The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: S5-109 - 2016-08-29 to 2016-09-02, San Francisco

meeting id: S5-109 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
S5‑165000 Agenda WG Chairman imported from 3GU
S5‑165001 Report from last SA5 meeting ETSI Secretariat imported from 3GU
S5‑165002 SA5 status report at last SA meeting WG Chairman imported from 3GU
S5‑165003 SA5 results at last SA meeting WG Chairman imported from 3GU
S5‑165004 Time Plan for OAM&P WG Vice Chair (Huawei) imported from 3GU
S5‑165005 OAM Executive Report from THIS Meeting WG Vice Chair (Huawei) imported from 3GU
S5‑165006 Leaders meeting agenda WG Chairman imported from 3GU
S5‑165007 Leaders meeting minutes WG Chairman imported from 3GU
S5‑165008 CH Agenda and Time Plan CH SWG Chair imported from 3GU
S5‑165009 CH Executive Report from THIS Meeting CH SWG Chair imported from 3GU
S5‑165010 SA5 Meeting Calendar WG Vice Chair (Huawei) imported from 3GU
S5‑165011 SA5 Working Procedures WG Vice Chair (Huawei) imported from 3GU
S5‑165012 SA5 Meeting Facility Requirements WG Vice Chair (Orange) imported from 3GU
S5‑165013 Process for management of draft TSs/TRs WG Chairman imported from 3GU
S5‑165014 CR Quality Check ETSI Secretariat imported from 3GU
S5‑165015 Deliverables due for the NEXT SA Plenary ETSI Secretariat imported from 3GU
S5‑165016 Ongoing SA5 WIDs and SIDs WG Vice Chair (Huawei) imported from 3GU
S5‑165017 SA5 3GPP Work Plan ETSI Secretariat imported from 3GU
S5‑165018 Minutes of New Work Item proposals - OAM&P WG Vice Chair (Orange) imported from 3GU
S5‑165019 Minutes of OAM&P Maintenance and Rel-14 small Enhancements MCC imported from 3GU
S5‑165020 Minutes for Study on Management and Orchestration Architecture of Next Generation Network and Service Rapporteur (Huawei) imported from 3GU
S5‑165021 Minutes for Study on Implementation for the Partitioning of Itf-N Rapporteur(China Mobile) imported from 3GU
S5‑165022 Minutes for Management concept, architecture and requirements for mobile networks that include virtualized network functions Rapporteur(China Mobile) imported from 3GU
S5‑165023 Minutes for Configuration Management for mobile networks that include virtualized network functions Rapporteur(ZTE) imported from 3GU
S5‑165024 Minutes for Fault Management for mobile networks that include virtualized network functions Rapporteur(Huawei) imported from 3GU
S5‑165025 Minutes for Performance management for mobile networks that include virtualized network functions Rapporteur(Intel) imported from 3GU
S5‑165026 Minutes for Lifecycle management for mobile networks that include virtualized network functions Rapporteur (Nokia Networks) imported from 3GU
S5‑165027 Minutes for Filtering of PM measurements and data volume measurements for shared networks Rapporteur(Ericsson) imported from 3GU
S5‑165028 Minutes of Study on OAM support for assessment of energy efficiency in mobile access networks Rapporteur (Orange) imported from 3GU
S5‑165029 Minutes for Study on OAM aspects of SON for AAS-based deployments Rapporteur (Nokia Networks) imported from 3GU
S5‑165030 Minutes for Study on Management and Orchestration of Network Slicing Rapporteur (Huawei) imported from 3GU
S5‑165031 Minutes for Study on management aspects of next generation network architecture and features Rapporteur(Nokia) imported from 3GU
S5‑165032 IPR and legal declaration WG Chairman imported from 3GU
S5‑165033 Status of email approvals WG Vice Chair (Orange) imported from 3GU
S5‑165034 Minutes of OAM support for Licensed Shared Access (LSA) Rapporteur (Nokia) imported from 3GU
S5‑165035 OAM&P SWG action list WG Vice Chair (Huawei) imported from 3GU
S5‑165036 Work Plan status WG Chair imported from 3GU
S5‑165037 Minutes of OAM&P SWG opening session WG Vice Chair (Huawei) imported from 3GU
S5‑165038 SA5 work plan structure SA vice chairman imported from 3GU
S5‑165039 Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network ATIS imported from 3GU
S5‑165040 Reply LS from CT3 to SA5 on PDP type extension to non-IP PDN type C3-162183 imported from 3GU
S5‑165041 Resubmitted LS reply from CT4 to SA5 on progress of the work on Diameter Base Protocol Update C4-163282 imported from 3GU
S5‑165042 Reply LS from CT4 to SA5 on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose C4-164288 imported from 3GU
S5‑165043 Resubmitted Liaison reply from ETSI TC EE to 3GPP SA5 about standard ES 202 336-12 (ICT equipment power, energy and environmental parameters monitoring information model) ETSI TC EE imported from 3GU
