The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R5-39b - 2008-06-24 to 2008-06-26, Paris

meeting id: R5-39b (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R5‑082000 Common Agenda Motorola, NEC, Agilent Technologies imported from 3GU
R5‑082001 Signalling Group Timetable Motorola imported from 3GU
R5‑082002 RF Group Timetable Agilent Technologies imported from 3GU
R5‑082003 Previous RAN Plenary Notes WG Chairman imported from 3GU
R5‑082004 Target of LTE TTCN development MCC TF160 imported from 3GU
R5‑082005 Discussion on Implementation Conformance Statement (ICS) used for LTE FDD and TDD CATT imported from 3GU
R5‑082006 Update Radio Bearer Establishment: Success (Dedicated bearer) Ericsson imported from 3GU
R5‑082007 Update Radio Bearer Establishment: Success (Dedicated bearer, NAS message piggybacked) Ericsson imported from 3GU
R5‑082008 New test case Radio Bearer Establishment: Success (Dedicated bearer, handover) Ericsson imported from 3GU
R5‑082009 New test case Radio Bearer Establishment: Success (Dedicated bearer, inter-frequency handover) Ericsson imported from 3GU
R5‑082010 New test case Radio Bearer Establishment: Success (SRB2) Ericsson imported from 3GU
R5‑082011 Applicability for test cases 8.2.1.4-5, 8.2.1.8-9 and 8.2.1.13 Ericsson imported from 3GU
R5‑082012 Cover for LTE Performance Requirement text proposal Motorola imported from 3GU
R5‑082013 Cover for LTE E-UTRAN RRC_IDLE State Mobility text proposal Motorola imported from 3GU
R5‑082014 Cover for LTE E-UTRAN RRC_CONNECTED State Mobility text proposal Motorola imported from 3GU
R5‑082015 Cover for LTE UE Transmit Timing Requirements text proposal Motorola imported from 3GU
R5‑082016 Cover for LTE E-UTRAN RRC_IDLE State Mobility text proposal Motorola imported from 3GU
R5‑082017 Addition of E-UTRA TDD Test frequencies for TS36.508 CMCC imported from 3GU
R5‑082018 List of test cases and scenarios proposal for 3G LTE Protocol Testing for PDCP Huawei imported from 3GU
R5‑082019 Text Proposal for LTE Tx Minimum Output Power AT4 wireless, Agilent Technologies, NTT DOCOMO imported from 3GU
R5‑082020 Text proposal for LTE Tx Minimum Output Power Uncertainty AT4 wireless, Agilent Technologies imported from 3GU
R5‑082021 Text proposal for LTE Tx Minimum Output Power Tolerance AT4 wireless, Agilent Technologies imported from 3GU
R5‑082022 Text proposal for LTE Transmit OFF Power AT4 wireless, Agilent Technologies imported from 3GU
R5‑082023 Text Proposal for Test Frequencies in TS 36.508 Agilent Technologies imported from 3GU
R5‑082024 Draft TS 36.523-2 issues for consideration Rapporteur imported from 3GU
R5‑082025 RAN5 PRD13 LTE/SAE TC prose specification requirements udate Samsung Electronics imported from 3GU
R5‑082026 Text Proposal for Chan bandwidths in TS 36.521-1 Agilent Technologies imported from 3GU
R5‑082027 Text Proposal for Occupied bandwidth in TS 36.521-1 Agilent Technologies imported from 3GU
R5‑082028 Restructure of TS 36.521-1 and RRM proposal Agilent Technologies imported from 3GU
R5‑082029 TS 36.521-1 after RAN5#39bis Agilent Technologies imported from 3GU
R5‑082030 LTE-RF channel bandwidth proposal Agilent Technologies imported from 3GU
R5‑082031 Updates of reference test conditions for TS 36.508 NTT DOCOMO imported from 3GU
R5‑082032 LTE Features and Test Prioritisation NTT DOCOMO imported from 3GU
R5‑082033 Text Proposal for LTE Adjacent Channel Leakage power Ratio NTT DOCOMO imported from 3GU
R5‑082034 Text Proposal for LTE Tx Spurious Emissions NTT DOCOMO imported from 3GU
