3GPP TDocs (written contributions) at meeting
Meeting: S2-61 - 2007-11-12 to 2007-11-16, Ljubljana
meeting id: S2-61 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S2‑074905 | Conclusion to the architecture alternatives for support of non ICS UE | Vodafone, NEC, Ericsson, Mavenir, China Mobile, NSN, Nokia | Revised in S2-075359 |
S2‑074920 | Latest version TR23.892 | Rapporteur (Alcatel-Lucent) | Revised in IMS SWG to S2-075567 |
S2‑074921 | Draft skeleton of TS 23.292 | Rapporteur (Alcatel-Lucent) | Revised in IMS SWG to S2-075479 |
S2‑074922 | Proposed Scope for 23.292 | Alcatel-Lucent | Revised in IMS SWG to S2-075480 |
S2‑074923 | LS (from GERAN WG2) on the continuity of voice calls between LTE and GERAN/UTRAN | GERAN WG2 (GP-070138) | Noted |
S2‑074924 | Reply LS (from SA WG1) regarding scenarios relevant for the design of inter GERAN/LTE cell reselection/handover procedures | SA WG1 (S1-071115) | Noted |
S2‑074925 | LS (from CT WG1) on the piggybacked transport of NAS signalling messages | CT WG1 (C1-071993) | Reply LS in S2-075598 |
S2‑074926 | LS (from CT WG1) on Closed Subscriber Groups for LTE Home cells | CT WG1 (C1-072156) | Postponed to meeting #62 |
S2‑074927 | LS (from CT WG1) on support for intra UTRAN service continuity based on Rel-7 VCC framework | CT WG1 (C1-072157) | Noted |
S2‑074928 | LS (from RAN WG2) on answer to "QoS Characterization for LTE/EPS" | RAN WG2 (R2-073853) | Noted |
S2‑074929 | Reply LS (from SA WG4) on QoS Characterization for LTE/EPS | SA WG4 (S4-070596) | Postponed to meeting #62 |
S2‑074930 | LS (from TSG CT) on New WI and TR for Diameter-based protocols usage and recommendations in 3GPP | TSG CT (CP-070682) | Postponed to meeting #62 |
S2‑074931 | Response LS (from TSG GERAN) to TC-RT DMO Group clarification regarding radio aspect of DMO | TSG GERAN (GP-071538) | Postponed to meeting #62 |
S2‑074932 | LS (from RAN WG4) on Home NodeB/eNodeB regarding localisation/authorisation | RAN WG4 (R4-071516) | Response drafted in S2-075592 |
S2‑074933 | Liaison (from IEEE 802.11 WG) to 3GPP SA WG2 regarding future interworking co-operation | IEEE 802.11 WG (IEEE 802.11-07/2520r1) | Postponed to meeting #62 |
S2‑074934 | LS (from ETSI TISPAN) on NAT Traversal | ETSI TISPAN (14tTD434r2) | Noted |
S2‑074935 | Reply LS (from SA WG3) on "LS on Home NodeB/eNodeB regarding localisation / authorisation" | SA WG3 (S3-070834) | Revised in S2-074961 |
S2‑074936 | Reply LS on "SAE Interworking with Pre-REL8 system" | SA WG3 (S3-070835) | Postponed to meeting #62 |
S2‑074937 | Reply LS (from SA WG3) on S3-070794 LS on Security Mode Command procedure (R3-071749) | SA WG3 (S3-070837) | Postponed to meeting #62 |
S2‑074938 | Reply LS (from SA WG3) on "Service Request" | SA WG3 (S3-070838) | Reply LS in S2-075598 |
S2‑074939 | Reply LS (from SA WG3) on Reply LS on DSMIPv6 security over the S2c reference point (S2-073947 / S3-070718) | SA WG3 (S3-070845) | Response drafted in S2-075731 |
S2‑074940 | LS from ITU-T Q.4/13 Rapporteur Group: ITU-T draft Recommendation Y.2111/Y.RACF R2, "Resource and admission control functions in Next Generation Networks" | ITU-T Q.4/13 Rapporteur Group (COM 13 -LS 215-E) | Postponed to meeting #62 |
S2‑074941 | Reply LS (from CT WG1) on redirection | CT WG1 (C1-072483) | Postponed to meeting #62 |
S2‑074942 | LS (from CT WG1) on Area and Access Restrictions | CT WG1 (C1-072484) | Postponed to meeting #62 |
S2‑074943 | LS from CT WG1: EPS Mobility Management (EMM) sublayer state machine in UE | CT WG1 (C1-072537) | Reply drafted in S2-075838 |
S2‑074944 | Reply (from CT WG1) to LS on CSG Cells Handling | CT WG1 (C1-072709) | Postponed to meeting #62 |
S2‑074945 | LS (from CT WG4) response to C4-071522 / S2-073939 on "LS on IP Fragmentation" | CT WG4 (C4-071576) | Reply in S2-075831 |
S2‑074946 | LS (from CT WG4) on CAT service requirements | CT WG4 (C4-071631) | Noted |
S2‑074947 | LS (from GERAN WG2) on the introduction of Inter-Domain Handover | GERAN WG2 (G2-070379) | Reply in S2-075842 |
S2‑074948 | LS (from RAN WG2) on Registration in registration in densely populated area (RED) | RAN WG2 (R2-072944) | Postponed to meeting #62 |
S2‑074949 | LS (from RAN WG2) on NAS Service Request | RAN WG2 (R2-074573) | Reply LS in S2-075598 |
S2‑074950 | LS (from RAN WG2) on S101 Interface | RAN WG2 (R2-074582) | Postponed to meeting #62 |
S2‑074951 | LS (from RAN WG2) on signalling for paging | RAN WG2 (R2-074587) | Response in S2-075586 |
S2‑074952 | LS (from RAN WG2) on UE specific paging DRX | RAN WG2 (R2-074594) | Response in S2-075587 |
S2‑074953 | LS from RAN WG3: Transfer of PDCP SDU Sequence Numbers over X2 Interface | RAN WG3 (R3-072019) | Postponed to meeting #62 |
S2‑074954 | Reply LS (from RAN WG3) on piggy-backed transport of NAS signalling messages | RAN WG3 (R3-072026) | Reply LS in S2-075598 |
S2‑074955 | LS from SA WG3: S6a Reference Point Security. | SA WG3 (S3-070842) | Postponed to meeting #62 |
S2‑074956 | LS (from SA WG3) on "Handling of IMEI(SV) on E-UTRAN" | SA WG3 (S3-070843) | Noted |
S2‑074957 | Reply LS (from SA WG3) on Passing the private user identity to the PNM AS | SA WG3 (S3-070858) | Postponed to meeting #62 |
S2‑074958 | Reply (from SA WG3) to LS S3-070785 = S2-073909 on Security Parameters | SA WG3 (S3-070876) | Postponed to meeting #62 |
S2‑074959 | LS from SA WG3: On Support of IMS emergency call over I-WLAN | SA WG3 (S3-070897) | Noted |
S2‑074960 | LS (from TSG SA) on Codecs and Common IMS | TSG SA (SP-070697) | Noted |
S2‑074961 | Reply LS (from SA WG3) on "LS on Home NodeB/eNodeB regarding localisation / authorisation" | SA WG3 (S3-070907) | Postponed to meeting #62 |
S2‑074962 | SMS/IP inconsistencies in specifications | Research In Motion | Noted |
S2‑074963 | Dedicated Bearer Activation in EMM_IDLE state | ZTE | Revised in parallel session in S2-075606 |
S2‑074964 | eNodeB Initiated Dedicated Bearer Deactivation | ZTE | Revised in parallel session in S2-075607 |
S2‑074965 | HSS Initiated Dedicated Bearer Modification | ZTE | Revised in parallel session in S2-075608 |
S2‑074966 | EMM State Transition | ZTE | Not Handled |
S2‑074967 | ISR principle proposal | ZTE | Noted |
S2‑074968 | ISR activation procedure | ZTE | Not Handled |
S2‑074969 | Periodic update | ZTE | Not Handled |
S2‑074970 | Delete the PGW address in HSS when the UE detach | ZTE | Noted |
S2‑074971 | UE context retrieval failure handling | ZTE | Noted |
S2‑074972 | LS from ETSI TISPAN: Way forward on the e2 and Gq' issue | ETSI TISPAN (15TD074) | Noted |
S2‑074973 | Study on Circuit Switched (CS) domain services over evolved Packet Switched (PS) access | Rapporteur | Approved |
S2‑074974 | Adding further clarifications to Alternative 1 (eMSC proposal) | Bouygues Telecom, T‑Mobile | Revised in parallel session in S2-075611 |
S2‑074975 | Adding new Alternative combining Alternative 1 and 3 | T-Mobile | Revised in parallel session in S2-075612 |
S2‑074976 | Conclusion for TR 23.879 | T-Mobile | Revised in S2-075730 |
S2‑074977 | Circuit Switched (CS) domain services over evolved Packet Switched (PS) access | T-Mobile | Revised in S2-075584 |
S2‑074978 | MBMS session control | Panasonic | Not Handled |
S2‑074979 | Mapping of MBMS functions | Panasonic | Revised in parallel session in S2-075595 |
S2‑074980 | PDN GW selection based on subscription data | China Mobile | Revised in parallel session in S2-075643 |
S2‑074981 | Subscriber priority decision and related procedures | China Mobile | Noted. Merge into S2-075640 if agreeable. |
S2‑074982 | - | China Mobile | - |
S2‑074983 | Reply LS on IP fragmentation | China Mobile | Revised in S2-075583 |
S2‑074984 | Area restriction alternative | China Mobile | Not Handled |
S2‑074985 | Reply LS on Home NodeB/eNodeB localisation/authorisation | China Mobile | Revised in S2-075592 |
S2‑074986 | - | China Mobile | - |
S2‑074987 | TR 23.893 version 0.3.0 | LG Electronics (Rapporteur) | Revised in IMS SWG to S2-075564 |
S2‑074988 | Session Transfer triggered by the network and Session Transfer Operator Policy | LG Electronics, Huawei, Orange, Telecom Italia, TOSHIBA | Not Handled |
S2‑074989 | Update MMSC AS architecture and Introduce logical entities | LG Electronics, Huawei, Orange, Telecom Italia, TOSHIBA | Revised in IMS SWG to S2-075478 |
S2‑074990 | Restructuring of MMSC TR to have common Architecture | LG Electronics, Huawei, KDDI, Orange, Qualcomm Europe, Telecom Italia, Telcordia, TOSHIBA, Marvell | Revised in IMS SWG to S2-075470 |
S2‑074991 | Way forward MMSC TR and Service Continuity TS | LG Electronics, BT, Huawei, KDDI, Orange, Qualcomm Europe, Telecom Italia, Telcordia, TOSHIBA | Noted |
S2‑074992 | WID for IMS Service Continuity | BT, KDDI, Huawei, LG Electronics, Orange, Qualcomm Europe, SK Telecom, Telcordia, Telecom Italia, TOSHIBA | Noted |
S2‑074993 | Transfer of TISPAN VCC from ETSI TISPAN to 3GPP | Telecom Italia, LG Electronics, Orange | Noted |
S2‑074994 | 23.206 CR0072: Transfer of a Common IMS item from ETSI TISPAN to 3GPP: Voice Call Continuity | Telecom Italia, LG Electronics, Orange | Noted |
S2‑074995 | Standardized Label for conversational video flows | Qualcomm Europe, T-Mobile | Revised in S2-075684 |
S2‑074996 | Priority as a Label Characteristics | Qualcomm Europe | Revised in S2-075594 |
S2‑074997 | Additions to support S2c based optimized LTE-CDMA 2000 handover | Qualcomm Europe | Noted |
S2‑074998 | Idle Mode Signalling Reduction for TS 23.402 | Qualcomm Europe | Not Handled |
S2‑074999 | Next steps for IP Mobility Mode Selection | Qualcomm Europe | Not Handled |
S2‑075000 | IKEv2 and IPSEC clean-up for S2c flows | Qualcomm Europe, Telecom Italia, Marvell | Revised in S2-075732 |
S2‑075001 | PDNGW Selection cleanup for S2c | Qualcomm Europe, Telecom Italia | Not Handled |
S2‑075002 | Usage of a specific mobility reference points towards the PDNGW | Qualcomm Europe | Not Handled |
S2‑075003 | S2c over Untrusted non-3GPP access: attach & detach flows | Qualcomm Europe, Samsung | Not Handled |
S2‑075004 | Alt-E and CS-> LTE VCC without simultaneous CS and PS | Qualcomm Europe, Alcatel-Lucent | Revised in S2-075665 |
S2‑075005 | SR-VCC Conclusions | Qualcomm Europe, Alcatel-Lucent | Revised in S2-075662 |
S2‑075006 | Information flow for PS-PS session continuity with IP-level mobility support | KDDI, Telcordia, LG Electronics | Revised in IMS SWG to S2-075476 |
S2‑075007 | Handover optimization from EUTRAN access to cdma2000 HRPD access | KDDI, Starent | Noted |
S2‑075008 | Draft Reply LS on UE specific paging DRX | China Mobile | Revised in S2-075587 |
S2‑075009 | Draft Reply LS on signalling for paging | China Mobile | WITHDRAWN |
S2‑075010 | Principles of IP fragmentation reducing mechanisms | Huawei | Not Handled |
S2‑075011 | Serving GW selection for non-3GPP access | Huawei | Revised in parallel session in S2-075645 |
S2‑075012 | QoS profile retrieval in GTP-based non-3GPP Roaming | Huawei | Revised in S2-075679 |
S2‑075013 | Impact on S11/S4 interface in case Serving GW Supporting Both PMIP and GTP | Huawei | Revised in S2-075681 |
S2‑075014 | - | Huawei | - |
S2‑075015 | Discussion on the trigger to deactivate ISR | Huawei | Not Handled |
S2‑075016 | Procedure of ISR Deactivation | Huawei | Not Handled |
S2‑075017 | Procedure on URA_PCH handling for ISR | Huawei | Not Handled |