S5‑165044 Resubmitted Liaison from ETSI TC EE to 3GPP SA5 in response to S5-162239 ETSI TC EE imported from 3GU
S5‑165045 Reply LS from SA2 to SA5 for enhancements required for charging of PDN connection to SCEF S2-163767 imported from 3GU
S5‑165046 Response LS from SA2 to SA5 “LS on Control Plane CIoT EPS Optimisation Indicator propagated to PGW for charging purpose” S2-163768 imported from 3GU
S5‑165047 Reply LS from SA2 to ETSI NTECH AFI cc SA5 on Autonomic Networking S2-164274 imported from 3GU
S5‑165048 LS from SA2 to SA5-CH on implication on charging from eFMSS S2-164279 imported from 3GU
S5‑165049 Editorial and minor technical changes to TS 28.525 based on EditHelp review Nokia Networks imported from 3GU
S5‑165050 Potential ad hoc meeting on NFV work items SA5 vice chairman imported from 3GU
S5‑165051 Network Slice Use Case Methodology Cisco Systems Belgium imported from 3GU
S5‑165052 Rel-13 CR 32.298 Correction on ASN.1 syntax for IMS, SMS and MONTE CDRs Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165053 Rel-13 CR 32.251 Correction on Non-IP PDP type - alignement with TS 29.061 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165054 Rel-13 CR 32.298 Correction on Non-IP PDP type -alignement with TS 29.061 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165055 Rel-13 CR 32.298 Correction on CPDT CDRs ASN.1 description Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165056 Rel-13 CR 32.251 Correction on RAT Type for charging SMS in MME Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165057 pCR TS 28.520 include comments received from edithelp Intel Corporation (UK) Ltd imported from 3GU
S5‑165058 Draft TS 28523 skeleton Intel Corporation (UK) Ltd imported from 3GU
S5‑165059 pCR TS 28.523 add introduction and scope Intel Corporation (UK) Ltd imported from 3GU
S5‑165060 pCR TS 58.522 add stage 2 solutions Intel Corporation (UK) Ltd imported from 3GU
S5‑165061 pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification Intel Corporation (UK) Ltd imported from 3GU
S5‑165062 pCR TS 28.520 change the terminologies related to legacy PM data Intel Corporation (UK) Ltd imported from 3GU
S5‑165063 pCR 32.856 Skeleton for new clause 5 ORANGE, Huawei imported from 3GU
S5‑165064 pCR 32.856 Proposed text for clause 5.1 ORANGE, Huawei imported from 3GU
S5‑165065 pCR 32.856 Proposed text for clause 5.2 ORANGE, Huawei imported from 3GU
S5‑165066 pCR 32.856 Proposed text for clause 5.3 ORANGE, Huawei imported from 3GU
S5‑165067 pCR 32.856 Update Scope ORANGE, Huawei imported from 3GU
S5‑165068 pCR 32.856 Align clause 4 with ES 203 228 v1.1.5 ORANGE imported from 3GU
S5‑165069 pCR 28.525 Fetch use case clarification Cisco Systems Inc. imported from 3GU
S5‑165070 pCR 28.525 Fetch On-boarded VNF Package Artifacts operation Cisco Systems Inc. imported from 3GU
S5‑165071 pCR 28.525 Abort VNF Package deletion operation Cisco Systems Inc. imported from 3GU
S5‑165072 pCR 28.525 Update NSD operation Cisco Systems Inc. imported from 3GU
S5‑165073 pCR 28.525 Delete NSD operation not in use Cisco Systems Inc. imported from 3GU
S5‑165074 pCR 28.525 Delete NSD operation when in use Cisco Systems Inc. imported from 3GU
S5‑165075 pCR 28.525 Query NSD operation Cisco Systems Inc. imported from 3GU
S5‑165076 pCR 28.525 On-board PNFD operation Cisco Systems Inc. imported from 3GU
S5‑165077 pCR 32.865 Cell merging correction Cisco Systems Inc. imported from 3GU
S5‑165078 pCR 32.865 Cell splitting correction Cisco Systems Inc. imported from 3GU
S5‑165079 Discussion Paper on 4G network slicing (IoT) management Cisco Systems Inc. imported from 3GU
S5‑165080 New WID for Study on Management and Orchestration of Network Slicing (IoT) in 4G Cisco Systems Inc. imported from 3GU
S5‑165081 Add missing Annex Ericsson LM imported from 3GU
S5‑165082 Rel-14 CR 32.103 Alignment with latest SA5 specification list and various enhancements Huawei, Ericsson imported from 3GU
S5‑165083 Discussion paper of the management for supporting RAN virtualization Intel Corporation (UK) Ltd imported from 3GU
S5‑165084 NEW SID Study on management aspects of the RAN virtualization Intel Corporation (UK) Ltd imported from 3GU
S5‑165085 Add virtualized resources related performance measurements Intel Corporation (UK) Ltd imported from 3GU
S5‑165086 pCR TS 28.526 add VNF termination procedure Intel Corporation (UK) Ltd imported from 3GU
S5‑165087 Discussion paper on direct consumption of VR PM by NM Nokia Networks imported from 3GU
S5‑165088 Discussion paper - Considerations for the VNF instantiation requested by EM Nokia Networks imported from 3GU
