performance measurements and alarms that are essential to evaluate the performance of WLAN offloading [...]. TR Approval Approved This TR was approved and placed under Change control
12.50 SP-140552 TS 28.667 Radio Planning Tool Access (RPTA) IRP - Requirements SA WG5 Abstract of document: TS 28.667 specifies the Requirements for the Radio Planning Tool (RPT) Access (RPTA) Integration Reference Point (IRP). Work done against WT-level Work item in SP-140026: UID 630012 Title [...]. TS Information Noted This TS was noted. Companies are invited to review thisTS and send comments to SA WG5
12.50 SP-140553 TR 28.820 on FMC FNOM Umbrella Operation Model (UOM) SA WG5 Abstract of document: This TR is a result of the Multi-SDO JWG on Model Alignment which TSG SA WG5 (SA WG5) has developed jointly with TMF and NGMN, and it contains a generic Umbrella Operation Model for Fixed [...]. TR Approval Approved This TR was approved and placed under Change control
12.50 SP-140554 TS 32.130 on OAM aspects of Network Sharing - Concepts and high-level requirements SA WG5 Abstract of document: This document defines concepts and requirements for the OA&M of network sharing. Work done against Feature-level Work item in SP-130607: UID 620057 Title OAM aspects of network sharing Ac [...]. TS Information Noted This TS was noted. Companies are invited to review thisTS and send comments to SA WG5
12.50 SP-140555 TS 28.668 Radio Planning Tool Access (RPTA) IRP - Information Service (IS) SA WG5 Abstract of document: TS 28.668 specifies the Information Service (IS) for the Radio Planning Tool (RPT) Access (RPTA) Integration Reference Point (IRP). Work done against WT-level Work item in SP-140026: UID [...]. TS Information Noted This TS was noted. Companies are invited to review thisTS and send comments to SA WG5
12.50 SP-140560 Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) Batch 2 SA WG5 28.611 CR0004; 28.623 CR0005; 28.626 CR0003; 28.629 CR0006; 28.633 CR0003; 28.653 CR0007; 28.656 CR0005; 28.659 CR0009; 28.663 CR0004; 28.673 CR0003; 28.676 CR0003; 28.703 CR0004; 28.706 CR0003; 28.709 CR0003; [...]. CR Pack Approval Approved This CR Pack was approved
12.50 SP-140559 Rel-12 CRs on OAM Maintenance and small Enhancements (OAM12) Batch 1 SA WG5 32.111-6 CR0006; 32.126 CR0002; 32.306 CR0003; 32.316 CR0001; 32.326 CR0002; 32.336 CR0001; 32.346 CR0001; 32.356 CR0001; 32.366 CR0001; 32.376 CR0002; 32.386 CR0002; 32.396 CR0003; 32.416 CR0004; 32.446 CR0058 [...]. CR Pack Approval Approved This CR Pack was approved
12.50 SP-140571 Rel-12 CRs on Radio Planning Tool (RPT) interface (OAM-RPTi) SA WG5 32.101 CR0056; 32.101 CR0057 CR Pack Approval Approved This CR Pack was approved
12.50 SP-140614 Rel-12 CRs on Network Management for 3GPP Interworking WLAN (OAM-IWLAN) SA WG5 28.612 CR0001R1; 28.616 CR0002R1 CR Pack Approval Approved This CR Pack was approved
12.51 - (SEC12) - Small Security Enhancements for Rel-12 - - - - - - - - -
12.52 - (TEI12) - TEI Rel-12 - - - - - - - - -
12.52 SP-140494 Stage 1 CR on TEI12 for Deletion of UPCON Requirements for Release 12 SA WG1 22.101 CR0475 CR Pack Approval Approved This CR Pack was approved
12.52 SP-140497 Stage 1 CR on TEI12 for ME-generated supervisory tones for voice over IMS SA WG1 22.173 CR0099R1 CR Pack Approval Approved This CR Pack was approved
12.52 SP-140523 Stage 1 CRs on TEI12 for I-WLAN clean-up SA WG1 22.011 CR0204R1; 22.011 CR0205R1; 22.278 CR0209R1; 22.278 CR0210R1; 22.234 CR0032R2 CR Pack Approval Approved This CR Pack was approved
12.52 SP-140425 3 CRs to 23.139, 23.246, 23.272 (TEI12, earlier WI Codes, Rel-12) SA WG2 23.139 CR0045R1; 23.246 CR0384R1; 23.272 CR0938 CR Pack Approval Approved This CR Pack was approved
