3GPP TDocs (written contributions) at meeting
Meeting: R4-71 - 2014-05-19 to 2014-05-23, Seoul
meeting id: R4-71 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑142558 | RAN4-71 meeting agenda | TB Chairman | imported from 3GU |
R4‑142559 | RAN4-70Bis Meeting report | ETSI Secretariat | imported from 3GU |
R4‑142560 | Harmonics and Intermodulation Products caused by LTE Advanced intra-band contiguous or non-contiguous Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑142561 | Introduction of intra-band non-contiguous Carrier Aggregation in Band 41 for 3DL to TS 36.104 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑142562 | Introduction of intra-band non-contiguous Carrier Aggregation in Band 41 for 3DL to TS 36.141 | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑142563 | TP for TR 36833-6-41: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced intra-band contiguous or non-contiguous Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑142564 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4 and Band 5 to TS 36.104 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142565 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4 and Band 5 to TS 36.141 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142566 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4 and Band 12 to TS 36.104 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142567 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4 and Band 12 to TS 36.141 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142568 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 5 and Band 12 to TS 36.104 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142569 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 5 and Band 12 to TS 36.141 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142570 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 5 and Band 12 to TS 36.104 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142571 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 5 and Band 12 to TS 36.141 | Alcatel-Lucent, US Cellular | imported from 3GU |
R4‑142572 | Introduction of intra-band non-contiguous Carrier Aggregation in Band 2 to TS 36.104 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142573 | Introduction of intra-band non-contiguous Carrier Aggregation in Band 2 to TS 36.141 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142574 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4 and Band 13 to TS 36.104 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142575 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 4 and Band 13 to TS 36.141 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142576 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 2 and Band 13 to TS 36.104 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142577 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 2 and Band 13 to TS 36.141 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142578 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 4 and Band 13 to TS 36.104 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142579 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 4 and Band 13 to TS 36.141 | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑142580 | Introduction of intra-band contiguous Carrier Aggregation in Band 12 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142581 | Introduction of intra-band contiguous Carrier Aggregation in Band 12 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142582 | Introduction of inter-band Carrier Aggregation of Band 2 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142583 | Introduction of inter-band Carrier Aggregation of Band 2 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142584 | Introduction of inter-band Carrier Aggregation of Band 4 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142585 | Introduction of inter-band Carrier Aggregation of Band 4 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142586 | Introduction of inter-band Carrier Aggregation of Band 5 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142587 | Introduction of inter-band Carrier Aggregation of Band 5 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142588 | Introduction of inter-band Carrier Aggregation of Band 12 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142589 | Introduction of inter-band Carrier Aggregation of Band 12 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142590 | Introduction of inter-band Carrier Aggregation of Band 29 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142591 | Introduction of inter-band Carrier Aggregation of Band 29 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142592 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 5 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142593 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 5 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142594 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 29 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142595 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 29 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142596 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 5 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142597 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 5 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142598 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 29 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142599 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 29 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142600 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 12 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142601 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 12 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142602 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 12 and Band 30 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142603 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 12 and Band 30 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142604 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 12 and Band 12 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142605 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 2, Band 12 and Band 12 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142606 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 12 and Band 12 to TS 36.104 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142607 | Introduction of 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 12 and Band 12 to TS 36.141 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑142608 | WF on REFSENS for LTE_CA_NC_B2 | Ericsson | imported from 3GU |
R4‑142609 | Wayforward for Study item LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz | TTA | imported from 3GU |
R4‑142610 | UL system performance for 2UL NC-CA with power backoff | Ericsson | imported from 3GU |
R4‑142611 | Technical Report - LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) | Rapporteur | imported from 3GU |
R4‑142612 | Multi-band corrections in 37.141 chapter 7 | NSN, Ericsson | imported from 3GU |
R4‑142613 | Multi-band corrections in 37.141 chapter 7 | NSN, Ericsson | imported from 3GU |
R4‑142614 | TP for TR 36.853 V0.0.4: For LTE_CA_B3_B3_B7 | TeliaSonera AB | imported from 3GU |
R4‑142615 | Introduction of CA 1+11 to 36.101 (Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142616 | Introduction of CA 1+11 to 36.104 (Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142617 | Introduction of CA 1+11 to 36.141 (Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142618 | Introduction of CA 1+11 to 36.307 (Rel-10) | SoftBank Mobile | imported from 3GU |
R4‑142619 | Introduction of CA 1+11 to 36.307 (Rel-11) | SoftBank Mobile | imported from 3GU |
R4‑142620 | Introduction of CA 1+11 to 36.307 (Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142621 | TP for TR36.851 (Rel-12): TIB and RIB proposal for CA 8+11 | SoftBank Mobile | imported from 3GU |
R4‑142622 | Introduction of CA 8+11 to 36.101(Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142623 | Introduction of CA 8+11 to 36.104(Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142624 | Introduction of CA 8+11 to 36.141(Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142625 | Introduction of CA 8+11 to 36.307(Rel-10) | SoftBank Mobile | imported from 3GU |
R4‑142626 | Introduction of CA 8+11 to 36.307(Rel-11) | SoftBank Mobile | imported from 3GU |
R4‑142627 | Introduction of CA 8+11 to 36.307(Rel-12) | SoftBank Mobile | imported from 3GU |
R4‑142628 | Introduction of test cases for 5MHz +5MHz : Event triggered reporting on deactivating Scells in non-DRX FDD and TDD | Ericsson | imported from 3GU |
R4‑142629 | PUSCH Demodulation Performance | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142630 | Review of RAN4#70bis agreements and draft LS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142631 | Subset Restriction for NAICS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142632 | Radiated Measurements Accuracy | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142633 | CW for AAS Conformance Test | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142634 | AAS Specifications | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142635 | Antenna Port and AAS | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142636 | TR 36.833-5-41 v0.4.0 | Sprint | imported from 3GU |
R4‑142637 | TR 36.833-5-41 v0.4.0 | Sprint | imported from 3GU |
R4‑142638 | TR 36.833-6-41 v0.2.0 | Sprint | imported from 3GU |
R4‑142639 | TP for 36.833-6-41: UE requirements | Sprint | imported from 3GU |
R4‑142640 | TP for 36.833-6-41: Correction to BW combination sets | Sprint | imported from 3GU |
R4‑142641 | TP for TR 36.851 V0.11.0: Triplexer insertion loss data for CA_3A-40A | TeliaSonera AB | imported from 3GU |
R4‑142642 | TP for TR 36.853: Updates to harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 2, Band 4 and Band 12 | NSN, T-Mobile USA | imported from 3GU |
R4‑142643 | Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 2, Band 4 and Band 4 | NSN, T-Mobile USA | imported from 3GU |
R4‑142644 | TP for TR 36.853: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 2, Band 4 and Band 4 | NSN, T-Mobile USA | imported from 3GU |
R4‑142645 | Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 4, Band 4 and Band 12 | NSN, T-Mobile USA | imported from 3GU |
R4‑142646 | TP for TR 36.853: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 4, Band 4 and Band 12 | NSN, T-Mobile USA | imported from 3GU |
R4‑142647 | TP for TR 36.851 V0.11.0: deltaTIB,c and deltaRIB,c for CA_8A-40A | TeliaSonera | imported from 3GU |
R4‑142648 | Additional correction to In-band blocking case nubering re-establisment | Nokia Corporation | imported from 3GU |
R4‑142649 | Motivation for New WI: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 3 and Band 8 | CHTTL | imported from 3GU |
R4‑142650 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 3 and Band 8 | CHTTL | imported from 3GU |
R4‑142651 | Corrections and Clarifications of UE specifications in TR 36.844 [FS_LTE_FDD_1670_US] | Lightsquared Inc. | imported from 3GU |
R4‑142652 | RDD Analysis for FS_LTE_FDD_1670_US | Lightsquared Inc. | imported from 3GU |
R4‑142653 | Corrections and Clarifications of eNB specifications in TR 36.844 [FS_LTE_FDD_1670_US] | Lightsquared Inc. | imported from 3GU |
R4‑142654 | TS 25.173 version 0.2.0 | ZTE | imported from 3GU |
R4‑142655 | Text Proposals to TS 25.173 version 0.2.0 | ZTE, CATR, CATT, CMCC, Huawei | imported from 3GU |
R4‑142656 | CR to TS 25.172 on introduction BDS to A-GANSS of FDD mode of UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR, CATT, Huawei, Intel, Qualcomm, Spirent | imported from 3GU |
R4‑142657 | CR to TS 36.171 on introduction BDS to A-GNSS of E-UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATR, CATT, CMCC, Huawei, Intel Corporation, Qualcomm Inc., Spirent | imported from 3GU |
R4‑142658 | Revised results of UE specific beam forming for AAS coexistence simulation | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142659 | Clarification on definitions and ACLR requirement in TS36.104 | ZTE, NSN, Tejet | imported from 3GU |
R4‑142660 | Clarification on definitions and ACLR requirement in TS36.104 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | imported from 3GU |
R4‑142661 | Clarification on definitions and ACLR requirement in TS36.141 | ZTE, NSN, Tejet | imported from 3GU |
R4‑142662 | Clarification on definitions and ACLR requirement in TS36.141 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | imported from 3GU |
R4‑142663 | Clarification on definitions and ACLR requirement in TS37.104 | ZTE, NSN, Tejet | imported from 3GU |
R4‑142664 | Clarification on definitions and ACLR requirement in TS37.104 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | imported from 3GU |
R4‑142665 | Clarification on definitions and ACLR requirement in TS37.141 | ZTE, NSN, Tejet | imported from 3GU |
R4‑142666 | Clarification on definitions and ACLR requirement in TS37.141 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | imported from 3GU |
R4‑142667 | Clarification on definitions and ACLR requirement in TS25.104 | ZTE, NSN, Tejet | imported from 3GU |
R4‑142668 | Clarification on definitions and ACLR requirement in TS25.104 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | imported from 3GU |
R4‑142669 | Correction on manufacturer's declaration in TS36.141 | ZTE, Tejet | imported from 3GU |
R4‑142670 | Correction on munufacturer's declaration in TS36.141 | ZTE, Tejet | imported from 3GU |
R4‑142671 | Introduction of Multi-band operation in TS25.142 | ZTE, Tejet | imported from 3GU |
R4‑142672 | Consideration on 256QAM BS RF/test requirements | ZTE, Tejet | imported from 3GU |
R4‑142673 | Introduction of operating band XXXII in TS25.104 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142674 | Introduction of operating band XXXII in TS25.105 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142675 | Introduction of operating band XXXII in TS25.113 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142676 | Introduction of operating band XXXII in TS34.124 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142677 | Introduction of operating band XXXII In TS25.141 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142678 | Introduction of operating band XXXII in TS25.142 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142679 | Introduction of operating band XXXII in TS25.307 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142680 | Introduction of operating band XXXII in TS25.461 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142681 | Introduction of operating band XXXII in TS25.466 | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142682 | Introduction of operating bands 29 and 32 in TS36.116 | Huawei | imported from 3GU |
R4‑142683 | TP for UE transmit modulation quality for non-contiguous intra-band CA | Rohde & Schwarz | imported from 3GU |
R4‑142684 | Near Field Measurement Technique and Preliminary Results for Radiated AAS BS testing | SATIMO Industries | imported from 3GU |
R4‑142685 | Introduction of Band XXXII and Band I+XXXII | Ericsson, Qualcomm Incorporated, Huawei | imported from 3GU |
R4‑142686 | Introduction of Band 32/XXXII and Band 20+32 CA | Ericsson, Orange | imported from 3GU |
R4‑142687 | New WID: LTE-Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 4, and Band 7 | Rogers, Ericsson | imported from 3GU |
R4‑142688 | New WID: LTE-Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 4, Band 7, and Band 12 | Rogers,Ericsson | imported from 3GU |
R4‑142689 | 36.833-2-23: LTE-Advanced Intra-band Non-contiguous Carrier Aggregation (CA) in Band 23 v1.1.0 | DISH Network | imported from 3GU |
R4‑142690 | TR 37.846: 2GHz FDD for UTRA and LTE in Region 1 v0.1.0 | DISH Network, Solaris Mobile Ltd | imported from 3GU |
R4‑142691 | Text Proposal for TR 37.846: Band Specific Issues for 2 GHz Band in Region 1 | DISH Network, Solaris Mobile Ltd | imported from 3GU |
R4‑142692 | Editorial Correction | Alcatel-Lucent | imported from 3GU |
R4‑142693 | Editorial Correction | Alcatel-Lucent | imported from 3GU |
R4‑142694 | Editorial Correction | Alcatel-Lucent | imported from 3GU |
R4‑142695 | Introduction of UE RRM performance requirements for UTRA Band I + SDL 1452 - 1496 MHz | Qualcomm Incorporated, Ericsson | imported from 3GU |
R4‑142696 | CA_3C is deleting 75RB+75RB uplink configuration for reference sensitivity | China Unicom | imported from 3GU |
R4‑142697 | RF: Corrections to spurious emission requirements with NS different than NS_01 (Rel-8) | Rohde & Schwarz, Ericsson | imported from 3GU |
R4‑142698 | RF: Corrections to spurious emission requirements with NS different than NS_01 (Rel-9) | Rohde & Schwarz, Ericsson | imported from 3GU |
R4‑142699 | RF: Corrections to spurious emission requirements with NS different than NS_01 (Rel-10) | Rohde & Schwarz, Ericsson | imported from 3GU |
R4‑142700 | RF: Corrections to spurious emission requirements with NS different than NS_01 (Rel-11) | Rohde & Schwarz, Ericsson | imported from 3GU |
R4‑142701 | RF: Corrections to spurious emission requirements with NS different than NS_01 (Rel-12) | Rohde & Schwarz, Ericsson | imported from 3GU |
R4‑142702 | Perf: Cleanup and better description of DL-RMC-s with dynamic coding rate for CSI requirements (Rel-8) | Rohde & Schwarz | imported from 3GU |
R4‑142703 | Perf: Cleanup and better description of DL-RMC-s with dynamic coding rate for CSI requirements (Rel-9) | Rohde & Schwarz | imported from 3GU |
R4‑142704 | Perf: Cleanup and better description of DL-RMC-s with dynamic coding rate for CSI requirements (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑142705 | Perf: Cleanup and better description of DL-RMC-s with dynamic coding rate for CSI requirements (Rel-11) | Rohde & Schwarz | imported from 3GU |
R4‑142706 | Perf: Cleanup and better description of DL-RMC-s with dynamic coding rate for CSI requirements (Rel-12) | Rohde & Schwarz | imported from 3GU |
R4‑142707 | Draft WI: AWS Extension Band for LTE | Verizon | imported from 3GU |
R4‑142708 | SCell activation and deactivation delay test case proposal | Ericsson | imported from 3GU |
R4‑142709 | SCell activation and deactivation delay test case for unknown SCell | Ericsson | imported from 3GU |
R4‑142710 | SCell activation and deactivation delay test case for unknown SCell | Ericsson | imported from 3GU |
R4‑142711 | SCell activation and deactivation delay test case for unknown SCell | Ericsson | imported from 3GU |
R4‑142712 | Serving Cell Interruption due to Measurements without Gaps | Ericsson | imported from 3GU |
R4‑142713 | Interruption requirements for 3 DL CA | Ericsson | imported from 3GU |
R4‑142714 | SCell activation and deactivation delay requirements for 3 DL CA | Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑142715 | Introduction of Band 32/XXXII in TS 37.113 | Ericsson, NSN, Huawei | imported from 3GU |
R4‑142716 | RSRQ Measurement in Scenarios with Multiple E-UTRA Carriers | Ericsson | imported from 3GU |
R4‑142717 | Introduction of Band 32 in TS 36.124 | Ericsson | imported from 3GU |
R4‑142718 | Introduction of multi-carrier BS testing in TS 25.141 | Ericsson | imported from 3GU |
R4‑142719 | Analysis of RRM requirements for TDD-FDD CA | Ericsson | imported from 3GU |
R4‑142720 | RRM requirements for TDD-FDD CA | Ericsson | imported from 3GU |
R4‑142721 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 1-5 | Ericsson | imported from 3GU |
