Tdoc List

2012-12-12 12:22

Tdoc Title Source Doc-type Doc-for Agenda Avail Treated Decision Wdrn Replaced-by Replaces
SP-120659 Draft agenda for TSG SA meeting #58 TSG SA Chairman Agenda Approval 2 Yes Yes The agenda was reviewed and approved. No
SP-120660 Draft Report of TSG SA meeting #57 TSG SA Secretary Report Approval 4.1 Yes Yes The draft report was reviewed and approved. The revision marks will be accepted and the report placed on the FTP server as version 1.0.0. No
SP-120661 The 3GPP system area in Rel-12 Qualcomm Presentation Presentation 5.1 Yes Yes Telefonica asked how long the lifetime of a phone was expected to be, if it could work on 2 AA batteries. Qualcomm explained that this was for MTC devices and would use much less power than a 'smart phone'. Qualcomm were thanked for this presentation, wh No
SP-120662 Draft agenda for TSG SA meeting #58 TSG SA Chairman Agenda Approval 99 No No WITHDRAWN Yes SP-120659
SP-120663 Public safety requirements for Release 12 US Department of Commerce Presentation Presentation 5.1 Yes Yes The US Department of Commerce were thanked for this presentation, which was noted. No
SP-120664 Network Enhancements for Better Customer Experience KDDI Presentation Presentation 5.1 Yes Yes Revised in SP-120900 No SP-120900
SP-120665 Rel-12 Priorities Deutsche Telekom Presentation Presentation 5.1 Yes Yes Alcatel-Lucent asked whether the proximity services were intended for commercial use and asked whether some priority should be given to certain PCC BBs. Deutsche Telekom clarified that the commercial issues are concentrated upon and benefits can be seen No
SP-120666 Areas of Focus for Release 12 AT&T Presentation Presentation 5.1 Yes Yes Alcatel-Lucent commented that many companies are interested in MTC and P4C and it is becoming clear that not all work in these Work Items is achievable in Rel-12. Juniper also commented that they have a presentation suggesting a subset of these to focus No
SP-120667 Samsung's View on Release 12 Items Samsung Electronics Presentation Presentation 5.1 Yes Yes KDDI asked for slide other Work Items can be included as new market items but noted that these are not in the prioritized list. Samsung were thanked for this presentation, which was noted. No
SP-120668 Enhanced Policy Control and Charging for Rel-12 Allot Communications, China Telecom, NTT DOCOMO, Tekelec, Openet, Movik Networks, Comverse, Sandvine, IAESI Presentation Presentation 5.1 Yes Yes It was clarified that slide 9 presents PCC-related work which is considered important, but does not suggest this is the whole Scope of Rel-12. Allot Communications, China Telecom, NTT DOCOMO, Tekelec, Openet, Movik Networks, Comverse, Sandvine and IAESI No
SP-120669 Shaping LTE to address the needs of the Public Safety community General Dynamics Broadband Presentation Presentation 5.1 Yes Yes T-Mobile asked why Application Servers are outside of 3GPP, as IMS is in 3GPP. It was explained that the internal working of the application server is not specified by 3GPP. General Dynamics Broadband were thanked for this presentation, which was noted. No
SP-120670 Rel-12 Focus areas Intel Presentation Presentation 5.1 Yes Yes Revised in SP-120687 No SP-120687
SP-120671 LGE's view on the focusing areas in Release 12 LG Electronics Presentation Presentation 5.1 Yes Yes LG Electronics were thanked for this presentation, which was noted. No
SP-120672 Verizon View on Priorities for Release 12 (SA and CT) Verizon Presentation Presentation 5.1 Yes Yes Intel commented that 3GPP needs to facilitate web-based application development in the specifications. Verizon were thanked for this presentation, which was noted. No
SP-120673 Focus Areas for Release 12 Nokia Siemens Networks, Nokia Presentation Presentation 5.1 Yes Yes Nokia Siemens Networks and Nokia were thanked for this presentation, which was noted. No
SP-120674 Requirements, potential solution approaches and technologies for Rel-12 Cygnus Broadband Presentation Presentation 5.1 Yes Yes Cygnus Broadband were not available to present this, but it was recognised that other presentations covered the same topics and the presentation was noted. No
SP-120675 Focus areas for 3GPP Rel-12 SOFTBANK MOBILE Corp. Presentation Presentation 5.1 Yes Yes SOFTBANK MOBILE Corp. were thanked for this presentation, which was noted. No
SP-120676 Release 12 content prioritization TeliaSonera Presentation Presentation 5.1 Yes Yes TeliaSonera were thanked for this presentation, which was noted. No
SP-120677 Rel-12 prioritization Telecom Italia Presentation Presentation 5.1 Yes Yes Alcatel-Lucent asked whether the MTC was focussed on all BBs or only congestion avoidance, Telecom Italia clarified that all activities are important for handling data and signalling growth. Verizon commented that the other P4C BBs in SP-120679 were not No
SP-120678 Rel-12: Areas of focus Alcatel-lucent Presentation Presentation 5.1 Yes Yes Formatting error: Revised in SP-120896 No SP-120896
SP-120679 3GPP Release 12 Prioritisation Telecom Italia, Telefonica, Deutsche Telekom, Orange Presentation Presentation 5.1 Yes Yes RIM asked if the Release planning improvements suggested in Slide 9 could be achieved by improving the SA WG1 requirements work, which often are more detailed than expected. SA WG2 Chairman commented that they are sometimes not detailed enough, but agree No
SP-120680 Key Work and Study Items for 3GPP Release 12 Vodafone, China Mobile, Ericsson, Huawei, Qualcomm OTHER Presentation 5.1 Yes Yes Vodafone, China Mobile, Ericsson, Huawei and Qualcomm were thanked for this contribution, which was noted. No
SP-120681 The Cost-Efficient Traffic Adaptable System NTT DOCOMO Presentation Presentation 5.1 Yes Yes Revised in SP-120882 No SP-120882
SP-120682 NEC's View on challenges and Technologies for Rel-12 NEC Presentation Presentation 5.1 Yes Yes Alcatel-Lucent asked why SaMOG is not promoted as a priority and . NEC clarified that SaMOG is important but felt that LIMONET is most important. NEC were thanked for this presentation, which was noted. No
SP-120683 3GPP Rel-12 Prioritization: Public Safety & Mission Critical communications Telefonica, Telecom Italia, Orange Presentation Presentation 5.1 Yes Yes Verizon commented that ProSe work has not yet started in SA WG2 and due to the overload of SA WG2, prioritization of work is needed. Telecom Italia agreed and added that the Public Safety work was a good opportunity for LTE use. Telefonica commented that No
