The 5G Standard

3GPP TDocs (written contributions) at meeting

Meeting: R1-66 - 2011-08-22 to 2011-08-26, Athens

meeting id: R1-66 (click id for more info on this meeting)

Click on the Tdoc to open its file.

TDoc Title Source Remarks
R1‑112020 Draft Agenda for RAN1#66 meeting RAN1 Chairman Revised
R1‑112021 Final report of RAN1#65 meeting MCC Support Approved
R1‑112022 LS on the frequency band specific compressed mode RAN2, Nokia Siemens Networks Noted
R1‑112023 LS on Removal of MDT M3 LTE Measurement RAN2, MediaTek Noted
R1‑112024 LS on timing advance calculation using time difference measurement RAN2, Renesas Noted
R1‑112025 Reply LS on signalling support to de-activate HS-SCCH orders RAN3, Qualcomm Noted
R1‑112026 Response to NGMN LS RP-110476 on coordination between ITU-T and 3GPP on synchronization RAN, Orange Noted
R1‑112027 LS on MDT UL Measurements SA5, Nokia Siemens Networks Noted
R1‑112028 LS on Equivalent PLMN identities and MDT SA, Teliasonera Noted
R1‑112029 Multiple timing advance for carrier aggregation in Rel-11 Huawei, HiSilicon Noted
R1‑112030 Draft reply LS on timing advance calculation using time difference measurement Huawei Not treated
R1‑112031 36.212 CR0118 (Rel-10, F) Corrections on payload size alignment of DCI formats in common or UE-specific search space Huawei, HiSilicon Withdrawn
R1‑112032 36.212 CR0119 (Rel-10, F) Corrections on transport block processing for UL-SCH Huawei, HiSilicon, I2R Noted - Revised
R1‑112033 draft 36.212 CR on channel coding of control information, DCI Format 2C and 4 Huawei, HiSilicon, CATT Noted - Revised
R1‑112034 Uplink signaling enhancements in Rel-11 carrier aggregation Huawei, HiSilicon Not treated
R1‑112035 TxD for format 1b with channel selection in Rel-11 Huawei, HiSilicon Noted
R1‑112036 Discussion on different UL-DL configuration for TDD with inter-band CA Huawei, HiSilicon Noted
R1‑112037 Considerations on further enhancements of Rel-10 eICIC Huawei, Hisilicon Not treated
R1‑112038 Full buffer performance evaluation of DL CS/CB in scenarios 3 and 4 Huawei, HiSilicon Not treated
R1‑112039 Full buffer performance evaluation of DL JT in scenarios 3 and 4 Huawei, HiSilicon Noted
R1‑112040 Non-Full buffer performance evaluation of DL JT in scenarios 3 and 4 Huawei, HiSilicon Not treated
R1‑112041 UL CoMP phase 2 evaluations in scenario 3 Huawei, HiSilicon Revised
R1‑112042 Text proposal for standard impacts and design principles of CoMP in Rel-11 Huawei, HiSilicon Revised
R1‑112043 Cooperating set management and control channel access consideration Huawei, HiSilicon Not treated
R1‑112044 Coordinated beamforming solution for Rel-11 Huawei, HiSilicon Withdrawn
R1‑112045 Prioritization of real-life network deployment issues Huawei, HiSilicon Noted
R1‑112046 Analysis of closed-loop DL MIMO rank adaptaion with received power imbalance Huawei, HiSilicon Noted
R1‑112047 Investigation on CSI feedback enhancements for closed-loop MIMO Huawei, HiSilicon Not treated
R1‑112048 CSI feedback and utilization for MU-MIMO and considerations for testing Huawei, HiSilicon Not treated
R1‑112049 Design principles of enhanced PDCCH Huawei, HiSilicon Not treated
R1‑112050 Open-loop DL MIMO for Rel.11 Huawei, HiSilicon Not treated
R1‑112051 DMRS enhancements for geographically distributed antennas Huawei, HiSilicon Not treated
R1‑112052 CSI-RS port selection for distributed antennas Huawei, HiSilicon Not treated
R1‑112053 Skeleton TR for UL Enhancement Study Item Huawei, HiSilicon Noted
R1‑112054 UL Reference Signal enhancements in Rel.11 Huawei, HiSilicon Not treated
R1‑112055 Enhancement for transmission of UCI on PUSCH Huawei, HiSilicon Not treated
R1‑112056 Uplink power control enhancements in Rel.11 Huawei, HiSilicon Noted
R1‑112057 Uplink timing advance for geographically distributed antennas Huawei, HiSilicon Noted
R1‑112058 Channel-independent UL MIMO Huawei, HiSilicon Not treated
R1‑112059 Response to Liaison “NGMN coordination between ITU-T and 3GPP on synchronization topic” ITU-T Study Group 15, Calnex Solutions, Ericsson Noted
R1‑112060 System Performance of JT-CoMP in Phase 2 TDD CATT Noted
R1‑112061 System Performance of CS/CB-CoMP in Phase2 TDD CATT Noted
R1‑112062 Performance Evaluations of JT-CoMP and TDM eICIC in the CoMP Scenario 3 KDDI Corporation Noted
R1‑112063 Feedback channel design and considerations for UL CLTD InterDigital Communications LLC Noted
R1‑112064 Dynamic antenna selection via HS-SCCH order for UL CLTD InterDigital Communications LLC Not treated
R1‑112065 S-DPCCH channelization code and power offset range InterDigital Communications LLC Noted
R1‑112066 Synchronization and radio link monitoring for UL CLTD InterDigital Communications LLC Noted
R1‑112067 Selection of Channelization Codes for HS-DPCCH when DPDCH is configured in 8-carrier HSDPA InterDigital Communications LLC Noted
R1‑112068 Physical Channel Mapping for 2xSF128 HS-DPCCH in 8C-HSDPA InterDigital Communications LLC Noted
R1‑112069 System simulation summary for MP-HSDPA InterDigital Communications LLC Noted
R1‑112070 System simulation text proposal for MP-HSDPA InterDigital Communications LLC Noted
R1‑112071 Draft LS reply on timing advance calculation using time difference measurement Ericsson, ST-Ericsson Not treated
R1‑112072 On timing advance calculation using time difference measurement Ericsson, ST-Ericsson Noted
R1‑112073 36.213 CR0324 (Rel-10, Cat F) Accumulation of power control commands from DCI format 3/3A with UL transmission Ericsson, ST-Ericsson Noted
R1‑112074 Views on trade-off analysis method for CA enhancements Ericsson, ST-Ericsson Noted
R1‑112075 On timing advance calculation using random access Ericsson, ST-Ericsson Withdrawn
R1‑112076 On PDCCH capacity for CA Ericsson, ST-Ericsson Noted
R1‑112077 On collision handling of periodic CSI feedback Ericsson, ST-Ericsson Not treated
R1‑112078 Enhanced transmit diversity for PUCCH Ericsson, ST-Ericsson Noted
R1‑112079 Operating principles of interband TDD CA with different UL-DL configurations Ericsson, ST-Ericsson Noted
R1‑112080 Hardware impact of supporting interband TDD CA with different UL-DL configurations Ericsson, ST-Ericsson Noted
R1‑112081 Considerations on use cases for introduction of additional carrier types Ericsson, ST-Ericsson Not treated
R1‑112082 Discussion on design principles for additional carrier types Ericsson, ST-Ericsson Not treated
R1‑112083 Simulation assumptions for evaluation of dynamic traffic adaptation for LTE TDD Ericsson, ST-Ericsson Not treated
R1‑112084 UL/DL interference scenarios in LTE TDD Ericsson, ST-Ericsson Not treated
R1‑112085 Potential Enhancements for SRS in Rel-11 Ericsson, ST-Ericsson Not treated
R1‑112086 Potential Enhancements for DMRS in Rel-11 Ericsson, ST-Ericsson Not treated
R1‑112087 Potential enhancements for CQI-only transmission Ericsson, ST-Ericsson Not treated
R1‑112088 Enhancements to UL power control for Rel-11 Ericsson, ST-Ericsson Noted
R1‑112089 First analysis of UL channel independent transmission schemes for Rel-11 Ericsson, ST-Ericsson Not treated
R1‑112090 Draft 36.213 CR on UL HARQ ACK determination Ericsson, ST-Ericsson Noted - Revised
R1‑112091 Discussion on Real-life DL MIMO issues Ericsson, ST-Ericsson Noted
R1‑112092 Enhanced CSI for DL MIMO Ericsson, ST-Ericsson Not treated
R1‑112093 DL CoMP Phase 2 Evaluation Results Ericsson, ST-Ericsson Noted
R1‑112094 Standardization Impact of CoMP Ericsson, ST-Ericsson Noted
R1‑112095 CoMP Phase 2 evaluation results Panasonic Revised
R1‑112096 Proposal of a CoMP study focused on relay-based networks DAC-UPC Not treated
R1‑112097 PHICH over booking can occur in narrow BW operation Sequans Communications Noted
R1‑112098 36.211 Draft CR (Rel-8, F) PHICH overbooking can occure in narrow BW Sequans Communications Revised
R1‑112099 36.211 Draft CR (Rel-9, A) PHICH overbooking can occure in narrow BW Sequans Communications Revised
R1‑112100 36.211 Draft CR (Rel-10, A) PHICH overbooking can occure in narrow BW Sequans Communications Revised
R1‑112101 Draft CR to 36.213 on PDSCH transmission scheme assumed for CSI reference resource of TM9 CATT Noted
R1‑112102 Overview and tradeoff analysis for Rel-11 carrier aggregation CATT Noted
R1‑112103 Enhancements on UL ACK/NACK in Rel-11 carrier aggregation CATT Not treated
R1‑112104 Enhancement for CSI transmission in LTE-A Rel-11 with CA CATT Not treated
R1‑112105 Transmit diversity for Format 3 and Format 1b with channel selection CATT Noted
R1‑112106 TDD Inter-band Carrier Aggregation CATT Noted
R1‑112107 Support of multiple timing advances in LTE-A Rel-11 with CA CATT Not treated
R1‑112108 Discussion on CoMP  Specification  Impact CATT Noted
R1‑112109 Considerations on CoMP in TDD  Mode CATT, CMCC Not treated
R1‑112110 Considerations on Interference  Measurement and its  Specification Impact in CoMP CATT Noted
R1‑112111 CQI  Feedback and its Specification  Impact in CoMP CATT Not treated
R1‑112112 Considerations on SRS  Enhancement for CoMP  Transmission CATT, CMCC Not treated
R1‑112113 Impact of time alignment error on real-life transmission CATT, CMCC Not treated
R1‑112114 Discussion on Rank adaptation CATT Noted
R1‑112115 Overall discussion on real life issues of DL MIMO CATT Noted
R1‑112116 CSI feedback for geographically-separated antennas CATT Not treated
R1‑112117 Codebook enhancements for DL MIMO CATT Not treated
R1‑112118 Views on control signalling enhancements for Rel-11 DL-MIMO CATT Not treated
R1‑112119 Design of enhanced PDCCH in Rel-11 CATT Not treated
R1‑112120 Discussion on enhancement for CQI-only transmission in Rel-11 CATT Not treated
R1‑112121 Considerations on UL MIMO enhancement for new deployment scenarios CATT Not treated
R1‑112122 Traffic adaptation evaluation methodologies and assumptions for LTE TDD eIMTA CATT Not treated
R1‑112123 Work plan for SI on LTE TDD eIMTA CATT Not treated
R1‑112124 Draft Agenda for RAN1#66 meeting RAN1 Chairman Approved
R1‑112125 Further clarification on PDSCH transmission in MBSFN subframes NEC Group Noted
R1‑112126 Clarification on cyclic prefix of PDSCH in MBSFN subframes NEC Group Noted - Revised
R1‑112127 Correction to the information of modulation and coding scheme for PUSCH transport block 1 in DCI format 4 NEC Group Noted
R1‑112128 Miscellaneous corrections to 36.213 NEC Group Noted - Revised