R5‑082035 Text Proposal for LTE UE Maximum Output Power NTT DOCOMO, RIM, ZTE imported from 3GU
R5‑082036 Text Proposal for LTE Occupied Bandwidth NTT DOCOMO imported from 3GU
R5‑082037 Text Proposal for LTE Spectrum Emission Mask NTT DOCOMO imported from 3GU
R5‑082038 Introduction of a new EMM testcase, Network initiated detach procedure with “re-attach required” Sony Ericsson Mobile Communications Japan imported from 3GU
R5‑082039 Update of Applicability table for EPS mobility management test case Sony Ericsson Mobile Communications Japan imported from 3GU
R5‑082040 Addition of a new test case RRC / Paging for notification of BCCH modification in idle mode NTT DOCOMO imported from 3GU
R5‑082041 Addition of a new test case RRC / Paging for Connection in idle mode NTT DOCOMO imported from 3GU
R5‑082042 Addition of a new test case RRC / Paging for Connection in idle mode (multiple paging records) NTT DOCOMO imported from 3GU
R5‑082043 Addition of a new test case RRC / Paging for Connection in idle mode (Shared Network environment) NTT DOCOMO imported from 3GU
R5‑082044 Update of the new test case RRC Connection Establishment during Cell reselection: Failure NTT DOCOMO imported from 3GU
R5‑082045 Update of the test case RRC Connection Reconfiguration / Handover: Success (Dedicated preamble) NTT DOCOMO imported from 3GU
R5‑082046 Update of the test case RRC Connection Reconfiguration / Handover: Success (Common preamble) NTT DOCOMO imported from 3GU
R5‑082047 Update of the test case RRC Connection Reconfiguration / Handover: Success (inter-frequency) NTT DOCOMO imported from 3GU
R5‑082048 Update of the test case RRC Connection Reconfiguration / Handover: Failure (Re-establishment successful) NTT DOCOMO imported from 3GU
R5‑082049 Addition of a new test case UM RLC/ Reassembly / 10-bit SN / 11-bit 'Length Indicators' / LI value > PDU size NTT DOCOMO imported from 3GU
R5‑082050 Addition of a new test case UM RLC/ In sequence delivery of upper layer PDUs without residual loss of RLC PDUs/ Maximum re-ordering delay exceeds the T_reordering time NTT DOCOMO imported from 3GU
R5‑082051 Addition of a new test case UM RLC/ In sequence delivery of upper layer PDUs with residual loss of RLC PDUs/ Maximum re-ordering delay exceeds the T_reordering time NTT DOCOMO imported from 3GU
R5‑082052 Addition of a new test case RRC Connection Reconfiguration / Radio Bearer Release /Handover: Success NTT DOCOMO imported from 3GU
R5‑082053 Addition of a new test case RRC Connection Reconfiguration / Handover: success (intra-cell, security reconfiguration) NTT DOCOMO imported from 3GU
R5‑082054 Addition of a new test case RRC Connection Reconfiguration / Handover (no delta configuration) NTT DOCOMO imported from 3GU
R5‑082055 Addition of a new test case RRC Connection Reconfiguration / Handover: Failure (re-establishment failure) NTT DOCOMO imported from 3GU
R5‑082056 Discussion paper on test loops for E-UTRA and EPC testing Ericsson imported from 3GU
R5‑082057 List of test cases/scenarios proposed for 3G LTE Protocol Testing for EMM (EPS Mobility Management) Nokia imported from 3GU
R5‑082058 Update of LTE Signaling Protocol Test Case Prioritisation T-Mobile, NTT DoCoMo imported from 3GU
R5‑082059 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RRC part 3 (Measurement Configuration Control and Reporting) Nokia imported from 3GU
R5‑082060 Proposal of LTE reference system configurations for TS 36.508 NTT DOCOMO, Ericsson imported from 3GU
R5‑082061 Connection Diagrams for TX and RX tests Rohde & Schwarz imported from 3GU