S2‑075018 | TAU/RAU Procedures for ISR | Huawei | Not Handled |
S2‑075019 | Downlink Data Transfer and Service Request for ISR | Huawei | Not Handled |
S2‑075020 | Draft Procedures for ISR | Huawei | Revised in parallel session in S2-075652 |
S2‑075021 | - | Huawei | - |
S2‑075022 | Detach procedure for ISR | Huawei | Not Handled |
S2‑075023 | Detach with the ISR | Huawei | Not Handled |
S2‑075024 | S-TMSI interworking with legacy network | Huawei | Not Handled |
S2‑075025 | Primary PDP Context Activation for UTRAN/GERAN access | Huawei | Not Handled |
S2‑075026 | Secondary PDP Context Activation for UTRAN GERAN access | Huawei | Not Handled |
S2‑075027 | Corrections to 23.401 pre-Rel-8 3G RAU procedures | Huawei | Revised in S2-075701 |
S2‑075028 | Addition of CAMEL to 23.401 pre-Rel-8 3G RAU procedures | Huawei | Revised in parallel session in S2-075655 |
S2‑075029 | - | Huawei | - |
S2‑075030 | - | Huawei | - |
S2‑075031 | Discussion on Optimized handover between LTE and HRPD | Huawei | Noted |
S2‑075032 | Optimized Idle Mode Handover from HRPD to E-UTRAN | Huawei | Not Handled |
S2‑075033 | Discussion on PDN GW address update | Huawei | Not Handled |
S2‑075034 | Discussion on IPMS for untrusted non-3GPP access | Huawei | Not Handled |
S2‑075035 | Discussion on optimized handover between 3GPP access and Wimax | Huawei | Revised in S2-075688 |
S2‑075036 | PCRF selection | Huawei | Noted |
S2‑075037 | MBMS procedure | Huawei | Used as the basis to draft the flows for SAE MBMS |
S2‑075038 | Analysis and optimization for alternative D2&E | Huawei | Not Handled |
S2‑075039 | Clarification for the delivery report | Huawei | Noted. Related LS Out in S2-075515 |
S2‑075040 | Clarification for interworking between IM and SMSIP | Huawei | Approved |
S2‑075041 | - | Huawei | - |
S2‑075042 | 23.204 CR0036: Annex C: IM user sends an Instant Message to a group list including SMS users | Huawei | Revised in IMS SWG to S2-075546 |
S2‑075043 | 23.204 CR0037: IM capable UE sends an Instant Message to an SMS user | Huawei, China Mobile | Revised in IMS SWG to S2-075544 |
S2‑075044 | Discussion the way forward for CSoPS | Huawei | Not Handled |
S2‑075045 | Deregistration procedure for CSoPS | Huawei | Revised in parallel session in S2-075613 |
S2‑075046 | Registration procedure for CSoPS | Huawei | Revised in parallel session in S2-075614 |
S2‑075047 | I6 reference point | Mavenir, Ericsson, NEC, Vodafone | Revised in IMS SWG to S2-075471 |
S2‑075048 | I7 reference point | Mavenir, Ericsson, Nokia Siemens Networks, NEC, Vodafone | Revised in IMS SWG to S2-075504 |
S2‑075049 | Registration event for enhanced MSC Server | Mavenir, Ericsson, Huawei, NEC, Vodafone | Revised in IMS SWG to S2-075505 |
S2‑075050 | Network ICS definitions | Mavenir, Ericsson, NEC, Vodafone | Noted |
S2‑075051 | Service configuration | Mavenir, NEC, Vodafone, Ericsson | Revised in IMS SWG to S2-075523 |
S2‑075052 | Enhanced MSC Server flows - Hold | Mavenir, Ericsson, Vodafone, Huawei, NEC, China Mobile | Not Handled |
S2‑075053 | Enhanced MSC Server flows - ECT | Mavenir, Ericsson, Vodafone, Huawei, NEC, China Mobile | Not Handled |
S2‑075054 | Clarification of IP CAN Session Granularity | Samsung, Motorola | Revised in S2-075670 |
S2‑075055 | IP address allocation for PMIP based interfaces | Samsung, IPWireless, Nextwave | Revised in S2-075627 |
S2‑075056 | Enabling multiple PDNs per PDN GW with PMIP based S5/S8 | Samsung, Azaire Networks | Revised in parallel session in S2-075618 |
S2‑075057 | TAU procedure with ISR | Samsung | WITHDRAWN |
S2‑075058 | Interworking with pre-Rel8 HSS | Samsung | Not Handled |
S2‑075059 | Discussion on MME id, STMSI format, NRI use | Nortel, ZTE | Not Handled |
S2‑075060 | Discussion on TAC option 1 and option 2 | Nortel | Not Handled |
S2‑075061 | Two RAT identifiers when ISR is used | Nortel | Not Handled |
S2‑075062 | Avoid Cancel Location when ISR is used | Nortel | Not Handled |
S2‑075063 | MBMS1 and MBMS2 mapping to MME and GW | Nortel | Not Handled |
S2‑075064 | Independent delivery of text-based broadcast message and MBMS core architecture | Nortel | Not Handled |
S2‑075065 | On PCRF selection and storage | ZTE | Noted |
S2‑075066 | Proposed text change for PCRF selection | ZTE | Noted |
S2‑075067 | Registration procedure of Alternative Architecture 1 | ZTE | Noted |
S2‑075068 | - | ZTE | - |
S2‑075069 | Protocol Type of PGW in the HSS | ZTE | Noted. Issue captured in S2-075680 |
S2‑075070 | Way forward on DSMIPv6 security model | Telecom Italia, QUALCOMM Europe, Marvell | Approved |
S2‑075071 | Clarification of Transport Level Packet Marking | T-Mobile | Revised in S2-075685 |
S2‑075072 | Adding the "Subscriber Type" parameter to TS 23.401 | T-Mobile | Revised in S2-075354 |
S2‑075073 | LS on addition of "subscriber type" to TS 23.401 | T-Mobile | For e-mail approval. Not approved. |
S2‑075074 | Adding the "bearer priority" and "prioritised bit rate" to the EPS bearer | T-Mobile | Not Handled |
S2‑075075 | E-UTRAN – GERAN External Network Assisted Cell Change | T-Mobile | Revised in S2-075355 |
S2‑075076 | IP address allocation at Attach procedure | Orange | Revised in S2-075621 |
S2‑075077 | DHCP relay and access to DNS at the PDN GW | Orange | Noted (include in S2-075459) |
S2‑075078 | 23.204 CR0038: Relationship between SMSIP and service level interworking | Huawei, China Mobile | Revised in IMS SWG to S2-075484 |
S2‑075079 | 23.228 CR0749: Multiple simultaneous registration correction | Qualcomm Europe | Revised in IMS SWG to S2-075489 |
S2‑075080 | IP-CAN definition | Qualcomm Europe | Noted |
S2‑075081 | Information flows for CS origination and termination | Qualcomm Europe | Revised in S2-075338 |
S2‑075082 | Information flows for combined PS and CS origination and termination | Qualcomm Europe | Revised in S2-075339 |
S2‑075083 | Information flows for PS-PS session continuity | Qualcomm Europe | Revised in S2-075340 |
S2‑075084 | Is CAMEL necessary for VCC deployment? | Qualcomm Europe | Noted |
S2‑075085 | 23.206 CR0073: Clarification of CAMEL support for VCC | Qualcomm Europe | Revised in IMS SWG to S2-075469 |
S2‑075086 | 23.204 CR0039: Definition, Symbol, Abbreviation Clauses for TS 23.204 Rel 8 | Qualcomm Europe | Revised in IMS SWG to S2-075540 |
S2‑075087 | 23.204 CR0040: Reference Clause for TS 23.204 Rel 8 | Qualcomm Europe | Revised in IMS SWG to S2-075526 |
S2‑075088 | 23.204 CR0041: Status Report for IM to SMS IW for TS 23.204 Rel 8 | Qualcomm Europe | Revised in IMS SWG to S2-075493 |
S2‑075089 | ICS CAMEL Procedure Updates | Qualcomm Europe | Not Handled |
S2‑075090 | ICS Domain Transfer STI updates | Qualcomm Europe | Revised in IMS SWG to S2-075495 |
S2‑075091 | 23.167 CR0076: Emergency Registration Time | Alcatel-Lucent | Revised in IMS SWG to S2-075473 |
S2‑075092 | 23.167 CR0077: Clarification of P-CSCF procedures | Alcatel-Lucent | Noted |
S2‑075093 | 23.167 CR0078: Feature Interactions during Emergency Call | Alcatel-Lucent | Revised in IMS SWG to S2-075525 |
S2‑075094 | 23.167 CR0079: Allowing emergency calls when UE is barred. | Alcatel-Lucent | Noted |
S2‑075095 | Alternative architecture and scenarios for VCC support during Emergency Calls | Alcatel-Lucent | Noted |
S2‑075096 | Alternative architecture and scenarios for VCC support during emergency calls | Alcatel-Lucent | Revised in IMS SWG to S2-075485 |
S2‑075097 | Tel URI Solution for IMS Emergency Calls | Qualcomm Europe | Revised in S2-075402 |
S2‑075098 | Requirements and Assumptions for Extended Support of IMS Emergency Sessions | Qualcomm Europe | Revised in IMS SWG to S2-075486 |
S2‑075099 | On the definition of a solution for IP mobility mode selection | Marvell | Noted |
S2‑075100 | On Network behaviour for Mobility Mode Selection | Marvell | Revised in S2-075733 and S2-075734 |
S2‑075101 | Additional PDN connectivity over EUTRAN with PMIP-based network interfaces | Marvell | Not Handled |
S2‑075102 | UE-initiated establishment of multiple PDN connectivity at initial attach over untrusted non-3GPP access | Marvell | Not Handled |
S2‑075104 | Clarification on the use of S2c for handoff between 3GPP and non-3GPP accesses | Marvell | Not Handled |
S2‑075105 | Clarification of PDN GW Selection function in 23.401 | Marvell | Revised in parallel session in S2-075619 |
S2‑075106 | Clarification of PDN GW selection function in 23.402 | Marvell | Not Handled |
S2‑075107 | Selection on PDN GW for support of multiple PDN GWs with S2c | Marvell | Revised in S2-075403 |
S2‑075108 | Clarification on provisioning of PDN GW address to the UE. | Marvell | Revised in parallel session in S2-075620 |
S2‑075109 | WID on Architecture of Customized Multimedia Information | SK Telecom, Samsung, Huawei, LG Electronics | Noted |
S2‑075110 | Idle Mode Dedicated Bearer Management | CATT | Noted |
S2‑075111 | PTI allocation | CATT | Revised in parallel session in S2-075609 |
S2‑075112 | Detach Procedure for ISR | CATT | Not Handled |
S2‑075113 | Paging flow for the ISR | CATT | Not Handled |
S2‑075115 | A new TS for Evolved MBMS | China Mobile, CATT, Huawei, ZTE, RITT | Not Handled |
S2‑075117 | Clarification of IRAT TAU requirement for GERAN/UTRAN to EUTRAN change | CATT | Not Handled |
S2‑075118 | the PDP context update in dynamic IP address allocation procedure | CATT | Noted |
S2‑075119 | Static IP address allocation | CATT | Noted |
S2‑075120 | The attach procedure for the external IP address allocation | CATT | Noted (covered by S2-075130) |
S2‑075121 | Update Detach procedure for load re-distribution | CATT | Noted |
S2‑075122 | Release old context during handover between LTE and HRPD | Alcatel-Lucent, Verizon Wireless, NSN, Nokia, Ericsson | Revised in S2-075702 |
S2‑075123 | On maintaining HRPD Sessions and QoS in HRPD between pre-registration and handover | Alcatel-lucent, Verizon Wireless, Ericsson. | Revised in S2-075703 |
S2‑075124 | Definition of SectorID | Alcatel-Lucent, Motorola, Verizon Wireless, Ericsson, Nokia, Nokia Siemens Networks. | Revised in S2-075704 |
S2‑075125 | Architectures and procedures comparison for eMBMS | ZTE | Not Handled |
S2‑075126 | IP multicast address allocation based on service area | ZTE | Not Handled |
S2‑075127 | eMBMS signalling flows | IPWireless, Nextwave | Not Handled |
S2‑075128 | PBR allocation and Label/QCI characteristics | IPWireless, Nextwave | Merged in S2-075594 |
S2‑075129 | Proposal for LS to RAN2 to communicate the decision for UL AMBR policing | IPWireless, Nextwave | Noted |
S2‑075130 | Introduce APN into the E-UTRAN initial attach procedure | Vodafone, Ericsson | Approved |
S2‑075131 | Addition of priority parameter to the label characteristics | Nokia Siemens Networks, Nokia | Noted (used for S2-075659) |
S2‑075132 | QCI – label relation | Nokia Siemens Networks, Nokia | Noted (proposal added to S2-075634) |
S2‑075133 | Tracking Area Update procedure with ISR functionality | Nokia Siemens Networks, Nokia | Revised in parallel session in S2-075651 |
S2‑075134 | ISR High Level Flows | Nokia Siemens Networks, Nokia | Revised in parallel session in S2-075642 |
S2‑075135 | 23.228 CR0750: Correction of MGCF interaction | Ericsson | Revised in IMS SWG to S2-075759 |
S2‑075136 | 23.228 CR0751: Correction of MGCF interaction | Ericsson | Revised in IMS SWG to S2-075760 |