R1‑112129 Views on Extension carrier and Carrier segments NEC Group Not treated
R1‑112130 Performance of Cell Range Extension with Time-domain solutions NEC Group Noted
R1‑112131 Evaluation Results for TDD CoMP JT Scenario 3 NEC Group Not treated
R1‑112132 Evaluation Results for FDD CoMP CB Scenario 3 NEC Group Not treated
R1‑112133 Specification Impact of HARQ Retransmission for Downlink CoMP NEC Group Not treated
R1‑112134 Enhancements to DL MU-MIMO CSI Feedback NEC Group Revised
R1‑112135 DL control channel enhancements for Rel-11 NEC Group Noted
R1‑112136 Performance aspects of DL control channel enhancements for Rel-11 NEC Group Noted
R1‑112137 DL Control channel enhancements with carrier aggregation solutions NEC Group Not treated
R1‑112138 Open-loop DL MIMO using UE specific RS NEC Group Not treated
R1‑112139 Downlink DM-RS enhancements NEC Group Not treated
R1‑112140 Phase 2 downlink CoMP evaluation results Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112141 Proposed update to TSG RAN1 Terms of Reference RAN1 Chairman Endorsed
R1‑112142 Enhancement for UL RS in Rel-11 CATT Not treated
R1‑112143 Performance evaluation of CS/CB for CoMP Scenario3 Sony Corporation Revised
R1‑112144 Performance evaluation of JP for CoMP Scenario3 Sony Corporation Revised
R1‑112145 Correction on RI feedback of Mode 2-1 for TM9 with 8 CSI-RS ports configuration and RI feedback description. China Telecom, ZTE, Huawei, Ericsson, ST-Ericsson Withdrawn
R1‑112146 36.214 CR0017 (Rel-10, Cat F) Alignment of UE RX-TX time difference measurement with RAN2 definition Ericsson, ST-Ericsson Noted
R1‑112147 Discussions on certain open issues in ICIC New Postcom Noted
R1‑112148 Feedback enhancements for CoMP New Postcom Not treated
R1‑112149 Discussions on timing difference based TA calculation New Postcom Noted
R1‑112150 Scenario 3 results and analysis for CoMP Phase 2 New Postcom Not treated
R1‑112151 Discussions on cell clustering for CoMP New Postcom Withdrawn
R1‑112152 Consideration of CA Enhancements for Rel-11 Texas Instruments Noted
R1‑112153 Support of Multiple Timing Advance Commands Texas Instruments Not treated
R1‑112154 System Performance Gains with Rel-10 ICIC and Het-Net Enhancements for Rel-11 Texas Instruments Noted
R1‑112155 Performance evaluation of CoMP in Phase II hetergeneous environment Texas Instruments Not treated
R1‑112156 On standardization impact of CoMP Texas Instruments Not treated
R1‑112157 Aspects of downlink control signaling enhancements in Rel.11 Texas Instruments Not treated
R1‑112158 Proposed Enhancements for Rel-11 SRS Texas Instruments Not treated
R1‑112159 Discussion on UCI Transmission Enhancements for Rel.11 Enhanced Uplink Texas Instruments Not treated
R1‑112160 Rel.11 Enhanced Uplink Improvements for New Deployment Scenarios Texas Instruments Not treated
R1‑112161 On supporting reduced power transmission in non-CA-based ICIC KDDI Corporation Not treated
R1‑112162 Downlink control signaling enhancement in CoMP scenario 4 KDDI Corporation Not treated
R1‑112163 Considerations on downlink control signaling enhancement KDDI Corporation Noted
R1‑112164 Downlink CSI feedback accuracy enhancement for MU-MIMO KDDI Corporation Revised
R1‑112165 CQI reports in frequency specific compressed mode Huawei, HiSilicon Noted
R1‑112166 Performance of absolute and recursive feedback methods Huawei, HiSilicon Noted
R1‑112167 CLTD Performance with CPC and Impact of Feedback Huawei, HiSilicon Noted
R1‑112168 Downlink PCI feedback channel timing design Huawei, HiSilicon Revised
R1‑112169 Performance of asymmetric and enhanced symmetric beamforming in SHO for CLTD Huawei, HiSilicon Noted
R1‑112170 Antenna selection scheme for UL CLTD Huawei, HiSilicon Not treated
R1‑112171 HS-SCCH Orders for UL CLTD Activation/Deactivation Huawei, HiSilicon Noted
R1‑112172 Channelisation code allocation and I/Q mapping for S-DPCCH Huawei, HiSilicon Noted
R1‑112173 On the use of remaining 2 bits in a slot of S-DPCCH Huawei, HiSilicon Noted
R1‑112174 E-DPCCH boosting for UL CLTD Huawei, HiSilicon Noted
R1‑112175 UL CLTD support in CELL_FACH state Huawei, HiSilicon Noted
R1‑112176 Interaction with DC-HSUPA Huawei, HiSilicon Noted
R1‑112177 CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Revised
R1‑112178 CR for 25.212: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Revised
R1‑112179 CR for 25.213: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Revised
R1‑112180 CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Revised
R1‑112181 CR for 25.215: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112182 Carriers remapping on HS-DPCCH after activation/deactivation for 8C-HSDPA Huawei, HiSilicon Revised
R1‑112183 Cubic metric analysis for HS-DPCCH designs of 8C-HSDPA Huawei, HiSilicon Noted
R1‑112184 On the benefits of DC-HSDPA operation in CELL_FACH state Huawei, HiSilicon Not treated
R1‑112185 Discussion on stand-alone HS-DPCCH Huawei, HiSilicon Noted
R1‑112186 Co-existence of 2ms and 10ms TTI Huawei, HiSilicon Not treated
R1‑112187 UE based TTI length decision in CELL-FACH state Huawei, HiSilicon Noted
R1‑112188 Solution of Fallback to R99 PRACH Huawei, HiSilicon Noted
R1‑112189 Blocking and Collision Probability Analysis for E-RACH Huawei, HiSilicon Not treated
R1‑112190 System Performance Evaluation of Intra-NodeB SF-DC Aggregation in uniform loading and 100% penetration Huawei, HiSilicon Not treated
R1‑112191 System Performance Evaluation of Intra-NodeB SF-DC Aggregation in uniform loading and 30% penetration Huawei, HiSilicon Not treated
R1‑112192 System Performance Evaluation of Intra-NodeB SF-DC Aggregation in non uniform loading and 100% penetration Huawei, HiSilicon Not treated
R1‑112193 System Performance Evaluation of Intra-NodeB SF-DC Aggregation in non uniform loading and 30% penetration Huawei, HiSilicon Not treated
R1‑112194 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 100% penetration Huawei, HiSilicon Not treated
R1‑112195 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 30% penetration Huawei, HiSilicon Not treated
R1‑112196 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 100% penetration Huawei, HiSilicon Not treated
R1‑112197 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 30% penetration Huawei, HiSilicon Not treated
R1‑112198 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 100% penetration with realistic RLC and flow control Huawei, HiSilicon Not treated
R1‑112199 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in uniform loading and 30% penetration with realistic RLC and flow control Huawei, HiSilicon Not treated
R1‑112200 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 30% penetration with realistic RLC and flow control Huawei, HiSilicon Not treated
R1‑112201 System Performance Evaluation of Inter-NodeB SF-DC Aggregation in non uniform loading and 100% penetration with realistic RLC and flow control Huawei, HiSilicon Not treated
R1‑112202 Summary of System performance for SF-DC Aggregation Huawei, HiSilicon Noted
R1‑112203 Text Proposal on System Performance Evaluation of SF-DC aggregation with ideal flow control Huawei, HiSilicon Not treated
R1‑112204 Text Proposal on System Performance Evaluation of SF-DC aggregation with realistic RLC and flow control Huawei, HiSilicon Not treated
R1‑112205 TP on Impact on performance of legacy Ues due to SF-DC aggregation Huawei, HiSilicon Noted
R1‑112206 TP on Specification impact due to SF-DC aggregation Huawei, HiSilicon Noted
R1‑112207 HS-DPCCH Timing Analysis for MP-HSDPA Huawei, HiSilicon Noted
R1‑112208 Initial link-level simulation results for UL MIMO Huawei, HiSilicon Noted
R1‑112209 TP on performance evaluation results for UL MIMO Huawei, HiSilicon Noted
R1‑112210 Considerations on UL MIMO Huawei, HiSilicon Noted
R1‑112211 Discussions on enhanced PDCCH structure ETRI Not treated
R1‑112212 Uplink power control for CoMP Scenarios 3 and 4 ETRI Noted
R1‑112213 Control/Timing Issues related to Mixed TDD Configurations in Inter-band CA Intel Corporation Not treated
R1‑112214 Supporting Different UL-DL Configurations for LTE-TDD Inter-band Carrier Aggregation Intel Corporation Noted
R1‑112215 On New Carrier Types: Extension Carriers and Carrier Segments Intel Corporation Not treated
R1‑112216 Discussion on RAN2 LS - timing advance calculation using time difference Intel Corporation Not treated
R1‑112217 Rank adaptatoin in heterogeneous networks Intel Corporation Noted
R1‑112218 CSI feedback enhancement in heterogeneous networks Intel Corporation Not treated
R1‑112219 Futther discussions on downlink control signaling enhancement Intel Corporation Not treated
R1‑112220 Discussions on UE-RS based open loop MIMO Intel Corporation Not treated
R1‑112221 On CSI-RS configuration/reconfiguration Intel Corporation Not treated
R1‑112222 Futher analysis on Macro-Pico scenario Intel Corporation Noted
R1‑112223 CoMP performance analysis in Scenarios 3 and 4 for full buffer traffic model Intel Corporation Revised
R1‑112224 CoMP performance analysis in Scenarios 3 and 4 for non full buffer traffic model Intel Corporation Not treated
R1‑112225 Analysis of PDCCH capacity for Scenario 3 and 4 Intel Corporation Not treated
R1‑112226 Analysis of CRS and PDSCH collisions in Scenarios 3 and 4 Intel Corporation Not treated
R1‑112227 Standardization impact for CoMP Intel Corporation Not treated
R1‑112228 Uplink Power Control Discussion for CoMP Scenario 4 Intel Corporation Not treated
R1‑112229 Interference environment and DL-UL traffic asymmetry in LTE-TDD systems Intel Corporation Not treated
R1‑112230 Deployment scenarios and evaluation assumptions for LTE-TDD SI Intel Corporation Not treated
R1‑112231 Discussion on LTE-TDD traffic asymmetry modeling Intel Corporation Not treated
R1‑112232 Discussion of UCI only transmission on PUSCH Intel Corporation Not treated
R1‑112233 Discussion on uplink DM-RS enhancements for Release 11 Intel Corporation Not treated
R1‑112234 Discussion on Timing Advance calculation using time difference measurement InterDigital Communications, LLC Noted
R1‑112235 Additional carrier types for R11 CA Enhancements InterDigital Communications, LLC Not treated
R1‑112236 Scenarios for FeICIC techniques InterDigital Communications, LLC Not treated
R1‑112237 Evaluation of FeICIC in R11 InterDigital Communications, LLC Not treated
