3GPP TDocs (written contributions) at meeting
Meeting: R4-70b - 2014-03-31 to 2014-04-04, San Jose del Cabo
meeting id: R4-70b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R4‑141265 | Meeting Agenda | Chairman | imported from 3GU |
R4‑141266 | RAN4-70 Meeting report | MCC Support | imported from 3GU |
R4‑141267 | RF: Corrections to spurious emission requirements with NS_11 and NS_20 (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑141268 | RF: Corrections to spurious emission requirements with NS_11 and NS_20 (Rel-11) | Rohde & Schwarz | imported from 3GU |
R4‑141269 | RF: Corrections to spurious emission requirements with NS_11, NS_20 and NS_21 (Rel-12) | Rohde & Schwarz | imported from 3GU |
R4‑141270 | RRM: Clean-up of time offset between cells in RSTD tests (Rel-9) | Rohde & Schwarz | imported from 3GU |
R4‑141271 | RRM: Clean-up of time offset between cells in RSTD tests (Rel-10) | Rohde & Schwarz | imported from 3GU |
R4‑141272 | RRM: Clean-up of time offset between cells in RSTD tests (Rel-11) | Rohde & Schwarz | imported from 3GU |
R4‑141273 | RRM: Clean-up of time offset between cells in RSTD tests (Rel-12) | Rohde & Schwarz | imported from 3GU |
R4‑141274 | CA: RRM Test case and test system complexity for E-UTRA CA with 3CC-s | Rohde & Schwarz | imported from 3GU |
R4‑141275 | Spectral density for unequal DL CC RB allocations in Max input level | Anritsu | imported from 3GU |
R4‑141276 | Unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑141277 | Unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑141278 | Unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑141279 | Intra-band non-contiguous CA unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑141280 | Intra-band non-contiguous CA unequal DL CC RB allocations in Maximum input level | Anritsu | imported from 3GU |
R4‑141281 | Spectral density for unequal DL CC RB allocations in ACS | Anritsu | imported from 3GU |
R4‑141282 | Correlation Matrix and Antenna Configuration for RRM Test Cases | Anritsu | imported from 3GU |
R4‑141283 | Draft CR for FDD-TDD CA for CA_1A-42A | NTT DOCOMO, INC. | imported from 3GU |
R4‑141284 | Clarification on support of constituent CA configurations for 3DL CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑141285 | Bandwidth combination sets for CA_42C | NTT DOCOMO, INC. | imported from 3GU |
R4‑141286 | Way Forward on PUCCH overprovisioning requirement for Band 28 spectra | KDDI | imported from 3GU |
R4‑141287 | UE requirements for B1+B41 combination in TDD-FDD | KDDI, Ericsson | imported from 3GU |
R4‑141288 | Simulation results on UE for Band1+Band41 CA | KDDI | imported from 3GU |
R4‑141289 | Band option for MSS spectra | KDDI | imported from 3GU |
R4‑141290 | Simulation results on UE for Band18+Band28 CA | KDDI | imported from 3GU |
R4‑141291 | UE archtecture on CA_B1-B18-B28 | KDDI | imported from 3GU |
R4‑141292 | Work Plan for CA_B1-B18-B28 (included in CA_B1-B18 work) | KDDI | imported from 3GU |
R4‑141293 | definitions for AAS | CATT, ZTE, Alcatel Lucent, Huawei, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑141294 | Resource block restrictions for Band 28 | Qualcomm Incorporated | imported from 3GU |
R4‑141295 | TP for TR37.814: L-band operation in Japan | KDDI | imported from 3GU |
R4‑141296 | Asymmetric contiguous CA allocation spectrum | Qualcomm Incorporated | imported from 3GU |
R4‑141297 | Power control for intra-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑141298 | B18 + B28 Tx and Rx relaxations | Qualcomm Incorporated | imported from 3GU |
R4‑141299 | Corrections to CA_NS_06 | Qualcomm Incorporated | imported from 3GU |
R4‑141300 | Corrections to CA_NS_06 | Qualcomm Incorporated | imported from 3GU |
R4‑141301 | Corrections to CA_NS_06 | Qualcomm Incorporated | imported from 3GU |
R4‑141302 | Minimum sub-block gap size for NC intra-band CA receiver specifications | Qualcomm Incorporated | imported from 3GU |
R4‑141303 | Correction on minimum sub-block gap size for NC intra-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑141304 | Correction on minimum sub-block gap size for NC intra-band CA | Qualcomm Incorporated | imported from 3GU |
R4‑141305 | Band 1 and Band 28 class A2 reference sensitivity | Qualcomm Incorporated | imported from 3GU |
R4‑141306 | Band 1 and Band 3 UE considerations for CA | Qualcomm Incorporated | imported from 3GU |
R4‑141307 | Interpretation of way forward for 3DL CA relaxations | Qualcomm Incorporated | imported from 3GU |
R4‑141308 | 2UL inter-band class A2 specifications | Qualcomm Incorporated | imported from 3GU |
R4‑141309 | Multi-band corrections in 36.141 chapter 6 | NSN, Alcatel-Lucent, Ericsson | imported from 3GU |
R4‑141310 | Multi-band corrections in 36.141 chapter 6 | NSN, Alcatel-Lucent, Ericsson | imported from 3GU |
R4‑141311 | Multi-band corrections in 36.141 chapter 7 | NSN, Alcatel-Lucent, Ericsson | imported from 3GU |
R4‑141312 | Multi-band corrections in 36.141 chapter 7 | NSN, Alcatel-Lucent, Ericsson | imported from 3GU |
R4‑141313 | Multi-band corrections in 37.141 chapter 6 | NSN | imported from 3GU |
R4‑141314 | Multi-band corrections in 37.141 chapter 6 | NSN | imported from 3GU |
R4‑141315 | Multi-band corrections in 37.141 chapter 7 | NSN | imported from 3GU |
R4‑141316 | Multi-band corrections in 37.141 chapter 7 | NSN | imported from 3GU |
R4‑141317 | Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 3, Band 7 and Band 7 | NSN, Orange, Deutsche Telekom | imported from 3GU |
R4‑141318 | TP for TR 36.853: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 3, Band 7 and Band 7 | NSN, Orange, Deutsche Telekom | imported from 3GU |
R4‑141319 | Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 3, Band 3 and Band 7 | NSN, Telefonica | imported from 3GU |
R4‑141320 | TP for TR 36.853: Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 3, Band 3 and Band 7 | NSN, Telefonica | imported from 3GU |
R4‑141321 | Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 3 and Band 20 | NSN | imported from 3GU |
R4‑141322 | TP for TR 36.851: Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 20 | NSN | imported from 3GU |
R4‑141323 | Harmonics and intermodulation products generated by the BS supporting LTE-A CA of Band 7 and Band 20 | NSN | imported from 3GU |
R4‑141324 | TP for TR 36.851: Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 7 and Band 20 | NSN | imported from 3GU |
R4‑141325 | Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 3 and Band 20 | NSN | imported from 3GU |
R4‑141326 | Additional bandwidth combination set for LTE Advanced inter-band Carrier Aggregation of Band 7 and Band 20 | NSN | imported from 3GU |
R4‑141327 | Considerations on BS requirements for 256QAM | NSN | imported from 3GU |
R4‑141328 | CR on B42/B43 co-existence | NTT DOCOMO, INC., NII, Intel, Sofbank Mobile, eAcc | imported from 3GU |
R4‑141329 | CR on B42/B43 co-existence | NTT DOCOMO, INC., NII, Intel, Sofbank Mobile, eAcc | imported from 3GU |
R4‑141330 | CR on B42/B43 co-existence | NTT DOCOMO, INC., NII, Intel, Sofbank Mobile, eAcc | imported from 3GU |
R4‑141331 | CR for clarification for receiver requirement on MB-MSR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑141332 | CR for clarification for receiver requirement on MB-MSR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑141333 | CR for clarification for receiver requirement on MB-MSR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑141334 | CR for clarification for receiver requirement on MB-MSR BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑141335 | Way forward on Multi-band BS for TDD-FDD joint operation including Carrier Aggregation | NTT DOCOMO, INC. | imported from 3GU |
R4‑141336 | Further Consideration on BS Specification for TDD-FDD joint operation including Carrier Aggregation | NTT DOCOMO, INC. | imported from 3GU |
R4‑141337 | Draft CR for TDD-FDD CA for CA_1A-42A(TS36.104/141) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141338 | TP for TR36.851: Co-existence study on LTE Advanced Carrier Aggregation of Band Combination (1+42) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141339 | TP for TR36.851: Operating bands and CA configurations on LTE Advanced Carrier Aggregation of Band Combination (1+42) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141340 | AAS BS specification structure and conformance | NTT DOCOMO, INC., NEC | imported from 3GU |
R4‑141341 | Further consideration on Unwanted Emissions for AAS BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑141342 | The number of physical transceivers for AAS BS | NTT DOCOMO, INC. | imported from 3GU |
R4‑141343 | TP for section 6(Operating bands and CA configurations) of TR36.853 on LTE Advanced Carrier Aggregation of Band Combination (1+19+21) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141344 | TR 36.833-1-42 v0.1.0: LTE-A intra-band contiguous CA in Band 42 | CATT | imported from 3GU |
R4‑141345 | TP for section 6(Harmonics and IMD Study for the BS) of TR36.853 on LTE Advanced Carrier Aggregation of Band Combination (1+19+21) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141346 | Work plan for LTE-A intra-band contiguous CA in Band 42 | CATT | imported from 3GU |
R4‑141347 | Introduction of CA band combination Band1 + Band19 + Band21 to TS 36.104 | NTT DOCOMO, INC. | imported from 3GU |
R4‑141348 | Spectrum and regulatory review for intra-band CA in Band 42 | CATT | imported from 3GU |
R4‑141349 | Introduction of CA band combination Band1 + Band19 + Band21 to TS 36.141 | NTT DOCOMO, INC. | imported from 3GU |
R4‑141350 | Band 42 intra-band contiguous CA impact on BS RF requirements | CATT | imported from 3GU |
R4‑141351 | Band 42 intra-band contiguous CA impact on RRM requirements | CATT | imported from 3GU |
R4‑141352 | Way forward on the impact of BS specification for 2 GHz MSS Band | NTT DOCOMO, INC. | imported from 3GU |
R4‑141353 | Band 42 intra-band contiguous CA impact on UE requirements | CATT | imported from 3GU |
R4‑141354 | Required changes to 36.307 for Band 42C | CATT | imported from 3GU |
R4‑141355 | AAS BS requirements considerations | NEC | imported from 3GU |
R4‑141356 | Technical Report for 3 Band Carrier Aggregation with Single Uplink | AT&T | imported from 3GU |
R4‑141357 | TP to confirm MCL values for AAS BS Classes in AAS BS TR | NEC | imported from 3GU |
R4‑141358 | TP on Radiated Output power Requirements for TR on AAS BS | NEC | imported from 3GU |
R4‑141359 | TP on Conducted Output power Requirements for AAS BS | NEC | imported from 3GU |
R4‑141360 | TP on Conducted Sensitivity Requirements for AAS BS TR | NEC | imported from 3GU |
R4‑141361 | Operating Band Unwanted Emission Requirement for AAS BS | NEC | imported from 3GU |
R4‑141362 | Transmitter Intermodulation Requirement for AAS BS | NEC | imported from 3GU |
R4‑141363 | TP on Error Vector Magnitude Requirements for AAS BS TR | NEC | imported from 3GU |
R4‑141364 | TP on ACLR Requirements for AAS BS | NEC | imported from 3GU |
R4‑141365 | TP on Time Alignment Error Requirements for AAS BS TR | NEC | imported from 3GU |
R4‑141366 | Packet loss rate due to measurements with deactivated Scell | Ericsson | imported from 3GU |
R4‑141367 | Analysis of serving cell interruption for single chip UE implementation | Ericsson | imported from 3GU |
R4‑141368 | Frequency switching time for measurements in gaps | Ericsson | imported from 3GU |
R4‑141369 | UE Behaviour for Transmission due to Measurement Gaps | Ericsson | imported from 3GU |
R4‑141370 | Correction on UE Behaviour for Transmission due to Measurement Gaps | Ericsson | imported from 3GU |
R4‑141371 | Further anaysis of RRM requirements for 3 DL CA | Ericsson | imported from 3GU |
R4‑141372 | RRM requirements in Section 7 for 3 DL CA | Ericsson | imported from 3GU |
R4‑141373 | RRM requirements in Section 8 for 3 DL CA | Ericsson | imported from 3GU |
R4‑141374 | RRM requirements in Section 9 for 3 DL CA | Ericsson | imported from 3GU |
R4‑141375 | Analysis of 1 Rx UE on RLM requirements | Ericsson | imported from 3GU |
R4‑141376 | Text Proposal: Demodulation for TR 36.833-2-23 LTE_CA_NC_B23 | Dish Network, Huawei, HiSilicon, Ericsson, Qualcom | imported from 3GU |
R4‑141377 | Text Proposal: RRM for TR 36.833-2-23 LTE_CA_NC_B23 | Dish Network, Huawei, HiSilicon | imported from 3GU |
R4‑141378 | Text Proposal: Affected Specifications for TR 36.833-2-23 LTE_CA_NC_B23 | DIsh Network | imported from 3GU |
R4‑141379 | TS 36.112 LMU Conformance Specification 0.3.0 | TruePosition | imported from 3GU |
R4‑141380 | On revising CSI reference measurement channel | Qualcomm Incorporated | imported from 3GU |
R4‑141381 | CR on CSI reference measurement channel table revision (Rel-10) | Qualcomm Incorporated | imported from 3GU |
R4‑141382 | CR on CSI reference measurement channel table revision (Rel-11) | Qualcomm Incorporated | imported from 3GU |
R4‑141383 | CR on CSI reference measurement channel table revision (Rel-12) | Qualcomm Incorporated | imported from 3GU |
R4‑141384 | Further system level simulation on CRS interference cancellation in CoMP | Qualcomm Incorporated | imported from 3GU |
R4‑141385 | Simulation results for TM10 localized ePDCCH demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑141386 | Performance requirements for CA_27B | Qualcomm Incorporated | imported from 3GU |
R4‑141387 | Performance requirements for CA_23A-23A | Qualcomm Incorporated | imported from 3GU |
R4‑141388 | Test framework for intraband-non-contiguous CA demodulation test | Qualcomm Incorporated | imported from 3GU |
R4‑141389 | Further discussion on scalable CA performance requirements | Qualcomm Incorporated | imported from 3GU |
R4‑141390 | Further discussion on MBMS BLER measurement | Qualcomm Incorporated | imported from 3GU |
R4‑141391 | TS 36.112 Section 4 Discussion and Text Proposal | TruePosition | imported from 3GU |
R4‑141392 | TS 36.112 Section 5 Text Proposal | TruePosition | imported from 3GU |
R4‑141393 | TS 36.112 Section 7 Text Proposal | TruePosition | imported from 3GU |
R4‑141394 | TS 36.112 Section 8 Text Proposal | TruePosition | imported from 3GU |
R4‑141395 | TS 36.112 Annex E Text Proposal | TruePosition | imported from 3GU |
R4‑141396 | TS 36.112 Annex F Text Proposal | TruePosition | imported from 3GU |
R4‑141397 | TS 36.112 Annex G Text Proposal | TruePosition | imported from 3GU |
R4‑141398 | TR 36833-5-41 V0.3.0 | Sprint | imported from 3GU |
R4‑141399 | TR 36833-6-41 V0.1.0 | Sprint | imported from 3GU |
R4‑141400 | CR for TS 36.101 on introduction CA_41D | Sprint | imported from 3GU |
R4‑141401 | CR to TS 36.101 on introduction of CA BW class D requirements | Sprint | imported from 3GU |
R4‑141402 | TP for TR 36.833-6-41: Bandwidth combination table for CA_B41A_41C | Sprint | imported from 3GU |
R4‑141403 | TP for TR36.851: Editorial corrections for CA 1+8 | SoftBank Mobile | imported from 3GU |
R4‑141404 | TP for TR36.851: TIB and RIB proposal for CA 1+11 | SoftBank Mobile | imported from 3GU |
R4‑141405 | TP for TR36.851: TIB and RIB proposal for CA 8+11 | SoftBank Mobile | imported from 3GU |
R4‑141406 | Further Discussion of RRM Requirements for 3DL/1UL CA | Alcatel-Lucent | imported from 3GU |
R4‑141407 | Introduce the support of 3DL CA to RRM requirements for Timing and signalling characteristics | Alcatel-Lucent | imported from 3GU |
R4‑141408 | Introduce the support of 3DL CA to RRM requirements for UE Measurements Procedures in RRC_CONNECTED State | Alcatel-Lucent | imported from 3GU |
R4‑141409 | Introduce the support of 3DL CA to RRM requirements for Measurements performance requirements for UE | Alcatel-Lucent | imported from 3GU |
R4‑141410 | Introduce the support of 3DL CA to RRM requirements for RSTD Measurements for E-UTRAN | Alcatel-Lucent | imported from 3GU |
R4‑141411 | Discussion on Typical Scenarios for SU-MIMO Deployments | NTT DOCOMO, INC. | imported from 3GU |
R4‑141412 | Discussion on Scenarios of Different Transmission Modes for NAICS | NTT DOCOMO, INC. | imported from 3GU |
R4‑141413 | Clarification on release inependent aspect for TDD-FDD CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑141414 | Discussion on transmitter off power for FDD/TDD CA | CATT | imported from 3GU |
R4‑141415 | Transmitter OFF power | CATT | imported from 3GU |
R4‑141416 | Transmitter OFF power | CATT | imported from 3GU |
R4‑141417 | Removing DPCH for handover from E-UTRAN to UTRA TDD for Rel-10 | CATT, Ericsson | imported from 3GU |
R4‑141418 | Removing DPCH for handover from E-UTRAN to UTRA TDD for Rel-11 | CATT, Ericsson | imported from 3GU |
R4‑141419 | Removing DPCH for handover from E-UTRAN to UTRA TDD for Rel-12 | CATT, Ericsson | imported from 3GU |
R4‑141420 | RRM requirements for UE increased minimum number of monitored carriers for E-UTRA | CATT | imported from 3GU |