S2‑075137 | 23.228 CR0752: Cleanup of NAT traversal procedures | Ericsson | Revised in IMS SWG to S2-075761 |
S2‑075138 | 23.228 CR0753: Cleanup of NAT traversal procedures | Ericsson | Revised in IMS SWG to S2-075762 |
S2‑075139 | Editorial changes on RUA registration for I1-cs model | Ericsson, Nortel | Approved |
S2‑075140 | Enhanced MSC server and different UE types | Ericsson, NEC, Vodafone | Not Handled |
S2‑075141 | O-SDS for the enhanced MSC server: potential IMS Subscriber | Ericsson, Mavenir, Vodafone, NEC, Nokia, Nokia Siemens Networks, Huawei | Not Handled |
S2‑075142 | Deriving IMPI/IPMU for non-ICS UE in Remote UA (RUA) registration | Ericsson, Nortel | Revised in IMS SWG to S2-075494 |
S2‑075143 | Clarification of CF service call flow | Ericsson, Huawei, Nokia Siemens Network | Revised in IMS SWG to S2-075498 |
S2‑075144 | CSI and SSMF/ICCF relationship | Ericsson | Revised in S2-075461 |
S2‑075145 | Handling of non-centralized services | Ericsson, Vodafone, Mavenir, NEC | Revised in S2-075335 Revised in IMS SWG to S2-075335 |
S2‑075146 | Conclusion on handling of multiple media | Ericsson, Nokia Siemens Networks, Nokia | Revised in IMS SWG to S2-075530 |
S2‑075147 | ICS and CSI Users | Ericsson | Not Handled |
S2‑075148 | Clarification on media and SIP signalling | Ericsson | Revised in IMS SWG to S2-075475 |
S2‑075149 | Handling of P-CSCF re-selection | Ericsson | Revised in IMS SWG to S2-075477 |
S2‑075150 | Clarifying location of interworking function | Ericsson | Revised in IMS SWG to S2-075512 |
S2‑075151 | Reference update | Ericsson | Approved |
S2‑075152 | Correcting the steps for status reporting | Ericsson | Noted |
S2‑075153 | 23.204 CR0042: Procedure for SMS to IM interworking | Ericsson | Noted |
S2‑075154 | 23.204 CR0043: Update of Scope for TS 23.204 | Ericsson | Revised in IMS SWG to S2-075518 |
S2‑075155 | Impact and conclusion of Architecture Options | Ericsson | Noted |
S2‑075156 | IM to SMSIP interworking | Ericsson | Noted |
S2‑075157 | Clarification on IP address allocation | Nokia Siemens Networks, Nokia, CATT | Revised in S2-075626 |
S2‑075158 | IP address configuration after the Attach | Nokia Siemens Networks, Nokia | Revised in S2-075628 |
S2‑075159 | Clarification on Access Authentication | Nokia Siemens Networks, Nokia, Verizon Wireless, Nortel | Not Handled |
S2‑075160 | An optimized WiMAX interworking solution | Nokia Siemens Networks, Nokia | Noted |
S2‑075161 | User Plane handling in EUTRAN to HRPD HO | Nokia, Nokia Siemens Networks, Verizon Wireless, Alcatel-Lucent, Motorola, Nortel, Ericsson, Cisco | Revised in drafting session in S2-075723 |
S2‑075162 | 23.204 CR0044: Concatenated Short Messages delivered as an large Instant Message | Comverse, Huawei | Revised in IMS SWG to S2-075509 |
S2‑075163 | 23.204 CR0045: IP-SM-GW Additional Features | Comverse, Huawei | Revised in IMS SWG to S2-075510 |
S2‑075164 | New Architecture Alternative for CS services over EPS | Nortel | Revised in parallel session in S2-075615 |
S2‑075165 | Updates to Call Flow for LTE to HRPD Handover | Motorola, Verizon Wireless, Alcatel-Lucent, Nortel, Ericsson, Cisco | Revised in S2-075689 |
S2‑075166 | Session ID for S101 - LTE - HRPD signaling interface | Motorola, Verizon Wireless, Alcatel-Lucent, Ericsson, Nokia Siemens Networks, Cisco | Revised in S2-075690 |
S2‑075167 | Protocol stack for S101 - LTE - HRPD signaling interface | Motorola, Verizon Wireless, Ericsson, Nortel, Alcatel-Lucent, Cisco | Revised in S2-075691 |
S2‑075168 | Activation of dedicated bearers at attach | Ericsson | Revised in parallel session in S2-075610 |
S2‑075169 | UE requested bearer resource allocation: Support of Multiple PDN | Ericsson | Revised in parallel session in S2-075601 |
S2‑075170 | ISR effects on TS23.401 procedures | Ericsson | Not Handled |
S2‑075171 | Interoperation with pre-Rel-8 CN nodes | Ericsson | Not Handled |
S2‑075172 | Attach & UE requested PDN Connectivity over S5/S8 | Ericsson | Revised in S2-075368 |
S2‑075173 | Determining if UE belongs to GTP or PMIP-based network at roaming | Ericsson | Noted: Principles captured in S2-075680 |
S2‑075174 | PDN GW selection for multiple PDN connections with S2a | Ericsson | Not Handled |
S2‑075175 | Activation of additional PDN connection for PMIP-based S5/S8 | Ericsson | Not Handled |
S2‑075176 | IP address usage for multiple PDN | Ericsson | Revised in parallel session in S2-075637 |
S2‑075177 | Connection of pre-Rel-8 GGSN to EPC | Ericsson | Not Handled |
S2‑075178 | Mandatory Direct tunnel for UTRAN in Release 8 | Ericsson, AT&T, Nokia Siemens Network, Nokia | Noted |
S2‑075179 | Attach and pdp context activation over 2G/3G | Ericsson | Revised in S2-075632 |
S2‑075180 | Refinements to PDN GW address storage in HSS | Ericsson | Revised in parallel session in S2-075646 |
S2‑075181 | Standardized QCI Characteristics | Ericsson, AT&T, Qualcomm Europe, Samsung, Vodafone, IPWireless, Nextwave, Telecom Italia | Revised in S2-075623 |
S2‑075182 | Strict Priority for Non-GBR QCIs | Ericsson, AT&T, Vodafone | Revised in S2-075624 |
S2‑075183 | Table of Standardized QCIs | Ericsson, Vodafone | Revised in S2-075625 |
S2‑075184 | Rate adaptation with "MBR>GBR bearers" | Ericsson | Not Handled |
S2‑075185 | Rate Adaptation text proposal | Ericsson, AT&T, Vodafone | Not Handled |
S2‑075186 | Signalling of Preferred / Fallback QoS | Ericsson, AT&T, Vodafone | Revised in S2-075686 |
S2‑075187 | Mapping between EPS and Rel99 QoS Parameters | Ericsson | Revised in parallel session in S2-075638 |
S2‑075188 | The EPS Subscribed QoS Profile | Ericsson, AT&T, Vodafone | Revised in parallel session in S2-075728 |
S2‑075189 | Bearer modification without QoS update | Ericsson | Not Handled |
S2‑075190 | 23.203 CR0059: Scope of the new 23.203 | Ericsson | Revised in S2-075739 |
S2‑075191 | Roaming aspects on PCC Binding mechanism | Ericsson | Not Handled |
S2‑075192 | PCRF discovery selection | Ericsson | Noted. High level principles included in CR in S2-075716. Clean-up P-CR in S2-075717 |
S2‑075193 | Call flows for S8a/non-3GPP access | Ericsson, Orange, AT&T, Telecom Italia | Revised in S2-075682 |
S2‑075194 | PCRF interaction at attach | Ericsson | Revised in parallel session in S2-075727 |
S2‑075195 | 23.203 CR0060: Proposal of content for TS 23.203 | Ericsson | Revised in S2-075738 |
S2‑075196 | Charging Characteristics FFS removal from 23.401 | Ericsson | Not Handled |
S2‑075197 | P-GW allocation when handover from E-UTRAN to HRPD | Ericsson, Verizon Wireless, Nortel, Motorola, Alcatel-Lucent, Nokia Siemens Network, Cisco, Nokia | Revised in S2-075710 |
S2‑075198 | IP address preservation when handover from E-UTRAN to HRPD | Ericsson, Cisco, Verizon Wireless, Alcatel-Lucent | Revised in S2-075709 |
S2‑075199 | Idle mode handover between E-UTRAN and HRPD | Ericsson, Verizon Wireless, Cisco, Nokia Siemens Network, Alcatel-Lucent, Nortel, Nokia | Revised in S2-075711 |
S2‑075200 | Idle mode handover from HRPD to E-UTRAN | Ericsson, Verizon Wireless | Revised in S2-075712 |
S2‑075201 | WiMax Integration in EPC | Ericsson, Three | Noted |
S2‑075202 | Signalling Flows for Evolved MBMS | Ericsson | Not Handled |
S2‑075203 | Moving eMBMS functionality from 23.401 somewhere else | Ericsson | Not Handled |
S2‑075204 | SR VCC: Evaluation of alternatives | Ericsson | Revised in S2-075735 |
S2‑075205 | Open issues-CSoLTE | Ericsson | Noted |
S2‑075206 | - Flows for Fallback to 2G/3G access for CS Voice Services | Ericsson | Revised in parallel session in S2-075616 |
S2‑075207 | GERAN WG2 LS Response on Inter Domain Handover | Ericsson | Revised in S2-075664 |
S2‑075208 | Principles for location privacy support in local breakout scenarios | Panasonic | Noted (Panasonic to take issue to SA WG1) |
S2‑075209 | Solutions for location privacy support in local breakout scenarios | Panasonic | Noted |
S2‑075210 | TS 23.402-140 | Motorola | Not Handled |
S2‑075211 | Initial hPCRF selection is based on MN- NAI only | Motorola | Noted |
S2‑075212 | Analysis of hPCRF re-selection Options | Motorola | Noted |
S2‑075214 | Architecture for optimized handover between mobile WiMAX access and 3GPP access | BT, Rogers Wireless, Sprint, Alcatel-Lucent, Azaire Networks, ETRI, Intel, IPWireless, Interdigital, Motorola, NEC, Nextwave, Nortel, RIM, Samsung, Starent Networks, Telecommunication Systems, TTPCom | Revised in S2-075605 |
S2‑075215 | Signalling flows for optimized handover between mobile WiMAX and 3GPP access | BT, Rogers Wireless, Sprint, Alcatel-Lucent, Azaire Networks, ETRI, Intel, IPWireless, Interdigital, Motorola, NEC, Nextwave, Nortel, RIM, Samsung, Starent Networks, Telecommunication Systems, TTPCom | Noted |
S2‑075216 | Corrections to Alternative D-1 | Motorola | Approved |
S2‑075217 | SR VCC solution analysis and conclusions | Motorola | Noted |
S2‑075218 | Signalling flows for adding/removing media components to/from different UEs | Motorola | Revised in IMS SWG to S2-075550 |
S2‑075219 | Signalling flows for transferring/retrieving media components to/from different UEs | Motorola | Revised in IMS SWG to S2-075551 |
S2‑075220 | Introduction of Network Initiated Multimedia Session Transfer | Motorola | Not Handled |
S2‑075221 | Support for Network Initiated Domain Transfer | Motorola | Not Handled |
S2‑075222 | - | Motorola | - |
S2‑075223 | Network initiated high-level flows | Motorola | Not Handled |
S2‑075224 | SMF renamed to PPTF and added new interfaces | Starent Networks | Not Handled |
S2‑075225 | P-CSCF context transfer | Starent Networks | Not Handled |
S2‑075226 | Multiple PDN Support for S2a Interface using MIPv4 FACoA Mode | LG Electronics | Not Handled |
S2‑075227 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity – backward direction | Huawei, LG Electronics, Orange, Telecom Italia, Qualcomm Europe, TOSHIBA | WITHDRAWN |
S2‑075228 | Information flows for Multimedia Session Continuity-CS multimedia call | Huawei, LG Electronics, Orange, Telecom Italia, Qualcomm Europe, TOSHIBA | WITHDRAWN |
S2‑075229 | Information flow for session transfer in case of PS to PS session continuity in conjunction with PS to CS– forward direction | Huawei, LG Electronics, Orange, Telecom Italia, Qualcomm Europe, TOSHIBA | WITHDRAWN |
S2‑075230 | 23.228 CR0754: Correction to Section Number | Qualcomm Europe | Revised in IMS SWG to S2-075490 |
S2‑075231 | 23.228 CR0755: DHCP provides P-CSCF IP address | Qualcomm Europe | Revised in IMS SWG to S2-075491 |
S2‑075232 | 23.228 CR0756: End-to-end QoS Reservation | Qualcomm Europe | Not Handled |
S2‑075233 | Evaluation of LCS Solutions for EPS | SiRF Technology, Ericsson, TruePosition, Alcatel-Lucent, Polaris Wireless | Revised in S2-075633 |
S2‑075234 | Per-user per-APN specific VAA | China Mobile | Revised in parallel session in S2-075647 |
S2‑075235 | Handover process of enhanced MSC | Huawei, Mavenir, Ericsson, NEC, Nokia, Nokia Simens Network, China Mobile | Not Handled |
S2‑075236 | Call Flows for I1-cs approach using CS multimedia bearers | Huawei | Revised in IMS SWG to S2-075500 |
S2‑075237 | Service change for I1-cs approach | Huawei | Revised in IMS SWG to S2-075501 |
S2‑075238 | Service support for video call | Huawei | WITHDRAWN |
S2‑075239 | Video Call fallback for I1-cs approach | Huawei | Revised in IMS SWG to S2-075502 |
