The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R3-06 - 1999-08-23 to 1999-08-27, Sophia Antipolis

meeting id: R3-06 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R3‑99806 TS 25.401 UTRAN Overall Description V1.2.1 Editor (Nortel Networks) -
R3‑99807 25.410 v0.3.1 Editor (BT) -
R3‑99808 25.420 UTRAN Iur Interface: General Aspects and Principles Editor -
R3‑99809 25:430 UTRAN Iub Interface: General Aspects and Principles V0.1.4 Editor -
r3‑99810 TS 25.442 UTRAN Implementation Specific O&M Transport Editor (Mannesmann Mobilfunk) -
R3‑99811 UMTS 25.413: UTRAN Iu Interface RANAP Signalling, v.1.1.2 Editor (Nokia) -
R3‑99812 UMTS 25.423 UTRAN Iur Interface RNSAP Signalling v1.2.2 Editor -
R3‑99813 UMTS 25.433: NBAP Specification V1.1.0 WG3 -
R3‑99814 - - -
R3‑99815 - - -
R3‑99816 TS 25.435 UTRAN Iub Interface User Plane Protocols for COMMON TRANSPORT CHANNEL Data Streams V0.3.1 Editor (Nortel Networks) -
R3‑99817 UMTS 25.427: Iur/Iub User plane protocol for DCH data streams, v.0.3.1 Editor -
R3‑99818 25.931 v1.2.0 Editor (CSELT) -
R3‑99819 UMTS 25.832 Manifestations of Handover and SRNS Relocation v.2.2.0 Editor -
R3‑99820 UMTS 30.531 WG3 Work Plan and Study Items Editor -
R3‑99821 - - -
R3‑99822 - - -
R3‑99823 Draft Agenda, Meeting #6 Chairman -
R3‑99824 Draft Minutes of Meeting #5 Secretary -
r3‑99825 Draft Agenda, sync Ad Hoc meeting WG3 Chairman -
r3‑99826 - - -
r3‑99827 Answer to TSG RAN WG1 -
r3‑99828 - - -
r3‑99829 : Liaison statement to WG2, WG3 and WG4 on power control issues Source: 3GPP RAN WG1 -
R3‑99830 SSDT impacts on Iub and Iur Rapporteur [Telecom Modus Ltd] -
R3‑99831 GSM/BSS ==> UMTS Handover Telecom Modus -
R3‑99832 : NBAP Message parameters for: System Information Update Source: Rapporteur (Telecom Modus Ltd.) -
R3‑99836 Liaison Statement on the evolution of GTP for Release’99 TSG-N WG2 -
R3‑99837 Liaison Statement on Response to GTP-U SAP and primitives TSG-N WG2 -
R3‑99838 Liaison statement to RAN WG3 on paging co-ordination over the Gs interface TSG-CN WG2 -
R3‑99839 Liaison statement to RAN WG3 on CN Domain Identifiers used over the Iu & Iur interfaces TSG-N2 -
R3‑99840 - - -
R3‑99841 Response LS to TSG CN WG1 on CM-SERVICE-REQUEST for multicall TSG RAN WG2 -
R3‑99842 Response to LS on UE requirement to report OFF RAN WG2 -
R3‑99843 Answer to Liaison Statement on Separate delivery of Transport Blocks within a Transport Block Set by MAC-d to L1 TSG RAN WG2 -
R3‑99844 Liaison statement on choosen Logical and Transport Channel on the Radio Interface for Cell Broadcast Service in UMTS TSG RAN WG 2 -
R3‑99845 LS to RAN WG3 on inclusion of TFI transmission without data RAN WG2 -
R3‑99846 New proposal for the logical model of Node B regarding the DSCH in TS 25.430 Alcatel -
R3‑99847 Proposal for a new DCH downlink control frame for DSCH signalling Alcatel -
R3‑99848 New proposal for the structure of checksum indicator in the DCH data frame (TS 25.427) and RACH data frame (TS 25.435) Alcatel -
R3‑99849 Proposal to remove the silence detection procedure in the user plane DCH FP (TS 25.427) Alcatel -
R3‑99850 Addition of DSCH protocol stack model to TS 25.401. Alcatel -
R3‑99851 Flow Control mechanisms between MAC-d and MAC-c/MAC-sh Alcatel -
R3‑99852 Synchronization of UTRAN nodes by AAL0/ATM cells Alcatel -
R3‑99854 Synchronised RL Reconfiguration procedure for DSCH Alcatel -