SP-120684 Release 12 Priorities Huawei Presentation Presentation 5.1 Yes Yes It was clarified that the WLAN Security is an SA WG3 Work Item in cooperation with SA WG2. Huawei were thanked for this presentation, which was noted. No
SP-120685 TSG SA Release 12 content prioritization Ericsson Presentation Presentation 5.1 Yes Yes Revised in SP-120688 No SP-120688
SP-120686 Key objectives in TSG SA for Rel-12 Research In Motion UK Ltd. Presentation Presentation 5.1 Yes Yes Orange asked how inter-QoS and SDO coordination improvements are expected to be achieved. Research In Motion suggested that inter-SDO cooperation needs to be leveraged to focus on these issues. It was clarified that the Security requirement referred to c No
SP-120687 Rel-12 Focus areas Intel Presentation Presentation 5.1 Yes Yes Intel were thanked for this presentation, which was noted. No SP-120670
SP-120688 TSG SA Release 12 content prioritization Ericsson Presentation Presentation 5.1 Yes Yes Ericsson clarified that they would also like to complete the technical work on the prioritized items for Rel-12. Ericsson were thanked for this presentation, which was noted. No SP-120685
SP-120689 High Priority Work and Study Items for 3GPP Release 12 Juniper Networks OTHER Discussion 5.1 Yes Yes This was provided for background information to the presentation in SP-120690 and was noted. No
SP-120690 JUSTIFICATION FOR RELEASE 12 PRIORITIZATION Juniper Networks Presentation Presentation 5.1 Yes Yes Juniper Networks were thanked for this presentation, which was noted. No
SP-120691 LS from the Broadband Forum: Answer to 3GPP liaison S2-122623 (bbf2012.691.00) on 3GPP BBAI status updates and assumptions Broadband Forum LS In Information 11.5 Yes Yes This LS was reviewed and noted. No
SP-120692 LS from CT WG1: LS on IMS service level trace removal of feature from old releases CT WG1 LS In Action 7.7 Yes Yes Noted. This LS was reviewed and noted. The reply from TSG CT in SP-120906 was reviewed. No
SP-120693 LS from Global ICT Standardisation Forum for India (GISFI): Liaison statement on GISFI Indian network security related standardization activity Global ICT Standardisation Forum for India (GISFI) LS In Information 13.26 Yes Yes This LS was reviewed and noted. No
SP-120694 LS from ETSI TC Human Factors: LS to 3GPP on possible feedback on M376 deliverables ETSI TC Human Factors LS In Action 6 Yes Yes Action deadline was 05/11/2012. Motorola Mobility commented that this was provided to make companies aware of the public procurement issues, This was then noted. No
SP-120695 LS from TCCA CCBG System Architecture Group: General Architecture Considerations for Critical Communication Systems TCCA CCBG System Architecture Group LS In Information 12.9 Yes Yes This LS was reviewed and noted. No
SP-120696 LS from RAN WG2: Reply LS on Cooperation for Energy Efficiency Measurement RAN WG2 LS In Information 13.11 Yes Yes This LS was noted. No
SP-120697 LS from RAN WG3: LS on Stage 3 change for broadband access network interworking RAN WG3 LS In Information 11.5 Yes Yes This LS was reviewed and noted. No
SP-120698 LS from RAN WG3: Support for Broadband Forum Accesses Interworking RAN WG3 LS In Action 11.5 Yes Yes This LS was reviewed and noted. No
SP-120699 LS from SA WG1: LS on OMA M2M device classification SA WG1 LS In Information 12.18 Yes Yes Noted No
SP-120700 LS from SA WG1: LS on Progression of normative ProSe work SA WG1 LS In Information 13.23 Yes Yes This LS was reviewed and noted. No
SP-120701 LS from SA WG3: Reply LS on SA WG3 eMBMS changes impacting CT WG6 SA WG3 LS In Information 9 Yes Yes This LS was noted. No
SP-120702 LS from SA WG3: Integration of Web GBA with Crypto API SA WG3 LS In Information 12.31 Yes Yes This LS was reviewed and noted. No
SP-120703 LS from SA WG3: Reply LS on Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 SA WG3 LS In Action 12.31 Yes Yes Nokia commented that SA WG3 had taken a different approach to this Liaison than other WGs and asked how this should be handled by TSG SA. It was considered useful to consider this information for sending to the GSMA. The SA WG3 Chairman explained that so No
SP-120704 LS from SA WG5: LS on modification of term '3G' in SA WG5 specifications SA WG5 LS In Information 12.30 Yes Yes Noted No
SP-120705 LS from SA WG5: LS on Cooperation for Energy Efficiency Measurement SA WG5 LS In Information 13.11 Yes Yes Noted. Nokia suggested that SA WG5 try again to have an effective correspondence with ETSI EE as there was little that can be done by TSG SA at present. Orange suggested informing ETSI EE of the work done by SA WG5. The SA WG5 Chairman reported that they No
SP-120706 LS from ITU-R WP 5D: LIAISON STATEMENT TO EXTERNAL ORGANIZATIONS INVITATION TO INPUT MATERIAL FOR DEVELOPMENT OF WORKING DOCUMENT TOWARD A PRELIMINARY DRAFT NEW REPORT ON THE USE OF IMT FOR BROADBAND PPDR APPLICATIONS ITU-R WP 5D LS In Action 7.6 Yes Yes Postponed SP-120461 from TSG SA#57. This LS was reviewed and noted. No
SP-120707 LS from TIA TR-45.8: Response to Availability of civic alerting function of 3GPP/3GPP2 terminal at roaming TIA TR-45.8 LS In Information 6 Yes Yes This LS was reviewed and noted. No
SP-120708 LS from SA WG2: LS on Clarification on authentication and policy control procedures for 3GPP UE roaming in BBF domain SA WG2 LS In Information 11.5 Yes Yes This LS was reviewed and noted. No
SP-120709 SA WG2 Status Report at TSG SA#58 SA WG2 Chairman Report Presentation 7.2 Yes Yes The SA WG2 Chairman was thanked for this report, which was noted. No
SP-120710 16 Rel-8 and mirror CRs to 23.060, 23.221, 23.251 and 23.401 (SAES) SA WG2 CR Pack Approval 8.5 Yes Yes Approved No
SP-120711 3 Rel-9 and mirror CRs to 23.271 (LCS_LTE_EPS) SA WG2 CR Pack Approval 9 Yes Yes Approved. Linked to RAN WG2: TS 36.305 CRs 0047/0048/0049 and CT WG4: TS 29.171 (No CRs available) No
SP-120712 1 Rel-9 (only) CR to 23.237 (IMS_SCC-SPI) SA WG2 CR Pack Approval 9 Yes Yes Approved No
SP-120713 12 Rel-9 and mirror CRs to 23.167, 23.272, 23.401 (TEI9; TEI9, SRVCC) SA WG2 CR Pack Approval 9 Yes Yes Approved No
SP-120714 11 Rel-10 (and mirror) CRs to 23.002, 23.216, 23.237 (TEI10) SA WG2 CR Pack Approval 10.25 Yes Yes Approved No
