3GPP TDocs (written contributions) at meeting
Meeting: R2-87b - 2014-10-06 to 2014-10-10, Shanghai
meeting id: R2-87b (click id for more info on this meeting)Click on the Tdoc to open its file.
TDoc | Title | Source | Remarks |
---|---|---|---|
R2‑144060 | Proposed agenda for RAN2 #87bis, Shanghai, China, 06.10.-10.10.2014 | Ericsson (RAN2 chairman) | Agenda |
R2‑144061 | Proposed agenda for RAN2 #87bis, Shanghai, China, 06.10.-10.10.2014 | Ericsson (RAN2 chairman) | Agenda |
R2‑144062 | Draft report of RAN2 #87, Dresden, Germany, 18.08.-22.08.2014 | ETSI MCC | Report |
R2‑144063 | LS on GSMA Wi-Fi PRD TS.22 Version 3 Publication (TSGWIF_274; contact: GSMA) | GSMA | LSin |
R2‑144064 | LS on Introduction of Power Saving Mode in GERAN (GP-140541; contact: Ericsson) | GERAN | LSin |
R2‑144065 | LS on range and resolution of P_MeNB and P_SeNB in dual connectivity (R1-143597; contact: NEC) | RAN1 | LSin |
R2‑144066 | Reply LS to S2-142936 = R2-143043 on eNB knowledge of low complexity UEs (R1-143635; conatct: Ericsson) | RAN1 | LSin |
R2‑144067 | Reply LS to S4-140750 = R2-143049 on introducing the EVS codec in MTSI (R1-143636; contact: Ericsson) | RAN1 | LSin |
R2‑144068 | LS on RAN1 agreements on Physical layer functionalities required for operation of Dual Connectivity (R1-143667; contact: NTT DOCOMO) | RAN1 | LSin |
R2‑144069 | LS on L1 parameters for SCE-PHY on efficient operation (R1-143665; contact: Huawei) | RAN1 | LSin |
R2‑144070 | LS on RRC parameters needed for Rel-12 Physical layer functionalities required for operation of Dual Connectivity (R1-143673; contact: NTT DOCOMO) | RAN1 | LSin |
R2‑144071 | LS on RRC parameters needed for Rel-12 NAICS (R1-143674; contact: MediaTek) | RAN1 | LSin |
R2‑144072 | Reply LS to R2-142935 on handling of low complexity UE categories during handover (R3-142075; contact: Huawei) | RAN3 | LSin |
R2‑144073 | Response LS to S2-142939 = R2-143541 on the Impacts of Packet Marking on RAN user plane handling of DL traffic (R3-142079; contact: Alcatel-Lucent) | RAN3 | LSin |
R2‑144074 | Reply LS to S5-143322 on SON enhancements progress (R3-142080; contact: NSN) | RAN3 | LSin |
R2‑144075 | LS on a new GTP-Uv1 extension header for dual connectivity support (R3-142090; contact: NSN) | RAN3 | LSin |
R2‑144076 | Reply LS to R1-142748/S2-142936 = R2-143017/R2-143043 on eNB knowledge of low complexity UEs (R3-142106; contact: Huawei) | RAN3 | LSin |
R2‑144077 | Reply LS to R2-142942 on normal and low performance group signalling (R4-144881; contact: Ericsson) | RAN4 | LSin |
R2‑144078 | LS on introduction of mobility parameters in RRC IDLE on the new RSRQ measurements definition (R4-145431; contact: NTT DOCOMO) | RAN4 | LSin |
R2‑144079 | LS on DL CA and support for the lower order DL fall-back modes (R4-145477; contact: Ericsson) | RAN4 | LSin |
R2‑144080 | Reply LS to R1-142652 = R2-142759 on D2D Multicarrier capabilities (R4-145512; contact: Qualcomm) | RAN4 | LSin |
R2‑144081 | LS on clarification of inclusion of rlf-InfoAvailable IE under HO failure scenario in Release 9 (R5-144784; contact: Huawei) | RAN5 | LSin |
R2‑144082 | LS on MIMO OTA Antenna test Function TR 36.978 (R5-144783; contact: Keysight) | RAN5 | LSin |
R2‑144083 | Reply LS to R3-141400 on SeNB Key Refresh and Counter Check procedures (S3-142295; contact: NTT DOCOMO) | SA3 | LSin |
R2‑144084 | Response LS to R2-142932 on parameter synchronization for ProSe/D2D (S3-142355; contact: Qualcomm) | SA3 | LSin |
R2‑144085 | Reply LS on availability of ProSe Direct Communication in limited service state (S1-143630; contact: Qualcomm) | SA1 | LSin |
R2‑144086 | LS on RRC parameters for ProSe LTE D2D (R1-143459; contact: Qualcomm) | RAN1 | LSin |
R2‑144087 | Reply LS to C1-143310 = R2-143007 on ProSe provisioning parameters (R1-143676; contact: Qualcomm) | RAN1 | LSin |
R2‑144088 | LS on TP for D2D for TS 36.300 (R1-143677; contact: Qualcomm) | RAN1 | LSin |
R2‑144089 | Response LS to S2-142263 on Core Network Assisted eNodeB parameters tuning (R3-142511; contact: Alcatel-Lucent) | RAN3 | LSin |
R2‑144090 | Reply LS to C1-141669 on location update collision with RAB release (R3-142507; contact: NSN) | RAN3 | LSin |
R2‑144091 | Reply LS to R1-143535 = R2-143067 on Rel-12 NAICS (R3-142566; contact: MediaTek) | RAN3 | LSin |
R2‑144092 | LS on UL Power Control in Dual-connectivity (R1-144454; contact: Ericsson) | RAN1 | LSin |
R2‑144093 | LS on Multi-carrier D2D and WAN operation (R1-144405; contact: Qualcomm) | RAN1 | LSin |
R2‑144094 | Fundamental characteristics of small data transmission enhancements (R1-144426; contact: Ericsson) | RAN1 | LSin |
R2‑144095 | LS on zero-power CSI-RS for small cell discovery signal (R1-144486; contact: Huawei) | RAN1 | LSin |
R2‑144096 | Response LS to R2-141013 on indication of modified UE power reduction capability in an earlier release (R4-146376; contact: Ericsson) | RAN4 | LSin |
R2‑144097 | LS on Group Call eMBMS congestion management for LTE (R3-142611; contact: Vodafone) | RAN3 | LSin |
R2‑144098 | Avoid | - | - |
R2‑144099 | Draft report of RAN2 #87, Dresden, Germany, 18.08.-22.08.2014 | ETSI MCC | Report |
R2‑144100 | 3GPP TSG RAN WG2 compendium v25.0 (status after RAN #65) | ETSI Secretariat | Info |
R2‑144101 | Report of RAN2 #87, Dresden, Germany, 18.08.-22.08.2014 | ETSI MCC | imported from 3GU |
R2‑144102 | Overview of L2 Reconfigurations in DC | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144103 | Total layer-2 buffer size for dual-connectivity capable UEs | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144104 | L2 Retransmissions at UL Direction Change | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144105 | PDCP Mapping Restriction for Split Bearer | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144106 | Cross Reporting in DC | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144107 | Issue on SPS C-RNTI Monitoring in DC | CMCC | imported from 3GU |
R2‑144108 | Correction regarding presence of GANSS Day field | Intel Corporation | imported from 3GU |
R2‑144109 | Correction regarding presence of GANSS Day field | Intel Corporation | imported from 3GU |
R2‑144110 | Correction regarding presence of GANSS Day field | Intel Corporation | imported from 3GU |
R2‑144111 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT, Mediatek Inc. | imported from 3GU |
R2‑144112 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT | imported from 3GU |
R2‑144113 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT | imported from 3GU |
R2‑144114 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT | imported from 3GU |
R2‑144115 | Consideration on the support of wideband RSRQ and new defined RSRQ in MDT | CMCC, CATT | imported from 3GU |
R2‑144116 | Addition of an Early Position Fix in LPP | Qualcomm Incorporated | imported from 3GU |
R2‑144117 | Addition of an Early Position Fix to LPP | Qualcomm Incorporated | imported from 3GU |
R2‑144118 | Limitations of current UE E-UTRA capability handling | Qualcomm Incorporated | imported from 3GU |
R2‑144119 | PDCP reordering after split bearer reconfiguration towards MCG bearer | Huawei, HiSilicon | imported from 3GU |
R2‑144120 | Initial data transmission after SCG addition and intra-MeNB HO | Huawei, HiSilicon | imported from 3GU |
R2‑144121 | Signalling design for UE capability in DC | Huawei, HiSilicon | imported from 3GU |
R2‑144122 | ASN.1 structure for dual connectivity | Huawei, HiSilicon | imported from 3GU |
R2‑144123 | Further discussion on the handling of SFN acquisition | Huawei, HiSilicon | imported from 3GU |
R2‑144124 | Discussion of procedural specification for bearer type change in DC | Huawei, HiSilicon | imported from 3GU |
R2‑144125 | Discarding PDCP PDU in the reception of split bearer | Huawei, HiSilicon | imported from 3GU |
R2‑144126 | Category 0 report during RRC connection establishment | Huawei, HiSilicon | imported from 3GU |
R2‑144127 | Category 0 report in Msg3 | Huawei, HiSilicon | imported from 3GU |
R2‑144128 | Category 0 report in Msg5 | Huawei, HiSilicon | imported from 3GU |
R2‑144129 | Clarification on DL parallel reception of category 0 UEs | Huawei, HiSilicon | imported from 3GU |
R2‑144130 | Downlink PDCP SDU limitation for category 0 UEs | Huawei, HiSilicon | imported from 3GU |
