3GPP TDocs (written contributions) at meeting
Meeting: R5-43b - 2009-06-23 to 2009-06-26, Beijing
meeting id: R5-43b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
01 | Common Agenda | Motorola, NEC, Agilent Technologies | - |
02 | Signalling Group Timetable | Motorola | - |
03 | RF Group Timetable | Agilent Technologies | - |
04 | Previous RAN Plenary Notes | WG Chairman | - |
05 | 36.523-3 v050 | Rapporteur | - |
06 | Batch 1A - Update of TC 9.1.2.1 Authentication accepted | Samsung | - |
07 | Batch 1B - New TC 9.1.2.2 Authentication not accepted by the network, GUTI used, identification procedure and authentication restart | Samsung | - |
08 | Batch 1B - New TC 9.1.2.5 Authentication not accepted by the UE, SQN failure | Sasmung | - |
09 | Batch 1A - New TC 9.3.2.1 Paging procedure | Samsung | - |
10 | Adding new Batch 1 TCs applicability | Samsung | - |
11 | Batch 3 - Removal of TC 9.1.4.1 Identification procedure, IMSI requested | Samsung | - |
12 | TP for In-band emissions | Rohde & Schwarz | - |
R5‑093000 | Common Agenda | WG Chairman | imported from 3GU |
R5‑093001 | Signalling Group Timetable | SIG Chairman | imported from 3GU |
R5‑093002 | RF Group Timetable | RF Chairman | imported from 3GU |
R5‑093003 | Previous RAN Plenary Notes | WG Chairman | imported from 3GU |
R5‑093004 | Chairs notes on GCF LTE activities | WG Chairman | imported from 3GU |
R5‑093005 | RAN5 Status Report at previous Plenary | WG Chairman | imported from 3GU |
R5‑093006 | TF 160 Status Report - previous Plenary | WG Chairman | imported from 3GU |
R5‑093007 | Meeting Schedule RAN5 | WG Chairman | imported from 3GU |
R5‑093008 | Meeting Schedule RAN5 update | WG Chairman | imported from 3GU |
R5‑093009 | Liaison statement - template | WG Chairman | imported from 3GU |
R5‑093010 | RAN5 next meeting details | WG Chairman | imported from 3GU |
R5‑093011 | Agenda - closing session | WG Chairman | imported from 3GU |
R5‑093012 | Liaison statement - GCF Update | WG Chairman | imported from 3GU |
R5‑093013 | Correction CR to 36.521-1: Update of Requirements for Demodulation of PDSCH (FDD) tests | Motorola | imported from 3GU |
R5‑093014 | Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test | Motorola | imported from 3GU |
R5‑093015 | Correction CR to 36.521-2: Applicability changes to introduce additional RRM tests | Motorola | imported from 3GU |
R5‑093016 | E-UTRA Intra/Inter Frequency Measurements for Cell Search Test Cases Development | Motorola | imported from 3GU |
R5‑093017 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN (FDD) cell re-selection tests | Motorola | imported from 3GU |
R5‑093018 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-GSM cell re-selection test | Motorola | imported from 3GU |
R5‑093019 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-GSM Handover test | Motorola | imported from 3GU |
R5‑093020 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-UTRAN FDD Handover test | Motorola | imported from 3GU |
R5‑093021 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-UE transmit timing accuracy test | Motorola | imported from 3GU |
R5‑093022 | Addition of test scenario CR to 36.521-3: E-UTRAN FDD-FDD Inter-frequency cell search when DRX is used under fading propagation conditions | Motorola | imported from 3GU |
R5‑093023 | Correction CR to 36.521-3: Update of E-UTRAN FDD-FDD Intra-frequency cell search when DRX is used under fading propagation conditions | Motorola | imported from 3GU |
R5‑093024 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-Contention Based Random Access test | Motorola | imported from 3GU |
R5‑093025 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD Non-Contention Based Random Access test | Motorola | imported from 3GU |
R5‑093026 | Correction CR to 36.521-3: Update of Requirements conditions for E-UTRAN FDD - UE timing advance adjustment accuracy test | Motorola | imported from 3GU |
R5‑093027 | LS on support for CSFB to UTRAN and GERAN | TSG WG RAN2 | imported from 3GU |
R5‑093028 | LS on FRC H-Set 8 Configuration | TSG WG RAN4 | imported from 3GU |
R5‑093029 | Response LS to LS on conformance test coverage for PUSCH Frequency Hopping | TSG WG RAN4 | imported from 3GU |
R5‑093030 | LS on LTE-HRPD Interworking | 3GPP2 TSG-C | imported from 3GU |
R5‑093031 | MCC TF160 June report | MCC TF160 | imported from 3GU |
R5‑093032 | Add a new clause on CCE allocation | MCC TF160 | imported from 3GU |
R5‑093033 | Add a new normative Annex for ASP documentation | MCC TF160 | imported from 3GU |
R5‑093034 | Small corrections and documentations for EUTRAN test models | MCC TF160 | imported from 3GU |
R5‑093035 | Correction CR to 36.521-3: Update of Annex H Default Message Contents for support of RRM | Motorola | imported from 3GU |
R5‑093036 | Update to preamble in L2 UM test cases | MCC TF160, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093037 | UTRAN SIB scheduling for LTE interRAT test | MCC TF160 | imported from 3GU |
R5‑093038 | Priority 2 - New EMM TC 9-1-4-2 | Samsung | imported from 3GU |
R5‑093039 | Priority 2 - New EMM TC 9-3-1-7 | Samsung | imported from 3GU |
R5‑093040 | Priority 2 - Removal of EMM TC 9-1-2-2 | Samsung, Nokia | imported from 3GU |
R5‑093041 | Mismatch between Protocol TC titles in 36523-1 36523-2 and WP TC list | Samsung, TF160 | imported from 3GU |
R5‑093042 | Removal of SS actions from IEs Values clause 4-6-7 | Samsung | imported from 3GU |
R5‑093043 | Editorial and More corrections to TS 36-509 | Samsung | imported from 3GU |
R5‑093044 | Priority 2 - Adding New EMM TC 9-1-4-2 to applicability | Samsung | imported from 3GU |
R5‑093045 | Priority 2 - Adding New EMM TC 9-3-1-7 to applicability | Samsung | imported from 3GU |
R5‑093046 | Priority 2 - Removal of EMM TC 9-1-2-2 from the applicability list | Samsung | imported from 3GU |
R5‑093047 | Addition of new test case 6.2.2.5 | NTT DOCOMO | imported from 3GU |
R5‑093048 | GCF Priority 3 - Addition of test case 6.2.3.6 | NTT DOCOMO | imported from 3GU |
R5‑093049 | GCF Priority 3 - Update to test case 8.1.1.2 | NTT DOCOMO | imported from 3GU |
R5‑093050 | GCF Priority 4 - Update to test case 8.1.1.3 | NTT DOCOMO | imported from 3GU |
R5‑093051 | GCF Priority 4 - Update to test case 8.1.1.4 | NTT DOCOMO | imported from 3GU |
R5‑093052 | GCF Priority 4 - Addition of new test case 8.1.2.6 | NTT DOCOMO | imported from 3GU |
R5‑093053 | GCF Priority 4 - Update to test case 8.1.2.8 | NTT DOCOMO | imported from 3GU |
R5‑093054 | GCF Priority 4 - Addition of new test case 8.1.2.9 | NTT DOCOMO | imported from 3GU |
R5‑093055 | GCF Priority 3 - Update to test case 8.1.3.3 | NTT DOCOMO | imported from 3GU |
R5‑093056 | GCF Priority 3 - Update to test case 8.2.1.2 | NTT DOCOMO | imported from 3GU |
R5‑093057 | GCF Priority 3 - Update to test case 8.2.1.4 | NTT DOCOMO | imported from 3GU |
R5‑093058 | GCF Priority 3 - Addition of test case 8.2.4.4 | NTT DOCOMO | imported from 3GU |
R5‑093059 | GCF Priority 4 - Update to test case 8.2.4.8 | NTT DOCOMO | imported from 3GU |
R5‑093060 | GCF Priority 3 - Update to test case 8.2.4.9 | NTT DOCOMO | imported from 3GU |
R5‑093061 | GCF Priority 2 - Update to test case 8.3.1.9 | NTT DOCOMO | imported from 3GU |
R5‑093062 | Addition of new test case 8.4.1.2 | NTT DOCOMO | imported from 3GU |
R5‑093063 | Update to test case 8.4.1.8 | NTT DOCOMO | imported from 3GU |