R4‑141421 | Increasing minimum number of carriers E-UTRA UE can monitor | CATT | imported from 3GU |
R4‑141422 | Transmitter OFF power | CATT | imported from 3GU |
R4‑141423 | Transmitter OFF power | CATT | imported from 3GU |
R4‑141424 | TP for TR 36.853: For LTE_CA_B1_B3_B26 | China Telecom | imported from 3GU |
R4‑141425 | TP for TR 36.853: For LTE_CA_B1_B3_B26 BS specific | China Telecom | imported from 3GU |
R4‑141426 | Simulation results for intra-band non-contiguous CA for Band 23 | Ericsson | imported from 3GU |
R4‑141427 | Simulation results for intra-band contiguous CA for Band 27 | Ericsson | imported from 3GU |
R4‑141428 | Test proposal for TDD-FDD CA UE performance requirement | Ericsson | imported from 3GU |
R4‑141429 | CR on correction on TDD IRC CQI test in Rel-11 | Ericsson | imported from 3GU |
R4‑141430 | CR on correction on TDD IRC CQI test in Rel-12 | Ericsson | imported from 3GU |
R4‑141431 | Simulation results with timing offset under non-collocated deployment for intra-band NC CA | Ericsson | imported from 3GU |
R4‑141432 | Test proposal for intra-band NC CA under non-collocated deployment with large power imbalance | Ericsson | imported from 3GU |
R4‑141433 | Methodology on performance requirement for DL CA with 2 or 3DL CCs in Rel-12 | Ericsson | imported from 3GU |
R4‑141434 | Test scope for UE performance requirement for DL CA with 2 or 3DL CCs in Rel-12 | Ericsson | imported from 3GU |
R4‑141435 | Working assumption for SU-MIMO UE performance test | Ericsson | imported from 3GU |
R4‑141436 | Test proposal for SU-MIMO UE demodulation requirement | Ericsson | imported from 3GU |
R4‑141437 | Test proposal for SU-MIMO UE CSI requirement | Ericsson | imported from 3GU |
R4‑141438 | CR to separate CA performance tests in 36.101 in Rel-10 | Ericsson | imported from 3GU |
R4‑141439 | CR to separate CA performance tests in 36.101 in Rel-11 | Ericsson | imported from 3GU |
R4‑141440 | CR to separate CA performance tests in 36.101 in Rel-12 | Ericsson | imported from 3GU |
R4‑141441 | Test proposal for CA_39A-41A UE performance requirement | Ericsson | imported from 3GU |
R4‑141442 | Way Forward on UE REFSENS for CA_1A-28A | KDDI | imported from 3GU |
R4‑141443 | Maximum Time Difference for TDD CA UEs Not Capable of Simultaneous Tx-Rx | Qualcomm Incorporated | imported from 3GU |
R4‑141444 | PRS Signal Levels in RSTD Reporting Tests with Fading Channels | Qualcomm Incorporated | imported from 3GU |
R4‑141445 | Way Forward on RSSI measurement for RSRQ | Qualcomm Incorporated, Verizon Wireless | imported from 3GU |
R4‑141446 | RRM Requirements for MTC Devices | Qualcomm Incorporated | imported from 3GU |
R4‑141447 | E-UTRA Requirements for Increasing the Number of Carriers to Monitor | Qualcomm Incorporated | imported from 3GU |
R4‑141448 | RSRP/RSRQ Requirements for High Doppler Channels | Qualcomm Incorporated | imported from 3GU |
R4‑141449 | MBSFN RS Based RSRP/RSRQ Requirements | Qualcomm Incorporated | imported from 3GU |
R4‑141450 | MBSFN RS Based RSRP/RSRQ Accuracy Simulation Results | Qualcomm Incorporated | imported from 3GU |
R4‑141451 | PCell Interruptions for Shorter Deactivated SCell Measurement Cycles | Qualcomm Incorporated | imported from 3GU |
R4‑141452 | TP for TR 36.833-6-41: Reference sensitivity power level | Sprint | imported from 3GU |
R4‑141453 | Rel 11 FeICIC RI Test Consideration | Qualcomm Incorporated | imported from 3GU |
R4‑141454 | Introduction of B39 and B41 for low cost MTC | CMCC | imported from 3GU |
R4‑141455 | Rel 11 FeICIC TM9 Demodulation Test | Qualcomm Incorporated | imported from 3GU |
R4‑141456 | Rel 11 FeICIC PBCH-IC | Qualcomm Incorporated | imported from 3GU |
R4‑141457 | LC-MTC PDSCH Demodulation | Qualcomm Incorporated | imported from 3GU |
R4‑141458 | SU-MIMO Receiver Type and Test Case Discussion | Qualcomm Incorporated | imported from 3GU |
R4‑141459 | CR: Rel 11 FeICIC TM9 Demodulation Test | Qualcomm Incorporated | imported from 3GU |
R4‑141460 | CR: Rel 11 FeICIC TM9 Demodulation Test | Qualcomm Incorporated | imported from 3GU |
R4‑141461 | CR: Clarification of PBCH pm-bch definition in 36.101 | Qualcomm Incorporated | imported from 3GU |
R4‑141462 | CR: Clarification of PBCH pm-bch definition in 36.101 | Qualcomm Incorporated | imported from 3GU |
R4‑141463 | BS specification impact for EUL enhancement feature | Ericsson | imported from 3GU |
R4‑141464 | Introduction of multi-carrier BS testing in TS 25.141 | Ericsson | imported from 3GU |
R4‑141465 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 1-5 | Ericsson | imported from 3GU |
R4‑141466 | Discussions on B42/43 UE-UE coexistence | CMCC | imported from 3GU |
R4‑141467 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 6-7 | Ericsson | imported from 3GU |
R4‑141468 | eIMTA coexistence simulation results | Ericsson | imported from 3GU |
R4‑141469 | Intra-frequency measurement with autonomous gap in eIMTA | Ericsson | imported from 3GU |
R4‑141470 | CR on Intra-frequency measurement with autonomous gap in eIMTA | Ericsson | imported from 3GU |
R4‑141471 | Simulation results for Inter-frequency RRM requirements for TDD configuration 0 | Ericsson | imported from 3GU |
R4‑141472 | CR on Inter-frequency RRM requirements for TDD configuration 0 | Ericsson | imported from 3GU |
R4‑141473 | Impact of 256 QAM on BS core requirements | Ericsson | imported from 3GU |
R4‑141474 | Impact of 256 QAM on UE core requirements | Ericsson | imported from 3GU |
R4‑141475 | TR 36.851 V0.10.0: Rel-12 Inter-band Carrier Aggregation | Ericsson | imported from 3GU |
R4‑141476 | Clarification of power allocation for RX test cases in TS 37.141 (Rel-11) | Ericsson | imported from 3GU |
R4‑141477 | Clarification of power allocation for RX test cases in TS 37.141 (Rel-12) | Ericsson | imported from 3GU |
R4‑141478 | Finalization of CM/MPR for DC-HSUPA with 16QAM | Qualcomm Incorporated | imported from 3GU |
R4‑141479 | Correction on W2L cell reselection test cases in CELL_FACH | Qualcomm Incorporated | imported from 3GU |
R4‑141480 | RDD of Uplink Pairing Options for FS_LTE_FDD_1670_US | Lightsquared Inc. | imported from 3GU |
R4‑141481 | Measurement requirements to monitor additional UTRA carriers in Idle/URA_PCH/CELL_PCH states | Qualcomm Incorporated | imported from 3GU |
R4‑141482 | Measurement requirements to monitor additional UTRA carriers in CELL_FACH state | Qualcomm Incorporated | imported from 3GU |
R4‑141483 | Measurement requirements to monitor additional UTRA carriers in CELL_DCH state | Qualcomm Incorporated | imported from 3GU |
R4‑141484 | Measurement requirements for optional searchers to monitor additional UTRA carriers in CELL_DCH state | Qualcomm Incorporated | imported from 3GU |
R4‑141485 | Remaining UE core requirements for UTRA Band I + SDL 1452 - 1496 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑141486 | Introduction of UE RF core requirements for UTRA Band I + SDL 1452 - 1496 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑141487 | Introduction of UE RRM performance requirements for UTRA Band I + SDL 1452 - 1496 MHz | Qualcomm Incorporated | imported from 3GU |
R4‑141488 | Correction and Clarification in TR 36.844 [FS_LTE_FDD_1670_US] | Lightsquared Inc | imported from 3GU |
R4‑141489 | Potential RAN4 requirements due to introduction of DCH enhancements | Qualcomm Incorporated | imported from 3GU |
R4‑141490 | CR of EPDCCH localzied test with TM10 QCL Type-B configuration (Rel-11): correction of CSI-RS configurations | Ericsson | imported from 3GU |
R4‑141491 | CR of EPDCCH localzied test with TM10 QCL Type-B configuration (Rel-12): correction of CSI-RS configurations | Ericsson | imported from 3GU |
R4‑141492 | EPDCCH test: final simulation results for EPDCCH demodulation performance | Ericsson | imported from 3GU |
R4‑141493 | UE core impact for EUL enhancement feature | Ericsson | imported from 3GU |
R4‑141494 | D2D co-existence simulation assumptions | Motorola Solutions | imported from 3GU |
R4‑141495 | Text Proposal: 2 GHz Region 1 Background for TR 37.846 | Dish Network, Solaris Mobile Ltd | imported from 3GU |
R4‑141496 | UE performance impact for EUL enhancement feature | Ericsson | imported from 3GU |
R4‑141497 | Text Proposal: 2 GHz Region 1 Regulatory Background for TR 37.846 | Dish Network, Solaris Mobile Ltd | imported from 3GU |
R4‑141498 | Text Proposal: 2 GHz Region 1 Specific Issues for TR 37.846 | Dish Network, Solaris Mobile Ltd | imported from 3GU |
R4‑141499 | Blind detection of NAICS parameters for CRS-based TMs | Ericsson | imported from 3GU |
R4‑141500 | Band Allocation Plan for 2 GHz Band in Region 1 | Dish Network, Solaris Mobile Ltd, Qualcomm | imported from 3GU |
R4‑141501 | Discussion on Rel-12 4Tx codebook PMI test | Intel Corporation | imported from 3GU |
R4‑141502 | Blind detection of NAICS parameters for DM-RS-based TMs | Ericsson | imported from 3GU |
R4‑141503 | Text Proposal: 2 GHz Region 1 Band Plan for TR 37.846 | Dish Network, Solaris Mobile Ltd, Qualcomm | imported from 3GU |
R4‑141504 | Discussion on feedback mode PUSCH 3-2 test | Intel Corporation | imported from 3GU |
R4‑141505 | Blind detection of semi static parameters | Ericsson | imported from 3GU |
R4‑141506 | Text Proposal: 2 GHz Region 1 General Issues and Potential Commonalities with Region 3 for TR 37.846 | Dish Network, Solaris Mobile Ltd | imported from 3GU |
R4‑141507 | Text Proposal: 2 GHz Region 1 E-UTRA Issues for TR 37.846 | Dish Network, Solaris Mobile Ltd | imported from 3GU |
R4‑141508 | Summary of the proposal for blind detection | Ericsson | imported from 3GU |
R4‑141509 | Discussion on FeICIC TM9 test | Intel Corporation | imported from 3GU |
R4‑141510 | Text Proposal: 2 GHz Region 1 MSR Issues for TR 37.846 | Dish Network, Solaris Mobile Ltd | imported from 3GU |
R4‑141511 | Discussion on FeICIC RI test 1 | Intel Corporation | imported from 3GU |
R4‑141512 | New WI Proposal: 2 GHz Band in Region 1 | Dish Network, Solaris Mobile Ltd | imported from 3GU |
R4‑141513 | 2 CRS APs vs 4 CRS APs | Ericsson | imported from 3GU |
R4‑141514 | Simulation results for the EPDCCH demodulation tests | Intel Corporation | imported from 3GU |
R4‑141515 | LS out on blind detection of parameters | Ericsson | imported from 3GU |
R4‑141516 | LTE TDD eIMTA feasibility analysis | Intel Corporation | imported from 3GU |
R4‑141517 | Clean up of TM9 SNR tests | Ericsson | imported from 3GU |
R4‑141518 | Clean up of TM9 SNR tests | Ericsson | imported from 3GU |
R4‑141519 | PMI test for Rel-12 DL MIMO enhancement | Qualcomm Incorporated | imported from 3GU |
R4‑141520 | LTE TDD eIMTA impacts on the UE demodulation requirements | Intel Corporation | imported from 3GU |
R4‑141521 | LTE TDD eIMTA impacts on the BS demodulation requirements | Intel Corporation | imported from 3GU |
R4‑141522 | Discussion on semi-static interference parameters blind detection and signaling | Intel Corporation | imported from 3GU |
R4‑141523 | Discussion on scenarios and assumptions for dynamic interference parameters blind detection | Intel Corporation | imported from 3GU |
R4‑141524 | Discussion on dynamic interference parameters detection for CRS-based transmission modes | Intel Corporation | imported from 3GU |
R4‑141525 | TP for TR 36.851: Correction of Harmonics and Intermod analysis for LTE-A Inter-band Carrier Aggregation of Band 4 and Band 27 (1UL) | NII Holdings | imported from 3GU |
R4‑141526 | Discussion on dynamic interference parameters detection for DMRS-based transmission modes | Intel Corporation | imported from 3GU |
R4‑141527 | UE Blocking for FS_LTE_FDD_1670_US [FS_LTE_FDD_1670_US] | Lightsquared Inc. | imported from 3GU |
R4‑141528 | Introduction of CA band B4+B27 to TS36.101 | NII Holdings | imported from 3GU |
R4‑141529 | Introduction of CA band B4+B27 to TS36.104 | NII Holdings | imported from 3GU |
R4‑141530 | Justification of corrections to the methodology comparison table in TR37.977 | Intel Corporation | imported from 3GU |
R4‑141531 | CR to TR37.977 on corrections to the methodology comparison table in TR37.977 | Intel Corporation | imported from 3GU |
R4‑141532 | On alternatives for updating the specification for testing with handsets wider than 72mm | Intel Corporation | imported from 3GU |
R4‑141533 | Low-cost MTC UE REFSENS requirements of Band 3, 8, and 20 | NSN, Nokia Corporation | imported from 3GU |
R4‑141534 | Evaluation of cell identification performance of low-cost MTC | NSN, Nokia Corporation | imported from 3GU |
R4‑141535 | LC-MTC HD-FDD Aspects | Qualcomm Incorporated | imported from 3GU |
R4‑141536 | TP for TR 36.853: LTE_CA_B2_B2_B5 introduction | Intel Corporation, Verizon | imported from 3GU |
R4‑141537 | TP for TR 36.853: LTE_CA_B4_B4_B5 introduction | Intel Corporation, Verizon | imported from 3GU |
R4‑141538 | TP for TR 36.853: LTE_CA_B2_B5_B13 introduction | Intel Corporation, Verizon | imported from 3GU |
R4‑141539 | TP for TR 36.853: LTE_CA_B4_B5_B13 introduction | Intel Corporation, Verizon | imported from 3GU |
R4‑141540 | TP for TR 36.851: LTE_CA_B5_B13 introduction | Intel Corporation, Verizon | imported from 3GU |
R4‑141541 | TP for TR 36.860: 2UL inter-band CA B2+B13 introduction | Intel Corporation, Verizon | imported from 3GU |
R4‑141542 | TP for TR 36.860: 2UL inter-band CA B4+B13 introduction | Intel Corporation, Verizon | imported from 3GU |
R4‑141543 | Dual uplink intermodulation and harmonics analysis for UE self-downlink performance | Intel Corporation | imported from 3GU |
R4‑141544 | Spectrum study on intermodulation analysis for 2UL CA | Intel Corporation | imported from 3GU |
R4‑141545 | WF for Class A4 definition and re-classification | Intel Corporation | imported from 3GU |
R4‑141546 | CR to 36.101 Rel-12 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑141547 | CR to 36.104 Rel-12 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑141548 | CR to 36.133 Rel-12 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑141549 | A-MPR for CA_7C Protecting Band 38 | Intel Corporation | imported from 3GU |
R4‑141550 | CR to 36.141 Rel-12 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑141551 | CR to 36.307 Rel-10 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑141552 | CR to 36.307 Rel-11 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑141553 | CR to 36.307 Rel-12 to introduce 3+7+20 | Vodafone | imported from 3GU |
R4‑141554 | TP to 36.853 1+3+20 | Vodafone | imported from 3GU |
R4‑141555 | CR to 36.101 Rel-12 to introduce 1+20 | Vodafone | imported from 3GU |
R4‑141556 | CR to 36.104 Rel-12 to introduce 1+20 | Vodafone | imported from 3GU |
R4‑141557 | TP for TR36.833-5-41: Specific RRM requirements for LTE Advanced Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑141558 | CR to 36.133 Rel-12 to introduce 1+20 | Vodafone | imported from 3GU |
R4‑141559 | Initial simulation results of RSRP/RSRQ for Low Cost MTC UE | Alcatel-Lucent | imported from 3GU |
R4‑141560 | Methodology for UE-UE coexistence study | Intel Corporation | imported from 3GU |
R4‑141561 | TR 36.833-5-40 skeleton | CMCC | imported from 3GU |
R4‑141562 | CR to 36.141 Rel-12 to introduce 1+20 | Vodafone | imported from 3GU |
R4‑141563 | Discussion of RRM Performance Requirements for Dual Connectivity | Alcatel-Lucent | imported from 3GU |
R4‑141564 | Further Discussion of MBSFN RSRP and RSRQ Measurement Requirements | Alcatel-Lucent | imported from 3GU |
R4‑141565 | Initial simulation results for MBSFN RSRP/RSRQ | Alcatel-Lucent | imported from 3GU |
R4‑141566 | CR to 36.307 Rel-10 to introduce 1+20 | Vodafone | imported from 3GU |
R4‑141567 | CR to 36.307 Rel-11 to introduce 1+20 | Vodafone | imported from 3GU |
R4‑141568 | UE Rx-Tx Time Difference Measurements from Multiple Serving Cells | Alcatel-Lucent | imported from 3GU |
R4‑141569 | CR to 36.307 Rel-12 to introduce 1+20 | Vodafone | imported from 3GU |
R4‑141570 | Further discussion on new RSRQ definition | Intel Corporation | imported from 3GU |
R4‑141571 | TP on channel bandwidth combination for intra-band contiguous CA in B40 for 3DL | CMCC | imported from 3GU |
R4‑141572 | Discussion about UE issues for B1+B3 | Vodafone | imported from 3GU |
R4‑141573 | TP to 36.853 1+7+20 | Vodafone | imported from 3GU |
R4‑141574 | Impact on TDD MTC RF | CMCC | imported from 3GU |
R4‑141575 | 1+7 relaxations follow up | Vodafone | imported from 3GU |
R4‑141576 | TP to 36.853 7+8+20 | Vodafone | imported from 3GU |
R4‑141577 | Discussion on the harmonic relations for Band 7 and 8 and classification of DL combination and proposal on relaxations | Vodafone | imported from 3GU |
R4‑141578 | Way forward on CA fallback | Vodafone, Orange, Telecom Italia, Ericsson, Deutsc | imported from 3GU |
R4‑141579 | Discussion on RF architecture for inter-band CA containing 3.5GHz band | CMCC | imported from 3GU |
R4‑141580 | Link level simulation results on cell identification for low-cost MTC | Intel Corporation | imported from 3GU |
