3GPP TDocs (written contributions) at meeting
Meeting: S2-59 - 2007-08-27 to 2007-08-31, Helsinki
meeting id: S2-59 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
S2‑073113 | Proposed meeting agenda for SA WG2#59 - non-IMS items | SA WG2 Chairman | Approved |
S2‑073114 | Proposed meeting agenda and schedule for SA WG2#59 IMS-SWG | IMS SWG Chairman | Revised in S2-073210 |
S2‑073115 | Draft report of SA WG2 meeting #58 | SA WG2 Secretary | Secretary to make editorials. Approved |
S2‑073116 | LS (from GERAN WG2) on the continuity of voice calls between LTE and GERAN/UTRAN | GERAN WG2 (GP-070138) | Postponed to meeting #60 |
S2‑073117 | LS (from RAN WG2) on Service Request for SAE/LTE | RAN WG2 (R2-072310) | Proposed reply in S2-073567 |
S2‑073118 | LS (from RAN WG3) on IP Fragmentation | RAN WG3 (R3-071186) | Response drafted in S2-073634 |
S2‑073119 | LS (from SA WG3) on Authorization over Mz in MBMS | SA WG3 (S3-070494) | Postponed to meeting #60 |
S2‑073120 | LS (from ETSI TISPAN WG2) on Connecting Corporate Networks over an Aggregated UNI type Interface | ETSI TISPAN WG2 (13tTD542) | Response drafted in S2-073456 |
S2‑073121 | LS (from TSG RAN) on 3GPP – non3GPP mobility | TSG RAN (RP-070512) | Noted |
S2‑073122 | LS (from TSG RAN) on Location Based Service support in E-UTRAN | TSG RAN (RP-070513) | Response LS was drafted in S2-073635 |
S2‑073123 | LS (from RAN WG3) on RAN WG3 EMBMS architecture discussion and agreements. | RAN WG3 (R3-071269) | Postponed to meeting #60 |
S2‑073124 | LS (from CT WG4) on GGSN's MBMS TEID-U for the Path Management | CT WG4 (C4-070896) | Response in S2-073633 |
S2‑073125 | Reply LS (from SA WG1) on ICS Video Call Support | SA WG1 (S1-071318) | Noted |
S2‑073126 | LS on Network Discovery & Selection | SA WG1 (S1-071321) | Postponed to meeting #60 |
S2‑073127 | LS (from RAN WG2) on Closed Subscriber Groups for LTE Home cells | RAN WG2 (R2-072991) | Noted |
S2‑073128 | 3GPP2 TSG-S CORRESPONDENCE: RE: Follow-up to 3GPP LS d "Mobility interworking between 3GPP and 3GPP2 systems" | 3GPP2 TSG-S | Noted |
S2‑073129 | Indicating APN in IETF based interfaces | Azaire Networks, Telia Sonera | Not Handled |
S2‑073130 | [DRAFT] LS response to S2-073124/ C4-070896 on "MBMS related misalignment between 23.246 and 29.060" | NEC | Revised in S2-073633 |
S2‑073131 | 23.246 CR0195: Remove GGSN TEID-U from MBMS bearer context in SGSN | NEC | Approved |
S2‑073132 | Handover scenarios with pre-REL8 networks | NEC | Noted |
S2‑073133 | Off-Path Signalling Solution | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073646 |
S2‑073134 | Policy Signalling for IETF-based LTE CN Node Relocation Procedures | Samsung, Nortel, Motorola, Intel, IPWireless, Nextwave, Alcatel-Lucent | Revised in S2-073647 |
S2‑073135 | Policy Signalling for Non-3GPP Attach and Detach Procedures | Samsung, Nortel, Motorola, IPWireless, Nextwave, Intel, Alcatel-Lucent | Revised in S2-073648 |
S2‑073136 | Policy Signalling for IETF-based Attach and Detach Procedures | Samsung, Nortel, Motorola, Intel, IPWireless, Nextwave, Alcatel-Lucent | Revised in S2-073649 |
S2‑073137 | Policy Signalling for IETF-based 3GPP Inter-RAT Handover | Samsung, Nortel, Motorla, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073650 |
S2‑073138 | Policy Signalling for IETF-based Dedicated Bearer Establishment | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073651 |
S2‑073139 | Policy Signalling for Non-3GPP Dedicated Bearer Procedures | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073652 |
S2‑073140 | Support for Simultaneous connection with Multiple PDN in Non-3GPP Access Systems | Samsung | Not Handled |
S2‑073141 | UL TFT delivery on attach procedure | Samsung | Not Handled |
S2‑073142 | Attach procedure for multiple PDN | Samsung | Merged into S2-073811 |
S2‑073143 | Clean-up of IMSI attachment during TAU | Samsung | Noted |
S2‑073144 | TAU on inter eNB handover with CN node relocation | Samsung | Approved |
S2‑073145 | RAT type indication during inter eNB handover | Samsung | Noted |
S2‑073146 | WITHDRAWN | Samsung | - |
S2‑073147 | Use of ARP in PCC | Samsung | Revised in S2-073681 |
S2‑073148 | RAT type and QCI selection | Samsung | Revised in S2-073682 |
S2‑073149 | Downlink signalling triggered paging procedure | CATT | Revised in S2-073782 |
S2‑073150 | Attach Procedure with Multiple default APNs | CATT | Revised in S2-073811 |
S2‑073151 | Detach Co-ordination Function for the Idle State Signaling Optimization | CATT | Not Handled |
S2‑073152 | EPS Bearer Identity is allocated by MME | CATT | Not Handled |
S2‑073153 | Paging and Idle State UP Termination for the ISSO | CATT | Not Handled |
S2‑073154 | Paging flow for the ISSO | CATT | Not Handled |
S2‑073155 | GBR Bearer handling in the Service Request and S1 Release procedure | CATT | Revised in S2-073788 |
S2‑073156 | UE Tracking function of MME | CATT | Revised in S2-073783 |
S2‑073157 | IPV6 stateless address allocation | CATT | Not Handled |
S2‑073158 | External IP address allocation | CATT | Not Handled |
S2‑073159 | IPV6 stateless address allocation | CATT | Not Handled |
S2‑073160 | PCRF to select QCI based on RAT type | CATT | Not Handled |
S2‑073161 | Response LS (from OMA-BCAST) to 3GPP SA WG2 on the Service Provider Interface between IMS and MBMS | OMA-BCAST (2007-0601R01-INP) | Noted |
S2‑073162 | Liaison Statement (from RAN WG2) to RAN WG4 on LTE Spectrum Flexibility | RAN WG2 (R2-072922) | Noted (Not to SA WG2) |
S2‑073163 | Reply LS (from RAN WG2) on IP Fragmentation | RAN WG2 (R2-072929) | Noted |
S2‑073164 | LS (from RAN WG2) on Neighbour cell list in LTE | RAN WG2 (R2-072954) | Noted |
S2‑073165 | LS from SA WG1: Mobility interworking between 3GPP and WIMAX systems | SA WG1 (S1-070992) | Noted |
S2‑073166 | LS from SA WG1: Mobility interworking between 3GPP and Broadband Wireless Access | SA WG1 (S1-070993) | Noted |
S2‑073167 | Response (from SA WG1) to LS on the need for "in-sequence data delivery" | SA WG1 (S1-071109) | Postponed to meeting #60 |
S2‑073168 | Reply LS (from SA WG1) regarding scenarios relevant for the design of inter GERAN/LTE cell reselection/handover procedures | SA WG1 (S1-071115) | Postponed to meeting #60 |
S2‑073169 | Reply LS (from SA WG1) on Location Based Service support in E-UTRAN | SA WG1 (S1-071117) | Noted |
S2‑073170 | Reply LS (from SA WG1) on further questions on Rate-Adaptive Real-time Media | SA WG1 (S1-071125) | Noted |
S2‑073171 | Reply (from SA WG1) on LS on differentiation of MBMS related HTTP traffic from other HTTP traffic | SA WG1 (S1-071126) | Noted |
S2‑073172 | Reply LS (from SA WG3) on Security about Home NodeB | SA WG3 (S3-070614) | Noted |
S2‑073173 | Reply LS (from SA WG3) on NAS Security Setup | SA WG3 (S3-070619) | Noted |
S2‑073174 | Reply LS (from SA WG3) on DSMIPv6 security over the S2c reference point | SA WG3 (S3-070623) | Response drafted in S2-073822 |
S2‑073175 | Reply LS (from SA WG4) on Verification of security principles | SA WG4 (S4-070486) | Noted |
S2‑073176 | Reply Liaison (from SA WG4) on further questions on Rate-Adaptive Real-time Media | SA WG4 (S4-070508) | Noted |
S2‑073177 | Control of AMBR share | ZTE | Noted |
S2‑073178 | Principles for support of multiple PDNs impacting attach procedures | Marvell | Noted |
S2‑073179 | UE-initiated establishment of additional PDN connectivity | Marvell | Not Handled |
S2‑073180 | Network-initiated establishment of multiple PDN connectivity at initial attach | Marvell | Merged into S2-073811 |
S2‑073181 | UE-initiated establishment of multiple PDN connectivity at initial attach | Marvell | Merged into S2-073811 |
S2‑073182 | UE-initiated establishment of multiple PDN connectivity at initial attach over trusted non-3GPP access | Marvell | Not Handled |
S2‑073183 | UE-initiated establishment of additional PDN connectivity over trusted non-3GPP access | Marvell | Not Handled |
S2‑073184 | Network-initiated establishment of multiple PDN connectivity at initial attach over untrusted non-3GPP access | Marvell | Not Handled |
S2‑073185 | UE-initiated establishment of multiple PDN connectivity at initial attach over untrusted non-3GPP access | Marvell | Not Handled |
S2‑073186 | UE-initiated establishment of multiple PDN connectivity at initial attach over untrusted access using S2c | Marvell | Not Handled |
S2‑073187 | WITHDRAWN | Marvell | - |
S2‑073188 | WITHDRAWN | Marvell | - |
S2‑073189 | Handover principles for support of multiple PDN GWs with support of non-3GPP access | Marvell | Not Handled |
S2‑073190 | Handover flows for support of multiple PDN GWs | Marvell | Not Handled |
S2‑073191 | WITHDRAWN | Marvell | - |
S2‑073192 | WITHDRAWN | Marvell | - |
S2‑073193 | Decomposing the issue of IP mobility management selection | Marvell | Not Handled |
S2‑073194 | Discussion on IP mobility management selection | Marvell | Not Handled |
S2‑073195 | Principles of IP MM management selection | Marvell | Revised in S2-073663 |
S2‑073196 | A mechanism for IP mobility management selection | Marvell | Not Handled |
S2‑073197 | Correlation between the selection of an IP mobility management mechanism and network discovery and selection | Marvell | Not Handled |
S2‑073198 | IP mobility management selection over trusted non-3GPP access | Marvell | Not Handled |
S2‑073199 | IP mobility management selection over untrusted non-3GPP access | Marvell | Not Handled |
S2‑073200 | Issues with IP mobility management selection and initial attachment over eUTRAN | Marvell | Not Handled |
S2‑073201 | Clarification on the provisioning of the PDN GW address to be used as Mobile IP Home Agent | Marvell | Not Handled |
S2‑073202 | Clarification on Initial Attach procedure from Untrusted Non-3GPP IP Access with DSMIPv6 for non-roaming case | Marvell | Not Handled |
S2‑073203 | UE requested bearer resource allocation | Ericsson | Revised in S2-073685 |
S2‑073204 | Interface clarifications for L-CAAF-n | Mavenir, Nortel, NEC, Ericsson | Revised in S2-073738 |
S2‑073205 | ICCF for L-CAAF-n | Mavenir, Nortel, NEC | Revised in S2-073739 |
S2‑073206 | L-CAAF-n registration and idle-mode mobility | Mavenir, Nortel, NEC | Not Handled |
S2‑073207 | L-CAAF-n registration flows | Mavenir, Nortel, NEC | Not Handled |
S2‑073208 | L-CAAF-n origination flows | Mavenir, Nortel, NEC | Not Handled |
S2‑073209 | L-CAAF-n termination flows | Mavenir, Nortel, NEC | Not Handled |
S2‑073210 | Proposed meeting agenda and schedule for SA WG2#59 IMS-SWG | IMS SWG Chairman | Approved |
S2‑073211 | WITHDRAWN | Intel | - |
S2‑073212 | WITHDRAWN | Intel | - |
S2‑073213 | Clarification on the use of S2c for handoff between 3GPP and non-3GPP accesses | Marvell | Revised in S2-073632 |
S2‑073214 | UE-initiated establishment of additional PDN connectivity over eUTRAN and IETF-based interfaces | Marvell | Not Handled |