R1‑112238 CoMP Phase 2 performance results InterDigital Communications, LLC Not treated
R1‑112239 Study on Enhanced MIMO for Geographically-Separated Antennas InterDigital Communications, LLC Not treated
R1‑112240 CSI Feedback for Non-Uniform Networks InterDigital Communications, LLC Not treated
R1‑112241 DL Control Signaling Enhancements InterDigital Communications, LLC Not treated
R1‑112242 Discussion on MIMO Enhancements for Backhaul Relays InterDigital Communications, LLC Not treated
R1‑112243 Study of Open-Loop MIMO using UE-specific RS InterDigital Communications, LLC Not treated
R1‑112244 Multiple Timing Advance related issues ZTE Revised
R1‑112245 Further CA enhancement on PDCCH ZTE Noted
R1‑112246 Consideration on uplink control channel enhancement ZTE Not treated
R1‑112247 On support of inter-band CA with different TDD UL-DL configurations ZTE Not treated
R1‑112248 Introduction of additional carrier types ZTE Not treated
R1‑112249 Considerations on the enhancement for UL RS ZTE Not treated
R1‑112250 Consideration on power control of UL MIMO ZTE Revised
R1‑112251 Uplink channel-independent MIMO schemes ZTE Not treated
R1‑112252 Draft CR 36.213 on PHICH-triggered retransmission and UE transmit antenna selection ZTE Noted - Revised
R1‑112253 36.213 CR0325 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK ZTE Revised
R1‑112254 36.213 CR0326 (Rel-10, F) on Corrections in Physical Uplink Control Channel Procedure ZTE Revised
R1‑112255 36.212 CR0120 (Rel-10, F) on correction of channel coding of control information and format 3/3a effective cell ZTE Noted - Revised
R1‑112256 Considerations on the enhancement for Partial Reciprocity in TDD ZTE Not treated
R1‑112257 CoMP Phase 2 CS/CB Evaluation Results ZTE Noted
R1‑112258 CoMP Phase 2 JP Evaluation Results ZTE Noted
R1‑112259 Consideration on specification impact of CoMP^^ ZTE Not treated
R1‑112260 Performance Evaluation of CS/CB and JP with non-zero X2 latency ZTE Noted
R1‑112261 Evaluation on impact of synchronization error between CoMP transmission points^^ ZTE Not treated
R1‑112262 Consideration on SRS enhancement for CoMP^^ ZTE Not treated
R1‑112263 Evaluation on necessity of DMRS enhancement under HetNet CoMP scenarios^^ ZTE Not treated
R1‑112264 Considerations on the enhancement for Partial Reciprocity in TDD ZTE Withdrawn
R1‑112265 Discussion on rank adaptation and CSI feedback granularity in real-life DL MIMO deployments ZTE Noted
R1‑112266 Feedback Enhancements for geographically-separated antennas ZTE Not treated
R1‑112267 DL MIMO Enhancements for Single-Cell with RRHs ZTE Not treated
R1‑112268 Discussion on codebook enhancement under 4Tx widely spaced XPOL Antenna ZTE Not treated
R1‑112269 Discussion on Power unbalance in Single-Cell with RRHs ZTE Withdrawn
R1‑112270 Aspects on DL control signaling enhancements ZTE Noted
R1‑112271 36.212 DraftCR (Rel-10, F) Clarification and correction to configuration signalling condition for channel quality information formats ZTE Noted - Revised
R1‑112272 36.213 CR0327 (Rel-10, F) Clarification and correction to CRS overhead assumption to derive CQI index ZTE Noted
R1‑112273 36.213 CR0328 (Rel-10, F) Correction to PDSCH transmission assumption for CQI calculation ZTE Noted - Revised
R1‑112274 36.213 DraftCR (Rel-10, F) Correction to the condition of enabling PMI feedback ZTE Noted - Revised
R1‑112275 Draft CR 212 _ Reordering UCI fields for joint report of RI and PTI ZTE, Samsung Noted
R1‑112276 36.213 CR0330 (Rel-10, F) Correction to UE procedure for reporting Channel State Information (CSI) ZTE Withdrawn
R1‑112277 36.211CR0161 (Rel-10, F) Correction on UE-Specific resource mapping formula ZTE Revised
R1‑112278 Usage of S-DPCCH remaining two bits for UL CLTD ZTE Not treated
R1‑112279 Further design considerations for UL MIMO ZTE Noted
R1‑112280 Views on support of different TDD configuration in Rel-11 Pantech Not treated
R1‑112281 Views on additional carrier types for CA in Rel-11 Pantech Not treated
R1‑112282 Discussions on different network configurations in eICIC Pantech Not treated
R1‑112283 Aperiodic CSI feedback trigging for joint transmission CoMP Pantech Not treated
R1‑112284 E-PDCCH resource management Pantech Not treated
R1‑112285 On PDCCH bundling Pantech Noted
R1‑112286 Enhance MIMO operation for low power node RRH Pantech Not treated
R1‑112287 Discussion on demodulation RS for DL MIMO enhancements in Rel-11 Pantech Not treated
R1‑112288 The SRS frequency hopping with multi-shot in Rel-11 Pantech Not treated
R1‑112289 The aperiodic sounding using non-precoded DMRS Pantech Not treated
R1‑112290 Considerations on UL DM-RS enhancements for Rel-11 Pantech Not treated
R1‑112291 Uplink configuration for a single cell with RRH Pantech Not treated
R1‑112292 On Downlink control signalling enhancements Ericsson, ST-Ericsson Not treated
R1‑112293 Transmit diversity schemes for PUCCH Format 3 Mitsubishi Electric Revised
R1‑112294 Evaluation Results for UL-CoMP Sharp Noted
R1‑112295 Standardization Impact of UL-CoMP Sharp Noted
R1‑112296 DL control channel enhancement for DL MIMO in Rel.11 Sharp Not treated
R1‑112297 UL RS Proposed Enhancements in Rel-11 Sharp Not treated
R1‑112298 TPC Issues on New Deployment Scenario Sharp Revised
R1‑112299 UL MIMO Proposed Enhancements in Rel-11 Sharp Not treated
R1‑112300 Fast uplink-downlink re-configuration with traffic adaptation by PHY layer signaling Sharp Revised
R1‑112301 Discussion on TDOA based TA calculation scheme Renesas Mobile Europe Ltd Noted
R1‑112302 Discussion on the remaining issues of UL CL Tx diversity Renesas Mobile Europe Ltd Noted
R1‑112303 System Performance Evaluation of SF-DC Inter-NodeB aggregation with Type 3 and Type 3i receivers in Pedestrian A channel Renesas Mobile Europe Ltd Noted
R1‑112304 System Performance Evaluation of SF-DC Inter-NodeB aggregation with Type 3 and Type 3i receivers in Vehicular A channel Renesas Mobile Europe Ltd Noted
R1‑112305 Transmit Diversity for PUCCH Format 3 and 1b with channel selection Renesas Mobile Europe Ltd Noted
R1‑112306 Operation Principles of CC specific TDD Configuration Renesas Mobile Europe Ltd Noted
R1‑112307 Initial Discussions on New Carrier Types for LTE Rel-11 Renesas Mobile Europe Ltd Not treated
R1‑112308 Discussion on Rel’11 eICIC scenarios Renesas Mobile Europe Ltd Revised
R1‑112309 Simulation results of CoMP in HetNet scenarios Renesas Mobile Europe Ltd Withdrawn
R1‑112310 On CoMP standardization impacts Renesas Mobile Europe Ltd Not treated
R1‑112311 Interference aware receiver modeling at system level Renesas Mobile Europe Ltd Not treated
R1‑112312 System level results on UE MMSE receiver modeling Renesas Mobile Europe Ltd Not treated
R1‑112313 On the real life DL MIMO issues Renesas Mobile Europe Ltd Not treated
R1‑112314 CSI feedback enhancements Renesas Mobile Europe Ltd Not treated
R1‑112315 On control signaling enhancements Renesas Mobile Europe Ltd Not treated
R1‑112316 System-level evaluation of PDCCH capacity impact on MU-MIMO performance Renesas Mobile Europe Ltd Noted
R1‑112317 Link-level evaluation of E-PDCCH design aspects Renesas Mobile Europe Ltd Not treated
R1‑112318 Need of standardized open-loop MIMO based on UE-specific RS Renesas Mobile Europe Ltd Not treated
R1‑112319 UCI-only PUSCH transmission enhancements Renesas Mobile Europe Ltd Revised
R1‑112320 Uplink enhancements for new deployments scenarios Renesas Mobile Europe Ltd Noted
R1‑112321 Discussion on simulation assumptions for TDD DL-UL interference management and traffic adaptation Renesas Mobile Europe Ltd Not treated
R1‑112322 Views on the use cases and scenarios for TDD DL-UL interference management Renesas Mobile Europe Ltd Not treated
R1‑112323 Draft LS response on timing advance calculation using time difference measurement LG Electronics Noted
R1‑112324 Draft CR for correction on nHARQ equation for TDD with PUCCH format 3 LG Electronics Noted - Revised
R1‑112325 Draft CR for clarification on UL DAI value for multiple UL grants in TDD LG Electronics Noted
R1‑112326 Draft CR for search space sharing in case of same DCI size LG Electronics Not treated
R1‑112327 Draft CR for a description of the HARQ-ACK feedback bits LG Electronics Noted
R1‑112328 TDD UL ACK/NACK mode 1 enhancements LG Electronics Not treated
R1‑112329 Simultaneous CSI+ACK/NACK transmission on PUCCH format 3 LG Electronics Not treated
R1‑112330 Discussion on multiple TA for carrier aggregation LG Electronics Not treated
R1‑112331 Performance Evaluation in Heterogeneous Networks LG Electronics Noted
R1‑112332 Handling the legacy transmission in ABS LG Electronics Not treated
R1‑112333 Enhancement to Time-domain Resource Partitioning LG Electronics Not treated
R1‑112334 Full-buffer Simulation results for scenario 3 & 4 LG Electronics Noted
R1‑112335 Non Full-buffer Simulation results for scenario 3 & 4 LG Electronics Noted
R1‑112336 Consideration points on E-PDCCH design LG Electronics Not treated
R1‑112337 Consideration of CSI Feedback Structure for CoMP LG Electronics Not treated
R1‑112338 Considerations on the Specification Impact of CoMP LG Electronics Not treated
R1‑112339 CoMP Performance Evaluation under Low-capacity/High-latency Backhaul LG Electronics Noted
R1‑112340 Consideration of X2 Backhaul for CoMP LG Electronics Not treated
R1‑112341 Simulation Assumptions for Further Enhancements to LTE TDD LG Electronics Not treated
R1‑112342 Simulation Results for Phase-2 CoMP Evaluation MediaTek Noted
R1‑112343 Further Discussions of Standardization Impacts on CoMP MediaTek Not treated
R1‑112344 Discussion on The Necessity of Additional Carrier Types MediaTek Not treated
R1‑112345 Discussion on Signaling Methods for UE-Specific PDCCH MediaTek Not treated
R1‑112346 Discussion on CSI-RS Reconfiguration for CoMP Scenario 4 MediaTek Not treated
R1‑112347 Definition of SRS measurements for Network-Based Positioning MediaTek Noted
R1‑112348 Identification of scenarios for Rel-11 Non-CA-based e2ICIC MediaTek Not treated
R1‑112349 HARQ Feedback Mechanism in CA with Different TDD Configurations MediaTek Not treated
R1‑112350 Comparison of Uplink Time Alignment Synchronization methods for SCell TA groups Panasonic Not treated
R1‑112351 36.212 CR0122 (Rel-10, F) on size alignment of DCI format 0, 1A and 1 Panasonic Noted - Revised
R1‑112352 Clarification on combination of RS on R-PDCCH and RS on PDSCH Panasonic Noted