R4‑141581 | Discussion on RRM requirements under high Doppler | Intel Corporation | imported from 3GU |
R4‑141582 | Link level simulation results on cell measurement for low-cost MTC | Intel Corporation | imported from 3GU |
R4‑141583 | On tighten RSRP measurement accuracy requirements | Intel Corporation | imported from 3GU |
R4‑141584 | PCell interruption for shorter SCell measurement cycle | Intel Corporation | imported from 3GU |
R4‑141585 | Discussion on increasing the minimum number of carriers for UE monitoring in E-UTRA | Intel Corporation | imported from 3GU |
R4‑141586 | Further study on the positioning enhancement in Hetnet scenario | Intel Corporation | imported from 3GU |
R4‑141587 | CA RRM requirements with multiple TAGs Tests for FDD | Intel Corporation | imported from 3GU |
R4‑141588 | CA RRM requirements with multiple TAGs Tests for TDD | Intel Corporation | imported from 3GU |
R4‑141589 | CA RRM requirements with multiple TAGs Tests for FDD | Intel Corporation | imported from 3GU |
R4‑141590 | CA RRM requirements with multiple TAGs Tests for TDD | Intel Corporation | imported from 3GU |
R4‑141591 | E-UTRAN FDD Event triggered reporting under deactivated Scell in non-DRX for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑141592 | E-UTRAN TDD Event triggered reporting under deactivated Scell in non-DRX for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑141593 | E-UTRAN FDD absolute and relative RSRP accuracies in CA for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑141594 | E-UTRAN TDD absolute and relative RSRP accuracies in CA for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑141595 | E-UTRAN FDD absolute and relative RSRQ accuracies in CA for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑141596 | RRM requirements under high Doppler | Intel Corporation | imported from 3GU |
R4‑141597 | E-UTRAN TDD absolute and relative RSRQ accuracies in CA for 10MHz+5MHz | Huawei, HiSilicon | imported from 3GU |
R4‑141598 | RRM requirements under high Doppler | Intel Corporation | imported from 3GU |
R4‑141599 | Methodology for introducing the new transmit timing test case of long DRX | Huawei, HiSilicon | imported from 3GU |
R4‑141600 | Addition of E-UTRAN FDD transmit timing test case with long DRX configurations in Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑141601 | Addition of E-UTRAN TDD transmit timing test case with long DRX configurations in Rel-12 | Huawei, HiSilicon | imported from 3GU |
R4‑141602 | Discussion on test cases of PUSCH 3-2 feedback for downlink MIMO enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑141603 | Correction of UE TM3 demodulation performance requirements | NTT DOCOMO, INC. | imported from 3GU |
R4‑141604 | Design and proposals for the intra-band non-contiguous CA demodulation test | Intel Corporation | imported from 3GU |
R4‑141605 | Discussion on test cases of R.12 4TX codebook for downlink MIMO enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑141606 | Simulation results for the EPDCCH demodulation tests | Huawei, HiSilicon | imported from 3GU |
R4‑141607 | Technical Report for AAS WI Ver 0.1.0 | Huawei | imported from 3GU |
R4‑141608 | Discussion on the demodulation tests for intra-band non-contiguous CA with power imbalance between component carriers | NTT DOCOMO, INC. | imported from 3GU |
R4‑141609 | CR for EPDCCH test (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑141610 | Discussion on the demodulation tests for intra-band non-contiguous CA with timing offset between component carriers | NTT DOCOMO, INC. | imported from 3GU |
R4‑141611 | Consideration on in-band blocking and other receiver requirements | Huawei | imported from 3GU |
R4‑141612 | CR for EPDCCH test (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑141613 | Text proposal with further details on UE specific beam forming and simulation assumption | Huawei | imported from 3GU |
R4‑141614 | Further consideration on FeICIC rank testing | Huawei, HiSilicon | imported from 3GU |
R4‑141615 | Text proposal on accuracy of radiated transmit power | Huawei | imported from 3GU |
R4‑141616 | Text proposal on conducted requirements | Huawei | imported from 3GU |
R4‑141617 | CR of modification on FeICIC rank testing (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑141618 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R11 | Huawei, HiSilicon | imported from 3GU |
R4‑141619 | Proposed work plan for Dual Connectivity | NTT DOCOMO, INC., NEC | imported from 3GU |
R4‑141620 | Text proposal on radiated receiver requirements | Huawei | imported from 3GU |
R4‑141621 | CR of modification on FeICIC rank testing (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑141622 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R12 | Huawei, HiSilicon | imported from 3GU |
R4‑141623 | Discussion on the maximum received timing difference for Dual Connectivity | NTT DOCOMO, INC. | imported from 3GU |
R4‑141624 | Discussion on the FeICIC TM9 testing | Huawei, HiSilicon | imported from 3GU |
R4‑141625 | Discussion on the requirements of CGI reading in CA scenario | Huawei, HiSilicon | imported from 3GU |
R4‑141626 | Text proposal on radiated transmit power | Huawei | imported from 3GU |
R4‑141627 | Introducing the CGI reading requirements in CA R10 | Huawei, HiSilicon | imported from 3GU |
R4‑141628 | Discussion on SC-CRS-IC in CoMP | Huawei, HiSilicon | imported from 3GU |
R4‑141629 | Introducing the CGI reading requirements in CA R11 | Huawei, HiSilicon | imported from 3GU |
R4‑141630 | Text proposal on requirement applicabilities | Huawei | imported from 3GU |
R4‑141631 | Introducing the CGI reading requirements in CA R12 | Huawei, HiSilicon | imported from 3GU |
R4‑141632 | Way forward on UE behaviour after measurement gap for R12 | Huawei, HiSilicon, CMCC, CATT | imported from 3GU |
R4‑141633 | Clarification on UE behaviour after measurement gap for R12 | Huawei HiSilicon, CMCC, CATT | imported from 3GU |
R4‑141634 | Further discussion on UE behaviour when max time difference on UL is reached | Huawei, HiSilicon | imported from 3GU |
R4‑141635 | Clarification on UE bahavior considering max transmit timing difference between TAGs r11 | Huawei, HiSilicon | imported from 3GU |
R4‑141636 | Clarification on UE bahavior considering max transmit timing difference between TAGs r12 | Huawei, HiSilicon | imported from 3GU |
R4‑141637 | LS on UE behaviour considering max transmit timing difference between TAGs | Huawei, HiSilicon | imported from 3GU |
R4‑141638 | E-UTRAN FDD " UE Timing Advance Adjustment Accuracy Test for Scell in sTAG | Huawei, HiSilicon | imported from 3GU |
R4‑141639 | E-UTRAN TDD - UE Timing Advance Adjustment Accuracy Test for Scell in sTAG | Huawei, HiSilicon | imported from 3GU |
R4‑141640 | Evaluation on requirement options considering increasing the minimum number of carriers for UE monitoring | Huawei, HiSilicon | imported from 3GU |
R4‑141641 | Text proposal on specification organization | Huawei | imported from 3GU |
R4‑141642 | Modification on EUTRA requirement considering increasing the minimum number of carriers for IDLE | Huawei, HiSilicon | imported from 3GU |
R4‑141643 | Study on RRM impact by 3DL CA | Huawei, HiSilicon | imported from 3GU |
R4‑141644 | Reply LS on UE Transmit Timing Accuracy test cases in DRX mode | Huawei, HiSilicon | imported from 3GU |
R4‑141645 | Discussion on UE Transmit Timing Accuracy test cases in DRX mode | Huawei, HiSilicon | imported from 3GU |
R4‑141646 | Clarification on UE Transmit Timing Accuracy test cases in DRX mode R9 | Huawei, HiSilicon | imported from 3GU |
R4‑141647 | Clarification on UE Transmit Timing Accuracy test cases in DRX mode R10 | Huawei, HiSilicon | imported from 3GU |
R4‑141648 | Clarification on UE Transmit Timing Accuracy test cases in DRX mode R11 | Huawei, HiSilicon | imported from 3GU |
R4‑141649 | Clarification on UE Transmit Timing Accuracy test cases in DRX mode R12 | Huawei, HiSilicon | imported from 3GU |
R4‑141650 | Correction for OCNG pattern number in RRM tests R10 | Huawei, HiSilicon | imported from 3GU |
R4‑141651 | Correction for OCNG pattern number in RRM tests R11 | Huawei, HiSilicon | imported from 3GU |
R4‑141652 | On LTE TDD-FDD CA multi-band configuration | NSN | imported from 3GU |
R4‑141653 | Correction for OCNG pattern number in RRM tests R12 | Huawei, HiSilicon | imported from 3GU |
R4‑141654 | Remove Band 29 descriptions in 5MHz tests | Huawei, HiSilicon | imported from 3GU |
R4‑141655 | CR on FeICIC PBCH performance requirement (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑141656 | Clarification on E-UTRAN TDD - UE Timing Advance Adjustment Accuracy Test R10 | Huawei, HiSilicon | imported from 3GU |
R4‑141657 | CR on FeICIC PBCH performance requirement (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑141658 | Clarification on E-UTRAN TDD " UE Timing Advance Adjustment Accuracy Test R11 | Huawei, HiSilicon | imported from 3GU |
R4‑141659 | Demodulation performance requirements under high Doppler scenario | Huawei, HiSilicon | imported from 3GU |
R4‑141660 | Clarification on E-UTRAN TDD - UE Timing Advance Adjustment Accuracy Test R12 | Huawei, HiSilicon | imported from 3GU |
R4‑141661 | Further discussion on performance requirements for intra-band non-contiguous CA | Huawei, HiSilicon | imported from 3GU |
R4‑141662 | Simulation results for 3.5GHz UE-UE co-existence | CATT | imported from 3GU |
R4‑141663 | CR to 36.104 on Introduction of LTE CA TDD FDD | NSN | imported from 3GU |
R4‑141664 | Correction on out-of-band blocking for CA | Huawei | imported from 3GU |
R4‑141665 | Analysis on Band42/43 UE-UE co-existence | CATT | imported from 3GU |
R4‑141666 | Demodulation performance requirements for small cell enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑141667 | Correction on out-of-band blocking for CA | Huawei | imported from 3GU |
R4‑141668 | MTC demodulation performance requirement | Huawei, HiSilicon | imported from 3GU |
R4‑141669 | Correction on some A-MPR tables | Huawei | imported from 3GU |
R4‑141670 | Test setup for MTC test cases with half duplexing mode | Huawei, HiSilicon | imported from 3GU |
R4‑141671 | Correction on some A-MPR tables | Huawei | imported from 3GU |
R4‑141672 | UE CA scalable performance requirement | Huawei, HiSilicon | imported from 3GU |
R4‑141673 | Update of TS 37.104 | Huawei | imported from 3GU |
R4‑141674 | Summary on feasibility study of TDD eIMTA | CATT , NSN, Nokia Corporation, Intel Corporation , Ericsson , Huawei | imported from 3GU |
R4‑141675 | Update of TS 37.104 | Huawei | imported from 3GU |
R4‑141676 | Channel Arrangement for 2GHz MSS band | NSN, Nokia Corporation | imported from 3GU |
R4‑141677 | Way forward on UE CA scalable performance requirement | Huawei, HiSilicon, Qualcomm, CMCC, Intel, MediaTek Inc., Samsung, LG Electronics, CATT, ZTE | imported from 3GU |
R4‑141678 | Discussion on UE specification impact for MTC | Huawei | imported from 3GU |
R4‑141679 | Simulation results for TDD UL/DL configuration 0 | CATT | imported from 3GU |
R4‑141680 | Discussion and simualtion results for Band 27 CA demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑141681 | Reduced bandwidth impact on reference sensitivity for MTC UE | Huawei | imported from 3GU |
R4‑141682 | Discussion and simualtion results for Band 23 CA demodulation performance requirements | Huawei, HiSilicon | imported from 3GU |
R4‑141683 | Single RX impact on reference sensitivity for MTC UE | Huawei | imported from 3GU |
R4‑141684 | Switching time impact on RF core requirement | Huawei | imported from 3GU |
R4‑141685 | Draft CR: Introduction of CA performance requirements for Band 27 CA | Huawei, HiSilicon | imported from 3GU |
R4‑141686 | Draft CR: Introduction of CA performance requirements for Band 23 CA | Huawei, HiSilicon | imported from 3GU |
R4‑141687 | Further discussion on UL reference measurement channel for MTC UE | Huawei | imported from 3GU |
R4‑141688 | Further simulation results of co-existence study for TDD eIMTA | Huawei | imported from 3GU |
R4‑141689 | UE Demodulation performance requirements for eIMTA | Huawei, HiSilicon | imported from 3GU |
R4‑141690 | CA_7C A-MPR simulation results for contiguous transmissions | Huawei | imported from 3GU |
R4‑141691 | BS Demodulation performance requirements for eIMTA | Huawei, HiSilicon | imported from 3GU |
R4‑141692 | Draft TR 36.855 v0.3.0 Feasibility of positioning enhancements for E-UTRA (2014-04) | Huawei, HiSilicon | imported from 3GU |
R4‑141693 | CA_7C Uplink configuration for reference sensitivity | Huawei | imported from 3GU |
R4‑141694 | TP on TR36.855 Performance characterization of Wide and Small BW UE Rx-Tx time difference measurement | Huawei, HiSilicon | imported from 3GU |
R4‑141695 | Discussion on BS demodualtion performance requirements for coverage enhancement | Huawei, HiSilicon | imported from 3GU |
R4‑141696 | On BLER measurement | Huawei, HiSilicon | imported from 3GU |
R4‑141697 | TR 36.860 v0.7.0 Dual uplink inter-band CA (2014-04) | Huawei | imported from 3GU |
R4‑141698 | Update of Dual unlink inter-band CA class A1 operating bands | Huawei | imported from 3GU |
R4‑141699 | FeICIC PBCH test metric | Huawei, HiSilicon | imported from 3GU |
R4‑141700 | Initial discussion on possible positioning enhancement solutions in het-net scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑141701 | Correction of Transmitter ON OFF requirement (TS 37.104 Rel-12) | Huawei | imported from 3GU |
R4‑141702 | Simulation evaluations for positioning enhancement in het-net scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑141703 | Correction of Transmitter ON OFF requirement (TS 37.141 Rel-12) | Huawei | imported from 3GU |
R4‑141704 | Update demodualtion performance requirements with new UE categories | Huawei,HiSilicon | imported from 3GU |
R4‑141705 | TR 36.833-2-42 V0.1.0 | Huawei | imported from 3GU |
R4‑141706 | TP on TR36.855 eCID enhancement in non-collocated serving cell scenarios | Huawei, HiSilicon | imported from 3GU |
R4‑141707 | Update demodualtion performance requirements with new UE categories | Huawei,HiSilicon | imported from 3GU |
R4‑141708 | Methodology for studying ECID enhancement with RRH | Huawei, HiSilicon | imported from 3GU |
R4‑141709 | TP for TR36.833-2-42: Operating bands and channel bandwidths | Huawei, Hisilicon | imported from 3GU |
R4‑141710 | TP for TR36.833-2-42: E-UTRA RF requirements for UE | Huawei, Hisilicon | imported from 3GU |
R4‑141711 | TP for TR36.833-2-42: Required changes to E-UTRA specifications | Huawei, Hisilicon | imported from 3GU |
R4‑141712 | Work plan for RAN4 work on Small Cell Enhancements | Huawei | imported from 3GU |
R4‑141713 | Additional bandwidth combinations for intra-band NC CA in Band 25 | Huawei, Hisilicon | imported from 3GU |
R4‑141714 | On UE receiver image requirement for 256QAM | Huawei | imported from 3GU |
R4‑141715 | On UE Maximum input level requirement for 256QAM | Huawei | imported from 3GU |
R4‑141716 | On BS requirements for 256QAM | Huawei | imported from 3GU |
R4‑141717 | Co-existence studies for LTE_CA_NC_B25_BW | Huawei | imported from 3GU |
R4‑141718 | Initial consideration of TDD inter-band CA B41+B42 | Huawei | imported from 3GU |
R4‑141719 | TP for TR 36.851: Channel bandwidth for CA B41+B42 | Huawei | imported from 3GU |
R4‑141720 | TP for TR 36.851: B41+B42 Harmonic and IMD analysis | Huawei | imported from 3GU |
R4‑141721 | Declaration of GSM single-RAT operation | Huawei | imported from 3GU |
R4‑141722 | Discussion on UE requirements for LTE_CA_NC_B25_BW | Huawei, Hisilicon | imported from 3GU |
R4‑141723 | Declaration of GSM single-RAT operation | Huawei | imported from 3GU |
R4‑141724 | Correction for CA sustained data rate test (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑141725 | Channel arrangement for 2GHz MSS band | Huawei | imported from 3GU |
R4‑141726 | Correction for CA sustained data rate test (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑141727 | Correction on wrong annotation for close- loop spatial multiplexing performance | Huawei, HiSilicon | imported from 3GU |
R4‑141728 | CR on OCNG and propagation conditions for dual layer TM9 test | Huawei, HiSilicon | imported from 3GU |
R4‑141729 | RRM requirement for TDD UL/DL configuration 0 | CATT | imported from 3GU |
R4‑141730 | UE performance rquirement for TDD eIMTA | CATT | imported from 3GU |
R4‑141731 | Higher-layer signalling for NAICS | MediaTek Inc. | imported from 3GU |
R4‑141732 | BS performance requirement for TDD eIMTA | CATT | imported from 3GU |
R4‑141733 | General requirements and considerations for blind detection in typical operations and simulation conditions/assumptions | MediaTek Inc. | imported from 3GU |