S5‑165089 pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N Nokia Networks imported from 3GU
S5‑165090 Discussion paper - options for initial configuration data in VNF instantiation Nokia Networks imported from 3GU
S5‑165091 pCR TS 28.525 Add UCs for initial configuration data in VNF instantiation Nokia Networks imported from 3GU
S5‑165092 pCR TS 28.526 Add procedure for initial configuration data in VNF instantiation Nokia Networks imported from 3GU
S5‑165093 Discussion paper - scenarios for NS update Nokia Networks imported from 3GU
S5‑165094 pCR TS 28.525 Add Use Cases for NS update with add VL and VNF Nokia Networks imported from 3GU
S5‑165095 pCR TS 28.525 Add Use Case for NS update with add SAP Nokia Networks imported from 3GU
S5‑165096 pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL Nokia Networks imported from 3GU
S5‑165097 pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL Nokia Networks imported from 3GU
S5‑165098 pCR 28.510 Add MOI deletion requirement ZTE Corporation imported from 3GU
S5‑165099 pCR 28.510 Add traceabilities of MOI configuration requirements ZTE Corporation imported from 3GU
S5‑165100 pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated ZTE Corporation imported from 3GU
S5‑165101 draft TS 28.513 skeleton ZTE Corporation imported from 3GU
S5‑165102 pCR TS 28.513 Add introduction and scope ZTE Corporation imported from 3GU
S5‑165103 Presentation TS 28.510 to SA for information ZTE Corporation imported from 3GU
S5‑165104 New Section on Determination of Completeness of Charging Information in IMS Deutsche Telekom AG imported from 3GU
S5‑165105 Discussion paper- enhancement of NRM to support the VNF ZTE Corporation imported from 3GU
S5‑165106 Rel-13 CR 32.251 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165107 Rel-13 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165108 Rel-13 CR 32.298 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165109 Proposed LS to CT1 on DCCII Deutsche Telekom AG imported from 3GU
S5‑165110 pCR TS 28.500 Consistency edits and clarifications NTT DOCOMO imported from 3GU
S5‑165111 pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship NTT DOCOMO imported from 3GU
S5‑165112 pCR TS 28.500 Aligning requirements and traceability on FM virtualization-specific use case NTT DOCOMO imported from 3GU
S5‑165113 pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases NTT DOCOMO imported from 3GU
S5‑165114 Rel-13 CR 32.253 Remove Editor's Note on parameters over T6a- Alignment with TS 23.282 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165115 Skeleton for 28.302 "Licensed Shared Access (LSA) Controller (LC) Integration Reference Point (IRP); Information Service" RED Technologies SAS imported from 3GU
S5‑165116 pCR TS 28.500 UC and requirements on automating different types of configuration NTT DOCOMO imported from 3GU
S5‑165117 pCR TS 28.525 Adding specification UCs and requirements related to updating NS NTT DOCOMO imported from 3GU
S5‑165118 Definition of operations and parameters RED Technologies SAS imported from 3GU
S5‑165119 pCR TS 28.500 Updating the NE and VNF concept China Mobile Com. Corporation imported from 3GU
S5‑165120 pCR TS 28.500 Adding the PM collection use case China Mobile Com. Corporation imported from 3GU
S5‑165121 Discussion TS 28.500 the collection machenism of VNF PM data related to virtualized resource China Mobile Com. Corporation imported from 3GU
S5‑165122 Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions China Mobile Com. Corporation imported from 3GU
S5‑165123 New Study on a RESTful HTTP-based Solution Set Nokia Networks imported from 3GU
S5‑165124 Corrections according to EditHelp in 32.817 Ericsson imported from 3GU
S5‑165125 pCR 32817 Remove Editor’s note about true file name Ericsson imported from 3GU
S5‑165126 pCR Conclusion and Recommendations for TR 32.817 Ericsson imported from 3GU
S5‑165127 Presentation of Specification/Report to TSG: TR 32.817, Version 1.0.0 Ericsson imported from 3GU
S5‑165128 Reply to ETSI TC EE PS on ES 203 228 ORANGE imported from 3GU
S5‑165129 Reply to ETSI TC EE 02 on ES 202 336-12 ORANGE imported from 3GU
S5‑165130 pCR 32.856 Proposed text for clause 5.2 ORANGE, Huawei imported from 3GU
S5‑165131 pCR 32.856 Proposed text for clause 5.3 ORANGE, Huawei imported from 3GU
S5‑165132 pCR TR 28.800 Add management architecture use case of reusing the existing management system for next generation network Huawei Technologies imported from 3GU