R2‑144131 | Maximum number of DL PDCP SDUs per TTI for category 0 | Huawei, HiSilicon | imported from 3GU |
R2‑144132 | Handover for category 0 UEs | Huawei, HiSilicon | imported from 3GU |
R2‑144133 | Support of DRS measurement in TS 36.331 | Huawei, HiSilicon | imported from 3GU |
R2‑144134 | Support of 256QAM in TS 36.306 | Huawei, HiSilicon | imported from 3GU |
R2‑144135 | Support of 256QAM in TS 36.331 | Huawei, HiSilicon | imported from 3GU |
R2‑144136 | Stage-2 description of Small Cell Enhancements Physical Layer | Huawei, HiSilicon | imported from 3GU |
R2‑144137 | RRC details to support DRS measurement | Huawei, HiSilicon | imported from 3GU |
R2‑144138 | MAC impacts of 256QAM | Huawei, HiSilicon | imported from 3GU |
R2‑144139 | Default configuration options and UE capability signaling | Intel Corporation | imported from 3GU |
R2‑144140 | DRX Configuration Alignment in Dual Connectivity | Intel Corporation | imported from 3GU |
R2‑144141 | SI update for PSCell | Intel Corporation | imported from 3GU |
R2‑144142 | UE capability signaling for dual connectivity | Intel Corporation | imported from 3GU |
R2‑144143 | Dual connectivity and in-device coexistence | Intel Corporation | imported from 3GU |
R2‑144144 | ProSe capability signaling | Intel Corporation | imported from 3GU |
R2‑144145 | Discovery Resource Configuration in Dedicated RRC signalling | Samsung | imported from 3GU |
R2‑144146 | DPriortisation between Random Access Procedure and Discovery | Samsung | imported from 3GU |
R2‑144147 | Priortisation between Random Access Procedure and D2D communication | Samsung | imported from 3GU |
R2‑144148 | Priority Handling Function for ProSe Direct Discovery | Samsung | imported from 3GU |
R2‑144149 | Handling L3 PDU Types in AS | Samsung | imported from 3GU |
R2‑144150 | Handover Aspects of Discovery Resource Allocation | Samsung | imported from 3GU |
R2‑144151 | Discovery Resources & UE-eNB Transmissions in Uplink | Samsung | imported from 3GU |
R2‑144152 | Remaining issues on multi-carrier operation | Intel Corporation | imported from 3GU |
R2‑144153 | Prohibiting SR for Low Priority Bearers | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144154 | Prohibiting SR for Low Priority Bearers | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144155 | Prohibiting SR for Low Priority Bearers | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144156 | Prohibiting SR for Low Priority Bearers | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144157 | Prohibiting SR for Low Priority Bearers | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144158 | Optimization for RAN assisted WLAN interworking | ZTE | imported from 3GU |
R2‑144159 | DRX and PPI for Dual Connectivity | ITRI | imported from 3GU |
R2‑144160 | When to Stop PDCP Re-ordering Functionality | ITRI | imported from 3GU |
R2‑144161 | Content in SCG-ConfigInfo | ITRI | imported from 3GU |
R2‑144162 | Discovery monitoring operation | Intel Corporation | imported from 3GU |
R2‑144163 | RRC Connection Establishment for ProSe (Communication and Discovery) | Intel Corporation | imported from 3GU |
R2‑144164 | Indication of Layer 3 PDU type in PDCP header | Intel Corporation, Alcatel-Lucent | imported from 3GU |
R2‑144165 | Analysis of solutions restricting UL grant for category 0 UEs | Intel Corporation | imported from 3GU |
R2‑144166 | L2 measurements in Dual Connectivity | Samsung | imported from 3GU |
R2‑144167 | RRC signaling for virtual PHR and P_MeNB/P_SeNB | Intel Corporation | imported from 3GU |
R2‑144168 | Clarification on inter-freq RSTD measurement | Samsung | imported from 3GU |
R2‑144169 | Further discussion of problems of UE Radio Capability information size | Intel Corporation | imported from 3GU |
R2‑144170 | Draft reply LS on the problem of UE Radio Capability information size | Intel Corporation | imported from 3GU |
R2‑144171 | Discussion on New LCID for DC PHR MAC CE | ITL Inc. | imported from 3GU |
R2‑144172 | Positioning enhancement to provide early location information | samsung | imported from 3GU |
R2‑144173 | Positioning enhancement to provide early location information | Samsung | imported from 3GU |
R2‑144174 | Introduction of the implicit grant handling feature description | Nokia Networks | imported from 3GU |
R2‑144175 | Clarification for the HARQ process activation flag in case of Implicit Grant Handling | Nokia Networks | imported from 3GU |
R2‑144176 | Extended measurement ID and MEASUREMENT CONTROL FAILURE message | Nokia Networks | imported from 3GU |
R2‑144177 | Extension of the MEASUREMENT CONTROL FAILURE message | Nokia Networks | imported from 3GU |
R2‑144178 | Introduction of new default configuration for HS-DSCH/RACH and HS-DSCH/E-DCH combinations | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144179 | Discussion on PDCP reordering after split bearer reconfiguration towards MCG bearer | Nokia Networks | imported from 3GU |
R2‑144180 | On PDCP's split-bearer-reception behaviour | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144181 | Remaining MAC issues for DC | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144182 | SCG-RLC Release for DC | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144183 | Correction to Galileo Assistance Data | Qualcomm Incorporated | imported from 3GU |
R2‑144184 | Correction to Galileo Assistance Data | Qualcomm Incorporated | imported from 3GU |
R2‑144185 | DRX Coordination for dual connectivity | BlackBerry UK Limited | imported from 3GU |
R2‑144186 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT, Mediatek Inc. | imported from 3GU |
R2‑144187 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT, Mediatek Inc. | imported from 3GU |
R2‑144188 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT, Mediatek Inc. | imported from 3GU |
R2‑144189 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT, Mediatek Inc. | imported from 3GU |
R2‑144190 | Support of TTI bundling without resource allocation restriction for LTE coverage enhancements for Rel-12 | China Telecom | imported from 3GU |
R2‑144191 | Support of TTI bundling without resource allocation restriction for LTE coverage enhancements for Rel-12 | China Telecom | imported from 3GU |
R2‑144192 | Consideration on mobility of D2D UE | Sharp | imported from 3GU |
R2‑144193 | Resource pool monitoring for inter cell D2D discovery | Sharp | imported from 3GU |
R2‑144194 | DRX configuration alignment | Ericsson | imported from 3GU |
R2‑144195 | Power Headroom Reporting in Dual Connectivity | Ericsson | imported from 3GU |
R2‑144196 | Terminology used in MAC for Dual Connectivity | Ericsson | imported from 3GU |
R2‑144197 | Report from Phase 1 of [87#24] | Ericsson | imported from 3GU |
R2‑144198 | Introduction of dual connectivity in MAC | Ericsson | imported from 3GU |
R2‑144199 | Corrections to RRC for WLAN/3GPP Radio interworking in UMTS | Ericsson | imported from 3GU |
R2‑144200 | Dedicated RAN assistance parameter handling | Ericsson | imported from 3GU |
R2‑144201 | Handling of Need ON fields in measObject | Nokia Networks | imported from 3GU |
R2‑144202 | Handling of Need ON fields in measObject | Nokia Networks | imported from 3GU |
R2‑144203 | Handling of Need ON fields in measObject | Nokia Networks | imported from 3GU |
R2‑144204 | Handling of Need ON fields in measObject | Nokia Networks | imported from 3GU |
R2‑144205 | Handling of Need ON fields in measObject | Nokia Networks | imported from 3GU |
R2‑144206 | Handling of Need ON fields in measObject | Nokia Networks | imported from 3GU |
R2‑144207 | Impact of the TBS restriction of Cat-0 UE | Nokia Networks, Vodafone | imported from 3GU |
R2‑144208 | Rel-12 ASN.1 Correction | Nokia Networks | imported from 3GU |
R2‑144209 | Rel-12 ASN.1 Correction | Nokia Networks | imported from 3GU |
R2‑144210 | Clarification of AS-Config extensions | Ericsson | imported from 3GU |
R2‑144211 | MCG Reestablishment | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144212 | RRC impact of SCG release procedure | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144213 | SeNB Initiated Bearer Release procedure | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144214 | Clarification of AS-Config extensions | Ericsson | imported from 3GU |