12.52 SP-140426 2 CRs to 23.234, 23.402 (TEI12, Rel-12) SA WG2 23.234 CR0172R2; 23.402 CR1300R1 CR Pack Approval Approved This CR Pack was approved
12.52 SP-140593 Rel-12 CRs on TEI (TEI12) SA WG3 33.203 CR0216R1; 33.203 CR0217R1; 33.203 CR0218R1; 33.234 CR0123; 33.310 CR0075R1; 33.310 CR0076R1; 33.310 CR0077R1; 33.310 CR0078; 33.310 CR0079; 33.320 CR0095R1 CR Pack Approval Approved This CR Pack was approved
12.52 SP-140476 CRs to TS 26.114 and TS 26.346 on 'Technical Enhancements and Improvements for Release 12 (TEI12)' (Release 12) SA WG4 26.114 CR0289R1; 26.346 CR0290R1; 26.346 CR0426R1 CR Pack Approval Approved This CR Pack was approved
12.53 - Any other Release 12 documents - - - - - - - - -
12.53 SP-140427 2 CRs to 23.401, 23.402 (GOCMe, Rel-12) SA WG2 23.401 CR2722R1; 23.402 CR1299R1 CR Pack Approval Approved This CR Pack was approved
12.53 SP-140590 Rel-12 CRs on E-UTRA Small cell enhancements - Physical layer aspects (LTE_SC_enh_L1) SA WG3 33.401 CR0526R1; 33.401 CR0532R1; 33.401 CR0535R1 CR Pack Approval Approved This CR Pack was approved
12.53 SP-140477 CR to TS 26.114 on 'Errors in the computation of b=AS for AMR and AMR-WB (M3A)' (Release 12) SA WG4 26.114 CR0288R1 CR Pack Approval Approved This CR Pack was approved
13 - Documents Related to Rel-13 and later Features - - - - - - - - -
13.1 - (SEES) - Service Exposure and Enablement Support - - - - - - - - -
13.1 SP-140411 LS from OMA: Liaison about OMA activities on NetAPIs and Service Exposure Framework OMA This liaison statement includes updated information about Open Mobile Alliance (OMA) activities related to Network APIs, announcing three new Work Items just approved, and seek for future collaboration. 3 Concl [...]. LS In Information Noted OMA-LS_1012-ARC_WG This incoming LS was noted
13.1 SP-140501 Stage 1 CRs on Service Exposure and Enablement Support (SEES) SA WG1 22.101 CR0473R5; 22.115 CR0073R5 CR Pack Approval Approved This CR Pack was approved
13.2 - (RSE and FS_RSE) - RAN Sharing Enhancements - - - - - - - - -
13.3 - (SRMMTC) - Service Requirements Maintenance for Machine-Type Communications - - - - - - - - -
13.4 - (MCPTT) - Mission Critical Push-to-Talk over LTE - - - - - - - - -
13.4 SP-140409 LS from TIA: TD SP-130727 - LS on Mission Critical Push To Talk over LTE TIA The TIA TR-8.8 Broadband Data Committee is pleased to receive the subject document from TSG SA. TR-8.8 has been recently working on project TIA-4973.211 Requirements for the Mission Critical Priority and QoS Co [...]. LS In Information Noted TR88-14-0033 This incoming LS was noted
13.4 SP-140503 TS 22.179 v.1.0.0 on Mission Critical Push To Talk over LTE (MCPTT) SA WG1 Abstract of document: The TS specifies the Stage 1 requirements for a Push to Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial uses (e [...]. TS Information Noted This TS was noted. Companies are invited to review thisTS and send comments to SA WG1
13.4 SP-140502 Exception Sheet for Mission Critical Push To Talk over LTE (MCPTT) SA WG1 Abstract of document: The TS specifies the stage 1 requirements for a Push to Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial uses (e [...]. Exception sheet Approval Approved This Exception sheet was approved
13.4 SP-140435 Updated WID: Update of MCPTT WID SA WG2 Objective: The SA WG1 objective is to specify the Stage 1 requirements for a Push To Talk functionality to support Mission Critical voice communication over LTE that can be used by public safety and commercial [...]. WID Approval Approved This WID was approved
13.5 - (SRM_GCSE_LTE) - Service Requirements Maintenance for Group Communication System Enablers for LTE - - - - - - - - -