S5‑165133 pCR TR 28.800 Add management use case for management and orchestration of the next generation network for build the new standalone management system Huawei Technologies imported from 3GU
S5‑165134 pCR TR 28.800 Add terminologies for network management and orchestration layering concept Huawei Technologies imported from 3GU
S5‑165135 pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration Huawei Technologies imported from 3GU
S5‑165136 pCR TR 28.801 Progress overview on network slicing in SA1, SA2, NGMN and analysis of potential management related aspects Huawei Technologies imported from 3GU
S5‑165137 pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs Huawei Technologies imported from 3GU
S5‑165138 pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs Huawei Technologies imported from 3GU
S5‑165139 pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs Huawei Technologies imported from 3GU
S5‑165140 pCR TR 28.801 Adding resource isolation terminologies for network slicing Huawei Technologies imported from 3GU
S5‑165141 pCR TR 28.801 adding slice management related teminology Huawei Technologies imported from 3GU
S5‑165142 Discussion of Network Slicing Descriptor Huawei Technologies imported from 3GU
S5‑165143 pCR TR 28.801 Adding definitions for network slicing lifecycle management Huawei Technologies imported from 3GU
S5‑165144 pCR TR 28.801 use case for network slice lifecycle management Huawei Technologies imported from 3GU
S5‑165145 pCR TR 28.801 High level use case for creating two new slice instances for different end user services Huawei Technologies imported from 3GU
S5‑165146 pCR TR 28.802 add use case for supporting cric management case Huawei Technologies imported from 3GU
S5‑165147 Adding Chapter and content for Concepts and Background Ericsson LM imported from 3GU
S5‑165148 Adding Network Slice and related Definitions Ericsson LM imported from 3GU
S5‑165149 High level use case for creating two new network slice instances for different end user services Ericsson LM imported from 3GU
S5‑165150 pCR TS 28.500 Align the usage of term on non-application Huawei Technologies imported from 3GU
S5‑165151 pCR TS 28.510 Align the usage of term on non-application Huawei Technologies imported from 3GU
S5‑165152 pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier Huawei Technologies imported from 3GU
S5‑165153 pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation Huawei Technologies imported from 3GU
S5‑165154 pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation Huawei Technologies imported from 3GU
S5‑165155 pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em Huawei Technologies imported from 3GU
S5‑165156 pCR TS 28.515 Rapporteur proposal Huawei Technologies imported from 3GU
S5‑165157 Presentation sheet TS 28.515 for information to SA Huawei Technologies imported from 3GU
S5‑165158 Presentation sheet TS 28.516 for information to SA Huawei Technologies imported from 3GU
S5‑165159 pCR TS 28.517 Adding VNF alarm notification subscription stage 2 on Ve-vnfm-em Huawei Technologies imported from 3GU
S5‑165160 pCR TS 28.517 Adding alarm Information Model on Ve-Vnfm-em Huawei Technologies imported from 3GU
S5‑165161 pCR TS 28.518 Adding stage 3 content Huawei Technologies imported from 3GU
S5‑165162 Revised WID Study on Management and Orchestration of Network Slicing for next generation network Ericsson LM imported from 3GU
S5‑165163 Revised WID Study on Management and Orchestration of Network Slicing for next generation network Ericsson LM imported from 3GU
S5‑165164 Update of Scope Ericsson LM imported from 3GU
S5‑165165 Adding Chapter and content for Concepts and Background Ericsson LM imported from 3GU
S5‑165166 pCR TS 28.510 add the relationship between VNF termination and MO deletion Intel Corporation (UK) Ltd imported from 3GU
S5‑165167 Adding Network Slice and related Definitions Ericsson LM imported from 3GU
S5‑165168 pCR TS 28.511 add CM procedures for the VNF instantiation Intel Corporation (UK) Ltd imported from 3GU
S5‑165169 pCR TS 28.511 add CM procedures for the VNF termination Intel Corporation (UK) Ltd imported from 3GU
S5‑165170 High level use case for creating two new network slice instances for different end user services Ericsson LM imported from 3GU
S5‑165171 Addition of use cases Nokia Networks imported from 3GU
S5‑165172 pCR TR 32.880 overview of protocols based on socket API China Mobile imported from 3GU
S5‑165173 Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM Ericsson Inc. imported from 3GU
S5‑165174 Add UC Fetch VNF related VR PM data produced by VNFM Ericsson Inc. imported from 3GU