S2‑075240 | Service support for multiple sessions | Huawei | WITHDRAWN |
S2‑075241 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity – backward direction | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Revised in IMS SWG to S2-075553 |
S2‑075242 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity – foreward direction | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Revised in IMS SWG to S2-075552 |
S2‑075243 | Information flows for Multimedia Session Continuity-CS multimedia call | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Revised in IMS SWG to S2-075559 |
S2‑075244 | Use Case PSI AS receive SMS | Huawei | Revised in IMS SWG to S2-075516 |
S2‑075245 | Procedure for PSI AS receiving SMS | Huawei | Revised in IMS SWG to S2-075517 |
S2‑075246 | Removal of FFS Statements on Proxy Binding Update Security | Motorola | Not Handled |
S2‑075247 | Editorial changes to 23.810 | Telcordia | Revised in S2-075719 |
S2‑075248 | Equivalent Classes | Telcordia | Revised in IMS SWG to S2-075539 |
S2‑075249 | Architecture Implementation Options | Telcordia | Revised in S2-075718 |
S2‑075250 | Alternative Solution for Improvement when Retargeting R-URIs | Telcordia | Revised in IMS SWG to S2-075557 |
S2‑075251 | Alternative Solution for Improvement for Incompatible Services | Telcordia | Revised in IMS SWG to S2-075558 |
S2‑075252 | Way forward for SRVCC between 1xRTT and EUTRAN | Nokia Siemens Networks, Verizon Wireless, Nortel, Cisco, Ericsson | Principles endorsed. WID Update in S2-075668. LS in S2-075669 |
S2‑075253 | - | Nokia Siemens Networks | - |
S2‑075254 | SR VCC: Alt E lighter approach | Nokia Siemens Networks | Revised in S2-075666 |
S2‑075255 | GRE Key Exchange Using PMIP | NTT DoCoMo, Alcatel-Lucent, Nortel | Not Handled |
S2‑075256 | 2G/3G Fallback: Combined TA/LA Update and Mobile Terminating Call | NTT DoCoMo | Revised in parallel session in S2-075617 |
S2‑075257 | Proposal on the way forward of ETWS in SA2 2. Agenda 10 3. This contribution proposes on the way forwad of ETWS in SA2. | NTT DoCoMo | Noted: See S2-075579 |
S2‑075258 | ETWS aspect on eMBMS | NTT DoCoMo | Noted |
S2‑075259 | Draft LS on Earthquake and Tsunami Warning System capability | NTT DoCoMo | Noted: See S2-075580 |
S2‑075260 | Proposal on PDP context activation | NTT DoCoMo | Not Handled |
S2‑075261 | Direct Tunnel Aspect in Rel8 EPC | China Mobile, NTT DoCoMo, Telecom Italia | Approved |
S2‑075263 | QCI characteristics | Samsung | Noted. Agreeable parts in S2-075659 |
S2‑075266 | QoS Profile Subscribed in HSS | Nokia, Nokia Siemens Networks | Merged in S2-075188 |
S2‑075267 | Subscriber QoS for Default Bearer Establishment | Nokia, Nokia Siemens Networks | Merged in S2-075188 |
S2‑075268 | Bearer mapping principle amendments to 3GPP IRAT handover and RAU/TAU scenarios | Nokia, Nokia Siemens Networks | Revised in parallel session in S2-075639 |
S2‑075269 | Handling of Dual-stack Bearers during Inter-3GPP mobility | Nokia, Nokia Siemens Networks | Revised in S2-075631 |
S2‑075270 | 23.228 CR0741R1: Establishment of Sessions with media "Inactive" indications | Ericsson, Nokia, Nokia Siemens Networks | Revised in IMS SWG to S2-075765 |
S2‑075271 | 23.228 CR0742R1: Establishment of Sessions with media "Inactive" indications | Ericsson, Nokia, Nokia Siemens Networks | Revised in IMS SWG to S2-075766 |
S2‑075272 | Clarification for storage of PDN GW address in HSS/AAA | Marvell | Not Handled |
S2‑075273 | Comparison of conditional call forwarding alternatives | ZTE, Nortel | Revised in IMS SWG to S2-075503 |
S2‑075274 | The Registration Expiration Time Setting for Enhanced MSC Server Solution | ZTE | Not Handled |
S2‑075275 | Discussion on Emergency Call for ICS UE | ZTE | Revised in IMS SWG to S2-075529 |
S2‑075276 | Discussion on Emergency Call for Enhanced MSC Server Approach | ZTE | Noted |
S2‑075280 | Termination of INVITE for UE based T-ADS in case of I1-cs | Samsung | Revised in S2-075444 |
S2‑075281 | UE domain selection for MT calls - Optimised call flow for I1-ps case | Samsung | Not Handled |
S2‑075282 | UE domain selection for MT calls - Optimised call flow for I1-cs case | Samsng | Revised in IMS SWG to S2-075445 |
S2‑075283 | 23.002 CR0182: Incorrect text on Iub specs in section 6.3.2 | Vodafone | Approved. Rel-8 Mirror in S2-075582 |
S2‑075284 | 23.228 CR0757: Transit scenario for combined transit/terminating networks | KPN | Not Handled |
S2‑075285 | Use of the Inter-Operator Identifier in IMS transit network configurations | KPN | Not Handled |
S2‑075286 | ICS-TR-1: ADS for ICS Users | Nortel, AT&T, Samsung | Revised in IMS SWG to S2-075531 |
S2‑075287 | ICS-TR-2: RUA in the session path | Nortel, Samsung, ZTE | Revised in IMS SWG to S2-075532 |
S2‑075288 | ICS-TR-3: ICS Association | Nortel, AT&T | Not Handled |
S2‑075289 | ICS-TR-4: Re-instating the original L-CAAF-n architecture | Nortel | Not Handled |
S2‑075290 | ICS-TR-5: L-CAAF-n call flows – Option 1 | Nortel | Not Handled |
S2‑075291 | ICS-TR-6: L-CAAF-n call flows – Option 2 | Nortel | Not Handled |
S2‑075292 | ICS-TR-7: L-CAAF-n registration call flows – Option 1 | Nortel | Not Handled |
S2‑075293 | ICS-TR-8: L-CAAF-n registration call flows – Option 2 | Nortel | Not Handled |
S2‑075294 | ICS-TR-9: Emergency Call Issue with ICS | Nortel | Noted |
S2‑075295 | ICS-TR-10: Unified ICS Architecture | Nortel, AT&T | Noted. Alternative proposals in S2-075356 and S2-075357 |
S2‑075296 | ICS-TR-11: Alternative to Service Data Synchronisation. | Nortel | Noted |
S2‑075297 | ICS-TR-12: Service Data Synchronisation – Interim Conclusion. | Nortel, Motorola, AT&T | Revised in IMS SWG to S2-075482 |
S2‑075298 | ICS-TR-13: Further conclusion on use of I1-ps and I1-cs. | Nortel, Ericsson, Telecom Italia, AT&T, ZTE | Revised in IMS SWG to S2-075527 |
S2‑075299 | ICS-TR-14: Conclusion on ICS UE using CS network enhanced non ICS UE support. | Nortel, AT&T | Revised in IMS SWG to S2-075528 |
S2‑075300 | ICS-TR-15: I1-ps & I1-cs-AS: Domain Transfers - active/held session identification. | Nortel | Noted |
S2‑075301 | ICS-TS-1: ICS Requirements: General | Nortel, AT&T | Revised in IMS SWG to S2-075535 |
S2‑075302 | ICS-TS-2: ICS Requirements: Service Consistency | Nortel, AT&T | Noted |
S2‑075303 | ICS-TS-3: ICS Requirements: Service Continuity | Nortel, AT&T | Not Handled |
S2‑075304 | ICS-TS-4: ICS Requirements: | Nortel, AT&T | Not Handled |
S2‑075305 | ICS-TS-5: Coexistence of ICS UE and non ICS UE | Nortel, AT&T | Not Handled |
S2‑075306 | TR 23.826 v.0.2.0 | Rapporteur (Nortel) | Noted |
S2‑075307 | Way Forward: Use of Tel-URI for Call-Back from PSTN PSAP | Nortel | Noted |
S2‑075308 | 23.228 CR0758: Handling of incoming sessions for a wildcarded PUI | Orange | Revised in S2-075622 |
S2‑075310 | Preparation work for TISPAN merge in aligning TS 23.002 and TS 23.228 | Orange | Submitted to Joint Session (S2J070020) |
S2‑075311 | TR 23.811 v0.4.0, "Service Level Interworking for Messaging Services; Stage 2" | Huawei (rapporteur) | Revised in IMS SWG to S2-075566 |
S2‑075312 | Conclusion to TR 23.811 | Huawei | Revised in IMS SWG to S2-075513 |
S2‑075313 | Report of ICS sessions | Huawei (ICS sessions chair) | Noted |
S2‑075314 | Draft Reply LS to IEEE 802.11 | Nokia Siemens Networks | Revised in S2-075585 |
S2‑075315 | SR-VCC Alt-E LTE-> CS handover clean-up | Qualcomm Europe, Alcatel-Lucent | Revised in S2-075663 |
S2‑075316 | E-MBMS documentation | Nokia Siemens Networks, Nokia | Not Handled |
S2‑075317 | E-MBMS session start and stop | Nokia Siemens Networks, Nokia | Not Handled |
S2‑075318 | - | Nokia Siemens Networks, Nokia | - |
S2‑075320 | PDN GW-initiated Detach procedure | Nokia Siemens Networks, Nokia | Revised in parallel session in S2-075599 |
S2‑075321 | HRPD => LTE Handover flows | Verizon Wireless, NSN, Ericsson, Cisco, Alcatel-Lucent, Motorola | Revised in S2-075698 |
S2‑075322 | PCRF Selection Discussion | Nortel, Camiant | Noted |
S2‑075323 | Consolidated Alternative F-1 | Nortel | Revised in S2-075667 |
S2‑075324 | Consolidated Alternative F-1 | Nortel | Noted |
S2‑075325 | On NAS security setup during the Attach procedure | Qualcomm Europe | Not Handled |
S2‑075326 | ICS UE registration requirement | Nokia Siemens Network, Nokia, at&t, Alcatel-Lucent, Nortel, Samsung, Verizon, Telecom Italia, Huawei, Ericsson, Mavenir, NEC | Revised in IMS SWG to S2-075496 |
S2‑075327 | TR 23.847 Study on Enhancements to IMS Service Functionalities Facilitating Multicast Bearer services | Nokia Siemens Networks | Revised in IMS SWG to S2-075487 |
S2‑075328 | Cover Page for Approval of TR 23.847 "Study on IMS utilizing multicast bearer services" | Nokia Siemens Networks | Revised in IMS SWG to S2-075488 |
S2‑075329 | Completion of References | Nokia Siemens Networks | Approved |
S2‑075330 | Clarification regarding the fallback from ICS enhanced VMSC to ICS UE based solution | Nokia, Nokia Siemens Networks, Nortel | Revised in IMS SWG to S2-075521 |
S2‑075331 | Co-existence of ICS UE and non ICS UE based solutions | Nokia, Nokia Siemens Networks, Ericsson, NEC | Revised in IMS SWG to S2-075472 |
S2‑075332 | The need for UE to learn the network support of ICS | Nokia, Nokia Siemens Networks, Nortel, Ericsson, NEC, Mavenir | Revised in IMS SWG to S2-075520 |
S2‑075333 | 23.228 CR0761: Alias definition | Nokia Siemens Networks, Nokia | Noted |
S2‑075334 | 23.228 CR0760: Alias definition | Nokia Siemens Networks, Nokia | Noted |
S2‑075335 | Handling of non-centralized services | Ericsson, Vodafone, Mavenir, NEC | Revised in IMS SWG to S2-075506 |
S2‑075336 | APN in the Attach procedure | Qualcomm Europe | Not Handled |
S2‑075337 | Corrections to alternative D-2 | Alcatel-Lucent, Qualcomm | WITHDRAWN |
S2‑075338 | Information flows for CS origination and termination | Qualcomm Europe, LG Electronics, Orange, Telecom Italia, Huawei | Revised in IMS SWG to S2-075560 |
S2‑075339 | Information flows for combined PS and CS origination and termination | Qualcomm Europe, LG Electronics, Orange, Telecom Italia, Huawei | Revised in IMS SWG to S2-075561 |
S2‑075340 | Information flows for PS-PS session continuity | Qualcomm Europe, LG Electronics, Orange, Telecom Italia, Huawei | Revised in IMS SWG to S2-075549 |
S2‑075341 | LS (from SA WG4) on new WID "IMS initiated and controlled PSS and MBMS user services" | SA WG4 (S4-070735) | Revised in S2-075373 |
S2‑075342 | INVITATION TO THE 3GPP/3GPP2 COMMON IMS WORKSHOP JANUARY 24 - 25, 2008 PUERTO VALLARTA, MEXICO | TSG SA Chairman | Noted |
S2‑075344 | Reply LS (from SA WG1) on SAE Interworking with Pre-REL8 system | SA WG1 (S1-071887) | Postponed to meeting #62 |
S2‑075345 | LS (from SA WG1) on Home NodeB/eNodeB regarding localisation/authorisation | SA WG1 (S1-071900) | Postponed to meeting #62 |
S2‑075346 | Reply (from SA WG1) to LS on Default Codecs for II-NNI | SA WG1 (S1-071896) | Noted |
S2‑075347 | LS (from SA WG1) on requirement on Overlap Signalling | SA WG1 (S1-071851) | Postponed to meeting #62 |
S2‑075348 | Clarification on use of SIP for MO call | Research in Motion, Nortel | Revised in IMS SWG to S2-075536 |
S2‑075349 | Addition of communication service setting modification flows over I1 | Research in Motion | Not Handled |