13.5 SP-140589 Release 12 CRs on Group Communication System Enablers for LTE (GCSE_LTE) SA WG3 33.246 CR0178; 33.246 CR0179R1; 33.246 CR0180R1; 33.246 CR0181R1; 33.246 CR0182; 33.246 CR0184R1; 33.888 CR0001R1; 33.888 CR0002R1; 33.888 CR0003R1; 33.888 CR0004R1; 33.888 CR0005R1; 33.888 CR0006 CR Pack Approval Approved This CR Pack was approved
13.6 - (ePROSE, PROSE_EXT) - Enhancements to Proximity-based Services - - - - - - - - -
13.6 SP-140629 New WID: Study on Security for Proximity-based Services SA WG3 Objective: The purpose of this study item is consider the security aspects of Proximity Services and document possible security solutions that may later be added to normative specification under other work item [...]. WID Approval Approved SP-140575 This WID was approved
13.7 - (ACDC and FS_ACDC) - Application specific Congestion control for Data Communication (including FS phase) - - - - - - - - -
13.7 SP-140507 Stage 1 CR on Application specific Congestion control for Data Communication (ACDC) SA WG1 22.011 CR0206R2 CR Pack Approval Approved This CR Pack was approved
13.7 SP-140516 Stage 1 CRs on Application specific Congestion control for Data Communication (FS_ACDC) SA WG1 22.806 CR0002; 22.806 CR0001R2 CR Pack Approval Approved This CR Pack was approved
13.8 - (CSIPTO and FS_CSIPTO) - Co-ordinated P-GW change for SIPTO (including FS phase) - - - - - - - - -
13.8 SP-140508 Stage 1 CR on Co-ordinated P-GW change for SIPTO (CSIPTO) SA WG1 22.101 CR0476R4 CR Pack Approval Approved This CR Pack was approved
13.8 SP-140509 Revised WID on Co-ordinated P-GW change for SIPTO (CSIPTO) SA WG1 Objective: The SA WG1 objective is to define system requirements for coordinated selective IP traffic offload that minimises service disruption by taking into account UE's knowledge of the IP flow characteristi [...]. WID Approval Approved This WID was approved
13.9 - (VoE-UTRAN_PPD) - Voice over E-UTRAN Paging Policy Differentiation - - - - - - - - -
13.9 SP-140430 1 CR to 23.228 (voE_UTRAN_PPD, Rel-13) SA WG2 23.228 CR1073R3 CR Pack Approval Approved This CR Pack was approved
13.10 - (eWebRTCi) - Enhancements to WebRTC interoperability - - - - - - - - -
13.10 SP-140504 Stage 1 CR on Enhancements to WebRTC interoperability (eWebRTCi) SA WG1 22.228 CR0206R1 CR Pack Approval Approved This CR Pack was approved
13.10 SP-140505 Revised WID on Enhancements to WebRTC interoperability (eWebRTCi) SA WG1 Objective: SA WG1 objectives: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases origin [...]. WID Approval Merged into SP-140630 SP-140630
13.10 SP-140577 Revised WID: Enhancements to WEBRTC interoperability SA WG3 Objective SA WG1 objectives: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases original [...]. WID Approval Revised SP-140630 Revised into SP-140630
13.10 SP-140630 Revised WID on Enhancements to WebRTC interoperability (eWebRTCi) SA WG1, SA WG3 Objective: SA WG1 objectives: The objective of this work item is to specify service requirements to enhance interoperability with WebRTC IMS clients in the following areas: 1. Requirements and use cases origin [...]. WID Approval Approved SP-140505 This WID was approved
13.11 - (IOPS and FS_IOPS) - Isolated E-UTRAN Operation for Public Safety (including FS phase) - - - - - - - - -
13.11 SP-140506 TS 22.346 v.1.0.0 on Isolated E-UTRAN Operation for Public Safety (IOPS) for one-step approval SA WG1 Abstract of document: TS 22.346 addresses service requirements of Isolated E-UTRAN Operation for Public Safety (IOPS). Ensuring the continued ability of Public Safety users to communicate within mission critic [...]. TS Approval Approved This TS was approved and placed under Change control
13.12 - (UPCON) - User Plane Congestion Management - - - - - - - - -