R1‑112353 36.213 CR0331 (Rel-10, F) Correction to uplink transmission scheme usage for random access response and PHICH-triggered retransmissions Panasonic Noted - Revised
R1‑112354 Clarification of one shot SRS Panasonic Noted
R1‑112355 Range for virtual PHR Panasonic Noted
R1‑112356 draft CR 36.213: Clarification on Search space description for SPS C-RNTI Panasonic Noted - Revised
R1‑112357 Carrier aggregation enhancement for Rel.11 Panasonic Not treated
R1‑112358 Issues on TDD different DL/UL configurations on different bands for Rel-11 Panasonic Not treated
R1‑112359 Standardization Impact of CoMP Panasonic Not treated
R1‑112360 Operation of Traffic Offloading in RRH-based Heterogeneous Network and Possible Spec Impact Panasonic Not treated
R1‑112361 Comparison between CoMP Scenario 3 and 4 Panasonic Not treated
R1‑112362 Flexible CoMP Operation based on Dedicated CSI-RS Configuration Panasonic Not treated
R1‑112363 Views on issues from real-life DL MIMO deployments Panasonic Not treated
R1‑112364 DL MIMO CSI Feedback Enhancements in Rel-11 Panasonic Not treated
R1‑112365 Considerations on PDCCH Enhancements for Release 11 Panasonic Not treated
R1‑112366 Initial system level performance comparison of Enhanced-PDCCH and PDCCH Panasonic Noted
R1‑112367 Uplink enhancement for Rel.11 Panasonic Noted
R1‑112368 PCFICH Detection in an eICIC Enabled Heterogeneous Network Research In Motion UK Limited Not treated
R1‑112369 PSS/SSS Detection in Heterogeneous Networks Research In Motion UK Limited Not treated
R1‑112370 Transmit Diversity for Channel Selection Research In Motion UK Limited Noted
R1‑112371 Discussion on Downlink MIMO CSI Enhancement in CoMP Research In Motion UK Limited Not treated
R1‑112372 PRACH Enhancement and UL Power Control for CoMP Scenario 4 Research In Motion UK Limited Noted
R1‑112373 Design Consideration for E-PDCCH Research In Motion UK Limited Not treated
R1‑112374 Phase 2 Evaluation Results for CoMP Research In Motion UK Limited Noted
R1‑112375 Traffic Scenario for dynamic UL/DL TDD configuration Research In Motion UK Limited Not treated
R1‑112376 PDCCH Enhancement in Rel-11 Carrier Aggregation Research In Motion UK Limited Noted
R1‑112377 36.213 CR0332 (Rel-10, Cat F) Clarification on mapping table in PUCCH format 1b with channel selection Research In Motion UK Limited, Panasonic Noted
R1‑112378 On PUCCH transmit diversity for Format 3 and Format 1b with Channel Selection Nokia Siemens Networks, Nokia Noted
R1‑112379 Views on inter-band CA with different TDD configurations on different bands Nokia Siemens Networks, Nokia Not treated
R1‑112380 Rel’11 considerations on common control channel performance in connection to TDM eICIC Nokia Siemens Networks, Nokia Not treated
R1‑112381 Uplink co-channel HetNet performance and PC optimization Nokia Siemens Networks, Nokia Not treated
R1‑112382 On TDM eICIC Performance with Different Receiver Models Nokia Siemens Networks, Nokia Not treated
R1‑112383 Potential for uplink capacity enhancement when applying TDM eICIC Nokia Siemens Networks, Nokia Not treated
R1‑112384 DL CoMP phase2 simulation results Nokia Siemens Networks, Nokia Not treated
R1‑112385 UL CoMP phase 2 simulation results Nokia Siemens Networks, Nokia Withdrawn
R1‑112386 Uplink Power Control with UL CoMP Nokia Siemens Networks, Nokia Not treated
R1‑112387 On the PUCCH Modifications for UL CoMP Nokia Siemens Networks, Nokia Noted
R1‑112388 Inter-cell orthogonal reference signal impact on UL CoMP performance Nokia Siemens Networks, Nokia Not treated
R1‑112389 Standardization impact of CoMP Nokia Siemens Networks, Nokia Not treated
R1‑112390 Cell aggregation: A unified approach to CoMP and carrier aggregation Nokia Siemens Networks, Nokia Revised
R1‑112391 CoMP performance in non-ideal backhaul Nokia Siemens Networks, Nokia Noted
R1‑112392 CoMP and the X2 interface Nokia Siemens Networks, Nokia Not treated
R1‑112393 Channel Estimation Modeling for Uplink in System Level Simulation Nokia Siemens Networks, Nokia Not treated
R1‑112394 On cell-edge enhancements via inter-cell orthogonal DM RS Nokia Siemens Networks, Nokia Not treated
R1‑112395 Need for Enhanced SR Multiplexing Capacity and Coverage Nokia Siemens Networks, Nokia Not treated
R1‑112396 On CSI Transmission Enhancements Nokia Siemens Networks, Nokia Not treated
R1‑112397 On uplink channel-independent MIMO schemes Nokia Siemens Networks, Nokia Not treated
R1‑112398 [Draft] LS reply on timing advance calculation using time difference measurement Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑112399 Closed Loop UL Transmit Diversity operation under CPC Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112400 HS-SCCH orders for UL TxD (de-)activation Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112401 Discussion on spare information bits in the S-DPCCH Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑112402 Standalone HS-DPCCH in Enhanced CELL_FACH Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112403 Further evaluations of HSDPA multipoint transmission Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112404 CR36.212 UE-specific search space Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted - Revised
R1‑112405 Proposal for trade-off analysis method for CA enhancements Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Qualcomm Incorporated Noted
R1‑112406 New DCI Formats with Differential Information Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Revised
R1‑112407 Transmit Diversity for PUCCH Format 1b with Channel Selection Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112408 CC-specific TDD configuration for enhanced CA in Re11 Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112409 Discussions on Additional Carrier Types in LTE Rel 11 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑112410 CA-based Het Net operation Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑112411 Scenarios for UE performance requirements Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112412 UL Reference Signal Time Difference Measurement Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Revised
R1‑112413 CoMP Phase 2 evaluations for Scenario 3 (DL: FDD and TDD) Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Revised
R1‑112414 CoMP Phase 2 evaluations for Scenario 3 (UL) Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑112415 Uplink Power Control Considerations for CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑112416 Overview of DL MIMO enhancements Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112417 Analysis of geographically-separated antenna systems Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑112418 Antenna calibration for TDD HTN CoMP Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112419 Evaluation assumptions for scenarios / antenna configurations to be evaluated for CSI feedback enhancement Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑112420 Considerations on CSI feedback enhancements for high-priority antenna configurations Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112421 PDCCH Enhancement in Rel-11 Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Not treated
R1‑112422 On UL beamforming Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112423 Individual Setting of UL Open-loop Power Control for Heterogeneous Networks with Shared Cell-ID Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Noted
R1‑112424 Simulation assumption of dynamicl TDD UL-DL configuration Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112425 Dynamic UL-DL allocation for TDD HTN networks Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112426 Standardization Support for UL CoMP Ericsson, ST-Ericsson Noted
R1‑112427 Views on carrier aggregation enhancement for Rel-11 NTT DOCOMO Noted
R1‑112428 On need of additional carrier type in Rel-11 CA NTT DOCOMO Not treated
R1‑112429 Investigation on performance improvement by CRE NTT DOCOMO Noted
R1‑112430 System performance of JP-CoMP in Scenario 3 NTT DOCOMO Revised
R1‑112431 System performance of CS/CB-CoMP in Scenario 3 NTT DOCOMO Revised
R1‑112432 Views on UL power control for HetNet scenario NTT DOCOMO Noted
R1‑112433 Scenarios and potential CSI feedback enhancements for DL MIMO in Rel-11 NTT DOCOMO Noted
R1‑112434 Capacity enhancement of DL MU-MIMO with increased feedback bits for small cells scenario NTT DOCOMO Not treated
R1‑112435 Enhanced operation for geographically distributed antennas in Rel-11 NTT DOCOMO Not treated
R1‑112436 Enhanced PDCCH for DL MIMO in Rel-11 NTT DOCOMO Not treated
R1‑112437 Operators scenarios for DL MIMO enhancements Orange, AT&T, CMCC, Deutsche Telekom, KDDI, NTT DOCOMO, Telecom Italia, Telefónica, Vodafone Noted
R1‑112438 Additional carrier types for LTE Rel-11 Motorola Mobility Not treated
R1‑112439 DL Performance results for eICIC Motorola Mobility Not treated
R1‑112440 Phase-2 Evaluations of Joint Transmission (JT) and Dynamic Cell Selection (DCS) Schemes Motorola Mobility Not treated
R1‑112441 Coordinated Scheduling (CS) Schemes with Low Power RRH: Details and Phase-2 Evaluations Results Motorola Mobility Noted
R1‑112442 Standardization Impact of CoMP with Coordinated Scheduling (CS) Schemes Motorola Mobility Not treated
R1‑112443 Views on Real-life DL-MIMO Deployment Issues and Prioritization Motorola Mobility Not treated
R1‑112444 Scenario and Modeling Discussion for DL-MIMO Enhancement Motorola Mobility Noted
R1‑112445 CSI Feedback Enhancement for Rel-11 Motorola Mobility Not treated
R1‑112446 Enhanced control channels for LTE Rel-11 Motorola Mobility Not treated
R1‑112447 Issues in Practical Multi-antenna Uplink Transmission - Relative Phase Continuity Motorola Mobility Not treated
R1‑112448 Clarification for the chanel coding of channel quality information ITRI Withdrawn
R1‑112449 Clarification for the definition of rank indicator ITRI Noted - Revised
R1‑112450 Correction of HARQ-ACK and_or RI multiplexed with UL-SCH ITRI Withdrawn
R1‑112451 Support cell-specific TDD UL-DL configuration for inter-band CA ITRI Noted
R1‑112452 Discussion on CA-based Heterogeneous Networks ITRI Not treated
R1‑112453 Clarification of CoMP Joint Transmission Operation ITRI Not treated
R1‑112454 Preliminary Study on Codebook Design for JT-CoMP in Scenario 4 ITRI Not treated