SP-120715 8 Rel-10 (and mirror) CRs to 23.060, 23.237, 23.401 (TEI10; TEI10, SAES; TEI10, IMS_SCC-SPI) SA WG2 CR Pack Approval 10.25 Yes Yes Approved. Note for 23.401 CR2477R4: Rel-11 changes are slightly different and are contained in 23.401 CR2478R3 under TEI11 (SP-120726). No
SP-120716 1 Rel-11 CR to 23.203 (QoS_SSL) SA WG2 CR Pack Approval 11.3 Yes Yes Approved No
SP-120717 12 Rel-11 CRs to 23.060, 23.401, 23.204, 23.228. 23.272, 23.682 (SIMTC, SIMTC-Reach) SA WG2 CR Pack Approval 11.4 Yes Yes Approved No
SP-120718 1 Rel-11 CR to 23.139 (BBAI) SA WG2 CR Pack Approval 11.5 Yes Yes Revised version proposed in SP-120755. This CR was therefore considered as revised in SP-120755. No
SP-120719 1 Rel-11 CR to 23.401 (NWK-PL2IMS) SA WG2 CR Pack Approval 11.8 Yes Yes Approved No
SP-120720 3 Rel-11 CRs to 23.203 (SAPP) SA WG2 CR Pack Approval 11.11 Yes Yes Approved No
SP-120721 1 Rel-11 CR to 23.060 (SIRIG) SA WG2 CR Pack Approval 11.17 Yes Yes Approved No
SP-120722 4 Rel-11 CRs to 23.272, 23.251 (FULL_MOCN-GERAN; FULL_MOCN-GERAN, FULL_MOCN-GERAN, FULL_MOCN-GERAN-GWCN) SA WG2 CR Pack Approval 11.18 Yes Yes 23.272 CR0810R6; 23.251 CR0077R5; 23.251 CR0080R3 were approved. 23.251 CR0067R7 was noted. No
SP-120723 3 Rel-11 CRs to 23.402 (SaMOG_WLAN) SA WG2 CR Pack Approval 11.19 Yes Yes Approved No
SP-120724 2 Rel-11 CRs to 23.216 and 23.251 (rSRVCC) SA WG2 CR Pack Approval 11.20 Yes Yes Approved No
SP-120725 2 Rel-11 CRs to 23.228 (RAVEL) SA WG2 CR Pack Approval 11.21 Yes Yes Approved No
SP-120726 13 Rel-11 CRs to various specifications (TEI11; TEI11, SAES; TEI11, NIMTC; TEI-11, LCS_LTE-NBPS) SA WG2 CR Pack Approval 11.34 Yes Yes Approved No
SP-120727 1 Rel-12 CR to 23.204 (SMSMI) SA WG2 CR Pack Approval 12.17 Yes Yes Approved No
SP-120728 5 Rel-12 CRs to 23.237, 23.292 (TEI12) SA WG2 CR Pack Approval 12.32 Yes Yes Approved No
SP-120729 Presentation of TR 23.862 version 1.0.0: 'EPC enhancements to Support Interworking with Data Application Providers (MOSAP); Stage 2 (Release 12)' for Information SA WG2 TR Information 12.4 Yes Yes Noted. RIM asked that the hanging paragraphs are removed during the development of this TR. This draft TR was presented for information and was noted. Members were asked to provide any comments and update proposals to SA WG2. No
SP-120730 Presentation of TR 23.853 version 1.0.0: 'Operator Policies for IP Interface Selection (OPIIS); (Release 12)' for Approval SA WG2 TR Approval 12.15 Yes Yes This TR was approved and placed under TSG SA change control (Release 12). No
SP-120731 Presentation of TR 23.863 version 2.0.0: 'Support of Short Message Service (SMS) in IMS without MSISDN; Stage 2 (Release 12)' for Approval SA WG2 TR Approval 12.17 Yes Yes This TR was approved and placed under TSG SA change control (Release 12). No
SP-120732 Presentation of TR 23.897 version 1.0.0: 'Feasibility study on IMS Business Trunking for IP-PBX in Static Mode of Operation (Release 12)' for Information SA WG2 TR Information 12.20 Yes Yes Noted No
SP-120733 Presentation of TR 23.800 version 1.0.0: 'Study on Application Based Charging; Stage 2 (Release 12)' for Information SA WG2 TR Information 13.20 Yes Yes Noted No
SP-120734 Presentation of TR 23.858 version 1.0.0: 'Usage Monitoring Control PCC Enhancement; (Release 12)' for Information SA WG2 TR Information 13.22 Yes Yes Noted No
SP-120735 Updated WID: 'IMS registration control (IMS_RegCon)' SA WG2 WID Approval 12.11 Yes Yes Approved No
SP-120736 Updated WID: 'User plane congestion management requirements (UPCON)' SA WG2 WID Approval 12.12 Yes Yes Proposed Update provided in SP-120890. This was then noted. No
SP-120737 Updated WID: 'LIPA Mobility and SIPTO at the Local Network (LIMONET)' SA WG2 WID Approval 12.14 Yes Yes The supporting companies needed confirmation. Nokia commented that there had been expectations of reducing the Scope of WIDs in SA WG2 and asked what the advantage of expanding the Scope in this way was. TeliaSonera agreed and asked to be removed as a su No
SP-120738 Updated WID: 'Operator Policies for IP Interface selection (OPIIS)' SA WG2 WID Approval 12.15 Yes Yes Approved No
SP-120739 Updated WID: 'IMS Business Trunking for IP-PBX in Static Mode of Operation (BusTI)' SA WG2 WID Approval 12.20 Yes Yes Noted. Proposed update in SP-120862 No
SP-120740 Updated Study WID: 'Study of IP Flow Mobility support for S2a and S2b Interfaces (FS_NBIFOM)' (S2 124793) SA WG2 WID Approval 13.19 Yes Yes Merged Update in SP-120742. This was noted. No
SP-120741 Updated Study WID: 'Study of IP Flow Mobility support for S2a and S2b Interfaces (FS_NBIFOM)' (S2 124868) SA WG2 WID Approval 13.19 Yes Yes Merged Update in SP-120742. This was noted. No
SP-120742 Updated Study WID: 'Study of IP Flow Mobility support for S2a and S2b Interfaces (FS_NBIFOM)' (merged updates) SA WG2 Chairman, MCC WID Approval 13.19 Yes Yes Approved. Merged Update of SP-120740 and SP-120741 No
SP-120743 New WID: 'Proximity-based Services ' SA WG2 WID Approval 13.23 Yes Yes It was clarified that this updates the WID provided by SA WG1 in SP-120883. There was some confusion over the intention of the changes. RIM suggested creating separate SA WG1 and SA WG2 WIDs for this. Vodafone asked why the objectives state that TR study No
SP-120744 New Study WID: 'Providing control of inbound/outbound Connections when a firewall or NAT is deployed in the PLMN ' SA WG2 WID Approval 15 Yes Yes Proposed update in SP-120887. This was therefore considered as revised in SP-120887. No
SP-120745 3GPP Work Plan review at Plenary #58 MCC Work Plan Manager Work plan Presentation 16.1 Yes Yes The MCC Work Plan manager was thanked for this report, which was noted. No
SP-120746 3GPP Releases Descriptions - Rel-11 to Rel-12 MCC Work Plan Manager OTHER Information 16.1 Yes Yes The MCC Work Plan manager was thanked for this report, which was noted. No
SP-120747 Standardization of Machine-type Communications MCC Work Plan Manager OTHER Presentation 12.18 Yes Yes The MCC Work Plan manager was thanked for this report, which was noted. No
SP-120748 Next steps for Rel-12 project management TSG SA Chairman Presentation Decision 5 Yes Yes China Mobile asked when the process would be applied. It was clarified that commitments will be made at TSG SA#59 and new Work Items from then will need to include resource budgets. Slide 5: T-Mobile asked whether the future Release planning would be don No