R4‑142722 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 1-5 | Ericsson | imported from 3GU |
R4‑142723 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 6-7 | Ericsson | imported from 3GU |
R4‑142724 | Activation and deacivation of SCells in dual connectivity | Ericsson | imported from 3GU |
R4‑142725 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 6-7 | Ericsson | imported from 3GU |
R4‑142726 | Acquisition of SeNB SFN in the dual connectivity | Ericsson | imported from 3GU |
R4‑142727 | LS on SFN handling in the dual connectivity | Ericsson | imported from 3GU |
R4‑142728 | Revised WID: additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 4 and Band 12 | T-Mobile USA | imported from 3GU |
R4‑142729 | New WID: additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 2 and Band 4 | T-Mobile USA | imported from 3GU |
R4‑142730 | CR to 36.101: Revision of CR-2196 | Sprint | imported from 3GU |
R4‑142731 | TP for 36.833-5-41: Correction to CA BW Class D | Sprint | imported from 3GU |
R4‑142732 | TP for 36.833-6-41: A-MPR for new BW Combination Set 1 | Sprint | imported from 3GU |
R4‑142733 | Conducted Requirements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142734 | RAN 4 scope for NAICS work. | Ericsson | imported from 3GU |
R4‑142735 | 4CRS Aps analysis of the complexity | Ericsson | imported from 3GU |
R4‑142736 | Strongest interferer detection | Ericsson | imported from 3GU |
R4‑142737 | Analysis of semi-static parameters for BD | Ericsson | imported from 3GU |
R4‑142738 | On QCL analysis | Ericsson | imported from 3GU |
R4‑142739 | Summary of proposal for the parameters and the conditions. | Ericsson | imported from 3GU |
R4‑142740 | Unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑142741 | Draft LS Out on NAICS | Ericsson | imported from 3GU |
R4‑142742 | Corrections to CA_NS_06 | Qualcomm Incorporated | imported from 3GU |
R4‑142743 | Way forward on RF impact | Ericsson | imported from 3GU |
R4‑142744 | Corrections to CA_NS_06 | Qualcomm Incorporated | imported from 3GU |
R4‑142745 | EUL RF UE | Ericsson | imported from 3GU |
R4‑142746 | Correction on some A-MPR tables | Huawei | imported from 3GU |
R4‑142747 | Correction on some A-MPR tables | Huawei | imported from 3GU |
R4‑142748 | EUL performance | Ericsson | imported from 3GU |
R4‑142749 | Intra-band contiguous CA ACS case 2 test clarification | Huawei, Hisilicon, Anritsu | imported from 3GU |
R4‑142750 | Intra-band contiguous CA ACS case 2 test clarification | Huawei, Hisilicon, Anritsu | imported from 3GU |
R4‑142751 | CR Reducing MPR for Contiguous CA with Non-Contiguous Resource Allocations | Motorola Mobility | imported from 3GU |
R4‑142752 | Intra-band contiguous CA ACS case 2 test clarification | Huawei, Hisilicon, Anritsu | imported from 3GU |
R4‑142753 | Unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑142754 | Unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑142755 | Modifications to intra-band contiguous CA class B receiver requirements | Broadcom Corporation | imported from 3GU |
R4‑142756 | AAS technical specification structure considerations and recommendations | NSN | imported from 3GU |
R4‑142757 | Conducted transmitter requirements for AAS | NSN | imported from 3GU |
R4‑142758 | TP for AAS conducted transmitter requirements | NSN | imported from 3GU |
R4‑142759 | AAS radiated output power requirement | NSN | imported from 3GU |
R4‑142760 | TP for AAS radiated output power requirement | NSN | imported from 3GU |
R4‑142761 | Figure of merit for specification of AAS OTA sensitivity | NSN | imported from 3GU |
R4‑142762 | Signal choice for AAS OTA receiver requirement | NSN | imported from 3GU |
R4‑142763 | Performance criteria for AAS OTA sensitivity | NSN | imported from 3GU |
R4‑142764 | Receiver configuration for AAS uplink radiated requirements | NSN | imported from 3GU |
R4‑142765 | TP for OTA receiver AAS requirements | NSN | imported from 3GU |
R4‑142766 | CoMP CRS-IC | Qualcomm Incorporated | imported from 3GU |
R4‑142767 | Performance requirements for 3 DL CA | Qualcomm Incorporated | imported from 3GU |
R4‑142768 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | imported from 3GU |
R4‑142769 | CR on UE performance requirements in release independent specification | Qualcomm Incorporated | imported from 3GU |
R4‑142770 | CR on UE performance requirements in release independent specification (Rel-11) | Qualcomm Incorporated | imported from 3GU |
R4‑142771 | CR on UE performance requirements in release independent specification (Rel-12) | Qualcomm Incorporated | imported from 3GU |
R4‑142772 | Simulation result for intraband non-contiguous CA timing offset test | Qualcomm Incorporated | imported from 3GU |
R4‑142773 | Inclusion of the out of band emission limit concluded in CEPT into band 28 | NTT DOCOMO, INC., Orange, Nokia Corporation, Vodafone, Telecom Italia,TeliaSonera, Telefónica | imported from 3GU |
R4‑142774 | On MBMS BLER measurement | Qualcomm Incorporated | imported from 3GU |
R4‑142775 | Inclusion of the out of band emission limit concluded in CEPT into band 28 | NTT DOCOMO, INC., Orange, Nokia Corporation, Vodafone, Telecom Italia,TeliaSonera, Telefónica | imported from 3GU |
R4‑142776 | Test metric for CA demodulation test for CA_23A-23A | Qualcomm Incorporated | imported from 3GU |
R4‑142777 | Simulation result for PMI test for DL MIMO enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑142778 | Test case design for PUSCH 3-2 mode | Qualcomm Incorporated | imported from 3GU |
R4‑142779 | Draft LS on Band 28 out of band emission limit | NTT DOCOMO, INC. | imported from 3GU |
R4‑142780 | Feasibility of introducing a new OOBE limit to Band 28 | NTT DOCOMO, INC., Orange, Nokia Corporation, Vodafone, Telecom Italia,TeliaSonera, Telefónica | imported from 3GU |
R4‑142781 | Introduction of CA_B42C (2DL/1UL) into TS 36.101 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142782 | Indoor and Vertical Positioning | Alcatel-Lucent | imported from 3GU |
R4‑142783 | Introduction of CA_B42C (2DL/2UL) into TS 36.101 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142784 | Introduce the support of 3DL CA to TS 36.133 Section 7.1 UE transmit timing | Alcatel-Lucent | imported from 3GU |
R4‑142785 | Introduce the support of 3DL CA to TS 36.133 Section 7.8 Interruptions with Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑142786 | UE to UE co-existence between B42/B43 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142787 | UE maximum received timing difference for Dual Connectivity | Alcatel-Lucent | imported from 3GU |
R4‑142788 | Reply LS on the potential requirements of synchronization accuracy between MeNB and SeNB | Alcatel-Lucent | imported from 3GU |
R4‑142789 | MBSFN RSRP and RSRQ Measurement Reporting Requirements | Alcatel-Lucent | imported from 3GU |
R4‑142790 | Increasing RSRQ Reporting Value Range | Alcatel-Lucent | imported from 3GU |
R4‑142791 | RSTD Simulation Results under ETU Channel | Alcatel-Lucent | imported from 3GU |
R4‑142792 | UE to UE co-existence between B42/B43 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142793 | UE to UE co-existence between B42/B43 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142794 | How to handle CA_B42C for 2DL/1UL | NTT DOCOMO, INC. | imported from 3GU |
R4‑142795 | New WID: LTE Advanced intra-band contiguous Carrier Aggregation in Band 42(2DL/1UL) | NTT DOCOMO, INC. | imported from 3GU |
R4‑142796 | Band plan for UL for 1980-2010 and DL for 2170-2200 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142797 | Clarification of supported UE capability for CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑142798 | Introduction of CA_1A-42A into 36.101 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142799 | Discussion on Band 42/43 UE co-existence | KT | imported from 3GU |
R4‑142800 | Correction to periodicity of ABS pattern in eICIC RRM test cases | Anritsu | imported from 3GU |
R4‑142801 | Correction to periodicity of ABS pattern in eICIC RRM test cases | Anritsu | imported from 3GU |
R4‑142802 | AAS BS specification structure and conformance | NTT DOCOMO, INC., NEC | imported from 3GU |
R4‑142803 | Correction to periodicity of ABS pattern in eICIC RRM test cases | Anritsu | imported from 3GU |
R4‑142804 | UE RF requiremets for CA_B42C for 2DL/1UL | NTT DOCOMO, INC. | imported from 3GU |
R4‑142805 | The Preferable Option on Unwanted Emissions for AAS BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑142806 | TP for section 6(CA configurations) of TR36.853 on LTE Advanced Carrier Aggregation of Band Combination (1+19+21) | NTT DOCOMO, INC. | imported from 3GU |
R4‑142807 | Introduction of CA band combination Band1 + Band19 + Band21 to TS 36.104 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142808 | Perf: Corrections to CA (Class C) performance with power imbalance (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑142809 | Introduction of CA band combination Band1 + Band19 + Band21 to TS 36.141 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142810 | Perf: Corrections to CA (Class C) performance with power imbalance (Rel-11) | Rohde & Schwarz | imported from 3GU |
R4‑142811 | BS Transmitter spurious emissions for 2 GHz MSS Band | NTT DOCOMO, INC. | imported from 3GU |
R4‑142812 | Perf: Corrections to CA (Class C) performance with power imbalance (Rel-12) | Rohde & Schwarz | imported from 3GU |
R4‑142813 | Introduction of CA band combination Band1 + Band42 to TS 36.104 | NTT DOCOMO, INC. | imported from 3GU |
R4‑142814 | Introduction of TDD-FDD joint operation including Carrier Aggregation to TS 36.104 | NTT DOCOMO, INC., Alcatel-Lucent, NSN, Ericsson | imported from 3GU |
R4‑142815 | Ambiguity of Transmitter off power | NTT DOCOMO, INC. | imported from 3GU |
R4‑142816 | RRM: Remove square brackets from eICIC RLM test requirement (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑142817 | RRM: Remove square brackets from eICIC RLM test requirement (Rel-11) | Rohde & Schwarz | imported from 3GU |
R4‑142818 | RRM: Remove square brackets from eICIC RLM test requirement (Rel-12) | Rohde & Schwarz | imported from 3GU |
R4‑142819 | Impact of 256QAM on CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑142820 | Demodulation and CSI requirements for small cell enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑142821 | Further discussion on test setup for MTC half duplexing mode | Huawei, HiSilicon | imported from 3GU |
R4‑142822 | MTC demodulation test cases and initial simulations | Huawei, HiSilicon | imported from 3GU |
R4‑142823 | Further discussion on UE CA scalable performance requirement | Huawei, HiSilicon | imported from 3GU |
R4‑142824 | TP for TR 36.851 V0.11.0: Triplexer insertion loss data for CA_1A-42A | TeliaSonera AB | imported from 3GU |
R4‑142825 | BS demodulation performance requirements with TTI bundling for VoIP | Huawei, HiSilicon | imported from 3GU |
R4‑142826 | Simualtion results for Band 23 CA demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑142827 | Introduction of CA performance requirements for Band 23 CA | Huawei, HiSilicon | imported from 3GU |
R4‑142828 | Discussion on test cases of PUSCH 3-2 feedback for downlink MIMO enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑142829 | Discussion on test cases of R.12 4TX codebook for downlink MIMO enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑142830 | Test cases and parameters for eIMTA UE demodulation and CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑142831 | MBMS BLER quantization and tests | Huawei, HiSilicon | imported from 3GU |
R4‑142832 | CR of modification on FeICIC rank testing (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑142833 | CR of modification on FeICIC rank testing (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑142834 | Discussion on FeICIC rank testing | Huawei, HiSilicon | imported from 3GU |
R4‑142835 | CR of introducing FeICIC TM9 testing (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑142836 | CR of introducing FeICIC TM9 testing (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑142837 | Discussion on the FeICIC TM9 testing | Huawei, HiSilicon | imported from 3GU |
R4‑142838 | Simulation results and discussion on intra-band non-contiguous CA performance requirements with timing offset | Huawei, HiSilicon | imported from 3GU |
R4‑142839 | CR for EPDCCH SDR test (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑142840 | CR for EPDCCH SDR test (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑142841 | Clean-up CR for demodulation requirements (Rel-10) | Huawei, HiSilicon | imported from 3GU |
R4‑142842 | Clean-up CR for demodulation requirements (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑142843 | Clean-up CR for demodulation requirements (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑142844 | Additional updates of UE categories for demodualtion performance requirements (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑142845 | Additional updates of UE categories for demodualtion performance requirements (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑142846 | TDD FDD demodulation and CSI requirements | Huawei, HiSilicon | imported from 3GU |
R4‑142847 | Way Forward on UE REFSENS for CA_1A-28A | KDDI | imported from 3GU |
R4‑142848 | T-put calculation for eICIC demodulation requirements | Anritsu, LG Electronics | imported from 3GU |
R4‑142849 | Throughput calculation for eICIC demodulation requirements | Anritsu, LG Electronics, Rohde & Schwarz, Huawei | imported from 3GU |
R4‑142850 | Throughput calculation for eICIC demodulation requirements | Anritsu, LG Electronics, Rohde & Schwarz, Huawei | imported from 3GU |
R4‑142851 | [Rel-11] Introduction of Band 28 requirements for flexible operation in Japan | KDDI, Ericsson | imported from 3GU |
R4‑142852 | [Rel-12] Introduction of Band 28 requirements for flexible operation in Japan | KDDI, Ericsson | imported from 3GU |
R4‑142853 | Add missing Uplink downlink configuration to eICIC TDD RI requirement | Anritsu | imported from 3GU |
R4‑142854 | Add missing Uplink downlink configuration to eICIC TDD RI requirement | Anritsu | imported from 3GU |
R4‑142855 | PUCCH overprovisioning for flexible operation of Band 28 in Japan | KDDI | imported from 3GU |
R4‑142856 | Add static propagation condition matrix for 1 x 2 | Anritsu | imported from 3GU |
R4‑142857 | TP for TR36.851: Filter data on Band 18 + Band 28L quadplexer | KDDI | imported from 3GU |
R4‑142858 | Correct Correlation Matrix and Antenna Configuration for RRM test cases A.4, A.7 | Anritsu | imported from 3GU |
R4‑142859 | Correct Correlation Matrix and Antenna Configuration for RRM test cases A.8 | Anritsu | imported from 3GU |
R4‑142860 | Study on operating inter-band CA in Band 1 + Band 41 | KDDI | imported from 3GU |
R4‑142861 | Cleanup of terminology for Rx requirements | Anritsu, Huawei, Hisilicon | imported from 3GU |
R4‑142862 | Cleanup of terminology for Rx requirements | Anritsu, Huawei, Hisilicon | imported from 3GU |
R4‑142863 | Cleanup of terminology for Rx requirements | Anritsu, Huawei, Hisilicon | imported from 3GU |
R4‑142864 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA REFSENS | Nokia Corporation | imported from 3GU |
R4‑142865 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA maximum input level | Nokia Corporation | imported from 3GU |
R4‑142866 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA ACS | Nokia Corporation | imported from 3GU |
R4‑142867 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA IIB and NB blocking, spurious response and WB intermodulation | Nokia Corporation | imported from 3GU |
R4‑142868 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA OOB blocking | Nokia Corporation | imported from 3GU |
R4‑142869 | Non-contiguous intraband CA Draft CR | Nokia Corporation | imported from 3GU |
R4‑142870 | Unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑142871 | nc-ib-ca TR 36.833-4 v0.4.0 | Nokia Corporation | imported from 3GU |
R4‑142872 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA Pcmax | Nokia Corporation | imported from 3GU |
R4‑142873 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA mpr draft cr to annex | Nokia Corporation | imported from 3GU |
R4‑142874 | Text proposal for TR 36.833-4: Uplink non-contiguous intraband CA MPR measurements for band 4 | Nokia Corporation | imported from 3GU |
R4‑142875 | 2 ul interband ca receiver requirements | Nokia Corporation | imported from 3GU |
R4‑142876 | Requirement proposal for intra-band non-contiguous CA for Band 23 and intra-band contiguous CA for Band 27 | Ericsson | imported from 3GU |
R4‑142877 | 2 ul interband ca 2+4 MSD | Nokia Corporation | imported from 3GU |
R4‑142878 | Test proposal for TDD-FDD CA UE performance requirement | Ericsson | imported from 3GU |
R4‑142879 | Simulation results with timing offset under non-collocated deployment for intra-band NC CA | Ericsson | imported from 3GU |
R4‑142880 | Discussion for test purpose 2 with large power imbalance under non-collocated deployment for intra-band NC CA | Ericsson | imported from 3GU |
R4‑142881 | Methodology on performance requirement for DL CA with 2 or 3DL CCs in Rel-12 | Ericsson | imported from 3GU |
R4‑142882 | Discussion on FeICIC TM9 demodulation requirements | Broadcom Corporation | imported from 3GU |
R4‑142883 | Way forward on methodology on performance requirement for DL CA with 2 or 3DL CCs in Rel-12 | Ericsson | imported from 3GU |
R4‑142884 | Discussion on scope of demodulation test under high Doppler environment | NTT DOCOMO, INC. | imported from 3GU |
R4‑142885 | Maximum received timing difference for synchronized Dual Connectivity | NTT DOCOMO, INC. | imported from 3GU |
R4‑142886 | Test scope for UE performance requirement for DL CA with 2 or 3DL CCs in Rel-12 | Ericsson | imported from 3GU |
R4‑142887 | Proposed work plan for Dual Connectivity | NTT DOCOMO, INC., NEC (Rapporteurs) | imported from 3GU |
R4‑142888 | Discussion on demodulation test for intra band NC CA with power imbalance | NTT DOCOMO, INC. | imported from 3GU |
R4‑142889 | Necessity of ensuring performance with high power level and large power imbalance for intra band NC CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑142890 | Draft reply LS on synchronization accuracy between MeNB and SeNB for Dual Connectivity | NTT DOCOMO, INC. | imported from 3GU |
R4‑142891 | Test proposal for SU-MIMO UE demodulation requirement | Ericsson | imported from 3GU |
R4‑142892 | Test proposal for SU-MIMO UE CSI requirement | Ericsson | imported from 3GU |
R4‑142893 | Introduction of CA band combination Band 4 and Band 27 to TS 36.141 | NII Holdings | imported from 3GU |
R4‑142894 | Introduction of CA band combination Band 4 and Band 27 to TS 36.307 | NII Holdings | imported from 3GU |
R4‑142895 | Introduction of CA band combination Band 4 and Band 27 to TS 36.307 | NII Holdings | imported from 3GU |
R4‑142896 | Introduction of CA band combination Band 4 and Band 27 to TS 36.307 | NII Holdings | imported from 3GU |
R4‑142897 | TP for TR 36.833-1-27 updates for RRM and Demod | NII Holdings | imported from 3GU |
R4‑142898 | Discussion on verification test for receiver type for SU-MIMO | Ericsson | imported from 3GU |
R4‑142899 | TR 36.833-1-42 v0.2.0: LTE-A intra-band contiguous CA in Band 42 | CATT | imported from 3GU |
R4‑142900 | CR on separating CA UE demodulation tests from single carrier tests in Rel-10 | Ericsson, Rohde & Schwarz | imported from 3GU |
