3GPP TDocs (written contributions) at meeting
Meeting: R3-07 - 1999-09-20 to 1999-09-24, TBD
meeting id: R3-07 (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R3‑99A77 | TS 25.401 UTRAN Overall Description V1.3.2 | Editor (Nortel Networks) | - |
r3‑99a78 | 25.410 v1.0.0 | Editor (BT) | - |
R3‑99a79 | 25.420 v0.1.7 UTRAN Iur Interface: General Aspects and Principles | Editor (TM Ltd.) | - |
R3‑99a80 | 25.430 UTRAN Iub General Aspects and Principles Version 0.1.5 | Editor | - |
r3‑99a81 | TS 25.442 UTRAN Implementation Specific O&M Transport | Editor (Mannesmann Mobilfunk) | - |
R3‑99A82 | UMTS 25.413: UTRAN Iu Interface RANAP Signalling, v.1.2.2 | Editor (Nokia) | - |
R3‑99A83 | UMTS 25.423 UTRAN Iur Interface RNSAP Signalling v1.3.1 | Editor | - |
R3‑99a84 | - | - | - |
R3‑99A86 | - | - | - |
R3‑99A87 | TS 25.435 UTRAN Iub Interface User Plane Protocols for COMMON TRANSPORT CHANNEL Data Streams V0.4.1 | Editor (Nortel Networks) | - |
R3‑99A88 | UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.4.1 | Editor | - |
R3‑99a89 | 25.931 v1.2.1 | Editor (CSELT) | - |
R3‑99a90 | UMTS 25.832 Manifestations of Handover and SRNS Relocation v.2.3.0 | Editor | - |
R3‑99a91 | UMTS 30.531 WG3 Work Plan and Study Items | Editor | - |
R3‑99A92 | - | - | - |
R3‑99a93 | - | - | - |
R3‑99A94 | Draft Agenda, Meeting #7 | Chairman | - |
r3‑99a95 | Draft Minutes of Meeting #6 | Secretary | - |
r3‑99a96 | : Liaison statement to WG2, WG3 and WG4 on power control issues | Source: 3GPP RAN WG1 | - |
r3‑99a97 | Ciphering in the case of multiple RABs | TSG S3 | - |
r3‑99a98 | Liaison on Length of SFN | TSG RAN WG2 | - |
r3‑99a99 | Reply to LS from WG1 on power control issues. | TSG RAN WG2 | - |
r3‑99b00 | Liaison statement to TSG RAN WG3 on the overall delay budget | TSG RAN WG2 | - |
r3‑99b01 | Response to LS on Ciphering mechanisms in case of multiple RABs. | TSG RAN WG2 | - |
r3‑99b02 | Liaison Statement to clarify transmission of variable-rate codec mode commands on the Iu -interface | TSG RAN WG2 | - |
r3‑99b03 | LS to RAN WG3 on SMS cell broadcast | RAN WG2 | - |
r3‑99b04 | Proposed LS to WG3 on status of the work on LCS | RAN WG2 | - |
r3‑99b05 | Proposed Reply to Liaison Statement on Timing Advance for TDD | RAN WG2 | - |
r3‑99b06 | - | - | - |
r3‑99b07 | - | - | - |
r3‑99b08 | - | - | - |
r3‑99b09 | LS on Uplink core network layer 3 message numbering | 3GPP CN1 | - |
r3‑99b10 | Response to Liaison Statements on MExE support of QoS negotiation and handover notifications. | TSG CN1 | - |
r3‑99b11 | Liaison statement to R3 on UMTS 25.832 Manifestations of Handover and SRNS Relocation v.2.1.1 | TSG CN2 | - |
R3‑99b12 | Liaison statement on L1 timing issues | TSG RAN WG1 | - |
R3‑99b13 | : Liaison statement on outer loop power control | Source: 3GPP RAN WG1 | - |
R3‑99b14 | : Liaison statement on power control limits | Source: RAN WG1 | - |
R3‑99b15 | - | - | - |
R3‑99b16 | - | - | - |
R3‑99b17 | Answer to the LS about TDD synchronisation methods | TSG RAN WG1 | - |
R3‑99b18 | Response to the LS “MExE support of QoS negotiation” | TSG S2/SMG12 | - |
R3‑99b19 | - | - | - |
R3‑99b20 | Liaison Statement - Cover letter for TR21.904, | TSG T2 SWG6 | - |