SP-120749 Summary and conclusions on strategic areas for Rel-12 TSG SA Chairman OTHER Decision 5.1 Yes Yes This was revised to take comments and agreed additional Work items into account in SP-120915 No
SP-120750 LS from CT WG6: Reply LS on SA WG3 eMBMS changes CT WG6 LS In Action 9 Yes Yes This LS was noted. No
SP-120751 LS from GERAN WG2: Response LS on reporting the UE E-UTRAN Capabilities for rSRVCC from GERAN to E-UTRAN GERAN WG2 LS In Information 11.20 Yes Yes This LS was reviewed and noted. No
SP-120752 Background on Revised CR to TS 22.101 and revised CR to TR 22.805 for UPCON KDDI, NTT DOCOMO, AT&T, Orange, SoftBank Mobile, Qualcomm Incorporated, NEC, Intel, Allot Communications, Movik Networks, InterDigital Communications, Cisco, Samsung, Huawei, Research in Motion Contribution Discussion 12.12 Yes Yes Revised in SP-120918 No SP-120918
SP-120753 Revision of CR0434R2 to TS 22.101: Addition of UPCON Requirements KDDI, NTT DOCOMO, Research in Motion, NEC, Allot Communications, Juniper Networks, SoftBank Mobile, Harris Corporation, InterDigital Communications, Bell Canada, AT&T, ETRI, Qualcomm Incorporated, Chunghwa Telecom, ITRI, Orange, Intel, Movik Networks, Cis CR Pack Approval 12.12 Yes Yes Revised in SP-120919 No SP-120919
SP-120754 Revision of CR0001R3 to TR 22.805: Update of Consolidated Requirements; Addition of Use Case to Requirements Traceability Annex KDDI CR Pack Approval 12.12 Yes Yes Revised in SP-120920 No SP-120920
SP-120755 Update to 23.139 CR0032R1: Correction to UE reflective QoS notification Qualcomm, Ericsson, ST-Ericsson CR Pack Approval 11.5 Yes Yes Approved. Revision of CR in SP-120718 No
SP-120756 SA WG4 Status Report at TSG SA#58 SA WG4 Chairman Report Presentation 7.4 Yes Yes The SA WG4 Chairman was thanked for this report, which was noted. No
SP-120757 CRs to TS 26.346 on 'PSS and MBMS Aspects (PMA-MBS_Ext)' (Release 9 until Release 11) SA WG4 CR Pack Approval 9 Yes Yes Approved No
SP-120758 CRs to TS 26.237 on 'Correction of nBookmark XML Schema (TEI9)' (Release 9 and Release 10) SA WG4 CR Pack Approval 9 Yes Yes Approved No
SP-120759 CR to TS 26.346 on 'Addition to the feature tag table (MBS_Enh)' (Release 10) SA WG4 CR Pack Approval 10.18 Yes Yes Approved No
SP-120760 CRs to TS 26.131 and TS 26.132 on 'Extensions of Acoustic Test Specifications in TS 26.131 and TS 26.132 (Ext_ATS)' (Release 11) SA WG4 CR Pack Approval 11.26 Yes Yes Approved No
SP-120761 CRs to TS 26.247, TS 26.346 and TR 26.946 on 'Enhancements to Multimedia: PSS, MMS, and MBMS Enhancements and Performance Improvements; Download Delivery Enhancements for MBMS (EMM-DDE)' (Release 11) SA WG4 CR Pack Approval 11.27 Yes Yes Approved No
SP-120762 TR 26.951 Enhancements to Multimedia (EMM): EMM, DDE and IPME Aspects (Release 11) v. 2.0.0 SA WG4 TR Approval 11.27 Yes Yes Approved as 26.851. No
SP-120763 Rel-11 Work Item Exception sheet for EMM-EFEC (Enhancement to FEC for MBMS) SA WG4 Exception Sheet Approval 11.27 Yes Yes It was commented that this work had been delayed for some time in SA WG4. It was clarified that TSG SA had agreed for SA WG4 to try to resolve this by voting at their next meeting, so this time is needed to complete if the issue is resolved. This excepti No
SP-120764 CR to TS 26.346 on 'MBMS UE UTC Time Synchronization (TEI11)' (Release 11) SA WG4 CR Pack Approval 11.34 Yes Yes Approved No
SP-120765 CR to TS 26.114 on 'Coordination of Video Orientation (CVO)' (Release 12) SA WG4 CR Pack Approval 12.26 Yes Yes Approved No
SP-120766 CR to TS 26.267 on 'Clarification on switching IVS to robust modulator mode (TEI12)' (Release 12) SA WG4 CR Pack Approval 12.32 Yes Yes Approved No
SP-120767 New Work Item Description on 'IMS-based Streaming and Download Delivery Enhancements' (IMS_SDE) (Feature) SA WG4 WID Approval 14 Yes Yes Approved No
SP-120768 New Work Item Description on 'Mobile stereoscopic 3D services extensions' (M3DV_Ext) (Feature) SA WG4 WID Approval 14 Yes Yes Approved No
SP-120769 New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE' (ART_LTE) (Feature) SA WG4 WID Approval 14 Yes Yes Approved No
SP-120770 New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - UE Delay aspects' (ART_LTE-UED) (BB) SA WG4 WID Approval 14 Yes Yes Approved No
SP-120771 New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - NarrowBand and WideBand aspects' (ART_LTE-NBWB) (BB) SA WG4 WID Approval 14 Yes Yes Approved No
SP-120772 New Work Item Description on 'Acoustic Requirements and Test methods for IMS-based conversational speech services over LTE - Super wideband and fullband aspects' (ART_LTE-SUPER) (BB) SA WG4 WID Approval 14 Yes Yes Approved No
SP-120773 SA WG5 Status Report SA WG5 Chairman Report Presentation 7.5 Yes Yes The SA WG5 Chairman was thanked for this report, which was noted. No
SP-120774 New WID Study on Alarm Management SA WG5 WID Approval 15 Yes Yes Approved No
SP-120775 New WID Short Message Service - Service Center (SMS-SC) Offline Charging SA WG5 WID Approval 12.29 Yes Yes Approved No
SP-120776 Revised WID Management for Carrier Aggregation for LTE SA WG5 WID Approval 11.32 Yes Yes Approved No
SP-120777 Revised WID Multi-vendor plug and play and Play eNB connection to the network SA WG5 WID Approval 12.30 Yes Yes Approved No
SP-120778 Revised WID 3GPP Fault Management Solution Profile for NGMN Next Generation Converged Operations Requirements (NGCOR) SA WG5 WID Approval 12.30 Yes Yes Approved No
SP-120779 Revised WID Network Management for 3GPP Interworking WLAN SA WG5 WID Approval 12.30 Yes Yes Approved No
SP-120780 WI Exception for LTE Self-Organizing Networks (SON) coordination management (OAM-SON-LTE_COORD) SA WG5 Exception sheet Approval 11.32 Yes Yes NEC commented that this extension was mainly requested in order to have a vote in SA WG5 and this work is self-contained and will not impact other work completion and suggested it is moved to Rel 12 instead of voting for Rel 11. Nokia Siemens Networks co No
SP-120781 WI Exception for IRP framework enhancements to support Management of Converged Networks SA WG5 Exception sheet Approval 11.32 Yes Yes This exception request was approved. No
SP-120782 Rel-10 CRs on OAM Maintenance and small Enhancements (OAM10) SA WG5 CR Pack Approval 10.24 Yes Yes Approved No
SP-120783 Rel-11 CRs on OAM Maintenance and small Enhancements (OAM11) SA WG5 CR Pack Approval 11.32 Yes Yes Approved No
SP-120784 Rel-8 CRs on Charging Management (CH8) SA WG5 CR Pack Approval 8.5 Yes Yes Approved No