13.12 SP-140434 Updated WID: Revised User Plane Congestion management WID SA WG2 Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. WID Approval Revised SP-140625 Revised to correct TD number on documents in SP-140625
13.12 SP-140625 Updated WID: Revised User Plane Congestion management WID SA WG2 Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. WID Approval Revised SP-140631 SP-140434
13.12 SP-140631 Updated WID: Revised User Plane Congestion management WID SA WG2 Objective: The SA WG1 objective is to specify normative stage 1 enhancements based on the requirements derived from the scenarios and use cases developed in FS_UPCON. These use cases addressed situations where [...]. WID Approval Approved SP-140625 This WID was approved
13.12 SP-140428 8 CRs to 23.002, 23.060, 23.203, 23.401 (UPCON, Rel-13) SA WG2 23.002 CR0277R2; 23.060 CR1879R3; 23.060 CR1882; 23.203 CR0896R2; 23.203 CR0897R2; 23.203 CR0899R2; 23.401 CR2728R2; 23.401 CR2733R2 CR Pack Approval Approved This CR Pack was approved
13.12 SP-140432 Presentation of 23.705 version 1.0.0: Study on system enhancements for user plane congestion management (Release 13) SA WG2 Abstract of document: TR 23.705 contains key issues' definition, solutions, evaluation and conclusion for RAN User Plane Congestion handling. Conclusion on normative standardization for solutions 1.5.5 Off-path [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG2
13.13 - (DRuMS) - Double Resource Reuse for Multiple Media Sessions - - - - - - - - -
13.13 SP-140431 2 CRs to 23.203, 23.228 (DRuMS, Rel-13) SA WG2 23.203 CR0908R2; 23.228 CR1084R2 CR Pack Approval Approved This CR Pack was approved
13.14 - (DÉCOR) - Dedicated Core Networks - - - - - - - - -
13.15 - (NB_IFOM) - IP Flow Mobility support for S2a and S2b Interfaces - - - - - - - - -
13.16 - (AESE) - Architecture Enhancements for Service Capability Exposure - - - - - - - - -
13.17 - (MONTE) - Monitoring Enhancements - - - - - - - - -
13.18 - (GROUPE) - Group based Enhancements - - - - - - - - -
13.19 - (eCSFB) - Enhanced CSFB - - - - - - - - -
13.19 SP-140579 Revised WID: Enhanced CSFB (Circuit Switched Fall Back) SA WG3 Objective: SA WG2 objectives: Investigate and describe how the CSFB procedures can be enhanced or improved for shortening CSFB call setup time (e.g., by reusing existing operations, it may be possible to enhanc [...]. WID Approval Approved This WID was approved
13.20 - (CSPS_coord) - Improvements to CS/PS coordination in UTRAN/GERAN Shared Networks - - - - - - - - -
13.21 - (E2EMTSI) - End-to-end MTSI extensions - - - - - - - - -
13.21 SP-140474 Revised WID on 'End-to-end Multimedia Telephony Service for IMS (MTSI) extensions' (E2EMTSI) SA WG4 Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. WID Approval Noted A company revision was provided in SP-140600.
13.21 SP-140594 Revised WID: End-to-end Multimedia Telephony Service for IMS (MTSI) extensions Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. WID Approval Revised SP-140600 Proposed replacement of SP-140474. Revised to include clean and Revision marked versions in SP-140600
13.21 SP-140600 Revised WID: End-to-end Multimedia Telephony Service for IMS (MTSI) extensions Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: End-to-end Fixed-Mobile interworking: - Extend the scope of TS 26.114 such that i [...]. WID Approval Approved SP-140594 Proposed replacement of SP-140474 This WID was approved
13.21 SP-140475 CR to TS 26.114 on 'Requirements for end-to-end video rate adaptation (E2EMTSI-S4)' (Release 12) SA WG4 26.114 CR0283R3 CR Pack Approval Noted A company contribution correcting this CR was provided in SP-140596. This was then noted.
