The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R5-43b - 2009-06-23 to 2009-06-26, Beijing

meeting id: R5-43b (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
01 Common Agenda Motorola, NEC, Agilent Technologies -
02 Signalling Group Timetable Motorola -
03 RF Group Timetable Agilent Technologies -
04 Previous RAN Plenary Notes WG Chairman -
05 36.523-3 v050 Rapporteur -
06 Batch 1A - Update of TC 9.1.2.1 Authentication accepted Samsung -
07 Batch 1B - New TC 9.1.2.2 Authentication not accepted by the network, GUTI used, identification procedure and authentication restart Samsung -
08 Batch 1B - New TC 9.1.2.5 Authentication not accepted by the UE, SQN failure Sasmung -
09 Batch 1A - New TC 9.3.2.1 Paging procedure Samsung -
10 Adding new Batch 1 TCs applicability Samsung -
11 Batch 3 - Removal of TC 9.1.4.1 Identification procedure, IMSI requested Samsung -
12 TP for In-band emissions Rohde & Schwarz -
R5‑093000 Common Agenda WG Chairman imported from 3GU
R5‑093001 Signalling Group Timetable SIG Chairman imported from 3GU
R5‑093002 RF Group Timetable RF Chairman imported from 3GU
R5‑093003 Previous RAN Plenary Notes WG Chairman imported from 3GU
R5‑093004 Chairs notes on GCF LTE activities WG Chairman imported from 3GU
R5‑093005 RAN5 Status Report at previous Plenary WG Chairman imported from 3GU
R5‑093006 TF 160 Status Report - previous Plenary WG Chairman imported from 3GU
R5‑093007 Meeting Schedule RAN5 WG Chairman imported from 3GU
R5‑093008 Meeting Schedule RAN5 update WG Chairman imported from 3GU
R5‑093009 Liaison statement - template WG Chairman imported from 3GU
R5‑093010 RAN5 next meeting details WG Chairman imported from 3GU
R5‑093011 Agenda - closing session WG Chairman imported from 3GU
R5‑093012 Liaison statement - GCF Update WG Chairman imported from 3GU
R5‑093013 Correction CR to 36.521-1: Update of Requirements for Demodulation of PDSCH (FDD) tests Motorola imported from 3GU
R5‑093014 Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test Motorola imported from 3GU
R5‑093015 Correction CR to 36.521-2: Applicability changes to introduce additional RRM tests Motorola imported from 3GU
R5‑093016 E-UTRA Intra/Inter Frequency Measurements for Cell Search Test Cases Development Motorola imported from 3GU
R5‑093017 Correction CR to 36.521-3: Update of Requirements for E-UTRAN (FDD) cell re-selection tests Motorola imported from 3GU
R5‑093018 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-GSM cell re-selection test Motorola imported from 3GU
R5‑093019 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-GSM Handover test Motorola imported from 3GU
R5‑093020 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-UTRAN FDD Handover test Motorola imported from 3GU
R5‑093021 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-UE transmit timing accuracy test Motorola imported from 3GU
R5‑093022 Addition of test scenario CR to 36.521-3: E-UTRAN FDD-FDD Inter-frequency cell search when DRX is used under fading propagation conditions Motorola imported from 3GU
R5‑093023 Correction CR to 36.521-3: Update of E-UTRAN FDD-FDD Intra-frequency cell search when DRX is used under fading propagation conditions Motorola imported from 3GU
R5‑093024 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-Contention Based Random Access test Motorola imported from 3GU
R5‑093025 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD Non-Contention Based Random Access test Motorola imported from 3GU
R5‑093026 Correction CR to 36.521-3: Update of Requirements conditions for E-UTRAN FDD - UE timing advance adjustment accuracy test Motorola imported from 3GU
R5‑093027 LS on support for CSFB to UTRAN and GERAN TSG WG RAN2 imported from 3GU
R5‑093028 LS on FRC H-Set 8 Configuration TSG WG RAN4 imported from 3GU
R5‑093029 Response LS to LS on conformance test coverage for PUSCH Frequency Hopping TSG WG RAN4 imported from 3GU
R5‑093030 LS on LTE-HRPD Interworking 3GPP2 TSG-C imported from 3GU
R5‑093031 MCC TF160 June report MCC TF160 imported from 3GU
R5‑093032 Add a new clause on CCE allocation MCC TF160 imported from 3GU
R5‑093033 Add a new normative Annex for ASP documentation MCC TF160 imported from 3GU
R5‑093034 Small corrections and documentations for EUTRAN test models MCC TF160 imported from 3GU
R5‑093035 Correction CR to 36.521-3: Update of Annex H Default Message Contents for support of RRM Motorola imported from 3GU
R5‑093036 Update to preamble in L2 UM test cases MCC TF160, Ericsson, ST-Ericsson imported from 3GU
R5‑093037 UTRAN SIB scheduling for LTE interRAT test MCC TF160 imported from 3GU
R5‑093038 Priority 2 - New EMM TC 9-1-4-2 Samsung imported from 3GU
R5‑093039 Priority 2 - New EMM TC 9-3-1-7 Samsung imported from 3GU
R5‑093040 Priority 2 - Removal of EMM TC 9-1-2-2 Samsung, Nokia imported from 3GU
R5‑093041 Mismatch between Protocol TC titles in 36523-1 36523-2 and WP TC list Samsung, TF160 imported from 3GU
R5‑093042 Removal of SS actions from IEs Values clause 4-6-7 Samsung imported from 3GU
R5‑093043 Editorial and More corrections to TS 36-509 Samsung imported from 3GU
R5‑093044 Priority 2 - Adding New EMM TC 9-1-4-2 to applicability Samsung imported from 3GU
R5‑093045 Priority 2 - Adding New EMM TC 9-3-1-7 to applicability Samsung imported from 3GU
R5‑093046 Priority 2 - Removal of EMM TC 9-1-2-2 from the applicability list Samsung imported from 3GU
R5‑093047 Addition of new test case 6.2.2.5 NTT DOCOMO imported from 3GU
R5‑093048 GCF Priority 3 - Addition of test case 6.2.3.6 NTT DOCOMO imported from 3GU
R5‑093049 GCF Priority 3 - Update to test case 8.1.1.2 NTT DOCOMO imported from 3GU
R5‑093050 GCF Priority 4 - Update to test case 8.1.1.3 NTT DOCOMO imported from 3GU
R5‑093051 GCF Priority 4 - Update to test case 8.1.1.4 NTT DOCOMO imported from 3GU
R5‑093052 GCF Priority 4 - Addition of new test case 8.1.2.6 NTT DOCOMO imported from 3GU
R5‑093053 GCF Priority 4 - Update to test case 8.1.2.8 NTT DOCOMO imported from 3GU
R5‑093054 GCF Priority 4 - Addition of new test case 8.1.2.9 NTT DOCOMO imported from 3GU
R5‑093055 GCF Priority 3 - Update to test case 8.1.3.3 NTT DOCOMO imported from 3GU
R5‑093056 GCF Priority 3 - Update to test case 8.2.1.2 NTT DOCOMO imported from 3GU
R5‑093057 GCF Priority 3 - Update to test case 8.2.1.4 NTT DOCOMO imported from 3GU
R5‑093058 GCF Priority 3 - Addition of test case 8.2.4.4 NTT DOCOMO imported from 3GU
R5‑093059 GCF Priority 4 - Update to test case 8.2.4.8 NTT DOCOMO imported from 3GU
R5‑093060 GCF Priority 3 - Update to test case 8.2.4.9 NTT DOCOMO imported from 3GU
R5‑093061 GCF Priority 2 - Update to test case 8.3.1.9 NTT DOCOMO imported from 3GU
R5‑093062 Addition of new test case 8.4.1.2 NTT DOCOMO imported from 3GU
R5‑093063 Update to test case 8.4.1.8 NTT DOCOMO imported from 3GU