R4‑141734 | Blind detection results of necessary parameters for interference with CRS-based TM | MediaTek Inc. | imported from 3GU |
R4‑141735 | Blind detection results of necessary parameters for interference with DMRS-based TM | MediaTek Inc. | imported from 3GU |
R4‑141736 | Consideration of a new inter-band CA class | MediaTek Inc. | imported from 3GU |
R4‑141737 | Reclassification of 2UL CA_B3_B20 from A1 to A4 | MediaTek Inc. | imported from 3GU |
R4‑141738 | Insertion Loss Analysis for TDD-FDD Carrier Aggregation of Band 3 and Band 40 | KT | imported from 3GU |
R4‑141739 | Reclassification of 2UL CA_B3_B7 from A3 to A4 | MediaTek Inc. | imported from 3GU |
R4‑141740 | UE self-desensitization level versus Tx power back-off | MediaTek Inc. | imported from 3GU |
R4‑141741 | WF on RF component parameters for 2UL inter-band CA MSD development | MediaTek Inc. | imported from 3GU |
R4‑141742 | Insertion Loss Analysis for TDD-FDD Carrier Aggregation of Band 8 and Band 40 | KT | imported from 3GU |
R4‑141743 | TP for TR 36.853: Coexistence Studies of Harmonics and intermodulation products analysis for LTE_CA_B1_B3_B8 | KT | imported from 3GU |
R4‑141744 | Discussion on TDD UL-DL configuration applicability in CA for R12 | Huawei, HiSilicon | imported from 3GU |
R4‑141745 | Refsens for 3DL CA in Band 40 | ZTE | imported from 3GU |
R4‑141746 | Clarifications on TDD UL-DL configuration applicability for R12 | Huawei, HiSilicon | imported from 3GU |
R4‑141747 | TP for TR 36.853: Coexistence Studies of Harmonics and intermodulation products analysis for LTE_CA_B3_B8_B27 | KT | imported from 3GU |
R4‑141748 | TP on Rx requirements for 3DL CA in Band 40 | ZTE | imported from 3GU |
R4‑141749 | Measurement statistics results of smartphones under hand phantom in TD-LTE bands | CATR | imported from 3GU |
R4‑141750 | RSRP/RSRQ Simulation Results of TDD UL/DL configuration 0 | Huawei, HiSilicon | imported from 3GU |
R4‑141751 | RX Requirements for 2UL inter-band CA | ZTE | imported from 3GU |
R4‑141752 | Discussion on the RRM requirements for eIMTA | Huawei, HiSilicon | imported from 3GU |
R4‑141753 | Wayforward on RRM requirements in eIMTA | Huawei, HiSilicon | imported from 3GU |
R4‑141754 | MSD in dual uplink inter-band CA class A2 | ZTE | imported from 3GU |
R4‑141755 | TP for TR 36.851: Coexistence Studies of Harmonics and intermodulation products analysis supporting LTE-A CA of Band 8 and Band 27 | KT | imported from 3GU |
R4‑141756 | TP for TS37.144 on hand phantom for smartphones TD-LTE requirements | CATR | imported from 3GU |
R4‑141757 | Discussion on RSRP/RSRQ requirements under high Doppler condition | Huawei, HiSilicon | imported from 3GU |
R4‑141758 | MSD in dual uplink inter-band CA class A4 | ZTE | imported from 3GU |
R4‑141759 | Measurement statistics results of LEE devices under free space in TD-LTE bands | CATR | imported from 3GU |
R4‑141760 | Text proposal for TR 36.860: IMD study for dual uplink inter-band CA | ZTE | imported from 3GU |
R4‑141761 | TP for TR 36.853: Additional insertion loss for LTE_CA_B1_B3_B8 | KT | imported from 3GU |
R4‑141762 | Further discussion on RRM requirements under high Doppler in E-UTRA | Huawei, HiSilicon | imported from 3GU |
R4‑141763 | Wayforward on RSRP/RSRQ requirements under high Doppler condition | Huawei, HiSilicon | imported from 3GU |
R4‑141764 | TP for TS37.144 on free space for LEE devices TD-LTE requirements | CATR | imported from 3GU |
R4‑141765 | Discussion of Intra-band contiguous CA class B and class C receiver requirements | Huawei, Hisilicon | imported from 3GU |
R4‑141766 | Simulation results for MBSFN RSRP/RSRQ accuracy | Huawei, HiSilicon | imported from 3GU |
R4‑141767 | Status report of LTE OTA requirement in CCSA TC9 | CATR | imported from 3GU |
R4‑141768 | Discussion on MBSFN RSRP/RSRQ measurement accuracy requirements | Huawei, HiSilicon | imported from 3GU |
R4‑141769 | LTE OTA test requirement for 20Mhz bandwidth | China Telecom | imported from 3GU |
R4‑141770 | Clarification of Intra-band contiguous CA class C narrow band blocking requirements | Huawei, Hisilicon | imported from 3GU |
R4‑141771 | RRM requirements on Measurements for Support of MBMS | Huawei, HiSilicon | imported from 3GU |
R4‑141772 | Link level simulation for cell identification for low-cost MTC | Huawei, HiSilicon | imported from 3GU |
R4‑141773 | CR for TR37.977 New Reference Measurement Channel for 20MHz FDD LTE in MIMO OTA test | China Telecom | imported from 3GU |
R4‑141774 | Clarification of Intra-band contiguous CA class C narrow band blocking requirements | Huawei, Hisilicon | imported from 3GU |
R4‑141775 | Link level simulation for RSRP/RSRQ measurement for low-cost MTC | Huawei, HiSilicon | imported from 3GU |
R4‑141776 | Simulation assumption of cell identification for TDD under low-cost MTC | Huawei, HiSilicon | imported from 3GU |
R4‑141777 | Clarification of Intra-band contiguous CA class C narrow band blocking requirements | Huawei, Hisilicon | imported from 3GU |
R4‑141778 | CR for TR37.977 New Reference Measurement Channel for 20MHz TD-LTE in MIMO OTA test | CATR | imported from 3GU |
R4‑141779 | Simulation assumption of RSRP/RSRQ measurement for TDD under low-cost MTC | Huawei, HiSilicon | imported from 3GU |
R4‑141780 | Modification of Intra-band contiguous CA class B receiver requirements | Huawei, Hisilicon | imported from 3GU |
R4‑141781 | Discussion on requirements of synchronization accuracy between MeNB and SeNB | Huawei, HiSilicon | imported from 3GU |
R4‑141782 | Draft LS on requirements of synchronization accuracy between MeNB and SeNB | Huawei, HiSilicon | imported from 3GU |
R4‑141783 | Equal PSD or equal power on intra-band contiguous CA ACS case 2 test | Huawei, Hisilicon | imported from 3GU |
R4‑141784 | Performance of RSRP/RSRQ Measurement in High Doppler Conditions | CATT | imported from 3GU |
R4‑141785 | Performance of MBSFN RS Based RSRP/RSRQ Measurement | CATT | imported from 3GU |
R4‑141786 | Intra-band contiguous CA ACS case 2 test clarification | Huawei, Hisilicon | imported from 3GU |
R4‑141787 | MBSFN RSRP/RSRQ measurement requirements | CATT | imported from 3GU |
R4‑141788 | Discussion on general approach for UTRA RRM requirements with increased number of carriers for UE to monitor | NSN | imported from 3GU |
R4‑141789 | Intra-band contiguous CA ACS case 2 test clarification | Huawei, Hisilicon | imported from 3GU |
R4‑141790 | Modification on EUTRA requirement considering increasing the minimum number of carriers for RRC Connected | Huawei, HiSilicon | imported from 3GU |
R4‑141791 | Intra-band contiguous CA ACS case 2 test clarification | Huawei, Hisilicon | imported from 3GU |
R4‑141792 | Discussion on final RRM requirements for UTRA with increased number of carriers for UE to monitor | NSN | imported from 3GU |
R4‑141793 | General MPR for 2UL intra-band NC CA | Huawei, Hisilicon | imported from 3GU |
R4‑141794 | Introduction of RRM requirements for UTRA with increased number of carriers for UE to monitor | NSN | imported from 3GU |
R4‑141795 | PUCCH over-provisioning simulation results for B28 | Huawei, Hisilicon | imported from 3GU |
R4‑141796 | Discussion on performance requirements for DCH Enhancements for UMTS | NSN | imported from 3GU |
R4‑141797 | Correction for CA soft buffer test (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑141798 | Correction for CA soft buffer test (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑141799 | CR on E-UTRAN inter frequency measuremnts for eIMTA | LG Electronics | imported from 3GU |
R4‑141800 | CR on inter frequency RSRP test case for eIMTA | LG Electronics | imported from 3GU |
R4‑141801 | CR on inter frequency RSRQ test case for eIMTA | LG Electronics | imported from 3GU |
R4‑141802 | Band plan for 1980-2010 MHz and 2170-2200 MHz | NTT DOCOMO, INC. | imported from 3GU |
R4‑141803 | Receiver requirements for 2UL inter-band CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑141804 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.101 | NTT DOCOMO, INC. | imported from 3GU |
R4‑141805 | UE RF spec impact for Dual connectivity | NTT DOCOMO, INC. | imported from 3GU |
R4‑141806 | Way forward on MPR for 2UL intra-band NC CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑141807 | Simulation results of RSRP and RSRQ for eIMTA in Rel-12 | LG Electronics | imported from 3GU |
R4‑141808 | dTIB and dRIB for TDD-FDD CA for CA_1A-42A | NTT DOCOMO, INC. | imported from 3GU |
R4‑141809 | CR on OCNG and propagation conditions for dual layer TM9 test (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑141810 | Pcmax for UL-MIMO and 2UL inter-band CA | NTT DOCOMO, INC. | imported from 3GU |
R4‑141811 | REFSENS for CA_1A-28A | NTT DOCOMO, INC. | imported from 3GU |
R4‑141812 | Simulation results of RSRP and RSRQ for high doppler case | LG Electronics | imported from 3GU |
R4‑141813 | SCell activation and deactivation delay test case proposal | Ericsson | imported from 3GU |
R4‑141814 | SCell activation and deactivation delay test case for known SCell | Ericsson | imported from 3GU |
R4‑141815 | CR on PCell Interruptions for Shorter Measurement Cycles | Qualcomm Incorporated, Mediatek Inc., Intel Corpor | imported from 3GU |
R4‑141816 | Designation of UL and DL CA classes and configurations | Qualcomm Incorporated | imported from 3GU |
R4‑141817 | SCell activation and deactivation delay test case for unknown SCell | Ericsson | imported from 3GU |
R4‑141818 | Additional requirement for power imbalance | NTT DOCOMO, INC. | imported from 3GU |
R4‑141819 | CA MPR reduction verification | Qualcomm Incorporated | imported from 3GU |
R4‑141820 | CR on dRIB for receiver requirements(Rel-10) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141821 | CR on dRIB for receiver requirements(Rel-11) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141822 | CR on dRIB for receiver requirements(Rel-12) | NTT DOCOMO, INC. | imported from 3GU |
R4‑141823 | Discussion on semi-static parameters for NAICS receiver | LG Electronics | imported from 3GU |
R4‑141824 | Alignment of power definitions | Ericsson | imported from 3GU |
R4‑141825 | TC power allocation for LTE CA and multicarrier | Ericsson | imported from 3GU |
R4‑141826 | Transmit Diversity for PRS | Qualcomm Incorporated | imported from 3GU |
R4‑141827 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | imported from 3GU |
R4‑141828 | Link performance for NAICS receiver with blind detection under CRS based transmission mode | LG Electronics | imported from 3GU |
R4‑141829 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.307 | NTT DOCOMO, INC. | imported from 3GU |
R4‑141830 | Required changes to 36.307 for CA_Band 40D | CATT | imported from 3GU |
R4‑141831 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | imported from 3GU |
R4‑141832 | Link performance for NAICS receiver with blind detection under DMRS based transmission mode | LG Electronics | imported from 3GU |
R4‑141833 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | imported from 3GU |
R4‑141834 | RSRP Accuracy for MTC Devices | Qualcomm Incorporated | imported from 3GU |
R4‑141835 | On the 3DL support and 2DL fall-back modes | Ericsson | imported from 3GU |
R4‑141836 | Remove [ ] from eICIC TDD RI requirement | Anritsu | imported from 3GU |
R4‑141837 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | imported from 3GU |
R4‑141838 | Impairment simulation results for TM10 localized ePDCCH test | LG Electronics | imported from 3GU |
R4‑141839 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | imported from 3GU |
R4‑141840 | TP on required changes to TS36.101 for 3DL CA in Band 40 | ZTE | imported from 3GU |
R4‑141841 | UE RF requirments in the release independent specs | Ericsson, KT | imported from 3GU |
R4‑141842 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | imported from 3GU |
R4‑141843 | Remove [ ] from eICIC TDD RI requirement | Anritsu | imported from 3GU |
R4‑141844 | Discussion about test coverage of Further Downlink MIMO enhancement | LG Electronics | imported from 3GU |
R4‑141845 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | imported from 3GU |
R4‑141846 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | imported from 3GU |
R4‑141847 | LS on RSSI Measurement | Qualcomm Incorporated | imported from 3GU |
R4‑141848 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | imported from 3GU |
R4‑141849 | UE-UE co-existence and the simulation assumptions | Ericsson | imported from 3GU |
R4‑141850 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | imported from 3GU |
R4‑141851 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | imported from 3GU |
R4‑141852 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | imported from 3GU |
R4‑141853 | Discussion on PMI tests using Rel-12 MIMO codebook | Ericsson | imported from 3GU |
R4‑141854 | Discussion on the metric of PUSCH 3-2 test | Ericsson | imported from 3GU |
R4‑141855 | Discussion on RSRP/RSRQ measurement accuracy requirements | CMCC | imported from 3GU |
R4‑141856 | Overview of UE performance requirements for low cost MTC | Ericsson | imported from 3GU |
R4‑141857 | Discussion on RRM requirements for 3DL CA | CATT | imported from 3GU |
R4‑141858 | Text proposal: Band 40D impact on RRM requirements | CATT | imported from 3GU |
R4‑141859 | Discussion on CM/MPR for DC-HSUPA with 16QAM | Ericsson | imported from 3GU |
R4‑141860 | Updated PBCH simulation results of FeICIC | CMCC | imported from 3GU |
R4‑141861 | WF on UE-UE co-existence and the simulation assumptions | Ericsson | imported from 3GU |
R4‑141862 | Impact of Low Cost MTC on RRM/Demod | CMCC | imported from 3GU |
R4‑141863 | On the EARFCN extension | Ericsson, Alcatel-Lucent | imported from 3GU |
R4‑141864 | Discussion on synchronization between MeNB and SeNB of dual connectivity | CMCC | imported from 3GU |
R4‑141865 | LS reply on extending E-UTRA band number and EARFCN numbering space | Ericsson | imported from 3GU |
R4‑141866 | Specification of the bits of the field 'modified MPR behavior' indicated in UE capability | Ericsson | imported from 3GU |
R4‑141867 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑141868 | RRM requirements for increased carrier monitoring in E-UTRA idle state | Ericsson | imported from 3GU |
R4‑141869 | Band 29 correction | Ericsson | imported from 3GU |
R4‑141870 | TP for TR 36.835: Specific BS RF requirements for LTE Advanced 3 Band Carrier Aggregation (3DL/1UL) | Alcatel-Lucent | imported from 3GU |
R4‑141871 | RRM requirements for increased carrier monitoring in E-UTRA connected state | Ericssson | imported from 3GU |
R4‑141872 | Band 29 correction | Ericsson | imported from 3GU |
R4‑141873 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑141874 | Band 29 correction | Ericsson | imported from 3GU |
R4‑141875 | RRM requirements for increased carrier monitoring in UTRA idle state | Ericsson | imported from 3GU |
R4‑141876 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 18) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑141877 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑141878 | RRM requirements for increased carrier monitoring in UTRA FACH and DCH states | Ericsson | imported from 3GU |
R4‑141879 | TP for TR 36.851: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 18) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑141880 | Defintion of the bits in the bitmap for indication of modified MPR behavior | Ericsson | imported from 3GU |
R4‑141881 | Number of carriers for E-UTRA interRAT monitoring | Ericsson | imported from 3GU |
R4‑141882 | LTE Coverage Enhancements: Overview and impact on RAN4 requirements | China Telecom | imported from 3GU |
R4‑141883 | Increased monitoring requierments in 25.133 | Ericsson | imported from 3GU |
R4‑141884 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 18 + 28) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑141885 | response LS to RAN2 on indication of modified UE power reduction capability in an earlier release | Ericsson | imported from 3GU |
R4‑141886 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 18 + 28) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑141887 | Requirements for increased carrier monitoring 25.133 | Ericsson | imported from 3GU |
R4‑141888 | Test configuration for verification of power control for intra-band contiguous CA | Ericsson | imported from 3GU |
R4‑141889 | Proposal on small gap | NTT DOCOMO | imported from 3GU |
R4‑141890 | Work plan on BS demodulation requirements for LTE coverage enhancements | China Telecom | imported from 3GU |
R4‑141891 | Requirements for increased carrier monitoring 36.133 | Ericsson | imported from 3GU |
R4‑141892 | PUSCH performance requirements for LTE coverage enhancements | China Telecom | imported from 3GU |
R4‑141893 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson | imported from 3GU |