R3‑99b21 | Reply to Liaison on TS 25.442 UTRAN Implementation Specific O&M Transport | TSG-SA WG5 | - |
R3‑99b22 | - | - | - |
R3‑99b23 | - | - | - |
R3‑99b24 | - | - | - |
R3‑99b25 | - | - | - |
R3‑99b26 | Liaison Statement on UMTS and RAB parameter value ranges and granularity | 3GPP TSG SA WG2 | - |
R3‑99b27 | Response liaison on Clarification of RAB Sub Flows concept and associated definitions | 3GPP TSG SA WG2 | - |
R3‑99b28 | Response liaison on RAB requirements for CS data and architecture for CS data services | Ericsson | - |
R3‑99b29 | SRNS Relocation and handover | 3GPP SA WG2 | - |
R3‑99B30 | Node B Configuration and Initial Cell Configuration Procedures | Motorola | - |
R3‑99B31 | Call Trace | Motorola | - |
R3‑99B32 | 3G Work item: | Motorola | - |
R3‑99B33 | - | - | - |
R3‑99B34 | Resource Status Indication message contents update and | Motorola | - |
r3‑99b35 | 3G Work item: | Motorola | - |
R3‑99B36 | [Study Item] SSDT impacts on Iub and Iur | Telecom Modus Ltd | - |
R3‑99B37 | Text proposal for SSDT | Telecom Modus Ltd and NEC | - |
R3‑99B38 | Principle, performance and benefits of SSDT | NEC and Telecom MODUS | - |
R3‑99b40 | Proposed Parameters to SRNS RELOCATION COMMIT Message | Fujitsu | - |
R3‑99b41 | Proposed Example Procedure of | Fujitsu | - |
R3‑99b42 | Proposed Principle on the Support for RRC Connection | Fujitsu | - |
R3‑99B43 | - | - | - |
R3‑99B44 | - | - | - |
R3‑99B46 | - | - | - |
r3‑99B47 | Procedures for slow transmit power control | NEC and Telecom Modus | - |
R3‑99B48 | - | - | - |
R3‑99B49 | Functional Division between UTRAN and CN contribution | Ericsson | - |
R3‑99B50 | IU Downlink Rate Control procedure description for 25.415 (Iu UP protocol) | Ericsson | - |
R3‑99B51 | Frame coding of PDU type 0 for Support Mode for predefined SDU size | Ericsson | - |
R3‑99B52 | Frame coding of PDU type 15 for Support Mode for predefined SDU size | Ericsson | - |
R3‑99B53 | Protocol states for Iu User Plane | Ericsson | - |
R3‑99B54 | Frame quality classification in Iu UP for Support Mode | Ericsson | - |
R3‑99B55 | Security Mode Control Procedure for RANAP | Ericsson | - |
R3‑99B56 | RANAP information elements definition | Ericsson | - |
R3‑99B57 | Comments to RANAP v.1.2.2 | Ericsson | - |
R3‑99B58 | Replacement of NBAP Procedures for Radio Resource Management: Node B Restarted and RNC Restarted | Ericsson | - |
R3‑99B59 | Proposed NBAP Procedure for Cell Configuration Management: Cell Reconfiguration | Ericsson | - |
R3‑99B60 | Merging of NBAP Procedures for Resource Event Management: Resource Status Indication and Resource Notification Indication | Ericsson | - |
R3‑99B61 | Measurements to be provided in Node B | Ericsson | - |
R3‑99B62 | Multiplexing Communication Control Ports | Ericsson | - |
R3‑99B63 | Transport of System information over Iub | Ericsson | - |
R3‑99B64 | Coding of propagation delay field in RACH FP | Ericsson | - |
R3‑99B65 | DL power level on the secondary-CCPCH | Ericsson | - |
R3‑99B66 | Iub user plane support for long UE sleep modes | Ericsson | - |
R3‑99B67 | Coding of Paging Indication information in the PCH Frame Protocol | Ericsson | - |
R3‑99b68 | Content in the Paging Message | NEC | - |
R3‑99b69 | The contents of the Location Reporting Control and Location Report Message | NEC | - |