R3‑99856 RNSAP "Cell Overload Information" procedure and message contents Alcatel -
r3‑99857 MExE support of handover notifications T2 MExE -
R3‑99858 MExE support of QoS negotiation T2 SWG1 MExE -
r3‑99859 Node B Restarted / RNC Restarted message contents Motorola -
r3‑99860 Block Resource procedure to support O&M lock Motorola -
r3‑99861 Cell Reconfiguration Motorola -
r3‑99862 Cell Setup and Cell Delete message structures Motorola -
r3‑99863 Node B Configuration and Initial Cell Configuration Procedures Motorola -
r3‑99864 Call Trace Motorola -
r3‑99865 Capability Exchange Procedure – Message Content and Format Motorola -
r3‑99866 - - -
r3‑99867 Common transport channel management Motorola -
R3‑99868 3G Work item: Motorola -
R3‑99869 Iu Data Frames Motorola -
R3‑99871 Reply to Liaison Statement TSGR3#4(99)572 "Liaison on Cell Configuration and Management Philosophy" TSG-SA WG5 -
R3‑99872 A potential merged sync solution including two approaches Ericsson -
R3‑99873 Node offset measurements using Synchronisation Control frames. Ericsson -
r3‑99874 Relationship between Cell SFN and super-frame cycle Ericsson -
r3‑99875 Definition of TOA, ToAWS and ToAWE in 25.401 (.427 & .435) Ericsson -
r3‑99876 Initialization of CFN Including Frame Offset Ericsson -
R3‑99877 Liaison to WG1 to consider by WG3: Number of SFN bits needed in each radio frame over BCH Ericsson -
r3‑99878 Sync related counters – ranges, resolutions and acronyms Ericsson -
r3‑99879 Comments on R3-99 914 “Length of SFN” Ericsson -
R3‑99880 Model and parameters for UE-UTRAN frame synchronisation Nokia -
R3‑99881 Measurement of UL/DL transmission delay and Achievement of Node synchronisaton Nokia -
R3‑99882 NBAP & RNSAP Procedure for TDD Synchronization Italtel / Siemens -
R3‑99901 - - -
R3‑99902 re: I3.05 – Node B O&M Functional Description SA-WG5 -
R3‑99903 Definition of Binding Id Mitsubishi Electric -
R3‑99904 Intra-Node B Hard Handover InterDigital -
R3‑99905 Synchronization of TDD Cells InterDigital Comm. Corp. -
R3‑99906 TDD Support of NRT Data Services with Dedicated Channels InterDigital Comm. Corp. -
R3‑99907 Uplink Outer Loop Power Control for TDD Mode. InterDigital Comm. Corp. -
R3‑99908 25.420 UTRAN Iur Interface: General Aspects and Principles Editor -
R3‑99909 Crossing of Reset message NEC -
R3‑99910 Content in the Paging Message NEC -
R3‑99911 The contents of the Location Reporting Control and Location Report Message NEC -
R3‑99912 Content in the Source RNC to Target RNC Transparent Field NEC -
R3‑99913 Timer for RANAP NEC -
R3‑99914 Liaison Statement on Length of SFN TSG RAN WG1 -
R3‑99915 LS answer to Overall Delay Budget within the Access Stratum Results and Requirements TSG SA WG2 -
R3‑99916 Clarification of RAB Sub Flows concept and associated definitions 3GPP SA WG2 -
R3‑99917 Answer to the liaison on the time constraints on the execution of cryptographic algorithms 3GPP TSG SA 2 -
R3‑99918 - - -
R3‑99919 Answer to Liaison Statement concerning Paging Co-ordination TSG SA2 -
r3‑99920 CN Domain Identifiers used over the Iu & Iur Interfaces TSG SA2 -
R3‑99921 Iub NBAP Signalling Bearer TSG-RAN WG3 -
R3‑99922 Uplink Quality Estimate in the DCH Frame Protocol Ericsson -
R3‑99923 Coding and structure of DCH FP data frames Ericsson -
R3‑99924 Power Control parameters on Iur and Iub. Ericsson -
R3‑99925 Replacement of NBAP Procedures for Radio Resource Management: Node B Restarted and RNC Restarted Ericsson -