R1‑112455 Opportunistic Coordinated Multi-Point Reception for Multi-Codeword Uplink Transmission I2R Not treated
R1‑112456 Clustering Methods for Base Station Cooperation in LTE-A I2R Not treated
R1‑112457 36.213 CR0333 (Rel-10, D) Editorial Corrections to 36.213 I2R, NTT DoCoMo Agreed in principle
R1‑112458 Draft 36.213 CR Corrections on reporting Channel State Information Huawei, HiSilicon Noted - Revised
R1‑112459 Draft 36.213 CR on HARQ-ACK feedback procedures Huawei, HiSilicon Noted - Revised
R1‑112460 Trade-off analysis of CA enhancements for Rel-11 Huawei, Hisilicon Noted
R1‑112461 PDCCH enhancement in Rel-11 carrier aggregation Huawei, HiSilicon Noted
R1‑112462 TxD scheme enhancement for PUCCH format 3 Huawei, HiSilicon Noted
R1‑112463 Additional carrier types – motivations and issues Huawei, HiSilicon Not treated
R1‑112464 Interference scenario analysis in further eICIC Huawei, Hisilicon Noted
R1‑112465 Small cell scenarios and assumptions for enhanced DL MIMO Huawei, Hisilicon Noted
R1‑112466 MIMO enhancements for downlink relay backhaul Huawei, HiSilicon Not treated
R1‑112467 Investigation on PUCCH enhancements in Rel.11 Huawei, HiSilicon Not treated
R1‑112468 Spatial multiplexing for 8Tx Uplink relay backhaul Huawei, HiSilicon Not treated
R1‑112469 Discussion on Evaluation of TDD DL-UL re-configuration dependent on traffic adaptation Huawei, Hisilicon Not treated
R1‑112470 Draft CR 36.212 correction on ACK/NACK mapping LG Electronics Agreed in principle
R1‑112471 Draft CR 36.213 correction on TBS translation table LG Electronics Noted - Revised
R1‑112472 Transmit Diversity for PUCCH Format 1b with Channel Selection in Rel-11 LG Electronics Noted
R1‑112473 Transmit Diversity for PUCCH Format 3 in Rel-11 LG Electronics Noted
R1‑112474 Consideration on Different TDD UL/DL Configurations for Inter-band CA LG Electronics Not treated
R1‑112475 Consideration on Additional Carrier Type LG Electronics Not treated
R1‑112476 Consideration on Issue Prioritization for Real-life DL MIMO Deployment LG Electronics Not treated
R1‑112477 Consideration on Rel-11 MIMO feedback enhancement LG Electronics Not treated
R1‑112478 Consideration on CSI feedback for geographically separated antennas LG Electronics Not treated
R1‑112479 Discussion on downlink control signaling enhancement LG Electronics Not treated
R1‑112480 Discussion on UL RS Enhancements for Rel-11 LG Electronics Not treated
R1‑112481 Consideration on UL DM RS for High-speed UEs in LTE-A LG Electronics Not treated
R1‑112482 Discussion on UCI transmission enhancement LG Electronics Not treated
R1‑112483 Enhancements to uplink power control in Rel-11 LG Electronics Noted
R1‑112484 Discussion on UL MIMO improvements in practical multi-antenna UE implementation LG Electronics Withdrawn
R1‑112485 Discussion on the potential benefit of X2 interface for downlink CoMP SOFTBANK MOBILE Not treated
R1‑112486 TPC Issues on New Deployment Scenario Sharp Noted
R1‑112487 Fast uplink-downlink re-configuration with traffic adaptation by PHY layer signaling Sharp Not treated
R1‑112488 Discussion on timing advance calculation using time difference measurement Samsung Not treated
R1‑112489 Draft 36.213 CR on HARQ-ACK Multiplexing in PUSCH for UL CA in TDD Samsung Noted
R1‑112490 Discussion on TTI bundling in TDD Samsung, CATT Noted
R1‑112491 36.211 CR0162 (Rel-10, F) Corrections on DMRS for Extended CP Samsung, Renesas Mobile Europe, Panasonic, LG Electronics, TI, Qualcomm, Research in Motion, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Huawei, HiSilicon, Motorola Mobility Agreed
R1‑112492 36.213 CR0334 (Rel-10, F) Corrections on PUCCH mode 1-1 Samsung Noted - Revised
R1‑112493 36.213 CR0335 (Rel-10, F) Corrections on PUCCH mode 2-1 Samsung, LG Electronics, ZTE Agreed in principle
R1‑112494 36.213 CR0336 (Rel-10, F) Corrections on transmission mode 9 Samsung Agreed
R1‑112495 Trade-off Considerations for CA Enhancements Samsung Noted
R1‑112496 Multi-Cell Periodic CSI Reporting Samsung Not treated
R1‑112497 HARQ-ACK and CSI Multiplexing in PUCCH for DL CA Samsung Not treated
R1‑112498 Enhancements to HARQ-ACK Multiplexing in PUSCH for DL CA Samsung Not treated
R1‑112499 HARQ-ACK Bundling for PUCCH Format 3 Samsung Not treated
R1‑112500 PUCCH Format 3 Transmit Diversity for Rel-11 Samsung Noted
R1‑112501 Discussion on transmit diversity for PUCCH format 1b with channel selection Samsung Noted
R1‑112502 DL/UL HARQ-ACK transmission in CA with different TDD configurations Samsung Not treated
R1‑112503 Data scheduling in CA with different TDD UL-DL configurations Samsung Not treated
R1‑112504 Additional Carrier Types for Rel.11 Samsung Not treated
R1‑112505 Open issues and scenarios for Rel-11 eICIC Samsung Not treated
R1‑112506 PDSCH performance under various macro-pico scenarios Samsung Noted
R1‑112507 CRS interference cancellation in HetNet scenarios for UE performance requirements Samsung Not treated
R1‑112508 Full buffer evaluation results for CoMP scenario 3 and 4 Samsung Revised
R1‑112509 Non-full buffer evaluation results for CoMP scenario 3 and 4 Samsung Noted
R1‑112510 Discussion on the performance aspects of CoMP and eICIC in heterogeneous networks Samsung Not treated
R1‑112511 Summary of CoMP evaluation results for phase 2 (scenarios 3 and 4) Samsung Withdrawn
R1‑112512 Discussion on the specification impact of CoMP Samsung Not treated
R1‑112513 Summary of email discussion on specification impacts of CoMP Samsung Noted
R1‑112514 Discussion on CSI Feedback for DL MIMO with Geographically Separated Tx Points Samsung Not treated
R1‑112515 Prioritization of CSI feedback enhancement scenarios for DL-MIMO Samsung Noted
R1‑112516 Compact DCI Format for PUSCH Assignments Samsung Noted
R1‑112517 Discussion on ePDCCH design issues Samsung Not treated
R1‑112518 Discussion on CSI Feedback for MU-MIMO Enhancement Samsung Not treated
R1‑112519 Discussion on CSI feedback enhancement for DL MIMO Samsung Not treated
R1‑112520 UL DM RS enhancement in Rel-11 Samsung Not treated
R1‑112521 SRS Enhancements in Rel.11 Samsung Not treated
R1‑112522 Discussion on UCI transmission enhancments in Rel-11 Samsung Not treated
R1‑112523 UL PC for Networks with Geographically Distributed RRHs Samsung Noted
R1‑112524 Traffic model for evaluating benefits of TDD UL-DL reconfiguration Samsung Not treated
R1‑112525 Preliminary evaluation of TDD uplink-downlink reconfiguration performance Samsung Not treated
R1‑112526 SC-FDMA symbol? Panasonic Noted
R1‑112527 Considerations on additional carrier types Nokia / Nokia Siemens Networks Not treated
R1‑112528 Priority Issues from Real-Life DL MIMO Deployments Nokia / Nokia Siemens Networks Noted
R1‑112529 Rel. 11 CSI Feedback Enhancement Studies Nokia / Nokia Siemens Networks noted
R1‑112530 On enhanced downlink control signalling for Rel-11 Nokia / Nokia Siemens Networks Noted
R1‑112531 Considerations on which gain mechanisms to evaluate when considering E-PDCCH Nokia / Nokia Siemens Networks Not treated
R1‑112532 Clarification on the codebook size for PUCCH format 3 based ACK/NAK feedback in TDD Qualcomm Incorporated Noted - Revised
R1‑112533 Clarification of Ambiguous DCI Formats 0 and 1A Qualcomm Incorporated Noted - Revised
R1‑112534 Clarification of reference power for CSI-RS based channel state information feedback Qualcomm Incorporated Noted - Revised
R1‑112535 Clarification of of PUCCH 2-1 operation Qualcomm Incorporated Noted
R1‑112536 CR Clarification of of PUCCH 2-1 operation Qualcomm Incorporated Not treated
R1‑112537 Tradeoff analysis method for CA enhancements Qualcomm Incorporated Noted
R1‑112538 Signalling enhancements for CA Qualcomm Incorporated Noted
R1‑112539 PUCCH transmit diversity for Format 3 and Format 1b with Channel selection Qualcomm Incorporated Noted
R1‑112540 Support of different TDD UL-DL configurations on different bands Qualcomm Incorporated Noted
R1‑112541 Use Cases for Extension Carriers Qualcomm Incorporated Not treated
R1‑112542 Summary of Rel-10 requirements for eICIC and scenarios for Rel-11 requirements Qualcomm Incorporated Not treated
R1‑112543 Scenarios for eICIC evaluations Qualcomm Incorporated Noted
R1‑112544 Phase 2 evaluation results for HetNet CoMP scenarios Qualcomm Incorporated Noted
R1‑112545 Comparison of CoMP Scenarios 3 and 4 Qualcomm Incorporated Not treated
R1‑112546 CoMP standardization impact Qualcomm Incorporated Not treated
R1‑112547 HetNet CoMP performance in Macro/Pico scenarios Qualcomm Incorporated Not treated
R1‑112548 Leveraging the existing X2 interface in HetNet CoMP deployments Qualcomm Incorporated Not treated
R1‑112549 Issues from real-life DL MIMO deployments Qualcomm Incorporated Not treated
R1‑112550 CSI feedback enhancements Qualcomm Incorporated Not treated
R1‑112551 UL RS enhancements Qualcomm Incorporated Not treated
R1‑112552 UCI transmission enhancements Qualcomm Incorporated Not treated
R1‑112553 Open loop UL MIMO Qualcomm Incorporated Not treated
R1‑112554 Power control enhancements for UL MIMO Qualcomm Incorporated Noted
R1‑112555 Codebook design for distributed antennas^^ Marvell Not treated
R1‑112556 Multiuser CQI enhancement for distributed antennas Marvell Not treated
R1‑112557 36.213 CR0337 (Rel-8, C) PDSCH EPRE for transmission mode 7 CATT Noted
R1‑112558 36.213 CR0338 (Rel-10, F) Corrections on aperiodic CSI transmission on PUSCH related to RACH procedure CATT Noted
R1‑112559 36.213 CR0339 (Rel-10, F) Corrections on HARQ-ACK codebook size determination CATT Agreed
R1‑112560 36.213 CR0340 (Rel-10, F) Corrections on TDD PUCCH format 1b with channel selection and HARQ-ACK transmission on PUSCH CATT Agreed
R1‑112561 36.213 CR0341 (Rel-10, F) Corrections on NACK generation CATT Agreed
R1‑112562 36.212 CR0123 (Rel-10, F) Corrections on N_{SRS} CATT Noted - Revised
R1‑112563 36.213 CR0342 (Rel-10, F) Corrections on power headroom reporting CATT Agreed
R1‑112564 36.213 CR0343 (Rel-10, F) Corrections on TDD HARQ-ACK modes CATT Noted
R1‑112565 36.213 CR0344 (Rel-10, F) Corrections on FDD HARQ-ACK procedure CATT Agreed in principle
R1‑112566 25.223 CR0064 (Rel-8, F) Clarification of 64QAM for LCR TDD TD Tech Noted - Revised
R1‑112567 25.223 CR0065 (Rel-9, A) Clarification of 64QAM for LCR TDD TD Tech Noted - Revised
R1‑112568 25.223 CR0066 (Rel-10, A) Clarification of 64QAM for LCR TDD TD Tech Noted - Revised