S2‑073215 | Network-initiated establishment of multiple PDN connectivity at initial attach over eUTRAN and IETF-based interfaces | Marvell | Not Handled |
S2‑073216 | UE-initiated establishment of multiple PDN connectivity at initial attach over eUTRAN and IETF-based interfaces | Marvell | Not Handled |
S2‑073217 | Network initiated of multiple PDN connectivity at initial attach over trusted non-3GPP access | Marvell | Not Handled |
S2‑073218 | Early MME relocation for idle mode mobility | Mitsubishi Electric | Noted |
S2‑073219 | Self-optimization of assigned TA list from reported list of last visited TAs | Mitsubishi Electric | LS drafted in S2-073784 |
S2‑073220 | Periodic Update Procedure for the ISSO | CATT | Not Handled |
S2‑073221 | TA list allocation in the TA Update procedures | CATT | Revised in S2-073791 |
S2‑073222 | Architecture alternative for CS Domain Services over evolved PS access | T-Mobile | Revised in S2-073858 |
S2‑073223 | Decision on DSMIPv6 security over the S2c reference point | Telecom Italia | Noted |
S2‑073224 | Principles for multiple PDN access through the S2c reference point | Telecom Italia | Not Handled |
S2‑073225 | The PCC/QoS Framework for non-3GPP Accesses in SAE | Orange | Noted |
S2‑073226 | Supporting GTP-based Roaming in SAE with non-3GPP Accesses | Orange | Noted |
S2‑073227 | I-WLAN Mobility TR23.827 v.0.3.1 | Orange | Noted |
S2‑073228 | The Comparison Criteria for I-WLAN Mobility Solutions | Orange | Revised in S2-073818 |
S2‑073229 | The comparisons and conclusions for I-LWAN Mobility solutions | Orange | Revised in S2-073819 |
S2‑073230 | The PCC/QoS Framework for 3GPP accesses in SAE | Orange | Revised in S2-073655 |
S2‑073231 | WITHDRAWN | Orange | - |
S2‑073232 | Architecture for optimized handover between mobile WiMAX access and 3GPP access with pre-registration | Motorola | Revised in S2-073821 |
S2‑073233 | Signalling flows for optimized handover from mobile WiMAX to 3GPP access: UE-initiated without resource preparation | Motorola | Revised in S2-073830 |
S2‑073234 | Signalling flows for optimized handover from mobile WiMAX to 3GPP access: UE-initiated with resource preparation | Motorola | Not Handled |
S2‑073235 | Signalling flows for optimized handover from mobile WiMAX to 3GPP access: Network-initiated with resource preparation | Motorola | Not Handled |
S2‑073236 | UE initiated multiple PDN connectivity over Trusted access using S2c interface | Marvell | Not Handled |
S2‑073237 | PCC/QoS – Way Forward | AT&T | Noted |
S2‑073238 | Discussion on Mobility Mode Selection mechanisms | Intel | Not Handled |
S2‑073239 | Mobility Mode Selection Principles | Intel | Not Handled |
S2‑073240 | Generic Interface for optimized handover to non-3GPP IP access | Intel | WITHDRAWN |
S2‑073241 | 23.060 CR0597: Clarification on QoS Negotiation for Network Requested Secondary PDP Context Activation | Huawei | Revised in S2-073656 |
S2‑073242 | 23.203 CR0049: PCC rule handling at PCEF in a special case | Huawei | Revised in S2-073657 |
S2‑073243 | 23.203 CR0050: Session binding clarification | Huawei | Revised in S2-073658 |
S2‑073244 | Signalling of AMBR | Huawei | Revised in S2-073684 |
S2‑073245 | Discussion on EPS Bearer identity | Huawei | Not Handled |
S2‑073246 | Update procedures based Bear ID Allocation | Huawei | Not Handled |
S2‑073247 | Discussion on the QoS Mapping Mechanism during Inter-Rat Handover | Huawei | Conclusions in S2-073798 |
S2‑073248 | The requirement of supporting local breakout and location privacy in EPS | Huawei | Noted |
S2‑073249 | Solution on supporting local breakout and location privacy simultaneously | Huawei | Noted |
S2‑073250 | Attach Type in attach procedure | Huawei | Noted |
S2‑073251 | The HSS-initiated the subscription data update procedure | Huawei | Not Handled |
S2‑073252 | Introduction of the update reason element | Huawei | Not Handled |
S2‑073253 | PDN address allocation in attach procedure | Huawei | Revised in S2-073814 |
S2‑073254 | Discussion on Optimization of Service Request | Huawei | Noted |
S2‑073255 | Discussion on the architecture of S-TMSI | Huawei | Noted |
S2‑073256 | Selective RAB establishment | Huawei | Noted |
S2‑073257 | Principles of Idle State Signalling Reduction | Huawei | Noted |
S2‑073258 | Discussion on how to handle URA_PCH in LTE | Huawei | Not Handled |
S2‑073259 | WITHDRAWN | Huawei | - |
S2‑073260 | Deactivation of Idle State Signalling Reduction | Huawei | Not Handled |
S2‑073261 | WITHDRAWN | Huawei | - |
S2‑073262 | Inter RAT Handover between EUTRAN and pre-Rel 8 3GPP Access network | Huawei | Noted |
S2‑073263 | TAU procedure between EUTRAN and pre-Rel 8 3GPP Access network | Huawei | Not Handled |
S2‑073264 | WITHDRAWN | Huawei | - |
S2‑073265 | Initial Attach procedure on S2b with PMIPv6 for roaming case via S-GW | Huawei | Not Handled |
S2‑073266 | Always regard 3GPP access as “Home Link” | Huawei | Not Handled |
S2‑073267 | IETF-based Detach Procedure for E-UTRAN Access | Huawei | Not Handled |
S2‑073268 | Discussion on detach procedure on S2a | Huawei | Not Handled |
S2‑073269 | Discussion on detach procedure on S2b | Huawei | Not Handled |
S2‑073270 | Discussion on detach procedure on S2c | Huawei | Not Handled |
S2‑073271 | Discussion on tunnel management in non-3GPP access | Huawei | Not Handled |
S2‑073272 | Discussion on multiple PDN support | Huawei | Revised in S2-073816 |
S2‑073273 | Register PDN GW address with APN | Huawei | Not Handled |
S2‑073274 | Transmitting RAT Type Information in Mobile IP Registration Message | Huawei | Not Handled |
S2‑073275 | Clarification on PGW address storage for Non-3GPP Access | Huawei | Not Handled |
S2‑073276 | Discussion on the mobility mode selection for untrusted non-3GPP access | Huawei | Not Handled |
S2‑073277 | Determining Access Network Trusted or not During Access Authentication Procedure | Huawei | Not Handled |
S2‑073278 | S2a Attach procedure for home routed roaming case with PMIPv6 | Huawei | Not Handled |
S2‑073279 | Principle of handover between 3GPP and non-3GPP | Huawei | Revised in S2-073801 |
S2‑073280 | Refine handover flows from 3GPP to non-3GPP | Huawei | Revised in S2-073866 |
S2‑073281 | Refine handover flows from non-3GPP to 3GPP | Huawei | Revised in S2-073867 |
S2‑073282 | Handover within Non-3GPP Accesses | Huawei | Revised in S2-073806 |
S2‑073283 | eMBMS Architecture Clarification | Huawei | Noted |
S2‑073284 | Editorial clarification | Huawei | Revised in S2-073759 |
S2‑073285 | Clarification for IMS MO procedure | Huawei | Revised in S2-073760 |
S2‑073286 | Scenarios clarification | Huawei | Revised in S2-073764 |
S2‑073287 | Delivery report procedure | Huawei | Noted |
S2‑073288 | Group delivery for service level interworking | Huawei | Revised in S2-073765 |
S2‑073289 | Clarification for the service level interworking functions | Huawei | Revised in S2-073761 |
S2‑073290 | Discussion of whether ICCF through in normal SIP path | Huawei | Revised in S2-073732 |
S2‑073291 | Call Forwarding for ICS -information flow | Huawei, Ericsson | Revised in S2-073741 |
S2‑073292 | ECT for ICS - information flow | Huawei, Nortel | Approved |
S2‑073293 | Conference service for ICS - information flow | Huawei, Nortel | Revised in S2-073744 |
S2‑073294 | Video call support for ICS | Huawei | Revised in S2-073729 |
S2‑073295 | Specific service identity executed by the AS | Huawei | Revised in S2-073772 |
S2‑073296 | Service triggering by UE capability | Huawei | Revised in S2-073773 |
S2‑073297 | Iu-CS based solution for CS domain services over evolved PS access | Huawei | Revised in S2-073861 |
S2‑073298 | CS registration procedure for Iu-CS based solution | Huawei | Revised in S2-073862 |
S2‑073299 | 23.060 CR0598: Removal of Emergency APN specification | Nokia Siemens Networks, Nokia, QUALCOMM Europe | Approved |
S2‑073300 | E-MBMS architecture aspects | Nokia Siemens Networks, Nokia | Noted |
S2‑073301 | Update SID on Multimedia Session Continuity | LG Electronics, Orange, Telecom Italia, Huawei, TOSHIBA | Revised in S2-073653 |
S2‑073302 | Additional definition for MMSC_FS | LG Electronics, Orange, Telecom Italia, Huawei, TOSHIBA, Ericsson | Noted |
S2‑073303 | IMS Network Controlled Domain Transfer and Session Continuity | LG Electronics, Orange, Telecom Italia, Huawei, ZTE, TOSHIBA | Noted |
S2‑073304 | Scenarios for Multimedia Session Continuity | LG Electronics, Orange, Telecom Italia, Huawei, KDDI, Telcordia, ZTE, Ericsson, TOSHIBA, Qualcomm, NEC | Noted |
S2‑073305 | Introduce proposing MMSC architecture | LG Electronics, Orange, Telecom Italia, Huawei, TOSHIBA | Noted |
S2‑073306 | Multimedia Session Continuity Architecture and Functional entities | LG Electronics, Orange, Telecom Italia, Huawei, Qualcomm, ZTE, TOSHIBA | Revised in S2-073726 |
S2‑073307 | Information flows for originating and terminating session | LG Electronics, Orange, Telecom Italia, Huawei, TOSHIBA | Not Handled |
S2‑073308 | Information flows for session continuity between PS access systems | LG Electronics, Orange, Telecom Italia, Huawei, TOSHIBA | Not Handled |
S2‑073309 | Information flows for session continuity between PS access systems in conjunction with PS-CS continuity | LG Electronics, Orange, Telecom Italia, Huawei, TOSHIBA | Not Handled |
S2‑073310 | Additional roaming considerations for architecture alternative | T-Mobile | Revised in S2-073759 |
S2‑073311 | Clarification on PDN GW selection for attach to untrusted non-3GPP access | Marvell | Not Handled |
S2‑073312 | 23.167 CR0069: IP-CAN support for IMS Emergency Sessions | QUALCOMM Europe, Nokia Siemens Networks, Nokia, Alcatel-Lucent, TeleCommunication Systems | Revised in S2-073628 |
S2‑073313 | 23.167 CR0067R4: IMS Emergency Session Redirection from the Home Network | QUALCOMM Europe | Revised in S2-073703 |
S2‑073314 | 23.228 CR0722: Support of Emergency Public User Tel URI using normal MSISDN | QUALCOMM Europe | Noted |
S2‑073315 | 23.228 CR0723: Support of Emergency Public User Tel URI using normal MSISDN | QUALCOMM Europe | Noted |
S2‑073316 | Extension of the Solution for IMS Emergency Calls in Release 8 | QUALCOMM Europe | Noted |
S2‑073317 | New Study Item for Extended Support of IMS Emergency Calls | QUALCOMM, TeleCommunication Systems, Alcatel-Lucent | Revised in S2-073733 |
S2‑073318 | Architecture Addition to TR 23.826 for VCC for IMS Emergency Calls | QUALCOMM Europe | Revised in S2-073709 |
S2‑073319 | Impacts Addition to TR 23.826 for VCC for IMS Emergency Calls | QUALCOMM Europe | Revised in S2-073710 |
S2‑073320 | Procedures Addition to TR 23.836 for VCC for IMS Emergency Calls | QUALCOMM Europe | Revised in S2-073711 |
S2‑073321 | Further Requirements and Assumptions | Motorola | Revised in S2-073712 |
S2‑073322 | Additions and Clarifications to Session Continuity Scenarios | Motorola | Revised in S2-073714 |
S2‑073323 | VCC Enhancements for Network-Controlled Domain Transfer | Motorola | Not Handled |