R5‑093064 GCF Priority 2 - Addition of new test case 8.4.2.4 NTT DOCOMO imported from 3GU
R5‑093065 GCF Priority 2 - Addition of new test case 8.4.2.6 NTT DOCOMO imported from 3GU
R5‑093066 GCF Priority 3 - Addition of new test case 9.2.1.2.5 NTT DOCOMO imported from 3GU
R5‑093067 GCF Priority 3 - Update to test case 9.2.1.2.6 NTT DOCOMO imported from 3GU
R5‑093068 GCF Priority 3 - Addition of new test case 9.2.1.2.7 NTT DOCOMO imported from 3GU
R5‑093069 GCF Priority 3 - Addition of new test case 9.2.1.2.11 NTT DOCOMO imported from 3GU
R5‑093070 GCF Priority 3 - Addition of new test case 9.2.1.2.13 NTT DOCOMO imported from 3GU
R5‑093071 GCF Priority 3 - Addition of new test case 9.2.1.2.15 NTT DOCOMO imported from 3GU
R5‑093072 GCF Priority 3 - Addition of new test case 9.2.3.1.25 NTT DOCOMO imported from 3GU
R5‑093073 GCF Priority 4 - Addition of new test case 9.2.3.2.5 NTT DOCOMO imported from 3GU
R5‑093074 GCF Priority 4 - Update to test case 9.2.3.2.6 NTT DOCOMO imported from 3GU
R5‑093075 GCF Priority 4 - Addition of new test case 9.2.3.2.7 NTT DOCOMO imported from 3GU
R5‑093076 GCF Priority 3 - Addition of new test case 9.2.3.2.9 NTT DOCOMO imported from 3GU
R5‑093077 GCF Priority 4 - Update to test case 9.2.3.2.15 NTT DOCOMO imported from 3GU
R5‑093078 GCF Priority 3 - Addition of new test case 9.3.1.17 NTT DOCOMO imported from 3GU
R5‑093079 Addition of new test case 10.7.1 NTT DOCOMO imported from 3GU
R5‑093080 Addition of new test case 10.7.2 NTT DOCOMO imported from 3GU
R5‑093081 Addition of new test case 10.7.3 NTT DOCOMO imported from 3GU
R5‑093082 Addition of new test case 10.7.4 NTT DOCOMO imported from 3GU
R5‑093083 Addition of new test case 10.7.5 NTT DOCOMO imported from 3GU
R5‑093084 Addition of new test case 10.8.2 NTT DOCOMO imported from 3GU
R5‑093085 Addition of new test case 10.8.3 NTT DOCOMO imported from 3GU
R5‑093086 Addition of new test case 10.8.4 NTT DOCOMO imported from 3GU
R5‑093087 Addition of new test case 10.8.5 NTT DOCOMO imported from 3GU
R5‑093088 Addition of new test case 10.8.6 NTT DOCOMO imported from 3GU
R5‑093089 List of test cases/scenarios proposal for LTE Protocol Testing in Idle Mode Operation NTT DOCOMO imported from 3GU
R5‑093090 Addition of applicability new LTE test case NTT DOCOMO imported from 3GU
R5‑093091 Correction to the default value of ul-Bandwidth in TS 36.508. NTT DOCOMO imported from 3GU
R5‑093092 Correction to the PDSCH power in TS36.508 NTT DOCOMO imported from 3GU
R5‑093093 Correction to the default value of reportAmount in TS 36.508. NTT DOCOMO imported from 3GU
R5‑093094 Addition of the default value of quantityConfig in TS 36.508. NTT DOCOMO imported from 3GU
R5‑093095 Clarification on UL data in UE test loop mode NTT DOCOMO imported from 3GU
R5‑093096 Interference reduction for LTE Signalling test cases with multiple cells NTT DOCOMO imported from 3GU
R5‑093097 Missing TCs applicability in 36-523-2 Samsung imported from 3GU
R5‑093098 LS to RAN4 on Timing Advance Command value during T2 for the E-UTRA - UE Timing Advance Adjustment Accuracy Test Case Motorola imported from 3GU
R5‑093099 Update to GCF priority 1 test case 9.2.1.1.2 Nokia imported from 3GU
R5‑093100 Update to GCF priority 2 test case 9.2.1.1.7 Nokia, CATR, TF160 imported from 3GU
R5‑093101 Update to GCF priority 2 test case 9.2.2.1.1 Nokia imported from 3GU
R5‑093102 Update to GCF priority 3 test case 9.2.2.1.2 Nokia imported from 3GU
R5‑093103 Update to GCF priority 2 test case 9.2.2.1.6 Nokia imported from 3GU
R5‑093104 Update of EVM Rohde & Schwarz imported from 3GU
R5‑093105 Update of In-band emissions Rohde & Schwarz imported from 3GU
R5‑093106 Correction of Tx general discription Rohde & Schwarz, Nokia imported from 3GU
R5‑093107 36.521 followup database Rohde & Schwarz imported from 3GU
R5‑093108 TDD Initial downlink channel setting Rohde & Schwarz imported from 3GU
R5‑093109 Discussion about TDD special subframe configuration Rohde & Schwarz imported from 3GU
R5‑093110 Update for TDD Intra-frequency RSRQ measurement accuracy Rohde & Schwarz imported from 3GU
R5‑093111 Update for TDD Inter-frequency RSRQ measurement accuracy Rohde & Schwarz imported from 3GU
R5‑093112 Update for E-UTRAN TDD Transmit timing accuracy Rohde & Schwarz imported from 3GU
R5‑093113 Update for E-UTRAN TDD Timing advanced adjustment accuracy Rohde & Schwarz imported from 3GU
R5‑093114 Update for E-UTRA FDD - UTRA TDD cell search(fading) Rohde & Schwarz imported from 3GU
R5‑093115 Update for E-UTRA FDD - UTRA TDD cell reselection Rohde & Schwarz imported from 3GU
R5‑093116 Test proposal for E-UTRA FDD - UTRA TDD HO Rohde & Schwarz imported from 3GU
R5‑093117 Test proposal for E-UTRA TDD random access: contention based scenario Rohde & Schwarz imported from 3GU
R5‑093118 Test proposal for E-UTRA TDD random access: non-contention based scenario Rohde & Schwarz imported from 3GU
R5‑093119 GCF Priority 2 - Addition new test case 6.2.3.3 Panasonic imported from 3GU
R5‑093120 GCF Priority 2 - Addition of applicability statement for E-UTRAN test case 6.2.3.3 for Inter-RAT Cell Reselection / from UTRA_Idle to E-UTRA RRC IDLE Panasonic imported from 3GU
R5‑093121 GCF Priority 2 - Addition of applicability statement for E-UTRAN test case 8.3.2.1 for Measurement configuration control and reporting / inter RAT measurements Panasonic imported from 3GU
R5‑093122 GCF Priority 4 - Addition of new test case 8.3.2.2 Panasonic imported from 3GU
R5‑093123 GCF Priority 4 - Addition of applicability statement for E-UTRAN test case 8.3.2.2 for Measurement configuration control and reporting / inter RAT measurements: Panasonic imported from 3GU
R5‑093124 GCF Priority 4 - Addition of new test case 8.3.2.5 Panasonic imported from 3GU
R5‑093125 GCF Priority 4 - Addition of applicability statement for E-UTRAN test case 8.3.2.5 for Measurement configuration control and reporting / inter RAT measurements: Panasonic imported from 3GU
R5‑093126 Generic information elements for Inter-RAT Report Configuration - PERIODICAL Panasonic imported from 3GU
R5‑093127 Discussion on the handling of timer tolerance for latency check test cases Panasonic imported from 3GU
R5‑093128 Correction of ATTACH test case Panasonic imported from 3GU
R5‑093129 Correction of COMBINED ATTACH test case Panasonic imported from 3GU
R5‑093130 Correction of PDCP handover test procedure Panasonic imported from 3GU
R5‑093131 Work plan for ETWS Panasonic imported from 3GU
R5‑093132 Completion of test case verdict for GUTI ALLOCATION Panasonic imported from 3GU
R5‑093133 Correction of PDCP status report Panasonic imported from 3GU
R5‑093134 Correction of discard timer value to be consistent with test tolerances Panasonic imported from 3GU