S2‑075350 | LS (from SA WG1) on support of "regional provisioning of service" in SAE/LTE | SA WG1 (S1-071845) | Postponed to meeting #62 |
S2‑075351 | LS (from SA WG1) on the way forward of the ETWS | SA WG1 (S1-071875) | Response drafted in S2-075812 (for e-mail approval) |
S2‑075352 | LS (from SA WG1) on proposal for a new TR on "Emergency requirements in the PS domain for VoIP and emergency services" | SA WG1 (S1-071884) | Postponed to meeting #62 |
S2‑075353 | LS (from SA WG1) on requirements for Tel-URI Provision for IMS Emergency Calls | SA WG1 (S1-071894) | Noted |
S2‑075354 | Adding the "Subscriber Type" parameter to TS 23.401 | T-Mobile | Revised in parallel session in S2-075640 |
S2‑075355 | E-UTRAN – GERAN External Network Assisted Cell Change | T-Mobile | Not Handled |
S2‑075356 | ICS-TR-10-a: Unified ICS Architecture | Nortel, AT&T | Revised in IMS SWG to S2-075483 |
S2‑075357 | ICS-TR-10-b: A new protocol variant of I1-cs | Nortel | Noted |
S2‑075359 | Conclusion to the architecture alternatives for support of non ICS UE | Vodafone, NEC, Ericsson, Mavenir, China Mobile, NSN, Nokia, Telefonica O2 Europe | Revised in IMS SWG to S2-075508 |
S2‑075360 | Discussion of registration in ICS | Alcatel-Lucent | Revised in IMS SWG to S2-075481 |
S2‑075368 | Attach & UE requested PDN Connectivity over S5/S8 | Ericsson | Approved |
S2‑075373 | LS (from SA WG4) on new WID "IMS initiated and controlled PSS and MBMS user services" | SA WG4 (S4-070735) | Noted |
S2‑075402 | Tel URI Solution for IMS Emergency Calls | Qualcomm Europe | Noted |
S2‑075444 | Termination of INVITE for UE based T-ADS in case of I1-cs | Samsung | Not Handled |
S2‑075445 | UE domain selection for MT calls - Optimised call flow for I1-cs case | Samsng | Not Handled |
S2‑075453 | Draft LS on Service-Level Inter-working for Messaging Services | Nokia Siemens Networks, Nokia | Revised and combined with S2-075515 in IMS SWG to S2-075547 |
S2‑075461 | CSI and SSMF/ICCF relationship | Ericsson, LG Electronics | Revised in IMS SWG to S2-075474 |
S2‑075462 | IPsec/IKEv2 vs Authentication suboption for DSMIPv6 | Nokia Siemens Networks, Nokia | Noted |
S2‑075468 | Reply LS (from SA WG3) on P-TMSI signature | SA WG3 (S3-070904) | Postponed to meeting #62 |
S2‑075469 | 23.206 CR0073R1: Clarification of CAMEL support for VCC | Qualcomm Europe | Revised in IMS SWG to S2-075556 |
S2‑075470 | Restructuring of MMSC TR to have common Architecture | LG Electronics, Huawei, KDDI, Orange, Qualcomm Europe, Telecom Italia, Telcordia, TOSHIBA, Marvell | Noted |
S2‑075471 | I6 reference point | Mavenir, Ericsson, NEC, Vodafone | Approved |
S2‑075472 | Co-existence of ICS UE and non ICS UE based solutions | Nokia, Nokia Siemens Networks, Ericsson, NEC | Revised in IMS SWG to S2-075522 |
S2‑075473 | 23.167 CR0076R1: Emergency Registration Time | Alcatel-Lucent | Approved |
S2‑075474 | CSI and SSMF/ICCF relationship | Ericsson, LG Electronics | Approved |
S2‑075475 | Clarification on media and SIP signalling | Ericsson | Noted |
S2‑075476 | Information flow for PS-PS session continuity with IP-level mobility support | KDDI, Telcordia, LG Electronics | Revised in IMS SWG to S2-075773 |
S2‑075477 | Handling of P-CSCF re-selection | Ericsson | Noted |
S2‑075478 | Update MMSC AS architecture and Introduce logical entities | LG Electronics, Huawei, Orange, Telecom Italia, TOSHIBA | Revised in IMS SWG to S2-075562 |
S2‑075479 | Draft skeleton of TS 23.292 | Rapporteur (Alcatel-Lucent) | Revised in IMS SWG to S2-075533 |
S2‑075480 | Proposed Scope for 23.292 | Alcatel-Lucent | Revised in IMS SWG to S2-075534 |
S2‑075481 | Discussion of registration in ICS | Alcatel-Lucent | Revised in IMS SWG to S2-075497 |
S2‑075482 | ICS-TR-12: Service Data Synchronisation – Interim Conclusion. | Nortel, Motorola, AT&T | Not Handled |
S2‑075483 | ICS-TR-10-a: Unified ICS Architecture | Nortel, AT&T | Revised in IMS SWG to S2-075499 |
S2‑075484 | 23.204 CR0038R1: Relationship between SMSIP and service level interworking | Huawei, China Mobile | Revised in IMS SWG to S2-075543 |
S2‑075485 | Alternative architecture and scenarios for VCC support during emergency calls | Alcatel-Lucent | Approved |
S2‑075486 | Requirements and Assumptions for Extended Support of IMS Emergency Sessions | Qualcomm Europe | Approved |
S2‑075487 | TR 23.847 Study on Enhancements to IMS Service Functionalities Facilitating Multicast Bearer services | Nokia Siemens Networks | For e-mail review |
S2‑075488 | Cover Page for Approval of TR 23.847 "Study on IMS utilizing multicast bearer services" | Nokia Siemens Networks | Approved |
S2‑075489 | 23.228 CR0749R1: Multiple simultaneous registration correction | Qualcomm Europe | Approved |
S2‑075490 | 23.228 CR0754R1: Correction to Section Number | Qualcomm Europe | Approved |
S2‑075491 | 23.228 CR0755R1: DHCP provides P-CSCF IP address | Qualcomm Europe | Approved |
S2‑075492 | 23.228 CR0759: DHCP provides P-CSCF IP address | Qualcomm Europe | Approved |
S2‑075493 | 23.204 CR0041R1: Status Report for IM to SMS IW for TS 23.204 Rel 8 | Qualcomm Europe | Revised in IMS SWG to S2-075542 |
S2‑075494 | Deriving IMPI/IPMU for non-ICS UE in Remote UA (RUA) registration | Ericsson, Nortel | Approved |
S2‑075495 | ICS Domain Transfer STI updates | Qualcomm Europe | For e-mail approval. Revision 1 approved: Revised in S2-075848 |
S2‑075496 | ICS UE registration requirement | Nokia Siemens Network, Nokia, at&t, Alcatel-Lucent, Nortel, Samsung, Verizon, Telecom Italia, Huawei, Ericsson, Mavenir, NEC | Approved |
S2‑075497 | - | Alcatel-Lucent | - |
S2‑075498 | Clarification of CF service call flow | Ericsson, Huawei, Nokia Siemens Network | For e-mail approval. Approved |
S2‑075499 | ICS-TR-10-a: Unified ICS Architecture | Nortel, AT&T | Revised in IMS SWG to S2-075507 |
S2‑075500 | Call Flows for I1-cs approach using CS multimedia bearers | Huawei | Approved |
S2‑075501 | Service change for I1-cs approach | Huawei | Noted |
S2‑075502 | Video Call fallback for I1-cs approach | Huawei | Noted |
S2‑075503 | Conclusion on centralization of conditional call forwarding when the call has been delivered using CS call control | Nortel, ZTE, Ericsson, Alcatel-Lucent, Nokia Siemens Networks, Nokia, Huawei | For e-mail approval. Approved |
S2‑075504 | I7 reference point | Mavenir, Ericsson, Nokia Siemens Networks, NEC, Vodafone | Approved |
S2‑075505 | Registration event for enhanced MSC Server | Mavenir, Ericsson, Huawei, NEC, Vodafone | For e-mail approval. Approved |
S2‑075506 | Handling of non-centralized services | Ericsson, Vodafone, Mavenir, NEC | Approved |
S2‑075507 | ICS-TR-10-a: Unified ICS Architecture | Nortel, AT&T | For e-mail approval. Revision 2 approved: Revised in S2-075849 |
S2‑075508 | Conclusion to the architecture alternatives for support of non ICS UE | Vodafone, NEC, Ericsson, Mavenir, China Mobile, NSN, Nokia, Telefonica O2 Europe | For e-mail approval. Revision 1 approved: Revised in S2-075850 |
S2‑075509 | 23.204 CR0044R1: Concatenated Short Messages delivered as an large Instant Message | Comverse, Huawei | Revised in IMS SWG to S2-075545 |
S2‑075510 | 23.204 CR0045R1: IP-SM-GW Additional Features | Comverse, Huawei | Revised in IMS SWG to S2-075541 |
S2‑075511 | Reply LS (from TISPAN WG2) on "Connecting Corporate Networks over an Aggregated UNI type Interface" | TISPAN WG2 (15bTD456r1) | Related LS Out in S2-075519 |
S2‑075512 | Clarifying location of interworking function | Ericsson | Approved |
S2‑075513 | Conclusion to TR 23.811 | Huawei | Approved |
S2‑075514 | Connecting IP-PBX to IMS (Business Trunking) | Nokia Siemens Networks | Noted |
S2‑075515 | - | IMS SWG | - |
S2‑075516 | Use Case PSI AS receive SMS | Huawei | Approved |
S2‑075517 | Procedure for PSI AS receiving SMS | Huawei | Approved |
S2‑075518 | 23.204 CR0043R1: Update of Scope for TS 23.204 | Ericsson | Revised in IMS SWG to S2-075764 |
S2‑075519 | LS to TISPAN WG2: Terminating Request URI handling | IMS SWG (Orange) | Approved |
S2‑075520 | The need for UE to learn the network support of ICS | Nokia, Nokia Siemens Networks, Nortel, Ericsson, NEC, Mavenir | For e-mail approval. Revision 2 approved: Revised in S2-075851 |
S2‑075521 | Clarification regarding the fallback from ICS enhanced VMSC to ICS UE based solution | Nokia, Nokia Siemens Networks, Nortel | Approved |
S2‑075522 | Co-existence of ICS UE and non ICS UE based solutions | Nokia, Nokia Siemens Networks, Ericsson, NEC | Approved |
S2‑075523 | Service configuration | Mavenir, NEC, Vodafone, Ericsson | Noted |
S2‑075524 | TR 23.893 coversheet | Rapporteur (LG Electronics) | Revised in IMS SWG to S2-075563 |
S2‑075525 | 23.167 CR0078R1: Feature Interactions during Emergency Call | Alcatel-Lucent | Revised in IMS SWG to S2-075763 |
S2‑075526 | 23.204 CR0040R1: Reference Clause for TS 23.204 Rel 8 | Qualcomm Europe | Noted |
S2‑075527 | Further conclusion on use of I1-ps and I1-cs | Nortel, Ericsson , Telecom Italia , AT&T , ZTE | For e-mail approval. Approved |
S2‑075528 | ICS-TR-14: Conclusion on ICS UE using CS network enhanced non ICS UE support. | Nortel, AT&T | Approved |
S2‑075529 | Discussion on Emergency Call for ICS UE | ZTE | For e-mail approval. Noted |
S2‑075530 | Conclusion on handling of multiple media | Ericsson, Nokia Siemens Networks, Nokia | Approved |
S2‑075531 | ICS-TR-1: ADS for ICS Users | Nortel, AT&T, Samsung | For e-mail approval. Noted |
S2‑075532 | ICS-TR-2: RUA in the session path | Nortel, Samsung, ZTE | Noted |
S2‑075533 | Draft skeleton of TS 23.292 | Rapporteur (Alcatel-Lucent) | Approved |
S2‑075534 | Proposed Scope for 23.292 | Alcatel-Lucent | Approved |
S2‑075535 | ICS-TS-1: ICS Requirements: General | Nortel, AT&T | Approved |
S2‑075536 | Clarification on use of SIP for MO call | Research in Motion, Nortel | For e-mail approval. Revision 2 approved: Revised in S2-075852 |
S2‑075537 | TR 23.811 Presentation cover sheet to TSG SA Plenary for Information | IMS SWG | Approved |
S2‑075538 | Architecture Implementation Options | Telcordia, Comverse, GET, ETRI | Approved |
S2‑075539 | Equivalent Classes | Telcordia | Approved |
S2‑075540 | 23.204 CR0039R1: Definition, Symbol, Abbreviation Clauses for TS 23.204 Rel 8 | Qualcomm Europe | Revised in IMS SWG to S2-075767 |
S2‑075541 | 23.204 CR0045R2: IP-SM-GW Additional Features | Comverse, Huawei | Approved |
S2‑075542 | 23.204 CR0041R2: Status Report for IM to SMS IW for TS 23.204 Rel 8 | Qualcomm Europe | Revised in IMS SWG to S2-075768 |
S2‑075543 | 23.204 CR0038R2: Relationship between SMSIP and service level interworking | Huawei, China Mobile | Revised in IMS SWG to S2-075769 |
S2‑075544 | 23.204 CR0037R1: IM capable UE sends an Instant Message to an SMS user | Huawei, China Mobile | Revised in IMS SWG to S2-075770 |
S2‑075545 | 23.204 CR0044R2: Concatenated Short Messages delivered as an large Instant Message | Comverse, Huawei | Revised in IMS SWG to S2-075771 |
S2‑075546 | 23.204 CR0036R1: Annex C: IM user sends an Instant Message to a group list including SMS users | Huawei | Approved |
S2‑075547 | Draft LS on Service-Level Inter-working for Messaging Services | Nokia Siemens Networks, Nokia | Revised in IMS SWG to S2-075772 |
S2‑075548 | 23.002 CR0185R1: Changes needed to 3GPP TS 23.002 Rel-8 | Orange / Joint meeting | Revised in S2-075821 |