R4‑142901 | CR on separating CA UE demodulation tests from single carrier tests in Rel-11 | Ericsson, Rohde & Schwarz | imported from 3GU |
R4‑142902 | TP for 36.833-1-42: Task description | CATT | imported from 3GU |
R4‑142903 | Introduction of intra-band CA_Band 42C to TS 36.104 | CATT | imported from 3GU |
R4‑142904 | Introduction of intra-band CA_Band 42C to TS 36.141 | CATT | imported from 3GU |
R4‑142905 | Introduction of CA_42C to TS 36.307 | CATT | imported from 3GU |
R4‑142906 | Introduction of CA_42C to TS 36.307 | CATT | imported from 3GU |
R4‑142907 | Introduction of CA_42C to TS 36.307 | CATT | imported from 3GU |
R4‑142908 | introduction of MB requirements to 25.142 | CATT, ZTE | imported from 3GU |
R4‑142909 | UE transmitter requirements related to CA_Band 42C | CATT | imported from 3GU |
R4‑142910 | CR on separating CA UE demodulation tests from single carrier tests in Rel-12 | Ericsson, Rohde & Schwarz | imported from 3GU |
R4‑142911 | Test proposal for DL intra-band contiguous CA with minimum channel spacing | Ericsson | imported from 3GU |
R4‑142912 | Way forward on UE demodulation performance tests with minimum channel spacing in Rel-12 | Ericsson | imported from 3GU |
R4‑142913 | Way forward on UE demodulation performance tests with minimum channel spacing in Rel-12 | Ericsson | imported from 3GU |
R4‑142914 | 4 CRS AP and mixed 2 and 4 CRS AP for NAICS | Ericsson | imported from 3GU |
R4‑142915 | Mixed TM between CRS-based and DMRS based TM for NAICS | Ericsson | imported from 3GU |
R4‑142916 | Proposal on interference model for NAICS | Ericsson | imported from 3GU |
R4‑142917 | CR on correction on CA capability in Rel-10 | Ericsson | imported from 3GU |
R4‑142918 | TS 36.112 Section 4 Discussion and Text Proposal | TruePosition | imported from 3GU |
R4‑142919 | TS 36.112 Section 7 Text Proposal | TruePosition | imported from 3GU |
R4‑142920 | TS 36.112 Section 8 Text Proposal | TruePosition | imported from 3GU |
R4‑142921 | TS 36.112 Annex A Text Proposal | TruePosition | imported from 3GU |
R4‑142922 | TS 36.112 Draft Document | TruePosition | imported from 3GU |
R4‑142923 | Number of D2D broadcast transmissions | Motorola Solutions | imported from 3GU |
R4‑142924 | Editorial cleanup and completion of annexes in TS 36.111 | TruePosition | imported from 3GU |
R4‑142925 | Way forward for MPR and A-MPR versioning | Qualcomm Incorporated | imported from 3GU |
R4‑142926 | Designation of UL and DL CA classes and configurations | Qualcomm Incorporated | imported from 3GU |
R4‑142927 | Out of band emissions for Band 28 | Qualcomm Incorporated | imported from 3GU |
R4‑142928 | Minimum sub-block gap size and related clarifications for NC intra-band CA receiver specifications | Qualcomm Incorporated | imported from 3GU |
R4‑142929 | Correction on minimum sub-block gap size and related clarifications for NC intra-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑142930 | Correction on minimum sub-block gap size and related clarifications for NC intra-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑142931 | Background to test configuration for intra-band contiguous CA power control | Ericsson | imported from 3GU |
R4‑142932 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson, Anritsu, Qualcomm Incorporated, Rohde & Schwarz | imported from 3GU |
R4‑142933 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson, Anritsu, Qualcomm Incorporated, Rohde & Schwarz | imported from 3GU |
R4‑142934 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson, Anritsu, Qualcomm Incorporated, Rohde & Schwarz | imported from 3GU |
R4‑142935 | Behaviour of early UEs not indicating 'modified MPR behavior' in their UE capability | Ericsson | imported from 3GU |
R4‑142936 | Bitmap definition with mandatory changes in the open release | Ericsson | imported from 3GU |
R4‑142937 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑142938 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑142939 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑142940 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑142941 | Draft response LS on indication of modified UE power reduction capability in an earlier release | Ericsson | imported from 3GU |
R4‑142942 | NS_12 and NS_13 changes in the open release | Ericsson | imported from 3GU |
R4‑142943 | RB restrictions for UE(s) not supporting NS_12 modifications in later release | Ericsson | imported from 3GU |
R4‑142944 | Modifications for NS_12 and NS_13 | Ericsson | imported from 3GU |
R4‑142945 | TP for 36.851: Band 1 and Band 28 class A2 reference sensitivity | Qualcomm Incorporated | imported from 3GU |
R4‑142946 | UL power restrictions for Band XXVI | Ericsson | imported from 3GU |
R4‑142947 | TP for 36.851: B1+B3 reference sensitivity | Qualcomm Incorporated | imported from 3GU |
R4‑142948 | Band 4 and Band 12 class A2 reference sensitivity | Qualcomm Incorporated, T-Mobile US | imported from 3GU |
R4‑142949 | TP for 36.851: Band 7 and Band 8 class A2 reference sensitivity | Qualcomm Incorporated | imported from 3GU |
R4‑142950 | Maximum allowed UL TX power for Band XXVI coexistence with Public Safety | Ericsson | imported from 3GU |
R4‑142951 | Re-evaluation of class A2 reference architecture | Qualcomm Incorporated | imported from 3GU |
R4‑142952 | Addition of bandwidth combination sets for CA_2A-29A, CA_3A-5A, CA_4A-5A, CA_4A-12A, and CA_4A-29A into 36.101 | Qualcomm Incorporated | imported from 3GU |
R4‑142953 | Addition of bandwidth combination sets for CA_3A-5A, CA_4A-5A, and CA_4A-12A into 36.307 | Qualcomm Incorporated | imported from 3GU |
R4‑142954 | Maximum allowed UL TX power for Band XXVI coexistence with Public Safety | Ericsson | imported from 3GU |
R4‑142955 | Addition of bandwidth combination sets for CA_3A-5A, CA_4A-5A, and CA_4A-12A into 36.307 | Qualcomm Incorporated | imported from 3GU |
R4‑142956 | UE RF considerations for B1+B41 | Qualcomm Incorporated | imported from 3GU |
R4‑142957 | On the test cases for intra-band non-contiguous aggregation (1 UL) | Ericsson | imported from 3GU |
R4‑142958 | UE architecture to support inter-band CA with 3.5 GHz bands | Qualcomm Incorporated | imported from 3GU |
R4‑142959 | TP for 36.860: 2UL inter-band CA impact to GNSS | Qualcomm Incorporated | imported from 3GU |
R4‑142960 | TP for 36.860: Update to 2UL inter-band CA bandwidth combinations sets | Qualcomm Incorporated | imported from 3GU |
R4‑142961 | Band plan for MSS 2 GHz | Qualcomm Incorporated | imported from 3GU |
R4‑142962 | Applicability of in-gap and out-of-gap measurements for intra-band NC CA | Ericsson | imported from 3GU |
R4‑142963 | Applicability of in-gap and out-of-gap measurements for intra-band NC CA | Ericsson | imported from 3GU |
R4‑142964 | Bandwidth combinations support for the 2DL fall-back | US Cellular, NSN | imported from 3GU |
R4‑142965 | Correction of test configurations for intra-band on-contiguous aggregation | Ericsson | imported from 3GU |
R4‑142966 | Draft LS on 3DL and support for the 2DL fall-back modes | Ericsson | imported from 3GU |
R4‑142967 | Correction of test configurations for intra-band non-contiguous aggregation | Ericsson | imported from 3GU |
R4‑142968 | Use of harmonic filters for class A2 UE requirements | Ericsson | imported from 3GU |
R4‑142969 | Clarification on CA bandwidth classes | Ericsson | imported from 3GU |
R4‑142970 | Clarification on CA bandwidth classes | Ericsson | imported from 3GU |
R4‑142971 | Avoiding restrictions for the Band 1 + Band 3 combination | Ericsson | imported from 3GU |
R4‑142972 | Clarification on CA bandwidth classes | Ericsson | imported from 3GU |
R4‑142973 | Clarification on UL and DL CA | Ericsson | imported from 3GU |
R4‑142974 | Clarification on UL and DL CA | Ericsson | imported from 3GU |
R4‑142975 | Clarification on UL and DL CA | Ericsson | imported from 3GU |
R4‑142976 | RF receiver requirements for uplink inter-band CA | Ericsson | imported from 3GU |
R4‑142977 | New BW combination sets handling | Ericsson | imported from 3GU |
R4‑142978 | UE RF requirments in the release independent specs | Ericsson, US Cellular | imported from 3GU |
R4‑142979 | Removal of Pcmax requirements for new feature UL inter-band CA in early release | Ericsson | imported from 3GU |
R4‑142980 | UE co-existence at 3.5GHz | Ericsson | imported from 3GU |
R4‑142981 | Removal of Pcmax requirements for new feature UL inter-band CA in early release | Ericsson | imported from 3GU |
R4‑142982 | UE co-existence | Ericsson | imported from 3GU |
R4‑142983 | TP on unwanted emission requirement for AAS | KDDI | imported from 3GU |
R4‑142984 | TP for TR 37.814: declaration levels related to regulatory requirements in Region 1 | NSN, Ericsson, Huawei | imported from 3GU |
R4‑142985 | Transmitter requirements for UEs supporting 3DL inter-band CA configurations (FDD) | Ericsson | imported from 3GU |
R4‑142986 | TP for TR 37.814:The frequency limits for OOBE outside 1452-1492 MHz for BS | Ericsson, Huawei, NSN | imported from 3GU |
R4‑142987 | TR 37.814: L-band for Supplemental Downlink in E-UTRA and UTRA | Ericsson, Orange | imported from 3GU |
R4‑142988 | Introduction of Band 32, XXXII | Ericsson, NSN, Huawei | imported from 3GU |
R4‑142989 | Introduction of requirements for 3DL inter-band carrier aggregation (FDD) | Ericsson | imported from 3GU |
R4‑142990 | Introduction of Band 32, XXXII | Ericsson, NSN, Huawei | imported from 3GU |
R4‑142991 | Introduction of Band 32, XXXII | Ericsson, NSN, Huawei | imported from 3GU |
R4‑142992 | Introduction of Band 20+32 CA | Ericsson, Orange | imported from 3GU |
R4‑142993 | Introduction of Band 20+32 CA | Ericsson, Orange | imported from 3GU |
R4‑142994 | TP for 36.853: UE requirements for intra-band contiguous CA in Band 12 | Ericsson | imported from 3GU |
R4‑142995 | Introduction of Band 20+32 CA | Ericsson, Orange | imported from 3GU |
R4‑142996 | TP for 36.853: UE requirements for band combinations with Band 30 | Ericsson | imported from 3GU |
R4‑142997 | Band arrangement for the 2GHz band | Ericsson | imported from 3GU |
R4‑142998 | TP for TR 36.861: BS co-existence between the 2GHz band and Band 1 | Ericsson | imported from 3GU |
R4‑142999 | Additional aggregate power control range for non-CA operation: allowed exceptions | Ericsson | imported from 3GU |
R4‑143000 | TP for TR 37.846: BS co-existence between the 2GHz band and Band 1 | Ericsson | imported from 3GU |
R4‑143001 | co-existence between the 2GHz band and Band 34 | Ericsson | imported from 3GU |
R4‑143002 | Introduction of additional requirement on additional power control range | Ericsson | imported from 3GU |
R4‑143003 | TP for TR 36.860: 2UL inter-band CA B2+B13 co-existence study | Intel Corporation, Verizon | imported from 3GU |
R4‑143004 | TP for TR 36.860: 2UL inter-band CA B4+B13 co-existence study | Intel Corporation, Verizon | imported from 3GU |
R4‑143005 | Filtering consideration for FDD-TDD joint operation | Intel Corporation | imported from 3GU |
R4‑143006 | Consideration and way forward on B1+B3 CA | Intel Corporation | imported from 3GU |
R4‑143007 | Justification of UTRA FDD Notebook TRP/TRS requirements proposal for bands I and VIII | Intel Corporation | imported from 3GU |
R4‑143008 | TP to TS37.144 on adding UTRA FDD Notebook TRP/TRS requirements for Bands I and VIII | Intel Corporation | imported from 3GU |
R4‑143009 | CA_B1_B3 UE considerations | MediaTek Inc. | imported from 3GU |
R4‑143010 | Rel 11 FeICIC TM9 Demodulation Test | Qualcomm Incorporated | imported from 3GU |
R4‑143011 | CA_B1_B3 UE considerations | MediaTek Inc. | imported from 3GU |
R4‑143012 | LC-MTC PDSCH demodulation simulation results | Intel Corporation | imported from 3GU |
R4‑143013 | Rel 11 FeICIC RI Test | Qualcomm Incorporated | imported from 3GU |
R4‑143014 | SU-MIMO Demodulation Aspects | Qualcomm Incorporated | imported from 3GU |
R4‑143015 | Further discussion on small measurement gap | Intel Corporation | imported from 3GU |
R4‑143016 | 2UL inter-band CA MSD test configurations | MediaTek Inc. | imported from 3GU |
R4‑143017 | SU-MIMO CSI Aspects | Qualcomm Incorporated | imported from 3GU |
R4‑143018 | Further discussion on increasing the minimum number of carriers for UE monitoring | Intel Corporation | imported from 3GU |
R4‑143019 | LC-MTC HD-FDD Aspects | Qualcomm Incorporated | imported from 3GU |
R4‑143020 | On indoor positioning accuracy | Intel Corporation | imported from 3GU |
R4‑143021 | CA_B2_B4 2UL IMD5 analysis | MediaTek Inc. | imported from 3GU |
R4‑143022 | CA_B2_B4 2UL IMD5 analysis | MediaTek Inc. | imported from 3GU |
R4‑143023 | Link simulation results for cell identification for low-cost MTC in TDD | Intel Corporation | imported from 3GU |
R4‑143024 | Link level simulation results on cell measurement for low-cost MTC in TDD | Intel Corporation | imported from 3GU |
R4‑143025 | TR 37.842: TP on AAS WI scope and objectives | ZTE, Tejet | imported from 3GU |
R4‑143026 | New WID: Support of 256QAM for High Power Base Stations | ZTE, Tejet | imported from 3GU |
R4‑143027 | RLM simulation results for low-cost MTC | Intel Corporation | imported from 3GU |
R4‑143028 | Discussion on SFN handling in the dual connectivity | Intel Corporation | imported from 3GU |
R4‑143029 | Discussion on maximum received timing difference for dual connectivity | Intel Corporation | imported from 3GU |
R4‑143030 | Further discussion on new RSRQ definition | Intel Corporation | imported from 3GU |
R4‑143031 | Discussion on RRM requirements under high Doppler | Intel Corporation | imported from 3GU |
R4‑143032 | Further discussion on tighten RSRP measurement accuracy requirements | Intel Corporation | imported from 3GU |
R4‑143033 | dTIB and dRIB for CA_1A-42A | NTT DOCOMO, INC. | imported from 3GU |
R4‑143034 | Discussion on NAICS interference semi-static parameters blind detection and signaling | Intel Corporation | imported from 3GU |
R4‑143035 | Pcmax definition for Dual connectivity | NTT DOCOMO, INC. | imported from 3GU |
R4‑143036 | Power imbalance level for additional requirement | NTT DOCOMO, INC. | imported from 3GU |
R4‑143037 | Discussion on NAICS receivers for CRS-based transmission modes | Intel Corporation | imported from 3GU |
R4‑143038 | Rx requirements for 2UL inter-band CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑143039 | Discussion on B1+28 inter-band CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑143040 | Discussion on NAICS receivers for DMRS-based transmission modes | Intel Corporation | imported from 3GU |
R4‑143041 | Draft LS on Rx requirements for 2UL inter-band CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑143042 | LTE TDD eIMTA impact on the UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑143043 | LTE TDD eIMTA PDSCH demodulation test setup | Intel Corporation | imported from 3GU |
R4‑143044 | CR on correction of downlink SDR tests with EPDCCH scheduling | Intel Corporation | imported from 3GU |
R4‑143045 | CR on correction of downlink SDR tests with EPDCCH scheduling | Intel Corporation | imported from 3GU |
R4‑143046 | Introduction of intra-band contiguous Carrier Aggregation in Band 42 to TS 36.104 | NTT DOCOMO, INC. | imported from 3GU |
R4‑143047 | On FeICIC RI test 1 requirement | Intel Corporation | imported from 3GU |
R4‑143048 | Introduction of intra-band contiguous Carrier Aggregation in Band 42 to TS 36.141 | NTT DOCOMO, INC. | imported from 3GU |
R4‑143049 | Simulation results of FeICIC TM9 test | Intel Corporation | imported from 3GU |
R4‑143050 | Simulation results of Rel-12 4Tx codebook PMI test | Intel Corporation | imported from 3GU |
R4‑143051 | Further discussion on feedback mode PUSCH 3-2 test | Intel Corporation | imported from 3GU |
R4‑143052 | Overview of UE performance requirements for low complexity UE | Ericsson | imported from 3GU |
R4‑143053 | Discussion on Rel-12 SU-MIMO advanced receiver | Intel Corporation | imported from 3GU |
R4‑143054 | Subframe scheduling for half-duplex FDD UE demodulation performance requirement | Ericsson | imported from 3GU |
R4‑143055 | Simulation result for single PMI test using Rel-12 MIMO codebook | Ericsson | imported from 3GU |
R4‑143056 | Simulation result for multiple PMI test using Rel-12 MIMO codebook | Ericsson | imported from 3GU |
R4‑143057 | Proposal on remaining receiver characteristics for dual uplink inter-band CA | ZTE | imported from 3GU |
R4‑143058 | Discussions on test setup for intra-band non-contiguous CA demodulation test with timing offset and power imbalance | Intel Corporation | imported from 3GU |
R4‑143059 | Discussion on PUSCH 3-2 test | Ericsson | imported from 3GU |
R4‑143060 | Text proposal for TR 36.860: Harmonics and IMD study for CA_4A-12A and CA_4A-17A | ZTE | imported from 3GU |
R4‑143061 | Text proposal for TR 36.860: Harmonics and IMD study for CA_1A-7A | ZTE | imported from 3GU |
R4‑143062 | Text proposal for TR 36.860: Harmonics and IMD study for CA_3A-20A and CA_3A-7A | ZTE | imported from 3GU |
R4‑143063 | E-UTRAN FDD Event triggered reporting on deactivating Scells and interruption probability (0.5%) without DRX for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑143064 | MSD in dual uplink inter-band CA class A4 | ZTE | imported from 3GU |
R4‑143065 | E-UTRAN TDD Event triggered reporting on deactivating Scells and interruption probability (0.5%) without DRX for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑143066 | E-UTRAN FDD RSTD measurement reporting in carrier aggregation for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑143067 | E-UTRAN TDD RSTD measurement reporting in carrier aggregation for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑143068 | Draft TR 36833-5-40 V0.1.0 | CMCC | imported from 3GU |
R4‑143069 | E-UTRAN FDD RSTD measurement accuracy in CA for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑143070 | E-UTRAN TDD RSTD measurement accuracy in CA for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑143071 | Simulation Assumptions for Studying D2D UE-to-UE Co-existence | Ericsson | imported from 3GU |
R4‑143072 | Views on Reference Receiver Selection for SU-MIMO | NTT DOCOMO, INC. | imported from 3GU |
R4‑143073 | Simulation Results for BW applicability in RSRP/RSRQ measurement accuracy in FeICIC | Huawei, HiSilicon | imported from 3GU |
R4‑143074 | Motivation of SU-MIMO Investigation in Multi-cell Scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑143075 | D2D Co-existence Simulation Results for Discovery | Ericsson | imported from 3GU |
R4‑143076 | Evaluation Results of SU-MIMO in Single-cell Scenario | NTT DOCOMO, INC. | imported from 3GU |
R4‑143077 | Study on Additional RI Requirement for SU-MIMO | NTT DOCOMO, INC. | imported from 3GU |
R4‑143078 | D2D Co-existence Simulation Results for Public Safety Communications | Ericsson | imported from 3GU |
R4‑143079 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R11 | Huawei, HiSilicon | imported from 3GU |
R4‑143080 | Views on Remaining Issues for NAICS Dynamic Parameters | NTT DOCOMO, INC. | imported from 3GU |
R4‑143081 | TP for TR 36833-5-40 on ACS and Maximum input level for unequal DL | CMCC | imported from 3GU |
R4‑143082 | Corrections on CA CQI tests | Intel Corporation, Broadcom | imported from 3GU |
R4‑143083 | Draft LS on D2D co-existence in adjacent bands | Ericsson | imported from 3GU |
R4‑143084 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143085 | Corrections on CA CQI tests | Intel Corporation, Broadcom | imported from 3GU |
R4‑143086 | Correction on LTE_CA_C_B39 | CMCC | imported from 3GU |
R4‑143087 | Impact of D2D In-band emissions on RF requirements | Ericsson | imported from 3GU |