R5‑093135 GCF priority 1 - Update of MAC test case 7.1.4.10 Ericsson, ST-Ericsson, NTT DoCoMo imported from 3GU
R5‑093136 GCF priority 2 - Update of RLC test case 7.2.3.21 Ericsson, ST-Ericsson, NTT DoCoMo imported from 3GU
R5‑093137 GCF priority 3 - Remove RRC test case 8.1.3.3 Ericsson, ST-Ericsson, NTT DoCoMo imported from 3GU
R5‑093138 GCF priority 3 - Remove RRC test case 8.1.3.3 applicability Ericsson, ST-Ericsson imported from 3GU
R5‑093139 CR to 36.521-1: Definition of Maximum Power state in TX/RX test cases NTT DOCOMO imported from 3GU
R5‑093140 CR to 36.521-1: Update to UE max output power test case NTT DOCOMO imported from 3GU
R5‑093141 CR to 34.121-1: Addition of UTRA FDD-E-UTRA FDD cell reselection test case (E-UTRA is of higher priority) NTT DOCOMO imported from 3GU
R5‑093142 CR to 34.121-1: Addition of UTRA FDD-E-UTRA FDD cell reselection test case (E-UTRA is of lower priority) NTT DOCOMO imported from 3GU
R5‑093143 CR to 36.521-3: Addition of E-UTRAN FDD Intra-frequency RRC Re-establishment NTT DOCOMO imported from 3GU
R5‑093144 CR to 36.521-3: Addition of E-UTRAN FDD Inter-frequency RRC Re-establishment NTT DOCOMO imported from 3GU
R5‑093145 GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 Anritsu Corporation imported from 3GU
R5‑093146 GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 Anritsu Corporation imported from 3GU
R5‑093147 GCF Priority 2 - Corrections to E-UTRAN test cases 6.1.2.8 and 6.1.2.9 Anritsu Corporation imported from 3GU
R5‑093148 Various corrections to RLC section of 36.523-1 Rohde & Schwarz imported from 3GU
R5‑093149 TP of UTRA FDD-E-UTRA TDD handover test case CATT imported from 3GU
R5‑093150 TP of UTRA FDD-E-UTRA TDD cell search test case CATT imported from 3GU
R5‑093151 Discussion paper on new EMM test cases after the core specification updates Nokia imported from 3GU
R5‑093152 List of test cases/scenarios proposed for 3G LTE Protocol Testing for EMM (EPS Mobility Management) Nokia imported from 3GU
R5‑093153 Corrections to default RRC message and IE contents Ericsson, ST Ericsson imported from 3GU
R5‑093154 Corrections to reference RB configurations Ericsson, ST Ericsson imported from 3GU
R5‑093155 Verification of UE setting of the RRC Establishment Cause Ericsson, ST Ericsson imported from 3GU
R5‑093156 Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause Ericsson, ST Ericsson imported from 3GU
R5‑093157 Update to Output Power Dynamics test cases AT4 wireless imported from 3GU
R5‑093158 Update to Annex E Cell Configuration Mapping AT4 wireless imported from 3GU
R5‑093159 System information scheduling for RF/RRM testing Agilent Technologies imported from 3GU
R5‑093160 Clarification to TS 36.509 activation and de-activation of UE Test Mode Agilent Technologies imported from 3GU
R5‑093161 RAN5-RF Action Points Agilent Technologies imported from 3GU
R5‑093162 LTE-RF: RMC update Agilent Technologies imported from 3GU
R5‑093163 LTE-RF: CR to test case for Aggregate power control tolerance Agilent Technologies imported from 3GU
R5‑093164 LTE-RF: CR for Power Control Absolute power tolerance test case Agilent Technologies imported from 3GU
R5‑093165 LTE-RF: CR for UE configured UE transmitted output power test case Agilent Technologies imported from 3GU
R5‑093166 LTE-RF: CR for UE minimum output power test case for TDD Agilent Technologies imported from 3GU
R5‑093167 LTE-RF: CR for Power Control Relative power tolerance test case Agilent Technologies imported from 3GU
R5‑093168 GCF Priority 3 - Addition of test case 6.2.3.6 CATR imported from 3GU
R5‑093169 GCF Priority 3 - Addition of test case 9.2.3.1.27 CATR imported from 3GU
R5‑093170 GCF Priority 3 - Addition of test case 9.2.3.1.28 CATR imported from 3GU
R5‑093171 GCF Priority 3 - Addition of test case 9.3.1.15 CATR imported from 3GU
R5‑093172 GCF Priority 3 - Addition of test case 9.2.2.2.14 CATR imported from 3GU
R5‑093173 GCF priority 3 - Update of RRC test case 8.2.1.7 Ericsson, ST-Ericsson imported from 3GU
R5‑093174 GCF priority 1 - Update of RRC test case 8.2.2.1 Ericsson, ST-Ericsson imported from 3GU
R5‑093175 GCF priority 1 - Update of RRC test case 8.2.2.2 Ericsson, ST-Ericsson imported from 3GU
R5‑093176 GCF priority 1 - Update of RRC test case 8.2.3.1 Ericsson, ST-Ericsson imported from 3GU
R5‑093177 GCF priority 2 - Update of RRC test case 8.3.2.6 Ericsson, ST-Ericsson imported from 3GU
R5‑093178 GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6'Normal tracking area update / UE with ISR active moves to E-UTRAN' Sony Ericsson Mobile imported from 3GU
R5‑093179 GCF Priority 3: Correction to 9.2.1.2.1 ''Combined attach procedure / Success / EPS and non-EPS services'' Sony Ericsson Mobile imported from 3GU
R5‑093180 Update of Applicability table for EMM test cases Sony Ericsson Mobile imported from 3GU
R5‑093181 GCF priority 2 - Update of Idle Mode test case 6.1.2.3 ZTE corporation, NEC imported from 3GU
R5‑093182 GCF priority 1 - Update of MAC test case 7.1.2.6 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093183 GCF priority 1 - Update of MAC test case 7.1.3.1 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093184 GCF priority 2 - Update of MAC test case 7.1.3.2 ZTE corporation, Motorola imported from 3GU
R5‑093185 GCF priority 1 - Update of MAC test case 7.1.3.3 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093186 GCF priority 1 - Update of MAC test case 7.1.3.4 ZTE corporation, Motorola imported from 3GU
R5‑093187 GCF priority 1 - Update of MAC test case 7.1.3.5 ZTE corporation, Motorola imported from 3GU
R5‑093188 GCF priority 1 - Update of MAC test case 7.1.3.6 ZTE corporation, Motorola imported from 3GU
R5‑093189 GCF priority 1 - Update of MAC test case 7.1.3.7 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093190 GCF priority 1 - Update of MAC test case 7.1.4.1 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093191 GCF priority 2 - Update of MAC test case 7.1.4.2 ZTE corporation, Motorola imported from 3GU
R5‑093192 GCF priority 1 - Update of MAC test case 7.1.4.6 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093193 GCF priority 1 - Update of MAC test case 7.1.4.7 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093194 GCF priority 1 - Update of MAC test case 7.1.4.8 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093195 GCF priority 1 - Update of MAC test case 7.1.4.11 ZTE corporation, Motorola imported from 3GU
R5‑093196 GCF priority 1 - Update of MAC test case 7.1.4.13 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093197 GCF priority 1 - Update of MAC test case 7.1.4.15 ZTE corporation, Motorola imported from 3GU
R5‑093198 GCF priority 2 - Update of MAC test case 7.1.4.16 ZTE corporation, Motorola imported from 3GU