R4‑141894 | LS on small gap | NTT DOCOMO | imported from 3GU |
R4‑141895 | Outgoing LS to be agreed during the meeting capturing RAN4 agreements on UE increased carrier monitoring for further RAN2 work | Ericsson | imported from 3GU |
R4‑141896 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson | imported from 3GU |
R4‑141897 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (18 + 28) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑141898 | Introduction of test cases for 10MHz +5MHz : absolute and relative RSRP accuracies in CA for FDD and TDD | Ericsson | imported from 3GU |
R4‑141899 | Requirement of RSRP/RSRQ measurement accuracy under high Doppler | NTT DOCOMO | imported from 3GU |
R4‑141900 | Introduction of test cases for 10MHz +5MHz : absolute and relative RSRQ accuracies in CA for FDD and TDD | Ericsson | imported from 3GU |
R4‑141901 | Test configuration for intra-band contiguous carrier aggregation power control | Ericsson | imported from 3GU |
R4‑141902 | TP for TR 36.851: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (18 + 28) | Alcatel-Lucent, KDDI | imported from 3GU |
R4‑141903 | Discussion on UE-UE co-existence requirements | China Telecom | imported from 3GU |
R4‑141904 | Introduction of test cases for 10MHz +5MHz : Event triggered reporting on deactivating Scells in non-DRX FDD and TDD | Ericsson | imported from 3GU |
R4‑141905 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.307 | NTT DOCOMO, INC. | imported from 3GU |
R4‑141906 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 13) | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑141907 | Verification of exceptions to REFSENS requirements for carrier aggregation | BlackBerry, Ericsson | imported from 3GU |
R4‑141908 | RRM specification impacts overview of Dual Connectivity | NTT DOCOMO | imported from 3GU |
R4‑141909 | Introduction of CA band combination Band1 + Band19 + Band21 into TS 36.307 | NTT DOCOMO, INC. | imported from 3GU |
R4‑141910 | Hand effect of TRP for UMTS | NTT DOCOMO | imported from 3GU |
R4‑141911 | Corrections to CELL FACH test cases release 11 | Ericsson | imported from 3GU |
R4‑141912 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 1-5 | Ericsson | imported from 3GU |
R4‑141913 | Corrections to CELL FACH test cases release 12 | Ericsson | imported from 3GU |
R4‑141914 | Measurement occasion cycle length in CELL_FACH | Broadcom Corporation | imported from 3GU |
R4‑141915 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 2 + 13) | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑141916 | Introduction of multi-carrier BS testing in TS 25.141 - clauses 6-7 | Ericsson | imported from 3GU |
R4‑141917 | Verification of exceptions to REFSENS requirements for carrier aggregation | BlackBerry, Ericsson | imported from 3GU |
R4‑141918 | Consideration on the band option for MSS 2GHz band | China Telecom | imported from 3GU |
R4‑141919 | High Doppler measurement accuracy requierments | Ericsson | imported from 3GU |
R4‑141920 | Considerations on UE transmission timing testcase based on liaison statement from RAN5 | Ericsson | imported from 3GU |
R4‑141921 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 4 + 13) | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑141922 | On PUCCH performance requirements for 3DL CA | China Telecom | imported from 3GU |
R4‑141923 | Response LS on UE Transmit Timing Accuracy test cases in DRX mode | Ericsson | imported from 3GU |
R4‑141924 | Applicability of exceptions to reference sensitivity requirements for CA | Ericsson | imported from 3GU |
R4‑141925 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 4 + 13) | Alcatel-Lucent, Verizon | imported from 3GU |
R4‑141926 | TP for TR36.851: Harmonics and intermodulation product analysis supporting LTE-Advanced CA of Band 3 and Band 40 | KT | imported from 3GU |
R4‑141927 | Increasing RSRQ reporting range | Ericsson | imported from 3GU |
R4‑141928 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 12 + 12) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141929 | Applicability of exceptions to reference sensitivity requirements for CA | Ericsson | imported from 3GU |
R4‑141930 | Introduction of DRX timing accuracy test for 1280ms DRX cycle | Ericsson | imported from 3GU |
R4‑141931 | TP for TR36.851: Harmonics and intermodulation product analysis supporting LTE-Advanced CA of Band 8 and Band 40 | KT | imported from 3GU |
R4‑141932 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (2 + 12 + 12) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141933 | Consideration on DRX timing accuracy test | Ericsson | imported from 3GU |
R4‑141934 | More on UL power restrictions for Band XXVI and their verification | Ericsson | imported from 3GU |
R4‑141935 | Harmonics and Intermodulation Products caused by LTE Advanced Contiguous or Non-contiguous Carrier Aggregation of Band 12 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141936 | DRX measurements in cell FACH state | Ericsson | imported from 3GU |
R4‑141937 | Impact of further uplink enhancements on RRM requirements | Ericsson | imported from 3GU |
R4‑141938 | Maximum allowed UL TX power for Band XXVI coexistence with Public Safety | Ericsson | imported from 3GU |
R4‑141939 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Contiguous or Non-contiguous Carrier Aggregation of Band 12 | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141940 | Maximum allowed UL TX power for Band XXVI coexistence with Public Safety | Ericsson | imported from 3GU |
R4‑141941 | RRM requirement impact due to introduction of second UE DRX cycle | Ericsson | imported from 3GU |
R4‑141942 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 12) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141943 | TP for TR 36.851: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 12) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141944 | On the test cases for intra-band non-contiguous aggregation (1 UL) | Ericsson | imported from 3GU |
R4‑141945 | Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 12 + 12) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141946 | Applicability of in-gap and out-of-gap measurements for intra-band NC CA | Ericsson | imported from 3GU |
R4‑141947 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (4 + 12 + 12) | Alcatel-Lucent, AT&T | imported from 3GU |
R4‑141948 | TP for TR 36.833-5-41: Specific BS RF requirements for LTE Advanced Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑141949 | Applicability of in-gap and out-of-gap measurements for intra-band NC CA | Ericsson | imported from 3GU |
R4‑141950 | PMI requirements for DL MIMO enhancement | ZTE | imported from 3GU |
R4‑141951 | Editorial corrections for UE performance requirments for R11 | CATT | imported from 3GU |
R4‑141952 | TP for TR 36.833-6-41: Specific BS RF requirements for LTE Advanced Non-Contiguous Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | imported from 3GU |
R4‑141953 | Correction of test configurations for intra-band non-contiguous aggregation | Ericsson | imported from 3GU |
R4‑141954 | Test cases for FeICIC TM9 demodulation requirements | ZTE | imported from 3GU |
R4‑141955 | Consideration on beam declaration | CATT | imported from 3GU |
R4‑141956 | Correction of test configurations for intra-band non-contiguous aggregation | Ericsson | imported from 3GU |
R4‑141957 | Corrections of multi-band BS testing to TS 36.141 (Clauses 1 - 5) | Alcatel-Lucent, NSN, Ericsson | imported from 3GU |
R4‑141958 | Discussion on RSRP and RSRQ requirements in high Doppler conditions | ZTE | imported from 3GU |
R4‑141959 | In-band blocking case nubering re-establisment | Nokia Corporation | imported from 3GU |
R4‑141960 | Band 29 correction | Ericsson | imported from 3GU |
R4‑141961 | Corrections of multi-band BS testing to TS 36.141 (Clauses 1 - 5) | Alcatel-Lucent, NSN, Ericsson | imported from 3GU |
R4‑141962 | 2UL interband CA: Rx test simulation results | Nokia Corporation | imported from 3GU |
R4‑141963 | Simulation results for FeICIC PBCH-IC BLER | ZTE | imported from 3GU |
R4‑141964 | Modification of measurement occasion cycle length parameters in CELL_FACH | Broadcom Corporation | imported from 3GU |
R4‑141965 | In-band blocking case nubering re-establisment | Nokia Corporation | imported from 3GU |
R4‑141966 | 2UL interband CA: Own Rx desensitization | Nokia Corporation | imported from 3GU |
R4‑141967 | In-band blocking case nubering re-establisment | Nokia Corporation | imported from 3GU |
R4‑141968 | Band 29 correction | Ericsson | imported from 3GU |
R4‑141969 | Initial discussion on performance tests for UL coverage enhancements | ZTE | imported from 3GU |
R4‑141970 | TP for TR 36.860: IMD frequency analysis for CA_1A-3A | Nokia Corporation | imported from 3GU |
R4‑141971 | In-band blocking case nubering re-establisment | Nokia Corporation | imported from 3GU |
R4‑141972 | A-MPR for CA_7C | Nokia Corporation | imported from 3GU |
R4‑141973 | In-band blocking case nubering re-establisment | Nokia Corporation | imported from 3GU |
R4‑141974 | CR for TS36.101 COMP demodulation requirements | ZTE | imported from 3GU |
R4‑141975 | B28 flexibility, simulation results | Nokia Corporation | imported from 3GU |
R4‑141976 | Consideration of feICIC demod test for TM9 | MediaTek Inc. | imported from 3GU |
R4‑141977 | Refsens UL configuration for CA_7C | Nokia Corporation | imported from 3GU |
R4‑141978 | CR for TS36.101 COMP demodulation requirements | ZTE | imported from 3GU |
R4‑141979 | Consideration of SU-MIMO demodulation test for enhanced performance | MediaTek Inc. | imported from 3GU |
R4‑141980 | CR for TS36.101 FRC tables for COMP demodulation requirements | ZTE | imported from 3GU |
R4‑141981 | CR for TS36.101 FRC tables for COMP demodulation requirements | ZTE | imported from 3GU |
R4‑141982 | A-MPR corrections | Nokia Corporation | imported from 3GU |
R4‑141983 | TP for TR 36.860: IMD frequency analysis for CA_3A-8A | Nokia Corporation | imported from 3GU |
R4‑141984 | Modification of measurement occasion cycle length parameters in CELL_FACH | Broadcom Corporation | imported from 3GU |
R4‑141985 | Discussions on new codebook test | MediaTek Inc. | imported from 3GU |
R4‑141986 | Discussions on test for reporting mode 3-2 | MediaTek Inc. | imported from 3GU |
R4‑141987 | On the UE requirements for CA_1A-28A | Ericsson | imported from 3GU |
R4‑141988 | Simulation Assumptions for Studying D2D Co-existence | Ericsson | imported from 3GU |
R4‑141989 | Test coverage of TX requirements for UL inter-band CA | Ericsson | imported from 3GU |
R4‑141990 | Simulations results of FeICIC PBCH IC | Broadcom Corporation | imported from 3GU |
R4‑141991 | D2D Co-existence Simulation Results | Ericsson | imported from 3GU |
R4‑141992 | Corretion to a note text | Nokia Corporation | imported from 3GU |
R4‑141993 | Corretion to a note text | Nokia Corporation | imported from 3GU |
R4‑141994 | Frequency stability for D2D UEs | Ericsson | imported from 3GU |
R4‑141995 | 3GPP TS 37.144 V0.1.0 | Nokia Corporation | imported from 3GU |
R4‑141996 | Draft Reply LS on D2D UE frequency stability | Ericsson | imported from 3GU |
R4‑141997 | Study of additional loss from hand phantom in besides the head and hand position | Nokia Corporation | imported from 3GU |
R4‑141998 | Introduction of operating band 32 in TS36.104 | NSN | imported from 3GU |
R4‑141999 | Impact of D2D on UE RF requirements | Ericsson | imported from 3GU |
R4‑142000 | Discussion on higher-layer signaling for NAICS | NVIDIA | imported from 3GU |
R4‑142001 | Requirement proposal for UTRA BHH position for TRP for bands I, II, V, VIII and XIX | Nokia Corporation, NTT DOCOMO | imported from 3GU |
R4‑142002 | Blind detection performance of dynamic interference parameters | NVIDIA | imported from 3GU |
R4‑142003 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA REFSENS | Nokia Corporation | imported from 3GU |
R4‑142004 | Way Forward for D2D co-existence Simulations | Ericsson | imported from 3GU |
R4‑142005 | Uplink non-contiguous intraband CA MPR measurements for band 4 | Nokia Corporation | imported from 3GU |
R4‑142006 | Band 28 lower duplexer operation in Japan for 1+18+28 3DL CA | Intel | imported from 3GU |
R4‑142007 | Deployment scenarios for non-contiguous uplink intraband CA | Nokia Corporation | imported from 3GU |
R4‑142008 | RF requirements for Single Receiver and HD-FDD MTC UE | Ericsson | imported from 3GU |
R4‑142009 | Editorial correction of note in clause 4.4 | Fujitsu | imported from 3GU |
R4‑142010 | Non contiguous uplink intraband CA feature draft CR | Nokia Corporation | imported from 3GU |
R4‑142011 | Editorial correction of note in clause 4.4 | Fujitsu | imported from 3GU |
R4‑142012 | Text proposal for TR 36.833-4: Non-contiguous intraband Band CA REFSENS Annex "A draft CR proposal | Nokia Corporation | imported from 3GU |
R4‑142013 | Impact of TBS and RB allocation on UE RF requirements | Ericsson | imported from 3GU |
R4‑142014 | WF for new RF test for power imbalance in non-contiguous intraband downlink CA reception | Nokia Corporation | imported from 3GU |
R4‑142015 | New Test Case for UE Transmit Timing Accuracy requirements in DRX | Fujitsu | imported from 3GU |
R4‑142016 | Specification of the complete set of RX requirements for UL inter-band CA | Ericsson | imported from 3GU |
R4‑142017 | MTC UE Feature Requirements | Ericsson | imported from 3GU |
R4‑142018 | TP for TR 36.851: Skeleton for TDD-FDD CA | Nokia Corporation | imported from 3GU |
R4‑142019 | Conducted Requirements | Alcatel-Lucent | imported from 3GU |
R4‑142020 | New WI for 3DL/1UL of B2+B2+B12 | US Cellular | imported from 3GU |
R4‑142021 | reply LS on synchronization accuracy between MeNB and SeNB for Dual Connectivity | NTT DOCOMO, INC. | imported from 3GU |
R4‑142022 | Transceiver boundary for AAS | KDDI | imported from 3GU |
R4‑142023 | TDD-FDD WI applicability to 2 UL and 3 DL features in REL-12 time frame | Nokia Corporation | imported from 3GU |
R4‑142024 | TX requirements for 3DL/1UL CA FDD | Ericsson | imported from 3GU |
R4‑142025 | AAS Specifications | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142026 | 2 ul interband ca receiver requiremens | Nokia Corporation | imported from 3GU |
R4‑142027 | TP for 36.853: completion of the RF RX requirements for 3DL/1UL CA FDD | Ericsson | imported from 3GU |
R4‑142028 | View on AAS conducted requirements | KDDI | imported from 3GU |
R4‑142029 | TP for 36.853: UE requirements for CA_2A-2A-13A, CA_2A-4A-13A, CA_4A-4A-13A, CA_2A-4A-5A, CA_2A-5A-12A, CA_2A-12A-12A and CA_4A-12A-12A | Ericsson | imported from 3GU |
R4‑142030 | on the impact of additinal insertion-loss for 3DL combinations including B30 | Ericsson | imported from 3GU |
R4‑142031 | AAS Conformance Test | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142032 | How to capture REFSENS requirement for dual uplink interband CA Class A4 | Nokia Corporation | imported from 3GU |
R4‑142033 | Specification of an additional aggregate power control range for non-CA operation | Ericsson | imported from 3GU |
R4‑142034 | Framework for UE demodulation and requirements for eIMTA | Ericsson | imported from 3GU |
R4‑142035 | Band 29 correction | Ericsson | imported from 3GU |
R4‑142036 | Introduction of an additional requirement on aggregate power tolerance | Ericsson | imported from 3GU |
R4‑142037 | UE co-existence requirements in different releases | Motorola Solutions | imported from 3GU |
R4‑142038 | CQI feedback periodicity correction for RLM in eICIC/FeICIC test setup | Ericsson | imported from 3GU |
R4‑142039 | Progress on MTC | Vodafone | imported from 3GU |
R4‑142040 | AAS RF requirements on EIRP accuracy | Vodafone | imported from 3GU |
R4‑142041 | CQI feedback periodicity correction for RLM in eICIC/FeICIC test setup | Ericsson | imported from 3GU |
R4‑142042 | Proposal for R4 TR on LTE Device to Device Proximity Services | Motorola Solutions | imported from 3GU |
R4‑142043 | Link level simulation results for PBCH with PBCH-IC | Ericsson | imported from 3GU |
R4‑142044 | Performance requirements for PBCH with PBCH-IC | Ericsson | imported from 3GU |
R4‑142045 | High Efficiency Power Amplifier open questions and impact in RAN4 | Vodafone | imported from 3GU |
R4‑142046 | LEE TRS requirements | Vodafone | imported from 3GU |
R4‑142047 | LEE TRP requirements | Vodafone | imported from 3GU |
R4‑142048 | Performance requirements for PBCH with PBCH-IC | Ericsson | imported from 3GU |
R4‑142049 | TM9 test for FeICIC | Ericsson | imported from 3GU |
R4‑142050 | LTE D2D near far issues | Motorola Solutions | imported from 3GU |
R4‑142051 | Band 28 UL RB restrictions | Ericsson | imported from 3GU |
R4‑142052 | Radiated Power Accuracy Requirements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142053 | Preliminary proposal on demodulation setup for eIMTA | Ericsson | imported from 3GU |