R2‑144215 | Paging corrections for low complexity UEs | Ericsson | imported from 3GU |
R2‑144216 | TBS limitation and indication of category for low complexity UEs | Ericsson | imported from 3GU |
R2‑144217 | Indication of category 0 | Ericsson | imported from 3GU |
R2‑144218 | Correction to RAN rules for UEs in high and medium mobility state | Intel Corporation | imported from 3GU |
R2‑144219 | Correction to RAN rules for UEs in high mobility state | Intel Corporation | imported from 3GU |
R2‑144220 | Corrections to WLAN/3GPP Radio Interworking for LTE | Intel Corporation | imported from 3GU |
R2‑144221 | ACB and ACB-skip signalling per PLMN | Intel Corporation | imported from 3GU |
R2‑144222 | ACB for CSFB and SSAC signalling per PLMN | Intel Corporation | imported from 3GU |
R2‑144223 | Further Mode 2 Switching Rules in RLF Exceptional Case | Sharp | imported from 3GU |
R2‑144224 | Introduction of Multiple Power Levels for different Discovery Range Classes | Deutsche Telekom | imported from 3GU |
R2‑144225 | PDCP SN Wrap Around at SeNB | Nokia Networks | imported from 3GU |
R2‑144226 | Corrections to MDT Stage-2 | Huawei, HiSilicon | imported from 3GU |
R2‑144227 | Discussion on inclusion of rlf-InfoAvailable IE under HO failure scenario in Release 9 | Huawei, HiSilicon | imported from 3GU |
R2‑144228 | Draft reply LS on inclusion of rlf-InfoAvailable IE under HO failure scenario in Release 9 | Huawei | imported from 3GU |
R2‑144229 | Public safety D2D communication requirements of multi-carrier for release 12 | U.S. Department Of Commerce | imported from 3GU |
R2‑144230 | Public safety requirements of assigned D2D resource allocation for release 12 | U.S. Department Of Commerce | imported from 3GU |
R2‑144231 | PHR trigger during the Scell reactivation | Huawei, HiSilicon | imported from 3GU |
R2‑144232 | Remaining issues for NAICS | Huawei, HiSilicon | imported from 3GU |
R2‑144233 | Introduction of ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑144234 | Discussion on Split bearer to split bearer change | III | imported from 3GU |
R2‑144235 | Corrections to NAICS parameters | Huawei, HiSilicon | imported from 3GU |
R2‑144236 | PHR triggering due to SCell activation | Samsung | imported from 3GU |
R2‑144237 | Minor corrections regarding WLAN interworking (Alternative 1) | Samsung | imported from 3GU |
R2‑144238 | Minor corrections regarding WLAN interworking (Alternative 2) | Samsung | imported from 3GU |
R2‑144239 | Indication of UE capability for the RAN-assisted WLAN interworking | Samsung | imported from 3GU |
R2‑144240 | UE capability for RAN-assisted WLAN interworking | Samsung | imported from 3GU |
R2‑144241 | Need of randomization for RAN-assisted WLAN interworking | Samsung | imported from 3GU |
R2‑144242 | Indication of Cat.0 UE capabiilty | Samsung | imported from 3GU |
R2‑144243 | Cat.0 UE capabiilty in Msg3 | Samsung | imported from 3GU |
R2‑144244 | Stop condition for temporary reordering | ZTE | imported from 3GU |
R2‑144245 | Clarify on no valid PUCCH resource during SR pending procedure | Huawei, HiSilicon | imported from 3GU |
R2‑144246 | Few open issues of PDCP reordering specification | ZTE | imported from 3GU |
R2‑144247 | Discussion on bearer type change | ZTE | imported from 3GU |
R2‑144248 | Bearer type change when temporary reordering is going on | ZTE | imported from 3GU |
R2‑144249 | Discussion on the remaining issues for PHR of DC | ZTE | imported from 3GU |
R2‑144250 | Discussion on the signalling for UL direction change in bear split | ZTE | imported from 3GU |
R2‑144251 | Discussion on the coexist of eIMTA and Small Cell DC | ZTE | imported from 3GU |
R2‑144252 | Further Thoughts on GBR in small cell DC | ZTE | imported from 3GU |
R2‑144253 | MAC Entity Modeling | MediaTek Inc. | imported from 3GU |
R2‑144254 | PHR Trigger for PSCell | MediaTek Inc. | imported from 3GU |
R2‑144255 | Coexistence between Dual Connectivity and CoMP | ZTE | imported from 3GU |
R2‑144256 | Uplink sending for eIMTA | Huawei, HiSilicon | imported from 3GU |
R2‑144257 | Clarification to physical channel combinations regarding MIMO operation | Huawei, HiSilicon | imported from 3GU |
R2‑144258 | SCG/Split bearer handling for re-establishment in dual connectivity | MediaTek Inc. | imported from 3GU |
R2‑144259 | A potential security issue of 1A | ZTE | imported from 3GU |
R2‑144260 | RRC re-establishment on SeNB for dual connectivity | MediaTek Inc. | imported from 3GU |
R2‑144261 | Clarification to physical channel combinations regarding MIMO operation | Huawei, HiSilicon | imported from 3GU |
R2‑144262 | Clarification to physical channel combinations regarding MIMO operation | Huawei, HiSilicon | imported from 3GU |
R2‑144263 | Corrections to eIMTA capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑144264 | Clarification to physical channel combinations regarding MIMO operation | Huawei, HiSilicon | imported from 3GU |
R2‑144265 | Corrections to eIMTA capabilities | Huawei, HiSilicon | imported from 3GU |
R2‑144266 | Issue on ProSe-BSR associated with multiple groups | ASUSTeK | imported from 3GU |
R2‑144267 | Discussion on improved HARQ retransmission for HSDPA | Huawei, HiSilicon | imported from 3GU |
R2‑144268 | Discussion on Random Access for D2D | ASUSTeK | imported from 3GU |
R2‑144269 | Introduction of improved HARQ retransmission for HSDPA | Huawei, HiSilicon | imported from 3GU |
R2‑144270 | Introduction of improved HARQ retransmission for HSDPA | Huawei, HiSilicon | imported from 3GU |
R2‑144271 | Introduction of improved HARQ retransmission for HSDPA | Huawei, HiSilicon | imported from 3GU |
R2‑144272 | Correction on F-DPCH capability reporting | Huawei, HiSilicon | imported from 3GU |
R2‑144273 | Discussion on ACK for D2D grant | ASUSTeK | imported from 3GU |
R2‑144274 | Transmission of delay tolerant access during SRNS relocation | Huawei, HiSilicon | imported from 3GU |
R2‑144275 | The impact analysis of eNB scheduling limitation method | CATT | imported from 3GU |
R2‑144276 | Discussion on Differentiability of D2D grant | ASUSTeK | imported from 3GU |
R2‑144277 | Cleanup corrections on abbreviations | Huawei | imported from 3GU |
R2‑144278 | Further discussion on ProSe interest indication | HTC | imported from 3GU |
R2‑144279 | Cleanup corrections for Access group mechanism | Huawei, HiSilicon | imported from 3GU |
R2‑144280 | Remaining issues on X2 for split bearer | Sharp | imported from 3GU |
R2‑144281 | Cleanup corrections for Access group mechanism | Huawei, HiSilicon | imported from 3GU |
R2‑144282 | Work plan for Downlink Enhancements for UMTS | Huawei, HiSilicon | imported from 3GU |
R2‑144283 | TR Skeleton for Study on Downlink Enhancements for UMTS | Huawei (Rapporteur) | imported from 3GU |
R2‑144284 | Considerations on Downlink Enhancements for UMTS | Huawei, HiSilicon | imported from 3GU |
R2‑144285 | Corrections on filtered UE power headroom reporting | Huawei, HiSilicon | imported from 3GU |
R2‑144286 | Corrections on filtered UE power headroom reporting | Huawei, HiSilicon | imported from 3GU |
R2‑144287 | Relation between ProSe-BSR and resource allocation mode | ASUSTeK | imported from 3GU |
R2‑144288 | Remaining issues on resource allocation and mobility related issues for D2D communication | Fujitsu | imported from 3GU |
R2‑144289 | Considerations on Resource Allocation for ProSe Discovery | Fujitsu | imported from 3GU |
R2‑144290 | Handling of measId when PSCell frequency is changed | Fujitsu | imported from 3GU |
R2‑144291 | Layer 1 parameter configuration for ProSe Direct Communication and Discovery | Intel Corporation | imported from 3GU |
R2‑144292 | Random access for D2D communication | Samsung | imported from 3GU |
R2‑144293 | PDCP issues in dual connectivity | Intel Corporation | imported from 3GU |
R2‑144294 | TAT expiry and D2D communication | Samsung | imported from 3GU |
R2‑144295 | RRC connection re-establishment | Samsung | imported from 3GU |
R2‑144296 | Location update collision with RAB release | Nokia Networks | imported from 3GU |
R2‑144297 | Access control for D2D communication | Samsung | imported from 3GU |
R2‑144298 | Resource allocation for ProSe-BSR | Samsung | imported from 3GU |