R5‑082062 Statistical testing of receiver characteristics Rohde & Schwarz imported from 3GU
R5‑082063 Discussion paper on data generation mechanisms for DRB testing Rohde & Schwarz, MCC-TF160 imported from 3GU
R5‑082064 Proposal for ASP structure (incl. example) Rohde & Schwarz imported from 3GU
R5‑082065 Discussion paper on structuring RAN5 test specification for FDD and TDD Ericsson, CMCC, Huawei, ZTE imported from 3GU
R5‑082066 New test case AM RLC /Concatenation and Reassembly (7.2.3.1) Ericsson imported from 3GU
R5‑082067 New test case AM RLC / Segmentation and Reassembly / 11 bit 'Length Indicators' / No PDU segmentation (7.2.3.2) Ericsson imported from 3GU
R5‑082068 New test case AM RLC / Operation of the RLC re-establishment procedure / UE Originated (7.2.3.12) Ericsson imported from 3GU
R5‑082069 New test case AM RLC / Operation of the RLC re-establishment procedure / UE Terminated (7.2.3.13) Ericsson imported from 3GU
R5‑082070 New test case AM RLC / Duplicate detection of RLC PDU segments (7.2.3.20) Ericsson imported from 3GU
R5‑082071 New test case AM RLC / Duplicate detection of RLC PDUs (7.2.3.21) Ericsson imported from 3GU
R5‑082072 New test case AM RLC / RLC re-establishment at inter eNB HO (7.2.3.22) Ericsson imported from 3GU
R5‑082073 Applicability of new AM RLC test cases Ericsson imported from 3GU
R5‑082074 Update of 36.521-1: Introduction of HRPD and CDMA2000 in RRM test cases Nortel imported from 3GU
R5‑082075 Update of 36.521-1: Correction of Additional channel bandwidth of E-UTRA Band 1 Nortel imported from 3GU
R5‑082076 Default downlink signal channel powers for LTE UE test Anritsu imported from 3GU
R5‑082077 Summary of TT and System uncertainties for regulatory TCs Anritsu imported from 3GU
R5‑082078 UE Spurious Emissions Measurement uncertainty & Test Tolerances Anritsu imported from 3GU
R5‑082079 LTE Spectrum Emission Mask test uncertainties and TTs Anritsu imported from 3GU
R5‑082080 LTE UE Max Power and ACLR tests, uncertainties and TTs Anritsu imported from 3GU
R5‑082081 LTE UE Max Rx Input and ACS test cases update Anritsu imported from 3GU
R5‑082082 LTE Rx Intermodulation test case uncertainties and TTs Anritsu imported from 3GU
R5‑082083 Correction to 6.1.2.3: Cell Configuration for multi Cell environment NTT DOCOMO imported from 3GU
R5‑082084 Correction to 8.1.3.7 and 8.1.3.9: Cell Configuration for multi Cell environment NTT DOCOMO imported from 3GU
R5‑082085 Addition of Cell Environment for multi Cell Configuration NTT DOCOMO imported from 3GU
R5‑082086 Addition of Cell and UE configuration for TS 36.508 NTT DOCOMO imported from 3GU
R5‑082087 Addition of Applicability new LTE test cases NTT DOCOMO imported from 3GU
R5‑082088 List of test cases/scenarios proposal for LTE - Layer 2 (MAC) Motorola imported from 3GU
R5‑082089 Proposed update of LTE test case list RRC part 2 (RRC Connection Reconfiguration) Ericsson imported from 3GU
R5‑082090 Update of default RRC message contents Ericsson imported from 3GU
R5‑082091 Addition of SRB and DRB radio bearer combinations to 36.508 Ericsson imported from 3GU
R5‑082092 Text proposal for LTE Transmit OFF Power AT4 wireless, Agilent Technologies imported from 3GU
R5‑082093 Text Proposal for TS36.521-1 TC7.6 Blocking Characteristics Nokia imported from 3GU
R5‑082094 Text Proposal for TS36.521-1 TC7.7 Spurious Response Nokia imported from 3GU
R5‑082095 Text Proposal for TS36.521-1 TC7.9 Spurious Emissions Nokia -
R5‑082096 36.523-3 v020 Rapporteur imported from 3GU
R5‑082097 Text Proposal for Annex C Downlink Physical Channels (AI 3.3.6) NEC imported from 3GU