R3‑99b70 | Content in the Source RNC to Target RNC Transparent Container | NEC | - |
R3‑99b71 | Timer for RANAP | NEC | - |
R3‑99b72 | Location Information in the Iu Release Complete | NEC | - |
R3‑99b73 | Transparent container in Relocation Required and Relocation Request | Alcatel | - |
r3‑99b74 | Editor’s Proposal for 25.410 | Editor | - |
R3‑99B75 | UMTS 25.433: NBAP Specification V1.2.1 | WG3 | - |
R3‑99b76 | NBAP : Block Resource Request Message | GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone | - |
R3‑99b77 | NBAP : Block Resource Response | GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone | - |
R3‑99b78 | NBAP : Block Resource Failure | GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone | - |
R3‑99b79 | NBAP Contribution Discussion: Study Item Report | Rapporteur (Vodafone) | - |
R3‑99b80 | NBAP : Proposal for additional Cause Values | Vodafone | - |
R3‑99b81 | TDD Synchronisation on air | Italtel / Siemens | - |
R3‑99b82 | TDD Synchronisation by a GPS receiver via the standardised Synchronisation Port | Italtel / Siemens | - |
R3‑99b83 | Node B states during TDD Synchronisation procedure on air | Italtel / Siemens | - |
R3‑99b84 | Parameters for the RNSAP Common Transport Channel Initialisation procedure | Italtel / Siemens | - |
R3‑99b85 | TDD parameters in RNSAP FDD Radio Link Setup Response | Italtel / Siemens | - |
R3‑99b86 | Radio Access Bearer Establishment: DSCH Establishment in RACH/FACH State | Italtel / Siemens | - |
R3‑99b87 | Radio Access Bearer Establishment: USCH Establishment in RACH/FACH State | Italtel / Siemens | - |
R3‑99b88 | Report of the NBAP & RNSAP TDD Parameters Study Item: | Italtel / Siemens | - |
R3‑99b89 | Report of the NBAP & RNSAP TDD Parameters Study Item: | Italtel / Siemens | - |
R3‑99b90 | Revision of TS 25.401 V1.3.1 | Italtel / Siemens | - |
R3‑99b91 | Revision of TS 25.420 V1.1.6 | Italtel / Siemens | - |
R3‑99b92 | Revision of TS 25.430 V0.1.6 | Italtel / Siemens | - |
R3‑99b93 | Revision of TS 25.423 V1.3.1 | Italtel / Siemens | - |
R3‑99b94 | Revision of TS 25.433 V1.2.0 | Italtel / Siemens | - |
R3‑99b95 | Iur Flow Control for FACH and DSCH traffic | Rapporteur (M. Schopp, Siemens) | - |
R3‑99b96 | Timing Advance for TDD | Siemens, Italtel | - |
R3‑99b97 | Proposals/Comments to RANAP V.1.2.2 ([25.413]) | Siemens/Italtel | - |
R3‑99b98 | Comments to Study Item ARC/16 (Interaction between RANAP and RNSAP for SRNS Relocation) | Siemens/Italtel | - |
R3‑99b99 | NBAP : Proposed changes to Node B Resource Status Indication | Siemens / Italtel | - |
R3‑99c00 | NBAP : Proposed changes to Node B Resource Notification | Siemens / Italtel | - |
R3‑99c01 | NBAP : State Alignment Procedure | Siemens / Italtel | - |
R3‑99c02 | Measurements provided in Node B for TDD mode | Siemens / Italtel | - |
R3‑99c03 | Proposed changes to Event-triggered measurement reporting | Siemens / Italtel | - |
R3‑99c04 | Status Report Study Item TDD Frame Protocols | Siemens/Italtel | - |
R3‑99c05 | Study Item (ARC/3) “Overall Delay Budget within the Access Stratum” | Siemens, Italtel | - |
R3‑99c06 | Priority handling at AAL2 and ATM layer on the Iub/Iur interfaces. | Alcatel | - |