R5‑093064 | GCF Priority 2 - Addition of new test case 8.4.2.4 | NTT DOCOMO | imported from 3GU |
R5‑093065 | GCF Priority 2 - Addition of new test case 8.4.2.6 | NTT DOCOMO | imported from 3GU |
R5‑093066 | GCF Priority 3 - Addition of new test case 9.2.1.2.5 | NTT DOCOMO | imported from 3GU |
R5‑093067 | GCF Priority 3 - Update to test case 9.2.1.2.6 | NTT DOCOMO | imported from 3GU |
R5‑093068 | GCF Priority 3 - Addition of new test case 9.2.1.2.7 | NTT DOCOMO | imported from 3GU |
R5‑093069 | GCF Priority 3 - Addition of new test case 9.2.1.2.11 | NTT DOCOMO | imported from 3GU |
R5‑093070 | GCF Priority 3 - Addition of new test case 9.2.1.2.13 | NTT DOCOMO | imported from 3GU |
R5‑093071 | GCF Priority 3 - Addition of new test case 9.2.1.2.15 | NTT DOCOMO | imported from 3GU |
R5‑093072 | GCF Priority 3 - Addition of new test case 9.2.3.1.25 | NTT DOCOMO | imported from 3GU |
R5‑093073 | GCF Priority 4 - Addition of new test case 9.2.3.2.5 | NTT DOCOMO | imported from 3GU |
R5‑093074 | GCF Priority 4 - Update to test case 9.2.3.2.6 | NTT DOCOMO | imported from 3GU |
R5‑093075 | GCF Priority 4 - Addition of new test case 9.2.3.2.7 | NTT DOCOMO | imported from 3GU |
R5‑093076 | GCF Priority 3 - Addition of new test case 9.2.3.2.9 | NTT DOCOMO | imported from 3GU |
R5‑093077 | GCF Priority 4 - Update to test case 9.2.3.2.15 | NTT DOCOMO | imported from 3GU |
R5‑093078 | GCF Priority 3 - Addition of new test case 9.3.1.17 | NTT DOCOMO | imported from 3GU |
R5‑093079 | Addition of new test case 10.7.1 | NTT DOCOMO | imported from 3GU |
R5‑093080 | Addition of new test case 10.7.2 | NTT DOCOMO | imported from 3GU |
R5‑093081 | Addition of new test case 10.7.3 | NTT DOCOMO | imported from 3GU |
R5‑093082 | Addition of new test case 10.7.4 | NTT DOCOMO | imported from 3GU |
R5‑093083 | Addition of new test case 10.7.5 | NTT DOCOMO | imported from 3GU |
R5‑093084 | Addition of new test case 10.8.2 | NTT DOCOMO | imported from 3GU |
R5‑093085 | Addition of new test case 10.8.3 | NTT DOCOMO | imported from 3GU |
R5‑093086 | Addition of new test case 10.8.4 | NTT DOCOMO | imported from 3GU |
R5‑093087 | Addition of new test case 10.8.5 | NTT DOCOMO | imported from 3GU |
R5‑093088 | Addition of new test case 10.8.6 | NTT DOCOMO | imported from 3GU |
R5‑093089 | List of test cases/scenarios proposal for LTE Protocol Testing in Idle Mode Operation | NTT DOCOMO | imported from 3GU |
R5‑093090 | Addition of applicability new LTE test case | NTT DOCOMO | imported from 3GU |
R5‑093091 | Correction to the default value of ul-Bandwidth in TS 36.508. | NTT DOCOMO | imported from 3GU |
R5‑093092 | Correction to the PDSCH power in TS36.508 | NTT DOCOMO | imported from 3GU |
R5‑093093 | Correction to the default value of reportAmount in TS 36.508. | NTT DOCOMO | imported from 3GU |
R5‑093094 | Addition of the default value of quantityConfig in TS 36.508. | NTT DOCOMO | imported from 3GU |
R5‑093095 | Clarification on UL data in UE test loop mode | NTT DOCOMO | imported from 3GU |
R5‑093096 | Interference reduction for LTE Signalling test cases with multiple cells | NTT DOCOMO | imported from 3GU |
R5‑093097 | Missing TCs applicability in 36-523-2 | Samsung | imported from 3GU |
R5‑093098 | LS to RAN4 on Timing Advance Command value during T2 for the E-UTRA - UE Timing Advance Adjustment Accuracy Test Case | Motorola | imported from 3GU |
R5‑093099 | Update to GCF priority 1 test case 9.2.1.1.2 | Nokia | imported from 3GU |
R5‑093100 | Update to GCF priority 2 test case 9.2.1.1.7 | Nokia, CATR, TF160 | imported from 3GU |
R5‑093101 | Update to GCF priority 2 test case 9.2.2.1.1 | Nokia | imported from 3GU |
R5‑093102 | Update to GCF priority 3 test case 9.2.2.1.2 | Nokia | imported from 3GU |
R5‑093103 | Update to GCF priority 2 test case 9.2.2.1.6 | Nokia | imported from 3GU |
R5‑093104 | Update of EVM | Rohde & Schwarz | imported from 3GU |
R5‑093105 | Update of In-band emissions | Rohde & Schwarz | imported from 3GU |
R5‑093106 | Correction of Tx general discription | Rohde & Schwarz, Nokia | imported from 3GU |
R5‑093107 | 36.521 followup database | Rohde & Schwarz | imported from 3GU |
R5‑093108 | TDD Initial downlink channel setting | Rohde & Schwarz | imported from 3GU |
R5‑093109 | Discussion about TDD special subframe configuration | Rohde & Schwarz | imported from 3GU |
R5‑093110 | Update for TDD Intra-frequency RSRQ measurement accuracy | Rohde & Schwarz | imported from 3GU |
R5‑093111 | Update for TDD Inter-frequency RSRQ measurement accuracy | Rohde & Schwarz | imported from 3GU |
R5‑093112 | Update for E-UTRAN TDD Transmit timing accuracy | Rohde & Schwarz | imported from 3GU |
R5‑093113 | Update for E-UTRAN TDD Timing advanced adjustment accuracy | Rohde & Schwarz | imported from 3GU |
R5‑093114 | Update for E-UTRA FDD - UTRA TDD cell search(fading) | Rohde & Schwarz | imported from 3GU |
R5‑093115 | Update for E-UTRA FDD - UTRA TDD cell reselection | Rohde & Schwarz | imported from 3GU |
R5‑093116 | Test proposal for E-UTRA FDD - UTRA TDD HO | Rohde & Schwarz | imported from 3GU |
R5‑093117 | Test proposal for E-UTRA TDD random access: contention based scenario | Rohde & Schwarz | imported from 3GU |
R5‑093118 | Test proposal for E-UTRA TDD random access: non-contention based scenario | Rohde & Schwarz | imported from 3GU |
R5‑093119 | GCF Priority 2 - Addition new test case 6.2.3.3 | Panasonic | imported from 3GU |
R5‑093120 | GCF Priority 2 - Addition of applicability statement for E-UTRAN test case 6.2.3.3 for Inter-RAT Cell Reselection / from UTRA_Idle to E-UTRA RRC IDLE | Panasonic | imported from 3GU |
R5‑093121 | GCF Priority 2 - Addition of applicability statement for E-UTRAN test case 8.3.2.1 for Measurement configuration control and reporting / inter RAT measurements | Panasonic | imported from 3GU |
R5‑093122 | GCF Priority 4 - Addition of new test case 8.3.2.2 | Panasonic | imported from 3GU |
R5‑093123 | GCF Priority 4 - Addition of applicability statement for E-UTRAN test case 8.3.2.2 for Measurement configuration control and reporting / inter RAT measurements: | Panasonic | imported from 3GU |
R5‑093124 | GCF Priority 4 - Addition of new test case 8.3.2.5 | Panasonic | imported from 3GU |
R5‑093125 | GCF Priority 4 - Addition of applicability statement for E-UTRAN test case 8.3.2.5 for Measurement configuration control and reporting / inter RAT measurements: | Panasonic | imported from 3GU |
R5‑093126 | Generic information elements for Inter-RAT Report Configuration - PERIODICAL | Panasonic | imported from 3GU |
R5‑093127 | Discussion on the handling of timer tolerance for latency check test cases | Panasonic | imported from 3GU |
R5‑093128 | Correction of ATTACH test case | Panasonic | imported from 3GU |
R5‑093129 | Correction of COMBINED ATTACH test case | Panasonic | imported from 3GU |
R5‑093130 | Correction of PDCP handover test procedure | Panasonic | imported from 3GU |
R5‑093131 | Work plan for ETWS | Panasonic | imported from 3GU |
R5‑093132 | Completion of test case verdict for GUTI ALLOCATION | Panasonic | imported from 3GU |
R5‑093133 | Correction of PDCP status report | Panasonic | imported from 3GU |
R5‑093134 | Correction of discard timer value to be consistent with test tolerances | Panasonic | imported from 3GU |
R5‑093135 | GCF priority 1 - Update of MAC test case 7.1.4.10 | Ericsson, ST-Ericsson, NTT DoCoMo | imported from 3GU |