S2‑073324 | Methods for Network-Initiated Domain Transfer | Motorola | Not Handled |
S2‑073325 | Introduction of Network-Controlled Multimedia Session Transfer | Motorola | Revised in S2-073727 |
S2‑073326 | An Architecture for Multimedia Session Continuity | Motorola | Revised in S2-073728 |
S2‑073327 | GBR Bearers with GBR=0 | Ericsson | Not Handled |
S2‑073328 | Rate adaptation with "MBR>GBR bearers" | Ericsson | Not Handled |
S2‑073329 | Preservation of bearers in idle mode | Ericsson | Revised in S2-073789 |
S2‑073330 | WITHDRAWN | Ericsson | - |
S2‑073331 | Bearer mapping at IRAT to/from LTE | Ericsson | Not Handled |
S2‑073332 | Overlapping IP address ranges and IETF protocol variants | Ericsson | Not Handled |
S2‑073333 | Protocol stacks for 23.401 | Ericsson | Not Handled |
S2‑073334 | Continuing to support PCO parameters | Ericsson | Not Handled |
S2‑073335 | PCRF interaction at attach procedure in 23.401 | Ericsson | Not Handled |
S2‑073336 | Idle-mode Signalling Reduction (ISR) | Ericsson | Noted |
S2‑073337 | Serving GW relocation | Ericsson | Noted |
S2‑073338 | User profile Management Procedures for 3GPP accesses | Ericsson | Not Handled |
S2‑073339 | Inter eNB HO procedure | Ericsson | Revised in S2-073792 |
S2‑073340 | HO Restriction List | Ericsson | Not Handled |
S2‑073341 | 2G to E-UTRAN IRAT Handover | Ericsson | Revised in S2-073878 |
S2‑073342 | 3G to E-UTRAN IRAT Handover | Ericsson | Not Handled |
S2‑073343 | Interworking scenarios with Pre-Rel-8 SGSN | Ericsson | Noted |
S2‑073344 | EPC - Pre-Release-8 Inter-work Specification Principles | Ericsson | Noted |
S2‑073345 | Intra-network compatibility between EPC and Pre-release-8 nodes | Ericsson | Noted |
S2‑073346 | 3GPP/non-3GPP handover | Ericsson | Merged into S2-073801 |
S2‑073347 | Storage of Selected PDN GW address in HSS with attach in non-3GPP | Ericsson | Not Handled |
S2‑073348 | Clarification of “access authentication” in 23.402 | Ericsson | Not Handled |
S2‑073349 | Wx* procedures for initial attach call flows | Ericsson | Not Handled |
S2‑073350 | User profile Management Procedures for non-3GPP accesses | Ericsson | Not Handled |
S2‑073351 | Control Plane for Evolved MBMS | Ericsson | Revised in S2-073786 |
S2‑073352 | MBMS Gateway Structure | Ericsson | Noted |
S2‑073353 | Evolved MBMS in visited networks | Ericsson | Not Handled |
S2‑073354 | WITHDRAWN | Ericsson | - |
S2‑073355 | WITHDRAWN | Ericsson | - |
S2‑073356 | IP fragmentation (LS response for RAN3) | Ericsson | Noted |
S2‑073357 | Proposed LS response | Ericsson | Revised in S2-073634 |
S2‑073358 | Clarification of the Attach Procedure | ETRI | Not Handled |
S2‑073359 | UE Identity Check Procedure | ETRI | Not Handled |
S2‑073360 | WITHDRAWN | QUALCOMM Europe | - |
S2‑073361 | Generic S2c based roaming | QUALCOMM Europe | Noted |
S2‑073362 | IP Address Allocation in EPS | QUALCOMM Europe, Nokia, Nokia Siemens Networks | Revised in S2-073815 |
S2‑073363 | Support for Overlapping Address Spaces in EPS | Cisco, Nortel, Qualcomm Europe, Verizon Wireless, Vodafone | Not Handled |
S2‑073364 | LTE-MM states definition and state transition | QUALCOMM Europe | Not Handled |
S2‑073365 | On NAS security setup during the Attach procedure | QUALCOMM Europe | Not Handled |
S2‑073366 | Selection of inter 3GPP system mobility mechanism | QUALCOMM Europe | Not Handled |
S2‑073367 | Report from SA2 email discussion on S2-073052 | QUALCOMM Europe | Noted |
S2‑073368 | Mobility Mode Selection via PDNGW selection | QUALCOMM Europe | Revised in S2-073625 |
S2‑073369 | WITHDRAWN | QUALCOMM Europe | - |
S2‑073370 | S2a MIPv4 FA Mode based Roaming | QUALCOMM Europe | Not Handled |
S2‑073371 | S2c over Untrusted non-3GPP Roaming | QUALCOMM Europe | Not Handled |
S2‑073372 | S2c over Trusted non-3GPP Roaming | QUALCOMM Europe | Not Handled |
S2‑073373 | PCC architecture principles for S2 reference points | QUALCOMM Europe, Camiant, KDDI | Noted |
S2‑073374 | PCC signalling for S2c attach procedure | QUALCOMM Europe | Revised in S2-073688 |
S2‑073375 | PCC signalling for S2c detach procedure | QUALCOMM Europe | Not Handled |
S2‑073376 | Removal of mobility hierarchy with CMIP | Nokia Siemens Networks, Nokia | Not Handled |
S2‑073377 | Relation of Client MIP and 3GPP access | Nokia Siemens Networks, Nokia | Not Handled |
S2‑073378 | Handover from E-UTRAN to CDMA2000 HRPD | Nokia Siemens Networks, Nokia | Noted |
S2‑073379 | Evaluation criteria for I-WLAN Mobility Solutions | Nokia Siemens Networks, Nokia | Merged into S2-073818 |
S2‑073380 | Interfaces required for handover optimisations for 3GPP2 HRPD access technologies | Nortel, Verizon Wireless, Ericsson, Cisco | Revised in S2-073629 |
S2‑073381 | E-UTRA <-> HRPD service continuity with optimised handover | Nortel, Verizon Wireless, Ericsson, Cisco | Revised in S2-073630 |
S2‑073382 | Interworking between EUTRAN and cdma2000 1xRTT Rev A | Nortel, Verizon Wireless, Cisco | Revised in S2-073631 |
S2‑073383 | PCC Architecture for 23.402 | Cisco, Verizon Wireless, Nokia, Nokia Siemens Network | Used as a basis for update in S2-073662 |
S2‑073384 | PCC Architecture for 23.402 Slides | Cisco, Verizon Wireless, Nokia, Nokia Siemens Network | Noted |
S2‑073385 | PCC Architecture for 23.402 White Paper | Cisco, Verizon Wireless, Nokia, Nokia Siemens Network | Noted |
S2‑073386 | LTE (GTP-PMIP) Roaming | Nortel, Vodafone, Verizon Wireless, Cisco, Motorola, Alcatel-Lucent, Nokia, Nokia Siemens Networks | Noted |
S2‑073387 | LTE (GTP-PMIP) Roaming Slides | Verizon Wireless, Nortel, Cisco, Motorola, Alcatel-Lucent | Noted |
S2‑073388 | Gateway Selection for LTE (GTP-PMIP) Roaming | Alcatel-Lucent Verizon Wireless | Noted |
S2‑073389 | I-WLAN Off-line charging rationale | Orange | Revised in S2-073654 |
S2‑073390 | 23.234 CR0166: I-WLAN Off-line Charging procedure correction | Orange | Revised in S2-073659 |
S2‑073391 | Initial Attach procedure for GTP-based Roaming with non-3GPP Accesses | Orange | Not Handled |
S2‑073392 | Untrusted non-3GPP IP Access to E-UTRAN Handover with GTP/PMIP on S5 in Non-Roaming Scenario | Orange | Noted. Include in S2-073803 and S2-073804. |
S2‑073393 | Handling of incoming sessions for a wildcarded PUI | Orange | Noted |
S2‑073394 | WITHDRAWN | Orange | - |
S2‑073395 | IP Mobility-mode Selection: Problem Statement & Scope | Motorola | Noted |
S2‑073396 | Multiple PDN: Architecture Options for PMIP interfaces (S5/S8 and S2a/b) | Motorola | Revised in S2-073626 |
S2‑073397 | User identification issues when integrating with non-3GPP accesses | Motorola | Not Handled |
S2‑073398 | TS 23.402 v1.2.1 | Motorola | Noted as the reference version for use for further updates. |
S2‑073399 | IMS Allows Seamless IP-CAN Change | Qualcomm Europe, LGE | Revised in S2-073713 |
S2‑073400 | Multimedia Session Continuity Call Flows | Qualcomm Europe | Not Handled |
S2‑073401 | 23.228 CR0724: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Revised in S2-073716 |
S2‑073402 | 23.228 CR0725: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Revised in S2-073717 |
S2‑073403 | Optimized bearer routing | Qualcomm Europe | Noted |
S2‑073404 | Access Network Discovery | Toshiba America Research Inc, Telcordia, Intel, and Interdigital | Not Handled |
S2‑073405 | Access Network Discovery | Toshiba America Research Inc, Telcordia, Ericsson, Motorola, Marvell, Intel, Qualcomm and Interdigital | Revised in S2-073833 |
S2‑073406 | Clarification on use of USSD for MT call | Research In Motion | Revised in S2-073848 |
S2‑073407 | Clarification on use of SIP for MO call | Research In Motion, Nortel | Revised in S2-073409 |
S2‑073408 | Supplementary Services Management | Research In Motion | Revised in S2-073740 |
S2‑073409 | Clarification on use of SIP for MO call | Research In Motion | Revised in S2-07846 |
S2‑073410 | Rearranging Section 5 | Telcordia, Comverse, BT, ETRI, KDDI | Revised in S2-073694 |
S2‑073411 | Contributions to Sections 5 - Architecture Reference Model | Telcordia, Comverse, BT, ETRI, KDDI | Revised in S2-073854 |
S2‑073412 | Mobility protocol selection mechanism | NEC | Not Handled |
S2‑073413 | Removal of editor's notes on LBO requirements | Alcatel-Lucent | Noted |
S2‑073414 | On removing forward references to S2/S5/S8 interfaces in the 23.402 section 4.1 and clarification of existing text. | Alcatel-lucent | Not Handled |
S2‑073415 | On information storage in section 5.6 of 23.401 | Alcatel-Lucent | Not Handled |
S2‑073416 | Additional Network elements description in section 4.4 of 23.402. | Alcatel-Lucent | Not Handled |
S2‑073417 | High level functions description in 23.402 | Alcatel-Lucent | Not Handled |
S2‑073418 | LBO requirements in 23.402 | Alcatel-Lucent | Revised in S2-073690 and S2-073691 |
S2‑073419 | Updated S2-073052 based on SA2 email discussion | QUALCOMM Europe | Noted |
S2‑073420 | Proposed P-CR to TS 23.401 based on SA2 email discussion on S2-073052 | QUALCOMM Europe | Noted |
S2‑073421 | Proposed P-CR to TS 23.402 based on SA2 email discussion on S2-073052 | QUALCOMM Europe | Noted |
S2‑073422 | Consideration on inter eNodeB handover without CN node relocation | LG Electronics | Not Handled |
S2‑073423 | E-UTRAN -> UTRAN Iu mode IRAT HO - Serving GW change | LG Electronics | Not Handled |
S2‑073424 | UTRAN Iu mode -> E-UTRAN IRAT HO - Serving GW change | LG Electronics | Not Handled |
S2‑073425 | E-UTRAN -> GERAN A/Gb mode IRAT HO - Serving GW change | LG Electronics | Not Handled |
S2‑073426 | GERAN A/Gb mode -> E-UTRAN IRAT HO - Serving GW change | LG Electronics | Not Handled |
S2‑073427 | Introduce UECAP Database | LG Electronics, Ericsson | Noted |
S2‑073428 | Refinement of Initial Attachment Flows over S2c | Nokia Siemens Networks, Nokia | Not Handled |
S2‑073429 | Handover Flow based on MOBIKE | Nokia Siemens Networks, Nokia | Revised in S2-073805 |
S2‑073430 | The need for a network based solution for ICS | Vodafone | Noted |
S2‑073431 | Policy Signalling for S2b Handover roaming scenario | IPWireless, Nextwave, Samsung | Revised in S2-073803 |
S2‑073432 | Policy Signalling for S2b Handover non-roaming scenario | IPWireless, Nextwave, Samsung | Revised in S2-073804 |
S2‑073433 | Policy Signalling for S2a Handover non-roaming scenario | IPWireless, Nextwave, Samsung | Revised in S2-073802 |
S2‑073434 | Policy Signalling for S2a Handover roaming scenario | IPWireless, Nextwave, Samsung | Not Handled |
S2‑073435 | Handling of AMBR in the multiple PDN connection scenario | IPWireless, Nextwave | Noted |
S2‑073436 | eMBMS signalling flows | IPWireless, Nextwave | Not Handled |
S2‑073437 | On-path/Off-path model co-existence | IPWireless, Nextwave | Not Handled |
S2‑073438 | Harmonisation of requirements for non-3GPP interworking | Intel, IPWireless, Nextwave | Revised in S2-073623 |
S2‑073439 | Proposed common handover architecture for optimised LTE-non-3GPP Access System handover | Intel, IPWireless, Nextwave | WITHDRAWN |