S5‑165175 Relation between NRM class and VNF/VNFC (implemented in VNFM) Ericsson Inc. imported from 3GU
S5‑165176 Problem of VL instance creation Ericsson Inc. imported from 3GU
S5‑165177 Add UC in 28.525 supporting Bulk MOIs creations Ericsson Inc. imported from 3GU
S5‑165178 R14 CR TS32.277 Message flow for Direct Communication via UE-to-Network Relay Huawei imported from 3GU
S5‑165179 R14 CR TS32.277 Message flow for Model B of ProSe Direct Discovery Huawei imported from 3GU
S5‑165180 R14 CR TS32.277 Message flow for ProSe One-to-One Direct Communication Huawei imported from 3GU
S5‑165181 R14 CR TS32.277 Message flow for Restricted Discovery Huawei imported from 3GU
S5‑165182 R14 CR TS32.277 Supplement for the ProSe Discovery and Communication Huawei imported from 3GU
S5‑165183 R14 CR TS32.251 Correction on the General Description Huawei imported from 3GU
S5‑165184 New WID Charging aspects of Improvements of Awareness of User Location Change Huawei imported from 3GU
S5‑165185 Possibility to terminate the charging session when no quota required Ericsson LM imported from 3GU
S5‑165186 Discussion of Control and User Plane Split Huawei Tech.(UK) Co., Ltd imported from 3GU
S5‑165187 New WID Study on mandatory AVP for 3GPP Diameter Accounting and Credit-Control Applications Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165188 Draft CR 32.103 Alignment with latest SA5 specification list and various enhancements Huawei, Ericsson imported from 3GU
S5‑165189 Rel-13 CR 32.251 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 Nokia, Alcatel-Lucent Shanghai Bell, Vodafone imported from 3GU
S5‑165190 Rel-13 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165191 Rel-13 CR 32.298 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 Nokia, Alcatel-Lucent Shanghai Bell imported from 3GU
S5‑165192 LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 BBF imported from 3GU
S5‑165193 LS from ETSI NFV to SA5 on NFV Interface and Architecture specifications ETSI ISG NFV imported from 3GU
S5‑165194 Discussion sequence proposal for 6.5.5 Ericsson LM imported from 3GU
S5‑165195 NGMN NWMO presentation Huawei -
S5‑165196 Reply to: Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network Ericsson -
S5‑165197 Discussion Sequence Proposal for 6.4.1.2 ZTE -
S5‑165198 Response LS from RAN2 cc SA5 on QoE reporting for streaming services R2-165972 -
S5‑165199 Reply to: LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 Ericsson -
S5‑165200 Informal presentation of draft LS NFV(16)000252 - LS OUT to 3GPP SA5 informing about update to application view in IFA015 Nokia Networks -
S5‑165201 New SID for Study on Management and Orchestration of Network Slicing (IoT) in 4G Cisco Systems Inc. -
S5‑165202 NEW SID Study on management aspects of the RAN virtualization Intel Corporation (UK) Ltd -
S5‑165203 New Study on a RESTful HTTP-based Solution Set Nokia Networks -
S5‑165204 pCR TR 28.800 Add management architecture use case of reusing the existing management system for next generation network Huawei Technologies -
S5‑165205 pCR TR 28.800 Add terminologies for network management and orchestration layering concept Huawei Technologies -
S5‑165206 pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration Huawei Technologies -
S5‑165207 pCR TS 28.525 Rapproteur proposal Nokia Networks -
S5‑165208 28.525 presentation sheet to SA Nokia Networks -
S5‑165209 Update of Scope Ericsson LM -
S5‑165210 pCR TR 28.801 Progress overview on network slicing in SA1, SA2, NGMN and analysis of potential management related aspects Huawei Technologies -
S5‑165211 Enhancements to offline charging for IMS AT&T -
S5‑165212 Adding Chapter and content for Concepts and Background Ericsson LM -
S5‑165213 Adding Network Slice and related Definitions Ericsson LM -
S5‑165214 pCR TR 28.801 High level use case for creating two new slice instances for different end user services Huawei Technologies -
S5‑165215 OAM&P SWG action list WG Vice Chair (Huawei) -
S5‑165216 pCR TR 28.801 use case for network slice lifecycle management Huawei Technologies -
S5‑165217 pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs Huawei Technologies -
S5‑165218 pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs Huawei Technologies -
S5‑165219 pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs Huawei Technologies -
S5‑165220 pCR TR 28.801 Adding resource isolation terminologies for network slicing Huawei Technologies -
S5‑165221 pCR TR 28.802 add use case for supporting cric management case Huawei Technologies -