13.21 SP-140596 CR 26.114-0283 rev 4 Requirements for End-to-end Video Rate Adaptation (Rel-12) Ericsson, Qualcomm Incorporated 26.114 CR0283R4 CR Pack Approval Approved Proposed revision of CR in SP-140475 This CR Pack was approved
13.22 - (ROI) - Video Enhancements by Region-of-Interest Information Signaling - - - - - - - - -
13.23 - (LI13) - Lawful Interception in Rel-13 - - - - - - - - -
13.23 SP-140578 Revised WID: Lawful Interception Rel-13 SA WG3 Objective: The objective of this work item is to enhance the 3GPP LI service to accommodate Release 13 service enhancements and extensions. Enhancements to specifications TS 33.106, TS 33.107 and TS 33.108 will [...]. WID Approval Approved This WID was approved
13.24 - (CH13) - Charging Management Rel-13 (including all building blocks and work tasks) - - - - - - - - -
13.25 - (OAM13) - OAM&P Rel-13 (including all building blocks and work tasks) - - - - - - - - -
13.26 - (SEC13) - Small Security Enhancements for Rel-13 - - - - - - - - -
13.27 - (TEI13) - TEI Rel-13 - - - - - - - - -
13.27 SP-140429 1 CR to 23.401 (TEI13, Rel-13) SA WG2 23.401 CR2723R1 CR Pack Approval Approved This CR Pack was approved
13.28 - Any other Release 13 documents - - - - - - - - -
14 - Documents related to current Study Items - - - - - - - - -
14.1 - (FS_MAPN) - Study on Need for multiple APNs - - - - - - - - -
14.2 - (FS_eICBD) - Study on Enhancements for infrastructure based data communication between devices - - - - - - - - -
14.2 SP-140517 TR 22.807 v.2.0.0 on Enhancements for infrastructure based data communication between devices (FS_eICBD) SA WG1 Abstract of document: In the study on enhancements for infrastructure based data communication between devices requirements four new service components were identified: - Dynamic assignment/revocation of global [...]. TR Approval Approved This TR was approved and placed under Change control
14.3 - (FS_FMSS) - Flexible Mobile Service Steering - - - - - - - - -
14.3 SP-140450 LS from CCSA TC5: LIAISON STATEMENT ON SAME (Softnet Arichtecture for Mobile) CCSA TC5 CCSA/TC5/WG9 has been working on the study of Softnet Arichtecture for Mobile(SAME) since July 2013. In the SAME study item three key issues are being discussed: on-demand network resource assigment, flexible s [...]. LS In Action Noted CCSA TC5 WG9 This incoming LS was noted
14.3 SP-140518 TR 22.808 v.2.0.0 on Flexible Mobile Service Steering (FS_FMSS) SA WG1 Abstract of document: In order to realize efficient and flexible mobile service steering in the operator deployed (S)Gi-LAN, the network operator uses information (e.g. user profile, network operator's policies [...]. TR Approval Approved This TR was approved and placed under Change control
14.3 SP-140511 New WID on Flexible Mobile Service Steering (FMSS) SA WG1 Objective: The objective is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the operator de [...]. WID Approval Revised SP-140632 NEC asked to be added as a supporting company for this WID.
14.3 SP-140632 New WID on Flexible Mobile Service Steering (FMSS) SA WG1 Objective: The objective is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the operator de [...]. WID Approval Revised SP-140638 SP-140511 Some editorial errors were made and this was revised in SP-14638
14.3 SP-140638 New WID on Flexible Mobile Service Steering (FMSS) SA WG1 Objective: The objective is to define service requirements to enable the 3GPP Core Network to define and modify traffic steering policies that will be used to select required service enablers of the operator de [...]. WID Approval Approved SP-140632 This WID was approved
14.3 SP-140510 Stage 1 CRs on Flexible Mobile Service Steering (FMSS) SA WG1 22.101 CR0479R1; 22.101 CR0478R3 CR Pack Approval Approved This CR Pack was approved
14.4 - (FS_MBSP) - Multimedia Broadcast Supplement for PWS - - - - - - - - -
14.4 SP-140519 TR 22.815 v.1.0.0 on Multimedia Broadcast Supplement for PWS (FS_MBSP) SA WG1 Abstract of document: The work on Public Warning System (PWS) within the 3GPP as standardised since 3GPP Release 9 has focused on delivering text-based warning notifications of limited content to the public at [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG1
14.5 - (FS_ECIP) - Enhanced Calling Information Presentation - - - - - - - - -
14.5 SP-140520 TR 22.810 v.2.0.0 on Enhanced Calling Information Presentation (FS_ECIP) SA WG1 Abstract of document: TR 22.810 contains use cases and identifies potential requirements for enhanced call information presentation. It concludes that the enhanced requirements introduced by ECIP be added to TS [...]. TR Approval Approved This TR was approved and placed under Change control