R5‑082098 Text Proposal for LTE Demodulation of PCFICH/PDCCH and PHICH NEC imported from 3GU
R5‑082099 Addition of a new test case EMM Attach Procedure / Success (valid GUTI) NEC imported from 3GU
R5‑082100 Proposal on Structure of Default Message Contents for TS 36.508 NEC imported from 3GU
R5‑082101 Addition of a new test case RRC Measurement configuration control and reporting / intra LTE measurements (event A1) NEC imported from 3GU
R5‑082102 Addition of a new test case RRC Measurement configuration control and reporting / intra LTE measurements (event A2) NEC imported from 3GU
R5‑082103 Update to cell reselection test case 6.1.2.3 NEC imported from 3GU
R5‑082104 Addition of a new test case Cell reselection using Qhyst, Qoffset and Treselection NEC imported from 3GU
R5‑082105 Addition of new RLC test case for AM RLC / Polling for status Qualcomm Europe imported from 3GU
R5‑082106 Addition of new RLC test case for AM RLC / Receiver Status Triggers Qualcomm Europe imported from 3GU
R5‑082107 Addition of new MAC test case for Logical channel prioritization handling Qualcomm Europe imported from 3GU
R5‑082108 Addition of applicability for new RLC test cases Qualcomm Europe imported from 3GU
R5‑082109 Addition of applicability for new MAC test case Qualcomm Europe imported from 3GU
R5‑082110 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RLC Qualcomm Europe -
R5‑082111 Default RRC message contents for measurements NEC imported from 3GU
R5‑082112 Defining default message contents for NAS messages NEC imported from 3GU
R5‑082113 Way forward before the alignment of LTE SIG work plan with feature priorities NEC imported from 3GU
R5‑082114 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RRC part 1 (Paging, RRC Connection establishment, release, RL failure) NEC (Editor) imported from 3GU
R5‑082115 List of test cases/scenarios proposal for 3G LTE Protocol Testing for IDLE Mode NEC imported from 3GU
R5‑082116 Correction of test case 8.1.2.7 NEC imported from 3GU
R5‑082117 Addition of new RLC test case for AM RLC / Correct use of Sequence Numbering Rohde & Schwarz imported from 3GU
R5‑082118 Addition of new RLC test case for AM RLC / Reassembly / 11-bit 'Length Indicators' / Reserved LI value Rohde & Schwarz imported from 3GU
R5‑082119 Future LTE bis meetings NEC imported from 3GU
R5‑082120 List of test cases/scenarios proposal for 3G Long Term Evolution Terminal Protocol Conformance Test Specifications WI NEC, Motorola imported from 3GU
R5‑082121 TS 36.523-1 after RAN5#39bis NEC imported from 3GU
R5‑082122 Addition of applicability for new test cases NEC imported from 3GU
R5‑082123 Addition of applicability for new idle mode test case NEC -
R5‑082124 LTE SIG work plan after RAN5#39bis NEC, Motorola imported from 3GU
R5‑082125 TS 36.509 after RAN5 #39'bis' Rohde & Schwarz imported from 3GU
R5‑082126 Invitation to RAN5#40 Rohde & Schwarz imported from 3GU
R5‑082127 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RLC Qualcomm Europe imported from 3GU
R5‑082128 Comments on 36.523-1 v020 Samsung Electronics imported from 3GU
R5‑082129 Restructure of TS 36.521-1 and RRM proposal Agilent Technologies Agreed
R5‑082130 Text Proposal for Chan bandwidths in TS 36.521-1 Agilent Technologies Agreed
R5‑082131 LS to RAN4 asking for clarification of Band I fdd and tdd requirements Agilent Technologies Withdrawn
R5‑082132 Text Proposal for LTE Tx Minimum Output Power AT4 wireless, Agilent Technologies, NTT DOCOMO Revised
R5‑082133 Text Proposal for LTE Adjacent Channel Leakage power Ratio NTT DOCOMO Revised