R5‑093136 | GCF priority 2 - Update of RLC test case 7.2.3.21 | Ericsson, ST-Ericsson, NTT DoCoMo | imported from 3GU |
R5‑093137 | GCF priority 3 - Remove RRC test case 8.1.3.3 | Ericsson, ST-Ericsson, NTT DoCoMo | imported from 3GU |
R5‑093138 | GCF priority 3 - Remove RRC test case 8.1.3.3 applicability | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093139 | CR to 36.521-1: Definition of Maximum Power state in TX/RX test cases | NTT DOCOMO | imported from 3GU |
R5‑093140 | CR to 36.521-1: Update to UE max output power test case | NTT DOCOMO | imported from 3GU |
R5‑093141 | CR to 34.121-1: Addition of UTRA FDD-E-UTRA FDD cell reselection test case (E-UTRA is of higher priority) | NTT DOCOMO | imported from 3GU |
R5‑093142 | CR to 34.121-1: Addition of UTRA FDD-E-UTRA FDD cell reselection test case (E-UTRA is of lower priority) | NTT DOCOMO | imported from 3GU |
R5‑093143 | CR to 36.521-3: Addition of E-UTRAN FDD Intra-frequency RRC Re-establishment | NTT DOCOMO | imported from 3GU |
R5‑093144 | CR to 36.521-3: Addition of E-UTRAN FDD Inter-frequency RRC Re-establishment | NTT DOCOMO | imported from 3GU |
R5‑093145 | GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 | Anritsu Corporation | imported from 3GU |
R5‑093146 | GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 | Anritsu Corporation | imported from 3GU |
R5‑093147 | GCF Priority 2 - Corrections to E-UTRAN test cases 6.1.2.8 and 6.1.2.9 | Anritsu Corporation | imported from 3GU |
R5‑093148 | Various corrections to RLC section of 36.523-1 | Rohde & Schwarz | imported from 3GU |
R5‑093149 | TP of UTRA FDD-E-UTRA TDD handover test case | CATT | imported from 3GU |
R5‑093150 | TP of UTRA FDD-E-UTRA TDD cell search test case | CATT | imported from 3GU |
R5‑093151 | Discussion paper on new EMM test cases after the core specification updates | Nokia | imported from 3GU |
R5‑093152 | List of test cases/scenarios proposed for 3G LTE Protocol Testing for EMM (EPS Mobility Management) | Nokia | imported from 3GU |
R5‑093153 | Corrections to default RRC message and IE contents | Ericsson, ST Ericsson | imported from 3GU |
R5‑093154 | Corrections to reference RB configurations | Ericsson, ST Ericsson | imported from 3GU |
R5‑093155 | Verification of UE setting of the RRC Establishment Cause | Ericsson, ST Ericsson | imported from 3GU |
R5‑093156 | Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause | Ericsson, ST Ericsson | imported from 3GU |
R5‑093157 | Update to Output Power Dynamics test cases | AT4 wireless | imported from 3GU |
R5‑093158 | Update to Annex E Cell Configuration Mapping | AT4 wireless | imported from 3GU |
R5‑093159 | System information scheduling for RF/RRM testing | Agilent Technologies | imported from 3GU |
R5‑093160 | Clarification to TS 36.509 activation and de-activation of UE Test Mode | Agilent Technologies | imported from 3GU |
R5‑093161 | RAN5-RF Action Points | Agilent Technologies | imported from 3GU |
R5‑093162 | LTE-RF: RMC update | Agilent Technologies | imported from 3GU |
R5‑093163 | LTE-RF: CR to test case for Aggregate power control tolerance | Agilent Technologies | imported from 3GU |
R5‑093164 | LTE-RF: CR for Power Control Absolute power tolerance test case | Agilent Technologies | imported from 3GU |
R5‑093165 | LTE-RF: CR for UE configured UE transmitted output power test case | Agilent Technologies | imported from 3GU |
R5‑093166 | LTE-RF: CR for UE minimum output power test case for TDD | Agilent Technologies | imported from 3GU |
R5‑093167 | LTE-RF: CR for Power Control Relative power tolerance test case | Agilent Technologies | imported from 3GU |
R5‑093168 | GCF Priority 3 - Addition of test case 6.2.3.6 | CATR | imported from 3GU |
R5‑093169 | GCF Priority 3 - Addition of test case 9.2.3.1.27 | CATR | imported from 3GU |
R5‑093170 | GCF Priority 3 - Addition of test case 9.2.3.1.28 | CATR | imported from 3GU |
R5‑093171 | GCF Priority 3 - Addition of test case 9.3.1.15 | CATR | imported from 3GU |
R5‑093172 | GCF Priority 3 - Addition of test case 9.2.2.2.14 | CATR | imported from 3GU |
R5‑093173 | GCF priority 3 - Update of RRC test case 8.2.1.7 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093174 | GCF priority 1 - Update of RRC test case 8.2.2.1 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093175 | GCF priority 1 - Update of RRC test case 8.2.2.2 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093176 | GCF priority 1 - Update of RRC test case 8.2.3.1 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093177 | GCF priority 2 - Update of RRC test case 8.3.2.6 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093178 | GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6'Normal tracking area update / UE with ISR active moves to E-UTRAN' | Sony Ericsson Mobile | imported from 3GU |
R5‑093179 | GCF Priority 3: Correction to 9.2.1.2.1 ''Combined attach procedure / Success / EPS and non-EPS services'' | Sony Ericsson Mobile | imported from 3GU |
R5‑093180 | Update of Applicability table for EMM test cases | Sony Ericsson Mobile | imported from 3GU |
R5‑093181 | GCF priority 2 - Update of Idle Mode test case 6.1.2.3 | ZTE corporation, NEC | imported from 3GU |
R5‑093182 | GCF priority 1 - Update of MAC test case 7.1.2.6 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093183 | GCF priority 1 - Update of MAC test case 7.1.3.1 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093184 | GCF priority 2 - Update of MAC test case 7.1.3.2 | ZTE corporation, Motorola | imported from 3GU |
R5‑093185 | GCF priority 1 - Update of MAC test case 7.1.3.3 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093186 | GCF priority 1 - Update of MAC test case 7.1.3.4 | ZTE corporation, Motorola | imported from 3GU |
R5‑093187 | GCF priority 1 - Update of MAC test case 7.1.3.5 | ZTE corporation, Motorola | imported from 3GU |
R5‑093188 | GCF priority 1 - Update of MAC test case 7.1.3.6 | ZTE corporation, Motorola | imported from 3GU |
R5‑093189 | GCF priority 1 - Update of MAC test case 7.1.3.7 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093190 | GCF priority 1 - Update of MAC test case 7.1.4.1 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093191 | GCF priority 2 - Update of MAC test case 7.1.4.2 | ZTE corporation, Motorola | imported from 3GU |
R5‑093192 | GCF priority 1 - Update of MAC test case 7.1.4.6 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093193 | GCF priority 1 - Update of MAC test case 7.1.4.7 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093194 | GCF priority 1 - Update of MAC test case 7.1.4.8 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093195 | GCF priority 1 - Update of MAC test case 7.1.4.11 | ZTE corporation, Motorola | imported from 3GU |
R5‑093196 | GCF priority 1 - Update of MAC test case 7.1.4.13 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093197 | GCF priority 1 - Update of MAC test case 7.1.4.15 | ZTE corporation, Motorola | imported from 3GU |
R5‑093198 | GCF priority 2 - Update of MAC test case 7.1.4.16 | ZTE corporation, Motorola | imported from 3GU |
R5‑093199 | GCF priority 1 - Update of PDCP test case 7.3.1.1 | ZTE corporation, Motorola | imported from 3GU |
R5‑093200 | GCF priority 2 - Update of RRC test case 8.1.3.4 | ZTE corporation, NEC | imported from 3GU |
