The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: S5-05 - 1999-07-20 to 1999-07-22, SAN DIEGO

meeting id: S5-05 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
S5‑99118 SA5 #4 meeting report SA5 #4 Secretary revised - see S5-99154
S5‑99120 3G TS 32.102 V1.2.1 (1999-06) WI2 Rapporteur noted
S5‑99121 Proposed LS to RAN3 on Cell Configuration and Management Philosophy T-Mobil discussed
S5‑99122 Network Element Management Architecture Lucent agreed
S5‑99123 Contribution to Fault management work item Siemens discussed
S5‑99124 Contribution to 32.102 section 7.3.1 Interfaces Sonera discussed
S5‑99125 Comments to Telecom Operations Map GB910 Version 1.1 Motorola & Siemens noted
S5‑99126 Report of Cheju ITU-T JQG6 meeting ITU-T SG11 liaison rappor noted
S5‑99127 GSM 12.04 v4.3.1 "Performance data measurements" S5 secretary noted
S5‑99128 Proposed LS to RAN3 on Cell Configuration and Management Philosophy Italtel discussed
S5‑99129 GSM 12.05 v7.0.0 "Call and event records" S5 secretary noted
S5‑99130 GSM 12.06 v4.1.1 "Network configuration management" S5 secretary noted
S5‑99131 3G TS 32.104 v0.0.1 (1999-07) T-Mobil discussed
S5‑99132 TMF Mobile Management Summary Meeting Report Motorola noted
S5‑99133 Proposed TMF-3GPP Liaison Agreement Motorola discussed - see S5-99157
S5‑99134 Alarm IRP and GUI Launch IRP presentation Ericsson discussed
S5‑99135 Discussion document on the Management Interface description Italtel discussed
S5‑99136 Discussion document on NE / NE-OS interface Italtel discussed
S5‑99137 Discussion document on Fault Management on the NE-OS / N-OS interface Italtel discussed
S5‑99138 Software Management Process description Siemens agreed
S5‑99139 GSM 12.11 v6.3.0 "Fault management of the BSS" S5 secretary noted
S5‑99140 GSM 12.15 v7.2.0 "GPRS charging" S5 secretary revised - see S5-99153
S5‑99141 Information Model for NE-OS / N-OS Interface Italtel discussed
S5‑99142 Network Element ownership of logical cell parameters Motorola discussed
S5‑99143 Cell Availability / Unavailability logical O&M NBAP Procedures Motorola discussed
S5‑99144 Comments on TR I3.05 Siemens, Italtel discussed
S5‑99145 Comments on the proposed liaison reply to RAN-3 :" Liaison on Cell Configuration and Management Philosophy" Italtel, Siemens discussed
S5‑99146 Technical project co-ordination within S2 and 3GPP 3GPP SA2 noted
S5‑99147 3GPP TSG S2 Report to SA plenary 3GPP SA2 chair noted
S5‑99148 Request for contact person(s) for Location Services in UMTS S2 LCS ad hoc chair discussed
S5‑99149 LS from RAN3 - Invitation to comment on I3.05 v0.2.1 – Node B O&M Functional Description RAN3 discussed - see S5-99161
S5‑99150 LS from SMG6 GRPS: "ETSI SMG6 and 3GPP TSG SA5 Work Integration" ETSI SMG6 GPRS discussed - see S5-99158
S5‑99151 Draft Agenda for S5 #5 (San Diego, 20 - 22 July, 1999) S5 chairman approved
S5‑99152 Dividing content of document S5-99098 "Management Framework for UMTS" in to baseline documents of WI-1 and WI-2 Nokia discussed
S5‑99153 GSM 12.15 v7.2.1 S5 secretary noted
S5‑99154 Approved report of the S5 #4 meeting S5 secretary approved
S5‑99155 Report from RAN3 O&M Ad Hoc Meeting #4 Helsinki, 6th July 1999 RAN3 O&M adhoc chair noted
S5‑99156 Proposed LS to RAN3 "re:Cell Configuration and Management Philosophy" S5 revised - see S5-99159
S5‑99157 Proposed LS to TSG-SA "Proposed TMF-3GPP Liaison Agreement" S5 postponed -> S5 #6
S5‑99158 LS to SMG6 GPRS " re: SMG6 and 3GPP TSG SA5 Work Integration" S5 approved
S5‑99159 LS to RAN3 "re:Cell Configuration and Management Philosophy" S5 approved
S5‑99160 Discussion document on Network Element Management Architecture Ericsson discussed
S5‑99161 LS to RAN3 " I3.05 – Node B O&M Functional Description" S5 approved

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links