SP-120785 Rel-9 CRs on Charging Management (CH9) SA WG5 CR Pack Approval 9 Yes Yes Approved No
SP-120786 Rel-9 CRs on Charging Management (CH9) Batch2 SA WG5 CR Pack Approval 99 No No WITHDRAWN Yes
SP-120787 Rel-10 CRs on Charging Management (CH10) SA WG5 CR Pack Approval 10.23 Yes Yes Approved No
SP-120788 Rel-12 CRs on Charging Management (CH12) SA WG5 CR Pack Approval 12.29 Yes Yes Approved No
SP-120789 Rel-11 CRs on Charging Management small Enhancements (CH11) SA WG5 CR Pack Approval 11.31 Yes Yes Approved No
SP-120790 Rel-11 CRs on Management of Carrier Aggregation for LTE (OAM-CA) SA WG5 CR Pack Approval 11.32 Yes Yes Approved No
SP-120791 Rel-11 CRs on LTE Self-Organizing Networks (SON) coordination management (OAM-SON-LTE_COORD) SA WG5 CR Pack Approval 11.32 Yes Yes Approved No
SP-120792 Rel-11 CRs on Charging for System Improvements for Machine Type Communications (SIMTC-CH) SA WG5 CR Pack Approval 11.31 Yes Yes Approved No
SP-120793 Rel-11 CRs on Unification of Charging session from SIP AS and SRVCC functions in IMS (UCHIMS_AS-SRVCC) SA WG5 CR Pack Approval 11.31 Yes Yes Approved No
SP-120794 Rel-10 CRs on Management of UE based network performance measurements (OAM-PM-UE) SA WG5 CR Pack Approval 10.24 Yes Yes Approved No
SP-120795 Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) Batch1 SA WG5 CR Pack Approval 11.32 Yes Yes Approved No
SP-120796 Rel-11 CRs on Enhanced Management of UE based network performance measurements (OAM-ePM-UE) Batch2 SA WG5 CR Pack Approval 11.32 Yes Yes 32.766 CR0049 revised in SP-120912 The remaining CRs were approved. No
SP-120797 Rel-12 CRs on Converged Management Model Alignment (Phase 2)(OAM-MODAL) SA WG5 CR Pack Approval 12.30 Yes Yes Approved No
SP-120798 Rel-11 CRs on QoS Control Based on Subscriber Spending Limits (QoS_SSL) SA WG5 CR Pack Approval 11.3 Yes Yes Approved No
SP-120799 Rel-11 CRs on IRP framework enhancements to support Management of Converged Networks (OAM-FMC-IRP) SA WG5 CR Pack Approval 11.32 Yes Yes Approved No
SP-120800 Rel-11 CRs on Inter-RAT Energy Saving Management (OAM-IRAT-ESM) SA WG5 CR Pack Approval 11.32 Yes Yes Approved No
SP-120801 Rel-11 CRs on Charging for Roaming Architecture for Voice over IMS with Local Breakout (RAVEL-CH) SA WG5 CR Pack Approval 11.21 Yes Yes Approved No
SP-120802 28.390 Fixed Mobile Convergence (FMC) Interface Integration Reference Point (IRP) Solution Profiles SA WG5 TS Information 12.30 Yes Yes Noted No
SP-120803 28.621 Telecommunication management; Generic Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120804 28.622 Telecommunication management; Generic Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120805 28.623 Telecommunication management; Generic Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120806 28.624 Telecommunication management; State Management Data Definition Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120807 28.625 Telecommunication management; State Management Data Definition Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120808 28.626 Telecommunication management; State Management Data Definition Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120809 28.627 Telecommunication management; Self-Organizing Networks (SON) Policy Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120810 28.628 Telecommunication management; Self-Organizing Networks (SON) Policy Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120811 28.629 Telecommunication management; Self-Organizing Networks (SON) Policy Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120812 28.631Telecommunication management; Inventory Management (IM) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120813 28.632 Telecommunication management; Inventory Management (IM) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120814 28.633 Telecommunication management; Inventory Management (IM) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120815 28.651 Telecommunication management; Universal Terrestrial Radio Access Network (UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120816 28.652 Telecommunication management; Universal Terrestrial Radio Access Network (UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120817 28.653 Telecommunication management; Universal Terrestrial Radio Access Network (UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120818 28.657 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120819 28.658 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120820 28.659 Telecommunication management; Evolved Universal Terrestrial Radio Access Network (E-UTRAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120821 28.661 Telecommunication management; Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120822 28.662 Telecommunication management; Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120823 28.663 Telecommunication management; Generic Radio Access Network (RAN) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120824 28.671 Telecommunication management; Home Node B (HNB) Subsystem (HNS) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120825 28.672 Telecommunication management; Home Node B (HNB) Subsystem (HNS) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120826 28.673 Telecommunication management; Home Node B (HNB) Subsystem (HNS) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120827 28.674 Telecommunication management; Home enhanced Node B (HeNB) Subsystem (HeNS) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120828 28.675 Telecommunication management; Home enhanced Node B (HeNB) Subsystem (HeNS) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120829 28.676 Telecommunication management; Home enhanced Node B (HeNB) Subsystem (HeNS); Network Resource Model (NRM); Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120830 28.704 Telecommunication management; IP Multimedia Subsystem (IMS) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120831 28.705 Telecommunication management; IP Multimedia Subsystem (IMS) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120832 28.706 Telecommunication management; IP Multimedia Subsystem (IMS) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120833 28.707 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120834 28.708 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120835 28.709 Telecommunication management; Evolved Packet Core (EPC) Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120836 28.731 Telecommunication management; Transport Network (TN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120837 28.732 Telecommunication management; Transport Network (TN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Information Service (IS) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120838 28.733 Telecommunication management; Transport Network (TN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Solution Set (SS) definitions SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120839 28.734 Telecommunication management; Signalling Transport Network (STN) interface Network Resource Model (NRM) Integration Reference Point (IRP); Requirements SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120840 32.107 Telecommunication management; Fixed Mobile Convergence (FMC) Federated Network Information Model (FNIM) SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120841 32.156 Telecommunication management; Fixed Mobile Convergence (FMC); Model Repertoire SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120842 32.157 Telecommunication management; Integration Reference Point (IRP) Information Service (IS) template SA WG5 TS Approval 11.32 Yes Yes Approved No
SP-120843 32.830 Telecommunication management; Study on version handling over Itf-N SA WG5 TR Approval 12.30 Yes Yes Approved No
SP-120844 32.854 Telecommunication management; Fixed Mobile Convergence (FMC) 3GPP / TM Forum Concrete Model Relationships and Use Cases SA WG5 TR Approval 11.32 Yes Yes Approved No
SP-120845 LS from SA WG3: Reply LS on Liaison statement on GISFI Indian network security related standardization activity SA WG3 LS In Information 13.26 Yes Yes This LS was reviewed and noted. No
SP-120846 SA WG3 Status Report SA WG3 Chairman REPORT Information 7.3 Yes Yes The SA WG3 Chairman was thanked for this report, which was noted. No
SP-120847 Revised WID for Security Aspects of WLAN Network Selection for 3GPP Terminals SA WG3 WID Approval 12.19 Yes Yes Approved No
SP-120848 Revised WID: System Improvements for Machine Type Communication (SIMTC) SA WG3 WID Approval 11.4 Yes Yes Approved No
SP-120849 Updated SID on 'Firewall Traversal (iFire) SA WG3 WID Approval 13.24 Yes Yes Approved No
SP-120850 New WID on Tunnelling of UE Services over Restrictive Access Networks SA WG3 WID Approval 14 Yes Yes Approved No
SP-120851 Revised WID Lawful Interception Rel-12 SA WG3 WID Approval 12.28 Yes Yes Approved No
SP-120852 TR 33.823 Security for Usage of GBA with a UE browser SA WG3 TR Approval 12.25 Yes Yes Approved No
SP-120853 TR 33.844 Security Study on IP Multimedia Subsystem (IMS) Based Peer-to-Peer Content Distribution Services SA WG3 TR Approval 13.3 Yes Yes Approved No
SP-120854 Release 12 CRs on Lawful Interception (LI12) SA WG3 CR Pack Approval 12.28 Yes Yes Approved No
SP-120855 Release 7 CRs on Development of UEA2 and UIA2 (AlgUEA2) SA WG3 CR Pack Approval 8.4 Yes Yes Approved No
SP-120856 Release 12 CRs on Security small Enhancements (SEC12) SA WG3 CR Pack Approval 12.31 Yes Yes Approved No
SP-120857 Release 10 CRs on Security small Enhancements (TEI10) SA WG3 CR Pack Approval 99 No No WITHDRAWN Yes
SP-120858 Release 11 CRs on Security small Enhancements (SEC11) SA WG3 CR Pack Approval 11.33 Yes Yes Approved No
SP-120859 Release 9 CRs to 33.310 on Network Domain Security (NDS) enhancements to support backhaul security (NDS_Backhaul) SA WG3 CR Pack Approval 9 Yes Yes Approved No
SP-120860 Release 9 CRs on Security small Enhancements (TEI9) SA WG3 CR Pack Approval 9 Yes Yes CRs 33.246 CR0165R1; 33.246 CR0166R1; 33.246 CR0167R1 were revised in SP-120894. The remaining CRs: 33.246 CR0168R1; 33.246 CR0169; 33.246 CR0170; 33.320 CR0093R1, were approved. No
SP-120861 Release 12 CRs for IMS media plane security extensions (eMEDIASEC) SA WG3 CR Pack Approval 12.24 Yes Yes Approved No
SP-120862 Update of WID: IMS Business Trunking for IP-PBX in Static Mode of Operation (BusTI) Deutsche Telekom WID Approval 12.20 Yes Yes Approved. Update to SP-120739 No SP-120739
SP-120863 Status Report from SA WG1 to TSG SA#58 SA WG1 Chairman Report Presentation 7.1 Yes Yes The SA WG1 Chairman was thanked for this report, which was noted. No
SP-120864 Stage 1 CRs on TEI Rel-8 (TEI8) SA WG1 CR Pack Approval 8.5 Yes Yes Approved No
SP-120865 Stage 1 CRs on TEI Rel-9 (TEI9) SA WG1 CR Pack Approval 9 Yes Yes Approved No
SP-120866 Stage 1 CRs on TEI Rel-10 (TEI10) SA WG1 CR Pack Approval 10.25 Yes Yes Approved No
SP-120867 Stage 1 CRs on TEI Rel-11 (TEI11) SA WG1 CR Pack Approval 11.34 Yes Yes Approved No
SP-120868 Stage 1 CRs on MTCe: Service Requirement Maintenance (MTCe-SRM) SA WG1 CR Pack Approval 12.8 Yes Yes Approved No
SP-120869 Stage 1 CRs on New Rel-11 requirements SA WG1 CR Pack Approval 11.34 Yes Yes Approved No
SP-120870 Stage 1 CRs on Public Warning System Security (PWS_Sec) SA WG1 CR Pack Approval 12.22 Yes Yes Approved No
SP-120871 Stage 1 CRs on User Plane Congestion Management (UPCON) SA WG1 CR Pack Approval 12.12 Yes Yes Noted. Proposed revision in SP-120753 No
SP-120872 Stage 1 CRs on Feasibility Study on User Plane Congestion Management (FS_UPCON) SA WG1 CR Pack Approval 12.12 Yes Yes Noted. Proposed revision in SP-120754 No
SP-120873 Stage 1 CRs on Sequential Flexible Alerting (SEQ_FA) SA WG1 CR Pack Approval 14 Yes Yes Approved No
SP-120874 Stage 1 CRs on Language and Modality Information for communications (LangInfo) SA WG1 CR Pack Approval 99 Yes Yes WITHDRAWN. Change should be made to a different TS. No
SP-120875 TR 22.803 V2.0.0 on Feasibility Study for Proximity Services (FS_ProSe) SA WG1 TR Approval 13.23 Yes Yes Approved No
SP-120876 Revised Work Item for Group Communication System Enablers for LTE (GCSE_LTE) SA WG1 WID Approval 12.9 Yes Yes Approved No
SP-120877 WID for Proximity-based Services (Normative work) (ProSe) SA WG1 WID Approval 13.23 Yes Yes Revised in SP-120883 No SP-120883
SP-120878 WID for Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) SA WG1 WID Approval 14 Yes Yes Proposed update in SP-120892. This was therefore considered as revised in SP-120892 No
SP-120879 WID for Sequential Flexible Alerting (SEQ_FA) SA WG1 WID Approval 14 Yes Yes Proposed update in SP-120895. This was therefore considered as revised in SP-120895. No
SP-120880 WID for Language and Modality Information for communications (LangInfo) SA WG1 WID Approval 14 Yes Yes Some modifications were needed and this was revised in SP-120937 No