R5‑093199 GCF priority 1 - Update of PDCP test case 7.3.1.1 ZTE corporation, Motorola imported from 3GU
R5‑093200 GCF priority 2 - Update of RRC test case 8.1.3.4 ZTE corporation, NEC imported from 3GU
R5‑093201 GCF priority 2 - Update of RRC test case 8.1.3.6 ZTE corporation, NEC imported from 3GU
R5‑093202 GCF priority 1 - Update of RRC test case 8.2.1.1 ZTE corporation, Ericsson, ST-Ericsson imported from 3GU
R5‑093203 GCF Priority 2 - Update of RRC test case 6.2.2.3 Alcatel-Lucent imported from 3GU
R5‑093204 GCF Priority 2 - Update of RRC test case 6.2.3.7 Alcatel-Lucent imported from 3GU
R5‑093205 GCF Priority 2 - Update of RRC test case 6.2.3.8 Alcatel-Lucent imported from 3GU
R5‑093206 GCF Priority 2 - Update of RRC test case 8.1.3.9 Alcatel-Lucent imported from 3GU
R5‑093207 GCF Priority 2 - Update of RRC test case 8.1.3.10 Alcatel-Lucent imported from 3GU
R5‑093208 GCF Priority 2 - Update of RRC test case 8.3.2.7 Alcatel-Lucent imported from 3GU
R5‑093209 GCF Priority 2 - Update of RRC test case 8.3.2.8 Alcatel-Lucent imported from 3GU
R5‑093210 Correction to CQI performance test case NEC imported from 3GU
R5‑093211 Introduction of Reporting of Precoding Matrix Indicator (PMI) test cases NEC imported from 3GU
R5‑093212 Correction to Demodulation of PDCCH/PCFICH test cases NEC imported from 3GU
R5‑093213 Correction to Demodulation of PHICH test cases NEC imported from 3GU
R5‑093214 Correction to RSRP measurement accuracy test cases NEC imported from 3GU
R5‑093215 GCF Priority 2 - Additon New Test Case 6.2.3.13 Panasonic imported from 3GU
R5‑093216 Addition of new test case 8.4.3.5 ZTE corporation imported from 3GU
R5‑093217 TDD fields in default physical layer parameters Nokia, Rohde & Schwarz imported from 3GU
R5‑093218 Correction to Annex B Rohde & Schwarz imported from 3GU
R5‑093219 LTE-RRM:Addition of common messages to Annex H Rohde & Schwarz imported from 3GU
R5‑093220 Mapping of uplink physical channels for TDD Nokia imported from 3GU
R5‑093221 LTE-RF: CR for notes in TDD DL RMC to be used in TX test cases Nokia -
R5‑093222 LTE-RRM: Introduction of Common Exception messages table for E-UTRAN TDD-UTRAN FDD handover and E-UTRAN TDD-UTRAN FDD measurements Nokia imported from 3GU
R5‑093223 GCF priority 2: TDD formulation update in 7.1.6.1 DRX Operation Nokia, CMCC, Huawei imported from 3GU
R5‑093224 GCF priority 2: TDD formulation update in 7.1.6.2 DRX Operation Nokia, CMCC, Huawei imported from 3GU
R5‑093225 LTE-RF: Discussion on extra message content for Demodulation of PDSCH Tests Nokia imported from 3GU
R5‑093226 LTE-RF: CR for notes in TDD DL RMC to be used in TX test cases Nokia imported from 3GU
R5‑093227 Update of TDD PDSCH test cases CMCC, CATT, R&S imported from 3GU
R5‑093228 Update of TDD PCFICH/PDCCH test cases CMCC, CATT, R&S imported from 3GU
R5‑093229 Update of TDD PHICH test cases CMCC, CATT, R&S imported from 3GU
R5‑093230 Maintenance of list of test cases/scenarios proposed for 3G LTE Protocol Testing for RRC Part 2 Ericsson, ST-Ericsson imported from 3GU
R5‑093231 GCF Priority 2 - Addition of E-UTRAN test case 6.2.3.3 for Cell reselection: Inter-RAT Cell Reselection / from UTRA_Idle to E-UTRA RRC IDLE ZTE corporation imported from 3GU
R5‑093232 Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: End of procedure after T301 expiry (after Radio Link Failure) ZTE corporation imported from 3GU
R5‑093233 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.4 CMCC, Huawei, NOKIA imported from 3GU
R5‑093234 GCF Priority 4 - Update of test case 8.2.4.10 RRC Connection Reconfiguration / Handover between FDD & TDD CMCC imported from 3GU
R5‑093235 GCF priority 1: Addition of new EMM test case 9.2.3.2.13 : Combined tracking area update / rejected / Roaming not allowed in this tracking area ZTE corporation imported from 3GU
R5‑093236 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 ZTE corporation imported from 3GU
R5‑093237 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 ZTE corporation imported from 3GU
R5‑093238 Applicability for new test cases 6.2.3.3 & 9.2.3.2.13 & 13.1.1 & 13.2.1 ZTE corporation imported from 3GU
R5‑093239 Correction of the values of the cell reselection thresholds threshX-High and threshX-Low ZTE corporation imported from 3GU
R5‑093240 Correction CR to 36.521-3: Update of inter-frequency E-UTRAN TDD-TDD cell re-selection 4.2.6 ZTE corporation imported from 3GU
R5‑093241 Correction CR to 36.521-3: Update of E-UTRAN TDD - UTRAN TDD cell re-selection 4.3.4 ZTE corporation imported from 3GU
R5‑093242 LTE-RF: CR for Additional Maximum Power Reduction ZTE corporation imported from 3GU
R5‑093243 LTE-RF: CR for UE maximum power reduction(MPR) test case ZTE corporation imported from 3GU
R5‑093244 LTE-RF: CR for configured UE transmitted output power test case for TDD ZTE corporation imported from 3GU
R5‑093245 LTE-RF: power control acuuracy ZTE corporation imported from 3GU
R5‑093246 LTE-RF: CR for UE maximum output power test case ZTE corporation imported from 3GU
R5‑093247 LTE-RF CR to 36.521-1: Update the E-UTRA channel numbers ZTE corporation imported from 3GU
R5‑093248 GCF Priority 2: Update of MAC TC 7.1.4.2 to cover the correct handing of TDD semi persisitent scheduling Huawei, CMCC, Nokia imported from 3GU
R5‑093249 GCF Priority 3 - Addition of TC 6.2.3.9 cell reselection when 1xRTT is higher priority Huawei imported from 3GU
R5‑093250 GCF Priority 3 - 6.2.3.10 cell reselection when 1xRTT is lower priority Huawei imported from 3GU
R5‑093251 Update of SN length in PDCP default configuration Huawei imported from 3GU
R5‑093252 Update of Applicability for PDCP tc based on FGI Huawei imported from 3GU
R5‑093253 CR to 36.521-3: Update of E-UTRA FDD to HRPD Handover and E-UTRA FDD to cdma2000 1xRTT Handover test cases Spirent Communications imported from 3GU
R5‑093254 List of test cases and scenarios proposal for 3G LTE Protocol Testing for PDCP after RAN5#43Bis Huawei imported from 3GU
R5‑093255 List of test cases and scenarios proposal for HeNB after RAN5#43Bis Huawei imported from 3GU
R5‑093256 LTE-RRM:E-UTRA TDD - TDD Inter frequency cell search with DRX Huawei imported from 3GU
R5‑093257 LTE-RRM:E-UTRA TDD - TDD Intra frequency cell search with DRX Huawei imported from 3GU
R5‑093258 LTE-RRM:TDD-TDD RSRP measurement Huawei imported from 3GU
R5‑093259 GCF Priority 2 - Addition of new EMM test case 9.2.3.3.5 Qualcomm Europe imported from 3GU
R5‑093260 GCF Priority 2 - Update of EMM test case 9.3.1.7a Qualcomm Europe imported from 3GU
R5‑093261 GCF Priority 4 - Addition of new EMM test case 9.2.1.1.3 Qualcomm Europe imported from 3GU
R5‑093262 GCF Priority 2 - Addition of applicability for new EMM test case 9.2.3.3.5 Qualcomm Europe imported from 3GU
R5‑093263 GCF Priority 4 - Addition of applicability for new EMM test case 9.2.1.1.3 Qualcomm Europe imported from 3GU