R2‑144299 | Clarification for common E-DCH resource release during CELL FACH to CELL FACH transition | Nokia Networks | imported from 3GU |
R2‑144300 | Stage-3 issues for ProSe-BSR | Samsung | imported from 3GU |
R2‑144301 | Cell reselection issue | Samsung | imported from 3GU |
R2‑144302 | Clarification on the common E-DCH resource release during CELL FACH to CELL FACH state transition | Nokia Networks | imported from 3GU |
R2‑144303 | PH information taking D2D transmission into account | Samsung | imported from 3GU |
R2‑144304 | Idle mode procedure to support inter-ProSe carrier | Samsung | imported from 3GU |
R2‑144305 | Mobility support for connected mode UE | Samsung | imported from 3GU |
R2‑144306 | Report on [87#30][LTE/ProSe] exceptional cases and exit conditions | Samsung | imported from 3GU |
R2‑144307 | Introduction of ProSe | Samsung | imported from 3GU |
R2‑144308 | Discovery Resource Configuration Parameters in SIB | Samsung | imported from 3GU |
R2‑144309 | Conflict handling for D2D communication | Samsung | imported from 3GU |
R2‑144310 | Update of LTE Rel-12 UE feature list (RAN2 part) | NTT DOCOMO, INC. | imported from 3GU |
R2‑144311 | UE capability for increased number of carrier monitoring | Ericsson | imported from 3GU |
R2‑144312 | Introduction of UE capability for increased number of carrier monitoring | Ericsson | imported from 3GU |
R2‑144313 | UE capability and scaling factor signalling for IncMon | Ericsson | imported from 3GU |
R2‑144314 | Email report [87#33][UMTS/IncMon] Review running CRs | Ericsson | imported from 3GU |
R2‑144315 | Introduction of increased number of frequencies to monitor | Ericsson | imported from 3GU |
R2‑144316 | Introduction of increased number of frequencies to monitor | Ericsson | imported from 3GU |
R2‑144317 | Discussion on DC UE capability | Samsung | imported from 3GU |
R2‑144318 | The efficient usage of 256QAM for PMCH | CATT | imported from 3GU |
R2‑144319 | Report on [87#23][LTE/DC] PDCP issues(Samsung) | Samsung | imported from 3GU |
R2‑144320 | Remaining issues from [87#23] on baseline PDCP reordering operation | Samsung | imported from 3GU |
R2‑144321 | Measurement release enhancement | Ericsson, Nokia Networks | imported from 3GU |
R2‑144322 | Remaining issues from [86#31] and [87#23] on PDCP reordering | Samsung | imported from 3GU |
R2‑144323 | PDCP SDU recovery upon bearer reconfiguration | Samsung | imported from 3GU |
R2‑144324 | Open issues on running MAC CR | Samsung | imported from 3GU |
R2‑144325 | Remaining issues on Activation/Deactivation | Samsung | imported from 3GU |
R2‑144326 | Remaining issues from [87#24] | Samsung | imported from 3GU |
R2‑144327 | UE capabilities for Increased Monitoring of Carriers | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144328 | Further details on BSR in dual connectivity | Samsung | imported from 3GU |
R2‑144329 | MAC functions in the secondary MAC | Samsung | imported from 3GU |
R2‑144330 | Mapping between logical channels and transport channels in the secondary MAC | Samsung | imported from 3GU |
R2‑144331 | Discussion on SCG random access | Samsung | imported from 3GU |
R2‑144332 | Text propsal for Logical channel prioritization | Samsung | imported from 3GU |
R2‑144333 | TAT expiry in dual connectivity | Samsung | imported from 3GU |
R2‑144334 | Measurement release enhancement | Ericsson, Nokia Networks | imported from 3GU |
R2‑144335 | Corrections for RAN assisted WLAN interworking | CATT | imported from 3GU |
R2‑144336 | Discussion on ProSe discovery interest indication | Microsoft Corporation | imported from 3GU |
R2‑144337 | Further Discussion on ProSe BSR | CATT | imported from 3GU |
R2‑144338 | Signalling for PCell interrupts | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144339 | Signalling for PCell interrupts | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144340 | Open Issues for Inter-frequency Communication | CATT | imported from 3GU |
R2‑144341 | D2D discovery during mobility and RLF | CATT | imported from 3GU |
R2‑144342 | Capability for PCell interrupts | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144343 | Capability for PCell interrupts | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144344 | [DRAFT] LS on monitoring PDCCH with SPS C-RNTI in DC | CMCC | imported from 3GU |
R2‑144345 | Considerations on RRC Connection establishment for D2D | CATT | imported from 3GU |
R2‑144346 | Detailed Signaling Flow for D2D Discovery | CATT | imported from 3GU |
R2‑144347 | Introduction of PCell interruption capability | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144348 | Remaining Issues of Inter-frequency and Inter-PLMN Discovery | CATT | imported from 3GU |
R2‑144349 | Analysis on need for synchronized SCG reconfiguration | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144350 | Introduction of Dual Connectivity in PDCP | LG Electronics Inc. (PDCP Rapporteur) | imported from 3GU |
R2‑144351 | Clarification on PDCP Window Operation | LG Electronics Inc. | imported from 3GU |
R2‑144352 | Handling of Duplicated PDCP PDU in Split Bearer | LG Electronics Inc. | imported from 3GU |
R2‑144353 | Condition for checking PDU stored in the reordering buffer | LG Electronics Inc. | imported from 3GU |
R2‑144354 | Capability indication for Low Cost MTC | MediaTek Inc. | imported from 3GU |
R2‑144355 | Corrections on layer-2 measurements | CATT | imported from 3GU |
R2‑144356 | PDCP reordering after Split Bearer release | LG Electronics Inc. | imported from 3GU |
R2‑144357 | CR to 25.306 on correction of Cell Reselection Indication Reporting | Huawei, HiSilicon | imported from 3GU |
R2‑144358 | Considerations on Parallel SCG Configuration | CATT | imported from 3GU |
R2‑144359 | Scheduling Request for ProSe communication | LG Electronics Inc. | imported from 3GU |
R2‑144360 | Draft LS on parallel procedures between MeNB and SeNB | CATT | imported from 3GU |
R2‑144361 | CR to 25.331 on the clarification of system information modification for Second Broadcast channel | Huawei, HiSilicon | imported from 3GU |
R2‑144362 | Consideration on Counter Check procedure | CATT | imported from 3GU |
R2‑144363 | Remaining Details for SeNB Failure Reporting | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144364 | Remaining issues of SCG RLF | CATT | imported from 3GU |
R2‑144365 | Discussion on IDC for Dual Connectivity | CATT | imported from 3GU |
R2‑144366 | Application of eIMTA in DC | CATT | imported from 3GU |
R2‑144367 | How to control the transmitting PDCP | CATT | imported from 3GU |
R2‑144368 | DRX interaction between MeNB and SeNB | CATT | imported from 3GU |
R2‑144369 | Exceptional cases for ProSe multicarrier support | III | imported from 3GU |
R2‑144370 | HFN De-Synchronisation at SeNB | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144371 | Discussion on RA procedure towards SeNB for dual connectivity | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144372 | PDCP split bearer reordering algorithm | Ericsson | imported from 3GU |
R2‑144373 | CR to 25.331 on clarification of exclusion of cells from intra-frequency detected set measurements | Huawei, HiSilicon | imported from 3GU |
R2‑144374 | PDCP termination of continued reordering | Ericsson | imported from 3GU |
R2‑144375 | CR to 25.331 on clarification of exclusion of cells from inter-frequency detected set measurements | Huawei, HiSilicon | imported from 3GU |
R2‑144376 | Handling of measurement gaps with DRS measurements | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144377 | SCell operation in OFF state | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144378 | On periodic DRS measurements | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144379 | PDCP status report for split bearer to MCG reconfiguration case | Panasonic | imported from 3GU |
R2‑144380 | HARQ process assignment for D2D Communications | Samsung | imported from 3GU |
R2‑144381 | SR issues for D2D communication | Panasonic | imported from 3GU |
R2‑144382 | ProSe BSR procedure for D2D communication | Panasonic | imported from 3GU |
R2‑144383 | D2D Communication Continuity in all Network Deployment | Panasonic | imported from 3GU |