R4‑143088 | Corrections on CA CQI tests | Intel Corporation, Broadcom | imported from 3GU |
R4‑143089 | Wayforward on TDD UL-DL configuration applicability in CA for R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143090 | Stability for initial frequency offsets in UE for D2D only mode | Ericsson | imported from 3GU |
R4‑143091 | Clarifications on TDD UL-DL configuration applicability for R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143092 | LS Response on D2D UE frequency stability | Ericsson | imported from 3GU |
R4‑143093 | UL configuration for sensitivity of TDD MTC UE | CMCC | imported from 3GU |
R4‑143094 | Considerations for Band1 and Band3 CA | China Telecom | imported from 3GU |
R4‑143095 | Proposal for minimum frequency gap between B1 UL and B3 DL for LTE Band1+3 CA | China Unicom | imported from 3GU |
R4‑143096 | Proposal for minimum frequency gap between B1 UL and B3 DL for LTE Band1+3 CA | China Unicom | imported from 3GU |
R4‑143097 | Preliminary discussion on CGI reading in CA test cases | Huawei, HiSilicon | imported from 3GU |
R4‑143098 | Impact of D2D on UE RF requirements | Ericsson | imported from 3GU |
R4‑143099 | Candidate Frequency bands for D2D requirements in Rel-12 | Ericsson | imported from 3GU |
R4‑143100 | REFSENS for TDD MTC | CMCC | imported from 3GU |
R4‑143101 | Wayforward on CGI reading in CA test case list | Huawei, HiSilicon | imported from 3GU |
R4‑143102 | REFSENS for low cost MTC UE with HD-FDD | Ericsson | imported from 3GU |
R4‑143103 | UE Maximum input level for 256QAM | CMCC | imported from 3GU |
R4‑143104 | Implementation margin for RF requirements for a single receiver MTC UE | Ericsson | imported from 3GU |
R4‑143105 | 2UL for inter-band CA of band 39 and band 41 | CMCC | imported from 3GU |
R4‑143106 | Impact of MTC TBS on UE RF requirements | Ericsson | imported from 3GU |
R4‑143107 | Structure of requirements for MTC UEs | Ericsson | imported from 3GU |
R4‑143108 | Introduce RRM measurement requirements for eIMTA | Huawei, HiSilicon | imported from 3GU |
R4‑143109 | Simulation results for RSRP/RSRQ accuracy of 2 Cells under high Doppler | Huawei, HiSilicon | imported from 3GU |
R4‑143110 | Wayforward on RSRP/RSRQ requirements under high Doppler condition | Huawei, HiSilicon | imported from 3GU |
R4‑143111 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.307 (Rel-12) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143112 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.307 (Rel-11) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143113 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.307 (Rel-10) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143114 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.101 | NTT DOCOMO, INC. | imported from 3GU |
R4‑143115 | Further discussion on RF impact of UE Category 0 | CATT | imported from 3GU |
R4‑143116 | Hand effect of TRS for UMTS | NTT DOCOMO INC,. | imported from 3GU |
R4‑143117 | DL reference measurement channels for UE Category 0(TDD) | CATT | imported from 3GU |
R4‑143118 | Motivation for New WI: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 3 and Band 8 | CHTTL | imported from 3GU |
R4‑143119 | New WID: LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) of Band 3, Band 3 and Band 8 | CHTTL | imported from 3GU |
R4‑143120 | Introduce RSRP/RSRQ measurement accuracy requirements for 3DL CA | Huawei, HiSilicon, Alcatel-lucent | imported from 3GU |
R4‑143121 | Simulation Results for TDD Cell identification for LC-MTC | Huawei, HiSilicon | imported from 3GU |
R4‑143122 | Reference receiver evaluation for SU-MIMO enhancement | MediaTek Inc. | imported from 3GU |
R4‑143123 | Simulation Results for 1RX RLM for LC-MTC | Huawei, HiSilicon | imported from 3GU |
R4‑143124 | Introduction of CA_B42C (2DL/1UL) into TS 36.307 (Rel-12) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143125 | Wayforward on RLM requirements for LC-MTC | Huawei, HiSilicon | imported from 3GU |
R4‑143126 | TM9 feICIC test evaluation | MediaTek Inc. | imported from 3GU |
R4‑143127 | Introduction of CA_B42C (2DL/1UL) into TS 36.307 (Rel-11) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143128 | Inter frequency measurements using autonomous gaps | CATT | imported from 3GU |
R4‑143129 | Introduction of CA_B42C (2DL/1UL) into TS 36.307 (Rel-10) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143130 | Draft TR 36.855 v0.5.0 Feasibility of positioning enhancements for E-UTRA (2014-05) | Huawei, HiSilicon | imported from 3GU |
R4‑143131 | RSRP/RSRQ evaluation results for LC-MTC UE | MediaTek Inc. | imported from 3GU |
R4‑143132 | Introduction of CA_B42C (2DL/2UL) into TS 36.307 (Rel-12) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143133 | Further discussion on RRM requirements for TDD eIMTA scenario | CATT | imported from 3GU |
R4‑143134 | TP on TR36.855 eCID enhancement in non-collocated serving cell scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑143135 | Introduction of CA_B42C (2DL/2UL) into TS 36.307 (Rel-11) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143136 | Further discussion on positioning enhancement solutions in het-net scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑143137 | Introduction of CA_B42C (2DL/2UL) into TS 36.307 (Rel-10) | NTT DOCOMO, INC. | imported from 3GU |
R4‑143138 | Analysis of ideal RSRP/RSRQ definition in high Doppler fading channel | MediaTek Inc. | imported from 3GU |
R4‑143139 | Way forward on positioning enhancement in het-net scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑143140 | Discussion on UE performance requirement for TDD eIMTA | CATT | imported from 3GU |
R4‑143141 | Discussion on RSRP and RSRQ requirements under high Doppler | ZTE | imported from 3GU |
R4‑143142 | Further discussion on UE behaviour when max time difference on UL is reached | Huawei, HiSilicon | imported from 3GU |
R4‑143143 | Clarification on UE bahavior considering max transmit timing difference between TAGs r11 | Huawei, HiSilicon | imported from 3GU |
R4‑143144 | Clarification on UE bahavior considering max transmit timing difference between TAGs r12 | Huawei, HiSilicon | imported from 3GU |
R4‑143145 | LS on UE behaviour considering max transmit timing difference between TAGs | Huawei, HiSilicon | imported from 3GU |
R4‑143146 | Simulation results for FeICIC TM9 demodulation | ZTE | imported from 3GU |
R4‑143147 | Proposal of addition of new device types in TR 25.914 and TS 37.144 | Sporton International Inc. | imported from 3GU |
R4‑143148 | TP for TR36.851: Insertion Loss for TDD-FDD CA of Band 8 and Band 40 | KT | imported from 3GU |
R4‑143149 | SCE potential impacts on RAN4 RRM requirements | ZTE | imported from 3GU |
R4‑143150 | Evaluation of minimal channel spacing impact to the demodulation performance | MediaTek Inc. | imported from 3GU |
R4‑143151 | Link level simulation for RSRP/RSRQ measurement for TDD low-cost MTC | Huawei, HiSilicon | imported from 3GU |
R4‑143152 | SCE potential impacts on RAN4 demodulation requirements | ZTE | imported from 3GU |
R4‑143153 | Modification on EUTRA requirement considering increasing the minimum number of carriers | Huawei, HiSilicon | imported from 3GU |
R4‑143154 | Discussions on eDL-MIMO PMI tests | MediaTek Inc. | imported from 3GU |
R4‑143155 | Further discussion on requirements of synchronization accuracy between MeNB and SeNB | Huawei, HiSilicon | imported from 3GU |
R4‑143156 | View on RRM requirements for increasing number of layers | Samsung | imported from 3GU |
R4‑143157 | Test framework of UE performance requirement for TDD eIMTA | CATT | imported from 3GU |
R4‑143158 | Draft LS on requirements of synchronization accuracy between MeNB and SeNB | Huawei, HiSilicon | imported from 3GU |
R4‑143159 | Discussions on PUSCH 3-2 test | MediaTek Inc. | imported from 3GU |
R4‑143160 | Discussion on spurious emission requirement for BC2 for MB-MSR | Huawei | imported from 3GU |
R4‑143161 | RRM impact of dual connectivity features | Huawei, HiSilicon | imported from 3GU |
R4‑143162 | R-ML receiver in RI test | MediaTek Inc. | imported from 3GU |
R4‑143163 | Introduction of CA Band 8 and Band 40 to TS 36.101 | KT | imported from 3GU |
R4‑143164 | View on signalling of RSSI measurement for RSRQ | Samsung | imported from 3GU |
R4‑143165 | Methodology for studying ECID enhancement with RRH | Huawei, HiSilicon | imported from 3GU |
R4‑143166 | Correction on spurious emission requirement for BC2 for MB-MSR | Huawei | imported from 3GU |
R4‑143167 | Further discussion on UE RF impact of DC | CATT | imported from 3GU |
R4‑143168 | Link level simulation results for cell identification for LC-MTC | MediaTek Inc. | imported from 3GU |
R4‑143169 | Test case design for PMI tests in FeDL-MIMO | Samsung | imported from 3GU |
R4‑143170 | Simulation evaluation for ECID enhancement with RRH | Huawei, HiSilicon | imported from 3GU |
R4‑143171 | Discussion on PUSCH3-2 test for DL MIMO enhancement | ZTE | imported from 3GU |
R4‑143172 | Correction on spurious emission requirement for BC2 for MB-MSR | Huawei | imported from 3GU |
R4‑143173 | Introduction of LTE-Advanced CA of Band 8 and Band 40 into TS 36.104 | KT | imported from 3GU |
R4‑143174 | Test case design for PUSCH3-2 CQI test in FeDL-MIMO | Samsung | imported from 3GU |
R4‑143175 | TP on Switching time impact on RF core requirement | Huawei | imported from 3GU |
R4‑143176 | Discussion on SFN timing difference in dual connectivity | Huawei, HiSilicon | imported from 3GU |
R4‑143177 | Initial simulation results for DL MIMO enhancement PMI test | ZTE | imported from 3GU |
R4‑143178 | Increasing minimum number of carriers E-UTRA UE can monitor | CATT | imported from 3GU |
R4‑143179 | Simulation results for TM9 FeICIC test | Samsung | imported from 3GU |
R4‑143180 | Some general considerations for dual connectivity | Huawei | imported from 3GU |
R4‑143181 | Simulation results of RSRP and RSRQ for high Doppler case | LG Electronics | imported from 3GU |
R4‑143182 | TP on UL reference measurement channel for MTC UE | Huawei | imported from 3GU |
R4‑143183 | Draft LS on response SFN handling issue in dual connectivity | Huawei, HiSilicon | imported from 3GU |
R4‑143184 | FRC for DL MIMO enahncement PMI requirements | ZTE | imported from 3GU |
R4‑143185 | DL CA test with minimum channel spacing in Rel-12 | Samsung | imported from 3GU |
R4‑143186 | RAN4 RF impacts of dual connectivity | Huawei | imported from 3GU |
R4‑143187 | Further discussion on DL reference measurement channel for FDD MTC UE | Huawei | imported from 3GU |
R4‑143188 | Demodulation performance of enhanced SU-MIMO UE receivers | NVIDIA | imported from 3GU |
R4‑143189 | Increased UE carrier monitoring in idle mode | Ericsson | imported from 3GU |
R4‑143190 | Draft TR 36.855 v0.4.0 Feasibility of positioning enhancements for E-UTRA (2014-05) | Huawei, HiSilicon | imported from 3GU |
R4‑143191 | Simulation results for FeICIC RI test 1 | Samsung | imported from 3GU |
R4‑143192 | TR 36.860 v0.8.0 Dual uplink inter-band CA (2014-04) | Huawei | imported from 3GU |
R4‑143193 | The power imbalance level of intra-band NC 2DL CA and the test configuration | Huawei, Hisilicon | imported from 3GU |
R4‑143194 | Discussion on reference measurement channel for TDD MTC UE | Huawei | imported from 3GU |
R4‑143195 | Introduction of LTE-Advanced CA of Band 8 and Band 40 into TS 36.141 | KT | imported from 3GU |
R4‑143196 | Further discussion on RRM requirements for LTE_UTRA_IncMon-Core for E-UTRA | CATT | imported from 3GU |
R4‑143197 | Analysis of ideal RSRP/RSRQ definition in high Doppler fading channel | MediaTek Inc. | imported from 3GU |
R4‑143198 | CR to TS 36 101 on modifing of CA BW class D requirements | Samsung | imported from 3GU |
R4‑143199 | Remaining aspects of higher-layer signaling for NAICS | NVIDIA | imported from 3GU |
R4‑143200 | TR 36.860 V0.8.0: Update of harmonic and IMD tables | Huawei | imported from 3GU |
R4‑143201 | CR for TS 36.101 on introduction CA_40D | CMCC | imported from 3GU |
R4‑143202 | Discussion on semi-static parameters for NAICS receiver | LG Electronics | imported from 3GU |
R4‑143203 | Consideration of the additional insertion loss for TDD/FDD CA | Huawei, Hisilicon | imported from 3GU |
R4‑143204 | RRM requirements for LTE_UTRA_IncMon-Core for E-UTRA in idle state | CATT | imported from 3GU |
R4‑143205 | CR to TS 36 101 on introduction of non-con CA requirements | Samsung | imported from 3GU |
R4‑143206 | Further results on blind detection of dynamic interference parameters | NVIDIA | imported from 3GU |
R4‑143207 | Blind detection under CRS based transmission mode | LG Electronics | imported from 3GU |
R4‑143208 | Further consideration of TDD inter-band CA B41+B42 | Huawei | imported from 3GU |
R4‑143209 | Consideration on radiated output power requirement | CATT | imported from 3GU |
R4‑143210 | Simulation results for interference cancellation under SU-MIMO | LG Electronics | imported from 3GU |
R4‑143211 | RRM requirements for LTE_UTRA_IncMon-Core for E-UTRA in RRC connected state | CATT | imported from 3GU |
R4‑143212 | Additional insertion loss for LTE_CA_B1_B3 | KT | imported from 3GU |
R4‑143213 | Draft CR for TDD inter-band CA B41+B42 | Huawei | imported from 3GU |
R4‑143214 | BS output power definitions and testing | Ericsson | imported from 3GU |
R4‑143215 | Simulation results for single and multiple PMI test on new 4 Tx codebook | LG Electronics | imported from 3GU |
R4‑143216 | Measurement requirements for MBSFN RSRP_RSRQ | CATT | imported from 3GU |
R4‑143217 | Increased UE carrier monitoring in RRC connected states | Ericsson | imported from 3GU |
R4‑143218 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143219 | Simulation results for PUSCH 3-2 reporting mode | LG Electronics | imported from 3GU |
R4‑143220 | TP for higher order IMD impacts for 2ULs CA_1A-5A UE | LG Electronics | imported from 3GU |
R4‑143221 | On UE receiver image rejection requirement | Huawei, Hisilicon | imported from 3GU |
R4‑143222 | Consideration on radiated output power requirement | CATT | imported from 3GU |
R4‑143223 | TP on reference sensitivity for MTC UE | Huawei | imported from 3GU |
R4‑143224 | Details of increased carrier monitoring specific to UTRA | Ericsson | imported from 3GU |
R4‑143225 | Introduction of Band 32, XXXII | Ericsson | imported from 3GU |
R4‑143226 | BS output power definitions and testing | Ericsson | imported from 3GU |
R4‑143227 | TP for self-desense analysis for CA_5A-7A UE | LG Electronics | imported from 3GU |
R4‑143228 | TP for TR 36.853: Additional insertion loss for LTE_CA_B1_B3_B8 | KT | imported from 3GU |
R4‑143229 | CR for MBSFN RSRP,RSRQ measurement requirements | CATT | imported from 3GU |
R4‑143230 | CR for BS requirements for 256QAM | Huawei | imported from 3GU |
R4‑143231 | Consideration on radiated output power requirement | CATT | imported from 3GU |
R4‑143232 | Way forward on 4CRS APs support | Ericsson | imported from 3GU |
R4‑143233 | REFSENS for LTE_CA_NC_B25_BW | Huawei, Hisilicon | imported from 3GU |
R4‑143234 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143235 | BS output power definitions and testing | Ericsson, Huawei, NSN | imported from 3GU |
R4‑143236 | Discussion on BS testing for 256QAM requirements | Huawei | imported from 3GU |
R4‑143237 | Requirements for increased carrier monitoring 25.133 | Ericsson | imported from 3GU |
R4‑143238 | TP for TR 36.853: Channel bandwidth for LTE_CA_B1_B3_B8 | KT | imported from 3GU |
R4‑143239 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143240 | SCell activation and deactivation delay test case for unknown SCell R10 | Huawei, HiSilicon | imported from 3GU |
R4‑143241 | Way forward on NAICS functionality | Ericsson | imported from 3GU |
R4‑143242 | TR 36.833-2-42 V0.2.0 | Huawei, Hisilicon | imported from 3GU |
R4‑143243 | On declaration of GSM single-RAT operation | Huawei | imported from 3GU |
R4‑143244 | Details of increased carrier monitoring specific to E-UTRA | Ericsson | imported from 3GU |
R4‑143245 | SCell activation and deactivation delay test case for unknown SCell R11 | Huawei, HiSilicon | imported from 3GU |
R4‑143246 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143247 | SCell activation and deactivation delay test case for unknown SCell R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143248 | Declaration of GSM single-RAT operation | Huawei | imported from 3GU |
R4‑143249 | Requirements for increased carrier monitoring 36.133 | Ericsson | imported from 3GU |
R4‑143250 | Way forward on fall back performance | Ericsson | imported from 3GU |
R4‑143251 | B42 and B43 UE co-existence | TeliaSonera, Telefonica, Deutsche Telekom | imported from 3GU |
R4‑143252 | Preliminary analysis on the RRM impacts of small cell enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑143253 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143254 | Declaration of GSM single-RAT operation | Huawei | imported from 3GU |
R4‑143255 | Discussion on RRM requirements for Dual Connectivity | CATT | imported from 3GU |
R4‑143256 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143257 | Discussion on MBMS measurement requirements | Huawei, HiSilicon | imported from 3GU |
R4‑143258 | Discussion on Conducted requirements | CMCC | imported from 3GU |
R4‑143259 | Further UE RF analysis for B1+B3 and the methodology to define the requirements | Huawei, Hisilicon | imported from 3GU |
R4‑143260 | Declaration of GSM single-RAT operation | Huawei | imported from 3GU |
R4‑143261 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143262 | Performance of 2 cells RSRP/RSRQ Measurement in High Doppler Conditions | CATT | imported from 3GU |
R4‑143263 | Further agreements on increased carrier monitoring | Ericsson | imported from 3GU |
R4‑143264 | RSTD simulation evaluation for fading channels | Huawei, HiSilicon | imported from 3GU |
R4‑143265 | Measurements for Radiated RF Receiver Performance of Wireless Devices Supported A-BDS | CATR | imported from 3GU |
R4‑143266 | Introduction of test cases for 5MHz +5MHz : Event triggered reporting on deactivating Scells in non-DRX FDD and TDD | Ericsson | imported from 3GU |
R4‑143267 | CR on PDSCH transmission for eICIC CSI requirements (Rel-11) | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑143268 | Correction for RSTD Measurement Accuracy in CA in RRM tests R10 | Huawei, HiSilicon | imported from 3GU |
R4‑143269 | Introduction of test cases for 5MHz +5MHz : RSTD Measurement Reporting Test Case | Ericsson | imported from 3GU |
R4‑143270 | View on 3DL combination and 2DL fallback modes for 3DL intra-band non-contiguous CA | Samsung | imported from 3GU |
R4‑143271 | Correction for RSTD Measurement Accuracy in CA in RRM tests R11 | Huawei, HiSilicon | imported from 3GU |
R4‑143272 | Introduction of test cases for 5MHz +5MHz : RSTD Measurement Accuracy in Carrier Aggregation for 5 + 5MHz bandwidth | Ericsson | imported from 3GU |
R4‑143273 | Correction for RSTD Measurement Accuracy in CA in RRM tests R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143274 | RSRP and RSRQ simulation results for high Doppler condition in two-cell scenario | Samsung | imported from 3GU |
R4‑143275 | Correction to PCI configuration conditions in FeICIC tests R11 | Huawei, HiSilicon | imported from 3GU |
R4‑143276 | Introduction of test cases for 5MHz +5MHz : E-UTRA event triggered reporting on deactivated SCell with PCell interruption in non-DRX | Ericsson | imported from 3GU |
R4‑143277 | Further discussion on B42 and B43 UE-UE coexistence | CMCC | imported from 3GU |
R4‑143278 | RSRP and RSRQ simulation results for TDD low-cost MTC | Samsung | imported from 3GU |