S5‑165222 New WID Study on mandatory AVP for 3GPP Diameter Accounting and Credit-Control Applications Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165223 Reply LS to LS reply from CT4 to SA5 on progress of the work on Diameter Base Protocol Update Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165224 New WID Charging aspects of Improvements of Awareness of User Location Change Huawei -
S5‑165225 Possibility to terminate the charging session when no quota required Ericsson LM -
S5‑165226 New Section on Determination of Completeness of Charging Information in IMS Deutsche Telekom AG -
S5‑165227 LS to CT1 on Determination of Completeness of Charging Information in IMS Deutsche Telekom AG -
S5‑165228 R14 CR TS32.277 Message flow for Direct Communication via UE-to-Network Relay Huawei -
S5‑165229 R14 CR TS32.277 Message flow for Model B of ProSe Direct Discovery Huawei -
S5‑165230 R14 CR TS32.277 Message flow for ProSe One-to-One Direct Communication Huawei -
S5‑165231 R14 CR TS32.277 Message flow for Restricted Discovery Huawei -
S5‑165232 R14 CR TS32.277 Supplement for the ProSe Discovery and Communication Huawei -
S5‑165233 Rel-13 CR 32.251 Correction on Non-IP PDP type - alignement with TS 29.061 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165234 Rel-13 CR 32.298 Correction on Non-IP PDP type -alignement with TS 29.061 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165235 Rel-13 CR 32.251 Correction on RAT Type for charging SMS in MME Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165236 Rel-13 CR 32.251 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165237 Rel-13 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165238 Rel-13 CR 32.298 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165239 R14 CR TS32.251 Correction on the General Description Huawei -
S5‑165240 Rel-13 CR 32.251 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 Nokia, Alcatel-Lucent Shanghai Bell, Vodafone -
S5‑165241 Rel-13 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165242 Process for management of draft TSs/TRs WG Chairman -
S5‑165243 SA5 Meeting Calendar WG Vice Chair (Huawei) -
S5‑165244 pCR TS 28.500 Consistency edits and clarifications NTT DOCOMO -
S5‑165245 pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship NTT DOCOMO -
S5‑165246 pCR TS 28.500 Updating the NE and VNF concept China Mobile Com. Corporation -
S5‑165247 pCR TS 28.500 Aligning requirements and traceability on certain LCM use cases NTT DOCOMO -
S5‑165248 pCR TS 28.500 UC and requirements on automating different types of configuration NTT DOCOMO imported from 3GU
S5‑165249 Revised WID Filtering of PM measurements and data volume measurements for shared networks Ericsson -
S5‑165250 pCR TS 28.500 Adding the PM collection use case China Mobile Com. Corporation -
S5‑165251 pCR TS 28.500 Align the usage of term on non-application Huawei Technologies imported from 3GU
S5‑165252 pCR 28.510 Add MOI deletion requirement ZTE Corporation -
S5‑165253 pCR 28.510 Add traceabilities of MOI configuration requirements ZTE Corporation -
S5‑165254 draft TS 28.513 skeleton ZTE Corporation -
S5‑165255 Discussion paper- enhancement of NRM to support the VNF ZTE Corporation -
S5‑165256 Relation between NRM class and VNF/VNFC (implemented in VNFM) Ericsson Inc. -
S5‑165257 pCR TS 28.510 Align the usage of term on non-application Huawei Technologies imported from 3GU
S5‑165258 pCR TS 28.510 Modify use case of MO creation after VNF instantiation with VNF instance indentifier Huawei Technologies imported from 3GU
S5‑165259 pCR TS 28.510 Adding the requirement and use case for createMO with trigger of VNF instantiation Huawei Technologies -
S5‑165260 pCR TS 28.510 add the relationship between VNF termination and MO deletion Intel Corporation (UK) Ltd imported from 3GU
S5‑165261 pCR draft TS 28.511 Add procedure of creating MOI(s) after a VNF is instantiated ZTE Corporation imported from 3GU
S5‑165262 pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation Huawei Technologies -
S5‑165263 pCR TS 28.511 add CM procedures for the VNF instantiation Intel Corporation (UK) Ltd -
S5‑165264 pCR TS 28.511 add CM procedures for the VNF termination Intel Corporation (UK) Ltd -
S5‑165265 pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em Huawei Technologies -
S5‑165266 pCR TS 28.515 Rapporteur proposal Huawei Technologies -
S5‑165267 Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM Ericsson Inc. -
S5‑165268 pCR TS 28.517 Adding VNF alarm notification subscription stage 2 on Ve-vnfm-em Huawei Technologies -