SP-120881 Rel-12 mirror CR: 23.002 CR0260: Adding the missing ATGW to IMS entities description subclause ZTE CR Pack Approval 11.34 Yes Yes Approved. Mirror CR to 23.002 CR0259R1 in SP-120726 No
SP-120882 The Cost-Efficient Traffic Adaptable System NTT DOCOMO Presentation Presentation 5.1 Yes Yes NTT DOCOMO were thanked for this presentation, which was noted. No SP-120681
SP-120883 WID for Proximity-based Services (Normative work) (ProSe) SA WG1 WID Approval 13.23 Yes Yes This WID was approved. No SP-120877
SP-120884 Extended Coverage for Public Safety (eCPS) Broadcom Corporation Contribution Discussion 99 Yes No WITHDRAWN Yes
SP-120885 Support Team Report MCC Support Team Coordinator REPORT Presentation 17.2 Yes Yes The MCC coordinator was thanked for this presentation, which was noted. No
SP-120886 Update to Specifications lists MCC Specifications Manager CR Pack Approval 99 No No WITHDRAWN Yes
SP-120887 New Study WID: 'Providing control of inbound/outbound Connections when a firewall or NAT is deployed in the PLMN ' Orange WID Approval 15 Yes Yes Noted. It was noted that the document header contained the wrong TD number. It was also noted that this work had not been included in work items for consideration in Rel-12. Nokia considered this a useful study for UE power consumption work. Verizon sugg No SP-120744
SP-120888 TSG GERAN Status Report TSG GERAN Chairman Report Presentation 7.8 Yes Yes The TSG GERAN Chairman was thanked for this report, which was noted. No
SP-120889 LS from ETSI TC EE: Liaison to 3GPP on Cooperation for Energy Efficiency Measurements ETSI TC EE LS In Information 13.11 Yes Yes This LS was noted. No
SP-120890 Updated WID: 'User plane congestion management requirements (UPCON)' NEC WID Approval 12.12 Yes Yes Approved. Update to SP-120736 No
SP-120891 LS from ETSI E2NA: Location of Media Transcoders ETSI E2NA LS In Action 6 Yes Yes Forwarded to WGs in SP-120933. Orange suggested forwarding this to SA WG2, CT WG1, CT WG3 and CT WG4 asking them to provide responses to TSG SA#59 where TSG SA will provide a coordinated response to ETSI E2NA. A LS to the WGs was drafted in SP-120917. Fi No
SP-120892 Proposed Change to WID for Web Real Time Communication (WebRTC) Access to IMS (IMS_WebRTC) in SP-120878 T-Mobile USA WID Approval 14 Yes Yes Approved. Update to SP-120878 No
SP-120893 Time Budget for SA WG2 Project Management SA WG2 Chairman Discussion Decision 5 Yes Yes Endorsed. Orange asked when the time budget would be introduced during a release. The SA WG2 Chairman replied that each Work Item request would include the budget and this would be recorded in the Work Plan, For items where the budget cannot be estimated No
SP-120894 Update of CRs 33.246 CR0165R1; 33.246 CR0166R1; 33.246 CR0167R1 in SP-120860: Release 9 CRs on Security small Enhancements (TEI9) Ericsson CR Pack Approval 9 Yes Yes Approved. Update to part of SP-120860 No
SP-120895 Editorial revision of SP-120879 New WID on Sequential Flexible Alerting (SEQ_FA) MCC, Orange WID Approval 14 Yes Yes Approved No SP-120879
SP-120896 Rel-12: Areas of focus Alcatel-lucent Presentation Presentation 5.1 Yes Yes Alcatel-lucent were thanked for this presentation, which was noted. No SP-120678
SP-120897 WID PCEF-based Charging for traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks SA WG5 WID Information 12.16 Yes Yes As this work was under review, this WID was noted. No
SP-120898 Discussion paper for UMONC WID China Telecom, Orange, China Unicom, KDDI, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine Contribution Discussion 13.22 Yes Yes This paper was then noted and the updated WID reviewed. No
SP-120899 New WID: Usage Monitoring Control PCC Enhancement China Telecom, China Unicom, Vodafone, KDDI, Orange, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine WID Approval 13.22 Yes Yes Revised in SP-120914 No SP-120914
SP-120900 Network Enhancements for Better Customer Experience KDDI, Sprint Presentation Presentation 5.1 Yes Yes Intel asked whether for slide 7, the QoS over multiple accesses included non-3GPP accesses. It was clarified that non-3GPP accesses were also intended. This needs to be studied as 3GPP cannot put requirements on non-3GPP Accesses. KDDI and Sprint were th No SP-120664
SP-120901 Public Safety Communication requirements in Release 12 Vodafone Contribution Approval 5 Yes Yes LS drafted in SP-120916 (revised during off-line discussions to SP-120923). This was then noted. No
SP-120902 Rev of S2-124833_4808_4302_Network sharing impact on the CSFB_23 251_v5.8 (Revision of 23.251 CR0067R7 from SP-120722) Huawei, Hisilicon, Vodafone CR Pack Approval 11.18 Yes Yes Approved. Revision of 23.251 CR0067R7 from SP-120722 No
SP-120903 TSG CT Status Report TSG CT Chairman REPORT Presentation 7.7 Yes Yes The TSG CT Chairman was thanked for this report, which was noted. No
SP-120904 IEFT Status report TSG CT Chairman REPORT Presentation 7.7 Yes Yes The TSG CT Chairman was thanked for this report, which was noted. No
SP-120905 Draft Report of TSG CT#58 TSG CT Secretary (MCC) REPORT Information 7.7 Yes Yes This was provided for information and was noted. No
SP-120906 LS from TSG CT: Reply LS on IMS service level trace removal of feature from old releases TSG CT LS In Information 7.7 Yes Yes It was clarified that SA WG5 would review this LS at their next meeting and a similar approach is expected from SA WG5 to remove the IMS service level trace functionality. This was then noted. No
SP-120907 LS from TSG RAN: [DRAFT] Letter to ITU-R WP5D [on Preliminary Draft New Report on THE USES OF IMT FOR BROADBAND PPDR APPLICATIONS] TSG RAN LS In Review / Endorsement 7.6 Yes Yes Revised in SP-120930 No SP-120930
SP-120908 LS from TSG RAN: Reply LS on backhaul study in MEF TSG RAN LS In Information 7.6 Yes Yes The TSG RAN Chairman indicated that the attachment to this may be of interested to delegates and encouraged delegates to read it. This LS was then noted. No
SP-120909 Updated TSG CT ToR TSG CT Chairman ToR Information 7.7 Yes Yes This updated Terms of reference was noted. No
SP-120910 TSG RAN Status Report to TSG SA#58 TSG RAN Chairman REPORT Presentation 7.6 Yes Yes The TSG RAN Chairman was thanked for this report, which was noted. No
SP-120911 Draft report of TSG RAN meeting #58 TSG RAN Secretary REPORT Information 7.6 Yes Yes This was provided for information and was noted. No