R4‑143279 | Increasing RSRQ value range in RRC connected state | Ericsson | imported from 3GU |
R4‑143280 | Proposal for newly agreed RRM test cases section numbering in R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143281 | Correction to PCI configuration conditions in FeICIC tests R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143282 | Simulation results for MBSFN RSRP/RSRQ | Samsung | imported from 3GU |
R4‑143283 | Remove the brackets of SNR values in FeICIC RLM tests R11 | Huawei, HiSilicon | imported from 3GU |
R4‑143284 | Remove the brackets of SNR values in FeICIC RLM tests R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143285 | Requirements for GSM measurements in cell FACH state with DRX | Ericsson | imported from 3GU |
R4‑143286 | EMC testing of multi-band operation for MSR BS | Ericsson, NSN | imported from 3GU |
R4‑143287 | UL configuration for REFSENS on CA_25A-25A considering additional bandwidth combinations | Samsung | imported from 3GU |
R4‑143288 | Introduction of CA_2A-2A into TS 36.101 | Ericsson | imported from 3GU |
R4‑143289 | Discussion on tighten legacy RSRP/RSRQ requirements | Huawei, HiSilicon | imported from 3GU |
R4‑143290 | Requirements for GSM measurements in cell FACH state with DRX | Ericsson | imported from 3GU |
R4‑143291 | Editorial correction for band 31 in 36.133 | Huawei, HiSilicon | imported from 3GU |
R4‑143292 | EMC testing of multi-band operation for MSR BS | Ericsson, NSN | imported from 3GU |
R4‑143293 | Preliminary discussion on introducing 3D positioning to 3GPP | Huawei, HiSilicon | imported from 3GU |
R4‑143294 | Considerations on test parameters of PUSCH for LTE coverage enhancements | Samsung | imported from 3GU |
R4‑143295 | Revised SI: Positioning enhancement for E-UTRA | Huawei, HiSilicon | imported from 3GU |
R4‑143296 | UTRA BHH Fail rate study | Nokia Corporation, Microsoft Corporation | imported from 3GU |
R4‑143297 | RRM requirements for extended DRX cycles | Ericsson | imported from 3GU |
R4‑143298 | Introduction of CA_2A-2A in TS36.104 | Ericsson | imported from 3GU |
R4‑143299 | EMC testing of multi-band operation for LTE BS | Ericsson, NSN | imported from 3GU |
R4‑143300 | Clean up the correction on PDSCH allocation in PRS subframe R10 | Huawei, HiSilicon | imported from 3GU |
R4‑143301 | Requirements for increased monitoring carriers | NTT DOCOMO | imported from 3GU |
R4‑143302 | Clean up the correction on PDSCH allocation in PRS subframe R11 | Huawei, HiSilicon | imported from 3GU |
R4‑143303 | Clean up the correction on PDSCH allocation in PRS subframe R12 | Huawei, HiSilicon | imported from 3GU |
R4‑143304 | Parallel reporting criteria for intra-frequency and inter-frequency measurements | Ericsson | imported from 3GU |
R4‑143305 | RSRP and RSRQ simulation results for high Doppler condition in two-cell scenario | Samsung | imported from 3GU |
R4‑143306 | EMC testing of multi-band operation for LTE BS | Ericsson, NSN | imported from 3GU |
R4‑143307 | Requirement proposal for UTRA BHH position for TRP for bands I, II, V, VIII and XIX | Nokia Corporation, NTT DOCOMO, Microsoft Corporati | imported from 3GU |
R4‑143308 | Reference sensitivity for 25A-25A | Nokia Corporation | imported from 3GU |
R4‑143309 | CR on PDSCH transmission for eICIC CSI requirements (Rel-12) | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑143310 | Parallel reporting criteria for intra-frequency and inter-frequency measurements | Ericsson | imported from 3GU |
R4‑143311 | Study of additional loss from hand phantom in besides the head and hand position in TRS tests | Nokia Corporation, Microsoft Corporation | imported from 3GU |
R4‑143312 | Way forward on high Doppler RRM | NTT DOCOMO | imported from 3GU |
R4‑143313 | Requirement proposal for UTRA BHH position for TRS for bands I, II, V, VIII and XIX | Nokia Corporation, NTT DOCOMO and Microsoft Corpor | imported from 3GU |
R4‑143314 | Introduction of CA_2A-2A in TS36.141 | Ericsson | imported from 3GU |
R4‑143315 | Further simulations on the network impact of EIRP accuracy | Ericsson | imported from 3GU |
R4‑143316 | Study of additional loss from hand phantom in besides the head and hand position in TRS tests | Nokia Corporation, Microsoft Corporation | imported from 3GU |
R4‑143317 | CR on PDSCH transmission for eICIC CSI requirements (Rel-10) | Huawei, HiSilicon, Anritsu | imported from 3GU |
R4‑143318 | Study of additional loss from hand phantom in besides the head and hand position in TRS tests | Nokia Corporation, Microsoft Corporation | imported from 3GU |
R4‑143319 | Measurement accuracy in high Doppler conditions with 2 cells | Ericsson | imported from 3GU |
R4‑143320 | Discussion on small gap | NTT DOCOMO | imported from 3GU |
R4‑143321 | On blind detection of CFI | Samsung | imported from 3GU |
R4‑143322 | Simulations on the impact of gain/phase coherency imapact on EIRP and sidelobe supression variation | Ericsson | imported from 3GU |
R4‑143323 | Study on CA_1A-3A | Nokia Corporation | imported from 3GU |
R4‑143324 | Study of additional loss from hand phantom in besides the head and hand position in TRS tests | Nokia Corporation, Microsoft Corporation | imported from 3GU |
R4‑143325 | Introduction of CA_2A-2A to TS 36.307 Rel-11 | Ericsson | imported from 3GU |
R4‑143326 | Measurement accuracy in high Doppler conditions | Ericsson | imported from 3GU |
R4‑143327 | [Draft] LS out on small gap | NTT DOCOMO | imported from 3GU |
R4‑143328 | Updated Performance of single cell RSRP/RSRQ Measurement in High Doppler Conditions | CATT | imported from 3GU |
R4‑143329 | Introduction of CA_2A-2A to TS 36.307 Rel-12 | Ericsson | imported from 3GU |
R4‑143330 | Considerations on test parameters of PUSCH for LTE coverage enhancements | Samsung | imported from 3GU |
R4‑143331 | Test parameters for UL VoIP with enhanced TTI bundling | China Telecom | imported from 3GU |
R4‑143332 | On conducted requirements | Ericsson | imported from 3GU |
R4‑143333 | Band 28 new emission requirement study | Nokia Corporation | imported from 3GU |
R4‑143334 | Simulation results on D2D and LTE WAN UE coexistence in public safety | Coolpad | imported from 3GU |
R4‑143335 | Considerations on test parameters of PUSCH for LTE coverage enhancements | Samsung | imported from 3GU |
R4‑143336 | RRM requirements for dual connectivity | NTT DOCOMO | imported from 3GU |
R4‑143337 | Receiver desensitization with inter-PA IMD | Nokia Corporation | imported from 3GU |
R4‑143338 | AAS specification structure | Ericsson | imported from 3GU |
R4‑143339 | On antenna connector isolation and reverse intermodulation | Ericsson | imported from 3GU |
R4‑143340 | Test parameters for UL VoIP with enhanced TTI bundling | China Telecom | imported from 3GU |
R4‑143341 | CA_7C A-MPR corrections | Nokia Corporation | imported from 3GU |
R4‑143342 | Discussion on higher layer signalling and blind detection in NAICS | Nokia Corporation, NSN | imported from 3GU |
R4‑143343 | REFSENS on 2UL intra-band NC CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑143344 | Introduction of PMI reporting requirements for DL MIMO enhancement | ZTE | imported from 3GU |
R4‑143345 | contiguous intraband CA UL allocation in REFSENS tests | Nokia Corporation | imported from 3GU |
R4‑143346 | CA_7C A-MPR corrections | Nokia Corporation | imported from 3GU |
R4‑143347 | On radiated receiver sensitivity requirement body text for AAS RF core specification | Ericsson | imported from 3GU |
R4‑143348 | On blind detection feasibility of parameter combination for CRS-based TM | Samsung | imported from 3GU |
R4‑143349 | Preliminary Link level simulation results for TM9 in FeICIC | Ericsson | imported from 3GU |
R4‑143350 | A-MPR for CA_41C | Nokia Corporation | imported from 3GU |
R4‑143351 | 2 GHz Band Plan for Region 1 | DISH Network, Solaris Mobile Ltd | imported from 3GU |
R4‑143352 | Introduction of operating band 32 and CA band 20+32 in TS36.104 | NSN, Ericsson, Huawei | imported from 3GU |
R4‑143353 | Simulation assumptions for UL VoIP with enhanced TTI bundling | China Telecom | imported from 3GU |
R4‑143354 | Introduction of 4Tx beam steering model | ZTE | imported from 3GU |
R4‑143355 | B42/43 UE-to-UE co-existence considerations | Nokia Corporation | imported from 3GU |
R4‑143356 | On blind detection feasibility of parameter combination for DMRS-based TM | Samsung | imported from 3GU |
R4‑143357 | Link level simulation results for RI under FeICIC setup | Ericsson | imported from 3GU |
R4‑143358 | Introduction of operating band 32 and CA band 20+32 in TS36.141 | NSN, Ericsson, Huawei | imported from 3GU |
R4‑143359 | Blind detection of interference parameters for CRS-based interference | Nokia Corporation, NSN | imported from 3GU |
R4‑143360 | Simulation results for SU-MIMO advanced receivers | CMCC | imported from 3GU |
R4‑143361 | On radiated transmit power requirement for AAS base stations | Ericsson | imported from 3GU |
R4‑143362 | Draft WID: Performance requirements of MMSE-IRC receiver for LTE BS | China Telecom | imported from 3GU |
R4‑143363 | Performance Evaluation of advanced SU-MIMO receiver | Samsung | imported from 3GU |
R4‑143364 | Further Discussion on demodulation test setup for eIMTA | Ericsson | imported from 3GU |
R4‑143365 | Dual uplink inter-band CA intermodulation | Broadcom Corporation | imported from 3GU |
R4‑143366 | Introduction of Band 32 in TS 36.113 | NSN, Ericsson, Huawei | imported from 3GU |
R4‑143367 | CR for TS36.101 CSI RMC table | ZTE | imported from 3GU |
R4‑143368 | Draft WID: 2 GHz Band for Region 1 | DISH Network, Solaris Mobile Ltd | imported from 3GU |
R4‑143369 | Simulation results for SU-MIMO advanced receivers | CMCC | imported from 3GU |
R4‑143370 | LS on CRs for MSR specifications | Ericsson | imported from 3GU |
R4‑143371 | Discussion on BS demodulation test parameters for FDD LTE coverage enhancements | ZTE | imported from 3GU |
R4‑143372 | Performance of advanced receivers for single cell SU-MIMO | Nokia Corporation, NSN | imported from 3GU |
R4‑143373 | CA_7C A-MPR corrections | Nokia Corporation | imported from 3GU |
R4‑143374 | CR on interrupts for inter-frequency measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑143375 | Inter-PA IMD measurement results | Nokia Corporation | imported from 3GU |
R4‑143376 | Pcmax definition principles for Dual Connectivity | InterDigital | imported from 3GU |
R4‑143377 | Simulation results for SU-MIMO advanced receivers | CMCC | imported from 3GU |
R4‑143378 | Simulation results for 1 Rx for RSRP/RSRQ measurements | Ericsson | imported from 3GU |
R4‑143379 | Link level simulation results for RLM for Low Cost MTC UE | Ericsson | imported from 3GU |
R4‑143380 | TP Declaration of Beams and EIRP requirements for AAS BS TR | NEC | imported from 3GU |
R4‑143381 | Introduction of a new CA_7C bandwidth combination set into 36.101 | Nokia Corporation | imported from 3GU |
R4‑143382 | TP on radiated receiver Requirements for AAS BS TR | NEC | imported from 3GU |
R4‑143383 | Replacement of Recommended and Minimum TRP/TRS requirements of TS37.144 to a single min requirement table | Sony Mobile Communications Japan Inc. | imported from 3GU |
R4‑143384 | Way forward on BS demodulation test parameters for FDD LTE coverage enhancements | ZTE | imported from 3GU |
R4‑143385 | New Work Item proposal: CRS Interference Mitigation for LTE Homogenous Deployments | Ericsson | imported from 3GU |
R4‑143386 | Discussion on MSR capability set | Huawei | imported from 3GU |
R4‑143387 | TP on Conducted Output power Requirements for AAS BS TR | NEC | imported from 3GU |
R4‑143388 | Simulation results for SU-MIMO advanced receivers | CMCC | imported from 3GU |
R4‑143389 | Enhancement of Measurement Gap Pattern | Alcatel-Lucent | imported from 3GU |
R4‑143390 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | imported from 3GU |
R4‑143391 | Introduction of CA band combination B1+B7 to TS 36.101 | LG Uplus | imported from 3GU |
R4‑143392 | Operating Band Unwanted Emission Requirement for AAS BS | NEC | imported from 3GU |
R4‑143393 | On radiated receiver sensitivity requirement for AAS base stations | Ericsson | imported from 3GU |
R4‑143394 | RLM parameters setup for low cost MTC with 1 Rx | Ericsson | imported from 3GU |
R4‑143395 | TP for TR 36.835: Specific BS RF requirements for LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) | Alcatel-Lucent | imported from 3GU |
R4‑143396 | Simulation results for 1 Rx for cell search | Ericsson | imported from 3GU |
R4‑143397 | Correction of UEM for Medium Range and Local Area BS | Ericsson | imported from 3GU |
R4‑143398 | Analysis on class A2 CA band combinations | Broadcom Corporation | imported from 3GU |
R4‑143399 | Harmonics and intermodulation products analysis for LTE_CA_B1_B5_B7 | Huawei | imported from 3GU |
R4‑143400 | TP for TR 36.833-2-02: Essential TP information for LTE Advanced intra band non-contiguous Carrier Aggregation (CA) in Band 2 | Ericsson | imported from 3GU |
R4‑143401 | Simulation results for SU-MIMO advanced receivers | CMCC | imported from 3GU |
R4‑143402 | Draft Reply LS on SFN handling in the dual connectivity | Qualcomm Incorporated | imported from 3GU |
R4‑143403 | Introduction of 3DLs CA band combination of Band1 +5 + 7 to TS 36.101(Rel12) | LG Uplus | imported from 3GU |
R4‑143404 | Testing for multi-band BS capable of operation in three or more bands | Alcatel-Lucent | imported from 3GU |
R4‑143405 | Transmitter Intermodulation Requirement for AAS BS | NEC | imported from 3GU |
R4‑143406 | On relation between core and test requirement | Ericsson | imported from 3GU |
R4‑143407 | Correction of UEM for Medium Range and Local Area BS | Ericsson | imported from 3GU |
R4‑143408 | Simulation results for SU-MIMO advanced receivers | CMCC | imported from 3GU |
R4‑143409 | LTE carrier aggregation of Band 1, Band 5 and Band 7 is introduced to TS36.101 (Rel 12) | LG Uplus | imported from 3GU |
R4‑143410 | On new capability sets without GSM single RAT | Ericsson | imported from 3GU |
R4‑143411 | TP for TR 36.833-2-02: REFSENS relaxations requirement for LTE Advanced intra band non-contiguous Carrier Aggregation (CA) in Band 2 | Ericsson | imported from 3GU |
R4‑143412 | CR for TS36.101 CSI RMC table | ZTE | imported from 3GU |
R4‑143413 | FCC AWS-3 Rules and Order Discussion | DISH Network | imported from 3GU |
R4‑143414 | CA relaxations | Broadcom Corporation | imported from 3GU |
R4‑143415 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | imported from 3GU |
R4‑143416 | AAS TR 37.842 Ver 0.2.0 | Rapporteur | imported from 3GU |
R4‑143417 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143418 | Transmitter Spurious Emission for AAS BS | NEC | imported from 3GU |
R4‑143419 | Introduction of CA band combination B1+B3+B8 to TS 36.101 | KT | imported from 3GU |
R4‑143420 | TP for TR 36.853: 3DL CA BS Impact | Ericsson | imported from 3GU |
R4‑143421 | Introduction of 3DLs CA band combination of Band1 +5 + 7 to TS 36.104 (Rel 12) | LG Uplus | imported from 3GU |
R4‑143422 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | imported from 3GU |
R4‑143423 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143424 | Impact of Rel-10 PCell interruption on system performance | NSN, Nokia Corporation | imported from 3GU |
R4‑143425 | TP for TR36.833-5-41: Specific RRM requirements for LTE Advanced Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑143426 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143427 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | imported from 3GU |
R4‑143428 | Correction of UEM for Medium Range and Local Area BS | Ericsson | imported from 3GU |
R4‑143429 | PRS Signal Levels in RSTD Reporting Tests with Fading Channels | Qualcomm Incorporated | imported from 3GU |
R4‑143430 | Different TDD configurations in CA | Ericsson | imported from 3GU |
R4‑143431 | TP for TR 37.842: Editorial clean-up of text in section 7.1 | Ericsson | imported from 3GU |
R4‑143432 | Requirements for increasing number of E-UTRAN carriers " Idle mode | Nokia Corporation, NSN | imported from 3GU |
R4‑143433 | CA TDD+FDD BS Impact | Ericsson | imported from 3GU |
R4‑143434 | Correction on the definition for High speed train scenarios | CATT | imported from 3GU |
R4‑143435 | Discussion on methodology of performance requirements for 3DL CA | CMCC | imported from 3GU |
R4‑143436 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143437 | Requirements for increasing number of E-UTRAN carriers " Connected mode | Nokia Corporation, NSN | imported from 3GU |
R4‑143438 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑143439 | CR for TS 36.307 rel-10 to introduce CA Band1 + Band5 + Band7 combination | LG Electronics | imported from 3GU |
R4‑143440 | WF on PCell interruption for short measurement cycle cases in Rel-10 | NSN, Nokia Corporation | imported from 3GU |
R4‑143441 | Correction on parameters for high speed train conditions in 36.104 (Rel-10) | CATT | imported from 3GU |
R4‑143442 | Introduction of 3 Band Carrier Aggregation of Band 1 and Band 3 and Band 8 to TS 36.104 | KT | imported from 3GU |
R4‑143443 | Solution for PCell interruption in Rel-12 | NSN, Nokia Corporation | imported from 3GU |
R4‑143444 | 2-cell simulation results of RSRP/RSRQ under high Doppler condition | CMCC | imported from 3GU |
R4‑143445 | Intra-band CA deployment scenarios | Broadcom Corporation | imported from 3GU |
R4‑143446 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143447 | Introduction of 3 Band Carrier Aggregation of Band 1 and Band 3 and Band 8 to TS 36.141 | KT | imported from 3GU |
R4‑143448 | WF on PCell interruption for short measurement cycle cases in Rel-10 | NSN, Nokia Corporation | imported from 3GU |
R4‑143449 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | imported from 3GU |
R4‑143450 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑143451 | 2-cell simulation results of RSRP/RSRQ under high Doppler condition | CMCC | imported from 3GU |
R4‑143452 | Correction on parameters for high speed train conditions in 36.104 (Rel-11) | CATT | imported from 3GU |
R4‑143453 | Introduction of Connected mode requirements for increasing number of E-UTRAN carriers | Nokia Corporation, NSN | imported from 3GU |
R4‑143454 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143455 | On moving forward with AAS in the next release | Ericsson | imported from 3GU |
R4‑143456 | Introduction of 3 Band Carrier Aggregation of Band 1 and Band 3 and Band 8 to TS 36.307 (Rel_10) | KT | imported from 3GU |
R4‑143457 | Correction on parameters for high speed train conditions in 36.141 (Rel-10) | CATT | imported from 3GU |
R4‑143458 | Introduction of 3 Band Carrier Aggregation of Band 1 and Band 3 and Band 8 to TS 36.307 (Rel_11) | KT | imported from 3GU |
R4‑143459 | CR for TS 36.307 rel-11 to introduce CA Band1 + Band5 + Band7 combination | LG Electronics | imported from 3GU |
R4‑143460 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | imported from 3GU |
R4‑143461 | LC-MTC Demodulation Aspects | Qualcomm Incorporated | imported from 3GU |
R4‑143462 | Correction on parameters for high speed train conditions in 36.104 (Rel-12) | CATT | imported from 3GU |
R4‑143463 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143464 | [Draft] LS on synchronized gap relevant signalling for Rel-12 PCell interruption | NSN, Nokia Corporation | imported from 3GU |
R4‑143465 | Example of a WID for release 13 | Ericsson | imported from 3GU |
R4‑143466 | Introduction of 3 Band Carrier Aggregation of Band 1 and Band 3 and Band 8 to TS 36.307 (Rel_12) | KT | imported from 3GU |
