The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R3-07 - 1999-09-20 to 1999-09-24, TBD

meeting id: R3-07 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R3‑99A77 TS 25.401 UTRAN Overall Description V1.3.2 Editor (Nortel Networks) -
r3‑99a78 25.410 v1.0.0 Editor (BT) -
R3‑99a79 25.420 v0.1.7 UTRAN Iur Interface: General Aspects and Principles Editor (TM Ltd.) -
R3‑99a80 25.430 UTRAN Iub General Aspects and Principles Version 0.1.5 Editor -
r3‑99a81 TS 25.442 UTRAN Implementation Specific O&M Transport Editor (Mannesmann Mobilfunk) -
R3‑99A82 UMTS 25.413: UTRAN Iu Interface RANAP Signalling, v.1.2.2 Editor (Nokia) -
R3‑99A83 UMTS 25.423 UTRAN Iur Interface RNSAP Signalling v1.3.1 Editor -
R3‑99a84 - - -
R3‑99A86 - - -
R3‑99A87 TS 25.435 UTRAN Iub Interface User Plane Protocols for COMMON TRANSPORT CHANNEL Data Streams V0.4.1 Editor (Nortel Networks) -
R3‑99A88 UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.4.1 Editor -
R3‑99a89 25.931 v1.2.1 Editor (CSELT) -
R3‑99a90 UMTS 25.832 Manifestations of Handover and SRNS Relocation v.2.3.0 Editor -
R3‑99a91 UMTS 30.531 WG3 Work Plan and Study Items Editor -
R3‑99A92 - - -
R3‑99a93 - - -
R3‑99A94 Draft Agenda, Meeting #7 Chairman -
r3‑99a95 Draft Minutes of Meeting #6 Secretary -
r3‑99a96 : Liaison statement to WG2, WG3 and WG4 on power control issues Source: 3GPP RAN WG1 -
r3‑99a97 Ciphering in the case of multiple RABs TSG S3 -
r3‑99a98 Liaison on Length of SFN TSG RAN WG2 -
r3‑99a99 Reply to LS from WG1 on power control issues. TSG RAN WG2 -
r3‑99b00 Liaison statement to TSG RAN WG3 on the overall delay budget TSG RAN WG2 -
r3‑99b01 Response to LS on Ciphering mechanisms in case of multiple RABs. TSG RAN WG2 -
r3‑99b02 Liaison Statement to clarify transmission of variable-rate codec mode commands on the Iu -interface TSG RAN WG2 -
r3‑99b03 LS to RAN WG3 on SMS cell broadcast RAN WG2 -
r3‑99b04 Proposed LS to WG3 on status of the work on LCS RAN WG2 -
r3‑99b05 Proposed Reply to Liaison Statement on Timing Advance for TDD RAN WG2 -
r3‑99b06 - - -
r3‑99b07 - - -
r3‑99b08 - - -
r3‑99b09 LS on Uplink core network layer 3 message numbering 3GPP CN1 -
r3‑99b10 Response to Liaison Statements on MExE support of QoS negotiation and handover notifications. TSG CN1 -
r3‑99b11 Liaison statement to R3 on UMTS 25.832 Manifestations of Handover and SRNS Relocation v.2.1.1 TSG CN2 -
R3‑99b12 Liaison statement on L1 timing issues TSG RAN WG1 -
R3‑99b13 : Liaison statement on outer loop power control Source: 3GPP RAN WG1 -
R3‑99b14 : Liaison statement on power control limits Source: RAN WG1 -
R3‑99b15 - - -
R3‑99b16 - - -
R3‑99b17 Answer to the LS about TDD synchronisation methods TSG RAN WG1 -
R3‑99b18 Response to the LS “MExE support of QoS negotiation” TSG S2/SMG12 -
R3‑99b19 - - -
R3‑99b20 Liaison Statement - Cover letter for TR21.904, TSG T2 SWG6 -
R3‑99b21 Reply to Liaison on TS 25.442 UTRAN Implementation Specific O&M Transport TSG-SA WG5 -
R3‑99b22 - - -
R3‑99b23 - - -
R3‑99b24 - - -
R3‑99b25 - - -
R3‑99b26 Liaison Statement on UMTS and RAB parameter value ranges and granularity 3GPP TSG SA WG2 -
R3‑99b27 Response liaison on Clarification of RAB Sub Flows concept and associated definitions 3GPP TSG SA WG2 -
R3‑99b28 Response liaison on RAB requirements for CS data and architecture for CS data services Ericsson -
R3‑99b29 SRNS Relocation and handover 3GPP SA WG2 -
R3‑99B30 Node B Configuration and Initial Cell Configuration Procedures Motorola -