R2‑144384 | Inter frequency Assistance | Panasonic | imported from 3GU |
R2‑144385 | Discussion on UL/DL handling upon S-RLF | Sharp | imported from 3GU |
R2‑144386 | Necessity of PDCP status report on S-RLF | Fujitsu | imported from 3GU |
R2‑144387 | Usage of Type 1 and Type 2 resources | Fujitsu | imported from 3GU |
R2‑144388 | CR to 25.319 on corrections for E-DCH decoupling | Huawei, HiSilicon | imported from 3GU |
R2‑144389 | Clarification on WLAN interworking | HTC | imported from 3GU |
R2‑144390 | Discussion on LCP issues for dual connectivity | KT Corp. | imported from 3GU |
R2‑144391 | radio link problem on SCG in Dual Connectivity | FiberHome | imported from 3GU |
R2‑144392 | Introduction of the UE capabilities for Further EUL enhancements subfeatures | Ericsson | imported from 3GU |
R2‑144393 | Introduction of the UE capabilities for Further EUL enhancements subfeatures | Ericsson | imported from 3GU |
R2‑144394 | Corrections for Further EUL enhancements | Ericsson | imported from 3GU |
R2‑144395 | D2D Measurement Reporting | Sony | imported from 3GU |
R2‑144396 | Communication Resource Allocation Mode Capability and Resource Pool Signalling Implications | Sony | imported from 3GU |
R2‑144397 | Planning of the Rel-12 RRC message and ASN.1 review for UTRA | Ericsson (Rapporteur) | imported from 3GU |
R2‑144398 | D2D transmission of ARP packets | Huawei, Hisilicon | imported from 3GU |
R2‑144399 | Options of D2D MAC PDU format | Huawei, Hisilicon | imported from 3GU |
R2‑144400 | Inter-frequency and inter-PLMN discovery resource | Sony | imported from 3GU |
R2‑144401 | Remaining issues for Intra-frequency D2D discovery | Huawei, Hisilicon | imported from 3GU |
R2‑144402 | RAN2 impacts of mode switch | Huawei, Hisilicon | imported from 3GU |
R2‑144403 | Remaining issues on ProSe-BSR Format | Huawei, Hisilicon | imported from 3GU |
R2‑144404 | D2D impacts on scheduling request and Text Proposals | Huawei, Hisilicon | imported from 3GU |
R2‑144405 | Open Issues on RRC Signalling for resource authorization | Sony | imported from 3GU |
R2‑144406 | D2D Impacts on Random Access and Text Proposals | Huawei, Hisilicon | imported from 3GU |
R2‑144407 | ProSe-BSR Triggering and Cancelling Mechanisms and Text Proposals | Huawei, Hisilicon | imported from 3GU |
R2‑144408 | Optional features for Hetnet mobility in TS 36.306 | Huawei, HiSilicon, Intel, Qualcomm Incorporated | imported from 3GU |
R2‑144409 | Autonomous state transition | Nokia Networks | imported from 3GU |
R2‑144410 | Reduction of possible values for WLAN backhaul rate thresholds in UMTS | Ericsson, Samsung | imported from 3GU |
R2‑144411 | Reduction of possible values for WLAN backhaul rate thresholds in LTE | Ericsson, Samsung | imported from 3GU |
R2‑144412 | Extended URA_PCH state | Nokia Networks | imported from 3GU |
R2‑144413 | L2 measurement modifications for Dual Connectivity (Option 1) | CATT | imported from 3GU |
R2‑144414 | CR to 25.300 on the correction of Second Broadcast Channel | Huawei, HiSilicon | imported from 3GU |
R2‑144415 | L2 measurement modifications for Dual Connectivity (Option 2) | CATT | imported from 3GU |
R2‑144416 | Restriction on simultaneous transmission/reception | ETRI | imported from 3GU |
R2‑144417 | Double grant issue on BSR reporting | CATT | imported from 3GU |
R2‑144418 | CR to 25.319 on the correction for Heterogeneous Networks Enhancements | Huawei, HiSilicon | imported from 3GU |
R2‑144419 | Further discussion on ProSe BSR | ETRI | imported from 3GU |
R2‑144420 | Details on S-RLF in Dual Connectivity | ETRI | imported from 3GU |
R2‑144421 | Consideration on UL data transmission for split bearer | ETRI | imported from 3GU |
R2‑144422 | Logical channel prioritisation for Uu | ETRI | imported from 3GU |
R2‑144423 | System Information Change for D2D Communication | Samsung | imported from 3GU |
R2‑144424 | Solving remaining FFSs in Stage-2 | Ericsson | imported from 3GU |
R2‑144425 | HARQ process assignment for D2D Communications | Samsung | imported from 3GU |
R2‑144426 | Layer 2/MAC Architecture Redrawing for D2D | Samsung | imported from 3GU |
R2‑144427 | Configuration of DRS-based measurements | Fujitsu | imported from 3GU |
R2‑144428 | Clarification on the case of more than one entry configured for the same physical frequency of E-UTRAN | CMCC, Huawei, HiSilicon, ZTE, CATT, MediaTek Inc. | imported from 3GU |
R2‑144429 | Handling of dedicated configuration when T350 is not configured | ASUSTeK | imported from 3GU |
R2‑144430 | RRC containers at SCG change | Ericsson | imported from 3GU |
R2‑144431 | Clarification on the case of more than one entry configured for the same physical frequency of E-UTRAN | CMCC, Huawei, Hisilicon, ZTE, CATT, MediaTek Inc. | imported from 3GU |
R2‑144432 | Inter-eNB view of SCG Change triggered by SeNB or MeNB | Ericsson | imported from 3GU |
R2‑144433 | UE capabilities for increased carrier monitoring | Samsung | imported from 3GU |
R2‑144434 | Clarification on the case of more than one entry configured for the same physical frequency of E-UTRAN | CMCC, Huawei, HiSilicon, ZTE, CATT, MediaTek Inc. | imported from 3GU |
R2‑144435 | Open issues on ASN.1 in dual connectivity | Ericsson | imported from 3GU |
R2‑144436 | SCG Radio Link Failure and RRC Reestablishment | Ericsson | imported from 3GU |
R2‑144437 | Stage-2 description of Increased Carrier monitoring feature | Samsung | imported from 3GU |
R2‑144438 | UE capability signalling for dual connectivity | Ericsson | imported from 3GU |
R2‑144439 | Remaining issues on L2 handling during reconfigurations | Ericsson | imported from 3GU |
R2‑144440 | DRX Coordination in Dual Connectivity | Samsung | imported from 3GU |
R2‑144441 | IDC issues in Dual Connectivity | Samsung | imported from 3GU |
R2‑144442 | Open issues on ACB per PLMN | Ericsson | imported from 3GU |
R2‑144443 | Introducing Beidou ICD v2.0 | Nokia Corporation, Nokia Networks | imported from 3GU |
R2‑144444 | Report on [87#21][LTE/DC] Running 36.331 CR | Samsung (rapporteur) | imported from 3GU |
R2‑144445 | Introduction of Dual Connectivity | Samsung | imported from 3GU |
R2‑144446 | Prose operation during mobility | Potevio | imported from 3GU |
R2‑144447 | Detection of D2D grant | ASUSTeK | imported from 3GU |
R2‑144448 | Dual connectivity: Remaining X2 related signalling issues | Samsung | imported from 3GU |
R2‑144449 | Introduction of increased number of frequencies to monitor | Ericsson | imported from 3GU |
R2‑144450 | UE capability for IncMon | Ericsson | imported from 3GU |
R2‑144451 | UE capability for IncMon | Ericsson | imported from 3GU |
R2‑144452 | Dual connectivity: Need and use of SCG reconfiguration procedures | Samsung | imported from 3GU |
R2‑144453 | Support of roaming for ProSe communication | BlackBerry UK Limited | imported from 3GU |
R2‑144454 | Discussion on allowed bearer type/HO combinations | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144455 | UE support of CA fallback configurations | Ericsson | imported from 3GU |
R2‑144456 | Collision of MeNB and SeNB reconfigurations | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144457 | UE support of CA fallback configurations | Ericsson | imported from 3GU |
R2‑144458 | DRB reconfigurations in DC | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144459 | PDCP SN number size change | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144460 | UE support of CA fallback configurations | Ericsson | imported from 3GU |
R2‑144461 | ProSe UE capability | ZTE | imported from 3GU |
R2‑144462 | ProSE prioritization and interest indication | ZTE | imported from 3GU |
R2‑144463 | Clarification on mode 1 resource allocation procedure | ZTE | imported from 3GU |
R2‑144464 | Dual Connectivity layer 2 reconfiguration (a.o. on SCG change) | Samsung | imported from 3GU |
R2‑144465 | Further considerations on exceptional cases | ZTE | imported from 3GU |
R2‑144466 | SA reception resource pool configuration | ZTE | imported from 3GU |
R2‑144467 | ProSe Discovery in inter-PLMN scenario | Ericsson | imported from 3GU |
R2‑144468 | ProSe Multi-Carrier Support for Communication | Ericsson | imported from 3GU |
R2‑144469 | Dual connectivity: procedural specification of layer 2 reconfiguration | Samsung | imported from 3GU |