R3‑99926 Refined NBAP Procedure for Cell Configuration Management: Cell Setup Ericsson -
R3‑99927 Proposed NBAP Procedure for Cell Configuration Management: Cell Reconfiguration Ericsson -
R3‑99928 Refined NBAP Procedure for Cell Configuration Management: Cell Delete Ericsson -
R3‑99929 Addressing Schemes for SCCP used for Iu and Iur Ericsson -
R3‑99930 Description of Usage of SCCP as Signalling Bearer for RNSAP Ericsson -
R3‑99931 Measurements to be provided in Node B Ericsson -
R3‑99932 The need for a “C-RNTI Release” procedure Ericsson -
R3‑99933 UE Identification over Iur (RNSAP) Ericsson -
R3‑99934 FACH/PCH Frame Protocol data frame structure Ericsson -
R3‑99935 Downlink Rate Control over Iu Ericsson -
R3‑99936 Frame coding for PDU type 0 for Support Mode for predefined SDU size Ericsson -
R3‑99937 RANAP information elements definition Ericsson -
R3‑99938 Clarification on usage of Classical IP over ATM Ericsson -
R3‑99939 Editor’s proposal of TS 25.415: V0.2.2 Editor -
R3‑99940 Comments to RANAP V1.1.1 Ericsson -
R3‑99941 Iu Interface Characteristics Ericsson -
R3‑99942 Principles and text proposal for RANAP RAB Assignment Ericsson -
R3‑99944 Proposed Example Procedure of Fujitsu -
R3‑99945 Timer for RNSAP (Draft) Fujitsu -
R3‑99946 Timer for NBAP (Draft) Fujitsu -
R3‑99947 Proposed Parameters to SRNS RELOCATION COMMIT MESSAGE Fujitsu -
R3‑99948 Proposed Principle on the Support for RRC Connection Fujitsu -
R3‑99949 Priority handling at AAL2 and ATM layer on the Iub/Iur interfaces. Alcatel -
R3‑99950 Proposal to add transmission power measurement reports per code in TS 25.433 Alcatel -
R3‑99951 Proposal for modification of parameters in the Radio Link Setup Request and Radio Link Addition Request messages Alcatel -
R3‑99952 Transparent field in Relocation Required and Relocation Request Alcatel -
R3‑99953 TDD Parameters in RNSAP Messages Italtel / Siemens -
R3‑99954 TDD Parameters in NBAP Messages Italtel / Siemens -
R3‑99955 AAL2 Packetisation and De-packetisation Delay Siemens, Italtel -
R3‑99956 : Combined event-triggered and periodic reporting Source: Siemens, Italtel -
R3‑99957 Amendments to 25.420 in support of “Standalone” USCH/DSCH Siemens/Italtel -
R3‑99958 Amendments to 25.430 in support of “Standalone” USCH/DSCH Siemens/Italtel -
R3‑99959 TDD synchronisation Italtel / Siemens -
R3‑99960 Timing Advance for TDD Siemens/Italtel -
R3‑99961 Info Model and State Management Functions for NodeB logical O&M Siemens / Italtel -
R3‑99962 NBAP Procedures for object oriented logical O&M Siemens / Italtel -
R3‑99963 USCH/DSCH data frames on Iub Siemens, Italtel -
R3‑99964 NBAP Messages for USCH/DSCH configuration Siemens, Italtel -
R3‑99965 Study Item (ARC/3) “Overall Delay Budget within the Access Stratum” Siemens, Italtel -
R3‑99966 Proposal for addition of DSCH parameters in the Radio Link Setup Request and Radio Link Reconfiguration messages Alcatel -
R3‑99967 NBAP procedures for Communication Control Port management, Common Transport Channel management Nortel Networks -
R3‑99968 NBAP procedures for Cell management Nortel Networks -
R3‑99969 Iub and Iur support of Asymmetric RL Reconfiguration Nortel Networks -
R3‑99970 - - -
R3‑99971 NBAP procedures for NodeB Setup and Availability Nortel Networks -
r3‑99972 Liaison Statement concerning the Iu network layer services for the packet domain TSG SA2 -