R3‑99B31 Call Trace Motorola -
R3‑99B32 3G Work item: Motorola -
R3‑99B33 - - -
R3‑99B34 Resource Status Indication message contents update and Motorola -
r3‑99b35 3G Work item: Motorola -
R3‑99B36 [Study Item] SSDT impacts on Iub and Iur Telecom Modus Ltd -
R3‑99B37 Text proposal for SSDT Telecom Modus Ltd and NEC -
R3‑99B38 Principle, performance and benefits of SSDT NEC and Telecom MODUS -
R3‑99b40 Proposed Parameters to SRNS RELOCATION COMMIT Message Fujitsu -
R3‑99b41 Proposed Example Procedure of Fujitsu -
R3‑99b42 Proposed Principle on the Support for RRC Connection Fujitsu -
R3‑99B43 - - -
R3‑99B44 - - -
R3‑99B46 - - -
r3‑99B47 Procedures for slow transmit power control NEC and Telecom Modus -
R3‑99B48 - - -
R3‑99B49 Functional Division between UTRAN and CN contribution Ericsson -
R3‑99B50 IU Downlink Rate Control procedure description for 25.415 (Iu UP protocol) Ericsson -
R3‑99B51 Frame coding of PDU type 0 for Support Mode for predefined SDU size Ericsson -
R3‑99B52 Frame coding of PDU type 15 for Support Mode for predefined SDU size Ericsson -
R3‑99B53 Protocol states for Iu User Plane Ericsson -
R3‑99B54 Frame quality classification in Iu UP for Support Mode Ericsson -
R3‑99B55 Security Mode Control Procedure for RANAP Ericsson -
R3‑99B56 RANAP information elements definition Ericsson -
R3‑99B57 Comments to RANAP v.1.2.2 Ericsson -
R3‑99B58 Replacement of NBAP Procedures for Radio Resource Management: Node B Restarted and RNC Restarted Ericsson -
R3‑99B59 Proposed NBAP Procedure for Cell Configuration Management: Cell Reconfiguration Ericsson -
R3‑99B60 Merging of NBAP Procedures for Resource Event Management: Resource Status Indication and Resource Notification Indication Ericsson -
R3‑99B61 Measurements to be provided in Node B Ericsson -
R3‑99B62 Multiplexing Communication Control Ports Ericsson -
R3‑99B63 Transport of System information over Iub Ericsson -
R3‑99B64 Coding of propagation delay field in RACH FP Ericsson -
R3‑99B65 DL power level on the secondary-CCPCH Ericsson -
R3‑99B66 Iub user plane support for long UE sleep modes Ericsson -
R3‑99B67 Coding of Paging Indication information in the PCH Frame Protocol Ericsson -
R3‑99b68 Content in the Paging Message NEC -
R3‑99b69 The contents of the Location Reporting Control and Location Report Message NEC -
R3‑99b70 Content in the Source RNC to Target RNC Transparent Container NEC -
R3‑99b71 Timer for RANAP NEC -
R3‑99b72 Location Information in the Iu Release Complete NEC -
R3‑99b73 Transparent container in Relocation Required and Relocation Request Alcatel -
r3‑99b74 Editor’s Proposal for 25.410 Editor -
R3‑99B75 UMTS 25.433: NBAP Specification V1.2.1 WG3 -
R3‑99b76 NBAP : Block Resource Request Message GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone -
R3‑99b77 NBAP : Block Resource Response GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone -
R3‑99b78 NBAP : Block Resource Failure GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone -
R3‑99b79 NBAP Contribution Discussion: Study Item Report Rapporteur (Vodafone) -
R3‑99b80 NBAP : Proposal for additional Cause Values Vodafone -
R3‑99b81 TDD Synchronisation on air Italtel / Siemens -
R3‑99b82 TDD Synchronisation by a GPS receiver via the standardised Synchronisation Port Italtel / Siemens -
R3‑99b83 Node B states during TDD Synchronisation procedure on air Italtel / Siemens -
R3‑99b84 Parameters for the RNSAP Common Transport Channel Initialisation procedure Italtel / Siemens -