S2‑073440 | General Optimised Handover Signalling Flows | IPWireless, Nextwave | WITHDRAWN |
S2‑073441 | WITHDRAWN | IPWireless, Nextwave | - |
S2‑073442 | Discussion on Emergency Call for ICS | ZTE | Noted |
S2‑073443 | CFNRc in ICS | ZTE | Revised in S2-073745 |
S2‑073444 | CFB and CD user flow | ZTE | Revised in S2-073746 |
S2‑073445 | Mid Call Using MRF by TAS | ZTE | Revised in S2-073747 |
S2‑073446 | 23.279 CR0037: CSI Phase 1 Alignment with stage 3 | Ericsson | Revised in S2-073706 |
S2‑073447 | 23.279 CR0038: CSI Phase 1Alignment with stage 3 | Ericsson | Revised in S2-073707 |
S2‑073448 | 23.228 CR0707R3: UE to UE communication without network support for the service | Ericsson | Noted |
S2‑073449 | 23.228 CR0708R2: UE to UE communication without network support for the service | Ericsson | Noted |
S2‑073450 | 23.228 CR0713R1: P-CSCF and PCRF deployment options | Ericsson | Approved |
S2‑073451 | 23.228 CR0714R1: P-CSCF and PCRF deployment options | Ericsson | Approved |
S2‑073452 | 23.228 CR0715R1: IP Flow Terminology Alignment | Ericsson | Revised in S2-073718 |
S2‑073453 | 23.228 CR0716R1: IP Flow Terminology Alignment | Ericsson | Revised in S2-073719 |
S2‑073454 | 23.228 CR0680R2: Support for Wildcarded IMPU for aggregated UNI support | Ericsson | Noted |
S2‑073455 | Way forward on Connecting Corporate Networks | Ericsson | Noted |
S2‑073456 | Draft Reply LS on "Connecting Corporate Networks over an Aggregated UNI type Interface" | Ericsson | Revised in S2-073757 |
S2‑073457 | 23.228 CR0726: Registration of application reference | Ericsson | Revised in S2-073720 |
S2‑073458 | 23.228 CR0727: Registration of application reference | Ericsson | Revised in S2-073721 |
S2‑073459 | 23.228 CR0728: S-CSCF validation of a SIP request | Ericsson | Revised in S2-073722 |
S2‑073460 | 23.228 CR0729: S-CSCF validation of a SIP request | Ericsson | Revised in S2-073723 |
S2‑073461 | 23.002 CR0175: IMS emergency services alignment | Ericsson | Revised in S2-073702 |
S2‑073462 | 23.002 CR0176: IMS emergency services alignment | Ericsson | Revised in S2-073703 |
S2‑073463 | 23.167 CR0070: Cleanup of GPRS aspects for Emergency services | Ericsson | WITHDRAWN |
S2‑073464 | Conclusion on ISC improvement on retargeting R-URIs | Ericsson | Approved |
S2‑073465 | 23.002 CR0177: Correction of IMS interworking with CS | Ericsson | Merged into S2-073724 |
S2‑073466 | 23.002 CR0178: Correction of IMS interworking with CS | Ericsson | Merged into S2-073725 |
S2‑073467 | Architecture Option | Ericsson, Comverse | Revised in S2-073763 |
S2‑073468 | Concatenated SMS | Ericsson, Comverse, Vodafone, Qualcomm | Revised in S2-073769 |
S2‑073469 | Delivery as SMS | Ericsson, Comverse, Qualcomm | Revised in S2-073770 |
S2‑073470 | SMS to IM Interworking | Ericsson, Comverse, Qualcomm | Revised in S2-073768 |
S2‑073471 | Status report scenario for IMS - SMS interworking | Ericsson, Comverse, Qualcomm | Revised in S2-073771 |
S2‑073472 | New appendix | Ericsson, Comverse, Qualcomm | Revised in S2-073762 |
S2‑073473 | 23.204 CR0035: SM Delivery Report Status handling | Ericsson | Revised in S2-073758 |
S2‑073474 | Underlying IP-CAN mobility and Multimedia Session Continuity | Ericsson | Noted |
S2‑073475 | CFNR clarification | Ericsson, Huawei | Noted |
S2‑073476 | Further clarification on Remote UA (RUA) registration | Ericsson | Revised in S2-073849 |
S2‑073477 | Clarification for call flows in IMS adaptor approach | Ericsson | Approved |
S2‑073478 | Clarification on RUA and ICCF | Ericsson | Revised in S2-073734 |
S2‑073479 | WITHDRAWN | Ericsson | - |
S2‑073480 | Update of definition of ICS UE | Ericsson, Mavenir, Nortel, NEC, Vodafone | Approved |
S2‑073481 | Update of section s | Ericsson, Alcatel-Lucent | Revised in S2-073735 |
S2‑073482 | Working assumption for ICS | Ericsson, Telecom Italia, Alcatel-Lucent | Revised in S2-073574 |
S2‑073483 | RUA registration for I1-cs AS model | Ericsson | Not Handled |
S2‑073484 | Remote UA (RUA) registration in IMS when attached to CS access – use cases | Ericsson | Not Handled |
S2‑073485 | TS 23.401 v1.1.1 | Vodafone (Rapporteur) | Noted |
S2‑073486 | TS 23.401 v1.1.2 | Vodafone (Rapporteur) | Noted as the reference version for use for further updates. |
S2‑073487 | TS 23.882 v1.11.0 | Vodafone (Rapporteur) | Noted as the reference version for use for further updates. |
S2‑073488 | UE domain selection for MT calls | Samsung | Revised in S2-073749 |
S2‑073489 | UE domain selection for MT calls – I1ps case | Samsung | Noted |
S2‑073490 | UE domain selection for MT calls – I1cs case | Samsung | Not Handled |
S2‑073491 | Impact of SIM swapping on ICS | Samsung | Revised in S2-073730 |
S2‑073492 | Mobility Scenario with P-CSCF Change | KDDI, Telcordia | Revised in S2-073715 |
S2‑073493 | Inter access gateway interface to optimize handover for all non-3GPP accesses | KDDI, Starent | Noted |
S2‑073494 | Optimisation of Handover Flows from non-3GPP accesses to 3GPP accesses | NEC | Not Handled |
S2‑073495 | Introduction of high-level flow for handover from non-3GPP to 3GPP accesses | NEC | Not Handled |
S2‑073496 | Update of handover flows in Annex C according to the proposed optimisation for handovers from non-3GPP to 3GPP accesses | NEC | Not Handled |
S2‑073497 | Definition of EPS Bearer for IETF-based S5/S8 (Section 4.6.1.3) | NEC | Not Handled |
S2‑073498 | Principles for Handover Optimization | ZTE | Noted |
S2‑073499 | Handover UE with dual radio capability | ZTE | Noted |
S2‑073500 | The Serving Gateway selection | ZTE | Not Handled |
S2‑073501 | Mobility management mode negotiation | ZTE | Not Handled |
S2‑073502 | Detach procedures | ZTE | Not Handled |
S2‑073503 | ISR activation | ZTE | Not Handled |
S2‑073504 | ISR deactivation in TAU procedure | ZTE | Not Handled |
S2‑073505 | Detach procedure | ZTE | Not Handled |
S2‑073506 | ISR functions description | ZTE | Not Handled |
S2‑073507 | Proposal for ISR principles and Attach procedure with ISR | Nortel | Not Handled |
S2‑073508 | New S-TMSI octet to identify the MME | Nortel | Noted |
S2‑073509 | UE TMSI/RAi identifier use with ISR | Nortel | Not Handled |
S2‑073510 | WITHDRAWN | Nortel | - |
S2‑073511 | TAU procedure with ISR | Nortel | Not Handled |
S2‑073512 | Detach scenario with ISR (Idle mode Signalling Reduction) | Nortel | Not Handled |
S2‑073513 | MRT handling with ISR | Nortel | Not Handled |
S2‑073514 | Limit SGSN changes for rel 8 with optional subscription data transfer between MME and SGSN | Nortel | Not Handled |
S2‑073515 | Two scenarios for interworking with pre-Rel8 SGSN | Nortel | Revised in S2-073800 |
S2‑073516 | Mapping of SAE MBMS CP and UP to MME and PDNGW | Nortel | Noted |
S2‑073517 | no use of IP Multicast for MBMS CP | Nortel | Not Handled |
S2‑073518 | WITHDRAWN | Nortel | - |
S2‑073519 | MBMS Bearer Service Identities | 3 | Not Handled |
S2‑073520 | Discussion of the S7 termination for PCC/QoS | Panasonic | Revised in S2-073665 |
S2‑073521 | PCC QoS Way Forward | Alcatel-Lucent, Camiant, China Mobile, Intel, IP Wireless, KDDI, LGE, Motorola, NEC, Next Wave, Nortel, NTT DoCoMo, Samsung, Sharp, SK Telecom | Noted |
S2‑073522 | Maintenance of Attach state in 3GPP access for 3GPP-non3GPP handover | NTT DoCoMo | Not Handled |
S2‑073523 | Draft LS on solution investigation request for paging permission with access control | NTT DoCoMo | Revised in S2-073865 |
S2‑073524 | Stage2 for Registration in Densely-populated area (RED) | NTT DoCoMo | Revised in S2-073929 |
S2‑073525 | A way forward for registration in densely-populated area | NTT DoCoMo | Noted |
S2‑073526 | A solution guideline for RED | NTT DoCoMo | Noted |
S2‑073527 | Support of Legacy PPP Services | NTT DoCoMo | Not Handled |
S2‑073528 | Idle mode mobility management for 2G/3G-CS and LTE | NTT DoCoMo | Noted |
S2‑073529 | Proposal on Location Updating regarding Existing network and LTE. | NTT DoCoMo | Revised in S2-073826 |
S2‑073530 | 23.203 CR0051: Removal of Emergency APN | Ericsson | Approved |
S2‑073531 | On information storage in section 5.7 of 23.402 | Alcatel-Lucent | Not Handled |
S2‑073532 | Dual Homing Architecture for 23.402 | Alcatel-Lucent | Revised in S2-073636 |
S2‑073533 | ICS documentation discussion | Alcatel-Lucent, Ericsson | Noted |
S2‑073534 | ICS Registration discussion | Alcatel-Lucent | Noted |
S2‑073535 | Correction of service consistency requirement | Alcatel-Lucent | Revised in S2-073731 |
S2‑073536 | ICS-1a: ICS architecture alternatives: Analysis and Recommendation – part 1 | Nortel, NewStep, Nokia, Nokia Siemens Networks, AT&T, Mavenir, Alcatel-Lucent, ZTE | Noted |
S2‑073537 | ICS-1b: ICS architecture alternatives: Analysis and Recommendation – part 2 (ICS UE; I1-cs vs. I1-ps) | Nortel, AT&T, Alcatel-Lucent, NewStep, Nokia, Nokia Siemens Networks, RIM, ZTE | Revised in S2-073753 |
S2‑073538 | ICS-1c: ICS architecture alternatives: Analysis and Recommendation – part 3 (non ICS UE) | Nortel, AT&T, Alcatel-Lucent, NewStep, Nokia, Nokia Siemens Networks, ZTE | Revised in S2-073754 |
S2‑073539 | ICS-1d: ICS architecture alternatives: Analysis and Recommendation – part 4 (SIP AS vs. IA) | Nortel, Nokia, Nokia Siemens Networks, AT&T, Alcatel-Lucent, NewStep, Motorola, ZTE | Revised in S2-073755 |
S2‑073540 | ICS-2: Comparative analysis of ICS UE solutions: ICCC vs. CS call control | Nortel, Alcatel-Lucent, NewStep, ZTE | Noted |
S2‑073541 | ICS-3: Comparative analysis of non ICS UE solutions: L-CAAF-n approach vs. CAMEL approach | Nortel, Mavenir, ZTE, Vodafone | Revised in S2-073752 |
S2‑073542 | ICS-4: I1-ps origination – DN used for Bearer Control Signalling session. | Nortel Nokia, Nokia Siemens Networks | Approved |
S2‑073543 | ICS-5: I1-ps origination session coordination. | Nortel Nokia, Nokia Siemens Networks | Revised in S2-073847 |
S2‑073544 | ICS-6: I1-ps & I1-cs-AS: Domain Transfers - active/held session identification. | Nortel, Nokia Siemens Networks, Nokia, Huawei | Noted |
S2‑073545 | ICS-7: I1-ps & I1-cs-AS: Domain Transfers - session coordination. | Nortel Nokia, Nokia Siemens Networks | Revised in S2-073845 |
S2‑073546 | ICS-8: Non ICS UE solutions: removal of R-CAAF + editorial. | Nortel, Mavenir, NEC, Ericsson, Vodafone | Revised in S2-073736 |
S2‑073547 | ICS-9: L-CAAF-n approach for non ICS UE; Service Capabilities. | Nortel, Mavenir, NEC, Ericsson, Vodafone | Approved |
S2‑073548 | ICS-10: Comparison of RUA Registration vs CS status proposal | Nortel, Alcatel-Lucent | Not Handled |
S2‑073549 | ICS-11a: Service Data Synchronization for ICS | Nortel, AT&T, Nokia, Nokia Siemens Networks, ZTE | Noted |
S2‑073550 | ICS-11b: Service Data Synchronization for ICS | Nortel, Nokia, Nokia Siemens Networks, ZTE | Noted |
S2‑073551 | ICS-12: L-CAAF-n approach: Physical Realization | Nortel, Mavenir, NEC, Vodafone | Revised in S2-073737 |