r3‑99973 Iu Interface Definitions BT -
r3‑99974 Iu Interface Specification Objectives BT -
r3‑99975 Iu Interface Architecture BT -
R3‑99976 : A new RNSAP and NBAP parameter Source:NTT DoCoMo -
R3‑99977 Proposed Introduction of DL Timing Adjustment command in Iur/Iub user plane protocols NTT DoCoMo -
R3‑99978 Iu UP framing NTT DoCoMo -
R3‑99979 Time alignment procedure without user data transmission NTT DoCoMo -
R3‑99980 Correspondence of mode in Iu UP protocol layer to services NTT DoCoMo -
R3‑99981 Separation of Header and Payload Checksum in NTT DoCoMo -
R3‑99982 Evaluation procedure NTT DoCoMo -
R3‑99983 Association between UE and events in UTRAN nodes NTT DoCoMo -
R3‑99984 Proposed Introduction of Radio failure detection in Iur/Iub user plane protocols NTT DoCoMo -
R3‑99985 - - -
r3‑99986 Draft Report at SI-ARC/5: Synchronization Rapporteur (Ericsson) -
R3‑99987 Parallel Procedures on RNSAP Ericsson -
R3‑99988 Overload Control Procedure NTT DoCoMo, Nippon Telecommunications Consulting -
R3‑99989 Health Check (Layer3) NTT DoCoMo -
R3‑99990 Restriction for active calls NTT DoCoMo, Nippon Telecommunications Consulting -
R3‑99991 NBAP : Block Resource Request Message GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone -
R3‑99992 NBAP : Block Resource Response GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone -
R3‑99993 NBAP : Block Resource Failure GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone -
R3‑99994 NBAP : Node B Failure Indication GSM Association VPT, Mannesmann Mobilfunk, T-Mobil, Vodafone -
R3‑99995 NBAP : Node B Resource Notification Vodafone -
R3‑99996 Capability Exchange Study Item: Report and Proposal Rapporteur -
R3‑99997 NBAP : Proposal for additional Cause Values Vodafone -
R3‑99999 Delay component TN1 (AAL delay) Nokia -
R3‑99A00 Iu functions Nokia -
R3‑99A01 RANAP functions Nokia -
R3‑99A02 Transmission of DSCH TFI in a DCH FP connection. Nokia -
R3‑99A03 Clarification on RNSAP Load Information Request and Load Information procedures. Nokia -
R3‑99A04 Handling of TB with air interface CRC failures. Nokia -
R3‑99A05 Use of the Propagation Delay for the Uplink synchronisation Nokia -
R3‑99A06 Clarification on the quality indicator parameter in DCH FP. Nokia -
R3‑99A07 DCH priorities Nokia -
R3‑99A08 RRM parameters in RNSAP RL Setup/RL Addition/RL Reconfiguration procedures. Nokia -
R3‑99A09 Radio Access Bearer Assignment Procedure Nokia -
R3‑99A10 Coordination of Relocation in multiple Iu signalling connections Nokia -
R3‑99A11 Interaction of Relocation Related and Other RANAP Procedures Nokia -
R3‑99A12 Measurement Termination Response T-Mobil, Mannesmann Mobilfunk, Vodafone, GSM Association VPT -
R3‑99A13 Measurement Termination Request T-Mobil, Mannesmann Mobilfunk, Vodafone, GSM Association VPT -
R3‑99A14 Measurement Initiation Request T-Mobil, Mannesmann Mobilfunk, Vodafone, GSM Association VPT -
R3‑99A15 Common Measurement Report Response T-Mobil -
R3‑99a16 E-mail discussion report for Study Item [Tdocs 750, 751, 763,764] NTT DoCoMo -
R3‑99A17 Report on silence detection study item Rapporteur -
R3‑99A18 UMTS Delay Budget Vodafone Limited -
R3‑99A19 - - -
R3‑99a21 Proposed LS from WG3 to WG1 on Synchronisation Issues. Alcatel -
R3‑99a22 Iu interface characteristics, Use of SCCP ALCATEL -
r3‑99a23 Ciphering in the case of multiple RABs TSG S3 -