R4‑142054 | On blind detection feasibility of parameter combination for CRS-based TM | Samsung | imported from 3GU |
R4‑142055 | On blind detection feasibility of parameter combination for DMRS-based TM | Samsung | imported from 3GU |
R4‑142056 | Requirements for Coverage Enhancements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142057 | On semi-static parameter for NAICS | Samsung | imported from 3GU |
R4‑142058 | Overview on performance enhancement for SU-MIMO scneario | Samsung | imported from 3GU |
R4‑142059 | TP for TR 37.814: The EIRP limits in Region 1 | Ericsson | imported from 3GU |
R4‑142060 | RSRP and RSRQ simulation results for high Doppler case | Samsung | imported from 3GU |
R4‑142061 | TP for TR 37.814: BS operating band unwanted emissions | Ericsson, Huawei | imported from 3GU |
R4‑142062 | RSRP and RSRQ simulation results for low-cost MTC with 1 Rx | Samsung | imported from 3GU |
R4‑142063 | TP on introducing channel bandwidth combination table for 3DL non-contiguous CA in band 41 | Samsung | imported from 3GU |
R4‑142064 | 4-Tx Codebook PMI Test | Alcatel-Lucent | imported from 3GU |
R4‑142065 | View on Rx requirements for 3DL intra-band non-contiguous CA in Band 41 | Samsung | imported from 3GU |
R4‑142066 | Proposed test for DL CA with 2 or 3DL CCs with minimum channel spacing in Rel-12 | Ericsson | imported from 3GU |
R4‑142067 | A-MPR Simulation Results for NS_12 | Samsung | imported from 3GU |
R4‑142068 | Power imbalance for intra-band Non-contiguous CA | Samsung | imported from 3GU |
R4‑142069 | Introduction of CA band combination Band 1 and Band 5 to TS 36.307 R10 | LG Uplus | imported from 3GU |
R4‑142070 | Test case design for multiple PMI test in FeDL-MIMO | Samsung | imported from 3GU |
R4‑142071 | TP to TR 36.851: Harmonics/IMD analysis and channel bandwidths for CA_7A-22A | Ericsson | imported from 3GU |
R4‑142072 | Test case design for single PMI test in FeDL-MIMO | Samsung | imported from 3GU |
R4‑142073 | Simulation results for TM9 FeICIC test | Samsung | imported from 3GU |
R4‑142074 | Introduction of CA band combination Band 1 and Band 5 to TS 36.307 R11 | LG Uplus | imported from 3GU |
R4‑142075 | Impact on RRM requirement in 3DL CA | Samsung | imported from 3GU |
R4‑142076 | Reply LS on Synchronization aspects for dual connectivity | Ericsson | imported from 3GU |
R4‑142077 | Discussion on increasing the minimum number of carriers for UE monotoring | Samsung | imported from 3GU |
R4‑142078 | Accuracy requirement on radiated transmit power | CATT | imported from 3GU |
R4‑142079 | Remove square bracket and editorial change for CoMP test cases | Samsung | imported from 3GU |
R4‑142080 | Introduction of CA band combination Band 1 and Band 5 to TS 36.307 R12 | LG Uplus | imported from 3GU |
R4‑142081 | TR 37.814: L-band for Supplemental Downlink in E-UTRA and UTRA | Ericsson, Orange | imported from 3GU |
R4‑142082 | RAN4 impacts of dual connectivity | Ericsson | imported from 3GU |
R4‑142083 | Assumptions for RLM for Low Cost MTC UE | Ericsson | imported from 3GU |
R4‑142084 | WF on REFSENS for LTE_CA_NC_B2 | Ericsson | imported from 3GU |
R4‑142085 | REFSENS Specification for the additional bandwidth combinations of the CA_25A-25A | Ericsson | imported from 3GU |
R4‑142086 | Introduction of Band 32/XXXII and Band 20+32 CA | Ericsson | imported from 3GU |
R4‑142087 | Introduction of new bandwidth combination set for CA_1A-5A UE | LG Electronics | imported from 3GU |
R4‑142088 | MPR for 2UL intra-band NC CA | Ericsson | imported from 3GU |
R4‑142089 | UL system performance for 2UL NC-CA with power backoff | Ericsson | imported from 3GU |
R4‑142090 | Introduction of Band 32 and Band 20+32 CA | Ericsson | imported from 3GU |
R4‑142091 | Introduction of Band XXXII and Band I+XXXII | Ericsson | imported from 3GU |
R4‑142092 | Additional ILs for CA_1A_7A UE | LG Electronics | imported from 3GU |
R4‑142093 | Introduction of Band XXXII and Band I+XXXII | Ericsson | imported from 3GU |
R4‑142094 | Dual Conectivity synchronization assumptions impact on TS36.101 | InterDigital | imported from 3GU |
R4‑142095 | Introduction of Band 32/XXXII | Ericsson | imported from 3GU |
R4‑142096 | Measurements results of IMD4 level for 2ULs CA_1A-5A UE | LG Electronics | imported from 3GU |
R4‑142097 | Spurious emission band UE co-existence requirements for Dual-uplink inter-band CA | LG Electronics | imported from 3GU |
R4‑142098 | Work plan for SU-MIMO demodulation and CSI reporting requirements | Huawei, HiSilicon | imported from 3GU |
R4‑142099 | Overview on SU-MIMO demodulation and CSI reporting requirements | Huawei, HiSilicon | imported from 3GU |
R4‑142100 | Revised A-MPR simulation results for S-band UE | LG Electronics | imported from 3GU |
R4‑142101 | TP for TR 36.853: 3DL combinations and channel bandwidth configurations | Telecom Italia, Orange, Vodafone, CMCC, US Cellula | imported from 3GU |
R4‑142102 | CR for finalizing DL COMP CSI reporting requirements (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑142103 | TP for Annex to merge A-MPR simulation results | LG Electronics | imported from 3GU |
R4‑142104 | LTE TRP and TRS measurements for bands 3, 7 and 20 with head+hands test setup | Telecom Italia | imported from 3GU |
R4‑142105 | CR for finalizing DL COMP CSI reporting requirements (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑142106 | TP On Conducted Sensitivity Conformance Testing | NEC | imported from 3GU |
R4‑142107 | Discussion on clarification of code rate calculation and RMC for CSI | Huawei, HiSilicon | imported from 3GU |
R4‑142108 | Dual uplink inter-band CA intermodulation | Broadcom Corporation | imported from 3GU |
R4‑142109 | CR for adding DL CoMP CSI RMC tables (Rel-11) | Huawei, HiSilicon | imported from 3GU |
R4‑142110 | CR for adding DL CoMP CSI RMC tables (Rel-12) | Huawei, HiSilicon | imported from 3GU |
R4‑142111 | Alternative for MSD in dual uplink CA | Broadcom Corporation | imported from 3GU |
R4‑142112 | CA_1A-28A analysis | Broadcom Corporation | imported from 3GU |
R4‑142113 | Discussion on blind detection for CRS-based interference | Huawei, HiSilicon | imported from 3GU |
R4‑142114 | Discussion on blind detection for DMRS-based interference | Huawei, HiSilicon | imported from 3GU |
R4‑142115 | AAS types and declaration | Ericsson | imported from 3GU |
R4‑142116 | B28 overprovisioning analysis | Broadcom Corporation | imported from 3GU |
R4‑142117 | On the relation between conducted requirements, beams and xx.104 | Ericsson | imported from 3GU |
R4‑142118 | On the impact of EIRP accuracy to network performance | Ericsson | imported from 3GU |
R4‑142119 | Conducted requirement options | Ericsson | imported from 3GU |
R4‑142120 | Specification structure options | Ericsson | imported from 3GU |
R4‑142121 | CA relaxations | Broadcom Corporation | imported from 3GU |
R4‑142122 | Introduction of Band 32/XXXII | Ericsson | imported from 3GU |
R4‑142123 | Test cases for SCell | Ericsson | imported from 3GU |
R4‑142124 | Modifications to intra-band contiguous CA class B RX requirements | Broadcom Corporation | imported from 3GU |
R4‑142125 | Modifications to intra-band contiguous CA class B receiver requirements | Broadcom Corporation | imported from 3GU |
R4‑142126 | Band 26 and the NS modifications | Ericsson, SouthernLINC | imported from 3GU |
R4‑142127 | CA_2A-2A REFSENS | Broadcom Corporation | imported from 3GU |
R4‑142128 | Modificaitons for NS_12 and NS_13 | Ericsson, SouthernLINC | imported from 3GU |
R4‑142129 | Test case for RACH on SCell | Ericsson | imported from 3GU |
R4‑142130 | A draft work plan | Verizon | imported from 3GU |
R4‑142131 | TRS comparissom benchmark besides the hand and head, and TRS delta between mechanical modes. | Motorola Mobility LLC, Aalborg University | imported from 3GU |
R4‑142132 | The channel arrangement for 2GHz including the MSS band | Ericsson | imported from 3GU |
R4‑142133 | Intra-band contiguous CA class D RX analysis | Broadcom Corporation | imported from 3GU |
R4‑142134 | Test case for UE Transmit Timing Accuracy for SCell | Ericsson | imported from 3GU |
R4‑142135 | Frequency error for UL inter-band CA | Broadcom Corporation | imported from 3GU |
R4‑142136 | Simplification of 36.101 Table 5.6A.1-1 for LTE_CA_C_B27 | NII Holdings | imported from 3GU |
R4‑142137 | CA features and release independence | Broadcom Corporation | imported from 3GU |
R4‑142138 | BS multi-band configurations | Ericsson | imported from 3GU |
R4‑142139 | 256QAM RF aspects | Broadcom Corporation | imported from 3GU |
R4‑142140 | On definition of radiated output power level | Ericsson | imported from 3GU |
R4‑142141 | Text Proposal for TR 36.851: BS harmonics and intermodulation analysis for TDD-FDD CA B1+B41 combination (CA_1A-41A) | Ericsson | imported from 3GU |
R4‑142142 | Consideration on TDD-FDD CA UE architecture | CMCC | imported from 3GU |
R4‑142143 | Harmonization of the channel arrangement for 2GHz including the MSS band | Ericsson, Sony Mobile Japan Inc | imported from 3GU |
R4‑142144 | Reducing MPR for Contiguous CA with Non-Contiguous Resource Allocations | Motorola Mobility | imported from 3GU |
R4‑142145 | On low directive AAS base stations | Ericsson | imported from 3GU |
R4‑142146 | TR 36.861 v0.4.0 (LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz) | SK Telecom, KT, LG Uplus, LG Electronics | imported from 3GU |
R4‑142147 | Impact on BS performance requirements | Ericsson | imported from 3GU |
R4‑142148 | CR Reducing MPR for Contiguous CA with Non-Contiguous Resource Allocations | Motorola Mobility | imported from 3GU |
R4‑142149 | On minimum requirement, test tolerances, test requirement and measurement uncertainty | Ericsson | imported from 3GU |
R4‑142150 | TP for TR 36.861 (LTE FDD in the bands 1980-2010 MHz and 2170-2200 MHz) | SK Telecom | imported from 3GU |
R4‑142151 | Specification of E-UTRA and UTRA in the band including the MSS spectrum | Ericsson | imported from 3GU |
R4‑142152 | On the need for new capability set | Ericsson, NSN | imported from 3GU |
R4‑142153 | Reference Architecture and IL Analysis for LTE_CA_B1_B3_B5 | SK Telecom | imported from 3GU |
R4‑142154 | On radiated output power for legacy BS | Ericsson | imported from 3GU |
R4‑142155 | On radiated receiver sensitivity | Ericsson | imported from 3GU |
R4‑142156 | Intermodualtion and IL Analysis for 2UL Carrier Aggregation of Band 3 and 5 (class A4) | SK Telecom | imported from 3GU |
R4‑142157 | Overview of minimum requirement for radiated receiver sensitivity | Ericsson | imported from 3GU |
R4‑142158 | Co-existence between the MSS spectrum and Band 34 | Ericsson | imported from 3GU |
R4‑142159 | MPR Reduction for NC Resource Allocations | Intel Corporation | imported from 3GU |
R4‑142160 | TP for TR 37.xxx: Update of AAS reference architecture in section 4.3 of AAS WI TR version 1.0 | Ericsson | imported from 3GU |
R4‑142161 | An Analysis of Cross Correlation of BDS Gold Codes for Dynamic Range Requirements | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142162 | On draft skeleton for TS | Ericsson | imported from 3GU |
R4‑142163 | Issues with NC intraband UL | Intel Corporation | imported from 3GU |
R4‑142164 | NS_12 A-MPR | Intel Corporation | imported from 3GU |
R4‑142165 | EIRP minimum requirement and core specification text | Ericsson | imported from 3GU |
R4‑142166 | TP for TR 37.xxx: Definitions, symbols and abbreviations in AAS BS WI TR, Part 1 | Ericsson | imported from 3GU |
R4‑142167 | TP for TR 37.xxx: Definitions, symbols and abbreviations in AAS BS WI TR, Part 2 | Ericsson | imported from 3GU |
R4‑142168 | Discussion on the Release 12 SU MIMO UE advanced receiver | Nokia Corporation, NSN | imported from 3GU |
R4‑142169 | On semi-static parameter signalling and blind detection in NAICS | Nokia Corporation, NSN | imported from 3GU |
R4‑142170 | Blind detection of interference parameters | Nokia Corporation, NSN | imported from 3GU |
R4‑142171 | Justification and draft WID for MIMO OTA antenna test function | Agilent Technologies | imported from 3GU |
R4‑142172 | AAS technical specification structure considerations and recommendations | NSN | imported from 3GU |
R4‑142173 | AAS reference diagram comments | NSN | imported from 3GU |
R4‑142174 | CR on clarification of UE behavior for inter-frequency measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑142175 | AAS OTA RX sensitivity requirement | NSN | imported from 3GU |
R4‑142176 | Minimum AAS requirements for radiated output power accuracy | NSN | imported from 3GU |
R4‑142177 | AAS conducted transmitter requirements | NSN | imported from 3GU |
R4‑142178 | AAS conducted receiver requirements | NSN | imported from 3GU |
R4‑142179 | AAS beam declaration | NSN | imported from 3GU |
R4‑142180 | CR on clarification of UE behavior for inter-frequency measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑142181 | eIMTA UL PC feasibility study | NSN, Nokia Corporation | imported from 3GU |
R4‑142182 | eIMTA CCIM feasibility study | NSN, Nokia Corporation | imported from 3GU |
R4‑142183 | Considerations on PCell interruption due to UE measurement on deactivated Scell for rel.10 | NSN, Nokia Corporation | imported from 3GU |
R4‑142184 | Way Forward on Pcell interruption for deactivated Scell measurement in shorter measurement cycle in rel.10 | NSN, Nokia Corporation | imported from 3GU |
R4‑142185 | CR on clarification of UE behavior for inter-frequency measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑142186 | TP for TR 36.853: For LTE_CA_B3_B3_B7 | TeliaSonera AB | imported from 3GU |
R4‑142187 | Discussion on PCell interrupts for rel.11&12 from network aspect | NSN, Nokia Corporation | imported from 3GU |
R4‑142188 | Intra-band NC CA demodulation test cases | NSN, Nokia Corporation | imported from 3GU |
R4‑142189 | E-UTRAN FDD - UE Transmit Timing Accuracy Tests for SCell in sTAG | NSN, Nokia Corporation | imported from 3GU |
R4‑142190 | E-UTRAN TDD - UE Transmit Timing Accuracy Tests for SCell in sTAG | NSN, Nokia Corporation | imported from 3GU |
R4‑142191 | Analysis on UE maximum received timing difference for Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑142192 | LS on UE maximum received timing difference for Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑142193 | CR on SCG Cell activation for introducing Dual Connectivity | NSN, Nokia Corporation | imported from 3GU |
R4‑142194 | Performance Analysis for LTE TDD-FDD joint operation including Carrier Aggregation | NSN, Nokia Corporation | imported from 3GU |
R4‑142195 | CR on 36.133 for LTE TDD-FDD joint operation including Carrier Aggregation | NSN, Nokia Corporation | imported from 3GU |
R4‑142196 | Discussion on PCell interrupts for rel.11&12 from UE aspect | Nokia Corporation, NSN | imported from 3GU |
R4‑142197 | Usability of SF after measurement gap for Rel.12 | NSN, Nokia Corporation | imported from 3GU |
R4‑142198 | UE behavior after Measurement Gap (CR for rel.12) | NSN, Nokia Corporation | imported from 3GU |
R4‑142199 | BS supporting LTE-A CA for Band 40 3DL | NSN | imported from 3GU |
R4‑142200 | BS supporting LTE-A CA for Band 41 3DL | NSN | imported from 3GU |
R4‑142201 | Draft Proposal | DIsh Network | imported from 3GU |
R4‑142202 | TP for TR 36.833-5-41: Specific BS RF requirements for LTE Advanced Carrier Aggregation in Band 40 for 3DL | Alcatel-Lucent | imported from 3GU |
R4‑142203 | Bulk Corrections for Harmonics and Intermod anlysis in TR 36.851 | NII Holdings | imported from 3GU |
R4‑142204 | Overview of Near-field to Far-field transformation | ZTE, Tejet | imported from 3GU |
R4‑142205 | Updated results of UE specific beam forming for AAS coexistence simulation | ZTE, Tejet | imported from 3GU |
R4‑142206 | Text proposals on results of UE specific beam forming coexistence simulation to AAS BS WI TR 37.cde | ZTE, Tejet | imported from 3GU |
R4‑142207 | TS 25.173 version 0.1.0 | ZTE, CMCC | imported from 3GU |
R4‑142208 | Network Assistance and Subset Restriction | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142209 | Text Proposals for TS 25.173 section 5 and Annex D/E/F | ZTE, CMCC | imported from 3GU |
R4‑142210 | Evaluation on BDS HDOP changes in one day | ZTE, Tejet | imported from 3GU |
R4‑142211 | CR to TS 25.172 on introduction BDS to A-GANSS of FDD mode of UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R4‑142212 | CR to TS 36.171 on introduction BDS to A-GNSS of E-UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bel | imported from 3GU |
R4‑142213 | On Semistatic Parameter Detection for NAICS | QUALCOMM Incorporated | imported from 3GU |
R4‑142214 | Clarification on some definitions in TS37.104 | ZTE, Tejet | imported from 3GU |
R4‑142215 | Clarification on some definitions in TS37.104 | ZTE, Tejet | imported from 3GU |