R1‑112569 25.221 CR0217 (Rel-7,F) Modifications for LCR TDD TD Tech Noted
R1‑112570 25.221 CR0218 (Rel-8,A) Modifications for LCR TDD TD Tech Noted
R1‑112571 25.221 CR0219 (Rel-9,A) Modifications for LCR TDD TD Tech Noted
R1‑112572 25.221 CR0220 (Rel-10,A) Modifications for LCR TDD TD Tech Noted - Revised
R1‑112573 25.224 CR0267 (Rel-7,F) Modifications for LCR TDD TD Tech Noted
R1‑112574 25.224 CR0268 (Rel-8,A) Modifications for LCR TDD TD Tech Noted
R1‑112575 25.224 CR0269 (Rel-9,A) Modifications for LCR TDD TD Tech Noted
R1‑112576 25.224 CR0270 (Rel-10,A) Modifications for LCR TDD TD Tech Noted - Revised
R1‑112577 Simulation results for Phase 2 CoMP scenario 3/4 CMCC Not treated
R1‑112578 Extension carrier in Rel-11 Potevio Not treated
R1‑112579 Support of different TDD UL-DL configurations on different bands Potevio Not treated
R1‑112580 Discussion on downlink control channel enhancements Potevio Not treated
R1‑112581 Discussion on UL-RS enhancements Potevio Not treated
R1‑112582 Considerations on RRH subset selection mechanism Potevio Not treated
R1‑112583 The enhancements of transmission schemes for downlink MIMO Potevio Not treated
R1‑112584 Cross-carrier scheduling on different TDD configurations MediaTek Not treated
R1‑112585 On Simulation Methodology for Study of LTE TDD Enhancement ZTE Not treated
R1‑112586 Further Considerations on Scenario3 Hitachi Ltd. Not treated
R1‑112587 System Design Considerations for CoMP and eICIC Hitachi Ltd. Not treated
R1‑112588 Scenarios identification for further enhanced non-CA-based ICIC ZTE Not treated
R1‑112589 Discussion of UL-MIMO Enhancement for LTE Rel-11 ZTE Not treated
R1‑112590 Further Discussion on UL/DL asymmetry for TDD system CMCC Not treated
R1‑112591 Discussion on the common solution for FDD and TDD on improving PCI and system information detection in the presence of dominant interferer CMCC Not treated
R1‑112592 Application scenario for introducing enhanced PDCCH in Rel-11 CMCC Noted
R1‑112593 Special subframe configuration CMCC Not treated
R1‑112594 Collision of Msg3 transmission and UE-specific Aperiodic SRS subframe ASUSTeK Noted
R1‑112595 PUSCH resource mapping for Msg3 in UE-specific aperiodic SRS subframe ASUSTeK Not treated
R1‑112596 Channel interleaving for Msg3 in UE-specific aperiodic SRS subframe ASUSTeK Not treated
R1‑112597 Discussion on different TDD UL-DL configurations on different bands in Carrier Aggregation HTC Not treated
R1‑112598 Discussion on Additional Carrier Types in Carrier Aggregation for Release 11 HTC Not treated
R1‑112599 Possible Enhancements to LTE TDD for DL-UL Interference Management and Traffic Adaptation HTC Not treated
R1‑112600 Investigation of Specification Impact for Rel. 11 CoMP NTT DOCOMO Not treated
R1‑112601 Coordinated beamforming based on interference measurement ITRI Withdrawn
R1‑112602 Further discussions on the channelizaton for HS-DPCCH Ericsson, ST-Ericsson Noted
R1‑112603 Open issues related to 8C-HSDPA Ericsson, ST-Ericsson Noted
R1‑112604 25.211 CR288R1 (Rel-11,B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112605 25.212 CR0296R1 (Rel-11,B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112606 25.213 CR0109R1 (Rel-11,B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112607 25.214 CR0652R1 (Rel-11,B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112608 Activation and deactivation of CLTD Ericsson, ST-Ericsson Noted
R1‑112609 On the quality of PCI feedback for CLTD Ericsson, ST-Ericsson Noted
R1‑112610 Power based deactivation for CLTD Ericsson, ST-Ericsson Noted
R1‑112611 Remaining design consideration for CLTD Ericsson, ST-Ericsson Noted
R1‑112612 25.863 CR0001 (Rel-11,B) Inclusion of CLTD in the ULTD technical report Ericsson, ST-Ericsson Revised
R1‑112613 Performance evaluation of Inter+Intra Node-B Aggregation for SF-DC-HSDPA Ericsson, ST-Ericsson Noted
R1‑112614 Performance evaluation of Intra Node-B Aggregation for SF-DC-HSDPA Ericsson, ST-Ericsson Noted
R1‑112615 Text proposal on the cubic metric impact from pre-coding for rank-2 transmissions Ericsson, ST-Ericsson Noted
R1‑112616 Further downlink enhancements to CELL_FACH Ericsson, ST-Ericsson Noted
R1‑112617 Further uplink enhancements to CELL_FACH Ericsson, ST-Ericsson Noted
R1‑112618 On the benefit of introducing UL 64 QAM for HSUPA Ericsson Not treated
R1‑112619 Frequency band-specific compressed mode Nokia Siemens Networks, Nokia Noted
R1‑112620 F-PCICH design Nokia Siemens Networks, Nokia Noted
R1‑112621 UL CLTD UE Behaviour Nokia Siemens Networks, Nokia Noted
R1‑112622 UL CLTD Operation in the Presence of CPC Nokia Siemens Networks, Nokia Noted
R1‑112623 UL CLTD compatibility with E-DCH in Cell_FACH Nokia Siemens Networks, Nokia Noted
R1‑112624 Draft 25.211 CR on Introduction of F-PCICH channel Nokia Siemens Networks, Nokia Noted
R1‑112625 HS-DPCCH for 8C-HSDPA Nokia Siemens Networks, Nokia Withdrawn
R1‑112626 Node B controlled HS-DPCCH setup for HS-FACH Nokia Siemens Networks, Nokia Noted
R1‑112627 Multiflow impact on legacy UEs Nokia Siemens Networks, Nokia Noted
R1‑112628 Multiflow RRH system results for balanced load Nokia Siemens Networks, Nokia Noted
R1‑112629 Multiflow RRH system results for unbalanced load Nokia Siemens Networks, Nokia Revised
R1‑112630 TP to 25.872 on SI conclusions Nokia Siemens Networks, Nokia Noted
R1‑112631 TP to 25.871 on pysical layer structures Nokia Siemens Networks, Nokia Noted
R1‑112632 TP to 25.871 link level performance of UL MIMO Nokia Siemens Networks, Nokia Noted
R1‑112633 TP to 25.871 system level performance of UL MIMO Nokia Siemens Networks, Nokia Withdrawn
R1‑112634 UL MIMO SHO operation Nokia Siemens Networks, Nokia Withdrawn
R1‑112635 TP to 25.871 on specification impacts Nokia Siemens Networks, Nokia Revised
R1‑112636 TR25.872 v1.0.1 Rapporteur (Nokia Siemens Networks) Noted - Revised
R1‑112637 Performance Evaluation Results for Phase 2 CoMP under Full-Buffer Traffic CHTTL Not treated
R1‑112638 CA Enhancement on Signalling HTC Noted
R1‑112639 Considerations for CoMP Operation HTC Not treated
R1‑112640 Real Life Issues for DL-MIMO HTC Not treated
R1‑112641 Enhanced PMI Indication for Refining MIMO Precoder Codebook^^ HTC Not treated
R1‑112642 Adaptive cell clustering scheme for CoMP in baseband pool deployment China Unicom Not treated
R1‑112643 Consideration on codebook enhancement for Rel-11 DL MIMO China Unicom Not treated
R1‑112644 DL MIMO Enhanment requirement for Different Scenarios China Unicom Not treated
R1‑112645 Performance evaluation for JP CoMP of scenario 3 China Unicom Not treated
R1‑112646 Enhancement of the cell-edge performance in the future evolution ChinaUnicom Not treated
R1‑112647 Discussions on CSI feedback enhancment for non-uniform networks with low-power nodes ChinaUnicom Not treated
R1‑112648 On scenarios for further time domain ICIC evaluations Ericsson, ST-Ericsson Noted
R1‑112649 Capacity enhancement for CQI-only transmission ^^ New Postcom^^ Not treated
R1‑112650 Frequency hopping and multi-shot A-SRS for A-SRS enhancements ^^ New Postcom^^ Not treated
R1‑112651 Non-precoded DMRS bearing A-SRS for capacity enhancement for A-SRS ^^ New Postcom^^ Not treated
R1‑112652 Support for openloop spatial multiplexing in R11 ^^ New Postcom^^ Not treated
R1‑112653 Consideration on how to get Femto ABS pattern New Postcom^^ Not treated
R1‑112654 Common Search Space for RACH on Scell New Postcom^^ Not treated
R1‑112655 Enhancements to MU-MIMO for LTE-A New Postcom^^ Not treated
R1‑112656 Inter-band CA with different UL-DL configuration in TDD New Postcom^^ Not treated
R1‑112657 DL MIMO without PMI Fujitsu Not treated
R1‑112658 Possibilities of using global precoding scheme in^^enhanced DL MIMO for geographically separated antennas Fujitsu Not treated
R1‑112659 Standard impact of antenna virtualization schemes in DL CoMP JP Fujitsu Not treated
R1‑112660 Phase 2 performance evaluation of JT CoMP Fujitsu Noted
R1‑112661 CS/CB performance evaluation for CoMP Scenario 3/4 Fujitsu Not treated
R1‑112662 Enhanced MU-MIMO for system with geographically-separated antenna deployments Fujitsu Not treated
R1‑112663 Control Signaling Enhancements for DL-MIMO Fujitsu Not treated
R1‑112664 Consideration on CSI Feedback for DL CoMP Fujitsu Not treated
R1‑112665 Considerations on Uplink Power Control for Scenario4 Fujitsu Withdrawn
R1‑112666 Consideration on SRS enhancement for DL CoMP Fujitsu Not treated
R1‑112667 DL-MIMO performance with time alignment error Fujitsu Not treated
R1‑112668 Non backward component carrier Fujitsu Not treated
R1‑112669 On support of low-cost MTC terminals with reduced Tx/Rx bandwidths Fujitsu Not treated
R1‑112670 Clarification of applicability of precoding power scaling factors for PDSCH Agilent Technologies, Motorola Noted - Revised
R1‑112671 On the use of Sync A procedure during transition from CELL_FACH to CELL_DCH Qualcomm Incorporated Revised
R1‑112672 25.214 CR0654 (Rel-8, F) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH Qualcomm Incorporated Noted - Revised
R1‑112673 Impact of PCI Update Rate on CLTD Performance in CPC Qualcomm Incorporated Noted
R1‑112674 Sensitivity to PCI Feedback Delay for UL CLTD Qualcomm Incorporated Noted
R1‑112675 Dynamic control of UL CLTD via HS-SCCH orders Qualcomm Incorporated Not treated
R1‑112676 On the reliability of sending control information on S-DPCCH in UL CLTD Qualcomm Incorporated Noted
R1‑112677 Impact to RAN1 Specifications due to UL CLTD Qualcomm Incorporated Noted
R1‑112678 Further analysis on Enhanced Symmetric Beamforming Qualcomm Incorporated Noted
R1‑112679 On the merits of Standalone HS-DPCCH in CELL_FACH Qualcomm Incorporated Noted
R1‑112680 Physical channels and procedures to support standalone HS-DPCCH in CELL_FACH Qualcomm Incorporated Revised
R1‑112681 On the limitation of H-RNTIs in CELL_FACH Qualcomm Incorporated Noted
R1‑112682 Comparison of link efficiency of transmission of small packets between R99 and EUL in CELL_FACH Qualcomm Incorporated Noted
R1‑112683 On the benefits of signaling based Interference control in CELL_FACH Qualcomm Incorporated Noted
R1‑112684 System Performance Evaluation of DF-DC Inter NodeB aggregation in uniform loading scenario- 100% penetration Qualcomm Incorporated Noted
R1‑112685 System Performance Evaluation of SF-DC Inter NodeB aggregation assuming realistic RLC and flow control in a uniform loading scenario Qualcomm Incorporated Noted