R5‑082134 Text Proposal for LTE Tx Spurious Emissions NTT DOCOMO Agreed
R5‑082135 Text Proposal for LTE UE Maximum Output Power NTT DOCOMO, RIM, ZTE Agreed
R5‑082136 Text Proposal for LTE Spectrum Emission Mask NTT DOCOMO Agreed
R5‑082137 LTE Spectrum Emission Mask test uncertainties and TTs Anritsu Revised
R5‑082138 UE Spurious Emissions Measurement uncertainty & Test Tolerances Anritsu Agreed
R5‑082139 LTE Features and Test Prioritisation NTT DOCOMO Revised
R5‑082140 Proposal of LTE reference system configurations for TS 36.508 NTT DOCOMO, Ericsson Revised
R5‑082141 Draft TS 36.508 after RAN5#39bis NTT DoCoMo Noted
R5‑082142 Work plan of TS 36.508 after RAN5#39bis NTT DoCoMo Noted
R5‑082143 Updates of reference test conditions for TS 36.508 NTT DOCOMO, Agilent Revised
R5‑082144 Proposal of LTE reference system configurations for TS 36.508 NTT DOCOMO, Ericsson Agreed
R5‑082145 Update of the new test case RRC Connection Establishment during Cell reselection: Failure NTT DOCOMO Approved
R5‑082146 Addition of Cell Environment for multi Cell Configuration NTT DOCOMO Agreed
R5‑082147 Summary of TT and System uncertainties for regulatory TCs Anritsu Noted
R5‑082148 Addition of E-UTRA TDD Test frequencies for TS36.508 CMCC Agreed
R5‑082149 Updates of reference test conditions for TS 36.508 NTT DOCOMO, Agilent Agreed
R5‑082150 Default downlink signal channel powers for LTE UE test Anritsu Agreed
R5‑082151 LTE UE Max Power and ACLR tests, uncertainties and TTs Anritsu Agreed
R5‑082152 Text proposal for LTE Transmit OFF Power AT4 wireless, Agilent Technologies Agreed
R5‑082153 LTE UE Max Rx Input and ACS test cases update Anritsu Agreed
R5‑082154 Text Proposal for TS36.521-1 TC7.7 Spurious Response Nokia Agreed
R5‑082155 Text Proposal for LTE Tx Minimum Output Power AT4 wireless, Agilent Technologies, NTT DOCOMO Agreed
R5‑082156 Text proposal for LTE Tx Minimum Output Power Uncertainty AT4 wireless, Agilent Technologies Agreed
R5‑082157 Text proposal for LTE Tx Minimum Output Power Tolerance AT4 wireless, Agilent Technologies Agreed
R5‑082158 Cover for LTE Performance Requirement text proposal Motorola Agreed
R5‑082159 Text Proposal for LTE Demodulation of PCFICH/PDCCH and PHICH NEC Agreed
R5‑082160 Cover for LTE E-UTRAN RRC_IDLE State Mobility text proposal Motorola Agreed
R5‑082161 Cover for LTE E-UTRAN RRC_CONNECTED State Mobility text proposal Motorola Agreed
R5‑082162 Update of 36.521-1: Introduction of HRPD and CDMA2000 in RRM test cases Nortel Agreed
R5‑082163 Cover for LTE UE Transmit Timing Requirements text proposal Motorola Agreed
R5‑082164 Statistical testing of receiver characteristics Rohde & Schwarz Agreed
R5‑082165 Cover for LTE E-UTRAN RRC_IDLE State Mobility text proposal Motorola Revised
R5‑082166 Text Proposal for Annex C Downlink Physical Channels (AI 3.3.6) NEC Agreed
R5‑082167 OBW Measurement uncertainty & Test Tolerances NTTDOCOMO, Anritsu Agreed
R5‑082168 Connection Diagrams for TX and RX tests Rohde & Schwarz Revised
R5‑082169 LTE Spectrum Emission Mask test uncertainties and TTs Anritsu Agreed
R5‑082170 Cover for LTE E-UTRAN RRC_IDLE State Mobility text proposal Motorola Agreed
R5‑082171 Text Proposal for LTE Adjacent Channel Leakage power Ratio NTT DOCOMO Agreed
R5‑082172 RAN5 Meeting Dates 2008/2009 Chair Noted
R5‑082173 Connection Diagrams for TX and RX tests Rohde & Schwarz Agreed
R5‑082174 TS 36.521-3 after RAN5#39bis Agilent P.Agreed
R5‑082175 LTE Features and Test Prioritisation NTT DOCOMO For e-mail approval