R5‑093201 | GCF priority 2 - Update of RRC test case 8.1.3.6 | ZTE corporation, NEC | imported from 3GU |
R5‑093202 | GCF priority 1 - Update of RRC test case 8.2.1.1 | ZTE corporation, Ericsson, ST-Ericsson | imported from 3GU |
R5‑093203 | GCF Priority 2 - Update of RRC test case 6.2.2.3 | Alcatel-Lucent | imported from 3GU |
R5‑093204 | GCF Priority 2 - Update of RRC test case 6.2.3.7 | Alcatel-Lucent | imported from 3GU |
R5‑093205 | GCF Priority 2 - Update of RRC test case 6.2.3.8 | Alcatel-Lucent | imported from 3GU |
R5‑093206 | GCF Priority 2 - Update of RRC test case 8.1.3.9 | Alcatel-Lucent | imported from 3GU |
R5‑093207 | GCF Priority 2 - Update of RRC test case 8.1.3.10 | Alcatel-Lucent | imported from 3GU |
R5‑093208 | GCF Priority 2 - Update of RRC test case 8.3.2.7 | Alcatel-Lucent | imported from 3GU |
R5‑093209 | GCF Priority 2 - Update of RRC test case 8.3.2.8 | Alcatel-Lucent | imported from 3GU |
R5‑093210 | Correction to CQI performance test case | NEC | imported from 3GU |
R5‑093211 | Introduction of Reporting of Precoding Matrix Indicator (PMI) test cases | NEC | imported from 3GU |
R5‑093212 | Correction to Demodulation of PDCCH/PCFICH test cases | NEC | imported from 3GU |
R5‑093213 | Correction to Demodulation of PHICH test cases | NEC | imported from 3GU |
R5‑093214 | Correction to RSRP measurement accuracy test cases | NEC | imported from 3GU |
R5‑093215 | GCF Priority 2 - Additon New Test Case 6.2.3.13 | Panasonic | imported from 3GU |
R5‑093216 | Addition of new test case 8.4.3.5 | ZTE corporation | imported from 3GU |
R5‑093217 | TDD fields in default physical layer parameters | Nokia, Rohde & Schwarz | imported from 3GU |
R5‑093218 | Correction to Annex B | Rohde & Schwarz | imported from 3GU |
R5‑093219 | LTE-RRM:Addition of common messages to Annex H | Rohde & Schwarz | imported from 3GU |
R5‑093220 | Mapping of uplink physical channels for TDD | Nokia | imported from 3GU |
R5‑093221 | LTE-RF: CR for notes in TDD DL RMC to be used in TX test cases | Nokia | - |
R5‑093222 | LTE-RRM: Introduction of Common Exception messages table for E-UTRAN TDD-UTRAN FDD handover and E-UTRAN TDD-UTRAN FDD measurements | Nokia | imported from 3GU |
R5‑093223 | GCF priority 2: TDD formulation update in 7.1.6.1 DRX Operation | Nokia, CMCC, Huawei | imported from 3GU |
R5‑093224 | GCF priority 2: TDD formulation update in 7.1.6.2 DRX Operation | Nokia, CMCC, Huawei | imported from 3GU |
R5‑093225 | LTE-RF: Discussion on extra message content for Demodulation of PDSCH Tests | Nokia | imported from 3GU |
R5‑093226 | LTE-RF: CR for notes in TDD DL RMC to be used in TX test cases | Nokia | imported from 3GU |
R5‑093227 | Update of TDD PDSCH test cases | CMCC, CATT, R&S | imported from 3GU |
R5‑093228 | Update of TDD PCFICH/PDCCH test cases | CMCC, CATT, R&S | imported from 3GU |
R5‑093229 | Update of TDD PHICH test cases | CMCC, CATT, R&S | imported from 3GU |
R5‑093230 | Maintenance of list of test cases/scenarios proposed for 3G LTE Protocol Testing for RRC Part 2 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093231 | GCF Priority 2 - Addition of E-UTRAN test case 6.2.3.3 for Cell reselection: Inter-RAT Cell Reselection / from UTRA_Idle to E-UTRA RRC IDLE | ZTE corporation | imported from 3GU |
R5‑093232 | Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: End of procedure after T301 expiry (after Radio Link Failure) | ZTE corporation | imported from 3GU |
R5‑093233 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.4 | CMCC, Huawei, NOKIA | imported from 3GU |
R5‑093234 | GCF Priority 4 - Update of test case 8.2.4.10 RRC Connection Reconfiguration / Handover between FDD & TDD | CMCC | imported from 3GU |
R5‑093235 | GCF priority 1: Addition of new EMM test case 9.2.3.2.13 : Combined tracking area update / rejected / Roaming not allowed in this tracking area | ZTE corporation | imported from 3GU |
R5‑093236 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 | ZTE corporation | imported from 3GU |
R5‑093237 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 | ZTE corporation | imported from 3GU |
R5‑093238 | Applicability for new test cases 6.2.3.3 & 9.2.3.2.13 & 13.1.1 & 13.2.1 | ZTE corporation | imported from 3GU |
R5‑093239 | Correction of the values of the cell reselection thresholds threshX-High and threshX-Low | ZTE corporation | imported from 3GU |
R5‑093240 | Correction CR to 36.521-3: Update of inter-frequency E-UTRAN TDD-TDD cell re-selection 4.2.6 | ZTE corporation | imported from 3GU |
R5‑093241 | Correction CR to 36.521-3: Update of E-UTRAN TDD - UTRAN TDD cell re-selection 4.3.4 | ZTE corporation | imported from 3GU |
R5‑093242 | LTE-RF: CR for Additional Maximum Power Reduction | ZTE corporation | imported from 3GU |
R5‑093243 | LTE-RF: CR for UE maximum power reduction(MPR) test case | ZTE corporation | imported from 3GU |
R5‑093244 | LTE-RF: CR for configured UE transmitted output power test case for TDD | ZTE corporation | imported from 3GU |
R5‑093245 | LTE-RF: power control acuuracy | ZTE corporation | imported from 3GU |
R5‑093246 | LTE-RF: CR for UE maximum output power test case | ZTE corporation | imported from 3GU |
R5‑093247 | LTE-RF CR to 36.521-1: Update the E-UTRA channel numbers | ZTE corporation | imported from 3GU |
R5‑093248 | GCF Priority 2: Update of MAC TC 7.1.4.2 to cover the correct handing of TDD semi persisitent scheduling | Huawei, CMCC, Nokia | imported from 3GU |
R5‑093249 | GCF Priority 3 - Addition of TC 6.2.3.9 cell reselection when 1xRTT is higher priority | Huawei | imported from 3GU |
R5‑093250 | GCF Priority 3 - 6.2.3.10 cell reselection when 1xRTT is lower priority | Huawei | imported from 3GU |
R5‑093251 | Update of SN length in PDCP default configuration | Huawei | imported from 3GU |
R5‑093252 | Update of Applicability for PDCP tc based on FGI | Huawei | imported from 3GU |
R5‑093253 | CR to 36.521-3: Update of E-UTRA FDD to HRPD Handover and E-UTRA FDD to cdma2000 1xRTT Handover test cases | Spirent Communications | imported from 3GU |
R5‑093254 | List of test cases and scenarios proposal for 3G LTE Protocol Testing for PDCP after RAN5#43Bis | Huawei | imported from 3GU |
R5‑093255 | List of test cases and scenarios proposal for HeNB after RAN5#43Bis | Huawei | imported from 3GU |
R5‑093256 | LTE-RRM:E-UTRA TDD - TDD Inter frequency cell search with DRX | Huawei | imported from 3GU |
R5‑093257 | LTE-RRM:E-UTRA TDD - TDD Intra frequency cell search with DRX | Huawei | imported from 3GU |
R5‑093258 | LTE-RRM:TDD-TDD RSRP measurement | Huawei | imported from 3GU |
R5‑093259 | GCF Priority 2 - Addition of new EMM test case 9.2.3.3.5 | Qualcomm Europe | imported from 3GU |
R5‑093260 | GCF Priority 2 - Update of EMM test case 9.3.1.7a | Qualcomm Europe | imported from 3GU |
R5‑093261 | GCF Priority 4 - Addition of new EMM test case 9.2.1.1.3 | Qualcomm Europe | imported from 3GU |
R5‑093262 | GCF Priority 2 - Addition of applicability for new EMM test case 9.2.3.3.5 | Qualcomm Europe | imported from 3GU |
R5‑093263 | GCF Priority 4 - Addition of applicability for new EMM test case 9.2.1.1.3 | Qualcomm Europe | imported from 3GU |
R5‑093264 | GCF Priority 1 - Corrections to RLC section | Qualcomm Europe | imported from 3GU |
R5‑093265 | GCF Priority 1 - Update of RLC test case 7.2.3.9 | Qualcomm Europe | imported from 3GU |