R2‑144470 | ProSe Layer-2 Identifiers | Ericsson | imported from 3GU |
R2‑144471 | Further discussion on mode switching | Ericsson | imported from 3GU |
R2‑144472 | SN and L fieds for High UE Category support | Ericsson | imported from 3GU |
R2‑144473 | Introduction of ProSe | Ericsson | imported from 3GU |
R2‑144474 | Measurement reporting for DRS measurements | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144475 | Dual connectivity, Capturing RAN1 agreements on physical layer configuration | Samsung | imported from 3GU |
R2‑144476 | [87#31][LTE/ProSe] How the Group Index is included in the BSR | Rapporteur (Ericsson) | imported from 3GU |
R2‑144477 | UE behaviour with Unsupported Carriers in NPG and RPG | Nokia Networks, Nokia Corporation | imported from 3GU |
R2‑144478 | On user inactivity of ProSe UE | ZTE | imported from 3GU |
R2‑144479 | Consideration on UL data transmission for split bearer | ETRI | imported from 3GU |
R2‑144480 | Report on [87#28][LTE/ProSe] Running 36.331 CR | Samsung (rapporteur) | imported from 3GU |
R2‑144481 | Introduction of ProSe | Samsung | imported from 3GU |
R2‑144482 | Summary of email [87#32][LTE/ProSe] Parameter configuration of PDCP/RLC/MAC entities | ZTE | imported from 3GU |
R2‑144483 | Clarification on the Security issue in ProSe communication | ZTE | imported from 3GU |
R2‑144484 | Inter-freq and Inter-PLMN discovery relevant signalling | ZTE | imported from 3GU |
R2‑144485 | Format of the ProSe-BSR | General Dynamics UK Ltd | imported from 3GU |
R2‑144486 | Further discussion on exceptional cases | General Dynamics UK Ltd | imported from 3GU |
R2‑144487 | ProSe Communication: High level aspects resource configuration | Samsung | imported from 3GU |
R2‑144488 | Clarification of MCCH to MCH mapping | Ericsson | imported from 3GU |
R2‑144489 | Configuration of UE initiated messages for DC | LG Electronics Inc. | imported from 3GU |
R2‑144490 | Handling of IDC problems for Dual Connectivity | LG Electronics Inc. | imported from 3GU |
R2‑144491 | Addition of PLMN ID List Reporting for GERAN neighbour cells | NEC | imported from 3GU |
R2‑144492 | MBMS Reception on SCG Cells | LG Electronics Inc. | imported from 3GU |
R2‑144493 | D2D operation with CA and DC | LG Electronics Inc. | imported from 3GU |
R2‑144494 | Support of UE interested in both D2D and MBMS | LG Electronics Inc. | imported from 3GU |
R2‑144495 | Triggering and cancelling ProSe BSR | LG Electronics Inc. | imported from 3GU |
R2‑144496 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT, Mediatek Inc. | imported from 3GU |
R2‑144497 | UE assistance information in dual connectivity | NEC | imported from 3GU |
R2‑144498 | L2 measurement in dual connectivity | NEC | imported from 3GU |
R2‑144499 | Simultaneous configuration of SCG and Split bearer | NEC | imported from 3GU |
R2‑144500 | MAC aspects of SCG Measurement gap | NEC | imported from 3GU |
R2‑144501 | Prose: Capturing RAN1 agreements on physical layer configuration | Samsung | imported from 3GU |
R2‑144502 | Exceptional case for Mode 2 to Mode 1 switching | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, US Department of Commerce | imported from 3GU |
R2‑144503 | Review in preparation of REL-12 ASN.1 freeze | Samsung | imported from 3GU |
R2‑144504 | Further Discussion on Exceptional Case | ITRI | imported from 3GU |
R2‑144505 | Discussion on Access Control for ProSe D2D Service | ITRI | imported from 3GU |
R2‑144506 | On Inter-Frequency ProSe Discovery | ITRI | imported from 3GU |
R2‑144507 | Radio link monitoring immediately after SCG configuration | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144508 | Capability signalling and Interest Indication for ProSe Communication | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144509 | Consideration on DRX coordination in dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144510 | Discussion on PHR transmission for power limited scenario | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144511 | Further Consideration on multi-carrier operation | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144512 | Discussion on intra-MeNB HO and capturing in stage 2 | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144513 | Mapping of SeNB modification on to RRC signalling | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144514 | Discussion on PDCP/RLC operation for dual connectivity | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144515 | Scheduling multiple groups for Mode 1 ProSE communication | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | imported from 3GU |
R2‑144516 | Limitation of Sequence Numbers and Length Fields in LTE Rel-12 | Ericsson | imported from 3GU |
R2‑144517 | Dedicated Configuration at cell change | Mediatek Inc. | imported from 3GU |
R2‑144518 | Limitation of Sequence Numbers and Length Fields in LTE Rel-12 | Ericsson | imported from 3GU |
R2‑144519 | Limitation of Sequence Numbers and Length Fields in LTE Rel-12 | Ericsson | imported from 3GU |
R2‑144520 | SSAC, ACB and ACB skip per PLMN | TeliaSonera, Deutsche Telekom, CMCC, Orange, Softbank Mobile | imported from 3GU |
R2‑144521 | ACB and ACB skip per PLMN | TeliaSonera, Deutsche Telekom, CMCC, Orange, Softbank Mobile | imported from 3GU |
R2‑144522 | Further discussion on MCCH and MTCH transmission | Huawei, HiSilicon | imported from 3GU |
R2‑144523 | Handling of dedicated parameters for RAN-assisted WLAN interworking upon leaving RRC_CONNECTED and upon re-establishment | Huawei, HiSilicon | imported from 3GU |
R2‑144524 | Clarification on handling of dedicated parameters upon cell selection (when not in RRC_IDLE and when leaving RRC_CONNECTED) | Huawei, HiSilicon | imported from 3GU |
R2‑144525 | CR on the action when entering RRC_CONNECTED | Huawei, HiSilicon | imported from 3GU |
R2‑144526 | ASN.1 issue in signalling of number of FDD frequency bands in UE measurement capability extension | Intel Corporation | imported from 3GU |
R2‑144527 | On basic procedure for SI change in SCG PSCell and PSCell Change | NTT DOCOMO, INC. | imported from 3GU |
R2‑144528 | Defining "SCG change" in stage 2 | NTT DOCOMO, INC. | imported from 3GU |
R2‑144529 | Handling of SeNB PDCP COUNT wrap around | NTT DOCOMO, INC. | imported from 3GU |
R2‑144530 | Capability supported in SCG PSCell for Dual Connectivity | NTT DOCOMO, INC. | imported from 3GU |
R2‑144531 | PDCP Operation on Handover To/From Split Bearer | NVIDIA | imported from 3GU |
R2‑144532 | Remaining Issues for Inter-frequency D2D discovery | Huawei, HiSilicon | imported from 3GU |
R2‑144533 | Remaining issues on inter-cell D2D discovery | Kyocera | imported from 3GU |
R2‑144534 | Inter-frequency and inter-PLMN D2D discovery | Kyocera | imported from 3GU |
R2‑144535 | Dedicated parameter handling upon connection setup | Kyocera | imported from 3GU |
R2‑144536 | Remaining layer 2 aspects for D2D | Kyocera | imported from 3GU |
R2‑144537 | Further Discussion on ProSe Capability Signaling | Qualcomm Incorporated | imported from 3GU |
R2‑144538 | Multi-carrier aspects for ProSe communications | InterDigital Communications | imported from 3GU |
R2‑144539 | Support of different RSRQ measurement types for WLAN offload | Ericsson | imported from 3GU |
R2‑144540 | Report and summary of email discussion [87#22] [LTE/DC] S-RLF and Reestablishment | Huawei (Rapporteur) | imported from 3GU |
R2‑144541 | Configuration aspects of D2D discovery | InterDigital Communications | imported from 3GU |
R2‑144542 | Introduction of ProSe | Qualcomm Incorporated | imported from 3GU |
R2‑144543 | Signaling for ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑144544 | MAC header format version mismatch handling | Qualcomm Incorporated | imported from 3GU |
R2‑144545 | Data Resource pool for ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑144546 | RRC signaling for DRS measurement | Intel Corporation | imported from 3GU |
R2‑144547 | PDCP header format for ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑144548 | Signaling Details for ProSe Direct Discovery | Qualcomm Incorporated | imported from 3GU |