R5‑093264 GCF Priority 1 - Corrections to RLC section Qualcomm Europe imported from 3GU
R5‑093265 GCF Priority 1 - Update of RLC test case 7.2.3.9 Qualcomm Europe imported from 3GU
R5‑093266 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RLC Qualcomm Europe -
R5‑093267 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RLC Qualcomm Europe imported from 3GU
R5‑093268 RAN5 test coverage for CSFB RRC test cases Qualcomm Europe imported from 3GU
R5‑093269 Corrections to TS 36.509 Qualcomm Europe imported from 3GU
R5‑093270 GCF Priority 3 - Update of RRC test case 8.3.2.9 Qualcomm Europe imported from 3GU
R5‑093271 Update of references in TS 36.523-1 Qualcomm Europe imported from 3GU
R5‑093272 Correction of RMCs (36.521 Annex A) Rohde & Schwarz imported from 3GU
R5‑093273 GCF Priority 4 - Addition of new RRC test case 8.3.2.10 Qualcomm Europe imported from 3GU
R5‑093274 GCF Priority 2 - Update of RRC test case 8.3.2.8 Qualcomm Europe imported from 3GU
R5‑093275 UE category (36.521 clause 8 Rohde & Schwarz imported from 3GU
R5‑093276 Completion of Global in-Channel TX-Test (36.521 Annex E) Rohde & Schwarz imported from 3GU
R5‑093277 Update of reporting configurations for CDMA2000 Qualcomm Europe -
R5‑093278 Completion of Statistical testing (36.521 Annex G) Rohde & Schwarz imported from 3GU
R5‑093279 GCF Priority 2 - Update of applicability for LTE-C2k interworking test cases Qualcomm Europe imported from 3GU
R5‑093280 Usage of the Global In-Channels TX-Test across different Signal Quality tests. Rohde & Schwarz imported from 3GU
R5‑093281 GCF Priority 4 - Addition of applicability for new RRC test case 8.3.2.10 Qualcomm Europe imported from 3GU
R5‑093282 Connection for 1 cell with antenna configuration 1x2 in static propagation conditions Rohde & Schwarz imported from 3GU
R5‑093283 LTE TX: 1 to 2 RX antenna Rohde & Schwarz imported from 3GU
R5‑093284 Correction to 6.6.2.2 Additional Spectrum Emission Mask Rohde & Schwarz imported from 3GU
R5‑093285 Correction to 6.6.2.3 ACLR Rohde & Schwarz imported from 3GU
R5‑093286 Update of reporting configurations for CDMA2000 Qualcomm Europe imported from 3GU
R5‑093287 Correction to 6.7 TX Intermodulation Rohde & Schwarz imported from 3GU
R5‑093288 Correction to 4.3.1.2.5 TDD reference test frequencies for Operating Band 37 Rohde & Schwarz imported from 3GU
R5‑093289 Correction to 7.6.1 In-Band Blocking Rohde & Schwarz imported from 3GU
R5‑093290 Without loop back: 6.5.2.1Error Vector Magnitude (EVM) Rohde & Schwarz imported from 3GU
R5‑093291 Add reference to test procedure for RRC Connection Release TCs Telecom Italia imported from 3GU
R5‑093292 Summary of the loopback discussion Rohde & Schwarz imported from 3GU
R5‑093293 GCF Priority 4 - New TC 8.1.3.7 RRC Connection Release: redirection from UTRAN to E-UTRAN Telecom Italia imported from 3GU
R5‑093294 GCF Priority 1 - Corrections to MAC test case 7.1.4.1 Motorola and MCC 160 imported from 3GU
R5‑093295 GCF Priority 1 - Corrections to MAC test case 7.1.4.5 Motorola and MCC 160 imported from 3GU
R5‑093296 GCF Priority 1 - Corrections to MAC test case 7.1.4.6 Motorola and MCC 160 imported from 3GU
R5‑093297 GCF Priority 1 - Corrections to MAC test case 7.1.4.8 Motorola and MCC 160 imported from 3GU
R5‑093298 GCF Priority 1 - Corrections to MAC test case 7.1.4.10 Motorola and MCC 160 imported from 3GU
R5‑093299 GCF Priority 1 - Corrections to MAC test case 7.1.4.13 Motorola and MCC 160 imported from 3GU
R5‑093300 GCF Priority 2 - Corrections to MAC test case 7.1.4.16 Motorola and MCC 160 imported from 3GU
R5‑093301 List of test cases/scenarios for 3G LTE Protocol Testing for LTE/C2K Interworking Motorola imported from 3GU
R5‑093302 GCF priority 2 - Update of RRC test case 8.3.1.3 Nokia imported from 3GU
R5‑093303 GCF priority 2 - Update of RRC test case 8.3.1.5 Nokia imported from 3GU
R5‑093304 GCF priority 1 - Update of RRC test case 8.3.3.1 Nokia imported from 3GU
R5‑093305 GCF priority 2 - Update of RRC test case 8.3.1.1 Nokia imported from 3GU
R5‑093306 List of test cases/scenarios proposal for 3G LTE Terminal Protocol Conformance Test Specifications - RRC part 3 (Measurement Configuration Control and Reporting) Nokia imported from 3GU
R5‑093307 LTE UE Tests: AWGN and signal-to-noise requirements Anritsu imported from 3GU
R5‑093308 Update of initial conditions for Annex references Anritsu imported from 3GU
R5‑093309 Update of 6.7 Tx Inter Mod Anritsu imported from 3GU
R5‑093310 Update of 6.6.1OBW Anritsu imported from 3GU
R5‑093311 Update of SEM Anritsu imported from 3GU
R5‑093312 Update of initial conditions for Tx Anritsu imported from 3GU
R5‑093313 Update of 7.3 Reference sensitivity level Anritsu imported from 3GU
R5‑093314 Uplink power tolerance, modulation, and RB allocation for Rx tests Anritsu imported from 3GU
R5‑093315 Removal of the GUTI reallocation procedures test cases Nokia imported from 3GU
R5‑093316 Removal of the GUTI reallocation procedures test cases Nokia imported from 3GU
R5‑093317 GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.1 Ericsson, ST-Ericsson imported from 3GU
R5‑093318 GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.2 Ericsson, ST-Ericsson imported from 3GU
R5‑093319 List of test cases/scenarios proposed for 3G LTE Protocol Testing for ESM (EPS Session Management) Motorola imported from 3GU
R5‑093320 Applicability for Output Power Dynamics test cases AT4 wireless imported from 3GU
R5‑093321 UL RB allocation for receiver tests Ericsson, ST-Ericsson imported from 3GU
R5‑093322 TDD only parameters usage in default DCI formats of 36.508 CATT imported from 3GU
R5‑093323 LTE RF - Core update on TC7.6.2 Out-of-band Blocking Nokia imported from 3GU
R5‑093324 LTE RF - Symbols Update on UL transmission configurations Nokia imported from 3GU
R5‑093325 LS on RLC UM in RMC Agilent Technologies imported from 3GU
R5‑093326 LTE RF/RRM: loopback discussion Agilent Technologies imported from 3GU
R5‑093327 GCF Priority 2 - Corrections of E-UTRA test case 6.1.2.11 Rohde & Schwarz, NEC imported from 3GU
R5‑093328 RRM OCNG and RMC update Ericsson, STEricsson imported from 3GU
R5‑093329 GCF Priority 3 - Update of RRC part 3 test case 8.3.1.4 NEC imported from 3GU
R5‑093330 RRM Radio Link Monitoring FDD update Ericsson, STEricsson imported from 3GU
R5‑093331 RRM Radio Link Monitoring TDD update Ericsson, STEricsson imported from 3GU
R5‑093332 GCF Priority 4 - Update of RRC part 3 test case 8.3.2.4 NEC imported from 3GU
R5‑093333 Update of table 4.6.6-7D to cover all interRAT Periodical reporting configurations NEC imported from 3GU
R5‑093334 Update to SEM and spurious emissions TC Qualcomm Japan imported from 3GU