14.5 SP-140513 New WID on Enhanced Calling Information Presentation (ECIP) SA WG1 Objective: The objective of this work item is to update the stage 1 CAT and CRS specifications (TS 22.182 and TS 22.183 respectively) with the enhancements introduced in TR 22.810, which include: - Support of a [...]. WID Approval Approved This WID was approved
14.5 SP-140512 Stage 1 CRs on Enhanced Calling Information Presentation (ECIP) SA WG1 22.182 CR0023R3; 22.183 CR0002R3 CR Pack Approval Approved This CR Pack was approved
14.6 - (FS_GUSH) - RAN Sharing Enhancements on GERAN and UTRAN - - - - - - - - -
14.6 SP-140521 Stage 1 CRs on RAN Sharing Enhancements on GERAN and UTRAN (FS_GUSH) SA WG1 22.852 CR0013R1; 22.852 CR0014R1; 22.852 CR0015R1 CR Pack Approval Approved This CR Pack was approved
14.6 SP-140514 New WID on GERAN UTRAN Sharing Enhancements (GUSH) SA WG1 Objective: The objective of this work item is to standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the following topics: [...]. WID Approval Revised SP-140633
14.6 SP-140633 New WID on GERAN UTRAN Sharing Enhancements (GUSH) SA WG1 Objective: The objective of this work item is to standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the following topics: [...]. WID Approval Revised SP-140637 SP-140514 Some editorial errors were made and this was revised in SP-14637
14.6 SP-140637 New WID on GERAN UTRAN Sharing Enhancements (GUSH) SA WG1 Objective: The objective of this work item is to standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the following topics: [...]. WID Approval Approved SP-140633 This WID was approved
14.6 SP-140515 Exception Sheet for GERAN UTRAN Sharing Enhancements (GUSH) SA WG1 Abstract of document: This work will standardise means that complement existing system capabilities for sharing common 2G and 3G RAN resources. The work will take into account the topics itemised in the tasks l [...]. Exception sheet Approval Approved This Exception sheet was approved
14.7 - (FS_eULRS) - Study on Enhancements to User Location Reporting Support - - - - - - - - -
14.8 - (FS_CATS) - Study on Control of Applications when Third party Servers encounter difficulties - - - - - - - - -
14.9 - (FS_UC_SPOOF) - Service aspects for dealing with User Control over spoofed calls - - - - - - - - -
14.9 SP-140522 TR 22.898 v.1.0.0 on Service aspects for dealing with User Control over spoofed calls (FS_UC_SPOOF) SA WG1 Abstract of document: The TR studies new service capabilities and enhancements to existing service capabilities needed to allow the called party to control spoofed calls New service network capabilities and enh [...]. TR Information Noted This TR was noted. Companies are invited to review thisTR and send comments to SA WG1
14.10 - (FS_CNO) - Study on Core Network Overload solutions - - - - - - - - -
14.11 - (FS_SEEE) - Study on System Enhancements for Energy Efficiency - - - - - - - - -
14.12 - (FS_Fire) - Study on Firewall Traversal - - - - - - - - -
14.13 - (FS_SPOOF) - Study on Security on spoofed call detection and prevention - - - - - - - - -
14.13 SP-140581 TR 33.831: Study on Security on Spoofed Call Detection and Prevention SA WG3 Abstract of document: The TR 33.831 studies the means to identify calls with spoofed Calling Line Identification terminating in the CS domain. CLI spoofing ranges from harmless hoax to criminal activities like [...]. TR Approval Approved This TR was approved and placed under Change control
14.14 - (FS_SECAM) - Security Assurance Methodology for 3GPP Network Elements - - - - - - - - -
14.15 - (FS_SPI) - Study on Subscriber Privacy Impact in 3GPP - - - - - - - - -
14.16 - (FS_IS_DASH) - Study on Improved Support for Dynamic Adaptive Streaming over HTTP - - - - - - - - -
14.16 SP-140479 TR 26.938 Improved Support for Dynamic Adaptive Streaming over HTTP in 3GPP (FS_IS_DASH) (Release 12), v. 2.0.0 SA WG4 Abstract of document: 3GPP's Dynamic Adaptive Streaming over HTTP (DASH) specifications had been developed in Rel-9 and Rel-10 jointly with MPEG. The specification is available in TS 26.247. Experiences from in [...]. TR Approval Approved This TR was approved and placed under Change control
14.17 - (FS_SEATS) - Study on Enhanced Acoustic Test Specifications - - - - - - - - -
14.18 - (FS_HTML5) - Study on HTML5 for a New Presentation Layer in 3GPP Services - - - - - - - - -
