3GPP active work programme
Click on UID to show list of all TSs and TRs associated with this work item.
Click on WI code to see a list of TSs and TRs specifically resulting from this work item.
Click on the percentage completion to see a list of approved Change Requests associated with this work item.
The "impact" shows an empirical best-guess of which TSs and TRs are likely to be modified as a result of the WI.
Work Items which have been abandoned are greyed out, and the TSG meeting at which they were abandoned is shown in the final column.
UID | code | title | release | lead body | completion | % done | WID TDoc | WID history | created date | last updated | remarks | abandoned |
---|---|---|---|---|---|---|---|---|---|---|---|---|
490036 | FS_CNO | Study on Core Network Overload solutions | Rel-12 | S2 | 11/12/2013 | SP-120490 | history | 2010/08/31 | 28/11/2013 | SP#62 completed. Linked to CT4 TR 23.857 Study on EPC Nodes Restoration (UID_490014) | ||
490136 | - | ... Study on Core Network Overload solutions (Phase 1) | Rel-12 | S2 | 12/12/2012 | SP-120490 | history | 2010/08/31 | 30/08/2012 | Phase 1: complete study of overload control related to MAP /Diameter signalling, other 3GPP Core Network signalling optimization | ||
490236 | - | ... Study on Core Network Overload solutions (Phase 2) | Rel-12 | S2 | 11/12/2013 | SP-120490 | history | 2010/08/31 | 28/11/2013 | SP#62 completed |