R3‑99b85 TDD parameters in RNSAP FDD Radio Link Setup Response Italtel / Siemens -
R3‑99b86 Radio Access Bearer Establishment: DSCH Establishment in RACH/FACH State Italtel / Siemens -
R3‑99b87 Radio Access Bearer Establishment: USCH Establishment in RACH/FACH State Italtel / Siemens -
R3‑99b88 Report of the NBAP & RNSAP TDD Parameters Study Item: Italtel / Siemens -
R3‑99b89 Report of the NBAP & RNSAP TDD Parameters Study Item: Italtel / Siemens -
R3‑99b90 Revision of TS 25.401 V1.3.1 Italtel / Siemens -
R3‑99b91 Revision of TS 25.420 V1.1.6 Italtel / Siemens -
R3‑99b92 Revision of TS 25.430 V0.1.6 Italtel / Siemens -
R3‑99b93 Revision of TS 25.423 V1.3.1 Italtel / Siemens -
R3‑99b94 Revision of TS 25.433 V1.2.0 Italtel / Siemens -
R3‑99b95 Iur Flow Control for FACH and DSCH traffic Rapporteur (M. Schopp, Siemens) -
R3‑99b96 Timing Advance for TDD Siemens, Italtel -
R3‑99b97 Proposals/Comments to RANAP V.1.2.2 ([25.413]) Siemens/Italtel -
R3‑99b98 Comments to Study Item ARC/16 (Interaction between RANAP and RNSAP for SRNS Relocation) Siemens/Italtel -
R3‑99b99 NBAP : Proposed changes to Node B Resource Status Indication Siemens / Italtel -
R3‑99c00 NBAP : Proposed changes to Node B Resource Notification Siemens / Italtel -
R3‑99c01 NBAP : State Alignment Procedure Siemens / Italtel -
R3‑99c02 Measurements provided in Node B for TDD mode Siemens / Italtel -
R3‑99c03 Proposed changes to Event-triggered measurement reporting Siemens / Italtel -
R3‑99c04 Status Report Study Item TDD Frame Protocols Siemens/Italtel -
R3‑99c05 Study Item (ARC/3) “Overall Delay Budget within the Access Stratum” Siemens, Italtel -
R3‑99c06 Priority handling at AAL2 and ATM layer on the Iub/Iur interfaces. Alcatel -
R3‑99C07 Abnormal Conditions and Unsuccessful Outcome of RANAP Ericsson -
R3‑99C08 Reference to GTP-U protocol specification Ericsson -
R3‑99C09 Bit order in the user plane Ericsson -
R3‑99C10 CRC Lenghts in the frame protocol Ericsson -
R3‑99C11 Commonalities between dedicated and common User Plane Protocols Ericsson -
R3‑99C12 User plane frame protocol headers Ericsson -
R3‑99C13 Position of CRC-indicators in UL payloads Ericsson -
R3‑99C14 Flow control for FACH data streams o/Iur Ericsson -
R3‑99C15 Parallel RNSAP Procedures Ericsson -
R3‑99C16 RNSAP Support for URAs Extending over RNC Boarders Ericsson -
R3‑99C17 Clarification of SCCP Establishment on Iur Ericsson -
R3‑99C18 Study Item Report: DL Power Control Rapporteur (Ericsson) -
R3‑99C20 Editor's Proposal for 25.413 Editor (Nokia) -
R3‑99C21 RANAP Services Nokia -
R3‑99C22 SCCP Services Nokia -
R3‑99C23 Principles for including the Uu interface related information to RANAP messages used for relocation of SRNS Nokia -
R3‑99C24 Modifications to RANAP specifications due to the lossless Relocation requirement Nokia -
R3‑99C25 RANAP support for volume based charging Nokia -
R3‑99C26 Interaction of Relocation and Other RANAP Procedures Nokia -
R3‑99C27 Location Information in RANAP messages Nokia -
R3‑99C28 Reset Resource RANAP Procedure Nokia -
R3‑99C29 Modifications to the RNSAP Relocation Commit procedure Nokia -
R3‑99C30 Clarifications to some RANAP IE definitions Nokia -
R3‑99C31 Transport Network delay issues, request for change Nokia -
R3‑99C32 Error reporting procedure in NBAP Nokia -
R3‑99C33 Hard Handover at the Iub Nokia -
R3‑99C34 Error reporting procedure in RNSAP Nokia -
R3‑99C35 Additional physical channel parameters in RNSAP/NBAP DCH procedures Nokia -