S2‑073552 | ICS-13: Conditional Call Forwarding with CS call control | Nortel | Noted |
S2‑073553 | VCC for IMS Emergency Work Item In Release 8. | Nortel | Revised in S2-073708 |
S2‑073554 | VCC For IMS Emergency Call Flows. | Nortel | Revised in S2-073834 |
S2‑073555 | Use of CS-Status Indication Issues | Ericsson | Not Handled |
S2‑073556 | Generic "subscriber type" indication via S1 interface | T-Mobile, Orange, AT&T, Vodafone, Telecom italia | Not Handled |
S2‑073557 | Status and way forward on PCC/QoS Issue | T-Mobile | Noted |
S2‑073558 | Restructuring section 7 of TR 23.811 | Huawei (Rapporteur) | Noted |
S2‑073559 | TR 23.811 version 0.2.0 | Huawei (Rapporteur) | Approved for use with further updates |
S2‑073560 | Service Request for LTE | Alcatel-Lucent;Samsung | Noted |
S2‑073561 | On MME selection and MME Addresses auto-configuration at E-NodeB’s | Alcatel-Lucent,IPwireless | LS to RAN WG3 drafted in S2-073790 |
S2‑073562 | 23.203 CR0052: Correction of input parameters list for PCC decisions | Nokia Siemens Networks, Nokia | Revised in S2-073660 |
S2‑073563 | 23.203 CR0053: Removal of Emergency APN specification | Nokia Siemens Networks, Nokia | Noted |
S2‑073564 | 23.203 CR0054: Removal of editor's notes | Nokia Siemens Networks, Nokia | Approved |
S2‑073565 | Bearer mapping principles for inter 3GPP RAT HOs | Nokia Siemens Networks, Nokia | Revised in S2-073798 |
S2‑073566 | Requirements for the 23.402 architecture | Nokia Siemens Networks, Nokia | Revised in S2-073683 |
S2‑073567 | Draft Response to LS on Service Request for SAE/LTE | Nokia Siemens Networks | Revised in S2-073781 |
S2‑073568 | Establishment of NAS security | Nokia Siemens Networks, Nokia | Not Handled |
S2‑073569 | Idle State Signalling Reduction | Nokia Siemens Networks, Nokia | Not Handled |
S2‑073570 | User Plane Termination for Idle State UEs | Nokia Siemens Networks, Nokia | Not Handled |
S2‑073571 | Interoperation Scenario with pre-Rel-8 SGSNs | Nokia Siemens Networks, Nokia | Revised in S2-073875 |
S2‑073572 | Interoperation Non-roaming Scenario with pre-Rel-8 SGSNs | Nokia Siemens Networks, Nokia | Revised in S2-073876 |
S2‑073573 | Interoperation RAU Flow with pre-Rel-8 SGSNs | Nokia Siemens Networks, Nokia | Noted |
S2‑073574 | WITHDRAWN | Ericsson, Telecom Italia, Alcatel-Lucent, Motorola | - |
S2‑073575 | HO candidate discovery and target selection discussion - intra-system vs. inter-system | Motorola | Revised in S2-073669 |
S2‑073576 | Optimization procedure for WiMAX access discovery | Motorola | Revised in S2-073670 |
S2‑073577 | Optimization procedure for WiMAX target selection | Motorola | Revised in S2-073671 |
S2‑073578 | Level of negotiation of QoS/PCC between home and visited networks on S9 interface | Motorola | Revised in S2-073692 |
S2‑073579 | 23.060 CR0599: Additional RF Loss Indication | Motorola | Noted |
S2‑073580 | Splitting of MBMS gateway in to CP and UP | Motorola | Noted |
S2‑073581 | QoS concepts for IETF based reference points | Samsung | Not Handled |
S2‑073582 | PCC Deployment Options | Samsung | Not Handled |
S2‑073583 | 23.228 CR0672R2: Remove requirements for multiple simultaneous registrations of the same UE | Nokia, Nokia Siemens Networks, Qualcomm | Revised in S2-073888 |
S2‑073584 | 23.228 CR0718R1: Remove alias UE requirement | Nokia, Nokia Siemens Networks | Approved |
S2‑073585 | Session Transfer Identifier Usage | Nokia Siemens Networks, Nokia, Ericsson, Motorola | Revised in S2-073751 |
S2‑073586 | Call flow for UE assisted ADS for terminating session | Nokia Siemens Networks, Nokia | Revised in S2-073750 |
S2‑073587 | Supplementary Services Management over CS access | Nokia Siemens Networks, Nokia, AT&T | Noted |
S2‑073588 | I1-ps, mid call handling (HELD call) | Nokia Siemens Networks, Nokia, Nortel | Revised in S2-073748 |
S2‑073589 | ICS UE registration requirement | Nokia Siemens Networks, Nokia, AT&T, Alcatel-Lucent | Noted |
S2‑073590 | Issues in Supplementary service settings synchronization | Nokia, Nokia Siemens Networks, AT&T, Nortel, RIM, NewStep, Ericsson, Motorola, Alcatel-Lucent | Revised in S2-073742 |
S2‑073591 | Handover from CDMA2000 HRPD to E-UTRAN | Nokia Siemens Networks, Nokia | Noted |
S2‑073592 | Security Association establishment for DS-MIPv6 | QUALCOMM Europe, Telecom Italia, Marvell | Not Handled |
S2‑073593 | Signalling of QoS Requests from UE | Nokia, Nokia Siemens Networks | Noted |
S2‑073594 | Signalling of Service Level QoS Information | Nokia, Nokia Siemens Networks | Not Handled |
S2‑073595 | WITHDRAWN | Nokia, Nokia Siemens Networks | - |
S2‑073596 | WITHDRAWN | IPWireless, Nextwave | - |
S2‑073597 | Diameter protocol for S6a | NTT DoCoMo | Not Handled |
S2‑073598 | Idle state Signaling Reduction: HSS single registration vs double registration | Alcatel-Lucent | Not Handled |
S2‑073599 | Idle state Signalling Reduction: URA-PCH | Alcatel-Lucent | Not Handled |
S2‑073600 | Idle state Signalling Reduction: context synchronization | Alcatel-Lucent | Not Handled |
S2‑073601 | Interworking with pre-R8: migration aspects and way forward | Alcatel-Lucent | Revised in S2-073832 |
S2‑073602 | Comparison between I_WLAN Mobility solutions | Alcatel-Lucent | Merged into S2-073818 |
S2‑073603 | Optimized non-3GPP access to 3GPP access handover | Panasonic | Noted |
S2‑073604 | Fallback from eUTRAN to 2G/3G access for CS Voice Services | Ericsson | Revised in S2-073863 |
S2‑073605 | WITHDRAWN | CATT | - |
S2‑073606 | Generic approach for optimized non-3gpp handover | Samsung | Not Handled |
S2‑073607 | Text proposal for Handover Optimization applicable to all non-3GPP accesses | Samsung | Not Handled |
S2‑073608 | Proposal for Idle mode signalling optimization | Samsung | Not Handled |
S2‑073609 | Evolved MBMS architecture discussion | Samsung | Noted |
S2‑073610 | E-MBMS Signalling Flow | Samsung | Not Handled |
S2‑073611 | WID for IMS Centralized Services | Alcatel-Lucent, AT&T, Nortel | Revised in S2-073756 |
S2‑073612 | On the separation of MBMS CP and MBMS UP functionalities | Panasonic, Huawei | Revised in S2-073664 |
S2‑073613 | Discussion on the separation of UP and CP in MBMS GW | ZTE | Noted |
S2‑073614 | Establishment of EMBMS bearer | ZTE | Not Handled |
S2‑073615 | 23.246 CR0196: Charging ID for MBMS Bearer Context | ZTE | Noted |
S2‑073616 | 23.246 CR0197: Charging ID for MBMS Bearer Context | ZTE | Noted |
S2‑073617 | P-CSCF awareness of access network type | Telecom Italia, Huawei | Noted |
S2‑073618 | 23.228 CR0730: P-CSCF awareness of access network type | Telecom Italia, Huawei | Revised in S2-073835 |
S2‑073619 | IMS local breakout | Telecom Italia | Noted |
S2‑073620 | Study Item on "System enhancements for the use of IMS services in local breakout" | Telecom Italia, Marvell, LG Electronics, Verizon Wireless | Revised in S2-073857 |
S2‑073621 | S6a interface functionalities and protocol framework | Nokia Siemens Networks | Not Handled |
S2‑073622 | Working assumption for ICS | Ericsson, Telecom Italia, Alcatel-Lucent, Motorola, China Mobile | Noted |
S2‑073623 | Harmonisation of requirements for non-3GPP interworking | Intel, IPWireless, Nextwave, Telecom Italia, Samsung | Revised in S2-073689 |
S2‑073624 | LS (from RAN WG2) on CSG Cells Handling | RAN WG2 (R2-073740) | Noted |
S2‑073625 | Mobility Mode Selection via PDNGW selection | QUALCOMM Europe | Not Handled |
S2‑073626 | Multiple PDN: Architecture Options for PMIP interfaces (S5/S8 and S2a/b) | Motorola | Not Handled |
S2‑073627 | LS (from CT WG4) on SAE Interworking with Pre-REL8 system | CT WG4 (C4-071351) | Response drafted in S2-073799 |
S2‑073628 | 23.167 CR0069R1: IP-CAN support for IMS Emergency Sessions | QUALCOMM Europe, Nokia Siemens Networks, Nokia, Alcatel-Lucent, TeleCommunication Systems, Ericsson | Revised in S2-073702 |
S2‑073629 | Interfaces required for handover optimisations for 3GPP2 HRPD access technologies | Nortel, Verizon Wireless, Ericsson, Cisco, US Cellular | Noted |
S2‑073630 | E-UTRA <-> HRPD service continuity with optimised handover | Nortel, Verizon Wireless, Ericsson, Cisco, US Cellular | Noted |
S2‑073631 | Interworking between EUTRAN and cdma2000 1xRTT Rev A | Nortel, Verizon Wireless, Cisco, US Cellular | Not Handled |
S2‑073632 | Clarification on the use of S2c for handoff between 3GPP and non-3GPP accesses | Marvell | Not Handled |
S2‑073633 | LS response to S2-073124/ C4-070896 on "MBMS related misalignment between 23.246 and 29.060" | NEC | Approved |
S2‑073634 | LS response to S2-073118/R3-71186 on "LS on IP Fragmentation" | SA WG2 | FOR E-MAIL APPROVAL. Revision 5 approved -> S2-073939 |
S2‑073635 | DRAFT LS on Location Based Service support in E-UTRAN | SA WG2 | FOR E-MAIL APPROVAL. Noted |
S2‑073636 | Dual Homing Architecture for 23.402 | Alcatel-Lucent | Noted |
S2‑073637 | LS (from CT WG3) on New WI and TR for Diameter-based protocols usage and recommendations in 3GPP | CT WG3 (C3-070873) | Postponed to meeting #60 |
S2‑073638 | LS (from CT WG3) on Support for Multiple IP addresses for a UE in PCC | CT WG3 (C3-070887) | Postponed to meeting #60 |
S2‑073639 | LS (from CT WG3) on Time-based tariff changes | CT WG3 (C3-070897) | Postponed to meeting #60 |
S2‑073640 | LS (from CT WG3) on Support of NAT traversal solutions for PCC | CT WG3 (C3-070902) | Postponed to meeting #60 |
S2‑073641 | LS (from CT WG3) on Reference model for II-NNI | CT WG3 (C3-070905) | Postponed to meeting #60 |
S2‑073642 | LS (from RAN WG3) on Area and Access Restrictions | RAN WG3 (R3-071726) | Postponed to meeting #60 |
S2‑073643 | LS (from RAN WG3) on "subscriber type" indication via S1 interface | RAN WG3 (R3-071728) | Postponed to meeting #60 |
S2‑073644 | LS (from RAN WG3) on LTE MBMS progress | RAN WG3 (R3-071732) | Postponed to meeting #60 |
S2‑073645 | LS (from RAN WG3) on Security Mode Command procedure for SAE/LTE | RAN WG3 (R3-071749) | Postponed to meeting #60 |
S2‑073646 | Off-Path Signalling Solution | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Not Handled |
S2‑073647 | Policy Signalling for IETF-based LTE CN Node Relocation Procedures | Samsung, Nortel, Motorola, Intel, IPWireless, Nextwave, Alcatel-Lucent | Not Handled |
S2‑073648 | Policy Signalling for Non-3GPP Attach and Detach Procedures | Samsung, Nortel, Motorola, IPWireless, Nextwave, Intel, Alcatel-Lucent | Not Handled |
S2‑073649 | Policy Signalling for IETF-based Attach and Detach Procedures | Samsung, Nortel, Motorola, Intel, IPWireless, Nextwave, Alcatel-Lucent | Revised in S2-073823 |
S2‑073650 | Policy Signalling for IETF-based 3GPP Inter-RAT Handover | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Not Handled |
S2‑073651 | Policy Signalling for IETF-based Dedicated Bearer Establishment | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073686 |
S2‑073652 | Policy Signalling for Non-3GPP Dedicated Bearer Procedures | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073687 |