R4‑142216 | RRM Requirements for UE with increased carriers for monitoring in connected mode | Broadcom Corporation | imported from 3GU |
R4‑142217 | Clarification on some definitions in TS37.141 | ZTE, Tejet | imported from 3GU |
R4‑142218 | UE ACLR Model for D2D Coexistence Simulations | Qualcomm Incorporated | imported from 3GU |
R4‑142219 | Clarification on some definitions in TS37.141 | ZTE, Tejet | imported from 3GU |
R4‑142220 | New RSRQ measurements definition | Nokia Corporation, NSN | imported from 3GU |
R4‑142221 | On Dynamic Parameter Detection for NAICS | QUALCOMM Incorporated | imported from 3GU |
R4‑142222 | D2D Coexistence: Simulation Assumptions and Results | Qualcomm Incorporated | imported from 3GU |
R4‑142223 | UE RF core requirements for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑142224 | Link Level Evaluations for Parameter Detection with SLIC Receiver | QUALCOMM Incorporated | imported from 3GU |
R4‑142225 | CR for introduction of new RSRQ measurements feature | Nokia Corporation, NSN | imported from 3GU |
R4‑142226 | Reply LS on frequency stability for D2D | Qualcomm Incorporated | imported from 3GU |
R4‑142227 | Link Level Evaluations for Parameter Detection with R-ML Receiver | QUALCOMM Incorporated | imported from 3GU |
R4‑142228 | Resource Block Restrictions for Band 28 with Lower Duplexer Operation | Motorola Mobility | imported from 3GU |
R4‑142229 | LS Out on defining the new RSRQ measurements definition | Nokia Corporation, NSN | imported from 3GU |
R4‑142230 | LS out on Parameter Detection for NAICS | QUALCOMM Incorporated | imported from 3GU |
R4‑142231 | LS Out on introducing the new RSRQ measurements definition | Nokia Corporation, NSN | imported from 3GU |
R4‑142232 | Correction on manufacturer's declaration in TS36.141 | ZTE, Tejet | imported from 3GU |
R4‑142233 | operating band update for TR25.113 | Huawei | imported from 3GU |
R4‑142234 | Correction on manufacturer's declaration in TS36.141 | ZTE, Tejet | imported from 3GU |
R4‑142235 | Introduction of Multi-band operation in TS25.142 | ZTE, Tejet | imported from 3GU |
R4‑142236 | Further consideration on small cell 256QAM BS RF requirements | ZTE, Tejet | imported from 3GU |
R4‑142237 | Operating band update for TS34.124 | Huawei | imported from 3GU |
R4‑142238 | Discussion on implementation for FDD and TDD joint operation including carrier aggregation | ZTE, Tejet | imported from 3GU |
R4‑142239 | Maximum number of carriers the UE should be able to moitor | Nokia Corporation, NSN | imported from 3GU |
R4‑142240 | RSTD inter-frequency requirements applicability | Ericsson | imported from 3GU |
R4‑142241 | RSTD inter-frequency requirements applicability | Ericsson | imported from 3GU |
R4‑142242 | Discussion for NACIS receiver with semi-static signaling | Broadcom Corporation | imported from 3GU |
R4‑142243 | TP for TR37.814, clause 12: lists of required changes in BS core specifications | Huawei | imported from 3GU |
R4‑142244 | CR introducing maximum number of carriers the UE should be able to monitor | Nokia Corporation, NSN | imported from 3GU |
R4‑142245 | RSTD inter-frequency requirements applicability | Ericsson | imported from 3GU |
R4‑142246 | MBSFN RSRP and RSRQ measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑142247 | Editorial corrections RRM | Ericsson | imported from 3GU |
R4‑142248 | TP for TR37.814, clause 12: lists of required changes in BS conformance specifications. | Huawei | imported from 3GU |
R4‑142249 | Editorial corrections RRM | Ericsson | imported from 3GU |
R4‑142250 | MBSFN BLER Measurements | Nokia Corporation, NSN | imported from 3GU |
R4‑142251 | TP for TR37.814, clause 12: lists of required changes in other specifications. | Huawei | imported from 3GU |
R4‑142252 | Editorial corrections RRM | Ericsson | imported from 3GU |
R4‑142253 | Small Cell Enhancements and cell detection | Nokia Corporation, NSN | imported from 3GU |
R4‑142254 | Test case corrections for eICIC | Ericsson, Intel | imported from 3GU |
R4‑142255 | TP for TR 37.814: Remaining UE requirements | Ericsson | imported from 3GU |
R4‑142256 | TP for TR37.814, section 12.1 | Huawei | imported from 3GU |
R4‑142257 | Test case corrections for eICIC | Ericsson, Intel | imported from 3GU |
R4‑142258 | Discussion on Dual Connectivity and RRM requirements | Nokia Corporation, NSN | imported from 3GU |
R4‑142259 | Test case corrections for eICIC | Ericsson, Intel | imported from 3GU |
R4‑142260 | TP for TR37.814 clause 11. Channel numbering for E-UTRA, UTRA and MSR | Huawei | imported from 3GU |
R4‑142261 | Draft CR for TDD-FDD CA for CA_1A-41A | Ericsson, KDDI | imported from 3GU |
R4‑142262 | TP for TR 37.814: Spurious emissions | Ericsson | imported from 3GU |
R4‑142263 | Text Proposal for TR 36.851: TDD-FDD CA for B1+B41 combination (CA_1A-41A) | Ericsson | imported from 3GU |
R4‑142264 | Text Proposal for TR 36.851: TDD-FDD CA for B1+B41 combination (CA_1A-41A) | Ericsson | imported from 3GU |
R4‑142265 | TP for TR36.851: WID assumptions excluding reasonable UE band combinations. | Huawei | imported from 3GU |
R4‑142266 | UE requirements for B1+B41 combination in TDD-FDD | Ericsson | imported from 3GU |
R4‑142267 | Multiband BS and TDD-FDD CA concerns | Huawei | imported from 3GU |
R4‑142268 | Introduction of Band 32/XXXII | Ericsson | imported from 3GU |
R4‑142269 | On TDD UL/DL subframe configurations in requirements | Ericsson | imported from 3GU |
R4‑142270 | On the terms paired and unpaired frequency range, band and spectrum in 3GPP specifications in the light of TDD-FDD CA and supplemental DL. | Huawei | imported from 3GU |
R4‑142271 | TDD UL/DL subframe configurations in requirements | Ericsson | imported from 3GU |
R4‑142272 | Methodology for studying UE Rx-Tx time difference with RRH | Ericsson | imported from 3GU |
R4‑142273 | On RRM requirements for low-cost MTC | Ericsson | imported from 3GU |
R4‑142274 | Requirements structure for MTC | Ericsson | imported from 3GU |
R4‑142275 | Link simulation results for cell identification for low-cost MTC with 1 Rx | Ericsson | imported from 3GU |
R4‑142276 | Link simulation results for RSRP RSRQ for low-cost MTC with 1 Rx | Ericsson | imported from 3GU |
R4‑142277 | On MBMS measurements | Ericsson | imported from 3GU |
R4‑142278 | Introduction text on common requirements | Ericsson | imported from 3GU |
R4‑142279 | Introduction text on common requirements | Ericsson | imported from 3GU |
R4‑142280 | Introduction text on common requirements | Ericsson | imported from 3GU |
R4‑142281 | Clean up for Band 29 | Ericsson | imported from 3GU |
R4‑142282 | Clean up for Band 29 | Ericsson | imported from 3GU |
R4‑142283 | UTRA TRP and TRS measurements for band I | Orange | imported from 3GU |
R4‑142284 | TP for TR 36.853: dTIB and dRIB for LTE_CA_B3_B7_B7 | Orange, Deutsche Telekom | imported from 3GU |
R4‑142285 | TP for TR 37.814: Regulatory EIRP emission limits in Region 1 | Orange | imported from 3GU |
R4‑142286 | TP for TR 36.860: Including 4th and 5th order IMD analysis for CA_B3_B7, CA_B3_B20 and CA_B7_B20 | TeliaSonera AB | imported from 3GU |
R4‑142287 | Reply LS on ProSe Out of Coverage discovery (R1-140950 Source: TSG RAN WG1, To: TSG RAN, Cc: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4,TSG SA,TSG SA WG2) | TSG RAN WG1 | - |
R4‑142288 | LS on impact on RRM measurements of P-CPICH scaling for Filtered UMTS (R1-140985 Source: TSG RAN WG1, To: TSG RAN WG4, Cc: ) | TSG RAN WG1 | - |
R4‑142289 | LS on small cell on/off and discovery (R1-141021 Source: TSG RAN WG1), To: TSG RAN WG2,TSG RAN WG3,TSG RAN WG4, Cc: ) | TSG RAN WG1) | - |
R4‑142290 | Reply to LS on mobility support for LC MTC UEs and MTC coverage enhancement (R1-141029 Source: TSG RAN WG1, To: TSG RAN WG2, Cc: TSG RAN WG4,TSG RAN) | TSG RAN WG1 | - |
R4‑142291 | Reply LS to S2-133846 = R2-133066 on GCSE with eMBMS (R2-141004 Source: TSG RAN WG2, To: TSG SA WG2, Cc: TSG RAN WG1,TSG RAN WG3,TSG RAN WG4) | TSG RAN WG2 | - |
R4‑142292 | Response LS on indication of modified UE power reduction capability in an earlier release (R2-141013 Source: TSG RAN WG2, To: TSG RAN WG4, Cc: ) | TSG RAN WG2 | - |
R4‑142293 | LS on UE Transmit Timing Accuracy test cases in DRX mode (R5-141130 Source: TSG RAN WG5, To: TSG RAN WG4, Cc: ) | TSG RAN WG5 | - |
R4‑142294 | Reply LS to R4-141254 = RP-140024 on BS classes and maximum BS power on 256QAM (RP-140510 Source: TSG RAN, To: TSG RAN WG4, Cc: TSG RAN WG1) | TSG RAN | - |
R4‑142295 | of TS.24 v2.0 Operator Minimum Acceptance Values for Device Antenna Performance (TSGAP_100 Source: GSMA, To: RAN WG4, TSG RAN WG5, CTIA, GCF CAG / SG, Cc: ) | GSMA | - |
R4‑142296 | the possibility of deploying UL in Band1 for B1+B3 CA Combination | China Unicom | - |
R4‑142297 | Consideration on the band option for MSS 2GHz band | China Telecom | - |
R4‑142298 | TS 36.112 LMU Conformance Specification 0.4.0 | TruePosition | - |
R4‑142299 | On EARFCN extension in GERAN | Broadcom, Blackberry, Qualcomm, NSN, CMCC | - |
R4‑142300 | CR 36.104-0423 rev 3 Definition of EARFCN to support additional carrier frequencies in GERAN | Broadcom, Blackberry, Qualcomm, NSN, CMCC | - |
R4‑142301 | Reply LS on extending E-UTRA band number and EARFCN numbering space [Reply to GP-130844] | Broadcom, Blackberry, Qualcomm, NSN, CMCC | - |
R4‑142302 | MTC UE Feature Requirements | Ericsson | - |
R4‑142303 | Work plan for RAN4 work on Small Cell Enhancements | Huawei | - |
R4‑142304 | Discussion and simualtion results for Band 27 CA demodulation performance requirements | Huawei, HiSilicon | - |
R4‑142305 | Discussion and simualtion results for Band 23 CA demodulation performance requirements | Huawei, HiSilicon | - |
R4‑142306 | RRM: Clean-up of time offset between cells in RSTD tests (Rel-9) | Rohde & Schwarz | - |
R4‑142307 | Test proposal for SU-MIMO UE demodulation requirement | Ericsson | - |
R4‑142308 | Blind detection of NAICS parameters for CRS-based TMs | Ericsson | - |
R4‑142309 | Blind detection of NAICS parameters for DM-RS-based TMs | Ericsson | - |
R4‑142310 | Further system level simulation on CRS interference cancellation in CoMP | Qualcomm Incorporated | - |
R4‑142311 | Link performance for NAICS receiver with blind detection under DMRS based transmission mode | LG Electronics | - |
R4‑142312 | Blind detection results of necessary parameters for interference with DMRS-based TM | MediaTek Inc. | - |
R4‑142313 | Blind detection of interference parameters | Nokia Corporation, NSN | - |
R4‑142314 | Reply LS on UE Transmit Timing Accuracy test cases in DRX mode | Huawei, HiSilicon | - |
R4‑142315 | Clarification on UE Transmit Timing Accuracy test cases in DRX mode R9 | Huawei, HiSilicon | - |
R4‑142316 | RSTD inter-frequency requirements applicability | Ericsson | - |
R4‑142317 | Editorial corrections RRM | Ericsson | - |
R4‑142318 | Remove [ ] from eICIC TDD RI requirement | Anritsu | - |
R4‑142319 | Corrections to CELL FACH test cases release 11 | Ericsson | - |
R4‑142320 | Corrections to CELL FACH test cases release 12 | Ericsson | - |
R4‑142321 | Test case for RACH on SCell | Ericsson | - |
R4‑142322 | Clarification of BW applicability in RSRP/RSRQ measurement accuracy R11 | Huawei, HiSilicon | - |
R4‑142323 | Simulations results of FeICIC PBCH IC | Broadcom Corporation | - |
R4‑142324 | Correction for CA sustained data rate test (Rel-11) | Huawei, HiSilicon | - |
R4‑142325 | CR on FeICIC PBCH performance requirement (Rel-11) | Huawei, HiSilicon | - |
R4‑142326 | Remove square bracket and editorial change for CoMP test cases | Samsung | - |
R4‑142327 | Booked for RRM session | - | - |
R4‑142328 | CR for adding DL CoMP CSI RMC tables (Rel-11) | Huawei, HiSilicon | - |
R4‑142329 | Correction of UE TM3 demodulation performance requirements | NTT DOCOMO, INC. | - |
R4‑142330 | CR on OCNG and propagation conditions for dual layer TM9 test | Huawei, HiSilicon | - |
R4‑142331 | Editorial corrections for UE performance requirments for R11 | CATT | - |
R4‑142332 | Editorial corrections for UE performance requirements for R12 | CATT | - |
R4‑142333 | TS 36.112 Section 7 Text Proposal | TruePosition | - |
R4‑142334 | TS 36.112 Section 8 Text Proposal | TruePosition | - |
R4‑142335 | CR on correction on TDD IRC CQI test in Rel-11 | Ericsson | - |
R4‑142336 | Test proposal for SU-MIMO UE demodulation requirement | Ericsson | - |
R4‑142337 | CR of modification on FeICIC rank testing (Rel-11) | Huawei, HiSilicon | - |
R4‑142338 | Way forward on parameters for FeICIC TM9 testing | Huawei, HiSilicon | - |
R4‑142339 | Remove square bracket and editorial change for CoMP test cases | Samsung | - |
R4‑142340 | Wayforward on RSRP/RSRQ requirements under high Doppler condition | Huawei, HiSilicon, CATT, Intel, NTT DOCOMO, CMCC, Ericsson, Anritsu, LG Electronics, Samsung, ZTE, MTK | - |
R4‑142341 | Way forward on Increasing RSRQ reporting range | Ericsson, Alcatel Lucent | - |
R4‑142342 | Way forward on small gaps | NTT DOCOMO, NSN, Nokia | - |
R4‑142343 | New Test Case for UE Transmit Timing Accuracy requirements in DRX | Fujitsu | - |
R4‑142344 | E-UTRAN FDD - UE Transmit Timing Accuracy Tests for SCell in sTAG | NSN, Nokia Corporation | - |
R4‑142345 | Way Forward on RSSI measurement for RSRQ | Qualcomm Incorporated, Verizon Wireless | - |
R4‑142346 | Meeting minutes for ad hoc on increasing number of carriers to monitor | Ericsson | - |
R4‑142347 | Introduction of test cases for 10MHz +5MHz : absolute and relative RSRQ accuracies in CA for FDD and TDD | Ericsson | - |
R4‑142348 | Introduction of test cases for 10MHz +5MHz : Event triggered reporting on deactivating Scells in non-DRX FDD and TDD | Ericsson | - |
R4‑142349 | Introduction of test cases for 10MHz +5MHz : absolute and relative RSRP accuracies in CA for FDD and TDD | Ericsson | - |
R4‑142350 | High Doppler Measurement Accuracy Simulation Assumptions | Ericsson | - |
R4‑142351 | E-UTRAN TDD - UE Transmit Timing Accuracy Tests for SCell in sTAG | NSN, Nokia Corporation | - |
R4‑142352 | Link performance for NAICS receiver with blind detection under CRS based transmission mode | LG Electronics | - |
R4‑142353 | LS Out on defining the new RSRQ measurements definition | Nokia Corporation, NSN | - |
R4‑142354 | LS Out on introducing the new RSRQ measurements definition | Nokia Corporation, NSN | - |
R4‑142355 | Way forward on UE behaviour after measurement gap for R12 | Huawei, HiSilicon, CMCC, Ericsson, CATT, NSN, Samsung, Intel, MTK | - |
R4‑142356 | Simulation assumptions for intraband NC demodulation test for timing offset | Intel | - |
R4‑142357 | Wayforward on intraband NC demodulation test purpose 2 | NSN | - |
R4‑142358 | LS on intraband NC CA timing offset | NTT DOCOMO | - |
R4‑142359 | Assumptions for RLM for Low Cost MTC UE | Ericsson | - |
R4‑142360 | Ad hoc minutes for eDL-MIMO | Alcatel Lucent | - |
R4‑142361 | Simulation assumptions for eDL-MIMO single PMI test | samsung | - |
R4‑142362 | Simulation assumptions for eDL-MIMO multiple PMI test | Huawei, HiSilicon | - |
R4‑142363 | CR to TS 25.172 on introduction BDS to A-GANSS of FDD mode of UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | - |
R4‑142364 | CR to TS 36.171 on introduction BDS to A-GNSS of E-UTRA | ZTE, Alcatel-Lucent, Alcatel-Lucent Shanghai Bel | - |
R4‑142365 | CR of EPDCCH localzied test with TM10 QCL Type-B configuration (Rel-11): correction of CSI-RS configurations | Ericsson | - |
R4‑142366 | CR for EPDCCH test (Rel-11) | Huawei, HiSilicon | - |
R4‑142367 | CR on Intra-frequency measurement with autonomous gap in eIMTA | Ericsson | - |
R4‑142368 | Wayforward on RRM requirements in eIMTA | Huawei, HiSilicon | - |
R4‑142369 | Way forward on Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | Ericsson, Teliasonera, Softbank Mobile, Telecom Italia, Nokia, NSN, Broadcom, Intel, Huawei, Hisilicon | - |
R4‑142370 | Simulation assumptions for eDL-MIMO multiple PMI test | Huawei, HiSilicon | - |
R4‑142371 | RRM: Clean-up of time offset between cells in RSTD tests (Rel-10) | Rohde & Schwarz | - |
R4‑142372 | Clarification on UE Transmit Timing Accuracy test cases in DRX mode R11 | Huawei, HiSilicon | - |
R4‑142373 | Wayforward on MBMS RSRP/RSRQ measurements | Qualcomm Incorporated, Ericsson, Huawei, HiSilicon, Alcatel-Lucent, Verizon, CATT, Nokia Corporation, NSN | - |
R4‑142374 | Wayforward on MBMS BLER measurements | Nokia, NSN | - |
R4‑142375 | LS on MBMS BLER measurements | Nokia, NSN | - |
R4‑142376 | Wayforward on SU-MIMO simulation parameters | Huawei, HiSilicon, Ericsson, NVIDIA, Qualcomm, Samsung, Intel, NTT DOCOMO, MediaTek | - |
R4‑142377 | Editorial corrections RRM | Ericsson | - |
R4‑142378 | Introduction text on common requirements | Ericsson | - |
R4‑142379 | Introduction text on common requirements | Ericsson | - |
R4‑142380 | Wayforward on TDD configuration applicability for RRM | Ericsson, Intel | - |