R4‑143467 | Further discussion on low-cost MTC REFSENS requirements | NSN, Nokia Corporation | imported from 3GU |
R4‑143468 | PCell interrupts for lower measCycleScell cycles " UE impact | NSN, Nokia Corporation | imported from 3GU |
R4‑143469 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑143470 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143471 | TR 36.851 V0.11.0: Rel-12 Inter-band Carrier Aggregation | Ericsson | imported from 3GU |
R4‑143472 | Correction on parameters for high speed train conditions in 36.141 (Rel-11) | CATT | imported from 3GU |
R4‑143473 | CR for TS 36.307 rel-12 to introduce CA Band1 + Band5 + Band7 combination | LG Electronics | imported from 3GU |
R4‑143474 | Introduction of Connected mode requirements for increasing number of E-UTRAN carriers | Nokia Corporation, NSN | imported from 3GU |
R4‑143475 | CR on correction on CA capability in Rel-11 | Ericsson | imported from 3GU |
R4‑143476 | On mutual coupling in AAS | Ericsson | imported from 3GU |
R4‑143477 | Discussion on general option for UTRA RRM requirements with increased number of carriers for UE to monitor | NSN, Nokia Corporation | imported from 3GU |
R4‑143478 | Discussion on semi-static interference parameter detection and signaling | Huawei, HiSilicon | imported from 3GU |
R4‑143479 | CA TDD+FDD for TS 36.104 | Ericsson | imported from 3GU |
R4‑143480 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑143481 | Discussion on maximum received timing difference of dual connectivity | CMCC | imported from 3GU |
R4‑143482 | CR for UTRA RRM requirements with increased number of carriers for UE to monitor | NSN, Nokia Corporation | imported from 3GU |
R4‑143483 | Intra-band deployment scenarios in DuCo | Broadcom Corporation | imported from 3GU |
R4‑143484 | Correction on parameters for high speed train conditions in 36.141 (Rel-12) | CATT | imported from 3GU |
R4‑143485 | TP for TR 36.851: The clarification of LTE TDD-FDD joint operation in BS RF requirement | NSN | imported from 3GU |
R4‑143486 | TP for LC-MTC REFSENS requirements | NSN, Nokia Corporation | imported from 3GU |
R4‑143487 | TR 36.861 v0.5.0 (LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz) | SK Telecom, KT, LG Uplus, LG Electronics | imported from 3GU |
R4‑143488 | Recommendations on LTE BS RF requirements for TDD-FDD joint operation including Carrier Aggregation | Alcatel-Lucent | imported from 3GU |
R4‑143489 | CR to 36.101 Rel-12 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑143490 | Network deployment scenarios for Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑143491 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑143492 | Correction on parameters for high speed train scenario in 36.101 (Rel-12) | CATT | imported from 3GU |
R4‑143493 | On introduction of new capability sets to 37.141 | NSN | imported from 3GU |
R4‑143494 | TP for TR36.853: Additional ILs for CA_1A-5A-7A UE | LG Electronics | imported from 3GU |
R4‑143495 | Scheduling restrictions of half-duplex low-cost MTC | NSN, Nokia Corporation | imported from 3GU |
R4‑143496 | Discussion on blind detection of interference parameters for CRS-based transmission | Huawei, HiSilicon | imported from 3GU |
R4‑143497 | Correction of PRS Signal Levels in RSTD Reporting Tests | Qualcomm Incorporated | imported from 3GU |
R4‑143498 | Maximal UE received timing difference for Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑143499 | Draft CR: Introduction of Dual Uplink Inter-band CA class A5 | Broadcom Corporation | imported from 3GU |
R4‑143500 | [Draft]Reply LS on maximum received timing difference for UE supporting Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑143501 | Recommendations on how to include the European regulatory requirements for emissions from the L-band base station in the 3GPP specifications | Alcatel-Lucent | imported from 3GU |
R4‑143502 | Simulation assumptions for LTE coverage enhancements | NSN | imported from 3GU |
R4‑143503 | Scheduling restrictions of half-duplex low-cost MTC | NSN, Nokia Corporation | imported from 3GU |
R4‑143504 | Recommendations on Small Cell BS RF requirements for 256 QAM | Alcatel-Lucent | imported from 3GU |
R4‑143505 | Discussion on blind detection of interference parameters for mixed CRS and DMRS based transmission | Huawei, HiSilicon | imported from 3GU |
R4‑143506 | Accuracy requirement for radiated transmit power | CATT | imported from 3GU |
R4‑143507 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑143508 | Correction on parameters for high speed train scenario in 36.101 (Rel-10) | CATT | imported from 3GU |
R4‑143509 | On introduction of new capability sets to 37.141 | NSN | imported from 3GU |
R4‑143510 | CR on 36.133 for LTE TDD-FDD joint operation including Carrier Aggregation | NSN, Nokia Corporation | imported from 3GU |
R4‑143511 | Simulation assumptions for LTE coverage enhancements | NSN | imported from 3GU |
R4‑143512 | [Draft]Reply LS on maximum received timing difference for UE supporting Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑143513 | Proposal for core specification text | Ericsson | imported from 3GU |
R4‑143514 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | imported from 3GU |
R4‑143515 | PCell Interruptions for Shorter Deactivated SCell Measurement Cycles | Qualcomm Incorporated | imported from 3GU |
R4‑143516 | Correction of Common RRM requirements for CA in release independent specification (Rel-10) | CATT | imported from 3GU |
R4‑143517 | Considerations on midification of agenda in TS36.307 | LG Electronics | imported from 3GU |
R4‑143518 | Discussion on PUCCH format 3 with 6AN bits | NSN | imported from 3GU |
R4‑143519 | CR on SCG Cell activation for introducing Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑143520 | Correction on parameters for high speed train scenario in 36.101 (Rel-11) | CATT | imported from 3GU |
R4‑143521 | CR on PCell Interruptions for Shorter Measurement Cycles | Qualcomm Incorporated | imported from 3GU |
R4‑143522 | Correction of Common RRM requirements for CA in release independent specification (Rel-11) | CATT | imported from 3GU |
R4‑143523 | CR for RTWP tests (Rel-12) | NSN, Nokia Corporation | imported from 3GU |
R4‑143524 | Introduction of CA band combination Band1 + Band5 + Band7 to TS 36.141 (Rel 12) | LG Uplus | imported from 3GU |
R4‑143525 | Clarification of ACLR test requirements in TS 37.104 (Rel-11) | Ericsson | imported from 3GU |
R4‑143526 | CR on 36.133 for LTE TDD-FDD joint operation including Carrier Aggregation | NSN, Nokia Corporation | imported from 3GU |
R4‑143527 | Discussion on UE performance requirements due to TDM operation | NSN, Nokia Corporation | imported from 3GU |
R4‑143528 | Reply LS on frequency stability for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑143529 | Introduction of Idle mode requirements for increasing number of E-UTRAN carriers | Nokia Corporation, NSN | imported from 3GU |
R4‑143530 | RSRQ Definition Applicability | Qualcomm Incorporated | imported from 3GU |
R4‑143531 | CR for RTWP tests (Rel-11) | NSN, Nokia Corporation | imported from 3GU |
R4‑143532 | Text proposal: Band 40D impact on RRM requirements | CATT | imported from 3GU |
R4‑143533 | MBSFN RSRP and RSRQ measurement requirements | Nokia Corporation, NSN | imported from 3GU |
R4‑143534 | Correction of Common RRM requirements for CA in release independent specification (Rel-12) | CATT | imported from 3GU |
R4‑143535 | Discussion on BS requirements due to Further EUL enhancements | NSN, Nokia Corporation | imported from 3GU |
R4‑143536 | CR for RTWP tests (Rel-12) | NSN, Nokia Corporation | imported from 3GU |
R4‑143537 | Co-existence simulation results for LTE D2D | Motorola Solutions | imported from 3GU |
R4‑143538 | On introduction of new capability sets to 37.141 | NSN | imported from 3GU |
R4‑143539 | Addition of channel bandwidths for NS_12 and NS_13 | Qualcomm Incorporated | imported from 3GU |
R4‑143540 | CR for RTWP tests (Rel-10) | NSN, Nokia Corporation | imported from 3GU |
R4‑143541 | Reply LS on frequency stability for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑143542 | Demodulation simulation results and discussion on SU-MIMO advanced receivers | Huawei, HiSilicon | imported from 3GU |
R4‑143543 | MBSFN BLER measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑143544 | Introduction of Band 40D in release independent specification (Rel-11) | CATT | imported from 3GU |
R4‑143545 | Discussion on BS requirements due to DCH Enhancements for UMTS | NSN, Nokia Corporation | imported from 3GU |
R4‑143546 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | imported from 3GU |
R4‑143547 | Introduction of Band 40D in release independent specification (Rel-11) | CATT | imported from 3GU |
R4‑143548 | TP for TR 36.853: Additional Insertion Loss for 3 band CA of B1+B3+B5 | SK Telecom | imported from 3GU |
R4‑143549 | Reply LS on frequency stability for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑143550 | TP for TR 36.851: Updated IL data for Band 1 and Band 7 | Qualcomm Incorporated | imported from 3GU |
R4‑143551 | Spurious emission band UE co-existence requirements for Dual-uplink inter-band CA | LG Electronics | imported from 3GU |
R4‑143552 | Simulation results and discussion on IRC requirement for SU-MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑143553 | CA TDD+FDD for TS 37.104 | Ericsson | imported from 3GU |
R4‑143554 | Simulation results for updated FeICIC RI test | CATT | imported from 3GU |
R4‑143555 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | imported from 3GU |
R4‑143556 | On introduction of new capability sets to 37.141 | NSN | imported from 3GU |
R4‑143557 | Reply LS on frequency stability for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑143558 | Further discussion on MBSFN RSRP and RSRQ measurements | Nokia Corporation | imported from 3GU |
R4‑143559 | ACLR Model for D2D Coexistence Simulations | Qualcomm Incorporated | imported from 3GU |
R4‑143560 | Correction of UEM for Medium Range and Local Area BS | Ericsson | imported from 3GU |
R4‑143561 | Requirements for UE Measurements Procedures in RRC_CONNECTED State for 3DL CA | Nokia Corporation, NSN | imported from 3GU |
R4‑143562 | CA TDD+FDD for TS 36.141 | Ericsson | imported from 3GU |
R4‑143563 | Discussion on CQI/RI requirements for SU-MIMO | Huawei, HiSilicon | imported from 3GU |
R4‑143564 | Reply LS on frequency stability for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑143565 | LS Out to RAN2 on introducing the new RSRQ measurements definition | Nokia Corporation, NSN | imported from 3GU |
R4‑143566 | UE coexistence simulation results to protect Band34 | LG Electronics | imported from 3GU |
R4‑143567 | ACLR Model for D2D Coexistence Simulations | Qualcomm Incorporated | imported from 3GU |
R4‑143568 | Summary of SU-MIMO demodulation results | Huawei, HiSilicon | imported from 3GU |
R4‑143569 | Dual Connectivity and RRM requirements | Nokia Corporation, NSN | imported from 3GU |
R4‑143570 | LS out on Parameter Detection for NAICS | QUALCOMM Incorporated | imported from 3GU |
R4‑143571 | Clarification of ACLR test requirements in TS 37.104 (Rel-12) | Ericsson | imported from 3GU |
R4‑143572 | CA features and release independence | Broadcom Corporation | imported from 3GU |
R4‑143573 | Benefits of Transmit Diversity for PRS | Qualcomm Incorporated | imported from 3GU |
R4‑143574 | TP for TR 36.851: Band 1 and Band 7 UE Tx and Rx relaxations | Qualcomm Incorporated, LG Electronics, Nokia Corpo | imported from 3GU |
R4‑143575 | TP for TR36.861: A-MPR table and Annex to merge A-MPR simulation results | LG Electronics and Nokia Corporation | imported from 3GU |
R4‑143576 | CA TDD+FDD for TS 37.141 | Ericsson | imported from 3GU |
R4‑143577 | Introduction of 3 Band Carrier Aggregation of Band 1,Band 3 and Band 5 to TS 36.101 | SK Telecom | imported from 3GU |
R4‑143578 | Discussion on Semistatic Parameters for NAICS | QUALCOMM Incorporated | imported from 3GU |
R4‑143579 | Introduction of 3 Band Carrier Aggregation of Band 1,Band 3 and Band 5 to TS 36.104 | SK Telecom | imported from 3GU |
R4‑143580 | D2D Coexistence: Simulation Assumptions | Qualcomm Incorporated | imported from 3GU |
R4‑143581 | Clarification of ACLR test requirements in TS 37.141 (Rel-11) | Ericsson | imported from 3GU |
R4‑143582 | Introduction of 3 Band Carrier Aggregation of Band 1,Band 3 and Band 5 to TS 36.141 | SK Telecom | imported from 3GU |
R4‑143583 | TP for TR 36.855 on performance characterization of PRS transmit diversity | Qualcomm Incorporated | imported from 3GU |
R4‑143584 | TR 37.842 Text Proposals: AAS specification organisation | ZTE, Tejet | imported from 3GU |
R4‑143585 | D2D Coexistence: Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑143586 | Introduction of 3 Band Carrier Aggregation of Band 1,Band 3 and Band 5 to TS 36.307(Rel.10) | SK Telecom | imported from 3GU |
R4‑143587 | Introduction of a new CA_7C bandwidth combination set into 36.307 (Rel-10) | Orange | imported from 3GU |
R4‑143588 | Clarification of ACLR test requirements in TS 37.141 (Rel-12) | Ericsson | imported from 3GU |
R4‑143589 | Simulation assumptions for BS performance | Ericsson | imported from 3GU |
R4‑143590 | 3DL CA BS Impact TS 36.104 | Ericsson | imported from 3GU |
R4‑143591 | Impact of HD-FDD on RRM requirements | Ericsson | imported from 3GU |
R4‑143592 | 3DL CA BS Impact TS 37.104 | Ericsson | imported from 3GU |
R4‑143593 | Introduction of CA_1A-7A into 36.101 | Qualcomm Incorporated | imported from 3GU |
R4‑143594 | RLM requirements for MTC | Ericsson | imported from 3GU |
R4‑143595 | UE RF core requirements for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑143596 | Small cell on/off impacts to measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑143597 | Introduction of 3 Band Carrier Aggregation of Band 1,Band 3 and Band 5 to TS 36.307(Rel.11) | SK Telecom | imported from 3GU |
R4‑143598 | MTC UE measurements Procedures in RRC_CONNECTED State | Ericsson | imported from 3GU |
R4‑143599 | Introduction of CA_1A-7A into 36.307 | Qualcomm Incorporated | imported from 3GU |
R4‑143600 | Introduction of 3 Band Carrier Aggregation of Band 1,Band 3 and Band 5 to TS 36.307(Rel.12) | SK Telecom | imported from 3GU |
R4‑143601 | 3DL CA BS Impact TS 36.141 | Ericsson | imported from 3GU |
R4‑143602 | Impact of Dual Connectivity on RRM Performance Requirements | Alcatel-Lucent | imported from 3GU |
R4‑143603 | Introduction of new CA_7C bandwidth combination set into 36.307 (Rel-11) | Orange | imported from 3GU |
R4‑143604 | Introduction of CA_1A-7A into 36.307 | Qualcomm Incorporated | imported from 3GU |
R4‑143605 | Clarification of Foffset-RAT in relation to radio bandwidth in TS 37.104 (Rel-11) | Ericsson | imported from 3GU |
R4‑143606 | 3DL CA BS Impact TS 37.141 | Ericsson | imported from 3GU |
R4‑143607 | TP for D2D TR: UE RF core requirements for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑143608 | Duplexer characteristics for S-band UE | LG Electronics | imported from 3GU |
R4‑143609 | 6 A/N bits PUCCH Format 3 performance evaluation | Ericsson | imported from 3GU |
R4‑143610 | Blind detection of interference parameters for DMRS-based interference | Nokia Corporation, NSN | imported from 3GU |
R4‑143611 | On the EARFCN extension | Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑143612 | CR on correction on CA capability in Rel-12 | Ericsson | imported from 3GU |
R4‑143613 | LS out on RAN4 D2D coexistence study | Qualcomm Incorporated | imported from 3GU |
R4‑143614 | TR 37.842 Text Proposals: AAS EIRP and its accuracy requirements | ZTE, Tejet | imported from 3GU |
R4‑143615 | CR on correction on CA capability in Rel-12 | Ericsson | imported from 3GU |
R4‑143616 | Blind Detection of P_A | MediaTek Inc. | imported from 3GU |
R4‑143617 | On AAS EIRP accuracy | ZTE, Tejet | imported from 3GU |
R4‑143618 | MTC UE measurements performance requirements | Ericsson | imported from 3GU |
R4‑143619 | MTC UE measurements performance requirements | Ericsson | imported from 3GU |
R4‑143620 | MBSFN RS based RSRP/RSRQ requirements | Qualcomm Incorporated | imported from 3GU |
R4‑143621 | CR on interrupts for inter-frequency measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑143622 | REFSENS Specification for the additional bandwidth combinations of the CA_25A-25A | Ericsson | imported from 3GU |
R4‑143623 | On maximum transmission timing difference | Ericsson | imported from 3GU |
R4‑143624 | Introduction of CA_1A-7A into 36.307 | Qualcomm Incorporated | imported from 3GU |
R4‑143625 | Measurement requirements to monitor additional carriers in Idle/URA_PCH/CELL_PCH states | Qualcomm Incorporated | imported from 3GU |
R4‑143626 | WF on different TDD configurations in CA | Ericsson | imported from 3GU |
R4‑143627 | Maximum transmission timing difference | Ericsson | imported from 3GU |
R4‑143628 | TP for 36.853: Relaxation for Band 20 in 3DL Band 7 + Band 8 + Band 20 | Qualcomm Incorporated, Intel Corporation, Nokia Co | imported from 3GU |
R4‑143629 | LS on On the EARFCN extension | Ericsson | imported from 3GU |
R4‑143630 | Measurement requirements to monitor additional carriers in Idle/URA_PCH/CELL_PCH states | Qualcomm Incorporated | imported from 3GU |
R4‑143631 | Clarification of Foffset-RAT in relation to radio bandwidth in TS 37.141 (Rel-11) | Ericsson | imported from 3GU |
R4‑143632 | CR on interrupts for inter-frequency measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑143633 | Blind Detection of Transmission Modes | MediaTek Inc | imported from 3GU |
R4‑143634 | E-UTRA Requirements on Increasing the Number of Carriers to Monitor | Qualcomm Incorporated | imported from 3GU |
R4‑143635 | Measurement requirements to monitor additional carriers in Idle/URA_PCH/CELL_PCH states | Qualcomm Incorporated | imported from 3GU |
R4‑143636 | Detailed proposals for UTRA RRM requirements with increased number of carriers for UE to monitor | NSN, Nokia Corporation | imported from 3GU |
R4‑143637 | RSRP/RSRQ Requirements for High Doppler Channels | Qualcomm Incorporated | imported from 3GU |
R4‑143638 | UL system performance for 2UL NC-CA with power backoff | Ericsson | imported from 3GU |
R4‑143639 | Introduction of new CA_7C bandwidth combination set into 36.307 (Rel-12) | Orange | imported from 3GU |
R4‑143640 | Clarification of Foffset-RAT in relation to radio bandwidth in TS 37.104 (Rel-12) | Ericsson, Huawei, NSN, ALU | imported from 3GU |
R4‑143641 | Analysis of MSD for CA class A2 architectures | Motorola Mobility | imported from 3GU |
R4‑143642 | LS on maximum transmission timing difference | Ericsson | imported from 3GU |
R4‑143643 | Measurement requirements to monitor additional carriers in Idle/URA_PCH/CELL_PCH states | Qualcomm Incorporated | imported from 3GU |
R4‑143644 | UE requirements for B1+B41 combination in TDD-FDD CA | Ericsson | imported from 3GU |
R4‑143645 | UE requirements for B1+B41 combination in TDD-FDD CA | Ericsson | imported from 3GU |
R4‑143646 | TP for TR 36.851: TDD-FDD CA for B1+B41 combination (CA_1A-41A) | Ericsson | imported from 3GU |
R4‑143647 | Front-end filtering considerations for Band 42 and Band 43 | Qualcomm Incorporated | imported from 3GU |
R4‑143648 | Introduction of CA_1A-41A in TS36.101 | Ericsson | imported from 3GU |
R4‑143649 | Introduction of CA_1A-41A in TS36.104 | Ericsson | imported from 3GU |
R4‑143650 | Introduction of CA_1A-41A in TS36.101 | Ericsson | imported from 3GU |
R4‑143651 | Towards reducing RF workload congestion in RAN4 | Qualcomm Incorporated | imported from 3GU |