14.18 SP-140480 TR 26.907 HTML5 for a new Presentation Layer in 3GPP Services (FS_HTML5) (Release 12), v. 2.0.0 SA WG4 Abstract of document: HTML5 was specified with the target of creating convergence among a wide range of interoperable browsers, which resulted from proprietary extensions of earlier HTML versions to fill identi [...]. TR Approval Approved This TR was approved and placed under Change control
14.19 - (FS_OAM_HetNet) - Study on management of Heterogeneous Networks - - - - - - - - -
14.20 - (FS_OAM_VIRNET) - Study on Network Management of Virtualized Networks - - - - - - - - -
14.20 SP-140439 LS from ETSI ISG NFV: Outgoing LS to TSG SA WG5 on Availability of the NFV ISG Management and Orchestration GS ETSI ISG NFV ETSI ISG NFV would like to inform TSG SA WG5 that the latest draft copy of the Management and Orchestration Group Specification, v061, is now openly available from the ETSI Portal at the following address; http [...]. LS In Information Noted NFV(14)000117 This incoming LS was noted
14.21 - (FS_ D-SON-OAM) - Study on Enhancements of OAM aspects of Distributed MLB SON function - - - - - - - - -
14.22 - (FS_OAM_AP_Itf-N) - Study on Application and Partitioning of Itf-N - - - - - - - - -
14.23 - (FS_SON-NM-CCO) - Study on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization - - - - - - - - -
14.23 SP-140549 TR 32.836 on Study on Enhanced Network Management (NM) centralized Coverage and Capacity Optimization SA WG5 Abstract of document: An NM centralized CCO function would help operators in reducing OPEX related to the maintenance and optimization of network coverage and capacity by automating these functions. An NM centr [...]. TR Approval Approved This TR was approved and placed under Change control
14.24 - (FS_REVOLTE_IMS_CH) - Charging aspects on Roaming End-to-end scenarios with VoLTE IMS and interconnecting networks - - - - - - - - -
15 - Proposed New WIDs (not part of an existing feature) - - - - - - - - -
15 SP-140436 New WID for SRVCC Enhancements for Transcoding Avoidance SA WG2 Objective: The objectives of this work item is to enhance the chances for an end-to-end transcoder free operation (TrFo) where possible, and/ or ensure that the proper CS radio resources are reserved for optima [...]. WID Approval Approved This WID was approved
15 SP-140481 New Work Item on 'TV video profile' (TVProf) SA WG4 Objective: The objective of this Work Item is to produce a technical specification which defines a limited set of operation points for TV services in order to enable a consistent service offering within 3GPP, b [...]. WID Approval Approved This WID was approved
15 SP-140482 New WID on 'Enhanced LTE UE delay test methods and requirements' (E_LTE_UED) SA WG4 Objective: The objective of this work item is to enhance the LTE UE delay test cases and requirements to cover at least the following issues: - Support of DTX in test equipment - Support of LTE radio optimizati [...]. WID Approval Approved This WID was approved
15 SP-140483 New WID on 'Media Handling Aspects of IMS-based Telepresence' (IMS_TELEP_S4) SA WG4 Objective: The objective of this Work Item is to specify the media handling aspects of IMS-based telepresence in 3GPP services. The study phase of the work item will investigate the following: - Media codecs ( [...]. WID Approval Approved This WID was approved
15 SP-140484 New WID on 'HTML5 Presentation Layer' (HTML5) SA WG4 Objective: The objectives of this work item have been derived from TR 26.907. The following aspects need to be addressed: - Define a common scene description solution using HTML5 - Specify the features and AP [...]. WID Approval Approved This WID was approved
15 SP-140485 New WID on 'Support of EVS in 3G Circuit-Switched Networks' (EVSoCS) SA WG4 Objective: On the service side, we propose 3GPP to start working on CS support of EVS over UTRAN (3G WCDMA). The objective of this Work Item is to enable users of 3G services to benefit from the enhanced user [...]. WID Approval Approved This WID was approved
15 SP-140486 New WID on 'Enhanced DASH' (eDASH) SA WG4 Objective: The objective of the work item is to address relevant enhancements for DASH-based services in 3GPP services and networks. The work item addresses normative aspects and operational guidelines to addre [...]. WID Approval Approved This WID was approved
15 SP-140487 New WID on 'SA4 part of QoS End-to-end Multimedia Telephony Service for IMS (MTSI) extensions' (QOSE2EMTSI-S4) SA WG4 Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: Improve end-to-end QoS handling by: Before starting normative work on QoS handli [...]. WID Approval Noted Proposed replacement in SP-140601 This WID was noted