R2‑144549 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑144550 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑144551 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑144552 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | imported from 3GU |
R2‑144553 | Remaining Aspects of Mode Switching | InterDigital Communications | imported from 3GU |
R2‑144554 | Introduction of ProSe Direct Communication | Qualcomm Incorporated | imported from 3GU |
R2‑144555 | DRS Measurement Procedures on Deactivated SCells | Samsung | imported from 3GU |
R2‑144556 | DRS Measurement Procedures on Deactivated SCells | Samsung | imported from 3GU |
R2‑144557 | DRS Measurement and Configuration Details | Samsung | imported from 3GU |
R2‑144558 | Annotations to running MAC CR for ProSe | Ericsson | imported from 3GU |
R2‑144559 | Clarifications on inter-frequency scenarios for ProSe Communication | Telecom Italia | imported from 3GU |
R2‑144560 | UE Capabilities for Dual Connectivity | Qualcomm Incorporated | imported from 3GU |
R2‑144561 | Dynamic switching of CDRX configurations | Qualcomm Incorporated | imported from 3GU |
R2‑144562 | Accuracy requirements for network-based timing difference acquisition | Qualcomm Incorporated | imported from 3GU |
R2‑144563 | Introduction of the extended value range for RSRQ | Huawei, HiSilicon, Samsung | imported from 3GU |
R2‑144564 | Introduction of the extended value range for RSRQ | Huawei, HiSilicon, Samsung | imported from 3GU |
R2‑144565 | Introduction of the extended value range for RSRQ | Huawei, HiSilicon, Samsung | imported from 3GU |
R2‑144566 | Increasing RSRQ value range | Huawei, HiSilicon | imported from 3GU |
R2‑144567 | Introduction of the extended value range for RSRQ | Huawei, HiSilicon, Samsung | imported from 3GU |
R2‑144568 | DL CA and support for the lower order DL fall-back modes | Huawei, HiSilicon | imported from 3GU |
R2‑144569 | CR on DL CA and support for the lower order DL fall-back modes | Huawei, HiSilicon | imported from 3GU |
R2‑144570 | CR on DL CA and support for the lower order DL fall-back modes | Huawei, HiSilicon | imported from 3GU |
R2‑144571 | CR on release indication to upper layer | LG Electronics Inc. | imported from 3GU |
R2‑144572 | Response LS on DL CA and support for the lower order DL fall-back modes | Huawei, HiSilicon | imported from 3GU |
R2‑144573 | Dual connectivity considering WLAN interworking | LG Electronics Inc. | imported from 3GU |
R2‑144574 | Indication of category 0 UE | LG Electronics Inc. | imported from 3GU |
R2‑144575 | RLC re-establishment when entering Cell_PCH state | Qualcomm Incorporated | imported from 3GU |
R2‑144576 | Clarification of cell-update-less transition from Cell_PCH state to Cell_FACH state | Qualcomm Incorporated | imported from 3GU |
R2‑144577 | Limitation on UE Radio Capability information size | Huawei, HiSilicon | imported from 3GU |
R2‑144578 | Introduction of Dual Connectivity | NTT DOCOMO, INC. | imported from 3GU |
R2‑144579 | Discussion on DC capability structure | NTT DOCOMO, INC. | imported from 3GU |
R2‑144580 | draft LS on Dual Connectivity capability | NTT DOCOMO, INC. | imported from 3GU |
R2‑144581 | RLC handling for DC | NTT DOCOMO, INC. | imported from 3GU |
R2‑144582 | Framework for TAG in DC | NTT DOCOMO, INC. | imported from 3GU |
R2‑144583 | CG configuration in SCG-ConfigInfo | NTT DOCOMO, INC. | imported from 3GU |
R2‑144584 | On the UE capability size | Samsung | imported from 3GU |
R2‑144585 | DRX for dual connectivity | Qualcomm Incorporated | imported from 3GU |
R2‑144586 | BSR MAC CE format for ProSe BSR | LG Electronics Inc. | imported from 3GU |
R2‑144587 | Prioritization handling between Legacy BSR and ProSe BSR | LG Electronics Inc. | imported from 3GU |
R2‑144588 | ProSe BSR format with support of more than 4 Groups | LG Electronics Inc. | imported from 3GU |
R2‑144589 | When to stop DL transmission and UL reception in SeNB | LG Electronics Inc. | imported from 3GU |
R2‑144590 | Continuation of ProSe comm operation upon mobility | LG Electronics Inc. | imported from 3GU |
R2‑144591 | DRX coordination for DC | LG Electronics Inc. | imported from 3GU |
R2‑144592 | ProSe Comm Interest Indication | LG Electronics Inc. | imported from 3GU |
R2‑144593 | Definition of Âcoverage (detection of a cell) | LG Electronics Inc. | imported from 3GU |
R2‑144594 | Clarification on the intended behaviors in limited service state | LG Electronics Inc. | imported from 3GU |
R2‑144595 | Clarification of reselection to ProSe carrier | LG Electronics Inc. | imported from 3GU |
R2‑144596 | RRC connection establishment (ACB, cause) | LG Electronics Inc. | imported from 3GU |
R2‑144597 | RRC connection establishment for ProSe Discovery | LG Electronics Inc. | imported from 3GU |
R2‑144598 | Provisioning of inter-frequency ProSe parameters to UE | LG Electronics Inc. | imported from 3GU |
R2‑144599 | Inter-frequency and Inter-PLMN support | LG Electronics Inc. | imported from 3GU |
R2‑144600 | UE capability for ProSe comm | LG Electronics Inc. | imported from 3GU |
R2‑144601 | Summary of email dis [87#29] [LTE/ProSe] Capabilities for ProSe Communication | LG Electronics Inc. | imported from 3GU |
R2‑144602 | Cell selection during re-esblishment | LG Electronics Inc. | imported from 3GU |
R2‑144603 | DRS measurement configuration | LG Electronics Inc. | imported from 3GU |
R2‑144604 | Reporting configuration for DRS measurement | LG Electronics Inc. | imported from 3GU |
R2‑144605 | MBMS Service Continuity for Inter-RAT Mobility | LG Electronics Inc. | imported from 3GU |
R2‑144606 | D2D PDCP Header Format and Procedures | Huawei, HiSilicon | imported from 3GU |
R2‑144607 | Multi-carrier configuration support at inter-RAT handover | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | imported from 3GU |
R2‑144608 | Multi-carrier configuration support at inter-RAT handover | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | imported from 3GU |
R2‑144609 | Multi-carrier configuration in Handover to UTRAN command | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | imported from 3GU |
R2‑144610 | Multi-carrier configuration in Handover to UTRAN command | Ericsson, Qualcomm Incorporated, Huawei, Orange, Telecom Italia | imported from 3GU |
R2‑144611 | Interaction between MeNB and SeNB concerning S-RLF | CMCC | imported from 3GU |
R2‑144612 | Clarification on WLAN interworking | HTC | imported from 3GU |
R2‑144613 | Introducing Beidou ICD v2.0 | Nokia Corporation, Nokia Networks | Disc |
R2‑144614 | Prose: Capturing RAN1 agreements on physical layer configuration | Samsung | CR |
R2‑144615 | Correction regarding presence of GANSS Day field | Intel Corporation | CR |
R2‑144616 | Correction regarding presence of GANSS Day field | Intel Corporation | CR |
R2‑144617 | Correction regarding presence of GANSS Day field | Intel Corporation | CR |
R2‑144618 | Inter-frequency and Inter-PLMN support | LG Electronics Inc. | Disc |
R2‑144619 | Further Discussion on ProSe Capability Signaling | Qualcomm Incorporated, LG Electronics Inc. | Disc |
R2‑144620 | Introduction of increased number of frequencies to monitor | Ericsson | CR |
R2‑144621 | Clarification on the case of more than one entry configured for the same physical frequency of E-UTRAN | CMCC, Huawei, HiSilicon, ZTE, CATT, MediaTek Inc. | CR |
R2‑144622 | Clarification on the case of more than one entry configured for the same physical frequency of E-UTRAN | CMCC, Huawei, HiSilicon, ZTE, CATT, MediaTek Inc. | CR |
R2‑144623 | Clarification on the case of more than one entry configured for the same physical frequency of E-UTRAN | CMCC, Huawei, HiSilicon, ZTE, CATT, MediaTek Inc. | CR |
R2‑144624 | Introduction of increased number of frequencies to monitor | Ericsson | CR |
R2‑144625 | Clarification on handling of dedicated parameters upon cell selection (when not in RRC_IDLE and when leaving RRC_CONNECTED) | Huawei, HiSilicon | CR |
R2‑144626 | Clarification on handling of dedicated parameters upon cell selection (when not in RRC_IDLE and when leaving RRC_CONNECTED) | Huawei, HiSilicon | CR |
R2‑144627 | Clarification on handling of dedicated parameters upon cell selection (when not in RRC_IDLE and when leaving RRC_CONNECTED) | Huawei, HiSilicon | CR |
R2‑144628 | Corrections to WLAN/3GPP Radio Interworking for LTE | Intel Corporation | CR |