S5‑165269 pCR TS 28.517 Adding alarm Information Model on Ve-Vnfm-em Huawei Technologies -
S5‑165270 pCR TS 28.518 Adding stage 3 content Huawei Technologies -
S5‑165271 pCR 28.500-110 update based on the reviews from edithelp China Mobile -
S5‑165272 pCR TS 28.523 add introduction and scope Intel Corporation (UK) Ltd -
S5‑165273 TDoc sequence proposal for 6.5.1 Orange -
S5‑165274 pCR TS 28.522 add stage 2 solutions Intel Corporation (UK) Ltd -
S5‑165275 Addressing EditHelp's comments China Mobile -
S5‑165276 pCR TS 28.520 add reference to ETSI GS NFV IFA008 specification Intel Corporation (UK) Ltd -
S5‑165277 pCR TS 28.520 change the terminologies related to legacy PM data Intel Corporation (UK) Ltd -
S5‑165278 Presentation TS 28.510 to SA for information ZTE Corporation -
S5‑165279 Rel-13 CR 32.298 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165280 Reply LS to Response LSs on Control Plane CIoT Optimisation Indicator propagated to PGW for charging purpose Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165281 Draft CR General description for Gy Session Optimization Ericsson -
S5‑165282 Rel-14 CR 32.299 Correction on Control Plane CIoT EPS Optimisation Indicator in PGW - alignement with 23.401 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165283 Meeting co-location with CT WGs in second quarter 2017 for SA5 SWG CH Charging SWG Chair -
S5‑165284 Rel-14 CR 32.299 Correction on "MO exception data" RRC establishment cause in offline charging- alignement with TS 23.401 Nokia, Alcatel-Lucent Shanghai Bell -
S5‑165285 draft TR 32.817 Ericsson -
S5‑165286 Draft TS 28.302 Nokia imported from 3GU
S5‑165287 Draft TR 32.856 ORANGE -
S5‑165288 Draft TR 32.880 China Mobile -
S5‑165289 pCR 28.525 Fetch On-boarded VNF Package Artifacts operation Cisco Systems Inc. -
S5‑165290 pCR 28.525 Abort VNF Package deletion operation Cisco Systems Inc. -
S5‑165291 pCR 28.525 Update NSD operation Cisco Systems Inc. -
S5‑165292 pCR 28.525 Delete NSD operation not in use Cisco Systems Inc. -
S5‑165293 pCR TS 28.526 add VNF termination procedure Intel Corporation (UK) Ltd -
S5‑165294 LS to IFA on the use of un-instantiated VNF instance ID in UpdateNS operation Noikia Networks -
S5‑165295 pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N Nokia Networks -
S5‑165296 Discussion paper - options for initial configuration data in VNF instantiation Nokia Networks imported from 3GU
S5‑165297 pCR TS 28.525 Add UCs for initial configuration data in VNF instantiation Nokia Networks -
S5‑165298 pCR TS 28.526 Add procedure for initial configuration data in VNF instantiation Nokia Networks -
S5‑165299 LSout to ETSI ISG NFV IFA WG on update NS scenarios Nokia Networks -
S5‑165300 pCR TS 28.525 Add Use Cases for NS update with add VL and VNF Nokia Networks -
S5‑165301 pCR TS 28.525 Add Use Case for NS update with add SAP Nokia Networks -
S5‑165302 pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL Nokia Networks -
S5‑165303 pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL Nokia Networks -
S5‑165304 pCR TS 28.525 Adding specification UCs and requirements related to updating NS NTT DOCOMO -
S5‑165305 28.525 presentation sheet to SA Nokia Networks -
S5‑165306 Cover sheet TS 28.520 Intel -
S5‑165307 pCR Conclusion and Recommendations for TR 32.817 Ericsson -
S5‑165308 Presentation of Specification/Report to TSG: TR 32.817, Version 1.0.0 Ericsson -
S5‑165309 Revised WID Filtering of PM measurements and data volume measurements for shared networks Ericsson -
S5‑165310 Skeleton for 28.302 "Licensed Shared Access (LSA) Controller (LC) Integration Reference Point (IRP); Information Service" RED Technologies SAS -
S5‑165311 Definition of operations and parameters RED Technologies SAS -
S5‑165312 pCR TS 28.510 Rapporteur proposal ZTE -
S5‑165313 Addition of use cases Nokia Networks -
S5‑165314 pCR TR 32.880 overview of protocols based on socket API China Mobile -
S5‑165315 pCR 32.856 Update Scope ORANGE, Huawei -
S5‑165316 pCR 32.856 Proposed text for clause 5.2 ORANGE, Huawei -
S5‑165317 LSout to ETSI ISG NFV IFA WG on the use of un-instantiated VNF instance ID in UpdateNS operation Noikia Networks -
S5‑165318 OAM&P SWG action list WG Vice Chair (Huawei) -
S5‑165319 Reply to: Resubmitted LS from ATIS NRSC to SA5 on RE: Establish a Metric to Determine a Drop in Registered Users in an IP-Based Network Ericsson -
S5‑165320 Reply to: LS from BBF to SA5 on Proposed TR-196i2 Corrigendum 3 Ericsson -
S5‑165321 LS on update of the work plan of stage 3 Huawei -