SP-120912 32.766 CR0049R1: Addition of Network Sharing support for MDT SA WG5 CR Pack Approval 11.32 Yes Yes Approved. Revision of 32.766 CR0049 in SP-120796 No
SP-120913 Draft WID for Public Safety Vodafone WID Approval 5 Yes Yes This was provided for information and was noted. No
SP-120914 New WID: Usage Monitoring Control PCC Enhancement China Telecom, China Unicom, Vodafone, KDDI, Orange, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine WID Approval 13.22 Yes Yes Some improvement to the Objective was needed and this was discussed off-line and revised in SP-120928 No SP-120899
SP-120915 Workshop on Release 12 content. DRAFT Summary and Conclusions TSG SA Chairman OTHER Decision 5.1 Yes Yes Verizon commented that FS_CNO could be considered for moving to CT WGs. This would need to be discussed and agreed in SA WG2. Orange suggested that P4C BB2 was considered by some companies as essential and suggested moving it to the other items for consi No SP-120749
SP-120916 [DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. TSG SA (Vodafone) LS OUT Approval 5 Yes Yes Revised in SP-120922 No SP-120922
SP-120917 [DRAFT] LS on providing information on transcoding functions in 3GPP standards TSG SA (Orange) LS OUT Approval 6 Yes Yes Editorial errors were noted and should be corrected. Renesas suggested copying this to GERAN WG2 and adding them to the first action. This was revised accordingly and draft removed, in SP-120933 No
SP-120918 Background on Revised CR to TS 22.101 and revised CR to TR 22.805 for UPCON KDDI, NTT DOCOMO, AT&T, Orange, SoftBank Mobile, Qualcomm Incorporated, NEC, Intel, Allot Communications, Movik Networks, InterDigital Communications, Cisco, Samsung, Research in Motion, LG Electronics Contribution Discussion 12.12 Yes Yes This was noted and the CRs reviewed. No SP-120752
SP-120919 Revision of CR0434R2 to TS 22.101: Addition of UPCON Requirements KDDI, NTT DOCOMO, Research in Motion, NEC, Allot Communications, Juniper Networks, SoftBank Mobile, Harris Corporation, InterDigital Communications, Bell Canada, AT&T, ETRI, Qualcomm Incorporated, Chunghwa Telecom, ITRI, Orange, Intel, Movik Networks, Cis CR Pack Approval 12.12 Yes Yes Approved No SP-120753
SP-120920 Revision of CR0001R3 to TR 22.805: Update of Consolidated Requirements; Addition of Use Case to Requirements Traceability Annex KDDI CR Pack Approval 12.12 Yes Yes Revised in SP-120925 No SP-120925 SP-120754
SP-120921 Workshop on Release 12 content. DRAFT Summary and Conclusions TSG SA Chairman OTHER Decision 5.1 Yes Yes TeliaSonera commented that information on the total available meeting time available in SA WG2 is essential for the March 2013 meeting. The SA WG2 Chairman clarified that budget numbers would be fixed at SA WG2#95. The slides were updated to indicate tha No SP-120915
SP-120922 [DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. TSG SA (Vodafone) LS OUT Approval 5 Yes Yes Revised to remove attachment in SP-120923 No SP-120916
SP-120923 [DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. TSG SA (Vodafone) LS OUT Approval 5 Yes Yes TeliaSonera asked what is meant by 'Public Safety Authorities'. Vodafone explained that this is in common use in SA WG1 to mean the various authorities dealing with national Public Safety requirements. It was suggested to change the text to 'taking into No SP-120922
SP-120924 [DRAFT] LS on Additional Public Safety and Critical Communications requirements in Release 12. TSG SA (Vodafone) LS OUT Approval 5 Yes Yes This was revised to remove draft and update the Source of the LS in SP-120931 No SP-120923
SP-120925 Revision of CR0001R3 to TR 22.805: Update of Consolidated Requirements; Addition of Use Case to Requirements Traceability Annex KDDI CR Pack Approval 12.12 Yes Yes Approved No SP-120920
SP-120926 Updated WID: 'LIPA Mobility and SIPTO at the Local Network (LIMONET)' SA WG2 WID Approval 12.14 Yes Yes Approved No SP-120737
SP-120927 Draft Reply LS on Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 TSG SA LS OUT Approval 12.31 Yes Yes This was revised to remove 'draft' in SP-120934 No
SP-120928 New WID: Usage Monitoring Control PCC Enhancement China Telecom, China Unicom, Vodafone, KDDI, Orange, ZTE, Allot Communications, Tekelec, Comverse, Juniper Networks, Openet, Openwave, Sandvine WID Approval 13.22 Yes Yes Approved No SP-120914
SP-120929 New WID: 'Proximity-based Services ' SA WG2 WID Approval 13.23 Yes Yes The SA WG2 Chairman asked for clarification of the title of the Feasibility Study which contains 'Rel-12'. It was agreed to revert back to the original title of the Study WID. The change of UICC impacts was questioned. It was clarified that this was chan No SP-120743
SP-120930 [Draft] Letter to ITU-R WP5D [on Preliminary Draft New Report on THE USES OF IMT FOR BROADBAND PPDR APPLICATIONS] TSG SA LS OUT Approval 7.6 Yes Yes Vodafone and AT&T provided a number of editorial corrections and clarifications. The LS was revised accordingly, also to remove draft and revision marks, in SP-120936 No SP-120907
SP-120931 LS on Additional Public Safety and Critical Communications requirements in Release 12. TSG SA LS OUT Approval 5 Yes Yes Approved No SP-120924
SP-120932 Workshop on Release 12 content. Summary and Conclusions TSG SA Chairman OTHER Decision 5.1 Yes Yes APPROVED. ZTE asked whether, for example, if the FS_UMONC work is completed at the next SA WG2 meeting, the time budget will still need to be provided. The SA WG2 Chairman explained that a request for zero budget is not useful. Intel asked whether the MO No SP-120921
SP-120933 LS on providing information on transcoding functions in 3GPP standards TSG SA LS OUT Approval 6 Yes Yes Approved No SP-120917
SP-120934 Reply LS on Recommendations for Minimal Wi-Fi Capabilities of Terminals v1 TSG SA LS OUT Approval 12.31 Yes Yes Approved No SP-120927
SP-120935 New WID: 'Proximity-based Services ' SA WG2 WID Approval 13.23 Yes Yes Approved. NOTE: This WID is regarded as an update to the approved WID in SP-120883. No SP-120929
SP-120936 Letter to ITU-R WP5D [on Preliminary Draft New Report on THE USES OF IMT FOR BROADBAND PPDR APPLICATIONS] TSG SA LS OUT Approval 7.6 Yes Yes Approved No SP-120930
SP-120937 WID for Language and Modality Information for communications (LangInfo) SA WG1 WID Approval 14 Yes Yes Approved No SP-120880