R3‑99C36 Handling of Compatibility Information for the Iub/Iur DCH FP Nokia -
R3‑99C37 UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.4.2 – Editor's proposal Editor -
R3‑99C38 Support for Compressed Mode control in UTRAN interfaces Nokia -
R3‑99c39 Health Check (Layer3) NTT DoCoMo -
R3‑99C40 Report on out-of-sync detection study item Raporteur -
R3‑99C41 Proposal of revival of “Normal mode” in UL Iur/Iub FP NTT DoCoMo -
R3‑99C42 Association between UE and events in UTRAN nodes NTT DoCoMo -
R3‑99C43 Evaluation procedure NTT DoCoMo -
R3‑99C44 Editor’s change proposal to UMTS 25.433: NBAP Specification V1.2.1 WG3 -
R3‑99c48 Charging related Procedure for RANAP NTT Software, NTT DoCoMo -
R3‑99c49 Routing Implementation Specific O&M outside RNC Telia -
R3‑99c50 Allocation of DL Channelization Code Fujitsu -
R3‑99c52 Proposal for modification of parameters in the Radio Link Setup Request and Radio Link Addition Request messages Alcatel -
R3‑99C53 Use of CORBA for Iub Logical O&M T-Mobil -
R3‑99c54 Proposal for additional parameters in RNSAP Radio Link Setup Request and Radio Link Reconfiguration messages in TS 25.423 Alcatel -
R3‑99c55 - - -
R3‑99c56 Proposal to add transmission power measurement reports per code in TS 25.433 Alcatel -
R3‑99c57 RNSAP "Cell Load Information" procedure and message contents Alcatel -
R3‑99c58 Proposal for addition of DSCH parameters in the Radio Link Setup Request and Radio Link Reconfiguration messages Alcatel -
R3‑99c59 Need for priority handling over Iub/Iur interfaces. Alcatel -
R3‑99C60 Changes to RANAP specifications for the support of lossless relocation Alcatel -
R3‑99C61 Changes to RNSAP specification for the support of lossless relocation Alcatel -
R3‑99c62 Sequence charts for SRNS relocation Alcatel -
R3‑99c63 Sequence charts for GPRS to UMTS cell reselection Alcatel -
R3‑99c64 Sequence charts for UMTS to GPRS cell reselection Alcatel -
R3‑99c65 Measurement Termination Response GSM Association VPT , Mannesmann Mobilfunk, Vodafone, -
R3‑99c66 Measurement Initiation Request GSM Association VPT , Mannesmann Mobilfunk, Vodafone, -
R3‑99c67 Measurement Termination Request GSM Association VPT , Mannesmann Mobilfunk, Vodafone, -
R3‑99c68 Measurement Report T-Mobil -
R3‑99c69 Addition of NodeB and NodeB Control Port objects in Resource Status Indication message Nortel Networks -
R3‑99c70 Resource Status Indication message content refinement for NodeB logical resources availability management Nortel Networks -
R3‑99c71 Node B Capacity management on Iub interface Nortel Networks -
R3‑99C72 RNSAP Support for URAs Extending over RNC Boarders Ericsson -
R3‑99C73 Enhanced NBAP Procedure for Common Transport Channels Management: Common Transport Channel Setup Ericsson -
R3‑99C74 Iub NBAP Signalling Bearer Ericsson -
R3‑99C75 Clarification on usage of Classical IP over ATM Ericsson -
R3‑99C76 Node Synchronisation clarifications Ericsson, Alcatel and NTT DoCoMo -
R3‑99C77 Liaison to WG1: Using 8 lsb of SFN in each BCH radio frame Ericsson -
R3‑99C78 Radio synchronisation Timing diagram for 25.401 Ericsson -
R3‑99C79 Dedicated NBAP Measurement Control and Reporting procedures Nokia -
R3‑99C80 UMTS Delay Budget Vodafone Limited -
R3‑99c81 - - -
R3‑99c83 - - -
R3‑99C84 - - -
r3‑99c85 - - -
r3‑99c86 - - -
r3‑99c87 - - -
r3‑99c88 - - -
r3‑99c89 - - -
R3‑99c90 - - -
R3‑99c91 - - -
r3‑99c92 Liaison on the removal of superframe concept in layer 1 TSG RAN WG1 -