S5‑165322 New SID for Study on Management and Orchestration of Network Slicing (IoT) in 4G Cisco Systems Inc. -
S5‑165323 New SID Study on management aspects of virtualized network functions that are part of the RAN Intel Corporation (UK) Ltd -
S5‑165324 New Study on a RESTful HTTP-based Solution Set Nokia Networks -
S5‑165325 pCR TS 28.500 Addressing note about “platform” in NE and VNF relationship NTT DOCOMO,China Mobile -
S5‑165326 pCR TS 28.500 Updating the NE and VNF concept China Mobile Com. Corporation -
S5‑165327 new draft TS 28.500 China Mobile -
S5‑165328 pCR TR 28.801 High level use case for creating two new slice instances for different end user services Huawei Technologies -
S5‑165329 Study on management aspects of next generation network architecture and features Nokia -
S5‑165330 Study on OAM aspects of SON for AAS-based deployments Nokia -
S5‑165331 pCR TS 28.500 Adding the PM collection use case China Mobile Com. Corporation -
S5‑165332 pCR 28.510 Add traceabilities of MOI configuration requirements ZTE Corporation -
S5‑165333 Draft TS 28.510 ZTE -
S5‑165334 Draft TS 28.513 ZTE -
S5‑165335 Discussion paper- enhancement of NRM to support the VNF ZTE Corporation -
S5‑165336 pCR TS 28.511 Adding procedure flow for createMO with trigger of VNF instantiation Huawei Technologies -
S5‑165337 pCR TS 28.515 Adding VNF alarm notification subscription requirement on Ve-vnfm-em Huawei Technologies -
S5‑165338 Draft TS 28.515 Huawei -
S5‑165339 Draft TS 28.517 Huawei -
S5‑165340 Draft TS 28.518 Huawei -
S5‑165341 Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM Ericsson Inc. -
S5‑165342 Draft TS 28.522 Intel -
S5‑165343 Draft TS 28.520 Intel -
S5‑165344 pCR TS 28.520 change the terminologies related to legacy PM data Intel Corporation (UK) Ltd -
S5‑165345 Draft TS 28.523 Intel -
S5‑165346 Draft TS 28.525 Nokia -
S5‑165347 Draft TS 28.526 Nokia -
S5‑165348 pCR TS 28.525 Update Use Case VNF instantiation initiated through Itf-N Nokia Networks -
S5‑165349 pCR TS 28.525 Add Use Cases for NS update with add VL and VNF Nokia Networks -
S5‑165350 pCR TS 28.525 Add Use Case for NS update with add SAP Nokia Networks -
S5‑165351 pCR TS 28.525 Add Use Case for NS instantiate with existing VNFs and new VL Nokia Networks -
S5‑165352 pCR TS 28.525 Add Use Case for NS instantiate with existing NSs and new VL Nokia Networks -
S5‑165353 LSout to ETSI ISG NFV IFA WG on the use of un-instantiated VNF instance ID in UpdateNS operation Noikia Networks -
S5‑165354 Draft TR 28.800 Huawei imported from 3GU
S5‑165355 pCR TR 28.800 Add terminologies for network management and orchestration layering concept Huawei Technologies -
S5‑165356 pCR TR 28.800 Add terminologies for network managmeent and orchestration/resource management and orchestration Huawei Technologies imported from 3GU
S5‑165357 Draft TR 28.801 Huawei imported from 3GU
S5‑165358 pCR TR 28.801 Adding use case for creating network slices with common and slice specific NFs Huawei Technologies -
S5‑165359 pCR TR 28.801 Adding use case for modifying network slices with common and slice specific NFs Huawei Technologies -
S5‑165360 pCR TR 28.801 Adding use case for terminating network slices with common and slice specific NFs Huawei Technologies -
S5‑165361 pCR TR 28.801 Adding resource isolation terminologies for network slicing Huawei Technologies -
S5‑165362 pCR TR 28.801 use case for network slice lifecycle management Huawei Technologies -
S5‑165363 pCR TR 28.801 High level use case for creating two new slice instances for different end user services Huawei Technologies -
S5‑165364 Update of Scope Ericsson LM -
S5‑165365 Adding Chapter and content for Concepts and Background Ericsson LM -
S5‑165366 pCR TR 28.802 add use case for supporting cric management case Huawei Technologies imported from 3GU
S5‑165367 Draft TS 28.511 ZTE imported from 3GU
S5‑165368 Add UC and reqs Virtualization-specific aspect failure detection and notification by VNFM Ericsson Inc. -
S5‑165369 Draft TS 28.301 Nokia imported from 3GU
S5‑165370 Draft TS 28.802 Nokia imported from 3GU
S5‑165371 LS to CT1 on Determination of Completeness of Charging Information in IMS Deutsche Telekom AG -
S5‑165372 LSout to ETSI ISG NFV IFA WG on update NS scenarios Nokia Networks -
S5‑165373 Revised WID Management concept, architecture and requirements for mobile networks that include virtualized network functions China Mobile Com. Corporation -
S5‑165374 OAM Executive Report from THIS Meeting WG Vice Chair (Huawei) -

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links