S2‑073653 | Update SID on Multimedia Session Continuity | LG Electronics, Orange, Telecom Italia, Huawei, TOSHIBA | Approved |
S2‑073654 | I-WLAN Off-line charging rationale | Orange | Noted |
S2‑073655 | The PCC/QoS Framework for 3GPP accesses in SAE | Orange | Noted |
S2‑073656 | WITHDRAWN | Huawei | - |
S2‑073657 | 23.203 CR0049R1: PCC rule handling at PCEF in a special case | Huawei | Revised in S2-073927 |
S2‑073658 | 23.203 CR0050R1: Session binding clarification | Huawei | Approved |
S2‑073659 | 23.234 CR0166R1: I-WLAN Off-line Charging procedure correction | Orange | Revised in S2-073928 |
S2‑073660 | 23.203 CR0052R1: Correction of input parameters list for PCC decisions | Nokia Siemens Networks, Nokia | Approved |
S2‑073661 | PCC: List of high level architecture principles | SA WG2 Chairman | Approved |
S2‑073662 | Agreements on PCC Architecture for 23.402 | Drafting group | Split into S2-073666, S2-073667 and S2-073668 |
S2‑073663 | Principles of IP MM management selection | Marvell, Telecom Italia, Huawei, Samsung | Revised in S2-073825 |
S2‑073664 | On the separation of MBMS CP and MBMS UP functionalities | Panasonic, Huawei | Noted |
S2‑073665 | Discussion of the S7 termination for PCC/QoS | Panasonic | Not Handled |
S2‑073666 | Agreements on PCC Architecture for 23.401 | Drafting group | Approved |
S2‑073667 | Policy verification performed in the SGW | Drafting group | Revised in S2-073808 |
S2‑073668 | Agreements on PCC Architecture for 23.402 | Drafting group | Approved |
S2‑073669 | HO candidate discovery and target selection discussion - intra-system vs. inter-system | Motorola, Interdigital, SK Telecom | Not Handled |
S2‑073670 | Optimization procedure for WiMAX access discovery | Motorola, Interdigital, SK Telecom | Not Handled |
S2‑073671 | Optimization procedure for WiMAX target selection | Motorola, Interdigital, SK Telecom | Not Handled |
S2‑073672 | PCC Architecture for 23.402 | Drafting group | Revised in S2-073810 |
S2‑073673 | LS Response (from CT WG1) on "PCC PCRF Requirements on rejection of Service Information" | CT WG1 (C1-071928) | Postponed to meeting #60 |
S2‑073674 | LS (from CT WG1) on the QoS Attribute "Signalling Indication" | CT WG1 (C1-071931) | Postponed to meeting #60 |
S2‑073675 | Reply LS (from CT WG1) on IP Fragmentation | CT WG1 (C1-071932) | Postponed to meeting #60 |
S2‑073676 | LS (from CT WG1) on the piggybacked transport of NAS signalling messages | CT WG1 (C1-071993) | Postponed to meeting #60 |
S2‑073677 | LS from CT WG1: Passing the private user identity to the PNM AS | CT WG1 (C1-072009) | Postponed to meeting #60 |
S2‑073678 | LS (from CT WG1) on alias identities discussions in CT1#48 | CT WG1 (C1-072067) | Postponed to meeting #60 |
S2‑073679 | LS (from CT WG1) on Closed Subscriber Groups for LTE Home cells | CT WG1 (C1-072156) | Postponed to meeting #60 |
S2‑073680 | LS (from CT WG1) on support for intra UTRAN service continuity based on Rel-7 VCC framework | CT WG1 (C1-072157) | Postponed to meeting #60 |
S2‑073681 | Use of ARP in PCC | Samsung | FOR E-MAIL APPROVAL. Approved |
S2‑073682 | RAT type and QCI selection | Samsung | FOR E-MAIL APPROVAL. Noted |
S2‑073683 | Requirements for the 23.402 architecture | Nokia Siemens Networks, Nokia | FOR E-MAIL APPROVAL. Noted |
S2‑073684 | Signalling of AMBR | Huawei | FOR E-MAIL APPROVAL. Approved |
S2‑073685 | UE requested bearer resource allocation | Ericsson | FOR E-MAIL APPROVAL. Revision 2 approved -> S2-073940 |
S2‑073686 | Policy Signalling for IETF-based Dedicated Bearer Establishment | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073902 |
S2‑073687 | Policy Signalling for Non-3GPP Dedicated Bearer Procedures | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073916 |
S2‑073688 | PCC signalling for S2c attach procedure | QUALCOMM Europe | Revised in S2-073892 |
S2‑073689 | Harmonisation of requirements for non-3GPP interworking | Intel, IPWireless, Nextwave, Samsung, Sprint | Revised in S2-073827 |
S2‑073690 | LBO requirements in 23.402 | Alcatel-Lucent | FOR E-MAIL APPROVAL. Revision 3 approved -> S2-073941 |
S2‑073691 | LBO requirements in 23.402 | Alcatel-Lucent | FOR E-MAIL APPROVAL. Approved |
S2‑073692 | Level of negotiation of QoS/PCC between home and visited networks on S9 interface | Motorola | FOR E-MAIL APPROVAL. Revision 1 approved -> S2-073942 |
S2‑073693 | Draft Reply to S2-073119: LS on Authorization over Mz in MBMS | China Mobile | Revised in S2-073874 |
S2‑073694 | Rearranging Section 5 | Telcordia, Comverse, BT, ETRI, KDDI | Approved |
S2‑073695 | LS (from RAN WG2) on Priority scenarios for LTE MBMS service continuity | RAN WG2 (R2-073710) | Postponed to meeting #60 |
S2‑073696 | LS (from RAN WG2) on CSG Cells Handling | RAN WG2 (R2-073740) | Noted (same as S2-073624) |
S2‑073697 | LS (from RAN WG2) on need to support "regional provision of service" in LTE/SAE | RAN WG2 (R2-073846) | Postponed to meeting #60 |
S2‑073698 | LS (from RAN WG2) on redirection | RAN WG2 (R2-073851) | Reply drafted in S2-073794 |
S2‑073699 | LS (from RAN WG2) on answer to "QoS Characterization for LTE/EPS" | RAN WG2 (R2-073853) | Postponed to meeting #60 |
S2‑073700 | LS (from RAN WG2) on "subscriber type" indication via S1 interface | RAN WG2 (R2-073856) | Postponed to meeting #60 |
S2‑073701 | Report on IMS-SWG Sessions | IMS-SWG Chair (Thomas Towle, QUALCOMM) | Approved |
S2‑073702 | 23.167 CR0069R2: IP-CAN support for IMS Emergency Sessions | QUALCOMM Europe, Nokia Siemens Networks, Nokia, Alcatel-Lucent, TeleCommunication Systems, Ericsson | Revised in S2-073843 |
S2‑073703 | 23.167 CR0067R5: IMS Emergency Session Redirection from the Home Network | QUALCOMM Europe | Revised in S2-073893 |
S2‑073704 | 23.002 CR0175R1: IMS emergency services alignment | Ericsson | Merged into S2-073724 |
S2‑073705 | 23.002 CR0176R1: IMS emergency services alignment | Ericsson | Merged into S2-073725 |
S2‑073706 | 23.279 CR0037R1: CSI Phase 1 Alignment with stage 3 | Ericsson | Approved |
S2‑073707 | 23.279 CR0038R1: CSI Phase 1Alignment with stage 3 | Ericsson | Approved |
S2‑073708 | VCC for IMS Emergency Work Item In Release 8. | Nortel | Revised in S2-073834 |
S2‑073709 | Architecture Addition to TR 23.826 for VCC for IMS Emergency Calls | QUALCOMM Europe | Approved |
S2‑073710 | Impacts Addition to TR 23.826 for VCC for IMS Emergency Calls | QUALCOMM Europe | Approved |
S2‑073711 | Procedures Addition to TR 23.836 for VCC for IMS Emergency Calls | QUALCOMM Europe | Approved |
S2‑073712 | Further Requirements and Assumptions | Motorola, KDDI | Approved |
S2‑073713 | IMS Allows Seamless IP-CAN Change | Qualcomm Europe, LGE | Approved |
S2‑073714 | Additions and Clarifications to Session Continuity Scenarios | Motorola | Revised in S2-073836 |
S2‑073715 | Mobility Scenario with P-CSCF Change | KDDI, Telcordia Technologies | Approved |
S2‑073716 | 23.228 CR0724R1: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Revised in S2-073775 |
S2‑073717 | 23.228 CR0725R1: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Revised in S2-073776 |
S2‑073718 | 23.228 CR0715R2: IP Flow Terminology Alignment | Ericsson | Approved |
S2‑073719 | 23.228 CR0716R2: IP Flow Terminology Alignment | Ericsson | Approved |
S2‑073720 | 23.228 CR0726R1: Registration of application reference | Ericsson | Approved |
S2‑073721 | 23.228 CR0727R1: Registration of application reference | Ericsson | Approved |
S2‑073722 | 23.228 CR0728R1: S-CSCF validation of a SIP request | Ericsson | Approved |
S2‑073723 | 23.228 CR0729R1: S-CSCF validation of a SIP request | Ericsson | Approved |
S2‑073724 | 23.002 CR0179: Correction of IMS interworking with CS and IMS emergency services alignment | Ericsson | Approved |
S2‑073725 | 23.002 CR0180: Correction of IMS interworking with CS and IMS emergency services alignment | Ericsson | Approved |
S2‑073726 | Multimedia Session Continuity Architecture and Functional entities | LG Electronics, Orange, Telecom Italia, Huawei, Qualcomm, ZTE, TOSHIBA, Nortel, Nokia(?) | Revised in S2-073838 |
S2‑073727 | Introduction of Network-Controlled Multimedia Session Transfer | Motorola | Noted |
S2‑073728 | An Architecture for Multimedia Session Continuity | Motorola | Revised in S2-073839 |
S2‑073729 | Video call support for ICS | Huawei | Approved |
S2‑073730 | Impact of SIM swapping on ICS | Samsung | Revised in S2-073841 |
S2‑073731 | Correction of service consistency requirement | Alcatel-Lucent | Approved |
S2‑073732 | Discussion of whether ICCF through in normal SIP path | Huawei | WITHDRAWN |
S2‑073733 | New Study Item for Extended Support of IMS Emergency Calls | QUALCOMM, TeleCommunication Systems, Alcatel-Lucent | Approved |
S2‑073734 | Clarification on RUA and ICCF | Ericsson | Approved |
S2‑073735 | Update of section s | Ericsson, Alcatel-Lucent | Revised in S2-073767 |
S2‑073736 | Non ICS UE solutions: removal of R-CAAF + editorial | Nortel, Mavenir, NEC, Ericsson, Vodafone, China Mobile | Approved |
S2‑073737 | ICS-12: L-CAAF-n approach: Physical Realization | Nortel, Mavenir, NEC, Vodafone | Approved |
S2‑073738 | Interface Clarifications for L-CAAF-n Approach | Mavenir, Nortel, NEC, Ericsson, Vodafone, China Mobile | Approved |
S2‑073739 | ICCF for L-CAAF-n | Mavenir, Nortel, NEC | Approved |
S2‑073740 | Supplementary Services Management | Research In Motion | Approved |
S2‑073741 | Call Forwarding for ICS -information flow | Huawei, Ericsson | Approved |
S2‑073742 | Issues in Supplementary service settings synchronization | Nokia, Nokia Siemens Networks, AT&T, Nortel, RIM, NewStep, Ericsson, Motorola, Alcatel-Lucent | Approved |
S2‑073743 | Report on the ICS sessions | ICS Session sChairman | Noted |
S2‑073744 | Conference service for ICS - information flow | Huawei, Nortel | Approved |
S2‑073745 | CFNRc in ICS | ZTE | Revised in S2-073842 |
S2‑073746 | CFB and CD user flow | ZTE | Approved |
S2‑073747 | Mid Call Using MRF by TAS | ZTE | Approved |
S2‑073748 | I1-ps, mid call handling (HELD call) | Nokia Siemens Networks, Nokia, Nortel | Approved |
S2‑073749 | UE domain selection for MT calls | Samsung | Approved |
S2‑073750 | Call flow for UE assisted ADS for terminating session | Nokia Siemens Networks, Nokia | Approved |
S2‑073751 | Session Transfer Identifier Usage | Nokia Siemens Networks, Nokia, Ericsson, Motorola | Approved |
S2‑073752 | ICS-3: Comparative analysis of non ICS UE solutions: L-CAAF-n approach vs. CAMEL approach | Nortel, Mavenir, ZTE, Vodafone, China Mobile | Approved |
S2‑073753 | ICS-1b: ICS architecture alternatives: Analysis and Recommendation – part 2 (ICS UE; I1-cs vs. I1-ps) | Nortel, AT&T, Alcatel-Lucent, NewStep, Nokia, Nokia Siemens Networks, RIM, ZTE | Approved |
S2‑073754 | ICS-1c: ICS architecture alternatives: Analysis and Recommendation – part 3 (non ICS UE) | Nortel, AT&T, Alcatel-Lucent, NewStep, Nokia, Nokia Siemens Networks, ZTE | Approved |