R5‑093335 Update to the Requirements for frequency-selective fading test Qualcomm Japan imported from 3GU
R5‑093336 Update to CQI reporting under AWGN conditions Qualcomm Japan imported from 3GU
R5‑093337 Correction of TC 9.2.1.1.5: Attach Procedure / Success / ATTACH ACCEPT message includes the PDN address assigned to the UE NEC imported from 3GU
R5‑093338 GCF priority 2 - Correction of TC 9.2.1.1.9 Attach / rejected / IMSI invalid NEC imported from 3GU
R5‑093339 GCF priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed NEC imported from 3GU
R5‑093340 GCF priority 2 - Correction of TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area NEC imported from 3GU
R5‑093341 GCF priority 2 - Correction of TC 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area NEC imported from 3GU
R5‑093342 GCF priority 3 - Correction of TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection NEC imported from 3GU
R5‑093343 CQI Reporting under Frequency Selective Interference Qualcomm Japan imported from 3GU
R5‑093344 GCF priority 3 - Correction of TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable NEC imported from 3GU
R5‑093345 Requirements for CQI reporting under frequency non- selective fading tests Qualcomm Japan imported from 3GU
R5‑093346 GCF priority 3 - Addition of new test case 9.2.3.2.1a: Combined tracking area update / successful / check of last visited TAI and handling of TAI list, LAI and TMSI NEC imported from 3GU
R5‑093347 New test case for PMI reporting Qualcomm Japan imported from 3GU
R5‑093348 CR to 36.521-2 Qualcomm Japan imported from 3GU
R5‑093349 GCF priority 4 - Addition of new test case 9.2.3.2.3 for combined tracking area update / successful for EPS services only / IMSI unknown in HSS NEC imported from 3GU
R5‑093350 List of test cases/scenarios proposal for 3G LTE Terminal Protocol Conformance Test Specifications - RRC part 1 (8.1 RRC connection management procedures, 8.5 RRC Others) NEC imported from 3GU
R5‑093351 Work plan for 3G Long-Term Evolution Terminal Protocol Conformance Test Specifications - Status after RAN5#43bis NEC, Motorola imported from 3GU
R5‑093352 Applicability of EMM test cases for EPS-only procedures NEC imported from 3GU
R5‑093353 Proposed update of test case list for inter-RAT test cases - sections 8.4 and 13 NEC imported from 3GU
R5‑093354 Proposal of new EMM TCs for inter-RAT procedures NEC imported from 3GU
R5‑093355 Applicability of new EMM test cases NEC imported from 3GU
R5‑093356 RRM: E-UTRAN FDD - UTRAN FDD SON ANR cell search reporting Ericsson, STEricsson imported from 3GU
R5‑093357 Update of RRM Confomance test applicability for SON Ericsson, STEricsson imported from 3GU
R5‑093358 List of test cases/scenarios proposal for LTE Protocol Testing in Idle Mode Operation/Multi-RAT RIM imported from 3GU
R5‑093359 List of test cases/scenarios proposal for LTE Protocol Testing for SMS over CSFB RIM imported from 3GU
R5‑093360 RRM:Update of Annex E for SON Ericsson, STEricsson imported from 3GU
R5‑093361 Correction of Tx general discription Rohde & Schwarz, Nokia imported from 3GU
R5‑093362 LTE-RF: message update to keep Tx power constant for some Rx test cases Nokia imported from 3GU
R5‑093363 Update to E-UTRAN to HRPD Cell Re-Selection (HRPD is of lower priority) test case Qualcomm Japan imported from 3GU
R5‑093364 Update to E-UTRAN to CDMA2000 1xRTT Cell Re-Selection (CDMA2000 1xRTT is of lower priority) test case Qualcomm Japan imported from 3GU
R5‑093365 LTE Signalling Protocol Test Case Prioritisation - Status after RAN5#43bis Vodafone imported from 3GU
R5‑093366 In-band Emissions for non-allocated RB Agilent Technologies imported from 3GU
R5‑093367 LTE-RRM:Test iteration in EUTRAN to other RATs HO and cell search Rohde & Schwarz imported from 3GU
R5‑093368 LTE RF - Clarification on test case configurations in General section Nokia imported from 3GU
R5‑093369 LTE RF - Applicability of 6.2.3 MPR Nokia imported from 3GU
R5‑093370 LTE RF - Verification of UE Output Power in Out of Band Emission tests Nokia imported from 3GU
R5‑093371 EMM Successful Attach - need for alignment of procedure sequence description Samsung imported from 3GU
R5‑093372 Batch 2 - Addition of new test case 6.2.2.4 Alcatel-Lucent imported from 3GU
R5‑093373 Batch 2 - Addition of new test case 8.3.3.4 Alcatel-Lucent imported from 3GU
R5‑093374 Batch 2 - Addition of new test case 8.3.3.5 Alcatel-Lucent imported from 3GU
R5‑093375 TDD only parameters usage in default DCI formats of 36.508 CATT -
R5‑093376 UTRAN SIB scheduling for LTE interRAT test MCC TF160 -
R5‑093378 Correction to the default value of reportAmount in TS 36.508. NTT DOCOMO -
R5‑093379 GCF Priority 2 - Additon New Test Case 6.2.3.13 Panasonic -
R5‑093380 Generic information elements for Inter-RAT Report Configuration - PERIODICAL Panasonic -
R5‑093381 Connection for 1 cell with antenna configuration 1x2 in static propagation conditions Rohde & Schwarz -
R5‑093382 Editorial and More corrections to TS 36.509 Samsung -
R5‑093383 Clarification to TS 36.509 activation and de-activation of UE Test Mode Agilent Technologies -
R5‑093384 MCC TF160 June report MCC TF160 -
R5‑093385 GCF Priority 3 - Addition of new test case 9.2.1.2.5 NTT DOCOMO -
R5‑093386 GCF Priority 3 - Update to test case 9.2.1.2.6 NTT DOCOMO -
R5‑093387 GCF Priority 3 - Addition of new test case 9.2.1.2.7 NTT DOCOMO -
R5‑093388 GCF Priority 4 - Addition of new test case 9.2.3.2.5 NTT DOCOMO -
R5‑093389 GCF Priority 4 - Update to test case 9.2.3.2.6 NTT DOCOMO -
R5‑093390 Priority 2 - New EMM TC 9-1-4-2 Samsung -
R5‑093391 Priority 2 - New EMM TC 9-3-1-7 Samsung -
R5‑093392 GCF Priority 1 - Corrections to MAC test case 7.1.4.13 Motorola and MCC 160 -
R5‑093393 GCF Priority 2 - Addition new test case 6.2.3.3 Panasonic -
R5‑093394 GCF Priority 4 - Addition of new test case 9.2.3.2.7 NTT DOCOMO -
R5‑093395 GCF Priority 3 - Addition of new test case 9.2.3.2.9 NTT DOCOMO -
R5‑093396 GCF Priority 4 - Update to test case 9.2.3.2.15 NTT DOCOMO -
R5‑093397 Addition of new test case 10.8.2 NTT DOCOMO -
R5‑093398 Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: End of procedure after T301 expiry (after Radio Link Failure) ZTE corporation -
R5‑093399 GCF priority 1: Addition of new EMM test case 9.2.3.2.13 : Combined tracking area update / rejected / Roaming not allowed in this tracking area ZTE corporation -
R5‑093400 Discussion about TDD special subframe configuration Rohde & Schwarz -
R5‑093401 LTE RF - Verification of UE Output Power in Out of Band Emission tests Nokia -
R5‑093402 CR to 36.521-1: Definition of Maximum Power state in TX/RX test cases NTT DOCOMO -
R5‑093403 RAN5-RF Action Points Agilent Technologies -
R5‑093404 System information scheduling for RF/RRM testing Agilent Technologies -