R5‑082200 New test case AM RLC / Operation of the RLC re-establishment procedure / UE Terminated (7.2.3.13) Ericsson Approved
R5‑082201 Addition of a new test case UM RLC/ Reassembly / 10-bit SN / 11-bit 'Length Indicators' / LI value > PDU size NTT DOCOMO Agreed
R5‑082202 Addition of a new test case UM RLC/ In sequence delivery of upper layer PDUs without residual loss of RLC PDUs/ Maximum re-ordering delay exceeds the T_reordering time NTT DOCOMO Agreed
R5‑082203 Addition of a new test case UM RLC/ In sequence delivery of upper layer PDUs with residual loss of RLC PDUs/ Maximum re-ordering delay exceeds the T_reordering time NTT DOCOMO Agreed
R5‑082204 Addition of Cell and UE configuration for TS 36.508 NTT DOCOMO Agreed
R5‑082205 Addition of new RLC test case for AM RLC / Correct use of Sequence Numbering Rohde & Schwarz Noted
R5‑082206 Update Radio Bearer Establishment: Success (Dedicated bearer, NAS message piggybacked) Ericsson Revised
R5‑082207 New test case Radio Bearer Establishment: Success (Dedicated bearer, handover) Ericsson Approved
R5‑082208 New test case Radio Bearer Establishment: Success (Dedicated bearer, inter-frequency handover) Ericsson Approved
R5‑082209 New test case Radio Bearer Establishment: Success (SRB2) Ericsson Approved
R5‑082210 Specifying specific procedure step sequences using plain language Samsung Electronics Noted
R5‑082211 Introduction of a new EMM testcase, Network initiated detach procedure with “re-attach required” Sony Ericsson Mobile Communications Japan Approved
R5‑082212 Update of Applicability table for EPS mobility management test case Sony Ericsson Mobile Communications Japan Approved
R5‑082213 List of test cases/scenarios proposal for LTE - Layer 2 (MAC) Motorola Noted
R5‑082214 Addition of new MAC TC for CCCH mapped to UL SCH / DL SCH invalid LCID (Logical Channel ID) Motorola Noted
R5‑082215 Addition of new MAC TC for DTCH of DCCH mapped to UL SCH / DL SCH Invalid LCID (Logical Channel ID) Motorola Noted
R5‑082216 Addition of new MAC TC for MAC-CONTENTION RESOLUTION [Temporary C-RNTI] Motorola Noted
R5‑082217 Addition of new MAC TC for MAC-CONTENTION RESOLUTION [C-RNTI] Motorola Noted
R5‑082218 CT1 SAE Update - June 2008 Motorola Noted
R5‑082219 Applicability of new AM RLC test cases Ericsson Agreed
R5‑082220 Addition of a new test case RRC Connection Reconfiguration / Handover: Failure (re-establishment failure) NTT DOCOMO Noted
R5‑082221 List of test cases/scenarios proposal for 3G LTE Protocol Testing for RRC part 3 (Measurement Configuration Control and Reporting) Nokia Noted
R5‑082222 List of test cases/scenarios proposed for 3G LTE Protocol Testing for EMM (EPS Mobility Management) Nokia Noted
R5‑082223 Way forward before the alignment of LTE SIG work plan with feature priorities NEC Noted
R5‑082224 Addition of new RLC test case for AM RLC / Polling for status Qualcomm Europe Agreed
R5‑082225 Addition of new RLC test case for AM RLC / Receiver Status Triggers Qualcomm Europe Agreed
R5‑082226 Addition of a new test case RRC / Paging for Connection in idle mode (multiple paging records) NTT DOCOMO Deferred
R5‑082227 Update Radio Bearer Establishment: Success (Dedicated bearer) Ericsson Approved
R5‑082228 Update Radio Bearer Establishment: Success (Dedicated bearer, NAS message piggybacked) Ericsson Approved
R5‑082229 Addition of a new test case EMM Attach Procedure / Success (valid GUTI) NEC Approved
R5‑082230 Editing test case list and work plan NEC Noted

page generated from database: 2024-03-25 09:25:51

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links