S2‑073755 | ICS-1d: ICS architecture alternatives: Analysis and Recommendation – part 4 (SIP AS vs. IA) | Nortel, Nokia, Nokia Siemens Networks, AT&T, Alcatel-Lucent, NewStep, Motorola, ZTE | Approved |
S2‑073756 | WID for IMS Centralized Services | Alcatel-Lucent, AT&T, Nortel | Revised in S2-073850 |
S2‑073757 | Draft Reply LS on "Connecting Corporate Networks over an Aggregated UNI type Interface" | Ericsson | Revised in S2-073844 |
S2‑073758 | 23.204 CR0035R1: SM Delivery Report Status handling | Ericsson | Approved |
S2‑073759 | Editorial clarification | Huawei, Ericsson, Comverse | Approved |
S2‑073760 | Clarification for IMS MO procedure | Huawei | Revised in S2-073777 |
S2‑073761 | Clarification for the service level interworking functions | Huawei | Approved |
S2‑073762 | New appendix | Ericsson, Comverse, Qualcomm | Revised in S2-073778 |
S2‑073763 | Architecture Option | Ericsson, Comverse | Revised in S2-073779 |
S2‑073764 | Scenarios clarification | Huawei | Approved |
S2‑073765 | Group delivery for service level interworking | Huawei | Approved |
S2‑073766 | Group delivery procedure | Huawei | Revised in S2-073780 |
S2‑073767 | Update of section s | Ericsson, Alcatel-Lucent | Approved |
S2‑073768 | SMS to IM Interworking | Ericsson, Comverse, Qualcomm | Approved |
S2‑073769 | Concatenated SMS | Ericsson, Comverse, Qualcomm, Vodafone | Approved |
S2‑073770 | Delivery as SMS | Ericsson, Comverse, Qualcomm | Approved |
S2‑073771 | Status report scenario for IMS - SMS interworking | Ericsson, Comverse, Qualcomm | Approved |
S2‑073772 | Specific service identity executed by the AS | Huawei | Revised in S2-073837 |
S2‑073773 | Service triggering by UE capability | Huawei | Revised in S2-073840 |
S2‑073774 | Contributions to Sections 5 - Architecture Reference Model | Telcordia, Comverse, BT, ETRI, KDDI | Approved |
S2‑073775 | 23.228 CR0724R2: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Revised in S2-073890 |
S2‑073776 | 23.228 CR0725R2: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Revised in S2-073891 |
S2‑073777 | Clarification for IMS MO procedure | Huawei | Approved |
S2‑073778 | New appendix | Ericsson, Qualcomm, Comverse | Approved |
S2‑073779 | Architecture Option | Ericsson, Comverse | Approved |
S2‑073780 | Group delivery procedure | Huawei | Approved |
S2‑073781 | draft Response to LS on Service Request for SAE/LTE | SA WG2 | Revised in S2-073899 |
S2‑073782 | Downlink signalling triggered paging procedure | CATT | Revised in S2-073900 |
S2‑073783 | UE Tracking function of MME | CATT | Approved |
S2‑073784 | Draft LS on TA list prediction | - | Revised in S2-073877 |
S2‑073785 | WITHDRAWN | - | - |
S2‑073786 | WITHDRAWN | - | - |
S2‑073787 | SAE MBMS CP and UP separation | MBMS drafting group | Revised in S2-073903 |
S2‑073788 | GBR Bearer handling in the Service Request and S1 Release procedure | CATT | Revised in S2-073904 |
S2‑073789 | Preservation of bearers in idle mode | Ericsson | Revised in S2-073905 |
S2‑073790 | draft LS on Mechanism for MME overload indication on the S1 interface | SA WG2 | Revised in S2-073906 |
S2‑073791 | TA list allocation in the TA Update procedures | CATT | Noted |
S2‑073792 | Elaboration of procedure Inter eNodeB Handover with CN node relocation | Ericsson | Noted |
S2‑073793 | Draft LS on Stage 2 Documentation Principles for SAE Specifications | - | Revised in S2-073894 |
S2‑073794 | draft Response to LS on redirection | SA WG2 | Revised in S2-073908 |
S2‑073795 | draft LS on Security Parameters | - | Revised in S2-073909 |
S2‑073796 | REPORT, Drafting Session | Drafting Convenor (Magnus Olsson) | Approved |
S2‑073797 | Idle mode Signalling Reduction description | Drafting group | Approved |
S2‑073798 | Bearer mapping principles for inter 3GPP RAT HOs | Nokia Siemens Networks, Nokia | Revised in S2-073915 |
S2‑073799 | [draft] LS Response on "SAE Interworking with Pre-REL8 system" | SA WG2 | Revised in S2-073917 |
S2‑073800 | Two scenarios for interworking with pre-Rel8 SGSN | Nortel | Revised in S2-073907 |
S2‑073801 | Principle of handover between 3GPP and non-3GPP | Huawei | FOR E-MAIL APPROVAL. Revision 3 approved -> S2-073943 |
S2‑073802 | Policy Signalling for S2a Handover non-roaming scenario | IPWireless, Nextwave, Samsung | Revised in S2-073881 |
S2‑073803 | Policy Signalling for S2b Handover roaming scenario | IPWireless, Nextwave, Samsung | FOR E-MAIL APPROVAL. Noted |
S2‑073804 | Policy Signalling for S2b Handover non-roaming scenario | IPWireless, Nextwave, Samsung | FOR E-MAIL APPROVAL. Revision 2 approved -> S2-073944 |
S2‑073805 | Handover Flow based on MOBIKE | Nokia Siemens Networks, Nokia | FOR E-MAIL APPROVAL. Approved |
S2‑073806 | Handover within Non-3GPP Accesses | Huawei | Approved |
S2‑073807 | PCC Architecture for 23.402 | Drafting group | Revised in S2-073831 |
S2‑073808 | Policy verification performed in the SGW | Drafting group | WITHDRAWN |
S2‑073809 | Location of PCEF Functions in P-GW, S-GW, and eNB for both the GTP-based and the IETF-based S5/S8 | Ericsson, Nokia, Nokia Siemens Networks | Revised in S2-073855 |
S2‑073810 | PCC Architecture for 23.402 | Drafting group | Approved |
S2‑073811 | Attach Procedure with Multiple default APNs | CATT, Marvell , Samsung | Revised in S2-073813 |
S2‑073812 | Attach Type in attach procedure | Huawei | FOR E-MAIL APPROVAL. Noted |
S2‑073813 | Attach Procedure with Multiple default APNs | CATT, Marvell , Samsung | Noted |
S2‑073814 | PDN address allocation in attach procedure | Huawei | FOR E-MAIL APPROVAL. Approved |
S2‑073815 | IP Address Allocation in EPS | QUALCOMM Europe, Nokia, Nokia Siemens Networks | FOR E-MAIL APPROVAL. Revision 2 approved -> S2-073945 |
S2‑073816 | Remove the FFS on support for UE connection to multiple PDNs | Huawei | Approved |
S2‑073817 | Discussion on multiple PDN support | Huawei | FOR E-MAIL APPROVAL. Revision 6 approved -> S2-073946 |
S2‑073818 | The Comparison Criteria for I-WLAN Mobility Solutions | Orange, Airvana, Alcatel-Lucent, Azaire Networks, Nokia Siemens Networks, Nokia, Telenor | Approved |
S2‑073819 | The comparisons and conclusions for I-LWAN Mobility solutions | Orange, Alcatel-Lucent, Azaire Networks, Networks, Nokia Siemens Networks, Nortel, Telenor | Revised in S2-073856 |
S2‑073820 | Mobility between 3GPP-WLAN Interworking and 3GPP Systems | Orange, China Mobile, Telenore, Azaire | Revised in S2-073864 |
S2‑073821 | Architecture for optimized handover between mobile WiMAX access and 3GPP access with pre-registration | BT, Sprint, Converse, Intel, IPWireless, NEC, Motorola, Samsung | Revised in S2-073829 |
S2‑073822 | Reply LS on DSMIPv6 security over the S2c reference point | SA WG2 (Drafting) | FOR E-MAIL APPROVAL. Revision 3 approved -> S2-073947 |
S2‑073823 | Policy Signalling for IETF-based Attach and Detach Procedures | Samsung, Nortel, Motorola, Intel, IPWireless, Nextwave, Alcatel-Lucent | Not Handled |
S2‑073824 | PDN principles … | Motorola | FOR E-MAIL APPROVAL. Approved |
S2‑073825 | Principles of IP MM management selection | Marvell, Telecom Italia, Huawei, Samsung | Revised in S2-073934 |
S2‑073826 | Proposal on Location Updating regarding Existing network and LTE. | NTT DoCoMo | Not Handled |
S2‑073827 | Harmonisation of requirements for non-3GPP interworking | Intel, IPWireless, Nextwave, Samsung, Sprint | Approved |
S2‑073828 | E-UTRA <-> HRPD service continuity with optimised handover | Nortel, Verizon Wireless, Ericsson, Cisco, Vodafone, Alcatel-Lucent, Motorola, Nokia, Nokia Siemens Network, KDDI, Airvana, Starent | Revised in S2-073872, S2-073873 |
S2‑073829 | Architecture for Optimized Handover between mobile WiMAX access and 3GPP access with pre-registration (TS 23.402) | BT, Roger Wireless, Sprint, Comverse, Intel, IPWireless, Interdigital, Motorola, Nextwave, Samsung | Revised in S2-073882 |
S2‑073830 | Signalling flows for optimized handover from mobile WiMAX to 3GPP access: UE-initiated without resource preparation | Motorola | Not Handled |
S2‑073831 | PCC Architecture for 23.402 | Drafting group | Revised to S2-073869, S2-073870, S2-073871 |
S2‑073832 | Interworking with pre-R8: migration aspects and way forward | Alcatel-Lucent | Noted |
S2‑073833 | Access Network Discovery | Toshiba America Research Inc, Telcordia, Ericsson, Motorola, Marvell, Intel, Qualcomm and Interdigital | Revised in S2-073924 |
S2‑073834 | VCC for IMS Emergency Work Item In Release 8. | Nortel | Approved |
S2‑073835 | 23.228 CR0730R1: P-CSCF awareness of access network type | Telecom Italia, Huawei | Approved |
S2‑073836 | Additions and Clarifications to Session Continuity Scenarios | Motorola, KDDI | Approved |
S2‑073837 | Specific service identity executed by the AS | Huawei | Approved |
S2‑073838 | Multimedia Session Continuity Architecture and Functional entities | LG Electronics, Orange, Telecom Italia, Huawei, Qualcomm, ZTE, TOSHIBA, Nortel | Approved |
S2‑073839 | An Architecture for Multimedia Session Continuity | Motorola | Approved |
S2‑073840 | Service triggering by UE capability | Huawei | Approved |
S2‑073841 | Impact of SIM swapping on ICS | Samsung | Approved |
S2‑073842 | CFNRc in ICS | ZTE | Approved |
S2‑073843 | 23.167 CR0069R3: IP-CAN support for IMS Emergency Sessions | QUALCOMM Europe, Nokia Siemens Networks, Nokia, Alcatel-Lucent, TeleCommunication Systems, Ericsson, Huawei | Approved |
S2‑073844 | Draft Reply LS on "Connecting Corporate Networks over an Aggregated UNI type Interface" | Ericsson | Revised in S2-073887 |
S2‑073845 | ICS-7: I1-ps & I1-cs-AS: Domain Transfers - session coordination. | Nortel Nokia, Nokia Siemens Networks | Revised in S2-073886 |
S2‑073846 | Clarification on use of SIP for MO call | Research In Motion | Noted |
S2‑073847 | ICS-5: I1-ps origination session coordination. | Nortel Nokia, Nokia Siemens Networks | Approved |
S2‑073848 | Clarification on use of USSD for MT call | Research In Motion | Approved |
S2‑073849 | Further clarification on Remote UA (RUA) registration | Ericsson | Approved |
S2‑073850 | WID for IMS Centralized Services | Alcatel-Lucent, AT&T, Nortel | Noted |
S2‑073851 | WITHDRAWN | NOT USED | - |
S2‑073852 | WITHDRAWN | NOT USED | - |
S2‑073853 | WITHDRAWN | NOT USED | - |
S2‑073854 | Contributions to Sections 5 - Architecture Reference Model | Telcordia, Comverse, BT, ETRI, KDDI | Revised in S2-073774 |
S2‑073855 | Location of PCEF Functions in P-GW, S-GW, and eNB for both the GTP-based and the IETF-based S5/S8 | Ericsson, Nokia, Nokia Siemens Networks | Revised in S2-073879, S2-073880 |
S2‑073856 | The comparisons and conclusions for I-LWAN Mobility solutions | Orange, Alcatel-Lucent, Azaire Networks, Networks, Nokia Siemens Networks, Nortel, Telenor | FOR E-MAIL APPROVAL. Approved |