R4‑143652 | TP for TR 36.851: TDD-FDD CA for B1+B41 combination (CA_1A-41A) | Ericsson | imported from 3GU |
R4‑143653 | Introduction of CA_1A-41A in 36.141 | Ericsson | imported from 3GU |
R4‑143654 | Introduction of CA_1A-41A in TS36.307, Rel-11 | Ericsson | imported from 3GU |
R4‑143655 | Introduction of CA_1A-41A in TS36.307, Rel-11 | Ericsson | imported from 3GU |
R4‑143656 | PMI and PUSCH 3-2 Tests | Alcatel-Lucent and Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑143657 | Introduction of CA_1A-41A in TS36.307, Rel-12 | Ericsson | imported from 3GU |
R4‑143658 | Discussions on maximum allowed receive timing difference at the UE for dual connectivity | Ericsson | imported from 3GU |
R4‑143659 | TP for TR 36.853: Channel bandwidth configurations for LTE_CA_B3_B7_B7 | Orange, Deutsche Telekom | imported from 3GU |
R4‑143660 | MTC UE TDD intra frequency measurements procedures in RRC_CONNECTED state | Ericsson | imported from 3GU |
R4‑143661 | Measurement requirements to monitor additional carriers in Idle/URA_PCH/CELL_PCH states | Qualcomm Incorporated | imported from 3GU |
R4‑143662 | WF on Band 42/43 co-existence and CA_Band 42C WI | CATT | imported from 3GU |
R4‑143663 | Reply LS on Synchronization aspects for dual connectivity | Ericsson | imported from 3GU |
R4‑143664 | SC-CRS-IC way forward | Ericsson,LGE, NVIDIA, Broadcom, ZTE, NSN, Nokia | imported from 3GU |
R4‑143665 | Discussion on RRM aspects for DuCo | Broadcom Corporation | imported from 3GU |
R4‑143666 | Measurement requirements to monitor additional carriers in CELL_FACH state | Qualcomm Incorporated | imported from 3GU |
R4‑143667 | UE capability issues for DC | Ericsson | imported from 3GU |
R4‑143668 | Introduction of 3 Band Carrier Aggregation of Band 3, Band 7 and Band 7 to 36.101 | Orange, Deutsche Telekom | imported from 3GU |
R4‑143669 | Dependency on 2UL inter-band CA WI for dual connectivity work including band combination for DC | Ericsson | imported from 3GU |
R4‑143670 | Measurement requirements to monitor additional carriers in CELL_DCH state | Qualcomm Incorporated | imported from 3GU |
R4‑143671 | On EARFCN extension in GERAN | Broadcom Corporation, BlackBerry Ltd, Qualcomm, NS | imported from 3GU |
R4‑143672 | MTC UE TDD measurements performance requirements | Ericsson | imported from 3GU |
R4‑143673 | Clarification of Foffset-RAT in relation to radio bandwidth in TS 37.141 (Rel-12) | Ericsson, Huawei, NSN, ALU | imported from 3GU |
R4‑143674 | UE performance requirements impact due to introduction of EUL enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑143675 | Introduction of 3 Band Carrier Aggregation of Band 3, Band 7 and Band 7 to 36.307 (Rel-10) | Orange, Deutsche Telekom | imported from 3GU |
R4‑143676 | UE RRM requirements impact due to introduction of EUL enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑143677 | CR for definition of EARFCN to support additional carrier frequencies in GERAN | Broadcom Corporation, BlackBerry Ltd, Qualcomm, NS | imported from 3GU |
R4‑143678 | Introduction of 3 Band Carrier Aggregation of Band 3, Band 7 and Band 7 to 36.307 (Rel-11) | Orange, Deutsche Telekom | imported from 3GU |
R4‑143679 | Potential RF impacts of un-synchronized dual connectivity | Ericsson | imported from 3GU |
R4‑143680 | New DL reference measurement channels for DCH enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑143681 | Reply LS on extending E-UTRA band number and EARFCN numbering space | Broadcom Corporation, BlackBerry Ltd, Qualcomm, NS | imported from 3GU |
R4‑143682 | Introduction of 3 Band Carrier Aggregation of Band 3, Band 7 and Band 7 to 36.307 (Rel-12) | Orange, Deutsche Telekom | imported from 3GU |
R4‑143683 | Further discussion on RAN4 requirements due to introduction of DCH enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑143684 | Further Link Level Evaluations for NAICS Parameter Detection | QUALCOMM Incorporated | imported from 3GU |
R4‑143685 | Further discussion on the increased number of carriers for UE monitoring | Broadcom Corporation | imported from 3GU |
R4‑143686 | TP for 36.851: Band 18 and Band 28 Tx and Rx relaxations | Qualcomm Incorporated | imported from 3GU |
R4‑143687 | Further discussion on blind detection of semi-static parameters for NAICS receiver | Broadcom Corporation | imported from 3GU |
R4‑143688 | TP for TR37.814 | Huawei | imported from 3GU |
R4‑143689 | Introduction of TDD-FDD joint operation including CA | NSN | imported from 3GU |
R4‑143690 | Further discussion for CoMP serving cell CRS-IC | Broadcom Corporation | imported from 3GU |
R4‑143691 | Introduction of TDD-FDD joint operation including CA | NSN | imported from 3GU |
R4‑143692 | TP for TR37.814, clause 12: lists of required changes in BS core specifications. | Ericsson, Huawei, NSN | imported from 3GU |
R4‑143693 | Draft WID for MIMO OTA antenna test function | Agilent Technologies | imported from 3GU |
R4‑143694 | Introduction of TDD-FDD joint operation including CA | NSN | imported from 3GU |
R4‑143695 | TP for TR37.814, clause 12: lists of required changes in BS conformance specifications. | Ericsson, Huawei, NSN | imported from 3GU |
R4‑143696 | Introduction of LTE_CA_NC_B42 into 36.101 | Huawei, Hisilicon, NII Holdings | imported from 3GU |
R4‑143697 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | imported from 3GU |
R4‑143698 | Analysis of regulator use of the terms 'paired spectrum' and 'unpaired spectrum' | Huawei | imported from 3GU |
R4‑143699 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | imported from 3GU |
R4‑143700 | Introduction of band 29 in TS 37.113 | Ericsson | imported from 3GU |
R4‑143701 | Introduction of LTE_CA_NC_B42 into 36.104 | Huawei, Hisilicon, NII Holdings | imported from 3GU |
R4‑143702 | Introduction of band 29 in TS 37.113 | Ericsson | imported from 3GU |
R4‑143703 | General changes for introducing TDD-FDD CA in TS36.104 | Huawei | imported from 3GU |
R4‑143704 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | imported from 3GU |
R4‑143705 | Introduction of LTE_CA_NC_B42 into 36.141 | Huawei, Hisilicon, NII Holdings | imported from 3GU |
R4‑143706 | Introduction of LTE_CA_NC_B42 into 36.307 | Huawei, Hisilicon, NII Holdings | imported from 3GU |
R4‑143707 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | imported from 3GU |
R4‑143708 | Introduction of LTE_CA_NC_B42 into 36.307 | Huawei, Hisilicon, NII Holdings | imported from 3GU |
R4‑143709 | General changes for introducing TDD-FDD CA in TS37.104 | Huawei | imported from 3GU |
R4‑143710 | Outstanding issues for future TDD-FDD CA work | Huawei | imported from 3GU |
R4‑143711 | Ambiguities impact on TDD-FDD CA | Huawei | imported from 3GU |
R4‑143712 | Revision of AAS WID | Huawei | - |
R4‑143713 | On number of AAS transmitters to be considered in Rel-12 | Huawei | - |
R4‑143714 | AAS remaining core work for Rel-12 | Huawei | - |
R4‑143715 | AAS future work for Rel-13 | Huawei | - |
R4‑143716 | Isolation of core and performance for radiated output power | Huawei | - |
R4‑143717 | On testing methods of antenna characteristics without core requirements | Huawei | - |
R4‑143718 | Text proposal on conducted output power | Huawei | - |
R4‑143719 | Text proposal on conducted unwanted emissions | Huawei | - |
R4‑143720 | Text proposal on radiated output power accuracy analyses | Huawei | - |
R4‑143721 | Text proposal on impacts of output power accuracy | Huawei | - |
R4‑143722 | Text proposal on radiated receiver requirements | Huawei | - |
R4‑143723 | Text proposal on requirements and specifications | Huawei | - |
R4‑143724 | Text proposal on transmitter inter-modulation | Huawei | - |
R4‑143725 | Text proposal on UE specific beam forming. | Huawei | - |
R4‑143726 | Simulation results for SU-MIMO advanced receivers | CMCC | - |
R4‑143727 | Discussion on maximum received timing difference of dual connectivity | CMCC | - |
R4‑143728 | Discussion on methodology of performance requirements for 3DL CA | CMCC | - |
R4‑143729 | Discussion on tighten RSRP measurement accuracy requirements | CMCC | - |
R4‑143730 | 2-cell simulation results of RSRP/RSRQ under high Doppler condition | CMCC | - |
R4‑143731 | WF on Band 42/43 co-existence and CA_Band 42C WI | CATT | - |
R4‑143732 | Introduction of RF requirements for CA_Band 42C | CATT | - |
R4‑143733 | Coexistence simulation results for LTE D2D | Motorola Solutions | - |
R4‑143734 | CR to 36.101 Rel-12 to introduce 3+7+20 | Vodafone | - |
R4‑143735 | CR to 36.104 Rel-12 to introduce 3+7+20 | Vodafone | - |
R4‑143736 | CR to 36.141 Rel-12 to introduce 3+7+20 | Vodafone | - |
R4‑143737 | CR to 36.307 Rel-10 to introduce 3+7+20 | Vodafone | - |
R4‑143738 | CR to 36.307 Rel-11 to introduce 3+7+20 | Vodafone | - |
R4‑143739 | CR to 36.307 Rel-12 to introduce 3+7+20 | Vodafone | - |
R4‑143740 | 1+7 relaxations proposal | Vodafone | - |
R4‑143741 | TP to 36.851 to add CA_1A-7A remaining specs | Vodafone | - |
R4‑143742 | CR to 36.101 Rel-12 to introduce 1+7 | Vodafone | - |
R4‑143743 | CR to 36.104 Rel-12 to introduce 1+7 | Vodafone | - |
R4‑143744 | CR to 36.141 Rel-12 to introduce 1+7 | Vodafone | - |
R4‑143745 | CR to 36.307 Rel-10 to introduce 1+7 | Vodafone | - |
R4‑143746 | CR to 36.307 Rel-11 to introduce 1+7 | Vodafone | - |
R4‑143747 | CR to 36.307 Rel-12 to introduce 1+7 | Vodafone | - |
R4‑143748 | TP to 36.853 to add B1 and B7 to CA_1+7+20 | Vodafone | - |
R4‑143749 | CR to 36.101 Rel-12 to introduce 1+7+20 | Vodafone | - |
R4‑143750 | CR to 36.104 Rel-12 to introduce 1+7+20 | Vodafone | - |
R4‑143751 | CR to 36.141 Rel-12 to introduce 1+7+20 | Vodafone | - |
R4‑143752 | CR to 36.307 Rel-10 to introduce 1+7+20 | Vodafone | - |
R4‑143753 | CR to 36.307 Rel-11 to introduce 1+7+20 | Vodafone | - |
R4‑143754 | CR to 36.307 Rel-12 to introduce 1+7+20 | Vodafone | - |
R4‑143755 | Manufacturer filter data on B1+B3 | Vodafone | - |
R4‑143756 | TP to 36.851 on B1+B3 | Vodafone | - |
R4‑143757 | TP to 36.853 1+3+20 | Vodafone | - |
R4‑143758 | CR to 36.101 Rel-12 to introduce 1+3+20 | Vodafone | - |
R4‑143759 | CR to 36.104 Rel-12 to introduce 1+3+20 | Vodafone | - |
R4‑143760 | CR to 36.141 Rel-12 to introduce 1+3+20 | Vodafone | - |
R4‑143761 | CR to 36.307 Rel-10 to introduce 1+3+20 | Vodafone | - |
R4‑143762 | CR to 36.307 Rel-11 to introduce 1+3+20 | Vodafone | - |
R4‑143763 | CR to 36.307 Rel-12 to introduce 1+3+20 | Vodafone | - |
R4‑143764 | Band 7+8 reference sensitivity and TP to 36.851 | Vodafone | - |
R4‑143765 | Proposal on the assumptions for 7+8 MSD calculations and pending requirements | Vodafone | - |
R4‑143766 | TP to 36.851 to add remaining requirements for 7+8 | Vodafone | - |
R4‑143767 | CR to 36.101 Rel-12 to introduce 7+8 | Vodafone | - |
R4‑143768 | CR to 36.104 Rel-12 to introduce 7+8 | Vodafone | - |
R4‑143769 | CR to 36.141 Rel-12 to introduce 7+8 | Vodafone | - |
R4‑143770 | CR to 36.307 Rel-10 to introduce 7+8 | Vodafone | - |
R4‑143771 | CR to 36.307 Rel-11 to introduce 7+8 | Vodafone | - |
R4‑143772 | CR to 36.307 Rel-12 to introduce 7+8 | Vodafone | - |
R4‑143773 | TP to 36.853 7+8+20 | Vodafone | - |
R4‑143774 | CR to 36.101 Rel-12 to introduce 7+8+20 | Vodafone | - |
R4‑143775 | CR to 36.104 Rel-12 to introduce 7+8+20 | Vodafone | - |
R4‑143776 | CR to 36.141 Rel-12 to introduce 7+8+20 | Vodafone | - |
R4‑143777 | CR to 36.307 Rel-10 to introduce 7+8+20 | Vodafone | - |
R4‑143778 | CR to 36.307 Rel-11 to introduce 7+8+20 | Vodafone | - |
R4‑143779 | CR to 36.307 Rel-12 to introduce 7+8+20 | Vodafone | - |
R4‑143780 | Way forward on CA fallback | Vodafone | - |
R4‑143781 | LEE TRP requirements | Vodafone | - |
R4‑143782 | LEE TRS requirements | Vodafone | - |
R4‑143783 | Low Cost MTC RAN4 TR ab.cde 003 | Vodafone | - |
R4‑143784 | Low Cost MTC reference sensitivity | Vodafone | - |
R4‑143785 | MB-MSR in multiband PA with single and multi antenna port | Vodafone | - |
R4‑143786 | Introduction of CA band combination B1+B20 to TS 36.101 | Vodafone | - |
R4‑143787 | Introduction of CA band combination Band 1 and Band 20 to TS 36.104 | Vodafone | - |
R4‑143788 | Introduction of CA band combination Band 1 and Band 20 to TS 36.141 | Vodafone | - |
R4‑143789 | Introduction of CA band combination Band 1 and Band 20 to TS 36.307 | Vodafone | - |
R4‑143790 | Introduction of CA band combination Band 1 and Band 20 to TS 36.307 | Vodafone | - |
R4‑143791 | Introduction of CA band combination Band 1 and Band 20 to TS 36.307 | Vodafone | - |
R4‑143792 | TP for TR 36.853: 3DL combinations and channel bandwidth configurations | Telecom Italia | - |
R4‑143793 | Clarification on different TDD configurations in CA | Ericsson | - |
R4‑143794 | eMBMS measurement requirements | Ericsson | - |
R4‑143795 | eMBMS reporting | Ericsson | - |
R4‑143796 | Handling of inter-frequency eMBMS measurements | Ericsson | - |
R4‑143797 | Methodology for studying E-CID with RRH | Ericsson | - |
R4‑143798 | Solutions for OTDOA with RRH | Ericsson | - |
R4‑143799 | Test case corrections for eICIC | Ericsson, Intel | - |
R4‑143800 | Removing square brackets in FeICIC test cases | Ericsson | - |
R4‑143801 | Removing square brackets in FeICIC test cases | Ericsson | - |
R4‑143802 | Co-existence between TDD systems in the same band | Ericsson | - |
R4‑143803 | CR on Co-existence between TDD systems in the same band | Ericsson | - |
R4‑143804 | CR on Co-existence between TDD systems in the same band | Ericsson | - |
R4‑143805 | CR on identification of new CGI with autonomous gaps in eIMTA | Ericsson | - |
R4‑143806 | EVM requirements for small BS | Ericsson | - |
R4‑143807 | TP for TR 37.842: Addition of body text to section 7.2 | Ericsson | - |
R4‑143808 | TP for TR 37.842: Definitions, symbols and abbreviations in AAS BS WI TR | Ericsson | - |
R4‑143809 | Finalization of CM and MPR for DC-HSUPA with 16QAM | Qualcomm Incorporated | - |
R4‑143810 | Finalization of Band XXVI coexistence requirements | Qualcomm Incorporated | - |
R4‑143811 | Finalization of Band XXVI coexistence requirements | Qualcomm Incorporated | - |
R4‑143812 | 3GPP band 28 out of band emission limit (CPG-PTD(14)175_A04_rev1_LS to 3GPP. Source: CPG-PTD, To: RAN4, Cc: ) | CPG-PTD | - |
R4‑143813 | LS on Further EUL Enhancements (R1-141756 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑143814 | LS on RAN1 Decisions for Enhanced DCH Work Item (R1-141757 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑143815 | LS on Progress in RAN1 #76bis for the UMTS Heterogeneous Networks WI (R1-141761 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑143816 | LS on RAN1 TDD-FDD CA outcome (R1-141827 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑143817 | REPLY LS on resource allocation restriction and identification of low complexity MTC UEs (R1-141890 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑143818 | LS on LTE Rel-12 UE feature list (R1-141897 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG3,TSG RAN WG4) | TSG RAN WG1 | - |
R4‑143819 | LS on SFN handling in the dual connectivity (R2-141849 Source: TSG RAN WG2, To: TSG RAN WG3,TSG RAN WG4, Cc: TSG RAN WG1) | TSG RAN WG2 | - |
R4‑143820 | LS on Activation/deactivation for Dual Connectivity (R2-141851 Source: TSG RAN WG2, To: TSG RAN WG4, Cc: TSG RAN WG1) | TSG RAN WG2 | - |
R4‑143821 | LS on WLAN signal measurements for WLAN/3GPP Radio interworking (R2-141855 Source: TSG RAN WG2, To: IEEE 802.11 WG, Cc: WiFi Alliance,TSG RAN WG4,TSG RAN WG5,TSG SA WG2,TSG RAN) | TSG RAN WG2 | - |
R4‑143822 | PCell interrupts for lower measCycleScell cycles " UE impact | NSN, Nokia Corporation | - |
R4‑143823 | Bandwidth combination of LTE-A Inter-bands Carrier Aggregation of Up to 20+20MHz for Bands B20 and B3, Independent of LTE Release | Etisalat | - |
R4‑143824 | Additional bandwidth combination of LTE-A Inter-bands Carrier Aggregation of Up to 20+20+20MHz for Bands B1, B3 and B20 starting from R.12 | Etisalat | - |
R4‑143825 | TS 36.112 Draft Document | TruePosition | - |
R4‑143826 | Editorial cleanup and completion of annexes in TS 36.111 | TruePosition | - |
R4‑143827 | Preparation of LTE Rel-12 UE feature list | NTT DOCOMO, INC. | - |
R4‑143828 | [DRAFT] Reply LS on LTE Rel-12 UE feature list | NTT DOCOMO, INC. | - |
R4‑143829 | WF for dual connectivity capability | NTT Docomo | - |
R4‑143830 | WF on dual connectivity scenarios | NTT Docomo | - |
R4‑143831 | Further results on blind detection of dynamic interference parameters | NVIDIA | - |
R4‑143832 | 4CRS Aps analysis of the complexity | Ericsson | - |
R4‑143833 | 4 CRS AP and mixed 2 and 4 CRS AP for NAICS | Ericsson | - |
R4‑143834 | Way forward on LC-MTC RSRP RSRQ measurements and cell identification | Ericsson | - |
R4‑143835 | Wayforward on RLM requirements for LC-MTC | Huawei, HiSilicon | - |
R4‑143836 | Performance Evaluation of advanced SU-MIMO receiver | Samsung | - |
R4‑143837 | Performance of advanced receivers for single cell SU-MIMO | Nokia Corporation, NSN | - |
R4‑143838 | Wayforward on MBMS RSRP RSRQ measurements | Qualcomm | - |
R4‑143839 | Wayforward on MBMS BLERmeasurements | Nokia | - |
R4‑143840 | Wayforward on SCE demod | Huawei | - |
R4‑143841 | Wayforward on potential RRM impact on SCE | Huawei | - |
R4‑143842 | Reply LS on Synchronization aspects for dual connectivity | Ericsson | - |
R4‑143843 | Draft LS on response SFN handling issue in dual connectivity | Huawei, HiSilicon | - |
R4‑143844 | Discussion on PUCCH format 3 with 6AN bits | NSN | - |
R4‑143845 | Way forward on BS demodulation test parameters for FDD LTE coverage enhancements | ZTE | - |
R4‑143846 | Wayforward on NAICS | Samsung | - |
R4‑143847 | LS out on Parameter Detection for NAICS | QUALCOMM Incorporated | - |
R4‑143848 | Meeting minutes for NAICS ad hoc | MediaTek | - |
R4‑143849 | Measurement accuracy in high Doppler conditions with 2 cells | Ericsson | - |
R4‑143850 | Wayforward on NAICS | Samsung | - |
R4‑143851 | CR on correction for TM10 CSI reporting requirements | Samsung,Ericsson,Huawei,Qualcomm,MediaTek | - |
R4‑143852 | CR on correction for TM10 CSI reporting requirements | Samsung,Ericsson,Huawei,Qualcomm,MediaTek | - |
R4‑143853 | Rel 11 FeICIC TM9 Demodulation Test | Qualcomm Incorporated | - |
R4‑143854 | Simulation result for intraband non-contiguous CA timing offset test | Qualcomm Incorporated | - |
R4‑143855 | Wayforward for CRS-IC in CoMP | Qualcomm | - |
R4‑143856 | Draft TR 36.855 v0.4.0 Feasibility of positioning enhancements for E-UTRA (2014-05) | Huawei, HiSilicon | - |
R4‑143857 | TP for TR 36.855 on performance characterization of PRS transmit diversity | Qualcomm Incorporated | - |
R4‑143858 | Way forward on positioning enhancement in het-net scenarios | Huawei, HiSilicon | - |
R4‑143859 | Meeting minutes for SU-MIMO ad hoc | Huawei | - |
R4‑143860 | Meeting minutes for Dual Connectivity ad hoc | Huawei | - |
R4‑143861 | Wayforward on downlink scheduling for MTC HD-FDD demod test | Huawei | - |
R4‑143862 | Introduction of test cases for 5MHz +5MHz : E-UTRA event triggered reporting on deactivated SCell with PCell interruption in non-DRX | Ericsson | - |
R4‑143863 | Introduction of test cases for 5MHz +5MHz : RSTD Measurement Reporting Test Case | Ericsson | - |
R4‑143864 | Introduction of test cases for 5MHz +5MHz : RSTD Measurement Accuracy in Carrier Aggregation for 5 + 5MHz bandwidth | Ericsson | - |
R4‑143865 | Way forward on methodology on performance requirement for DL CA with 2 or 3DL CCs in Rel-12 | Ericsson | - |
R4‑143866 | Wayforward on the methodology of CA performance requirements for more than two CCs including FDD + TDD CA | CMCC | - |
R4‑143867 | Way forward on UE demodulation performance tests with minimum channel spacing in Rel-12 | Ericsson | - |