R5‑093405 CR to 36.521-1: Definition of Maximum Power state in TX/RX test cases NTT DOCOMO -
R5‑093406 LTE-RF CR to 36.521-1: Update the E-UTRA channel numbers ZTE corporation -
R5‑093407 LTE RF - Symbols Update on UL transmission configurations Nokia -
R5‑093408 Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test Motorola -
R5‑093409 Update to Output Power Dynamics test cases AT4 wireless -
R5‑093410 LTE-RF: CR to test case for Aggregate power control tolerance Agilent Technologies -
R5‑093411 LTE-RF: CR for Power Control Absolute power tolerance test case Agilent Technologies -
R5‑093412 LTE-RF: CR for UE configured UE transmitted output power test case Agilent Technologies -
R5‑093413 LTE-RF: CR for UE minimum output power test case for TDD Agilent Technologies -
R5‑093414 LTE-RF: CR for Power Control Relative power tolerance test case Agilent Technologies -
R5‑093415 LTE-RF: CR for UE maximum output power test case ZTE corporation -
R5‑093416 TP of UTRA FDD-E-UTRA TDD handover test case CATT -
R5‑093417 TP of UTRA FDD-E-UTRA TDD cell search test case CATT -
R5‑093418 Usage of the Global In-Channels TX-Test across different Signal Quality tests. Rohde & Schwarz -
R5‑093419 Update to SEM and spurious emissions TC Qualcomm Japan -
R5‑093420 Update of 7.3 Reference sensitivity level Anritsu -
R5‑093421 UL RB allocation for receiver tests Ericsson, ST-Ericsson -
R5‑093422 Correction CR to 36.521-1: Update of Requirements for Demodulation of PDSCH (FDD) tests Motorola -
R5‑093423 Correction to Demodulation of PDCCH/PCFICH test cases NEC -
R5‑093424 Correction to Demodulation of PHICH test cases NEC -
R5‑093425 Update of TDD PDSCH test cases CMCC, CATT, R&S -
R5‑093426 Update of TDD PHICH test cases CMCC, CATT, R&S -
R5‑093427 Correction to CQI performance test case NEC -
R5‑093428 Update to the Requirements for frequency-selective fading test Qualcomm Japan -
R5‑093429 Mapping of uplink physical channels for TDD Nokia -
R5‑093430 Completion of Global in-Channel TX-Test (36.521 Annex E) Rohde & Schwarz -
R5‑093431 Completion of Statistical testing (36.521 Annex G) Rohde & Schwarz -
R5‑093432 Correction CR to 36.521-3: Update of inter-frequency E-UTRAN TDD-TDD cell re-selection 4.2.6 ZTE corporation -
R5‑093433 Correction CR to 36.521-3: Update of E-UTRAN TDD - UTRAN TDD cell re-selection 4.3.4 ZTE corporation -
R5‑093434 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-GSM Handover test Motorola -
R5‑093435 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-UTRAN FDD Handover test Motorola -
R5‑093436 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-Contention Based Random Access test Motorola -
R5‑093437 Test proposal for E-UTRA TDD random access: contention based scenario Rohde & Schwarz -
R5‑093438 Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD Non-Contention Based Random Access test Motorola -
R5‑093439 Test proposal for E-UTRA TDD random access: non-contention based scenario Rohde & Schwarz -
R5‑093440 CR to 36.521-3: Addition of E-UTRAN FDD Intra-frequency RRC Re-establishment NTT DOCOMO -
R5‑093441 CR to 36.521-3: Addition of E-UTRAN FDD Inter-frequency RRC Re-establishment NTT DOCOMO -
R5‑093442 CR to 36.521-3: Update of E-UTRA FDD to HRPD Handover and E-UTRA FDD to cdma2000 1xRTT Handover test cases Spirent Communications -
R5‑093443 TP of UTRA FDD-E-UTRA TDD handover test case CATT -
R5‑093444 TP of UTRA FDD-E-UTRA TDD cell search test case CATT -
R5‑093445 In-band Emissions for non-allocated RB Agilent Technologies -
R5‑093446 LS on relative power tolerance and exceptions Agilent Technologies -
R5‑093447 Addition of test scenario CR to 36.521-3: E-UTRAN FDD-FDD Inter-frequency cell search when DRX is used under fading propagation conditions Motorola -
R5‑093448 Correction CR to 36.521-3: Update of E-UTRAN FDD-FDD Intra-frequency cell search when DRX is used under fading propagation conditions Motorola -
R5‑093449 Update for E-UTRA FDD - UTRA TDD cell search(fading) Rohde & Schwarz -
R5‑093450 LTE-RRM:TDD-TDD RSRP measurement Huawei -
R5‑093451 RRM Radio Link Monitoring FDD update Ericsson, STEricsson -
R5‑093452 RRM Radio Link Monitoring TDD update Ericsson, STEricsson -
R5‑093453 Update to Annex E Cell Configuration Mapping AT4 wireless -
R5‑093454 Applicability for Output Power Dynamics test cases AT4 wireless -
R5‑093455 RRM: E-UTRAN FDD - UTRAN FDD SON ANR cell search reporting Ericsson, STEricsson -
R5‑093456 LTE-RRM:Addition of common messages to Annex H Rohde & Schwarz -
R5‑093457 RRM OCNG and RMC update Ericsson, STEricsson -
R5‑093458 E-UTRA Intra/Inter Frequency Measurements for Cell Search Test Cases Development Motorola -
R5‑093459 LS to RAN4 on Timing Advance Command value during T2 for the E-UTRA - UE Timing Advance Adjustment Accuracy Test Case Motorola -
R5‑093460 LTE RF - Clarification on test case configurations in General section Nokia -
R5‑093461 Correction of Tx general discription Rohde & Schwarz, Nokia -
R5‑093462 Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test Motorola -
R5‑093463 Update to E-UTRAN to HRPD Cell Re-Selection (HRPD is of lower priority) test case Qualcomm Japan -
R5‑093464 Update to E-UTRAN to CDMA2000 1xRTT Cell Re-Selection (CDMA2000 1xRTT is of lower priority) test case Qualcomm Japan -
R5‑093465 Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test Motorola -
R5‑093466 System information scheduling for RF/RRM testing Agilent Technologies -
R5‑093467 Update of TDD PDSCH test cases CMCC, CATT, R&S -
R5‑093468 LS on relative power tolerance and exceptions Agilent Technologies -
R5‑093500 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 ZTE corporation -
R5‑093501 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 ZTE corporation -
R5‑093502 Proposed update of test case list for inter-RAT test cases - sections 8.4 and 13 NEC -
R5‑093503 List of test cases/scenarios proposal for LTE Protocol Testing in Idle Mode Operation NTT DOCOMO -
R5‑093504 Work plan for ETWS Panasonic -
R5‑093505 GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.4 CMCC, Huawei, NOKIA -
R5‑093506 GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 Anritsu Corporation -
R5‑093507 GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 Anritsu Corporation -
R5‑093508 GCF Priority 2 - Corrections to E-UTRAN test cases 6.1.2.8 and 6.1.2.9 Anritsu Corporation -
R5‑093509 Missing TCs applicability in 36-523-2 Samsung -
R5‑093510 GCF priority 1 - Update of MAC test case 7.1.4.10 Ericsson, ST-Ericsson, NTT DoCoMo -
R5‑093511 GCF Priority 3 - Addition of test case 6.2.3.6 NTT DOCOMO -
R5‑093512 Add a new normative Annex for ASP documentation MCC TF160 -
R5‑093513 Small corrections and documentations for EUTRAN test models MCC TF160 -
R5‑093514 GCF Priority 3 - Addition of test case 9.3.1.15 CATR -