R3‑99C07 | Abnormal Conditions and Unsuccessful Outcome of RANAP | Ericsson | - |
R3‑99C08 | Reference to GTP-U protocol specification | Ericsson | - |
R3‑99C09 | Bit order in the user plane | Ericsson | - |
R3‑99C10 | CRC Lenghts in the frame protocol | Ericsson | - |
R3‑99C11 | Commonalities between dedicated and common User Plane Protocols | Ericsson | - |
R3‑99C12 | User plane frame protocol headers | Ericsson | - |
R3‑99C13 | Position of CRC-indicators in UL payloads | Ericsson | - |
R3‑99C14 | Flow control for FACH data streams o/Iur | Ericsson | - |
R3‑99C15 | Parallel RNSAP Procedures | Ericsson | - |
R3‑99C16 | RNSAP Support for URAs Extending over RNC Boarders | Ericsson | - |
R3‑99C17 | Clarification of SCCP Establishment on Iur | Ericsson | - |
R3‑99C18 | Study Item Report: DL Power Control | Rapporteur (Ericsson) | - |
R3‑99C20 | Editor's Proposal for 25.413 | Editor (Nokia) | - |
R3‑99C21 | RANAP Services | Nokia | - |
R3‑99C22 | SCCP Services | Nokia | - |
R3‑99C23 | Principles for including the Uu interface related information to RANAP messages used for relocation of SRNS | Nokia | - |
R3‑99C24 | Modifications to RANAP specifications due to the lossless Relocation requirement | Nokia | - |
R3‑99C25 | RANAP support for volume based charging | Nokia | - |
R3‑99C26 | Interaction of Relocation and Other RANAP Procedures | Nokia | - |
R3‑99C27 | Location Information in RANAP messages | Nokia | - |
R3‑99C28 | Reset Resource RANAP Procedure | Nokia | - |
R3‑99C29 | Modifications to the RNSAP Relocation Commit procedure | Nokia | - |
R3‑99C30 | Clarifications to some RANAP IE definitions | Nokia | - |
R3‑99C31 | Transport Network delay issues, request for change | Nokia | - |
R3‑99C32 | Error reporting procedure in NBAP | Nokia | - |
R3‑99C33 | Hard Handover at the Iub | Nokia | - |
R3‑99C34 | Error reporting procedure in RNSAP | Nokia | - |
R3‑99C35 | Additional physical channel parameters in RNSAP/NBAP DCH procedures | Nokia | - |
R3‑99C36 | Handling of Compatibility Information for the Iub/Iur DCH FP | Nokia | - |
R3‑99C37 | UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.4.2 – Editor's proposal | Editor | - |
R3‑99C38 | Support for Compressed Mode control in UTRAN interfaces | Nokia | - |
R3‑99c39 | Health Check (Layer3) | NTT DoCoMo | - |
R3‑99C40 | Report on out-of-sync detection study item | Raporteur | - |
R3‑99C41 | Proposal of revival of “Normal mode” in UL Iur/Iub FP | NTT DoCoMo | - |
R3‑99C42 | Association between UE and events in UTRAN nodes | NTT DoCoMo | - |
R3‑99C43 | Evaluation procedure | NTT DoCoMo | - |
R3‑99C44 | Editor’s change proposal to UMTS 25.433: NBAP Specification V1.2.1 | WG3 | - |
R3‑99c48 | Charging related Procedure for RANAP | NTT Software, NTT DoCoMo | - |
R3‑99c49 | Routing Implementation Specific O&M outside RNC | Telia | - |
R3‑99c50 | Allocation of DL Channelization Code | Fujitsu | - |
R3‑99c52 | Proposal for modification of parameters in the Radio Link Setup Request and Radio Link Addition Request messages | Alcatel | - |
R3‑99C53 | Use of CORBA for Iub Logical O&M | T-Mobil | - |
R3‑99c54 | Proposal for additional parameters in RNSAP Radio Link Setup Request and Radio Link Reconfiguration messages in TS 25.423 | Alcatel | - |