R1‑112686 TCP Performance Evaluation of SF-DC Inter NodeB aggregation assuming realistic RLC, flow control and congestion control Qualcomm Incorporated Noted
R1‑112687 TP to 27.871 on Updated System Performance Evaluations for MP-Tx Qualcomm Incorporated Noted
R1‑112688 TP on Impact to RAN specifications due to HSDPA MP-Tx Qualcomm Incorporated Noted
R1‑112689 TP on Conclusions of HSDPA MP-Tx feature Qualcomm Incorporated Noted
R1‑112690 TP on 25.871 on Chapter 5 "Physical Layer Structure Alternatives due to UL MIMO in HSPA" Qualcomm Incorporated Noted
R1‑112691 TP to 25.871 on Chapter 10 " Impact to UE and UTRAN implementation due to UL MIMO in HSPA" Qualcomm Incorporated Noted
R1‑112692 TP to 25.871 on "Conclusions on UL MIMO in HSPA" Qualcomm Incorporated Noted
R1‑112693 36.212 CR0124 (Rel-10, F) Corrections on DCI format 1B/1D CATT Noted - Revised
R1‑112694 Multiple timing advance commands Qualcomm Incorporated Not treated
R1‑112695 Multiple TA for CA with RRH and repeater Pantech Not treated
R1‑112696 CoMP Phase 2 evaluations for Scenario 3 (DL: TDD) Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112697 Performance evaluation of CS/CB for CoMP Scenario3 Sony Corporation Not treated
R1‑112698 Performance evaluation of JP for CoMP Scenario3 Sony Corporation Not treated
R1‑112699 PRACH antenna port Panasonic Noted - Revised
R1‑112700 UCI-only PUSCH transmission enhancements Renesas Mobile Europe Ltd Not treated
R1‑112701 Transmit diversity schemes for PUCCH Format 3 Mitsubishi Electric Noted
R1‑112702 TP to 25.871 on specification impacts Nokia Siemens Networks, Nokia Noted
R1‑112703 36.211CR0161R1 (Rel-10, F) Correction on UE-Specific resource mapping formula ZTE Noted
R1‑112704 36.213 CR0329 (Rel-10, F) Correction on type3 feedback of Mode 2-1 for TM9 with 8 CSI-RS ports China Telecom, ZTE, Huawei, Ericsson, ST-Ericsson Agreed in principle
R1‑112705 Carriers remapping on HS-DPCCH after activation/deactivation for 8C-HSDPA Huawei, HiSilicon Noted
R1‑112706 Soft buffer handling in TS36.213 and TS36.321 NTT DOCOMO Noted
R1‑112707 Multiple Timing Advance related issues ZTE Noted
R1‑112708 Consideration on power control of UL MIMO ZTE Noted
R1‑112709 Full buffer evaluation results for CoMP scenario 3 and 4 Samsung Noted
R1‑112710 Selected highlights from RAN#52 of relevance to RAN1 RAN1 Chairman Noted
R1‑112711 Cell aggregation: A unified approach to CoMP and carrier aggregation Nokia Siemens Networks, Nokia Noted
R1‑112712 25.863 DraftCR (Rel-11,B) Inclusion of CLTD in the ULTD technical report Ericsson, ST-Ericsson Noted
R1‑112713 Multiflow RRH system results for unbalanced load Nokia Siemens Networks, Nokia Noted
R1‑112714 On the use of Sync A procedure during transition from CELL_FACH to CELL_DCH Qualcomm Incorporated Noted
R1‑112715 Physical channels and procedures to support standalone HS-DPCCH in CELL_FACH Qualcomm Incorporated Noted
R1‑112716 LS on Radio metrics with respect to QoE SA4, Qualcomm Noted
R1‑112717 On the applicability of UL CLTD in CELL_FACH Qualcomm Incorporated Noted
R1‑112718 Update of CoMP Phase 2 evaluation results for JT with non full buffer traffic model Panasonic Not treated
R1‑112719 36.213 CR0345 (Rel-10, F) Corrections on PUCCH mode 1-0 and 1-1 Samsung, LGE Noted
R1‑112720 Downlink PCI feedback channel timing design Huawei, HiSilicon Noted
R1‑112721 System performance of JP-CoMP in Scenario 3 NTT DOCOMO Not treated
R1‑112722 System performance of CS/CB-CoMP in Scenario 3 NTT DOCOMO Not treated
R1‑112723 Minutes from RAN1#66 HSPA sessions HSPA session chairman Endorsed
R1‑112724 Draft Reply LS on the frequency band specific compressed mode NSN Noted - Revised
R1‑112725 25.214 CR0657 (Rel-10, F) Frequency band specific compressed mode NSN Withdrawn
R1‑112726 25.214 CR0654R1 (Rel-8, F) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH Qualcomm Inc. Agreed
R1‑112727 25.214 CR0655 (Rel-9, A) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH Qualcomm Inc. Agreed
R1‑112728 25.214 CR0656 (Rel-10, A) Clarification of when to use Sync A procedure when UE transitions from CELL_FACH to CELL_DCH Qualcomm Inc. Agreed
R1‑112729 25.223 CR0064R1 (Rel-8, F) Clarification of 64QAM for LCR TDD TD Tech Revised
R1‑112730 25.223 CR0065R1 (Rel-9, A) Clarification of 64QAM for LCR TDD TD Tech Revised
R1‑112731 25.223 CR0066R1 (Rel-10, A) Clarification of 64QAM for LCR TDD TD Tech Revised
R1‑112732 25.221 CR0220R1 (Rel-10, F) Clarifications on HSUPA for LCR TDD TD Tech Revised
R1‑112733 25.224 CR0270R1 (Rel-10, F) Clarifications on SYNC-UL signatures for E-RUCCH procedure for LCR TDD TD Tech Revised
R1‑112734 25.872 v1.0.3 HSDPA Multipoint Transmission Nokia Siemens Networks Noted - Revised
R1‑112735 Simulation result summary for HSDPA Multipoint Transmission InterDigital Communications Noted - Revised
R1‑112736 25.211 CR0288R2 (Rel-11, B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Endorsed
R1‑112737 25.212 CR0296R2 (Rel-11, B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112738 25.213 CR0109R2 (Rel-11, B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112739 25.214 CR0652R2 (Rel-11, B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112740 Draft LS on RAN1 agreements on 8C-HSDPA Ericsson, ST-Ericsson Noted - Revised
R1‑112741 [DRAFT] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112742 25.871 v1.0.2 Uplink MIMO for HSPA Qualcomm Inc. Noted - Revised
R1‑112743 25.211 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112744 25.212 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112745 25.213 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112746 25.214 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112747 25.215 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112748 void - Withdrawn
R1‑112749 void - Withdrawn
R1‑112750 void - Withdrawn
R1‑112751 void - Withdrawn
R1‑112752 void - Withdrawn
R1‑112753 void - Withdrawn
R1‑112754 void - Withdrawn
R1‑112755 void - Withdrawn
R1‑112756 void - Withdrawn
R1‑112757 void - Withdrawn
R1‑112758 void - Withdrawn
R1‑112759 void - Withdrawn
R1‑112760 Draft LS reply on timing advance calculation using time difference measurement Huawei Noted - Revised
R1‑112761 36.211 Draft CR (Rel-8, F) PHICH overbooking can occure in narrow BW Sequans Communications Not treated
R1‑112762 36.211 Draft CR (Rel-9, A) PHICH overbooking can occure in narrow BW Sequans Communications Not treated
R1‑112763 36.211 Draft CR (Rel-10, A) PHICH overbooking can occure in narrow BW Sequans Communications Not treated
R1‑112764 [Draft] LS on the unicast usage in MBSFN subframe Panasonic Noted - Revised
R1‑112765 36.211 CR0163 (Rel-10, F) Clarification of applicability of precoding power scaling factors for PDSCH Agilent Technologies, Motorola Agreed
R1‑112766 36.211 CR0164 (Rel-10, F) Correction to modulation and upconversion on PRACH Panasonic Agreed
R1‑112767 Draft LS on soft buffer handling in TS36.213 and TS36.321 NTT DOCOMO Noted - Revised
R1‑112768 CoMP performance analysis in Scenarios 3 and 4 for full buffer traffic model Intel Corporation Not treated
R1‑112769 36.213 CR0325R1 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK ZTE Noted - Revised
R1‑112770 36.212 CR0128 (Rel-10, F) Corrections on channel coding of control information and DCI Format 4 Huawei, HiSilicon, CATT Agreed
R1‑112771 36.212 CR0120R1 (Rel-10, F) on correction of channel coding of control information ZTE Noted - Revised
R1‑112772 36.212 CR0125 (Rel-10, F) Minor Correction on DCI Format 1 Description Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Agreed
R1‑112773 36.212 CR0126 (Rel-9, F) Correction on ACK/NACK mapping LG Electronics Agreed
R1‑112774 36.212 CR0127 (Rel-10, A) Correction on ACK/NACK mapping LG Electronics Agreed
R1‑112775 36.212 CR0128 (Rel-10, F) Clarification and correction to configuration signalling condition for channel quality information formats ZTE Withdrawn
R1‑112776 36.213 CR0277R1 (Rel-10, F) Correction to reception of PRS in MBSFN subframes Qualcomm Incorporated, Panasonic, NEC, Ericsson, ST-Ericsson, ZTE Agreed
R1‑112777 36.212 CR0123R1 (Rel-10, F) Corrections on N_{SRS} CATT Agreed
R1‑112778 36.213 CR0346 (Rel-10, F) Correction on TBS translation table LG Electronics Agreed
R1‑112779 36.213 CR0347 (Rel-10, F) Correction to the condition of enabling PMI feedback ZTE, China Telecom., ITRI Revised
R1‑112780 36.213 CR0348 (Rel-10, F) Miscellaneous corrections to 36.213 NEC Group Agreed
R1‑112781 Downlink CSI feedback accuracy enhancement for MU-MIMO KDDI Corporation Not treated
R1‑112782 36.213 CR0326R1 (Rel-10, F) on Corrections in Physical Uplink Control Channel Procedure ZTE Noted - Revised
R1‑112783 36.213 CR0349 (Rel-10, F) Corrections on PUSCH and PUCCH modes Samsung, LG Electronics, Intel, ZTE, Motorola Mobility Agreed
R1‑112784 UL CoMP phase 2 evaluations in scenario 3 Huawei, HiSilicon Noted
R1‑112785 Text proposal for standard impacts and design principles of CoMP in Rel-11 Huawei, HiSilicon Noted
R1‑112786 36.213 CR0328R1 (Rel-10, F) A correction to PDSCH transmission assumption for CQI calculation Fujitsu Noted
R1‑112787 36.213 CR0325R2 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK ZTE, Qualcomm Incorporated, Huawei, HiSilicon, CATT, Samsung, I2R, Ericsson, ST-Ericsson Noted - Revised
R1‑112788 void - Withdrawn
R1‑112789 36.213 CR0350 (Rel-10, F) CR on UL HARQ ACK determination Ericsson, ST-Ericsson, CATT Noted - Revised
R1‑112790 LS reply on timing advance calculation using time difference measurement RAN1, Huawei Agreed
R1‑112791 36.212 CR0124R1 (Rel-10, F) Corrections on DCI format 1B/1D CATT Noted - Revised
R1‑112792 36.213 CR0339R1 (Rel-10, F) Corrections on HARQ-ACK codebook size determination CATT Withdrawn
R1‑112793 CoMP Phase 2 evaluations for Scenario 3 (DL: FDD and TDD) Alcatel-Lucent Shanghai Bell, Alcatel-Lucent Not treated
R1‑112794 Conclusions of offline session on CoMP Phase 2 evaluations Samsung Noted
R1‑112795 36.213 CR0326R2 (Rel-10, F) Corrections on Physical Uplink Control Channel Procedure ZTE, CATT, I2R, NTT DoCoMo, LG Electronics, Qualcomm Incorporated, Samsung, Ericsson, ST-Ericsson Agreed
R1‑112796 LS on soft buffer handling in TS36.213 and TS36.321 RAN1, NTT DOCOMO Agreed