15 SP-140595 New WID on QoS End-to-end Multimedia Telephony Service for IMS (MTSI) extensions Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: Improve end-to-end QoS handling by: Before starting normative work on QoS handlin [...]. WID Approval Revised SP-140601 Proposed replacement of SP-140487. Revised to include clean and Revision marked versions in SP-140601
15 SP-140601 New WID on QoS End-to-end Multimedia Telephony Service for IMS (MTSI) extensions Ericsson, ORANGE, Deutsche Telekom AG, TELECOM ITALIA S.p.A. Objective: The objective of this New Work Item is to extend TS 26.114 to cover for end-to-end media improvements. In particular: Improve end-to-end QoS handling by: Before starting normative work on QoS handlin [...]. WID Approval Approved SP-140595 Proposed replacement of SP-140487 This WID was approved
16 - Proposed New Study Items (SIDs) - - - - - - - - -
16 SP-140437 New Study WID on Optimizations to Support High Latency Communications SA WG2 Objective: The objective of this study item is to study possible enhancements that facilitate for applications to use 3GPP constrained devices over the 3GPP IP connectivity and being able to support large numbe [...]. WID Approval Revised SP-140635
16 SP-140635 New Study WID on Optimizations to Support High Latency Communications TSG SA Objective: The objective of this study item is to study possible enhancements that facilitate for applications to use 3GPP constrained devices over the 3GPP IP connectivity and being able to support large numbe [...]. WID Approval Approved SP-140437 This WID was approved
16 SP-140580 New WID: Study on IMS enhanced spoofed call prevention and detection SA WG3 Objective: The objective of this study is to evaluate the IETF STIR active drafts for use in 3GPP networks for spoofed call detection and make recommendations on what aspects of IETF STIR active drafts should b [...]. WID Approval Revised SP-140611
16 SP-140611 New WID: Study on IMS enhanced spoofed call prevention and detection SA WG3 Objective: The objective of this study is to evaluate the IETF STIR active drafts for use in 3GPP networks for spoofed call detection and make recommendations on what aspects of IETF STIR active drafts should b [...]. WID Approval Approved SP-140580 This WID was approved
17 - Project Management - - - - - - - - -
17.1 - Review of the work plan - - - - - - - - -
17.1 SP-140525 3GPP Work Plan review at Plenary #65 MCC Work Plan Manager - OTHER Presentation Revised SP-140641
17.1 SP-140641 3GPP Work Plan review at Plenary #65 MCC Work Plan Manager - OTHER Presentation Noted SP-140525 This contribution was noted
17.1 SP-140527 LTE for Public Safety (authority-to-authority) communications MCC Work Plan Manager Status of LTE for Public Safety (authority-to-authority) communications OTHER Information Noted This contribution was noted
17.1 SP-140530 3GPP_Carrier Aggregation for LTE MCC Work Plan Manager Status of Carrier Aggregation for LTE. OTHER Information Noted This contribution was noted
17.1 SP-140528 3GPP Rel-12_description MCC Work Plan Manager Latest Rel-12 description document OTHER Information Noted This contribution was noted
17.1 SP-140529 3GPP Rel-13_description MCC Work Plan Manager Latest Rel-13 description document OTHER Information Noted This contribution was noted
17.2 - Release contents and planning discussions - - - - - - - - -
17.2 SP-140443 Closure of early Releases MCC Specifications Manager This contribution proposes the closure of one or more of the earliest 3GPP Releases remaining open. Decisions on each candidate Release are sought from each TSG. OTHER Discussion Approved This proposal was approved and was agreed that all releases up to Release 7 are closed.
17.3 - Specification Status - - - - - - - - -
17.3 SP-140445 Correction of implementation error of 21.900 CR0045 MCC Specifications Manager 21.900 CR0047 CR Pack Approval Approved This CR Pack was approved
17.3 SP-140446 Encourage allocation of CR numbers at first sight (21.900 CR0043R2) MCC Specifications Manager 21.900 CR0043R2 CR Pack Approval Approved This CR Pack was approved
17.3 SP-140447 UML tool in 21.801 MCC Specifications Manager 21.801 CR0039R2 CR Pack Approval Approved This CR Pack was approved
18 - Project Support - - - - - - - - -
18.1 - Improvements to working methods - - - - - - - - -
18.2 - MCC Status Report - - - - - - - - -
18.2 SP-140444 Support Team report MCC Director Update of MCC activities Report Presentation Noted This Report was noted

Created: 2014-10-08 09:51     END OF LIST

Last Allocated Document: SP-140642