R3‑99c55 | - | - | - |
R3‑99c56 | Proposal to add transmission power measurement reports per code in TS 25.433 | Alcatel | - |
R3‑99c57 | RNSAP "Cell Load Information" procedure and message contents | Alcatel | - |
R3‑99c58 | Proposal for addition of DSCH parameters in the Radio Link Setup Request and Radio Link Reconfiguration messages | Alcatel | - |
R3‑99c59 | Need for priority handling over Iub/Iur interfaces. | Alcatel | - |
R3‑99C60 | Changes to RANAP specifications for the support of lossless relocation | Alcatel | - |
R3‑99C61 | Changes to RNSAP specification for the support of lossless relocation | Alcatel | - |
R3‑99c62 | Sequence charts for SRNS relocation | Alcatel | - |
R3‑99c63 | Sequence charts for GPRS to UMTS cell reselection | Alcatel | - |
R3‑99c64 | Sequence charts for UMTS to GPRS cell reselection | Alcatel | - |
R3‑99c65 | Measurement Termination Response | GSM Association VPT , Mannesmann Mobilfunk, Vodafone, | - |
R3‑99c66 | Measurement Initiation Request | GSM Association VPT , Mannesmann Mobilfunk, Vodafone, | - |
R3‑99c67 | Measurement Termination Request | GSM Association VPT , Mannesmann Mobilfunk, Vodafone, | - |
R3‑99c68 | Measurement Report | T-Mobil | - |
R3‑99c69 | Addition of NodeB and NodeB Control Port objects in Resource Status Indication message | Nortel Networks | - |
R3‑99c70 | Resource Status Indication message content refinement for NodeB logical resources availability management | Nortel Networks | - |
R3‑99c71 | Node B Capacity management on Iub interface | Nortel Networks | - |
R3‑99C72 | RNSAP Support for URAs Extending over RNC Boarders | Ericsson | - |
R3‑99C73 | Enhanced NBAP Procedure for Common Transport Channels Management: Common Transport Channel Setup | Ericsson | - |
R3‑99C74 | Iub NBAP Signalling Bearer | Ericsson | - |
R3‑99C75 | Clarification on usage of Classical IP over ATM | Ericsson | - |
R3‑99C76 | Node Synchronisation clarifications | Ericsson, Alcatel and NTT DoCoMo | - |
R3‑99C77 | Liaison to WG1: Using 8 lsb of SFN in each BCH radio frame | Ericsson | - |
R3‑99C78 | Radio synchronisation Timing diagram for 25.401 | Ericsson | - |
R3‑99C79 | Dedicated NBAP Measurement Control and Reporting procedures | Nokia | - |
R3‑99C80 | UMTS Delay Budget | Vodafone Limited | - |
R3‑99c81 | - | - | - |
R3‑99c83 | - | - | - |
R3‑99C84 | - | - | - |
r3‑99c85 | - | - | - |
r3‑99c86 | - | - | - |
r3‑99c87 | - | - | - |
r3‑99c88 | - | - | - |
r3‑99c89 | - | - | - |
R3‑99c90 | - | - | - |
R3‑99c91 | - | - | - |
r3‑99c92 | Liaison on the removal of superframe concept in layer 1 | TSG RAN WG1 | - |
R3‑99c93 | SCTP Evaluation | Motorola | - |
R3‑99c94 | SCTP Evaluation | Motorola | - |
R3‑99c95 | Iur ALCAP Signalling Bearer and SCTP Evaluation | Motorola | - |
R3‑99c96 | Timing Advance for TDD, effect on DCH control frame | Siemens, Italtel | - |
R3‑99C97 | Draft LS on Uu protocol information for Relocation of SRNS | Nokia | - |
R3‑99C98 | Draft LS on usage of E interface in 2G-3G interworking | Nokia | - |
R3‑99c99 | Another Editor’s Proposal for 25.410 | Editor | - |
R3‑99D00 | Proposed liaison statement to SA2, SA3, N1 | Ericsson | - |
R3‑99D01 | Response to the Liaison Statement on the evolution of GTP for Release’99 | TSG-R WG3 | - |
