The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: S5-07 - 1999-10-26 to 1999-10-29, TAMPERE

meeting id: S5-07 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
S5‑99208 Draft report for SA5 #6 (Cork, 31st Aug - 3rd Sept, 1999) S5 secretary approved
S5‑99209 Draft agenda for SA5 #7 (Tampere, 26th Oct - 29th Oct, 1999) S5 chairman approved
S5‑99210 Contribution to 31.104: for annex B "Measurement Report File Transfer Procedure" T-Mobil revised - see S5-99260
S5‑99211 3G TS 32.106 v0.2.0 "3G Configuration management" 31.106 rapporteur revised - see S5-99216
S5‑99212 LS from T1P1.5 "GSM LCS Charging" T1P1.5 (99-582) discussed - see S5-99250
S5‑99213 3G TS 32.101 v1.2.0 Telecom management principles and high level reqs T3 secretary noted
S5‑99214 3G TS 32.102 v1.2.0 Telecom management architecture T3 secretary noted
S5‑99215 3G TS 32.104 v1.0.0 Performance Management T3 secretary noted
S5‑99216 3G TS 32.106 v1.0.0 Configuration Management T3 secretary noted
S5‑99217 3G TS 32.111 v1.0.0 Fault Management T3 secretary noted
S5‑99218 Contribution to 32.104: Measurement File Format definition Lucent (TP) postponed -> SA5 #8
S5‑99219 Contribution to 32.104: Amended Figure 1 for 32.104 Motorola (MT) revised - see S5-99257
S5‑99220 Discussion document: Call trace requirements Motorola (MT) -
S5‑99221 Contribution to 32.101: Merging of Section 5 ( Architectural Framework) and Section 9 (UMTS Management Interfaces) Motorola (MT) discussed
S5‑99222 Contribution to 32.111: NMC interface Siemens (LH) postponed -> S5 #8
S5‑99223 Integration Reference Points (IRPs) – Technical overview Ericsson (TT) postponed -> S5 #8
S5‑99224 Alarm IRP Specification: CORBA Solution Set Ericsson (TT) postponed -> S5 #8
S5‑99225 Alarm IRP Specification: SNMP Solution Set Ericsson (TT) postponed -> S5 #8
S5‑99226 Liaison officers report on the TMF Liaison Officer (MT) noted
S5‑99227 Contrib to 32.111: Requirements for the NMC interface of Fault Management Sonera (KK) discussed
S5‑99228 LS from RAN3: Call Trace Message Contents and Call Trace Deactivation RAN3 (R3-99D39) postponed
S5‑99229 Contrib to 32.111: Revision to introduction Italtel (GC) discussed
S5‑99230 Contrib to 32.111: Revision to scope Italtel (GC) discussed
S5‑99231 Contrib to 32.111: Revision to definitions clause Italtel (GC) postponed -> S5 #8
S5‑99232 Contrib to 32.111: Revision to clause 4 "Fault Management concept" Italtel (GC) postponed -> S5#8
S5‑99233 Contrib to 32.101: Terminology to be used for management systems Ericsson (UH) agreed
S5‑99234 Contrib to 32.104: Performance Data IRP Specification: Information Model Ericsson (UH) postponed -> S5 #8
S5‑99235 Comments on IRP Proposals &, Alarm Integration Reference Point (see S5-99177) Motorola (MT) postponed -> S5#8
S5‑99236 Chairman's Report from Kyongju TSG-SA #5 meeting S5 chairman noted
S5‑99237 Draft. CORBA-Generic Network and NE Level Information Model TMN Liaison Officer noted
S5‑99238 Draft Standard. Framework for CORBA-Based TMN Interfaces TMN Liaison Officer noted
S5‑99239 LS from ITU-T Q.19/4 to ETSI TMN "Progress on the use of CORBA within the TMN in ITU-T Q.19/4" TMN Liaison Officer noted
S5‑99240 Meeting Report - JQG 6 (IMT-2000 Management), Sept 13-16 1999 ITU noted
S5‑99241 Draft Recommendation M.3020 (07/95): TMN INTERFACE SPECIFICATION METHODOLOGY ITU noted
S5‑99242 M.3020 Appendix 1: Example use of GDMI (LCS Provision) ITU noted
S5‑99243 3G TS 22.115 "Charging and Billing" S1 discussed - see S5-99251
S5‑99244 Contribution to 32.111: NMC interface (modified section 8.1 of S5-99222) T-Mobil -
S5‑99245 Report - Cross-work item technical discussion & 32.101 rapporteur session 31.101 rapporteur revised - see S5-99264
S5‑99246 3G TR 30.802, Project Plan, Bearer & QoS version 1.0.0 S2 reviewed
S5‑99247 3G PD 30.806, Project Plan, Location and cell broadcast services V 1.0.0 S2 reviewed
S5‑99248 3G PD 30.808, Project Plan, Packet and Circuit Architecture V1.0.0 S2 reviewed
S5‑99249 3G TR 30.812, Project Plan, Services and Service Platforms V1.0.0 S2 reviewed
S5‑99250 Reply to LS from T1P1.5 "GSM LCS Charging" S5 agreed
S5‑99251 LS for S1: Comments to TS 22.115 S5 revised - see S5-99267
S5‑99252 Report of S5#, Charging Report S5 charging rapp revised - see S5-99255
S5‑99253 Discussion document - Work plan for 2000 S5 vice-chairman discussed
S5‑99254 Requirements on the RNC routing of IP O&M signalling Telia postponed -> SA5 #8
S5‑99255 Report from charging group at SA5 #7 S5 charging rapp noted
S5‑99256 Network management related document from ETSI TIPHON meeting #15 S5 secretary noted
S5‑99257 Contribution to 32.104: Amended Figure 1 for 32.104 PM group agreed
S5‑99258 Report from architecture rapporteurs group (32.102) 31.102 rapp noted
S5‑99259 Contribution to 32.104 (amendment to S5-99194) Lucent agreed
S5‑99260 Contribution to 31.104: "Measurement Report File Transfer Procedure" PM group agreed
S5‑99261 Report from PM rapporteur group at SA5 #7 PM rapporteur noted
S5‑99262 Report from FM rapporteur group at SA5 #7 FM rapporteur noted
S5‑99263 Report from CM rapporteur group at SA5 #7 CM rapporteur revised - see S5-99266
S5‑99264 Report from Cross-work item & 32.101 rapporteur sessions 32.101 rapporteur noted
S5‑99265 Definition and completion of Release 1999 TSG-SA noted
S5‑99266 Report from CM rapporteur group at SA5 #7 CM rapporteur noted
S5‑99267 LS to S1: Comments on TS 22.115 S5 approved

page generated from database: 2024-03-25 09:25:51

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links