R4‑142381 | Correction on UE Behaviour for Transmission due to Measurement Gaps | Ericsson | - |
R4‑142382 | SCell activation and deactivation delay test case for known SCell | Ericsson | - |
R4‑142383 | WF on maximum received tiing difference for dual connectivity | NTT DOCOMO | - |
R4‑142384 | Introduction of UE RRM performance requirements for UTRA Band I + SDL 1452 - 1496 MHz | Qualcomm Incorporated | - |
R4‑142385 | Draft TR 36.855 v0.3.0 Feasibility of positioning enhancements for E-UTRA (2014-04) | Huawei, HiSilicon | - |
R4‑142386 | TP on TR36.855 Performance characterization of Wide and Small BW UE Rx-Tx time difference measurement | Huawei, HiSilicon | - |
R4‑142387 | Introduction of CA performance requirements for Band 27 CA | Huawei, HiSilicon | - |
R4‑142388 | CR to separate CA performance tests in 36.101 in Rel-10 | Ericsson | - |
R4‑142389 | CR to separate CA performance tests in 36.101 in Rel-11 | Ericsson | - |
R4‑142390 | CR to separate CA performance tests in 36.101 in Rel-12 | Ericsson | - |
R4‑142391 | CR on PCell Interruptions for Shorter Measurement Cycles | Qualcomm Incorporated, Mediatek Inc., Intel Corpor | - |
R4‑142392 | Proposed test for DL CA with 2 or 3DL CCs with minimum channel spacing in Rel-12 | Ericsson | - |
R4‑142393 | Way Forward on Pcell interruption for deactivated Scell measurement in shorter measurement cycle in rel.10 | NSN, Nokia Corporation, Ericsson, LG Uplus, KT, SK Telecom, CATT, Softbank, Sprint, China Unicom | - |
R4‑142394 | WF on Pcell interruption for future releases | NSN | - |
R4‑142395 | CR on 36.133 for LTE TDD-FDD joint operation including Carrier Aggregation | NSN, Nokia Corporation | - |
R4‑142396 | Way forward on BS demodulation requirements for FDD LTE coverage enhancements | Huawei, CT | - |
R4‑142397 | BS demodulation test parameters for FDD LTE coverage enhancements | Huawei, ZTE,CT | - |
R4‑142398 | Way forward on LCMTC demodulation requirements | Huawei, Intel | - |
R4‑142399 | Way forward on eIMTA demodulation | Ericsson | - |
R4‑142400 | Way forward on Serving Cell CRS-IC in CoMP | Ericsson | - |
R4‑142401 | Meeting minutes for ad hoc on NAICS | Intel | - |
R4‑142402 | Way forward on semi-static parameters for NAICS | Qualcomm, Samsung, Intel, NVIDIA, Huawei, HiSilicon, LG, NTT DOCOMO | - |
R4‑142403 | Way forward on dynamic parameters for NAICS | Qualcomm, Samsung, NTT DOCOMO | - |
R4‑142404 | CR on B42/B43 co-existence | NTT DOCOMO, INC., NII, Intel, Sofbank Mobile, eAcc | - |
R4‑142405 | Modification of Intra-band contiguous CA class B receiver requirements | Huawei, Hisilicon | - |
R4‑142406 | Technical Report for 3 Band Carrier Aggregation with Single Uplink | AT&T | - |
R4‑142407 | Intra-band contiguous CA ACS case 2 test clarification | Huawei, Hisilicon | - |
R4‑142408 | Unequal DL CC RB allocations in Maximum input level | Anritsu | - |
R4‑142409 | Unequal DL CC RB allocations in Maximum input level | Anritsu | - |
R4‑142410 | Intra-band non-contiguous CA unequal DL CC RB allocations in Maximum input level | Anritsu | - |
R4‑142411 | RF: Corrections to spurious emission requirements with NS_11 and NS_20 (Rel-10) | Rohde & Schwarz | - |
R4‑142412 | RF: Corrections to spurious emission requirements with NS_11, NS_20 and NS_21 (Rel-12) | Rohde & Schwarz | - |
R4‑142413 | Co-location between Band 42 and Band 43 in TS 36.104 | Huawei | - |
R4‑142414 | Co-location between Band 42 and Band 43 in TS 36.141 | Huawei | - |
R4‑142415 | Co-location between Band 42 and Band 43 in TS 37.104 | Huawei | - |
R4‑142416 | Co-location between Band 42 and Band 43 in TS 37.141 | Huawei | - |
R4‑142417 | Correction on some A-MPR tables | Huawei | - |
R4‑142418 | Correction on out-of-band blocking for CA | Huawei | - |
R4‑142419 | Correction on minimum sub-block gap size for NC intra-band CA | Qualcomm Incorporated | - |
R4‑142420 | Clarification on some definitions in TS37.104 | ZTE, Tejet | - |
R4‑142421 | Clarification on some definitions in TS37.141 | ZTE, Tejet | - |
R4‑142422 | Update of TS 37.104 | Huawei | - |
R4‑142423 | Band 29 correction | Ericsson | - |
R4‑142424 | TS 36.112 Section 4 Discussion and Text Proposal | TruePosition | - |
R4‑142425 | TS 36.112 Section 5 Text Proposal | TruePosition | - |
R4‑142426 | TS 36.112 Annex G Text Proposal | TruePosition | - |
R4‑142427 | Designation of UL and DL CA classes and configurations | Qualcomm Incorporated | - |
R4‑142428 | Modifications to intra-band contiguous CA class B receiver requirements | Broadcom Corporation | - |
R4‑142429 | Introduction of an additional requirement on aggregate power tolerance | Ericsson | - |
R4‑142430 | Modificaitons for NS_12 and NS_13 | Ericsson, SouthernLINC | - |
R4‑142431 | CA features and release independence | Broadcom Corporation | - |
R4‑142432 | LEE TRP requirements | Vodafone | - |
R4‑142433 | RAN4#70bis AAS Ad hoc agenda and meeting minutes | Huawei | - |
R4‑142434 | TP on channel bandwidth combination for intra-band contiguous CA in B40 for 3DL | CMCC | - |
R4‑142435 | Refsens for 3DL CA in Band 40 | ZTE | - |
R4‑142436 | TP on Rx requirements for 3DL CA in Band 40 | ZTE | - |
R4‑142437 | CR for TS 36.101 on introduction CA_41D | Sprint | - |
R4‑142438 | CR to TS 36.101 on introduction of CA BW class D requirements | Sprint | - |
R4‑142439 | TP on Error Vector Magnitude Requirements for AAS BS TR | NEC | - |
R4‑142440 | TP on ACLR Requirements for AAS BS | NEC | - |
R4‑142441 | TP on Time Alignment Error Requirements for AAS BS TR | NEC | - |
R4‑142442 | Spectrum and regulatory review for intra-band CA in Band 42 | CATT, NSN | - |
R4‑142443 | Bandwidth combination sets for CA_42C | NTT DOCOMO, INC. | - |
R4‑142444 | Additional bandwidth combinations for intra-band NC CA in Band 25 | Huawei, Hisilicon | - |
R4‑142445 | Co-existence studies for LTE_CA_NC_B25_BW | Huawei | - |
R4‑142446 | Text proposal on new AAS definitions | CATT, Alcatel-Lucent; Alcatel-Lucent Shanghai Bell, ZTE, Huawei, Ericsson | - |
R4‑142447 | TP on introducing channel bandwidth combination table for 3DL non-contiguous CA in band 41 | Samsung | - |
R4‑142448 | TP for TR 36.833-6-41: Reference sensitivity power level | Sprint | - |
R4‑142449 | Introduction of CA band B4+B27 to TS36.101 | NII Holdings | - |
R4‑142450 | Introduction of CA band B4+B27 to TS36.104 | NII Holdings | - |
R4‑142451 | TP for TR 37.842: Radiated output power requirements in section 7 | Ericsson | - |
R4‑142452 | TP for TR 37.xxx: Update of AAS reference architecture in section 4.3 of AAS WI TR version 1.0 | Ericsson | - |
R4‑142453 | WF for Radiated output power requirement | Ericsson | - |
R4‑142454 | Cross transceiver coupling and reverse intermodulation | Ericsson | - |
R4‑142455 | TP for TR 36.851: Channel bandwidth for CA B41+B42 | Huawei | - |
R4‑142456 | TP for TR 36.851: B41+B42 Harmonic and IMD analysis | Huawei | - |
R4‑142457 | TP to TR 36.851: Harmonics/IMD analysis and channel bandwidths for CA_7A-22A | Ericsson | - |
R4‑142458 | Dual uplink intermodulation and harmonics analysis for UE self-downlink performance | Intel Corporation | - |
R4‑142459 | TP for TR 36.851: LTE_CA_B5_B13 introduction | Intel Corporation, Verizon | - |
R4‑142460 | TR TP for AAS conducted receiver requirements | NSN, NEC, Huawei, ALU, Ericsson | - |
R4‑142461 | TP for TR 37.xxx: Update of AAS reference architecture in section 4.3 of AAS WI TR version 1.0 | Ericsson | - |
R4‑142462 | TP for TR 37.842: Radiated output power requirements in section 7 | Ericsson | - |
R4‑142463 | Priority for the next meeting (AAS) | Huawei | - |
R4‑142464 | WF on conductive reauirements | Alcatel Lucent, Huawei | - |
R4‑142465 | WF for Radiated output power requirement | Ericsson, NEC, ALU, Huawei | - |
R4‑142466 | TP for TR 36.853 For LTE_CA_B3_B7_B20 | TeliaSonera | - |
R4‑142467 | WF on AAS EIRP accuracy | Ericsson | - |
R4‑142468 | TP on EIRP accuracy analysis | Huawei | - |
R4‑142469 | WF on radiated receiver sensitivity | Ericsson | - |
R4‑142470 | Text proposal with further details on UE specific beam forming and simulation assumption | Huawei | - |
R4‑142471 | 2UL inter-band class A2 specifications | Qualcomm Incorporated | - |
R4‑142472 | Way forward on CA fallback | Vodafone, Orange, Telecom Italia, Ericsson, Deutsc | - |
R4‑142473 | Ad hoc minutes: BS specification improvement | Ericsson | - |
R4‑142474 | TP for 36.853: UE requirements for CA_2A-2A-13A, CA_2A-4A-13A, CA_4A-4A-13A, CA_2A-4A-5A, CA_2A-5A-12A, CA_2A-12A-12A and CA_4A-12A-12A | Ericsson | - |
R4‑142475 | Simulation results on UE for Band18+Band28 CA | KDDI | - |
R4‑142476 | TP for TR 36.853: Additional insertion loss for LTE_CA_B1_B3_B8 | KT | - |
R4‑142477 | TP for TR 36.853: Coexistence Studies of Harmonics and Intermodulation Products caused by LTE Advanced Carrier Aggregation of Band Combination (1 + 18 + 28) | Alcatel-Lucent, KDDI | - |
R4‑142478 | TP for section 6(Operating bands and CA configurations) of TR36.853 on LTE Advanced Carrier Aggregation of Band Combination (1+19+21) | NTT DOCOMO, INC. | - |
R4‑142479 | TP for section 6(Harmonics and IMD Study for the BS) of TR36.853 on LTE Advanced Carrier Aggregation of Band Combination (1+19+21) | NTT DOCOMO, INC. | - |
R4‑142480 | TP for TR 36.853: Coexistence Studies of Harmonics and intermodulation products analysis for LTE_CA_B3_B8_B27 | KT | - |
R4‑142481 | TP to 36.853 7+8+20 | Vodafone | - |
R4‑142482 | Text Proposal for TR 36.851: BS harmonics and intermodulation analysis for TDD-FDD CA B1+B41 combination (CA_1A-41A) | Ericsson | - |
R4‑142483 | TP for TR36.851: Co-existence study on LTE Advanced Carrier Aggregation of Band Combination (1+42) | NTT DOCOMO, INC. | - |
R4‑142484 | TP for TR36.851: Harmonics and intermodulation product analysis supporting LTE-Advanced CA of Band 3 and Band 40 | KT | - |
R4‑142485 | TP for TR36.851: Harmonics and intermodulation product analysis supporting LTE-Advanced CA of Band 8 and Band 40 | KT | - |
R4‑142486 | Way forward on Multi-band BS for TDD-FDD joint operation including Carrier Aggregation | NTT DOCOMO, INC., NSS, Ericsson | - |
R4‑142487 | TP for TR37.814 clause 11. Channel numbering for E-UTRA, UTRA and MSR | Huawei | - |
R4‑142488 | Introduction of Band XXXII and Band I+XXXII | Ericsson, Qualcomm | - |
R4‑142489 | TP for TR37.814, clause 12: lists of required changes in BS core specifications | Huawei | - |
R4‑142490 | Multi-band corrections in 37.141 chapter 6 | NSN | - |
R4‑142491 | Multi-band corrections in 37.141 chapter 7 | NSN | - |
R4‑142492 | Multi-band corrections in 36.141 chapter 6 | NSN, Alcatel-Lucent, Ericsson | - |
R4‑142493 | Multi-band corrections in 36.141 chapter 7 | NSN, Alcatel-Lucent, Ericsson | - |
R4‑142494 | TP for TR37.814, section 12.1 | Huawei | - |
R4‑142495 | WF on UE co-existence simulation | China Telecom, Ericsson, TeliaSonera | - |
R4‑142496 | Text Proposal: 2 GHz Region 1 Background for TR 37.846 | Dish Network, Solaris Mobile Ltd | - |
R4‑142497 | Text Proposal: 2 GHz Region 1 General Issues and Potential Commonalities with Region 3 for TR 37.846 | Dish Network, Solaris Mobile Ltd | - |
R4‑142498 | Text Proposal: 2 GHz Region 1 E-UTRA Issues for TR 37.846 | Dish Network, Solaris Mobile Ltd | - |
R4‑142499 | Uplink configuration for reference sensitivity of MTC UE | Huawei | - |
R4‑142500 | Way Forward on reference sensitivity for MTC UE | Huawei | - |
R4‑142501 | Clarification of power allocation for RX test cases in TS 37.141 (Rel-11) | Ericsson | - |
R4‑142502 | WF on UE requirement for 256QAM | Huawei | - |
R4‑142503 | R4 TR on LTE Device to Device Proximity Services | Qualcomm | - |
R4‑142504 | 3DL CA relaxations | Broadcom | - |
R4‑142505 | WF for D2D co-existence simulation assumptions | Qualcomm | - |
R4‑142506 | LS on Enhanced BCH parameters ( Source: RAN1, To: RAN2, RAN3, Cc: RAN4) | RAN1 | - |
R4‑142507 | LS on RAN1 progress on NAICS higher-layer signalling ( Source: RAN1, To: RAN4, Cc: ) | RAN1 | - |
R4‑142508 | Reply LS on increased number of LTE frequencies to monitor in UMTS ( Source: RAN2, To: RAN1, Cc: ) | RAN2 | - |
R4‑142509 | WF on How to introduce 3DL CA band combinations to TS36.104/141 | NTT Docomo | - |
R4‑142510 | Way forward on how to handle B42/B43 co-existence requirements | NTT Docomo | - |
R4‑142511 | Way forward on how to handle release independent manner for TDD-FDD CA | NTT DOCOMO, INC., Nokia corporation., TeliaSonera, KT corp., SK Telecom, NII, Broadcom | - |
R4‑142512 | Way forward on band 1+3 CA | China Unicom | - |
R4‑142513 | Way forward on 2ULCA class A1 | LG Electronics, SK Telecom, Huawei, LG plus | - |
R4‑142514 | Farwell speech for Nan Li | - | - |
R4‑142515 | LS out on Parameter Detection for NAICS | QUALCOMM Incorporated | - |
R4‑142516 | Way forward on 3DL CA RRM requirements | Alcatel Lucent | - |
R4‑142517 | New Test Case for UE Transmit Timing Accuracy requirements in DRX | Fujitsu | - |
R4‑142518 | SCell activation and deactivation delay test case for known SCell | Ericsson | - |
R4‑142519 | SCell activation and deactivation delay test case for known SCell | Ericsson | - |
R4‑142520 | Way forward on Increasing the minimum number of carriers for UE monitoring in UTRA and E-UTRA | Ericsson, Teliasonera, Softbank Mobile, Telecom Italia, Nokia, NSN, Broadcom, Intel, Huawei, Hisilicon | - |
R4‑142521 | Outgoing LS to be agreed during the meeting capturing RAN4 agreements on UE increased carrier monitoring for further RAN2 work | Ericsson | - |
R4‑142522 | LS out on Parameter Detection for NAICS | QUALCOMM Incorporated | - |
R4‑142523 | Way forward for PRS Signal Levels in RSTD Delay Test Cases | Alcatel Lucznt, Ericsson, Intel, Huawei | - |
R4‑142524 | LS out on Parameter Detection for NAICS | QUALCOMM Incorporated | - |
R4‑142525 | Introduction of test cases for 10MHz +5MHz : absolute and relative RSRQ accuracies in CA for FDD and TDD | Ericsson | - |
R4‑142526 | LS Out on defining the new RSRQ measurements definition | Nokia Corporation, NSN | - |
R4‑142527 | LS Out on introducing the new RSRQ measurements definition | Nokia Corporation, NSN | - |
R4‑142528 | WF on maximum received tiing difference for dual connectivity | NTT DOCOMO | - |
R4‑142529 | Wayforward on MBMS BLER measurements | Nokia, NSN | - |
R4‑142530 | Outgoing LS to be agreed during the meeting capturing RAN4 agreements on UE increased carrier monitoring for further RAN2 work | Ericsson | - |
R4‑142531 | Booked for RRM | - | - |
R4‑142532 | Booked for RRM | - | - |
R4‑142533 | Booked for RRM | - | - |
R4‑142534 | Booked for RRM | - | - |
R4‑142535 | Minutes of UE CA RF Ad-Hoc | Nokia Corporation | - |
R4‑142536 | MPR for non-contiguous intraband CA | Nokia Corporation | - |
R4‑142537 | TP on channel bandwidth combination for intra-band contiguous CA in B40 for 3DL | CMCC | - |
R4‑142538 | RF: Corrections to spurious emission requirements with NS_11 and NS_20 (Rel-10) | Rohde & Schwarz | - |
R4‑142539 | RF: Corrections to spurious emission requirements with NS_11 and NS_20 (Rel-11) | Rohde & Schwarz | - |
R4‑142540 | RF: Corrections to spurious emission requirements with NS_11, NS_20 and NS_21 (Rel-12) | Rohde & Schwarz | - |
R4‑142541 | Way Forward on PUCCH overprovisioning requirement for Band 28 spectra | KDDI | - |
R4‑142542 | Further discussion on UL reference measurement channel for MTC UE | Huawei | - |
R4‑142543 | Text proposal for TR 36.860: IMD study for dual uplink inter-band CA | ZTE | - |
R4‑142544 | WF on radiated receiver sensitivity | Ericsson | - |
R4‑142545 | WF on UE co-existence simulation | China Telecom, Ericsson, TeliaSonera | - |
R4‑142546 | TP for TR 36.833-6-41: Specific BS RF requirements for LTE Advanced Non-Contiguous Carrier Aggregation in Band 41 for 3DL | Alcatel-Lucent, Sprint | - |
R4‑142547 | TP for TR36.833-2-42: Required changes to E-UTRA specifications | Huawei, Hisilicon | - |
R4‑142548 | TP for TR 36.851: LTE_CA_B5_B13 introduction | Intel Corporation, Verizon | - |
R4‑142549 | TP for TR36.851: TIB and RIB proposal for CA 1+11 | SoftBank Mobile | - |
R4‑142550 | TP for TR 36.853: LTE_CA_B2_B5_B13 introduction | Intel Corporation, Verizon | - |
R4‑142551 | TP for TR 36.853: LTE_CA_B4_B4_B5 introduction | Intel Corporation, Verizon | - |
R4‑142552 | TP for TR 36.853: LTE_CA_B4_B5_B13 introduction | Intel Corporation, Verizon | - |
R4‑142553 | Simulation results on UE for Band18+Band28 CA | KDDI | - |
R4‑142554 | TP for TR 36.853: LTE_CA_B2_B5_B13 introduction | Intel Corporation, Verizon | - |
R4‑142555 | TP for section 6(Operating bands and CA configurations) of TR36.853 on LTE Advanced Carrier Aggregation of Band Combination (1+19+21) | NTT DOCOMO, INC. | - |
R4‑142556 | TP for TR 36.853: LTE_CA_B4_B4_B5 introduction | Intel Corporation, Verizon | - |
R4‑142557 | TP for TR 36.853: LTE_CA_B4_B5_B13 introduction | Intel Corporation, Verizon | - |
page generated from database: 2024-03-25 09:25:51