R1‑112797 New DCI Formats with Differential Information Alcatel-Lucent, Alcatel-Lucent Shanghai Bell Noted
R1‑112798 Discussion on Rel’11 eICIC scenarios Renesas Mobile Europe Ltd Noted
R1‑112799 Example error case in support of Draft CR R1-112090 Ericsson, ST-Ericsson Not treated
R1‑112800 Offline discussion summary on UL CoMP evaluation Sharp Not treated
R1‑112801 Way forward on identification of scenarios for eICIC Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, AT&T, CATT, CMCC, Deutsche Telekom, Fujitsu, Qualcomm Inc, Samsung Revised
R1‑112802 36.212 CR0122R1 (Rel-10, F) Size adjustment of DCI format 0, 1A and 1 Panasonic, Qualcomm, ZTE, Ericsson, ST-Ericsson, Huawei, HiSilicon, Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, LG, TI, CATT Agreed
R1‑112803 Way forward on scenarios for further eICIC Ericsson, Huawei, HiSilicon, ST-Ericsson Noted
R1‑112804 Measurement definition for SRS MediaTek Withdrawn
R1‑112805 Enhancements to DL MU-MIMO CSI Feedback NEC Group Not treated
R1‑112806 Way forward on identification of scenarios for eICIC Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, AT&T, CATT, CMCC, Deutsche Telekom, Fujitsu, Qualcomm Inc, Samsung Noted
R1‑112807 36.213 CR0351 (Rel-10, F) Correction on UL DMRS resources for PHICH-triggered retransmission ZTE, Texas Instruments, LG Electronics Noted - Revised
R1‑112808 RAN1 Phase 2 CoMP Results Samsung Revised
R1‑112809 UL Time of Arrival Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, Andrew Noted
R1‑112810 Draft LS on Physical Layer Measurement for network positioning Alcatel-Lucent Noted - Revised
R1‑112811 RAN1 Phase 2 CoMP Results Samsung Not treated
R1‑112812 CR for 25.211: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112813 CR for 25.212: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112814 CR for 25.213: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112815 CR for 25.214: Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112816 Summary of offline session on simulation assumptions for LTE TDD eIMTA CATT Not treated
R1‑112817 25.223 CR0064R2 (Rel-8, F) Clarification of 64QAM for LCR TDD TD Tech Agreed
R1‑112818 25.223 CR0065R2 (Rel-9, A) Clarification of 64QAM for LCR TDD TD Tech Agreed
R1‑112819 25.223 CR0066R2 (Rel-10, A) Clarification of 64QAM for LCR TDD TD Tech Agreed
R1‑112820 25.221 CR0220R2 (Rel-10, F) Clarifications on HSUPA for LCR TDD TD Tech Agreed
R1‑112821 25.224 CR0270R2 (Rel-10, F) Clarifications on SYNC-UL signatures for E-RUCCH procedure for LCR TDD TD Tech Agreed
R1‑112822 36.213 CR0331R1 (Rel-10, F) Correction to uplink transmission scheme usage for random access response and PHICH-triggered retransmissions Panasonic, ZTE, Texas Instruments Withdrawn
R1‑112823 [Draft] LS on TDD inter-band CA with different UL-DL configurations on different bands CATT Noted - Revised
R1‑112824 DL and UL CoMP Chairman’s Notes NTT DOCOMO, Samsung Endorsed
R1‑112825 UL_enh Chairman’s Notes Samsung Endorsed
R1‑112826 RS relation between R-PDCCH and PDSCH for the 2nd slot configuration 0 Panasonic Noted
R1‑112827 Way forward on "SC-FDMA symbol" Panasonic Not treated
R1‑112828 36.213 CR0352 (Rel-10, F) Clarification on the common search space description Panasonic, Qualcomm Inc, ZTE, NEC, Huawei, HiSilicon, Motorola Mobility, Ericsson, ST-Ericsson Agreed
R1‑112829 Way forward on CoMP performance gains Huawei, Orange, CMCC, Telefónica, CATT, CATR, HiSilicon Noted
R1‑112830 36.211 CR0165 (Rel-10, F) Clarification on cyclic prefix of PDSCH in MBSFN subframes NEC group, Panasonic, Qualcomm Incorporated, Samsung, Renesas Mobile Europe, Alcatel-Lucent, Alcatel-Lucent Shanghai Bell, CATT, Ericsson, ST-Ericsson Agreed
R1‑112831 36.211 CR0166 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc Noted - Revised
R1‑112832 36.213 CR0353 (Rel-10, F) Clarification on ambiguous DCI information between UE-specific search space and common search space for DCI formats 0 and 1A Qualcomm Inc., LGE, ETRI Noted - Revised
R1‑112833 36.213 CR0354 (Rel-10, F) Clarification of Reference PDSCH Power for CSI-RS based CSI Feedback Qualcomm Inc. Agreed
R1‑112834 Way forward on DCI format 3/3A Ericsson, ST-Ericsson, LG Electronics, Panasonic, Qualcomm, Huawei, HiSilicon, NTT DoCoMo Agreed
R1‑112835 36.213 CR0331R1 (Rel-10, F) Correction to uplink transmission scheme usage for random access response and PHICH-triggered retransmissions Panasonic, ZTE, Texas Instruments Agreed
R1‑112836 36.213 CR0355 (Rel-10, F) Corrections on reporting Channel State Information Huawei, HiSilicon,Qualcomm Incorporated, CATT, ZTE, Ericsson, ST-Ericsson Noted - Revised
R1‑112837 36.211 CR0166R1 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc, Texas Instruments, Ericsson, ST-Ericsson Revised
R1‑112838 36.212 CR0120R2 (Rel-10, F) on correction of channel coding of control information ZTE Agreed
R1‑112839 36.212 CR0124R2 (Rel-10, F) Corrections on DCI format 1B/1D CATT Agreed
R1‑112840 36.213 CR0351R1 (Rel-10, F) Correction on UL DMRS resources for PHICH-triggered retransmission ZTE, Texas Instruments, LG Electronics Agreed
R1‑112841 - - Not treated
R1‑112842 36.213 CR0347R1 (Rel-10, F) Correction to the condition of enabling PMI feedback ZTE, China Telecom., ITRI Noted - Revised
R1‑112843 36.213 CR0347R2 (Rel-10, F) Correction to the condition of enabling PMI feedback ZTE, China Telecom., ITRI Agreed
R1‑112844 36.213 CR0355R1 (Rel-10, F) Corrections on reporting Channel State Information Huawei, HiSilicon,Qualcomm Incorporated, CATT, ZTE, Ericsson, ST-Ericsson Noted - Revised
R1‑112845 36.213 CR0353R1 (Rel-10, F) Clarification on ambiguous DCI information between UE-specific search space and common search space for DCI formats 0 and 1A Qualcomm Inc., LGE, ETRI, Panasonic Agreed
R1‑112846 36.213 CR0349R1 (Rel-10, F) Corrections on PUSCH and PUCCH modes Samsung, LG Electronics, Intel, ZTE, Motorola Mobility, NSN Withdrawn
R1‑112847 36.212 CR0119R1 (Rel-10, F) Corrections on transport block processing for UL-SCH Huawei, HiSilicon, I2R Agreed
R1‑112848 36.213 CR0356 (Rel-10, F) Corrections on HARQ-ACK feedback procedures Huawei, HiSilicon, CATT, LGE Noted - Revised
R1‑112849 36.213 CR0325R3 (Rel-10, F) on Corrections in UE procedure for reporting HARQ-ACK ZTE, Qualcomm Incorporated, Huawei, HiSilicon, CATT, Samsung, I2R, Ericsson, ST-Ericsson Agreed
R1‑112850 36.213 CR0350R1 (Rel-10, F) CR on UL HARQ ACK determination Ericsson, ST-Ericsson, CATT Agreed
R1‑112851 Draft of TR36.819 v1.1.0 for CoMP SI Samsung Noted - Revised
R1‑112852 Proposal for DL CoMP standardization impact Ericsson, Motorola Mobility, Nokia, Nokia Siemens Networks, Qualcomm, ST-Ericsson Noted
R1‑112853 LS on the unicast usage in MBSFN subframe RAN1, Panasonic Agreed
R1‑112854 Report from the offline discussion on scenarios priorities and evaluation assumptions for the DL MIMO enhancements SI Ad hoc Chairman (Orange) Endorsed
R1‑112855 Way forward Chairman emeritus Noted
R1‑112856 Summary of ad hoc session on FeICIC simulation assumptions Ad hoc Chairman (NTT DoCoMo) Agreed
R1‑112857 36.211 CR0166R2 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc, Texas Instruments, Ericsson, ST-Ericsson Noted - Revised
R1‑112858 36.213 CR0355R2 (Rel-10, F) Corrections on reporting Channel State Information Huawei, HiSilicon,Qualcomm Incorporated, CATT, ZTE, Ericsson, ST-Ericsson Agreed
R1‑112859 36.213 CR0356R1 (Rel-10, F) Corrections on HARQ-ACK feedback procedures Huawei, HiSilicon, CATT, LGE Noted
R1‑112860 Reply LS on the frequency band specific compressed mode RAN1, Nokia Siemens Networks Agreed
R1‑112861 [DRAFT] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Noted - Revised
R1‑112862 LS on RAN1 agreements on 8C-HSDPA RAN1, Ericsson Agreed
R1‑112863 36.211 CR0166R3 (Rel-10, F) Corrections on indication in scrambling identity field in DCI format 2B and 2C Huawei, HiSilicon, Fujitsu, ZTE, Qualcomm Inc, Texas Instruments, Ericsson, ST-Ericsson Agreed
R1‑112864 LS on Physical Layer Measurement for network positioning RAN1, Alcatel-Lucent Agreed
R1‑112865 36.819 v1.1.0 for Coordinated Multi-Point Operation for LTE Samsung Noted - Revised
R1‑112866 36.212 CR0129 (Rel-10, F) Clarification and correction to configuration signalling condition for channel quality information formats ZTE Agreed
R1‑112867 LS on TDD inter-band CA with different UL-DL configurations on different bands RAN1, CATT Agreed
R1‑112868 25.211 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Endorsed
R1‑112869 25.212 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Endorsed
R1‑112870 25.213 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Endorsed
R1‑112871 25.214 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Endorsed
R1‑112872 25.215 CR draft (Rel-11, B) Introduction of Uplink Closed Loop Transmit Diversity for HSPA Huawei, HiSilicon Endorsed
R1‑112873 [Draft] LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA Huawei Noted - Revised
R1‑112874 void - Withdrawn
R1‑112875 25.212 CR0296R3 (Rel-11, B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Endorsed
R1‑112876 25.213 CR0109R3 (Rel-11, B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Endorsed
R1‑112877 25.214 CR0652R3 (Rel-11, B) Introduction of 8C-HSDPA Ericsson, ST-Ericsson Endorsed
R1‑112878 25.871 v2.0.0 Uplink MIMO for HSPA Qualcomm Inc. Agreed
R1‑112879 25.872 v2.0.0 HSDPA Multipoint Transmission Nokia Siemens Networks Agreed
R1‑112880 Simulation result summary for HSDPA Multipoint Transmission InterDigital Communications, LLC., Alcatel-Lucent, Alcatel-Lucent Shanghai-Bell, Ericsson, HiSilicon, Huawei, Nokia, Nokia Siemens Networks, Qualcomm Incorporated, Renesas Mobile Europe Ltd., ST-Ericsson Agreed
R1‑112881 LS on RAN1 agreements on uplink Closed Loop Transmit Diversity for HSPA RAN1, Huawei Agreed
R1‑112882 36.819 v1.2.0 for Coordinated Multi-Point Operation for LTE Samsung Agreed
R1‑112883 Report from email discussion on scenarios and assumptions for DL MIMO feedback enhancements Orange (rapporteur) Agreed
R1‑112884 Summary of email discussion on simulation assumptions for study on further enhancements to LTE TDD for DL-UL interference management and traffic adaptation Rapporteur (CATT) Agreed

page generated from database: 2024-03-25 09:25:51

Get news. Get knowledge. Get involved
Get news.
Get knowledge.
Get involved.
Image
The 5G Standard
3GPP General Enquiries:
info@3gpp.org 


Connect:

Quick Links