UID code title release lead body completion %
done
WID TDoc WID history created date last updated remarks abandoned
510108 EPC_NR_ISR EPC Node Restoration with Idle mode Signalling Reduction (ISR) activated Rel-10 C4 03/06/2011

100

CP-110287 history 2011/02/22 17/05/2011 CP#52 completed. Triggered by DRAFT TR 23.857 Study on EPC Nodes Restoration (FS_EPC_NR) UID_490014