S2‑075549 | Information flows for PS-PS session continuity | Qualcomm Europe, LG Electronics, Orange, Telecom Italia, Huawei | Approved |
S2‑075550 | Signalling flows for adding/removing media components to/from different UEs | Motorola | Approved |
S2‑075551 | Signalling flows for transferring/retrieving media components to/from different UEs | Motorola | Revised in IMS SWG to S2-075774 |
S2‑075552 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity – foreward direction | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Revised in IMS SWG to S2-075775 |
S2‑075553 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity – backward direction | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Revised in IMS SWG to S2-075776 |
S2‑075554 | - | - | - |
S2‑075555 | Report on IMS-SWG Sessions | IMS-SWG Chair (Thomas Towle, Qualcomm) | Approved |
S2‑075556 | 23.206 CR0073R2: Clarification of CAMEL support for VCC | Qualcomm Europe | Noted |
S2‑075557 | Alternative Solution for Improvement when Retargeting R-URIs | Telcordia | Noted |
S2‑075558 | Alternative Solution for Improvement for Incompatible Services | Telcordia | Noted |
S2‑075559 | Information flows for Multimedia Session Continuity-CS multimedia call | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Revised in IMS SWG to S2-075777 |
S2‑075560 | Information flows for CS origination and termination | Qualcomm Europe, LG Electronics, Orange, Telecom Italia, Huawei | Revised in IMS SWG to S2-075568 |
S2‑075561 | Information flows for combined PS and CS origination and termination | Qualcomm Europe, LG Electronics, Orange, Telecom Italia, Huawei | Revised in S2-075825 |
S2‑075562 | Update MMSC AS architecture and Introduce logical entities | LG Electronics, Huawei, Orange, Telecom Italia, TOSHIBA | Approved |
S2‑075563 | TR 23.893 coversheet | Rapporteur (LG Electronics) | Approved |
S2‑075564 | TR 23.893 version 0.x.x | LG Electronics (Rapporteur) | For e-mail review |
S2‑075565 | TR 23.892 Presentation cover sheet to TSG SA Plenary for Information | IMS SWG | Approved |
S2‑075566 | TR 23.811 v0.5.0, "Service Level Interworking for Messaging Services; Stage 2" | Huawei (rapporteur) | For e-mail review |
S2‑075567 | Latest version TR 23.892 | Rapporteur (Alcatel-Lucent) | For e-mail review |
S2‑075568 | Information flows for CS origination and termination | Qualcomm Europe, LG Electronics, Orange, Telecom Italia, Huawei | Approved |
S2‑075569 | REPORT, SAE Drafting Meeting | SA WG2 Chairman | Approved |
S2‑075570 | LS (from CT WG1, CT WG3 and CT WG4) on Common IMS | CT WGs 1, 3 and 4 (C1-073122) | Noted |
S2‑075571 | LS (from CT WG1) on completion of TR 24.880 and recommended architecture changes for AS/MRFC media control | CT WG1 (C1-073184) | Postponed to meeting #62 |
S2‑075572 | LS (from CT WG1) on Network Initiated PDP Context | CT WG1 (C1-073190) | Postponed to meeting #62 |
S2‑075573 | LS (from CT WG1) on new WID "IMS initiated and controlled PSS and MBMS user services" | CT WG1 (C1-073198) | Postponed to meeting #62 |
S2‑075574 | Reply LS (from CT WG4) (C4-071868/R3-072019) Transfer of PDCP SDU Sequence Numbers over X2 Interface | CT WG4 (C4-071892) | Postponed to meeting #62 |
S2‑075575 | LS (from CT WG4) on inclusion of IMSI in acknowledge message on S6a point | CT WG4 (C4-071899) | Postponed to meeting #62 |
S2‑075576 | LS (from CT WG4) on Existence of GGSN in Rel-8 | CT WG4 (C4-072013) | For e-mail approval. Postponed to meeting #62 |
S2‑075577 | Reply (from CT WG4) to LS on Stage 2 Documentation Principles for SAE Specifications | CT WG4 (C4-072034) | Postponed to meeting #62 |
S2‑075578 | LS Reply (from CT WG4) on S6a Reference Point Security | CT WG4 (C4-072035) | Postponed to meeting #62 |
S2‑075580 | Study/Work Item creation / update on ETWS. | Drafting group | Revised in S2-075811 |
S2‑075581 | LS on ETWS. | Drafting group | Revised in S2-075812 |
S2‑075582 | 23.002 CR0184: Incorrect text on Iub specs in section 6.3.2 | Vodafone | Approved |
S2‑075583 | Reply LS on IP fragmentation | China Mobile | Revised in S2-075604 |
S2‑075584 | Circuit Switched (CS) domain services over evolved Packet Switched (PS) access | T-Mobile, Bougues Telecom, Interdigital, Samsung | Noted |
S2‑075585 | Draft Reply LS to IEEE 802.11 | SA WG2 (Drafting) | Revised in S2-075593 |
S2‑075586 | Reply LS to RAN WG2 on signalling for paging | SA WG2 (Drafting) | Revised in S2-075795 |
S2‑075587 | Draft Reply LS on UE specific paging DRX | SA WG2 (Drafting) | Revised in S2-075832 |
S2‑075588 | Reply (from RAN WG3) on LS on Area and Access Restrictions | RAN WG3 () | Postponed to meeting #62 |
S2‑075589 | LS (from RAN WG3) on mechanism to support reordering in target eNB | RAN WG3 (R3-072409) | Postponed to meeting #62 |
S2‑075590 | LS from RAN WG3: Request for clarification and feedback on switching of the UL Tunnel Endpoint at X2 Handover | RAN WG3 (R3-072409) | Postponed to meeting #62 |
S2‑075591 | LS (from CT WG3) on protocol level support for the transfer of Gq' procedures to the Rx interface. | CT WG3 (C3-071111) | Postponed to meeting #62 |
S2‑075592 | Reply LS on Home NodeB/eNodeB localisation/authorisation | China Mobile | Revised in S2-075833 |
S2‑075593 | Reply LS to IEEE 802.11 | SA WG2 | Approved |
S2‑075594 | Priority and Label/QCI characteristics | Alcatel-Lucent, IPWireless, Nextwave, Nortel, Qualcomm Europe | Noted (used for S2-075659) |
S2‑075595 | Mapping of MBMS functions | Panasonic | Not Handled |
S2‑075596 | 23.246 CR0198: Including E-UTRAN and Eps in 23.246 | Nokia Siemens Networks, Ericsson, Panasonic, Huawei, Nortel, Motorola, ZTE | Revised in S2-075791 |
S2‑075597 | - | - | - |
S2‑075598 | Draft Reply LS on piggy-backed Service Request | SA WG2 | For e-mail approval. Approved. Revised by MCC in S2-075871 |
S2‑075599 | - | Nokia Siemens Networks, Nokia | - |
S2‑075600 | REPORT, SAE MBMS Session | Session Convenor (Liu Hong) | Approved |
S2‑075601 | UE requested bearer resource allocation: Support of Multiple PDN | Ericsson | For e-mail approval. Approved |
S2‑075602 | Implementation of GUTI, MME identifier, AND, ECM/EMM states in 23.401 | Vodafone | For e-mail approval. Revision 1 approved: Revised in S2-075853 |
S2‑075603 | 23.246 CR0198R2: Including E-UTRAN and Eps in 23.246 | Panasonic | WITHDRAWN (included in S2-075819) |
S2‑075604 | Reply LS on IP fragmentation | China Mobile | Revised in S2-075831 |
S2‑075605 | Architecture for optimized handover between mobile WiMAX access and 3GPP access | BT, Rogers Wireless, Sprint, Alcatel-Lucent, Azaire Networks, ETRI, Intel, IPWireless, Interdigital, Motorola, NEC, Nextwave, Nortel, RIM, Samsung, Starent Networks, Telecommunication Systems, TTPCom | Noted |
S2‑075606 | Dedicated Bearer Activation in EMM_IDLE state | ZTE | Revised in parallel session in S2-075742 |
S2‑075607 | eNodeB Initiated Dedicated Bearer Deactivation | ZTE | Revised in parallel session in S2-075743 |
S2‑075608 | HSS Initiated Dedicated Bearer Modification | ZTE | Revised in parallel session in S2-075744 |
S2‑075609 | PTI allocation | CATT | Approved |
S2‑075610 | Activation of dedicated bearers at attach | Ericsson | Revised in parallel session in S2-075745 |
S2‑075611 | Adding further clarifications to Alternative 1 (eMSC proposal) | Bouygues Telecom, T‑Mobile | For e-mail approval. Approved |
S2‑075612 | Adding new Alternative combining Alternative 1 and 3 | T-Mobile | For e-mail approval. Approved |
S2‑075613 | Deregistration procedure for CSoPS | Huawei | For e-mail approval. Approved |
S2‑075614 | Registration procedure for CSoPS | Huawei | For e-mail approval. Approved |
S2‑075615 | New Architecture Alternative for CS services over EPS | Nortel | Approved |
S2‑075616 | - Flows for Fallback to 2G/3G access for CS Voice Services | Ericsson | For e-mail approval. Approved |
S2‑075617 | 2G/3G Fallback: Combined TA/LA Update and Mobile Terminating Call | NTT DoCoMo | For e-mail approval. Revision 1 approved: Revised in S2-075854 |
S2‑075618 | Enabling multiple PDNs per PDN GW with PMIP based S5/S8 | Samsung, Azaire Networks | For e-mail approval. Approved |
S2‑075619 | Clarification of PDN GW Selection function in 23.401 | Marvell | For e-mail approval. Revision 2 approved: Revised in S2-075855 |
S2‑075620 | Clarification on provisioning of PDN GW address to the UE. | Marvell | For e-mail approval. Approved |
S2‑075621 | IP address allocation at Attach procedure | Orange, China Mobile | Revised in S2-075629 |
S2‑075622 | 23.228 CR0758R1: Handling of incoming sessions for a wildcarded PUI | Orange, Alcatel-Lucent | Noted |
S2‑075623 | Standardized QCI Characteristics | Ericsson, AT&T, Qualcomm Europe, Samsung, Vodafone, IPWireless, Nextwave, Telecom Italia, Rogers Wireless, Motorola, Nortel, Verison Wireless, TeliaSonera | Revised in S2-075634 |
S2‑075624 | Strict Priority for Non-GBR QCIs | Ericsson, AT&T, Vodafone, Rogers Wireless, TeliaSonera | Revised in S2-075635 |
S2‑075625 | Table of Standardized QCIs | Ericsson, Vodafone, Rogers Wireless, TeliaSonera | Revised in S2-075636 |
S2‑075626 | Clarification on IP address allocation | Nokia Siemens Networks, Nokia, CATT | Revised in S2-075789 |
S2‑075627 | IP address allocation for PMIP based interfaces | Samsung, IPWireless, Nextwave | Revised in S2-075800 |
S2‑075628 | IP address configuration after the Attach | Nokia Siemens Networks, Nokia | Revised in S2-075796 |
S2‑075629 | IP address allocation at Attach procedure | Orange, China Mobile | Revised in S2-075805 |
S2‑075631 | Handling of Dual-stack Bearers during Inter-3GPP mobility | Nokia, Nokia Siemens Networks | Revised in S2-075797 |
S2‑075632 | Attach and pdp context activation over 2G/3G | Ericsson | Revised in parallel session in S2-075641 |
S2‑075633 | Evaluation of LCS Solutions for EPS | SiRF Technology, Ericsson, TruePosition, Alcatel-Lucent, Polaris Wireless, TCS, SK Telecom, Qualcomm Europe | Approved |
S2‑075634 | Standardized QCI Characteristics | Ericsson, AT&T, Qualcomm Europe, Samsung, Vodafone, IPWireless, Nextwave, Telecom Italia, Rogers Wireless, Motorola, Nortel, Verison Wireless, TeliaSonera, Starent Networks | Revised in S2-075657 |
S2‑075635 | Strict Priority for Non-GBR QCIs | Ericsson, AT&T, Vodafone, Rogers Wireless, TeliaSonera, Verison, Starent Networks | Noted (used for S2-075659) |
S2‑075636 | Table of Standardized QCIs | Ericsson, Vodafone, Rogers Wireless, TeliaSonera, Verison, Starent Networks | Revised in S2-075683 |
S2‑075637 | IP address usage for multiple PDN | Ericsson | Approved |
S2‑075638 | Mapping between EPS and Rel99 QoS Parameters | Ericsson | Approved |
S2‑075639 | Bearer mapping principle amendments to 3GPP IRAT handover and RAU/TAU scenarios | Nokia, Nokia Siemens Networks | For e-mail approval. Revision 1 approved: Revised in S2-075856 |
S2‑075640 | Adding the "Subscriber Type" parameter to TS 23.401 | T-Mobile | Revised in parallel session in S2-075729 |
S2‑075641 | Attach and pdp context activation over 2G/3G | Ericsson | For e-mail approval. Revision 1 approved: Revised in S2-075857 |
S2‑075642 | ISR High Level Flows | Nokia Siemens Networks, Nokia | For e-mail approval. Approved |
S2‑075643 | PDN GW selection based on subscription data | China Mobile | Revised in parallel session in S2-075747 |
S2‑075644 | PDN GW selection based on subscription data | China Mobile | Revised in parallel session in S2-075746 |