R5‑093266 | List of test cases/scenarios proposal for 3G LTE Protocol Testing for RLC | Qualcomm Europe | - |
R5‑093267 | List of test cases/scenarios proposal for 3G LTE Protocol Testing for RLC | Qualcomm Europe | imported from 3GU |
R5‑093268 | RAN5 test coverage for CSFB RRC test cases | Qualcomm Europe | imported from 3GU |
R5‑093269 | Corrections to TS 36.509 | Qualcomm Europe | imported from 3GU |
R5‑093270 | GCF Priority 3 - Update of RRC test case 8.3.2.9 | Qualcomm Europe | imported from 3GU |
R5‑093271 | Update of references in TS 36.523-1 | Qualcomm Europe | imported from 3GU |
R5‑093272 | Correction of RMCs (36.521 Annex A) | Rohde & Schwarz | imported from 3GU |
R5‑093273 | GCF Priority 4 - Addition of new RRC test case 8.3.2.10 | Qualcomm Europe | imported from 3GU |
R5‑093274 | GCF Priority 2 - Update of RRC test case 8.3.2.8 | Qualcomm Europe | imported from 3GU |
R5‑093275 | UE category (36.521 clause 8 | Rohde & Schwarz | imported from 3GU |
R5‑093276 | Completion of Global in-Channel TX-Test (36.521 Annex E) | Rohde & Schwarz | imported from 3GU |
R5‑093277 | Update of reporting configurations for CDMA2000 | Qualcomm Europe | - |
R5‑093278 | Completion of Statistical testing (36.521 Annex G) | Rohde & Schwarz | imported from 3GU |
R5‑093279 | GCF Priority 2 - Update of applicability for LTE-C2k interworking test cases | Qualcomm Europe | imported from 3GU |
R5‑093280 | Usage of the Global In-Channels TX-Test across different Signal Quality tests. | Rohde & Schwarz | imported from 3GU |
R5‑093281 | GCF Priority 4 - Addition of applicability for new RRC test case 8.3.2.10 | Qualcomm Europe | imported from 3GU |
R5‑093282 | Connection for 1 cell with antenna configuration 1x2 in static propagation conditions | Rohde & Schwarz | imported from 3GU |
R5‑093283 | LTE TX: 1 to 2 RX antenna | Rohde & Schwarz | imported from 3GU |
R5‑093284 | Correction to 6.6.2.2 Additional Spectrum Emission Mask | Rohde & Schwarz | imported from 3GU |
R5‑093285 | Correction to 6.6.2.3 ACLR | Rohde & Schwarz | imported from 3GU |
R5‑093286 | Update of reporting configurations for CDMA2000 | Qualcomm Europe | imported from 3GU |
R5‑093287 | Correction to 6.7 TX Intermodulation | Rohde & Schwarz | imported from 3GU |
R5‑093288 | Correction to 4.3.1.2.5 TDD reference test frequencies for Operating Band 37 | Rohde & Schwarz | imported from 3GU |
R5‑093289 | Correction to 7.6.1 In-Band Blocking | Rohde & Schwarz | imported from 3GU |
R5‑093290 | Without loop back: 6.5.2.1Error Vector Magnitude (EVM) | Rohde & Schwarz | imported from 3GU |
R5‑093291 | Add reference to test procedure for RRC Connection Release TCs | Telecom Italia | imported from 3GU |
R5‑093292 | Summary of the loopback discussion | Rohde & Schwarz | imported from 3GU |
R5‑093293 | GCF Priority 4 - New TC 8.1.3.7 RRC Connection Release: redirection from UTRAN to E-UTRAN | Telecom Italia | imported from 3GU |
R5‑093294 | GCF Priority 1 - Corrections to MAC test case 7.1.4.1 | Motorola and MCC 160 | imported from 3GU |
R5‑093295 | GCF Priority 1 - Corrections to MAC test case 7.1.4.5 | Motorola and MCC 160 | imported from 3GU |
R5‑093296 | GCF Priority 1 - Corrections to MAC test case 7.1.4.6 | Motorola and MCC 160 | imported from 3GU |
R5‑093297 | GCF Priority 1 - Corrections to MAC test case 7.1.4.8 | Motorola and MCC 160 | imported from 3GU |
R5‑093298 | GCF Priority 1 - Corrections to MAC test case 7.1.4.10 | Motorola and MCC 160 | imported from 3GU |
R5‑093299 | GCF Priority 1 - Corrections to MAC test case 7.1.4.13 | Motorola and MCC 160 | imported from 3GU |
R5‑093300 | GCF Priority 2 - Corrections to MAC test case 7.1.4.16 | Motorola and MCC 160 | imported from 3GU |
R5‑093301 | List of test cases/scenarios for 3G LTE Protocol Testing for LTE/C2K Interworking | Motorola | imported from 3GU |
R5‑093302 | GCF priority 2 - Update of RRC test case 8.3.1.3 | Nokia | imported from 3GU |
R5‑093303 | GCF priority 2 - Update of RRC test case 8.3.1.5 | Nokia | imported from 3GU |
R5‑093304 | GCF priority 1 - Update of RRC test case 8.3.3.1 | Nokia | imported from 3GU |
R5‑093305 | GCF priority 2 - Update of RRC test case 8.3.1.1 | Nokia | imported from 3GU |
R5‑093306 | List of test cases/scenarios proposal for 3G LTE Terminal Protocol Conformance Test Specifications - RRC part 3 (Measurement Configuration Control and Reporting) | Nokia | imported from 3GU |
R5‑093307 | LTE UE Tests: AWGN and signal-to-noise requirements | Anritsu | imported from 3GU |
R5‑093308 | Update of initial conditions for Annex references | Anritsu | imported from 3GU |
R5‑093309 | Update of 6.7 Tx Inter Mod | Anritsu | imported from 3GU |
R5‑093310 | Update of 6.6.1OBW | Anritsu | imported from 3GU |
R5‑093311 | Update of SEM | Anritsu | imported from 3GU |
R5‑093312 | Update of initial conditions for Tx | Anritsu | imported from 3GU |
R5‑093313 | Update of 7.3 Reference sensitivity level | Anritsu | imported from 3GU |
R5‑093314 | Uplink power tolerance, modulation, and RB allocation for Rx tests | Anritsu | imported from 3GU |
R5‑093315 | Removal of the GUTI reallocation procedures test cases | Nokia | imported from 3GU |
R5‑093316 | Removal of the GUTI reallocation procedures test cases | Nokia | imported from 3GU |
R5‑093317 | GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.1 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093318 | GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.2 | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093319 | List of test cases/scenarios proposed for 3G LTE Protocol Testing for ESM (EPS Session Management) | Motorola | imported from 3GU |
R5‑093320 | Applicability for Output Power Dynamics test cases | AT4 wireless | imported from 3GU |
R5‑093321 | UL RB allocation for receiver tests | Ericsson, ST-Ericsson | imported from 3GU |
R5‑093322 | TDD only parameters usage in default DCI formats of 36.508 | CATT | imported from 3GU |
R5‑093323 | LTE RF - Core update on TC7.6.2 Out-of-band Blocking | Nokia | imported from 3GU |
R5‑093324 | LTE RF - Symbols Update on UL transmission configurations | Nokia | imported from 3GU |
R5‑093325 | LS on RLC UM in RMC | Agilent Technologies | imported from 3GU |
R5‑093326 | LTE RF/RRM: loopback discussion | Agilent Technologies | imported from 3GU |
R5‑093327 | GCF Priority 2 - Corrections of E-UTRA test case 6.1.2.11 | Rohde & Schwarz, NEC | imported from 3GU |
R5‑093328 | RRM OCNG and RMC update | Ericsson, STEricsson | imported from 3GU |
R5‑093329 | GCF Priority 3 - Update of RRC part 3 test case 8.3.1.4 | NEC | imported from 3GU |
R5‑093330 | RRM Radio Link Monitoring FDD update | Ericsson, STEricsson | imported from 3GU |
R5‑093331 | RRM Radio Link Monitoring TDD update | Ericsson, STEricsson | imported from 3GU |
R5‑093332 | GCF Priority 4 - Update of RRC part 3 test case 8.3.2.4 | NEC | imported from 3GU |
R5‑093333 | Update of table 4.6.6-7D to cover all interRAT Periodical reporting configurations | NEC | imported from 3GU |
R5‑093334 | Update to SEM and spurious emissions TC | Qualcomm Japan | imported from 3GU |
R5‑093335 | Update to the Requirements for frequency-selective fading test | Qualcomm Japan | imported from 3GU |
R5‑093336 | Update to CQI reporting under AWGN conditions | Qualcomm Japan | imported from 3GU |
