The 5G Standard



3GPP active work programme


Click on UID to show list of all TSs and TRs associated with this work item.

Click on WI code to see a list of TSs and TRs specifically resulting from this work item.

Click on the percentage completion to see a list of approved Change Requests associated with this work item.

The "impact" shows an empirical best-guess of which TSs and TRs are likely to be modified as a result of the WI.

Work Items which have been abandoned are greyed out, and the TSG meeting at which they were abandoned is shown in the final column.

UID code title release lead body completion %
done
WID TDoc WID history created date last updated remarks abandoned
480037 SMOG S2b Mobility based on GTP Rel-10 C1, C3, C4, S2 18/03/2011

100

SP-100357 history 2010/06/06 18/03/2011 CP#51 completed. SP#49 Stage 2 completed. Related to Rel-10 UID_470049 Study on S2b mobility based on GTP (TR23.834), UID_350027 SAE for support for non-3GPP accesses. Stage1 in Rel-8 UID_320022 Reqs for evolution of 3GPP system architecture (AIPN-SAE)
480137 - ... Stage 2 for S2b Mobility based on GTP Rel-10 S2 23/09/2010

100

SP-100357 history 2010/06/06 06/09/2010 SP#49 completed
490009 SMOG-St3 ... Stage 3 for S2b Mobility based on GTP Rel-10 C1, C3, C4 18/03/2011

100

CP-100644 history 2010/09/01 18/03/2011 CP#51 Stage 3 completed
490109 - ...... CT4 part of Stage 3 for S2b Mobility based on GTP Rel-10 C4 18/03/2011

100

CP-100644 history 2010/09/01 18/03/2011 CP#51 completed
490209 - ...... CT3 part of Stage 3 for S2b Mobility based on GTP Rel-10 C3 18/03/2011

100

CP-100644 history 2010/09/01 18/03/2011 CP#51 completed
490309 - ...... CT1 part of Stage 3 for S2b Mobility based on GTP Rel-10 C1 10/12/2010

100

CP-100644 history 2010/09/01 25/11/2010 CP#50 completed