S2‑075645 | Serving GW selection for non-3GPP access | Huawei | Revised in parallel session in S2-075828 |
S2‑075646 | Refinements to PDN GW address storage in HSS | Ericsson | For e-mail approval. Approved |
S2‑075647 | Per-user per-APN specific VAA | China Mobile | For e-mail approval. Approved |
S2‑075649 | Implementation of GUTI, MME identifier, AND, ECM/EMM states in 23.401 | Vodafone | Revised in parallel session in S2-075602 |
S2‑075650 | draft LS on EPS Identities | SA WG2 (Vodafone) | For e-mail approval. Approved. Revised by MCC in S2-075872 |
S2‑075651 | Tracking Area Update procedure with ISR functionality | Nokia Siemens Networks, Nokia | Approved |
S2‑075652 | Draft Procedures for ISR | Huawei | Revised in parallel session in S2-075749 |
S2‑075653 | - | - | - |
S2‑075655 | Addition of CAMEL to 23.401 pre-Rel-8 3G RAU procedures | Huawei | Approved |
S2‑075656 | Corrections to 23.401 pre-Rel-8 3G RAU procedures | Huawei | Approved |
S2‑075657 | Standardized QCI Characteristics | Ericsson, AT&T, Qualcomm Europe, Samsung, Vodafone, IPWireless, Nextwave, Telecom Italia, Rogers Wireless, Motorola, Nortel, Verison Wireless, TeliaSonera, Starent Networks | Approved |
S2‑075658 | LS (from RAN WG2) on need for Priority and PBR signaling as part of the QoS information | RAN WG2 (R2-075465) | Reply drafted in S2-075660, but postponed to meeting #62 |
S2‑075659 | Priority as QCI Characteristics | Ericsson, AT&T, Cisco, Motorola, Nokia, Nokia Siemens Networks, Nortel, Rogers Wireless, Samsung, Starent Networks, TeliaSonera, Verizon Wireless, Vodafone | Noted |
S2‑075660 | LS on the QCI characteristic "priority" (reply to R2-075465) | Drafting group (Lorenzo) | Noted |
S2‑075661 | LS on possible linkage with Multimedia Priority Service | Drafting group (Saso) | Revised in S2-075835 |
S2‑075662 | SR-VCC Conclusions | Qualcomm Europe, Alcatel-Lucent, Huawei | Noted |
S2‑075663 | SR-VCC Alt-E LTE-> CS handover clean-up | Qualcomm Europe, Alcatel-Lucent, Huawei | Approved |
S2‑075664 | GERAN WG2 LS Response on Inter Domain Handover | Ericsson | Revised in S2-075842 |
S2‑075665 | Alt-E and CS-> LTE VCC without simultaneous CS and PS | Qualcomm Europe, Alcatel-Lucent | For e-mail approval. Revision 3 approved: Revised in S2-075858 |
S2‑075666 | SR VCC: Alt E lighter approach | Nokia Siemens Networks | For e-mail approval. Approved |
S2‑075667 | Consolidated Alternative F-1 | Nortel | For e-mail approval. Approved |
S2‑075668 | Updated WID: 3GPP System Architecture Evolution Specification (SAES) | Nokia Siemens Networks, Verizon Wireless, Nortel, Alcatel-Lucent, Ericsson, Motorola, Cisco | Revised in S2-075840 |
S2‑075669 | LS to SA WG1 on directional requirements | SA WG2 (Drafting) | For e-mail approval. WITHDRAWN for further discussion |
S2‑075670 | Clarification of IP CAN Session Granularity | Samsung, Motorola | Noted (to be discussed how to include in S2-075716, s2-075717) |
S2‑075671 | Reply LS (*from RAN WG2) on CSG Cells Handling | RAN WG2 (R2-075456) | Postponed to meeting #62 |
S2‑075672 | LS (from RAN WG2) on "Principles on Idle Mode Signalling Reduction" | RAN WG2 (R2-075462) | Postponed to meeting #62 |
S2‑075673 | LS (from RAN WG2) on Packet Delay Budget | RAN WG2 (R2-075469) | Postponed to meeting #62 |
S2‑075674 | LS (from RAN WG2) on Access Class barring | RAN WG2 (R2-075473) | Postponed to meeting #62 |
S2‑075675 | LS (from RAN WG2) on GBR bearer handling while RRC Idle | RAN WG2 (R2-075479) | Noted |
S2‑075676 | LS(from RAN WG2) on LS on "subscriber type" indication via S1 | RAN WG2 (R2-075458) | Postponed to meeting #62 |
S2‑075677 | Reply LS (from RAN WG2) on Registration in Densely-populated area - clarification on some technical issues | RAN WG2 (R2-075419) | Postponed to meeting #62 |
S2‑075679 | QoS profile retrieval in GTP-based non-3GPP Roaming | Huawei | Approved |
S2‑075680 | - | Drafting group | - |
S2‑075681 | Impact on S11/S4 interface in case Serving GW Supporting Both PMIP and GTP | Huawei | Approved |
S2‑075682 | Call flows for S8a/non-3GPP access | Ericsson, Orange, AT&T, Telecom Italia | Approved |
S2‑075683 | Mapping Table of Rel-8 QCIs to Rel-7 | Drafting group | For e-mail approval. Revision 2 approved: Revised in S2-075859 |
S2‑075684 | Standardized Label for conversational video flows | Qualcomm Europe, T-Mobile | Approved |
S2‑075685 | Clarification of Transport Level Packet Marking | T-Mobile | Approved |
S2‑075686 | Signalling of Preferred / Fallback QoS | Ericsson, AT&T, Vodafone | For e-mail approval. Revision 3 approved: Revised in S2-075860 |
S2‑075687 | Removal of eMBMS from 23.401 | Ericsson | Revised in S2-075820 |
S2‑075688 | Discussion on optimized handover between 3GPP access and Wimax | Huawei | Noted |
S2‑075689 | Updates to Call Flow for LTE to HRPD Handover | Motorola, Verizon Wireless, Alcatel-Lucent, Nortel, Ericsson, Cisco | Approved |
S2‑075690 | Session ID for S101 - LTE - HRPD signaling interface | Motorola, Verizon Wireless, Alcatel-Lucent, Ericsson, Nokia Siemens Networks, Cisco | Revised in parallel session in S2-075721 |
S2‑075691 | Protocol stack for S101 - LTE - HRPD signaling interface | Motorola, Verizon Wireless, Ericsson, Nortel, Alcatel-Lucent, Cisco | Revised in parallel session in S2-075720 |
S2‑075692 | WID: Harmonization of Gq'/Rx for Common IMS | Joint Meeting | Approved |
S2‑075693 | LS on Harmonization of Gq'/Rx for Common IMS. | Joint Meeting | Approved |
S2‑075694 | Proposed WID: Maintenance of TISPAN release 1 common IMS | Joint meeting | Revised in S2-075817 |
S2‑075695 | Proposed WID: Maintenance of TISPAN release 2 common IMS | Joint meeting | Revised in S2-075818 |
S2‑075696 | WI - Documentation of TISPAN NGN R1 and R2 in 3GPP TSG SA WG2 | Joint meeting | Approved |
S2‑075697 | 23.002 CR0185: Changes needed to 3GPP TS 23.002 Rel-8 | Orange / Joint meeting | Revised in IMS SWG to S2-075548 |
S2‑075698 | HRPD => LTE Handover flows | Verizon Wireless, NSN, Ericsson, Cisco, Alcatel-Lucent, Motorola | Not Handled |
S2‑075699 | Discussion Summary on GERAN/UTRAN flow documentation | NTT DoCoMo | Noted |
S2‑075701 | Corrections to 23.401 pre-Rel-8 3G RAU procedures | Huawei | Revised in parallel session in S2-075656 |
S2‑075702 | Release old context during handover between LTE and HRPD | Alcatel-Lucent, Verizon Wireless, NSN, Nokia, Ericsson | Approved |
S2‑075703 | On maintaining HRPD Sessions and QoS in HRPD between pre-registration and handover | Alcatel-lucent, Verizon Wireless, Ericsson. | Revised in drafting session in S2-075722 |
S2‑075704 | Definition of SectorID | Alcatel-Lucent, Motorola, Verizon Wireless, Ericsson, Nokia, Nokia Siemens Networks. | Approved |
S2‑075709 | IP address preservation when handover from E-UTRAN to HRPD | Ericsson, Cisco, Verizon Wireless, Alcatel-Lucent, U S Cellular, L G Electronics, Starent Networks, SK Telecom | Revised in parallel session in S2-075725 |
S2‑075710 | P-GW allocation when handover from E-UTRAN to HRPD | Ericsson, Verizon Wireless, Nortel, Motorola, Alcatel-Lucent, Nokia Siemens Network, Cisco, Nokia, U S Cellular, L G Electronics, Starent Networks, SK Telecom | Approved |
S2‑075711 | Idle mode handover between E-UTRAN and HRPD | Ericsson, Verizon Wireless, Cisco, Nokia Siemens Network, Alcatel-Lucent, Nortel, Nokia, U S Cellular, KDDI, L G Electronics, Starent Networks, SK Telecom | Revised in parallel session in S2-075724 |
S2‑075712 | Idle mode handover from HRPD to E-UTRAN | Ericsson, Verizon Wireless, U S Cellular, L G Electronics, Starent Networks, SK Telecom | Not Handled |
S2‑075714 | Presentation of IEs for PMIP-based S5/S8 Procedures | Samsung | Not Handled |
S2‑075715 | Comments to S2-075462 | Qualcomm Europe, Teliasonera, Telecom Italia, Panasonic, Azaire Networks | Noted |
S2‑075716 | 23.203 CR0061: PCRF discovery selection principles | Ericsson | For e-mail approval. Revision 7 approved: Revised in S2-075862 |
S2‑075717 | Clean up of PCRF discovery selection text for TS 23.401 and TS 23.402 | Motorola | For e-mail approval. Approved |
S2‑075718 | Architecture Implementation Options | Telcordia, Comverse, GET, ETRI | Revised in IMS SWG to S2-075538 |
S2‑075719 | Editorial changes to 23.810 | Telcordia, Comverse, GET, ETRI | Approved |
S2‑075720 | Protocol stack for S101 - LTE - HRPD signaling interface | Motorola, Verizon Wireless, Ericsson, Nortel, Alcatel-Lucent, Cisco | Approved |
S2‑075721 | Session ID for S101 - LTE - HRPD signaling interface | Motorola, Verizon Wireless, Alcatel-Lucent, Ericsson, Nokia Siemens Networks, Cisco | Approved |
S2‑075722 | On maintaining HRPD Sessions and QoS in HRPD between pre-registration and handover | Alcatel-lucent, Verizon Wireless, Ericsson. | Approved |
S2‑075723 | User Plane handling in EUTRAN to HRPD HO | Nokia, Nokia Siemens Networks, Verizon Wireless, Alcatel-Lucent, Motorola, Nortel, Ericsson, Cisco | Revised in S2-075798 |
S2‑075724 | Idle mode handover between E-UTRAN and HRPD | Ericsson, Verizon Wireless, Cisco, Nokia Siemens Network, Alcatel-Lucent, Nortel, Nokia, U S Cellular, KDDI, L G Electronics, Starent Networks, SK Telecom | Approved |
S2‑075725 | IP address preservation when handover from E-UTRAN to HRPD | Ericsson, Cisco, Verizon Wireless, Alcatel-Lucent, U S Cellular, L G Electronics, Starent Networks, SK Telecom | Approved |
S2‑075727 | PCRF interaction at attach | Ericsson | For e-mail approval. Revision 2 approved: Revised in S2-075863 |
S2‑075728 | The EPS Subscribed QoS Profile | Ericsson, AT&T, Vodafone | For e-mail approval. Approved |
S2‑075729 | Adding the "Subscriber Type" parameter to TS 23.401 | T-Mobile | For e-mail approval. Not approved. |
S2‑075730 | Conclusion for TR 23.879 | T-Mobile, Bougues Telecom | Noted |
S2‑075731 | LS to SA WG2 on decision to use IPSec/IKEv2 for S2 Security | SA WG2 | For e-mail approval. Approved. Revised by MCC in S2-075873 |
S2‑075732 | IKEv2 and IPSEC clean-up for S2c flows | Qualcomm Europe, Telecom Italia, Marvell | Approved |
S2‑075733 | On Network behaviour for Mobility mode selection: Scenarios for Mobility Mode Selection | Drafting group | Approved |
S2‑075734 | On Network behaviour for Mobility mode selection: Initial Attach behaviour for Mobility Mode Selection | Drafting group | Revised in S2-075792 |
S2‑075735 | SR VCC: Evaluation of alternatives | Ericsson | For e-mail approval. Revision 1 approved: Revised in S2-075864 |
S2‑075736 | Presentation Cover sheet for TR 23.879 for TSG SA information | Rapporteur (T-Mobile) | Revised in S2-075841 |
S2‑075737 | Draft restructured TS 23.402 | Rapporteur (Motorola) | Revised in S2-075793 |
S2‑075738 | 23.203 CR0060R1: Proposal of content for TS 23.203 | Ericsson | Revised in S2-075845 |
S2‑075739 | 23.203 CR0059R1: Scope of the new 23.203 | Ericsson | Revised in S2-075844 |
S2‑075742 | Dedicated Bearer Activation in EMM_IDLE state | ZTE | Approved |
S2‑075743 | eNodeB Initiated Dedicated Bearer Deactivation | ZTE | Approved |
S2‑075744 | HSS Initiated Dedicated Bearer Modification | ZTE | Approved |
S2‑075745 | Activation of dedicated bearers at attach | Ericsson | For e-mail approval. Revision 9 approved: Revised in S2-075866 |
S2‑075746 | 23.060 CR0607: GGSN selection based on subscription information | China Mobile | For e-mail approval. Noted for further discussion |