R5‑093337 | Correction of TC 9.2.1.1.5: Attach Procedure / Success / ATTACH ACCEPT message includes the PDN address assigned to the UE | NEC | imported from 3GU |
R5‑093338 | GCF priority 2 - Correction of TC 9.2.1.1.9 Attach / rejected / IMSI invalid | NEC | imported from 3GU |
R5‑093339 | GCF priority 2 - Correction of TC 9.2.1.1.14 Attach / rejected / tracking area not allowed | NEC | imported from 3GU |
R5‑093340 | GCF priority 2 - Correction of TC 9.2.1.1.15 Attach / rejected / roaming not allowed in this tracking area | NEC | imported from 3GU |
R5‑093341 | GCF priority 2 - Correction of TC 9.2.1.1.17 Attach / rejected / no suitable cells in tracking area | NEC | imported from 3GU |
R5‑093342 | GCF priority 3 - Correction of TC 9.2.1.1.19 Attach / Abnormal case / Failure due to non integrity protection | NEC | imported from 3GU |
R5‑093343 | CQI Reporting under Frequency Selective Interference | Qualcomm Japan | imported from 3GU |
R5‑093344 | GCF priority 3 - Correction of TC 9.2.1.2.3 Combined attach procedure / Success / EPS services only / MSC temporarily not reachable | NEC | imported from 3GU |
R5‑093345 | Requirements for CQI reporting under frequency non- selective fading tests | Qualcomm Japan | imported from 3GU |
R5‑093346 | GCF priority 3 - Addition of new test case 9.2.3.2.1a: Combined tracking area update / successful / check of last visited TAI and handling of TAI list, LAI and TMSI | NEC | imported from 3GU |
R5‑093347 | New test case for PMI reporting | Qualcomm Japan | imported from 3GU |
R5‑093348 | CR to 36.521-2 | Qualcomm Japan | imported from 3GU |
R5‑093349 | GCF priority 4 - Addition of new test case 9.2.3.2.3 for combined tracking area update / successful for EPS services only / IMSI unknown in HSS | NEC | imported from 3GU |
R5‑093350 | List of test cases/scenarios proposal for 3G LTE Terminal Protocol Conformance Test Specifications - RRC part 1 (8.1 RRC connection management procedures, 8.5 RRC Others) | NEC | imported from 3GU |
R5‑093351 | Work plan for 3G Long-Term Evolution Terminal Protocol Conformance Test Specifications - Status after RAN5#43bis | NEC, Motorola | imported from 3GU |
R5‑093352 | Applicability of EMM test cases for EPS-only procedures | NEC | imported from 3GU |
R5‑093353 | Proposed update of test case list for inter-RAT test cases - sections 8.4 and 13 | NEC | imported from 3GU |
R5‑093354 | Proposal of new EMM TCs for inter-RAT procedures | NEC | imported from 3GU |
R5‑093355 | Applicability of new EMM test cases | NEC | imported from 3GU |
R5‑093356 | RRM: E-UTRAN FDD - UTRAN FDD SON ANR cell search reporting | Ericsson, STEricsson | imported from 3GU |
R5‑093357 | Update of RRM Confomance test applicability for SON | Ericsson, STEricsson | imported from 3GU |
R5‑093358 | List of test cases/scenarios proposal for LTE Protocol Testing in Idle Mode Operation/Multi-RAT | RIM | imported from 3GU |
R5‑093359 | List of test cases/scenarios proposal for LTE Protocol Testing for SMS over CSFB | RIM | imported from 3GU |
R5‑093360 | RRM:Update of Annex E for SON | Ericsson, STEricsson | imported from 3GU |
R5‑093361 | Correction of Tx general discription | Rohde & Schwarz, Nokia | imported from 3GU |
R5‑093362 | LTE-RF: message update to keep Tx power constant for some Rx test cases | Nokia | imported from 3GU |
R5‑093363 | Update to E-UTRAN to HRPD Cell Re-Selection (HRPD is of lower priority) test case | Qualcomm Japan | imported from 3GU |
R5‑093364 | Update to E-UTRAN to CDMA2000 1xRTT Cell Re-Selection (CDMA2000 1xRTT is of lower priority) test case | Qualcomm Japan | imported from 3GU |
R5‑093365 | LTE Signalling Protocol Test Case Prioritisation - Status after RAN5#43bis | Vodafone | imported from 3GU |
R5‑093366 | In-band Emissions for non-allocated RB | Agilent Technologies | imported from 3GU |
R5‑093367 | LTE-RRM:Test iteration in EUTRAN to other RATs HO and cell search | Rohde & Schwarz | imported from 3GU |
R5‑093368 | LTE RF - Clarification on test case configurations in General section | Nokia | imported from 3GU |
R5‑093369 | LTE RF - Applicability of 6.2.3 MPR | Nokia | imported from 3GU |
R5‑093370 | LTE RF - Verification of UE Output Power in Out of Band Emission tests | Nokia | imported from 3GU |
R5‑093371 | EMM Successful Attach - need for alignment of procedure sequence description | Samsung | imported from 3GU |
R5‑093372 | Batch 2 - Addition of new test case 6.2.2.4 | Alcatel-Lucent | imported from 3GU |
R5‑093373 | Batch 2 - Addition of new test case 8.3.3.4 | Alcatel-Lucent | imported from 3GU |
R5‑093374 | Batch 2 - Addition of new test case 8.3.3.5 | Alcatel-Lucent | imported from 3GU |
R5‑093375 | TDD only parameters usage in default DCI formats of 36.508 | CATT | - |
R5‑093376 | UTRAN SIB scheduling for LTE interRAT test | MCC TF160 | - |
R5‑093378 | Correction to the default value of reportAmount in TS 36.508. | NTT DOCOMO | - |
R5‑093379 | GCF Priority 2 - Additon New Test Case 6.2.3.13 | Panasonic | - |
R5‑093380 | Generic information elements for Inter-RAT Report Configuration - PERIODICAL | Panasonic | - |
R5‑093381 | Connection for 1 cell with antenna configuration 1x2 in static propagation conditions | Rohde & Schwarz | - |
R5‑093382 | Editorial and More corrections to TS 36.509 | Samsung | - |
R5‑093383 | Clarification to TS 36.509 activation and de-activation of UE Test Mode | Agilent Technologies | - |
R5‑093384 | MCC TF160 June report | MCC TF160 | - |
R5‑093385 | GCF Priority 3 - Addition of new test case 9.2.1.2.5 | NTT DOCOMO | - |
R5‑093386 | GCF Priority 3 - Update to test case 9.2.1.2.6 | NTT DOCOMO | - |
R5‑093387 | GCF Priority 3 - Addition of new test case 9.2.1.2.7 | NTT DOCOMO | - |
R5‑093388 | GCF Priority 4 - Addition of new test case 9.2.3.2.5 | NTT DOCOMO | - |
R5‑093389 | GCF Priority 4 - Update to test case 9.2.3.2.6 | NTT DOCOMO | - |
R5‑093390 | Priority 2 - New EMM TC 9-1-4-2 | Samsung | - |
R5‑093391 | Priority 2 - New EMM TC 9-3-1-7 | Samsung | - |
R5‑093392 | GCF Priority 1 - Corrections to MAC test case 7.1.4.13 | Motorola and MCC 160 | - |
R5‑093393 | GCF Priority 2 - Addition new test case 6.2.3.3 | Panasonic | - |
R5‑093394 | GCF Priority 4 - Addition of new test case 9.2.3.2.7 | NTT DOCOMO | - |
R5‑093395 | GCF Priority 3 - Addition of new test case 9.2.3.2.9 | NTT DOCOMO | - |
R5‑093396 | GCF Priority 4 - Update to test case 9.2.3.2.15 | NTT DOCOMO | - |
R5‑093397 | Addition of new test case 10.8.2 | NTT DOCOMO | - |
R5‑093398 | Update of RRC part TC 8.5.1.2 RRC Connection Re-establishment: End of procedure after T301 expiry (after Radio Link Failure) | ZTE corporation | - |
R5‑093399 | GCF priority 1: Addition of new EMM test case 9.2.3.2.13 : Combined tracking area update / rejected / Roaming not allowed in this tracking area | ZTE corporation | - |
R5‑093400 | Discussion about TDD special subframe configuration | Rohde & Schwarz | - |
R5‑093401 | LTE RF - Verification of UE Output Power in Out of Band Emission tests | Nokia | - |
R5‑093402 | CR to 36.521-1: Definition of Maximum Power state in TX/RX test cases | NTT DOCOMO | - |
R5‑093403 | RAN5-RF Action Points | Agilent Technologies | - |
R5‑093404 | System information scheduling for RF/RRM testing | Agilent Technologies | - |
R5‑093405 | CR to 36.521-1: Definition of Maximum Power state in TX/RX test cases | NTT DOCOMO | - |
R5‑093406 | LTE-RF CR to 36.521-1: Update the E-UTRA channel numbers | ZTE corporation | - |