R3‑99A24 Model and parameters for UE-UTRAN frame synchronisation Nokia -
R3‑99A27 Draft Answer to the Liaison Statement from CN WG2 on CN Domain Identifiers used over the Iu & Iur Interfaces Ericsson -
R3‑99A28 Draft Answer to the Liaison Statement from CN WG2 on the allocation of an SSN for RANAP Ericsson -
R3‑99A29 Clean up of Message Names in RNSAP RNSAP Editor -
R3‑99A30 Dedicated NBAP Measurement Control and Reporting procedures Nokia -
R3‑99A31 Modification of Message Names for Dedicated Measurements in RNSAP and NBAP RNSAP and NBAP Editors -
R3‑99A32 3G Work item: Mitsubishi Electric -
R3‑99A33 3G Work item: Mitsubishi -
R3‑99A34 3G Work item: Mitsubishi -
R3‑99A35 3G Work item: Mitsubishi -
R3‑99A36 Proposed liaison on UTRAN Frame Synchronisation model TSG RAN WG3 -
R3‑99A37 Reply to Liaison Statement on Timing Advance for TDD RAN WG2 -
R3‑99a38 Proposed liaison statement to RAN WG1 on TFCI transmission Alcatel -
R3‑99A39 Liaison Statement on the usage of the Physical channel BER as UL Quality estimate in the UL DCH Frame Protocol on Iub/Iur TSG RAN WG3 -
R3‑99A40 Summary Iur / Iub SWG Iub/Iur SWG Chairman -
R3‑99A41 UMTS 25.433: NBAP Specification V1.1.2 WG3 -
R3‑99A42 Draft Liaison Statement Concerning Length of SFN TSG RAN WG3 -
R3‑99a43 LS about TDD Synchronisation Methods TSG RAN WG3 -
R3‑99A44 Definition of Synchronisation related parameters used in NBAP,RNSAP NTT DoCoMo -
R3‑99A45 Inclusion of “Node Synchronization Control Frames” Ericsson -
R3‑99A46 TDD Parameters in RNSAP and NBAP RADIO LINK ADDITION Messages Italtel / Siemens -
r3‑99A47 Draft Answer on Liaison Statements regarding MExE support of handover notifications and QoS negotiation TSG-RAN3 -
R3‑99A48 Proposed liaison statement on L1 Timing issues TSG RAN WG3 -
R3‑99A49 Proposed liaison Statement on the support of different RL DL_TX_ power levels in case of Soft Handover TSG RAN WG3 -
r3‑99a58 SCCP Modifications Editor (BT) -
r3‑99a59 Ericsson comments to Iu functions contributions Ericsson -
R3‑99A60 UTRAN Definitions Nokia -
R3‑99A61 Draft Liaison regarding Relocation and GSM-UMTS handover Nokia -
R3‑99A63 Summary of Iu SWG editors meeting Iu SWG Chairman -
R3‑99A64 Summary of Iu SWG Iu SWG Chairman -
R3‑99A65 Proposed response liaison statement to SA2 on Clarification of RAB Sub Flows concept and associated definitions Ericsson -
r3‑99a66 Liaison on Length of SFN TSG RAN WG2 -
r3‑99a67 Reply to LS from WG1 on power control issues. TSG RAN WG2 -
r3‑99a68 Liaison statement to TSG RAN WG3 on the overall delay budget TSG RAN WG2 -
r3‑99a69 Response to LS on Ciphering mechanisms in case of multiple RABs. TSG RAN WG2 -
r3‑99a70 Liaison Statement to clarify transmission of variable-rate codec mode commands on the Iu -interface TSG RAN WG2 -
r3‑99a71 LS to RAN WG3 on SMS cell broadcast RAN WG2 -
r3‑99a72 Proposed LS to WG3 on status of the work on LCS RAN WG2 -
r3‑99a73 Proposed Reply to Liaison Statement on Timing Advance for TDD RAN WG2 -
R3‑99a74 Modified Principles and text proposal for RANAP RAB Assignment Ericsson -
R3‑99A76 Proposed liaison statement to SA2, SA4, N3, (cc: R2) on the Iu User Plane specification status in RAN WG3 Ericsson -
R3‑99A85 TS 25.415v1.0.1 Iu Interface CN-UTRAN User Plane Protocol Ericsson -

page generated from database: 2024-03-25 09:25:51

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links