S2‑075747 | PDN GW selection based on subscription data | China Mobile | For e-mail approval. Revision 2 approved: Revised in S2-075867 |
S2‑075748 | - | - | - |
S2‑075749 | Draft Procedures for ISR | Huawei | For e-mail approval. Revision 2 approved: Revised in S2-075876 |
S2‑075750 | Drafting Notes: 8.1.1, 8.2.1, 8.2.4, 8.2.8, 8.2.9, 8.3.1.2, 8.3.3, 8.3.4, 8.3.5, 10.2 | Magnus Olsson, Gavin Wong, Liu Hong | Approved |
S2‑075751 | - | - | - |
S2‑075752 | - | - | - |
S2‑075753 | - | - | - |
S2‑075754 | - | - | - |
S2‑075755 | - | - | - |
S2‑075756 | - | - | - |
S2‑075759 | 23.228 CR0750R1: Correction of MGCF interaction | Ericsson | Approved |
S2‑075760 | 23.228 CR0751R1: Correction of MGCF interaction | Ericsson | Approved |
S2‑075761 | 23.228 CR0752R1: Cleanup of NAT traversal procedures | Ericsson | Revised in IMS SWG to S2-075815 |
S2‑075762 | 23.228 CR0753R1: Cleanup of NAT traversal procedures | Ericsson | Revised in IMS SWG to S2-075816 |
S2‑075763 | 23.167 CR0078R2: Feature Interactions during Emergency Call | Alcatel-Lucent | Revised in S2-075822 |
S2‑075764 | 23.204 CR0043R2: Update of Scope for TS 23.204 | Ericsson | Approved |
S2‑075765 | 23.228 CR0741R2: Establishment of Sessions with media "Inactive" indications | Ericsson, Nokia, Nokia Siemens Networks | Approved |
S2‑075766 | 23.228 CR0742R2: Establishment of Sessions with media "Inactive" indications | Ericsson, Nokia, Nokia Siemens Networks | Approved |
S2‑075767 | 23.204 CR0039R2: Definition, Symbol, Abbreviation Clauses for TS 23.204 Rel 8 | Qualcomm Europe | Revised in S2-075823 |
S2‑075768 | 23.204 CR0041R3: Status Report for IM to SMS IW for TS 23.204 Rel 8 | Qualcomm Europe | Revised in S2-075824 |
S2‑075769 | 23.204 CR0038R3: Relationship between SMSIP and service level interworking | Huawei, China Mobile | Revised in IMS SWG to S2-075814 |
S2‑075770 | 23.204 CR0037R2: IM capable UE sends an Instant Message to an SMS user | Huawei, China Mobile | Approved |
S2‑075771 | 23.204 CR0044R3: Concatenated Short Messages delivered as an large Instant Message | Comverse, Huawei | Approved |
S2‑075772 | Draft LS on Service-Level Inter-working for Messaging Services | Nokia Siemens Networks, Nokia | Revised in IMS SWG to S2-075813 |
S2‑075773 | Information flow for PS-PS session continuity with IP-level mobility support | KDDI, Telcordia, LG Electronics | Revised in S2-075826 |
S2‑075774 | Signalling flows for transferring/retrieving media components to/from different UEs | Motorola | Approved |
S2‑075775 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity – foreward direction | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Approved |
S2‑075776 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity – backward direction | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Approved |
S2‑075777 | Information flows for Multimedia Session Continuity-CS multimedia call | Huawei, Telecom Italia, Orange, LGE, QualComm Europe, TOSHIBA | Approved |
S2‑075778 | - | - | - |
S2‑075779 | - | - | - |
S2‑075780 | - | - | - |
S2‑075781 | - | - | - |
S2‑075782 | - | - | - |
S2‑075783 | - | - | - |
S2‑075784 | - | - | - |
S2‑075785 | - | - | - |
S2‑075786 | - | - | - |
S2‑075787 | - | - | - |
S2‑075788 | Reply LS on Network Initiated PDP Context | IMS SWG | Noted. To be considered at meeting #62 |
S2‑075789 | Clarification on IP address allocation | Nokia Siemens Networks, Nokia, CATT | Revised in S2-075804 |
S2‑075791 | 23.246 CR0198R1: Including E-UTRAN and Eps in 23.246 | Nokia Siemens Networks, Nokia, Telefon AB LM Ericsson, Motorola, AT&T | Revised in S2-075819 |
S2‑075792 | On Network behaviour for Mobility mode selection: Initial Attach behaviour for Mobility Mode Selection | Drafting group | Approved |
S2‑075793 | Draft restructured TS 23.402 | Rapporteur (Motorola) | For e-mail review |
S2‑075794 | Coversheet for TS 23.401 to send to TSG SA for approval | - | Revised in S2-075829 |
S2‑075795 | Reply LS to RAN WG2 on signalling for paging | SA WG2 | Approved |
S2‑075796 | IP address configuration after the Attach | Nokia Siemens Networks, Nokia | Approved |
S2‑075797 | Handling of Dual-stack Bearers during Inter-3GPP mobility | Nokia, Nokia Siemens Networks | Approved |
S2‑075798 | User Plane handling in EUTRAN to HRPD HO | Nokia, Nokia Siemens Networks, Verizon Wireless, Alcatel-Lucent, Motorola, Nortel, Ericsson, Cisco | Approved |
S2‑075800 | IP address allocation for PMIP based interfaces | Samsung, IPWireless, Nextwave | Approved |
S2‑075804 | Clarification on IP address allocation | Nokia Siemens Networks, Nokia, CATT | Approved |
S2‑075805 | IP address allocation at Attach procedure | Orange, China Mobile | Approved |
S2‑075809 | Presentation Cover sheet for TR 23.402 for TSG SA approval | Rapporteur (Motorola) | Revised in S2-075830 |
S2‑075810 | Updated Release 8 Work Programme for SA WG2 | Work Plan Group | Noted |
S2‑075811 | Study/Work Item creation / update on ETWS. | NTT DoCoMo, OKI Electric Industry , Panasonic Mobile Communications, SHARP, SOFTBANK MOBILE Corp., TOSHIBA, eMobile Ltd , NEC, Qualcomm Europe | Revised in S2-075839 |
S2‑075812 | LS on Earthquake and Tsunami Warning System | Drafting group | For e-mail approval. Approved. Revised by MCC in S2-075874 |
S2‑075813 | Draft LS on Service-Level Inter-working for Messaging Services | Nokia Siemens Networks, Nokia | Approved. MCC to attach updated TS |
S2‑075814 | 23.204 CR0038R4: Relationship between SMSIP and service level interworking | Huawei, China Mobile | Approved |
S2‑075815 | 23.228 CR0752R2: Cleanup of NAT traversal procedures | Ericsson | Approved |
S2‑075816 | 23.228 CR0753R2: Cleanup of NAT traversal procedures | Ericsson | Approved |
S2‑075817 | Proposed WID: Maintenance of TISPAN release 1 common IMS | Joint meeting | Approved |
S2‑075818 | Proposed WID: Maintenance of TISPAN release 2 common IMS | Joint meeting | Approved |
S2‑075819 | 23.246 CR0198R3: Including E-UTRAN and Eps in 23.246 | Nokia Siemens Networks, Nokia, Telefon AB LM Ericsson, Motorola, AT&T | Revised in S2-075843 |
S2‑075820 | Removal of eMBMS from 23.401 | Ericsson | Approved |
S2‑075821 | 23.002 CR0185R2: Changes needed to 3GPP TS 23.002 Rel-8 | Orange / Joint meeting | For e-mail approval. Revision 3 approved: Revised in S2-075868 |
S2‑075822 | 23.167 CR0077R3: Clarification of P-CSCF procedures | - | Approved |
S2‑075823 | 23.204 CR0039R3: Definition, Symbol, Abbreviation Clauses for TS 23.204 Rel-8 | Qualcomm Europe | Approved |
S2‑075824 | 23.204 CR0041R4: Status Report for IM to SMS IW for TS 23.204 Rel-8 | Qualcomm Europe | Approved |
S2‑075825 | Information flows for combined PS and CS origination and termination | - | Approved |
S2‑075826 | Information flow for PS-PS session continuity with IP-level mobility support | - | Approved |
S2‑075828 | Serving GW selection for non-3GPP access | Huawei | For e-mail approval. Revision 1 approved: Revised in S2-075869 |
S2‑075829 | Coversheet for TS 23.401 to send to TSG SA for approval | Rapporteur (Vodafone) | Approved |
S2‑075830 | Presentation Cover sheet for TR 23.402 for TSG SA approval | Rapporteur (Motorola) | Approved |
S2‑075831 | Reply LS on IP Fragmentation | SA WG2 | Approved |
S2‑075832 | Reply LS on UE specific paging DRX | SA WG2 | Approved |
S2‑075833 | Reply LS on Home NodeB/eNodeB localisation/authorisation | SA WG2 | Approved |
S2‑075835 | LS on possible linkage with Multimedia Priority Service | Drafting group (Saso) | Approved |
S2‑075837 | Drafting group discussion on outline for Release 8 TS 23.203 | Ericsson (Drafting Group) | Proposals Endorsed |
S2‑075838 | Draft Response LS on EPS Mobility Management (EMM) sublayer state machine in UE | SA WG2 (Vodafone) | For e-mail approval. Approved. Revised by MCC in S2-075875 |
S2‑075839 | Updated WID on ETWS. | NTT DoCoMo, OKI Electric Industry , Panasonic Mobile Communications, SHARP, SOFTBANK MOBILE Corp., TOSHIBA, eMobile Ltd , NEC, Qualcomm Europe | Approved |
S2‑075840 | Updated WID: 3GPP System Architecture Evolution Specification (SAES) | Nokia Siemens Networks, Verizon Wireless, Nortel, Alcatel-Lucent, Ericsson, Motorola, Cisco | Approved |
S2‑075841 | Presentation Cover sheet for TR 23.879 for TSG SA information | Rapporteur (T-Mobile) | Approved |
S2‑075842 | GERAN WG2 LS Response on Inter Domain Handover | SA WG2 | Approved |
S2‑075843 | 23.246 CR0198R4: Including E-UTRAN and Eps in 23.246 | Nokia Siemens Networks, Nokia, Telefon AB LM Ericsson, Motorola, AT&T | Approved |
S2‑075844 | 23.203 CR0059R2: Scope of the new 23.203 | Ericsson | Approved |
S2‑075845 | 23.203 CR0060R2: Proposal of content for TS 23.203 | Ericsson | Approved |
S2‑075848 | ICS Domain Transfer STI updates | Qualcomm Europe | E-mail approved |
S2‑075849 | ICS-TR-10-a: Unified ICS Architecture | Nortel, AT&T | E-mail approved |
S2‑075850 | Conclusion to the architecture alternatives | Vodafone, NEC, Ericsson, Mavenir, China Mobile, NSN, Nokia, Telefonica O2 Europe, Nortel, Huawei, AT&T | E-mail approved |
S2‑075851 | The need for UE to learn the network support of ICS | Nokia, Nokia Siemens Networks, Nortel, Ericsson, NEC, Mavenir | E-mail approved |
S2‑075852 | Clarification on use of SIP for MO call | Research in Motion, Nortel | E-mail approved |
S2‑075853 | Implementation of GUTI, MME identifier, AND, ECM/EMM states in 23.401 | Vodafone | E-mail approved |
S2‑075854 | 2G/3G Fallback: Combined TA/LA Update and Mobile Terminating Call | NTT DoCoMo | E-mail approved |
S2‑075855 | Clarification of PDN GW Selection function in 23.401 | Marvell | E-mail approved |
S2‑075856 | Bearer mapping principle amendments to 3GPP IRAT handover and RAU/TAU scenarios | Nokia, Nokia Siemens Networks | E-mail approved |
S2‑075857 | Attach and pdp context activation over 2G/3G | Ericsson | E-mail approved |
S2‑075858 | Alt-E and CS-> LTE VCC without simultaneous CS and PS | Qualcomm Europe, Alcatel-Lucent | E-mail approved |
S2‑075859 | Mapping Table of Rel-8 QCIs to Rel-7 | Drafting group | E-mail approved |
S2‑075860 | Signalling of Preferred / Fallback QoS | Ericsson, AT&T, Vodafone | E-mail approved |
S2‑075862 | 23.203 CR0061R1: PCRF discovery selection principles | Ericsson | E-mail approved |
S2‑075863 | PCRF interaction at attach | Ericsson | E-mail approved |
S2‑075864 | SR VCC: Evaluation of alternatives | Ericsson | E-mail approved |
S2‑075866 | Activation of dedicated bearers at attach | Ericsson | E-mail approved |
S2‑075867 | PDN GW selection based on subscription data | China Mobile | E-mail approved |
S2‑075868 | 23.002 CR0185R3: Changes needed to 3GPP TS 23.002 Rel-8 | Orange / Joint meeting | E-mail approved |
S2‑075869 | Serving GW selection for non-3GPP access | Huawei | E-mail approved |
S2‑075871 | Reply LS on piggy-backed Service Request | SA WG2 | E-mail approved |
S2‑075872 | LS on EPS Identities | SA WG2 | E-mail approved |
S2‑075873 | Reply LS on DSMIPv6 security over the S2c reference point (S2-074939 / S3-070845) | SA WG2 | E-mail approved |
S2‑075874 | LS on Earthquake and Tsunami Warning System | SA WG2 | E-mail approved |
S2‑075875 | Response LS on EPS Mobility Management (EMM) sublayer state machine in UE | SA WG2 | E-mail approved |
S2‑075876 | Draft Procedures for ISR | Huawei | E-mail approved |
page generated from database: 2024-04-22 07:58:53