R4‑143868 | Introduce RSRP/RSRQ measurement accuracy requirements for 3DL CA | Huawei, HiSilicon, Alcatel-lucent, Nokia, NSN, Ericsson, CATT | - |
R4‑143869 | Introduce the support of 3DL CA to TS 36.133 Section 7.1 "UE transmit timing" | Alcatel-Lucent, Huawei, HiSilicon, CATT | - |
R4‑143870 | SCell activation and deactivation delay requirements for 3 DL CA | Ericsson, Alcatel-Lucent, Huawei, HiSilicon | - |
R4‑143871 | Introduce the support of 3DL CA to TS 36.133 Section 7.8 Interruptions with Carrier Aggregation | Alcatel-Lucent | - |
R4‑143872 | Requirements for UE Measurements Procedures in RRC_CONNECTED State for 3DL CA | Nokia Corporation, NSN | - |
R4‑143873 | Introduce RRM measurement requirements for eIMTA | Huawei, HiSilicon, CATT, Ericsson | - |
R4‑143874 | Inter frequency measurements using autonomous gaps | CATT,Huawei, HiSilicon | - |
R4‑143875 | Throughput calculation for eICIC demodulation requirements | Anritsu, LG Electronics, Rohde & Schwarz, Huawei | - |
R4‑143876 | Wayforward on SU-MIMO performance | Ericsson | - |
R4‑143877 | Wayforward on eIMTA demod | Intel | - |
R4‑143878 | RRM requirements for TDD-FDD CA | Ericsson, Nokia, NSN | - |
R4‑143879 | CR on 36.133 for LTE TDD-FDD joint operation including Carrier Aggregation | NSN, Nokia Corporation | - |
R4‑143880 | TP for TR 36.833-1-27 updates for RRM and Demod | NII Holdings | - |
R4‑143881 | CR on PDSCH transmission for eICIC CSI requirements (Rel-11) | Huawei, HiSilicon, Anritsu | - |
R4‑143882 | CR for EPDCCH SDR test (Rel-11) | Huawei, HiSilicon | - |
R4‑143883 | Meeting minutes for IncMon ad hoc | Ericsson | - |
R4‑143884 | Working assumption for TDD-FDD CA UE performance tests | Ericsson | - |
R4‑143885 | Wayforward on RRM requirements for eIMTA | Ericsson | - |
R4‑143886 | Wayforward on IncMon | Ericsson | - |
R4‑143887 | Wayforward on Pcell interruption for deactivated SCell measurements in Rel-11 | Ericsson | - |
R4‑143888 | LS on maximum transmission timing difference | Ericsson | - |
R4‑143889 | Clarification on UE bahavior considering max transmit timing difference between TAGs r11 | Huawei, HiSilicon | - |
R4‑143890 | WF on different TDD configurations in CA | Ericsson | - |
R4‑143891 | CR of introducing FeICIC TM9 testing (Rel-11) | Huawei, HiSilicon | - |
R4‑143892 | CR of modification on FeICIC rank testing (Rel-11) | Huawei, HiSilicon | - |
R4‑143893 | Additional updates of UE categories for demodualtion performance requirements (Rel-12) | Huawei, HiSilicon | - |
R4‑143894 | Wayforward on RSRP/RSRQ requirements under high Doppler condition | Huawei, HiSilicon | - |
R4‑143895 | Rel-12 UE feature list for SU-MIMO | NTT DOCOMO, Ericsson, Huawei, HiSilicon | - |
R4‑143896 | Wayforward on demodulation test under high Doppler environment | NTT DOCOMO | - |
R4‑143897 | Wayforward on Pcell interruption for deactivated SCell measurements in Rel-12 | NSN, Nokia | - |
R4‑143898 | TS 36.112 Section 7 Text Proposal | TruePosition | - |
R4‑143899 | TS 36.112 Section 8 Text Proposal | TruePosition | - |
R4‑143900 | Meeting minutes for ehanced DL-MIMO ad hoc | Alcatel Lucent | - |
R4‑143901 | Wayforward on PUSCH 3-2 test | Huawei, HiSilicon, ALU | - |
R4‑143902 | WF on interruption hnadling for inter-freq/RAT measurements in R12 | NTT DOOCMO | - |
R4‑143903 | WF on demodulation test for intra band NC CA with timing offset | NTT DOCOMO | - |
R4‑143904 | FRC for DL MIMO enahncement PMI requirements | ZTE | - |
R4‑143905 | WF on tightening absolute RSRP requirements | CMCC | - |
R4‑143906 | LS on extending RSRQ range | Ericsson | - |
R4‑143907 | LS Out to RAN2 on introducing the new RSRQ measurements definition | Nokia Corporation, NSN | - |
R4‑143908 | Clarifications on TDD UL-DL configuration applicability for R12 | Huawei, HiSilicon | - |
R4‑143909 | CR on PCell Interruptions for Shorter Measurement Cycles | Qualcomm Incorporated | - |
R4‑143910 | Introduce the support of 3DL CA to TS 36.133 Section 7.8 "Interruptions with Carrier Aggregation" | Alcatel-Lucent, Huawei, HiSilicon, Qualcomm, CATT, Ericsson, Intel | - |
R4‑143911 | Wayforward on Pcell interruption for deactivated SCell measurements in Rel-12 | NSN, Nokia | - |
R4‑143912 | LS Out to RAN2 on introducing the new RSRQ measurements definition | Nokia Corporation, NSN | - |
R4‑143913 | Methodology for studying ECID enhancement with RRH | Huawei, HiSilicon | - |
R4‑143914 | LS on extending RSRQ range | Ericsson | - |
R4‑143915 | Preparation of LTE Rel-12 UE feature list | NTT DOCOMO, INC. | - |
R4‑143916 | WF on demodulation test for intra band NC CA with power imbalance | NTT DOCOMO | - |
R4‑143917 | Further agreements on increased carrier monitoring | Ericsson | - |
R4‑143918 | Booked for RRM session | - | - |
R4‑143919 | Booked for RRM session | - | - |
R4‑143920 | Booked for RRM session | - | - |
R4‑143921 | Booked for RRM session | - | - |
R4‑143922 | Booked for RRM session | - | - |
R4‑143923 | Booked for RRM session | - | - |
R4‑143924 | Booked for RRM session | - | - |
R4‑143925 | Booked for RRM session | - | - |
R4‑143926 | Booked for RRM session | - | - |
R4‑143927 | Booked for RRM session | - | - |
R4‑143928 | Booked for RRM session | - | - |
R4‑143929 | Booked for RRM session | - | - |
R4‑143930 | Booked for RRM session | - | - |
R4‑143931 | Designation of UL and DL CA classes and configurations | Qualcomm Incorporated | - |
R4‑143932 | Correction of test configurations for intra-band non-contiguous aggregation | Ericsson | - |
R4‑143933 | Correction on minimum sub-block gap size and related clarifications for NC intra-band CA | Qualcomm Incorporated | - |
R4‑143934 | Correction of UEM for Medium Range and Local Area BS | Ericsson | - |
R4‑143935 | Correction of UEM for Medium Range and Local Area BS | Ericsson | - |
R4‑143936 | LS on CRs for MSR specifications | Ericsson | - |
R4‑143937 | Introduction of Band 28 requirements for flexible operation in Japan | KDDI, Ericsson | - |
R4‑143938 | TS 36.112 Annex A Text Proposal | TruePosition | - |
R4‑143939 | CR to TS 36.101 on introduction of CA BW class D requirements | Sprint, ALU, China Mobile, Ericsson | - |
R4‑143940 | UE transmitter requirements related to CA_Band 42C | CATT | - |
R4‑143941 | TP for TR37.814, clause 12: lists of required changes in BS core specifications. | Ericsson, Huawei, NSN | - |
R4‑143942 | Introduction of operating band XXXII in TS25.104 | Ericsson, Huawei, NSN | - |
R4‑143943 | Introduction of Band 32/XXXII | Ericsson, NSN, Huawei | - |
R4‑143944 | TP for TR37.814, clause 12: lists of required changes in BS conformance specifications. | Ericsson, Huawei, NSN | - |
R4‑143945 | Introduction of operating band XXXII In TS25.141 | Ericsson, Huawei, NSN | - |
R4‑143946 | Introduction of operating band 32 and CA band 20+32 in TS36.141 | NSN, Ericsson, Huawei | - |
R4‑143947 | Introduction of Band 32/XXXII | Ericsson, NSN, Huawei | - |
R4‑143948 | Introduction of Band 32, XXXII | Ericsson | - |
R4‑143949 | Introduction of Band 20+32 CA | Ericsson, Orange | - |
R4‑143950 | Introduction of Band 20+32 CA | Ericsson, Orange | - |
R4‑143951 | Introduction of Band 20+32 CA | Ericsson, Orange | - |
R4‑143952 | TP for TR 36.861: BS co-existence between the 2GHz band and Band 1 | Ericsson | - |
R4‑143953 | TP for TR 37.846: BS co-existence between the 2GHz band and Band 1 | Ericsson | - |
R4‑143954 | CR to TS 36.101 on introduction of 3DL intra-band non-contiguous CA requirements | Samsung, Sprint, Alcatel-Lucent | - |
R4‑143955 | TP for TR 36833-6-41: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced intra-band contiguous or non-contiguous Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | - |
R4‑143956 | Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 20 | NSN, Etisalat, Broadcom, Ericsson, Qualcomm, Huawei, Alcatel-Lucent | - |
R4‑143957 | Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 20, independent of LTE Release | Etisalat, NSN, Qualcomm, Huawei, Alcatel-Lucent, Broadcom, KT | - |
R4‑143958 | TP to 36.851 on B1+B3 | Vodafone | - |
R4‑143959 | WF on B1+B3 reference sensitivity | vodaphone | - |
R4‑143960 | AAS WI Ad hoc meeting agenda and meeting minutes for RAN4#71 | Huawei | - |
R4‑143961 | TR 36.860 V0.8.0: Update of harmonic and IMD tables | Huawei | - |
R4‑143962 | WF on 2UL inter-band CA impact to GNSS | Qualcomm | - |
R4‑143963 | TP for higher order IMD impacts for 2ULs CA_1A-5A UE | LG Electronics | - |
R4‑143964 | WF for AAS BS conformance testing | Ericsson | - |
R4‑143965 | TP for TR 37.842: Definitions, symbols and abbreviations in AAS BS WI TR | Ericsson | - |
R4‑143966 | OTA receiver sensitivity: summary and WF | NSN | - |
R4‑143967 | TP for OTA receiver AAS requirements | NSN | - |
R4‑143968 | AAS WI Ad hoc meeting agenda and meeting minutes for RAN4#71 | Huawei | - |
R4‑143969 | Way Forward on BS configurations for TDD-FDD joint operation including Carrier Aggregation | NTT Docomo | - |
R4‑143970 | Introduction of operating band 32 and CA band 20+32 in TS36.104 | NSN, Ericsson, Huawei | - |
R4‑143971 | Revised results of UE specific beam forming for AAS coexistence simulation | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - |
R4‑143972 | WF for AAS BS conformance testing | Ericsson | - |
R4‑143973 | OTA receiver sensitivity: summary and WF | NSN | - |
R4‑143974 | TP for OTA receiver AAS requirements | NSN | - |
R4‑143975 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 1-5 | Ericsson | - |
R4‑143976 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 6-7 | Ericsson | - |
R4‑143977 | Way forward on CA_Band 42C | CATT | - |
R4‑143978 | Ad hoc minutes: BS specification improvement | Ericsson | - |
R4‑143979 | WF on Conducted output power and unwanted emissions | Ericsson | - |
R4‑143980 | TP on Conducted Output power Requirements for AAS BS TR | NEC | - |
R4‑143981 | Text proposal on transmitter inter-modulation | Huawei | - |
R4‑143982 | CR to TR37.902 on improving tablets definition | Intel Corporation, Sony Mobile | - |
R4‑143983 | Text proposal on radiated output power accuracy analyses | Huawei | - |
R4‑143984 | TP Declaration of Beams and EIRP requirements for AAS BS TR | NEC | - |
R4‑143985 | Introduction of CA_41D to 36.307(Rel-10) | Sprint | - |
R4‑143986 | Introduction of CA_41D to 36.307(Rel-11) | Sprint | - |
R4‑143987 | Introduction of CA band combination CA_41D into TS 36.307 (Rel-12) | Sprint | - |
R4‑143988 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA REFSENS | Nokia Corporation | - |
R4‑143989 | Clarification on definitions and ACLR requirement in TS36.104 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | - |
R4‑143990 | Clarification on definitions and ACLR requirement in TS36.141 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | - |
R4‑143991 | Clarification on definitions and ACLR requirement in TS37.104 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | - |
R4‑143992 | Clarification on definitions and ACLR requirement in TS37.141 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | - |
R4‑143993 | Clarification on definitions and ACLR requirement in TS25.104 | ZTE, NSN, Ericsson, Alcatel Lucent, Huawei, Tejet | - |
R4‑143994 | Clarification of Foffset-RAT in relation to radio bandwidth in TS 37.104 (Rel-11) | Ericsson, Huawei, NSN, ALU | - |
R4‑143995 | Clarification of Foffset-RAT in relation to radio bandwidth in TS 37.141 (Rel-11) | Ericsson, Huawei, NSN, ALU | - |
R4‑143996 | BS output power definitions and testing | Ericsson, Huawei, NSN | - |
R4‑143997 | Way forward on CA fallback | Vodafone | - |
R4‑143998 | TP for 36.853: UE requirements for intra-band contiguous CA in Band 12 | Ericsson | - |
R4‑143999 | TP for 36.853: UE requirements for band combinations with Band 30 | Ericsson | - |
R4‑144000 | TP for TR 36.853: Additional Insertion Loss for 3 band CA of B1+B3+B5 | SK Telecom | - |
R4‑144001 | Introduction of 3 Band Carrier Aggregation to TS 36.104 | SK Telecom | - |
R4‑144002 | Introduction of 3 Band Carrier Aggregation to TS 36.141 | SK Telecom | - |
R4‑144003 | TP for TR 36.853: Additional insertion loss for LTE_CA_B1_B3_B8 | KT | - |
R4‑144004 | Introduction of CA band combination B1+B3+B8 to TS 36.101 | KT | - |
R4‑144005 | TP for TR 36.853: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 2, Band 4 and Band 4 | NSN, T-Mobile USA | - |
R4‑144006 | TP for TR 36.853: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 4, Band 4 and Band 12 | NSN, T-Mobile USA | - |
R4‑144007 | Introduction of 3 Band Carrier Aggregation of Band 1,Band 3 and Band 5 to TS 36.101 | SK Telecom | - |
R4‑144008 | for RRM and demodulation performance ad hoc in June 2014 | Huawei, HiSilicon | - |
R4‑144009 | CR for phablet OTA testing to TR 25.914 | Sporton International Inc. | - |
R4‑144010 | CA features and release independence | Broadcom Corporation | - |
R4‑144011 | Reply LS on frequency stability for D2D | Qualcomm Incorporated | - |
R4‑144012 | WF on Band XXVI | Ericsson | - |
R4‑144013 | Reply Liaison on WLAN signal measurements for WLAN/3GPP Radio interworking (IEEE_802_11WG Source: IEEE 802.11 WG, To: TSG RAN WG2, Cc: TSG RAN WG4,TSG RAN WG5,TSG SA WG2,TSG RAN) | IEEE 802.11 WG | - |
R4‑144014 | LS on D2D Multicarrier Capabilities (R1-142652 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4,TSG SA WG2, Cc: ) | TSG RAN WG1 | - |
R4‑144015 | LS on small cell discovery signal (R1-142698 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑144016 | LS on introducing the EVS codec in MTSI (S4-140750 Source: TSG SA WG4, To: TSG CT WG1,TSG CT WG3,TSG CT WG4,TSG SA WG2,TSG RAN WG1, Cc: TSG RAN WG4) | TSG SA WG4 | - |
R4‑144017 | Way forward on new capability sets to 37.141 | NSN | - |
R4‑144018 | Simplification of Band 12/17 in-band blocking test cases | U.S. Cellular, Intel | - |
R4‑144019 | WF on band 1+42 TDD-FDD CA | NTT Docomo | - |
R4‑144020 | TP for TR 36.851: The clarification of LTE TDD-FDD joint operation in BS RF requirement | NSN | - |
R4‑144021 | Way Forward on BS configurations for TDD-FDD joint operation including Carrier Aggregation | NTT Docomo | - |
R4‑144022 | Introduction of Band 28 requirements for flexible operation in Japan | KDDI, Ericsson | - |
R4‑144023 | Radiated transmit power requirement WF | Ericsson | - |
R4‑144024 | Discussion on reference measurement channel for TDD MTC UE | Huawei | - |
R4‑144025 | Introduction of a new CA_7C bandwidth combination set into 36.101 | Nokia Corporation, Huawei, Orange and Qualcomm Incorporated, Deutsche Telekom | - |
R4‑144026 | Minutes of UE CA issues Ad-Hoc | Nokia Corporation | - |
R4‑144027 | Agreements of UE CA issues Ad-Hoc | Nokia Corporation | - |
R4‑144028 | Draft WID for MIMO OTA antenna test function | Agilent Technologies | - |
R4‑144029 | Low Cost MTC reference sensitivity | Vodafone | - |
R4‑144030 | WF On UE requirements for SCE | Huawei, Hisilicon | - |
R4‑144031 | WF on 2UL inter-band CA MSD test configurations | Mediatek | - |
R4‑144032 | Simulation Assumptions for Studying D2D UE-to-UE Co-existence | Ericsson | - |
R4‑144033 | D2D Coexistence: Simulation Results | Qualcomm Incorporated | - |
R4‑144034 | LS out on RAN4 D2D coexistence study | Qualcomm Incorporated | - |
R4‑144035 | Reply LS on SFN handling in the dual connectivity (R3-141479 Source: TSG RAN WG3, To: TSG RAN WG2, Cc: TSG RAN WG1,TSG RAN WG4) | TSG RAN WG3 | - |
R4‑144036 | LS on Further EUL Enhancements (R1-142617 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑144037 | LS on MBSFN MDT (R2-142873 Source: TSG RAN WG2, To: TSG RAN WG3,TSG RAN WG4,TSG SA WG5, Cc: ) | TSG RAN WG2 | - |
R4‑144038 | WF on BS requirements for 256QAM | Huawei | - |
R4‑144039 | Way forward on 3DL CA finalization | Telecom Italia | - |
R4‑144040 | Inclusion of the out of band emission limit concluded in CEPT into band 28 | NTT DOCOMO, INC., Nokia corporation, Telecom Italia, Orange, TeliaSonera | - |
R4‑144041 | Introduction of CA_B42C (2DL/2UL) into TS 36.101 | NTT DOCOMO, INC. | - |
R4‑144042 | UE to UE co-existence between B42/B43 | NTT DOCOMO, INC. | - |
R4‑144043 | WF on MPR/A-MPR versioning and NS_12,13 | Ericsson | - |
R4‑144044 | Reply LS on extending E-UTRA band number and EARFCN numbering space | Broadcom Corporation, BlackBerry Ltd, Qualcomm, NS | - |
R4‑144045 | LS on Further EUL Enhancements (R1-142617 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑144046 | Minutes from ad-hoc for B42 and B43 UE co-existence | TeliaSonera | - |
R4‑144047 | WF on spurious emission levels/ranges and AMPR simulations | TeliaSonera | - |
R4‑144048 | TR 36.833-1-42 v0.3.0: LTE-A intra-band contiguous CA in Band 42 | CATT | - |
R4‑144049 | Text proposal on transmitter inter-modulation | Huawei | - |
R4‑144050 | UE to UE co-existence between B42/B43 | NTT DOCOMO, INC. | - |
R4‑144051 | Introduction of LTE-Advanced CA of Band 8 and Band 40 to TS36.101 | KT, TeliaSonera | - |
R4‑144052 | Simulation Assumptions for Studying D2D UE-to-UE Co-existence | Ericsson | - |
R4‑144053 | LS out on RAN4 D2D coexistence study | Qualcomm Incorporated | - |
R4‑144054 | TP for D2D TR: UE RF core requirements for D2D | Qualcomm Incorporated | - |
R4‑144055 | Introduction of a new CA_7C bandwidth combination set into 36.101 | Nokia Corporation, Orange, Huawei, Qualcomm Incorporated, Deutsche Telekom | - |
R4‑144056 | Introduction of Band 40D in release independent specification (Rel-11) | CATT | - |
R4‑144057 | Introduction of Band 40D in release independent specification (Rel-12) | CATT | - |
R4‑144058 | Introduction of CA band combination CA_41D into TS 36.307 (Rel-10) | Sprint | - |
R4‑144059 | Introduction of CA band combination CA_41D into TS 36.307 (Rel-11) | Sprint | - |
R4‑144060 | LS on discovery signal details (R1-142733 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑144061 | LS on Progress in RAN1 #77 for the UMTS Heterogeneous Networks Enhancements WI (R1-142618 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3, Cc: TSG RAN WG4) | TSG RAN WG1 | - |
R4‑144062 | Response LS on TTI switching indication (R1-142709 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3, Cc: ) | TSG RAN WG1 | - |
R4‑144063 | LS on interference management techniques in Hetnet (R1-142613 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3, Cc: ) | TSG RAN WG1 | - |
R4‑144064 | LS on NAICS High Layer Signaling (R1-142702 Source: TSG RAN WG1, To: TSG RAN WG2,WG4, Cc: TSG RAN WG3) | TSG RAN WG1 | - |
R4‑144065 | Way forward on 3DL CA finalization | Telecom Italia | - |
R4‑144066 | UE to UE co-existence between B42/B43 | NTT DOCOMO, INC. | - |
R4‑144067 | Way forward on 3DL CA finalization | Telecom Italia | - |
R4‑144068 | Proposal for RRM and demodulation performance ad hoc in June 2014 | Huawei, HiSilicon | - |
R4‑144069 | Introduction of CA_42C to TS 36.307 | CATT | - |
R4‑144070 | Introduction of CA_42C to TS 36.307 | CATT | - |
R4‑144071 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity in RAN1#77 (R1-142755 Source: TSG RAN WG1, To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑144072 | TS 36.112 Draft Document | TruePosition | - |
R4‑144073 | 1+7 relaxations proposal | Vodafone | - |
R4‑144074 | Draft LS on 3DL and support for the 2DL fall-back modes | Ericsson | - |
R4‑144075 | Introduction of 3DL CA combinations to release independence spec 36.307, Rel-11 | Ericsson | - |
R4‑144076 | Introduction of 3DL CA combinations to release independence spec 36.307, Rel-12 | Ericsson | - |
R4‑144077 | TS 36.112 Draft Document | TruePosition | - |
R4‑144078 | WF on dual connectivity scenarios | NTT Docomo | - |
R4‑144079 | CR for TS 36.101 on introduction CA_40D | CMCC | - |
page generated from database: 2024-04-22 07:58:53