R5‑093407 | LTE RF - Symbols Update on UL transmission configurations | Nokia | - |
R5‑093408 | Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test | Motorola | - |
R5‑093409 | Update to Output Power Dynamics test cases | AT4 wireless | - |
R5‑093410 | LTE-RF: CR to test case for Aggregate power control tolerance | Agilent Technologies | - |
R5‑093411 | LTE-RF: CR for Power Control Absolute power tolerance test case | Agilent Technologies | - |
R5‑093412 | LTE-RF: CR for UE configured UE transmitted output power test case | Agilent Technologies | - |
R5‑093413 | LTE-RF: CR for UE minimum output power test case for TDD | Agilent Technologies | - |
R5‑093414 | LTE-RF: CR for Power Control Relative power tolerance test case | Agilent Technologies | - |
R5‑093415 | LTE-RF: CR for UE maximum output power test case | ZTE corporation | - |
R5‑093416 | TP of UTRA FDD-E-UTRA TDD handover test case | CATT | - |
R5‑093417 | TP of UTRA FDD-E-UTRA TDD cell search test case | CATT | - |
R5‑093418 | Usage of the Global In-Channels TX-Test across different Signal Quality tests. | Rohde & Schwarz | - |
R5‑093419 | Update to SEM and spurious emissions TC | Qualcomm Japan | - |
R5‑093420 | Update of 7.3 Reference sensitivity level | Anritsu | - |
R5‑093421 | UL RB allocation for receiver tests | Ericsson, ST-Ericsson | - |
R5‑093422 | Correction CR to 36.521-1: Update of Requirements for Demodulation of PDSCH (FDD) tests | Motorola | - |
R5‑093423 | Correction to Demodulation of PDCCH/PCFICH test cases | NEC | - |
R5‑093424 | Correction to Demodulation of PHICH test cases | NEC | - |
R5‑093425 | Update of TDD PDSCH test cases | CMCC, CATT, R&S | - |
R5‑093426 | Update of TDD PHICH test cases | CMCC, CATT, R&S | - |
R5‑093427 | Correction to CQI performance test case | NEC | - |
R5‑093428 | Update to the Requirements for frequency-selective fading test | Qualcomm Japan | - |
R5‑093429 | Mapping of uplink physical channels for TDD | Nokia | - |
R5‑093430 | Completion of Global in-Channel TX-Test (36.521 Annex E) | Rohde & Schwarz | - |
R5‑093431 | Completion of Statistical testing (36.521 Annex G) | Rohde & Schwarz | - |
R5‑093432 | Correction CR to 36.521-3: Update of inter-frequency E-UTRAN TDD-TDD cell re-selection 4.2.6 | ZTE corporation | - |
R5‑093433 | Correction CR to 36.521-3: Update of E-UTRAN TDD - UTRAN TDD cell re-selection 4.3.4 | ZTE corporation | - |
R5‑093434 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-GSM Handover test | Motorola | - |
R5‑093435 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-UTRAN FDD Handover test | Motorola | - |
R5‑093436 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD-Contention Based Random Access test | Motorola | - |
R5‑093437 | Test proposal for E-UTRA TDD random access: contention based scenario | Rohde & Schwarz | - |
R5‑093438 | Correction CR to 36.521-3: Update of Requirements for E-UTRAN FDD Non-Contention Based Random Access test | Motorola | - |
R5‑093439 | Test proposal for E-UTRA TDD random access: non-contention based scenario | Rohde & Schwarz | - |
R5‑093440 | CR to 36.521-3: Addition of E-UTRAN FDD Intra-frequency RRC Re-establishment | NTT DOCOMO | - |
R5‑093441 | CR to 36.521-3: Addition of E-UTRAN FDD Inter-frequency RRC Re-establishment | NTT DOCOMO | - |
R5‑093442 | CR to 36.521-3: Update of E-UTRA FDD to HRPD Handover and E-UTRA FDD to cdma2000 1xRTT Handover test cases | Spirent Communications | - |
R5‑093443 | TP of UTRA FDD-E-UTRA TDD handover test case | CATT | - |
R5‑093444 | TP of UTRA FDD-E-UTRA TDD cell search test case | CATT | - |
R5‑093445 | In-band Emissions for non-allocated RB | Agilent Technologies | - |
R5‑093446 | LS on relative power tolerance and exceptions | Agilent Technologies | - |
R5‑093447 | Addition of test scenario CR to 36.521-3: E-UTRAN FDD-FDD Inter-frequency cell search when DRX is used under fading propagation conditions | Motorola | - |
R5‑093448 | Correction CR to 36.521-3: Update of E-UTRAN FDD-FDD Intra-frequency cell search when DRX is used under fading propagation conditions | Motorola | - |
R5‑093449 | Update for E-UTRA FDD - UTRA TDD cell search(fading) | Rohde & Schwarz | - |
R5‑093450 | LTE-RRM:TDD-TDD RSRP measurement | Huawei | - |
R5‑093451 | RRM Radio Link Monitoring FDD update | Ericsson, STEricsson | - |
R5‑093452 | RRM Radio Link Monitoring TDD update | Ericsson, STEricsson | - |
R5‑093453 | Update to Annex E Cell Configuration Mapping | AT4 wireless | - |
R5‑093454 | Applicability for Output Power Dynamics test cases | AT4 wireless | - |
R5‑093455 | RRM: E-UTRAN FDD - UTRAN FDD SON ANR cell search reporting | Ericsson, STEricsson | - |
R5‑093456 | LTE-RRM:Addition of common messages to Annex H | Rohde & Schwarz | - |
R5‑093457 | RRM OCNG and RMC update | Ericsson, STEricsson | - |
R5‑093458 | E-UTRA Intra/Inter Frequency Measurements for Cell Search Test Cases Development | Motorola | - |
R5‑093459 | LS to RAN4 on Timing Advance Command value during T2 for the E-UTRA - UE Timing Advance Adjustment Accuracy Test Case | Motorola | - |
R5‑093460 | LTE RF - Clarification on test case configurations in General section | Nokia | - |
R5‑093461 | Correction of Tx general discription | Rohde & Schwarz, Nokia | - |
R5‑093462 | Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test | Motorola | - |
R5‑093463 | Update to E-UTRAN to HRPD Cell Re-Selection (HRPD is of lower priority) test case | Qualcomm Japan | - |
R5‑093464 | Update to E-UTRAN to CDMA2000 1xRTT Cell Re-Selection (CDMA2000 1xRTT is of lower priority) test case | Qualcomm Japan | - |
R5‑093465 | Correction CR to 36.521-1: Update of Requirements for Additional Maximum Power Reduction (A-MPR) test | Motorola | - |
R5‑093466 | System information scheduling for RF/RRM testing | Agilent Technologies | - |
R5‑093467 | Update of TDD PDSCH test cases | CMCC, CATT, R&S | - |
R5‑093468 | LS on relative power tolerance and exceptions | Agilent Technologies | - |
R5‑093500 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 | ZTE corporation | - |
R5‑093501 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 | ZTE corporation | - |
R5‑093502 | Proposed update of test case list for inter-RAT test cases - sections 8.4 and 13 | NEC | - |
R5‑093503 | List of test cases/scenarios proposal for LTE Protocol Testing in Idle Mode Operation | NTT DOCOMO | - |
R5‑093504 | Work plan for ETWS | Panasonic | - |
R5‑093505 | GCF Priority 1 - Update of E-UTRA MAC test case 7.1.2.4 | CMCC, Huawei, NOKIA | - |
R5‑093506 | GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 | Anritsu Corporation | - |
R5‑093507 | GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 | Anritsu Corporation | - |
R5‑093508 | GCF Priority 2 - Corrections to E-UTRAN test cases 6.1.2.8 and 6.1.2.9 | Anritsu Corporation | - |
R5‑093509 | Missing TCs applicability in 36-523-2 | Samsung | - |
R5‑093510 | GCF priority 1 - Update of MAC test case 7.1.4.10 | Ericsson, ST-Ericsson, NTT DoCoMo | - |
R5‑093511 | GCF Priority 3 - Addition of test case 6.2.3.6 | NTT DOCOMO | - |
R5‑093512 | Add a new normative Annex for ASP documentation | MCC TF160 | - |
R5‑093513 | Small corrections and documentations for EUTRAN test models | MCC TF160 | - |
R5‑093514 | GCF Priority 3 - Addition of test case 9.3.1.15 | CATR | - |
R5‑093515 | Correction of PDCP handover test procedure | Panasonic | - |