R2‑144629 | Reduction of possible values for WLAN backhaul rate thresholds in UMTS | Ericsson, Samsung | CR |
R2‑144630 | Reduction of possible values for WLAN backhaul rate thresholds in LTE | Ericsson, Samsung | CR |
R2‑144631 | Draft reply LS to CT4 on the problem of UE Radio Capability information size | Intel Corporation | LSout |
R2‑144632 | Introduction of signalling for PCell interruptions | Nokia Networks, Nokia Corporation | CR |
R2‑144633 | Introduction of signalling for PCell interruptions | Nokia Networks, Nokia Corporation | CR |
R2‑144634 | Introduction of capability for PCell interruptions | Nokia Networks, Nokia Corporation | CR |
R2‑144635 | Introduction of capability for PCell interruptions | Nokia Networks, Nokia Corporation | CR |
R2‑144636 | Draft reply LS to on DL CA and support for the lower order DL fall-back modes (to: RAN4; cc: -; contact: Qualcomm) | Qualcomm | LSout |
R2‑144637 | Draft reply LS to RAN5 on clarification of inclusion of rlf-InfoAvailable IE under HO failure scenario in Release 9 | Huawei | LSout |
R2‑144638 | Summary of email dis [87#29] [LTE/ProSe] Capabilities for ProSe Communication | LG Electronics Inc. | Disc |
R2‑144639 | Clarification of MCCH to MCH mapping | Ericsson | CR |
R2‑144640 | Draft LS to RAN3 on allowing PMCH without any sessions | Qualcomm | LSout |
R2‑144641 | Corrections for Further EUL enhancements | Ericsson | CR |
R2‑144642 | Corrections on filtered UE power headroom reporting | Huawei, HiSilicon | CR |
R2‑144643 | Corrections on filtered UE power headroom reporting | Huawei, HiSilicon | CR |
R2‑144644 | Introduction of the implicit grant handling feature description | Nokia Networks | CR |
R2‑144645 | CR to 25.306 on correction of Cell Reselection Indication Reporting | Huawei, HiSilicon | CR |
R2‑144646 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | CR |
R2‑144647 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | CR |
R2‑144648 | LS to RAN3 on Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks | LSout |
R2‑144649 | Correction to 25.331 for CSFB UE on cell reselection back to LTE | CMCC, Huawei, HiSilicon, CATT, Mediatek Inc. | CR |
R2‑144650 | DRAFT LS on Way Forward for IncMon in RAN2 | Ericsson | LSout |
R2‑144651 | Clarification on WLAN interworking | HTC | CR |
R2‑144652 | LS to RAN3 on Introduction of the UL CLTD feedback from the Multiflow assisting cell (to: RAN3; cc: -; contact: NSN) | RAN2 | LSout |
R2‑144653 | Introduction of the UL CLTD feedback from the Multiflow assisting cell | Nokia Networks, Nokia Corporation, Qualcomm Incorporated | CR |
R2‑144654 | Optional features for Hetnet mobility in TS 36.306 | Huawei, HiSilicon, Intel, Qualcomm Incorporated | CR |
R2‑144655 | Rel-12 ASN.1 Correction | Nokia Networks | CR |
R2‑144656 | Addition of an Early Position Fix to LPP | Qualcomm Incorporated | CR |
R2‑144657 | PDCP SN number size change | Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR |
R2‑144658 | Dual Connectivity layer 2 reconfiguration (a.o. on SCG change) | Samsung | CR |
R2‑144659 | Reply LS on the problem of UE Radio Capability information size | RAN2 | LSout |
R2‑144660 | Introduction of Dual Connectivity | NTT DOCOMO, INC. | CR |
R2‑144661 | Report of the LTE UP ad hoc meeting | LG Electronics (Vice-Chairman) | Report |
R2‑144662 | LS on monitoring PDCCH with SPS C-RNTI in DC (to: RAN1; cc: -; contact: CMCC) | RAN2 | LSout |
R2‑144663 | LS on ProSe priorities (to: SA2; cc: RAN3, CT1; contact: InterDigital Communications) | InterDigital Communications | LSout |
R2‑144664 | Introduction of Dual Connectivity | Samsung | CR |
R2‑144665 | Introduction of signalling for PCell interruptions | Nokia Networks, Nokia Corporation | CR |
R2‑144666 | Introduction of signalling for PCell interruptions | Nokia Networks, Nokia Corporation | CR |
R2‑144667 | Reply LS on clarification of inclusion of rlf-InfoAvailable IE under HO failure scenario in Release 9 (to: RAN5; cc: -; contact: Huawei) | RAN2 | LSout |
R2‑144668 | LS on allowing PMCH without any sessions (to: RAN3; cc: -; contact: Qualcomm) | RAN2 | LSout |
R2‑144669 | Avoid | - | - |
R2‑144670 | Avoid | - | - |
R2‑144671 | Avoid | - | - |
R2‑144672 | Avoid | - | - |
R2‑144673 | Avoid | - | - |
R2‑144674 | Avoid | - | - |
R2‑144675 | Avoid | - | - |
R2‑144676 | ACB and ACB-skip signalling per PLMN | TeliaSonera, Intel Corporation, Deutsche Telekom, CMCC, Orange, Softbank Mobile | CR |
R2‑144677 | ACB for CSFB and SSAC signalling per PLMN | TeliaSonera, Intel Corporation, Deutsche Telekom, CMCC, Orange, Softbank Mobile | CR |
R2‑144678 | Reply LS to on DL CA and support for the lower order DL fall-back modes (to: RAN4; cc: -; contact: Qualcomm) | RAN2 | LSout |
R2‑144679 | Draft Reply LS on availability of ProSe Direct Communication in limited service state (to SA1; cc: SA2, CT1; contact: Qualcomm) | Qualcomm | LSout |
R2‑144680 | Stage-2 description of Small Cell Enhancements Physical Layer | Huawei, HiSilicon | CR |
R2‑144681 | Support of DRS measurement in TS 36.331 | Huawei, HiSilicon | CR |
R2‑144682 | Draft LS on DRS based measurement (to: RAN1, RAN4; cc: -; contact: Huawei) | Huawei | LSout |
R2‑144683 | Support of 256QAM in TS 36.306 | Huawei, HiSilicon | CR |
R2‑144684 | Support of 256QAM in TS 36.331 | Huawei, HiSilicon | CR |
R2‑144685 | Draft LS on Access Control for Prose (Discovery and Communication) (to: CT1; cc: SA2; contact: Panasonic) | Panasonic | LSout |
R2‑144686 | Editorial correction of WLAN radio interworking | Intel Corporation | CR |
R2‑144687 | Minor corrections regarding WLAN interworking | Samsung | CR |
R2‑144688 | Minor corrections regarding WLAN interworking | Samsung | CR |
R2‑144689 | Reply LS on DRS based measurement (to: RAN1, RAN4; cc: -; contact: Huawei) | RAN2 | LSout |
R2‑144690 | Minor corrections regarding WLAN interworking | Samsung | CR |
R2‑144691 | Minor corrections regarding WLAN interworking | Samsung | CR |
R2‑144692 | Clarification on handling of dedicated parameters upon cell selection&reselection | Huawei, HiSilicon | CR |
R2‑144693 | Clarification on handling of dedicated parameters upon cell selection&reselection | Huawei, HiSilicon, Samsung | CR |
R2‑144694 | Category 0 report in Msg3 | Huawei, HiSilicon, Samsung, Media Tek Inc. | CR |
R2‑144695 | Support of TTI bundling without resource allocation restriction for LTE coverage enhancements for Rel-12 | China Telecom, ZTE, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR |
R2‑144696 | Support of TTI bundling without resource allocation restriction for LTE coverage enhancements for Rel-12 | China Telecom, ZTE, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell | CR |
R2‑144697 | Corrections to eIMTA capabilities | Huawei, HiSilicon | CR |
R2‑144698 | Corrections to eIMTA capabilities | Huawei, HiSilicon | CR |
R2‑144699 | ACB, ACB-skip, CSFB and SSAC signalling per PLMN | TeliaSonera, Intel Corporation, Deutsche Telekom, CMCC, Orange, Softbank Mobile | CR |
R2‑144700 | Introduction of dual connectivity in MAC (Option 3) | Ericsson | CR |
R2‑144701 | Introduction of dual connectivity in MAC (Option 2) | Ericsson | CR |
R2‑144702 | Minor corrections regarding WLAN interworking | Samsung | CR |
R2‑144703 | Clarification on handling of dedicated parameters upon cell selection&reselection | Huawei, HiSilicon | CR |
R2‑144704 | Clarification on handling of dedicated parameters upon cell selection (when not in RRC_IDLE and when leaving RRC_CONNECTED) | Huawei, HiSilicon, Samsung | CR |
R2‑144705 | Support of DRS measurement in TS 36.331 | Huawei, HiSilicon | CR |
R2‑144706 | Reply LS on availability of ProSe Direct Communication in limited service state (to SA1, SA2; cc: CT1; contact: Qualcomm) | RAN2 | LSout |
R2‑144707 | Introduction of ProSe | Qualcomm Incorporated | CR |
R2‑144708 | Introduction of ProSe | Samsung | CR |
R2‑144709 | LS on Access Control for Prose (Discovery and Communication) (to: CT1; cc: SA2; contact: Panasonic) | RAN2 | LSout |
R2‑144710 | LS on ProSe priorities (to: SA2; cc: RAN3, CT1; contact: InterDigital Communications) | RAN2 | LSout |
R2‑144711 | Introduction of dual connectivity in MAC | Ericsson | CR |
page generated from database: 2024-03-25 09:25:51