R3‑99D03 | 3G Work item: | Motorola | - |
R3‑99D04 | 3G Work item: | Motorola | - |
R3‑99D05 | 3G Work item: | Motorola | - |
R3‑99D06 | 3G Work item: | Motorola | - |
R3‑99d07 | 3G Work item: | Motorola | - |
R3‑99d08 | 3G Work item: | Motorola | - |
R3‑99d09 | 3G Work item: | Motorola | - |
R3‑99d10 | Proposed Liaison : Reply to LS from WG1 on power control issues. | TSG RAN WG3 | - |
r3‑99d11 | LS on RAB requirements for CS data | TSG-N3 | - |
R3‑99d12 | 25.420 v0.1.8 UTRAN Iur Interface: General Aspects and Principles | Editor (TM Ltd.) | - |
R3‑99d13 | A draft liaison statement to RAN-WG1 regarding Adjustment Loop | T-MODUS | - |
R3‑99d14 | SSDT Adhoc Report | SSDT Adhoc Chair (TM Ltd) | - |
R3‑99d15 | Text proposal for SSDT | Telecom Modus Ltd and NEC | - |
R3‑99d16 | A draft liaison statement to RAN-WG1 regarding SSDT | SSDT Adhoc | - |
R3‑99d17 | Draft liaison statement to RAN-WG1 regarding Physical Channel Structure selection | WG3-SSDT Adhoc | - |
R3‑99d18 | Example of TDD Synchronisation Procedure | Italtel / Siemens | - |
R3‑99d19 | Report of the ad-hoc Meeting “Delay Budget within the Access Stratum” | Italtel / Siemens | - |
R3‑99d20 | Another Editor’s Proposal for 25.410 | Editor | - |
R3‑99d22 | 25.430 UTRAN Iub General Aspects and Principles Version 0.2.1 | Editor | - |
R3‑99D23 | UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.5.1 | Editor | - |
R3‑99D24 | Summary of Iu SWG | Iu SWG Chairman | - |
R3‑99D25 | Summary Iur / Iub SWG | Iub/Iur SWG Chairman | - |
r3‑99d26 | TS 25.435 UTRAN Iub Interface User Plane Protocols for COMMON TRANSPORT CHANNEL Data Streams V0.4.2 | Editor (Nortel Networks) | - |
R3‑99d27 | - | - | - |
R3‑99d28 | Eb/No parameters in RNSAP messages | Alcatel | - |
R3‑99D29 | Text proposal for the RL failure and RL restore procedures | Nokia | - |
R3‑99D30 | Proposed answer to the LS from WG1 on power control limits. | Nokia | - |
R3‑99D31 | Proposed LS to WG1 and WG2 on the decoding of TFCI. | Nokia | - |
R3‑99D32 | LS on Uu protocol information for Relocation of SRNS | Nokia | - |
R3‑99D33 | Draft LS on RANAP Data Volume Reporting | Nokia | - |
R3‑99d34 | - | - | - |
R3‑99d35 | 25.430 UTRAN Iub General Aspects and Principles Version 0.2.1 | Editor | - |
R3‑99D36 | TS 25.442 UTRAN Implementation Specific O&M Transport v 0.3.1 | Editor (Mannesmann Mobilfunk) | - |
R3‑99d37 | - | - | - |
R3‑99D38 | Protocol termination of RRC over BCH | TSG RAN WG3 | - |
r3‑99d39 | - | - | - |
R3‑99d40 | - | - | - |
R3‑99D41 | - | - | - |
R3‑99D42 | - | - | - |
R3‑99D43 | - | - | - |
R3‑99D44 | TS 25.435 UTRAN Iub Interface User Plane Protocols for COMMON TRANSPORT CHANNEL Data Streams V0.5.0 | Editor (Nortel Networks) | - |
R3‑99D45 | TS 25.401 UTRAN Overall Description V1.4.1 | Editor (Nortel Networks) | - |
R3‑99D46 | - | - | - |
R3‑99D47 | UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.6.0 | Editor | - |
R3‑99D48 | Proposed liaison statement to SA4 | Ericsson | - |
R3‑99D49 | Proposed liaison statement to SA3, CN1, RAN2 | Ericsson | - |
R3‑99D50 | Proposed liaison statement to N3 | Ericsson | - |
R3‑99D51 | Draft response to "LS on L3 Segmentation" from N1 | Nokia | - |
page generated from database: 2024-04-22 07:58:53