R5‑093516 | Correction of PDCP status report | Panasonic | - |
R5‑093517 | GCF Priority 1 - Corrections to MAC test case 7.1.4.1 | Motorola and MCC 160 | - |
R5‑093518 | GCF Priority 1 - Corrections to MAC test case 7.1.4.5 | Motorola and MCC 160 | - |
R5‑093519 | GCF Priority 1 - Corrections to MAC test case 7.1.4.8 | Motorola and MCC 160 | - |
R5‑093520 | GCF Priority 2 - Corrections to MAC test case 7.1.4.16 | Motorola and MCC 160 | - |
R5‑093521 | Add a new clause on CCE allocation | MCC TF160 | - |
R5‑093522 | GCF priority 2 - Update of MAC test case 7.1.4.16 | ZTE corporation, Motorola | - |
R5‑093523 | Various corrections to RLC section of 36.523-1 | Rohde & Schwarz | - |
R5‑093524 | GCF Priority 1 - Update of RLC test case 7.2.3.9 | Qualcomm Europe | - |
R5‑093525 | GCF Priority 1 - Corrections to MAC test case 7.1.4.13 | Motorola and MCC 160 | - |
R5‑093526 | GCF priority 1 - Update of RRC test case 8.2.1.1 | ZTE corporation, Ericsson, ST-Ericsson | - |
R5‑093527 | Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause | Ericsson, ST Ericsson | - |
R5‑093528 | GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.1 | Ericsson, ST-Ericsson | - |
R5‑093529 | GCF Priority 1: Adding Test Coverage for Verification of UE setting of the RRC Establishment Cause in EMM test case 9.3.1.2 | Ericsson, ST-Ericsson | - |
R5‑093530 | Interference reduction for LTE Signalling test cases with multiple cells | NTT DOCOMO | - |
R5‑093531 | GCF Priority 2 - Addition new test case 6.2.3.3 | Panasonic | - |
R5‑093532 | GCF Priority 2 - Update of RRC test case 8.3.2.8 | Qualcomm Europe | - |
R5‑093533 | GCF Priority 4 - Addition of new RRC test case 8.3.2.10 | Qualcomm Europe | - |
R5‑093534 | GCF Priority 2 - Addition of new EMM test case 9.2.3.3.5 | Qualcomm Europe | - |
R5‑093535 | Correction of discard timer value to be consistent with test tolerances | Panasonic | - |
R5‑093536 | GCF priority 2: TDD formulation update in 7.1.6.1 DRX Operation | Nokia, CMCC, Huawei | - |
R5‑093537 | GCF priority 2: TDD formulation update in 7.1.6.2 DRX Operation | Nokia, CMCC, Huawei | - |
R5‑093538 | GCF Priority 2 - Corrections to E-UTRAN test case 6.1.1.1 | Anritsu Corporation | - |
R5‑093539 | GCF priority 2 - Update of Idle Mode test case 6.1.2.3 | ZTE corporation, NEC | - |
R5‑093540 | GCF Priority 2 - Additon New Test Case 6.2.3.13 | Panasonic | - |
R5‑093541 | GCF priority 2: TDD formulation update in 7.1.6.1 DRX Operation | Nokia, CMCC, Huawei | - |
R5‑093542 | GCF priority 2: TDD formulation update in 7.1.6.2 DRX Operation | Nokia, CMCC, Huawei | - |
R5‑093543 | GCF Priority 2 - Corrections to MAC test case 7.1.4.16 | Motorola and MCC 160 | - |
R5‑093544 | Correction of discard timer value to be consistent with test tolerances | Panasonic | - |
R5‑093545 | GCF priority 2 - Update of RRC test case 8.1.3.6 | ZTE corporation, NEC | - |
R5‑093546 | GCF Priority 2 - Update of RRC test case 6.2.2.3 | Alcatel-Lucent | - |
R5‑093547 | GCF Priority 2 - Update of RRC test case 6.2.3.7 | Alcatel-Lucent | - |
R5‑093548 | GCF Priority 2 - Update of RRC test case 6.2.3.8 | Alcatel-Lucent | - |
R5‑093549 | GCF Priority 2 - Update of RRC test case 8.1.3.9 | Alcatel-Lucent | - |
R5‑093550 | GCF Priority 2 - Update of RRC test case 8.1.3.10 | Alcatel-Lucent | - |
R5‑093551 | GCF Priority 2 - Update of RRC test case 8.3.2.7 | Alcatel-Lucent | - |
R5‑093552 | GCF Priority 2 - Update of RRC test case 8.3.2.8 | Alcatel-Lucent | - |
R5‑093553 | GCF priority 2 - Update of RRC test case 8.3.1.5 | Nokia | - |
R5‑093554 | GCF Priority 3 - Addition of new test case 9.2.1.2.11 | NTT DOCOMO | - |
R5‑093555 | GCF Priority 2 - Addition of new test case 8.4.2.4 | NTT DOCOMO | - |
R5‑093556 | GCF Priority 2 - Addition of new test case 8.4.2.6 | NTT DOCOMO | - |
R5‑093557 | List of test cases/scenarios proposal for LTE Protocol Testing for SMS over IMS | Alcatel-Lucent | - |
R5‑093558 | GCF priority 1 - Update of MAC test case 7.1.4.10 | Ericsson, ST-Ericsson, NTT DoCoMo | - |
R5‑093559 | Discussion on the handling of timer tolerance for latency check test cases | Panasonic | - |
R5‑093560 | GCF Priority 3: Introduction of a new EMM test case 9.2.3.1.6'Normal tracking area update / UE with ISR active moves to E-UTRAN' | Sony Ericsson Mobile | - |
R5‑093561 | GCF Priority 3: Correction to 9.2.1.2.1 ''Combined attach procedure / Success / EPS and non-EPS services'' | Sony Ericsson Mobile | - |
R5‑093562 | GCF Priority 3 - Addition of test case 9.2.3.1.27 | CATR | - |
R5‑093563 | GCF Priority 3 - Addition of test case 9.3.1.15 | CATR | - |
R5‑093564 | Correction of ATTACH test case | Panasonic | - |
R5‑093565 | Response LS to 3GPP2 | TSG WG RAN5 | - |
R5‑093566 | GCF Priority 2 - Update of RRC test case 6.2.2.3 | Alcatel-Lucent | - |
R5‑093567 | GCF Priority 2 - Update of RRC test case 6.2.3.8 | Alcatel-Lucent | - |
R5‑093568 | GCF Priority 2 - Update of RRC test case 8.1.3.9 | Alcatel-Lucent | - |
R5‑093569 | GCF priority 2 - Update of RRC test case 8.3.1.3 | Nokia | - |
R5‑093570 | GCF priority 2 - Update of RRC test case 8.3.1.1 | Nokia | - |
R5‑093571 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.1.1 | ZTE corporation | - |
R5‑093572 | GCF Priority 1 - Addition of new Multi-layer Procedures test case 13.2.1 | ZTE corporation | - |
R5‑093573 | Update of SN length in PDCP default configuration | Huawei | - |
R5‑093574 | GCF Priority 2 - Updates to E-UTRAN test case 6.1.2.7 | Anritsu Corporation | - |
R5‑093575 | CR resubmission guideline for RAN5#44 | Anritsu | - |
R5‑093576 | GCF Priority 1 - Corrections to MAC test case 7.1.4.5 | Motorola and MCC 160 | - |
R5‑093577 | Addition of new test case 6.2.2.5 | NTT DOCOMO | - |
R5‑093578 | GCF priority 2 - Update of MAC test case 7.1.4.16 | ZTE corporation, Motorola | - |
R5‑093579 | GCF Priority 2 - Addition of new test case 8.4.2.4 | NTT DOCOMO | - |
R5‑093580 | CR writing requirements - brief update V3 | Samsung | - |
R5‑093581 | CR resubmission guideline for RAN5#44 | Anritsu | - |
R5‑093582 | GCF priority 2 - Update of RRC test case 8.1.3.4 | ZTE corporation, NEC | - |
R5‑093583 | GCF priority 2 - Update of Idle Mode test case 6.1.2.3 | ZTE corporation, NEC | - |
R5‑093584 | GCF priority 2 - Update of RRC test case 8.1.3.6 | ZTE corporation, NEC | - |
R5‑093585 | Add reference to test procedure for RRC Connection Release TCs | Telecom Italia | - |
R5‑093586 | GCF Priority 2 - Addition new test case 6.2.3.3 | Panasonic | - |
R5‑093587 | GCF priority 2 - Correction of TC 9.2.1.1.9 Attach / rejected / IMSI invalid | NEC | - |
R5‑093588 | GCF priority 2 - Update of RRC test case 8.1.3.4 | ZTE corporation, NEC | - |
R5‑093589 | GCF priority 2 - Update of RRC test case 8.1.3.6 | ZTE corporation, NEC | - |
R5‑093590 | GCF Priority 2: Update of MAC TC 7.1.4.2 to cover the correct handing of TDD semi persisitent scheduling | Huawei, CMCC, Nokia | - |
R5‑093591 | SIG action points after RAN5#43bis | ETSI Secretary | - |
R5‑093592 | GCF Priority 2 - Additon New Test Case 6.2.3.13 | Panasonic | - |
R5‑093593 | draft meeting report RAN5#43bis | ETSI Secretary | - |
R5‑093594 | List of test cases/scenarios proposal for LTE - Layer 2 (MAC) | Motorola | - |
R5‑093595 | Missing TCs applicability in 36-523-2 | Samsung | - |
R5‑093596 | List of agreed CRs of RAN5#43bis | ETSI Secretary | - |
page generated from database: 2024-03-25 09:25:51