R3‑99c93 SCTP Evaluation Motorola -
R3‑99c94 SCTP Evaluation Motorola -
R3‑99c95 Iur ALCAP Signalling Bearer and SCTP Evaluation Motorola -
R3‑99c96 Timing Advance for TDD, effect on DCH control frame Siemens, Italtel -
R3‑99C97 Draft LS on Uu protocol information for Relocation of SRNS Nokia -
R3‑99C98 Draft LS on usage of E interface in 2G-3G interworking Nokia -
R3‑99c99 Another Editor’s Proposal for 25.410 Editor -
R3‑99D00 Proposed liaison statement to SA2, SA3, N1 Ericsson -
R3‑99D01 Response to the Liaison Statement on the evolution of GTP for Release’99 TSG-R WG3 -
R3‑99D03 3G Work item: Motorola -
R3‑99D04 3G Work item: Motorola -
R3‑99D05 3G Work item: Motorola -
R3‑99D06 3G Work item: Motorola -
R3‑99d07 3G Work item: Motorola -
R3‑99d08 3G Work item: Motorola -
R3‑99d09 3G Work item: Motorola -
R3‑99d10 Proposed Liaison : Reply to LS from WG1 on power control issues. TSG RAN WG3 -
r3‑99d11 LS on RAB requirements for CS data TSG-N3 -
R3‑99d12 25.420 v0.1.8 UTRAN Iur Interface: General Aspects and Principles Editor (TM Ltd.) -
R3‑99d13 A draft liaison statement to RAN-WG1 regarding Adjustment Loop T-MODUS -
R3‑99d14 SSDT Adhoc Report SSDT Adhoc Chair (TM Ltd) -
R3‑99d15 Text proposal for SSDT Telecom Modus Ltd and NEC -
R3‑99d16 A draft liaison statement to RAN-WG1 regarding SSDT SSDT Adhoc -
R3‑99d17 Draft liaison statement to RAN-WG1 regarding Physical Channel Structure selection WG3-SSDT Adhoc -
R3‑99d18 Example of TDD Synchronisation Procedure Italtel / Siemens -
R3‑99d19 Report of the ad-hoc Meeting “Delay Budget within the Access Stratum” Italtel / Siemens -
R3‑99d20 Another Editor’s Proposal for 25.410 Editor -
R3‑99d22 25.430 UTRAN Iub General Aspects and Principles Version 0.2.1 Editor -
R3‑99D23 UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.5.1 Editor -
R3‑99D24 Summary of Iu SWG Iu SWG Chairman -
R3‑99D25 Summary Iur / Iub SWG Iub/Iur SWG Chairman -
r3‑99d26 TS 25.435 UTRAN Iub Interface User Plane Protocols for COMMON TRANSPORT CHANNEL Data Streams V0.4.2 Editor (Nortel Networks) -
R3‑99d27 - - -
R3‑99d28 Eb/No parameters in RNSAP messages Alcatel -
R3‑99D29 Text proposal for the RL failure and RL restore procedures Nokia -
R3‑99D30 Proposed answer to the LS from WG1 on power control limits. Nokia -
R3‑99D31 Proposed LS to WG1 and WG2 on the decoding of TFCI. Nokia -
R3‑99D32 LS on Uu protocol information for Relocation of SRNS Nokia -
R3‑99D33 Draft LS on RANAP Data Volume Reporting Nokia -
R3‑99d34 - - -
R3‑99d35 25.430 UTRAN Iub General Aspects and Principles Version 0.2.1 Editor -
R3‑99D36 TS 25.442 UTRAN Implementation Specific O&M Transport v 0.3.1 Editor (Mannesmann Mobilfunk) -
R3‑99d37 - - -
R3‑99D38 Protocol termination of RRC over BCH TSG RAN WG3 -
r3‑99d39 - - -
R3‑99d40 - - -
R3‑99D41 - - -
R3‑99D42 - - -
R3‑99D43 - - -
R3‑99D44 TS 25.435 UTRAN Iub Interface User Plane Protocols for COMMON TRANSPORT CHANNEL Data Streams V0.5.0 Editor (Nortel Networks) -
R3‑99D45 TS 25.401 UTRAN Overall Description V1.4.1 Editor (Nortel Networks) -
R3‑99D46 - - -
R3‑99D47 UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.6.0 Editor -
R3‑99D48 Proposed liaison statement to SA4 Ericsson -
R3‑99D49 Proposed liaison statement to SA3, CN1, RAN2 Ericsson -
R3‑99D50 Proposed liaison statement to N3 Ericsson -
R3‑99D51 Draft response to "LS on L3 Segmentation" from N1 Nokia -

page generated from database: 2024-04-22 07:58:53

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links