R5‑093515 Correction of PDCP handover test procedure Panasonic -
R5‑093516 Correction of PDCP status report Panasonic -
R5‑093517 GCF Priority 1 - Corrections to MAC test case 7.1.4.1 Motorola and MCC 160 -
R5‑093518 GCF Priority 1 - Corrections to MAC test case 7.1.4.5 Motorola and MCC 160 -
R5‑093519 GCF Priority 1 - Corrections to MAC test case 7.1.4.8 Motorola and MCC 160 -
R5‑093520 GCF Priority 2 - Corrections to MAC test case 7.1.4.16 Motorola and MCC 160 -
R5‑093521 Add a new clause on CCE allocation MCC TF160 -
R5‑093522 GCF priority 2 - Update of MAC test case 7.1.4.16 ZTE corporation, Motorola -
R5‑093523 Various corrections to RLC section of 36.523-1 Rohde & Schwarz -
R5‑093524 GCF Priority 1 - Update of RLC test case 7.2.3.9 Qualcomm Europe -
R5‑093525 GCF Priority 1 - Corrections to MAC test case 7.1.4.13 Motorola and MCC 160 -
R5‑093526 GCF priority 1 - Update of RRC test case 8.2.1.1 ZTE corporation, Ericsson, ST-Ericsson -
R5‑093527 Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause Ericsson, ST Ericsson -
R5‑093528 GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.1 Ericsson, ST-Ericsson -
R5‑093529 GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.2 Ericsson, ST-Ericsson -
R5‑093530 Interference reduction for LTE Signalling test cases with multiple cells NTT DOCOMO -
R5‑093531 GCF Priority 2 - Addition new test case 6.2.3.3 Panasonic -
R5‑093532 GCF Priority 2 - Update of RRC test case 8.3.2.8 Qualcomm Europe -
R5‑093533 GCF Priority 4 - Addition of new RRC test case 8.3.2.10 Qualcomm Europe -
R5‑093534 GCF Priority 2 - Addition of new EMM test case 9.2.3.3.5 Qualcomm Europe -
R5‑093535 Correction of discard timer value to be consistent with test tolerances Panasonic -
R5‑093536 GCF priority 2: TDD formulation update in 7.1.6.1 DRX Operation Nokia, CMCC, Huawei -
R5‑093537 GCF priority 2: TDD formulation update in 7.1.6.2 DRX Operation Nokia, CMCC, Huawei -
R5‑093538 GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 Anritsu Corporation -
R5‑093539 GCF priority 2 - Update of Idle Mode test case 6.1.2.3 ZTE corporation, NEC -
R5‑093540 GCF Priority 2 - Additon New Test Case 6.2.3.13 Panasonic -
R5‑093541 GCF priority 2: TDD formulation update in 7.1.6.1 DRX Operation Nokia, CMCC, Huawei -
R5‑093542 GCF priority 2: TDD formulation update in 7.1.6.2 DRX Operation Nokia, CMCC, Huawei -
R5‑093543 GCF Priority 2 - Corrections to MAC test case 7.1.4.16 Motorola and MCC 160 -
R5‑093544 Correction of discard timer value to be consistent with test tolerances Panasonic -
R5‑093545 GCF priority 2 - Update of RRC test case 8.1.3.6 ZTE corporation, NEC -
R5‑093546 GCF Priority 2 - Update of RRC test case 6.2.2.3 Alcatel-Lucent -
R5‑093547 GCF Priority 2 - Update of RRC test case 6.2.3.7 Alcatel-Lucent -
R5‑093548 GCF Priority 2 - Update of RRC test case 6.2.3.8 Alcatel-Lucent -
R5‑093549 GCF Priority 2 - Update of RRC test case 8.1.3.9 Alcatel-Lucent -
R5‑093550 GCF Priority 2 - Update of RRC test case 8.1.3.10 Alcatel-Lucent -
R5‑093551 GCF Priority 2 - Update of RRC test case 8.3.2.7 Alcatel-Lucent -
R5‑093552 GCF Priority 2 - Update of RRC test case 8.3.2.8 Alcatel-Lucent -
R5‑093553 GCF priority 2 - Update of RRC test case 8.3.1.5 Nokia -
R5‑093554 GCF Priority 3 - Addition of new test case 9.2.1.2.11 NTT DOCOMO -
R5‑093555 GCF Priority 2 - Addition of new test case 8.4.2.4 NTT DOCOMO -
R5‑093556 GCF Priority 2 - Addition of new test case 8.4.2.6 NTT DOCOMO -
R5‑093557 List of test cases/scenarios proposal for LTE Protocol Testing for SMS over IMS Alcatel-Lucent -
R5‑093558 GCF priority 1 - Update of MAC test case 7.1.4.10 Ericsson, ST-Ericsson, NTT DoCoMo -
R5‑093559 Discussion on the handling of timer tolerance for latency check test cases Panasonic -
R5‑093560 GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6'Normal tracking area update / UE with ISR active moves to E-UTRAN' Sony Ericsson Mobile -
R5‑093561 GCF Priority 3: Correction to 9.2.1.2.1 ''Combined attach procedure / Success / EPS and non-EPS services'' Sony Ericsson Mobile -
R5‑093562 GCF Priority 3 - Addition of test case 9.2.3.1.27 CATR -
R5‑093563 GCF Priority 3 - Addition of test case 9.3.1.15 CATR -
R5‑093564 Correction of ATTACH test case Panasonic -
R5‑093565 Response LS to 3GPP2 TSG WG RAN5 -
R5‑093566 GCF Priority 2 - Update of RRC test case 6.2.2.3 Alcatel-Lucent -
R5‑093567 GCF Priority 2 - Update of RRC test case 6.2.3.8 Alcatel-Lucent -
R5‑093568 GCF Priority 2 - Update of RRC test case 8.1.3.9 Alcatel-Lucent -
R5‑093569 GCF priority 2 - Update of RRC test case 8.3.1.3 Nokia -
R5‑093570 GCF priority 2 - Update of RRC test case 8.3.1.1 Nokia -
R5‑093571 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 ZTE corporation -
R5‑093572 GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 ZTE corporation -
R5‑093573 Update of SN length in PDCP default configuration Huawei -
R5‑093574 GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 Anritsu Corporation -
R5‑093575 CR resubmission guideline for RAN5#44 Anritsu -
R5‑093576 GCF Priority 1 - Corrections to MAC test case 7.1.4.5 Motorola and MCC 160 -
R5‑093577 Addition of new test case 6.2.2.5 NTT DOCOMO -
R5‑093578 GCF priority 2 - Update of MAC test case 7.1.4.16 ZTE corporation, Motorola -
R5‑093579 GCF Priority 2 - Addition of new test case 8.4.2.4 NTT DOCOMO -
R5‑093580 CR writing requirements - brief update V3 Samsung -
R5‑093581 CR resubmission guideline for RAN5#44 Anritsu -
R5‑093582 GCF priority 2 - Update of RRC test case 8.1.3.4 ZTE corporation, NEC -
R5‑093583 GCF priority 2 - Update of Idle Mode test case 6.1.2.3 ZTE corporation, NEC -
R5‑093584 GCF priority 2 - Update of RRC test case 8.1.3.6 ZTE corporation, NEC -
R5‑093585 Add reference to test procedure for RRC Connection Release TCs Telecom Italia -
R5‑093586 GCF Priority 2 - Addition new test case 6.2.3.3 Panasonic -
R5‑093587 GCF priority 2 - Correction of TC 9.2.1.1.9 Attach / rejected / IMSI invalid NEC -
R5‑093588 GCF priority 2 - Update of RRC test case 8.1.3.4 ZTE corporation, NEC -
R5‑093589 GCF priority 2 - Update of RRC test case 8.1.3.6 ZTE corporation, NEC -
R5‑093590 GCF Priority 2: Update of MAC TC 7.1.4.2 to cover the correct handing of TDD semi persisitent scheduling Huawei, CMCC, Nokia -
R5‑093591 SIG action points after RAN5#43bis ETSI Secretary -
R5‑093592 GCF Priority 2 - Additon New Test Case 6.2.3.13 Panasonic -
R5‑093593 draft meeting report RAN5#43bis ETSI Secretary -
R5‑093594 List of test cases/scenarios proposal for LTE - Layer 2 (MAC) Motorola -
R5‑093595 Missing TCs applicability in 36-523-2 Samsung -
R5‑093596 List of agreed CRs of RAN5#43bis ETSI Secretary -

page generated from database: 2024-03-25 09:25:51

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links