S2‑073857 | Study Item on "System enhancements for the use of IMS services in local breakout" | Telecom Italia, Marvell, LG Electronics, Verizon Wireless | Revised in S2-073884 |
S2‑073858 | Architecture alternative for CS Domain Services over evolved PS access | T-Mobile | Revised in S2-073911 |
S2‑073859 | Additional roaming considerations for architecture alternative | T-Mobile | Revised in S2-073912 |
S2‑073860 | TS 23.401 coversheet for presentation to TSG SA for information | Rapporteur (Vodafone) | Revised in S2-073925 |
S2‑073861 | Iu-CS based solution for CS domain services over evolved PS access | Huawei | FOR E-MAIL APPROVAL. Approved |
S2‑073862 | CS registration procedure for Iu-CS based solution | Huawei | FOR E-MAIL APPROVAL. Approved |
S2‑073863 | Fallback from eUTRAN to 2G/3G access for CS Voice Services | Ericsson | FOR E-MAIL APPROVAL. Approved |
S2‑073864 | Mobility between 3GPP-WLAN Interworking and 3GPP Systems | Orange, China Mobile, Telenore, Azaire | FOR E-MAIL APPROVAL. Noted |
S2‑073865 | [draft] LS on solution investigation request for paging permission with access control | SA WG2 (NTT DoCoMo) | FOR E-MAIL APPROVAL. Approved version in S2-073937 |
S2‑073866 | Refine handover flows from 3GPP to non-3GPP | Huawei | Not Handled |
S2‑073867 | Refine handover flows from non-3GPP to 3GPP | Huawei | Not Handled |
S2‑073868 | Principles of MTU size | Ericsson | Noted |
S2‑073869 | PCC Architecture for 23.401 | Drafting group | Approved |
S2‑073870 | PCC Architecture for 23.402 | Drafting group | Approved |
S2‑073871 | PCC Architecture Figures Update | Drafting group | Revised in S2-073918 |
S2‑073872 | (Normative parts) E-UTRA <-> HRPD service continuity with optimised handover | Nortel, Verizon Wireless, Ericsson, Cisco, Vodafone, Alcatel-Lucent, Motorola, Nokia, Nokia Siemens Network, KDDI, Airvana, Starent | Approved |
S2‑073873 | (Updated figures) E-UTRA <-> HRPD service continuity with optimised handover | Nortel, Verizon Wireless, Ericsson, Cisco, Vodafone, Alcatel-Lucent, Motorola, Nokia, Nokia Siemens Network, KDDI, Airvana, Starent | Approved |
S2‑073874 | Draft Reply to S2-073119: LS on Authorization over Mz in MBMS | China Mobile | Not Handled |
S2‑073875 | Interoperation Scenario with pre-Rel-8 SGSNs | Nokia Siemens Networks, Nokia | Approved |
S2‑073876 | Interoperation Non-roaming Scenario with pre-Rel-8 SGSNs | Nokia Siemens Networks, Nokia | Revised in S2-073914 |
S2‑073877 | Draft LS on TA list prediction | SA WG2 | Revised in S2-073901 |
S2‑073878 | 2G to E-UTRAN IRAT Handover | Ericsson | Approved |
S2‑073879 | TS 23.401 part: Location of PCEF Functions in P-GW, S-GW, and eNB for both the GTP-based and the IETF-based S5/S8 | Ericsson, Nokia, Nokia Siemens Networks | Approved |
S2‑073880 | TS 23.402 part: Location of PCEF Functions in P-GW, S-GW, and eNB for both the GTP-based and the IETF-based S5/S8 | Ericsson, Nokia, Nokia Siemens Networks | Approved |
S2‑073881 | Policy Signalling for S2a Handover non-roaming scenario | IPWireless, Nextwave, Samsung | Approved |
S2‑073882 | Architecture for Optimized Handover between mobile WiMAX access and 3GPP access with pre-registration (TS 23.402) | BT, Roger Wireless, Sprint, Comverse, Intel, IPWireless, Interdigital, Motorola, Nextwave, Samsung | Revised in S2-073932 |
S2‑073883 | Flows for Optimized Handover between mobile WiMAX access and 3GPP access with pre-registration (TS 23.402) | BT, Roger Wireless, Sprint, Comverse, Intel, IPWireless, Interdigital, Motorola, Nextwave, Samsung | WITHDRAWN from e-mail approval |
S2‑073884 | Study Item on "System enhancements for the use of IMS services in local breakout" | Telecom Italia, Marvell, LG Electronics, Verizon Wireless | Revised in S2-073931 |
S2‑073885 | SA WG2 Update of the work plan | Work Plan Group | Noted |
S2‑073886 | I1-ps & I1-cs-AS: Domain Transfers - session coordination | Nortel, Nokia, Nokia Siemens Networks | Approved |
S2‑073887 | Reply LS on "Connecting Corporate Networks over an Aggregated UNI type Interface" | SA WG2 | Approved |
S2‑073888 | 23.228 CR0672R3: Remove requirements for multiple simultaneous registrations of the same UE | Nokia, Nokia Siemens Networks, Qualcomm | Approved |
S2‑073889 | Report from the SAE drafting sessions | SAE Drafting Session Chairman | Approved |
S2‑073890 | 23.228 CR0724R3: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Approved |
S2‑073891 | 23.228 CR0725R3: Handling of invalid and unauthorized media | Qualcomm Europe, Telecom Italia, Vodafone | Revised in S2-073898 |
S2‑073892 | PCC signalling for S2c attach procedure | Drafting group | Revised in S2-073933 |
S2‑073893 | 23.167 CR0067R6: IMS Emergency Session Redirection from the Home Network | QUALCOMM Europe, Research in Motion | Approved |
S2‑073894 | LS on Stage 2 Documentation Principles for SAE Specifications | SA WG2 | Approved |
S2‑073895 | [draft] LS on "Principles on Idle Mode Signalling Reduction" | SA WG2 | FOR E-MAIL APPROVAL. Approved version in S2-073938 |
S2‑073896 | Presentation cover sheet for TS 23.402 | Rapporteur (Motorola) | Revised in S2-073926 |
S2‑073897 | Guidance for drafting figures containing GTP and IETF variants | TS 23.401 and TS 23.402 Rapporteurs, Samsung | Endorsed. P-Crs to add to annex in S2-073922 and S2-073923 |
S2‑073898 | 23.228 CR0725R4: Handling of invalid and unauthorized media based on Communication Service Identifiers | Qualcomm, Telecom Italia, Vodafone | Approved |
S2‑073899 | Response to LS on Service Request for SAE/LTE | SA WG2 | Approved |
S2‑073900 | Downlink signalling triggered paging procedure | CATT | Approved |
S2‑073901 | LS on TA list prediction | SA WG2 | Approved |
S2‑073902 | Policy Signalling for IETF-based Dedicated Bearer Establishment | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Revised in S2-073919, S2-073920 |
S2‑073903 | SAE MBMS CP and UP separation | MBMS drafting group | Approved |
S2‑073904 | GBR Bearer handling in the Service Request and S1 Release procedure | CATT | Approved |
S2‑073905 | Preservation of bearers in idle mode | Ericsson | Revised in S2-073910 |
S2‑073906 | LS on Mechanism for MME overload indication on the S1 interface | SA WG2 | Approved |
S2‑073907 | Two scenarios for interworking with pre-Rel8 SGSN | Nortel | Revised in S2-073913 |
S2‑073908 | Response to LS on redirection | SA WG2 | Approved |
S2‑073909 | LS on Security Parameters | - | Approved |
S2‑073910 | Preservation of bearers in idle mode | Ericsson | FOR E-MAIL APPROVAL. Revision 2 approved -> S2-073948 |
S2‑073911 | Architecture alternative for CS Domain Services over evolved PS access | T-Mobile | FOR E-MAIL APPROVAL. Approved |
S2‑073912 | Additional roaming considerations for architecture alternative | T-Mobile | FOR E-MAIL APPROVAL. Approved |
S2‑073913 | Two scenarios for interworking with pre-Rel8 SGSN | Nortel | Approved |
S2‑073914 | Interoperation Non-roaming Scenario with pre-Rel-8 SGSNs | Nokia Siemens Networks, Nokia | Approved |
S2‑073915 | Bearer mapping principles for inter 3GPP RAT HOs | Nokia Siemens Networks, Nokia | Approved |
S2‑073916 | Policy Signalling for Non-3GPP Dedicated Bearer Procedures | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Approved |
S2‑073917 | LS Response on "SAE Interworking with Pre-REL8 system" | SA WG2 | Approved |
S2‑073918 | PCC Architecture Figures Update | Drafting group | Revised in S2-073921 |
S2‑073919 | TS 23.401 part: Policy Signalling for IETF-based Dedicated Bearer Establishment | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Approved |
S2‑073920 | TS 23.402 part: Policy Signalling for IETF-based Dedicated Bearer Establishment | Samsung, Nortel, Motorola, Alcatel-Lucent, IPWireless, Nextwave, Intel | Approved |
S2‑073921 | PCC Architecture Figures Update | Drafting group | Approved |
S2‑073922 | Guidance for drafting figures. | TS 23.401 Rapporteur | FOR E-MAIL APPROVAL. Approved |
S2‑073923 | Guidance for drafting figures. | TS 23.402 Rapporteur | FOR E-MAIL APPROVAL. Approved |
S2‑073924 | Access Network Discovery | Toshiba America Research Inc, Telcordia, Ericsson, Motorola, Marvell, Intel, Qualcomm and Interdigital | FOR E-MAIL APPROVAL. Revision 4 approved -> S2-073949 |
S2‑073925 | TS 23.401 coversheet for presentation to TSG SA for information | Rapporteur (Vodafone) | Approved |
S2‑073926 | TS 23.402 coversheet for presentation to TSG SA for information | Rapporteur (Motorola) | Approved |
S2‑073927 | 23.203 CR0049R2: PCC rule handling at PCEF in a special case | Huawei | Approved |
S2‑073928 | 23.234 CR0166R2: I-WLAN Off-line Charging procedure correction | Orange | Approved |
S2‑073929 | Stage2 for Registration in Densely-populated area (RED) | NTT DoCoMo | Approved |
S2‑073930 | TR 23.827 coversheet for presentation to TSG SA for information | Rapporteur (Vodafone) | Not Handled |
S2‑073931 | Study Item on "System enhancements for the use of IMS services in local breakout" | Telecom Italia, Marvell, LG Electronics, Verizon Wireless | FOR E-MAIL APPROVAL. Revision 3 approved -> S2-073936 |
S2‑073932 | WITHDRAWN | BT, Roger Wireless, Sprint, Comverse, Intel, IPWireless, Interdigital, Motorola, Nextwave, Samsung | - |
S2‑073933 | PCC signalling for S2c attach procedure | Drafting group | Approved |
S2‑073934 | Principles of IP MM management selection | Marvell, Telecom Italia, Huawei, Samsung | FOR E-MAIL APPROVAL. Noted |
S2‑073935 | Reply LS on "Connecting Corporate Networks over an Aggregated UNI type Interface" | SA WG2 - IMS SWG | WITHDRAWN |
S2‑073936 | Study Item on "System enhancements for the use of IMS services in local breakout" | Telecom Italia, Marvell, LG Electronics, Verizon Wireless | Approved |
S2‑073937 | LS on solution investigation request for paging permission with access control | SA WG2 | Approved |
S2‑073938 | LS on "Principles on Idle Mode Signalling Reduction" | SA WG2 | Approved |
S2‑073939 | LS response to S2-073118/R3-71186 on "LS on IP Fragmentation" | SA WG2 | Approved |
S2‑073940 | UE requested bearer resource allocation | Ericsson | Approved |
S2‑073941 | LBO requirements in 23.402 | Alcatel-Lucent | Approved |
S2‑073942 | Level of negotiation of QoS/PCC between home and visited networks on S9 interface | Motorola | Approved |
S2‑073943 | Principle of handover between 3GPP and non-3GPP | Huawei | Approved |
S2‑073944 | Policy Signalling for S2b Handover non-roaming scenario | IPWireless, Nextwave, Samsung | Approved |
S2‑073945 | IP Address Allocation in EPS | QUALCOMM Europe, Nokia, Nokia Siemens Networks | Approved |
S2‑073946 | Discussion on multiple PDN support | Huawei | Approved |
S2‑073947 | Reply LS on DSMIPv6 security over the S2c reference point | SA WG2 (Drafting) | Approved |
S2‑073948 | Preservation of bearers in idle mode | Ericsson | Approved |
S2‑073949 | Access Network Discovery | Toshiba America Research Inc, Telcordia, Ericsson, Motorola, Marvell, Intel, Qualcomm | Approved |
page generated from database: 2024-04-22 07:58:53